HomeMy WebLinkAbout1919 N Spurgeon St - PlanCity of Santa Ana, CA, Department of Building & Safety
Subject: Review of PV Array installed on Existing Residence
Project: Jimenez
1919 N Spurgeon St
Santa Ana, CA
V&A Project No. 22-3457
We have reviewed the existing home for the proposed PV array installation. Based upon our
analysis, we have found that the existing home is sufficient to support the added load of the PV
array. Analysis based upon: 2022 CBC
Our professional services have been performed using the degree of care and skill ordinarily
exercised under similar circumstances by reputable engineers practicing in this locality. No
other warranty, expressed or implied, is made as to the professional options included in this
report. We hope this provides you with the information you need at this time. Please call us if
you have any questions regarding this report.
Sincerely,
VINCI & ASSOCIATES
James R. Vinci, S.E.
License No. S-4411
V I N C I & A S S O C I A T E S
Structural Engineers
4/28/2023
175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360
805.496.2100 • VinciSE.com
4/28/2023
1919 N Spurgeon
St06/15/23
V I N C I & A S S O C I A T E S
Structural Engineers
STRUCTURAL CALCULATIONS
FOR
PHOTOVOLTAIC
Santa Ana, CA
CLIENT: Titan Solar Power
805.496.2100 • VinciSE.com
175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360
ARRAY
JOB NO: 22-3457
Jimenez
1919 N Spurgeon St
1919 N Spurgeon
St06/15/23
DATE:V I N C I & A S S O C I A T E S SHEET:1
PROJECT:Jimenez Structural Engineers JOB NO.:22-3457
1919 N Spurgeon St 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.:JRV
Santa Ana, CA 805.496.2100 • VinciSE.com
CLIENT:Titan Solar Power
DESIGN DATA:
ROOF DESIGN LOAD:
ROOFING ( Concrete Tile )=12 psf
SHEATHING =2
ROOF RAFTERS / TRUSS =2
MISCELLANEOUS =1
ROOF RAFTER/TRUSS DESIGN DEAD LOAD = 17.0 psf
CEILING & INSULATION =3.25
MISCELLANEOUS =1.25
DESIGN DEAD LOAD =21.5 psf
DESIGN LIVE LOAD =20 psf
DESIGN SNOW LOAD =0 psf
WIND DESIGN CRITERIA:
BASIC WIND SPEED =100 mph
WIND EXPOSURE =C
NUMBER OF STORIES =2
ROOF SLOPE =30°
SOLAR MODULE
Solar Module Width:=43.23 in
Solar Module Length:=67.8 in
Solar Module Area =20.35 ft2
Solar Module Dead Load =2.68 psf
Number of PV Modules =11
Number of Mounts to Roof =34
Maximum Spacing of Mounts =4 ft o.c.
Tributary Area to Mounts
20.35 ft2 x ( 11 /34 ) = 6.59 ft2 (Average)
( 4 ft oc x 67.8 in / 12''/ft ) / 2 =11.30 ft2 (Worst Case)
Solar Module Vertical Support Point Load
11.30 ft2 x 2.68 psf = 30.3 lbs
TOTAL AREA OF ADDED SOLAR PANELS
( 3.60 ft x 5.65 ft ) x ( 11 Modules ) = 223.9 ft2
4/28/2023
-1919 N Spurgeon
St06/15/23
DATE:V I N C I & A S S O C I A T E S SHEET:2
PROJECT:Jimenez Structural Engineers JOB NO.:22-3457
1919 N Spurgeon St 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.:JRV
Santa Ana, CA 805.496.2100 • VinciSE.com
CLIENT:Titan Solar Power
DESIGN CONNECTION TO ROOF TO RESIST WIND UPLIFT
REFER TO NEXT SHEET FOR
UPLIFT FORCE CALCULATIONS
ZONE 1 UPLIFT = -.6(2.68psf)
Design Force = ( Uplift x (0.6) ) -.6(2.68psf)
Net Uplift =
ADD 3.09 Connections per Module (MIN)
CONNECTION 11 Modules, 34 Connections
DETAIL Max Trib Area =ft2
HERE UPLIFT / CONN. = 11.3 ft2 x 23.0 psf
= 260.2 lbs/conn
PER 2018 NDS (TABLE 12.2A)
PALLOW = 130 lbs/in x CD x Ct
for (2) screws
WITH 1.63'' PENETRATION INTO JOIST
PALLOW = 1.63 '' x 208 lbs/in x 2
= 676 lbs > 260 lbs
Therefore O.K.
FACTOR OF SAFETY:
F.O.S. = 2.60 > 1.5
Therefore O.K.
