Loading...
HomeMy WebLinkAbout1917 W Bay Crest St - PlanGOVERNING CODES EXISTING IRONRIDGE SITE MAP & PV LAYOUT ELECTRICAL 1-LINE DIAGRAM ATTACHMENT LAYOUT SYSTEM LABELING DETAIL RSD DATA SHEET INVERTER DATA SHEET SHEET INDEX PROPERTY PLAN MODULE DATA SHEET RACKING DATA SHEET ATTACHMENT DATA SHEET PV 1.0 PV 2.0 PV 3.0 PV 4.0 PV 5.0 D 6.0 D 7.0 D 8.0 D 9.0 D 10.0 SYSTEM RATING EQUIPMENT SUMMARY ELECTRICAL INFORMATION MAIN SERVICE PANEL BUS SIZE: MAIN SERVICE BREAKER SIZE: MOUNTING SYSTEM: BUILDING INFORMATION ONE STORY HOUSE CONSTRUCTION TYPE: V-B OCCUPANCY: R-3 ROOF: WIND SPEED:110 mph Truss 2 x 4 @ 24" O.C. FLAT TILE VICINITY MAP (SCALE: NTS) SATELLITE VIEW (SCALE: NTS) GENERAL NOTES 1. All electrical materials shall be new and listed by recognized electrical testing laboratory Custom made equipment shall have complete test data submitted by the manufacturer attesting to its safety 2. Outdoor equipment shall be NEMA 3R rated or equivalent 3. All metallic equipment shall be grounded 4. Contractor shall obtain electrical permits prior to installation and shall coordinate all inspections, testing commissioning and acceptance with the client, utility co. and city inspectors as needed. 5. The electrical contractor shall verify the exact locations of service points and service sizes with the serving utility company and comply with all utility companies requirements. 6. Drawings are diagrammatic only, routing of raceways shall be option of the contractor unless otherwise noted and shall be coordinated with other trades. 7. If the roof material or the roof structure not adequate for PV installation, call the engineer of record prior to installation. The contractor is responsible to verify that the roof is capable of withstanding the extra weight. 8. If the distances for cable runs are different than shown, the contractor shall notify the electrical engineer to validate the wire size. Final drawings will be red-lined and updated as appropriate. 9. Whenever a discrepancy in quality of equipment arises on the drawing or specifications, the contractor shall be responsible for providing and installing all materials and services required by the strictest conditions noted on the drawings or in the specifications to ensure complete compliance and longevity of the operable system required by the engineer of record. PHOTOVOLTAIC NOTES: 1. Rooftop mounted photovoltaic panels and modules shall be tested, listed and identified by recognized testing laboratory 2. Solar system shall not cover any plumbing or mechanical vents 3. Modules and support structures shall be grounded unless racking has integrated ground. 4. Removal of an interactive inverter or other equipment shall not disconnect the bonding connection between the grounding electrode conductor and the photovoltaic source and/or output circuit grounded conductors. 5. All PV modules and associated equipment and wiring shall be protected from physical damage. 6. Live parts of PV source circuits and PV output circuits over 150v to ground shall not be accessible to other than qualified persons while energized. 7. Inverter is equipped with integrated DC disconnect, thus providing ground fault protection 8. All conductors shall be copper and 75 deg rated 9. A single conductor shall be permitted to be used to perform the multiple functions of dc grounding, AC grounding and bonding between AC and DC systems. 10.Non-current carrying metal parts of equipment shall be effectively bonded together. Bond both ends of raceways. 125A 100A DC 5.600 KW STC AC 4.060 KW STC 14 HANWHA 400 WATT MODULES WITH IQ8+ MICROINVERTERS ECB DATA SHEET D 11.0 TITLE SHEET PV 0.