HomeMy WebLinkAbout106 E 4th St - PlanStructural Calculations for a Roof Mounted Solar Photovoltaic System for:
George Hansen
106 E 4th St
Santa Ana, CA 92701
Applicable Codes:
2022 California Building Code, 2022 California Electric Code,
2022 California Mechanical Code, American Society of Civil Engineers
Standard ASCE 7-16 Minimum Design Loads for Buildings and Other
Structures, American Wood Council 2018 National Design Specification
for Wood Construction, Local Municipal Code, and all other codes which
are adopted by reference or enacted by law.
Assumed Design Parameters:
The existing structure has been built under a building permit and is in its
original condition. The existing roof structure is capable of its code
required live load and the ability of the roof structure to support live loads
has not been substantially reduced by the age of the structure, termites or
mold, or unauthorized modifications to the existing structure. Solar Energy
Contractor shall make an inspection of the existing roof framing system
prior to installation of the roof mounted solar energy system to verify that
the existing roof is capable of supporting minimum roof live loads.
Assumed Design Parameters:
All 2x members are grade Douglas Fir #2 or better
All 4X members are grade Douglas Fir #1 or better
All Roof Connectors are Simpson Strong-Tie or Equal
All Concrete Foundations are f'c = 2500 psi or stronger
Sht # 1 of 7
2023-4620 Effect Energy George Hansen August 24, 2023
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Original Structure was built to the Type-V Wood Framed Standards of the
Applicable Building Code at the time of Construction.
106 E 4th St - 101116506
& 2018087910/10/2023
Note to Building Official:
Based upon a review of the proposed plans I am confident that the
existing roof framing system is capable of safely supporting the additional
loads caused by the new solar photovoltaic energy system. The contractor
shall field verify that the existing roof structure is in its original permited
condition and verify that it can support the normal code required roof live
loads. Attached in this package are several calculations showing that the
roof members can support the additional weight of the solar array.
Furthermore, an analysis of the solar array's support for wind forces and a
seismic analysis of the existing structure are also included.
Check Existing 2X10 Roof Rafters @ 36" O.C.:
(Assume max rafter span = 5 ft.)
w =30 psf x 3 ft. = 90 plf
Total load on rafters = 90 plf x 5 ft. = 450 lbs
Sht # 2 of 7
2023-4620 Effect Energy George Hansen August 24, 2023
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
5'
106 E 4th St - 101116506
& 2018087910/10/2023
Check Existing 2X10 Roof Rafters @ 36" O.C.:
Snow Load =0 psf
Dead Load =14 psf
Live Load =16 psf
WDL + LL =30 psf x 3 ft. = 90 plf
WDL =14 psf x 3 ft. = 42 plf
w =30 psf x 3 ft. = 90 plf
Total load on rafters =( 90 plf x 0.8 ft ) + ( 42 plf x 4.2 ft ) + ( 6' x 3.7' x 3 psf x 1 )
=315 lbs < 450 lbs OK
OK. Per 2022 California Existing Building Code Section 503.3 Alterations
Check attachment of Support to Existing Structure for Wind Uplift
CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7-16 WIND LOADS ON BUILDING
APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK
ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2.
NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7-16 EFFECTIVE WIND AREA:
FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS
EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING
CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT
BE LESS THAN ONE-THIRD ITS LENGTH.
