HomeMy WebLinkAbout1722 S Woodland Pl - Plan0
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
COVER PAGE
1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED ELECTRICAL TESTING LABORATORY CUSTOM MADE EQUIPMENT SHALL HAVE
COMPLETE TEST DATA SUBMITTED BY THE MANUFACTURER ATTESTING TO ITS SAFETY
2. OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED
3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED
4. ALL SPECIFIC WIRING IS BASED ON THE USE OF COPPER.
5.CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING
COMMISSIONING AND ACCEPTANCE WITH THE CLIENT, UTILITY CO. AND CITY INSPECTORS AS NEEDED.
6.THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY
AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS. IF THE SOLAR BACK FED BREAKER IS OVER THE BUSS SIZE 20% LIMIT, CONTRACTOR SHALL
INCLUDE THE COST TO REPLACE MAIN BREAKER OR ENLARGE MAIN CAPACITY.
7. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE
COORDINATED WITH OTHER TRADES.
8. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS
RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING THE EXTRA WEIGHT.
9. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE
WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS APPROPRIATE.
10. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE
SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS.
OWNER
SCOPE
PROJECT
ADDRESS
PROJECT DATA GENERAL NOTES VICINITY MAP
SHEET INDEX
0 COVER PAGE
PHOTOVOLTAIC NOTES
SATELLITE VIEW
BUILDING
INFORMATION:
SINGLE LINE DIAGRAM
CODE REQUIRED SIGNAGE
3
4
ATTACHMENT LAYOUT5
6
7
INVERTER DATA SHEET
D1 MODULE DATA SHEET
RACKING DATA SHEET
MODULE & RACKING CERTIFICATE
ATTACHMENT DATA SHEET
ELECTRICAL
INFORMATION
MAIN SERVICE PANEL
BUSBAR RATING
MAIN SERVICE
BREAKER RATING
1ɸ, 3W, 120/240V
ROOF PLAN
MODULE MAP
RACKING
INFORMATION
Main Service Panel
Solar Module
Micro Inverter /
Optimizer
EMT / FMT / PVC
/ RMC type conduit/
Romex NM Cable/
FNMT (Fluid non-metalic tube)
36'' SetbackInverter
Utility Meter
Production Meter
PV Load Center
IQ Combiner Box
Junction Box
Sunpower PV Supervisor
18'' Setback
EV Outlet
CONSTRUCTION TYPE: V-B
ROOF
TYPE
AHJ
APN
LOT AREA
LIVING AREA
MSP
UM
PM
INV
PV
PVS6
IQ
J/B
EV
LUIS MANUEL LOPEZ
10
1 SOLAR EDGE ENERGY HUB SE6000H-USS3 (240V)
LG CHEM RESU 10H PRIME 9.6 kWh1
1722 S WOODLAND PL,
SANTA ANA, CA 92707
AC Disconnect ACD
SSP Service Sub Panel
COMPOSITION SHINGLE
1,300 SQFT
01324606
CITY OF SANTA ANA
WIRE SIZE CALCULATIONS
INVERTER MAP
D2
D3
D4
D5
D6
GROUNDING SPECSD7
ROOF MOUNT INSTALLATION OF
DC PHOTOVOLTAIC SYSTEM
3.95 KW DC
3.95 KW
3.65 KW AC
NEW UPGRADED
D8
1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED AND IDENTIFIED UL 1703.
2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL VENTS
3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED.
4. SOLAR INVERTER MUST HAVE A MANUFACTURE INSTALLED DISCONNECTING MEANS THAT PREVENTS PARALLEL FEEDING UTILITY LINES DURING POWER
OUTAGE.
5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING
ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS.
6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE.
7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS OVER 150V TO GROUND SHALL NOT BE
ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE ENERGIZED.
8 .INVERTER IS EQUIPPED W/ INTEGRATED GFCI, THUS PROVIDING GROUND FAULT PROTECTION
9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED
10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY OR APPROVED BY THE DEPARTMENT.
11. THE OUTPUT OF A UTILITY INTERACTIVE-INVERTER SHALL BE PERMITTED TO BE CONNECTED TO THE SUPPLY SIDE OF THE SERVICE DISCONNECTING
MEANS AS PER 230.82(6)
12. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING, AC GROUNDING
AND BONDING BETWEEN AC AND DC SYSTEMS SIZED AS PER SEC 250.122
13. EQUIPMENT GROUND CONDUCTOR REQUIRED IN RACEWAYS SIZED PER CEC 250-122.
14. PER ART 250.92. NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER. BOND BOTH ENDS OF RACEWAYS
ALL OTHER ORDINANCE ADOPTED BY THE
LOCAL GOVERNING AGENCIES
THE INSTALLATION OF SOLAR ARRAYS AND
PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY
WITH THE FOLLOWING CODES:
2022 CALIFORNIA BUILDING CODE
2022 CALIFORNIA RESIDENTIAL CODE
2022 CALIFORNIA FIRE CODE
2022 CALIFORNIA PLUMBING CODE
2022 CALIFORNIA ELECTRICAL CODE
2022 CALIFORNIA MECHANICAL CODE
2022 CALIFORNIA ENERGY CODE
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE
2022 CALIFORNIA HISTORICAL CODE
2022 CALIFORNIA EXISTING BUILDING CODE
2022 CALIFORNIA REFERENCED STANDARDS CODE
2022 CALIFORNIA ADMINISTRATIVE STANDARDS CODE
OPTIMIZER DATA SHEET
1
2
6,098 SQFT 1.1 SITE PLAN
Battery BackupBB
Auto TransformerAT
Solar Edge Meter EnclosureSEM
Distribution PanelDP
Rapid Shutdown Controller RSC
Rapid Shutdown Box RSB
Itron MeterIM
UNIT INDEX
CODE REFERENCES
IRONRIDGE RACKING
TRUSSES 2"X6" @ 24" O.C
OCCUPANCY: R
ONE STORY BUILDING
200A
200A
CANADIAN SOLAR 395W (BLACK)
CS3N-395MS
(don't delete this note)
BATTERY DATA SHEET
The scope of the plans is for the installation of the solar photovoltaic
system only and the approval is subject to compliance with all
applicable city and state codes and regulations regarding construction.
The approval of the plans does not constitute any certification of the
accuracy, completeness, or building permit status of the existing
buildings and structures as shown.
Bldg# 101115454
Elec# 20179903
Issued 06/14/23
1722 S Woodland Pl
06/15/23
1
ROOF PLAN
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
N
0°
S
180°
E
90°
W
270°
SCALE
0 5 1 10ft
ROOF AREA CALCULATIONS
FIRE SPRINKLERS - NO
TOTAL ROOF AREA (SQ.FT.) - 2,095
SOLAR AREA (SQ.FT.) - 220
% OF COVERED AREA - 10.5%
PHOTOVOLTAIC SYSTEM
1 Solar Edge Energy Hub 6.0 Kw Inverter SE6000H-USS3 (240V)
Solar Edge S440 Power Optimizers10
FROM JUNCTION BOX TO ROOF EAVE EMT TYPE CONDUIT WILL RUN OVER
THE ROOF AT 1 1/2" HEIGHT, THEN UNDER THE EAVE TO PV EQUIPMENT3.95 KW DC
10 Canadian Solar 395W Modules (CS3N-395MS) (BLACK)
1
8
'
' f
i
re
s
e
t
b
a
c
k
36'' fire setback
36'' fire setback
INV
ACD
MSP
LG Chem Battery
J/B
Gate
Gate
Solar Array
10 Canadian Solar 395W
10 S440 Optimizers
Tilt: 20 Deg
Azimuth: 270 Deg
S
W
o
o
d
l
a
n
d
P
l
1722 S Woodland
Pl06/15/23
1.1
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
SITE PLAN
N
0°
S
180°
E
90°
W
270°
PROPERTY LINE
SCALE
10ft5 1 0
INV
ACD
MSP
LG Chem Battery
Gate
Gate
Pu
b
l
i
c
S
i
d
e
w
a
l
k
Driveway
(E)HOUSE
S
W
o
o
d
l
a
n
d
P
l
55'
95'
13'
21'
25'
62'
1722 S Woodland
Pl06/15/23
2
SINGLE LINE
DIAGRAM
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
ITEM DESCRIPTION QTY#
PV MODULE
MAIN SERVICE PANEL
MAIN SERVICE PANEL
& UTILITY METER
BUSBAR RATING
BREAKER RATING
1
ITEM DESCRIPTION QTY#
PVC JUNCTION BOX 4"x4"x2" UL LISTED WATER TIGHT NEMA TYPE 3
1
1
1
5
3
1
4
6
MAIN
SERVICE
PANEL
120/240V
1P,3W
2
EXISTING
GROUNDING SYSTEM
UTILITY
M
2
3
5700W
INVERTER
PEAK PWR TRACKING VOLTAGE
INVERTER EFFICIENCY
ENCLOSURE :
MAXIMUM INPUT CURRENT
MAXIMUM OUTPUT CURRENT
MAXIMUM INPUT POWER
MAXIMUM OUTPUT POWER
4 1
380 V
99.0 %
NEMA 3R
16.5 A
25.0 A
12,000 W
6,000 W
SOLAREDGE ENERGY HUB SE6000H-USS3 (240V)
SOLAREDGE POWER OPTIMIZER
RATED DC INPUT POWER
MAXIMUM INPUT VOLTAGE
MPPT RANGE
MAXIMUM SHORT CIRCUIT CURRENT (Isc)
MAXIMUM OUTPUT CURRENT
OPTIMIZER WEIGHT
MAXIMUM POWER PER STRING
5
S440
440W
60 Vdc
8 to 60 Vdc
14.5 Adc
15 Adc
1.5 Lbs
10POWER OPTIMIZER
60AAC DISCONNECT NON FUSED AC DISCONNECT LOCKABLE,
BLADE TYPE, NEMA 3R, 120/240V 16
NEW UPGRADED
NEW
2
1
33
200A
200A
200A
FOR WIRE SIZE CALCULATIONS PLEASE SEE PAGE #3
INSTALL 2P
40A CB(PV) AT
OPPOSITE END
OF BUS FROM
MAIN FEEDER CB
10
Canadian Solar 395W
CS3N-395MS (BLACK)
Voc = 44.3V
Vmp = 37.0V
Isc = 11.44A
Imp = 10.68A
(N)200A
String: (10) Modules, (10) Optimizers
7
(2) #8 AWG TWHN-2
(1) #10 AWG EGC/GEC
3/4'' EMT TYPE CONDUIT
17 BATTERY BACKUP BATTERY BACKUP SYSTEMS
