Loading...
HomeMy WebLinkAbout106 E 4th St - PlanStructural Calculations for a Roof Mounted Solar Photovoltaic System for: George Hansen 106 E 4th St Santa Ana, CA 92701 Applicable Codes: 2022 California Building Code, 2022 California Electric Code, 2022 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-16 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Construction, Local Municipal Code, and all other codes which are adopted by reference or enacted by law. Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. Solar Energy Contractor shall make an inspection of the existing roof framing system prior to installation of the roof mounted solar energy system to verify that the existing roof is capable of supporting minimum roof live loads. Assumed Design Parameters: All 2x members are grade Douglas Fir #2 or better All 4X members are grade Douglas Fir #1 or better All Roof Connectors are Simpson Strong-Tie or Equal All Concrete Foundations are f'c = 2500 psi or stronger Sht # 1 of 7 2023-4620 Effect Energy George Hansen August 24, 2023       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Original Structure was built to the Type-V Wood Framed Standards of the Applicable Building Code at the time of Construction. 106 E 4th St - 101116506 & 2018087910/10/2023 Note to Building Official: Based upon a review of the proposed plans I am confident that the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. The contractor shall field verify that the existing roof structure is in its original permited condition and verify that it can support the normal code required roof live loads. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. Check Existing 2X10 Roof Rafters @ 36" O.C.: (Assume max rafter span = 5 ft.) w =30 psf x 3 ft. = 90 plf Total load on rafters = 90 plf x 5 ft. = 450 lbs Sht # 2 of 7 2023-4620 Effect Energy George Hansen August 24, 2023       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com 5' 106 E 4th St - 101116506 & 2018087910/10/2023 Check Existing 2X10 Roof Rafters @ 36" O.C.: Snow Load =0 psf Dead Load =14 psf Live Load =16 psf WDL + LL =30 psf x 3 ft. = 90 plf WDL =14 psf x 3 ft. = 42 plf w =30 psf x 3 ft. = 90 plf Total load on rafters =( 90 plf x 0.8 ft ) + ( 42 plf x 4.2 ft ) + ( 6' x 3.7' x 3 psf x 1 ) =315 lbs < 450 lbs OK OK. Per 2022 California Existing Building Code Section 503.3 Alterations Check attachment of Support to Existing Structure for Wind Uplift CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7-16 WIND LOADS ON BUILDING APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2. NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7-16 EFFECTIVE WIND AREA: FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT BE LESS THAN ONE-THIRD ITS LENGTH. EFFECTIVE AREA = 15 SQ FT Sht # 3 of 7 2023-4620 Effect Energy George Hansen August 24, 2023       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com % CHANGE =315 lbs - 450 lbs x 100 =-30% < 5% OK450 lbs 106 E 4th St - 101116506 & 2018087910/10/2023 Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Tributary Area to Each Solar Mount = 6 ft. x 3.7 ft. = 22.2 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): p = q h (GC p )(γ E )(γ a )Eq'n 29.4-7 ASCE 7-16 q h = 0.00256 K z K zt K d K e V 2 Eq'n 26.10-1 ASCE 7-16 Note: K z =velocity pressure coefficient Section 29.10.1 ASCE 7-16 K z =0.9 (Exposure C, Height = 20 ft or less) K zt =Topographical Factor = 1.0 K d =Wind Directionality Factor = 0.85 K e =Ground Elevation Factor = 1.0 V =130 mph ;VASB =101 mph q h =0.00256 (0.9) (1.0) (0.85) (1.0) (101)² q h =19.98 psf GC p =-2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) γ E =Exposure Factor = 1.5 γ a =Solar Array Pressure Equalization Factor = 0.7 