Loading...
HomeMy WebLinkAbout1213 N Lyon St - Plan0 PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR COVER PAGE 1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED ELECTRICAL TESTING LABORATORY CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED BY THE MANUFACTURER ATTESTING TO ITS SAFETY 2. OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED 3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED 4. ALL SPECIFIC WIRING IS BASED ON THE USE OF COPPER. 5.CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING COMMISSIONING AND ACCEPTANCE WITH THE CLIENT, UTILITY CO. AND CITY INSPECTORS AS NEEDED. 6.THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS. IF THE SOLAR BACK FED BREAKER IS OVER THE BUSS SIZE 20% LIMIT, CONTRACTOR SHALL INCLUDE THE COST TO REPLACE MAIN BREAKER OR ENLARGE MAIN CAPACITY. 7. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. 8. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING THE EXTRA WEIGHT. 9. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS APPROPRIATE. 10. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS. OWNER SCOPE PROJECT ADDRESS PROJECT DATA GENERAL NOTES VICINITY MAP SHEET INDEX 0 COVER PAGE PHOTOVOLTAIC NOTES SATELLITE VIEW BUILDING INFORMATION: SINGLE LINE DIAGRAM CODE REQUIRED SIGNAGE 3 4 ATTACHMENT LAYOUT5 6 7 INVERTER DATA SHEET D1 MODULE DATA SHEET RACKING DATA SHEET RACKING CERTIFICATE ATTACHMENT DATA SHEET ELECTRICAL INFORMATION MAIN SERVICE PANEL BUSBAR RATING MAIN SERVICE BREAKER RATING 1ɸ, 3W, 120/240V ROOF PLAN MODULE MAP RACKING INFORMATION Main Service Panel Solar Module Micro Inverter / Optimizer EMT / FMT / PVC / RMC type conduit/ Romex NM Cable/ FNMT (Fluid non-metalic tube) 36'' SetbackInverter Utility Meter Production Meter PV Load Center IQ Combiner Box Junction Box Sunpower PV Supervisor 18'' Setback EV Outlet CONSTRUCTION TYPE: V-B ROOF TYPE AHJ APN LOT AREA LIVING AREA MSP UM PM INV PV PVS6 IQ J/B EV SABINA HUERTA 12 1 SOLAR EDGE SE3000H-US RGM SI1 1213 N LYON ST SANTA ANA, CA 92701 AC DisconnectACD SSP Service Sub Panel COMPOSITION SHINGLE 1,527 SQFT 40028709 CITY OF SANTA ANA WIRE SIZE CALCULATIONS INVERTER MAP D2 D3 D4 D5 D6 GROUNDING SPECSD7 ROOF MOUNT INSTALLATION OF DC PHOTOVOLTAIC SYSTEM 4.26 KW DC 4.26 KW 3.94 KW AC EXISTING 1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED AND IDENTIFIED UL 1703. 2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL VENTS 3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. 4. SOLAR INVERTER MUST HAVE A MANUFACTURE INSTALLED DISCONNECTING MEANS THAT PREVENTS PARALLEL FEEDING UTILITY LINES DURING POWER OUTAGE. 5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS. 6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE. 7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS OVER 150V TO GROUND SHALL NOT BE ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE ENERGIZED. 8 .INVERTER IS EQUIPPED W/ INTEGRATED GFCI, THUS PROVIDING GROUND FAULT PROTECTION 9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED 10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY OR APPROVED BY THE DEPARTMENT. 11. THE OUTPUT OF A UTILITY INTERACTIVE-INVERTER SHALL BE PERMITTED TO BE CONNECTED TO THE SUPPLY SIDE OF THE SERVICE DISCONNECTING MEANS AS PER 230.82(6) 12. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING, AC GROUNDING AND BONDING BETWEEN AC AND DC SYSTEMS SIZED AS PER SEC 250.122 13. EQUIPMENT GROUND CONDUCTOR REQUIRED IN RACEWAYS SIZED PER CEC 250-122. 