LG RESU PRIME 10H 9.6 kWh
1722 S Woodland
Pl06/15/23
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
3
FROM PV MODULES TO JBOX
FROM JBOX TO INVERTER
(2)
WIRE SIZE
CALCULATIONS
1
(1) #6 AWG BARE CU EGC,
2
#8 AWG CU EGC,
(3)
3
(1) #8 AWG CU EGC,
MAXIMUM INVERTER OUTPUT CURRENT (A)
TEMPERATURE FACTOR
TEMPERATURE ADJUSTMENT (A)
OUTPUT CALCULATIONS
PV SYSTEM MAX DC OUTPUT
PV SYSTEM MAX AC OUTPUT
MAXIMUM POWER (W)
PEAK PWR TRACKING VOLTAGE (V)
CONSIDER CONTINUOUS COEFFICIENT
SHORT CIRCUIT CURRENT (A)
ADJUSTED CONDUCTOR AMPACITY (A)
1.25
1.25
1.25
0.91
(2)
(1)
Pmax (PTC Rating)
25.0
380
1 99.0 %
25.0 * 1.25 / 0.91 34.4
#8 AWG THWN-2
SOLAR EDGE SE6000H-USS3 (240V)
25.0 * 1.25 31.3
1 1/2''
(TEMP - 39 + 22 = 61C)0.58
RACEWAY HEIGHT FROM ROOF
ADJST. FACTOR (1 thru 3 WIRES)1.0
FREE IN THE AIR
3/4'' EMT TYPE CONDUIT
3/4'' EMT TYPE CONDUIT
MAIN SERVICE PANEL RATING
BUSBAR RATING
MAIN BREAKER
PV BACKFEED BREAKER SIZE
120% RULE:
MAX ALLOWED FEED
40A
* /* 1.25 *1.2510395 380 16.2
//16.2 0.58 1.0 27.9
#10 AWG THWN-2
WIRE CHART WIRE CHART
* 10 395 3.95 KW
** 10 369.1 0.99 3.65 KW
CONSIDER CONTINUOUS COEFFICIENT
CONSIDER CONTINUOUS COEFFICIENT
200A
200A
240A
200A ''MB'' + 40A "SOLAR" = 240A ≤240A MAX
FROM INVERTER TO MAIN SERVICE PANEL
CONSIDER CONTINUOUS (A)
MAX NUMBER OF MODULES IN STRING 10
#10 AWG PV-WIRE
10
CS3N-395MS (BLACK)395 W
369.1 W
395
1722 S Woodland
Pl06/15/23
16.2 A
CODE REQUIRED
SIGNAGE
4
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
59.3-60-60.5
6000W
25.0 A
25.0 A MAX
25.0 A MAX
25.0 A MAX
15 A
CAUTION
NEC 705.10(B) & NEC 690.56(B)
Permanent directory or plaque providing location of service disconnecting means and
photovoltaic system disconnecting means, if not located at the same location. (Plaques shall
be metal or plastic, with engraved or machine printed letters, or electro-photo plating, in a
contrasting color to the plaque. Plaques shall be permanently attached to the equipmenq or in the
required location using an approved method that is suitable to withstand the environment to which it
is exposed. Plaques and signage shall meet legibility, defacemet, exposure and adhesion
requirements of Underwriters Laboratories marking and labeling system 969(UL969).
Plaques will have red background & white lettering.
N
0°
S
180°
E
90°
W
270°
POWER TO THIS BUILDING IS ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
DISCONNECTS LOCATED AS SHOWN:
JB
B
O
X
WARNING
ELECTRICAL SHOCK HAZARD
TERMINALS ON THE LINE AND
LOAD SIDES MAY BE ENERGIZED
IN THE OPEN POSITION
NEC 690.13(B)
TURN OFF PHOTOVOLTAIC
AC DISCONNECT PRIOR TO
WORKING INSIDE PANEL
NEC 110.27(C) & OSHA 1910.145(f)(7)
DC
D
i
s
c
o
n
n
e
c
t
ELECTRICAL SHOCK HAZARD
TERMINALS ON THE LINE AND
LOAD SIDES MAY BE ENERGIZED
IN THE OPEN POSITION
NEC 690.13(B)
DC VOLTAGE IS ALWAYS PRESENT
WHEN SOLAR MODULES
ARE EXPOSED TO SUNLIGHT NEC 690.53
NEC 690.13(B)
In
v
e
r
t
e
r
/
P
V
L
o
a
d
WARNING
THE DISCONNECTION OF THE
GROUNDING CONDUCTOR(S)
MAY RESULT IN OVERVOLTAGE
ON THE EQUIPMENT
NEC 690.31(I)
NEC 690.54
AC
D
i
s
c
o
n
n
e
c
t
NEC 690.54
NEC 690.52
WARNING
ELECTRICAL SHOCK HAZARD
TERMINALS ON THE LINE AND
LOAD SIDES MAY BE ENERGIZED
IN THE OPEN POSITION
NEC 690.13(B)
PM
M
E
T
E
R
NEC 705.12(D)(3) & NEC 690.59
Ma
i
n
/
S
u
b
P
a
n
e
l
NEC 690.54
NEC 690.13 (F), NEC 705.12(B)(3-4) & NEC 690.59
NEC 705.12(D)(3) & NEC 690.59
NEC 690.15 (C) & NEC 690.33(E)(2)
NEC 690.13(B)
SINGLE 120-VOLT SUPPLY
DO NOT CONNECT
MULTIWIRE BRANCH CIRCUIT
NEC 710.15(C) & 692.9 (C)
TURN OFF PHOTOVOLTAIC
AC DISCONNECT PRIOR TO
WORKING INSIDE PANEL
NEC 110.27(C) & OSHA 1910.145(f)(7)
WARNING
ELECTRICAL SHOCK HAZARD
TERMINALS ON THE LINE AND
LOAD SIDES MAY BE ENERGIZED
IN THE OPEN POSITION
NEC 690.13(B)
NEC 705.12 (B)(2)(c)
LABELING REQUIREMENTS FOR ARTICLE 690
NEC 690.13(B) Each PV system disconnecting means shall plainly indicate whether
in the open (off) or closed (on) position and be permanently marked “PV SYSTEM
DISCONNECT” or equivalent. Additional markings shall be permitted based upon
the specific system configuration. For PV system disconnecting means where the
line and load terminals may be energized in the open position, the device shall be
marked with the following words or equivalent.
