Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1906 E Kemper Ave - Plan
CODE INFORMATION APPLICABLE CODES, LAWS AND REGULATIONS CODE INFORMATION APPLICABLE CODES, LAWS AND REGULATIONS 2022 CALIFORNIA BUILDING CODE (CBC) 2022 CALIFORNIA RESIDENTIAL CODE (CRC) 2022 CALIFORNIA FIRE CODE (CFC) 2022 CALIFORNIA ELECTRICAL CODE (CEC) 2022 CALIFORNIA MECHANICAL CODE (CMC) 2022 CALIFORNIA PLUMBING CODE (CPC) PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE NO R I N N E S T A U B 19 0 6 K E M P E R A V E SA N T A A N A , C A L I F O R N I A 9 2 7 0 5 RP-365850 4. 0 7 k W SPRI - ANAHEIM 01-26-2023 C. Holgado CHARLENE HOLGADO (N) GRID TIED PHOTOVOLTAIC SYSTEM SOLAR INDIVIDUAL PERMIT PACKAGE NORINNE STAUB 1906 KEMPER AVE (714) 328-3184 SANTA ANA, CALIFORNIA 92705 4.07 kW AHJ: SANTA ANA CITY UTILITY: SOUTHERN CALIFORNIA EDISON CO SATELLITE IMAGE CO V E R S H E E T PROJECT LOCATION NTS SHEET INDEX SCOPE OF WORK - (N) 4.070 kW PHOTOVOLTAIC SYSTEM - (11) APTOS DNA-120-BF26-370W PV MODULES AND (11) ENPHASE IQ7HS-66-M-US MICROINVERTER - POINT OF INTERCONNECTION AT MAIN SERVICE PANEL WITH CIRCUIT BREAKER - MAIN PANEL UPGRADE TO (N) 225A/200A NOTES SHEET PVA-0 ARCHITECTURAL DRAWINGS ELECTRICAL DRAWINGS PVE-1 ELECTRICAL SINGLE-LINE DIAGRAM & PVE-2 ELECTRICAL CALCULATION PVE-3 ELECTRICAL DATA & SPECIFICATIONS SPECIFICATIONS PVE-4 PVE-5 BRANCH DIAGRAM STRUCTURAL DRAWINGS PVS-1 STRUCTURAL INFORMATION & PVA-0 COVER SHEET PVA-1 ARRAY LAYOUT EQUINOX GROUNDING DETAILS PV MOUNTING DETAILS Bldg# 101113862 Elec# 20178721 Issued 02/14/23 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 1906 E Kemper Ave 02/15/23 20psf 95mph C 0psf Exposure Cat: Ground Snow: Code: 2022 California Building Code ASCE 7-16 Live Load: Ult Wind Speed: Design Criteria: 1/30/2023 Attn.: To Whom It May Concern re: Job NORINNE STAUB: 1906 KEMPER AVE, SANTA ANA, CALIFORNIA 92705 The following calculations are for the structural engineering design of the photovoltaic panels. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. If you have any questions, don't hesitate to contact. 51 Rio Roble, San Jose, CA 95134 | 1-408-240-5500 Steven Procter Digitally signed by Steven Procter Date: 2023.01.30 11:02:47 -06'00' 1906 E Kemper Ave02/15/23 Date :11/9/2022 Job Code: NORINNE STAUB 2 of 6 Structrure Geometry: Mean Roof Height, hn =13 ft Eave Height, he =8 ft Buiding Length, L =70.42 ft Building Width, B =52.5 ft Module Area =23.5 ft² Roof Properties: Roof Pitch (deg) = Roofing Type = Sheathing Type = Wood Species = Wood Fb (psf) = Wood Fv (psf) = Wood E (psf) = Wood Lag Withdrawal (lb/in) = Framing Type = Framing OC Spacing (in.) = Section Thickness, b (in.) = Section Depth, d (in.) = Section Modulus, Sx (in.^3) = Beam Span (ft) = Pen Trib Width (ft) = Rail Span (ft) = C D (Wind) = C D (Snow) = CLS = C M = Ct = CL = CF = Cfu = Ci = Cr = Mallowable_Wind (lb-ft) = Mallowable_snow (lb-ft) = 1357 975 1.0 1.15 1.3 1.0 1.0 1.0 1.00 1.0 1.6 1.15 4.00 3.16 11.86 5.50 7.56 1.50 2x6 Rafter 24 230400000 266 129600 25920 5/8 OSB Sheathing Doug Fir-Larch #2 Comp Shingle 22 Roof 1 51 Rio Roble, San Jose, CA 95134 | 1-408-240-5500 1906 E Kemper Ave02/15/23 Date :11/9/2022 Job Code: NORINNE STAUB 3 of 6 Dead Load: 3.0 2.0 0.9 1.0 Total Roof 1 DL 6.9 psf 2.5 psf Roof_Dist_DL = M_Roof_Dist_DL = Def_Roof_Dist_DL = PV_uni_Dist_DL = M_PV_uni_Dist_DL = Def_PV_uni_Dist_DL = Total_uni_DL = M_Total_uni_DL = Def_Total_uni_DL = Rail_Down_DL = Rail_M_DL = Pens_Down_DL = Pens_Side_DL = Wind Load: Ultimate Wind Speed = 95 mph Directionality Factor, kd = 0.85 Topographic Factor, kzt = 1 Velocity Pressure Exposure Factor, kz = 0.85 Ground Elevation Factor, ke = 1.00 psf Velocity Pressure, qz = 16.67 Solar Equalization Factor, γa = 0.60 12 8 29 7 0.0195 17 307 81 0.0051 0.0144 5 13 226 PV DL Roof 1 Comp Shingle 5/8 OSB Sheathing 2x6 Rafter @ 24" OC Misc (Insulation etc) 51 Rio Roble, San Jose, CA 95134 | 1-408-240-5500 1906 E Kemper Ave02/15/23 Date :11/9/2022 Job Code: NORINNE STAUB 4 of 6 Array Edge Factor, γE = External Pressure Up, GCp_1 = External Pressure Up, GCp_2 = External Pressure Up, GCp_3 = External Pressure Down, GCp = psf Design Pressure Up, p_1 = psf Design Pressure Up, p_2 = psf Design Pressure Up, p_3 = psf Design Pressure Down, p = uni_Dist_W_up = M_uni_Dist_W_up = Def_uni_Dist_W_up = uni_Dist_W_down = M_uni_Dist_W_down = Def_uni_Dist_W_down = Module_Up_W1 = Module_Up_W2 = Module_Down_W = Rail_Up_W1 = Rail_Up_W2 = Rail_Down_W = Rail_M_Up_W1 = Rail_M_Up_W2 = Rail_M_Down_W = Pens_Up_W1 = Pens_Up_W2 = Pens_Down_W = Module Check: Roof 1 Down = 16 psf <75 psf OK Roof 1 Up z1 = 14 psf <75 psf OK Roof 1 Up z2 = 20 psf <75 psf OK -417 202 56 -284 -79 -116 -104 51 16 -71 -23 -33 563 0.0357 -0.0502 32 -45 -791 -34.51 16.00 -22.51 -33.01 -2.30 0.60 -1.50 -2.20 Roof 1 1.5 51 Rio Roble, San Jose, CA 95134 | 1-408-240-5500 1906 E Kemper Ave02/15/23 Date :11/9/2022 Job Code: NORINNE STAUB 5 of 6 Rail Check (LRFD): Roof 1 1.4D : 11 lb-ft <548 lb-ft OK Roof 1 1.2D + 1.6S + 0.5W : 38 lb-ft <548 lb-ft OK Roof 1 1.2D + 0.5S + 1.0W : 66 lb-ft <548 lb-ft OK Roof 1 0.9D + 1.0W (Up z1) : 72 lb-ft <548 lb-ft OK Roof 1 0.9D + 1.0W (Up z2) : 109 lb-ft <548 lb-ft OK Attachment Check (ASD): Roof 1 1.0D + 0.6W : 150 lbs <803 lbs OK Roof 1 1.0D + 0.75*[1.0S + 0.6W] : 120 lbs <803 lbs OK Roof 1 1.0D + 1.0S : 29 lbs <803 lbs OK Roof 1 0.6D + 0.6W (Up z1) : 153 lbs <803 lbs OK Roof 1 0.6D + 0.6W (Up z2) : 233 lbs <803 lbs OK Lag Screw Uplift Check (ASD): Roof 1 Lag Screw Withdrawl Value = 266 lbs 5/16 Dia. Roof 1 Lag Screw Penetration = 2.5 Roof 1 0.6D + 0.6W (Up z1) : 153 lbs <665 lbs OK Roof 1 0.6D + 0.6W (Up z2) : 233 lbs <665 lbs OK Framing Check (ASD): Roof 1 uni 1.0D + 0.6W : 645 lb-ft <1357 lb-ft OK Roof 1 uni 1.0D + 0.75*[1.0S + 0.6W] : 560 lb-ft <1357 lb-ft OK Roof 1 uni 1.0D + 1.0S : 307 lb-ft <975 lb-ft OK Roof 1 uni 0.6D + 0.6W (Up z1) : 291 lb-ft <1357 lb-ft OK Seismic Check: Stucco 10.0 psf 2x4 Studs @ 16"2.0 psf Gypsum 3.0 psf Misc. (Insulation, etc.)2.0 psf 51 Rio Roble, San Jose, CA 95134 | 1-408-240-5500 1906 E Kemper Ave02/15/23 Date :11/9/2022 Job Code: NORINNE STAUB 6 of 6 17 psf 1967 ft^2 33434 lbs 7 psf 3697 ft^2 25677 lbs 53 lbs 11 581 lbs %increase = (Wexisting + Wadditional) / Wexisting = OK Limits of Scope of Work and Liability 0.98% The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. The