PROJECT NARRATIVE:
SYSTEM DESCRIPTION:
1. 9.085 KW DC GRID-TIED SOLAR PHOTOVOLTAIC SYSTEM
2. (2) ARRAY ON A TWO STORY RESIDENCE WITH A COMPOSITION SHINGLE ROOF.
3. (23) INVERTER LOCATED UNDER ARRAY.
4. CONNECT SYSTEM TO MSP WITH A NEW 2-POLE PV BREAKER.
5. RUN EMT ON ROOF, UNDER EAVES ON THE EXTERIOR OF THE RESIDENCE.
6. ROOF STRUCTURE: 2" X 6" RAFTERS @ 24" O.C
7. FIRE RATING: CANADIAN TYPE-2 MODULE WITH UNIRAC CLASS-A RACKING
SYSTEM EQUIPMENT LIST:
(23) CANADIAN SOLAR (CSI) CS3N-395MS (395W)
(23) ENPHASE IQ8+ INVERTERS :IQ8PLUS 72-2-US (240V) [SI1-JUN20]
(38) UNIRAC UNIVERSAL AF MID CLAMPS
(16) UNIRAC UNIVERSAL AF END CLAMPS
(44) UNIRAC FLASHLOC DUO FOOTING
(~150FT) UNIRAC SOLARMOUNT STANDARD RAIL
(1) 40 AMP 2-POLE PV BREAKER (AT SUBPANEL)
REFERENCE CODES AND CONSTRUCTION NOTES:
THIS PROJECT SHALL COMPLY WITH THE
FOLLOWING CODES:
2019 CALIFORNIA ELECTRICAL CODE (CEC),
2019 CALIFORNIA RESIDENTIAL CODE (CRC),
2019 CALIFORNIA BUILDING CODE (CBC),
2019 CALIFORNIA FIRE CODE (CFC),
2019 CALIFORNIA PLUMBING CODE (CPC),
2019 CALIFORNIA MECHANICAL CODE (CMC),
MANUFACTURER AND PV INDUSTRY STANDARDS,
AND ALL STATE AND JURISDICTION BY-LAWS AND
ORDINANCES.
PROJECT SHALL BE INSTALLED BY A LICENSED
CONTRACTOR.
VICINITY MAP: (NOT TO SCALE)FRONT OF RESIDENCE
PV SYSTEM SUMMARY : 9.085KW
ROOF MOUNT RESIDENTIAL PHOTOVOLTAIC SYSTEM
SYYSTEM SIZE (DC) : STC: 23 X 395 = 9085 W DC
: PTC: 23 X 372.75 = 8573.25 W DC
SYSTEM SIZE (CEC-AC): 23 X 372.75 X 99% = 8487.52 W AC
MODULES : 23 X CANADIAN SOLAR (CSI) CS3N-395MS (395W)
INVERTER : 23 X ENPHASE - IQ8PLUS 72-2-US (240V) [SI1-JUN20]
ROOF : COMPOSITION SHINGLE
TILT : 31° PITCH
AZIMUTH : 125° & 305°
SHEET INTEX
PV-1 COVER
PV-2 SITE PLAN
PV-2A OPTIMIZER CHART
PV-3 ARRAY LAYOUT
PV-3A FIRE NOTES
PV-4 STRUCTURAL ELEVATION
PV-5 SINGLE LINE DIAGRAM
PV-5A ELEVATION
PV-6 ELECTRICAL NOTES
PV-7 PLACARDS
ATTACHMENTS:
+ MODULE SPEC SHEET
+ INVERTER SPEC SHEET
+ RACKING SPEC SHEET
+ ENGINEERING LETTER
# OF ARRAYS PITCH ORIENTATION
2 31°125° & 305°
JURISDICTION
CITY OF SANTA ANA
DIG ALERT 811 TO BE CONTACTED IN COMPLIANCE
WITH EXCAVATION SAFETY IN ACCORDANCE TO
GOVERMENT CODE 4216 WILL BE FOLLOW PRIOR
TO ANY EXCAVATION TAKING PLACE.
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-213
www. Loyd W Martin .com
Solar Structures Engineering
#2022-4673 Structural Only
November 10, 2022
BLDG #101112934 ISS. 12/6/22
ELEC #20178076 ISS. 12/6/22
The scope of the plans is for the installation of the solar photovoltaic system only and the
approval is subject to compliance with all applicable city and state codes and regulations
regarding construction. The approval of the plans does not constitute any certification of the
accuracy, completeness, or building permit status of the existing buildings and structures as
shown.
1901 N Laird St
12/06/22
MSPSUB
JB
AC CB
SHEET:
DRAFTER
SIGNATURE
PROJECT ADDRESS:
REVISION #
DATE:
11/09/2022
DRAWING
TYPE
PENGUIN HOME SOLUTIONS CHRISTIAN DANG
1901 LAIRD ST,
(000) 000-0000
21860 VAN BUREN BLVD, BLDG 11, SUITE 101,
RIVERSIDE, CA 92518
(888) 488 8001
LICENSE#: C-10 1033658
SANTA ANA, CA 92706
SITE PLAN
SCALE: 1/16" = 1'-0"1
PV-2
SITE PLAN
NOTES:
· SMOKE / CARBON MONOXIDE ALARMS ARE REQUIRED TO BE
INSTALLED AND IN WORKING CONDITION.
· NOTIFY UTILITY COMPANY BEFORE ACTIVATION OF PV SYSTEM.
· DO NOT INSTALL INVERTER WHERE IT COULD BE EXPOSED TO
DIRECT SUNLIGHT TO AVOID UNWANTED POWER REDUCTION DUE TO
AN INCREASE IN THE INTERNAL TEMPERATURE OF THE INVERTER.
NORTH
APN #: 6212013049
SPRINKLER SYSTEM: NO
TOTAL ROOF AREA: 2038.12
SOLAR ARRAY AREA: 513.07
% AREA COVERAGE: 25.17%
(N) IQ8PLUS 72-2-US (240V) [SI1-JUN20]
ENPHASE INVERTERS
(N) IQ COMBINER BOX
(N) AC DISCONNECT SWITCH
(E) RE
S
I
D
E
N
C
E
(E) MAIN SERVICE PANEL
(SOLAR POINT OF CONNECTION)
(N) PV ARRAY AR-01
(E) PROPERTY LINE
(E) SUB HOUSE
LAI
R
D
STR
E
E
T
(E) DRIVEWAY
1204.2.1.1 PATHWAYS TO RIDGE NOT FEWER THAN TWO 36-INCH-WIDE
(914 MM) PATHWAYS ON SEPARATE ROOF PLANES, FROM LOWEST
ROOF EDGE TO RIDGE, SHALL BE PROVIDED ON ALL BUILDINGS. NOT
FEWER THAN ONE PATHWAY SHALL BE PROVIDED ON THE STREET OR
DRIVEWAY SIDE OF THE ROOF. FOR EACH ROOF PLANE WITH A
PHOTOVOLTAIC ARRAY, NOT FEWER THAN ONE 36-INCH-WIDE (914 MM)
PATHWAY FROM LOWEST ROOF EDGE TO RIDGE SHALL BE PROVIDED
ON THE SAME ROOF PLANE AS THE PHOTOVOLTAIC ARRAY, ON AN
ADJACENT ROOF PLANE OR STRADDLING THE SAME AND ADJACENT
ROOF PLANES
FIRE CODE
1204.2.1.2 SETBACKS AT RIDGE FOR PHOTOVOLTAIC ARRAYS
OCCUPYING 33 PERCENT OR LESS OF THE PLAN VIEW TOTAL
ROOF AREA, A SETBACK OF NOT LESS THAN 18 INCHES (457
MM) WIDE IS REQUIRED ON BOTH SIDES OF A HORIZONTAL
RIDGE. FOR PHOTOVOLTAIC ARRAYS OCCUPYING MORE THAN
33 PERCENT OF THE PLAN VIEW TOTAL ROOF AREA, A
SETBACK OF NOT LESS THAN 36 INCHES (457 MM) WIDE IS
REQUIRED ON BOTH SIDES OF A HORIZONTAL RIDGE.
(N) PV ARRAY AR-02
ROOF ACCESS POINT
44'-9"
98'-4"
12
3
'
-
9
"
97
'
-
3
"
(E) SUB PANEL
ROOF ACCESS POINT
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-213
www. Loyd W Martin .com
Solar Structures Engineering
#2022-4673 Structural Only
November 10, 2022
1901 N Laird St
12/06/22
SHEET:
DRAFTER
SIGNATURE
PROJECT ADDRESS:
REVISION #
DATE:
11/09/2022
DRAWING
TYPE
PENGUIN HOME SOLUTIONS CHRISTIAN DANG
1901 LAIRD ST,
(000) 000-0000
21860 VAN BUREN BLVD, BLDG 11, SUITE 101,
RIVERSIDE, CA 92518
(888) 488 8001
LICENSE#: C-10 1033658
SANTA ANA, CA 92706
PV-2A
OPTIMIZER CHART
1901 N Laird St
12/06/22
MSPSUB
JB
AC CB
SHEET:
DRAFTER
SIGNATURE
PROJECT ADDRESS:
REVISION #
DATE:
11/09/2022
DRAWING
TYPE
PENGUIN HOME SOLUTIONS CHRISTIAN DANG
1901 LAIRD ST,
(000) 000-0000
21860 VAN BUREN BLVD, BLDG 11, SUITE 101,
RIVERSIDE, CA 92518
(888) 488 8001
LICENSE#: C-10 1033658
SANTA ANA, CA 92706
PV-3
ARRAY LAYOUT
MODULE DETAILS
SCALE: 1/2" = 1'-0" 2
ROOF PLAN WITH MODULES LAYOUT
SCALE: 3/32" = 1'-0" 1
ADDITIONAL NOTES:
· FINAL LOCATION OF ALL CONDUIT AND JUNCTION BOXES TO BE DETERMINED AT TIME OF INSTALLATION.
· CONDUIT TO BE PAINTED TO MATCH EXTERIOR OF RESIDENCE WHERE APPLICABLE AND IS TO BE SUPPORTED
EVERY 10' MAX.
· 30" WIDE X 36" DEEP WORKING SPACE CLEARANCES REQUIRED ABOUT ALL ELECTRICAL EQUIPMENT.
· STAGGER PENETRATIONS TO EVENLY DISTRIBUTE LOAD ACROSS ALL TRUSSES UNDER ARRAY.
· ALL DIMENSIONS ARE APPROXIMATIONS.
· DO NOT INSTALL INVERTER WHERE IT COULD BE EXPOSED TO DIRECT SUNLIGHT TO AVOID UNWANTED POWER
REDUCTION DUE TO AN INCREASE IN THE INTERNAL TEMPERATURE OF THE INVERTER.
CONSTRUCTION NOTES
· ROOF PITCH: 31°
· ROOF CLADDING: COMPOSITION SHINGLE
· ROOF STRUCTURE: 2" X 6" RAFTERS @ 24" O.C O/C
· MOUNTS ARE ON GRID SPACING, OCCURRING AT RAFTERS.
· VERIFY RAFTER LOCATIONS IN FIELD.
· REFER TO MODULE AND RACKING MFR'S INSTALL MANUALS.
· MAX SPAN BETWEEN MOUNTS: 72" O.C.
· PLUMBING AND MECHANICAL VENTS SHALL NOT BE COVERED
BY SOLAR MODULES.
· ALL FASTENERS STAINLESS STEEL U.O.N.
(N) IQ8PLUS 72-2-US (240V) [SI1-JUN20]
ENPHASE INVERTERS
(N) IQ COMBINER BOX
STRING 2
STRING 1
ROOF AREA STATEMENT
ROOF MODULES
QTY PITCH TRUE
ORIENTATION
1 17 31°125°
2 6 31°305°NORTH
SPECS:
L : 76.4"
W : 41.3"
D : 1.38"
49.6 LBS
CANADIAN
SOLAR (CSI)
CS3N-395MS
(395W)
76.4"
41.3"
1.38"
17 MODULES 125° AZIMUTH
MODULE ROOF AREA: 680.62
SOLAR ARRAY AREA: 378.95
% AREA COVERAGE: 55.68%
6 MODULES 305° AZIMUTH
MODULE ROOF AREA: 1136.03
SOLAR ARRAY AREA: 134.12
% AREA COVERAGE: 11.81 %
2" X 6" RAFTERS @ 24" O.C
(N) UNIRAC SOLARMOUNT
STANDARD RAIL
(N) CONDUIT RUN: 3/4" EMT
(N) ROOF MOUNTS
EVERY 72" O.C MAX
(N) JUNCTION BOX
(UNDER ARRAY)
(N) PV ARRAY AR-01
(378.95 SQ.FT.)
(E) MAIN SERVICE PANEL
(SOLAR POINT OF CONNECTION)
(E) SUB PANEL
(N) PV ARRAY AR-02
(134.12 SQ.FT.)
PV-4
1
31°
31°
(N) AC DISCONNECT SWITCH
6'-11"
18'-7"
3'3'
3'
7'-5"
3'-6"
8'-10"
2'-9"
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-213
www. Loyd W Martin .com
Solar Structures Engineering
#2022-4673 Structural Only
November 10, 2022
NOTE:
Engineer of Record assumes that all structural
components of the existing building were permitted
and met the requirements of the Building Code at the
time of construction. Solar Contractor shall field verify
that the roof framing is in its existing permitted
condition and capable of supporting required live
loads. Framing specified on solar plans shall be
assumed to be minimum size and spacing, actual
framing may be different.
1901 N Laird St
12/06/22
SHEET:
DRAFTER
SIGNATURE
PROJECT ADDRESS:
REVISION #
DATE:
11/09/2022
DRAWING
TYPE
PENGUIN HOME SOLUTIONS CHRISTIAN DANG
1901 LAIRD ST,
(000) 000-0000
21860 VAN BUREN BLVD, BLDG 11, SUITE 101,
RIVERSIDE, CA 92518
(888) 488 8001
LICENSE#: C-10 1033658
SANTA ANA, CA 92706
PV-3A
FIRE NOTES
1204.1 General Solar photovoltaic systems shall be installed in accordance with sections
1204.2 through 1204.5, and the California Building Code or California Residential Code. The electrical portion of solar PV systems shall be installed in accordance with the
California Electrical Code.
1204.2 Access and Pathways Chapter 12 Energy Systemshttps://up.codes/viewer_export/juris_key/california/pub/california_fire_code_2019/ref/12 6/24Roof access, pathways, and
spacing requirements shall be provided in accordance with Sections
1204.2.1 through 1204.3.3. Pathways shall be over areas capable of supporting fire fighter accessing the roof. Pathways shall be located in areas with minimal obstructions, such as
vent pipes, conduit or mechanical equipment.Exceptions:1. Detached, no habitable group structures including, but not limited to, detached garages serving group R-3 buildings, parking
shade structures, carports, solar trellises and similar structures.2. Roof access, pathways and spacing requirements need not be provided where the fire code official has determined
that rooftop operations will not be employed.
1204.2.1 Solar Photovoltaic Systems for Group R-3 Buildings Solar photovoltaic systems for Group R-3 buildings shall comply with Sections 1204.2.1.1 through 1204.2.1.3.Exceptions
:1.These requirements shall not apply to structures designed and constructed in accordance with the California Residential Code.2. These requirements shall not apply to roofs with
slopes of 2 units vertical in 12 units horizontal or less.
1204.2.1.1 Pathways to ridge not fewer than two 36-inch-wide (914 mm) pathways on separate roof planes, from lowest roof edge to ridge, shall be provided on all buildings. Not fewer
than one pathway shall be provided on the street or driveway side of the roof. For each roof plane with a photovoltaic array, not fewer than one 36-inch-wide (914 mm) pathway from
lowest roof edge to ridge shall be provided on the same roof plane as the photovoltaic array, on an adjacent roof plane or straddling the same and adjacent roof planes
1204.2.1.2 Setbacks at ridge for photovoltaic arrays occupying 33 percent or less of the plan view total roof area, a setback of not less than 18 inches (457 mm) wide is required on both
sides of a horizontal ridge. For photovoltaic arrays occupying more than 33 percent of the plan view total roof area, a setback of not less than 36 inches (457 mm) wide is required on
both sides of a horizontal ridge.
1204.2.1.3 Alternative setbacks at ridge where an automatic sprinkler system is installed within the dwelling in accordance with Section 903313 setbacks at the ridge shall conform
within the dwelling in accordance with Section 903.3.1.3, setbacks at the ridge shall conform to one of the following:1For photovoltaic arrays occupying 66 percent or less of the plan
view one of the following:1. For photovoltaic arrays occupying 66 percent or less of the plan view total roof area a setback of not less than 18inches (457 mm) wide is required on both
sides total roof area, a setback of not less than 18inches (457 mm) wide is required on both sides of a horizontal ridge 2 For photovoltaic arrays occupying more than 66 percent of the
plan view a horizontal ridge.3. For photovoltaic arrays occupying more than 66 percent of the plan view total roof area a setback of not less than 36inches (914 mm) wide is required on
both sides total roof area, a setback of not less than 36inches (914 mm) wide is required on both sides of a horizontal ridge a horizontal ridge.
120.4.2.2 Emergen1204.2.2 Emergency escape and rescue openings panels and modules installed on Group R-3 buildings shall not be placed on the portion of a roof that is below an
emergency escape buildings shall not be placed on the portion of a roof that is below an emergency escape and rescue opening A pathway of not less than 36 inches (914 mm) wide
shall be provided and rescue opening. A pathway of not less than 36 inches (914 mm) wide shall be provided to the emergency escape and rescue opening the emergency escape and
rescue opening.120.4.2.3 Locations of DC Conductors Conduit
1204.2.3 Locations of DC conductors conduit, wiring systems, and raceways for photovoltaic circuits shall be located as close as possible to the ridge or hip or valley and from the hip or
circuits shall be located as close as possible to the ridge or hip or valley and from the hip or valley as directly as possible to an outside wall to reduce trip hazards and maximize ventilate
valley as directly as possible to an outside wall to reduce trip hazards and maximize ventilation opportunities conduit runs between sub arrays and to DC combiner boxes shall be
installed in opportunities. Conduit runs between sub arrays and to DC combiner boxes shall be installed in a manner that minimizes the total amount of conduit on the roof by taking the
shortest path from a manner that minimizes the total amount of conduit on the roof by taking the shortest path from the array to the DC combiner box. The DC combiner boxes shall be
located such that conduit the array to the DC combiner box. The DC combiner boxes shall be located such that conduit runs are minimized in the pathways between arrays DC wiring
shall be installed in metallic runs are minimized in the pathways between arrays. DC wiring shall be installed in metallic conduit or raceways when located within enclosed spaces in a
building Conduit shall run a conduit or raceways when located within enclosed spaces in a building. Conduit shall run along the bottom of load bearing members the bottom of load
bearing members.
1901 N Laird St
12/06/22
SHEET:
DRAFTER
SIGNATURE
PROJECT ADDRESS:
REVISION #
DATE:
11/09/2022
DRAWING
TYPE
PENGUIN HOME SOLUTIONS CHRISTIAN DANG
1901 LAIRD ST,
(000) 000-0000
21860 VAN BUREN BLVD, BLDG 11, SUITE 101,
RIVERSIDE, CA 92518
(888) 488 8001
LICENSE#: C-10 1033658
SANTA ANA, CA 92706
PV-4
STRUCTURAL ELEVATION
QUANTITY WEIGHT / UNIT TOTAL WEIGHT
MODULE 23 49.6 LBS 1140.80 LBS
INVERTER 23 2.38 LBS 54.74 LBS
FOOTINGS 44 1.25 LBS 55.00 LBS
RAILING 150FT 0.75 LBS/FT 112.50 LBS
UFO CLAMPS 38 0.10 LBS 3.8 LBS
END CLAMPS 16 0.10 LBS 1.60 LBS
WEIGHT OF ARRAY 1368.44 LBS
AREA 1816.65 SQFT
WEIGHT PER AREA 0.75 LBS/SQFT
STRUCTURAL EVALUATION:
DEAD LOAD:
0.75 PSF < 4.0 PSF OK
24.9 LBS/PEN < 45 LBS/PEN OK
FOOTING SPACING:
72" = 72"" OK
TOP PLATE
LOAD BEARING WALL
RIDGE BOARD
2" X 6" RAFTERS @ 24" O.C
MID CLAMP
SOLAR MODULE
#14 5/16 X 2.5 SELF TAPING
SCREWS.