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 CONTRACTOR Drawn by:New@engineerinc.io 04/28/2023DATE: Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com TITLE SHEET PV 0.0 THE INSTALLATION OF SOLAR ARRAYS AND PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH THE FOLLOWING CODES: . 2020 National Electrical Code · 2022 California Building Code · 2022 California Residential Code · 2022 California Green Building Standard Code · 2022 California Plumbing Code · 2022 California Mechanical Code · 2022 California Electrical Code · 2022 California Fire Code · 2022 California Energy Code · 2016 International Property Maintenance Code ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES ROOF PLAN P 12.0 LOAD CALCULATION D 13.0 Date Certified and Exp. Date : 3/31/2024 Signed: 05/03/2023 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (747) 333-5991 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg# 101114924 Elec# 20179513 Issued 05/23/23 1917 W Bay Crest St 05/24/23 SOLAR MODULES ___ Hanwha 400 Watt Model #Q.PEAK DUO BLK ML-G10+ 400 EMT type Conduit Solar Module (N)Junction Box Fire Setback Line JB ....................... ........................ ..................... ............. ............. 14 INDEX (N)Microinverter 14 INVERTER INVERTER TYPE: Micro: ___ Enphase IQ8+ Model # IQ8PLUS-72-2-US(240V) SITE MAP & PV LAYOUT PV 1.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 ECB (N) Enphase Combiner Box.... CONTRACTOR Drawn by:New@engineerinc.io 04/28/2023DATE: MSP (E) Main Service Panel125A Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Total Roof Area: 1641 Total Module Area: 308 18.76% of Coverage Romex............................... Solar PV Array 14 - Hanwha 400W Modules 14 - IQ8+ Microinverters Pitch: 20 Deg Orientation: 161 Deg MSP ECB JB Ba y Cr est St 3' fi r e s e t b a c k 18'' fire se t b a c k bb bb b b aaaaa a a a JB SCALE: 3/16" = 1'-0" 180 ° 90 ° 270 ° 0° S W N E Exp. Date : 3/31/2024 Date Certified and Signed: 05/17/2023 1917 W Bay Crest St05/24/23 PV SYSTEM AS INDICATED Scale: Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 ELECTRICAL 1-LINE DIAGRAM Drawn by:New@engineerinc.io 04/28/2023DATE: 100A HANWHA 400W MODULES14 J BOX NEMA3R 1 2 BR A N C H CI R C U I T - A ENPHASE Q CABLE (2)#12 AWG PV WIRE (1)#6 AWG EGC FREE IN THE AIR 14 ENPHASE IQ8+ MICROINVERTERS INSTALL (2)20A PV 2-POLE C/B PV MONITORING DEVICE (3)#10 AWG THWN/THWN-2 (1)#8 AWG GND 3/4'' EMT, 2 FEET ENPHASE IQ COMBINER 4 120/240V, NEMA 3R (2)#14 AWG THWN/ THWN-2 15A 2-POLE (2)#12/2 ROMEX 23 FEET IN ATTIC DOWNSIZED TO _____ MAIN C/B NOTE: Service Panel does not contain center fed Main Breaker: EXISTING ______ MAIN SERVICE PANEL 120/240V, 1P, 3W GEC(E)GROUNDING ELECTRODE SYSTEM MAIN METER 125A INSTALL ____ 2P CB(PV) INSTALL AT OPPOSITE END OF BUS FROM MAIN FEEDER CB 30A CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com 1 2 BR A N C H CI R C U I T - B 6 8 SYSTEM RATING DC 5.60 KW STC AC 4.06 KW STC J BOX NEMA3R #12/2 ROMEX 23 FEET IN ATTIC PV ARRAY RATING WIRE SIZE CALCULATION BRANCH CIRCUIT - A BRANCH CIRCUIT - A Number Modules 8 Q.PEAK DUO BLK ML-G10+ 400 Hanwha 400 Watt Number OF Microinverters in Circuit 8 Number MicroInverters 8 Enphase IQ8+ Microinverters IQ8Plus-72-2-US(240V)Microinverter Maximum Output Current (A)1.21 Total DC Wattage (Watts)Watts STC, (Watts/Module) 8 * 400 = 3200 Branch Circuit Total Current (A)8 * 1.21 * 1.25 = 12.1 Array Currents I-SC 11.14 A I-MP 10.77 A Breaker Size Per Branch Circuit (A)20 Module Voltage V-OC 45.3 V V-MP 37.13 V BRANCH CIRCUIT - B BRANCH CIRCUIT - B Number Modules 6 Q.PEAK DUO BLK ML-G10+ 400 Hanwha 400 Watt Number OF Microinverters in Circuit 6 Number MicroInverters 6 Enphase IQ8+ Microinverters IQ8Plus-72-2-US(240V)Microinverter Maximum Output Current (A)1.21 Total DC Wattage (Watts)Watts STC, (Watts/Module) 6 * 400 = 2400 Branch Circuit Total Current (A)6 * 1.21 * 1.25 = 9.08 Array Currents I-SC 11.14 A I-MP 10.77 A Breaker Size Per Branch Circuit (A)20 Module Voltage V-OC 45.3 V V-MP 37.13 V FROM JBOX TO ENPHASE COMBINER BOX Maximum Continuous Current (A)12.1 More Than 3 CCC Adjustment Factor 0.8 Adjusted Conductor Ampacity(A)12.1 / 0.8 = 15.13 Raceway Height From Roof (Temp 39+22=61C)3 1/2" # of wire( # BC *2)4 Ambient Temp Factor Per NEC Table 310.15(b)(2)(a)0.71 Temp. Derate Factor (max. Continuous current divided ambient tem. Factor (A)15.13 / 0.71 = 21.3 Wire Size from NEC Table 310.15(b)16 10 AWG FROM ENPHASE COMBINER BOX TO MAIN PANEL Total Number Of Microinverters 14 Total Amps From All Microinverters (A)14 * 1.21 = 16.94 Consider Continuous (A)16.94 * 1.25 = 21.175 Temp. Derate Factor(0.91 at wall of the Building) (A)21.175 / 0.91 = 23.27 Wire Size from NEC Table 310.15(b)16 10 AWG Ambient Temp Factor Per NEC Table 310.15(b)(2)(a)0.91 MAIN PANEL PV Backfeed Breaker Size (A)30 Main Breaker (A) 100 Main Bus Rating (A) 125 Total Amps On Bus (A) 120% 100 + 30 = 130 <= 150(A) Exp. Date : 3/31/2024 Date Certified and Signed: 05/17/2023 1917 W Bay Crest St05/24/23 CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: SYSTEM LABELING DETAIL (STICKER TO BE LOCATED ON CONDUIT WITH DC CURRENT EVERY 4' HORIZONTALLY OR 10' VERTICALLY AND 1' FROM EACH SIDE OF A BEND) (TO BE LOCATED ON SUB-PANEL ONLY WHEN SUB-PANEL IS DEDICATED FOR PV ONLY) (STICKER LOCATED INSIDE PANEL NEXT TO SOLAR BREAKER) (STICKER LOCATED INSIDE PANEL BELOW PV BREAKER) PV ARRAY J BOX INVERTER INTEGRATED DC DISCONNECT PV SUB-PANEL *if applicable SUB-PANEL *if applicable AC DISCONNECT *if applicable METER MAIN SERVICE PANEL *if applicable (STICKER LOCATED ON THE PV SUB PANEL) CAUTION AUTHORIZED SOLAR PERSONNAL ONLY! CAUTION SOLAR DC CURRENT PRESENT DURING DAYLIGHT HOURS WARNING! ELECTRIC SHOCK HAZARD. IF GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. DC DISCONNECT DC PHOTOVOLTAIC POWER SOURCE RATED MAX POWER POINT CURRENT- AMPS RATED MAX POWER POINT VOLTAGE- VOLTS MAXIMUM SYSTEM VOLTAGE- VOLTS SHORT CIRCUIT CURRENT- AMPS WARNING! ELECTRIC SHOCK HAZARD. DO NOT TOUCH THE TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. PV LOAD CENTER SIZED FOR PV BREAKERS ONLY OR RENDERED UNABLE TO ACCEPT ANY ADDITIONAL LOADS. PV SUB-PANEL ONLY AC DISCONNECT AC PHOTOVOLTAIC POWER SOURCE RATED AC OUTPUT CURRENT: A MAX NOMINAL AC OPERATING VOLTAGE: 240 Vac THIS PANEL FED BY MULTIPLE SOURCES (UTILITY & SOLAR) SOLAR WARNING! INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE Permanent directory or plaque providing location of service disconnecting means and photovoltaic system disconnecting means, if not located at the same location. (Plaques shall be metal or plastic, with engraved or machine printed letters, or electro-photo plating, in a contrasting color to the plaque. Plaques shall be permanently attached to the equipmenq or in the required location using an approved method that is suitable to withstand the environment to which it is exposed. Plaques and signage shall meet legibility, defacemet, exposure and adhesion requirements of Underwriters Laboratories marking and labeling system 969(UL969). 21.175 LABEL 1 LABEL 2 LABEL 3 LABEL 4 LABEL 5 LABEL 6 LABEL 7 LABEL 8 LABEL 9 LABEL 10 LABEL 11 LABEL 12 87 109 12 7 7 9 8 10 7 7 9 8 1011 7 4 51 2 DIRECTORY MARKINGS, LABELS AND WIRING SIGNS A. Purpose: Provide emergency responders with appropriate warning and guidance with respect to isolating solar electric system. This can facilitate identifying energized electrical lines that connect solar panels to the inverter, as these should not be cut when venting for smoke removal B. Main Service Disconnect. 