EFFECTIVE AREA = 15 SQ FT
Sht # 3 of 7
2023-4620 Effect Energy George Hansen August 24, 2023
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
% CHANGE =315 lbs - 450 lbs x 100 =-30% < 5% OK450 lbs
106 E 4th St - 101116506
& 2018087910/10/2023
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Tributary Area to Each Solar Mount = 6 ft. x 3.7 ft. = 22.2 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C):
p = q h (GC p )(γ E )(γ a )Eq'n 29.4-7 ASCE 7-16
q h = 0.00256 K z K zt K d K e V 2 Eq'n 26.10-1 ASCE 7-16
Note:
K z =velocity pressure coefficient Section 29.10.1 ASCE 7-16
K z =0.9 (Exposure C, Height = 20 ft or less)
K zt =Topographical Factor = 1.0
K d =Wind Directionality Factor = 0.85
K e =Ground Elevation Factor = 1.0
V =130 mph ;VASB =101 mph
q h =0.00256 (0.9) (1.0) (0.85) (1.0) (101)²
q h =19.98 psf
GC p =-2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
γ E =Exposure Factor = 1.5
γ a =Solar Array Pressure Equalization Factor = 0.7 Fig. 29.4-8 ASCE 7-16
p = q h (GC p )(γ E )(γ a )
p = 19.98 psf (-2.0) (1.5) (0.7) = 42 psf
Sht # 4 of 7
2023-4620 Effect Energy George Hansen August 24, 2023
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
106 E 4th St - 101116506
& 2018087910/10/2023
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Nominal (Unfactored) Uplift at each support = 42 psf x 22.2 sq. ft. = 932.4 lbs
Note: Section 2.4.1 of ASCE 7-16, Basic Load Combinations for Allowable Stress
Design. Note: Applicable Load Combination #5 (D + 0.6W)
Design (Factored) Uplift at each support = 0.6 x 932.4 lbs = 559 lbs
Load per lag screw = 559 lbs / 1 = 559 lbs
Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below
according to the 2018 NDS.
W ' = W x Cd x Ct Table 10.3.1 2018 NDS
where
W = 266 lbs / in. of embedment per Table 12.2a
Cd = 1.6 per Table 2.3.2 of 2018 NDS
Ct = 1.0 per Table 2.3.3 of 2018 NDS
W' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 559 lbs OK
Sht # 5 of 7
2023-4620 Effect Energy George Hansen August 24, 2023
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Use Support connected to 2x Min. Roof Member w/
(1) 5/16" x 3.5" lag screws per connection minimum.
106 E 4th St - 101116506
& 2018087910/10/2023
Check Seismic load due to added dead load of photovoltaic system.
Determine Seismic Weight of Existing Building:
Effective Existing Seismic Weight
Area of (E) Building =Approximately 3,300 Sq. ft
Approximate
Effective =3,300 sq. ft. x 30 psf ave. = 99,000 LBS
Seismic Weight
DETERMINE BASE SHEAR
V = Cs W EQ'N 12.8-1 ASCE 7-16
EQ'N 12.8-2 ASCE 7-16
R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1
R =6.5 WOOD SHEAR WALLS
Ie = 1.0 IMPORTANCE FACTOR
SDS = 2/3 x SMS
SMS = FA x SS
SMS = 1.2 x 1.5 = 1.8
SDS = 2/3 x 1.8 = 1.2
Cs ==0.185 EQ'N 12.8-2 ASCE 7-16
Sht # 6 of 7
2023-4620 Effect Energy George Hansen August 24, 2023
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Cs =SDS
R
Ie
SDS
R
Ie
106 E 4th St - 101116506
& 2018087910/10/2023
EXISTING BASE SHEAR
V = 0.185 x 99,000 LBS = 18,315 LBS
DETERMINE NEW BASE SHEAR
Determine Seismic Weight of Building with Solar Array:
EXISTING
SEISMIC =99,000 LBS
WEIGHT
NEW SOLAR
ARRAY =3 PSF x 31 PANELS x 7.4' x 3.4' = 2,340 LBS
NEW
SEISMIC =99,000 LBS + 2,340 LBS = 101,340 LBS
WEIGHT
THEREFORE NEW BASE SHEAR:
V = 0.185 x 101,340 = 18,748 LBS EQ'N 12.8-1 ASCE 7-16
OK. PER ASCE 7-16 SECTION 11B.4 ALTERATIONS
EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT
FROM ANALYSIS SINCE NEW SEISMIC FORCE IS
LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE
Sht # 7 of 7
2023-4620 Effect Energy George Hansen August 24, 2023
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
"Alterations may be made to any structure without requiring the existing structure to
comply with this standard, provided that the alterations comply with the requirements for a
new structure. Alterations that increase the seismic force in any existing structural element
by more than 10% or decrease the design strength of any existing structural element to
resist seismic forces by more than 10% shall not be permitted unless the entire seismic
force-resisting system is determined to comply with this standard for a new structure."