calculations produced for this dwelling's assessment are only for the proposed solar panel installation referenced in the stamped plan set and were made according to generally recognized structural anlaysis standards and procedures. Total Roof Area = Total Roof W =Existing Weight PV Panel W = Number of Panels = Total PV W =Additional Weight Total Wall DL = Total Wall Area = Total Wall W =Existing Weight Total Roof DL = 51 Rio Roble, San Jose, CA 95134 | 1-408-240-5500 1906 E Kemper Ave02/15/23 CITY OF SANTA ANA SOLAR PERMIT APPLICATION WORKSHEET PLEASE PRINT REV: 8/29/19 PROJECT ADDRESS: SUITE: SAPIN # USE OF BUILDING: RESIDENTIAL COMMERCIAL INDUSTRIAL OTHER MASTER ID# NATURE OF WORK: SOLAR P.V. SYSTEM SOLAR WATER HEATING/COLLECTOR SYSTEM OTHER JOB DESCRIPTIO N : ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ BUILDING OWNERS NAME: PHONE NO: ADDRESS:CITY: STATE:ZIP: TENANTS NAME (Comm/Ind):PHONE NO: CONTRACTORS NAME: STATE CONTR. #: LICENSE CLASS: PHONE NO: ADDRESS:CITY: STATE:ZIP: WORKERS COMP. POLICY#: EXP. DATE: INSURANCE COMPANY: SANTA ANA BUS. LIC. #: ARCHITECT/ENGINEER: STATE LICENSE #: PHONE NO: ADDRESS:CITY: STATE:ZIP: CONTACT NAME: PHONE NO: E-MAIL ADDRESS: BLDG. FEE $ OCC. GROUP:P/C FEE PD $ VALUATION: $ SUBMITTAL DATE:____________________TYPE OF CONSTR: FLOOD ZONE:___________________PROCESSED________________________ PLANNING OK TO CHECK & DATE:__________________________ BLDG. DEPT. APPROVAL & DATE:___________________________ PLNG CONDITIONS: _________________________________________________________________________________________________ NUMBER OF PANELS:___________________ SYSTEM kWA:_________________________ 1906 KEMPER AVE SANTA ANA, CA 92705 NORINNE STAUB (714) 328-3184 1906 KEMPER AVE SANTA ANA CA 92705 SUNPOWER CORPORATION 1414 HARBOUR WAY S RICHMOND CA 94804 CAMILLE ADECER 5102608384 camille.adecer@sunpowercorp.com 1906 E Kemper Ave02/15/23 CITY OF SANTA ANA DEVELOPMENT FEES WORKSHEET -- ELECTRICAL PERMIT APP FOR ELECTRICAL 06-30-2020 APP-02 CEC2019 Project Address: Contractor: Tenant Name:Address: Building Owner: City: St.: Zip: Address: Contractor License No.: City: St.: Zip: Contractor Email: Phone: Phone: Contact Person: Contact E-Mail Strongly Recommended PLEASE PRINT: Contact Phone: NEW BUILDING OCCUPANCY CHANGE ELECTRICAL ITEM Count $ EACH ELECTRICAL ITEM Count $ EACH 125 Volt Receptacle Outlets 1.57 LOW VOLTAGE SYSTEMS – EACH: phone, data outlet, speaker, thermostat, door holder, doorbell, pull station, smoke detector, alarm device, card reader, etc. (circle items)Light Switches, Occupancy Sensors 1.70 Light Fixtures 1.13 COMMERCIAL: Air Conditioners, Heat Pumps 104.40 FIRST 10 devices or outlets 36.50 Factory-Wired Units (Solid Hook-Ups) 26.71 Additional devices, each 3.45 Dedicated Circuits (15 or 20 AMP Receptacles) 26.71 Each control panel, power supply annunciator, switch or aux equip.17.39Time Clock, Photo-Cell, Time Switch 13.03 Track-Light, Cable Tray, Special Raceway, Plugmold, Under-Floor Duct, Plug-In Busway, Surface Duct, Etc. (Each 100 Feet or any fraction thereof) 26.71 RESIDENTIAL: Single Dwelling unit 39.56 Each add’l dwelling unit (2 to 20) 34.80 Each add’l unit (over 20) 21.24 SERVICE METERS & PANELS: Service Meter, Reset Meter, Subpanel, Switchboard, Motor Control Center, Transfer Switch, Busduct, or other Distribution Equipment changes or modifications. (circle items as needed) MISCELLANEOUS Light Standard (Pole) with 1 Fixture 26.72 Additional Fixtures – same pole 0.00 Power Pole (Temporary) 111.04 Use this column if a Service All others here Additional distribution poles 26.72 Under 400 amperes 57.40 Swimming Pool, Spa, Fountain 130.46 400 amperes to 1199 amperes 156.51 Above ground spa 56.37 1200 amperes and over 260.79 Demolition 52.21 POWER APPARATUS: Motor, Transformer, Welder, Industrial Equipment, Oven, Rectifier, Generator, Surge Arrestor, Water Heater, Photovoltaic Panel, or other Power Equipment changes or modifications. (circle items as needed) Per HP, kW, or kVA SIGNS & neon/LED decorative lighting ($200 refundable sign bond) 80.95 NEW or TOTAL REWIRE for SINGLE FAMILY DWELLINGS SFD Per square foot .16 0 to 1 3.84 Garage Per square foot .16 Over 1 to 10 25.09 SUBTOTAL $ Over 10 to 50 49.78 P/C 65% of SUBTOTAL $ Over 50 to 100 113.06 MIN. FEE – (Nonresidential) $ 79.06 Over 100 to 500 162.45 ISSUANCE & General Plan Surcharge $ 59.30 + 23.79 = $83.09 Over 500 202.92 TOTAL $ OFFICE USE ONLY BLDG PMT RECEIPT BY DATE OCCUPANCY TYPE P/CPAID 1906 KEMPER AVE SANTA ANA, CA 92705 NORINNE STAUB 1906 KEMPER AVE SANTA ANA CA 92705 (714) 328-3184 CAMILLE ADECER camille.adecer@sunpowercorp.com5102608384 SUNPOWER CORPORATION 1414 HARBOUR WAY S RICHMOND CA 948041906 E Kemper Ave02/15/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2. Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6. Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7. Will the PV system be installed without using any ballast system or counter-weight system? 8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org Digitally signed by Camille Adecer Date: 2023.02.07 10:35:33 -08'00' 4 4 4 4 4 4 4 4 4 4 1906 E Kemper Ave02/15/23 aptos solar technology TM Solar for Innovators Designed & Engineered in Silicon Valley 370W l 365W l 360W Produce up to 30% more energy with rear-side generation Advanced split cell technology with 9 ultra-thin busbars allows for less resistance and more photon capture Ideal solution for applications affected by shading All-black design for pristine aesthetics No excessive silver bussing or ribbons Robust product design is reslient in extreme weather. Up to 5400 Pa snow load and 210 mph wind speeds 30 Year Warranty 3140 De La Cruz Blvd., Ste 200 Santa Clara, CA 95054 wwww.aptossolar.com info@aptossolar.com 3X IEC Standards Linear Performance Warranty 1 year 10 years 20 years 93.2% 87.8%90.7% 80.2% Aptos Warranty Industry Standard 98% 97% 25 years 30 years 76.7% 83.7% +2.5% +4.1% +4.9% +5.7% 85.1% 82.4% Standard Warranty Optional Extended WarrantyRETC Top Performer Residential l Commercial 120 Bifacial TM DN Our DNA Split-cell Series impressively combines advanced technologies to maximize performance. Produce up to 30% more energy with the bi-facial rear side generation. Our patented DNA, Dual Nano Absorber, technology allows