Loading...
HomeMy WebLinkAbout1025 N Mirasol St - PlanSunergy, Inc 1 Gamella Street Rancho Mission Viejo, CA, 92694 Subject: Structural Certification for Installation of Solar Panels Job Number: 2022-16827 Client: Adrian Vega - 010003 Address: 1025 Mirasol Street, Santa Ana, CA 92701 Attn.: To Whom It May Concern Design Criteria: ● ● Ground Snow Load = 0 psf; Roof Snow Load = 0 psf ARRAY 1 ● Basic Wind Speed = 110 mph Exposure Category C ● Existing Roof Dead Load: ARRAY 1 = 10 psf ● Existing Roof Live Load: 20 psf PV System Assembly Installation Requirements Prepared By: PZSE, Inc. - Structural Engineers Roseville, CA If you have any questions on the above, do not hesitate to call. December 20, 2022 PZSE’s scope of work is limited to performing a structural evaluation of loading at the address above. After review, PZSE certifies that the alteration to the existing structure by installation of the PV system meets the requirements of the applicable codes and criteria shown below: The existing structure is adequate to support the PV alteration per 2019 CEBC §502.4 & 503.3 & 502.5 & 503.4. The PV module assembly including all structural supporting components shall be installed in accordance with the manufacturers specifications and meet or exceed all requirements set forth by the referenced codes above. The PV system shall be mounted flush to the existing roof surface. The contractor shall notify PZSE of any signs of damage to the roof framing prior to commencing the installation. PZSE shall then determine if the existing roof is adequate to support the applied loads. The electrical engineering and system waterproofing shall be addressed by others. Applicable Codes = 2019 CBC, ASCE 7-16, and NDS-18 1025 Mirasol Street Santa Ana, CA 92701 1478 Stone Point Drive, Suite 190, Roseville, CA 95661 T 916.961.3960 F 916.961.3965 W www.pzse.com Experience | Integrity | Empowerment Paul Zacher Digitally signed by Paul Zacher DN: CN=Paul Zacher, O=Structural Engineers, L=Roseville, S=California, C=US Reason: I am the author of this document Date: 2022.12.20 15:39:38-08'00' 1025 N Mirasol St 01/27/23 Certificate Of Completion Envelope Id: BA69A245B0474A168D07299DCAC73D34 Status: Completed Subject: Complete with DocuSign: Vega Authorization.pdf Source Envelope: Document Pages: 1 Signatures: 1 Envelope Originator: Certificate Pages: 4 Initials: 0 Chris Hammerstone AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 1 Gamella St Ladera Ranch, CA 92694 chammerstone@sunergycorp.com IP Address: 70.187.156.162 Record Tracking Status: Original 1/5/2023 3:48:59 PM Holder: Chris Hammerstone chammerstone@sunergycorp.com Location: DocuSign Signer Events Signature Timestamp Adrian Vega adrian.vega89@yahoo.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 76.89.202.162 Signed using mobile Sent: 1/5/2023 3:49:20 PM Viewed: 1/5/2023 4:47:12 PM Signed: 1/5/2023 4:47:54 PM Electronic Record and Signature Disclosure: Accepted: 1/5/2023 4:47:12 PM ID: 1b1748db-a339-4830-9173-474302c72ad1 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 1/5/2023 3:49:20 PM Certified Delivered Security Checked 1/5/2023 4:47:12 PM Signing Complete Security Checked 1/5/2023 4:47:54 PM Completed Security Checked 1/5/2023 4:47:54 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure 1025 N Mirasol St 01/27/23 ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Sunergy, Inc (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 3/30/2022 11:35:13 AM Parties agreed to: Adrian Vega 1025 N Mirasol St 01/27/23 Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact Sunergy, Inc: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: chammerstone@sunergycorp.com To advise Sunergy, Inc of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at chammerstone@sunergycorp.com