HomeMy WebLinkAbout1401 W Santa Clara Ave - PlanSHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
A0
PROJECT INFO
VICINITY MAP
PV NOTES
ARRAY AREA: 20.41 SQFT x 19 = 387.84 SQFT
PROJECT SCOPE
INSTALLATION OF ROOF MOUNT SOLAR PV SYSTEM
PV EQUIPMENT QTY MODEL NO AND MANUFACTURER
MODULES:14 400W Q.PEAK DUO BLK ML-G10+ 400
HANHWA Q.CELL MODULES
INVERTER:14 IQ7PLUS-72-2-US (240V)
ENPHASE MICRO INVERTERS
SYSTEM SIZE: 5.600 DC kW RATING
5.045 CEC AC RATINGVICINITY MAP
PROJECT SITE
OWNER: OSCAR GARIBAY
ADDRESS:1401 W SANTA CLARA AVE
SANTA ANA, CA 92706
PHONE: 530-746-8077
EMAIL: OSCARGARIBAY92@GMAIL.COM
APN:00127203
(ORANGE COUNTY)
UTILITY: SCE
SHEET INDEX
A0 VICINITY MAP, PROJECT INFO, PV NOTES
A1 SITE PLAN
A2 MOUNTING PLAN
E1 SINGLE LINE DIAGRAM
E2 ELECTRICAL CALCULATIONS
E3 REQUIRED SIGNAGE
E4 MODULE DATA SHEET
E5 - E5.1 INVERTER DATA SHEET & CERTIFICATION
E6 OPTIMIZER DATA SHEET
S1-S1.1 STANCHION DATA SHEET
S2 RACKING DATA SHEET
S3 RACKING ENGINEERING
S4 RACKING GROUNDING
S5 RACKING CERTIFICATION
5.600 DC KW SOLAR PV MICRO INVERTER SYSTEM - ROOF MOUNT
GARIBAY RESIDENCE
1401 W SANTA CLARA AVE SANTA ANA, CA 92706
AERIAL VIEW
SOLAR PHOTOVOLTAIC SYSTEM NOTES
1. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED TESTING LABORATORY AND INSTALLED PER THE
LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS, CEC 110.2, 110.3, 690.4(B) AND 690.12(D).
2. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND
SWITCHES.
3. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AND BONDED IN ACCORDANCE WITH CEC ARTICLE 250.
4. ALL PV CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE PROTECTION AGAINST OVERCURRENT PER
CEC 690.9.
5. DISCONNECTING MEANS OF THE PV SYSTEM (INCLUDING RAPID SHUTDOWN INITIATION) SHALL BE LOCATED IN READILY
ACCESSIBLE LOCATION NEAR THE EQUIPMENT, CEC 690.13, 690.15.
6. ENERGY STORAGE SYSTEMS TERMINALS LOCATED MORE THAN 5 FEET AWAY OR ON OPPOSITE SIDE OF WALL FROM
CONNECTED EQUIPMENT MUST HAVE DISCONNECTING MEANS IN ACCORDANCE WITH CEC 706.7(E) AND LABELED PER
706.7(D). A SECOND DISCONNECTING MEANS LOCATED AT THE CONNECTED EQUIPMENT SHALL BE INSTALLED WHERE
THE DISCONNECTING MEANS AT THE ESS END OF THE CIRCUIT IS NOT WITHIN SIGHT.
7. RAPID SHUTDOWN EQUIPMENT TO COMPLY WITH CEC 690.12.
8. THE UTILITY-INTERACTIVE INVERTERS SHALL AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE CONNECTED
ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THE SYSTEM AND SHALL REMAIN
IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED,
CEC 705.40.
9. ALL CONDUCTORS IN EXPOSED OUTDOOR LOCATIONS SHALL BE LISTED AND IDENTIFIED FOR USE IN DIRECT SUNLIGHT
AND FOR THE APPLICATION. CEC310.10(D) AND 690.31(C) THROUGH (F).
10. INSULATION OF EXPOSED CONDUCTORS UNDER THE MODULES SHALL BE USE-2 OR PV-WIRE TYPE FOR PV SYSTEMS,
CEC 690.31(C).
11. FINE-STRANDED CABLE CONNECTIONS MUST BE MADE IN LUGS AND TERMINALS LISTED AND MARKED FOR THE USE,
CEC 110.14.
12. ALL PV CIRCUIT CONDUCTORS SHALL BE MARKED ON EACH END AND GROUPED FOR UNIQUE IDENTIFICATION, CEC
690.31(B).
13. ALL GROUNDED, (NEUTRAL), CONDUCTORS' INSULATION SHALL BE SOLID WHITE, GRAY, OR WITH 3-WHITE STRIPES, CEC
200.6, 200.7, & 400.22; AND ALL GROUNDING CONDUCTORS SHALL BE OF BARE WIRE WITHOUT COVERING, OR WITH
INSULATION OF GREEN OR GREEN WITH YELLOW STRIPES, CEC 250.119 & 400.23. THE COLOR OF UNGROUNDED
CONDUCTORS SHALL BE OTHER THAN FOR GROUNDED, (NEUTRAL), AND GROUNDING CONDUCTORS, CEC 310.110(C).
14. MAXIMUM CONDUCTOR LENGTH BETWEEN SUPPLY SIDE CONNECTION AND OVERCURRENT PROTECTION IS 10 FEET,
CEC 705.31.
15. CONNECTIONS ON THE LOAD SIDE OF THE SERVICE DISCONNECTING MEANS OF THE OTHER SOURCE(S) AT ANY
DISTRIBUTION EQUIPMENT ON THE PREMISES SHALL MEET THE FOLLOWING, CEC 705.12(B).
16. DC WIRING INSIDE A BUILDING MUST BE IN METALLIC TYPE RACEWAYS, CONDUITS, ENCLOSURES, OR CABLE
SHEATHINGS, CEC 690.31(G).
17. METALLIC TYPE RACEWAYS, CONDUITS, ENCLOSURES, AND CABLE SHEATHS CONTAINING CIRCUITS OVER 250-VOLTS
TO GROUND MUST BE BONDED IN ACCORDANCE WITH CEC 250.97.
18. ALL EXTERIOR CONDUIT, FITTINGS AND BOXES SHALL BE RAIN TIGHT AND APPROVED FOR USE IN WET LOCATIONS, CEC
314.15
19. FLEXIBLE, FINE-STRANDED CABLES SHALL BE TERMINATED ONLY WITH TERMINALS, LUGS, DEVICES OR CONNECTOR
THAT ARE IDENTIFIED AND LISTED FOR SUCH USE, CEC 690.31(H) & 110.14.
20. CONNECTORS SHALL BE OF LATCHING OR LOCKING TYPE. CONNECTORS THAT ARE READILY ACCESSIBLE AND
OPERATING AT OVER 30 VOLTS SHALL REQUIRE TOOL TO OPEN AND MARKED DO NOT DISCONNECT UNDER
LOAD OR NOT FOR CURRENT INTERRUPTING , CEC 690.33(C) & (E)(2).
21. EQUIPMENT GROUNDING CONDUCTOR FOR PV MODULES SMALLER THAN 6 AWG SHALL BE PROTECTED FROM
PHYSICAL DAMAGE BY A RACEWAY OR CABLE ARMOR, CEC 690.46 & 250.120(C).
22. THE INTERCONNECTION POINT SHALL BE ON THE SUPPLY SIDE OF ALL GROUND-FAULT PROTECTION EQUIPMENT, CEC
705.32.