NEC 690.13(F) Type of Disconnect. A dc PV system disconnecting means shall be
marked for use in PV systems or be suitable for backfeed operation.
NEC 690.15(C) An isolating device shall be rated to open the maximum circuit
current under load or be marked “Do Not Disconnect Under Load” or “Not for
Current Interrupting.”
NEC 690.31(B)(1) PV system circuit conductors shall be identified at all accessible
points of termination, connection and splices. The means of identification shall be
permitted by separate color coding, marking tape, tagging or other approved means.
NEC 690.31(G)(1) Where circuits are embedded in build up, laminate or membrane
roofing materials not covered by PV modules and associated equipment, the location
of the circuits shall be clearly marked.
NEC 690.31(G)(4) PV dc system circuit labels shall appear on every section of the wiring
system that is separated by enclosures, walls, partitions, ceilings, or floors. Spacing between
labels or markings, or between a label and a marking, shall not be more than 3 m (10 ft).
Labels required in this section shall be suitable for the environment where they are installed.
NEC 690.31(I) Solidly-grounded bipolar PV systems shall be clearly marked with a permanent,
legible warning notice indicating that the disconnection of the grounded conductor(s) may
result in overvoltage on the equipment.
NEC 690.33(E)(2) Interruption of Circuit. Connectors shall be a type that requires the use of a
tool to open and marked “Do Not Disconnect Under Load” or “Not for Current Interrupting.”
NEC 690.52 Alternating-current modules shall be marked with identification of terminals or
leads and with identification of the following ratings.
NEC 690.53A permanent label for the dc PV power source indicating items (1) through (3)
shall be provided by the installer at dc PV system disconnecting means and at each dc
equipment disconnecting means required by 690.15. Where a disconnecting means has more
than one dc PV power source, the values in 690.53 (1) through (3) shall be specified for each
source.
NEC 690.54 All interactive system(s) points of interconnection with other
sources shall be marked as an accessible location at the disconnecting
means as a power source and with the rated ac output current and the
nominal operating ac voltage.
NEC 690.55 The PV system output circuit conductors shall be marked to
indicate polarity where connected to energy storage systems.
NEC 690.56(B)Plaques or directories shall be installed in accordance with
705.10.
NEC 690.56(C)(3) A rapid shutdown switch shall have a label located on
or no more than 1 meter (3 ft) from the switch that includes the following
wording.
NEC 690.56(C)(1)(a-b) The type of PV system shall be labeled as described
in a) or b):
NEC 690.59 PV systems connected to other sources shall be installed in
accordance with Parts I and II of Article 705.
SOLAR ELECTRIC
PV PANELS
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH ON THE
"OFF" POSITION TO
SHUTDOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD
IN ARRAY
IFC 605.11.3.1(1) & 690.56(C)(1)(a)
NEC 690.56(C)(3)
NEC 690.31(G)(3)(4)
NEC 690.31(G)(1)CO
N
D
U
I
T
RATED AC OUTPUT CURRENT:
NOMINAL OPERATING AC VOLTAGE:
PHOTOVOLTAIC AC DISCONNECT
MAXIMUM VOLTAGE
MAXIMUM CIRCUIT CURRENT
MAX RATED OUTPUT CURRENT OF
THE CHARGE CONTROLLER
OR DC-TO-DC CONVERTER
(IF INSTALLED)
DC DISCONNECT
PHOTOVOLTAIC
WARNING WARNING DUAL POWER SOURCE
SECOND SOURCE IS PHOTOVOLTAIC SYSTEM
RATED AC OUTPUT CURRENT:
NOMINAL OPERATING AC VOLTAGE:
PHOTOVOLTAIC AC DISCONNECT NOMINAL OPERATING AC VOLTAGE
NOMINAL OPERATING AC FREQUENCY
MAXIMUM AC POWER
MAXIMUM AC CURRENT
MAX OVERCURRENT DEVICE RATING
FOR AC MODULE PROTECTION
RATED AC OUTPUT CURRENT:
NOMINAL OPERATING AC VOLTAGE:
PHOTOVOLTAIC AC DISCONNECT WARNING DUAL POWER SOURCE
SECOND SOURCE IS PHOTOVOLTAIC SYSTEM
MAIN PHOTOVOLTAIC
SYSTEM DISCONNECT WARNING
CAUTION
PHOTOVOLTAIC SYSTEM CIRCUIT IS BACKFED
WARNING
POWER SOURCE OUTPUT
CONNECTION. DO NOT
RELOCATE THIS
OVERCURRENT DEVICE.