and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from Sunergy, Inc To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to chammerstone@sunergycorp.com and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with Sunergy, Inc To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: 1025 N Mirasol St 01/27/23 i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to chammerstone@sunergycorp.com and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that: You can access and read this Electronic Record and Signature Disclosure; and You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and  Until or unless you notify Sunergy, Inc as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by Sunergy, Inc during the course of your relationship with Sunergy, Inc. 1025 N Mirasol St 01/27/23 128'-10" 70 ' - 7 " 128'-10" 70 ' - 7 " 5'-6" 25'-9" 4'-4" 41'-10" MS P UM LCJB ARRAY LOCATIONS PHOTOVOLTAIC ROOF MOUNT SYSTEM 13 MODULES - SYSTEM SIZE STC (5.2 kW DC / 4.225 kW AC) 1025 MIRASOL ST, SANTA ANA, CA 92701, USA (33.7545118°, -117.8381794°) ROOF ACCESS POINT ● SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IN LOCATIONS WHERETHE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES OR SIGNS. SAFETY PLAN NOTES ● INSTALLERS SHALL DRAW IN DESIGNATED SAFETY AREA AROUND HOME. ● INSTALLERS SHALL UPDATE NAME, ADDRESS AND PHONE NUMBER OF NEAREST URGENT CARE FACILITY RELATIVE TO THE SITE BEFORE STARTING WORK. GENERAL NOTES: a. INSTALLATION OF STORAGE BATTERIES SYSTEM SHALL BE IN ACCORDANCE WITH NEC ARTICLE 690, AND ALL OTHER APPLICABLE NEC CODES WHERE NOTED OR EXISTING. b. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL COMPLY WITH NEC ARTICLE 110. c. ALL CONDUCTORS, INCLUDING THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE IN ACCORDANCE WITH NEC ARTICLE 250. d. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE; THIS SYSTEM IS UTILITY INTERACTIVE PER UL 1741 AND DOES NOT INCLUDE STORAGE BATTERIES OR OTHER ALTERNATIVE STORAGE SOURCES. e. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL JURISDICTIONAL BUILDING CODE. f. PV MODULES TO BE RATED UL 1703 CLASS C FIRE RATING OR BETTER. g. ALL EQUIPMENT TO BE CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY. GOVERNING CODES ALL WORK SHALL CONFORM TO THE FOLLOWING CODES 1. 2019 CA BUILDING CODE 2. 2019 CA ENERGY CODE 3. 2019 CA ELECTRICAL CODE 4. 2019 CA FIRE CODE TITLE 24 SUPPLEMENT 5. 2019 CA GREEN CODE 6. 2019 CA MECHANICAL CODE 7. 2019 CA PLUMBING CODE 8. 2019 CA RESIDENTIAL CODE 9. ANY OTHER LOCAL AMENDMENTS SYSTEM SUMMARY STC (5.2 kW DC / 4.225 kW AC) STC DC: (13) 400W = 5.20 kW STC AC: (13) 325W = 4.225 kW ● (13) SOLARIA POWER X-400R (400W) MODULES MODULES ● (13) IQ8M-72-2-US (240V) MICROINVERTERS ● 1x BRANCH OF 7 CONNECTED IN PARALLEL ● 1x BRANCH OF 6 CONNECTED IN PARALLEL SITE PLAN & SAFETY PLAN SCALE: 1/16" = 1' REV SHEET NAME SHEET SIZE SHEET NUMBER ANSI B DATE DESCRIPTION REVISIONS PV-1 HOMEOWNER INFO 11" X 17" SIGNATURE & SEAL CONTRACTOR AD R I A N V E G A 1 0 2 5 M I R A S O L S T , S A N T A AN A , C A 9 2 7 0 1 , U S A NAME: SUNERGY, INC. ADDRESS: 23182 ALCALDE DR SUITE GLAGUNA HILLS, CA 92653 PHONE: (562) 544-7394 LICENSE #: 1061794 APN: - EMAIL: - PHONE: - 0012/19/2022 Initial Design HOUSE PHOTO SCALE: NTS VICINITY MAP SCALE: NTS COVER PAGE SHEET INDEX PV-1 COVER PAGE PV-2 ROOF PLAN WITH MODULES PV-3 ATTACHMENT DETAIL PV-4 THREE LINE DIAGRAM PV-5 WIRING CALCULATION PV-6 PLACARDS PV-7+ EQUIPMENT SPECIFICATION PROJECT SITE FR O N T O F H O U S E 1 0 2 5 M I R A S O L S T AHJ: CA | ORANGE UTILITY: SOUTHERN CALIFORNIA EDISON CO PROPERTY LINE FENCE GATEROOF ATTACHMENT DIMENSIONSPV MODULE AC JB MAIN SERVICE PANEL (NEW, 225A) UTILITY METER (EXISTING) AC DISCONNECT UNFUSED (N/A) ACF AC DISCONNECT FUSED (N/A) PRODUCTION METER (N/A) JUNCTION BOX (NEW) LOAD CENTER (COMBINER PANEL) (NEW) SOLAREDGE METER (N/A) SUBPANEL (N/A) DC DISCONNECT (N/A) DC COMBINER (N/A) OPTIMIZER MICRO-INVERTER AC COMBINER AT BACKUP LOAD PANEL (N/A) BATTERY (N/A) INV SM LC BLP SUB DCC DCD ACC MSP PM UM BAT (13) INVERTER (NEW) AUTO TRANSFORMER (N/A) LE G E N D DRIVEWAY ROOF ACCESS POINT The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg# 101113588 Elec# 20178523 Issued 01/26/23 1025 N Mirasol St 01/27/23 MS P UM LCJB ROOF DESCRIPTION TABLE ROOF PLANE TRUSSES SIZE TRUSSES SPACING ATTACHMENT SPACING MODULE COUNT ARRAY TILT AZIMUTH #1 2" x 6" 24" O.C. 72" O.C. 10 18° 90° #2 2" x 6" 24" O.C. 72" O.C. 03 18° 180° ROOF ACCESS POINT ● SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IN LOCATIONS WHERETHE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES OR SIGNS. MODULE AREA & WEIGHT CALCULATIONS PANEL TYPES (COUNT, AREA, WEIGHT): ● (13x) SOLARIA POWER X-400R (400W) MODULES (67.8" x 44.7", 48.7 LBS) MICRO-INVERTER TYPES (COUNT, WEIGHT): ● (13x) IQ8M-72-2-US (240V) (2.38 LBS) ATTACHMENT COUNT: 29 MOUNTING SYSTEM WEIGHT/MODULE: 1.5 LBS TOTAL ROOF AREA: 2559.55 SF TOTAL ARRAY AREA: (13) 67.8" x 44.7" = 273.60 SF TOTAL ARRAY WEIGHT: (13) 48.7 + (13) 2.4 + (13) 1.5 = 684 LBS WEIGHT AT EACH CONNECTION: 684 LBS / 29 = 23.58 LBS DISTRIBUTED LOAD: 684 LBS / 273.60 SF = 2.50 PSF ROOF AREA COVERED BY ARRAY: 274 SF / 2559.55 SF = 10.70% BILL OF MATERIALS SOLAR PV MODULES 13 SOLARIA POWER X-400R (400W) MODULES MICRO INVERTERS 13 IQ8M-72-2-US (240V) JUNCTION BOX (AC) 01 JUNCTION BOX 600V, NEMA 3R UL LISTED ATTACHMENTS 29 Flashfoot2 RAIL 09 XR-10 RAIL SPLICES 04 RAIL SPLICES MID CLAMPS 18 MID CLAMPS END CLAMPS 16 END CLAMPS GROUNDING LUG 04 GROUNDING LUG REV SHEET NAME SHEET SIZE SHEET NUMBER ANSI B DATE DESCRIPTION REVISIONS PV-2 HOMEOWNER INFO 11" X 17" SIGNATURE & SEAL CONTRACTOR AD R I A N V E G A 10 2 5 M I R A S O L S T , S A N T A AN A , C A 9 2 7 0 1 , U S A NAME: SUNERGY, INC. ADDRESS: 23182 ALCALDE DR SUITE GLAGUNA HILLS, CA 92653 PHONE: (562) 544-7394 LICENSE #: 1061794 APN: - EMAIL: - PHONE: - 0012/19/2022 Initial Design ROOF PLAN WITH MODULES SCALE: 1/8" = 1'-0" 1 ROOF PLAN WITH MODULES (E ) F R O N T Y A R D 1 0 2 5 M I R A S O L S T 1 PROPERTY LINE FENCE GATEROOF ATTACHMENT DIMENSIONSPV MODULE AC JB MAIN SERVICE PANEL (NEW, 225A) UTILITY METER (EXISTING) AC DISCONNECT UNFUSED (N/A) ACF AC DISCONNECT FUSED (N/A) PRODUCTION METER (N/A) JUNCTION BOX (NEW) LOAD CENTER (COMBINER PANEL) (NEW) SOLAREDGE METER (N/A) SUBPANEL (N/A) DC DISCONNECT (N/A) DC COMBINER (N/A) OPTIMIZER MICRO-INVERTER AC COMBINER AT BACKUP LOAD PANEL (N/A) BATTERY (N/A) INV SM LC BLP SUB DCC DCD ACC MSP PM UM BAT (13) INVERTER (NEW) AUTO TRANSFORMER (N/A) LE G E N D 0" EXPOSURE CATEGORY = C WIND SPEED = 100 MPH SNOW LOAD = 0 LBS/FT2 18" F IRE P A T HWAY 18" FIRE P A T H W A Y BA C K O F H O U S E 18" F I R E P A THW A Y 18" FIRE P A THW A Y 18" FIRE P A T HWAY 18" FIRE P A T HW A Y RO O F 0 1 PI T C H 1 8 ° AZ I M U T H 9 0 ° ROOF 02 PITCH 18° AZIMUTH 180° 18 " F I R E S E T B A C K 18 " F I R E S E T B A C K 1025 N Mirasol St 01/27/23 6" T Y P . REV SHEET NAME SHEET SIZE SHEET NUMBER ANSI B DATE DESCRIPTION REVISIONS PV-3 HOMEOWNER INFO 11" X 17" SIGNATURE & SEAL CONTRACTOR AD R I A N V E G A 1 0 2 5 M I R A S O L S T , S A N T A AN A , C A 9 2 7 0 1 , U S A NAME: SUNERGY, INC. ADDRESS: 23182 ALCALDE DR SUITE GLAGUNA HILLS, CA 92653 PHONE: (562) 544-7394 LICENSE #: 1061794 APN: - EMAIL: - PHONE: - 0012/19/2022 Initial Design ATTACHMENT DETAIL ATTACHMENT DETAIL SCALE: NTS ATTACHMENT DETAIL (ENLARGED SECTION VIEW) SCALE: NTS IRONRIDGE XR10 RACKING SYSTEM 2"X6" TRUSSES @ 24" O.C. 5/16"x3" SS LAG BOLT WITH MIN 21 2" THREAD EMBEDMENT, SEALED PENETRATION INTO RAFTERS PV MODULE IRONRIDGE