End of Calculations
Email: loydwmartin@gmail.com www.loydwmartin.com
% CHANGE =18,748 LBS - 18,315 LBS x 100 = 2.4 % < 10 % OK18,315 LBS
106 E 4th St - 101116506
& 2018087910/10/2023
Project Name:
George Hansen
Property address:
106 E 4th St,
Santa Ana, CA 92701
DATE: 08/ 18/2023
VICINITY MAP
SCALE: NTS
PV SOLAR SYSTEM DETAILS
ELECTRICAL INFORMATION:
EXISTING
MAIN SERVICE PANEL BUS SIZE: 150A
MAIN SERVICE BREAKER SIZE: 150A
MOUNTING SYSTEM:
BUILDING INFORMATION:
CONSTRUCTION TYPE: V-B
OCCUPANCY: M
ROOF:
SYSTEM SIZE: DC STC: 15.190 KW
SYSTEM SIZE: AC CEC: 10.819 KW
SOLAR MODULES: ( )
SATELLITE VIEW
SCALE: NTS
MAIN
3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED
4. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO
INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING
COMMISSIONING AND ACCEPTANCE WITH THE CLIENT,
UTILITY CO. AND CITY INSPECTORS AS NEEDED.
5. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF
SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY
AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS.
6. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL
BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL
BE COORDINATED WITH OTHER TRADES.
7. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV
INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS
RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING
THE EXTRA WEIGHT.
8. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE
CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE
WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS
APPROPRIATE.
9. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE
DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED
BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE
SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF
THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS.
10. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS,
ETC. SHALL BE HANDED OVER TO OWNER'S REPRESENTATIVE AT THE
COMPLETION OF WORK
PHOTOVOLTAIC NOTES:
1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL
BE TESTED, LISTED AND IDENTIFIED BY RECOGNIZED ELECTRICAL
TESTING LABORATORY
2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL
VENTS
3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED.
5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL
NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING
ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR
OUTPUT CIRCUIT GROUNDED CONDUCTORS.
4. SOLAR INVERTER SHALL BE LISTED TO UL1741.
6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND
WIRING SHALL BE PROTECTED FROM PHYSICAL DAMAGE.
7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT
CIRCUITS OVER 150V TO GROUND SHALL NOT BE
ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE
ENERGIZED.
8. INVERTER IS EQUIPED WITH INTEGRATED GFDI, THUS
PROVIDING GROUND FAULT PROTECTION
9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG
RATED
10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A
RECOGNIZED ELECTRICAL TESTING LABORATORY.
11. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE
USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC
GROUNDING, AC GROUNDING AND BONDING BETWEEN
AC AND DC SYSTEMS.
12. NON-CURRENT CARRYING METAL PARTS OF
EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER.
BOND BOTH ENDS OF RACEWAYS.
GENERAL NOTES
1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED
ELECTRICAL TESTING LABORATORY
CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED
BY THE MANUFACTURER ATTESTING TO ITS SAFETY
2. OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED OR BETTER
31 Silfab 490 Watt
IRONRIDGE
FOAM ROOF
INVERTERS: ( ) Enphase IQ8A Microinverters31
ROOF PLAN
SINGLE LINE DIAGRAM
ATTACHMENT LAYOUT
SIGNAGE
RSD DATA SHEET
INVERTER DATA SHEET
1
INDEX
2
3
4
5
6
7
8
9
10
SITE PLAN
MODULE DATA SHEET
RACKING DATA SHEET
ATTACHMENT DATASHEET
ECB DATA SHEET11
: RAFTER 2 X 10 @ 36" O.C.
THE INSTALLATION OF SOLAR ARRAYS AND
PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH
THE FOLLOWING CODES:
·2020 National Electrical Code
·2022 California Building Code
·2022 California Residential Code
·2022 California Green Building Standard Code
·2022 California Plumbing Code
·2022 California Mechanical Code
·2022 California Electrical Code
·2022 California Fire Code
·2022 California Energy Code
·2016 International Property Maintenance Code
AD ADOPTED BY THE STATE OF CALIFORNIA
ALL OTHER ORDINANCE ADOPTED BY THE
LOCAL GOVERNING AGENCIES
2 X 10 @ 60" O.C.
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
www. Loyd W Martin .com
Solar Structures Engineering
#2023-4620 Structural Only
August 24, 2023
The scope of the plans is for the installation of the solar
photovoltaic system only and the approval is subject to compliance
with all applicable city and state codes and regulations regarding
construction. The approval of the plans does not constitute any
certification of the accuracy, completeness, or building permit
status of the existing buildings and structures as shown.