31°
UNIRAC SOLARMOUNT STANDARD RAIL
UNIRAC SOLARHOOK FLASH LOC DUO FOOTING
MATERIAL LIST
23
ENPHASE -
IQ8PLUS 72-2-US
(240V)
[SI1-JUN20]
QTY EQUIPMENT DESCRIPTION
23
CANADIAN
SOLAR (CSI)
CS3N-395MS
(395W)
1 JUNCTION BOX 600VDC, NEMA 3R, UL LISTED
1 AC DISCONNECT 600VAC, 60A, NEMA 3R, UL LISTED
1 IQ COMBINER BOX X-IQ-AM1-240-4
1 PV BREAKER 2 POLE, 240V, 40A
44 ATTACHMENTS UNIRAC FLASHLOC DUO FOOTING
150' RAIL UNIRAC RACKING
38 MID CLAMPS UNIRAC UNIVERSAL AF MID
CLAMPS
16 END CLAMPS UNIRAC UNIVERSAL AF END
CLAMPS
50' CONDUIT 3/4" OR LARGER EMT CONDUIT
1/2" PLYWOOD SHEATHING
COMPOSITION SHINGLE ROOF
@ 31° PITCH
LAG BOLT SCHEDULE
LOCATION INFIELD 3' SIDE ZONES 3' CORNER ZONES
SELF
TAPING
SCREWS
5/16" x 2.5" 5/16" x 2.5"5/16" x 2.5"
OPEN CIRCUIT VOLTAGE (Voc) :
MAX. POWER VOLTAGE (Vmp) :
SHORT CIRCUIT CURRENT (Isc) :
MAX. POWER CURRENT (Imp) :
PTC RATING :
44.3V
37.0V
11.44A
10.68A
372.75W
MAX. DC INPUT VOLTAGE :
MPPT VOLTAGE RANGE :
MAX. AC OUTPUT VOLTAGE RANGE :
MAX. AC OUTPUT CURRENT :
MAX. AC POWER OUPUT :
NEC EFFICIENCY :
60V
29V-45V
211-264V
1.21A
290W
97.0%
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-213
www. Loyd W Martin .com
Solar Structures Engineering
#2022-4673 Structural Only
November 10, 2022
NOTE:
Engineer of Record assumes that all structural components of
the existing building were permitted and met the requirements
of the Building Code at the time of construction. Solar
Contractor shall field verify that the roof framing is in its
existing permitted condition and capable of supporting
required live loads. Framing specified on solar plans shall be
assumed to be minimum size and spacing, actual framing
may be different.
(1) 5/16" x 3.5" SS LAG
SCREWS WITH 2.5" MIN
EMBEDMENT INTO WOOD
1901 N Laird St
12/06/22
SHEET:
DRAFTER
SIGNATURE
PROJECT ADDRESS:
REVISION #
DATE:
11/09/2022
DRAWING
TYPE
PENGUIN HOME SOLUTIONS CHRISTIAN DANG
1901 LAIRD ST,
(000) 000-0000
21860 VAN BUREN BLVD, BLDG 11, SUITE 101,
RIVERSIDE, CA 92518
(888) 488 8001
LICENSE#: C-10 1033658
SANTA ANA, CA 92706
PV-5
SINGLE LINE DIAGRAM
9.085 kW (DC) SOLAR ARRAY:
(23) CANADIAN SOLAR (CSI) CS3N-395MS (395W) WITH
(23) ENPHASE IQ8+ INVERTERS :IQ8PLUS 72-2-US (240V) [SI1-JUN20]
(1) STRING OF (13) MODULES & (1) STRING OF (10) MODULES
NOTES:
· CONDUTORS ON ROOF MUST BE SUNLIGHT RESISTANT, 90°C RATED AND SUITABLE FOR WET LOCATIONS.
· SEE RACKING SPEC SHEETS FOR RACKING EQUIPMENT GROUNDING METHOD.
· ALL GROUNDING CONDUCTORS MUST BE PROTECTED FROM DAMAGE IF NOT INSTALLED IN CONDUIT.
· ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL MEANS DESIGNED AND LISTED FOR
SUCH USE. WIRING MUST BE PERMANENTLY AND COMPLETELY HELD OFF OF THE ROOF.
· ALL DEVICES USED FOR BONDING FRAMES OF MODULES OR OTHER EQUIPMENT TO THE GROUNDING SYSTEM
MUST BE LISTED AND IDENTIFIED FOR THE PURPOSE.
· ALL CONDUCTORS SHALL BE COPPER.
· ALL ROOFTOP RACEWAYS SHALL BE INSTALLED A>=7/8" ABOVE ROOF.
· INTEGRATED GROUNDING IN ACCORDANCE WITH THE RACKING MANUFACTURER INSTALLATION INSTRUCTIONS
CAN ONLY BE USED FOR BONDING THE MODULES TO THE RACKING WHERE THE SPECIFIC MODULE CATALOG
NUMBER HAS BEEN TESTED TO UL2703 STANDARDS BY AN ACCREDITED NRTL. WHERE THE MODULE CATALOG
NUMBER IS NOT PART OF THE RACKING SYSTEM APPROVED MODULE LIST, BOND ALL MODULES AND ALL RAILS
USING A UL2703 LISTED LAY-IN LUG SUCH AS ILSCO GBL-4DBT.
(2) 5/8" X 8' GND RODS SPACED
6' (MIN.) APART IF NO UFER
HOME LOADS
#4 AWG CU GEC
120/240 VAC SERVICE
EXISTING 125A DUAL MAIN
SERVICE PANEL W/ 100A
MAIN BREAKER.
MAIN SERVICE PANEL IS NOT CENTER FED.
100AMP 2-POLE
MAIN BREAKER
(2) 5/8" X 8' GND RODS SPACED
6' (MIN.) APART IF NO UFER
UTILITY
METER
N
G
UTILITY
METER
IQ COMBINER
15 AMPS
ENPHASE MONITORING
JUNCTION
BOX
AC POWER LINE
PLC OVER AC LINE
CONDUCTORS EXPOSED TO FREE AIR
(4) #12 AWG ENPHASE-TRUNK WIRE
(1) #6 AWG BARE COPPER GROUND
WIRE IN CONDUIT CAN BE #8 AWG THWN-2
3/4" EMT OR EQUIVALENT
(4) #10 AWG THWN-2 CONDUCTORS
(1) #8 AWG THWN-2 GROUND
AC DISCONNECT
IQ8+ MICROINVERTER
WIFI/ETHERNET
& CELLULAR
3/4" EMT OR EQUIVALENT
(2) #8 AWG THWN-2 CONDUCTORS
(1) #8 AWG THWN-2 NEUTRAL
(1) #8 AWG THWN-2 GROUND
NEW SQUARE D
DU222RB
60AMP, 240V, 2P
NON-FUSED,
NEMA 3R ENCLOSURE
(OR EQUIV.)
AR-01 & AR-02
(23) CANADIAN SOLAR (CSI)
CS3N-395MS (395W) IN (1) STRING OF
(13) MODULES & (1) STRING OF (10)
MODULES
(23)
20 AMPS
20 AMPS
(E) 125A
SUB PANEL
40A
POINT OF
CONNECTION
1901 N Laird St
12/06/22
SHEET:
DRAFTER
SIGNATURE
PROJECT ADDRESS:
REVISION #
DATE:
11/09/2022
DRAWING
TYPE
PENGUIN HOME SOLUTIONS CHRISTIAN DANG
1901 LAIRD ST,
(000) 000-0000
21860 VAN BUREN BLVD, BLDG 11, SUITE 101,
RIVERSIDE, CA 92518
(888) 488 8001
LICENSE#: C-10 1033658
SANTA ANA, CA 92706
PV-5A
ELEVATION
ELEVATION
SCALE: 1/4" = 1'-0"1
(N) IQ COMBINER
(N) AC DISCONNECT (E) DUAL MAIN
SERVICE PANEL
(N) MODULES
FENCE
GAS METER
CUBICMETERS
(N) MODULES
(E) SUB PANEL
1901 N Laird St
12/06/22
SHEET:
DRAFTER
SIGNATURE
PROJECT ADDRESS:
REVISION #
DATE:
11/09/2022
DRAWING
TYPE
PENGUIN HOME SOLUTIONS CHRISTIAN DANG
1901 LAIRD ST,
(000) 000-0000
21860 VAN BUREN BLVD, BLDG 11, SUITE 101,
RIVERSIDE, CA 92518
(888) 488 8001
LICENSE#: C-10 1033658
SANTA ANA, CA 92706
PV-6
ELECTRICAL CALCS
ASSUMPTIONS:
HIGH TEMPERATURE = 37 °C
LOW TEMPERATURE = -10 °C
ADDED TEMPERATURE FOR CONDUIT RUN ON ROOF = 22 °C
90 °C RATED WIRE FOR DC CURRENT
75 °C RATED WIRE FOR AC CURRENT THAT TERMINATES AT A
BREAKER
PV MODULE SPECS
MAKE
MODEL
SHORT CIRCUIT CURRENT
OPEN CIRCUIT VOLTAGE
OPERATING CURRENT
OPERATING VOLTAGE
NOMINAL POWER
INVERTER SPECS
MAKE
MODEL
MAX. DC INPUT VOLTAGE
MPPT VOLTAGE RANGE
MAX. AC OUTPUT VOLTAGE RANGE
MAX. AC OUTPUT CURRENT
MAX. AC POWER OUPUT
NEC EFFICIENCY
9.085 kW (DC) SOLAR ARRAY:
(23) CANADIAN SOLAR (CSI) CS3N-395MS (395W) WITH
(23) ENPHASE IQ8+ INVERTERS :IQ8PLUS 72-2-US (240V) [SI1-JUN20]
(1) STRING OF (13) MODULES & (1) STRING OF (10) MODULES
ELECTRICAL NOTES:
· ALL PV MODULES, ARRAY FRAMING AND RACKING SHALL BE GROUNDED PER MFR'S SPECIFICATIONS.
· ALL EQUIPMENT WILL BE UL 1703, UL 1741, OR UL 2703 LISTED AND CERTIFIED.
· INTEGRATED GROUNDING IN ACCORDANCE WITH THE RACKING MANUFACTURER INSTALLATION
INSTRUCTIONS CAN ONLY BE USED FOR BONDING THE MODULES TO THE RACKING WHERE THE
SPECIFIC MODULE CATALOG NUMBER HAS BEEN TESTED TO UL2703 STANDARDS BY AN ACCREDITED
NRTL. WHERE THE MODULE CATALOG NUMBER IS NOT PART OF THE RACKING SYSTEM APPROVED
MODULE LIST, BOND ALL MODULES AND ALL RAILS USING A UL2703 LISTED LAY-IN LUG SUCH AS
ILSCO GBL-4DBT.
· ALL WIRE TERMINATIONS, SPLICES AND CONNECTIONS SHALL BE MADE USING A LISTED DEVICE OR
ELECTRICAL BOX SUITED FOR THE PURPOSE. ALL WIRES NOT IN CONDUIT TO BE PROVIDED WITH
STRAIN RELIEF AT ENTRY INTO JUNCTION BOXES.
