Loading...
HomeMy WebLinkAbout1323 E St Gertrude Unit #B - PlanDigitally sealed by RJM on 1/27/23 23-01219 1/27/23 Job Number: 9240 Limonite Ave, Jurupa Valley, CA 92509 Email: se@mcpherson.engineering Mobile: (909) 569-2244 Structural Analysis Report For Photovoltaic System Addition to Existing Structure At The CENDOYA WAREHOUSE 323 E. ST. GERTRUDE PL, SUITEB SANTA ANA, CA 92705 Designed in Accordance with CBC 2022, ASCE 7-16, NDS 2018 Date: E.O.R.: Ryan McPherson, P.E. 01/30/2023 © McPherson Engineering 1 of 6 1323 E St Gertrude Unit B - 101115120 & 2017966710/12/2023 McPherson Engineering By:F.A. Date:1/27/23 Project Info 3 Gravity Loads 4 Lateral Loads 5 Summary 7 Table Of Contents 01/30/2023 © McPherson Engineering 2 of 6 1323 E St Gertrude Unit B - 101115120 & 2017966710/12/2023 McPherson Engineering By:F.A. Date:1/27/23 Location: 323 E. ST. GERTRUDE PL, SUITEB SANTA ANA, CA 92705 Existing Structure Info: Number of Stories =1 Aroof =9000 sq. ft.Roof Square Footage A3rd_flr =0 sq. ft.Third Floor Square Footage (if applicable) A2nd_flr =0 sq. ft.Second Floor Square Footage (if applicable) Site Properties: Lattitude = Longitude = Ss = 1.273 S1 = 0.456 Exposure Category =B Wind Speed =100 m.p.h. P.V. Array Info: Model =JKM395M-72HL-V Height of Panel =79.06 in. Width of Panel =39.45 in. Area of Panel = 21.7 ft.2 Number of Panels =97 Area of Panel w/ Racking = 27.70 ft.2 (max area, not including outside edges) Total Area of Array =2569 ft.2 (max total area of entire PV system) Panel Tilt =10.00 deg Block Weight =32 lbs Max. Blocks per bay =2 Max. Dead Load per bay =124 lbs. Array distributed weight =4.06 p.s.f.(maximum total distributed load of ballast, racking, and modules) Total System Weight =10422 lbs weight of entire pv system including racking Project Info 33.720553 -117.852680 01/30/2023 © McPherson Engineering 3 of 6 1323 E St Gertrude Unit B - 101115120 & 2017966710/12/2023 McPherson Engineering By:F.A. Date:1/27/23 Existing Loads: Roof Design Loads: Roofing = 4.0 p.s.f.Composition roofing Sheathing =1.5 p.s.f.5/8" Plywood Framing =1.5 p.s.f.Roof Trusses/Purlins Misc =3.0 p.s.f.(includes mechanical) DLr1 =10.0 p.s.f.Roofing Dead Load Ceiling =3.0 p.s.f. DLr2 =13.0 p.s.f.Total Existing Roof Dead Load LLr = 20.0 p.s.f.Roof Live Load (Per C.B.C 2016, Table 1607.1) Wall Design Loads: DLwall =15.0 p.s.f.dead load of wood framed exterior wall hwall =10.0 ft.height of walls Lwall =379.5 ft.total length of walls Wwall =56.9 kips Proposed Loads: Panels =4.1 p.s.f.weight of panels, rack system, and ballast weight DLr1_proposed =17.1 p.s.f.Proposed Roof Dead Load LLr_proposed = 0.0 p.s.f. Check Proposed Gravity Loads: Total Existing Roof Load Wex = (DLr1 + LLr) (Aroof) =297.0 kips Total Proposed Roof Load Wprop = (DLr1 + LLr) (Aroof - Aarray) + (DLr1_proposed + LLr_proposed) (Aarray) =256.1 kips Proposed Load Demand Gravity Loads Wprop - Wex =-13.79%Wex TOTAL DECREASE IN GRAVITY LOADS, PANELS OK! Roof Live Load (panels cannot support live loads, including the weight of stacked materials or workers) half of the total weight of walls (tributary to seismic loading on roof diaphragm) 01/30/2023 © McPherson Engineering 4 of 6 1323 E St Gertrude Unit B - 101115120 & 2017966710/12/2023 McPherson Engineering By:F.A. Date:1/27/23 Seismic Design Parameters Risk Category =2 Per Table 1-5-1 R =6.5 Response Modification Factor (Table 12-2.1) Site Class = D Per 11.4.2 Ie =1 Seismic Importance Factor (Table 1.5-2) Ss =1.27 Short Period P.G.A. S1 =0.46 1-Sec Period P.G.A. S.D.C. = D Seismic Design Category Per 11.6 Fa =1.200 Site Coefficient per Table 11.4-1 Fv =1.700 Site Coefficient per Table 11.4-2 SMS = SDS Fa =1.53 Short Period M.C.E. Per Eq. 11.4-1 SM1 = SD1 Fv =0.78 1-Sec Period M.C.E. Per Eq. 11.4-2 SDS = 2/3 (SMS) =1.02 Short Period Design Parameter Per Eq 11.4-3 SD1 = 2/3 (SM1) =0.52 