Bldg# 101116506
Elec# 20180879
Issued 10/10/23
Approvals:
PLNG: FArias
BLDG: JLo
ELEC: MSmith
106 E 4th St - 101116506
& 2018087910/10/2023
Project Name:
George Hansen
Property address:
106 E 4th St,
Santa Ana, CA 92701
DATE: 08/18/2023
ROOF PLAN1
EMT Conduit
(E) Main Service Panel
Solar Module
INDEX
(N) Junction Box
Microinverters
Setback
MSP
JB
Total Roof Area: 2563
Total Module Area: 682
26.60% of Coverage
AC(N) AC Disconnect
ECB(N) Enphase Combiner Box
SSP(E) 0A Sub Panel
AC
ECB
E 4th St
Solar PV Array
31- Silfab 490Watt Modules
31- Enphase IQ8A MicroInverters
Tilt: 10 Deg
Orientation: 180 Deg
36'' fire setback
48
'
'
f
i
r
e
s
e
t
b
a
c
k
36
'
'
f
i
r
e
s
e
t
b
a
c
k
48'' fire setback
c c
c c
c c
c c
c c
b c
b b
b b
b
b
b b
a b
a a
a a
a a
a
a
a
48'' Pathway
48'' Pathway
6'-6"3'-4"
SCALE: 3/32" = 1'-0"
S
180 °
E
90 °
W
270 °
N
0°
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
(3DUDSHW6XSSRUW
(6WHSRYHU
INSIDE THE BUILDING
All of the equipment is minimum 48" off the ground
and has a maximum height of 78"
ROOF ACCESS HATCH
www. Loyd W Martin .com
Solar Structures Engineering
#2023-4620 Structural Only
August 24, 2023
NOTE:
Engineer of Record assumes that all structural components of
the existing building were permitted and met the requirements
of the Building Code at the time of construction. Solar
Contractor shall field verify that the roof framing is in its
existing permitted condition and capable of supporting
required live loads. Framing specified on solar plans shall be
assumed to be minimum size and spacing, actual framing may
be different.
Ma
i
n
S
t
The height of the parapet wall on the Main Street side and the
parapet for the rear of the building are both about 3'.
48
''
Pa
t
h
w
a
y
48
'
'
P
a
t
h
w
a
y
106 E 4th St - 101116506
& 2018087910/10/2023
Project Name:
George Hansen
Property address:
106 E 4th St,
Santa Ana, CA 92701
DATE: 08/18/2023
SINGLE LINE
DIAGRAM2
60A 2P BLADE TYPE 240V NON-FUSIED
AC DISCONNECT
120% RULE CALCULATION PER NEC 705.12(D)(2)(3)
SUB BUSBAR RATING:200 AMPS
SERVICE BREAKER RATING:150 AMPS
PV BACKFEDING CURRENT:AMPS
BUSBAR X 120%- MAIN BREAKER = MAX PV BREAKER
240 - 150 = 90
60
PERCENT
OF VALUES
NUMBER OF CURRENT
CARRYING CONDUCTORS IN EMT
.80 4-6
.70 7-9
.50 10-20
#ITEM DESCRIPTION QTY
1 PV MODULE
2
3 JUNCTION BOX 4"x4"x2" UL LISTED WATER TIGHT
NEMA TYPE 3 2
4 AC DISCONNECT 1
5 MAIN SERVICE
PANEL 1
6
KEY NOTES:
·SOLID BARE G.E.C (FREE-AIR) MOUNTED UNDER ARRAY
·PER NEC ARTICLE 690.35 INVERTER GROUND FAULT PROTECTION PROVIDED
·ALL GROUNDS AND NEUTRALS BONDED TO EXISTING GROUNDING
CONDUCTOR W/IRREVERSIBLE CRIP CONNECTOR,
·BACKFED BREAKERS MUST BE LOCATED @ OPPOSITE END OF BUS BAR
FROM MAIN BREAKER OR MAIN LUG ON GRID SIDE. WHEN A BACKFED
BREAKER IS THE METHOD OF UTILITY INTERCONNECTION, BREAKER SHALL
NOT READ ' LINE OR LOAD'.
