HomeMy WebLinkAbout1705 W Cubbon St - PlanExpedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 1705 W Cubbon St 04/14/23 Expedited Permit Process for PV Systems — Micro-Inverter2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 1705 W Cubbon St 04/14/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan 1705 W Cubbon St 04/14/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT 1705 W Cubbon St 04/14/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone: Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (P MAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO- INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE ®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram 1705 W Cubbon St 04/14/23 SHEET INDEX DESCRIPTION GENERAL NOTES APPLICABLE CODES PHOTOVOLTAIC NOTES AERIAL VIEW VICINITY MAP UNIT INDEX PV-0 Inverter (INV) Main Service Panel (MSP) Utility Meter (UM) Production Meter (PM) Itron Meter (IM) IQ Combiner Box (IQ) Junction Box (J/B) FIRE SETBACK (36'' TYP) FIRE SETBACK (18'' TYP) Service Sub Panel (SSP) PV Load Center (PV) AC Disconnect (ACD) Conduit Solar Module PROJECT DESCRIPTION:SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE SOLAR MODULES: INVERTERS: EXISTING: MSP BUS: MAIN BREAKER: 1P, 3W, 120/240V 100A 100A ELECTRICAL INFORMATION NEW PV BREAKER: 20A COVER PAGE INDEX NO. PV-0 PV-1 PV-2 PV-3 PV-4 PV-5 PV-6 D-1 D-2 D-3 D-4 D-5 D-6 D-7 COVER PAGE SITE PLAN THREE LINE DIAGRAM ELECTRICAL CALCULATION ATTACHMENT LAYOUT STRUCTURAL DETAIL CODE REQUIRED SIGNAGE MODULE DATA SHEET INVERTER DATA SHEET IQ COMBINER BOX DATA SHEET SYSTEM SIZE: DC STC: 2.40 kW AC CEC: 2.14 kW 1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED AND IDENTIFIED UL 1703. 2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL VENTS. 3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. 4. SOLAR INVERTER MUST HAVE A MANUFACTURE INSTALLED DISCONNECTING MEANS THAT PREVENTS PARALLEL FEEDING UTILITY LINES DURING POWER OUTAGE. 5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS. 6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE. 7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS OVER 150V TO GROUND SHALL NOT BE ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE ENERGIZED. 8. INVERTER IS EQUIPPED W/ INTEGRATED GFDI, THUS PROVIDING GROUND FAULT PROTECTION. 9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED. 10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY OR APPROVED BY THE DEPARTMENT. 11. CONDUITS SHOULD BE PAINTED TO MATCH EXISTING ROOF AND WALL COLORS. 12. ALL WORK SHALL BE IN ACCORD WITH THE 2022 CBC, 2022 CEC AND 2022 NEC WITH SPECIAL EMPHASIS ON ARTICLE 690. 13. THE OUTPUT OF A UTILITY INTERACTIVE-INVERTER SHALL BE PERMITTED TO BE CONNECTED TO THE SUPPLY SIDE OF THE SERVICE DISCONNECTING MEANS AS PER 230.82(6). 14. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING, AC GROUNDING AND BONDING BETWEEN AC AND DC SYSTEMS SIZED AS PER SEC 250.122 15. EQUIPMENT GROUND CONDUCTOR REQUIRED IN RACEWAYS SIZED PER CEC 250-122. 