1-Sec Period Design Parameter Per Eq 11.4-4 Approximate Fundamental Period (Per 12.8.2.1) per Eq. 12.8-7 hn = 30 ft Ct =0.02 (per table 12.8-2) x = 0.75 (per table 12.8-2) T =0.26 sec Approximate Fundamental Period TL =8 sec Long-Period Transition Period per Figure 22-12 Seismic Response Coefficient (Per 12.8.1.1) CS = (SDS Ie)/R = 0.16 Seismic Response Coefficient Per Eq. 12.8-2 Cs1 = (SD1 Ie)/R T = 0.31 Max. Seismic Response Coefficient Per Eq. 12.8-3 if T ≤ TL Cs2 =0.01 Min. Seismic Response Coefficient Per Eq. 12.8-5 Cs2 = 0.044 SDS Ie =0.04 Min. Seismic Response Coefficient Per Eq. 12.8-5 Cs3 = 0.5 S1 Ie/R =0.04 Min. Seismic Response Coefficient Per Eq. 12.8-6 if S 1 ≥ 0.6g CS =0.16 Design Seismic Coefficient Check Additional Base Shear Wexisting =173.9 kips Weight of Existing Roof and Half of Wall Weight Wpanels =10.4 kips Weight of Proposed PV System Vexisting = Cs Wexisting =27.2 kips Base Shear of Existing Structure Vpanels = Cs Wpanels =1.6 kips Base Shear of Proposed Panels Vpanels Vexisting Lateral Loads T = Ct (hn)x = 5.99% < 10%PER C.B.C. 502.5 EXCEPTION, STRUCTURE DOES NOT REQUIRE SEISMIC RETROFIT, PANELS OK! 01/30/2023 © McPherson Engineering 5 of 6 1323 E St Gertrude Unit B - 101115120 & 2017966710/12/2023 McPherson Engineering By:F.A. Date:1/27/23 Gravity Loads: DEMAND DECREASED BY 13.79% = OK! Lateral Loads: DEMAND INCREASED BY 5.99% < 10% = OK! Anchorage: TOTAL PV SYSTEM WEIGHT NOT TO EXCEED 10422 LBS TOTAL DISTRIBUTED WEIGHT NOT TO EXCEED 4.06 PSF MAX. CONCENTRATED LOAD NOT TO EXCEED 124 LBS OFFSET LIVE LOAD IS 434LBS, CONCENTRATED LOAD ANALYSIS IS OK BY INSPECTION! BALLAST MOUNT AND ANCHORAGE SYSTEM DESIGN BY UNIRAC/PZSE IN ACCORDANCE W/ ASCE 7-16 Summary 01/30/2023 © McPherson Engineering 6 of 6 1323 E St Gertrude Unit B - 101115120 & 2017966710/12/2023 COVER PAGE AUTHORITIES HAVING JURISDICTION BUILDING : CITY OF SANTA ANA UTILITY : SCE NEW PHOTOVOLTAIC SYSTEM 37.92 KW DC 1323 E. ST. GERTRUDE PL, SUITE B SANTA ANA, CA 92705, USA GENERAL NOTES VICINITY MAP SATELLITE VIEW SHEET INDEX 1.1.1 PROJECT NOTES: 1.1.2 THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE CALIFORNIA ELECTRIC CODE (CEC) ARTICLE 690, ALL MANUFACTURERS’S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. 1.1.3 THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION 1.1.4 GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS IN ACCORDANCE WITH CEC 690.41(B) 1.1.5 ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC 690.4: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY 1.1.6 MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO CEC 690.7. 1.1.7 ALL INVERTERS, PHOTOVOLTAIC MODULES,PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING [CEC 110.3]. 1.1.8 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE CEC AND AHJ. 1.2.1 SCOPE OF WORK: 1.2.2 PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT ATTACHMENT TYPE: UNIRAC RM 5 RACKING MSP UPGRADE: NO PROJECT INFORMATION PROJECT NAME: CENDOYA WAREHOUSE BLDG SCOPE OF WORK SYSTEM SIZE : STC : 96 X 395W= 37.92 kW DC PTC : 96 X 363.2W = 34.87 kW DC AC SIZE: 33 kW AC (96) JINKO SOLAR JKM395M-72HL-TV MODULES (1) SMA SUNNY TRIPOWER CORE1 STP50-US-41 INVERTER (96) SMA JMS - F RAPID SHUTDOWN DEVICE DESIGN SPECIFICATION OCCUPANCY: - GROUP B CONSTRUCTION: - TYPE V-B ZONING: - CITY OF SANTA ANA GROUND SNOW LOAD - 0 PSF WIND EXPOSURE - B WIND SPEED - 100 MPH RISK CATEGORY -II APPLICABLE CODES & STANDARDS BUILDING: CBC 2022, CRC 2022, CMC 2022 ELECTRICAL: CEC 2022, CEBC 2022 FIRE: CFC 2022 RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK T-001 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N CONTRACTOR INFORMATION: CONTRACTOR NAME: TURNKEY SOLAR PROJECT MANAGER: LIZ BATZ EMAIL: LIZ@TURNKEYENERGY.COM PH: (559) 321-8130 1.3.1 WORK INCLUDES: 1.3.2 PV RACKING SYSTEM INSTALLATION - UNIRAC RM 5 RACKING 1.3.3 PV