14. PER ART 250.92. NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER. BOND BOTH ENDS OF RACEWAYS 2019 CALIFORNIA ELECTRICAL CODE 2019 CALIFORNIA BUILDING CODE 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE 2019 CALIFORNIA ENERGY CODE 2019 CALIFORNIA MECHANICAL CODE 2019 CALIFORNIA PLUMBING CODE 2019 CALIFORNIA RESIDENTIAL CODE 2019 CALIFORNIA FIRE CODE ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES THE INSTALLATION OF SOLAR ARRAYS AND PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH THE FOLLOWING CODES: OPTIMIZER DATA SHEET 1 2 6,600 SQFT Battery Backup BB Auto TransformerAT Solar Edge Meter EnclosureSEM Distribution PanelDP Rapid Shutdown Controller RSC Rapid Shutdown Box RSB Itron MeterIM UNIT INDEX CODE REFERENCES IRONRIDGE RACKING TRUSSES 2"X6" @ 24" O.C OCCUPANCY: R ONE STORY BUILDING 200A 200A LONGI SOLAR 355W LR4-60HPB-355M (don't delete this note) SITE PLAN1.1 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg# 101114321 Elec# 20179061 Issued 03/17/23 1213 N Lyon St 03/20/23 1 ROOF PLAN PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR N 0° S 180° E 90° W 270° SCALE 0 5 1 10ft ROOF AREA CALCULATIONS FIRE SPRINKLERS - NO TOTAL ROOF AREA (SQ.FT.) - 2800 SOLAR AREA (SQ.FT.) - 240 % OF COVERED AREA - 8.6% PHOTOVOLTAIC SYSTEM 1 Solar Edge 3.0 Kw Inverter (SE3000H-US RGM SI1) 12 Solar Edge P401 Power Optimizers FROM JUNCTION BOX TO ROOF EAVE EMT TYPE CONDUIT WILL RUN OVER THE ROOF AT 1 1/2" HEIGHT, THEN UNDER THE EAVE TO PV EQUIPMENT4.26 KW DC 12 Longi Solar 355W Modules (LR4-60HPB-355M) Gate 18'' fire setback 36'' fire setback 1 8 ' ' f i r e s e t b a c k 36'' fire setback 36 ' ' f i r e s e t b a c k Slope Change Line N L y o n S t Solar Array 2 8 Longi Solar 355W 8 P401 Optimizers Pitch: 6 Deg Azimuth: 270 Deg Solar Array 1 4 Longi Solar 355W 4 P401 Optimizers Pitch: 6 Deg Azimuth: 180 Deg J/B MSPINV ACD 1213 N Lyon St 03/20/23 2 SINGLE LINE DIAGRAM PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR ITEM DESCRIPTION QTY# PV MODULE MAIN SERVICE PANEL MAIN SERVICE PANEL & UTILITY METER BUSBAR RATING BREAKER RATING 1 ITEM DESCRIPTION QTY# PVC JUNCTION BOX 4"x4"x2" UL LISTED WATER TIGHT NEMA TYPE 3 1 1 1 5 3 1 4 6 M MAIN SERVICE PANEL 120/240V 1P,3W 2 EXISTING GROUNDING SYSTEM UTILITY 2 3 INVERTER PEAK PWR TRACKING VOLTAGE CEC EFFICIENCY PROTECTION RATING: MAXIMUM INPUT CURRENT MAXIMUM OUTPUT CURRENT MAXIMUM INPUT POWER MAXIMUM CONTINUOUS OUTPUT POWER 4 5700W 1 SOLAREDGE SE3000H-US RGM SI1 (240V) 380 V 99.0 % NEMA 4X 8.5 A 12.5 A 4,650 W 3,000 W SOLAREDGE POWER OPTIMIZER RATED DC INPUT POWER MAXIMUM INPUT VOLTAGE MPPT RANGE MAXIMUM SHORT CIRCUIT CURRENT (Isc) MAXIMUM OUTPUT CURRENT OPTIMIZER WEIGHT MAXIMUM POWER PER STRING 5 12POWER OPTIMIZER P401 400W 60 Vdc 8 to 60 Vdc 11.75 Adc 15 Adc 1.5 Lbs 30AAC DISCONNECT NON FUSED AC DISCONNECT LOCKABLE, BLADE TYPE, NEMA 3R, 120/240V 16 EXISTING EXISTING 2 1 3 String: (12) Modules, (12) Optimizers (E)200A3 200A 200A 200A FOR WIRE SIZE CALCULATIONS PLEASE SEE PAGE #3 INSTALL 2P 20A CB(PV) AT OPPOSITE END OF BUS FROM MAIN FEEDER CB 12 LONGI SOLAR 355W LR4-60HPB-355M Voc = 40.6V Vmp = 34.6V Isc = 11.25A Imp = 10.27A 1213 N Lyon St 03/20/23 1.1 PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR SITE PLAN PROPERTY LINE MSPINV ACDGate POOL Driveway 60' 110' 7' 25' 19' N L y o n S t Pu b l i c S i d e w a l k N 0° S 180° E 90° W 270° SCALE 0 5 1 10ft 1213 N Lyon St 03/20/23 PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR 3 FROM PV MODULES TO JBOX FROM JBOX TO INVERTER (2) WIRE SIZE CALCULATIONS 1 (1) #6 AWG BARE CU EGC, 2 #8 AWG CU EGC, (3) 3 (1) #8 AWG CU EGC, MAXIMUM INVERTER OUTPUT CURRENT (A) TEMPERATURE FACTOR