· PROVIDE AND INSTALL CONDUIT EXPANSION FITTINGS, PER MANUFACTURER'S SPECIFICATIONS, IN
CONDUIT RUNS WHERE THERMAL EXPANSION IS 0.25" OR MORE, BASED ON RECORD MAXIMUM AND
MINIMUM TEMPERATURES FOR THE SITE (SEE NEC TABLE 310.15(B)(2)(C), AND USING EXPANSION
COEFFICIENT OF STEEL.
· BOTH ENDS OF ALL METALLIC CONDUIT CONTAINING GROUNDING ELECTRODE CONDUCTORS SHALL
BE BONDED PER NEC 250.64(E).
· PROVIDE AND INSTALL ALL GROUNDING AS REQUIRED BY NEC ARTICLES 250, 690 AND SYSTEM
MANUFACTURER.
· INSTALLATIONS WHICH USE TRANSFORMER-LESS INVERTERS - PV WIRE-600V/RHW-2 TYPE IS
REQUIRED FOR ALL DC WIRE RUNS IN FREE AIR, OR NOT IN CONDUIT.
· EACH CURRENT CARRYING CONDUCTOR IN ALL PV SOURCE CIRCUITS OR PV OUTPUT CIRCUITS
SHALL BE DISCONNECTED/ FUSED, WHEN NECESSARY.
·CONTRACTOR SHALL VERIFY EXISTENCE OF UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATIONS.
·ELECTRICAL TRENCH RUNS, WHERE USED, SHALL USE SCHEDULE 40 PVC CONDUIT AND PROVIDE 18"
MIN CLEARANCE FROM TOP OF CONDUIT TO GRADE, AND MAGNETIC WARNING TAPE AT 12" BELOW
GRADE. 24" CLEARANCE AND SCHEDULE 80 PVC IS REQUIRED IN AREAS WHERE SUBJECT TO
VEHICLE TRAFFIC.
· CHECK WITH LOCAL JURISDICTION FOR ANY ADDITIONAL FILL AND COMPACTION REQUIREMENTS,
SPOILS TREATMENT AND/OR EROSION CONTROL MEASURES PRIOR TO EXCAVATION.
· INSTALLATIONS IN LIGHTENING-PRONE LOCATIONS ARE RECOMMENDED TO UTILIZE DC LIGHTENING
ARRESTORS IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.
·SUPPLY SIDE CONNECTIONS SHALL ONLY BE MADE WITH LISTED AND APPROVED TAPS.
·ALL WIRE RUNS SHALL NOT EXCEED 2% CALCULATED VOLTAGE DROP.
·USE WATERPROOF FITTINGS FOR ALL EXTERIOR CONDUIT.
·GROUNDING CONDUCTOR (DC SIDE OF INVERTER) IS #10 IF IN CONDUIT, OR #6 awg IF EXPOSED AND
SUBJECT TO DAMAGE (NEC 690.46).
CANADIAN SOLAR
CS3N-395MS (395W)
11.44A
44.3V
10.68A
37.0V
395W
ENPHASE
IQ8PLUS-72-2-US
60V
29V-45V
240V/211-264V
1.21A
290VA
97.0%
1901 N Laird St
12/06/22
SHEET:
DRAFTER
SIGNATURE
PROJECT ADDRESS:
REVISION #
DATE:
11/09/2022
DRAWING
TYPE
PENGUIN HOME SOLUTIONS CHRISTIAN DANG
1901 LAIRD ST,
(000) 000-0000
21860 VAN BUREN BLVD, BLDG 11, SUITE 101,
RIVERSIDE, CA 92518
(888) 488 8001
LICENSE#: C-10 1033658
SANTA ANA, CA 92706
PV-7
PLACARDS
WARNING
WARNING
INVERTER OUTPUT CONNECTION. DO NOT
RELOCATE THIS OVERCURRENT DEVICE.
NEC SECTION LOCATION OF LABEL LABEL TEXT AND APPERANCE NEC SECTION LOCATION OF LABEL LABEL TEXT AND APPERANCE
690.54 ALL INTERACTIVE SYSTEM(S) POINTS OF INTERCONNECTION
WITH OTHER SOURCES SHALL BE MARKED AT AN ACCESSIBLE
LOCATION AT THE DISCONNECTING MEANS AS A POWER
SOURCE AND WITH THE RATED AC OUTPUT CURRENT AND THE
NOMINAL OPERATING AC VOLTAGE.
690.56(B)
690.4(D)
705.10
A PERMANENT PLAQUE OR DIRECTORY SHALL BE INSTALLED
AT EACH SERVICE EQUIPMENT LOCATION, OR AT AN
APPROVED READILY VISIBLE LOCATION. THE PLAQUE OR
DIRECTORY SHALL DENOTE THE LOCATION OF EACH POWER
SOURCE DISCONNECTING MEANS FOR THE BUILDING OR
STRUCTURE AND BE GROUPED WITH OTHER PLAQUES OR
DIRECTORIES FOR OTHER ON-SITE SOURCES. THE PLAQUE OR
DIRECTORY SHALL BE MARKED WITH THE WORDING
“C UTION: MULTIPLE SOURCES OF POWER͘” NY
POSTED DIAGRAMS SHALL BE CORRECTLY ORIENTED WITH
RESPECT TO THE DIAGRAM'S LOCATION. THE MARKING SHALL
COMPLY WITH 110.21(B).
690.13(B)
690.15
705.20
EACH PV SYSTEM DISCONNECTING MEANS SHALL PLAINLY
INDICATE WHETHER IN THE OPEN (OFF) OR CLOSED (ON)
POSITION AND BE PERMANENTLY MARKED:
“PV SYSTEM DISCONNECT”
OR EQUIVALENT.
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SHUTDOWN PV SYSTEM
AND REDUCE SHOCK
HAZARD IN ARRAY
SOLAR ELECTRIC
PV PANELS
WHERE ALL TERMINALS OF THE DISCONNECTING MEANS
MAY BE ENERGIZED IN THE OPEN POSITION, A WARNING
SIGN SHALL BE MOUNTED ON OR ADJACENT TO THE
DISCONNECTING MEANS.
690.13(B)
690.15(C)
705.12
(B)(3)(2)
705.12
(B)(3)(3)
690.56 (C)
A PERMANENT WARNING LABEL SHALL BE APPLIED TO THE
DISTRIBUTION EQUIPMENT ADJACENT TO THE BACK-FED
BREAKER FROM THE INVERTER.
PHOTOVOLTAIC SYSTEM AC DISCONNECT
PERMANENT WARNING LABELS SHALL BE APPLIED TO
DISTRIBUTION EQUIPMENT
(2) A RAPID SHUTDOWN SWITCH SHALL HAVE A LABEL
LOCATED ON OR NO MORE THAN 3 FT FROM THE SWITCH
THAT INCLUDES THIS WORDING. THE LABEL SHALL BE
REFLECTIVE, WITH ALL LETTERS CAPITALIZED AND HAVING A
MINIMUM HEIGHT OF 3/8 IN., IN WHITE ON RED
BACKGROUND .
BUILDINGS WITH PV SYSTEMS SHALL HAVE A PERMANENT
LABEL LOCATED AT EACH SERVICE EQUIPMENT LOCATION
TO WHICH THE PV SYSTEMS ARE CONNECTED OR AT AN
APPROVED READILY VISIBLE LOCATION AND SHALL
INDICATE THE LOCATION OF RAPID SHUTDOWN INITIATION
DEVICES. THE LABEL SHALL INCLUDE A SIMPLE DIAGRAM OF
A BUILDING WITH A ROOF AND SHALL INCLUDE THE
FOLLOWING WORDS:
THE TITLE “SOLAR PV SYSTEM IS EQUIPPED WITH
RAPID SHUTDOWN” SHALL UTILIZE CAPITALIZED
CHARACTERS WITH A MINIMUM HEIGHT OF 3/8 IN. IN
BLACK ON YELLOW BACKGROUND, AND THE REMAINING
CHARACTERS SHALL BE CAPITALIZED WITH A MINIMUM
HEIGHT OF 3/16 IN. IN BLACK ON WHITE BACKGROUND.
MAXIMUM AC OPERATING CURRENT:
NOMINAL OPERATING AC VOLTAGE:
35 AMPS
240 VOLTS
RAPI' SHUT'OWN SWIT&H
)OR SOLAR P 9 S<STEM
WARNING
THIS EQUIPMENT FED BY MULTIPLE SOURCES.
TOTAL RATING OF ALL OVERCURRENT DEVICES
EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE
SHALL NOT EXCEED AMPACITY OF BUSBAR.
ELECTRICAL SHOCK HAZARD
TERMINALS ON BOTH LINE AND LOAD SIDES
MAY BE ENERGIZED IN THE OPEN POSITION
MAIN PHOTOVOLTAIC
SYSTEM DISCONNECT
(1) BUILDING WITH MORE THAN ONE RAPID SHUTDOWN TYPE. FOR BUILDINGS THAT HAVE PV SYSTEMS WITH
BOTH RAPID SHUTDOWN TYPES OR A PV SYSTEM WITH A RAPID SHUTDOWN TYPE AND PV SYSTEM WITH NO
RAPID SHUTDOWN, A DETAILED PLAN VIEW DIAGRAM OF THE ROOF SHALL BE PROVIDED SHOWING EACH
DIFFERENT PV SYSTEM AND DOTTED LINE AROUND AREAS THAT REMAIN ENERGIZED AFTER THE RAPID
SHUTDOWN SWITCH IS OPERATED.
PHOTOVOLTAIC
AC DISCONNECT
CAUTION:
MULTIPLE SOURCES OF POWER
WITH DISCONNECTS LOCATED AS SHOWN
NE& LA%ELING RE4UIREMENTS
IQ8PLUS 72-2-US
(240V) [SI1-JUN20]
ENPHASE
INVERTERSN LA
I
R
D
S
T
R
E
E
T
MAIN SERVICE PANEL
"YOU ARE HERE"
(E) SUBPANEL
MSPSUB
JB
AC CB
PV AC DISCONNECT SWITCH
PV IQ COMBINER BOX
1901 N Laird St
12/06/22
CS3N-380|385|390|395|400MS
380 W ~ 400 W
Canadian Solar (USA) Inc. is committed to providing high quality
solar products, solar system solutions and services to customers
around the world. Canadian Solar was recognized as the No.
1 module supplier for quality and performance/price ratio in
the IHS Module Customer Insight Survey, and is a leading PV
project developer and manufacturer of solar modules, with
over 52 GW deployed around the world since 2001.
MORE RELIABLE
Comprehensive LID / LeTID mitigation
technology, up to 50% lower degradation
Module power up to 400 W
Module efficiency up to 19.7%425 W
Better shading tolerance
Minimizes micro-crack impacts
* For detailed information, please refer to the Installation Manual.