WARNING
DO NOT DISCONNECT
UNDER LOAD
RAPID SHUT DOWN SWITCH
FOR SOLAR PV SYSTEM
WARNING: PHOTOVOLTAIC
POWER SOURCE
WARNING
PHOTOVOLTAIC POWER SOURCE
DO NOT REMOVE UNLESS REPLACED IN EXACT LOCATION - PV POWER CIRCUIT DIRECTLY BELOW
WARNING
FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY
AND CONDUCTORS LEAVING THE ARRAY: SIGH TO
BE LOCATED ON OR NO MORE THAN 3 FT AWAY
FROM SERVICE DISCONNECTING MEANS TO WHICH
THE PV SYSTEMS ARE CONNECTED AND SHALL
INDICATE THE LOCATION OF ALL IDENTIFIED RAPID
SHUTDOWN SWITCHES IF NOT AT THE SAME
LOCATION. [CEC 690.56(C)(1)(A)]
480 V
240 Vac
240 Vac
240 Vac
240 Vac
NEC 690.13(B)
AC DISCONNECT
PHOTOVOLTAIC
40 A
SOLAR ARRAY
ON THE ROOF
SOLAR INVERTER
PV SYSTEM DISCONNECT
FOR UTILITY OPERATION
LG CHEM BATTERY
SERVICE POINT &
UTILITY METERING
S
W
o
o
d
l
a
n
d
P
l
1722 S Woodland
Pl06/15/23
ATTACHMENT
LAYOUT
5
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
STRUCTURAL STAMPROOF
PITCH
ROOFING
TYPE
ATTACHMENT
TYPE
FRAMING
TYPE
FRAMING
SIZE
PENETRATION
PATTERN
20°
RACKING
TYPE
MAX
PENETRATION
SPACING
ROOFING
LAYERS
WIND SPEED 95 MPH
SNOW LOAD 0 PSF
EXPOSURE C
LAG BOLTS MOUNTS AND MOUNTING HARDWARE WILL BE
SEALED WITH CHEM LINK SEALANT OR EQUIVALENT.
MODULE WEIGHT (LBS)
# OF MODULES
TOTAL MODULE WEIGHT (LBS)
RACK WEIGHT (LBS)
TOTAL SYSTEM WEIGHT (LBS)
# OF STANDOFFS
LOADING PER STANDOFF (LBS)
TOTAL MODULE AREA (SQ.FT.)
LOADING (PSF)
WEIGHT LOAD CALCULATION INDEX
ROOF SHEATHED WITH 1/2" PLYWOOD AND UPPER
SURFACE IS FACED WITH FELT PAPER
TOTAL ROOF AREA (Sq. FT)
% OF COVERED AREA
PV MODULE MODEL #
OPTIMIZERS WEIGHT (LBS)
10
Roof 1 Layer Comp Shingle Ironridge XR10 Truss Stacked 72"2"X6" @ 24" O.C
3
1
2
4
ITEM NO.
1
DESCRIPTION
2
3
4
BOLT LAG 5/16 X 4.75"
ASSY, FLASHING
ASSY, CAPFOOT
WASHER, EPDM BACKED
Qty in Kit
4
4
4
4
5/16" X 4.75"
Flash Foot 2
MIN 2.5" EMBEDMENT
RACKING RAIL
ATTACHMENT
ROOF FRAMING
16
220
2095
516
103
15
634
39.6
2.88
10.5
2''X6'' Blocking
SOLAR MODULE
ROOF
ASCE 7-16
Max 3.5''
51.6
CS3N-395MS (BLACK)
72"
24"
1722 S Woodland
Pl06/15/23
6
MODULE
MAP
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
[FOR INSTALLER USE ONLY]
PHOTOVOLTAIC SYSTEM
1 Solar Edge Energy Hub 6.0 Kw Inverter SE6000H-USS3 (240V)
Solar Edge S440 Power Optimizers10
3.95 KW DC
10 Canadian Solar 395W Modules (CS3N-395MS) (BLACK)
Solar Array
10 Canadian Solar 395W
10 S440 Optimizers
Tilt: 20 Deg
Azimuth: 270 Deg
1722 S Woodland
Pl06/15/23
7
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
INVERTER
MAP
INVERTERPHOTOVOLTAIC SYSTEM
1 Solar Edge Energy Hub 6.0 Kw Inverter SE6000H-USS3 (240V)
Solar Edge S440 Power Optimizers10
3.95 KW DC
[FOR INSTALLER USE ONLY]
10 Canadian Solar 395W Modules (CS3N-395MS) (BLACK)
Solar Array
10 Canadian Solar 395W
10 S440 Optimizers
Tilt: 20 Deg
Azimuth: 270 Deg
1722 S Woodland
Pl06/15/23
D1
MODULE
DATA SHEET
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
1722 S Woodland
Pl06/15/23
INVERTER
DATA SHEET
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
D2
1722 S Woodland
Pl06/15/23
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
OPTIMIZER
DATA SHEET
D3
1722 S Woodland
Pl06/15/23
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
D4
RACKING
DATA SHEET
1722 S Woodland
Pl06/15/23
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
ATTACHMENT
DATA SHEET
D5
1722 S Woodland
Pl06/15/23
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
D6
MODULE &
RACKING
CERTIFICATE
1722 S Woodland
Pl06/15/23
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
D7
GROUNDING
SPECS
1722 S Woodland
Pl06/15/23
PV SYSTEM
AS INDICATED
April 25, 2023
LUIS MANUEL LOPEZ
1722 S WOODLAND PL,
SANTA ANA, CA 92707
Drawn By : Narek A.
