DISABLED ACCESS COMPLIANCE
DOCUMENTATION FORM
F,'1.
ACC-01 CBC 2016
A. PURPOSE OF THIS DOCUMENTATION: (check one)
I finding of unreasonable hardship for projects UNDER the valuation threshold*
ffi Finoing of unreasonable hardship for projects OVER the valuation threshold.
E Certifcation of Full Compliance with the 2016 California Building Code
. Valuation threshold as defined in the 2016 California Building Code, Section 118-202.4 (Exception #8) and
Section 202 is $156.162 (as of January 2017\
B. PROJECT INFORMATION TO BE COMPLETED BY PETITIONER:
The cost of all construction contemplated in the determination of the valuation of improvement
threshold based on the valuation of site and building improvements for the last three-year period.
lssuance Date Valuation of lmprovements
Nol known by new owner
Total
2. zook ol Folal Construction Cost or Project Valuation:
3. The actual amount to be spent to provide disabled access
$ 265,000
$ s88,07s
4. Describe the impact of the proposed improvements on financial feasibility of lhe project.
New bullding ownership is exceeding the 207. ol construction costs to upgrade accessibility features at entire site
Beler lo Table 6 valual ons
5. Describe the nature of the use of the facility under construction and its availability to persons with
disabilities and the nature of accessibility that would be gained or lost:
Existing iacility is an office use park. There is currenlly accessible parking at garage level, with elevator lobby access to
buildings, wilh layoul to be updaled to current code. There is an existing accessible path oi lravel ,rom Harbor Blvd. lo the
raised podium level which serves main I st floor entrances lo blrrldrngs.
Accessibility ,eatu re that would be ga ned' Locat on ol required slandard accessible parking stals at park ng garage
level, represent the sho(est roule possible 1o bolh buildings, through lhe elevator lobby Accessib lity feature 10 be
lost- D!e 1o required overhead clearance, (8' 2") slandard accessible stalls at parking level will not meet this
requirement. The proposed van accessible stall locat on is located outside ol park ng garage level, but does note
meet shortest route to building entrances and th s location is also limrted to a single van stall, inslead ol lhe requ red
Rev 119/2017 two slalls Pagelol2
Project Address:
3100 3130 S. Harbor Blvd
Permit Number:
10198428 35
ProJect Description:
lnlerior tenant improvemenls
Floor Number:
1-5
Business Name / Owner:
Kearny Fleal Estale Co
Business Phone Number
(310) 203-1861
Legal Property Owner:
Kearny Harbor, LLC
Phone Number:
(310) 203-1861
Total Construction Cost or Project Valuation
$ r,345,000
Cost of Providing Complete Disabled Access
$ see'ozg ( w tl&,-ul *.-g/ i' 4.a,
t_
Permit No.
6. ldentify the accessibility features and equivalent facilities that WILL be brought into compliance with
the latest edition of Title 24 as a part of this project and an estimate of the cost of each item:
(Documentation may be required)
Accessible Features to be Made Accessible Cost of lmprovement
a. Entrance
Door E Landing E Stairway/Steps n Ramp S 14,soo
b. Path of Travel
E Path of travel from accessible parking to the building enlrance
and area of remodel
! Path of travel to sanitary facilities i public phone / drinking fountain $
E Path of travel from the public way to the building entrance $ s00
C Sanitary facilities ( Floor no. 1 s )$ s+s,ooo
d. Public phone(s)$
e. Drinkingfountain(s)$
$ zz,ozg
g. Signage & Alarms $
i. Other:$
Total:
7. ldentify the accessibility features that WILL NOT comply if a request for unreasonable hardship is
granted. Provide an estimated cost of compliance for each ilem. (Documentation may be requied)
Accessible Features Not to be lmproved Cost of lmprovement
a
Accessrble parkng rn park ng garage level duo lo exrstrng burldrng elemenls that do nol
provide required clearance (8' 2") existing str!clural beams and sewer plumbing nes at $ lechn cally infeasabile
b
garage leve , overhead concrele perimeler podrurn wa I at entry
$
C $
$Total:
I certify that the above noted information is true and correct.
E Legal Property Owner I ArchitecUEngineer E Contractor E Otner
Print Name: Lit" K"llY Phone No. (949) 798-7300
1787l Vo. Karman Ave , lrvr,]e, CA.92614Address:
Signature Date
Approved by:
Rev: 1/9/2017
FOR AGENCY USE ONLY
Page 2 of 2
f. Parking
$ s88,079
8. Petitioner must be the legal property owner or his/her legal representative:
Date: