Loading...
HomeMy WebLinkAbout1424 N Flower St - PlanDate: 12/02/2022 Job Number: 11631 Prepared for : ECO FORCE ELECTRIC INC., 17415 VILLA CORTA ST, LA PUENTE, CA 91744 Project.: ELIZABETH ROMERO , 1424 N FLOWER ST, Santa Ana, CA, 92706 The following calculations are for the structural engineering design of the photovoltaic panels and are valid only for the structural info referenced in the stamped plan set. The verification of such info is the responsibility of others. After review, I certify that the roof structure has sufficient structural capacity for the applied PV loads. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. Engineerinc.io 303 N Glenoaks Blvd Suite 200 Burbank, CA 91502 (747) 333 - 5991 new@engineerinc.io Date Certified and Signed: 12/02/2022 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1424 N Flower St 02/15/23 Solar Module Details Module Type Q CELLS Q.PEAK DUO BLK Module Quantity 11 Module Model Number 400 WATT Design Criteria Code: 2019 California Building Code ASCE 7-16 Live Load (psf)20 Ult Wind Speed (mph)120 Exposure Cat C Ground Snow (psf)5 Structure Geometry Eave Height, he (ft)15 to 20ft Pitch of main roof (deg)24 Building Length, L (ft)68 Building Width, B (ft)50 Roof Area (Module Area) ft2 3400.00 Standoff(i.e., Roof Mount) Spacing Feet 4` Roof Properties Roof Geometry type Mono Slope Roof Roof Type Single Span Rafter Roof Pitch (deg)24 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1424 N Flower St 02/15/23 Roofing Type Comp Shingles Sheathing Type 1/2" OSB Board Wood species No. 2, Douglas Fir-Larch Wood Fb (psf)900 Wood Fv (psf)180 Wood E (psf)1600000 Purlin C/C Spacing (in)12 Rafter C/C. Spacing (in.)24 Purlin Section Thickness, b (in.)2 Section Depth, d (in.)4 Rafter Section Thickness, b (in.)2 Section Depth, d (in.)6 Maximum Rafter Span (ft)11 Factors Cd(wind)1.60 Cd(Snow)1.60 CLS 1.15 CM 1 Ct 1 CL 0.75 CF 1.5 Cfu 1 Cv 1 Cr 1 M allowable_wind 1020.94 M allowable_snow 733.80 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1424 N Flower St 02/15/23 Dead Load(psf) Comp Shingles 3.00 psf 1/2" OSB Board 2.00 psf Insulation 2.00 psf Total Roof 1DL 7 psf No. 2, Douglas Fir-Larch 31.00 lb/ft3 Solar Panel DL 3.00 psf Roof 1 Roof_Dist_DL 7.00 psf M_Roof_Dist_DL 6982.00 Def_Roof_Dist_DL 2.64 PV_uni_Dist_DL 3.00 psf M_PV_uni_Dist_DL 39.02 Def_PV_uni_Dist_DL 0.01 Total_Uni_DL 11.00 psf M_Total_DL 7021.02 Def_Total_DL 2.66 Snow Load(psf) Ground Snow Load, pg 5 Importance Factor, Ic 1 Thermal Factor, Ct 1 Exposure Factor, Ce 1 Flat roof snow, pF 5 Slope Factor, Cs 1 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1424 N Flower St 02/15/23 Sloped Row Snow, ps 5 Uni_Dist_S 5.00 M_uni_Dist_s 75.63 Def_uni_Dist_S 0.03 Wind Load Ultimate Wind Speed 120 Directionality Factor,kd 0.85 Topographic factor 1.00 Velocity pressure exposure factor,kz 0.88 Ground Elevation Factor,ke -0.53 Side Wall Width 50 Median Roof Height -35.87 Velocity pressure,qz 27.57 External Pressure Up,GCp_1 -0.22 External Pressure Up,GCp_2 -0.6 External Pressure Up,GCp_3 -0.9 External Pressure Down,GCp 0.28 Design Pressure Up,p_1 -5.07 Design Pressure Up,p_2 -13.83 Design Pressure Up,p_3 -20.74 Design Pressure Up,p 6.45 Uni_Dist_W_up -20.74 M_uni_Dist_W_up -313.69 Def_uni_Dist_W_up -0.12 