TEMPERATURE ADJUSTMENT (A) OUTPUT CALCULATIONS PV SYSTEM MAX DC OUTPUT PV SYSTEM MAX AC OUTPUT MAXIMUM POWER (W) PEAK PWR TRACKING VOLTAGE (V) CONSIDER CONTINUOUS COEFFICIENT SHORT CIRCUIT CURRENT (A) ADJUSTED CONDUCTOR AMPACITY (A) 1.25 1.25 1.25 0.91 (2) (1) Pmax (PTC Rating) 12.5 380 99 % 1 12.5 * 1.25 / 0.91 17.2 #10 AWG THWN-2 SOLAR EDGE SE3000H-US RGM SI1 (CEC) 12.5 * 1.25 15.6 1 1/2'' (TEMP - 39 + 22 = 61C)0.58 RACEWAY HEIGHT FROM ROOF ADJST. FACTOR (1 thru 3 WIRES)1.0 FREE IN THE AIR, 3/4'' RMC TYPE CONDUIT BETWEEN ARRAYS 3/4'' EMT TYPE CONDUIT 3/4'' EMT TYPE CONDUIT MAIN SERVICE PANEL RATING BUSBAR RATING MAIN BREAKER PV BACKFEED BREAKER SIZE 120% RULE: MAX ALLOWED FEED 20A * /* 1.25 *1.2512355 380 17.5 //17.5 0.58 1.0 30.2 #10 AWG THWN-2 WIRE CHART WIRE CHART * 12 355 4.26 KW ** 12 331.6 0.99 3.94 KW CONSIDER CONTINUOUS COEFFICIENT CONSIDER CONTINUOUS COEFFICIENT 200A 200A 240A 200A ''MB'' + 20A "SOLAR" = 220A ≤ 240A MAX FROM INVERTER TO MAIN SERVICE PANEL CONSIDER CONTINUOUS (A) MAX NUMBER OF MODULES IN STRING 12 #10 AWG PV-WIRE 12 LR4-60HPB-355M 355 W 331.6 W 355 1213 N Lyon St 03/20/23 17.5 A CODE REQUIRED SIGNAGE 4 PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR 59.3-60-60.5 3000 W 12.5 A 12.5 A MAX 12.5 A MAX 12.5 A MAX 15 A CAUTION NEC 705.10(B) & NEC 690.56(B) Permanent directory or plaque providing location of service disconnecting means and photovoltaic system disconnecting means, if not located at the same location. (Plaques shall be metal or plastic, with engraved or machine printed letters, or electro-photo plating, in a contrasting color to the plaque. Plaques shall be permanently attached to the equipmenq or in the required location using an approved method that is suitable to withstand the environment to which it is exposed. Plaques and signage shall meet legibility, defacemet, exposure and adhesion requirements of Underwriters Laboratories marking and labeling system 969(UL969). Plaques will have red background & white lettering. N 0° S 180° E 90° W 270° POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: JB B O X WARNING ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION NEC 690.13(B) TURN OFF PHOTOVOLTAIC AC DISCONNECT PRIOR TO WORKING INSIDE PANEL NEC 110.27(C) & OSHA 1910.145(f)(7) DC D i s c o n n e c t ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION NEC 690.13(B) DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT NEC 690.53 NEC 690.13(B) In v e r t e r / P V L o a d WARNING THE DISCONNECTION OF THE GROUNDING CONDUCTOR(S) MAY RESULT IN OVERVOLTAGE ON THE EQUIPMENT NEC 690.31(I) NEC 690.54 AC D i s c o n n e c t NEC 690.54 NEC 690.52 WARNING ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION NEC 690.13(B) PM M E T E R NEC 705.12(D)(3) & NEC 690.59 Ma i n / S u b P a n e l NEC 690.54 NEC 690.13 (F), NEC 705.12(B)(3-4) & NEC 690.59 NEC 705.12(D)(3) & NEC 690.59 NEC 690.15 (C) & NEC 690.33(E)(2) NEC 690.13(B) SINGLE 120-VOLT SUPPLY DO NOT CONNECT MULTIWIRE BRANCH CIRCUIT NEC 710.15(C) & 692.9 (C) TURN OFF PHOTOVOLTAIC AC DISCONNECT PRIOR TO WORKING INSIDE PANEL NEC 110.27(C) & OSHA 1910.145(f)(7) WARNING ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION NEC 690.13(B) NEC 705.12 (B)(2)(c) LABELING REQUIREMENTS FOR ARTICLE 690 NEC 690.13(B) Each PV system disconnecting means shall plainly indicate whether in the open (off) or closed (on) position and be permanently marked “PV SYSTEM DISCONNECT” or equivalent. Additional markings shall be permitted based upon the specific system configuration. For PV system disconnecting means where the