for panel to harvest energy from all directions and operate exceptionally in high heat temperatures. Solar for Innovators Electrical Specifiactions STCrated Output Pmpp (W) Module Efficiency Open Circuit Voltage VVOC (V) Short Circiut Current ISC (A) Rated Voltage Vmp (V) Rated Voltage Imp (A) 360W 365W 370W 19.50%19.77%20.04% 40.8 41.1 41.4 11.12 34.0 10.59 11.19 34.3 10.66 11.26 34.5 10.72 Standard Test Conditions for front-face of panel: 1000 W/m2, 25°C, measurement uncertainty <3% Temperature Coefficients Temperature Coefficients Pmp Temperature Coefficients Isc Temperature Coefficients VOC Normal Operating Cell Temperature (NOCT) -0.32% +0.054%/°C -0.26%/°C 45°C(±2°C) Test Operating Conditions Maximum Series Fuse Maximum System Voltage Maximum Load Capacity (Per UL 1703) Fire Performance Class 20A 1,500 VDC (UL&IEC) 5400 PA Snow Load / 5400 PA Wind Load Class C/Type 1,2 Packaging Configuration Number of Modules per Pallet Number of Pallets per 40ſt. Container Pallet Dimensions Pallet Weight (kg) 31 26 1800 X 1125 X 1181 640 806 Mechanical Properties Cell Type Glass Frame Junction Box Dimensions Output Cable Monocrystalline 3.2mm, anti-reflection coating, high transmission, low iron, tempered glass Anodized Aluminum Alloy IP68 1762 X 1048 X 35mm 4mm2 (EU)12AWG,39.37in.(1200mm) Weight Cable Length Encapsulant 20.5kg 1200mm,STAUBLI EVO 2 EVA/POE Aptos Solar Technology reserves the right to make specification changes without notice 120 Bifacial TM DN aptos solar technology TM 35mm1048mm 17 6 2 m m 94 0 m m DNA-120-BF26-360W DNA-120-BF26-365W DNA-120-BF26-370W I-V Curve 0 2 4 6 8 10 12 10 20 30 40 50 360W Number of Modules per 40ſt. Container Certifications UL,IEC 61730-1, UL,IEC 61730-2 Bifacial Output Pmpp(W) at STC 360 365 370 Bi-facial Boost 5% Bi-facial Boost 15% Bi-facial Boost 25% 378 383 389 414 420 426 450 456 463 35 35 1906 E Kemper Ave02/15/23 The high-powered smart grid-ready IQ7HS Microinverter with integrated MC4 connectors dramatically simplifies the installation process while achieving the highest system efficiency. The IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing, enabling Enphase to provide an industry-leading warranty of up to 25 years. IQ7HS Microinverter To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Microinverter Region: AMERICAS Easy to Install • Lightweight and simple • Faster installation with improved, lighter two-wire cabling • Built-in rapid shutdown compliant (NEC 2014 & 2017) Efficient and Reliable • Highest CEC efficiency of 97.0% • More than a million hours of power-on testing • Class II double-insulated enclosure • UL listed Smart Grid-Ready • Complies with advanced grid support, voltage and frequency ride-through requirements • Remotely updates and responds to changing grid-requirements • Configurable for varying grid profiles • Meets CA Rule 21 (UL1741-SA) To learn more about Enphase offerings, visit enphase.com © 2022 Enphase Energy. All rights reserved. All trademarks or brands used are the property of Enphase Energy, Inc. 12-12-2022 INPUT DATA (DC) IQ7HS-66-M-US Commonly used module pairings¹ 320W - 460W Module compatibility² 66 cell/120 half-cell/132 half-cell Maximum input DC voltage 59V Peak power tracking voltage 38V - 43V Operating range 20V - 59V Min/Max start voltage 30V/59V Max DC short circuit current (module Isc) 15A Overvoltage class DC port II DC port backfeed current 0A PV array configuration 1 x 1 ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) @240 VAC @208 VAC Peak output power 384 VA 369 VA Maximum continuous output power 384 VA 369 VA Nominal (L-L) voltage/range³ 240V/211-264V 208V/183-229V Maximum continuous output current 1.60 A (240V) 1.77 A (208V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47 Hz to 68 Hz 47 Hz to 68 Hz AC short circuit fault current over 3 cycles 4.82 A 4.82 A Maximum units per 20 A (L-L) branch circuit4 10 9 Overvoltage class AC port III III AC port backfeed current 18 mA 18 mA Power factor setting 1.0 1.0 Power factor (adjustable) 0.85 leading ...0.85 lagging 0.85 leading ...0.85 lagging EFFICIENCY @240V @208V CEC weighted efficiency 97.0 % 96.5 % MECHANICAL DATA Ambient temperature range Relative humidity range Connector type Dimensions (WxHxD) Weight Cooling Approved for wet locations Pollution degree Enclosure Environmental category / UV exposure rating Altitude -40ºC to +60ºC 4% to 100% (condensing) Staubli made MC4 212 mm x 175 mm x 30.2 mm (without bracket) 1.08 kg (2.38 lbs) Natural convection - No fans Yes PD3 Class II, corrosion resistant polymeric enclosure NEMA type 6/outdoor 2000m FEATURES Communication Power Line Communication (PLC) Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect means required by NEC 690 and C22.1-2018 Rule 64-220. Compliance CA Rule 21 (UL1741-SA), HECO v1.1 UL62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according to manufacturer’s instructions. 1. No enforced DC/AC ratio. See the compatibility calculator at https://enphase.com/en-us/support/module-compatibility. 2. Provided the module is compatible with all other parameters in the datasheet. 3. Nominal voltage range can be extended beyond nominal if required by the utility. 4. Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. IQ7HS Microinverter 1906 E Kemper Ave02/15/23 FF0002 DQD 507 Rev. 2019-04-30 © 2022 CSA Group. All rights reserved. Page 1 Certificate of Compliance Certificate: 602704 Project: Master Contract: Date Issued: 2022-09-13 Issued to: 80078172 80140858 Aptos Solar Technology LLC 3140 De La Cruz Blvd., Ste. 200 Santa Clara, California 95054 United States Attention: Thanh Ngoc Pham The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C' and 'US' for Canada and US or with adjacent indicator 'US' for US only or without either indicator for Canada only Issued by:Yuanyuan (Yolanda) Zhou Yuanyuan (Yolanda) Zhou PRODUCTS CLASS 5311 10 - POWER SUPPLIES - Photovoltaic Modules and Panels CLASS 5311 90 - POWER SUPPLIES - Photovoltaic Modules and Panels - Certified to U.S. Standards Photovoltaic modules with Fire class (Canada): Class C, Fire Performance (USA) Type 1, maximum system voltage of 1500 V dc, model series: DNA-144-BF26-xxxW (xxx=430-450 in steps of 5), Fuse rating 20A. Photovoltaic modules with Fire class (Canada): Class C, Fire Performance (USA) Type 1, maximum