1. Residential buildings - The marking main be placed within the main service disconnect. The marking shall be placed outside cover if the main service disconnect is operable with the service panel closed. 2. Commercial buildings - Tha marking shall be placed adjacent to the main service disconnect clearly visible from the location where the level is operated 3. Markings: Verbiage, Format and Type of Material. a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All letters shall be capitalized. Arial or similar font, non bold. c. Material: Reflective, weather resistant material suitable for the environment (use UL - 969 as standard for weather rating). Durable adhesive materials meet this requirement. C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC combiners and junction boxes: 1. Markings: Verbiage, Format and Type of Material. a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turns, above and for below penetrations, all DC combiners and junction boxes b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall adhere to "V. V-3b, c" of this requirement. c. Inverters are not required to have caution markings 1.Marking is required on all interior and exterior DC conduit raceways,enclosures,cable assemblies,and junction boxes,combiner boxes and disconnects. 2.The materials used for marking shall be reflective,weather resistant material suitable for the environment. Minimum 3/8 "letter height; all upper case letters Arial or similar font; Red background with white lettering. 3.Marcking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE. 4.Marking shall be placed adjacent to the main service disconnect in a location clearly visible from the location where the disconnect is operated PV 3.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 Drawn by:New@engineerinc.io 04/28/2023DATE: SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS 180 ° 90 ° 270 ° 0° S W N E CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com SERVICE POINT & UTILITY METERING ENPHASE COMBINER BOX You Are Here PV SOLAR ARRAY Exp. Date : 3/31/2024 Date Certified and Signed: 05/17/2023 1917 W Bay Crest St05/24/23 PROPERTY PLAN LEGEND MSP Main Service Panel................ PV 4.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 Enphase Combiner BoxECB.......... Drawn by:New@engineerinc.io 04/28/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Ba y C r e s t S t PROPERTY LINE MSP ECB 50'-7" 50'-7" 50'-7" 50'-7" 6' 6'-8" 7'-2" 34'-5" SCALE: 1/8" = 1'-0" 180 ° 90° 270 ° 0° S W N E Date Certified and Exp. Date : 3/31/2024 Signed: 05/03/2023 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (747) 333-5991 1917 W Bay Crest St05/24/23 ATTACHMENT LAYOUT DESIGN CRITERIA Modules: Max Distributed Load: 3 PSF Wind Spped: 110 mph POINT LOAD CALCULATION PER ARRAY Module Weight (lbs) # Of Modules 48.5 Total Module Weight (lbs) Rack Weight (lbs) Microinverters Weight (lbs) Total System Weight (lbs) # Of Standoffs Max Span Between Standoffs (in) Loading Per Standoff (lbs) Total Area (sq.ft.) Loading (PSF) 679 135.8 33.32 848.12 31 72 27.35 308 2.75 RAIL ATTACHMENT Truss 2 x 4 @ 24" O.C. 14 14 PV 5.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 Drawn by:New@engineerinc.io 04/28/2023DATE: Prior to the commencement of work, the contractor shall verify the existing roof and framing conditions. Notify New@engineerinc.io of any Discrepancies prior to starting construction. Prior to the commencement of work, the contractor shall inspect framing for any damage such as water damage, cracked framing, etc. and notify New@engineerinc.io if any issues are found. These Plans are stamped for structural code compliance of the roof framing supporting the proposed PV installation reference only. These plans are not stamped for water leakage. PV modules, racking, and attachment components must follow manufacturer