line and load terminals may be energized in the open position, the device shall be marked with the following words or equivalent. NEC 690.13(F) Type of Disconnect. A dc PV system disconnecting means shall be marked for use in PV systems or be suitable for backfeed operation. NEC 690.15(C) An isolating device shall be rated to open the maximum circuit current under load or be marked “Do Not Disconnect Under Load” or “Not for Current Interrupting.” NEC 690.31(B)(1) PV system circuit conductors shall be identified at all accessible points of termination, connection and splices. The means of identification shall be permitted by separate color coding, marking tape, tagging or other approved means. NEC 690.31(G)(1) Where circuits are embedded in build up, laminate or membrane roofing materials not covered by PV modules and associated equipment, the location of the circuits shall be clearly marked. NEC 690.31(G)(4) PV dc system circuit labels shall appear on every section of the wiring system that is separated by enclosures, walls, partitions, ceilings, or floors. Spacing between labels or markings, or between a label and a marking, shall not be more than 3 m (10 ft). Labels required in this section shall be suitable for the environment where they are installed. NEC 690.31(I) Solidly-grounded bipolar PV systems shall be clearly marked with a permanent, legible warning notice indicating that the disconnection of the grounded conductor(s) may result in overvoltage on the equipment. NEC 690.33(E)(2) Interruption of Circuit. Connectors shall be a type that requires the use of a tool to open and marked “Do Not Disconnect Under Load” or “Not for Current Interrupting.” NEC 690.52 Alternating-current modules shall be marked with identification of terminals or leads and with identification of the following ratings. NEC 690.53A permanent label for the dc PV power source indicating items (1) through (3) shall be provided by the installer at dc PV system disconnecting means and at each dc equipment disconnecting means required by 690.15. Where a disconnecting means has more than one dc PV power source, the values in 690.53 (1) through (3) shall be specified for each source. NEC 690.54 All interactive system(s) points of interconnection with other sources shall be marked as an accessible location at the disconnecting means as a power source and with the rated ac output current and the nominal operating ac voltage. NEC 690.55 The PV system output circuit conductors shall be marked to indicate polarity where connected to energy storage systems. NEC 690.56(B)Plaques or directories shall be installed in accordance with 705.10. NEC 690.56(C)(3) A rapid shutdown switch shall have a label located on or no more than 1 meter (3 ft) from the switch that includes the following wording. NEC 690.56(C)(1)(a-b) The type of PV system shall be labeled as described in a) or b): NEC 690.59 PV systems connected to other sources shall be installed in accordance with Parts I and II of Article 705. SOLAR ELECTRIC PV PANELS SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH ON THE "OFF" POSITION TO SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY IFC 605.11.3.1(1) & 690.56(C)(1)(a) NEC 690.56(C)(3) NEC 690.31(G)(3)(4) NEC 690.31(G)(1)CO N D U I T RATED AC OUTPUT CURRENT: NOMINAL OPERATING AC VOLTAGE: PHOTOVOLTAIC AC DISCONNECT MAXIMUM VOLTAGE MAXIMUM CIRCUIT CURRENT MAX RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER OR DC-TO-DC CONVERTER (IF INSTALLED) DC DISCONNECT PHOTOVOLTAIC WARNING WARNING DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM RATED AC OUTPUT CURRENT: NOMINAL OPERATING AC VOLTAGE: PHOTOVOLTAIC AC DISCONNECT NOMINAL OPERATING AC VOLTAGE NOMINAL OPERATING AC FREQUENCY MAXIMUM AC POWER MAXIMUM AC CURRENT MAX OVERCURRENT DEVICE RATING FOR AC MODULE PROTECTION RATED AC OUTPUT CURRENT: NOMINAL OPERATING AC VOLTAGE: PHOTOVOLTAIC AC DISCONNECT WARNING DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM MAIN PHOTOVOLTAIC SYSTEM DISCONNECT WARNING CAUTION PHOTOVOLTAIC SYSTEM CIRCUIT IS BACKFED WARNING POWER SOURCE OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE. WARNING DO NOT DISCONNECT UNDER LOAD RAPID SHUT DOWN SWITCH FOR SOLAR PV SYSTEM WARNING: PHOTOVOLTAIC POWER SOURCE WARNING PHOTOVOLTAIC POWER SOURCE DO NOT REMOVE UNLESS REPLACED IN EXACT LOCATION - PV POWER CIRCUIT DIRECTLY BELOW WARNING FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGH TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [CEC 690.56(C)(1)(A)] 480 V 240 Vac 240 Vac 240 Vac 240 Vac NEC 690.13(B) AC DISCONNECT PHOTOVOLTAIC 20 A SERVICE POINT & UTILITY METERING PV SYSTEM DISCONNECT FOR UTILITY OPERATION SOLAR INVERTER SOLAR ARRAY ON THE ROOF N L y o n S t 1213 N Lyon St 03/20/23 ATTACHMENT LAYOUT 5 PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR STRUCTURAL STAMPROOF PITCH ROOFING TYPE ATTACHMENT TYPE FRAMING TYPE FRAMING SIZE PENETRATION PATTERN 6° RACKING TYPE MAX PENETRATION SPACING ROOFING LAYERS WIND SPEED 95 MPH SNOW LOAD 0 PSF EXPOSURE C LAG BOLTS MOUNTS AND MOUNTING HARDWARE WILL BE SEALED WITH CHEM LINK SEALANT OR EQUIVALENT. MODULE WEIGHT (LBS) # OF MODULES TOTAL MODULE WEIGHT (LBS) RACK WEIGHT (LBS) TOTAL SYSTEM WEIGHT (LBS) # OF STANDOFFS LOADING PER STANDOFF (LBS) TOTAL MODULE AREA (SQ.FT.) LOADING (PSF) WEIGHT LOAD CALCULATION INDEX ROOF SHEATHED WITH 1/2" PLYWOOD AND UPPER SURFACE IS FACED WITH FELT PAPER TOTAL ROOF AREA (Sq. FT) % OF COVERED AREA PV MODULE MODEL # OPTIMIZERS WEIGHT (LBS) 12 Roof 1 Layer Comp Shingle Ironridge XR10 Truss Stacked 72"2"X6" @ 24" O.C 3 1 2 4 ITEM NO. 1 DESCRIPTION 2 3 4 BOLT LAG 5/16 X 4.75" ASSY, FLASHING ASSY, CAPFOOT WASHER, EPDM BACKED Qty in Kit 4 4 4 4 5/16" X 4.75" Flash Foot 2 MIN 2.5" EMBEDMENT RACKING RAIL ATTACHMENT ROOF FRAMING 18 240 2800 516 103 18 637 35.4 2.66 8.6 2''X8'' Blocking SOLAR MODULE ROOF ASCE 7-16 Max 3.5'' 43.0 LR4-60HPB-355M 72''24'' 1213 N Lyon St 03/20/23 6 MODULE MAP PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR [FOR INSTALLER USE ONLY] PHOTOVOLTAIC SYSTEM 1 Solar Edge 3.0 Kw Inverter (SE3000H-US RGM SI1) 12 Solar Edge P401 Power Optimizers 4.26 KW DC 12 Longi Solar 355W Modules (LR4-60HPB-355M) Solar Array 2 8 Longi Solar 355W 8 P401 Optimizers Pitch: 6 Deg Azimuth: 270 Deg Solar Array 1 4 Longi Solar 355W 4 P401 Optimizers Pitch: 6 Deg Azimuth: 180 Deg 1213 N Lyon St 03/20/23 7 PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR INVERTER MAP INVERTERPHOTOVOLTAIC SYSTEM 1 Solar Edge 3.0 Kw Inverter (SE3000H-US RGM SI1) 12 Solar Edge P401 Power Optimizers 4.26 KW DC [FOR INSTALLER USE ONLY] 12 Longi Solar 355W Modules (LR4-60HPB-355M) Solar Array 2 8 Longi Solar 355W 8 P401 Optimizers Pitch: 6 Deg Azimuth: 270 Deg Solar Array 1 4 Longi Solar 355W 4 P401 Optimizers Pitch: 6 Deg Azimuth: 180 Deg 1213 N Lyon St 03/20/23 D1 MODULE DATA SHEET PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR 1213 N Lyon St 03/20/23 INVERTER DATA SHEET PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR D2 1213 N Lyon St 03/20/23 PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR OPTIMIZER DATA SHEET D3 1213 N Lyon St 03/20/23 PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR ATTACHMENT DATA SHEET D5 1213 N Lyon St 03/20/23 PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR D6 RACKING CERTIFICATE 1213 N Lyon St 03/20/23 PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR D6 RACKING CERTIFICATE 1213 N Lyon St 03/20/23 PV SYSTEM AS INDICATED NOVEMBER 23, 2022 SABINA HUERTA 1213 N LYON ST SANTA ANA, CA 92701 Drawn By : Narek A. Clean Energy Solutions Inc. Address: 1055 West 7th Street 33rd Floor, Los Angeles, CA 90017 Phone Number: (800)994 1134 Lic# 998787 Class C-10 CONTRACTOR D7 GROUNDING SPECS 1213 N Lyon St 03/20/23 Expedited Permit Process for PV Systems1 Expedited Permit Process for PV Systems Standard String System The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Standard String System to use with the Expe- dited Permit Process. The Micro-Inverter, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 1213 N Lyon St 03/20/23 Expedited Permit Process for PV Systems2 Expedited Permit Process for Small-Scale PV Systems Standard String System The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 1213 N Lyon St 03/20/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Standard String System Site Plan                                                         Gate 18'' fire setback 36'' fire setback 1 8 ' ' f i r e s e t b a c k 36'' fire setback 36 ' ' f i r e s e t b a c k Slope Change Line N L y o n S t Solar Array 2 8 Longi Solar 355W 8 P401 Optimizers Pitch: 6 Deg Azimuth: 270 Deg Solar Array 1 4 Longi Solar 355W 4 P401 Optimizers Pitch: 6 Deg Azimuth: 180 Deg J/B MSPINV ACD Clean Energy Solutions Inc. 1055 West 7th Street 33rd Floor,Sabina Huerta Los Angeles, CA 90017 1213 N Lyon St, Santa Ana, CA 92701 (800) 994 1134 3.94KW 1213 N Lyon St 03/20/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Standard String System Electrical Diagram                                                                                                                                                                                                                                                    Clean Energy Solutions Inc. 1055 West 7th Street 33rd Floor,Sabina Huerta Los Angeles, CA 90017 1213 N Lyon St, Santa Ana, CA 92701 (800) 994 1134 3.94KW 1213 N Lyon St 03/20/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Notes for Standard String System Electrical Diagram Contractor Name, Address and Phone: _________________ _________________ _________________ _________________ Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: __________________________ Site Address: ________________________ System AC Size: ______________________ SIZE FSCM NO DWG NO REV SCALE NTS Date:SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS A V V A A W V MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING V W V A A INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OCPD(s), ONE FOR EACH INVERTER. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ______oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE _____oC 2.) 2005 ASHRAE FUNDEMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix D): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE ® REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) RATED MPP CURRENT RATED MPP VOLTAGE MAX SYSTEM VOLTAGE MAX CIRCUIT CURRENT A V V A PHOTOVOLTAIC POWER SOURCE WARNING: ELECTRICAL SHOCK HAZARD–LINE AND LOAD MAY BE ENERGIZED IN OPEN POSITION AC OUTPUT CURRENT NOMINAL AC VOLTAGE A V SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Clean Energy Solutions Inc. 1055 West 7th Street 33rd Floor,Sabina