16. PER ART NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER. (13) ENPHASE IQ8PLUS-72-2-US [240] [SI1] (120/240V) MICROINVERTERS (13) URECO 400W (FBM400MFG-BB) RACKING DATA SHEET ATTACHMENT DATA SHEET GROUNDING SPECS RACKING CERTIFICATION RACKING DETAILSD-8 2022 CALIFORNIA ELECTRICAL CODE 2022 CALIFORNIA BUILDING CODE 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE 2022 CALIFORNIA ENERGY CODE 2022 CALIFORNIA MECHANICAL CODE 2022 CALIFORNIA PLUMBING CODE 2022 CALIFORNIA RESIDENTIAL CODE 2022 CALIFORNIA FIRE CODE 2022 NATIONAL ELECTRICAL CODE ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES ALL ELECTRICAL WORK TO BE INSTALLED BY A QUALIFIED AND LICENSED ELECTRICAL CONTRACTOR. ALL SOLAR MODULES SHALL BE UL LISTED 1703 & CEC APPROVED. ALL INVERTERS SHALL BE UL LISTED 1741 CERTIFIED & CEC APPROVED. ALL ELECTRICAL COMPONENTS AND MATERIALS SHALL BE LISTED FOR IT'S PURPOSE AND INSTALLED IN A WORKMAN LIKE MANNER. ALL OUTDOOR EQUIPMENT SHALL MEET APPROPRIATE NEMA STANDARDS. THE ELECTRICAL CONTRACTOR IS ADVISED THAT ALL DRAWINGS AND COMPONENT MANUALS ARE TO BE UNDERSTOOD PRIOR TO INSTALLATION. THE CONTRACTOR IS ADVISED TO HAVE ALL SWITCHES IN THE OFF POSITION AND FUSES REMOVED PRIOR TO INSTALLATION OF FUSE-BEARING COMPONENTS. THIS SYSTEM IS INTENDED TO BE OPERATED IN PARALLEL WITH THE UTILITY SERVICE PROVIDER. ANTI-ISLANDING PROTECTION IS A REQUIREMENT OF UL 1741 AND IS INTENDED TO PREVENT THE OPERATION OF THE PV SYSTEM WHEN THE UTILITY GRID IS NOT OPERATIONAL. PERMISSION TO OPERATE THE SYSTEM IS NOT AUTHORIZED UNTIL FINAL INSPECTIONS AND APPROVALS ARE OBTAINED FROM THE LOCAL AUTHORITY HAVING JURISDICTION AND THE LOCAL UTILITY SERVICE PROVIDER. THE METHOD OF ATTACHMENT CREATES A UNIFIED STRUCTURE TO MEET DEAD LOAD, WIND LOAD, AND SEISMIC REQUIREMENTS. SOLAR MODULES WILL BE SECURED TO THE EXISTING ROOF AS SPECIFIED ON THE STRUCTURAL SHEETS. EXISTING ROOF EQUIPMENT WILL NOT BE EFFECTED BY THE PV SYSTEM. ALL STRUCTURAL DESIGN AND INSTALLATION COMPONENTS ARE THE RESPONSIBILITY OF OTHERS AND OUTSIDE THE SCOPE OF THIS DOCUMENT. ALL FASTENERS SHALL BE CORROSION RESISTANT APPROPRIATE FOR SITE CONDITIONS. CONNECTORS SHALL BE TORQUED PER DEVICE LISTING OR ENGINEERING RECOMMENDATIONS. ALL ROOFING REPAIR MUST MAINTAIN EXISTING CLASS AND TYPE OF ROOF AND ALL WORK SHALL BE IN ACCORDANCE WITH THE ROOF IN MANUFACTURER'S INSTALLATION REQUIREMENTS. The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg# 101114650 Elec# 20179314 Issued 04/13/23 1705 W Cubbon St 04/14/23 SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE D-3 IQ COMBINER BOX DATA SHEET 1705 W Cubbon St 04/14/23 SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE D-4 RACKING DATA SHEET 1705 W Cubbon St 04/14/23 SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE D-5 GROUNDING SPECS 1705 W Cubbon St 04/14/23 SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE D-6 ATTACHMENT DATA SHEET 1705 W Cubbon St 04/14/23 SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE D-7 RACKING CERTIFICATION 1705 W Cubbon St 04/14/23 SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE D-8 RACKING DETAILS 1705 W Cubbon St 04/14/23 SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE SITE PLAN PV-1 ELECTRICAL EQUIPMENT INFORMATION # Quantity Description - 6 (N) Ureco 400W (FBM400MFG-BB) (Page D-1) - 6 (N) Enphase Microinverters IQ8PLUS-72-2-US (120/240V) [240] [SI1] (Page D-2) 1 1 (N) Junction-Box 2 1 (N) Enphase IQ Combiner Box With IQ Gateway IQ MODEL# X-IQ-AM1-240-4 (120/240V) (Page D-3) 3 1 (N) 30A Non-Fused AC Disconnect (120/240V) 4 1 (E) 100A Main Service Panel (120/240V, 1ɸ, 3W) FIRE SETBACK (36'' TYP) FIRE SETBACK (18'' TYP) SCALE 0 5 20ft10 ROOF ACCESS PROPERTY LINE Roof access is not located in areas that require placement of ground ladders over exterior wall openings CRC R331.4.1. 55' 113' 41' 100' 21' 13' 35' 31' 67' (E) GARAGE Driveway Public Sidewalk Pu b l i c S i d e w a l k S W e s t e r n A v e W Cubbon St Solar Array 6 Ureco 400W Modules 6 IQ8+ Microinverters Pitch: 20 Deg Orientation: 180 Deg [1] [2] [3] [4]Number of modules 6 Module area (sq.ft)21 Total Module area (sq.ft) 126 Total area of roof (sq.ft) 1370 Total area of array covered in the roof (%)9.2 ROOF ACCESS 1705 W Cubbon St 04/14/23 SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE PV-2 THREE LINE DIAGRAM ELECTRICAL EQUIPMENT INFORMATION # Quantity Description 1 6 (N)Ureco 400W (FBM400MFG-BB) (Page D-1) 2 6 (N) Enphase Microinverters IQ8PLUS-72-2-US (120/240V) [240] [SI1] (Page D-2) 3 1 (N)Junction-Box 4 1 (N) Enphase IQ Combiner Box With IQ Gateway IQ MODEL# X-IQ-AM1-240-4 (120/240V) (Page D-3) 5 1 (N) 30A Non-Fused AC Disconnect (120/240V) 6 1 (E) 100A Main Service Panel (120/240V, 1ɸ, 3W) 1 2 G GN L1 L2 G N 4 L1 L2 IQ Gateway (N)2P 20A J/B B 3 6 15A C 2 NOTE: Photovoltaic system is rapid shut down ready 8' Minimum Embedment Rod at 6' From Equipment Ground Conductor Unless Existing Ground is UFER. M L1 L1 NL2 NL2 L1 L2 L1 L1 L1 L2 L2 L2 N G 6 TO UTILITY GRID 100A END FEED OCPD INSTALL 2P 20A CB(PV) FURTHEST FROM MAIN FEEDER CB A 1 BRANCH (6) URECO 400W MODULES (6)IQ8PLUS MICROINVERTERS L1 L2 G N L1 L2 G N 5 C 1705 W Cubbon St 04/14/23 1.CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT PER CEC 310.10(D). 2.CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE SUITABLE FOR USE IN WET LOCATIONS PER CEC310.10(C). 3.MAXIMUM DC/AC VOLTAGE DROP SHALL BE NO MORE THAN 2%. 4.ALL CONDUCTORS SHALL BE IN CONDUIT UNLESS OTHERWISE NOTED. 5.BREAKER/FUSE SIZES CONFORMS TO CEC 240.6 CODE SECTION. 6.AC GROUNDING ELECTRODE CONDUCTOR SIZED PER CEC 250.66. 7.AMBIENT TEMPERATURE CORRECTION FACTOR IS BASED ON CEC 690.31(A). 8.AMBIENT TEMPERATURE ADJUSTMENT FACTOR IS BASED ON CEC 310.15(B)(2). 9.MAX. SYSTEM VOLTAGE CORRECTION IS PER CEC 690.7. 