MODULE AND INVERTER INSTALLATION - JINKO SOLAR JKM395M-72HL-TVMODULE / SMA SUNNY TRIPOWER CORE1 STP50-US-41INVERTER/SMA JMS - F RAPID SHUTDOWN DEVICE 1.3.4 PV EQUIPMENT ROOF MOUNT 1.3.5 PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX 1.3.6 PV LOAD CENTERS (IF INCLUDED) 1.3.7 PV METERING/MONITORING (IF INCLUDED) 1.3.8 PV DISCONNECTS 1.3.9 PV GROUNDING ELECTRODE & BONDING TO (E) GEC 1.3.10 PV FINAL COMMISSIONING 1.3.11 (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV 1.3.12 SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE COVER PAGET-001 G-001 A-101 SITE PLAN RESOURCE DOCUMENTS ELECTRICAL PLAN ELECTRICAL CALCULATIONS A-102 E-602 R-001 - R-005 NOTES PLACARDE-604 WARNING LABELSE-603 LINE DIAGRAME-601 ATTACHMENT PLANA-103 STRUCTURAL PLANA-104 APN: 014-331-23 B.0 B.0 Bldg# 101115120 Issued 10/11/23 Elec# 20179667 Issued 10/12/23 Approvals: BLDG: JLo ELEC: MSmith PLNG: CSantana 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 NOTES RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK G-001 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N NOTES 1. EXISTING PLUMBING VENTS, SKYLIGHTS,EXHAUST OUTLETS, VENTILATION INTAKE AIR OPENINGS SHALL NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC SYSTEM. 2. EQUIPMENT. INVERTERS, MOTOR GENERATORS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AC PHOTOVOLTAIC MODULES, SOURCE-CIRCUIT COMBINERS, AND CHARGE CONTROLLERS INTENDED FOR USE IN PHOTOVOLTAIC POWER SYSTEMS SHALL BE IDENTIFIED AND LISTED FOR THE APPLICATION. (CEC 690.4(B)) 3. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND NON ROOF SWITCHES. ROOF SWITCHES TO BE NEMA 4 RATED. 4. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AND BONDED IN ACCORDANCE WITH NEC ARTICLE 250. 5.PROTECTION DEVICES FOR PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS ALSO CONNECTED TO SOURCES HAVING SIGNIFICANTLY HIGHER CURRENT AVAILABILITY (E.G., PARALLEL STRINGS OF MODULES, UTILITY POWER), SHALL BE PROTECTED AT THE SOURCE FROM OVERCURRENT. [ CEC 690.9(A)] 6.PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION THAT CONTROLS SPECIFIC CONDUCTORS. [ CEC 690.12] 7.THE UTILITY INTERACTIVE INVERTERS SHALL AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THE SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED. [CEC 705.41] 8.ALL CONDUCTOR EXPOSED TO WEATHER SHALL BE LISTED & IDENTIFIED FOR USE IN DIRECT SUNLIGHT. [ CEC 310.10(D)(1)] 9.THE MODULE CONDUCTORS MUST BE TYPE USE-2 OR LISTED FOR PHOTOVOLTAIC (PV) WIRE. ( CEC 690.31(C) 10.ALL CONDUCTORS SHALL BE MARKED ON EACH END FOR UNIQUE IDENTIFICATION. 11.AN INSULATED GROUNDED CONDUCTOR OF 6 AWG OR SMALLER SHALL BE IDENTIFIED AS A CONTINUOUS WHITE FINISH.[ CEC 200.6] 12.THE OUTPUT OF AN INTERCONNECTED ELECTRICAL POWER SOURCE SHALL BE PERMITTED TO BE CONNECTED TO THE LOAD SIDE. INTERCONNECTING PROVISIONS FOR OTHER POWER SOURCES SHALL COMPLY WITH 705.12(B)(1) THROUGH 705.12(B)(5) 13. EACH SOURCE INTERCONNECTION OF ONE OR MORE POWER SOURCES INSTALLED IN ONE SYSTEM SHALL BE MADE AT A DEDICATED CIRCUIT BREAKER OR FUSIBLE DISCONNECTING MEANS [ CEC 705.12(B)(1)] 14.THE SUM OF THE AMPERE RATING OF THE OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO THE BUSBAR OR CONDUCTOR SHALL NOT EXCEED 120% OF THE RATING OF BUSBAR OR CONDUCTOR.[CEC 705.12(B)(2)(3)(B)] 15.A CONNECTION AT EITHER END, BUT NOT BOTH ENDS, OF A CENTER-FED PANEL BOARD IN DWELLINGS SHALL BE PERMITTED WHERE THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR DOES NOT EXCEED 120 PERCENT OF THE CURRENT RATING OF THE BUSBAR. [CEC 705.12(B)(2)(3)(D)] 16.EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUS BAR OR CONDUCTOR SHALL BE MARKED TO INDICATE THE PRESENCE OF ALL SOURCES. [ CEC 705.12(B)(3)] 17.CIRCUIT BREAKER, IF BACKFED, SHALLBE SUITABLE FOR SUCH OPERATION. [ CEC 705.12(B)(4)] 18.TO MINIMIZE OVERHEATING OF THE BUSBAR IN PANELBOARD, THE PANELBOARD MAIN CIRCUIT BREAKER AND THE PV POWER SOURCE CIRCUIT BREAKER SHALL BE PHYSICALLY LOCATED AT THE OPPOSITE END OF THE BUSBAR. 