Fig. 29.4-8 ASCE 7-16 p = q h (GC p )(γ E )(γ a ) p = 19.98 psf (-2.0) (1.5) (0.7) = 42 psf Sht # 4 of 7 2023-4620 Effect Energy George Hansen August 24, 2023       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com 106 E 4th St - 101116506 & 2018087910/10/2023 Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Nominal (Unfactored) Uplift at each support = 42 psf x 22.2 sq. ft. = 932.4 lbs Note: Section 2.4.1 of ASCE 7-16, Basic Load Combinations for Allowable Stress Design. Note: Applicable Load Combination #5 (D + 0.6W) Design (Factored) Uplift at each support = 0.6 x 932.4 lbs = 559 lbs Load per lag screw = 559 lbs / 1 = 559 lbs Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2018 NDS. W ' = W x Cd x Ct Table 10.3.1 2018 NDS where W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2018 NDS Ct = 1.0 per Table 2.3.3 of 2018 NDS W' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 559 lbs OK Sht # 5 of 7 2023-4620 Effect Energy George Hansen August 24, 2023       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3.5" lag screws per connection minimum. 106 E 4th St - 101116506 & 2018087910/10/2023 Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Effective Existing Seismic Weight Area of (E) Building =Approximately 3,300 Sq. ft Approximate Effective =3,300 sq. ft. x 30 psf ave. = 99,000 LBS Seismic Weight DETERMINE BASE SHEAR V = Cs W EQ'N 12.8-1 ASCE 7-16 EQ'N 12.8-2 ASCE 7-16 R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1 R =6.5 WOOD SHEAR WALLS Ie = 1.0 IMPORTANCE FACTOR SDS = 2/3 x SMS SMS = FA x SS SMS = 1.2 x 1.5 = 1.8 SDS = 2/3 x 1.8 = 1.2 Cs ==0.185 EQ'N 12.8-2 ASCE 7-16 Sht # 6 of 7 2023-4620 Effect Energy George Hansen August 24, 2023       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Cs =SDS R Ie SDS R Ie 106 E 4th St - 101116506 & 2018087910/10/2023 EXISTING BASE SHEAR V = 0.185 x 99,000 LBS = 18,315 LBS DETERMINE NEW BASE SHEAR Determine Seismic Weight of Building with Solar Array: EXISTING SEISMIC =99,000 LBS WEIGHT NEW SOLAR ARRAY =3 PSF x 31 PANELS x 7.4' x 3.4' = 2,340 LBS NEW SEISMIC =99,000 LBS + 2,340 LBS = 101,340 LBS WEIGHT THEREFORE NEW BASE SHEAR: V = 0.185 x 101,340 = 18,748 LBS EQ'N 12.8-1 ASCE 7-16 OK. PER ASCE 7-16 SECTION 11B.4 ALTERATIONS EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE Sht # 7 of 7 2023-4620 Effect Energy George Hansen August 24, 2023       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 "Alterations may be made to any structure without requiring the existing structure to comply with this standard, provided that the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10% or decrease the design strength of any existing structural element to resist seismic forces by more than 10% shall not be permitted unless the entire seismic force-resisting system is determined to comply with this standard for a new structure." End of Calculations Email: loydwmartin@gmail.com www.loydwmartin.com % CHANGE =18,748 LBS - 18,315 LBS x 100 = 2.4 % < 10 % OK18,315 LBS 106 E 4th St - 101116506 & 2018087910/10/2023 Project Name: George Hansen Property address: 106 E 4th St, Santa Ana, CA 92701 DATE: 08/ 18/2023 VICINITY MAP SCALE: NTS PV SOLAR SYSTEM DETAILS ELECTRICAL INFORMATION: EXISTING MAIN SERVICE PANEL BUS SIZE: 150A MAIN SERVICE BREAKER SIZE: 150A MOUNTING SYSTEM: BUILDING INFORMATION: CONSTRUCTION TYPE: V-B OCCUPANCY: M ROOF: SYSTEM SIZE: DC STC: 15.190 KW SYSTEM SIZE: AC CEC: 10.819 KW SOLAR MODULES: ( ) SATELLITE VIEW SCALE: NTS MAIN 3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED 4. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING COMMISSIONING AND ACCEPTANCE WITH THE CLIENT, UTILITY CO. AND CITY INSPECTORS AS NEEDED. 5. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS. 6. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. 7. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING THE EXTRA WEIGHT. 8. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS APPROPRIATE. 9. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS. 10. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS, ETC. SHALL BE HANDED OVER TO OWNER'S REPRESENTATIVE AT THE COMPLETION OF WORK PHOTOVOLTAIC NOTES: 1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED AND IDENTIFIED BY RECOGNIZED ELECTRICAL TESTING LABORATORY 2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL VENTS 3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. 5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS. 4. SOLAR INVERTER SHALL BE LISTED TO UL1741. 6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING SHALL BE PROTECTED FROM PHYSICAL DAMAGE. 7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS OVER 150V TO GROUND SHALL NOT BE ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE ENERGIZED. 8. INVERTER IS EQUIPED WITH INTEGRATED GFDI, THUS PROVIDING GROUND FAULT PROTECTION 9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED 10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY. 11. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING, AC GROUNDING AND BONDING BETWEEN AC AND DC SYSTEMS. 12. NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER. BOND BOTH ENDS OF RACEWAYS. GENERAL NOTES 1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED ELECTRICAL TESTING LABORATORY CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED BY THE MANUFACTURER ATTESTING TO ITS SAFETY 2. OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED OR BETTER 31 Silfab 490 Watt IRONRIDGE FOAM ROOF INVERTERS: ( ) Enphase IQ8A Microinverters31 ROOF PLAN SINGLE LINE DIAGRAM ATTACHMENT LAYOUT SIGNAGE RSD DATA SHEET INVERTER DATA SHEET 1 INDEX 2 3 4 5 6 7 8 9 10 SITE PLAN MODULE DATA SHEET RACKING DATA SHEET ATTACHMENT DATASHEET ECB DATA SHEET11 : RAFTER 2 X 10 @ 36" O.C. THE INSTALLATION OF SOLAR ARRAYS AND PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH THE FOLLOWING CODES: ·2020 National Electrical Code ·2022 California Building Code ·2022 California Residential Code ·2022 California Green Building Standard Code ·2022 California Plumbing Code ·2022 California Mechanical Code ·2022 California Electrical Code ·2022 California Fire Code ·2022 California Energy Code ·2016 International Property Maintenance Code AD ADOPTED BY THE STATE OF CALIFORNIA ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES 2 X 10 @ 60" O.C. PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 www. Loyd W Martin .com Solar Structures Engineering #2023-4620 Structural Only August 24, 2023 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg# 101116506 Elec# 20180879 Issued 10/10/23 Approvals: PLNG: FArias BLDG: JLo ELEC: MSmith 106 E 4th St - 101116506 & 2018087910/10/2023 Project Name: George Hansen Property address: 106 E 4th St, Santa Ana, CA 92701 DATE: 08/18/2023 ROOF PLAN1 EMT Conduit (E) Main Service Panel Solar Module INDEX (N) Junction Box Microinverters Setback MSP JB Total Roof Area: 2563 Total Module Area: 682 26.60% of Coverage AC(N) AC Disconnect ECB(N) Enphase Combiner Box SSP(E) 0A Sub Panel AC ECB E 4th St Solar PV Array 31- Silfab 490Watt Modules 31- Enphase IQ8A MicroInverters Tilt: 10 Deg Orientation: 180 Deg 36'' fire setback 48 ' ' f i r e s e t b a c k 36 ' ' f i r e s e t b a c k 48'' fire setback c c c c c c c c c c b c b b b b b b b b a b a a a a a a a a a 48'' Pathway 48'' Pathway 6'-6"3'-4" SCALE: 3/32" = 1'-0" S 180 ° E 90 ° W 270 ° N 0° PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 ( 3DUDSHW6XSSRUW ( 6WHSRYHU INSIDE THE BUILDING All