system voltage of 1500 V dc, model series: DNA-120-BF26-xxxW (xxx=350-370 in steps of 5), Fuse rating 20A. Photovoltaic modules with Fire class (Canada): Class C, Fire Performance (USA) Type 1, maximum system voltage of 1500 V dc, model series: DNA-120-BF10-xxxW (xxx=440-450 in steps of 5), Fuse rating 30A. Photovoltaic modules with Fire class (Canada): Class C, Fire Performance (USA) Type 1, maximum system voltage of 1500 V dc, model series: DNA-108-BF10-xxxW (xxx=400-410 in steps of 5), Fuse rating 30A. Photovoltaic modules with Fire class (Canada): Class C, Fire Performance (USA) Type 1 or 2, maximum system voltage of 1000 V dc, model series: DNA-144-MF23-xxxW (xxx=400-410, in steps of 5), Fuse rating 20A. Photovoltaic modules with Fire class (Canada): Class C, Fire Performance (USA) Type 1 or 2, maximum system voltage of 1000 V dc, model series: DNA-144-MF26-xxxW (xxx=430-450, in steps of 5), Fuse rating 20A. Photovoltaic modules with Fire class (Canada): Class C, Fire Performance (USA) Type 1 or 2, maximum system voltage of 1500 V dc, model series: DNA-144-MF23S-xxxW (xxx=400-410 in steps of 5), Fuse rating 20A. Certificate: 80078172 Project: 80140858 Master Contract: 602704 Date Issued: 2022-09-13 DQD 507 Rev. 2019-04-30 © 2022 CSA Group. All rights reserved. Page 2 Photovoltaic modules with Fire class (Canada): Class C, Fire Performance (USA) Type 1 or 2, maximum system voltage of 1000 V dc, model series: DNA-120-MF23-xxxW (xxx=320-330, in steps of 5), Fuse rating 20A. Photovoltaic modules with Fire class (Canada): Class C, Fire Performance (USA) Type 1 or 2, maximum system voltage of 1000 V dc, model series: DNA-120-MF26-xxxW (xxx=360-370, in steps of 5), Fuse rating 20A. Notes: 1. The electrical characteristics are within ±3 percent of the indicated values of Isc, Voc, and Pmax under standard test conditions (irradiance of 100 mW/cm2, AM 1.5 spectrum, and a cell temperature of 25°C (77°F)), NOCT: 45ºC. 2. The operating ambient temperature of these devices may exceed 40 °C at full load for all wire sizes if it is determined suitable in the field use application. APPLICABLE REQUIREMENTS CSA CAN/CSA-C22.2 NO. 61730-1:11 Photovoltaic (PV) module safety qualification -Part 1: Requirements for construction -First Edition 2011-08; Update No. 1: October 2013. CSA CAN/CSA-C22.2 NO. 61730-1:11 Photovoltaic (PV) module safety qualification -Part 1: Requirements for construction -First Edition, Amendment 1:2013 to CAN/CSA-C22.2 No. 61730-1:11 October 2013. CSA CAN/CSA-C22.2 NO. 61730-1:11 Photovoltaic (PV) module safety qualification -Part 1: Requirements for construction -First Edition, Amendment 2:2015 to CAN/CSA-C22.2 No. 61730-1:11 February 2015. CSA CAN/CSA-C22.2 NO. 61730-2:11 Photovoltaic (PV) module safety qualification -Part 2: Requirements for testing - First Edition 2011-08; Update No. 1: October 2013. CSA CAN/CSA-C22.2 NO. 61730-2:11 Photovoltaic (PV) module safety qualification -Part 2: Requirements for testing - First Edition, Amendment 1:2013 to CAN/CSA-C22.2 No. 61730-2:11 October 2013. UL 61730- Part 1: Requirements for Construction, 2017-12-04, revision date 2020-04-30. UL 61730- Part 2: Requirements for Testing, 2017-12-04, revision date 2020-04-30. Notes: accreditation with the Standards Council of Canada (SCC). www.scc.ca MARKINGS Each unit shall bear all the required markings identified in the applicable certification report(s). 1906 E Kemper Ave02/15/23 © 2022 Enphase Energy, Inc. enphase.com July 29, 2022 To whom it may concern, This letter confirms and attests that: SPWR-A5 is equivalent to Enphase Models: IQ7HS-66-ACM-US, 369 VA, 208Vac Grid Support Utility Interactive Inverter IQ7HS-66-E-ACM-US, 369 VA, 208Vac Grid Support Utility Interactive Inverter IQ7HS-66-M-US, 369 VA, 208Vac Grid Support Utility Interactive Inverter IQ7HS-66-ACM-US, 384 VA, 240Vac Grid Support Utility Interactive Inverter IQ7HS-66-E-ACM-US, 384 VA, 240Vac Grid Support Utility Interactive Inverter IQ7HS-66-M-US, 384 VA, 240Vac Grid Support Utility Interactive Inverter Regards, Aranjit Sangha Senior Staff Engineer Enphase Energy Inc. 1420 North McDowell Blvd. Petaluma, CA 94954 v: (707) 763-4784 x7098 asangha@enphaseenergy.com 1906 E Kemper Ave02/15/23 AUTHORIZATION TO MARK Applicant: Manufacturer: Address:Address: Country:Country:0 1 Standard(s): Product: Brand Name: Models: This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for the exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Authorization to Mark. Only the Client is authorized to permit copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek’s Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat- Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:24Mar2021] Photovoltaic Racking System installed using the SunPower InvisiMount Installation Guide 508988 Rev O Classic InvisiMount, Universal InvisiMount SunPower ; InvisiMount Party Authorized To Apply Mark: Report Issuing Office: Control Number: 5024883 Authorized by: for L. Matthew Snyder, Certification Manager Same as Manufacturer Intertek Testing Services NA, Inc., Lake Forest, CA SunPower Corporation 1464 W. Merrill Avenue Rialto, CA 92376 SunPower Corporation 1414 Harbour Way South Suite 1901 Richmond, CA 94804 USA USA This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. Page 1 of 1ATM for Report 105208800LAX-001 18-Oct-22ATM Issued: ________________ ED 16.3.15 (1-Jul-2022) Mandatory Listing Constructional Data Report (CDR) Report Number 105208800LAX-001 Original Issued: 18-Oct-2022 Revised: None Standard(s) Applicant Manufacturer 1 Address Address Country Country Contact Contact Phone Phone FAX FAX Email Email Arnold Torres USA (909)666-9806 1.0 Reference and Address SunPower Corporation Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat-Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:24Mar2021] SunPower Corporation (919)454-5674 (510)260-8509 pat.cruz@sunpowercorp.com eely@sunpower.com 1464 W. Merrill Avenue Rialto, CA 92376 NA arnold.torres@Kuehne-Nagel.com 1414 Harbour Way South Suite 1901 Richmond, CA 94804 Pat Cruz Ethan Ely NA USA Page 1 of 49 1906 E Kemper Ave02/15/23 Report No. 105208800LAX-001 SunPower Corporation Page 2 of 49 Issued: 18-Oct-2022 Revised: None Product Brand name Models Model Similarity Ratings Other Ratings 2.0 Product Description