19. ALL THE NEC REQUIRED WARNING SIGNS, MARKINGS, AND LABELS SHALL BE POSTED ON EQUIPMENT AND DISCONNECTS PRIOR TO ANY INSPECTIONS TO BE PERFORMED BY THE BUILDING DEPARTMENT INSPECTOR. 20.WHERE PV SYSTEM DC CIRCUIT'S RUN INSIDE A BUILDING, THEY SHALL BE CONTAINED IN METAL RACEWAYS TYPE MC METAL CLAD CABLE OR METAL ENCLOSURES FROM POINT OF PENETRATION OF THE SURFACE OF THE BUILDING TO THE FIRST READILY ACCESSIBLE DISCONNECTING MEANS. [ CEC 690.31(G)] 21.FLEXIBLE, FINE-STRANDED CABLES SHALL BE TERMINATED ONLY WITH TERMINALS, LUGS, DEVICES OR CONNECTOR THAT ARE IS IN ACCORDANCE WITH CEC 110.14 22.CONNECTORS SHALL BE OF LATCHING OR LOCKING TYPE. CONNECTORS THAT ARE READILY ACCESSIBLE AND OPERATING AT OVER 30V DC OR 15V AC SHALL REQUIRE TOOL TO OPEN AND MARKED "DO NOT DISCONNECT UNDER LOAD" OR "NOT FOR CURRENT INTERRUPTING".[CEC 690.33(C) & (E)(2)] 23. EQUIPMENT GROUNDING CONDUCTOR FOR PV MODULES SMALLER THAN 6AWG SHALL BE PROTECTED FROM PHYSICAL DAMAGE BY A RACEWAY OR CABLE ARMOR.[CEC 690.46 & 250.120(C)] 24. AN EQUIPMENT GROUNDING CONDUCTOR SHALL NOT BE SMALLER THAN 14 AWG. [ CEC 690.45] 25. FINE STRANDED CABLES USED FOR BATTERY TERMINALS, DEVICES, AND CONNECTIONS REQUIRE LUGS AND TERMINALS IS IN ACCORDANCE WITH NEC 110.14 26.GROUNDING ELECTRODE CONDUCTOR(S) SHALL BE INSTALLED IN ONE CONTINUOUS LENGTH WITHOUT A SPLICE OR JOINT. IF NECESSARY,SPLICES OR CONNECTIONS SHALL BE MADE AS PERMITTED. (CEC 250.64 C) 27.ALL SMOKE ALARMS, CARBON MONOXIDE ALARMS AND AUDIBLE NOTIFICATION DEVICES SHALL BE LISTED AND LABELED IN ACCORDANCE WITH UL 217 AND UL 2034. THEY WILL BE INSTALLED IN ACCORDANCE WITH NFPA 72 AND NFPA 720.(CRC 2022 R314 & R315). 28.SMOKE ALARMS AND CARBON MONOXIDE ALARMS WILL BE RETROFITTED INTO THE EXISTING DWELLING. THESE SMOKE ALARMS ARE REQUIRED TO BE IN ALL BEDROOMS,OUTSIDE EACH BEDROOM, AND AT LEAST ONE ON EACH FLOOR OF THE HOUSE CARBON MONOXIDE ALARMS ARE REQUIRED TO BE RETROFITTED OUTSIDE EACH BEDROOM AND AT LEAST ONE ON EACH FLOOR OF THE HOUSE.THESE ALARMS MAY BE SOLELY BATTERY OPERATED IF THE PHOTOVOLTAIC PROJECT DOES NOT INVOLVE THE REMOVAL OF INTERIOR WALL AND CEILING FINISHES INSIDE THE HOME, OTHERWISE, THE ALARMS MUST BE HARD WIRED AND INTERCONNECTED. GROUND FAULT PROTECTION 1.PHOTOVOLTAIC INVERTERS SHALL BE EQUIPPED WITH DC GROUND FAULT PROTECTION. INVERTERS ARE ALSO EQUIPPED WITH ANTI-ISLANDING CIRCUITRY. DISCONNECTING MEANS 1.MEANS SHALL BE PROVIDED TO ISOLATE EACH SOURCE CIRCUIT FROM THE SYSTEM. 2.WHERE A CIRCUIT GROUNDING CONNECTION IS NOT DESIGNED TO BE AUTOMATICALLY INTERRUPTED AS PART OF THE GROUND-FAULT PROTECTION, A SWITCH OR CIRCUIT BREAKER USED AS A DISCONNECTING MEANS SHALL NOT HAVE A POLE ON THE GROUNDED CONDUCTOR. 3.THE GROUNDED CONDUCTOR MAY HAVE A BOLTED OR TERMINAL DISCONNECTING MEANS TO ALLOW MAINTENANCE OR TROUBLESHOOTING BY QUALIFIED PERSONNEL. 4.EQUIPMENT SUCH AS PHOTOVOLTAIC SOURCE CIRCUITS, OVER CURRENT DEVICES, AND BLOCKING DIODES SHALL BE PERMITTED ON THE PHOTOVOLTAIC SIDE OF THE PHOTOVOLTAIC DISCONNECTING MEANS. 5.MEANS SHALL BE PROVIDED TO DISCONNECT INVERTERS FROM ALL UNGROUNDED CONDUCTORS OF ALL SOURCES. IF THE EQUIPMENT IS ENERGIZED FROM MORE THAN ONE SOURCE, THE DISCONNECTING MEANS SHALL BE GROUPED AND IDENTIFIED. 6.A SINGLE DISCONNECTING MEANS SHALL BE PERMITTED FOR THE COMBINED OUTPUT OF ONE OR MORE INVERTERS IN A GRID INTERACTIVE SYSTEM. 