HomeMy WebLinkAbout2010 1%2 S Main St - Misc. PermitJ Planning & B uildin g Agency
Buildinq safety Division
20 C ivic Center Plaza
P.0. Box 1988 (M-19)
Santa Ana, C A 92702
(714) 647-s800
www.santa-ana.org
DISABLED ACCESS COMPLIANCE
DOCUMENTATION FORM
ACC-01 CBC 2019
A. PURPOSE 0F THIS D0CUMENTATION:(checkone)
X finOing of unreasonable hardship for projects UNDER the valuation threshold-
L_l Finding of unreasonable hardship for prolects OVER the valuation threshold*
n Certification of Full Compliance with the 2019 California Building Code
* Valuation threshold as defined in the 2019 California Building Code, Section 1'l 8-202.4 (Exception #8) and
Section 202 is $170.466.00 (as of January 2020)
B. PROJECT INFORI\iIATION TO BE COMPLETED BY PETITIONER:
Project Address:
2010 - 1/2 lrain St
Permit Number
101 104316
Projoct Descriptionl
R€move portion of inlerior non bearing panition
Floor Number:
Business Name / Owner:
TBD - Tenant space is vacant
Legal Property Owner Phone Number
Total Conskuction Cost or Project Valuation
$ $+,+oo
Cost of Providing Complete Disabled Access
$ $r,ozo
Permit No lssuance Date Valuation of lmprovements
Total
2. 20o/o ol -|.otal Construction Cost or Project Valuation:
3. The actual amount to be spenl to provide disabled access:
$ $880
5. Describe the nature of the use of the facility under construction and its availability to persons with
disabilities and the nature of accessibility that would be gained or lost:
Building willbe vacant during construction.
Rev 0210412020 Page 1 of 2
$ $1,070
-,-SANTA
NA/l[{*
Business Phone Number:
1 . The cost of all construction contemplated in the determination of the valuation of improvement threshold
based on the valuation of site and building improvements for the last three-year period.
4. Describe the impact of the proposed improvements on financial feasibility of the project.
Accessible parking space shall be re-striped
I
6. ldentify the accessibility features and equivalent facilities that l4lLt be brought into compliance with the
latest edition of Title 24 as a part of this project and an estimate of the cost of each item: (Documentation
may be requted)
Accessible Features to be Made Accessible Cost of lm prove ment
a. Entrance
tr Door E Landing ! StaiMay/Steps E Ramp $ Exg Complies
E Path of travel from accessible parking to the building entrance
and area of remodel S Exg Comples
E Path of travel to sanitary facilities / public phone / drinking
founta in $
E Path of travel from the public way to the building entrance $
c. Sanitary facilities ( Floor no )$
d. Public phone(s)$
e. Drinkingfountain(s)$
f. Parking $ 1.070
g. Signage & Alarms $
i. Other $
$Total
7. ldentfy the accessibility features that WILL N0T comply if a request for unreasonable hardshp rs
granted. Provide an estimated cost of compliance for each item: (Docunentation fi)ay be requircd)
Accessible teatures Notto be lmproved Cost of lm pro ve ment
a. Toilet room upgrades $ $25,ooo
b $
$
$Iotal
8. Petitioner must be the legal property owner or his/her legal representative:
I certify that the above noted information is true and correct.
E Legal Property Owner ftArchitecvEngineer fl Contractor E Otner:
Print Name: Richard clarke Phone No. 805-459-1609
Address 2775 Pioneer Ranch Rd. Templeton, CA 93465
Signature Feb 10 2021
Approved by
Re\t:0210412020
Date
Page 2 of 2
b. Path of Travel:
c.
Date:
FOR AG ENCY USE ONLY
Uuw )lq /at