Clean Energy Solutions Inc.
Address:
1055 West 7th Street
33rd Floor, Los Angeles,
CA 90017
Phone Number:
(800)994 1134
Lic# 998787
Class C-10
CONTRACTOR
D8
BATTERY
DATA SHEET
1722 S Woodland
Pl06/15/23
Expedited Permit Process for PV Systems1
Expedited Permit Process for PV Systems
Standard String System
The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due to their similarity with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of the
installation.
The following pages contain forms for the Standard String System to use with the Expe-
dited Permit Process. The Micro-Inverter, AC Module, and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic-
tions that have adopted the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submitted in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
1722 S Woodland
Pl06/15/23
Expedited Permit Process for PV Systems2
Expedited Permit Process for Small-Scale PV Systems
Standard String System
The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations
are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been
suggested to provide as a path to permit approval.
Required Information for Permit:
1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it
should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings
with a 3’ perimeter space at ridge and sides may not need separate fire service review.
2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specification sheets and installation manuals (if available) for all manufactured components including, but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1: Structural Review of PV Array Mounting System
Is the array to be mounted on a defined, permitted roof structure? l Yes l No
If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1.
Roof Information:
1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________
____________________________________________________________________________________________________
If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…).
2. Does the roof have a single roof covering? l Yes l No
If No, submit completed worksheet for roof structure WKS1.
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________
Mounting System Information:
1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap
beneath the module frames? l Yes l No
If No, provide details of structural attachment certified by a design professional.
2. For manufactured mounting systems, fill out information on the mounting system below:
a. Mounting System Manufacturer ___________Product Name and Model#________________________________
b. Total Weight of PV Modules and Rails ___________lbs
c. Total Number of Attachment Points____________
d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1)
e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for
maximum spacing allowed based on maximum design wind speed)
f. Total Surface Area of PV Modules (square feet)_________________ ft 2
g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2
If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1.
Step 2: Electrical Review of PV System (Calculations for Electrical Diagram)
In order for a PV system to be considered for an expedited permit process, the following must apply:
1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,440 Watts or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)).
5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV
system. Interactive PDF diagrams are available at www.solarabcs.org/permitting.
Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant
understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively
communicate, provide an alternative diagram with appropriate detail.
1722 S Woodland
Pl06/15/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
3
Standard String System Site Plan
1
8
'
' fi
re
se
t
ba
c
k
36'' fire setback
36'' fire setback
ACD
MSP
INV
LG Chem Battery
J/B
Gate
Gate
Solar Array
10 Canadian Solar 395W
10 S440 Optimizers
Tilt: 20 Deg
Azimuth: 270 Deg 1722 S Woodland
Pl06/15/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
Standard String System Electrical Diagram
1722 S Woodland
Pl06/15/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
5
Notes for Standard String System Electrical Diagram
Contractor Name,
Address and Phone:
_________________
_________________
_________________
_________________
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
Site Name: __________________________
Site Address: ________________________
System AC Size: ______________________
SIZE FSCM NO DWG NO REV
SCALE NTS Date: SHEET
Drawn By:
Checked By:
MAX POWER-POINT CURRENT (IMP)
MAX POWER-POINT VOLTAGE (VMP)
OPEN-CIRCUIT VOLTAGE (VOC)
SHORT-CIRCUIT CURRENT (ISC)
MAX SERIES FUSE (OCPD)
MAXIMUM POWER (P MAX)
MAX VOLTAGE (TYP 600VDC)
VOC TEMP COEFF (mV/oC or %/oC )
IF COEFF SUPPLIED, CIRCLE UNITS
A
V
V
A
A
W
V
MODULE MAKE
MODULE MODEL
PV MODULE RATINGS @ STC (Guide Section 5)
MAX DC VOLT RATING
MAX POWER @ 40oC
NOMINAL AC VOLTAGE
MAX AC CURRENT
MAX OCPD RATING
V
W
V
A
A
INVERTER MAKE
INVERTER MODEL
INVERTER RATINGS (Guide Section 4)
1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YES NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
REQUIREMENT? YES NO N/A
3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX
CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING. (See Guide Section 9)
5) TOTAL OF ______ INVERTER OCPD(s), ONE FOR EACH INVERTER. DOES TOTAL
SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)?
YES NO
NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9):
1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ______oC
2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE _____oC
2.) 2005 ASHRAE FUNDEMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED
47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT
LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47oC OR LESS (ALL OF UNITED STATES),
a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER
FUSE.
b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER
FUSE.
NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix D):
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODE® REFERENCES
SHOWN AS (NEC XXX.XX)
NOTES FOR ALL DRAWINGS:
SIGNSSEE GUIDE SECTION 7
SIGN FOR DC DISCONNECT
SIGN FOR INVERTER OCPD AND
AC DISCONNECT (IF USED)
RATED MPP CURRENT
RATED MPP VOLTAGE
MAX SYSTEM VOLTAGE
MAX CIRCUIT CURRENT
A
V
V
A
PHOTOVOLTAIC POWER SOURCE
WARNING: ELECTRICAL SHOCK
HAZARDLINE AND LOAD MAY BE
ENERGIZED IN OPEN POSITION
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
A
V
SOLAR PV SYSTEM
AC POINT OF CONNECTION
THIS PANEL FED BY MULTIPLE
SOURCES (UTILITY AND SOLAR)
1722 S Woodland
Pl06/15/23
1722 S WOODLAND PL.,
SANTA ANA, CA 92707
LOPEZ, LUIS MANUEL
CLEAN ENERGY SOLUTIONS INC.
1055 WEST 7TH STR.,
33RD FLR,
LOS ANGELES, CA 90017
800-994-1134
Design Criteria
1- Code: CALIFORNIA BLDG CODE 2022 / ASCE 7-16
2 - Wind: 110 MPH, Exposure: C
3 - Wood Species: DF-L No. 1 (SG = 0.5 )
Notice: Use restrictions of these calculations.
The attached Calculations are valid only when bearing original signature hereon.
Contractor/Client to verify existing dimensions/conditions prior to construction
& solar racking is installed per manufacturer span requirements.
The use of these calculations is solely intended for the above mentioned project.
4/26/2023
Structural Calculations for
SOLAR POWER SYSTEM CONNECTION CHECK AT:
Job:
1-844-PV ELITE | info@yoursolarplans.com
3000 E. Birch Street Suite 201 | Brea CA 92821
1722 S Woodland
Pl06/15/23
ASCE 29.4.4 Rooftop Solar Panels Parallel to the Roof Surface on Buildings of All Heights and Roof Slopes.
Roof Slope = 20 °
Roof Shape Gable
Tributary Width s = 6.00 ft
Tributary Length l = 3.18 ft
Effective Area A e = 19.10 ft2
Height of Structure h = 15 ft
Wind Speed V = 110 mph
Exposure Category C
Building Width B = 40 ft
Building Length L = 40 ft
Zone Width a = 4 ft
Elevation Height zg = 62 ft
Wind Directionality Kd = 0.85
Topography Factor Kt = 1.00
Ground Elevation Factor Ke = 1.00
Velocity Pressure Exposure Coefficient Kz = 0.85
Velocity Pressure q z = 0.00256KzKztKdKeV2 = 22.30 psf
Solar Array Pressure Equalization a = 0.76
Array Edge Factor E = 1.50
Zone GCp p = qz(GCp)( E)( a )
3 - -
3r 3.42 -86.84
3e 2.92 -74.30
2 - -
2r 2.92 -74.30
2e - -
2n 2.92 -74.30
1 - -
1' - -
1722 S Woodland
Pl06/15/23
LAG SCREW ANALYSIS
Loads
Wind Pressures qz = -74.30 psf
Solar Panel Load QD = 3 psf
Panel Length l = 6.367 ft
Panel Width b 3.425 ft
Attachment Spacing s = 6 ft
Portrait
Tributary Area At = 19.10 ft2
Wind Load PW = qz * At = -1419 lbs
Dead Load PD = QD * At = 57.3 lbs
Uplift Pa = 0.6 PD + 0.6 Pw = -817 lbs
Landscape
Tributary Area At = b * s = 10.275 ft2
Wind Load PW = qz * At = -763 lbs
Dead Load PD = QD * At = 30.825 lbs
Uplift Pa = 0.6 PD + 0.6 Pw = -440 lbs
Lag Screw
Specific Gravity of Lumber SG = 0.50 (Douglas Fir-Larch)
Diameter of Lag Screw D = 5/16 in
Withdraw Design /in 1800*SG 3/2 *D 3/4 = 266 lbs/in
Depth of Embedment lp = 2.50 in
Total Nominal Withdrawal Value W = W * l p = 665 lbs
Load Duration Factor CD = 1.6
Withdrawal Design Value W' = W * C D = 1064 lbs
Demand Capacity Ratio DCR = Pa / W' = 0.77 < 1 OK
1722 S Woodland
Pl06/15/23
ASCE 30.3.2 Design Wind Pressure Beam/ Top Chord Check
Roof Slope = 20 °
Roof Shape Gable
Tributary Width s = 2.00 ft
Tributary Length L = 20.00 ft
Effective Area A = L ( MAX [ s , L/3] ) = 100 ft2
Height of Structure h = 15 ft
Wind Speed V = 110 mph
Exposure Category C
Building Width B = 40 ft
Building Length L = 40 ft
Zone Width a = 4 ft
Elevation Height zg = 62 ft
Wind Directionality Kd = 0.85
Topography Factor Kt = 1.00
Ground Elevation Factor Ke = 1.00
Velocity Pressure Exposure Coefficient Kz = 0.85
Velocity Pressure q z = 0.00256KzKztKdKeV2 = 22.30 psf
Internal Pressure Coefficient (GCpi) = -0.18
Zone GCp p = q z [(GCp) - (Gcpi)]
3 - -
3r 1.80 -44.16
3e 2.25 -54.19
2 - -