of the equipment is minimum 48" off the ground and has a maximum height of 78" ROOF ACCESS HATCH www. Loyd W Martin .com Solar Structures Engineering #2023-4620 Structural Only August 24, 2023 NOTE: Engineer of Record assumes that all structural components of the existing building were permitted and met the requirements of the Building Code at the time of construction. Solar Contractor shall field verify that the roof framing is in its existing permitted condition and capable of supporting required live loads. Framing specified on solar plans shall be assumed to be minimum size and spacing, actual framing may be different. Ma i n S t The height of the parapet wall on the Main Street side and the parapet for the rear of the building are both about 3'. 48 '' Pa t h w a y 48 ' ' P a t h w a y 106 E 4th St - 101116506 & 2018087910/10/2023 Project Name: George Hansen Property address: 106 E 4th St, Santa Ana, CA 92701 DATE: 08/18/2023 SINGLE LINE DIAGRAM2 60A 2P BLADE TYPE 240V NON-FUSIED AC DISCONNECT 120% RULE CALCULATION PER NEC 705.12(D)(2)(3) SUB BUSBAR RATING:200 AMPS SERVICE BREAKER RATING:150 AMPS PV BACKFEDING CURRENT:AMPS BUSBAR X 120%- MAIN BREAKER = MAX PV BREAKER 240 - 150 = 90 60 PERCENT OF VALUES NUMBER OF CURRENT CARRYING CONDUCTORS IN EMT .80 4-6 .70 7-9 .50 10-20 #ITEM DESCRIPTION QTY 1 PV MODULE 2 3 JUNCTION BOX 4"x4"x2" UL LISTED WATER TIGHT NEMA TYPE 3 2 4 AC DISCONNECT 1 5 MAIN SERVICE PANEL 1 6 KEY NOTES: ·SOLID BARE G.E.C (FREE-AIR) MOUNTED UNDER ARRAY ·PER NEC ARTICLE 690.35 INVERTER GROUND FAULT PROTECTION PROVIDED ·ALL GROUNDS AND NEUTRALS BONDED TO EXISTING GROUNDING CONDUCTOR W/IRREVERSIBLE CRIP CONNECTOR, ·BACKFED BREAKERS MUST BE LOCATED @ OPPOSITE END OF BUS BAR FROM MAIN BREAKER OR MAIN LUG ON GRID SIDE. WHEN A BACKFED BREAKER IS THE METHOD OF UTILITY INTERCONNECTION, BREAKER SHALL NOT READ ' LINE OR LOAD'. ·PER CEC 250.65(C): CONDUCTOR SPLICES ONLY ALLOWED WITH COMPRESSION CONNECTORS OR EXOTHERMIC WELDING ·ALL GROUNDS AND NEUTRALS BONDED TO EXISTING GROUNDING CONDUCTOR W/IRREVERSIBLE CRIP CONNECTOR, ·VERIFY (E) UFER GROUND NEAR MSP. IF (E) UFER IS NOT ACCESSIBLE OR VERIFIABLE, INSTALL A NEW 5/8" Ø X 8' LONG GROUNDING ROD AND BOND SOLAR SYSTEM EQUIPMENT GROUNDING ACCORDINGLY. ... 2 3 3 4 1 2 Brench a: (10) Modules,(10) MicroInverters 60A 31 Silfab 490 Watt SILFAB SOLAR SIL-490 HN Voc = 53.96V, Vmp = 45.23V Isc = 11.36A, Imp = 10.83A 7 1 3 INVERTERS 31 EXISTING MAIN SERVICE PANEL & METER 200A BUSBAR & 150A MAIN BREAKER ENPHASE IQ COMBINER 4/4C 80A, 120/240V, NEMRA 3R ENPHASE COMBINER BOX 1 ENVOY 3G PV MONITORING SYSTEMENPHASE MONITORING 6 20A 15A 7 WIRE CHART #MAX AMPS X NEC MULT = DESIGN AMPS BREAKER SIZE (A)WIRE TYPE EGC/GEC WIRE RATING X TEMP DERATE X CONDUCTOR DERATE = DERATED WIRE CONDUIT SIZE 2 (1) #10 AWG CU-THWN-2 EGC (1) #8 AWG CU-THWN-2 EGC 20 (6) #10 AWG, CU-THWN-2 40 X .71 X .8 = 22.72 >= 19.93 ... 1 2 Brench b: (10) Modules, (10) MicroInverters 3 3/4" EMT31 X 1.25 X 1.45 = 56.18 A 60 (3) #6 AWG, CU-THWN-2 75 X .91 X 1 = 68.25 >= 56.18 1a 1a 20A ENPHASE IQ8A MICROINVERTERS IQ8A-72-2-US (240V) PEAK PWR TRACKING VOLTAGE: = 36-45 V CEC EFFICIENCY := 97.5% ENCLOSURE :NEMA 6 MAXIMUM INPUT CURRENT:= 15 A MAXIMUM OUTPUT CURRENT: = 1.45A MAXIMUM INPUT POWER: = 295 - 500W MAXIMUM OUTPUT POWER: = 349VA 3/4" EMT NOTE:AC DISCONNECT VISIBLE AND LOCKABLE 1a 20 (1) #6 BARE SOLID COPPER GEC IN FREE AIR30 X .71 X 1 = 21.3 >= 18.125(2) #12 AWG, ENPHASE Q CABLE10X 1.25 X 1.45 = 18.125 A 120/240V 1P,3W 200A BUS TOP FED MAIN C/B 5 60A ... 