Huerta Los Angeles, CA 90017 1213 N Lyon St, Santa Ana, CA 92701 (800) 994 1134 3.94KW 1213 N Lyon St 03/20/23 City of Santa Ana, I Sabina Huerta give authorization to Clean Energy Solutions to install panels at my property located at 1213 N Lyon St Santa Ana, CA 92701. If you have any questions, please contact Clean Energy Solutions thank you. 1213 N Lyon St 03/20/23 1213 N. LYON ST. SANTA ANA, CA 92701 HUERTA, SABINA Prepared For: CLEAN ENERGY SOLUTIONS, INC. 1055 WEST 7TH STREET, 33RD FLOOR LOS ANGELES, CA 90017 (800) 994-1134 Design Criteria 1- Code: CALIFORNIA BLDG CODE 2019 / ASCE 7-16 2 - Wind: 95 MPH, Exposure: C 3 - Wood Species: DF-L No. 2 (SG = 0.5 ) Notice: Use restrictions of these calculations. The attached Calculations are valid only when bearing original signature hereon. Contractor/Client to verify existing dimensions/conditions prior to construction & solar racking is installed per manufacturer span requirements. The use of these calculations is solely intended for the above mentioned project. 1-844-PV ELITE | info@yoursolarplans.com 3000 E. Birch Street Suite 201 | Brea CA 92821 9/12/2022 Structural Calculations for SOLAR POWER SYSTEM CONNECTION CHECK AT: Job: 1213 N Lyon St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`abcbdefgdhijhklgbjabcbmnon`cbpfbkgliqdglgbrcfrklflsbijsbigdgrgabtlfebdrcliqjbfhiblghrifhibdsljbjechiugabvehfjhiu krjbljrwghriwcrkbddxydbcddarefjkriphcsliqregwegrvglhibjpcrsgahdgrrfzhgagabfrklf{egarchgq|lthiu}echdjhkghrivbprcb wcrkbbjhiuzhgajbdhuix ~fbldbirgbgalggab{`|l€lcjdvqrklghrizbvdhgbzhffirgvbewjlgbjgrdewwrcg{‚ƒ„…††x‡hijregzaqx ˆEH=L;EC:<  .. .4\‰. 0 7'....# ..!.8. 0 7'4  ...  .. #..4. .Š\..4#..# .‹ . . #....4.4‰.#.. ! !./Œ 768...#+...! .4.. !..\.‰.!#\44.#.....##+. ..! 9.4!!.4.\.4. #.! ..‹\.4 # T ..4\...#... .‰...4 \..  Ž‘’ “”•–”—”˜™š™™›œœžŸ ¡¢£›¡¤Ÿ•œ¥—”¦”•Ÿ¥¥œ¥ 1213 N Lyon St 03/20/23 ASCE 29.4.4 Rooftop Solar Panels Parallel to the Roof Surface on Buildings of All Heights and Roof Slopes. Roof Slope  = 6 ° Roof Shape Gable Tributary Width s = 6.00 ft Tributary Length l = 2.88 ft Effective Area A e = 17.27 ft2 Height of Structure h = 15 ft Wind Speed V = 95 mph Exposure Category C Building Width B = 30 ft Building Length L = 50 ft Zone Width a = 3 ft Elevation Height zg = 163 ft Wind Directionality Kd = 0.85 Topography Factor Kt = 1.00 Ground Elevation Factor Ke = 0.99 Velocity Pressure Exposure Coefficient Kz = 0.85 Velocity Pressure q z = 0.00256KzKztKdKeV2 = 16.57 psf Solar Array Pressure Equalization a = 0.77 Array Edge Factor E = 1.50 Zone GCp p = qz(GCp)(E)(a) 3 3.05 -58.29 3r -- 3e -- 2 2.23 -42.50 2r -- 2e -- 2n -- 1 1.64 -31.36 1'0.90 -17.18 1213 N Lyon St 03/20/23 LAG SCREW ANALYSIS Loads Wind Pressures qz = -42.50 psf Solar Panel Load QD = 3 psf Panel Length l = 5.758 ft Panel Width b 3.4055 ft Attachment Spacing s = 6 ft Portrait Tributary Area At = 17.27 ft2 Wind Load P W = qz * At = -734 lbs Dead Load P D = Q D * At = 51.821 lbs Uplift Pa = 0.6 P D + 0.6 Pw = -409 lbs Landscape Tributary Area At = b * s = 10.217 ft2 Wind Load P W = qz * At = -434 lbs Dead Load P D = Q D * At = 30.65 lbs Uplift Pa = 0.6 P D + 0.6 Pw = -242 lbs Lag Screw 5/16" x 5" Specific Gravity of Lumber SG = 0.50 (Douglas Fir-Larch) Diameter of Lag Screw D = 5/16 in Withdraw Design /in 1800*SG 3/2 *D 3/4 = 266 lbs/in Depth of Embedment lp = 2.50 in Total Nominal Withdrawal Value W = W * l p = 665 lbs Load Duration Factor CD = 1.6 Withdrawal Design Value W' = W * C D = 1064 lbs Demand Capacity Ratio DCR = Pa / W' = 0.38 < 1 OK 1213 N Lyon St 03/20/23 ASCE 30.3.2 Design Wind Pressure