2r 2.25 -54.19
2e - -
2n 2.25 -54.19
1 - -
1' - -
1722 S Woodland
Pl06/15/23
Beam/ Top Chord Check Lumber:
Moment Demand
# of Attachment per Rafter NA = Span : Orientation
Lenght (ft) :
Dead Load Roof Material:QD = psf
Live Load QLr = psf
Wind Load p = psf
Snow Load QS = psf
Rafter Spacing s = in
Wind Load, Portrait Portrait UL =
Wind Load, Landscape Landscape UW =
Linear Dead Load wd = plf
Live Load wLr = plf Start ft Start ft
End ft End ft
Snow Load ws = plf Start ft Start ft
End ft End ft
Ma, Moment
D lb-ft
D+Lr lb-ft
D+S lb-ft
0.6D+0.6W lb-ft
D+0.45W+0.75Lr lb-ft
D+0.45W+0.75S lb-ft
Moment Capacity Framing Member Size Lumber Grade : DF-L No. 1
CM = 1 Ct = 1 Cr= CF = fb = psi Cfu =C i =
Breadth b = in
Depth d = in
Section Modulus Sx = bd 2 / 6 = in3
Bending Stress Capacity Fb = CM * C t * Cr * C F * fb = psi Table 4.3.1 NDS 2015
Deflection Limit E = ksi I = in4
Transient Deflection in
Transient Deflection Allowed > [OKAY]
Total Deflection in
Total Deflection Allowed > [OKAY]
1.0 1
20
0.00
24
SHINGLE
0.312
366 180
1.6 2392 psi D+0.45W+0.75S 1336 psi 0.56 OKAY
1.6 2392 psi D+0.45W+0.75Lr 1336 psi 0.56 OKAY
1.6 2392 psi
0.395
289 120
1700 20.80
0.6D+0.6W 2215 psi 0.93 OKAY
1.15 1719 psi D+S 591 psi 0.34 OKAY
OKAY
1.25 1869 psi D+Lr 675 psi 0.36 OKAY
DCR
0.9 1346 psi D 591 psi 0.44
7.56
1495
CD Fb' = C D * F b ASD Load Ma / S x
2x6
1.15 1.3
20.00
14.23
20.00
1000
1.50
5.50
373
425
373
1396
842
842
0
0.0
0
1.5
0
0
0.0
Portrait
1.5
0.0
Portrait
0 0.0 0.0
A T (ft2)
19.1
10.275
pd (lbs)
57.3 -1035
pw (lbs) ps (lbs)
0
14.23 40
0.0 0.0 0.0 0.0
0 0.0
Portrait
0
0.0 30.825 -557 0
0 0.0
Portrait
0 0.0 0.0 0
0.0
20
1 2 3 4 Eave
2
0.0
0.0 0.0 0.0
0.0
0 0.0 0.0 0.0 0.0
0 0.0 0.0 0.0
0.0
0 0.0 0.0
0.0
9.50 9.50 0.00 0.00 1.00
Portrait
3 8.7 57.3
10.00
-54.19
DF-L No. 1
4 j lj (ft) pd,j (lbs) pw,j (lbs) ps,j (lbs)
Portrait
1 2.3 57.3 -1035 0.0
7.0 57.3 -1035
-1035 0.0
4 13.4 57.3 -1035 0.0
ൌ ሺ െ ሻ െ െ െ
‐2000.0
‐1500.0
‐1000.0
‐500.0
0.0
500.0
1000.0
1500.0
0.000 5.000 10.000 15.000 20.000 25.000
1722 S Woodland
Pl06/15/23
EISMIC WEIGHT COMPARISON / ANALYSIS - (PER CEBC 2022 Part 10 Chapter 5 Section 502.5)
PV System Weight
Module Model CS
Panel Weight Wpanel = 51.6 lbs
Number of Panels NPV = 10
Total PV System Weight W PV = Wpanel * NPV = 516 lbs
Existing Roof Weight
Roof Weight QD =10.0 psf
Building Length Lbuild =40 ft
Building Width W build =40 ft
Roof Area Abuild =1600 ft2
Building Perimeter Pbuild = 160 ft
Wall Height ht = 8 ft
Wall weight Qwall = 15 psf
Interior wall weight Qint = 10 psf
Roof Load Wfloor = Abuild * QD = 16000 lbs
Wall LoadWwall = ht /2 * Qwall * Pbuild + Abuild * Qint /2 = 17600 lbs
Total Story Weight Wbuild = Wfloor + Wwall = 33600 lbs
Percentage Weight Increase WPV / Wbuild = 1.54%< 10% OKAY
1722 S Woodland
Pl06/15/23
1722 S Woodland
Pl06/15/23
Rev: 7/15/2021
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
SOL-01 CBC 2019
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1.Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2.Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3.Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4.Will the PV system weigh maximum 4 pounds per square feet or less?
5.Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6.Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7.Will the PV system be installed without using any ballast system or counter-weight
system?
8.Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9.Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10. Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Phone Number: Date:
Email Address:
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M -19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
1722 S Woodland Pl Santa Ana, CA 92707
Clean Energy Solutions
998787
Bernard Albosta
800-994-1134 5/2/23
mluna@cleanenergysolar.org
1722 S Woodland
Pl06/15/23