Photovoltaic Racking System installed using the SunPower InvisiMount Installation Guide 508988 Rev O SunPower ; InvisiMount NA Classic InvisiMount and Universal InvisiMount systems use the same mounting rail, L-feet and accessories, while the Classic InvisiMount system is designed to work exclusively SunPower modules with clamps attaching to extruded features on SunPower Gen 5 frames, and Universal InvisiMount is designed to work with all other module frames, using top-mounted mid clamps, and flange-mounted end clamps. Classic InvisiMount systems use the Row-to-row (R2R) grounding clip, while Universal InvisiMount systems use Grounding jumper (DynoRaxx Dynobond). Fire Class Rating: Class A for Type 1 and Type 2 Fuse Rating: 20 A Mechanical Load Testing: Mechanical Load Rating: 10PSF Downward, 5PSF Upward, 5PSF Sloped Load Module Orientation: Portrait or Landscape See illustration 1 for list of approved modules. Description The product covered by this report is a roof-mounted PV mounting system produced by SunPower Corporation and evaluated for low and steep-slope roofs. The system is comprised of mounting rails attached to the roof with L-feet and uses mid clamps and end clamps to secure the PV modules to the mounting rails. Bonding connections are made from module to rail using bonding mid clamp, Module-to-rail fasteners that attach in the top rail channel, secure module frames, and bond modules to the rail throughout a row. End clamps are also rated for bonding module frames to mounting rails. Row-to-row bonding is acheived with bonding jumpers, and the system requires one rail-mounted ground lug or grounding junction box per section in order to electrically bond the modules to the system ground. The Installer of the systems is responsible for following the installation manual for the installation of the grounding lug and shall provide an appropriate method of direct-to-earth grounding according to the latest edition of the National Electrical Code, including NEC 250: Grounding and Bonding, and NEC 690: Solar Photovoltaic Systems. Any local electrical codes must be adhered in addition to the national electrical codes. Classic InvisiMount, Universal InvisiMount ED 16.3.15 (1-Jul-2022) Mandatory Report No. 105208800LAX-001 SunPower Corporation Page 17 of 49 Issued: 18-Oct-2022 Revised: None Illustration 1 - Classic InvisiMount - Approved Module List Illustration 2 - Universal InvisiMount - Approved Module List 7.0 Illustrations ED 16.3.15 (1-Jul-2022) Mandatory 1906 E Kemper Ave02/15/23 COMP MOUNTS Pegasus Solar Inc 100 West Ohio Avenue, Richmond, CA 94804 T: 510.210.3797 www.pegasussolar.com WATERTIGHT FOR LIFE Pegasus Solar's Comp Mounts are a cost effective, high-quality option for rail installations on composition shingle roofs. Designed to last decades, the one-piece flashing with elevated cone means there is simply nothing to fail. A BETTER DAY ON THE JOB Simple 3-piece design for rapid installation Encapsulating design raises the water seal 0.9" above roof deck One-piece flashing with elevated cone – No press-fits or deck-level EPDM washers to fail 25-year Warranty Manufactured with advanced materials and coatings to outlast the roof itself Superior Waterproofing Tested to AC286 without sealant 0.9" elevated water seal Code Compliant Fully IBC/CBC Code Compliant Exceeds ASCE 7-16 Standards All-In-One Kit Packaging Flashings, L-Feet and SS lags with bonded EPDM washers are included in each 24-pack COMP MOUNTS Pegasus Solar Inc 100 West Ohio Avenue, Richmond, CA 94804 T: 510.210.3797 www.pegasussolar.com 1. Drill pilot hole in center of rafter. 3. Place L-Foot over cone and install lag with washer through L-Foot. 2. Optional: Apply a "U-shape" of sealant to underside of flashing and postition under 2nd shingle course, cone over pilot hole. 4. Drive lag to required depth. Attach rail per rail manufacturer's instructions. Comp Mount Install Kits tents PendinBoxes per Palletg. All rPaights reserved. 2019 Pegasus Solar Inc PSCR-CBB0 Closed Slot L-Foot, Flashing, 5/16"x 4-1/2" SS Lag with metalized EPDM washer PSCR-UBB0 Open Slot L-Foot, Flashing, 5/16"x 4-1/2" SS Lag with metalized EPDM washer SPCR-CBBH Closed Slot L-Foot, Flashing, 5/16"x 4-1/2" SS Lag with metalized EPDM washer and M10 Hex Bolt BlackL-Foot and Black Flashing Most Composition Shingle IBC, ASCE/SEI 7-16, AC286 Railed Systems Galvalume Plus Aluminum 24 72 L-Foot Type Kit Contents SKU Kit Quantity L-Foot Material Flashing Material Compatible Rail Install Application Certifications Roof Type Finish Closed Slot PSCR-CMM0 L-Foot, Flashing, 5/16"x 4-1/2" SS Lag with metalized EPDM washer Mill L-Foot and Mill Flashing Painted Galvalume Plus PSCR-UMM0 Open Slot L-Foot, Flashing, 5/16"x 4-1/2" SS Lag with metalized EPDM washer 1906 E Kemper Ave02/15/23 SunPower ® InvisiMount™ | Residential Mounting System Simple and Fast Installation • Integrated module-to-rail grounding • Pre-assembled mid and end clamps • Levitating mid clamp for easy placement • Mid clamp width facilitates consistent, even module spacing • UL 2703 Listed integrated grounding Flexible Design • Addresses sloped and low-sloped residential roofs • Design in landscape and portrait with up to 8ʼ rail span • Pre-drilled rails and rail splice • Rails enable easy obstacle management Customer-Preferred Aesthetics • Best-in-class system aesthetics • Black anodized components • Low-profile mid clamps and capped, flush end clamps Part of Superior System • Best-in-class system reliability and aesthetics • Optional rooftop transition flashing, rail- mounted J-box, and wire management rail clips • Combine with SunPower modules and mySunPower ® monitoring app Elegant Simplicity SunPower ® InvisiMount™ is a SunPower-designed rail-based mounting system. The InvisiMount system addresses residential sloped roofs and combines faster installation time, design flexibility, and superior aesthetics. Classic InvisiMount is specifically envisioned and engineered to pair with SunPower modules; Universal InvisiMount is compatible with a wide range of modules. The resulting system-level approach amplifies the installation and aesthetic benefits—for homeowners and for installers. sunpower.com Datasheet SunPower ® InvisiMount™ | Residential Mounting System InvisiMount Component Details Classic mid clamp Black