1 2 Brench c: (11) Modules, (11) MicroInverters 1b 20A 1b 20 (1) #6 BARE SOLID COPPER GEC IN FREE AIR30 X .71 X 1 = 21.3 >= 19.93(2) #12 AWG, ENPHASE Q CABLE11 X 1.25 X 1.45 = 19.93 A 11 X 1.25 X 1.45 = 19.93 A 8 8 1(E) 200A SUB PANEL,120/240SUB PANEL EXISTING 15 0 A PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 106 E 4th St - 101116506 & 2018087910/10/2023 Project Name: George Hansen Property address: 106 E 4th St, Santa Ana, CA 92701 DATE: 08/18/2023 SIGNAGE3 WARNING! ELECTRIC SHOCK HAZARD. DO NOT TOUCH THE TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. PHOTOVOLTAIC SYSTEM AC DISCONNECT WARNING: INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE Permanent directory or plaque providing location of service disconnecting means and photovoltaic system disconnecting means, if not located at the same location. (Plaques shall be metal or plastic, with engraved or machine printed letters, or electro-photo plating, in a contrasting color to the plaque. Plaques shall be permanently attached to the equipmenq or in the required location using an approved method that is suitable to withstand the environment to which it is exposed. Plaques and signage shall meet legibility, defacemet, exposure and adhesion requirements of Underwriters Laboratories marking and labeling system 969(UL969). OPERATING VOLTAGE VOLTS OPERATING CURRENT 56 AMPS RAPID SHUT DOWN SWITCH FOR SOLAR PV SYSTEM WARNING DUAL POWER SUPPLY SOURCES:UTILITY GRID AND PV POWER SOURCE ELECTRIC SYSTEM 240 WARNING PHOTOVOLTAIC SYSTEM COMBINER PANEL DO NOT ADD LOADS MARKINGS, LABELS AND WIRING SIGNS A. Purpose: Provide emergency responders with appropriate warning and guidance with respect to isolating solar electric system. This can facilitate identifying energized electrical lines that connect solar panels to the inverter, as these should not be cut when venting for smoke removal B. Main Service Disconnect. 1. Residential buildings - The marking main be placed within the main service disconnect. The marking shall be placed outside cover if the main service disconnect is operable with the service panel closed. 2. Commercial buildings - Tha marking shall be placed adjacent to the main service disconnect clearly visible from the location where the level is operated 3. Markings: Verbiage, Format and Type of Material. a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All letters shall be capitalized. Arial or similar font, non bold. c. Material: Reflective, weather resistant material suitable for the environment (use UL - 969 as standard for weather rating). Durable adhesive materials meet this requirement. C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC combiners and junction boxes: 1. Markings: Verbiage, Format and Type of Material. a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turns, above and for below penetrations, all DC combiners and junction boxes b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall adhere to "V. V-3b, c" of this requirement. c. Inverters are not required to have caution markings 1.Marking is required on all interior and exterior DC conduit raceways,enclosures,cable assemblies,and junction boxes,combiner boxes and disconnects. 2.The materials used for marking shall be reflective,weather resistant material suitable for the environment. Minimum 3/8 "letter height; all upper case letters Arial or similar font; Red background with white lettering. 