7.DISCONNECTING MEANS SHALL BE PROVIDED TO DISCONNECT A FUSE FROM ALL SOURCES OF SUPPLY IF THE FUSE IS ENERGIZED FROM BOTH DIRECTIONS AND IS ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS. SUCH A FUSE IN A PHOTOVOLTAIC SOURCE CIRCUIT SHALL BE CAPABLE OF BEING DISCONNECTED INDEPENDENTLY OF FUSES IN OTHER PHOTOVOLTAIC SOURCE CIRCUITS. DC CONDUCTORS POSITIVE(UNGROUNDED)RED NEGATIVE(UNGROUNDED)BLACK 120/208V OR 240V AC CONDUCTORS PHASE L1 BLACK PHASE L2 RED (SEE NOTE) PHASE L3 BLUE 480/277V AC CONDUCTORS PHASE L1 BROWN PHASE L2 ORANGE PHASE L3 YELLOW NEUTRAL WHITE OR GREY GROUND GREEN OR BARE Cu NOTE:THREE PHASE HIGH LEG MUST BE IN ORANGE COLOR PER NFPA 70. GENERAL CONDUCTOR INSULATION KEY 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 ELECTRICAL CALCULATIONS PERCENT OF VALUES NUMBER OF CURRENT CARRYING CONDUCTORS IN EMT 0.80 4-6 0.70 7-9 0.50 10-20 AMBIENT TEMPERATURE SPECS RECORD LOW TEMP 2° AMBIENT TEMP (HIGH TEMP 2%)31° CONDUIT HEIGHT 0.5" ROOF TOP TEMP 31° CONDUCTOR TEMPERATURE RATE 90° INVERTER SPECIFICATIONS MANUFACTURER / MODEL #SMA SUNNY TRIPOWER CORE1 STP50-US-41 NOMINAL AC POWER 50000W NOMINAL OUTPUT VOLTAGE 480 VAC NOMINAL OUTPUT CURRENT 64 A SOLAR MODULE SPECIFICATIONS MANUFACTURER / MODEL # JINKO SOLAR JKM395M-72HL-TV MODULE STC 5% BIFACIAL GAIN VMP 39.83V 39.83V IMP 9.92A 10.41A VOC 48.26V 48.26V ISC 10.23A 10.74A TEMP. COEFF. VOC -0.29%/°C PTC RATING 363.2W MODULE DIMENSION 79.96 × 39.69×1.57 (In Inch) RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK E-602 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N MLPE: SMA JMS - F MAXIMUM POWER 600W MAXIMUM OUTPUT CURRENT 15 ADC DC WIRE CALCULATION WIRE ID PARALLEL FEEDERS EXPECTED WIRE TEMP (In Celsius) TEMP. CORRECTION PER TABLE 310.15(B)(2)(a) NO. OF CURRENT CARRYING CONDUCTORS CONDUIT FILL CORRECTION PER NEC 310.15(B)(3)(a) CIRCUIT CONDUCTOR SIZE CIRCUIT CONDUCTOR AMPACITY @75°(PER FEEDER SET) CIRCUIT CONDUCTOR AMPACITY @90°(PER FEEDER SET) REQUIRED CIRCUIT CONDUCTOR AMPACITY PER CEC 690.8(A&B) 1.56 X Isc DERATED AMPACITY OF CIRCUIT CONDUCTOR PER CEC TABLE 310.16 TEMP. CORRECTION PER TABLE (310.16) X CONDUIT FILL CORRECTION PER CEC 310.15(B)(2)(a) X CIRCUIT CONDUCTOR AMPACITY @90°(PER FEEDER SET) DERATED AMPACITY OF CIRCUIT CONDUCTOR IS GREATER THAN REQUIRED ESTIMATED DISTANCE (FT) EXPECTED VOLTAGE DROP (%) 1 1 31°0.96 12 1 #10 AWG 35A 40A 16.75A*38.4A YES 30 0.12 2 1 31°0.96 12 0.5 #10 AWG 35A 40A 16.75A*19.20A YES 10 0.04 AC WIRE CALCULATION WIRE ID PARALLEL FEEDERS EXPECTED WIRE TEMP (In Celsius) TEMP. CORRECTION PER TABLE 310.15(B)(2)(a) NO. OF CURRENT CARRYING CONDUCTORS CONDUIT FILL CORRECTION PER CEC 310.15(B)(3)(a) CIRCUIT CONDUCTOR SIZE CIRCUIT CONDUCTOR AMPACITY @75°(PER FEEDER SET) CIRCUIT CONDUCTOR AMPACITY @90°(PER FEEDER SET) REQUIRED CIRCUIT CONDUCTOR AMPACITY PER CEC 690.8(A&B) 1.25 X I DERATED AMPACITY OF CIRCUIT CONDUCTOR PER CEC TABLE 310.16 TEMP. CORRECTION PER TABLE (310.16) X CONDUIT FILL CORRECTION PER CEC 310.15(B)(2)(a) X CIRCUIT CONDUCTOR AMPACITY @90°(PER FEEDER SET) DERATED AMPACITY OF CIRCUIT CONDUCTOR IS GREATER THAN REQUIRED ESTIMATED DISTANCE (FT) EXPECTED VOLTAGE DROP (%) 3 1 31°0.96 3 1 #3 AWG 100A 115A 49.61A 110.4A YES 70 0.31 4 1 31°0.96 3 1 #3/0AWG 200A 225A 200A 216A YES 10 TOTAL AC VOLTAGE DROP (%)0.44 0.13 5% BI-FACIAL GAIN CALCULATIONS IMP = 9.92 X 1.05 = 10.41A ISC = 10.23 X 1.05 = 10.74A NOTE : BIFACIAL GAINS USED TO CONSIDER WORST CASE CONDITIONS FOR WIRE CALCULATIONS TOTAL DC VOLTAGE DROP (%)0.16 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 PHOTOVOLTAIC AC DISCONNECT RATED AC OPERATING CURRENT: NOMINAL OPERATING AC VOLTAGE: WARNING LABELS RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK E-603 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N METER AC DISCONNECT 3 5 7 9 11210 12 83 13 (WHEN PRESENT) INVERTERDC DISCONNECTJUNCTION BOX 4 46 WARNING: DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM ! WARNING ELECTRIC SHOCK HAZARD TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION LABEL LOCATION: COMBINER BOX, MAIN SERVICE PANEL, AC DISCONNECT (PER CODE: CEC 690.13(B)) LABEL LOCATION: CONDUIT, COMBINER BOX (PER CODE: CEC690.31(G)(3)(4) & CEC 690.13(G)(4) WARNING: PHOTOVOLTAIC POWER SOURCE ! LABEL LOCATION: INVERTER, JUNCTION BOXES (ROOF), (PER CODE: CEC690.13.G.3 & CEC 690.13.G.4) WARNING - Electric Shock Hazard No user serviceable parts inside Contact authorized service provider for assistance 3 4 6 LABEL PER CEC 690.56(C)- PROVIDE AT NEW SUB PANEL OR SERVICE PANEL FOR RAPID SHUTDOWN COMPLIANT SYSTEM 9 SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS LABEL LOCATION: MAIN SERVICE PANEL, UTILITY METER (PER CODE: CEC 705.12(B)(3-4) & CEC 690.59) 5 13 TURN OFF PHOTOVOLTAIC AC DISCONNECT PRIOR TO WORKING INSIDE PANEL LABEL LOCATION: COMBINER BOX, MAIN SERVICE PANEL (PER CODE: CEC 110.27 (C)) 2 PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT (PER CODE: CEC 690.13 (B) 8 LABEL LOCATION: AC DISCONNECT (PER CODE: CEC 690.54) LABEL LOCATION: MAIN SERVICE PANEL (PER CODE: CEC 705.12 (B)(2)(c)) 7 POWER SOURCE OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE. WARNING!WARNING THE DISCONNECTION OF THE GROUNDED CONDUCTOR(S) MAY RESULT IN OVERVOLTAGE ON THE EQUIPMENT LABEL LOCATION: COMBINER BOX (PER CODE: CEC 690.31(I)) ! LABEL LOCATION: MAIN SERVICE PANEL (PER CODE: CEC 690.13(B)) 12 MAIN PHOTOVOLTAIC SYSTEM DISCONNECT LABEL LOCATION: MAIN SERVICE PANEL (PER CODE: CEC 690.15 (C) & CEC 690.33(E)(2)) 10 DO NOT DISCONNECT UNDER LOAD 1 11 ! NOTE: MATERIALS USED FOR ALL MARKING SHALL BE REFLECTIVE, WEATHER RESISTANT AND SUITABLE FOR THE ENVIRONMENT. ALL LETTERS SHALL BE A MINIMUM HEIGHT OF 3/8", CAPITALIZED AND WHITE ON A RED BACKGROUND. WARNING! CAUTION PHOTOVOLTAIC SYSTEM DISCONNECT IS BACKFEED LABEL LOCATION: MAIN SERVICE PANEL (PER CODE: CEC 690.13 (F), CEC 705.12(D)(3-4) & CEC 690.59) ! ADHESIVE FASTENED SIGNS: · THE LABEL SHALL BE SUITABLE FOR THE ENVIRONMENT WHERE IT IS INSTALLED. · WHERE REQUIRED ELSEWHERE IN THIS CODE, ALL FIELD APPLIED LABELS, WARNINGS, AND MARKINGS SHOULD COMPLY WITH ANSI Z535.4 [CEC 110.21(B) FIELD MARKING]. · ADHESIVE FASTENED SIGNS MAY BE ACCEPTABLE IF PROPERLY ADHERED. VINYL SIGNS SHALL BE WEATHER RESISTANT [CFC 605.11.1.3] AC DISCONNECT 83 14 (WHEN PRESENT)TRANSFORMER 208V 200A PHOTOVOLTAIC AC DISCONNECT RATED AC OPERATING CURRENT: NOMINAL OPERATING AC VOLTAGE: 14 LABEL LOCATION: AC DISCONNECT (PER CODE: CEC 690.54) NOTE: MATERIALS USED FOR ALL MARKING SHALL BE REFLECTIVE, WEATHER RESISTANT AND SUITABLE FOR THE ENVIRONMENT. ALL LETTERS SHALL BE A MINIMUM HEIGHT OF 3/8", CAPITALIZED AND WHITE ON A RED BACKGROUND. 480V 39.68A PV ARRAY MSP 15 15 LABEL LOCATION: MSP (PER CODE: CEC 705.12 (B)(3)(3) WARNING: THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE SHALL NOT EXCEED AMPACITY OF BUSBAR C.0 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 G L1 L2 LOAD LINE 4 L3 (N)45 kVA TRANSFORMER PRIMARY-120/208V WYE SECONDARY-277/480V WYE 3 PHASE NEMA 3R, UL LISTED (ON GROUND) 4 N G L1 L2 N L3 3 G N (E) MAIN BREAKER 400A/3P GEC (E) GROUNDING ELECTRODE CONDUCTOR PER CEC 250.62, 250.64, & 250.66 (E) MAIN BONDING JUMPER PER CEC 250.8 & 250.28 (E) GROUNDING ELECTRODE SYSTEM PER CEC 250.50 (E) BONDING JUMPER PER CEC 250.92(A)(2) N L2 L1 M L3 TO UTILITY TRANSFORMER = 1 DC INPUT MPPT 1 DC INPUT MPPT 2 DC INPUT MPPT 3 DC INPUT MPPT 4 (N)SMA SUNNY TRIPOWER CORE1 STP50-US-41 OUTPUT: (277/480) VAC, 64A 97.5% CEC WEIGHTED EFFICIENCY NEMA 3R, UL LISTED, INTERNAL GFDI WITH INTEGRATED DC DISCONNECT (ON ROOF) DC INPUT MPPT 5 DC INPUT MPPT 6 3 OCPD ON PRIMARY SIDE: (33000x1.25)/(208x1.732) = 114.50A OCPD ON SECONDARY SIDE: (33000x1.25)/(480x1.732)= 49.61A (96)JINKO SOLAR JKM395M-72HL-TV MODULES (96) JMS-F SUNSPEC RAPID SHUTDOWN DEVICE MPPT:1 1 STRING OF (16) MODULES MPPT:2 1 STRING OF (16) MODULES MPPT:3 1 STRING OF (16) MODULES MPPT:4 1 STRING OF (16) MODULES MPPT:5 1 STRING OF (16) MODULES MPPT:6 1 STRING OF (16) MODULES LOAD LINE (N) PV BREAKER 200A/3P (CUTLER HAMMER CC3200) (N) JUNCTION BOX 1000 V, NEMA 3R UL