MORE POWER
Lower LCOE & BOS cost
HiKu Mono PERC (All-Black)
Heavy snow load up to 5400 Pa,
enhanced wind load up to 2400 Pa*
3000 Oak Road, Suite 400, Walnut Creek, CA 94597, USA, www.csisolar.com/na, service.ca@csisolar.com
12
Years
Years
products you order or use. Please contact your local Canadian Solar sales representative
in which the products will be used.
PRODUCT CERTIFICATES*
MANAGEMENT SYSTEM CERTIFICATES*
*According to the applicable Canadian Solar Limited Warranty Statement.
Enhanced Product Warranty on Materials
and Workmanship*
Linear Power Performance Warranty*
1 st year power degradation no more than 2%
Subsequent annual power degradation no more than 0.55%
Canadian Solar (USA) Inc.
IEC 61215 / IEC 61730 / CE
FSEC (US Florida)
UL 61730 / IEC 61701 / IEC 62716
d P d W M i l
May 2021 | All rights reserved | Module Product Datasheet v2.7_F30_J1_NACanadian Solar (USA) Inc.
PARTNER SECTION
ENGINEERING DRAWING (mm)CS3N-400MS / I-V CURVES
products due to the on-going innovation and product enhancement. CSI Solar Co., Ltd. reserves the
right to make necessary adjustment to the information described herein at any time without further
notice.
professional skills and please carefully read the safety and installation instructions before using our PV
modules.
MECHANICAL DATA
Data
Cell Type Mono-crystalline
Cell Arrangement 132 [2 X (11 X 6) ]
Dimensions
Weight
Front Cover 3.2 mm tempered glass
Frame Anodized aluminium alloy
Cable 4 mm2 (IEC), 12 AWG (UL)
Cable Length
(Including Connector)
Connector T4 series or MC4
Per Pallet 30 pieces
720 pieces
* For detailed information, please contact your local Canadian Solar sales and
technical representatives.
TEMPERATURE CHARACTERISTICS
Data
-0.35 % / °C
-0.27 % / °C
0.05 % / °C
Nominal Module Operating Temperature 42 ± 3°C
V
A
12
11
10
7
6
5
4
3
2
1
0 V
A
1000 W/m2
2
600 W/m2
400 W/m2
200 W/m2
5°C
25°C
45°C
65°C
12
11
10
7
6
5
4
3
2
1
0
065 50 55 40 45 30 35 20 25 10 15 065 50 55 40 45 30 35 20 25 10 15
Rear View
Mounting Hole
1
1
5
5
1
3
0
0
1000
6- 5
-XU[TJOTM
.URK
3U[TZOTM
.URK
A A
B
B
1
4
Frame Cross Section
A - A B - B
25
35
35
35
ELECTRICAL DATA | STC*
CS3N 380MS 385MS 390MS 395MS 400MS
380 W 385 W 390 W 395 W 400 W
Opt. Operating Voltage (Vmp) 36.4 V 36.6 V 36.8 V 37.0 V 37.2 V
Opt. Operating Current (Imp) 10.44 A 10.52 A 10.60 A 10.68 A 10.76 A
Open Circuit Voltage (Voc) 43.7 V 43.9 V 44.1 V 44.3 V 44.5 V
Short Circuit Current (Isc) 11.26 A 11.32 A 11.38 A 11.44 A 11.50 A
19.2% 19.4% 19.7%18.7% 18.9%
Operating Temperature
1000V (IEC/UL)
Module Fire Performance TYPE 1 (UL 61730 1500V) or TYPE 2 (UL 61730
1000V) or CLASS C (IEC 61730)
20 A
Class A
Power Tolerance
* Under Standard Test Conditions (STC) of irradiance of 1000 W/m2, spectrum AM 1.5 and cell
temperature of 25°C.
ELECTRICAL DATA | NMOT*
CS3N 380MS 385MS 390MS 395MS 400MS
283 W
33.9 V
8.36 A
41.1 V
9.08 A
287 W
34.1 V
8.42 A
41.3 V
9.13 A
291 W
34.3 V
8.49 A
41.5 V
9.18 A
295 W
34.5 V
8.56 A
41.7 V
9.23 A
298 W
34.7 V
8.6 A
41.9 V
9.28 A
Opt. Operating Voltage (Vmp)
Opt. Operating Current (Imp)
Open Circuit Voltage (Voc)
Short Circuit Current (Isc)
2, spectrum AM 1.5,
ambient temperature 20°C, wind speed 1 m/s.
1901 N Laird St
12/06/22
1901 N Laird St
12/06/22
X-IQ-AM1-240-4
CELLMODEM-M1-06-SP-05)
X-IQ-AM1-240-4C
MODEL NUMBER
ACCESSORIES AND REPLACEMENT PARTS (not included, order separately)
ELECTRICAL SPECIFICATIONS
MECHANICAL DATA
INTERNET CONNECTION OPTIONS
COMPLIANCE
1901 N Laird St
12/06/22
SOLARMOUNT is the professionals’ choice for residential PV mounting applications. Every aspect of the
system is designed for an easier, faster installation experience. SOLARMOUNT is a complete solution with
revolutionary universal clamps, FLASHKIT PRO, full system UL 2703 certification and 25-year warranty. Not
only is SOLARMOUNT easy to install, but best-in-class aesthetics make it the most attractive on any block!
THE PROFESSIONALS’ CHOICE FOR RESIDENTIAL RACKING
BEST INSTALLATION EXPERIENCE • CURB APPEAL • COMPLETE SOLUTION • UNIRAC SUPPORT
NOW FEATURING FLASHKIT PRO
The Complete Roof Attachment Solution
NOW WITH UNIVERSAL MIDCLAMPS
Accommodates 30mm-51mm module frames
One tool, one-person installs are here!
REVOLUTIONARY NEW ENDCLAMPS
Concealed design and included End Caps
SOLARMOUNT
CONCEALED
UNIVERSAL
CLAMPS
OPTIONAL
FRONT TRIM
New & Improved:
THE PROFESSIONALS’ CHOICE
With Superior Aesthetics
FEATURING TECHNOLOGY
25
YEAR
FULL-SYSTEM
WARRANTY
UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORT
ENGINEERING
EXCELLENCE
UNMATCHED
EXPERIENCE
PERMIT
DOCUMENTATION
DESIGN
TOOLS
CERTIFIED
QUALITY
BANKABLE
WARRANTY
BETTER DESIGNS
TRUST THE INDUSTRY’S BEST DESIGN TOOL
Start the design process for every project in our U-Builder on-line design tool.
It’s a great way to save time and money.
BETTER SYSTEMS
ONE SYSTEM - MANY APPLICATIONS
Quickly set modules flush to the roof on steep pitched roofs. Orient a large variety
of modules in Portrait or Landscape. Tilt the system up on flat or low slow roofs.
Components available in mill, clear, and dark finishes to optimize your design financials
and aesthetics.
BETTER RESULTS
MAXIMIZE PROFITABILITY ON EVERY JOB
Trust Unirac to help you minimize both system and labor costs from the time the job is
quoted to the time your teams get off the roof. Faster installs. Less Waste. More Profits.
BETTER SUPPORT
WORK WITH THE INDUSTRIES MOST EXPERIENCED TEAM
Professional support for professional installers and designers. You have access to
our technical support and training groups. Whatever your support needs, we’ve got
you covered. Visit Unirac.com/solarmount for more information.
UNIVERSAL SELF
STANDING MIDCLAMPS
U-BUILDER ONLINE DESIGN
TOOL SAVES TIME & MONEY
Visit design.unirac.com
BANKABLE WARRANTY
Dont leave your project to chance, Unirac has the financial
strength to back our products and reduce your risk. Have
peace of mind knowing you are providing products of
exceptional quality. SOLARMOUNT is covered by a 25 year
limited product warranty and a 5 year limited finish warranty.
TECHNICAL SUPPORT
Unirac’s technical support team is dedicated to answering
questions & addressing issues in real time. An online
library of documents including engineering reports,
stamped letters and technical data sheets greatly
simplifies your permitting and project planning process.
CERTIFIED QUALITY PROVIDER
Unirac is the only PV mounting vendor with ISO certifications
for 9001:2008, 14001:2004 and OHSAS 18001:2007,
which means we deliver the highest standards for fit,
form, and function. These certifications demonstrate our
excellence and commitment to first class business practices.
UL2703BONDING & GROUNDING
MECHANICAL LOADING
SYSTEM FIRE CLASSIFICATIONL
I
S
T
E
D
SOLARMOUNT
CONCEALED UNIVERSAL
ENDCLAMPS
END CAPS INCLUDED
WITH EVERY ENDCLAMP
ENHANCE YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAIN
PUB2016MAY16 - PRINTED UPDATE
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-213
www. Loyd W Martin .com
Solar Structures Engineering
#2022-4673 Structural Only
November 10, 2022
1901 N Laird St
12/06/22
Expedited Permit Process for PV Systems - Micro-Inverter1
Expedited Permit Process for PV Systems
Micro-Inverter
The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due to their similarity with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of the
installation.
The following pages contain forms for the Micro-Inverter to use with the Expedited Per-
mit Process. The Standard String, AC Module, and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic-
tions that have adopted the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submitted in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
1901 N Laird St
12/06/22
Expedited Permit Process for PV Systems — Micro-Inverter2
Expedited Permit Process for Small-Scale PV Systems
Micro-Inverter
The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations
are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been
suggested to provide as a path to permit approval.
Required Information for Permit:
1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it
should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings
with a 3’ perimeter space at ridge and sides may not need separate fire service review.
2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specification sheets and installation manuals (if available) for all manufactured components including, but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1: Structural Review of PV Array Mounting System
Is the array to be mounted on a defined, permitted roof structure? l Yes l No
If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1.
Roof Information:
1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________
____________________________________________________________________________________________________
If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…).
2. Does the roof have a single roof covering? l Yes l No
If No, submit completed worksheet for roof structure WKS1.
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________
Mounting System Information:
1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap
beneath the module frames? l Yes l No
If No, provide details of structural attachment certified by a design professional.
2. For manufactured mounting systems, fill out information on the mounting system below:
a. Mounting System Manufacturer ___________Product Name and Model#________________________________
b. Total Weight of PV Modules and Rails ___________lbs
c. Total Number of Attachment Points____________
d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1)
e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for
maximum spacing allowed based on maximum design wind speed)
f. Total Surface Area of PV Modules (square feet)_________________ ft 2
g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2
If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1.
Step 2: Electrical Review of PV System (Calculations for Electrical Diagram)
In order for a PV system to be considered for an expedited permit process, the following must apply:
1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,440 Watts or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)).