3.Marcking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE. 4.Marking shall be placed adjacent to the main service disconnect in a location clearly visible from the location where the disconnect is operatedSOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: N 0 ° S 180 ° E 90 ° W 270 ° 106 E 4th St, Santa Ana, CA 92701 UTILITY METERING INSIDE THE BUILDING AC DISCONNECT INSIDE THE BUILDING ENPHASE COMBINER You Are Here SERVICE SUB PANEL INSIDE THE BUILDING SOLAR PV ARRAY ROOF ACCESS HATCH 106 E 4th St - 101116506 & 2018087910/10/2023 Project Name: George Hansen Property address: 106 E 4th St, Santa Ana, CA 92701 DATE: 08/18/2023 SITE PLAN4 (E) Main Service Panel Solar Module INDEX (N) AC Disconnect MSP AC (N) Enphase Combiner BoxECB (E) Sub PanelSSP P. de Arq. Enr i q u e G u e r r e r o H e r n á n d e z . P. de Arq. Adr i a n A . R o m e r o A r g u e l l e s . P. de Arq. Fra n c i s c o E s p i t i a R a m o s . P. de Arq. Hu g o S u á r e z R a m í r e z . E 4th St Driveway PROPERTY LINE AC ECB 27'-11" 127'-5" 29'-6" 127'-5" 34'-9" 32'-8" 6'-6"3'-4" 9'-1" SCALE: 1/16" = 1'-0" S 180 ° E 90 ° W 270 ° N 0° PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 ROOF ACCESS HATCH www. Loyd W Martin .com Solar Structures Engineering #2023-4620 Structural Only August 24, 2023 ROOF EDGE 58'-0" 1' 10 '- 1 " 106 E 4th St - 101116506 & 2018087910/10/2023 Project Name: George Hansen Property address: 106 E 4th St, Santa Ana, CA 92701 DATE: 08/18/2023 ATTACHMENT LAYOUT5 MODULE WEIGHT (lbs) # OF MODULES TOTAL MODULE WEIGHT (lbs) RACK WEIGHT (lbs) TOTAL SYSTEM WEIGHT (lbs) # OF STANDOFFS MAX SPAN BETWEEN STANDOFFS (in) LOADING PER STANDOFF (lbs) TOTAL AREA (sq.ft.) LOADING (PSF) 1763.9 352.78 2190.46 42 72 52.15 3.21 682 MICROINVERTER WEIGHT (lbs)73.78 1. 2 Prosolar Fast Jack Attachment 3. Roof attachment hardware to be mounted to existing structure ( ) with 72" O.C. rail spans or less. 4. Lag bolts are 5/16" X 3.5" stainless steel with 2.5" minimum embedment into the center of the roof 5. Roof sheathed with 1/2" plywood and upper surface is faced with felt paper. Finished roof surface is layer of . RAIL ATTACHMENT 31 56.9 IronRidge XR Racking System RAFTER RAFTER 2 X 10 @ 36" O.C. FOAM ROOF Fast Jack Attachment IRONRIDGE XR10 RAIL 5/16" HANGER BOLT STAINLESS STEEL MIN. 2.5" EMBED INTO FRAMING MEMBER Plywood & Building Felt Solar Module 6'' 2 X 10 @ 36" O.C. 1 Layer of .FOAM ROOF FAST JACK ATTACHMENT DETAILS RAFTER 3/8" X 3/4" SS Hex Bolt 3/8" SS Flat Washer 1 Layer of ______________ 5/16"SS Lag Bolt Min 2.5" Embed into framing Member Threaded Fast Jack Base FOAM ROOF RAFTER 2 X 10 @ 60" O.C. 2 X 10 @ 36" O.C. 2 X 10 @ 60" O.C. 5' 3' 6'-6"3'-4" PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 www. Loyd W Martin .com Solar Structures Engineering #2023-4620 Structural Only August 24, 2023 (1) 5/16" x 3.5" SS LAG SCREWS WITH 2.5" MIN EMBEDMENT INTO WOOD 106 E 4th St - 101116506 & 2018087910/10/2023 Project Name: George Hansen Property address: 106 E 4th St, Santa Ana, CA 92701 DATE: 08/18/2023 INVERTER DATA SHEET6 PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 106 E 4th St - 101116506 & 2018087910/10/2023 Project Name: George Hansen Property address: 106 E 4th St, Santa Ana, CA 92701 DATE: 08/18/2023 MODULE DATA SHEET7 PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 106 E 4th St - 101116506 & 2018087910/10/2023 Project Name: George Hansen Property address: 106 E 4th St, Santa Ana, CA 92701 DATE: 08/18/2023 8 RSD DATA SHEET PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 106 E 4th St - 101116506 & 2018087910/10/2023 Project Name: George Hansen Property address: 106 E 4th St, Santa Ana, CA 92701 DATE: 08/18/2023 9 RACKING DATA SHEET PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 106 E 4th St - 101116506 & 2018087910/10/2023 Project Name: George Hansen Property address: 106 E 4th St, Santa Ana, CA 92701 DATE: 08/18/2023 10 ATTACHMENT DATA SHEET PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 106 E 4th St - 101116506 & 2018087910/10/2023 Project Name: George Hansen Property address: 106 E 4th St, Santa Ana, CA 92701 DATE: 08/18/2023 11 ECB DATA SHEET PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 106 E 4th St - 101116506 & 2018087910/10/2023