Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1101 W 6th St - Plan
Digitally sealed by RJM on Date: Job #: 11/1/22 11/1/22 22-17606 Mobile: (909) 566-0066 Structural Analysis Report For Photovoltaic System Addition to Existing Structure At The Melros Residence 1101 W 6th St Santa Ana , CA 92703 Designed in Accordance with CBC 2019, ASCE 7-16 E.O.R.: Ryan McPherson, P.E. 9240 Limonite Ave Jurupa Valley, CA 92509 Email: SE@mcpe.group 11/1/2022 2:48 PM 1 of 7 ©McPherson Engineering 1101 W 6th St 03/21/23 McPherson Engineering By: T.B. Date: 11/1/22 Project Info 3 Gravity Loads 4 Lateral Loads 5 Wind Uplift Design 6 Summary 7 Table Of Contents 11/1/2022 2:48 PM 2 of 7 ©McPherson Engineering 1101 W 6th St 03/21/23 McPherson Engineering By: T.B. Date: 11/1/22 Location: 1101 W 6th St Santa Ana , CA 92703 Existing Structure Info: Number of Stories = 1 Aroof = 1983 sq. ft. Roof Square Footage A3rd_flr = 0 sq. ft. Third Floor Square Footage (if applicable) A2nd_flr = 0 sq. ft.Second Floor Square Footage (if applicable) Site Properties: Lattitude = Longitude = Ss = 1.297 S1 = 0.462 Exposure Category = C Ult. Wind Speed = 110 m.p.h. P.V. Array Info: Model = SEG-400-BMD-HV Height of Panel = 67.79 in. Width of Panel = 44.64 in. Area of Panel = 21.0 ft.2 Number of New Panels = 14 Number of Exis. Panels = 0 Total Area of Array = 294.2 ft.2 Spacing of Anchors = 6.0 ft. max. on center rows of racks per panel = 2 Panel Tilt = 27-45 deg Project Info 33.749869 -117.881713 11/1/2022 2:48 PM 3 of 7 ©McPherson Engineering 1101 W 6th St 03/21/23 McPherson Engineering By: T.B. Date: 11/1/22 Existing Loads: Roof Design Loads: Roofing = 4.0 p.s.f.Composition roofing Sheathing = 1.5 p.s.f.1/2" Plywood Framing = 1.5 p.s.f.2x Rafter/Truss Framing Misc = 1.0 p.s.f. DLr1 = 8.0 p.s.f.Roofing Dead Load (applied to top of rafters/trusses only) Ceiling = 2.0 p.s.f. Drywall and 2x framing DLr2 = 10.0 p.s.f. Total Existing Roof Dead Load LLr = 20.0 p.s.f. Roof Live Load (Per C.B.C, Table 1607.1) SL = 0.0 p.s.f.Snow Load Floor Design Loads: (if applicable) Flooring = 10.0 p.s.f.Weight of floor finish Sheathing = 2.2 p.s.f.3/4" plywood Framing = 2.0 p.s.f.2x framing or manufactured floor truss Interior Partitions = 15.0 p.s.f.2x framed walls with drywall finish each side Ceiling = 5.0 p.s.f.Drywall ceiling finish below Misc. = 0.8 p.s.f. DLf = 35.0 p.s.f.Total Existing Floor Dead Load Proposed Loads: Panels = 2.8 p.s.f. weight of panels including rack system DLr1_proposed = 10.8 p.s.f. Proposed Roof Dead Load (applied to top only) DLr2_proposed = 12.8 p.s.f.Total Proposed Roof Dead Load LLr_proposed = 0.0 p.s.f. Check Proposed Gravity Loads: Total Existing Roof Load Wex = (DLr1 + LLr) (Aroof) = 55.5 kips Total Proposed Roof Load Wprop = (DLr1 + LLr) (Aroof - Aarray) + (DLr1_proposed + LLr_proposed) (Aarray) = 50.5 kips Proposed Load Demand Roof Live Loads need not be applied to the area covered with by PV panel where the clear space between the panels and the roof sureface is 24in or less, 1607.13.5.1 item 1 Exception Gravity Loads Wprop - Wex = -9.14% Wex TOTAL DECREASE IN GRAVITY LOADS, PANELS OK! 11/1/2022 2:48 PM 4 of 7 ©McPherson Engineering 1101 W 6th St 03/21/23 McPherson Engineering By: T.B. Date: 11/1/22 Seismic Design Parameters Risk Category = 2 Per Table 1-5-1 R = 6.5 Response Modification Factor (Table 12-2.1) Site Class = D Per 11.4.2 Ie = 1 Seismic Importance Factor (Table 1.5-2) Ss = 1.30 Short Period P.G.A. S1 = 0.46 1-Sec Period P.G.A. S.D.C. = D Seismic Design Category Per 11.6 Fa = 1.20 Site Coefficient per Table 11.4-1 ASCE 7-16 Supplement #1 Tables used for Fa and Fv Fv = 1.70 Site Coefficient per Table 11.4-2 (note: section 11.4.8 Exception #2 calc used) SMS = SDS Fa = 1.56 Short Period M.C.E. Per Eq. 11.4-1 SM1 = SD1 Fv = 0.79 1-Sec Period M.C.E. Per Eq. 11.4-2 SDS = 2/3 (SMS) = 1.04 Short Period Design Parameter Per Eq 11.4-3 SD1 = 2/3 (SM1 ) = 0.52 1-Sec Period Design Parameter Per Eq 11.4-4 Approximate Fundamental Period (Per 12.8.2.1) per Eq. 12.8-7 hn = 15 ft Ct = 0.02 (per table 12.8-2) x = 0.75 (per table 12.8-2) T = 0.15 sec Approximate Fundamental Period TL = 8 sec Long-Period Transition Period per Figure 22-12 Seismic Response Coefficient (Per 12.8.1.1) CS = (SDS Ie)/R = 0.16 Seismic Response Coefficient Per Eq. 12.8-2 Cs1 = 1.5*(SD1 Ie)/R T = 0.79 Max. Seismic Response Coefficient Per Eq. 12.8-3 if T ≤ TL Cs2 = 0.01 Min. Seismic Response Coefficient Per Eq. 12.8-5 Cs2 = 0.044 SDS Ie = 0.05 Min. Seismic Response Coefficient Per Eq. 12.8-5 Cs3 = 0.5 S1 Ie/R = 0.04 Min. Seismic Response Coefficient Per Eq. 12.8-6 if S 1 ≥ 0.6g CS = 0.16 Design Seismic Coefficient Check Additional Base Shear Wexisting = 19.8 kips Weight of Existing Structure Wpanels = 0.8 kips Weight of Proposed Panels Vexisting = Cs Wexisting = 3.2 kips Roof Level Shear of Existing Structure Vpanels = Cs Wpanels = 0.1 kips Additional Roof Level Shear of Proposed Panels Vpanels Vexisting T = Ct (hn) x = 4.09% < 10%PER C.E.B.C. 502.5 EXCEPTION, STRUCTURE DOES NOT REQUIRE SEISMIC RETROFIT, PANELS OK! Lateral Loads 11/1/2022 2:48 PM 5 of 7 ©McPherson Engineering 1101 W 6th St 03/21/23 McPherson Engineering By: T.B. Date: 11/1/22 Rooftop Solar Panels Wind Pressures (Section 29.4, ASCE 7-16) Vult = 110 mph Kzt = 1.00 (sec 26.8.2) h = 15 ft Exposure Category = C Kz = 0.85 (sec 26.10.1) Roof Zone = 2 Kd = 0.85 (sec 26.6) Roof θ = 27-45 deg Ke = 1.00 (sec 26.9) qh = 0.00256 Kz Kzt Kd Ke V 2 qh = 22.38 (eq. 26.10-1) GPp = -2 uplift γE = 1.5 (sec 29.4.4) γa = 0.71 (fig 29.4-8) γE = 1.5 FIG 29.4-7)γc = 0.94 (fig 29.4-7) hpt = 0 γa = 0.71 (fig 29.4-8)γ p = 0.9 (fig 29.4-7) ω = 0.00 deg (panel tilt) GPp = -2 uplift GCrm = 1.4 uplift p = qh (GPp) γ E γa (eq 29.4-7) p = qh (GCrn) γ E γC γp (eq 29.4-6) p = -47.6 p.s.f.p = 39.7 p.s.f. Check Anchorage to Existing Structure 0.6DL - 0.6W controlling load combination (eq. 16-15 for ASD) DL = 2.8 p.s.f.dead load of panel (inlcuding rack system) W = 47.6 p.s.f.wind load normal to face of panel Arealag = 16.9 sq. ft.area tributary to each anchor SPanc = 6.0 ft.spacing of anchors Puplift = Arealag (0.6DL - 0.6W) = 455.6 lbs total uplift on anchor Material = DFL lumber anchor material Dialag = 5/16 in. diameter of screw Penlag = 2.5 in. min. penetration to existing framing Wlag = 266 lb/in. withdrawal load per in. of penetration per NDS Table 11.2A CD = 1.6 load duration factor for wind per NDS Table 2.3.2 Ct = 0.8 temperature factor per NDS Table 2.3.3 Noscrews = 1 number of screws in withdrawal Pallow = Penlag (Wlag CD Ct) * Noscrews = 851.2 lbs total allowable withrawal on anchor Puplift Pallow Anchorage = USE (1) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION 0.54 < 1.00 Anchor is OK! Wind Uplift Anchorage = Flush Mounted Panels - ASCE Section 29.4.4 (where applicable) Flat Roof Panels - ASCE Section 29.4.3 (where applicable) 11/1/2022 2:48 PM 6 of 7 ©McPherson Engineering 1101 W 6th St 03/21/23 McPherson Engineering By: T.B. Date: 11/1/22 Gravity Loads: DEMAND DECREASED BY 9.14% = OK! Lateral Loads: DEMAND INCREASED BY 4.09% < 10% = OK! Anchorage: DEMAND OF 455.6LB. < CAPACITY OF 851.2LB. = OK! USE (1) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION Summary: STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY ANCHORS ON EAVES/OVERHANGS ARE OK! Summary 11/1/2022 2:48 PM 7 of 7 ©McPherson Engineering 1101 W 6th St 03/21/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2. Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6. Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7. Will the PV system be installed without using any ballast system or counter-weight system? 8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 1101 W. 6TH ST American Solar Advantage 1009565 X X X X X X X X X X BOBBY D HARRIS III 877-765-2388 PERMITTING@ASA.SOLAR 11/17/22 1101 W 6th St 03/21/23 EXPEDITED PERMIT PROCESS FOR PV SYSTEMS MICRO-INVERTER The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 1 EXPEDITED PERMIT PROCESS FOR PV SYSTEMS - MICRO-INVERTER 1101 W 6th St 03/21/23 l l ll EXPEDITED PERMIT PROCESS FOR SMALL-SCALE PV SYSTEMS MICRO-INVERTER The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? Yes If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? Yes If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer Seg solar Product Name and Model# SEG-400-BMD-HV[400W] b. Total Weight of PV Modules and Rails 722.68 lbs c. Total Number of Attachment Points 28 d. Weight per Attachment Point (b÷c) ___25.81lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail 72 inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet) 294.20 ft2 g. Distributed Weight of PV Module on Roof (b÷f) 2.45 lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 2 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 2 EXPEDITED PERMIT PROCESS FOR PV SYSTEMS — MICRO-INVERTER 1101 W 6th St 03/21/23 Joe and Jane Homeowner 123 Sunnyside St., Fontana, CA : 6.0 kW Solar Array Bill and Ted's Solar 456 Excellent Drive San Dimas, CA 800-555-1212 MICRO-INVERTER SITE PLAN Contractor Name, Address and Phone: Site Plan for Small-Scale, Single-Phase PV Systems Site Name: Site Address: System AC Size Drawn By: SIZE FSCM NO DWG NO REV Checked By: SCALE NTS Date: SHEET 3 EXP E D I T E D P ER M I T P RO C E S S FO R P V S YS T E M S 1101 W 6th St 03/21/23 E1.1a MODMODMOD MICRO-INVERTER ELECTRICAL DIAGRAM UTILITY SERVICE M SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND 7 1 ARRAY GROUNDING 6 5 8 MAIN DC DC AC AC 2 MICRO-INVERTERS IN BRANCH-DCCIRCUIT AC 3 4 J-BOX AC DISCO M OCPD G INVERTER OCPD MOD MOD MOD G G AC COMBINER BUILDING MAIN SERVICE PANEL 1 DC MICRO-INVERTERS DC IN BRANCH-DCCIRCUIT PANEL 2 4 GROUNDING 5 ELECTRODE AC AC AC FOR UNUSED MODULES 3 PUT "N/A” in BLANK ABOVE CONDUIT AND CONDUCTOR SCHEDULE TAG 1 2 3 4 5 DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME CONDUIT SIZE N/A N/A N/A SAME Drawn By: Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV GEC EGC X ALL THAT APPLY SAME SAME Checked By: SCALE NTS Date:SHEET 4 EXP E D I T E D P ER M I T P RO C E S S FO R P V S YS T E M S EQUIPMENT SCHEDULE TAG DESCRIPTION PART NUMBER NOTES 1 PV DC or AC MODULE SEG SOLAR SEG-400-BMD-HV[400W] 2 DC/AC INVERTER (MICRO) ENPHASE ENERGY IQ8PLUS-72-2-US 3 J-BOX (IF USED) 600V, 55A MAX, 4 INPUTS, MOUNTED ON ROOF FOR WIRE & CONDUIT TRANSITION 4 PV ARRAY 5 AC COMB. PANEL (IF USED) ENPHASE IQ COMBINER BOX 3 (X-IQ-AM1-240-3) 6 GEN METER (IF USED) N/A 7 AC DISCONNECT (IF USED) LOCKABLE BLADE TYPE NON-FUSIBLE AC DISCONNECT NEMA 3R 30A-2P 120/240VAC 8 SERVICE PANEL EXISTING 240V/125A BUS BAR RATING, MAIN SERVICE PANEL, SINGLE PHASE, WITH A 100A MAIN DISCONNECT 10 AWG 10 AWG 3 4 6 AWG 1 1101 W 6th St 03/21/23 E1.2a 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO- INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR MICRO-INVERTER ELECTRICAL DIAGRAM PV MODULE RATINGS @ STC (Guide Section 5) NOTES FOR ALL DRAWINGS: INVERTER RATINGS (Guide Section 4) SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP 2oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE 31oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. Drawn By: Contractor Name, Address and Phone: Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV Checked By:SCALE NTS Date:SHEET SOLAR PV SYSTEM AC POINT OF CONNECTION AC OUTPUT CURRENT 17A NOMINAL AC VOLTAGE 240V THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) No sign necessary since 690.51 marking on PV module covers needed information OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE ® REFERENCES SHOWN AS (CEC 705.12(B)(2)(3)(b)) 5 MODULE MAKE SEG SOLAR MODULE MODEL SEG-400-BMD-HV[400W] MAX POWER-POINT CURRENT (IMP) 12.99 AMPS MAX POWER-POINT VOLTAGE (VMP) 30.81 VOLTS OPEN-CIRCUIT VOLTAGE (VOC) 37.12 VOLTS SHORT-CIRCUIT CURRENT (ISC) 13.60 AMPS MAX SERIES FUSE (OCPD)25A MAXIMUM POWER (PMAX)400 WATT MAX VOLTAGE (TYP 600VDC)1500V VOC TEMP COEFF (mV/oC or %/oC )-0.27° %/°C IF COEFF SUPPLIED, CIRCLE UNITS EXP E D I T E D P ER M I T P RO C E S S FO R P V S YS T E M S INVERTER MAKE ENPHASE ENERGY INVERTER MODEL IQ8PLUS-72-2-US MAX DC VOLT RATING 60 VOLTS MAX POWER @ 40oC 290 WATTS NOMINAL AC VOLTAGE 240 VOLTS MAX AC CURRENT 1.21 AMPS MAX OCPD RATING 20 AMPS 14 1101 W 6th St 03/21/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y SINGLE LINE DIAGRAM PV4 PV MODULE RATING @ STC MANUFACTURER MAX. POWER-POINT CURRENT (IMP) MAX. POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) 12.99 AMPS 30.81 VOLTS 37.12 VOLTS 13.60 AMPS NOM. MAX. POWER AT STC (PMAX) MAX. SYSTEM VOLTAGE VOC TEMPERATURE COEFFICIENT 400 WATT 1500V -0.27° %/°C SEG SOLAR SEG-400-BMD-HIV[400W] 120% RULE BUS BAR RATING X 120%) - MAIN BREAKER RATING = MAX. PV OCPD (125A x 120%) - 100 = 50A Rooftop conductor ampacities designed in compliance with art. 690.8, Tables 310.15(B)(2)(a), 310.15(B)(3)(a), 310.15(B)(3)(c), 310.15(B)(16), Chapter 9 Table 4, 5, & 9. Location specific temperature obtained from ASHRAE 2017 data tables AMBIENT TEMP (HIGH TEMP 2%) RECORD LOW TEMP 2°C 31°C CONDUIT HEIGHT 0.5" ROOF TOP TEMP 53°C CONDUCTOR TEMPERATURE RATE 90°C SYSTEM SIZE: 5.600 kW DC 5.049 kW CEC AC MODULE:(14) SEG SOLAR SEG-400-BMD-HIV[400W] INVERTER:(14) ENPHASE ENERGY IQ8PLUS-72-2-US[240V] INVERTER SPECIFICATIONS MANUFACTURER MAX. POWER AT 40 C 60 VOLTS NOMINAL AC VOLTAGE 290 WATTS MAX. AC CURRENT 240 VOLTS MAX. OCPD RATING MAX. PANELS/CIRCUIT SHORT CIRCUIT CURRENT 1.21 AMPS 20 AMPS MAX. DC VOLT RATING 13 15 AMPS ENPHASE ENERGY IQ8PLUS-72-2-US THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) AC OUTPUT CURRENT NOMINAL AC VOLTAGE 240V 17A WIRE QTY WIRE TAG #CONDUIT WIRE TYPE INVERTER QTY:NOC: CONDUIT FILL: TEMP RATING: WIRE AMP TEMP DE-RATE: WIRE OCP: GRND SIZE GRND WIRE TYPE WIRE GAUGE: TERMINAL 75°C RATING:NEC:STRING AMPS x x = x x =1.25 1.21A 07 10.59A 28.80A 25A90°C 35A x x =1.25 1.21A 07 #8 THWN-210.59A x x = 24.32A90°C 35A x x =1.25 1.21A 14 #8 THWN-221.18A x x = 