Uni_Dist_W_down 6.45 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1424 N Flower St 02/15/23 M_uni_Dist_W_down 97.56 Def_uni_Dist_W_down 0.04 Lag Screw Uplift Check (ASD) 5/16" Lag Screw Withdrawl value 205.00 lb/in Lag Screw Penetration 2.50 in Roof1 0.6D+0.6W(up z1)3043.65 > 512.5 Roof1 0.6D+0.6W(up z2)3038.394 > 512.5 Framing Check (ASD): Roof1 uni 1.0D+0.6W 7079.56 > 1020.94 Lag Screw Penetration 7121.64 > 1020.94 Roof1 0.6D+0.6W(up z1)7096.65 > 733.80 Roof1 0.6D+0.6W(up z2)4024.40 > 1020.94 Seismic Check: Wood 5.00 psf 2x4 Studs @ 16"2.00 psf Gypsum 3.00 psf Misc(insulatioon,etc)2.00 psf Total wall DL 12.00 psf Total Wall Area (Approx)2590.00 ft2 Total Wall W 31080 lbs Total Roof DL 7.50 psf Total Roof Area (Approx)1313.44 ft2 Total Roof W 9850.8 lbs 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1424 N Flower St 02/15/23 OK PV Panel W 3.00 psf Area of panel 220.00 ft2 Total Roof W 550.46 lbs % increase=(Wadditional)/Wexisting 1.44% The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. Limits of Scope of Work and Liability Existing structure is assumed to have been designed and constructed following appropriate codes at time of erection, and assumed to have appropriate permits. The calculations produced are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were completed according to generally recognized structural analysis standards and procedures, professional engineering and design experience, opinions and judgements. Existing deficiencies which are unknown or were not observable during time of inspection are not included in this scope of work. All PV modules, racking, and mounting equipment shall be designed and installed per manufacturer's approved installation specifications. The Engineer of Record and Engineerinc assume no responsibility for misuse or improper installation. This analysis is not stamped for water leakage. Framing was determined based on information in provided plans and/or photos, along with engineering judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any concerns prior to starting construction. Prior to the commencement of work, the contractor shall verify the existing roof and framing conditions. Notify Engineerinc and the engineer of record of any Discrepancies prior to starting construction. Prior to the commencement of work, the contractor shall inspect framing for any damage such as water damage, cracked framing, etc. and notify the E.O.R. if any issues are found.These plans/calculations are stamped for structural code compliance of the roof framing supporting the proposed PV installation reference only. These plans/calculations are not stamped for water leakage. PV modules, racking, and attachment components must follow manufacturer guidelines and requirements. 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1424 N Flower St 02/15/23 PV-6.3 RACKING SPECSHEET DC SYSTEM SIZE CEC AC SYSTEM SIZE SYSTEM INFORMATION : 4400W : 4103W MODULES: (11)Q CELLS Q.PEAK DUO BLK ML-G10+ 400W INVERTER: (11)ENPHASE IQ8PLUS-72-2-US ENGINEER OF RECORD CUSTOMER INFORMATION NAME&ADDRESS: ELIZABETH ROMERO 1424 N FLOWER ST, SANTA ANA, CA 92706 33°75'77.5"N 117°87'67.9"W PROJECT NUMBER: DESIGNER/CHECKED BY: SOLAROFIX SCALE:AS NOTED DATE:9/22/22 PAPER SIZE:17"x11" REV:A