23. CABLES/WIRES THAT ARE SUBJECT TO PHYSICAL DAMAGE, SUCH AS THOSE NOT LOCATED UNDER THE MODULES,
MUST BE PROTECTED, CEC 300.4.
24. PROPOSED LOCATIONS OF ELECTRICAL SERVICE REPLACEMENTS MUST ALSO BE APPROVED BY THE ELECTRICAL
UTILITY COMPANY.
25. FOR ELECTRICAL SERVICE REPLACEMENTS, BONDING TO THE METAL PIPES OF NATURAL GAS, HOT WATER, AND COLD
WATER MUST BE PROVIDE, CEC 250.104.
26. GROUNDING ROD ELECTRODES SHALL BE MINIMUM 5/8 IN DIAMETER AND INSTALLED 8 MINIMUM IN CONTACT WITH
SOIL, CEC 250.52(A)(5), 250.53(G).
27. MINIMUM 7/8 CLEARANCE FROM ROOF TO BOTTOM OF CONDUIT OR USE A TEMPERATURE ADDER OF 33 DEGREES
C. CEC 310.15(B)(3)(C)
28. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, & VENTILATIONS INTAKE AIR OPENINGS SHALL NOT BE
COVERED OR BLOCKED BY THE SOLAR PHOTOVOLTAIC SYSTEM.
29. EXISTING DWV PLUMBING VENT TERMINATIONS THAT ARE HORIZONTALLY LOCATED CLOSER THAN 12" FROM THE
PROPOSED MODULES, MUST BE REROUTED, OR MUST BE EXTENDED A MINIMUM OF 6" ABOVE THE SURFACE OF THE
MODULES, CPC 906.1.
30. EXISTING B-VENT TERMINATIONS, FOR FUEL BURNING APPLIANCES, WHERE ADJACENT TO THE PROPOSED MODULES,
MUST BE EXTENDED 12" ABOVE THE MODULES' TOP SURFACE, CMC 802.6.1(1) & CPC 509.6.1(1).
31. THE MARKINGS, "WARNING: PHOTOVOLTAIC POWER SOURCE", FOR DC RACEWAYS AND CABLE ASSEMBLIES MUST BE
AT 10' O.C.; AND BENDS, ABOVE OR BELOW PENETRATIONS OF ROOFS, CEILINGS, WALLS, OR BARRIERS, CEC
690.31(G)(4).
32. PV COMBINER PANELBOARDS MUST HAVE PERMANENT MARKINGS INDICATING THAT THEY ARE DEDICATED FOR PV
CIRCUITS ONLY NO LOADS ARE TO BE CONNECTED.
33. WORKING CLEARANCES TO BE PROVIDED AT NEW AND EXISTING ELECTRICAL EQUIPMENT, CEC 110.26.
34. A LADDER MUST BE PROVIDED FOR INSPECTIONS IN ACCORDANCE WITH CAL-OSHA REGULATIONS, SECURED AND
EXTENDING 3' ABOVE THE ROOF.
35. ALL OF THE REQUIRED MARKINGS, SIGNS, AND LABELS MUST BE INSTALLED ON ALL EQUIPMENT PRIOR TO ANY
INSPECTIONS.
36. LABELS SHALL BE REFLECTIVE, AND ALL LETTERS SHALL BE CAPITALIZED AND SHALL BE A MINIMUM HEIGHT OF 3/8'' IN
WHITE ON A RED BACKGROUND. CEC 690.31(G)(4)
37. IDENTIFICATION OF POWER SOURCE RAPID SHUTDOWN AND LABELING SHALL BE IN ACCORDANCE WITH CEC 690.56(C).
38. WHEN THE MAIN CIRCUIT BREAKER IS DERATED, A PERMANENT MARKING MUST BE PROVIDED ON THE PANELBOARD TO
INDICATE THAT THE MAIN CIRCUIT BREAKER HAS BEEN DOWNSIZED TO _______ AMPS, DO NOT UPSIZE IT.
39. PANELS AND MODULES NOT TO BE INSTALLED ON ROOF BELOW AN EMERGENCY ESCAPE AND RESCUE OPENING. CRC
R324.6.2.2
40. GROUND-MOUNTED PV SYSTEMS MUST HAVE A CLEAR, BRUSH-FREE AREA OF 10-FEET AND A FIRE SEPARATION
DISTANCE OF 5-FEET MINIMUM TO OTHER STRUCTURES AND PROPERTY LINES, CRC R324.7 & R302.1.
41. PLAN CHECK AND PERMIT FOR PV SYSTEM AND ASSOCIATED EQUIPMENT ONLY.
42. ALL PROJECTS SUBJECT TO FIELD VERIFICATION FOR CODE COMPLIANCE.
43. APPROVED SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED WITHIN THE DWELLING UNIT AND SHALL BE
FIELD VERIFIED EITHER THROUGH FINAL BUILDING INSPECTION. SMOKE ALARMS ARE REQUIRED TO BE
INSTALLED IN ALL BEDROOMS, OUTSIDE EACH BEDROOM, AND AT LEAST ONE ON EACH FLOOR OF THE HOUSE.
CARBON MONOXIDE ALARMS ARE REQUIRED OUTSIDE EACH BEDROOM AND AT LEAST ONE ON EACH FLOOR OF
THE HOUSE. R314.1, R315.1
44. NOTIFY SERVING UTILITY BEFORE ACTIVATION OF PV SYSTEM.
APPLICABLE CODES
ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL
COMPLY WITH THE FOLLOWING APPLICABLE CODES
2019 CA BUILDING CODES (CBC)
2019 CA RESIDENTIAL CODES (CRC)
2019 CA MECHANICAL CODES (CMC)
2019 CA PLUMBING CODES (CPC)
2019 CA FIRE CODES (CFC)
2019 CA ELECTRICAL CODES (CEC)
2019 CA ENERGY CODES (CEnC)
2019 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGreen)
OCCUPANCY: R3-SFD CONSTRUCTION TYPE: VB
# OF STORIES: 1 BLDG AREA (SQFT):1152
SPRINKLERS: NONE ROOF AREA (SQFT):1936
MAIN SERVICE PANEL INFORMATION
EXISTING: YES UPGRADE: NO
BUS RATING: 125A MAIN BREAKER SIZE: 100A
UTILITY FED: OH MB POSITION: CENTER
DERATE?: NO DERATE SIZE: N/A
PROJECT SITE
ENGINEERING CRITERIA FOR RACKING
DESIGN WIND SPEED: 110 MPH
WIND EXPOSURE CATEGORY: B
GROUND SNOW LOAD: 0 PSF
9-23
Bldg# 101112549
Elec# 20177781
Issued: 10/28/22
1401 W Santa Clara
Ave10/31/22
Structural Calculations for a Roof Mounted Solar Photovoltaic System for:
Oscar Garibay Residence
1401 W Santa Clara Ave.,
Santa Ana, CA 92706
Applicable Codes:
2019 California Building Code, 2019 California Electric Code,
2019 California Mechanical Code, American Society of Civil Engineers
Standard ASCE 7-16 Minimum Design Loads for Buildings and Other
Structures, American Wood Council 2018 National Design Specification
for Wood Construction, Local Municipal Code, and all other codes which
are adopted by reference or enacted by law.
Assumed Design Parameters:
The existing structure has been built under a building permit and is in its
original condition. The existing roof structure is capable of its code
required live load and the ability of the roof structure to support live loads
has not been substantially reduced by the age of the structure, termites or
mold, or unauthorized modifications to the existing structure. Solar Energy
Contractor shall make an inspection of the existing roof framing system
prior to installation of the roof mounted solar energy system to verify that
the existing roof is capable of supporting minimum roof live loads.
