Loading...
HomeMy WebLinkAbout2010 1%2 S Main St - Misc. PermitJ Planning & B uildin g Agency Buildinq safety Division 20 C ivic Center Plaza P.0. Box 1988 (M-19) Santa Ana, C A 92702 (714) 647-s800 www.santa-ana.org DISABLED ACCESS COMPLIANCE DOCUMENTATION FORM ACC-01 CBC 2019 A. PURPOSE 0F THIS D0CUMENTATION:(checkone) X finOing of unreasonable hardship for projects UNDER the valuation threshold- L_l Finding of unreasonable hardship for prolects OVER the valuation threshold* n Certification of Full Compliance with the 2019 California Building Code * Valuation threshold as defined in the 2019 California Building Code, Section 1'l 8-202.4 (Exception #8) and Section 202 is $170.466.00 (as of January 2020) B. PROJECT INFORI\iIATION TO BE COMPLETED BY PETITIONER: Project Address: 2010 - 1/2 lrain St Permit Number 101 104316 Projoct Descriptionl R€move portion of inlerior non bearing panition Floor Number: Business Name / Owner: TBD - Tenant space is vacant Legal Property Owner Phone Number Total Conskuction Cost or Project Valuation $ $+,+oo Cost of Providing Complete Disabled Access $ $r,ozo Permit No lssuance Date Valuation of lmprovements Total 2. 20o/o ol -|.otal Construction Cost or Project Valuation: 3. The actual amount to be spenl to provide disabled access: $ $880 5. Describe the nature of the use of the facility under construction and its availability to persons with disabilities and the nature of accessibility that would be gained or lost: Building willbe vacant during construction. Rev 0210412020 Page 1 of 2 $ $1,070 -,-SANTA NA/l[{* Business Phone Number: 1 . The cost of all construction contemplated in the determination of the valuation of improvement threshold based on the valuation of site and building improvements for the last three-year period. 4. Describe the impact of the proposed improvements on financial feasibility of the project. Accessible parking space shall be re-striped I 6. ldentify the accessibility features and equivalent facilities that l4lLt be brought into compliance with the latest edition of Title 24 as a part of this project and an estimate of the cost of each item: (Documentation may be requted) Accessible Features to be Made Accessible Cost of lm prove ment a. Entrance tr Door E Landing ! StaiMay/Steps E Ramp $ Exg Complies E Path of travel from accessible parking to the building entrance and area of remodel S Exg Comples E Path of travel to sanitary facilities / public phone / drinking founta in $ E Path of travel from the public way to the building entrance $ c. Sanitary facilities ( Floor no )$ d. Public phone(s)$ e. Drinkingfountain(s)$ f. Parking $ 1.070 g. Signage & Alarms $ i. Other $ $Total 7. ldentfy the accessibility features that WILL N0T comply if a request for unreasonable hardshp rs granted. Provide an estimated cost of compliance for each item: (Docunentation fi)ay be requircd) Accessible teatures Notto be lmproved Cost of lm pro ve ment a. Toilet room upgrades $ $25,ooo b $ $ $Iotal 8. Petitioner must be the legal property owner or his/her legal representative: I certify that the above noted information is true and correct. E Legal Property Owner ftArchitecvEngineer fl Contractor E Otner: Print Name: Richard clarke Phone No. 805-459-1609 Address 2775 Pioneer Ranch Rd. Templeton, CA 93465 Signature Feb 10 2021 Approved by Re\t:0210412020 Date Page 2 of 2 b. Path of Travel: c. Date: FOR AG ENCY USE ONLY Uuw )lq /at