INTEGRATED GROUNDING END CLAMP 1/2" OSB SHEATHING IRONRIDGE FLASH FOOT2 ATTACHMENT (E)ASPHALT SHINGLES ROOF SEE (PV 3) FOR ENLARGED VIEW PV MODULES 2"X6" TRUSSE S @ 2 4 " O . C . (E)ASPHALT SHINGLES ROOF GENERAL STRUCTURAL NOTES: 1. THE SOLAR PANELS ARE TO BE MOUNTED TO THE ROOF FRAMING USING THE IRONRIDGE RAIL WITH FLASH FOOT-2 ATTACHMENT. THE MOUNTING FEET ARE TO BE SPACED AS SHOWN IN THE DETAILS, AND MUST BE STAGGERED TO ADJACENT FRAMING MEMBERS TO SPREAD OUT THE ADDITIONAL LOAD. 2. UNLESS NOTED OTHERWISE, MOUNTING ANCHORS SHALL BE 5/16" LAG SCREWS WITH A MINIMUM OF 2-1/2" PENETRATION INTO ROOF FRAMING. 3. THE PROPOSED PV SYSTEM ADDS 2.6 PSF TO THE ROOF FRAMING SYSTEM. 4. ROOF LIVE LOAD = 20 PSF TYPICAL, 0 PSF UNDER NEW PV SYSTEM. 5. GROUND SNOW LOAD = 0 PSF 6. WIND SPEED = 100 MPH 7. EXPOSURE CATEGORY = C 8. MAX SPACING BETWEEN ATTACHMENTS (INCHES) = 72" 1025 N Mirasol St 01/27/23 ELECTRICAL NOTES 1) ALL GROUNDING TO COMPLY WITH NEC 690.47. 2) ROOFTOP CONDUIT SHALL BE LOCATED MIN. 7/8" ABOVE ROOF SURFACE. 3) ALL TERMINALS SHALL BE MIN. 75°C RATED. SYSTEM SUMMARY STC (5.2 kW DC / 4.225 kW AC) STC DC: (13) 400W = 5.2 kW STC AC: (13) 325W = 4.225 kW ● (13) SOLARIA POWER X-400R (400W) MODULES MODULES ● (13) IQ8M-72-2-US (240V) MICROINVERTERS ● 1x BRANCH OF 7 CONNECTED IN PARALLEL ● 1x BRANCH OF 6 CONNECTED IN PARALLEL 1 1 2 G 2 1 1 2 G 7 MOD: SOLARIA POWER X-400R (400W) MODULES INV: IQ8M-72-2-US (240V) (240V) (1 BRANCH X 7 MICRO-INV) 1 1 2 G 2 1 1 2 G 6 MOD: SOLARIA POWER X-400R (400W) MODULES INV: IQ8M-72-2-US (240V) (240V) (1 BRANCH X 6 MICRO-INV) 1 2 1 2 G N JUNCTION BOX 600V, NEMA 3R UL LISTED G N 20A(N) 20A(N) IQ COMBINER PANEL WITH ENPHASE ENVOY XAM1-120 (OR EQUIV) TO UTILITY GRID M BI-DIRECTIONAL UTILITY METER UTILITY: SOUTHERN CALIFORNIA EDISON CO SERVICE: 240V 60HZ 1PH G N 200A(N) 30A(N) MAIN SERVICE PANEL (NEW, BOTTOM-FED) BUS RATING: 225A MAIN BREAKER: 200A (N) MS-01 MS-02 MCB-01 MCB-02 LC-01 AC wire details Wire Min Ampacity Live Neutral Ground Min EMT Min PVC Min RMC MS-01 11.81A (2)10 AWG PV 10 AWG PV 06 AWG BARE (NOT IN CONDUIT)- - - MS-02 10.13A (2)10 AWG PV 10 AWG PV 06 AWG BARE (NOT IN CONDUIT)- - - MCB-01 11.81A (2)10 AWG THWN-2 10 AWG THWN-2 10 AWG THWN-2 1/2 in 1/2 in 1/2 in MCB-02 10.13A (2)10 AWG THWN-2 10 AWG THWN-2 10 AWG THWN-2 1/2 in 1/2 in 1/2 in LC-01 21.94A (2)10 AWG THWN-2 10 AWG THWN-2 10 AWG THWN-2 1/2 in 1/2 in 1/2 in UTILITY FEED + TOTAL BACKFEED 200A + 25A = 225A LESS OR EQUAL TO BUS RATING x 120% 225A x 120% = 270A INTERCONNECTION 120% RULE (MAIN PANEL) CALCULATION ENSURES BUS IS SAFE REGARDLESS OF LOADS Isc(25°C) = 13.68A, Tisc = 0.048A/°C Isc(T) = Isc(25°C) + [Tisc x (T-25°C)] Isc(2°C) = 12.58A, Isc(31°C) = 13.97A Voc(25°C) = 37.30V, Tvoc = -0.280V/°C Voc(T) = Voc(25°C) + [Tvoc x (T-25°C)] Voc(2°C) = 43.74V, Voc(31°C) = 35.62V EXTREME CASE MODULE OUTPUT (SOLARIA POWER X-400R (400W) MODULES) EE TO CONSUMPTION CT CT CT REV SHEET NAME SHEET SIZE SHEET NUMBER ANSI B DATE DESCRIPTION REVISIONS PV-4 HOMEOWNER INFO 11" X 17" SIGNATURE & SEAL CONTRACTOR AD R I A N V E G A 1 0 2 5 M I R A S O L S T , S A N T A AN A , C A 9 2 7 0 1 , U S A NAME: SUNERGY, INC. ADDRESS: 23182 ALCALDE DR SUITE GLAGUNA HILLS, CA 92653 PHONE: (562) 544-7394 LICENSE #: 1061794 APN: - EMAIL: - PHONE: - 0012/19/2022 Initial Design ELECTRICAL THREE LINE DIAGRAM SCALE: NTS THREE LINE DIAGRAM 1025 N Mirasol St 01/27/23 SYSTEM SUMMARY STC (5.2 kW DC / 4.225 kW AC) STC DC: (13) 400W = 5.2 kW STC AC: (13) 325W = 4.225 kW ● (13) SOLARIA POWER X-400R (400W) MODULES MODULES ● (13) IQ8M-72-2-US (240V) MICROINVERTERS ● 1x BRANCH OF 7 CONNECTED IN PARALLEL ● 1x BRANCH OF 6 CONNECTED IN PARALLEL AC wire details WireID #Modules Nominal Voltage Backfeed *1.25 /cond. set Min OCPD Total Power Conductor sets ccConductors /conduit