Assumed Design Parameters:
All 2x members are grade Douglas Fir #2 or better
All 4X members are grade Douglas Fir #1 or better
All Roof Connectors are Simpson Strong-Tie or Equal
All Concrete Foundations are f'c = 2500 psi or stronger
Original Structure was built to the Type-V Wood Framed Standards
of the Applicable Building Code at the time of Construction.
Sht # 1 of 7
2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
AL IFORNIAICI L
-21
2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212022-3915 Green Road Solar Oscar Garibay Residence Date: September 28, 2022
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
1401 W Santa
Clara Ave10/31/22
Sht # 2 of 7
Note to Building Official:
Based upon a review of the proposed plans and information, the
existing roof framing system is capable of safely supporting the additional
loads caused by the new solar photovoltaic energy system. The contractor
shall field verify that the existing roof structure is in its original permited
condition and verify that it can support the normal code required roof live
loads. Attached in this package are several calculations showing that the roof
members can support the additional weight of the solar array.
Furthermore, an analysis of the solar array's support for wind forces and a
seismic analysis of the existing structure are also included.
W DL + LL
R1 R2
12.5'
Total load on truss = 60 plf x 12.5 ft. = 750 lbs
w = 30 psf x 2 ft. = 60 plf
Check Existing 2x4 Roof Trusses @ 24" O.C.: *
*Note: Contractor to Field Verify Framing
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 2019 2020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 2020 2020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 2020 2020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 2020 2020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 2020 2020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 2020 2020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 2020 2020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 2020 2020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 2020 2020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 2021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 20212021-265 Penguin Solar Mario Lopez Residence Date: January 23, 20212021-357 Penguin Solar Lee Jones Residence Date: February 02, 20212021-402 Penguin Solar Patricia Johnston Residence Date: February 04, 20212021-501 Penguin Solar Debra Jakobczak Residence Date: February 12, 20212021-814 Penguin Solar Beatriz Garcia Residence Date: March 10, 20212021-63 Penguin Solar Frank Flores Residence Date: March 16, 20212021-863 Penguin Solar Frank Flores Residence Date: March 16, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-975 Penguin Solar Armida King Residence Date: March 25, 20212021-1292 Penguin Solar Christine Wilson Residence Date: April 19, 20212021-1313 Penguin Solar Greta Thompson Residence Date: April 21, 20212021-1367 Penguin Solar Manuel Anguiano Meza Residence Date: April 24, 20212021-2523 Penguin Solar Sam Celovsky Residence Date: July 02, 20212021-5723 Grid Alt IE Albert Garcia Residence Date: January 04, 20222022-001 Grid Alt IE Albert Garcia Residence Date: January 04, 2022 2022-3915 Green Road Solar Oscar Garibay Residence Date: September 28, 2022
1401 W Santa
Clara Ave10/31/22
Check Existing 2x4 Roof Trusses @ 24" O.C.:
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 2019 2020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020
Check attachment of Support to Existing Structure for Wind Uplift
CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7- 16 WIND LOADS ON BUILDING
APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK
ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2.
NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7- 16 EFFECTIVE WIND AREA:
"FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS
EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING
CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT
BE LESS THAN ONE-THIRD ITS LENGTH."
EFFECTIVE AREA = 15 SQ FT
2020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROF E SSIONALENGINEER
C
V
L
FOETATS
A L IFORNIAICI L
-21
2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 2020 2020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 2020 2020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 2020 2020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 2020 2020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 2020 2020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 2020 2020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 2020 2020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 2020
Total load on truss = 60 plf x 1.5' + 28 plf x 11' + ( 4' x 2.75' x 3 psf x 4 )
= 530 lbs < 750 lbs OK
2020-3759 Mohr Power Smith Residence Date: December 17, 2020 2020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021
R1 R2
12.5'
w LLw DL
P
2021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 2021
P
2021-265 Penguin Solar Mario Lopez Residence Date: January 23, 2021
1.5'11'
2021-357 Penguin Solar Lee Jones Residence Date: February 02, 20212021-402 Penguin Solar Patricia Johnston Residence Date: February 04, 20212021-501 Penguin Solar Debra Jakobczak Residence Date: February 12, 20212021-814 Penguin Solar Beatriz Garcia Residence Date: March 10, 20212021-63 Penguin Solar Frank Flores Residence Date: March 16, 20212021-863 Penguin Solar Frank Flores Residence Date: March 16, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
Sht # 3 of 7
2021-975 Penguin Solar Armida King Residence Date: March 25, 20212021-1292 Penguin Solar Christine Wilson Residence Date: April 19, 2021
P P
2021-1313 Penguin Solar Greta Thompson Residence Date: April 21, 20212021-1367 Penguin Solar Manuel Anguiano Meza Residence Date: April 24, 20212021-2523 Penguin Solar Sam Celovsky Residence Date: July 02, 20212021-5723 Grid Alt IE Albert Garcia Residence Date: January 04, 20222022-001 Grid Alt IE Albert Garcia Residence Date: January 04, 2022 2022-3915 Green Road Solar Oscar Garibay Residence Date: September 28, 2022
w = 30 psf x 2 ft. = 60 plf
1401 W Santa
Clara Ave10/31/22
Sht # 4 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 2019 2020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 2020 2020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 2020 2020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 2020 2020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 2020 2020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 2020 2020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 2020 2020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 2021
qh
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROF E SSIONALENGINEER
C
V
L
FOETATS
A L IFORNIAICI L
-21
Tributary Area to Each Solar Mount = 4 ft. x 2.75 ft. = 11 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C):
Eq'n 29.4- 7 ASCE 7- 16
Kz = velocity pressure coefficient
p =qh ðGCp ÞðγEÞðγa Þð
=0.00256 Kz Kzt Kd Ke V2
Note:
Section 29.10.1 ASCE 7- 16
Kz = 0.9 (Exposure C, Height = 20 ft or less)
Kzt = Topographical Factor = 1.0
Kd = Wind Directionality Factor = 0.85
Ke = Ground Elevation Factor = 1.0
V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC
qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2
p =qh ðGCp ÞðγEÞðγa Þð
qh =20 psf
p = 20 psf (- 2.0) (1.5) (0.7) = 42 psf
Eq'n 26.10- 1 ASCE 7- 16
GCp = - 2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
GC p = Exposure Factor = 1.5ðγE
GCp = Solar Array Pressure Equalization Factor = 0.7 ðγa Fig. 29.4- 8 ASCE 7- 16
Design (Factored) Uplift at each support = 0.6 x 462 lbs = 277 lbs
Nominal (Unfactored) Uplift at each support = 42 psf x 11 sq. ft. = 462 lbs
Note: Section 2.4.1 of ASCE 7- 16, Basic Load Combinations for Allowable Stress
Load per lag screw = 277 lbs / 1 = 277 lbs
Design. Note: Applicable Load Combination #5 (D + 0.6W)
2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 2021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 20212021-265 Penguin Solar Mario Lopez Residence Date: January 23, 20212021-357 Penguin Solar Lee Jones Residence Date: February 02, 20212021-402 Penguin Solar Patricia Johnston Residence Date: February 04, 20212021-501 Penguin Solar Debra Jakobczak Residence Date: February 12, 20212021-814 Penguin Solar Beatriz Garcia Residence Date: March 10, 20212021-63 Penguin Solar Frank Flores Residence Date: March 16, 20212021-863 Penguin Solar Frank Flores Residence Date: March 16, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-975 Penguin Solar Armida King Residence Date: March 25, 20212021-1292 Penguin Solar Christine Wilson Residence Date: April 19, 20212021-1313 Penguin Solar Greta Thompson Residence Date: April 21, 20212021-1367 Penguin Solar Manuel Anguiano Meza Residence Date: April 24, 20212021-2523 Penguin Solar Sam Celovsky Residence Date: July 02, 20212021-5723 Grid Alt IE Albert Garcia Residence Date: January 04, 2022 2022-001 Grid Alt IE Albert Garcia Residence Date: January 04, 2022 2022-3915 Green Road Solar Oscar Garibay Residence Date: September 28, 2022
1401 W Santa
Clara Ave10/31/22
Sht # 5 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 2019 2020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below
according to the 2018 NDS.