ZONE 3 UPLIFT = - 0.6 (2.68 psf)ZONE 2 UPLIFT = -.6(2.68psf)
Design Force = ( Uplift x (0.6) ) - 0.6 (2.68 psf)Design Force = ( Uplift x (0.6) ) -.6(2.68psf)
Net Uplift = Net Uplift =
3.09 Connections per Module (MIN)3.09 Connections per Module (MIN)
11 Modules, 34 Connections 11 Modules, 34 Connections
Max Trib Area = ft2 Max Trib Area = ft2
UPLIFT / CONN. = 7.537 ft2 x UPLIFT / CONN. = 11.3 ft2 x
= 247.2 lbs/conn = 294 lbs/conn
PER 2018 NDS (TABLE 12.2A)PER 2018 NDS (TABLE 12.2A)
PALLOW = 130 lbs/in x CD x Ct PALLOW = 130 lbs/in x CD x Ct
for (2) screws for (2) screws
WITH 1.63'' PENETRATION INTO JOIST WITH 1.63'' PENETRATION INTO JOIST
PALLOW = 1.63 '' x 208 lbs/in x 2 PALLOW = 1.63 '' x 208 lbs/in x 2
= 676 lbs > = 676 lbs >
Therefore O.K.Therefore O.K.
FACTOR OF SAFETY:FACTOR OF SAFETY:
F.O.S. = 2.74 > 1.5 F.O.S. = 2.30 > 1.5
-
11.30
M5X60
M5X60
11.30
26.0 psf
4/28/2023
23.0 psf
41.1 psf
46.0 psf 57.3 psf
32.8 psf
294 lbs
26.0 psf
M5X60
7.54
Therefore O.K.
32.8 psf
247 lbs
Therefore O.K.
1919 N Spurgeon
St06/15/23
DATE:V I N C I & A S S O C I A T E S SHEET:3
PROJECT:Jimenez Structural Engineers JOB NO.:22-3457
1919 N Spurgeon St 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.:JRV
Santa Ana, CA 805.496.2100 • VinciSE.com
Company Titan Solar Power
Wind Analysis Per ASCE 7-16 - Components and Cladding
Exposure Category : C
Importance Factor : 1
Basic Wind Speed : 100
Topographical factor : 1 Flat
Bldg Ht to eave : 19 ft
Bldg Ht to Ridge : 24 ft
Bldg L : 42 ft
Bldg W : 30 ft
Effective area : 11.30 ft2 a = 3 (width of edge strips, ASCE 7, 28.3-1)
Design pressures for Roof Top Solar Panels
qh = 19.58 psf (q h = 0.00256K z K zt K d K e V 2 ) (ASCE 7, 26.10)
Kz = 0.9 Kzt = 1 Kd = 0.85 Ke = 1
G Cp = External pressure coefficient ASCE 7, 30.3.2)
G Cpi = 0.18 or -0.18 (ASCE 7, 26.13-1, Enclosed Building)
Zone 1 Zone 1' Zone 2 Zone 2e Zone 2n Zone 2r Zone 3 Zone 3e Zone 3r Zone 4 Zone 5
G Cp 0.88 -- 0.88 0.88 0.88 - 0.88 0.88 0.70 0.70
-G Cp -1.75 -- -1.75 -1.96 -1.75 - -2.44 -1.96 -0.80 0.00
(ASCE 7, 30.3-2A
Roof Top Solar Panels (psf)Zone 1 Max Pressure = -41.05 psf GOVERNS
ƳΕ = 1.5 (ASCE 7, 29.4-7)Zone 2 Max Pressure = -46.04 psf GOVERNS
(USING WORST CASE EDGE FACTOR)Zone 3 Max Pressure = -57.33 psf GOVERNS
p = qh (GCp ) (ƳΕ) (Ƴα) (ASCE 7, 29.4.4) Ƴα = 0.8
Zone 1 Zone 1' Zone 2 Zone 2e Zone 2n Zone 2r Zone 3 Zone 3e Zone 3r Zone 4 Zone 5
Positive 20.65 20.65 20.65 20.65 20.65 20.65 16.45 16.45
Negative -41.05 -41.05 -46.04 -41.05 -57.33 -46.04 -18.80 0.00
Components and Cladding Pressure (psf) Zone 1 Max Pressure = -37.74 psf
Zone 2 Max Pressure = -41.89 psf
Zone 3 Max Pressure = -51.30 psf
p = qh [(G Cp ) - (G Cpi)](pressure on component, ASCE 7, 30.3-1)
p (min) = 16 psf (ASCE 7, 30.2.2)
Zone 1 Zone 1' Zone 2 Zone 2e Zone 2n Zone 2r Zone 3 Zone 3e Zone 3r Zone 4 Zone 5
Positive 20.73 20.73 20.73 20.73 20.73 20.73 19.69 19.69
Negative -37.74 -37.74 -41.89 -37.74 -51.30 -41.89 -21.93 -21.93
4/28/2023
-
1919 N Spurgeon
St06/15/23
DATE:V I N C I & A S S O C I A T E S SHEET:4
PROJECT:Jimenez Structural Engineers JOB NO.:22-3457
1919 N Spurgeon St 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.:JRV
Santa Ana, CA 805.496.2100 • VinciSE.com
CLIENT:Titan Solar Power
LATERAL FORCES: (Base Shear Calculations - 2022 CBC / ASCE-16 )
SEISMIC:
Site Class: D (Use D if unknown)
S1= 0.468 (USGS Software)SS= 1.31 (USGS Software)
Fv = 1.7 (Table 11.4-2)Fa = 1.2 (Table 11.4-1)
I = 1.0 (Sec 1.5-2 ASCE 7-16)
R = 6.5 (Table 12.2-1 ASCE 7-16)
SMS = Fa * SS = 1.577 (Eq. 16-20)SDS = (Eq. 16-39)
SM1= Fv * S1 = 0.796 (Eq. 16-21)SD1 = (Eq. 16-40)
TL = 8 s (Fig 22-14, ASCE 7)
Ts = SD1 / S DS = 0.505 s 80% x 0.505 = >0.182 s
Ta = Ct * (hn)x = (Eq. 12.8-7)Ct = 0.02 (Table 12.8-2 ASCE 7-16)
hn = 19.0 ft x = 0.75 (Table 12.8-2 ASCE 7-16)