Expected max temp Adjusted ampacity (ampacity x temp derate x conduit fill derate) Conductor & neutral size EGC size (Cu) Conductor metal Max length V drop Min EMT size Min PVC size Min RMC size MS-01 7 240 V 11.81 A 20 A 2.3 kW 1 2 31 35 x 0.94 x 1.00 = 32.90 A 10 AWG PV 06 AWG BARE (NOT IN CONDUIT)Cu 50 ft 0.41 % - - - MS-02 6 240 V 10.13 A 20 A 1.9 kW 1 2 31 35 x 0.94 x 1.00 = 32.90 A 10 AWG PV 06 AWG BARE (NOT IN CONDUIT)Cu 50 ft 0.35 % - - - MCB-01 7 240 V 11.81 A 20 A 2.3 kW 1 2 31 35 x 0.94 x 1.00 = 32.90 A 10 AWG THWN-2 10 AWG THWN-2 Cu 50 ft 0.41 % 1/2 in 1/2 in 1/2 in MCB-02 6 240 V 10.13 A 20 A 1.9 kW 1 2 31 35 x 0.94 x 1.00 = 32.90 A 10 AWG THWN-2 10 AWG THWN-2 Cu 50 ft 0.35 % 1/2 in 1/2 in 1/2 in LC-01 13 240 V 21.94 A 25 A 4.2 kW 1 2 31 35 x 0.94 x 1.00 = 32.90 A 10 AWG THWN-2 10 AWG THWN-2 Cu 10 ft 0.15 % 1/2 in 1/2 in 1/2 in UTILITY FEED + TOTAL BACKFEED 200A + 25A = 225A LESS OR EQUAL TO BUS RATING x 120% 225A x 120% = 270A INTERCONNECTION 120% RULE (MAIN PANEL) CALCULATION ENSURES BUS IS SAFE REGARDLESS OF LOADS Isc(25°C) = 13.68A, Tisc = 0.048A/°C Isc(T) = Isc(25°C) + [Tisc x (T-25°C)] Isc(2°C) = 12.58A, Isc(31°C) = 13.97A Voc(25°C) = 37.30V, Tvoc = -0.280V/°C Voc(T) = Voc(25°C) + [Tvoc x (T-25°C)] Voc(2°C) = 43.74V, Voc(31°C) = 35.62V EXTREME CASE MODULE OUTPUT (SOLARIA POWER X-400R (400W) MODULES) ELECTRICAL NOTES 1) ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION. 2) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600V AND 90°C WET ENVIRONMENT. 3) WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. 4) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC 110.26. 5) DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, FITTINGS AND ACCESSORIES TO FULFILL APPLICABLE CODES AND STANDARDS. 6) WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. 7) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. 8) MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURER'S INSTRUCTION. 9) MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C.VIA WEEB LUG OR ILSCO GBL-4DBT LAY-IN LUG. 10) PV EQUIPMENT SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH NEC 690. 11) EXACT LOCATION OF AUXILIARY GROUNDING TO BE DETERMINED AT TIME OF INSTALL. 12) EXISTING WIRES MUST BE REPLACED IF SMALLER THAN LISTED MINIMUM SIZES PER NEC 310.15(B)(16). REV SHEET NAME SHEET SIZE SHEET NUMBER ANSI B DATE DESCRIPTION REVISIONS PV-5 HOMEOWNER INFO 11" X 17" SIGNATURE & SEAL CONTRACTOR AD R I A N V E G A 10 2 5 M I R A S O L S T , S A N T A AN A , C A 9 2 7 0 1 , U S A NAME: SUNERGY, INC. ADDRESS: 23182 ALCALDE DR SUITE GLAGUNA HILLS, CA 92653 PHONE: (562) 544-7394 LICENSE #: 1061794 APN: - EMAIL: - PHONE: - 0012/19/2022 Initial Design WIRING CALCULATION 1025 N Mirasol St 01/27/23 CAUTION: POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN NOTES AND SPECIFICATIONS: x SIGNS AND LABELS SHALL MEET THE REQUIREMENTS OF THE CEC 2016 ARTICLE 110.21(B), UNLESS SPECIFIC INSTRUCTIONS ARE REQUIRED BY SECTION 690, OR IF REQUESTED BY THE LOCAL AHJ. x SIGNS AND LABELS SHALL ADEQUATELY WARN OF HAZARDS USING EFFECTIVE WORDS, COLORS AND SYMBOLS. x LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR WIRING METHOD AND SHALL NOT BE HAND WRITTEN. x LABEL SHALL BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. x SIGNS AND LABELS SHALL COMPLY WITH ANSI Z535.4-2011, PRODUCT SAFETY SIGNS AND LABELS, UNLESS OTHERWISE SPECIFIED. x DO NOT COVER EXISTING MANUFACTURER LABELS. THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED ELECTRICAL SHOCK HAZARD WARNING ! LABEL LOCATION: INVERTER(S), DC DISCONNECTS. PER CODE(S): CEC 2016: 690.35(F), NEC 2014: 690.35(F), NEC 2011: 690.35(F) WARNING! SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM DUAL POWER SUPPLY LABEL LOCATION: UTILITY SERVICE METER AND MAIN SERVICE