5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV
system. Interactive PDF diagrams are available at www.solarabcs.org/permitting.
Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant
understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively
communicate, provide an alternative diagram with appropriate detail.
1901 N Laird St
12/06/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
3
Micro-Inverter Site Plan
Edwin Diaz
Dang Christian
21860 Van Buren Blvd
Riverside CA 1901 Laird St
92518 8487.52
1901 N Laird St
12/06/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
Micro-Inverter Electrical Diagram
Contractor Name,
Address and Phone:
One-Line Standard Electrical Diagram
for Micro-Inverter PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
E1.1a
SCALE NTS Date: SHEET
Drawn By:
Checked By:
DESCRIPTION OR CONDUCTOR TYPE
USE-2 or PV WIRE
GEC EGC X ALL THAT APPLY
EXTERIOR CABLE LISTED W/ INV.
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
NO DC GEC IF 690.35 SYSTEM
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
TAG
1
2
3
4
5
CONDUIT AND CONDUCTOR SCHEDULE
COND.
GAUGE
MFG
MFG
NUMBER OF
CONDUCTORS
MFG Cable
MFG Cable
CONDUIT
TYPE
N/A
N/A
N/A
SAME
SAME
CONDUIT
SIZE
N/A
N/A
N/A
SAME
SAME
DESCRIPTION
PV DC or AC MODULE
DC/AC INVERTER (MICRO)
J-BOX (IF USED)
PV ARRAY
AC COMB. PANEL (IF USED)
GEN METER (IF USED)
AC DISCONNECT (IF USED)
SERVICE PANEL
TAG
1
2
3
4
5
6
7
8
PART NUMBER NOTES
FOR UNUSED MODULES
PUT "N/A in BLANK ABOVE
1
1
3
2
3
EQUIPMENT SCHEDULE
2
_____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
J-BOX
4
AC DISCO
M
BUILDING
GROUNDING
ELECTRODE
G
M
UTILITY
SERVICE
MAIN SERVICE PANEL
MAIN
OCPD
INVERTER
OCPD
6
7
8
5
4
5
G
SEE GUIDE APPENDIX D FOR
INFORMATION ON MODULE AND
ARRAY GROUNDING
AC COMBINER
PANEL
G
____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
Edwin Diaz
21860 Van Buren Blvd
Riverside CA
Dang Christian
8487.52
1901 Laird St
92518
1901 N Laird St
12/06/22
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
5
Contractor Name,
Address and Phone:
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
E1.2a
SCALE NTS Date: SHEET
Drawn By:
Checked By:
MAX POWER-POINT CURRENT (IMP)
MAX POWER-POINT VOLTAGE (VMP)
OPEN-CIRCUIT VOLTAGE (VOC)
SHORT-CIRCUIT CURRENT (ISC)
MAX SERIES FUSE (OCPD)
MAXIMUM POWER (PMAX)
MAX VOLTAGE (TYP 600VDC)
VOC TEMP COEFF (mV/oC or %/oC )
IF COEFF SUPPLIED, CIRCLE UNITS
MODULE MAKE
MODULE MODEL
PV MODULE RATINGS @ STC (Guide Section 5)
MAX DC VOLT RATING
MAX POWER @ 40oC
NOMINAL AC VOLTAGE
MAX AC CURRENT
MAX OCPD RATING
INVERTER MAKE
INVERTER MODEL
INVERTER RATINGS (Guide Section 4)
1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YES NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
REQUIREMENT? YES NO N/A
3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX
CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING. (See Guide Section 9)
5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO-
INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR
EXCEPTION IN 690.64(B)(2)(a)? YES NO
NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9):
1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC
2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC
2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED
47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT
LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47oC OR LESS (ALL OF UNITED STATES),
a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER
FUSE.
b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER
FUSE.
NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E):
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODE®REFERENCES
SHOWN AS (NEC XXX.XX)
NOTES FOR ALL DRAWINGS:
SIGNSSEE GUIDE SECTION 7
SIGN FOR DC DISCONNECT
SIGN FOR INVERTER OCPD AND AC
DISCONNECT (IF USED)
No sign necessary since 690.51
marking on PV module covers
needed information
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
SOLAR PV SYSTEM
AC POINT OF CONNECTION
THIS PANEL FED BY MULTIPLE
SOURCES (UTILITY AND SOLAR)
Notes for Micro-Inverter Electrical Diagram
Edwin Diaz
21860 Van Buren Blvd
Riverside CA
92518
Dang Christian
1901 Laird St
8487.52
1901 N Laird St
12/06/22
PENGUIN HOME SOLUTIONS
11/14/2022
I _____________ hereby authorize Penguin Home Solutions to apply for a solar
permit and install solar panels on my property located at 1901 Laird St, Santa Ana
CA 92706.
Thank you,
____________Christian Dang (Nov 14, 2022 14:09 PST)
Christian Dang
Christian Dang
1901 N Laird St
12/06/22
Authorization letter - Christian Dang
Final Audit Report 2022-11-14
Created:2022-11-14
By:Permit Team (permit@penguin1.com)
Status:Signed
Transaction ID:CBJCHBCAABAArDiRb3mjLfplrXhH84D6_DiJ09eXS3jO
"Authorization letter - Christian Dang" History
Document created by Permit Team (permit@penguin1.com)
2022-11-14 - 9:25:25 PM GMT- IP address: 47.180.151.141
Document emailed to christiandang77@gmail.com for signature
2022-11-14 - 9:25:48 PM GMT
Email viewed by christiandang77@gmail.com
2022-11-14 - 10:09:15 PM GMT- IP address: 172.90.92.150
Signer christiandang77@gmail.com entered name at signing as Christian Dang
2022-11-14 - 10:09:41 PM GMT- IP address: 172.90.92.150
Document e-signed by Christian Dang (christiandang77@gmail.com)
Signature Date: 2022-11-14 - 10:09:43 PM GMT - Time Source: server- IP address: 172.90.92.150
Agreement completed.
2022-11-14 - 10:09:43 PM GMT
1901 N Laird St
12/06/22
1901 N Laird St
12/06/22
Structural Calculations for a Roof Mounted Solar Photovoltaic System for:
Christian Dang Residence
1901 Laird St.,
Santa Ana, CA 92706
Applicable Codes:
2019 California Building Code, 2019 California Electric Code,
2019 California Mechanical Code, American Society of Civil Engineers
Standard ASCE 7-16 Minimum Design Loads for Buildings and Other
Structures, American Wood Council 2018 National Design Specification
for Wood Construction, Local Municipal Code, and all other codes which
are adopted by reference or enacted by law.
Assumed Design Parameters:
The existing structure has been built under a building permit and is in its
original condition. The existing roof structure is capable of its code
required live load and the ability of the roof structure to support live loads
has not been substantially reduced by the age of the structure, termites or
mold, or unauthorized modifications to the existing structure. Solar Energy
Contractor shall make an inspection of the existing roof framing system
prior to installation of the roof mounted solar energy system to verify that
the existing roof is capable of supporting minimum roof live loads.
Assumed Design Parameters:
All 2x members are grade Douglas Fir #2 or better
All 4X members are grade Douglas Fir #1 or better
All Roof Connectors are Simpson Strong-Tie or Equal
All Concrete Foundations are f'c = 2500 psi or stronger
Original Structure was built to the Type-V Wood Framed Standards
of the Applicable Building Code at the time of Construction.
Sht # 1 of 7
2021-204 Cesar Lopez - Vladimirov Residence Date: January 19, 2020
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2022- 4673 Penguin Solar Christian Dang Residence Date: November 9, 2022
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-213
1901 N Laird St
12/06/22
Sht # 2 of 7
(Assume max rafter span = 11.8 ft.)
Note to Building Official:
Based upon a review of the proposed plans and information, the
existing roof framing system is capable of safely supporting the additional
loads caused by the new solar photovoltaic energy system. The contractor
shall field verify that the existing roof structure is in its original permited
condition and verify that it can support the normal code required roof live
loads. Attached in this package are several calculations showing that the roof
members can support the additional weight of the solar array.
Furthermore, an analysis of the solar array's support for wind forces and a
seismic analysis of the existing structure are also included.
W DL + LL
R1 R211.8'
Total load on rafter = 60 plf x 11.8 ft. = 708 lbs
w = 30 psf x 2 ft. = 60 plf
Check Existing 2x6 Roof Rafters @ 24" O.C.: *
*Note: Contractor to Field Verify Framing
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20- 119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 2020 2020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 2020 2020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 2020 2020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 2020 2020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 20202020-3083 HPM Solar Lisa Morales Residence Date: November 8, 2020 2020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 20202020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3459 ilum Solar Scott Wirth Residence Date: November 30, 2020 2020-3469 Solar Journey Crystal Hastings Residence Date: December 1, 20202020-3499 Asgard Energy Sandeep Zaveri Residence Date: December 2, 20202020-3503 Cesar Lopez - Alvarez Residence Date: December 2, 20202021-204 Cesar Lopez - Vladimirov Residence Date: January 19, 20202021-5238 Grid Alt IE Roberto Garcia Residence Date: November 30, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-213
2021-5438 Grid Alt IE Charles Rangel Residence Date: December 10, 20212021-5492 Ilum Solar Jessica Hurtarte Residence Date: December 14, 20212021-5494 Green Conception Hanseung Lee Residence Date: December 14, 20212022-708 Better Earth John Bradshaw Residence Date: February 22, 20222022-712 Better Earth Michael Wallace Residence Date: February 22, 20222022-741 Havok Management Dianne Lewis Residence Date: February 23, 20222022-741 Havok Management Dianne Lewis Residence Date: February 23, 20222022-746 Havok Management Rudy Sanchez Residence Date: February 23, 2022 2022-1002 Desert Solar Ifthika Nissar Residence Date: March 8, 20222022-1027 Better Earth Rafael Mendoza Alvarez Residence Date: March 9, 20222022-1378 Better Earth Lee Anderson Residence Date: March 25, 20222022-1453 Ilum Solar Weiguang Lai Residence Date: March 29, 20222022-1907 Jarco Solar Luehmann Residence Date: May 2, 20222022-1910 Jarco Solar Colas Residence Date: May 2, 20222022-1959 ESD 22-344 Aragaon Residence Date: May 4, 20222022-1959 ESD 22-344 Aragon Residence Date: May 4, 20222022-1979 Havok Management Shawn Robinson Residence Date: May 5, 2022 2022-2021 Effect Energy Justin Stone Residence Date: May 9, 20222022-2024 ilum Solar Randy Holdren Residence Date: May 10, 20222022-3734 Solar Draft PV 17 Senisa Way Residence Date: September 14, 20222022-3817 ESD 22-811 Jen Tran Residence Date: September 21, 20222022-4100 Solar Plan Design Ruben Reyes Residence Date: October 7, 20222022-4595 Solar Outsource Perry Greenlee Residence Date: November 6, 20222022-4600 Solar Plan Design Hung Tran Residence Date: November 6, 20222022-4638 ESD 22-859 Sam Infantino Residence Date: November 8, 20222022-4641 Penguin Solar William Nelson Residence Date: November 8, 20222022-4642 Penguin Solar Kim Morrison Residence Date: November 8, 20222022-4672 Penguin Solar Alexander San Gabriel Residence Date: November 9, 20222022- 4673 Penguin Solar Christian Dang Residence Date: November 9, 2022
1901 N Laird St
12/06/22
Check Existing 2x6 Roof Rafters @ 24" O.C.:
Sht # 3 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020
Check attachment of Support to Existing Structure for Wind Uplift
CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7- 16 WIND LOADS ON BUILDING
APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK
ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2.
NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7- 16 EFFECTIVE WIND AREA:
"FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS
EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING
CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT
BE LESS THAN ONE-THIRD ITS LENGTH."
EFFECTIVE AREA = 15 SQ FT
2020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20- 119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 2020 2020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 2020 2020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 2020 2020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 2020 2020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 2020 2020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 20202020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3459 ilum Solar Scott Wirth Residence Date: November 30, 2020 2020-3469 Solar Journey Crystal Hastings Residence Date: December 1, 20202020-3499 Asgard Energy Sandeep Zaveri Residence Date: December 2, 20202020-3503 Cesar Lopez - Alvarez Residence Date: December 2, 20202020-3503 Cesar Lopez - Alvarez Residence Date: December 2, 2020 2021-204 Cesar Lopez - Vladimirov Residence Date: January 19, 20202021-5238 Grid Alt IE Roberto Garcia Residence Date: November 30, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-213
2021-5438 Grid Alt IE Charles Rangel Residence Date: December 10, 20212021-5492 Ilum Solar Jessica Hurtarte Residence Date: December 14, 20212021-5494 Green Conception Hanseung Lee Residence Date: December 14, 20212022-708 Better Earth John Bradshaw Residence Date: February 22, 20222022-712 Better Earth Michael Wallace Residence Date: February 22, 20222022-741 Havok Management Dianne Lewis Residence Date: February 23, 20222022-741 Havok Management Dianne Lewis Residence Date: February 23, 20222022-746 Havok Management Rudy Sanchez Residence Date: February 23, 2022 2022-1002 Desert Solar Ifthika Nissar Residence Date: March 8, 20222022-1027 Better Earth Rafael Mendoza Alvarez Residence Date: March 9, 20222022-1378 Better Earth Lee Anderson Residence Date: March 25, 20222022-1453 Ilum Solar Weiguang Lai Residence Date: March 29, 20222022-1907 Jarco Solar Luehmann Residence Date: May 2, 20222022-1910 Jarco Solar Colas Residence Date: May 2, 20222022-1959 ESD 22-344 Aragaon Residence Date: May 4, 20222022-1959 ESD 22-344 Aragon Residence Date: May 4, 20222022-1979 Havok Management Shawn Robinson Residence Date: May 5, 20222022-2021 Effect Energy Justin Stone Residence Date: May 9, 20222022-2024 ilum Solar Randy Holdren Residence Date: May 10, 20222022-3734 Solar Draft PV 17 Senisa Way Residence Date: September 14, 20222022-3817 ESD 22-811 Jen Tran Residence Date: September 21, 20222022-4100 Solar Plan Design Ruben Reyes Residence Date: October 7, 20222022-4595 Solar Outsource Perry Greenlee Residence Date: November 6, 20222022-4600 Solar Plan Design Hung Tran Residence Date: November 6, 20222022-4638 ESD 22-859 Sam Infantino Residence Date: November 8, 20222022-4641 Penguin Solar William Nelson Residence Date: November 8, 20222022-4642 Penguin Solar Kim Morrison Residence Date: November 8, 20222022-4672 Penguin Solar Alexander San Gabriel Residence Date: November 9, 2022
w DL + LL = 30 psf x 2 ft. = 60 plf
Total load on rafter = 60 plf x 3 ft. + 28 plf x 8.8 ft + ( 6' x 2.75' x 3 psf x 2 ) +
( 6' x 1.65' x 3 psf x 2 )
= 585 lbs < 708 lbs OK
R1 R2
11.8'
w LLw DL
8.8'
P
3'
P P P
2022- 4673 Penguin Solar Christian Dang Residence Date: November 9, 2022
1901 N Laird St
12/06/22
Sht # 4 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20- 119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 2020 2020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 2020 2020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 2020 2020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 2020 2020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 2020 2020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 20202020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3459 ilum Solar Scott Wirth Residence Date: November 30, 2020 2020-3469 Solar Journey Crystal Hastings Residence Date: December 1, 20202020-3499 Asgard Energy Sandeep Zaveri Residence Date: December 2, 20202020-3503 Cesar Lopez - Alvarez Residence Date: December 2, 20202020-3503 Cesar Lopez - Alvarez Residence Date: December 2, 2020 2021-204 Cesar Lopez - Vladimirov Residence Date: January 19, 20202021-5238 Grid Alt IE Roberto Garcia Residence Date: November 30, 20212021-5438 Grid Alt IE Charles Rangel Residence Date: December 10, 20212021-5492 Ilum Solar Jessica Hurtarte Residence Date: December 14, 20212021-5494 Green Conception Hanseung Lee Residence Date: December 14, 2021
qh
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C):
Eq'n 29.4- 7 ASCE 7- 16
Kz = velocity pressure coefficient
p =qh ðGCp ÞðγEÞðγa Þð
=0.00256 Kz Kzt Kd Ke V2
Note:
Section 29.10.1 ASCE 7- 16
Kz = 0.9 (Exposure C, Height = 20 ft or less)
Kzt = Topographical Factor = 1.0
Kd = Wind Directionality Factor = 0.85
Ke = Ground Elevation Factor = 1.0
V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC
qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2
p =qh ðGCp ÞðγEÞðγa Þð
qh =20 psf
p = 20 psf (- 2.0) (1.5) (0.7) = 42 psf
Eq'n 26.10- 1 ASCE 7- 16
GCp = - 2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
GC p = Exposure Factor = 1.5ðγE
GCp = Solar Array Pressure Equalization Factor = 0.7 ðγa Fig. 29.4- 8 ASCE 7- 16
Design (Factored) Uplift at each support = 0.6 x 693 lbs = 416 lbs
Nominal (Unfactored) Uplift at each support = 42 psf x 16.5 sq. ft. = 693 lbs
Note: Section 2.4.1 of ASCE 7- 16, Basic Load Combinations for Allowable Stress
Load per lag screw = 416 lbs / 1 = 416 lbs
Design. Note: Applicable Load Combination #5 (D + 0.6W)
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-213
2022-708 Better Earth John Bradshaw Residence Date: February 22, 20222022-712 Better Earth Michael Wallace Residence Date: February 22, 20222022-741 Havok Management Dianne Lewis Residence Date: February 23, 20222022-741 Havok Management Dianne Lewis Residence Date: February 23, 20222022-746 Havok Management Rudy Sanchez Residence Date: February 23, 2022 2022-1002 Desert Solar Ifthika Nissar Residence Date: March 8, 20222022-1027 Better Earth Rafael Mendoza Alvarez Residence Date: March 9, 20222022-1378 Better Earth Lee Anderson Residence Date: March 25, 20222022-1453 Ilum Solar Weiguang Lai Residence Date: March 29, 20222022-1907 Jarco Solar Luehmann Residence Date: May 2, 20222022-1910 Jarco Solar Colas Residence Date: May 2, 20222022-1959 ESD 22-344 Aragaon Residence Date: May 4, 20222022-1959 ESD 22-344 Aragon Residence Date: May 4, 20222022-1979 Havok Management Shawn Robinson Residence Date: May 5, 2022 2022-2021 Effect Energy Justin Stone Residence Date: May 9, 20222022-2024 ilum Solar Randy Holdren Residence Date: May 10, 20222022-3734 Solar Draft PV 17 Senisa Way Residence Date: September 14, 20222022-3817 ESD 22-811 Jen Tran Residence Date: September 21, 20222022-4100 Solar Plan Design Ruben Reyes Residence Date: October 7, 20222022-4595 Solar Outsource Perry Greenlee Residence Date: November 6, 20222022-4600 Solar Plan Design Hung Tran Residence Date: November 6, 20222022-4638 ESD 22-859 Sam Infantino Residence Date: November 8, 20222022-4641 Penguin Solar William Nelson Residence Date: November 8, 20222022-4642 Penguin Solar Kim Morrison Residence Date: November 8, 20222022-4672 Penguin Solar Alexander San Gabriel Residence Date: November 9, 20222022- 4673 Penguin Solar Christian Dang Residence Date: November 9, 2022
1901 N Laird St
12/06/22
Sht # 5 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20- 119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 2020 2020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 2020 2020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below
according to the 2018 NDS.
W ' = W x Cd x Ct Table 10.3.1 2018 NDS
where:
W = 266 lbs / in. of embedment per Table 12.2a
Cd = 1.6 per Table 2.3.2 of 2018 NDS
Ct = 1.0 per Table 10.3.4 of 2018 NDS
W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 277 lbs OK
Use Support connected to 2x Min. Roof Member
w/ (1) 5/16" x 3.5" lag screws per connection minimum.