k = 1.0
* *GOVERNS * *
VMIN = ( SDS) / ( R / I ) =0.16 W (Eq. 12.8-2 ASCE 7-16)
NEED NOT EXCEED:
IF T ≤ TL USE:
V = ( SD1) / T *( R / I ) =W (Eq. 12.8-3 ASCE 7-16)
IF T TL USE:
V = ( SD1)*(TL) / T² *( R / I ) =W (Eq. 12.8-4 ASCE 7-16)
SHALL NOT BE LESS THAN:
V = W (Eq. 12.8-5 ASCE 7-16)0.01
19.71
0.45
4/28/2023
0.182 s
1.05
0.53
²/3 * SMS =
²/3 * SM1 =
0.404
1919 N Spurgeon
St06/15/23
4/28/23, 4:40 PM U.S. Seismic Design Maps
https://www.seismicmaps.org 1/3
1919 N Spurgeon St, Santa Ana, CA 92706, USA
Latitude, Longitude: 33.76238610000001, -117.8649262
Date 4/28/2023, 4:40:13 PM
Design Code Reference Document ASCE7-16
Risk Category II
Site Class D - Default (See Section 11.4.3)
Type Value Description
SS 1.314 MCER ground motion. (for 0.2 second period)
S1 0.468 MCER ground motion. (for 1.0s period)
SMS 1.577 Site-modified spectral acceleration value
SM1 null -See Section 11.4.8 Site-modified spectral acceleration value
SDS 1.051 Numeric seismic design value at 0.2 second SA
SD1 null -See Section 11.4.8 Numeric seismic design value at 1.0 second SA
Type Value Description
SDC null -See Section 11.4.8 Seismic design category
Fa 1.2 Site amplification factor at 0.2 second
Fv null -See Section 11.4.8 Site amplification factor at 1.0 second
PGA 0.553 MCEG peak ground acceleration
FPGA 1.2 Site amplification factor at PGA
PGAM 0.664 Site modified peak ground acceleration
T L 8 Long-period transition period in seconds
SsRT 1.314 Probabilistic risk-targeted ground motion. (0.2 second)
SsUH 1.413 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration
SsD 1.517 Factored deterministic acceleration value. (0.2 second)
S1RT 0.468 Probabilistic risk-targeted ground motion. (1.0 second)
S1UH 0.506 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration.
S1D 0.6 Factored deterministic acceleration value. (1.0 second)
PGAd 0.629 Factored deterministic acceleration value. (Peak Ground Acceleration)
PGAUH 0.553 Uniform-hazard (2% probability of exceedance in 50 years) Peak Ground Acceleration
1919 N Spurgeon
St06/15/23
DATE:V I N C I & A S S O C I A T E S SHEET:6
PROJECT:Jimenez Structural Engineers JOB NO.:22-3457
1919 N Spurgeon St 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.:JRV
Santa Ana, CA 805.496.2100 • VinciSE.com
CLIENT:Titan Solar Power
LATERAL FORCES:TWO STORY STRUCTURE
2022 CBC
F1 hr = 5.0 ft
SEISMIC BASE SHEAR:
V = 0.162 W (SEE PREVIOUS) F2 h1-h2 = 9.0 ft
h2 = 10.0 ft
F1': ROOF = 22 PSF F2': FLOOR = 15 PSF
WALLS = 7 TRIB 2ND FLR WALLS = 7
28.5 TRIB 1ST FLR WALLS = 7
x 0.162 29
4.61 PSF x 0.162
4.69 PSF
F1 = F2 (F1' x h1)=6.06 psf
(F1' x h1) + (F2' x h2)
F2 = F1' + F2'= 9.30 psf
WIND LOADS:
ps = λ kzt Iw ps30 (Eq. 28.6-1)
λ = 1.21 ps30A = psf psA psf
Iw = 1.00 ps30B = psf psB psf
kzt = 1.00 ps30C =psf psC psf
ps30D =psf psD psf
TOTAL
F1ULT:= ( 5 ft + 9 ft /2 ) x (23.2704 psf +12.12 psf ) = 336.2088 plf >> 336 plf
F1ASD:= plf x 0.6 = 201.7253 plf >> 202 plf
F2ULT:= ( 9 ft /2 + 10 ft /2 ) x (23.2704 psf +12.12 psf ) = 336.2088 plf >> 672 plf
F2ASD:= plf x 0.6 = 201.7253 plf >> 403 plf
4/28/2023
-12.12
15.39
-7.15
-10.00
-
12.70
-5.90
336.21
19.20 23.27
336.21
1919 N Spurgeon
St06/15/23
DATE:V I N C I & A S S O C I A T E S SHEET:7
PROJECT:Jimenez Structural Engineers JOB NO.:22-3457
1919 N Spurgeon St 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.:JRV
Santa Ana, CA 805.496.2100 • VinciSE.com
CLIENT:Titan Solar Power
CHECK IMPACT OF NEW SOLAR PANELS ON SEISMIC LOAD
ADD ROOF PLAN
HERE
TOTAL ROOF AREA:
( 42.0 ft x 30.0 ft ) + ( 0.0 ft x 0.0 ft ) +
( 0.0 ft x 0.0 ft ) + ( 0.0 ft x 0.0 ft ) =
EXISTING ESTIMATED SEISMIC LOAD (BASE SHEAR)
1260 ft2 x 6.06 psf = 7630.39 lbs
AREA OF ADDED SOLAR PANELS (PER PAGE 1)= ft2
WEIGHT OF PANELS: 2.68 psf
ADDED SEISMIC LOAD:
2.68 psf x ft2 x 0.16 =97.0 lbs
Therefore O.K.