PANEL. PER CODE(S): NEC 2014: 705.12(D)(3), NEC 2011: 705.12(D)(4) ELECTRICAL SHOCK HAZARD WARNING LABEL LOCATION: INVERTER(S), ENPHASE ENVOY ENCLOSURE (IF APPLICABLE). PER CODE(S): CEC 2019: 690.15, NEC 2014: 690.5(C), NEC 2011: 690.5(C) ! ELECTRICAL SHOCK HAZARD WARNING ! LABEL LOCATION: INVERTER(S), AC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2019: 690.17(B), NEC 2014: 690.17(E), NEC 2011: 690.17(4) WARNING ! DO NOT RELOCATE THIS OVERCURRENT DEVICE LABEL LOCATION: ADJACENT TO PV BREAKER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B), NEC 2014: 705.12(D)(2)(3)(b), NEC 2011: 705.12(D)(7) ! DO NOT ADD LOADS PHOTOVOLTAIC SYSTEM COMBINER PANEL WARNING LABEL LOCATION: PHOTOVOLTAIC AC COMBINER (IF APPLICABLE). PER CODE(S): CEC 2016: 705.12(D)(2)(3)(c), NEC 2014: 705.12(D)(2)(3)(c), NEC 2011: 705.12(D)(4) LABEL LOCATION: INTERIOR AND EXTERIOR DC CONDUIT EVERY 1O FT, AT EACH TURN, ABOVE AND BELOW PENETRATIONS, ON EVERY JB/PULL BOX CONTAINING DC CIRCUITS. PER CODE(S): CEC 2019: 690.13, NEC 2014: 690.31(G)(3), 690.31(G)(4), NEC 2011: 690.31(E)(3), 690.31(E)(4), IFC 2012: 605.11.1.4 LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2019: 690.53, NEC 2014: 690.54, NEC 2011: 690.54 PHOTOVOLTAIC AC DISCONNECT PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN LABEL LOCATION: WEATHER RESISTANT MATERIAL, DURABLE PLAQUE, UL969 AS STANDARD TO WEATHER RATING (UL LISTING OF MARKINGS NOT REQUIRED), MIN 3 8" LETTER HEIGHT ARIAL OR SIMILAR FONT NON-BOLD, PLACED WITHIN THE MAIN SERVICE DISCONNECT, PLACED ON THE OUTSIDE OF THE COVER WHEN DISCONNECT IS OPERABLE WITH SERVICE PANEL CLOSED. (PER CODE: CEC690.12, 690.56(C)) OTHERWISE SPECIFIED. x D O NOT COVER EXISTIN G MANUFACTURER LABELS.SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS MS P UM LC REV SHEET NAME SHEET SIZE SHEET NUMBER ANSI B DATE DESCRIPTION REVISIONS PV-6 HOMEOWNER INFO 11" X 17" SIGNATURE & SEAL CONTRACTOR AD R I A N V E G A 10 2 5 M I R A S O L S T , S A N T A AN A , C A 9 2 7 0 1 , U S A NAME: SUNERGY, INC. ADDRESS: 23182 ALCALDE DR SUITE GLAGUNA HILLS, CA 92653 PHONE: (562) 544-7394 LICENSE #: 1061794 APN: - EMAIL: - PHONE: - 0012/19/2022 Initial Design PLACARDS PV ARRAY COMBINER PANEL UTILITY METER MAIN SERVICE PANEL10 2 5 M I R A S O L S T 1025 N Mirasol St 01/27/23 1025 N Mirasol St 01/27/23 EQUIPMENT SPECIFICATION REV SHEET NAME SHEET SIZE SHEET NUMBER ANSI B DATE DESCRIPTION REVISIONS PV-7 HOMEOWNER INFO 11" X 17" SIGNATURE & SEAL CONTRACTOR AD R I A N V E G A 1 0 2 5 M I R A S O L S T , S A N T A AN A , C A 9 2 7 0 1 , U S A NAME: SUNERGY, INC. ADDRESS: 23182 ALCALDE DR SUITE GLAGUNA HILLS, CA 92653 PHONE: (562) 544-7394 LICENSE #: 1061794 APN: - EMAIL: - PHONE: - 0012/19/2022 Initial Design 1025 N Mirasol St 01/27/23 REV SHEET NAME SHEET SIZE SHEET NUMBER ANSI B DATE DESCRIPTION REVISIONS PV-8 HOMEOWNER INFO 11" X 17" SIGNATURE & SEAL CONTRACTOR AD R I A N V E G A 1 0 2 5 M I R A S O L S T , S A N T A AN A , C A 9 2 7 0 1 , U S A NAME: SUNERGY, INC. ADDRESS: 23182 ALCALDE DR SUITE GLAGUNA HILLS, CA 92653 PHONE: (562) 544-7394 LICENSE #: 1061794 APN: - EMAIL: - PHONE: - 0012/19/2022 Initial Design EQUIPMENT SPECIFICATION 1025 N Mirasol St 01/27/23 REV SHEET NAME SHEET SIZE SHEET NUMBER ANSI B DATE DESCRIPTION REVISIONS PV-9 HOMEOWNER INFO 11" X 17" SIGNATURE & SEAL CONTRACTOR AD R I A N V E G A 1 0 2 5 M I R A S O L S T , S A N T A AN A , C A 9 2 7 0 1 , U S A NAME: SUNERGY, INC. ADDRESS: 23182 ALCALDE DR SUITE GLAGUNA HILLS, CA 92653 PHONE: (562) 544-7394 LICENSE #: 1061794 APN: - EMAIL: - PHONE: - 0012/19/2022 Initial Design EQUIPMENT SPECIFICATION 1025 N Mirasol St 01/27/23 REV SHEET NAME SHEET SIZE SHEET NUMBER ANSI B DATE DESCRIPTION REVISIONS PV-10 HOMEOWNER INFO 11" X 17" SIGNATURE & SEAL CONTRACTOR AD R I A N V E G