W ' = W x Cd x Ct Table 10.3.1 2018 NDS
where:
W = 266 lbs / in. of embedment per Table 12.2a
Cd = 1.6 per Table 2.3.2 of 2018 NDS
Ct = 1.0 per Table 10.3.4 of 2018 NDS
W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 277 lbs OK
Use Support connected to 2x Min. Roof Member
w/ (1) 5/16" x 3.5" lag screws per connection minimum.
2020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 2020 2020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 2020 2020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 2020 2020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 2020 2020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 2020 2020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 2020 2020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 2021
Note: Zone 2
2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROF E SSIONALENGINEER
C
V
L
FOETATS
A L IFORNIAICI L
-21
2021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 20212021-265 Penguin Solar Mario Lopez Residence Date: January 23, 20212021-357 Penguin Solar Lee Jones Residence Date: February 02, 20212021-402 Penguin Solar Patricia Johnston Residence Date: February 04, 20212021-501 Penguin Solar Debra Jakobczak Residence Date: February 12, 20212021-814 Penguin Solar Beatriz Garcia Residence Date: March 10, 20212021-63 Penguin Solar Frank Flores Residence Date: March 16, 20212021-863 Penguin Solar Frank Flores Residence Date: March 16, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-975 Penguin Solar Armida King Residence Date: March 25, 20212021-1292 Penguin Solar Christine Wilson Residence Date: April 19, 20212021-1313 Penguin Solar Greta Thompson Residence Date: April 21, 20212021-1367 Penguin Solar Manuel Anguiano Meza Residence Date: April 24, 20212021-2523 Penguin Solar Sam Celovsky Residence Date: July 02, 20212021-5723 Grid Alt IE Albert Garcia Residence Date: January 04, 2022 2022-001 Grid Alt IE Albert Garcia Residence Date: January 04, 2022 2022-3915 Green Road Solar Oscar Garibay Residence Date: September 28, 2022
1401 W Santa
Clara Ave10/31/22
Check Seismic load due to added dead load of photovoltaic system.
Determine Seismic Weight of Existing Building:
Effective Existing Seismic Weight
Area of (E) Building = Approximately 1,200 Sq. ft.
Approximate
Effective
Seismic Weight
= 1,200 sq. ft. x 30 psf ave. = 36,000 LBS
DETERMINE BASE SHEAR
V = Cs W
Cs =
SDS
R
Ie
R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1
R = 6.5 WOOD SHEAR WALLS
Ie = 1.0 IMPORTANCE FACTOR
SDS =
2/3 x SMS
SMS =
FA x SS
SMS =
1.2 x 1.5 = 1.8
SDS =2/3 x 1.8 = 1.2
Cs =
1.2
6.5
1
= 0.185
Sht # 6 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 2019 2020-053 Axis Solar Ryerson Residence Date: November 9, 2019
EQ'N 12.8- 1 ASCE 7- 16
EQ'N 12.8- 2 ASCE 7- 16
EQ'N 11.4- 3 ASCE 7- 16
EQ'N 11.4- 1 ASCE 7- 16
EQ'N 12.8- 2 ASCE 7- 16
2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 2020 2020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 2020 2020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 2020 2020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 2020 2020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 2020 2020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 2020 2020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 2020 2020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 2020 2020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 2021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 20212021-265 Penguin Solar Mario Lopez Residence Date: January 23, 20212021-357 Penguin Solar Lee Jones Residence Date: February 02, 20212021-402 Penguin Solar Patricia Johnston Residence Date: February 04, 20212021-501 Penguin Solar Debra Jakobczak Residence Date: February 12, 20212021-814 Penguin Solar Beatriz Garcia Residence Date: March 10, 20212021-63 Penguin Solar Frank Flores Residence Date: March 16, 20212021-863 Penguin Solar Frank Flores Residence Date: March 16, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-975 Penguin Solar Armida King Residence Date: March 25, 20212021-1292 Penguin Solar Christine Wilson Residence Date: April 19, 20212021-1313 Penguin Solar Greta Thompson Residence Date: April 21, 20212021-1367 Penguin Solar Manuel Anguiano Meza Residence Date: April 24, 20212021-2523 Penguin Solar Sam Celovsky Residence Date: July 02, 20212021-5723 Grid Alt IE Albert Garcia Residence Date: January 04, 20222022-001 Grid Alt IE Albert Garcia Residence Date: January 04, 2022 2022-3915 Green Road Solar Oscar Garibay Residence Date: September 28, 2022
1401 W Santa
Clara Ave10/31/22
V = 0.185 x 36,000 LBS = 6,660 LBS
DETERMINE NEW BASE SHEAR
EXISTING BASE SHEAR
Determine Seismic Weight of Building with Solar Array:
EXISTING
SEISMIC
WEIGHT
= 36,000 LBS
NEW SOLAR
ARRAY = 3 PSF x 14 PANELS x 3.3' x 5.5' = 762 LBS
NEW
SEISMIC
WEIGHT
= 36,000 LBS + 762 LBS = 36,762 LBS
THEREFORE NEW BASE SHEAR:
V = 0.185 x 36,762 = 6,801 LBS
% CHANGE =6,801 LBS - 6,660 LBS
6,660 LBS x 100 = 2.1 % < 10% OK
EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT
FROM ANALYSIS SINCE NEW SEISMIC FORCE IS
LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE.
"Alterations are permitted to be made to any structure without requiring the
existing structure to comply with this standard provided the alterations comply
with the requirements for a new structure. Alterations that increase the
seismic force in any existing structural element by more than 10 percent or
decrease the design strength of any existing structural element to resist
seismic forces by more than 10 percent shall not be permitted unless the
entire seismic force-resisting system is determined to comply with this
standard for a new structure."