10.CONDUCTORS ARE SIZED PER WIRE AMPACITY TABLE CEC 310.15(B)(16). SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE PV-3 WIRE SIZE CALCULATION WIRE TAG#WIRE TYPE AND SIZE QUANTITY OF WIRES GROUNDING SIZE WIRE AMPACITY TEMPERATURE CONDUIT TYPE ABOVE ROOF TEMP. DERATE FACTOR ADJUSTING FACTOR CORRECTED CONDUCTOR AMP CURRENT AMP A Q CABLE #10 2 #6, BARE CU 40 A 90°Free in the air >3.5 - 12''0.71 1 N/A 28.4 9.1 B THWN-2 #10 (L1,L2)2 #8, EGC CU 40 A 90°3/4'' EMT >3.5 - 12''0.71 1 N/A 28.4 9.1 C THWN-2 #10 (L1,L2,N)3 #8, EGC CU 40 A 90°3/4'' EMT ALONG THE WALL 0.91 1 N/A 36.4 9.1 PV SYSTEM OUTPUT CALCULATION 6 IQ8PLUS-72-2-US (CEC) 97.0 % 6 Ureco 400W (FBM400MFG-BB) 400.0 W Pmax (PTC Rating) 367.8 W Max DC Output 6 * 400.0 2.40 KW Max AC Output 6 * 367.8 * 0.970 2.14 KW WIRE AMPACITY # QUANTITY ISC CONSIDER CONTINUOUS COEFFICIENT CURRENT AMP A 6 1.21 1.25 9.1 B 6 1.21 1.25 9.1 C 6 1.21 1.25 9.1 ELECTRICAL CALCULATION MAIN SERVICE PANEL RATING BUSBAR RATING 100 A MIAN BREAKER 100 A PV BREAKER SIZE 20 A 120% RULE MAX ALLOWED FEED 120 A 100A ''MB'' + 20A "SOLAR" =120A ≤ 120A MAX 1705 W Cubbon St 04/14/23 ATTACHMENT LAYOUT SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE PV-4 SOLAR ARRAY MOUNTING RAIL TYPE: IRONRIDGE XR10 RACKING SOLAR ARRAY ATTACHMENT TYPE: FLASH FOOT2 ATTACHMENT SPACING: 72'' MAX FRAMING: RAFTERS 2'' x 4'' @ 24'' O.C FINISHED ROOF SURFACE IS ONE LAYER OF COMPOSITION SHINGLE. WIND SPEED: 110 mph FOR EXPOSURE C SNOW LOAD: 0 psf 72'' 24'' NOTE TO INSTALL: VERIFY THE ROOF FRAMING INFO BEFORE INSTALLATION AND NOTIFY THE EOR IF THERE IS ANY INCONSISTENCY BETWEEN SITE VERIFICATION AND FOLLOWINGS: 2x 4 RAFTERS @ 24" OC SPACING WITH MAX UNSUPPORTED SPAN EQUAL OR LESS THAN 6 FT 1705 W Cubbon St 04/14/23 SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE STRUCTURAL DETAIL PV-5PV-5 ATTACHMENT DETAIL- FLASH FOOT2 5/16 HEX-BOLT STAINLESS STEEL 5/16" LAG SCREW 2.5" EMBEDMENT PILOT HOLE REQUIRED NOTE:ROOF ATTACHMENTS WILL HAVE A MINIMUM OF 2.5" EMBEDMENT IN RAFTER. NOTE:STANDOFF LAG BOLTS ARE STAINLESS STEEL (SS) MID-CLAMP AND END-CLAMP ANATOMY MODULE MID CLAMP END CLAMP MODULE ROOF FRAMING DETAILS SOLAR MODULE IRONRIDGE XR-10/168"RAIL FLASH FOOT2 SCALE:NTS GROUNDING DETAILS MODULE TO MODULE & MODULE TO RAIL MID CLAMP ASSEMBLY SELF-DRILLING SCREW IRONRIDGE RAIL MODULE FRAME RAIL GROUNDING MID-CLAMP SCALE: NTS T-BOLT SCALE: NTS IRONRIDGE INTERNAL SPLICE GROUNDING LUG RAIL TO RAIL 5/16" X 3.5" LAG SCREW 1 BOLT PER PENETRATION MODULE COLLAR TIE COMPOSITION SHINGLE ROOF 2'' X 4'' RAFTERS @24" SPACING LOAD BEARING WALL SCALE:NTS 6" MAX 20o 2'' X 6'' BLOCKING WEIGHT LOAD CALCULATION MODULE WEIGHT(LBS):47.84 NUMBER OF MODULES:6 OPTIMIZERS WEIGHT(LBS):2.38 TOTAL WEIGHT OF MODULES(LBS):287 SOLAR RACKING WEIGHT(LBS):57 TOTAL MICROINVERTERS WEIGHT(LBS):14 TOTAL SYSTEM WEIGHT(LBS):359 NUMBER OF ATTACHMENTS:12 LOADING PER ATTACHMENT(LBS):29.9 SOLAR ARRAY DEAD LOAD(LBS/FT2):2.85 TOTAL SOLAR AREA(SQFT):126 TOTAL ROOF AREA(SQFT):1370 TOTAL AREA OF ARRAY COVERED IN THE ROOF (%) 9.2 1705 W Cubbon St 04/14/23 SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE PV-6 CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: PHOTOVOLTAIC ARRAY 14 METER MAIN SERVICE PANEL 7 9 12 13 AC DISCONNECT * if applicable 7 SUB-PANEL * if applicable 7 9 8 11 10 7 9 6 PV SUB-PANEL * if applicable 8 11 10 INVERTER *if applicable 3 INTEGRATED DC DISCONNECT 4 5 J BOX 1 2 8 10 SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS 1 (TO BE LOCATED ON SUB-PANEL ONLY WHEN SUB-PANEL IS DEDICATED FOR PV ONLY) PV SUB-PANEL ONLY CAUTION AUTHORIZED SOLAR PERSONNAL ONLY! WARNING! ELECTRIC SHOCK HAZARD. IF GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. RAPID SHUT DOWN SWITCH FOR SOLAR PV SYSTEM 705.12 (D)(3) CAUTION DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM AC DISCONNECT AC PHOTOVOLTAIC POWER SOURCE RATED AC OUTPUT CURRENT: 7.3A MAX NOMINAL AC OPERATING VOLTAGE: 240 Vac THIS PANEL FED BY MULTIPLE SOURCES (UTILITY & SOLAR) WARNING! ELECTRIC SHOCK HAZARD. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. ALL SIGNAGE/LABELS SHALL BE IN THE FOLLOWING FORMAT: 1. WHITE LETTERING ON A RED BACKGROUND AND WEATHER RESISTANT 2. MINIMUM 3/8" LETTER HEIGHT 3. ALL LETTERS SHALL BE CAPITALIZED 4. ARIAL OR SIMILAR FONT, NON-BOLD 5. SHALL BE IN ACCORDANCE WITH APPROPRIATE SECTIONS, TABLES AND ARTICLES OF THE NEC, IFC. (STICKER TO BE LOCATED ON CONDUIT WITH DC CURRENT EVERY 4' HORIZONTALLY OR 10' VERTICALLY AND 1' FROM EACH SIDE OF A BEND) WARNING: PHOTOVOLTAIC POWER SOURCE 2 14 3 4 5 6 7 (STICKER LOCATED INSIDE PANEL NEXT TO SOLAR BREAKER) (STICKER LOCATED INSIDE PANEL BELOW PV BREAKER) PV LOAD CENTER SIZED FOR PV BREAKERS ONLY OR RENDERED UNABLE TO ACCEPT ANY ADDITIONAL LOADS. SOLAR WARNING INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE 9 10 11 8 (STICKER LOCATED ON THE PV SUB PANEL) 12 13 CODE REQUIRED SIGNAGEPHOTOVOLTAIC ARRAY ON ROOF DC DISCONNECT DC PHOTOVOLTAIC POWER SOURCE RATED MAX POWER POINT CURRENT- 12.84 AMPS RATED MAX POWER POINT VOLTAGE- 31.17 VOLTS MAXIMUM SYSTEM VOLTAGE- 41.66 VOLTS SHORT CIRCUIT CURRENT- 13.68 AMPS SERVICE POINT & UTILITY METERING IQ COMBINER BOX W Cubbon St SOLAR DISCONNECT 1705 W Cubbon St 04/14/23 MODULE DATA SHEET D-1 SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE 1705 W Cubbon St 04/14/23 SCOPE: 2.40 KW DC Roof Mounted PV Electrical System 6 - Ureco 400W PV Modules 6 - IQ8+ Enphase Microinverters DATE:03/10/2023 SCALE:AS NOTED PAPER SIZE:17"x11" CUSTOMER INFORMATION BUILDING INFO: ONE STORY BUILDING ROOF TYPE: COMPOSITION SHINGLE ROOF STRUCTURE: 2''X4'' RAFTERS 24'' O/C MOUNTING SYSTEM: IRONRIDGE RACKING PARCEL NUMBER: 10936105 LOT AREA: 6,272 SQFT LIVING AREA: 1,139 SQFT COMPANY NAME: SKYSOLARPRO ANDREY LITVINOV: #867980 TYPE: C10 DATE: 11/30/2023 ADDRESS: 11208 DONA LOLA DRIVE STUDIO CITY, CA 91604 PHONE: (323) 428-4892 SIGNATURE NAME: PET MARTINEZ ADDRESS: 1705 W CUBBON ST, SANTA ANA, CA 92703 CITY OF SANTA ANA UTILITY: SCE D-2 INVERTER DATA SHEET 1705 W Cubbon St 04/14/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 1705 W Cubbon St, Santa Ana, CA 