Per CEBC SECTION 503.4
223.9
223.9
=1.3% < 10%% INCREASE =97.0
7630.387485
4/28/2023
-
1260 ft2
1919 N Spurgeon
St06/15/23
Check Top Chord of Existing Truss
Apr. 28, 2023 16:41
Design Check Calculation Sheet
WoodWorks Sizer 2023
Loads:
Load Type Distribution Pat- Location [ft] Magnitude Unit
tern Start End Start End
Roof-DL Dead Full Area No 10.00(24.0") psf
Roof-LLR Roof constr. Full Area Yes 20.00(24.0") psf
PV1 Dead Point No 2.25 30 lbs
PV2 Dead Point No 6.25 30 lbs
PV3 Dead Point No 6.75 30 lbs
PV4 Dead Point No 10.75 30 lbs
Self-weight Dead Full UDL No 1.2 plf
Maximum Reactions (lbs) and Bearing Lengths (in) :
1.5' 8.5'
17.922'
15.5'
Unfactored:
Dead 148 279 74
Roof Live 193 332 129
Factored:
Total 341 612 203
Bearing:
Length 0.50* 0.52 0.50*
Min req'd 0.50* 0.52** 0.50*
*Minimum bearing length setting used: 1/2" for end supports and 1/2" for interior supports
**Minimum bearing length governed by the required width of the supporting member.
Lumber-soft, D.Fir-L, No.2, 2x4 (1-1/2"x3-1/2")
Supports: All - Timber-soft Beam, D.Fir-L No.2
Roof joist spaced at 24.0" c/c; Total length: 18.06'; Clear span(horz): 1.5', 6.938', 6.938'; Volume = 0.7 cu.ft.; Slope: 30.0 deg
Lateral support: top = continuous, bottom = at all supports; Repetitive factor: applied where permitted (refer to online help);
This section PASSES the design code check.
Analysis vs. Allowable Stress and Deflection using NDS 2018 :
Criterion Analysis Value Design Value Unit Analysis/Design
Shear fv = 78 Fv' = 225 psi fv/Fv' = 0.35
Bending(+) fb = 1158 Fb' = 1941 psi fb/Fb' = 0.60
Bending(-) fb = 1762 Fb' = 1803 psi fb/Fb' = 0.98
Deflection:
Interior Dead 0.11 = L/856
Live 0.24 = L/395 0.40 = L/240 in 0.61
Total 0.36 = L/270 0.54 = L/180 in 0.66
Cantil. Dead -0.08 = L/246
Live -0.17 = L/120 0.17 = L/120 in 1.00
Total -0.26 = L/80 0.23 = L/90 in 1.11
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
A0
PROJECT INFO
VICINITY MAP
PV NOTES
VICINITY MAP
AERIAL VIEW
PROJECT SITE INFORMATION
NAME: JESUS JIMENEZ
ADDRESS:1919 N SPURGEON ST,
SANTA ANA, CA 92706
PHONE: (714) 651-1532
EMAIL: Jrjimenez190466@gmail.com
APN:
00315357
(ORANGE COUNTY)
UTILITY: SCE
AHJ: SANTA ANA CITY (CA)
BUILDING INFO
OCCUPANCY: R3-SFD CONSTRUCTION TYPE: VB
# OF STORIES: 2 BLDG AREA (SQFT): 1138
SPRINKLERS: NONE ROOF AREA (SQFT): 1348
ENGINEERING CRITERIA FOR RACKING
DESIGN WIND SPEED: 110 MPH
WIND EXPOSURE CATEGORY: B
GROUND SNOW LOAD: O PSF
PROJECT SCOPE
INSTALLATION OF ROOF MOUNT SOLAR PV SYSTEM
PV EQUIPMENT QTY MODEL NO AND MANUFACTURER
MODULES:11 MODEL#: HY-DH108P8-400
400W HYPERION MODULES
OPTIMIZERS:11 S440 SOLAREDGE OPTIMIZERS
AC COMBINER:1 SE3800H-US (240V)
SOLAREDGE HD INVERTER
SYSTEM SIZE:4.400 DC kW RATING
4.048 CEC AC RATING
ARRAY AREA:20.35 SQFT x 11 = 223.90 SQFT
MAIN SERVICE PANEL INFORMATION
UTILITY: SCE
EXISTING: YES UPGRADE: NO
BUS RATING: (E)200A MAIN BREAKER: (E)200A
PHASE: 1PH MB POSITION: END
# OF WIRES: 3 DERATE?: NO
VOLTAGE: 240V DERATE SIZE: N/A