32.90A75°C 30A #12 40A #10 35A #10 3/4" EMT 3/4" EMT WIRE FROM - - JUNCTION BOX TO COMBINER PANEL COMBINER PANEL TO SUB PANEL ARRAY TO JUNCTION BOX1 2 3 Q CABLE THWN-2 THWN-2 4 0.80 3 1.00 PV WIRE 0.96 0.76 0.94 4 NA #6 SBC 35A x x =1.25 1.21A 14 #8 THWN-221.18A x x = 32.90A75°C 35A #103/4" EMT SUB PANEL TO MSP4 THWN-23 1.00 0.94 G N (N) LOCKABLE BLADE TYPE NON-FUSIBLE AC DISCONNECT NEMA 3R 30A-2P 120/240VAC G L1L1 L2L2 07 MICRO-INVERTERS IN BRANCH CIRCUIT #1 L2L2 L1L1 07 MICRO-INVERTERS IN BRANCH CIRCUIT #2 TERMINATOR CAP ON LAST CABLE CONNECTOR AC TRUNK CABLE (TYP) L1 L2 N G N 15A G M* IQ-Envoy 15A 1 2 (N) JUNCTION BOX 600 V, NEMA 3R UL LISTED 14 NEW SEG SOLAR SEG-400-BMD-HIV[400W] MODULES WITH NEW 14 - ENPHASE ENERGY IQ8PLUS-72-2-US[240V] 240VAC, 1.21A MAX CEC WEIGHTED EFFICIENCY 97% NEMA 3R, UL LISTED, INTERNAL GFDI 10A OR 15A (N) COMBINER PANEL ENPHASE IQ COMBINER 4, X-IQ- AM1-240-4 64A/240V CONTINUOUS, PROTECTION MAX 80A BREAKER ON SOLAR OUTPUT; WITH 10 KAIC CIRCUIT BREAKERS G N 100A M 30A (E) LOADS (E) LOADS EXISTING GROUNDING ELECTRODE SYSTEM 30A (E) LOADS EXISTING 240V/125A,SUB PANEL, SINGLE PHASE G N (E) LOADS 4 100A (E) LOADS (E) LOADS TO INTERIOR EXISTING LOADS 3 POINT OF INTERCONNECT, LOAD SIDE EXISTING 240V/125A BUS BAR RATING, MAIN SERVICE PANEL, SINGLE PHASE, WITH A 100A MAIN DISCONNECT UTILITY COMPANY - SCE UTILITY METER# 222012-450580 (N) PV BREAKER 3 This item has been digitally signed and sealed on Mar 01, 2023 1101 W 6th St 03/21/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y CAUTION: POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN PV5 SIGNAGE NOTES 1. CEC ARTICLES 690 AND 705 AND CRC SECTION R331 MARKINGS SHOWN HEREON 2. ALL MARKINGS SHALL CONSIST OF THE FOLLOWING: A. UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR MACHINE PRINTED LETTERS OR ELECTRO-PLATING B. RED BACKGROUND COLOR WITH WHITE TEXT AND LINE WORK C. ARIAL FONT 3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN THE LOCATIONS SPECIFIED. 4. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT USING POP-RIVETS OR SCREWS. 5. THE LABEL SHALL BE SUITABLE FOR THE ENVIRONMENT WHERE IT IS INSTALLED. 6. WHERE REQUIRED ELSEWHERE IN THIS CODE, ALL FIELD APPLIED LABELS, WARNINGS, AND MARKINGS SHOULD COMPLY WITH ANSI Z535.4 [CEC 110.21(B) FIELD MARKING]. 7. ADHESIVE FASTENED SIGNS MAY BE ACCEPTABLE IF PROPERLY ADHERED. VINYL SIGNS SHALL BE WEATHER RESISTANT [IFC 605.11.1.3] (UNLESS BUSBAR IS FULLY RATED) (CEC 705.12) WHITE LETTERS WITH RED BACKGROUND A C CEC 690.15, 690.13(B) BLACK TEXT WITH YELLOW BACKGROUND SUB PANEL M CEC 690.54 WHITE LETTERS WITH RED BACKGROUND CEC 690.13(B) WHITE LETTERS WITH RED BACKGROUND ELECTRIC SHOCK HAZARD TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT BLACK OUTLINE WITH BLACK TEXT / WARNING IS IN BLACK TEXT AND ORANGE BACKGROUND CEC 690.17(E) CEC 690.56 (C)(3) WHITE LETTERS WITH RED BACKGROUND CEC 690.13.G.3 & CEC 690.13.G.4 WHITE LETTERS WITH RED BACKGROUND ARRAY J/B CEC 690.31(G)(3)(4) & CEC 690.13(G)(4) TO BE PLACED AT LEAST EVERY 10FT WHITE LETTERS WITH RED BACKGROUND TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR ELECTRIC PV PANELS CEC 705.12 BLACK LETTERS WITH ORANGE BACKGROUND CEC 690.56(C)(1)(A) BLACK OUTLINE WITH BLACK TEXT AND WHITE BACKGROUND / NOTE ON TOP IS IN BLACK TEXT AND YELLOW BACKGROUND WARNING: PHOTOVOLTAIC POWER SOURCE SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN ! WARNING THIS EQUIPMENT FEED BY MULTIPLE SOURCES.TOTAL RATING OF ALL OVERCURRENT DEVICE,SHALL NOT EXCEED AMPACITY OF BUSBAR PV SUB PANEL ONLY WARNING! SOLAR DISCONNECT WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM WARNING: Electrical Shock Hazard No user serveable parts inside contact authorized service provider for assistance PHOTOVOLTAIC SYSTEM AC DISCONNECT RATED AC OPERATING CURRENT 16.94 AMPS AC NOMINAL OPERATING VOLTAGE 240 VOLTS SOLAR PV ARRAY MSPACD MTR IQC YOU ARE HERE SERVICE PANEL AC DISCONNECT FOR UTILITY OPERATION (RAPID SHUTDOWN DEVICE) IQ AC COMBINER W 6 T H S T , SUB IQ AC COMBINER This item has been digitally signed and sealed on Mar 01, 2023 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1 27 ' - 4 " 54'-9" 1 2 7 ' - 4 " 54'-9" 1 2 ' - 1 1 " 13'-0" 60 ' - 1 1 " 2'-2" 5'-0" 5'-0" MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y SOLAR PHOTOVOLTAIC SYSTEM NOTES: 1. ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES: 2022 CA BUILDING CODE, PART 2 2022 CA RESIDENTIAL CODE PART, 2.5 2022 CA MECHANICAL CODE, PART 4 2022 CA ELECTRICAL CODE, PART 3 2022 CA PLUMBING CODE, PART 5 2022 CA EXISTING BUILDING CODE, PART 10 2022 CA GREEN BUILDING STANDARDS CODE, PART 11 2022 CA REFERENCE STANDARDS CODE, PART 12 2022 CA FIRE CODE 2. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, VENTILATION'S INTAKE AIR OPENINGS SHALL NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC SYSTEM. 3. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY AND INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. [NEC 690.4(D)] 4. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND SWITCHES. 5. PAINT PV CONDUIT TO MATCH THE DWELLING EXTERIOR. 6. CONTACT THE SERVICING UTILITY BEFORE POWERING ON THE PHOTOVOLTAIC SYSTEM. SCALE: NTS 3 VICINITY MAP PV 1 INDEX OF SHEETS RM PV1 PV2 PV3 PV4 PV5 PV6 TITLE SHEET - SITE PLAN & NOTES ROOF PLAN STRUCTURAL DETAILS SINGLE LINE DIAGRAM (S.L.D.) SIGNAGE INSTALLER OPTIMIZER/ MICROINVERTER MAP COMP SHINGLE SITE INFORMATION 1 STORY ROOF: SCOPE OF WORK (14) SEG SOLAR SEG-400-BMD-HIV[400W] PURE PV MODULES (14) ENPHASE ENERGY IQ8PLUS-72-2-US[240V] [1] AC COMBINER PANEL (E) 125A MAIN SERVICE PANEL DESIGN CRITERIA SINGLE FAMILY RESIDENCE OCCUPANCY: R-3, U CONSTRUCTION TYPE: VB WIND SPEED: 110 MPH EXPOSURE CATEGORY: C MIN STANDOFF HEIGHT OF: 6" CONDUIT:3/4" FIRE SPRINKLER: NO LAT & LONG. : 33.7498692, -117.8817128 SNOW LOAD: 0 SYSTEM FIRE RATING CLASS A WHEN TYPE I OR II PV MODULE USED PER R902.3 OR R904.4 ROOF AREA: 1983 SQ.FT. PV ARRAY AREA: 294.2 SQ.FT. SCALE: 1/16" 1 PLOT PLAN PV 1 TITLE SHEET- SITE PLAN & NOTES PV1 (N) ROOF MOUNTED PV SOLAR MODULES JB FMC USED FOR OUTDOOR CONDUIT RUNS,EMT USED FOR EXTERNAL CONDUIT RUNS (E) DRIVEWAY PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E (E) MAIN RESIDENCE MS P MT R AC D IQ C MAIN SERVICE PANEL & METER (N) 30A AC DISCONNECT VISIBLE BLADE,LOCKABLE TYPE (N) IQ AC COMBINER PANEL (E) FENCE SU B SUB PANEL W 6TH ST, FRONT OF HOUSE N S H E L T O N ST . NOTES EXTERIOR CONDUIT MAY NOT BE INSTALLED WITHIN ANY REQUIRED MUST BE 5'0" MAXIMUM LENGTH ON EXTERIOR OR ALL IN ATTIC PATHWAY TO THE RIDGE AND SHALL NOT BE INSTALLED WITHIN ANY REQUIRED SETBACK AT THE RIDGE NO INTERIOR CONDUIT SHALL BE INSTALLED WITHIN ANY REQUIRED SETBACK AT THE RIDGE. SHED This item has been digitally signed and sealed on 12/20/2022 STRUCTURAL ONLYBLDG# 101114273 ISS. 3/16/2023 ELEC# 20179021 ISS. 3/21/2023 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 1101 W 6th St 03/21/23 1 27 ' - 4 " 54'-9" 1 2 7 ' - 4 " 54'-9" 1 2 ' - 1 1 " 13'-0" 60 ' - 1 1 " 2'-2" 5'-0" 5'-0" MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y SOLAR PHOTOVOLTAIC SYSTEM NOTES: 1. ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES: 2022 CA BUILDING CODE, PART 2 2022 CA RESIDENTIAL CODE PART, 2.5 2022 CA MECHANICAL CODE, PART 4 2022 CA ELECTRICAL CODE, PART 3 2022 CA PLUMBING CODE, PART 5 2022 CA EXISTING BUILDING CODE, PART 10 2022 CA GREEN BUILDING STANDARDS CODE, PART 11 2022 CA REFERENCE STANDARDS CODE, PART 12 2022 CA FIRE CODE 2. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, VENTILATION'S INTAKE AIR OPENINGS SHALL NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC SYSTEM. 3. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY AND INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. [NEC 690.4(D)] 4. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND SWITCHES. 5. PAINT PV CONDUIT TO MATCH THE DWELLING EXTERIOR. 6. CONTACT THE SERVICING UTILITY BEFORE POWERING ON THE PHOTOVOLTAIC SYSTEM. SCALE: NTS 3 VICINITY MAP PV 1 INDEX OF SHEETS RM PV1 PV2 PV3 PV4 PV5 PV6 TITLE SHEET - SITE PLAN & NOTES ROOF PLAN STRUCTURAL DETAILS SINGLE LINE DIAGRAM (S.L.D.) SIGNAGE INSTALLER OPTIMIZER/ MICROINVERTER MAP COMP SHINGLE SITE INFORMATION 1 STORY ROOF: SCOPE OF WORK (14)SEG SOLAR SEG-400-BMD-HIV[400W] PURE PV MODULES (14)ENPHASE ENERGY IQ8PLUS-72-2-US[240V] [1]AC COMBINER PANEL (E)125A MAIN SERVICE PANEL DESIGN CRITERIA SINGLE FAMILY RESIDENCE OCCUPANCY: R-3, U CONSTRUCTION TYPE: VB WIND SPEED: 110 MPH EXPOSURE CATEGORY: C MIN STANDOFF HEIGHT OF: 6" CONDUIT:3/4" FIRE SPRINKLER: NO LAT & LONG. : 33.7498692, -117.8817128 SNOW LOAD: 0 SYSTEM FIRE RATING CLASS A WHEN TYPE I OR II PV MODULE USED PER R902.3 OR R904.4 ROOF AREA: 1983 SQ.FT. PV ARRAY AREA: 294.2 SQ.FT. SCALE: 1/16" 1 PLOT PLAN PV 1 TITLE SHEET- SITE PLAN & NOTES PV1 (N)ROOF MOUNTED PV SOLAR MODULES JB FMC USED FOR OUTDOOR CONDUIT RUNS,EMT USED FOR EXTERNAL CONDUIT RUNS (E)DRIVEWAY PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E (E)MAIN RESIDENCE MS P MT R AC D IQ C MAIN SERVICE PANEL & METER (N)30A AC DISCONNECT VISIBLE BLADE,LOCKABLE TYPE (N)IQ AC COMBINER PANEL (E)FENCE SU B SUB PANEL W 6TH ST, FRONT OF HOUSE N S H E L T O N S T . NOTES EXTERIOR CONDUIT MAY NOT BE INSTALLED WITHIN ANY REQUIRED MUST BE 5'0" MAXIMUM LENGTH ON EXTERIOR OR ALL IN ATTIC PATHWAY TO THE RIDGE AND SHALL NOT BE INSTALLED WITHIN ANY REQUIRED SETBACK AT THE RIDGE NO INTERIOR CONDUIT SHALL BE INSTALLED WITHIN ANY REQUIRED SETBACK AT THE RIDGE. (E)ADU This item has been digitally signed and sealed on 12/20/2022 STRUCTURAL ONLY 1101 W 6th St 03/21/23 2' - 8 " 22 ' - 9 " 28 ' - 1 " NE W P V A T T A C H M E N T S AT 6 ' - 0 " O . C . 44.64" MODULE WIDTH 67 . 7 9 " MO D U L E HE I G H T MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y KEY LEGEND: MAIN SERVICE PANEL GAS METER INVERTER AC DISCONNECT DC DISCONNECT SUB PANEL MANUAL TRANSFER SWITCH = PV CONDUIT RUN = (N) SOLAR MODULE (E) SOLAR MODULE 3' FIRE SETBACKS 18" FIRE SETBACKS ROOF SYMBOLS: DORMER ATTIC VENT ATTACHMENT CHIMNEY ROOF PVC VENT ROOF T-VENT FLAT O'HAGINS VENT = = = 36" FSB 18" FSB = = = = = = HEAT EXCHANGE VENT = TURBINE ATTIC VENT OVERHEAD UTILITY FEED = = ROUND ATTIC VENT ROUND SKY LIGHT = = RECTANGLE SKY LIGHT = AC UNIT = SATELLITE DISH = = = = = = = PV ONLY IQ AC COMBINER JUNCTION BOX (READILY ACCESSIBLE) SMART SWITCH (MID) GENERATOR AUTOTRANSFER SWITCH = = = = = MSP INV IQC ACD ESS BACKUP INTERFACE (ESS) = GATEWAY (ESS) BI DCD SUB JB UTILITY PRODUCTION METER BATTERY (ESS)MID GEN ATS MTS GTW = = = MTR AZIMUTH ARRAY TILT MODULE QUANTITY ROOF DATA 1 34° 270° 14 Total roof area(sq.ft.): Total array area(sq.ft.): Array percentage: 1983 294.2 14.8%PV2 ROOF PLAN JB SCALE: 3/32" 1 SITE PLAN PV 2 FMC USED FOR OUTDOOR CONDUIT RUNS,EMT USED FOR EXTERNAL CONDUIT RUNS RAFTER = OPTIMIZER/MICRO-INVERTER = RAIL = MS P MT R IQ C AC D MAIN SERVICE PANEL & METER (N) 30A AC DISCONNECT VISIBLE BLADE,LOCKABLE TYPE (N) IQ AC COMBINER PANEL 1 8 " F I R E S E T B A C K 1 8 " F IR E S E T B A CK STRING #2 - 07 MODULES STRING #1 - 07 MODULES STRING(S) 36" FIRE SETBACK 36" FIRE SETBACK 36" FIRE SETBACK N S H E L T O N ST . W 6TH ST, FRONT OF HOUSE SU B SUB PANEL NOTES EXTERIOR CONDUIT MAY NOT BE INSTALLED WITHIN ANY REQUIRED MUST BE 5'0" MAXIMUM LENGTH ON EXTERIOR OR ALL IN ATTIC PATHWAY TO THE RIDGE AND SHALL NOT BE INSTALLED WITHIN ANY REQUIRED SETBACK AT THE RIDGE NO INTERIOR CONDUIT SHALL BE INSTALLED WITHIN ANY REQUIRED SETBACK AT THE RIDGE. This item has been digitally signed and sealed on 12/20/2022 1101 W 6th St 03/21/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y STRUCTURAL DETAILS PV3 SNAPNRACK ULTRA RAIL 92 L FOOT SHOWN. COMPATIBLE WITH ULTRA RAIL ALL PURPOSE 90 L FOOT MODULE HEIGHT OFF ROOF, RANGE: UR-40: 31 UR-60: 41 2" - 41 8" - 51 2" 8" L-FOOT TO BASE ATTACHMENT DOWNSLOPE FROM ROOF PENETRATION FLASHING SHIELDS ENTIRE ROOF PENTRATION 5 SNAPNRACK ULTRA RAIL 16" LAG SCREW S.S. COMP SHINGLE ROOFING, TYP. ROOF DECKING, TYP. WOOD RAFTER SHOWN, SIMILAR AT OTHER STRUCTURAL MEMBER TYPES PENETRATION DETAIL 21 2" MIN. EMBEDMENT INTO WOOD MEMBER (N) SOLAR MODULES PV ROOF ATTACHMENT (SEE DETAIL TO THE LEFT) SNAPNRACK (RACKING SYSTEM) 2X4 FRAMING @ 24" O.C. TYP. 6' MAX 2 2' O.C. PARTIAL ROOF FRAMING PLAN NOT TO SCALE 3' MIN 1 8 " MI N . 1 ATTACHMENT DETAIL NOT TO SCALE MODULE MODULE WEIGHT (LBS) MODULE AREA (FT²) # OF MODULES TOTAL PV SYSTEM WEIGHT (LBS) LOADING PER STANDOFF (PSF) TOTAL AREA (FT²) LOADING (PSF) 47.39 14 663.5 63.00 334.24 2.76 21.01 This item has been digitally signed and sealed on 12/20/2022 1101 W 6th St 03/21/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y SINGLE LINE DIAGRAM PV4 PV MODULE RATING @ STC MANUFACTURER MAX. POWER-POINT CURRENT (IMP) MAX. POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) 12.99 AMPS 30.81 VOLTS 37.12 VOLTS 13.60 AMPS NOM. MAX. POWER AT STC (PMAX) MAX. SYSTEM VOLTAGE VOC TEMPERATURE COEFFICIENT 400 WATT 1500V -0.27° %/°C SEG SOLAR SEG-400-BMD-HIV[400W] 120% RULE BUS BAR RATING X 120%) - MAIN BREAKER RATING = MAX. PV OCPD (125A x 120%) - 100 = 50A Rooftop conductor ampacities designed in compliance with art. 690.8, Tables 310.15(B)(2)(a), 310.15(B)(3)(a), 310.15(B)(3)(c), 310.15(B)(16), Chapter 9 Table 4, 5, & 9. Location specific temperature obtained from ASHRAE 2017 data tables AMBIENT TEMP (HIGH TEMP 2%) RECORD LOW TEMP 2°C 31°C CONDUIT HEIGHT 0.5" ROOF TOP TEMP 53°C CONDUCTOR TEMPERATURE RATE 90°C SYSTEM SIZE: 5.600 kW DC 5.049 kW CEC AC MODULE:(14) SEG SOLAR SEG-400-BMD-HIV[400W] INVERTER:(14) ENPHASE ENERGY IQ8PLUS-72-2-US[240V] INVERTER SPECIFICATIONS MANUFACTURER MAX. POWER AT 40 C 60 VOLTS NOMINAL AC VOLTAGE 290 WATTS MAX. AC CURRENT 240 VOLTS MAX. OCPD RATING MAX. PANELS/CIRCUIT SHORT CIRCUIT CURRENT 1.21 AMPS 20 AMPS MAX. DC VOLT RATING 13 15 AMPS ENPHASE ENERGY IQ8PLUS-72-2-US THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) AC OUTPUT CURRENT NOMINAL AC VOLTAGE 240V 17A WIRE