·PER CEC 250.65(C): CONDUCTOR SPLICES ONLY ALLOWED WITH
COMPRESSION CONNECTORS OR EXOTHERMIC WELDING
·ALL GROUNDS AND NEUTRALS BONDED TO EXISTING GROUNDING
CONDUCTOR W/IRREVERSIBLE CRIP CONNECTOR,
·VERIFY (E) UFER GROUND NEAR MSP. IF (E) UFER IS NOT ACCESSIBLE OR
VERIFIABLE, INSTALL A NEW 5/8" Ø X 8' LONG GROUNDING ROD AND BOND
SOLAR SYSTEM EQUIPMENT GROUNDING ACCORDINGLY.
...
2 3
3 4
1
2
Brench a: (10) Modules,(10) MicroInverters
60A
31
Silfab 490 Watt
SILFAB SOLAR SIL-490 HN
Voc = 53.96V, Vmp = 45.23V
Isc = 11.36A, Imp = 10.83A
7 1
3
INVERTERS
31
EXISTING MAIN SERVICE PANEL &
METER 200A BUSBAR & 150A MAIN
BREAKER
ENPHASE IQ COMBINER 4/4C
80A, 120/240V,
NEMRA 3R
ENPHASE
COMBINER BOX 1
ENVOY 3G PV MONITORING SYSTEMENPHASE
MONITORING
6
20A
15A
7
WIRE CHART
#MAX AMPS X NEC MULT =
DESIGN AMPS
BREAKER
SIZE (A)WIRE TYPE EGC/GEC
WIRE RATING X TEMP DERATE X
CONDUCTOR DERATE =
DERATED WIRE
CONDUIT SIZE
2 (1) #10 AWG CU-THWN-2 EGC
(1) #8 AWG CU-THWN-2 EGC
20 (6) #10 AWG, CU-THWN-2 40 X .71 X .8 = 22.72 >= 19.93
...
1
2
Brench b: (10) Modules, (10) MicroInverters
3 3/4" EMT31 X 1.25 X 1.45 = 56.18 A 60 (3) #6 AWG, CU-THWN-2 75 X .91 X 1 = 68.25 >= 56.18
1a
1a
20A
ENPHASE IQ8A MICROINVERTERS
IQ8A-72-2-US (240V)
PEAK PWR TRACKING VOLTAGE: = 36-45 V
CEC EFFICIENCY := 97.5%
ENCLOSURE :NEMA 6
MAXIMUM INPUT CURRENT:= 15 A
MAXIMUM OUTPUT CURRENT: = 1.45A
MAXIMUM INPUT POWER: = 295 - 500W
MAXIMUM OUTPUT POWER: = 349VA
3/4" EMT
NOTE:AC DISCONNECT VISIBLE AND LOCKABLE
1a 20 (1) #6 BARE SOLID COPPER GEC IN FREE AIR30 X .71 X 1 = 21.3 >= 18.125(2) #12 AWG, ENPHASE Q CABLE10X 1.25 X 1.45 = 18.125 A
120/240V
1P,3W
200A BUS
TOP FED
MAIN C/B
5
60A
...
1
2
Brench c: (11) Modules, (11) MicroInverters
1b
20A
1b 20 (1) #6 BARE SOLID COPPER GEC IN FREE AIR30 X .71 X 1 = 21.3 >= 19.93(2) #12 AWG, ENPHASE Q CABLE11 X 1.25 X 1.45 = 19.93 A
11 X 1.25 X 1.45 = 19.93 A
8
8 1(E) 200A SUB PANEL,120/240SUB PANEL
EXISTING
15
0
A
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
106 E 4th St - 101116506
& 2018087910/10/2023
Project Name:
George Hansen
Property address:
106 E 4th St,
Santa Ana, CA 92701
DATE: 08/18/2023
SIGNAGE3
WARNING!
ELECTRIC SHOCK HAZARD.
DO NOT TOUCH THE TERMINALS.
TERMINALS ON BOTH THE LINE AND
LOAD SIDES MAY BE ENERGIZED IN
THE OPEN POSITION.