UTILITY FED: OH
METER#: 222010-109642
SHEET INDEX
A0 PROJECT INFO, VICINITY MAP, NOTES
A1 SITE PLAN
A2 MOUNTING ROOF PLAN
E1 SINGLE LINE DIAGRAM
E2 ELECTRICAL CALCULATIONS
E3 - E3.1 REQUIRED SIGNAGE & DIRECTORY
E4 - E4.1 MODULE DATA SHEET & CERTIFICATION
E5 - E5.1 INVERTER DATA SHEET & CERTIFICATION
E6 OPTIMIZER DATA SHEET
S1 - S1.1 STANCHION DATA SHEET
S2 RACKING DATA SHEET
S3 - S3.3 RACKING ENGINEERING
S4 RACKING GROUNDING
S5 RACKING CERTIFICATION
APPLICABLE CODES
ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL COMPLY
WITH THE FOLLOWING 2022 APPLICABLE CODES
2022 CA BUILDING CODES (CBC)
2022 CA RESIDENTIAL CODES (CRC)
2022 CA MECHANICAL CODES (CMC)
2022 CA PLUMBING CODES (CPC)
2022 CA FIRE CODES (CFC)
2022 CA ELECTRICAL CODES (CEC)
2022 CA ENERGY CODES (CEnC)
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGreen)
4.400 DC kW SOLAR PV STRING INVERTER SYSTEM - ROOF MOUNT
1919 N SPURGEON ST, SANTA ANA, CA 92706
JIMENEZ RESIDENCE
SOLAR PHOTOVOLTAIC SYSTEM NOTES
2022 CODE REFERENCE
CEC 110.2
CEC 110.3
ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED TESTING LABORATORY AND INSTALLED PER
THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS
ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND
SWITCHES.
CEC 110.26 WORKING CLEARANCES TO BE PROVIDED AT NEW AND EXISTING ELECTRICAL EQUIPMENT
CEC ARTICLE 250 ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AND BONDED
ALL PV CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE PROTECTION AGAINST OVERCURRENT
CEC 690.13
CEC 690.15
DISCONNECTING MEANS OF THE PV SYSTEM (INCLUDING RAPID SHUTDOWN INITIATION) SHALL BE LOCATED IN
READILY ACCESSIBLE LOCATION NEAR THE EQUIPMENT
CEC 690.12 RAPID SHUTDOWN EQUIPMENT TO COMPLY WITH CEC 690.12.
CEC 705.40
THE UTILITY-INTERACTIVE INVERTERS SHALL AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE CONNECTED
ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THE SYSTEM AND SHALL
REMAIN IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN
RESTORED
CEC 310.10(D)
CEC 690.31(A) TO (F)
ALL CONDUCTORS IN EXPOSED OUTDOOR LOCATIONS SHALL BE LISTED AND IDENTIFIED FOR USE IN DIRECT
SUNLIGHT AND FOR THE APPLICATION.
CEC 690.31(C INSULATION OF EXPOSED CONDUCTORS UNDER THE MODULES SHALL BE USE-2 OR PV-WIRE TYPE FOR PV
SYSTEMS
CEC 110.14 FINE-STRANDED CABLE CONNECTIONS MUST BE MADE IN LUGS AND TERMINALS LISTED AND MARKED FOR THE
USE,
CEC 690.31(B) ALL PV CIRCUIT CONDUCTORS SHALL BE MARKED ON EACH END AND GROUPED FOR UNIQUE IDENTIFICATION
CEC 200.6, CEC
200.7 CEC 400.22
CEC 250.119
CEC 400.23
CEC 310.110(C)
ALL GROUNDED, (NEUTRAL), CONDUCTORS' INSULATION SHALL BE SOLID WHITE, GRAY, OR WITH 3-WHITE
STRIPES, CEC 200.6, 200.7, & 400.22; AND ALL GROUNDING CONDUCTORS SHALL BE OF BARE WIRE WITHOUT
COVERING, OR WITH INSULATION OF GREEN OR GREEN WITH YELLOW STRIPES, CEC 250.119 & 400.23. THE
COLOR OF UNGROUNDED CONDUCTORS SHALL BE OTHER THAN FOR GROUNDED, (NEUTRAL), AND
GROUNDING CONDUCTORS, CEC 310.110(C).