AC SYSTEM SIZE : 3190W AHJ: CITY OF SANTA ANA ECO FORCE ELECTRIC INC. 17415 VILLA CORTA ST, LA PUENTE, CA 91744 T:626-862-5218 CSLB#1062299 CONTRACTOR INFORMATION 1424 N Flower St 02/15/23 PV-6.4 MOUNT SPECSHEET DC SYSTEM SIZE CEC AC SYSTEM SIZE SYSTEM INFORMATION : 4400W : 4103W MODULES: (11)Q CELLS Q.PEAK DUO BLK ML-G10+ 400W INVERTER: (11)ENPHASE IQ8PLUS-72-2-US ENGINEER OF RECORD CUSTOMER INFORMATION NAME&ADDRESS: ELIZABETH ROMERO 1424 N FLOWER ST, SANTA ANA, CA 92706 33°75'77.5"N 117°87'67.9"W PROJECT NUMBER: DESIGNER/CHECKED BY: SOLAROFIX SCALE:AS NOTED DATE:9/22/22 PAPER SIZE:17"x11" REV:A AC SYSTEM SIZE : 3190W AHJ: CITY OF SANTA ANA ECO FORCE ELECTRIC INC. 17415 VILLA CORTA ST, LA PUENTE, CA 91744 T:626-862-5218 CSLB#1062299 CONTRACTOR INFORMATION 1424 N Flower St 02/15/23 GENERAL NOTES 1. MODULES ARE LISTED UNDER UL 1703 AND CONFORM TO THE STANDARDS. 2. INVERTERS ARE LISTED UNDER UL 1741 AND CONFORM TO THE STANDARDS. 3. DRAWINGS ARE DIAGRAMMATIC, INDICATING GENERAL ARRANGEMENT OF THE PV SYSTEM AND THE ACTUAL SITE CONDITION MIGHT VARY. 4. WORKING CLEARANCES AROUND THE NEW PV ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH CEC 110.26. 5. ALL GROUND WIRING CONNECTED TO THE MAIN SERVICE GROUNDING IN MAIN SERVICE PANEL/ SERVICE EQUIPMENT. 6. ALL CONDUCTORS SHALL BE 600V, 75°C STANDARD COPPER UNLESS OTHERWISE NOTED. 7. WHEN REQUIRED, A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 8. THE SYSTEM WILL NOT BE INTERCONNECTED BY THE CONTRACTOR UNTIL APPROVAL FROM THE LOCAL JURISDICTION AND/OR THE UTILITY. 9. ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREES, WIRES OR SIGNS. 10. PV ARRAY COMBINER/JUNCTION BOX PROVIDES TRANSITION FROM ARRAY WIRING TO CONDUIT WIRING. 11. THE INSTALLATION WILL PROVIDE VERIFICATION AT TIME OF INSPECTION THAT 2019 CRC SECTIONS 314/315 (SMOKE AND CO DETECTORS) ARE IN COMPLIANCE. 12. SOLAR SYSTEM SHALL BE IN COMPLIANCE OF 2019 CBC TITLLE 24 PV REQUIREMENTS. EQUIPMENT LOCATION: 1. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY CEC 110.26. 2. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY CEC 690.31 (A),(C) AND CEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C). 3. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO CEC 690.34. 4. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 5. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO CEC APPLICABLE CODES. 6. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE STRUCTURAL NOTES: 1. RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. 2. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. 3. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 4. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 5. WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. WIRING & CONDUIT NOTES: 1. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 2. CONDUCTORS SIZED ACCORDING TO CEC 690.8, CEC 690.7. 3. DC WIRING LIMITED TO MODULE FOOTPRINT. MICRO INVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. 4. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [CEC 110.15]. INTERCONNECTION NOTES: 1. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [CEC 690.64 (B)] 2. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING [CEC705.12(D)(2)(3)]. 3. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [CEC 705.12(D)(2)(3)]. 4. AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVER CURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVER CURRENT DEVICE MAY BE EXCLUDED ACCORDING TO CEC 705.12 (D)(2)(3)(C). 5. FEEDER TAP INTER CONNECTION (LOAD SIDE) ACCORDING TO CEC 705.12 (D)(2)(1) 6. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO CEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH CEC 230.42 7. BACK FEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [CEC 705.12 (D)(5]. GROUNDING NOTES: 1. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 2. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO CEC 690.43 AND MINIMUM CEC TABLE 250.122. 3. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 4. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO CEC 690.45 AND MICRO INVERTER MANUFACTURER'S INSTRUCTIONS. 5. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 7. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [CEC 250.119] 8. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH CEC 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO CEC 250,CEC 690.47 AND AHJ. 9. GROUND-FAULT DETECTION SHALL COMPLY WITH CEC 690.5 IN GENERAL AND CEC 690.5(A)(1) SPECIFICALLY. 10. DISCONNECTION AND OVER-CURRENT PROTECTION NOTES. 11. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 12. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 13. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS ≤30V AND ≤240VA [CEC 690.12]. LOCATION OF LABEL ACCORDING TO AHJ. 14. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO CEC 690.8, 690.9, AND 240. 15. MICRO INVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH CEC 110.3(B). 2.6.7 IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO CEC 690.11 AND UL1699B. GENERAL NOTES PV-2.0 GENERAL NOTES DC SYSTEM SIZE CEC AC SYSTEM SIZE SYSTEM INFORMATION : 4400W : 4103W MODULES: (11)Q CELLS Q.PEAK DUO BLK ML-G10+ 400W INVERTER: (11)ENPHASE IQ8PLUS-72-2-US ENGINEER OF RECORD CUSTOMER INFORMATION NAME&ADDRESS: ELIZABETH ROMERO 1424 N FLOWER ST, SANTA ANA, CA 92706 33°75'77.5"N 117°87'67.9"W PROJECT NUMBER: DESIGNER/CHECKED BY: SOLAROFIX SCALE:AS NOTED DATE:9/22/22 PAPER SIZE:17"x11" REV:A AC SYSTEM SIZE : 3190W AHJ: CITY OF SANTA ANA ECO FORCE ELECTRIC INC. 17415 VILLA CORTA ST, LA PUENTE, CA 91744 T:626-862-5218 CSLB#1062299 CONTRACTOR INFORMATION 1424 N Flower St 02/15/23 PV-3.0 B MOUNTING DETAILS SCALE: 1/8"=1'-0" SITE INFORMATION SR.NO AZIMUTH PITCH NO. OF MODULES ARRAY AREA (SQ. FT.)ROOF TYPE ATTACHMENT ROOF EXPOSURE FRAME TYPE FRAME SIZE FRAME SPACING MAX RAIL SPAN OVER HANG MP-01 180° 24° COMPOSITE SHINGLE SWH L-FEET KIT ATTIC RAFTER 2 X 6 2'-0" 4'-0" 2'-0" DEAD LOAD CALCULATIONS BOM QUANTITY LBS/UNIT TOTAL WEIGHT (LBS) MODULES MID-CLAMP END-CLAMP RAIL LENGTH SPLICE BAR SWH L-FEET KIT MICRO-INVERTER TOTAL WEIGHT OF THE SYSTEM (LBS) TOTAL ARRAY AREA ON THE ROOF (SQ. FT.) WEIGHT PER SQ. FT.