LISTED (6 X 20A FUSES) #4 AWG GEC (CU) #4 AWG GEC (CU) (N)AC DISCONNECT VISIBLE, LOCKABLE, LABELED 200A AC DISCONNECT WITH (3)200A FUSES, 208V, 3PHASE NEMA 3R, UL LISTED SQUARE D (D324NRB) (EXTERIOR) (N)AC DISCONNECT VISIBLE, LOCKABLE, LABELED 100A AC DISCONNECT WITH (3) 60A FUSES, 480V, 3PHASE NEMA 3R, UL LISTED (SQUARE D - H363NRB) (EXTERIOR) (N) 200A/3P (N) GROUNDING ELECTRODE SYSTEM PER CEC 250.30(A)(2)(1) (N) GROUNDING ELECTRODE SYSTEM PER CEC 250.30(A)(1) & 250.28(D)(1) 2 OUTPUT (E) MAIN-SERVICE PANEL, 400A RATED, 120/208V ,WYE THREE PHASE , 4 WIRE (INTERIOR) (E)BI-DIRECTIONAL UTILITY METER 3-PHASE, 4-W, 120V/208V WYE, 400A RATED (INTERIOR) E (E) 200A/3P (N) BONDING RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK E-601 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N LINE DIAGRAM Vmax = Voc + ((TLow - TStc) x (VocCoef x Voc/100)) Vmax = 48.26 + ((2ºC - 25ºC) x (-0.29 x 48.26/100)) Vmax = 48.26 + (-23 x (-0.13)) Vmax = 51.25 = 1000/51.25 = 19.51 (Maximum number of modules in series) DC SYSTEM SIZE: 37.92 kW DC AC SYSTEM SIZE: 33 kW AC METER NO - 259000-038162 ID PARALLEL FEEDER PHASE CONDUCTOR QTY, SIZE AND TYPE PER CONDUIT NEUTRAL GROUND CONDUCTOR QTY, SIZE AND TYPE PER CONDUIT CONDUIT SIZE CONDUIT TYPE 1 1 12 AWG #10 PV-WIRE/USE-2KV, CU N/A 1 AWG #6 BARE,COPPER EGC N/A FREE AIR 2 1 12 AWG #10 PV-WIRE/USE-2KV, CU N/A 1 AWG #10 THWN-2,COPPER EGC 1-1/2"EMT 3 1 3 AWG #3 THWN-2,COPPER AWG #8 THWN-2,COPPER 1 AWG #8 THWN-2,COPPER EGC EMT 4 1 3 AWG #3/0 THWN-2,COPPER 1 THWN-2,COPPER 1 AWG #4 THWN-2,COPPER EGC 2"EMTAWG #4 1 NOTE - BACKFEED COMPLIANT VIA 2022 CEC 705.12 (B)(3)(3) E EXISTING NOTE 50KW INVERTER WILL BE POWER EXPORT LIMITED TO 33KW AC OUTPUT. 1-1/4" (96) JINKO SOLAR JKM395M-72HL-TV MODULES WITH (96) SMA JMS - F RAPID SHUTDOWN DEVICES FOR (1) SMA SUNNY TRIPOWER CORE1 STP50-US-41 INVERTER (6) STRINGS OF 16 MODULES CONNECTED IN SERIES C.0 NOTE A SYSTEM BONDING JUMPER MUST BE INSTALLED INSIDE THE TRANSFORMER. IT SHALL BOND THE GROUNDED (NEUTRAL) CONDUCTORS FROM EACH SIDE TO THE GEC SYSTEM, THE METAL CASE, AND TO THE EGCs FROM EACH SIDE C.0 C.0 C.0 B.0 B.0 B.0 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 JB INV MS P TN F AC D AC D UM RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK E-604 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N PLACARDS MULTIPLE SOURCES OF POWER WITH DISCONNECTS LOCATED AS SHOWN: CAUTION N S EW UTILITY DISCONNECT (EXTERIOR) MAIN SERVICE PANEL (INTERIOR) PV ARRAY PV DISCONNECT (EXTERIOR) UTILITY METER (INTERIOR)C.0 PV DISCONNECT (ON ROOF) NOTE PLACARDS TO BE MOUNTED IN THE FOLLOWING LOCATIONS: (1) AT THE INTERIOR SERVICE PANEL. (2) AT THE EXTERIOR PV DISCONNECT. C.0 C.0 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK R-001 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N RESOURCE DOCUMENT 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 MS P TN F AC D AC D UM 65'-0" 75 ' - 0 " 101'-0" JB INV 40 ' - 6 " 30'-4" 5'-11" 4' - 1 0 " 12 0 ' - 1 " 101'-6" 12 0 ' - 9 " 4' - 0 " RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK A-101 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N SITE PLAN 1 SITE PLAN SCALE:1/8" = 1'-0" N S EW LEGEND - JUNCTION BOXJB - VENT, ATTIC FAN (ROOF OBSTRUCTION) - PROPERTY LINE - FIRE SETBACK - CHIMNEY (ROOF OBSTRUCTION) - SKYLIGHT (ROOF OBSTRUCTION) - FENCE 4' FIRE SETBACK (E) MAIN BUILDING (96) JINKO SOLAR JKM395M-72HL-TVW MODULES (N) SMA SUNNY TRIPOWER CORE1 STP50-US-41 INVERTERS (ON ROOF) (E) MAIN SERVICE PANEL (INTERIOR) PARKING AREA PARKING AREA (N) VISIBLE LOCKABLE LABELED AND FUSED AC DISCONNECT (UTILITY DISCONNECT) (EXTERIOR) (N) TRANSFORMER (GROUND) PA R K I N G A R E A E.ST. GERTRUDE PL (N) VISIBLE LOCKABLE LABELED AND FUSED AC DISCONNECT (UTILITY DISCONNECT) (EXTERIOR) (E) UTILITY METER (INTERIOR) ROOF ACCESS HATCH B.0 (E) FENCE B.0 B.0 This item has been