CEC 711.11(C)MAXIMUM CONDUCTOR LENGTH BETWEEN SUPPLY SIDE CONNECTION AND OVERCURRENT PROTECTION IS 10
FEET
CEC 705.12(B)CONNECTIONS ON THE LOAD SIDE OF THE SERVICE DISCONNECTING MEANS OF THE OTHER SOURCE(S) AT ANY
DISTRIBUTION EQUIPMENT ON THE PREMISES
CFC 605.11.2 DC WIRING INSIDE A BUILDING MUST BE IN METALLIC TYPE RACEWAYS, CONDUITS, ENCLOSURES, OR CABLE
SHEATHINGS
CEC 250.97 METALLIC TYPE RACEWAYS, CONDUITS, ENCLOSURES, AND CABLE SHEATHS CONTAINING CIRCUITS OVER
250-VOLTS TO GROUND MUST BE BONDED
CEC 314.15 ALL EXTERIOR CONDUIT, FITTINGS AND BOXES SHALL BE RAIN TIGHT AND APPROVED FOR USE IN WET LOCATIONS
CEC 690.31(C)(5)
CEC 110.14.
FLEXIBLE, FINE-STRANDED CABLES SHALL BE TERMINATED ONLY WITH TERMINALS, LUGS, DEVICES OR
CONNECTOR THAT ARE IDENTIFIED AND LISTED FOR SUCH USE
CEC 690.33 (D)(2)
CONNECTORS SHALL BE OF LATCHING OR LOCKING TYPE. CONNECTORS THAT ARE READILY ACCESSIBLE AND
OPERATING AT OVER 30 VOLTS SHALL REQUIRE TOOL TO OPEN AND MARKED “DO NOT DISCONNECT UNDER
LOAD” OR “NOT FOR CURRENT INTERRUPTING”
CEC 690.45
CEC 250.122
EQUIPMENT GROUNDING CONDUCTOR FOR PV MODULES SMALLER THAN 6 AWG SHALL BE PROTECTED FROM
PHYSICAL DAMAGE BY A RACEWAY OR CABLE ARMOR, CEC 690.46 & 250.120(C).
CEC 705.32 WHERE PROTECTION IS INSTALLED IN ACCORDANCE WITH 230.95, THE OUTPUT OF AN INTERACTIVE SYSTEM
SHALL BE CONNECTED TO THE SUPPLY SIDE OF THE GROUND-FAULT PROTECTION.
CEC 690.31(G)(4)THE MARKINGS, "WARNING: PHOTOVOLTAIC POWER SOURCE", FOR DC RACEWAYS AND CABLE ASSEMBLIES
MUST BE AT 10' O.C.; AND BENDS, ABOVE OR BELOW PENETRATIONS OF ROOFS, CEILINGS, WALLS, OR BARRIERS
CEC 300.4 CABLES/WIRES THAT ARE SUBJECT TO PHYSICAL DAMAGE, SUCH AS THOSE NOT LOCATED UNDER THE MODULES,
MUST BE PROTECTED
CEC 310.15
WHERE RACEWAYS OR CABLES ARE EXPOSED TO DIRECT SUNLIGHT ON OR ABOVE ROOFTOPS, RACEWAYS OR
CABLES SHALL BE INSTALLED A MINIMUM DISTANCE ABOVE THE ROOF TO THE BOTTOM OF THE RACEWAY OR
CABLE OF 7∕8 IN. WHERE THE DISTANCE ABOVE THE ROOF TO THE BOTTOM OF THE RACEWAY IS LESS THAN 7∕8
IN., A TEMPERATURE ADDER OF 60°F SHALL BE ADDED TO THE OUTDOOR TEMPERATURE TO DETERMINE THE
APPLICABLE AMBIENT TEMPERATURE FOR APPLICATION OF THE CORRECTION FACTORS IN TABLE 310.15(B)(2)(A)
OR TABLE 310.15(B)(2)(B).
CEC 690.56(C)IDENTIFICATION OF POWER SOURCE RAPID SHUTDOWN AND LABELING SHALL BE IN ACCORDANCE WITH CEC
690.56(C).
CEC 690.31(G)(4)LABELS SHALL BE REFLECTIVE, AND ALL LETTERS SHALL BE CAPITALIZED AND SHALL BE A MINIMUM HEIGHT OF 3/8''
IN WHITE ON A RED BACKGROUND. CEC 690.31(G)(4)
690.56(C)IDENTIFICATION OF POWER SOURCE RAPID SHUTDOWN AND LABELING SHALL BE IN ACCORDANCE WITH CEC
690.56(C).
WHEN THE MAIN CIRCUIT BREAKER IS DERATED, A PERMANENT MARKING MUST BE PROVIDED ON THE
PANELBOARD TO INDICATE THAT THE MAIN CIRCUIT BREAKER HAS BEEN DOWNSIZED TO _______ AMPS, DO NOT
UPSIZE IT.
CRC R324.7
CRC R302.1.
GROUND-MOUNTED PV SYSTEMS MUST HAVE A CLEAR, BRUSH-FREE AREA OF 10-FEET AND A FIRE SEPARATION
DISTANCE OF 5-FEET MINIMUM TO OTHER STRUCTURES AND PROPERTY LINES
EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, & VENTILATIONS INTAKE AIR OPENINGS SHALL NOT BE
COVERED OR BLOCKED BY THE SOLAR PHOTOVOLTAIC SYSTEM.