End of Calculations
Sht # 7 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 2018 2018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 2018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 2019 2020-053 Axis Solar Ryerson Residence Date: November 9, 2019
EQ'N 12.8- 1 ASCE 7- 16
EQ'N 12.8- 1 ASCE 7- 16
OK. PER ASCE 7-16 SECTION 11.B.3 ALTERATIONS
2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 2020 2020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 2020 2020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 2020 2020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 2020 2020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 2020 2020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 2020 2020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 2020 2020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 2020 2020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 20202020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 2020 2020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 2020 2020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 2020 2020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 2020 2020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 2020 2020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 2021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 20212021-265 Penguin Solar Mario Lopez Residence Date: January 23, 20212021-357 Penguin Solar Lee Jones Residence Date: February 02, 20212021-402 Penguin Solar Patricia Johnston Residence Date: February 04, 20212021-501 Penguin Solar Debra Jakobczak Residence Date: February 12, 20212021-814 Penguin Solar Beatriz Garcia Residence Date: March 10, 20212021-63 Penguin Solar Frank Flores Residence Date: March 16, 20212021-863 Penguin Solar Frank Flores Residence Date: March 16, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-975 Penguin Solar Armida King Residence Date: March 25, 20212021-1292 Penguin Solar Christine Wilson Residence Date: April 19, 20212021-1313 Penguin Solar Greta Thompson Residence Date: April 21, 20212021-1367 Penguin Solar Manuel Anguiano Meza Residence Date: April 24, 20212021-2523 Penguin Solar Sam Celovsky Residence Date: July 02, 20212021-5723 Grid Alt IE Albert Garcia Residence Date: January 04, 20222022-001 Grid Alt IE Albert Garcia Residence Date: January 04, 2022 2022-3915 Green Road Solar Oscar Garibay Residence Date: September 28, 2022
1401 W Santa
Clara Ave10/31/22
Certificate Of Completion
Envelope Id: 4EB84C8F99D640359BD185D6CEE781E9 Status: Completed
Subject: Please DocuSign: GRS CONTRACT.pdf
Source Envelope:
Document Pages: 8 Signatures: 5 Envelope Originator:
Certificate Pages: 2 Initials: 2 Travis Haynes
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
176 Quiet Grove
Irvine, CA 92618
jaredemmer@neotricpower.com
IP Address: 76.219.214.120
Record Tracking
Status: Original
8/9/2022 3:39:39 PM
Holder: Travis Haynes
jaredemmer@neotricpower.com
Location: DocuSign
Signer Events Signature Timestamp
Travis Haynes
jaredemmer@neotricpower.com
CUstomer
Neotric Power
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 76.219.214.120
Sent: 8/9/2022 3:40:17 PM
Viewed: 8/9/2022 3:40:27 PM
Signed: 8/9/2022 3:43:22 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Oscar Garibay
oscargaribay92@gmail.com
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 108.228.226.12
Sent: 8/9/2022 3:43:23 PM
Viewed: 8/9/2022 3:46:04 PM
Signed: 8/9/2022 3:53:34 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 8/9/2022 3:40:17 PM
Certified Delivered Security Checked 8/9/2022 3:46:04 PM
Signing Complete Security Checked 8/9/2022 3:53:34 PM
1401 W Santa
Clara Ave10/31/22
Envelope Summary Events Status Timestamps
Completed Security Checked 8/9/2022 3:53:34 PM
Payment Events Status Timestamps
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
E1
ELECTRICAL
LINE DIAGRAM
(N) 14 - Q.PEAK DUO BLK ML-G10+400
HANHWA Q.CELL MODULES
(N) 14 - IQ7PLUS-72-2-US (240V) [SI1]
ENPHASE MICRO INVERTERS
WIRE/CONDUIT SCHEDULE
TAG DESCRIPTION CONDUCTOR TYPE/SIZE/QUANTITY CONDUIT
SIZE/TYPE
AC1 ARRAY TO JBOX
4 #12 AWG ENPHASE Q CABLE
L1-BLACK & L2-RED FREE AIR
1 #6 AWG GND-BARE COPPER
AC2 JBOX TO AC COMBINER
4 #10 AWG 2L1 & 2L2 THWN-2
3/4" EMT
1 #8 AWG GND THWN-2
AC3 AC COMBINER TO AC
DISCONNECT
3 #10 AWG L1, L2 & N THWN-2
3/4" EMT
1 #8 AWG GND THWN-2
AC4 AC DISCONNECT TO
MAIN SERVICE PANEL
3 #10 AWG L1, L2 & N THWN-2
3/4" EMT
1 #8 AWG GND THWN-2
(N) JBOX
NEMA 3R
A - 7
AC1 AC2
IQ
ENVOY
PCB
N
G
CT
(N)20A
(N)20A
(N) ENPHASE IQ
COMBINER BOX
(X-IQ-AM1-240-4)
*NO ADDITIONAL LOADS*
B - 7
AC3 (N)15A
INTERCONNECTION COMPLIANCE PER 705 CODE
SUM OF CIRCUITS WITH 125%
MAX AC OUTPUT (AMPS) TOTAL # OF
MICROS
TOTAL MAX AC
OUTPUT 125% RESULT (AMPS)OCPD SIZE
1.21 14 16.94 1.25 21.18 30A
SERVICE PANEL CALCULATIONS WITH 120%
BUS RATING SIZE MUTIPLIER (120%) RESULT MAIN
BREAKER
INVERTER AC
OUTPUT+125%RESULT
125 1.20 150 100 21.18 121.18
150.00 >/= 121.18 = OK
NOTE:
705.12(B)(2)(3) BUSBARS
(B) WHERE TWO SOURCES, ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER
SOURCE, ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT CONTAINS LOADS, THE SUM OF 125
PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE
OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE
AMPACITY OF THE BUSBAR. THE BUSBAR SHALL BE SIZED FOR THE LOADS CONNECTED IN
ACCORDANCE WITH ARTICLE 220. A PERMANENT WARNING LABEL SHALL BE APPLIED TO THE
DISTRIBUTION EQUIPMENT ADJACENT TO THE BACK-FED BREAKER FROM THE POWER SOURCE THAT
DISPLAYS THE FOLLOWING OR EQUIVALENT WORDING:
DEVICE.
THE WARNING SIGN(S) OR LABEL(S) SHALL COMPLY WITH 110.21(B).
BRANCH CIRCUIT CALCULATION
CIRCUIT MAX AC OUTPUT
(AMPS)
# OF
MODULES RESULT (AMPS) 125%RESULT
(AMPS)ocpd size
A 1.21 7 8.47 1.25 10.59 20A
B 1.21 7 8.47 1.25 10.59 20A
NOTE:
THE ENPHASE IQ MICROINVERTER SYSTEM USES A NEW AND IMPROVED CABLING SYSTEM. THE Q CABLE IS DG
TYPE AND CONTAINS ONLY TWO #12 AWG LINE CONDUCTORS. THE Q CABLE MALE CONNECTORS PLUG
DIRECTLY INTO THE IQ MICROS, WHOSE DOUBLE INSULATION RATING REQUIRES NO NEUTRAL OR GROUND
CONDUCTORS
PV MODULE MAXIMUM DC VOLTAGE
MODULE
VOC
MODULES PER
INVERTER
VOC TEMP
COEFFICIENT Tl -25 ( x VOC) VOC)/100 VOLTS
45.30 1.00 -0.27 -32 -12.23 3.91 49.21
49.21V < 60V = OK
NOTE: MAXIMUM DC VOLTAGE SHALL NOT EXCEED INVERTER MANUFACTURER'S MAXIMUM INPUT VOLTAGE
MODULE SPECIFICATION
MANUFACTURER HANWHA Q CELLS
MODEL NO.Q.PEAK DUO BLK ML-G10+400
PEAK POWER 400 W
MPP VOLTAGE (VMPP)37.13 V
MPP CURRENT (IMPP)10.77 A
OPEN CIRCUIT VOLTAGE (VOC)45.30 V
SHORT CIRCUIT CURRENT (ISC)11.14 A
INVERTER SPECIFICATION
INVERTER MAKE ENPHASE ENERGY
INVERTER MODEL NO.IQ7PLUS-72-2-US (240V) [SI1]
MAX INPUT DC VOLTAGE 60 V
MAX CONT. OUTPUT POWER 290 VA
RECOMMENDED INPUT POWER 235 W - 440 W
NOMIMAL AC VOLTAGE/RANGE 240 V/ 211-264 V
MAX AC CURRENT 1.21 A
NOTE:
1) PV BREAKER MUST BE INSTALLED
AT THE FARTHEST, OPPOSITE END
OF MAIN BREAKER
2) SOLAR GROUND TYING INTO THE
UFER GROUND POINT
EXISTING
125A MAIN SERVICE PANEL
240V, 1P, 3W; CENTER FED
N
G
(E) EARTH
GROUND
M(E) 100A
MCB
UTILITY
METER
(N) 30A
PV OCPD
(N) 30A AC
DISCONNECT
G
AC4
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
E3
REQUIRED
SIGNAGE
SIGNAGE NOTES:DIRECTORY PLACARD
6"
512"
CAUTION
POWER TO THIS BUILDING ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
DISCONNECTS AS SHOWN
DRIVEWAY
818-634-6527
GREEN ROAD
SOLAR
MAIN SERVICE
PANEL
J
AC COMBINER
AC DISCO
SOLAR
ARRAY
MICROINVERTER AND ACM SYSTEMS PV LABELING
CEC ARTICLES 690 AND 705 AND CA RESIDENTIAL CODE SECTION R324 REQUIRE THE FOLLOWING
LABELS OR MARKINGS BE INSTALLED AT THESE COMPONENTS OF THE PHOTOVOLTAIC SYSTEM:
M
MAIN SERVICE
PANELAC COMBINER/
SUBPANEL
PV ARRAY
JBOX
A
A
W SANTA CLARA AVE
ADDRESS: W SANTA CLARA AVE
NEC 690.13(B)
D
RATED AC OUTPUT CURRENT
NORMAL OPERATING VOLTAGE
A
V
NEC 690.54
NEC 690.56 (C)(3)
RAPID SHUTDOWN SWITCH
FOR SOLAR PV SYSTEM
REQUIRED AT LOCATION ON OR NO
MORE THAN 1 METER (3 FT) FROM THE
SWITCH
NEC 690.56(C)(1)
WARNING: PHOTOVOLTAIC
POWER SOURCE
NEC 705.12 (B)(2)(c)
A
NEC 690.31(G)(3)(4)
F
C
E
B
!PV SYSTEM
DISCONNECT
G
NEC 705.12(B)(3-4) & NEC 690.59
POWER SOURCE OUTPUT CONNECTION
DO NOT RELOCATE THIS
OVERCURRENT DEVICE
WARNING ! !