PHOTOVOLTAIC SYSTEM
AC DISCONNECT
WARNING:
INVERTER OUTPUT CONNECTION
DO NOT RELOCATE THIS OVERCURRENT
DEVICE
Permanent directory or plaque providing location of service disconnecting means and photovoltaic system
disconnecting means, if not located at the same location. (Plaques shall be metal or plastic, with engraved or machine
printed letters, or electro-photo plating, in a contrasting color to the plaque. Plaques shall be permanently attached to the
equipmenq or in the required location using an approved method that is suitable to withstand the environment to which it is
exposed. Plaques and signage shall meet legibility, defacemet, exposure and adhesion requirements of Underwriters
Laboratories marking and labeling system 969(UL969).
OPERATING VOLTAGE VOLTS
OPERATING CURRENT 56 AMPS
RAPID SHUT
DOWN SWITCH
FOR SOLAR PV
SYSTEM
WARNING
DUAL POWER SUPPLY
SOURCES:UTILITY GRID
AND PV POWER SOURCE
ELECTRIC SYSTEM
240
WARNING
PHOTOVOLTAIC SYSTEM
COMBINER PANEL
DO NOT ADD LOADS
MARKINGS, LABELS AND WIRING SIGNS
A. Purpose: Provide emergency responders with appropriate warning and guidance with
respect to isolating solar electric system.
This can facilitate identifying energized electrical lines that connect solar panels to the
inverter, as these should not be cut when venting for smoke removal
B. Main Service Disconnect.
1. Residential buildings - The marking main be placed within the main service
disconnect. The marking shall be placed
outside cover if the main service disconnect is operable with the service panel closed.
2. Commercial buildings - Tha marking shall be placed adjacent to the main service
disconnect clearly visible from the location where the level is operated
3. Markings: Verbiage, Format and Type of Material.
a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED
b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All
letters shall be capitalized. Arial or similar font, non bold.
c. Material: Reflective, weather resistant material suitable for the environment (use UL -
969 as standard for weather rating). Durable adhesive materials meet this requirement.
C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC
combiners and junction boxes:
1. Markings: Verbiage, Format and Type of Material.
a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC
conduits, raceways, enclosures, and cable assemblies,
at turns, above and for below penetrations, all DC combiners and junction boxes
b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall
adhere to "V. V-3b, c" of this requirement.
c. Inverters are not required to have caution markings
1.Marking is required on all interior and exterior DC conduit raceways,enclosures,cable
assemblies,and junction boxes,combiner boxes and disconnects.
2.The materials used for marking shall be reflective,weather resistant material suitable
for the environment.
Minimum 3/8 "letter height; all upper case letters Arial or similar font; Red background
with white lettering.
3.Marcking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE.
4.Marking shall be placed adjacent to the main service disconnect in a location clearly
visible from the location where the disconnect is operatedSOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SHUT DOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD
IN THE ARRAY
SOLAR ELECTRIC
PV PANELS
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
CAUTION
POWER TO THIS BUILDING IS ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
DISCONNECTS LOCATED AS SHOWN:
N
0 °
S
180 °
E
90 °
W
270 °
106 E 4th St, Santa Ana, CA 92701
UTILITY METERING
INSIDE THE BUILDING
AC DISCONNECT
INSIDE THE BUILDING
ENPHASE COMBINER
You Are
Here
SERVICE SUB PANEL
INSIDE THE BUILDING
SOLAR PV ARRAY
ROOF ACCESS HATCH
106 E 4th St - 101116506
& 2018087910/10/2023
Project Name:
George Hansen
Property address:
106 E 4th St,
Santa Ana, CA 92701
DATE: 08/18/2023
SITE PLAN4
(E) Main Service Panel
Solar Module
INDEX
(N) AC Disconnect
MSP
AC
(N) Enphase Combiner BoxECB
(E) Sub PanelSSP
P. de Arq. Enr
i
q
u
e
G
u
e
r
r
e
r
o
H
e
r
n
á
n
d
e
z
.
P. de Arq. Adr
i
a
n
A
.
R
o
m
e
r
o
A
r
g
u
e
l
l
e
s
.
P. de Arq. Fra
n
c
i
s
c
o
E
s
p
i
t
i
a
R
a
m
o
s
.
P. de Arq. Hu
g
o
S
u
á
r
e
z
R
a
m
í
r
e
z
.