Beam/ Top Chord Check Roof Slope  = 6 ° Roof Shape Gable Tributary Width s = 2.00 ft Tributary Length L = 18.75 ft Effective Area A = L ( MAX [ s , L/3] ) = 100 ft2 Height of Structure h = 15 ft Wind Speed V = 95 mph Exposure Category C Building Width B = 30 ft Building Length L = 50 ft Zone Width a = 3 ft Elevation Height zg = 163 ft Wind Directionality Kd = 0.85 Topography Factor Kt = 1.00 Ground Elevation Factor Ke = 0.99 Velocity Pressure Exposure Coefficient Kz = 0.85 Velocity Pressure q z = 0.00256KzKztKdKeV2 = 16.57 psf Internal Pressure Coefficient (GCpi) = -0.18 Zone GCp p = q z [(GCp) - (Gcpi)] 3 1.40 -26.18 3r - - 3e - - 2 1.40 -26.18 2r - - 2e - - 2n - - 1 1.00 -19.56 1'0.90 -17.90 1213 N Lyon St 03/20/23 Beam/ Top Chord Check Lumber: Moment Demand # of Attachment per Rafter N A = Span : Orientation Lenght (ft) : Dead Load Roof Material: Q D = psf Live Load QLr = psf Wind Load p = psf Snow Load QS = psf Rafter Spacing s = in Wind Load, Portrait Portrait UL = Wind Load, Landscape Landscape U W = Linear Dead Load wd = plf Live Load wLr = plf Start ft Start ft End ft End ft Snow Load ws = plf Start ft Start ft End ft End ft Ma, Moment D lb-ft D+Lr lb-ft D+S lb-ft 0.6D+0.6W lb-ft D+0.45W+0.75Lr lb-ft D+0.45W+0.75S lb-ft Moment Capacity Framing Member Size Lumber Grade : DF-L No. 2 C M = 1 Ct = 1 Cr= CF = fb = psi C fu =C i = Breadth b = in Depth d = in Section Modulus Sx = bd 2 / 6 = in3 Bending Stress Capacity Fb = CM * C t * Cr * C F * fb = psi Table 4.3.1 NDS 2015 Deflection Limit E = ksi I = in4 Transient Deflection in Transient Deflection Allowed > [OKAY] Total Deflection in Total Deflection Allowed > [OKAY] -26.18 DF-L No. 2 2 j lj (ft) pd,j  (lbs) pw,j  (lbs) ps,j  (lbs) Portrait 1 2.7 51.8 -452 0.0 7.0 51.8 -452 0 0.0 0 0.0 0.0 0 0.0 0.0 6.00 11.75 0.00 0.00 1.00 Portrait 0 0.0 0.0 10.00 1 2 3 4 Eave 2 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0 0.0 Portrait 0 0.0 0.0 0 0.0 20 40 0.0 0.0 0.0 0.0 0 0.0 Portrait 0 0.0 30.65 -268 0 0 0.0 0 2 0 0 0.0 Portrait 2 0.0 Portrait 0 0.0 0.0 AT (ft2) 17.274 10.217 pd (lbs) 51.821 -452 p w (lbs) ps (lbs) 0 7.76 2x6 1.15 1.3 18.75 7.76 18.75 900 1.50 5.50 304 517 304 268 220 220 DCR 0.9 1211 psi D 482 psi 0.40 7.56 1346 CD Fb' = C D * F b ASD Load Ma * S x 1.15 1547 psi D+S 482 psi 0.31 OKAY OKAY 1.25 1682 psi D+Lr 821 psi 0.49 OKAY 1.6 2153 psi 0.287 492 120 1600 20.80 0.6D+0.6W 426 psi 0.20 OKAY 1.0 1 20 0.00 24 Comp 0.145 971 180 1.6 2153 psi D+0.45W+0.75S 349 psi 0.16 OKAY 1.6 2153 psi D+0.45W+0.75Lr 349 psi 0.16 OKAY ൌ ሺ െ ሻ െ െ െ ‐200.0 ‐100.0 0.0 100.0 200.0 300.0 0.000 5.000 10.000 15.000 20.000 1213 N Lyon St 03/20/23 EISMIC WEIGHT COMPARISON / ANALYSIS - (PER CEBC 2019 Part 10 Chapter 5 Section 502.5) PV System Weight Module Model Longi Panel Weight Wpanel = 43 lbs Number of Panels NPV = 12 Total PV System Weight W PV = Wpanel * NPV = 516 lbs Existing Roof Weight Roof Weight QD =10.0 psf Building Length Lbuild =50 ft Building Width W build =30 ft Roof Area Abuild =1500 ft2 Building Perimeter Pbuild = 160 ft Wall Height ht = 8 ft Wall weight Qwall = 15 psf Interior wall weight Qint = 10 psf Roof Load Wfloor = Abuild * QD = 15000 lbs Wall LoadWwall = ht /2 * Qwall * Pbuild + Abuild * Qint /2 = 17100 lbs Total Story Weight Wbuild = Wfloor + Wwall = 32100 lbs Percentage Weight Increase WPV / Wbuild = 1.61%< 10% OKAY 1213 N Lyon St 03/20/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 1213 N Lyon St Santa Ana, CA 92701 Clean Energy Solutions 998787 Bernard Albosta 800-994-1134 3/9/23 mluna@cleanenergysolar.org 1213 N Lyon St 03/20/23