CPC 906.1
EXISTING DWV PLUMBING VENT TERMINATIONS THAT ARE HORIZONTALLY LOCATED CLOSER THAN 12" FROM THE
PROPOSED MODULES, MUST BE REROUTED, OR MUST BE EXTENDED A MINIMUM OF 6" ABOVE THE SURFACE OF
THE MODULES
CMC 802.6.1(1)
CPC 509.6.1(1)
EXISTING B-VENT TERMINATIONS, FOR FUEL BURNING APPLIANCES, WHERE ADJACENT TO THE PROPOSED
MODULES, MUST BE EXTENDED 12" ABOVE THE MODULES' TOP SURFACE, CMC 802.6.1(1) & CPC 509.6.1(1).
CEC 250.52(A)(5)
CEC 250.53(G)
GROUNDING ROD ELECTRODES SHALL BE MINIMUM 5/8’’ IN DIAMETER AND INSTALLED 8’ MINIMUM IN
CONTACT WITH SOIL
CEC 250.104 FOR ELECTRICAL SERVICE REPLACEMENTS, BONDING TO THE METAL PIPES OF NATURAL GAS, HOT WATER, AND
COLD WATER MUST BE PROVIDED
PROPOSED LOCATIONS OF ELECTRICAL SERVICE REPLACEMENTS MUST ALSO BE APPROVED BY THE ELECTRICAL
UTILITY COMPANY.
CRC R314.1
CRC R315.1
APPROVED SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED WITHIN THE DWELLING UNIT AND SHALL
BE FIELD VERIFIED EITHER THROUGH FINAL BUILDING INSPECTION. SMOKE ALARMS ARE REQUIRED TO BE
INSTALLED IN ALL BEDROOMS, OUTSIDE EACH BEDROOM, AND AT LEAST ONE ON EACH FLOOR OF THE HOUSE.
CARBON MONOXIDE ALARMS ARE REQUIRED OUTSIDE EACH BEDROOM AND AT LEAST ONE ON EACH FLOOR
OF THE HOUSE.
CRC R324.3
PHOTOVOLTAIC (PV) SYSTEMS SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTIONS R324.3.1
THROUGH R324.7.1 AND THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE ELECTRICAL PORTION OF
SOLAR PV SYSTEMS SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE CALIFORNIA ELECTRICAL
CODE.
CRC R324.6
ROOF ACCESS, PATHWAYS AND SETBACK REQUIREMENTS SHALL BE PROVIDED IN ACCORDANCE WITH
SECTIONS R324.6.1 THROUGH R324.6.2.1. ACCESS AND MINIMUM SPACING SHALL BE REQUIRED TO PROVIDE
EMERGENCY ACCESS TO THE ROOF, TO PROVIDE PATHWAYS TO SPECIFIC AREAS OF THE ROOF, PROVIDE FOR
SMOKE VENTILATION OPPORTUNITY AREAS, AND TO PROVIDE EMERGENCY EGRESS FROM THE ROOF.
A LADDER MUST BE PROVIDED FOR INSPECTIONS IN ACCORDANCE WITH CAL-OSHA REGULATIONS, SECURED
AND EXTENDING 3' ABOVE THE ROOF. LADDERS SHALL BE OSHA APPROVED AND SECURED TO THE STRUCTURE
FOR INSPECTION PURPOSES.
CONTRACTORS ARE REQUIRED TO BE PRESENT FOR THE FIRST AND/OR FINAL INSPECTIONS.
ALL OF THE REQUIRED MARKINGS, SIGNS, AND LABELS MUST BE INSTALLED ON ALL EQUIPMENT PRIOR TO ANY
INSPECTIONS.
PLAN CHECK AND PERMIT FOR PV SYSTEM AND ASSOCIATED EQUIPMENT ONLY.
ALL PROJECTS SUBJECT TO FIELD VERIFICATION FOR CODE COMPLIANCE.
NOTIFY SERVING UTILITY BEFORE ACTIVATION OF PV SYSTEM.
PROJECT SITE
STRUCTURAL ONLY
www.vincise.com
S T R U C T U R A L E N G I N E E R S
4.28.2023
The scope of the plans is for the installation of the solar
photovoltaic system only and the approval is subject to
compliance with all applicable city and state codes and
regulations regarding construction. The approval of the
plans does not constitute any certification of the accuracy,
completeness, or building permit status of the existing
buildings and structures as shown.