QTY WIRE TAG #CONDUIT WIRE TYPE INVERTER QTY:NOC: CONDUIT FILL: TEMP RATING: WIRE AMP TEMP DE-RATE: WIRE OCP: GRND SIZE GRND WIRE TYPE WIRE GAUGE: TERMINAL 75°C RATING:NEC:STRING AMPS x x = x x =1.25 1.21A 07 10.59A 28.80A 25A90°C 35A x x =1.25 1.21A 07 #8 THWN-210.59A x x = 24.32A90°C 35A x x =1.25 1.21A 14 #8 THWN-221.18A x x = 32.90A75°C 30A #12 40A #10 35A #10 3/4" EMT 3/4" EMT WIRE FROM - - JUNCTION BOX TO COMBINER PANEL COMBINER PANEL TO SUB PANEL ARRAY TO JUNCTION BOX1 2 3 Q CABLE THWN-2 THWN-2 4 0.80 3 1.00 PV WIRE 0.96 0.76 0.94 4 NA #6 SBC 35A x x =1.25 1.21A 14 #8 THWN-221.18A x x = 32.90A75°C 35A #103/4" EMT SUB PANEL TO MSP4 THWN-23 1.00 0.94 G N (N) LOCKABLE BLADE TYPE NON-FUSIBLE AC DISCONNECT NEMA 3R 30A-2P 120/240VAC G L1L1 L2L2 07 MICRO-INVERTERS IN BRANCH CIRCUIT #1 L2L2 L1L1 07 MICRO-INVERTERS IN BRANCH CIRCUIT #2 TERMINATOR CAP ON LAST CABLE CONNECTOR AC TRUNK CABLE (TYP) L1 L2 N G N 15A G M* IQ-Envoy 15A 1 2 (N) JUNCTION BOX 600 V, NEMA 3R UL LISTED 14 NEW SEG SOLAR SEG-400-BMD-HIV[400W] MODULES WITH NEW 14 - ENPHASE ENERGY IQ8PLUS-72-2-US[240V] 240VAC, 1.21A MAX CEC WEIGHTED EFFICIENCY 97% NEMA 3R, UL LISTED, INTERNAL GFDI 10A OR 15A (N) COMBINER PANEL ENPHASE IQ COMBINER 4, X-IQ- AM1-240-4 64A/240V CONTINUOUS, PROTECTION MAX 80A BREAKER ON SOLAR OUTPUT; WITH 10 KAIC CIRCUIT BREAKERS G N 100A M 30A (E) LOADS (E) LOADS EXISTING GROUNDING ELECTRODE SYSTEM 30A (E) LOADS EXISTING 240V/125A,SUB PANEL, SINGLE PHASE G N (E) LOADS 4 100A (E) LOADS (E) LOADS TO INTERIOR EXISTING LOADS 3 POINT OF INTERCONNECT, LOAD SIDE EXISTING 240V/125A BUS BAR RATING, MAIN SERVICE PANEL, SINGLE PHASE, WITH A 100A MAIN DISCONNECT UTILITY COMPANY - SCE UTILITY METER# 222012-450580 (N) PV BREAKER 3 This item has been digitally signed and sealed on Mar 01, 2023 1101 W 6th St 03/21/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y CAUTION: POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN PV5 SIGNAGE NOTES 1. CEC ARTICLES 690 AND 705 AND CRC SECTION R331 MARKINGS SHOWN HEREON 2. ALL MARKINGS SHALL CONSIST OF THE FOLLOWING: A. UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR MACHINE PRINTED LETTERS OR ELECTRO-PLATING B. RED BACKGROUND COLOR WITH WHITE TEXT AND LINE WORK C. ARIAL FONT 3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN THE LOCATIONS SPECIFIED. 4. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT USING POP-RIVETS OR SCREWS. 5. THE LABEL SHALL BE SUITABLE FOR THE ENVIRONMENT WHERE IT IS INSTALLED. 6. WHERE REQUIRED ELSEWHERE IN THIS CODE, ALL FIELD APPLIED LABELS, WARNINGS, AND MARKINGS SHOULD COMPLY WITH ANSI Z535.4 [CEC 110.21(B) FIELD MARKING]. 7. ADHESIVE FASTENED SIGNS MAY BE ACCEPTABLE IF PROPERLY ADHERED. VINYL SIGNS SHALL BE WEATHER RESISTANT [IFC 605.11.1.3] (UNLESS BUSBAR IS FULLY RATED) (CEC 705.12) WHITE LETTERS WITH RED BACKGROUND A C CEC 690.15, 690.13(B) BLACK TEXT WITH YELLOW BACKGROUND SUB PANEL M CEC 690.54 WHITE LETTERS WITH RED BACKGROUND CEC 690.13(B) WHITE LETTERS WITH RED BACKGROUND ELECTRIC SHOCK HAZARD TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT BLACK OUTLINE WITH BLACK TEXT / WARNING IS IN BLACK TEXT AND ORANGE BACKGROUND CEC 690.17(E) CEC 690.56 (C)(3) WHITE LETTERS WITH RED BACKGROUND CEC 690.13.G.3 & CEC 690.13.G.4 WHITE LETTERS WITH RED BACKGROUND ARRAY J/B CEC 690.31(G)(3)(4) & CEC 690.13(G)(4) TO BE PLACED AT LEAST EVERY 10FT WHITE LETTERS WITH RED BACKGROUND TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR ELECTRIC PV PANELS CEC 705.12 BLACK LETTERS WITH ORANGE BACKGROUND CEC 690.56(C)(1)(A) BLACK OUTLINE WITH BLACK TEXT AND WHITE BACKGROUND / NOTE ON TOP IS IN BLACK TEXT AND YELLOW BACKGROUND WARNING: PHOTOVOLTAIC POWER SOURCE SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN ! WARNING THIS EQUIPMENT FEED BY MULTIPLE SOURCES.TOTAL RATING OF ALL OVERCURRENT DEVICE,SHALL NOT EXCEED AMPACITY OF BUSBAR PV SUB PANEL ONLY WARNING! SOLAR DISCONNECT WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM WARNING: Electrical Shock Hazard No user serveable parts inside contact authorized service provider for assistance PHOTOVOLTAIC SYSTEM AC DISCONNECT RATED AC OPERATING CURRENT 16.94 AMPS AC NOMINAL OPERATING VOLTAGE 240 VOLTS SOLAR PV ARRAY MSPACD MTR IQC YOU ARE HERE SERVICE PANEL AC DISCONNECT FOR UTILITY OPERATION (RAPID SHUTDOWN DEVICE) IQ AC COMBINER W 6 T H S T , SUB IQ AC COMBINER This item has been digitally signed and sealed on Mar 01, 2023 1101 W 6th St 03/21/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y MICRO /OPTIMIZER MAP PV6 INTERNAL USE ONLY This item has been digitally signed and sealed on Mar 01, 2023 1101 W 6th St 03/21/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y NOTES PV7 INTERNAL USE ONLY SITE NOTES: 1. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 3. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 4. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 5. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. EQUIPMENT LOCATIONS: 1. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. 2. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C). 3. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC 690.34. 4. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 2.2.6 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 5. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. STRUCTURAL NOTES: 1. RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY / SUBARRAY, ACCORDING TO RAI MANUFACTURER’S INSTRUCTIONS. 2. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. 3. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED W/ APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 4. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 2.3.6 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. WIRING & CONDUIT NOTES: 1. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 2. CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. 3. VOLTAGE DROP LIMITED TO 1.5%. 4. DC WIRING LIMITED TO MODULE FOOTPRINT. MICRO INVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. 5. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [NEC 110.15]. GROUNDING NOTES: 1. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 2. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC TABLE 250.122. 3. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 4. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45 AND MICRO INVERTER MANUFACTURERS’ INSTRUCTIONS. 5. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OFA MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 7. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] 8. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 AND AHJ. 9. GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.41(B)(1) AND (2) TO REDUCE FIRE HAZARDS DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 2. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 3. PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY RESPONDERS IN ACCORDANCE WITH 690.12(A) THROUGH (D). 4. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND 240. 5. MICRO INVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). 6. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO NEC 690.11 AND UL1699B. INTERCONNECTION NOTES: 1. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 705.12 (B)] 2. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS OUTPUT MAY NOT EXCEED 120% OF BUS BAR RATING [NEC 705.12(D)(2)(3)]. 3. THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUS BAR, PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(B)(2)(3)]. 4. AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC 705.12 (B)(2)(3)(C). 5. FEEDER TAP INTERCONNECTION (LOADSIDE) ACCORDING TO NEC 705.12 (B)(2)(1) 6. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 2.7.8BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [NEC 705.12 (B)(5)]. 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 2' - 8 " 22 ' - 9 " 28 ' - 1 " NE W P V A T T A C H M E N T S AT 6 ' - 0 " O . C . 44.64" MODULE WIDTH 67 . 7 9 " MO D U L E HE I G H T MA R I A M E R L O S 11 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y KEY LEGEND: MAIN SERVICE PANEL GAS METER INVERTER AC DISCONNECT DC DISCONNECT SUB PANEL MANUAL TRANSFER SWITCH = PV CONDUIT RUN = (N) SOLAR MODULE (E) SOLAR MODULE 3' FIRE SETBACKS 18" FIRE SETBACKS ROOF SYMBOLS: DORMER ATTIC VENT ATTACHMENT CHIMNEY ROOF PVC VENT ROOF T-VENT FLAT O'HAGINS VENT = = = 36" FSB 18" FSB = = = = = = HEAT EXCHANGE VENT = TURBINE ATTIC VENT OVERHEAD UTILITY FEED = = ROUND ATTIC VENT ROUND SKY LIGHT = = RECTANGLE SKY LIGHT = AC UNIT = SATELLITE DISH = = = = = = = PV ONLY IQ AC COMBINER JUNCTION BOX (READILY ACCESSIBLE) SMART SWITCH (MID) GENERATOR AUTOTRANSFER SWITCH = = = = = MSP INV IQC ACD ESS BACKUP INTERFACE (ESS) = GATEWAY (ESS) BI DCD SUB JB UTILITY PRODUCTION METER BATTERY (ESS)MID GEN ATS MTS GTW = = = MTR AZIMUTH ARRAY TILT MODULE QUANTITY ROOF DATA 1 34° 270° 14 Total roof area(sq.ft.): Total array area(sq.ft.): Array percentage: 1983 294.2 14.8%PV2 ROOF PLAN JB SCALE: 3/32" 1 SITE PLAN PV 2 FMC USED FOR OUTDOOR CONDUIT RUNS,EMT USED FOR EXTERNAL CONDUIT RUNS RAFTER = OPTIMIZER/MICRO-INVERTER = RAIL = MS P MT R IQ C AC D MAIN SERVICE PANEL & METER (N) 30A AC DISCONNECT VISIBLE BLADE,LOCKABLE TYPE (N) IQ AC COMBINER PANEL 18 " F I R E S E T B A C K 18 " F IR E S E T B A CK STRING #2 - 07 MODULES STRING #1 - 07 MODULES STRING(S) 36" FIRE SETBACK 36" FIRE SETBACK 36" FIRE SETBACK N S H E L T O N ST . W 6TH ST, FRONT OF HOUSE SU B SUB PANEL NOTES EXTERIOR CONDUIT MAY NOT BE INSTALLED WITHIN ANY REQUIRED MUST BE 5'0" MAXIMUM LENGTH ON EXTERIOR OR ALL IN ATTIC PATHWAY TO THE RIDGE AND SHALL NOT BE INSTALLED WITHIN ANY REQUIRED SETBACK AT THE RIDGE NO INTERIOR CONDUIT SHALL BE INSTALLED WITHIN ANY REQUIRED SETBACK AT THE RIDGE. This item has been digitally signed and sealed on 12/20/2022 1101 W 6th St 03/21/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y STRUCTURAL DETAILS PV3 SNAPNRACK ULTRA RAIL 92 L FOOT SHOWN. COMPATIBLE WITH ULTRA RAIL ALL PURPOSE 90 L FOOT MODULE HEIGHT OFF ROOF, RANGE: UR-40: 31 UR-60: 41 2" - 41 8" - 51 2" 8" L-FOOT TO BASE ATTACHMENT DOWNSLOPE FROM ROOF PENETRATION FLASHING SHIELDS ENTIRE ROOF PENTRATION 5 SNAPNRACK ULTRA RAIL 16" LAG SCREW S.S. COMP SHINGLE ROOFING, TYP. ROOF DECKING, TYP. WOOD RAFTER SHOWN, SIMILAR AT OTHER STRUCTURAL MEMBER TYPES PENETRATION DETAIL 21 2" MIN. EMBEDMENT INTO WOOD MEMBER (N) SOLAR MODULES PV ROOF ATTACHMENT (SEE DETAIL TO THE LEFT) SNAPNRACK (RACKING SYSTEM) 2X4 FRAMING @ 24" O.C. TYP. 6' MAX 2 2' O.C. PARTIAL ROOF FRAMING PLAN NOT TO SCALE 3' MIN 1 8 " MI N . 1 ATTACHMENT DETAIL NOT TO SCALE MODULE MODULE WEIGHT (LBS) MODULE AREA (FT²) # OF MODULES TOTAL PV SYSTEM WEIGHT (LBS) LOADING PER STANDOFF (PSF) TOTAL AREA (FT²) LOADING (PSF) 47.39 14 663.5 63.00 334.24 2.76 21.01 This item has been digitally signed and sealed on 12/20/2022 1101 W 6th St 03/21/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y NOTES PV7 INTERNAL USE ONLY SITE NOTES: 1. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 3. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 4. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 5. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. EQUIPMENT LOCATIONS: 1. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. 2. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C). 3. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC 690.34. 4. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 2.2.6 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 5. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. STRUCTURAL NOTES: 1. RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY / SUBARRAY, ACCORDING TO RAI MANUFACTURER’S INSTRUCTIONS. 2. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. 3. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED W/ APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 4. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 2.3.6 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. WIRING & CONDUIT NOTES: 1. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 2. CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. 3. VOLTAGE DROP LIMITED TO 1.5%. 4. DC WIRING LIMITED TO MODULE FOOTPRINT. MICRO INVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. 5. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [NEC 110.15]. GROUNDING NOTES: 1. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 2. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC TABLE 250.122. 3. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 4. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45 AND MICRO INVERTER MANUFACTURERS’ INSTRUCTIONS. 5. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OFA MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 7. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] 8. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 AND AHJ. 9. GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.41(B)(1) AND (2) TO REDUCE FIRE HAZARDS DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 2. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 3. PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY RESPONDERS IN ACCORDANCE WITH 690.12(A) THROUGH (D). 4. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND 240. 5. MICRO INVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). 6. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO NEC 690.11 AND UL1699B. INTERCONNECTION NOTES: 1. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 705.12 (B)] 2. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS OUTPUT MAY NOT EXCEED 120% OF BUS BAR RATING [NEC 705.12(D)(2)(3)]. 3. THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUS BAR, PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(B)(2)(3)]. 4. AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC 705.12 (B)(2)(3)(C). 5. FEEDER TAP INTERCONNECTION (LOADSIDE) ACCORDING TO NEC 705.12 (B)(2)(1) 6. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 2.7.8BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [NEC 705.12 (B)(5)]. 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : C I T Y O F S A N T A A N A SINGLE LINE DIAGRAM PV4 PV MODULE RATING @ STC MANUFACTURER MAX. POWER-POINT CURRENT (IMP) MAX. POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) 12.99 AMPS 30.81 VOLTS 37.12 VOLTS 13.60 AMPS NOM. MAX. POWER AT STC (PMAX) MAX. SYSTEM VOLTAGE VOC TEMPERATURE COEFFICIENT 400 WATT 1500V -0.27° %/°C SEG SOLAR SEG-400-BMD-HIV[400W] Rooftop conductor ampacities designed in compliance with art. 690.8, Tables 310.15(B)(2)(a), 310.15(B)(3)(a), 310.15(B)(3)(c), 310.15(B)(16), Chapter 9 Table 4, 5, & 9. Location specific temperature obtained from ASHRAE 2017 data tables AMBIENT TEMP (HIGH TEMP 2%) RECORD LOW TEMP 2°C 31°C CONDUIT HEIGHT 7/8" ROOF TOP TEMP 53°C CONDUCTOR TEMPERATURE RATE 90°C SYSTEM SIZE: 5.600 kW DC 5.049 kW AC MODULE: (14)SEG SOLAR SEG-400-BMD-HIV[400W] INVERTER: (14)ENPHASE ENERGY IQ8PLUS-72-2-US[240V] INVERTER SPECIFICATIONS MANUFACTURER MAX. POWER AT 40 C 60 VOLTS NOMINAL AC VOLTAGE 290 WATTS MAX. AC CURRENT 240 VOLTS MAX. OCPD RATING MAX. PANELS/CIRCUIT SHORT CIRCUIT CURRENT 1.21 AMPS 20 AMPS MAX. DC VOLT RATING 13 15 AMPS ENPHASE ENERGY IQ8PLUS-72-2-US THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) AC OUTPUT CURRENT NOMINAL AC VOLTAGE 240V 17A WIRE QTY WIRE TAG #CONDUIT WIRE TYPE INVERTER QTY:NOC: CONDUIT FILL: TEMP RATING: WIRE AMP TEMP DE-RATE: WIRE OCP: GRND SIZE GRND WIRE TYPE WIRE GAUGE: TERMINAL 75°C RATING:NEC:STRING AMPS x x = x x =1.25 1.21A 07 10.59A 28.80A 25A90°C 35A x x =1.25 1.21A 07 #8 THWN-210.59A x x = 24.32A90°C 35A x x =1.25 1.21A 14 #8 THWN-221.18A x x = 32.90A75°C 30A #12 40A #10 35A #10 3/4" EMT 3/4" EMT WIRE FROM - - JUNCTION BOX TO COMBINER PANEL COMBINER PANEL TO SUB PANEL ARRAY TO JUNCTION BOX1 2 3 Q CABLE THWN-2 THWN-2 4 0.80 3 1.00 PV WIRE 0.96 0.76 0.94 4 NA #6 SBC 65A x x =1.25 1.21A 14 #8 THWN-221.18A x x = 61.1A75°C 65A #63/4" EMT SUB PANEL TO MSP4 THWN-23 1.00 0.94 G N (N) LOCKABLE BLADE TYPE NON-FUSIBLE AC DISCONNECT NEMA 3R 30A-2P 120/240VAC G L1L1 L2L2 07 MICRO-INVERTERS IN BRANCH CIRCUIT #1 L2L2 L1L1 07 MICRO-INVERTERS IN BRANCH CIRCUIT #2 TERMINATOR CAP ON LAST CABLE CONNECTOR AC TRUNK CABLE (TYP) L1 L2 N G N 20A G M* IQ-GATEWAY 20A 1 2 (N)JUNCTION BOX 600 V, NEMA 3R UL LISTED 14 NEW SEG SOLAR SEG-400-BMD-HIV[400W] MODULES WITH NEW 14 - ENPHASE ENERGY IQ8PLUS-72-2-US[240V] 240VAC, 1.21A MAX CEC WEIGHTED EFFICIENCY 97% NEMA 3R, UL LISTED, INTERNAL GFDI 10A OR 15A (N)COMBINER PANEL ENPHASE IQ COMBINER 4, X-IQ- AM1-240-4 64A/240V CONTINUOUS, PROTECTION MAX 80A BREAKER ON SOLAR OUTPUT; WITH 10 KAIC CIRCUIT BREAKERS G N 100A M 60A (E) LOADS (E) LOADS EXISTING GROUNDING ELECTRODE SYSTEM 25A (E) LOADS NEW 240V/125A,SUB PANEL, SINGLE PHASE G N (E) LOADS 4 (E) LOADS (E) LOADS TO INTERIOR EXISTING LOADS 3 POINT OF INTERCONNECT, LOAD SIDE EXISTING 240V/125A BUS BAR RATING, MAIN SERVICE PANEL, SINGLE PHASE, WITH A 100A MAIN DISCONNECT UTILITY COMPANY - SCE UTILITY METER# 222012-450580 (N)PV BREAKER 3 (E) LOADS ENPHASE Q CABLE TO BE ATTACHED TO RAIL MIN. 7/8" ABOVE ROOF SURFACE 120% RULE BUS BAR RATING X 120%) - MAIN BREAKER RATING = MAX. PV OCPD (125A x 120%) - 100 = 50A 1101 W 6th St 06/02/23 ~1 2 7 . 3 6 ' ~54.74' ~1 2 7 . 3 4 ' ~54.73' 12' - 1 1 " 13'-0" 60 ' - 1 1 " 2'-2" 5'-0" 5'-0" MA R I A M E R L O S 11 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : C I T Y O F S A N T A A N A SOLAR PHOTOVOLTAIC SYSTEM NOTES: 1. ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES: 2022 CA ADMINISTRATIVE CODE, PART 1 2022 CA BUILDING CODE, PART 2 2022 CA RESIDENTIAL CODE PART, 2.5 2022 CA MECHANICAL CODE, PART 4 2022 CA ELECTRICAL CODE, PART 3 2022 CA PLUMBING CODE, PART 5 2022 CA EXISTING BUILDING CODE, PART 10 2022 CA GREEN BUILDING STANDARDS CODE, PART 11 2022 CA REFERENCE STANDARDS CODE, PART 12 2022 CA FIRE CODE 2. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, VENTILATION'S INTAKE AIR OPENINGS SHALL NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC SYSTEM. 3. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY AND INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. [NEC 690.4(D)] 4. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND SWITCHES. 5. PAINT PV CONDUIT TO MATCH THE DWELLING EXTERIOR. 6. CONTACT THE SERVICING UTILITY BEFORE POWERING ON THE PHOTOVOLTAIC SYSTEM. SCALE: NTS 3 VICINITY MAP PV 1 INDEX OF SHEETS RM PV1 PV2 PV3 PV4 PV5 PV6 TITLE SHEET - SITE PLAN & NOTES ROOF PLAN STRUCTURAL DETAILS SINGLE LINE DIAGRAM (S.L.D.) SIGNAGE INSTALLER OPTIMIZER/ MICROINVERTER MAP COMP SHINGLE SITE INFORMATION 1 STORY ROOF: SCOPE OF WORK (14)SEG SOLAR SEG-400-BMD-HIV[400W] PURE PV MODULES (14)ENPHASE ENERGY IQ8PLUS-72-2-US[240V] [1]AC COMBINER PANEL (E)125A MAIN SERVICE PANEL DESIGN CRITERIA SINGLE FAMILY RESIDENCE OCCUPANCY: R-3, U CONSTRUCTION TYPE: VB WIND SPEED: 110 MPH EXPOSURE CATEGORY: C MIN STANDOFF HEIGHT OF: 6" CONDUIT:3/4" FIRE SPRINKLER: NO LAT & LONG. : 33.7498692, -117.8817128 SNOW LOAD: 0 SYSTEM FIRE RATING CLASS A WHEN TYPE I OR II PV MODULE USED PER R902.3 OR R904.4 ROOF AREA: 1983 SQ.FT. PV ARRAY AREA: 294.2 SQ.FT. SCALE: 1/16" 1 PLOT PLAN PV 1 TITLE SHEET- SITE PLAN & NOTES PV1 (N)ROOF MOUNTED PV SOLAR MODULES JB FMC USED FOR OUTDOOR CONDUIT RUNS (E)DRIVEWAY PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E (E)MAIN RESIDENCE MS P MT R AC D IQ C MAIN SERVICE PANEL & METER (N)30A AC DISCONNECT VISIBLE BLADE,LOCKABLE TYPE (N)IQ AC COMBINER PANEL (E)FENCE SU B SUB PANEL W 6TH ST, FRONT OF HOUSE N S H E L T O N S T . NOTES EXTERIOR CONDUIT MAY NOT BE INSTALLED WITHIN ANY REQUIRED MUST BE 5'0" MAXIMUM LENGTH ON EXTERIOR OR ALL IN ATTIC PATHWAY TO THE RIDGE AND SHALL NOT BE INSTALLED WITHIN ANY REQUIRED SETBACK AT THE RIDGE NO INTERIOR CONDUIT SHALL BE INSTALLED WITHIN ANY REQUIRED SETBACK AT THE RIDGE. SHED (E)100A MAIN BREAKER (N)125A SUB PANEL The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. REVISED 20179021 Issued 03/21/23 20179753 Issued 06/01/23 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 MODULE HEIGHT OFF ROOF, RANGE: UR-40: 31 12" -412" UR-60: 41 ,8" -518" SNAPNRACK ULTRA RAIL SNAPNRACK ULTRA RAIL 92□ L FOOT SHOWN. COMPATIBLE WITH ULTRA RAIL ALL PURPOSE 90D L FOOT L-FOOT TO BASE ATTACHMENT DOWNSLOPE FROM ROOF PENETRATION FLASHING SHIELDS ENTIRE ROOF PENTRATION ¾6"□ LAG SCREW S.S. COMP SHINGLE ROOFING, TYP. ROOF DECKING, TYP. WOOD RAFTER SHOWN, SIMILAR AT OTHER STRUCTURAL MEMBER TYPES PENETRATION DETAIL fi\ __ A_T_T_A_C_H_M_E_N_T_D _E _T A_IL V NOT TO SCALE (SEE DETAIL TO 2X4 FRAM ING @ 24" O.C. TYP. MODULE TH E LEFT) MODULE WEIGHT (LBS) MODULE AREA (FP) # OF MODULES -�- I I I I t i I I I I <p I ,. 6' MAX NAPNRACK (RACKING SYSTEM ) ,__ _ _, I I I I I I I I I j - j--j I I I I I I I I I I I I $ I -Ep-I - .. I .. I I,.2' O.C. -er- -, I I I I I I I I - 4- 4 I I I I I I I I I iI I =iI co I ..