2020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 20202020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 2020 2020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 2020 2020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 2020 2020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 2020 2020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 20202020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3459 ilum Solar Scott Wirth Residence Date: November 30, 2020 2020-3469 Solar Journey Crystal Hastings Residence Date: December 1, 20202020-3499 Asgard Energy Sandeep Zaveri Residence Date: December 2, 20202020-3503 Cesar Lopez - Alvarez Residence Date: December 2, 20202020-3503 Cesar Lopez - Alvarez Residence Date: December 2, 2020 2021-204 Cesar Lopez - Vladimirov Residence Date: January 19, 20202021-5238 Grid Alt IE Roberto Garcia Residence Date: November 30, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-213
2021-5438 Grid Alt IE Charles Rangel Residence Date: December 10, 2021 2021-5492 Ilum Solar Jessica Hurtarte Residence Date: December 14, 20212021-5494 Green Conception Hanseung Lee Residence Date: December 14, 20212022-708 Better Earth John Bradshaw Residence Date: February 22, 20222022-741 Havok Management Dianne Lewis Residence Date: February 23, 20222022-746 Havok Management Rudy Sanchez Residence Date: February 23, 2022 2022-1002 Desert Solar Ifthika Nissar Residence Date: March 8, 20222022-1027 Better Earth Rafael Mendoza Alvarez Residence Date: March 9, 20222022-1378 Better Earth Lee Anderson Residence Date: March 25, 20222022-1453 Ilum Solar Weiguang Lai Residence Date: March 29, 20222022-1907 Jarco Solar Luehmann Residence Date: May 2, 20222022-1910 Jarco Solar Colas Residence Date: May 2, 20222022-1959 ESD 22-344 Aragaon Residence Date: May 4, 20222022-1959 ESD 22-344 Aragon Residence Date: May 4, 20222022-1979 Havok Management Shawn Robinson Residence Date: May 5, 2022 2022-2021 Effect Energy Justin Stone Residence Date: May 9, 20222022-2024 ilum Solar Randy Holdren Residence Date: May 10, 20222022-3734 Solar Draft PV 17 Senisa Way Residence Date: September 14, 20222022-3817 ESD 22-811 Jen Tran Residence Date: September 21, 20222022-4100 Solar Plan Design Ruben Reyes Residence Date: October 7, 20222022-4595 Solar Outsource Perry Greenlee Residence Date: November 6, 20222022-4600 Solar Plan Design Hung Tran Residence Date: November 6, 20222022-4638 ESD 22-859 Sam Infantino Residence Date: November 8, 20222022-4641 Penguin Solar William Nelson Residence Date: November 8, 20222022-4642 Penguin Solar Kim Morrison Residence Date: November 8, 20222022-4672 Penguin Solar Alexander San Gabriel Residence Date: November 9, 20222022- 4673 Penguin Solar Christian Dang Residence Date: November 9, 2022
1901 N Laird St
12/06/22
Check Seismic load due to added dead load of photovoltaic system.
Determine Seismic Weight of Existing Building:
Effective Existing Seismic Weight
Area of (E) Building = Approximately 1,900 Sq. ft.
Approximate
Effective
Seismic Weight
= 1,900 sq. ft. x 30 psf ave. = 57,000 LBS
DETERMINE BASE SHEAR
V = Cs W
Cs =
SDS
R
Ie
R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1
R = 6.5 WOOD SHEAR WALLS
Ie = 1.0 IMPORTANCE FACTOR
SDS =
2/3 x SMS
SMS =
FA x SS
SMS =
1.2 x 1.5 = 1.8
SDS =2/3 x 1.8 = 1.2
Cs =
1.2
6.5
1
= 0.185
Sht # 6 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019
EQ'N 12.8- 1 ASCE 7- 16
EQ'N 12.8- 2 ASCE 7- 16
EQ'N 11.4- 3 ASCE 7- 16
EQ'N 11.4- 1 ASCE 7- 16
EQ'N 12.8- 2 ASCE 7- 16
2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20- 119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 2020 2020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 2020 2020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 2020 2020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 2020 2020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 2020 2020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 20202020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3459 ilum Solar Scott Wirth Residence Date: November 30, 2020 2020-3469 Solar Journey Crystal Hastings Residence Date: December 1, 20202020-3499 Asgard Energy Sandeep Zaveri Residence Date: December 2, 20202020-3503 Cesar Lopez - Alvarez Residence Date: December 2, 20202020-3503 Cesar Lopez - Alvarez Residence Date: December 2, 2020 2021-204 Cesar Lopez - Vladimirov Residence Date: January 19, 20202021-5238 Grid Alt IE Roberto Garcia Residence Date: November 30, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFE SSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-213
2021-5438 Grid Alt IE Charles Rangel Residence Date: December 10, 20212021-5492 Ilum Solar Jessica Hurtarte Residence Date: December 14, 20212021-5494 Green Conception Hanseung Lee Residence Date: December 14, 20212022-708 Better Earth John Bradshaw Residence Date: February 22, 20222022-712 Better Earth Michael Wallace Residence Date: February 22, 20222022-741 Havok Management Dianne Lewis Residence Date: February 23, 20222022-741 Havok Management Dianne Lewis Residence Date: February 23, 20222022-746 Havok Management Rudy Sanchez Residence Date: February 23, 2022 2022-1002 Desert Solar Ifthika Nissar Residence Date: March 8, 20222022-1027 Better Earth Rafael Mendoza Alvarez Residence Date: March 9, 20222022-1378 Better Earth Lee Anderson Residence Date: March 25, 20222022-1453 Ilum Solar Weiguang Lai Residence Date: March 29, 20222022-1907 Jarco Solar Luehmann Residence Date: May 2, 20222022-1910 Jarco Solar Colas Residence Date: May 2, 20222022-1959 ESD 22-344 Aragaon Residence Date: May 4, 20222022-1959 ESD 22-344 Aragon Residence Date: May 4, 20222022-1979 Havok Management Shawn Robinson Residence Date: May 5, 2022 2022-2021 Effect Energy Justin Stone Residence Date: May 9, 20222022-2024 ilum Solar Randy Holdren Residence Date: May 10, 20222022-3734 Solar Draft PV 17 Senisa Way Residence Date: September 14, 20222022-3817 ESD 22-811 Jen Tran Residence Date: September 21, 20222022-4100 Solar Plan Design Ruben Reyes Residence Date: October 7, 20222022-4595 Solar Outsource Perry Greenlee Residence Date: November 6, 20222022-4600 Solar Plan Design Hung Tran Residence Date: November 6, 20222022-4638 ESD 22-859 Sam Infantino Residence Date: November 8, 20222022-4641 Penguin Solar William Nelson Residence Date: November 8, 20222022-4642 Penguin Solar Kim Morrison Residence Date: November 8, 20222022-4672 Penguin Solar Alexander San Gabriel Residence Date: November 9, 20222022- 4673 Penguin Solar Christian Dang Residence Date: November 9, 2022
1901 N Laird St
12/06/22
V = 0.185 x 57,000 LBS = 10,545 LBS
DETERMINE NEW BASE SHEAR
EXISTING BASE SHEAR
Determine Seismic Weight of Building with Solar Array:
EXISTING
SEISMIC
WEIGHT
= 57,000 LBS
NEW SOLAR
ARRAY = 3 PSF x 23 PANELS x 3.3' x 5.5' = 1,252 LBS
NEW
SEISMIC
WEIGHT
= 57,000 LBS + 1,252 LBS = 58,252 LBS
THEREFORE NEW BASE SHEAR:
V = 0.185 x 58,252 = 10,777 LBS
% CHANGE =10,777 LBS - 10,545 LBS
10,545 LBS x 100 = 2.2 % < 10% OK
EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT
FROM ANALYSIS SINCE NEW SEISMIC FORCE IS
LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE.
"Alterations are permitted to be made to any structure without requiring the
existing structure to comply with this standard provided the alterations comply
with the requirements for a new structure. Alterations that increase the
seismic force in any existing structural element by more than 10 percent or
decrease the design strength of any existing structural element to resist
seismic forces by more than 10 percent shall not be permitted unless the
entire seismic force-resisting system is determined to comply with this
standard for a new structure."
End of Calculations
Sht # 7 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 2019 2019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 2019
EQ'N 12.8- 1 ASCE 7- 16
EQ'N 12.8- 1 ASCE 7- 16
OK. PER ASCE 7-16 SECTION 11.B.3 ALTERATIONS
2020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20- 119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 2020 2020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 20202020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 20202020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 2020 2020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 2020 2020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 2020 2020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2936 ESD 20-614 2892 Falcon - Walker Date: October 30, 20202020-2938 ESD 20-610 Sisto - RNR Date: October 30, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 20202020-2982 Infinity Solar Luna Residence Date: November 3, 20202020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 2020 2020-3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 20202020-3360 Axis Solar Hogan Residence Date: November 23, 2020 2020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3459 ilum Solar Scott Wirth Residence Date: November 30, 2020 2020-3469 Solar Journey Crystal Hastings Residence Date: December 1, 20202020-3499 Asgard Energy Sandeep Zaveri Residence Date: December 2, 20202020-3503 Cesar Lopez - Alvarez Residence Date: December 2, 20202020-3503 Cesar Lopez - Alvarez Residence Date: December 2, 2020 2021-204 Cesar Lopez - Vladimirov Residence Date: January 19, 20202021-5238 Grid Alt IE Roberto Garcia Residence Date: November 30, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-213
2021-5438 Grid Alt IE Charles Rangel Residence Date: December 10, 20212021-5492 Ilum Solar Jessica Hurtarte Residence Date: December 14, 20212021-5494 Green Conception Hanseung Lee Residence Date: December 14, 20212022-708 Better Earth John Bradshaw Residence Date: February 22, 20222022-712 Better Earth Michael Wallace Residence Date: February 22, 20222022-741 Havok Management Dianne Lewis Residence Date: February 23, 20222022-741 Havok Management Dianne Lewis Residence Date: February 23, 20222022-746 Havok Management Rudy Sanchez Residence Date: February 23, 2022 2022-1002 Desert Solar Ifthika Nissar Residence Date: March 8, 20222022-1027 Better Earth Rafael Mendoza Alvarez Residence Date: March 9, 20222022-1378 Better Earth Lee Anderson Residence Date: March 25, 20222022-1453 Ilum Solar Weiguang Lai Residence Date: March 29, 20222022-1907 Jarco Solar Luehmann Residence Date: May 2, 20222022-1910 Jarco Solar Colas Residence Date: May 2, 20222022-1959 ESD 22-344 Aragaon Residence Date: May 4, 20222022-1959 ESD 22-344 Aragon Residence Date: May 4, 20222022-1979 Havok Management Shawn Robinson Residence Date: May 5, 2022 2022-2021 Effect Energy Justin Stone Residence Date: May 9, 20222022-2024 ilum Solar Randy Holdren Residence Date: May 10, 20222022-3734 Solar Draft PV 17 Senisa Way Residence Date: September 14, 20222022-3817 ESD 22-811 Jen Tran Residence Date: September 21, 20222022-4100 Solar Plan Design Ruben Reyes Residence Date: October 7, 20222022-4595 Solar Outsource Perry Greenlee Residence Date: November 6, 20222022-4600 Solar Plan Design Hung Tran Residence Date: November 6, 20222022-4638 ESD 22-859 Sam Infantino Residence Date: November 8, 20222022-4641 Penguin Solar William Nelson Residence Date: November 8, 20222022-4642 Penguin Solar Kim Morrison Residence Date: November 8, 20222022-4672 Penguin Solar Alexander San Gabriel Residence Date: November 9, 20222022- 4673 Penguin Solar Christian Dang Residence Date: November 9, 2022
1901 N Laird St
12/06/22