oxide stainless steel 300 series 63 g (2.2 oz) Universal mid clamp Black anodized aluminum 6000 series 60 g (2.1 oz) Classic end clamp Black anodized aluminum 6000 series 110 g (3.88 oz) Universal end clamp Black anodized aluminum 6000 series 103 g (3.63 oz) Rail Black anodized aluminum 6000 series 830 g/m (9 oz/ft) Rail splice Aluminum alloy 6000 series 830 g/m (9 oz/ft) Rail bolt M10-1.5 × 25 mm; custom T-head SS304 18 g (0.63 oz) Rail nut M10-1.5; DIN 6923 SS304 nominal Ground lug assembly SS304; A2-70 bolt; tin-plated copper lug 106.5 g (3.75 oz) Row-to-row grounding clip SS 301 with SS 304 M6 bolts 75 g (2.6 oz) Row-to-row grounding jumper Stainless steel 300 series 10 g (0.35 oz) Row-to-row spacer Black POM-grade plastic 5 g (0.18 oz) Roof Attachment BOM • InvisiMount Comp Shingle Attachment with Pegasus • InvisiMount Flat Tile Replacement Attachment with Pegasus • InvisiMount S-Tile Replacement Attachment with Pegasus • InvisiMount W-Tile Replacement Attachment with Pegasus InvisiMount Operating Conditions Temperature −40°C to 90°C (−40°F to 194°F) Roof Attachment Hardware Warranties Refer to roof attachment hardware manufacturer’s documentation. InvisiMount Warranties And Certifications Warranties • 25-year product warranty • 5-year finish warranty Certifications • UL 2703 Listed • Class A Fire Rated Professional Engineer (PE) must then stamp all calculations. If you have any questions please contact SunPower Technical Support at 1-855-977-7867. © 2022 SunPower Corporation. All Rights Reserved. SUNPOWER, the SUNPOWER logo, EQUINOX, and INVISIMOUNT are trademarks or registered trademarks of SunPower Corporation. All other trademarks are the property of their respective owners. Specifications included in this datasheet are subject to change without notice. InvisiMount Components Mid Clamp End Clamp Rail and Rail SpliceGround Lug Assembly sunpower.com 509506 RevG ¹ With Classic InvisiMount, a module frame that is compatible with the InvisiMount system is required for hardware interoperability; modules without this frame may be used with Universal InvisiMount. ² SunPower recommends that all Equinox™, InvisiMount™, and AC module systems always be designed using the InvisiMount Span Tables #524734. If a designer decides to instead use the component capacities listed in this document to design a system, note that the capacities shown are Load and Resistance Factor Design (LRFD) design loads, and are NOT to be used for Allowable Stress Design (ASD) calculations; and that a licensed InvisiMount Component LRFD Capacities² Classic Mid clamp Uplift 664 lbf Shear 540 lbf Universal Mid clamp Uplift 962 lb Shear 437 lb Classic End clamp Uplift 899 lbf Shear 220 lbf Universal End clamp Uplift 605 lb Shear 242 lb Rail Moment: upward 548 lbf-ft Moment: downward 580 lbf-ft Rail splice Moment: upward 548 lbf-ft Moment: downward 580 lbf-ft L-foot Uplift 1000 lbf Shear 390 lbf Datasheet Row-to-Row Spacer Row-to-Row Grounding Clip Universal End ClampRow-to-row Grounding Jumper (DynoBond) Universal Mid Clamp Rail and Rail SpliceGround Lug Assembly Universal InvisiMount Classic InvisiMount 1906 E Kemper Ave02/15/23 Improve Support, Reduce Costs An intuitive monitoring website enables you to: See a visual map of customer sites Remotely manage hundreds of sites Remotely diagnose and troubleshoot system issues Drill down for the status of individual devices Add Value for Customers With mySunPower monitoring customers can: Track their energy production by day, month, year and in different weather conditions See their energy use and estimated bill savings Maximize their savings with automatic system alerts and tips Customize storage settings and easily monitor and track available battery power Receive elective system reports SunPower ® Monitoring Plug-and-Play Installation This complete solution for residential monitoring and control includes the SunPower ® PV Supervisor (PVS) which improves the installation process, overall system reliability, and customer experience: Compact footprint for improved aesthetics Robust cloud connectivity and comprehensive local connectivity Flexible configuration of devices during installation Consumption metering Revenue-quality production metering Web-based commissioning Remote diagnostics of PVS and inverters Durable UL Type 3R enclosure helps reduce maintenance costs Easy integration with SunPower eBOS Robust Cloud Connectivity Multiple options to maintain optimal connectivity: Hardwired Ethernet WiFi Cellular backup sunpower.com SunPower ® Monitoring | Residential SunPower PV Supervisor Operating Conditions Temperature −22°F to +140°F (−30°C to +60°C) Humidity (max.) 95%, non-condensing Warranty and Certifications Warranty 10-year Limited Warranty Certifications UL, cUL, CE, UL 61010-1 and -2, FCC Part 15 (Class B) Mechanical Weight 5.5 lb (2.5 kg) Dimensions 11.8 × 8.0 × 4.2 in. (30.5 × 20.5 × 10.8 cm) Enclosure rating UL 50E Type 3R Site Requirements Number of modules supported per PVS 85 (SunPower AC modules) Internet access High-speed internet access via accessible router or switch Power 100–240 VAC (L–N), 50 or 60 Hz 208 VAC (L–L in phase 3), 60 Hz Communication RS-485 Supports string inverters, external meters, and other auxiliary devices Integrated metering One channel of revenue-quality production metering Two channels of consumption metering Ethernet 1 LAN (or optional WAN) port PLC Supports SunPower AC modules WiFi 802.11b/g/n 2.4 GHz and 5 GHz Cellular LTE Cat-M1/3G UMTS ZigBee IEEE 802.15.4 MAC, 2.4 GHz ISM band Data storage 60 days Upgrades Automatic firmware upgrades Web and Mobile Device Support Customer site mysunpower.com Partner site monitor.sunpower.com Browsers Firefox, Safari, and Chrome Mobile devices iPhone®, iPad®, and Android Customer app 1 Create account online at mysunpower.com 2 On a mobile device, download the SunPower Monitoring app from Apple App Store or Google Play™ Store 3 Sign in using account email and password SunPower ® AC ModulesPVS SunPower ® Pro Fleet Management for Installers mySunPowerTM for Homeownes © 2020 SunPower Corporation. All Rights Reserved. SUNPOWER, the SUNPOWER logo and MYSUNPOWER are trademarks or registered trademarks of SunPower Corporation in the U.S. and other countries as well. All other logos and trademarks are the properties of their respective owners. 