guidelines and requirements. Attachments to be installed in a staggered orientation to properly distribute loads. Blocking DF#2 2 x 6 1 Layer of . Plywood & Building Felt Solar Module 6" Attachment ROOF SECTION DETAIL Truss 2 x 4 @ 24" O.C. FLAT TILE (3.8) (7.5) (2.13) (5.51) (7.09) (1.18) 1 3 2 DESCRIPTION ASSY, ALL TILE HOOK BOLT, LAG 5/16 X 4" BASE3 2 1 NO. IRONRIDGE ALL TILE HOOK DETAILS CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com 11'-7" 9'-7" Date Certified and Exp. Date : 3/31/2024 Signed: 05/03/2023 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (747) 333-5991 1917 W Bay Crest St05/24/23 INVERTER DATA SHEET D 6.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 Drawn by:New@engineerinc.io 04/28/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Exp. Date : 3/31/2024 Date Certified and Signed: 05/17/2023 1917 W Bay Crest St05/24/23 ENPHASE RAPID SHUTDOWN, COMPATIBILITY WITH PV D 7.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 Drawn by:New@engineerinc.io 04/28/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Exp. Date : 3/31/2024 Date Certified and Signed: 05/17/2023 1917 W Bay Crest St05/24/23 MODULE DATA SHEET D 8.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 Drawn by:New@engineerinc.io 04/28/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Exp. Date : 3/31/2024 Date Certified and Signed: 05/17/2023 1917 W Bay Crest St05/24/23 RACKING DATA SHEET D 9.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 Drawn by:New@engineerinc.io 04/28/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Exp. Date : 3/31/2024 Date Certified and Signed: 05/17/2023 1917 W Bay Crest St05/24/23 ATTACHMENT DATA SHEET D 10.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 Drawn by:New@engineerinc.io 04/28/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Exp. Date : 3/31/2024 Date Certified and Signed: 05/17/2023 1917 W Bay Crest St05/24/23 D 11.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 ENPHASE AC COMBINER BOX DATASHEET Drawn by:New@engineerinc.io 04/28/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Exp. Date : 3/31/2024 Date Certified and Signed: 05/17/2023 1917 W Bay Crest St05/24/23 P 12.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 ROOF PLAN Drawn by:New@engineerinc.io 04/28/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com MSP ECB Ba y C r e s t S t SCALE: 1/8" = 1'-0" 180 ° 90° 270 ° 0° S W N E Exp. Date : 3/31/2024 Date Certified and Signed: 05/17/2023 1917 W Bay Crest St05/24/23 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Melanie Hansen 1917 Bay Crest St, Santa Ana, CA 92704 LOAD CALCULATION Drawn by:New@engineerinc.io 04/28/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com D 13.0 Exp. Date : 3/31/2024 Date Certified and Signed: 05/17/2023 1917 W Bay Crest St05/24/23 Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 1917 W Bay Crest St05/24/23 Expedited Permit Process for PV Systems — Micro-Inverter2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 1917 W Bay Crest St05/24/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan 1917 W Bay Crest St05/24/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT 1917 W Bay Crest St05/24/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone: Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO- INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE ®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram 1917 W Bay Crest St05/24/23 Date: 05/03/2023 Job Number: 13622 Prepared for : Green Day Power, 9745 Business Park Dr Sacramento, CA 95827 Project.: Melanie Hansen , 1917 Bay Crest St, Santa Ana, CA, 92704 The following calculations are for the structural engineering design of the photovoltaic panels and are valid only for the structural info referenced in the stamped plan set. The verification of such info is the responsibility of others. After review, I certify that the roof structure has sufficient structural capacity for the applied PV loads. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. Engineerinc.io 303 N Glenoaks Blvd Suite 200 Burbank, CA 91502 (747) 333 - 5991 new@engineerinc.io Date Certified and Signed: 05/03/2023 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1917 W Bay Crest St05/24/23 Solar Module Details Module Type Hanwha Module Quantity 14 Module Model Number 400 WATT Design Criteria Code: 2022 California Building Code ASCE 7-16 Live Load (psf)20 Ult Wind Speed (mph)110 Exposure Cat C Ground Snow (psf)20 Structure Geometry Eave Height, he (ft)15 to 20ft Pitch of main roof (deg)20 Building Length, L (ft)50 Building Width, B (ft)50 Roof Area (Module Area) ft2 2500.00 Standoff(i.e., Roof Mount) Spacing Feet 6` NOTE: attachments should be installed in a staggered configuratiion to properly destributor loading. Roof Properties Roof Geometry type Gable Roof Roof Type Truss Roof Pitch (deg)20 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1917 W Bay Crest St05/24/23 Roofing Type Flat Tile Sheathing Type 1/2" OSB Board Wood species No. 2, Douglas Fir-Larch Wood Fb (psf)900 Wood Fv (psf)180 Wood E (psf)1600000 Purlin C/C Spacing (in)12 Rafter C/C. Spacing (in.)24 Purlin Section Thickness, b (in.)2 Section Depth, d (in.)4 Rafter Section Thickness, b (in.)2 Section Depth, d (in.)4 Maximum Rafter Span (ft)7 Factors Cd(wind)1.60 Cd(Snow)1.60 CLS 1.15 CM 1 Ct 1 CL 0.75 CF 1.5 Cfu 1 Cv 1 Cr 1 M allowable_wind 413.44 M allowable_snow 297.16 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1917 W Bay Crest St05/24/23 Dead Load(psf) Flat Tile 5.00 psf 1/2" OSB Board 2.00 psf Insulation 2.00 psf Total Roof 1DL 9 psf No. 2, Douglas Fir-Larch 31.00 lb/ft3 Solar Panel DL 3.00 psf Roof 1 Roof_Dist_DL 7.00 psf M_Roof_Dist_DL 2083.48 Def_Roof_Dist_DL 1.24 PV_uni_Dist_DL 3.00 psf M_PV_uni_Dist_DL 10.54 Def_PV_uni_Dist_DL 0.01 Total_Uni_DL 11.00 psf M_Total_DL 2094.02 Def_Total_DL 1.25 Snow Load(psf) Ground Snow Load, pg 20 Importance Factor, Ic 1 Thermal Factor, Ct 1 Exposure Factor, Ce 1 Flat roof snow, pF 20 Slope Factor, Cs 1 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1917 W Bay Crest St05/24/23 Sloped Row Snow, ps 20 Uni_Dist_S 20.00 M_uni_Dist_s 122.50 Def_uni_Dist_S 0.07 Wind Load Ultimate Wind Speed 110 Directionality Factor,kd 0.85 Topographic factor 1.00 Velocity pressure exposure factor,kz 0.88 Ground Elevation Factor,ke 2.59 Side Wall Width 50 Median Roof Height 129.36 Velocity pressure,qz 23.17 External Pressure Up,GCp_1 -0.7 External Pressure Up,GCp_2 -0.6 External Pressure Up,GCp_3 -1.3 External Pressure Down,GCp -0.18 Design Pressure Up,p_1 -13.56 Design Pressure Up,p_2 -11.62 Design Pressure Up,p_3 -25.18 Design Pressure Up,p -3.49 Uni_Dist_W_up -25.18 M_uni_Dist_W_up -154.23 Def_uni_Dist_W_up -0.09 Uni_Dist_W_down -3.49 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1917 W Bay Crest St05/24/23 M_uni_Dist_W_down -21.38 Def_uni_Dist_W_down -0.01 Lag Screw Uplift Check (ASD) 5/16" Lag Screw Withdrawl value 205.00 lb/in Lag Screw Penetration 2.50 in Roof1 0.6D+0.6W(up z1)1420.536 > 512.5 Roof1 0.6D+0.6W(up z2)1421.7 > 512.5 Framing Check (ASD): Roof1 uni 1.0D+0.6W 2094.02 > 413.44 Lag Screw Penetration 2185.90 > 413.44 Roof1 0.6D+0.6W(up z1)2216.52 > 297.16 Roof1 0.6D+0.6W(up z2)1163.87 > 413.44 Seismic Check: Wood 5.00 psf 2x4 Studs @ 16"2.00 psf Gypsum 3.00 psf Misc(insulatioon,etc)2.00 psf Total wall DL 12.00 psf Total Wall Area (Approx)2590.00 ft2 Total Wall W 31080 lbs Total Roof DL 7.50 psf Total Roof Area (Approx)1276.93 ft2 Total Roof W 9576.975 lbs 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1917 