(LBS) WEIGHT PER PENETRATION (LBS) MODULES DATA Q CELLS Q.PEAK DUO BLK ML-G10+ 400W MODULE DIMS 74.0"x41.1"x1.26" LAG SCREWS 5/16"x3.5":2.5"MIN EMBEDMENT MINIMUM FIRE ACCESS PATHWAYS PER CFC 2019 RIDGE TO ARRAY: 1'-6" EAVE TO ARRAY : 3'-0" HIP/VALLEY W/ ADJACENT ARRAY: 1'-6" EACH SIDE HIP/VALLEY W/O ADJACENT ARRAY: 0'-0" NOTE: INSTALLER TO VERIFY RAFTER SIZE, SPACING AND SLOPED SPANS, AND NOTIFY ANY DISCREPANCIES BEFORE PROCEEDING. FIRE SETBACK PV-3.0 MOUNTING DETAILS DC SYSTEM SIZE CEC AC SYSTEM SIZE SYSTEM INFORMATION : 4400W : 4103W MODULES: (11)Q CELLS Q.PEAK DUO BLK ML-G10+ 400W INVERTER: (11)ENPHASE IQ8PLUS-72-2-US ENGINEER OF RECORD CUSTOMER INFORMATION NAME&ADDRESS: ELIZABETH ROMERO 1424 N FLOWER ST, SANTA ANA, CA 92706 33°75'77.5"N 117°87'67.9"W PROJECT NUMBER: DESIGNER/CHECKED BY: SOLAROFIX SCALE:AS NOTED DATE:9/22/22 PAPER SIZE:17"x11" REV:A AC SYSTEM SIZE : 3190W AHJ: CITY OF SANTA ANA ECO FORCE ELECTRIC INC. 17415 VILLA CORTA ST, LA PUENTE, CA 91744 T:626-862-5218 CSLB#1062299 CONTRACTOR INFORMATION AERIAL VIEW 11 48.5 533.5 14 0.050 0.7 16 0.050 0.8 138 0.680 93.84 4 0.360 1.44 44 1.8 79.2 11 2.38 26.18 735.66 232.32 3.17 16.66 ALUMINIUM RAILS 2X6 RAFTER @ 2'-0"SPACING ARRAY MP-01 11 232.32 4' Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 G 1424 N Flower St 02/15/23 PV-3.1 STRUCTURAL DETAILS DC SYSTEM SIZE CEC AC SYSTEM SIZE SYSTEM INFORMATION : 4400W : 4103W MODULES: (11)Q CELLS Q.PEAK DUO BLK ML-G10+ 400W INVERTER: (11)ENPHASE IQ8PLUS-72-2-US ENGINEER OF RECORD CUSTOMER INFORMATION NAME&ADDRESS: ELIZABETH ROMERO 1424 N FLOWER ST, SANTA ANA, CA 92706 33°75'77.5"N 117°87'67.9"W PROJECT NUMBER: DESIGNER/CHECKED BY: SOLAROFIX SCALE:AS NOTED DATE:9/22/22 PAPER SIZE:17"x11" REV:A AC SYSTEM SIZE : 3190W AHJ: CITY OF SANTA ANA ECO FORCE ELECTRIC INC. 17415 VILLA CORTA ST, LA PUENTE, CA 91744 T:626-862-5218 CSLB#1062299 CONTRACTOR INFORMATION RAIL SOLAR MODULE SWH L-FEET KIT 2x6 RAFTERS @ 2'-0" SPACING LOAD BEARING WALL PV MODULE SWH STANDARD RAIL (E) COMP SHINGLE 5/16 HEX BOLT SWH L-FEET KIT STAINLESS STEEL 5/16" LAG BOLT 2.5" EMBEDEMENT PILOT HOLE REQUIRED (E) BUILDING STRUCTURE 6" MAX ROOF FRAMING DETAIL ATTACHMENT DETAIL Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 G 1424 N Flower St 02/15/23 3 (N)30A AC DISCONNECT EATON DG221URB AC DISCONNECT NON FUSED 30A, 120/240V, 2P (E)100A MAIN BREAKER M PV BREAKER AT THE OPPOSITE END OF BUSBAR 20A, 2P PV BREAKER EXISTING 120/240V 1PH 60HZ UTILITY GRID (E)GROUND ELECTRODE (E)100A END FED MAIN PANEL (N) (11) ENPHASE IQ8PLUS-72-2-US WITH (11) Q CELLS Q.PEAK DUO BLK ML-G10+ 400W 1 (1) BRANCH OF (11) MICRO-INVERTERS (11 MODULES) (N) Q CELLS Q.PEAK DUO BLK ML-G10+ 400 400W MODULES (N)JUNCTION BOX OR EQUIV 3 IQ ENVOY 10A, 2P (N) 125A ENPHASE IQ COMBINER 4 AC COMBINER WITH ENPHASE ENVOY-S EN-X-IQ-AM1-240-4-ES 120/240 NEMA 3R INSTALL (1) 20A PV 2P BREAKERS 20A 2 PV-4.0 SINGLE LINE DIAGRAM DC SYSTEM SIZE CEC AC SYSTEM SIZE SYSTEM INFORMATION : 4400W : 4103W MODULES: (11)Q CELLS Q.PEAK DUO BLK ML-G10+ 400W INVERTER: (11)ENPHASE IQ8PLUS-72-2-US ENGINEER OF RECORD CUSTOMER INFORMATION NAME&ADDRESS: ELIZABETH ROMERO 1424 N FLOWER ST, SANTA ANA, CA 92706 33°75'77.5"N 117°87'67.9"W PROJECT NUMBER: DESIGNER/CHECKED BY: SOLAROFIX SCALE:AS NOTED DATE:9/22/22 PAPER SIZE:17"x11" REV:A AC SYSTEM SIZE : 3190W AHJ: CITY OF SANTA ANA ECO FORCE ELECTRIC INC. 17415 VILLA CORTA ST, LA PUENTE, CA 91744 T:626-862-5218 CSLB#1062299 CONTRACTOR INFORMATION SINGLE LINE DIAGRAM: DC SYSTEM SIZE -4.400KWDC, 3.190KW AC, 4.103KW CEC AC OCPD CALCULATIONS: MAIN PANEL RATING:100A, MAIN BREAKER RATING:100A 120% RULE: (100AX1.2)-100A=20A ALLOWABLE BACKFEED IS 20A INVERTER OVERCURRENT PROTECTION= INVERTER O/P I X CONTINUOUS LOAD(1.25)X #OF INVERTERS =1.21x1.25x11=16.64 A =>PV BREAKER = 20A ALLOWABLE BACKFEED 20A => 20A PV BREAKER THE DESIGNED INTERCONNECTION MEETS THE 705.12(B)(2) REQUIREMENTS ELECTRICAL NOTES: 1.MAXIMUM DC/AC VOLTAGE DROP SHALL BE NO MORE THAN 2%. 