digitally signed and sealed on Aug 16, 2023 Structural only 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 MS P TN F AC D AC D UM 65'-0" 75 ' - 0 " JB INV 4' - 0 " RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK A-102 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N ELECTRICAL PLAN 1 ELECTRICAL PLAN ROOF SECTION(S) TILT - 5° AZIMUTH - 180° MODULE - 96 ROOF 1 SCALE:3/16" = 1'-0" N S EW - MODULE STRING 6 (16 MODULES) (96) JINKO SOLAR JKM395M-72HL-TV MODULES WITH (96) SMA JMS - F RAPID SHUTDOWN DEVICES FOR (1) SMA SUNNY TRIPOWER CORE1 STP50-US-41 INVERTER (6) STRINGS OF 16 MODULES CONNECTED IN SERIES 4' FIRE SETBACK (E) MAIN BUILDING (N) SMA SUNNY TRIPOWER CORE1 STP50-US-41 INVERTER (ON ROOF) (N) CONDUIT RUN E.ST. GERTRUDE PL (N) VISIBLE LOCKABLE LABELED AND FUSED AC DISCONNECT (UTILITY DISCONNECT) (EXTERIOR) (N) TRANSFORMER (GROUND) (N) VISIBLE LOCKABLE LABELED AND FUSED AC DISCONNECT (PV DISCONNECT) (EXTERIOR) (E) MAIN SERVICE PANEL (INTERIOR) (E) UTILITY METER (INTERIOR) ROOF 1 ROOF ACCESS HATCH B.0 B.0 B.0 B.0 LEGEND - JUNCTION BOXJB - VENT, ATTIC FAN (ROOF OBSTRUCTION) - FIRE SETBACK - CHIMNEY (ROOF OBSTRUCTION) - SKYLIGHT (ROOF OBSTRUCTION) 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 53'-7" N N N N N N N N N NNN 62 ' - 4 " 7" 12" 12" 7 13 16 " 4 3 16 " RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK A-103 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N 1 ATTACHMENT PLAN SCALE:3/16" = 1'-0" AVERAGE PSF: TOTAL WEIGHT ON ROOF RACKING WEIGHT MODULE WEIGHT BALLAST WEIGHT TOTAL STRUCTURE AREA 9683 LBS 1156 LBS 4925 LBS 3510 LBS 2543 SQ.FT 3.81 PSF ARRAY-1 DESIGN CRITERIA NUMBER OF PANELS IN ARRAY = 96 MODULES MODULE TYPE = JINKO SOLAR JKM395M-72HL-TV (395W) MODULES ATTACHMENT= UNIRAC RM 5 RACKING ROOF TYPE: ROLLED COMP ROOF ROOF 1 ARRAY TILT - 5° AZIMUTH - 180° ATTACHMENT PLAN ATTACHMENT DETAIL PLAN REVIEW - MODULE WITH NORTH DEFELCTOR BAY WITH BLOCK COUNT-2 LEGENDS: BAY WITH BLOCK COUNT-1 MODULE UNIRAC RM5 BALLAST TRAY MODULE STRUCTURAL MEMBER ROOF SURFACE N AVERAGE PSF: TOTAL WEIGHT ON ROOF RACKING WEIGHT MODULE WEIGHT BALLAST WEIGHT TOTAL STRUCTURE AREA 9683 LBS 1156 LBS 4925 LBS 3510 LBS 2543 SQ.FT 3.81 PSF ROOF 1- ARRAY 1 C.0 This item has been digitally signed and sealed on Aug 16, 2023 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 8' - 0 " 25'-0" 2'-0" 75'-0" 65 ' - 0 " RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK A-104 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N 1 STRUCTURAL PLAN SCALE:1/4" = 1'-0" ROOF 1 ARRAY TILT - 3° AZIMUTH - 180° STRUCTURAL PLAN 2"X 4" @24" APART 6"X23" SPACED 25' APART 4"x15" @ 8'-0 APART This item has been digitally signed and sealed on 08/16/2023 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK R-002 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N RESOURCE DOCUMENT 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK R-003 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N RESOURCE DOCUMENT C.0 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK R-004 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N RESOURCE DOCUMENT C.0 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023 RE V SHEET TITLE DA T E DE S C R I P T I O N RE V I S I O N S SI G N A T U R E W I T H S E A L PR O J E C T N A M E & A D D R E S S DRAWN DATE DRAWN BY 08/16/2023 JK SHEET NUMBER REVIEWED BY JVK R-005 CE N D O Y A W A R E H O U S E BL D G 13 2 3 E . S T . GE R T R U D E P L , S U I T E B S A N T A A N A , C A 92 7 0 5 , U S A A. 0 01 / 2 5 / 2 0 2 3 PE R M I T P L A N TURNKEY SOLAR 7257 N MAPLE AVE #108 FRESNO, CA 93720, USA PHONE NO: (559) 321-8130 LICENSE NO - 991046 GREENTECH RENEWABLES B. 0 07 / 1 4 / 2 0 2 3 AH J R E V I S I O N CONTRACTOR 08 / 1 6 / 2 0 2 3 C. 0 AH J R E V I S I O N RESOURCE DOCUMENT C.0 1323 E St Gertrude Unit B - 101115120 & 20179667 10/12/2023