530536 Rev D 1906 E Kemper Ave02/15/23 Equinox Junction Boxes SunPower®Equinox™ Accessories SPECIFICATIONS Model RMJ v2 Comp Shingle Transition J-Box Kit Part Number 530167 530168 Max. Voltage Rating 600 V (AC or DC) Ambient Temp. Range −35°C to 75°C (−31°F to 167°F) Enclosure Material Flame-retardant, UV-resistant, high-impact resistant resin Attachment/Flashing Material 304 stainless steel Steel w/zinc-aluminum coating Cavity Dimensions 150 ×150 ×62 mm (5.91” ×5.91” ×2.13”) Enclosure Volume 1150 cc (70 in3) Attachment/Flashing Finish Black oxide Black powder coat Compatibility InvisiMount rail Comp shingle roofs Assembled Weight 0.78 kg (1.7 lb)1.27 kg (2.8 lb) Certifications & Ratings • Watertight, UL Type 4 • UL 94 5VA • UL 1741 • UL 2703 (with InvisiMount) • Watertight, UL Type 4 • UL 94 5VA • UL 1741 Additional Hardware Included • 3/4″ cord grip • Lay-in lug • 3/4″cord grip • #12 screws with EPDM washer Composition Shingle Roof Transition Junction Box Datasheet InvisiMount™ Rail-Mounted Junction Box (RMJ) v2 • 70% larger than original InvisiMount J-box. • Integrated grounding to InvisiMount rail, replacing grounding lug assembly. • Snap-on attachment for fast and secure installation. • Enables transitioning conductors directly through the roof. • Integrated flashing for peace of mind. • Compatible with composition shingle roofs. COMPONENT DIMENSIONS J- B o x E n c l o s u r e (u s e d i n b o t h R M J a n d T r a n s i t i o n J - b o x ) Fl a s h i n g (u s e d o n l y w i t h T r a n s i t i o n J - B o x ) Equinox Junction Boxes SunPower®Equinox™ Accessories Datasheet 539382 RevA 1906 E Kemper Ave02/15/23 EGC: Bare CU #6 BRANCH CIRCUIT FROM PV ARRAY TO JUNCTION BOX #12 2 A -- 1 CONDUCTOR / CONDUIT SCHEDULE DESCRIPTION & CONDUCTOR TYPE CONDUCTOR SIZE (AWG)CONDUIT/CABLE TYPE CONDUIT SIZENUMBER OF CONDUCTORS 1 TAG GROUNDED (INCLUDE GEC) UNGROUNDEDü INSTALLATION NOTES 1 CHECK BOX FOR WHETHER SYSTEM IS GROUNDED OR UNGROUNDED: FOR UNGROUNDED SYSTEMS: · DC OCPD DISCONNECT BOTH CONDUCTORS OF EACH SOURCE CIRCUIT. · UNGROUNDED CONDUCTORS MUST BE IDENTIFIED PER 210.5(C). WHITE FINISHED CONDUCTORS ARE NOT PERMITTED. 2 3 4 5 6 7 8 9 10 DC / DC CONVERTERS NO SOURCE CIRCUIT JUNCTION BOX SUNVAULT ESS SUNVAULT BATTERY INVERTER SOLAR LOAD CENTER PV PRODUCTION METER SEPARATE AC DISCONNECT HEAT DETECTOR YES NO 11 13 BACK UP LOAD CENTER NON-BACK UP LOAD CENTER EV SUPPLY EQUIPMENT TAG DESCRIPTION 12 REMOTE POWER OFF SWITCH 14 HUB+ · CONSUMPTION CT: CATEGORY 1 - SIMPLE - SINGLE PAIR OF CTs. NO 3THWN-2 EGC: THWN-2 1 NO #10 #10 EMT 3/4"C C (N) LOAD CENTER MIN., 120/240 V, M.L.O, NEMA-3R LOCATION: GND YES 20A, 2P 20A, 2P NEAR MSP 100A ETHERNET CONNECTION TO DSL/CABLE MODEM CAT5e15A, 2P PVS6 (3) #14 THWN (1) #14 THWN EGC NO NO B JUNCTION BOX, NEMA-3R THWN-2 EGC: THWN-2 1 4 B 3 #10 #10 EMT 3/4" #10 #10 DC AC Branch Circuit #2 ROOFTOP ARRAY WIRING A DC AC Branch Circuit #1AC 5 AC MODULES 6 AC MODULES H (E) UTILITY BIDIRECTIONAL METER #: 222013-514904 EXISTING GROUND NO MLO NO NO NO NO TOP FED MCB PV BREAKER: TO BE INSTALLED ON THE OPPOSITE SIDE OF THE MAIN OCPD OF THE BUSBAR (E) LOADS (E) LOADS (E) LOADS GND INCOMING SOURCE FEED , 120/240 V, 1 PH, 3 W *MSP MAX PV BREAKER (A): x 120% - = LOCATION: MANUF: GND 200A, 2P 70A 225A 25A, 2P EXTERIOR WALL ---- 225A 200A (N) MAIN SERVICE PANEL 1 PV MODULE MICROINVERTER (FIELD-INSTALLED) MISOLAR / BRANCH 1. PROPER LISTING EXPECTED FOR CONDITIONS OF USE ON ALL LUGS, FITTINGS, CRIMPS, ETC. 2. ALL CONDUIT BEND RADII TO CONFORM TO THE NEC MINIMUM BEND RADII REQUIREMENTS. 3. MINIMUM CLEARANCE SHALL BE MAINTAINED PER NEC FOR ALL NEW EQUIPMENT TO BE INSTALLED. 4. EXISTING GROUNDING ELECTRODE SYSTEM MUST MEET NEC AND LOCAL UTILITY REQUIREMENTS. 5. COPPER CONDUCTORS SHALL BE USED UNLESS SPECIFIED. 6. TYPE NM (ROMEX) CONDUCTORS ARE ALLOWED FOR INTERNAL AND ATTIC RUNS AND SHALL BE INSTALLED MEETING NEC REQUIREMENTS. 7. IF MAIN SERVICE PANEL IS TO BE UPGRADED, IT WILL BE PERMITTED AND INSTALLED BY 3RD PARTY. 8. AC WIRING SHALL UPSIZE IF VOLTAGE DROP EXCEEDS 2%. 9. RUN CONDUCTORS IN EXISTING CONDUIT WHEN AVAILABLE PROVIDED IT HAS NO OTHER CONDUCTORS RUNNING THROUGH IT. 10. EQUIVALENT SPECIFICATION ON CABLES AND ELECTRICAL EQUIPMENT SPECIFIED ARE ACCEPTABLE. ELECTRICAL NOTES SUNPOWER PROVIDED MICROINVERTER EXTENSION CABLE, LISTED AS AN ASSEMBLY MODEL: ENPHASE IQ7HS-66-M-US [240] | QTY: 11 MODEL: APTOS DNA-120-BF26-370W | QTY: 11 PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE NO R I N N E S T A U B 19 0 6 K E M P E R A V E SA N T A A N A , C A L I F O R N I A 9 2 7 0 5 RP-365850 4. 0 7 k W SPRI - ANAHEIM 01-26-2023 C. Holgado CHARLENE HOLGADO A1 CHANGE AHJ 01-26-2023 CH A2 AHJ CODES 01-30-2023 CH SHEET NTS EL E C T R I C A L S I N G L E - L I N E D I A G R A M & S P E C I F I C A T I O N S PVE-1 1906 E Kemper Ave02/15/23 ELECTRICAL CALCULATIONS BRANCH 2BRANCH 1 NUMBER OF MODULES VOLTAGE RATED AC OUTPUT CURRENT: IOUT = MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE TEMPERATURE ADDER TEMPERATURE USED FOR AMPACITY DE-RATING TEMPERATURE DE-RATING COEFFICIENT FILL DE-RATING COEFFICIENT IWIREMIN = IOUT / TEMP_COEFF / FILL_COEFF WIRE SIZE AMPACITY CONDUCTOR SIZE CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP OVERCURRENT PROTECTION MINIMUM OCPD = IOUT x 1.25 CALCULATED VOLTAGE DROP ONE WAY CIRCUIT LENGTH SUBPANEL TO GRID-TIE WIRING VOLTAGE SUM OF BRANCHES: IOUT_TOTAL = MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE TEMPERATURE USED FOR AMPACITY DE-RATING TEMPERATURE DE-RATING COEFFICIENT FILL DE-RATING COEFFICIENT IWIREMIN = IOUT / TEMP_COEFF / FILL_COEFF WIRE SIZE AMPACITY CONDUCTOR SIZE CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP OVERCURRENT PROTECTION MINIMUM OCPD = IOUT x 1.25 VOLTAGE DROP ONE WAY CIRCUIT LENGTH ROOF JCT BOX TO SUBPANEL WIRING #10 5 240 V 8 A 10.00 A 34 °C 22 °C 56 °C 0.71 0.8 14.08 A 40 A #10 #10 0.54% 20A, 2P 10.00 A #10 6 240 V 9.6 A 12.00 A 34 °C 22 °C 56 °C 0.71 0.8 16.90 A 40 A #10 #10 0.64% 20A, 2P 12.00 A 65 FT.65 FT. 22.00 A 25A, 2P 0.09% #10 #10 40 A 18.33 A 1.00 0.96 34 °C 34 °C #10 5 FT. 22.00 A 17.6 A 240 V PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE NO R I N N E S T A U B 19 0 6 K E M P E R A V E SA N T A A N A , C A L I F O R N I A 9 2 7 0 5 RP-365850 4. 