2. BREAKER/FUSE SIZES CONFORMS TO CEC 240.6 CODE SECTION. 3. AC GROUNDING ELECTRODE CONDUCTOR SIZED PER CEC 250.66. 4. AMBIENT TEMPERATURE CORRECTION FACTOR IS BASED ON CEC 690.31(A). 5. AMBIENT TEMPERATURE ADJUSTMENT FACTOR IS BASED ON CEC 310.15(B)(2). 6. MAX. SYSTEM VOLTAGE CORRECTION IS PER CEC 690.7.7. CONDUCTORS ARE SIZED PER WIRE AMPACITY TABLE CEC 310.15(B)(16). 8. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT PER CEC 310.10(D). 9. CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE SUITABLE FOR USE IN WET LOCATIONS PER CEC 310.10(C). ELECTRICAL CALCULATION AC WIRE CALCULATIONS:- MATERIAL:COPPER & TEMPERATURE RATING:90°C TAG ID REQUIRED CONDUCTOR AMPACITY CORRECTED AMPACITY CALCULATION TERMINAL RATING CHECK DERATED CONDUCTOR AMPACITY CHECK 1 1.21 X 11 = X 1.25 = 16.64A 30 X 0.87 X 1 =26.1A <20A < 2 40 X 0.87 X 1 =34.8A <20A < 3 40 X 0.87 X 1 =34.8A <20A < MODULE SPECIFICATION MODEL Q CELLS Q.PEAK DUO BLK ML-G10+ 400W MODULE POWER @ STC 400W OPEN CIRCUIT VOLTAGE:Voc 45.30V MAX POWER VOLTAGE:Vmp 37.13V SHORT CIRCUIT VOLTAGE:Isc 11.14A MAX POWER CURRENT:Imp 10.77A MICRO INVERTER SPECIFICATIONS MODEL ENPHASE IQ8PLUS-72-2-US POWER RATING 290VA MAX OUTPUT CURRENT 1.21A CEC WEIGHTED EFFICIENCY 97% MAX NO OF MICRO INVERTERS/BRANCH 13 MAX DC VOLTAGE 60V CONDUIT SCHEDULE TAG ID CONDUIT SIZE CONDUCTOR NEUTRAL GROUND 1 NONE (2) 12AWG ENPHASE Q CABLE PER BRANCH CIRCUIT NONE (1) 6 AWG BARE COPPER 2 3/4"EMT OR EQUIV (2) 10AWG THHN/THWN-2 NONE (1) 8 AWG THHN/THWN-2 3 3/4"EMT OR EQUIV (2) 10 AWG THHN/THWN-2 (1) 10 AWG THHN/THWN-2 (1) 8 AWG THHN/THWN-2 X = X = X = X = 13.31 = = 1.21 1.25 1.21 1.25 26.1A 34.8A 34.8A 11 16.64A 13.31 11 16.64A 13.31 16.64A 16.64A 16.64A 16.64A 16.64A 16.64A 1424 N Flower St 02/15/23 UM AC CBMSP JB POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN WARNING ! ALL PLACARDS SHALL BE OF WEATHER PROOF CONSTRUCTION, BACKGROUND ON ALL PLACARDS SHALL BE RED WITH WHITE LETTERING U.O.N. PLACARD SHALL BE MOUNTED DIRECTLY ON THE EXISTING UTILITY ELECTRICAL SERVICE.FASTENERS APPROVED BY THE LOCAL JURISDICTION 1424 N FLOWER ST, SANTA ANA, CA 92706 WARNING CAUTION: SOLAR CIRCUIT LABEL LOCATION POINT OF INTERCONNECTION (PER CODE: CEC 705.12(2)(b) [ Not Required if Panel board is rated not less than sum of ampere ratings of all overcurrent devices supplying it] ELECTRIC SHOCK HAZARD THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED LABEL LOCATION DC DISCONNECT,INVERTER [PER CODE: CEC 690.41)] [To be used when inverter is ungrounded] WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVER-CURRENT DEVICE WARNING:PHOTOVOLTAIC POWER SOURCE LABEL LOCATION CONDUIT, COMBINER BOX [PER CODE: CEC690.31(G)(3)] WARNING-Electric Shock Hazard No User Serviceable Parts inside Contact authorized service provide for assistance LABEL LOCATION INVERTER, JUNCTION BOXES(ROOF), AC DISCONNECT [PER CODE: CEC 690.13] LABEL LOCATION DISCONNECT, POINT OF