WARNING ! !
H
WARNING ! !
IF THERE IS NO INVERTER PLACE LABEL ON
COMBINER BOX, IF THERE IS NO COMBINER BOX
PLACE ON MAIN SERVICE PANEL.
PHOTOVOLTAIC SYSTEM
COMBINER PANEL
DO NOT ADD LOADS
i
DIRECTORY PLACARDJ
NEC 705.10 & NEC 690.56(B) REQUIRES A
PERMANENT PLAQUE OR DIRECTORY DENOTING ALL
ELECTRIC POWER SOURCE ON OR IN THE PREMISES
OR RAPID FIRE SHUTDOWN EQUIPMENT; INSTALL AT
MAIN SERVICE PANEL
ALL ROOF CONDUIT
16.94
240
B
G H I D
F
C
E
B
J
C
ALL INTERIOR AND EXTERIOR DC CONDUIT, ENCLOSURES, RACEWAYS, CABLE ASSEMBLIES,
JUNCTION BOXES, COMBINER BOXES AND DISCONNECTS ARE MARKED.
THE MARKINGS ON THE CONDUITS, RACEWAYS AND CABLE ASSEMBLIES ARE EVERY 10 FEET,
WITHIN ONE FOOT OF ALL TURNS OR BENDS AND WITHIN ONE FOOT ABOVE AND BELOW ALL
PENETRATIONS OF ROOF/CEILING ASSEMBLIES, WALLS AND BARRIERS.
MARKING IS PLACED ADJACENT TO THE MAIN SERVICE DISCONNECT IN A LOCATION CLEARLY
VISIBLE FROM WHERE THE DISCONNECT IS OPERATED. (CFC 605.11.1.3 & CRC R324)
THE MARKINGS SAY WARNING: PHOTOVOLTAIC POWER SOURCE
AND HAVE 3/8-INCH (9.5 MM) MINIMUM-SIZED WHITE LETTERS ON A RED BACKGROUND. THE
SIGNS ARE MADE OF REFLECTIVE WEATHER RESISTANT MATERIAL.
WHERE PV CIRCUITS ARE EMBEDDED IN BUILT-UP, LAMINATE OR MEMBRANE ROOFING
MATERIALS IN ROOF AREAS NOT COVERED BY PV MODULES AND ASSOCIATED EQUIPMENT, THE
LOCATION OF CIRCUITS SHALL BE CLEARLY MARKED.
REQUIRED LABELS SHALL BE PERMANENT AND SUITABLE FOR THE ENVIRONMENT.
AC
DISCO
C G
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
E4
MODULE
DATA SHEET
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
E5
INVERTER
DATA SHEET
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
E6
AC COMBINER
DATA SHEET
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
E2
ELECTRICAL
CALCULATIONS
INVERTER SPECIFICATION
INVERTER MAKE ENPHASE ENERGY
INVERTER MODEL NO. IQ7PLUS-72-2-US (240V) [SI1]
MAX INPUT DC VOLTAGE 60 V
MAX CONT. OUTPUT POWER 290 VA
RECOMMENDED INPUT POWER 235 W - 440 W
NOMIMAL AC VOLTAGE/RANGE 240 V/ 211-264 V
MAX AC CURRENT 1.21 A
AC CONDUCTOR AMPACITY CALCULATIONS - SUM OF CIRCUITS
AC COMBINER TO POINT OF CONNECTION
A AMBIENT TEMPERATURE ADJUSTMENT
EXPOSED CONDUIT 39 CELSIUS
TEMPERATURE CORRECTION FACTOR 0.96 CEC TABLE 310.15 (B)(2)(A)
# OF CURRENT CARRYING CONDUCTORS 2 (UP TO 8 CONDUCTORS IN ROOF MOUNTED CONDUITS EXPOSED TO SUNLIGHT)
CONDUIT FILL CORRECTION 1.00 .80 (FOR 4 TO 6 CONDUCTORS IN CONDUIT) OR 1.00 (FOR 3 OR LESS CONDUCTORS IN CONDUIT)
CEC TABLE 310.15 (B)(3)(A)
CIRCUIT CONDUCTOR SIZE #10 AWG
40 AMPS CEC TABLE 310.15 (B)(16)
INVERTER'S MAXIMUM AC OUTPUT CURRENT 1.21 AMPS INVERTER MANUFACTURER SPECIFICATIONS
B REQUIRED AC CONDUCTOR AMPACITY 21.17 AMPS REQUIRED CIRCUIT CONDUCTOR AMPACITY = 1.25 X AC MODULE OUTPUT CURRENT X TOTAL # OF AC MODULES
C DERATED AMPACITY OF CIRCUIT CONDUCTORS 38.40 AMPS TEMPERATURE CORRECTION X CONDUIT FILL CORRECTION X CIRCUIT CONDUCTOR AMPACITY
CEC TABLE 310.15 (B)(2)(A)
NOTE: "C" MUST BE GREATER THAN "B" 38.40A > 21.17A = OK
LOCATION INFORMATION
NEC TABLE 310.15 (B)(2)(a)-TEMP CORRECTION FACTORS
HIGH TEMP 34
LOW TEMP 2
VOLTAGE CORRECTION FACTOR -TABLE 690.7(A)1.10
7/8" ABOVE ROOF 67
TEMP CORRECTION FACTOR (ABOVE ROOF)0.58
TEMP CORRECTION FACTOR (INSIDE CONDUIT)0.96
AC CONDUCTOR AMPACITY CALCULATIONS
JBOX/COMBINER BOX TO AC COMBINER - PER RANCH CIRCUIT
A EXPECTED WIRE TEMPERATURE (FREE AIR)34 CELSIUS
310.15(B)(3)(C) RACEWAYS AND CABLES EXPOSED TO SUNLIGHT ON ROOFTOPS. WHERE RACEWAYS OR CABLES
ARE EXPOSED TO DIRECT SUNLIGHT ON OR ABOVE ROOFTOPS, RACEWAYS OR CABLES SHALL BE INSTALLED A
B SUNLIGHT ON OR ABOVE ROOF 67 CELSIUS WIRING/CONDUIT RACEWAY WILL BE EQUAL TO 7/8'' OR MORE ABOVE THE ROOFTOP PER CEC 310.15(B)(3)(c)
TEMPERATURE CORRECTION FACTOR
CEC TABLE 310.15 (B)(2)(A)0.96
C # OF CURRENT CARRYING CONDUCTORS 4 (UP TO 8 CONDUCTORS IN ROOF MOUNTED CONDUITS EXPOSED TO SUNLIGHT)
D CONDUIT FILL CORRECTION 0.80 .80 (FOR 4 TO 6 CONDUCTORS IN CONDUIT) OR 1.00 (FOR 3 OR LESS CONDUCTORS IN CONDUIT)
CEC TABLE 310.15 (B)(3)(A)
E CIRCUIT CONDUCTOR SIZE #10 AWG
F 35 AMPS CEC TABLE 310.15 (B)(16)
G REQUIRED CIRCUIT CONDUCTOR AMPACITY 10.59 AMPS REQUIRED CIRCUIT CONDUCTOR AMPACITY = 1.25 X AC MODULE OUTPUT CURRENT X # OF AC MODULES PER
CIRCUIT
H DERATED AMPACITY OF CIRCUIT CONDUCTOR 26.88 AMPS TEMPERATURE CORRECTION X CONDUIT FILL CORRECTION X CIRCUIT CONDUCTOR AMPACITY
CEC TABLE 310.15 (B)(2)(A)
NOTE: "H" MUST BE LARGER THAN "G" 26.88A > 10.59A = OK - CIRCUIT WITH 7 MODULES
MODULE SPECIFICATION
MANUFACTURER HANHWA Q.CELLS
MODEL NO.Q.PEAK DUO BLK
ML-G10+400
PEAK POWER 400 W
MPP VOLTAGE (VMPP) 37.13 V
MPP CURRENT (IMPP) 10.77 A
OPEN CIRCUIT VOLTAGE (VOC) 45.30 V
SHORT CIRCUIT CURRENT (ISC) 11.14 A
1401 W Santa
Clara Ave10/31/22
Rev: 7/15/2021
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
SOL-01 CBC 2019
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1. Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2. Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3. Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4. Will the PV system weigh maximum 4 pounds per square feet or less?
5. Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6. Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7. Will the PV system be installed without using any ballast system or counter-weight
system?
8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10. Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Date:
Email Address:
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
1401 W Santa Clara Ave, Santa Ana, CA 92706
LA Power Center
978687
Arin Gharibian
Phone Number:818-634-6527 10/24/22
greenroadsolar@gmail.com
1401 W Santa
Clara Ave10/31/22
Expedited Permit Process for PV Systems - Micro-Inverter1
Expedited Permit Process for PV Systems
Micro-Inverter
The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due to their similarity with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of the
installation.
The following pages contain forms for the Micro-Inverter to use with the Expedited Per-
mit Process. The Standard String, AC Module, and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic-
tions that have adopted the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submitted in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