W Bay Crest St05/24/23 OK PV Panel W 3.00 psf Area of panel 280.00 ft2 Total Roof W 718.66 lbs % increase=(Wadditional)/Wexisting 1.89% The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. Limits of Scope of Work and Liability Existing structure is assumed to have been designed and constructed following appropriate codes at time of erection, and assumed to have appropriate permits. The calculations produced are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were completed according to generally recognized structural analysis standards and procedures, professional engineering and design experience, opinions and judgements. Existing deficiencies which are unknown or were not observable during time of inspection are not included in this scope of work. All PV modules, racking, and mounting equipment shall be designed and installed per manufacturer's approved installation specifications. The Engineer of Record and Engineerinc assume no responsibility for misuse or improper installation. This analysis is not stamped for water leakage. Framing was determined based on information in provided plans and/or photos, along with engineering judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any concerns prior to starting construction. Prior to the commencement of work, the contractor shall verify the existing roof and framing conditions. Notify Engineerinc and the engineer of record of any Discrepancies prior to starting construction. Prior to the commencement of work, the contractor shall inspect framing for any damage such as water damage, cracked framing, etc. and notify the E.O.R. if any issues are found.These plans/calculations are stamped for structural code compliance of the roof framing supporting the proposed PV installation reference only. These plans/calculations are not stamped for water leakage. PV modules, racking, and attachment components must follow manufacturer guidelines and requirements. 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 1917 W Bay Crest St05/24/23 Structural Engineering Letter Date: 05/03/2023 Project Name: Melanie Hansen Project Address: 1917 Bay Crest St, Santa Ana, CA, 92704 Contractor : Green Day Power Contractor Address : 9745 Business Park Dr Sacramento, CA 95827 Attn : To Whom It May Concern A Field observation of the condition of the existing framing system was performed by an audit team from Green Day Power. From the Field observation of the property, the existing roof structure observed as follows: Existing roof is supported by 2 x 4 @ 24" rafters at the solar array. The rafters are sloped at approximately 20 degree and have maximum projected horizontal span of 7 feet in between load bearing supports. Design Criteria Applicable codes: 2022 California Building Code ASCE 7-16 Ground Snow Load: 20 psf Roof Dead Load: 20 psf Wind speed: 110 mph Risk Category: II Date Certified and Signed: 05/03/2023 I certify that the capacity of the structural roof framing that directly supports the additional gravity loading due to the solar panel supports and modules had been reviewed and determined to meet or exceed the requirements in accordance with the Design Criteria. If you have any questions or concerns please contact us, Engineerinc.io, 303 N Glenoaks Blvd Suite 200 Burbank, CA 91502 (747) 333 - 5991 new@engineerinc.io 1917 W Bay Crest St05/24/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.Will the PV system weigh maximum 4 pounds per square feet or less? 5.Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.Will the PV system be installed without using any ballast system or counter-weight system? 8.Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M -19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 1917 W Bay Crest St05/24/23