A 1 0 2 5 M I R A S O L S T , S A N T A AN A , C A 9 2 7 0 1 , U S A NAME: SUNERGY, INC. ADDRESS: 23182 ALCALDE DR SUITE GLAGUNA HILLS, CA 92653 PHONE: (562) 544-7394 LICENSE #: 1061794 APN: - EMAIL: - PHONE: - 0012/19/2022 Initial Design EQUIPMENT SPECIFICATION 1025 N Mirasol St 01/27/23 REV SHEET NAME SHEET SIZE SHEET NUMBER ANSI B DATE DESCRIPTION REVISIONS PV-11 HOMEOWNER INFO 11" X 17" SIGNATURE & SEAL CONTRACTOR AD R I A N V E G A 1 0 2 5 M I R A S O L S T , S A N T A AN A , C A 9 2 7 0 1 , U S A NAME: SUNERGY, INC. ADDRESS: 23182 ALCALDE DR SUITE GLAGUNA HILLS, CA 92653 PHONE: (562) 544-7394 LICENSE #: 1061794 APN: - EMAIL: - PHONE: - 0012/19/2022 Initial Design EQUIPMENT SPECIFICATION 1025 N Mirasol St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irasol St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`ab[a`cde\fg\hijklm``cnoiap[gpqZnr[\s tuvwxyzzy{v|}x~|€vx|€yx‚€xƒ„xz~…vvxz||†uvz‡vzxˆ‰Šxu‰‹| ŒŽ‘’“””•–—˜™š›”“œœ›œ‘”—‘”“žŸ‘ —š“–—˜™’“’¡œ¢Ÿ£’’“œ“£’Ÿ“œ‘–“‘œ’¤¥¦§¨ @JJIGHIJEKLMDJHO P 78'&#""V (&/,+(&0(&R©'ª-"$,"'&" 3+(&0(&$%'" #/3$&%+3&-«S ¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬ ¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬ ­®¯°±²³´µ¶·¸°µ¹º»·»¼½°¾¿²À»»·®°¾¾°°®²·¾³¸·³¾»ÁÂÃÄů°Æ À»ÇÈɵDz°Ê¾É±²ºÇ·»±»·¸ËÌÍ W7Î"'&#""!%5%' (+#""!-"5# (ωŠxu‰‹| ­®¯°±²³´µ¶·¸°µ¹º»·»¼½°¾¿²À»»·®°¾¾°°®²·¾³¸·³¾»ÁÂÃÄÍ T 71#"5*$&"*% *&/,"!0%&#,#""V (#""!, &#%&" 'R7(7Ð%' (3-%)+9S7¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬ ÑJCHMDHÒÓÔÕMAKGHIJEKLMDJHO P 78'&$") & ('&#)-&)#%  ( #*,#"*)-&*'( *&"$") &12$"*)+'0& "$"#&% % P Ö×(%, 4 %&&$"*)+!#%$'ωŠxu‰‹| ­®¯°±¹¾°È¶¼»¼»·Ç¶º²°®²·¾³¸·³¾ÇºÇ··Ç¸Àµ»Ê·¸»¾·¶Ø»¼´ÉǼ»²¶Ùʹ¾°®»²²¶°ÊÇºÍ W7?"#$% )!%-&)#*$") & ('/'&$'3V++")& !"#$%&" " &$") & ('/'&$4+"0Ú %7Û") & (Q/'&$Û% )!%-&)##¬¬¬¬¬¬¬¬¬¬¬1#"*)-&Ü%$% *Û"*+ݬ¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬ 47"&%+Þ(&"!12Û"*)+'% *ß%+'¬¬¬¬¬¬¬¬¬¬¬+4' -7"&%+Ü )$4#"!à&&%-$ &1" &'¬¬¬¬¬¬¬¬¬¬¬¬ *7Þ(&,#à&&%-$ &1" &R4á -S ¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬+4'R!(#%&#&% â:+4'3'ÞãQP S 7Û%6$)$Q,%- (ä&0 à&&%-$ &1" &'" %ß%+¬¬¬¬¬¬¬¬¬¬¬¬¬¬ -'R',#"*)-&$% )%+!"# $%6$)$',%- (%++"0*4%'*" $%6$)$*'( 0 *',*S !7"&%+Q)#!%-à#%"!12Û"*)+'R'Y)%#!&S¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬!&W (7Î'&#4)&*Þ(&"!12Û"*)+" ß""!R4á !S¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬+4'å!&W ­®¼¶²·¾¶´³·»¼½»¶ÙÀ·°®·À»æç²É²·»µ¶²Ù¾»Ç·»¾·ÀÇÊ躴²é®· ê ±²»»ÁÂÃÄë Z[\]ì _íd\b[`gbcde\fg\hijklZnr[\sîïcdbadc[giprji`íd\b[`gbcdðgcq`csñ t€|zxz†|zyòóu{uvx~v|}x‡|€u…xzx†|zy€xô„x…vx„xz~…v„z|‡xuuƒvwx†|õõ|ö…€÷~uvy„„õ{ø P 712$"*)+'3)&+&/= &#%-&5 5#&#'3% *-"$4 #4"6'%#* &V*!"#)' 12'/'&$'7 W712%##%/'-"$,"'*"!â'#''&# ('"#+'',# 5#&#7 T 7&"&%+ 5#&#-%,%-&/%'%-" & )")'%-,"0#")&,)&P T3ââ;Þ%&&'"#+'' â7%- &#-" -&" ," &'" &+"%*'*"!'#5-*'-" -& ($% 'Rù0;7ùâRäSS7 :71 "!&'&% *%#*+-&#-%+*%(#%$'RXP 7P 3XP 7P %3XP 7P 43"#XP 7P -S-% 4)'*&"%--)#%&+/#,#' &&12 '/'&$78 &#%-&51Î?*%(#%$'%#%5%+%4+2355567892 2 768  336 ¶ºº°³··À»²·ÇʼǾ¼»º»¸·¾¶¸Çº¼¶Çپǵ¸°µ¹º»·»ºÉÍ Ù³¶¼»·°·À»»º»¸·¾¶¸Çº¼¶Çپǵ¶²¹¾°È¶¼»¼·°À»º¹·À»ǹ¹º¶¸ÇÊ· ³Ê¼»¾²·Çʼ»Ç¸À´ºÇÊ¿·°غº¶ÊÍ ­®·À»»º»¸·¾¶¸Çº²É²·»µ¶²µ°¾»¸°µ¹º»·ÀÇÊ·À»²·ÇʼǾ¼»º»¸·¾¶¸Çº¼¶Çپǵ¸ÇÊ»®®»¸·¶È»ºÉ ¸°µµ³Ê¶¸Ç·»±¹¾°È¶¼»ÇÊǺ·»¾ÊÇ·¶È»¼¶Çپǵ½¶·Àǹ¹¾°¹¾¶Ç·»¼»·Ç¶ºÍ      !"#$%&'() *+, )- ), .) )./ )01 Flashings with M1 by Chemlink 1025 N Mirasol St 01/27/23 012345634839 5689 3 9863  5 9 396395638  !" #$% &''$(( ')*$+ ,-.. '/$'0(1.  23456!$..$7-8$ 1 7-# (%& 9::;333;< =< = 1-$).  >1# ..;1! .$%1-?.$;)* ($)@1A($#( 1-$" #$+B $ 'B $C#$D$ 1-$&''$((+< =E1FA(-'$1G%H  %& 1A($#&1-I$+4G:JK1. & A LMNO PLQRST UVWST XOY LQZ[O S\L U]^_` LaOO\ Ub]cdef` Qg_hi_jef` klmn o pqrstunvwx yzqqr 1025 N Mirasol St 01/27/23 012345634839 5689 3 9863  5 9 3963903 695 59  !"# !$"%&' ())!&**")+,&- .&/01&2 ")"!)34&# !1#"451"6!"% 7!81#!/9:&! &!+;2<* &%* 21 &$"%&- 21 &())!&**- 2<* &%(21=&- >?