1401 W Santa
Clara Ave10/31/22
Expedited Permit Process for PV Systems — Micro-Inverter2
Expedited Permit Process for Small-Scale PV Systems
Micro-Inverter
The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations
are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been
suggested to provide as a path to permit approval.
Required Information for Permit:
1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it
should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings
with a 3’ perimeter space at ridge and sides may not need separate fire service review.
2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specification sheets and installation manuals (if available) for all manufactured components including, but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1: Structural Review of PV Array Mounting System
Is the array to be mounted on a defined, permitted roof structure? l Yes l No
If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1.
Roof Information:
1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________
____________________________________________________________________________________________________
If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…).
2. Does the roof have a single roof covering? l Yes l No
If No, submit completed worksheet for roof structure WKS1.
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________
Mounting System Information:
1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap
beneath the module frames? l Yes l No
If No, provide details of structural attachment certified by a design professional.
2. For manufactured mounting systems, fill out information on the mounting system below:
a. Mounting System Manufacturer ___________Product Name and Model#________________________________
b. Total Weight of PV Modules and Rails ___________lbs
c. Total Number of Attachment Points____________
d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1)
e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for
maximum spacing allowed based on maximum design wind speed)
f. Total Surface Area of PV Modules (square feet)_________________ ft 2
g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2
If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1.
Step 2: Electrical Review of PV System (Calculations for Electrical Diagram)
In order for a PV system to be considered for an expedited permit process, the following must apply:
1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,440 Watts or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)).
5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV
system. Interactive PDF diagrams are available at www.solarabcs.org/permitting.
Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant
understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively
communicate, provide an alternative diagram with appropriate detail.
1401 W Santa
Clara Ave10/31/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
3
Micro-Inverter Site Plan
LA Power Center
Oscar Garibay818-634-6527
820 Thompson Ave Unit 28 Glendale CA 91201 1401 W Santa Clara Ave, Santa Ana, CA 92706
5.0
1401 W Santa
Clara Ave10/31/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
Micro-Inverter Electrical Diagram
Contractor Name,
Address and Phone:
One-Line Standard Electrical Diagram
for Micro-Inverter PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
E1.1a
SCALE NTS Date: SHEET
Drawn By:
Checked By:
DESCRIPTION OR CONDUCTOR TYPE
USE-2 or PV WIRE
GEC EGC X ALL THAT APPLY
EXTERIOR CABLE LISTED W/ INV.
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
NO DC GEC IF 690.35 SYSTEM
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
TAG
1
2
3
4
5
CONDUIT AND CONDUCTOR SCHEDULE
COND.
GAUGE
MFG
MFG
NUMBER OF
CONDUCTORS
MFG Cable
MFG Cable
CONDUIT
TYPE
N/A
N/A
N/A
SAME
SAME
CONDUIT
SIZE
N/A
N/A
N/A
SAME
SAME
DESCRIPTION
PV DC or AC MODULE
DC/AC INVERTER (MICRO)
J-BOX (IF USED)
PV ARRAY
AC COMB. PANEL (IF USED)
GEN METER (IF USED)
AC DISCONNECT (IF USED)
SERVICE PANEL
TAG
1
2
3
4
5
6
7
8
PART NUMBER NOTES
FOR UNUSED MODULES
PUT "N/A in BLANK ABOVE
1
1
3
2
3
EQUIPMENT SCHEDULE
2
_____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
J-BOX
4
AC DISCO
M
BUILDING
GROUNDING
ELECTRODE
G
M
UTILITY
SERVICE
MAIN SERVICE PANEL
MAIN
OCPD
INVERTER
OCPD
6
7
8
5
4
5
G
SEE GUIDE APPENDIX D FOR
INFORMATION ON MODULE AND
ARRAY GROUNDING
AC COMBINER
PANEL
G
____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
LA Power Center
818-634-6527
820 Thompson Ave Unit 28 Glendale CA 91201
Oscar Garibay
5.0
1401 W Santa Clara Ave, Santa Ana, CA 92706
1401 W Santa
Clara Ave10/31/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
5
Contractor Name,
Address and Phone:
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
E1.2a
SCALE NTS Date: SHEET
Drawn By:
Checked By:
MAX POWER-POINT CURRENT (IMP)
MAX POWER-POINT VOLTAGE (VMP)
OPEN-CIRCUIT VOLTAGE (VOC)
SHORT-CIRCUIT CURRENT (ISC)
MAX SERIES FUSE (OCPD)
MAXIMUM POWER (PMAX)
MAX VOLTAGE (TYP 600VDC)
VOC TEMP COEFF (mV/oC or %/oC )
IF COEFF SUPPLIED, CIRCLE UNITS
MODULE MAKE
MODULE MODEL
PV MODULE RATINGS @ STC (Guide Section 5)
MAX DC VOLT RATING
MAX POWER @ 40oC
NOMINAL AC VOLTAGE
MAX AC CURRENT
MAX OCPD RATING
INVERTER MAKE
INVERTER MODEL
INVERTER RATINGS (Guide Section 4)
1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YES NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
REQUIREMENT? YES NO N/A
3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX
CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING. (See Guide Section 9)
5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO-
INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR
EXCEPTION IN 690.64(B)(2)(a)? YES NO
NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9):
1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC
2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC
2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED
47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT
LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47oC OR LESS (ALL OF UNITED STATES),
a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER
FUSE.