0 7 k W SPRI - ANAHEIM 01-26-2023 C. Holgado CHARLENE HOLGADO A1 CHANGE AHJ 01-26-2023 CH A2 AHJ CODES 01-30-2023 CH SHEET EL E C T R I C A L C A L C U L A T I O N NTS PVE-2 1906 E Kemper Ave02/15/23 · RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS SIGNAGE LOCATIONS: · SHALL BE LOCATED ON OR NO MORE THAN 1 M (3 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. AMPS VOLTS PHOTOVOLTAIC POINT OF INTERCONNECTION WARNING: DUAL POWER SOURCE. SECOND SOURCE IS PHOTOVOLTAIC SYSTEM SIGNAGE LOCATIONS: · MAIN SERVICE PANEL · INDOOR / OUTDOOR SUBPANEL MAXIMUM RATED AC OUTPUT CURRENT: MAXIMUM OPERATING AC VOLTAGE: 17.6 A 240 V 1. MATERIAL USED FOR THE SIGNAGE SHALL BE REFLECTIVE, WEATHER RESISTANT AND SUITABLE FOR THE ENVIRONMENT. 2. ALL SIGNAGE SHALL HAVE ALL CAPITAL LETTERS WITH MINIMUM 3 8" LETTER HEIGHT, WHITE ON RED BACKGROUND. 3. MAIN SERVICE DISCONNECT MARKING SHALL BE PLACED ADJACENT TO MAIN SERVICE DISCONNECT IN A LOCATION CLEARLY VISIBLE FROM THE LOCATION WHERE THE LEVER IS OPERATED. 4. MARKING IS REQUIRED ON ALL INTERIOR AND EXTERIOR DC CONDUIT, RACEWAYS, ENCLOSURES, CABLE ASSEMBLIES, AND JUNCTION BOXES TO ALERT THE FIRE SERVICE TO AVOID CUTTING THEM. MARKINGS SHALL BE PLACED EVERY 10', AT TURNS AND ABOVE AND/OR BELOW PENETRATIONS, AND AT ALL DC COMBINER AND JUNCTION BOXES. 5. DO NOT USE SCREWS FOR SIGNAGE ATTACHMENT. USE ONLY APPROVED ADHESIVE. SIGNAGE NOTES ELECTRICAL DATA & SPECIFICATIONS PV SOLAR BREAKER DO NOT RELOCATE THIS OVERCURRENT DEVICE NEC 705.12(B)(2)(3)(b) SIGNAGE LOCATIONS: · MAIN SERVICE PANEL · NEW INDOOR / OUTDOOR LOAD CENTER · INDOOR / OUTDOOR SUBPANEL PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE NO R I N N E S T A U B 19 0 6 K E M P E R A V E SA N T A A N A , C A L I F O R N I A 9 2 7 0 5 RP-365850 4. 0 7 k W SPRI - ANAHEIM 01-26-2023 C. Holgado CHARLENE HOLGADO A1 CHANGE AHJ 01-26-2023 CH A2 AHJ CODES 01-30-2023 CH SHEET EL E C T R I C A L D A T A & S P E C I F I C A T I O N S NTS PVE-3 1906 E Kemper Ave02/15/23 PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE NO R I N N E S T A U B 19 0 6 K E M P E R A V E SA N T A A N A , C A L I F O R N I A 9 2 7 0 5 RP-365850 4. 0 7 k W SPRI - ANAHEIM 01-26-2023 C. Holgado CHARLENE HOLGADO A1 CHANGE AHJ 01-26-2023 CH A2 AHJ CODES 01-30-2023 CH N- L C FIGURE 1: SUNPOWER EQUINOX GROUNDING DETAILS SHEET NTS POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECT(S) LOCATED AS SHOWN: CAUTION: PHOTOVOLTAIC ARRAY ON ROOF SERVICE POINT & UTILITY METERING SOLAR LOAD CENTER FIGURE 2: PLACARD IDENTIFYING LOCATION OF DISCONNECTS AND POWER SOURCES PL A C A R D / S U N P O W E R E Q U I N O X GR O U N D I N G D E T A I L S 1906 KEMPER AVE PVE-4 1906 E Kemper Ave02/15/23 ROOF 1 N- L C PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE NO R I N N E S T A U B 19 0 6 K E M P E R A V E SA N T A A N A , C A L I F O R N I A 9 2 7 0 5 RP-365850 4. 0 7 k W SPRI - ANAHEIM 01-26-2023 C. Holgado CHARLENE HOLGADO A1 CHANGE AHJ 01-26-2023 CH A2 AHJ CODES 01-30-2023 CH 1ROOF AZIMUTH PITCH MODULE QTY. 5:12 180° 11 SHEET BR A N C H D I A G R A M NTS N PVE-5 PRINT NAME OF CREW LEAD ON SITE: _________________________________ CREW LEAD SIGNATURE: _________________________________ BRANCH VOLTAGES: 1. 2. 3. 4. 5. 6. 1906 E Kemper Ave02/15/23 N KEMPER AVE ROOF 1 36" 36" 18 " N- L C (E) GARAGE (E) FENCE/GATE ROOF ACCESS POINT ROOF ACCESS POINT (E) FENCE/GATE READILY ACCESSIBLE PV DISCONNECT MEANS 52'-6" 3'-9" 3'-6" 70 '- 5 " 12 ' - 8 " 16' - 1 0 " PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE NO R I N N E S T A U B 19 0 6 K E M P E R A V E SA N T A A N A , C A L I F O R N I A 9 2 7 0 5 RP-365850 4. 0 7 k W SPRI - ANAHEIM 01-26-2023 C. Holgado CHARLENE HOLGADO SHEET AR R A Y L A Y O U T ROOF TYPE CONTRACT MODULE MICROINVERTER STORY & QUANTITY TYPE & QUANTITY HOME TYPE TOTAL ARRAY AREA ROOF ATTACHMENT QUANTITY SQ.FT. COMP SHINGLE 1 - STORY 11 APTOS DNA-120-BF26-370W 11 ENPHASE IQ7HS-66-M-US [240] 24 223 1/16" = 1'-0" L E G E N D JUNCTION BOX UTILITY SERVICE POINT AND METERING PROPERTY LINE FIRE ACCESS PATHWAY CONDUIT N-LC NEW LOAD CENTER NOTE: 1. FIELD ADJUSTMENTS OF FEWER THAN 6” MAY BE ALLOWED BASED ON SITE CONDITIONS AND MEASUREMENTS. N 1ROOF AZIMUTH PITCH MODULE QTY. 5:12 180° 11 PVA-1 TOTAL ROOF AREA: SQ. FT. TOTAL ARRAY AREA: SQ. FT. TOTAL PERCENTAGE OF ROOF COVERED BY SOLAR: 223 3087 7% ROOF AREA (ft2)1217 SEALED FOR ATTACHMENTS AND EXISTING FRAMING ONLY Steven Procter Digitally signed by Steven Procter Date: 2023.02.12 19:07:40 -06'00' 1906 E Kemper Ave02/15/23 FIGURE 3: MOUNTING CLAMP POSITIONING DETAILSTABLE 2: PENETRATION GUIDE FOR INSTALL STACKED STAGGERED FULLY STAGGERED STACKED/STAGGEREDFULLY STAGGERED *CHECK TABLE 1 FOR MAX. PENETRATION SPACING AND PENETRATION PATTERN FOR EACH ARRAY. TWO OR MORE ROWS OF MODULES ONE ROW OF MODULES TABLE 1 – ARRAYS INFORMATION ROOF PITCH ROOFING TYPE ATTACHMENT TYPE NO. OF STORIES FRAMING TYPE (in.) MAX. RAFTER SPAN (ft.) PENETRATION PATTERN (in.) MAX. ATTACHMENT SPACING (in.) MAX. RAIL OVERHANG (in.) ROOF 1 22°Comp Shingle Pegasus L-foot 1 2x6 Rafter @ 24" OC 11.86'Staggered 48"16" -------------------- -------------------- -------------------- -------------------- -------------------- INVISIMOUNT RAIL PV MODULE 3.5"M A X 2"MI N EXTERNAL LOAD BEARING WALL INTERNAL LOAD BEARING WALL STRUCTURAL FRAMING SIDE DETAIL Roof 1 H (mm) S ( m m ) S ( m m ) L ( m m ) H (mm) W (mm) PERMISSIBLE RANGE OF CLAMP 1.1. (1/4L-50)<S≤(1/4L+50) [For modules whose length is less than 1966mm] 1.2. 300≤S≤350 [For modules whose length is more than or equal 2000mm] 2. 0<H≤1/4W MID CLAMP L FOOT INVISIMOUNT RAIL 0.75" MIN. (E) RAFTER 5/16" S.S. LAG BOLT WITH 5/16" WASHER @ CENTER TYP. PRE-DRILL REQUIRED. 2- 1 / 2 " M I N . PV MODULE COMPOSITION SHINGLES FLASHING 3. 5 " 1. 8 " 1. 7 " INVISIMOUNT ROOF ATTACHMENT DETAILS HARDWARE: PEGASUS L-FOOT PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE NO R I N N E S T A U B 19 0 6 K E M P E R A V E SA N T A A N A , C A L I F O R N I A 9 2 7 0 5 RP-365850 4. 0 7 k W SPRI - ANAHEIM 01-26-2023 C. Holgado CHARLENE HOLGADO SHEET ST R U C T U R A L I N F O R M A T I O N AN D M O U N T I N G D E T A I L S NTS PVS-1 SEALED FOR ATTACHMENTS AND EXISTING FRAMING ONLY Steven Procter Digitally signed by Steven Procter Date: 2023.02.12 19:07:48 -06'00' 1906 E Kemper Ave02/15/23 1906 E Kemper Ave02/15/23