INTERCONNECTION [PER CODE: CEC 690.13(B)] LABEL LOCATION AC DISCONNECT , POINT OF INTERCONNECTION [PER CODE: CEC 690.54] LABEL LOCATION MARKINGS PLACED ON ALL INTERIOR AND EXTERIOR DC CONDUIT, RACEWAYS, ENCLOSURES AND CABLE ASSEMBLES AT LEAST EVERY 10 FT, AT TURNS AND ABOVE/BELOW PENETRATIONS AND ALL COMBINER/JUNCTION BOXES. (PER CODE: CFC1204.5) LABEL LOCATION POINT OF INTERCONNECTION [PER CODE: CEC705.12(D)(4)] ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION LABEL LOCATION AC DISCONNECT,POINT OF INTERCONNECTION [PER CODE: CEC 690.13(B)] DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING LABEL LOCATION AC DISCONNECT,POINT OF INTERCONNECTION [PER CODE: CEC 690.13(B)] LABEL LOCATION WEATHER RESISTANT MATERIAL, DURABLE ADHESDIVE, UL969 AS STANDARD TO WEATHER RATING (UL LISTING OF MARKINGS NOT REQUIRED), MIN 3 8" LETTER HEIGHT ARIAL OR SIMILAR FONT NON-BOLD,PLACED WITHIN THE MAIN SERVICE DISCONNECT,PLACED ON THE OUTSIDE OF THE COVER WHEN DISCONNECT IS OPERATED WITH THE SERVICE PANEL CLOSED. (PWER CODE: CEC690.15 ,690.13(B)) WARNING DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM SOLAR DISCONNECT WARNING RATED AC OPERATING CURRENT AC NOMINAL OPERATING VOLTAGE AMPS AC VAC PHOTOVOLTAIC SYSTEM AC DISCONNECT SWITCH CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN LABEL LOCATION AC DISCONNECT, DC DISCONNECT, POINT OF INTERCONNECTION (PER CODE: CEC690.56(C)(1)(A)) LABEL LOCATION INVERTER,POINT OF INTERCONNECTION [PER CODE: CEC 690.56(C)(3)] RAPID SHUTDOWN SWITCH FOR SOLAR SYSTEM 13.31 240 SYSTEM UTILIZES MICRO-INVERTERS LOCATED UNDER SOLAR MODULE WARNING PLACARDS NOTE:ALL SIGNAGE CANNOT BE HAND WRITTEN CEC 110.21 PHOTOVOLTAIC ARRAY ON ROOF PV-5.0 WARNING PLACARDS DC SYSTEM SIZE CEC AC SYSTEM SIZE SYSTEM INFORMATION : 4400W : 4103W MODULES: (11)Q CELLS Q.PEAK DUO BLK ML-G10+ 400W INVERTER: (11)ENPHASE IQ8PLUS-72-2-US ENGINEER OF RECORD CUSTOMER INFORMATION NAME&ADDRESS: ELIZABETH ROMERO 1424 N FLOWER ST, SANTA ANA, CA 92706 33°75'77.5"N 117°87'67.9"W PROJECT NUMBER: DESIGNER/CHECKED BY: SOLAROFIX SCALE:AS NOTED DATE:9/22/22 PAPER SIZE:17"x11" REV:A AC SYSTEM SIZE : 3190W AHJ: CITY OF SANTA ANA ECO FORCE ELECTRIC INC. 17415 VILLA CORTA ST, LA PUENTE, CA 91744 T:626-862-5218 CSLB#1062299 CONTRACTOR INFORMATION (E) UTILITY METER (EXTERIOR) (N) AC DISCONNECT(EXTERIOR) (N) COMBINER PANEL(EXTERIOR) (E) MAIN SERVICE PANEL (EXTERIOR) 1424 N Flower St 02/15/23 PV-6.0 MODULE SPECSHEET DC SYSTEM SIZE CEC AC SYSTEM SIZE SYSTEM INFORMATION : 4400W : 4103W MODULES: (11)Q CELLS Q.PEAK DUO BLK ML-G10+ 400W INVERTER: (11)ENPHASE IQ8PLUS-72-2-US ENGINEER OF RECORD CUSTOMER INFORMATION NAME&ADDRESS: ELIZABETH ROMERO 1424 N FLOWER ST, SANTA ANA, CA 92706 33°75'77.5"N 117°87'67.9"W PROJECT NUMBER: DESIGNER/CHECKED BY: SOLAROFIX SCALE:AS NOTED DATE:9/22/22 PAPER SIZE:17"x11" REV:A AC SYSTEM SIZE : 3190W AHJ: CITY OF SANTA ANA ECO FORCE ELECTRIC INC. 17415 VILLA CORTA ST, LA PUENTE, CA 91744 T:626-862-5218 CSLB#1062299 CONTRACTOR INFORMATION 1424 N Flower St 02/15/23 PV-6.1 INVERTER SPECSHEET DC SYSTEM SIZE CEC AC SYSTEM SIZE SYSTEM INFORMATION : 4400W : 4103W MODULES: (11)Q CELLS Q.PEAK DUO BLK ML-G10+ 400W INVERTER: (11)ENPHASE IQ8PLUS-72-2-US ENGINEER OF RECORD CUSTOMER INFORMATION NAME&ADDRESS: ELIZABETH