@A B>CDEF GHIEF JAK ALMLN >COPA EQ> GNRST >UAAQ GVNWXYZT C[S\]S^YZT 532_9+`9.$._.$5a`._`b+3 a23/c!+;d9_3 e33ef(00`g(`(++0b 3f`3_9._(h03092`35di9$;j `gd$/c!fggd/c!_gd/c e33ef(00`g(`(++0b $.5e39klmnjop2b2`38 `gd$/c!fggd/c!_gd/c e33ef(00`g(`(++0b QOI L q r s t CFEGu?QOEGCFEGuCQFJ>CUAGuPA .$5j e(ae3 8ke 8ke $a8h3_.k .$5a`._2 8ke"v4& 8ke"v4& .$5a9` `b+3 $i( $i( $i( 2(83 2(83 .$5a9` 29w3 $i( $i( $i( 2(83 2(83 532_9+`9.$ +;5!(8.5a03 5i(9$;3_`3_x89_.y z/h.fx9ka235y +;(__(b (.8hj+($30x9ka235y e3$83`3_x9ka235y (592.$$3`x9ka235y 23_;93+($30 QOI L q r s t {|} +(_`$a8h3_ $.`32 k._a$a2358.5a032 +a`~$i(1h0($€(h.;3  ‚ ƒ‚ A„u?…DAEQ>CUAGuPA ƒ ††††† 89_./9$;3_`3_2 9$h_($g/ 9_a9` DFG ‡‡‡‡5 ( DFG ‡‡‡‡5 ( DFG ‡‡‡‡5 ( DFG ‡‡‡‡5 ( DFG ‡‡‡‡5 ( DFG ‡‡‡‡5 ( ˆ‰YFŠ ‹ OCG?>CF D ha9059$e e_.a$59$e 303`_.53I D uQ?P?QŒ >AJK?CA DO?E>AJK?CA…OEAP DO?E FC…G ?EKAJQAJ FC…G  Ž   ‹  I 233ea953(++3$59f5k._ 9$k._8(`9.$.$8.5a03($5 (__(be_.a$59$e OCCFDY?EAJ …OEAP I †††† 89_./9$;3_`3_2 9$h_($g/ 9_a9` ‘’“”•–”—’˜™•š›œž Ÿ ¡¢”£™¤¥¦§ Ÿ ¡¢”£™¨’©ª– ™• «¬­ «¬­ «™˜®­ ¯  ° ¯  ± ¯ ¯  œ Ÿ§² °¬œ ³™´” ¯  œµ®®¶ ¯ ¯ ®¶§–•”£’“ ¯  ® Ÿ§² °¬œ ¯  ¯ 1025 N Mirasol St 01/27/23 012345634839 5689 3 9863    !! "#$ !%&'()*  +,), -).%*).,'"#!"/*0!! *)$ *) !!$ *0!*)1$ 2345 62789: ;<=9: >5? 5@ABC 27DE5 9F2 ;CGHI 2J55F ;KCLMNOI 7PHQRHSNOI TU"&V+W'"&XYZWW+Y[XT"\ TU"&V+W'"&XY/&(Y]+[/T"\ &"+'XWZXY/&(Y]+[/&\ *^&WY'XWZXYZWW+Y[X*\ TU*+WX+*_Z*+[&"-\ TUXTZT"&V+W["TU\ TU/&(Y]+[Y`"abb/-\ /&Y+T"&+__[/cdc\ X_&+__*Z""(X+-XW(+ZXY* 8:;eE58Df5 8:;eE58:;5E g?8:;eE5>DF39=2h2F7i=jkSH2HQGklMmn TU-/&(YWYX] TU"&V+Wopb &TX(/&(Y]+ TUZWW+Y TU&"-WYX] 39?5>F5>8Df5 39?5>F5>8:;5E 39?5>F5>>DF39=2i=jkSH2HQGklMqn r \X_ZYX(XY`W+sZXW+*/X*Xt(+'tW+u*VXY^-&+*Y^X**VXY^T++YY^+ W+sZXW+T+Yv`+* & c w\X_]++WYX&T+Y+WW+sZXW+--&+*Y^X*T+Y+W*&u+YT++YY^+ W+sZXW+T+Yv`+* & c x\*Xy+"^&Y&/&(YX"&V+W*&ZW+[-\&-ZY&W*t*+-&TU ZWW+Y&+azb{|x*X]&W&"-WYX]Y-X*&+Y p\*Xy+X/+WY+W&ZY"ZYXWZXY[\&-ZY&W*&W-X]Y&X/+WY+W &"-T"+W+WYX]{[*]}) *)z\ |\Y&Y(&_~~~~~~X/+WY+W&ZY"ZYXWZXY&"-[!\&+_&W+^TXW&' X/+WY+WXWZXY{-&+*Y&Y(*Z""(`tW+u+W*&T"(`VXY^r wbdtZ*tW +U+"YX&Xazb{ap[t\[w\[\v`+* & &Y+*_&WX/+WY+WXWZXY*[]}) *) z\$ r {\(&V+*Y+U"+YTtX+YY+T"+WYZW+t*+-&*^W+TXXTZTT+ +UYW+T+-W`tZ(tY+T"+WYZW+_&W*^W+(&YX&T&*Y*XTX(WY& X*Y((YX&(&YX&{(&V+*Y+U"+Y+-TtX+YY+T"~~~~ w{\^X]^+*Y&YXZ&Z*TtX+YY+T"+WYZW+t*+-&*^W+^X]^+*Y T&Y^wd-W`tZ(tY+T"+WYZW+_&W*^W+(&YX&T&*Y*XTX(WY& X*Y((YX&(&YX&{^X]^+*Y&YXZ&Z*Y+T"+WYZW+~~~~ w{\wbbz*^W+_Z-T+Y(*wd-+*X]Y+T"+WYZW+*-&&Y+U++- p€XY^+ZXY+-*YY+*["(T*"WX]*X*pp{r \{_&W(+**Y^z ZWW+Y'WW`X]&-ZY&W*XW&&_'T&ZY+-*Z(XY&-ZXYY (+*Yb{|t&/+W&&_-Z*X]Y^+&ZY-&&W-+*X]Y+T"+WYZW+&_ p€&W(+**[((&_ZXY+-*YY+*\ \r wV]zb&-ZY&W*W+]++W((`+"Yt(+_&WT&-Z(+* VXY^X!&_€{aT"*&W(+**V^+"W&Y+Y+-t`r w'T"&W*T((+W _Z*+{ ‚\r bV]zb&-ZY&W*W+]++W((`+"Yt(+_&WT&-Z(+* VXY^X!&_z{aT"*&W(+**V^+"W&Y+Y+-t`r |'T"&W*T((+W _Z*+{ &Y+*_&WWW`XWZXYVXWX][]}) *)a  ƒƒ )„+\$ &"-…&/+WZWW+Y"W&Y+YX&-+/X+ YX&(+(+YWX(&-+† W+_+W++* *^&V*‡ˆ‰Š‹‹‹Œ ‹‹ &Y+*_&W((-WVX]*$ 23=92Ž255=e3;5257F3:9 23=96:>;7;327:9957F 23=96:>39?5>F5>:7g;D9;D7 ;327:9957Fi36e25;n !).!!0!)azb{|r  )."/ },‘!   )%) D7:eFgeF7e>>59F 9:839DED7?:EFD=5 *&(W"/*`*Y+T "&XY&_&+YX& Y^X*"+(_+-t`TZ(YX"(+ *&ZW+*[ZYX(XY`-*&(W\ ’ 63  9“5 9 ”•–—396390˜3 695 ™˜š5™›9™ œžŸ ¡Ÿ ¢£¤ ¥¦§¨¨©ª «¬­ ®ª®¯¬® ª ®¬°± «²§¨¨ ª ¨¨¨ ¦¨¬«± ³´µ¶Ÿ·¤ ¸¹±º °¨®«² «§¨ ª ¬®² «¨ ®¨«§¨ ² »» §® ª » ¼¤½Ÿª ¨«²º¡ Ÿ·ž §¬««² 1025 N Mirasol St 01/27/23 ®1234256®78®9 9 ® ® 523®2® ® 97®52®® ®232® 328® ®9 ® ®®25® 5!® ®"® 523®28®2®#35®$®%®2&'®5$53(®)5)568®24%5*®43568®"3(®®4&!®$5® ®2®)5!®3®525®®%®25®3223®2®45®)5)56® ®+%23,®648® ® 523®2® ®-./ . / ® DocuSign Envelope ID: BA69A245-B047-4A16-8D07-299DCAC73D34 1025 N Mirasol St 01/27/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 1025 Mirasol St. Sunergy, Inc 1061794 X X X X X X X X X X Chris Hammerstone 562-544-7394 chammerstone@sunergycorp.com 12/21/22 1025 N Mirasol St 01/27/23