b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER
FUSE.
NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E):
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODE®REFERENCES
SHOWN AS (NEC XXX.XX)
NOTES FOR ALL DRAWINGS:
SIGNSSEE GUIDE SECTION 7
SIGN FOR DC DISCONNECT
SIGN FOR INVERTER OCPD AND AC
DISCONNECT (IF USED)
No sign necessary since 690.51
marking on PV module covers
needed information
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
SOLAR PV SYSTEM
AC POINT OF CONNECTION
THIS PANEL FED BY MULTIPLE
SOURCES (UTILITY AND SOLAR)
Notes for Micro-Inverter Electrical Diagram
LA Power Center
818-634-6527
820 Thompson Ave Unit 28 Glendale CA 91201
Oscar Garibay
1401 W Santa Clara Ave, Santa Ana, CA 92706
5.0
1401 W Santa
Clara Ave10/31/22
2
3'
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
A2
MOUNTING
PLAN
SIDE VIEW 1 LAG PER ATTACHMENT
2.5" MIN EMBEDMENT
ROOF
SHEATING
EXISTING ROOF
IRONRIDGE
XR10 RAIL
E-CURB
FLASHING
MODULE
L-FOOT
PROSOLAR
3" HIGH FASTJACKS
ROOF ATTACHMENT DETAIL
FLAT ROOF
SCALE: 1-1/2" = 1'-0"
MOUNTING PLAN
SCALE: 3/32" = 1'-0"
N
S
EW
24 TOTAL ATTACHMENTS
@ 48" OC MAX
ATTACHED TO EXISTING 6X12
BEAMS
FIRE ACCESS POINT
(NOT TO BE OVER ANY
DOORS, WINDOWS OR
OTHER OBSTRUCTIONS)
(E) 125A MAIN SERVICE
PANEL
(N) 14 - Q.PEAK DUO BLK ML-G10+400
HANHWA Q.CELL MODULES
WITH (N) 14 - IQ7PLUS-72-2-US (240V)
ENPHASE MICRO INVERTERS
CIRCUIT A - 7 MODULES
CIRCUIT B - 7 MODULES
(N) 3/4" EMT CONDUIT
RUN ABOVE ROOF OR
UNDER EAVES WHERE
POSSIBLE
WIRING/CONDUIT RACEWAY
WILL BE 7/8'' MINIMUM ABOVE THE
ROOFTOP PER CEC 310.15(B)(3)(C)
A A A A A A A
B B B B B B B
SOLAR PANEL DEAD WEIGHT CALCULATION
MODULE HANWHA Q CELL
WIDTH (IN) LENGTH (IN) AREA (SQFT) WEIGHT (LBS) QTY
TOTAL
MODULE
AREA
TOTAL
MODULE
WEIGHT
41.14 73.97 21.13 48.50 14 295.86 679.00
RACKING IRONRIDGE
RACKING
WEIGHT
LBS/LNFT
MOUNTING
SYSTEM
WEIGHT
TOTAL
SYSTEM
WEIGHT
TOTAL
ATTACHMENT
POINTS
POINT
LOAD
CALCS
DISTRIBUTED LOAD
CALCULATION
.75 84.88 763.88 24 31.83 2.58 PSF
NOTE: THE POINT LOADING AND DISTRIBUTED LOADING SHOULD BE MAX 5 LBS/FT2
ROOF COVERAGE
TOTAL
MODULE
AREA
ROOF FACE
AREA (SQFT)
ROOF
COVERAGE COMPLIANCE WITH R324.6.2 SET BACK AT RIDGE
295.86 1936 15.28 15.28 </= 33% = OK
ROOF INFORMATION
ROOF TYPE COMP SHINGLE ROOF - 1 LAYER
RAFTERS AND/OR TRUSS RAFTER SPACING (IN)ATTACHMENT
SPACING
2 X 4 24" OC 48" OC
LEGEND
(E) EXISTING
(N) NEW
(P) NEW
CONDUIT RUN
VIF VERIFY IN FIELD
JUNCTION BOX
MAIN SERVICE PANEL
AC COMBINER
INVERTER
AC DISCONNECT
SUBPANEL
SOLAR METER
FIRE ACCESS POINTS
FIRE PATHWAY/SETBACKS
x
(N) ENPHASE IQ
COMBINER BOX
(X-IQ-AM1-240-4)
(N) 30A AC DISCONNECT
9-23
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
A1
SITE PLAN
LEGEND:
(E) - EXISTING
(N) - NEW
SITE PLAN
SCALE: 1"= 20'
(E) 1- STORY
1152 SQFT
(E) 125A MAIN SERVICE
PANEL
W S A N T A C L A R A A V E
(N) 14 - 400W Q.PEAK DUO BLK
ML-G10+400 HANHWA Q.CELL MODULES
WITH (N) 14 - IQ7PLUS-72-2-US (240V)
ENPHASE MICRO INVERTERS
(N)ENPHASE IQ
COMBINER BOX
(X-IQ-AM1-240-4)
(N) 30A AC DISCONNECT
N
HESPERIAN
ST
PR
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
(E) DRIVEWAY 9-23
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
S1
STANCHION
DATA SHEET
9-23
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
S1.1
STANCHION
WATERPROOFING
9-23
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
S2
RACKING
DATA SHEET
9-23
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
S3
RACKING
ENGINEERING
9-23
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
S3.1
RACKING
ENGINEERING
9-23
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
S4
GROUNDING
DATA SHEET
9-23
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
S5
RACKING
CERTIFICATION
9-23
1401 W Santa
Clara Ave10/31/22
SHEET TITLE
SHEET NUMBER
OWNER
PROJECT TITLE
JOBSITE ADDRESS
GARIBAY
RESIDENCE
1 401
W SANTA
CLARA AVE
SANTA ANA, CA
92706
CONTRACTOR
820 THOMPSON AVE, UNIT 28
GLENDALE CA 91201
PHONE: 818-634-6527
C10 CA LICENSE # 978687
LA POWER CENTER
CORPORATION
ARMIN GHARIBIAN SAKI, LICENSE HOLDER
DATE DESCRIPTION
REVISION
DATE
DRAWN08-18-22 DESIGN
REVISION
DESIGN BY: LG/SC
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
5.600 DC kW
5.045 kW CEC-AC Rating
MICRO INVERTER SYSTEM
S3.2
RACKING
ENGINEERING
1401 W Santa
Clara Ave10/31/22
1401 W Santa
Clara Ave10/31/22