92703 Andrey Litvinov, SKY SOLAR PRO C(10) 867980 x X X X X X X X X X ANDREY LITVINOV 818-938-0338 permit@skysolarpro.com 03.15.2023 A. Litvinov 1705 W Cubbon St 04/14/23 SKY SOLAR PRO Attn.: To Whom It May Concern re job: PET MARTINEZ 1705 W CUBBON ST, SANTA ANA, CA 92703 Design Criteria: Code:2022 CBC ASCE 7-16 Live Load:20 psf Ult Wind Speed:110 mph Exposure Cat:C Ground Snow:0 psf Min Roof Snow: NA AHZ Consulting Engineers Inc. Professional Engineer projects@ahzengineers.com 3/14/2023 The following calculations are for the structural engineering design of the photovoltaic panels and are valid only for the structural info referenced in the stamped plan set. The verification of such info is the responsibility of others. After review, I certify that the roof structure has sufficient structural capacity for the applied PV loads. All mounting equipment shall be designed and installed per manufacturer's approved installation specifications. www.ahzengineers.com 1705 W Cubbon St 04/14/23 Job Code: PET MARTINEZ 2 of 6 Roof Properties: Roof Type = Roof Pitch (deg) = Mean Roof Height (ft) = Attachment Trib Width (ft) = Attachment Spacing (ft) = Framing Type = Framing Size = Framing OC Spacing (in.) = Section Thickness, b (in.) = Section Depth, d (in.) = Section Modulus, Sx (in.^3) = Moment of Inertia, Ix (in.^4) = Framing Span (ft) = Deflection Limit D+L (in.) = Deflection Limit S or W (in.) = Framing Upgrade = Sister Size = Wood Species = Wood Fb (psi) = Wood Fv (psi) = Wood E (psi) = C D (Wind) = C D (Snow) = C M = Ct = CL = Ci = CF = Cfu = Cr = F'b_wind (psi) = F'b_snow (psi) = F'v_wind (psi) = F'v_snow (psi) = M_allowable_wind (lb-ft) = M_allowable_snow (lb-ft) = V_allowable_wind (lbs) = V_allowable_snow (lbs) = E' (psi) = 725 1600000 456 1008 207 634 1785 288 1.15 2484 1.5 1.00 1.0 1.6 1.15 180 1600000 DF #2 900 Adequate NA 0.80 6 1.2 3.1 5.4 1.5 3.5 2x4 24 6 Rafter 13 3.25 Shingle 20 Roof 1 www.ahzengineers.com 1705 W Cubbon St 04/14/23 Job Code: PET MARTINEZ 3 of 6 Load Calculation: Panels Dead Load (psf) = Roofing Weight (psf) = Decking Weight (psf) = Framing Weight (psf) = Misc. Additional Weight (psf) = Existing Dead Load (psf) = Total Dead Load (psf) = Ultimate Wind Speed (mph) = Directionality Factor, kd = Topographic Factor, kzt = Velocity Press Exp Factor, kz = Ground Elevation Factor, ke = Velocity Pressure, qz (psf) = Array Edge Factor, γE = Solar Equalization Factor, γa = External Pressure Up, GCp_1 = External Pressure Up, GCp_2 = External Pressure Up, GCp_3 = External Pressure Down, GCp = Design Pressure Up, p_1 (psf) = Design Pressure Up, p_2 (psf) = Design Pressure Up, p_3 (psf) = Design Pressure Down, p (psf) = Hardware Checks: Ref. Widthrawal Value, W (lb/in) = (C M = Ct = Ceg = 1.0) C D = Adjusted Widthrawal Value, W' (lb/in) = Lag Penetration, p (in.) = Allowable Widthrawal Force, W'p (lbs) = Applied Uplift Force (lbs) = 1064 -516 426 2.5 266 1.6 Lag Screw Checks: Roof 1 16.0 -50.8 -60.6 0.6 -39.1 -2.6 -3.1 1.25 