ROMERO 1424 N FLOWER ST, SANTA ANA, CA 92706 33°75'77.5"N 117°87'67.9"W PROJECT NUMBER: DESIGNER/CHECKED BY: SOLAROFIX SCALE:AS NOTED DATE:9/22/22 PAPER SIZE:17"x11" REV:A AC SYSTEM SIZE : 3190W AHJ: CITY OF SANTA ANA ECO FORCE ELECTRIC INC. 17415 VILLA CORTA ST, LA PUENTE, CA 91744 T:626-862-5218 CSLB#1062299 CONTRACTOR INFORMATION 1424 N Flower St 02/15/23 PV-6.2 COMBINER SPECSHEET DC SYSTEM SIZE CEC AC SYSTEM SIZE SYSTEM INFORMATION : 4400W : 4103W MODULES: (11)Q CELLS Q.PEAK DUO BLK ML-G10+ 400W INVERTER: (11)ENPHASE IQ8PLUS-72-2-US ENGINEER OF RECORD CUSTOMER INFORMATION NAME&ADDRESS: ELIZABETH ROMERO 1424 N FLOWER ST, SANTA ANA, CA 92706 33°75'77.5"N 117°87'67.9"W PROJECT NUMBER: DESIGNER/CHECKED BY: SOLAROFIX SCALE:AS NOTED DATE:9/22/22 PAPER SIZE:17"x11" REV:A AC SYSTEM SIZE : 3190W AHJ: CITY OF SANTA ANA ECO FORCE ELECTRIC INC. 17415 VILLA CORTA ST, LA PUENTE, CA 91744 T:626-862-5218 CSLB#1062299 CONTRACTOR INFORMATION 1424 N Flower St 02/15/23 UM AC CBMSP JB PV-1.0 PV-1.0 A SITE PLAN SCALE:1/16"=1'-0" ELECTRIC CODE CEC 2019 FIRE CODE CFC 2019 RESIDENTIAL CODE CRC 2019 BUILDING CODE CBC 2019 WIND SPEED 92 MPH SNOW LOAD 0 PSF GENERAL INFORMATION (E) UTILITY METER (EXTERIOR) PV-1.0 A1 VICINITY MAP SCALE: NTS SITE PLAN-1 SITE PLAN PROPERTY LINE N F L O W E R S T DC SYSTEM SIZE CEC AC SYSTEM SIZE SYSTEM INFORMATION : 4400W : 4103W MODULES: (11)Q CELLS Q.PEAK DUO BLK ML-G10+ 400W INVERTER: (11)ENPHASE IQ8PLUS-72-2-US ENGINEER OF RECORD CUSTOMER INFORMATION NAME&ADDRESS: ELIZABETH ROMERO 1424 N FLOWER ST, SANTA ANA, CA 92706 33°75'77.5"N 117°87'67.9"W PROJECT NUMBER: DESIGNER/CHECKED BY: SOLAROFIX SCALE:AS NOTED DATE:9/22/22 PAPER SIZE:17"x11" REV:A AC SYSTEM SIZE : 3190W AHJ: CITY OF SANTA ANA ECO FORCE ELECTRIC INC. 17415 VILLA CORTA ST, LA PUENTE, CA 91744 T:626-862-5218 CSLB#1062299 CONTRACTOR INFORMATION ELIZABETH ROMERO- 4.400KWDC, 3.190KW AC, 4.103KW CEC AC INDEX INDEX NO. PV-1.0 PV-2.0 PV-3.0 PV-3.1 PV-4.0 PV-5.0 PV-6.0 PV-6.1 PV-6.2 PV-6.3 PV-6.4 DESCRIPTION SITE PLAN GENERAL NOTES MOUNTING DETAILS STRUCTURAL DETAILS SINGLE LINE DIAGRAM WARNING PLACARDS MODULE SPECSHEET INVERTER SPECSHEET COMBINER SPECSHEET RACKING SPECSHEET MOUNTING SPECSHEET DRIVE WAY (N) AC DISCONNECT(EXTERIOR) (N) COMBINER PANEL(EXTERIOR) PHOTOVOLTAIC ARRAY ON ROOF EACH MICRO-INVERTER IS CONNECTED TO ONE MODULE W 15TH ST (E) MAIN SERVICE PANEL (EXTERIOR) 80'-6" 35 ' - 1 0 " 105'-7" 36'-4" 59 ' - 5 " Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 G ***The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown.*** Bldg permit #101113626 Elect permit #20178551 Permits issued on 1/31/23 1424 N Flower St 02/15/23 Expedited Permit Process for PV Systems — Micro-Inverter2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 1424 N Flower St 02/15/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan                                                         1424 N Flower St 02/15/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT 1424 N Flower St 02/15/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone: Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO- INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram 1424 N Flower St 02/15/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 1424 N Flower St 02/15/23