- 3' MIN (i'\ PARTIAL ROOF FRAMING PLAN U NOT TO SCALE 47.39 21.01 14 TOTAL PV SYSTEM WEIGHT (LBS)663.5 LOADING PER STANDOFF (PSF)63.00 TOT AL AREA (FP)334.24 LOADING (PSF)2.76 STRUCTURAL DETAILS PV3 1101 W 6th St 06/02/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : C I T Y O F S A N T A A N A CAUTION: POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN PV5 SIGNAGE NOTES 1. CEC ARTICLES 690 AND 705 AND CRC SECTION R331 MARKINGS SHOWN HEREON 2. ALL MARKINGS SHALL CONSIST OF THE FOLLOWING: A. UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR MACHINE PRINTED LETTERS OR ELECTRO-PLATING B. RED BACKGROUND COLOR WITH WHITE TEXT AND LINE WORK C. ARIAL FONT 3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN THE LOCATIONS SPECIFIED. 4. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT USING POP-RIVETS OR SCREWS. 5. THE LABEL SHALL BE SUITABLE FOR THE ENVIRONMENT WHERE IT IS INSTALLED. 6. WHERE REQUIRED ELSEWHERE IN THIS CODE, ALL FIELD APPLIED LABELS, WARNINGS, AND MARKINGS SHOULD COMPLY WITH ANSI Z535.4 [CEC 110.21(B) FIELD MARKING]. 7. ADHESIVE FASTENED SIGNS MAY BE ACCEPTABLE IF PROPERLY ADHERED. VINYL SIGNS SHALL BE WEATHER RESISTANT [IFC 605.11.1.3] (UNLESS BUSBAR IS FULLY RATED) (CEC 705.12) WHITE LETTERS WITH RED BACKGROUND A C CEC 690.15, 690.13(B) BLACK TEXT WITH YELLOW BACKGROUND SUB PANEL M CEC 690.54 WHITE LETTERS WITH RED BACKGROUND CEC 690.13(B) WHITE LETTERS WITH RED BACKGROUND ELECTRIC SHOCK HAZARD TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT BLACK OUTLINE WITH BLACK TEXT / WARNING IS IN BLACK TEXT AND ORANGE BACKGROUND CEC 690.17(E) CEC 690.56 (C)(3) WHITE LETTERS WITH RED BACKGROUND CEC 690.13.G.3 & CEC 690.13.G.4 WHITE LETTERS WITH RED BACKGROUND ARRAY J/B CEC 690.31(G)(3)(4) & CEC 690.13(G)(4) TO BE PLACED AT LEAST EVERY 10FT WHITE LETTERS WITH RED BACKGROUND TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR ELECTRIC PV PANELS CEC 705.12 BLACK LETTERS WITH ORANGE BACKGROUND CEC 690.56(C)(1)(A) BLACK OUTLINE WITH BLACK TEXT AND WHITE BACKGROUND / NOTE ON TOP IS IN BLACK TEXT AND YELLOW BACKGROUND WARNING: PHOTOVOLTAIC POWER SOURCE SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN ! WARNING THIS EQUIPMENT FEED BY MULTIPLE SOURCES.TOTAL RATING OF ALL OVERCURRENT DEVICE,SHALL NOT EXCEED AMPACITY OF BUSBAR PV SUB PANEL ONLY WARNING! SOLAR DISCONNECT WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM WARNING: Electrical Shock Hazard No user serveable parts inside contact authorized service provider for assistance PHOTOVOLTAIC SYSTEM AC DISCONNECT RATED AC OPERATING CURRENT 16.94 AMPS AC NOMINAL OPERATING VOLTAGE 240 VOLTS SOLAR PV ARRAY MSPACD MTR IQC YOU ARE HERE SERVICE PANEL AC DISCONNECT FOR UTILITY OPERATION (RAPID SHUTDOWN DEVICE) IQ AC COMBINER W 6 T H S T , SUB SUB PANEL 1101 W 6th St 06/02/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : C I T Y O F S A N T A A N A MICRO /OPTIMIZER MAP PV6 INTERNAL USE ONLY 1101 W 6th St 06/02/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : C I T Y O F S A N T A A N A NOTES PV7 INTERNAL USE ONLY SITE NOTES: 1. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 3. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 4. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 5. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. EQUIPMENT LOCATIONS: 1. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. 2. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C). 3. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC 690.34. 4. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 2.2.6 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 5. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. STRUCTURAL NOTES: 1. RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY / SUBARRAY, ACCORDING TO RAI MANUFACTURER’S INSTRUCTIONS. 2. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. 3. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED W/ APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 4. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 2.3.6 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. WIRING & CONDUIT NOTES: 1. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 2. CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. 3. VOLTAGE DROP LIMITED TO 1.5%. 4. DC WIRING LIMITED TO MODULE FOOTPRINT. MICRO INVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. 5. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [NEC 110.15]. GROUNDING NOTES: 1. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 2. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC TABLE 250.122. 3. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 4. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45 AND MICRO INVERTER MANUFACTURERS’ INSTRUCTIONS. 5. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OFA MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 7. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] 8. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 AND AHJ. 9. GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.41(B)(1) AND (2) TO REDUCE FIRE HAZARDS DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 2. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 3. PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY RESPONDERS IN ACCORDANCE WITH 690.12(A) THROUGH (D). 4. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND 240. 5. MICRO INVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). 6. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO NEC 690.11 AND UL1699B. INTERCONNECTION NOTES: 1. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 705.12 (B)] 2. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS OUTPUT MAY NOT EXCEED 120% OF BUS BAR RATING [NEC 705.12(D)(2)(3)]. 3. THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUS BAR, PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(B)(2)(3)]. 4. AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC 705.12 (B)(2)(3)(C). 5. FEEDER TAP INTERCONNECTION (LOADSIDE) ACCORDING TO NEC 705.12 (B)(2)(1) 6. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 2.7.8BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [NEC 705.12 (B)(5)]. 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 1101 W 6th St 06/02/23 MA R I A M E R L O S 1 1 0 1 W 6 T H S T , , S A N T A AN A , C A 9 2 7 0 3 PH O N E : ( 7 1 4 ) - 4 6 8 - 8 1 0 3 AP N : 4 0 5 0 8 2 1 4 AM E R I C A N S O L A R A D V A N T A G E 1 3 3 4 8 M O N T E V I S T A A V E CH I N O , C A 9 1 7 1 0 (8 7 7 ) 7 6 5 - 2 3 8 8 CS L B - C 1 0 # 1 0 0 9 5 6 5 BO B B Y D H A R R I S PH O T O V O L T A I C S Y S T E M P L A N 5 . 6 0 0 k W D C , 5 . 0 4 9 k w A C DA T E : 0 8 / 2 8 / 2 0 2 2 P L O T T E D : 8 / 2 3 / 2 0 2 2 DE S I G N E R : N . Y . A H J : R I V E R S I D E C O U N T Y MICRO /OPTIMIZER MAP PV6 INTERNAL USE ONLY This item has been digitally signed and sealed on Mar 01, 2023 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23 1101 W 6th St 03/21/23