0.70 -2 0.85 1.00 22.4 110 0.85 1.0 Roof 1 Wind Load Calculations: 6.6 9.6 0.6 1.0 3.0 2.0 Dead Load Calculations: 3.0 Roof 1 www.ahzengineers.com 1705 W Cubbon St 04/14/23 Job Code: PET MARTINEZ 4 of 6 Uplift DCR = Ref. Lateral Value, Z (lbs) = (C M = Ct = C Δ = Ceg = 1.0) C D = Adjusted Lateral Value, Z' (lbs) = Applied Laeral Force (lbs) = Angle of Resultant Force, α (deg) = Adjusted Interaction Lateral Value, Z' α (lbs) = Lateral DCR = Roof Framing Checks: LC1: D+S Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = LC2: D+0.6W Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = LC3: D+0.75(S+0.6W) Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = LC4: 0.6D+0.6W Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = 0.85 0.40 634 1008 541 399 0.56 0.24 634 1008 358 239 0.68 0.28 634 1008 428 285 0.32 0.14 456 725 98 Force Checks: Roof 1 147 1059 0.02 20 88 0.9 243 0.49 270 www.ahzengineers.com 1705 W Cubbon St 04/14/23 Job Code: PET MARTINEZ 5 of 6 LC1: D+L Deflection (in.) = Deflection Limit (in.) = Deflection DCR = LC2: S Deflection (in.) = Deflection Limit (in.) = Deflection DCR = LC3: W (Down) Deflection (in.) = Deflection Limit (in.) = Deflection DCR = LC4: W (Up) Deflection (in.) = Deflection Limit (in.) = Deflection DCR = Seismic Check: Wall Weight (psf) = Tributary Wall Area (ft2) = Total Wall Weight (lbs) = Roof Weight (psf) = Roof Area (ft2) = Total Roof Weight (lbs) = Total Existing Weight (lbs) = Total Additional PV Weight (lbs) = (Existing W + Additional W)/(Existing W) = 101% The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. Limits of Scope of Work and Liability: Additional PV Weight: 386 Weight Increase: 1000 17000 7 2400 15844 32844 0.36 Existing Weight: 17 -0.29 0.80 0.80 0.19 0.00 0.15 0.00 0.80 1.2 0.14 Deflection Checks (Service Level): Roof 1 0.17 www.ahzengineers.com 1705 W Cubbon St 04/14/23 Job Code: PET MARTINEZ 6 of 6 Existing structure is assumed to have been designed and constructed following appropriate codes at time of erection, and assumed to have appropriate permits. The calculations produced are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were completed according to generally recognized structural analysis standards and procedures, professional engineering and design experience, opinions and judgements. Existing deficiencies which are unknown or were not observable during time of inspection are not included in this scope of work. All PV modules, racking, and mounting equipment shall be designed and installed per manufacturer's approved installation specifications. The Engineer of Record and the engineering consulting firm assume no responsibility for misuse or improper installation. This analysis is not stamped for water leakage. Framing was determined based on information in provided plans and/or photos, along with engineering judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any concerns prior to starting construction. www.ahzengineers.com 1705 W Cubbon St 04/14/23