E 4th St
Driveway
PROPERTY LINE
AC
ECB
27'-11"
127'-5"
29'-6"
127'-5"
34'-9"
32'-8"
6'-6"3'-4"
9'-1"
SCALE: 1/16" = 1'-0"
S
180 °
E
90 °
W
270 °
N
0°
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
ROOF ACCESS HATCH
www. Loyd W Martin .com
Solar Structures Engineering
#2023-4620 Structural Only
August 24, 2023
ROOF EDGE
58'-0"
1'
10
'-
1
"
106 E 4th St - 101116506
& 2018087910/10/2023
Project Name:
George Hansen
Property address:
106 E 4th St,
Santa Ana, CA 92701
DATE: 08/18/2023
ATTACHMENT
LAYOUT5
MODULE WEIGHT (lbs)
# OF MODULES
TOTAL MODULE WEIGHT (lbs)
RACK WEIGHT (lbs)
TOTAL SYSTEM WEIGHT (lbs)
# OF STANDOFFS
MAX SPAN BETWEEN STANDOFFS (in)
LOADING PER STANDOFF (lbs)
TOTAL AREA (sq.ft.)
LOADING (PSF)
1763.9
352.78
2190.46
42
72
52.15
3.21
682
MICROINVERTER WEIGHT (lbs)73.78
1.
2 Prosolar Fast Jack Attachment
3. Roof attachment hardware to be mounted to existing structure
( ) with 72" O.C. rail spans
or less.
4. Lag bolts are 5/16" X 3.5" stainless steel with 2.5" minimum embedment into
the center of the roof
5. Roof sheathed with 1/2" plywood and upper surface is faced with felt paper.
Finished roof surface is layer of .
RAIL
ATTACHMENT
31
56.9 IronRidge XR Racking System
RAFTER
RAFTER
2 X 10 @ 36" O.C.
FOAM ROOF
Fast Jack Attachment
IRONRIDGE XR10 RAIL
5/16" HANGER BOLT STAINLESS STEEL
MIN. 2.5" EMBED INTO FRAMING MEMBER
Plywood & Building Felt
Solar Module
6''
2 X 10 @ 36" O.C.
1 Layer of .FOAM ROOF
FAST JACK ATTACHMENT DETAILS
RAFTER
3/8" X 3/4"
SS Hex Bolt
3/8" SS
Flat Washer
1 Layer of ______________
5/16"SS Lag Bolt Min 2.5"
Embed into framing Member
Threaded Fast
Jack Base
FOAM ROOF
RAFTER
2 X 10 @ 60" O.C.
2 X 10 @ 36" O.C.
2 X 10 @ 60" O.C.
5'
3'
6'-6"3'-4"
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
www. Loyd W Martin .com
Solar Structures Engineering
#2023-4620 Structural Only
August 24, 2023
(1) 5/16" x 3.5" SS LAG
SCREWS WITH 2.5" MIN
EMBEDMENT INTO WOOD
106 E 4th St - 101116506
& 2018087910/10/2023
Project Name:
George Hansen
Property address:
106 E 4th St,
Santa Ana, CA 92701
DATE: 08/18/2023
INVERTER
DATA SHEET6
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
106 E 4th St - 101116506
& 2018087910/10/2023
Project Name:
George Hansen
Property address:
106 E 4th St,
Santa Ana, CA 92701
DATE: 08/18/2023
MODULE
DATA SHEET7
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
106 E 4th St - 101116506
& 2018087910/10/2023
Project Name:
George Hansen
Property address:
106 E 4th St,
Santa Ana, CA 92701
DATE: 08/18/2023
8 RSD
DATA SHEET
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
106 E 4th St - 101116506
& 2018087910/10/2023
Project Name:
George Hansen
Property address:
106 E 4th St,
Santa Ana, CA 92701
DATE: 08/18/2023
9 RACKING
DATA SHEET
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
106 E 4th St - 101116506
& 2018087910/10/2023
Project Name:
George Hansen
Property address:
106 E 4th St,
Santa Ana, CA 92701
DATE: 08/18/2023
10 ATTACHMENT
DATA SHEET
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
106 E 4th St - 101116506
& 2018087910/10/2023
Project Name:
George Hansen
Property address:
106 E 4th St,
Santa Ana, CA 92701
DATE: 08/18/2023
11 ECB
DATA SHEET
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
106 E 4th St - 101116506
& 2018087910/10/2023