Bldg# 101115455
Elec# 20179904
Issued 06/14/23
1919 N Spurgeon St
06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
SITE PLAN
A1
LEGEND:
(E) - EXISTING
(N) - NEW
(P) - PROPOSED
SITE PLAN
SCALE: 1/16"=1'
(N) 11 -MODEL#: HY-DH108P8-400
400W HYPERION MODULES WITH
S440 SOLAREDGE OPTIMIZERS
(E)2 - STORY
1138 SQ FT
(E) DRIVEWAY
(E) 200A MAIN SERVICE PANEL
SCE METER#: 222010-109642
N
S
P
U
R
G
E
O
N
S
T
(N) SE3800H-US (240V)
SETAPP SOLAREDGE HD
INVERTER
PROPERTY LINE
3
1
2
(N) 30A AC DISCONNECT
PR
O
P
E
R
T
Y LINE
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
4
5
6
9
1
0
8
7
1
1
STRUCTURAL ONLY
www.vincise.com
S T R U C T U R A L E N G I N E E R S
4.28.2023
(E) TOOL SHED
W/O ELECTRICAL
REVISED: 6.13.2023
1919 N Spurgeon
St06/15/23
D INVMSP
JB
1
2
3'3'
18" MIN
18" MIN
3'
3'
2 X 4 RAFTER
@ 24" OC
2 78"
1-5/
8
"
MIN
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R CA L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
MOUNTING PLAN
SOLAR PANEL DEAD WEIGHT CALCULATION
MODULE HYPERION
WIDTH (IN)LENGTH (IN)AREA (SQFT) WEIGHT (LBS) QTY
TOTAL
MODULE
AREA
TOTAL MODULE
WEIGHT
43.23 67.80 20.35 48.50 11 223.90 533.50
RACKING EVEREST
RACKING
WEIGHT
LBS/LNFT
MOUNTING
SYSTEM WEIGHT
TOTAL SYSTEM
WEIGHT
TOTAL
ATTACHMENT
POINTS
POINT LOAD
CALCS DISTRIBUTED LOAD CALCULATION
.75 66.69 600.19 34 17.65 2.68 PSF
NOTE: THE POINT LOADING AND DISTRIBUTED LOADING SHOULD BE MAX 5 LBS/FT2
ROOF COVERAGE
TOTAL MODULE
AREA
ROOF FACE AREA
(SQFT)
ROOF
COVERAGE COMPLIANCE WITH R324.6.2 SET BACK AT RIDGE
223.90 1348 16.61 % </= 33% 18" SET BACK AT RIDGE
ROOF INFORMATION
ROOF TYPE COMP SHINGLE ROOF - 2 LAYERS MAX
RAFTERS TRUSS RAFTER SPACING (IN)ATTACHMENT SPACING
2 X 4 N/A 24" OC 48" OC A2
(N) 3/4" EMT CONDUIT
RUN ABOVE ROOF OR
UNDER EAVES WHERE POSSIBLE
7/8'' MINIMUM ABOVE THE ROOF
CEC 310.15(B)(3)(C)
(N) 34 TOTAL
ATTACHMENTS
@ 4FT ON CENTER
(N) 11 - MODEL#: HY-DH108P8-400
400W HYPERION MODULES WITH
S440 SOLAREDGE OPTIMIZERS
STRING A - 11 MODULES
FIRE ACCESS POINT#2
AREA NOT TO BE OVER
ANY DOORS, WINDOWS
OR OTHER
OBSTRUCTIONS.
FIRE ACCESS POINT#1
AREA NOT TO BE OVER
ANY DOORS, WINDOWS
OR OTHER
OBSTRUCTIONS.
LEGEND
(E) EXISTING
(N) NEW
(P) PROPOSED
CONDUIT RUN
VIF VERIFY IN FIELD
JUNCTION BOX
MAIN SERVICE PANEL
AC COMBINER
INVERTER
AC DISCONNECT
SUBPANEL
SOLAR METER
FIRE ACCESS POINTS
FIRE PATHWAY/SETBACKS
JB
MSP
D
SP
INV
AC
M
x
MOUNTING PLAN
SCALE: 3/32"=1'
NOTE: ALL DIMENSIONS SHOWN
RELATING TO EXISTING
CONSTRUCTION ARE
APPROXIMATE. THE CONTRACTOR
SHALL FIELD VERIFY ALL ACTUAL
DIMENSIONS. DIMENSIONS,
UNLESS NOTED +/- IR VIF (VERIFY
IN FIELD), EXACT LOCATIONS,
DISTANCES, ELEVATIONS AND
SIMILAR DATA SHALL BE
GOVERNED BY ACTUAL FIELD
CONDITIONS.
A
(E) 200A MAIN SERVICE PANEL
SCE METER#: 222010-109642
(N) SE3800H-US (240V)
SETAPP SOLAREDGE HD
INVERTER
(N) 30A AC DISCONNECT
A
A
A
A
A
A
A
A
A A
3FT FIRE PATHWAY
3FT FIRE
PATHWAY
271°
AZIMUTH
20.0°
SLOPE
270°
AZIMUTH
30.0°
SLOPE
90°
AZIMUTH
30.0°
SLOPE
MODULE
EVEREST
CROSSRAIL 44-X
EVEREST SPLICE
FOOT X
END CLAMP
ASSEMBLY
EVEREST K2 SOLAR SEAL
BUTYL PAD
2 - MSX60 SELF-DRILLING
WOOD SCREWS THROUGH
7/16" OSB DIRECTL INTO THE
RAFTER FULLY THREADED,
1-5/8" OF EMBEDMENT INTO
RAFTER
ROOF ATTACHMENT DETAIL
COMP SHINGLE ROOF
SCALE: 2" = 1'-0"
SIDE VIEW
NOTE:
MODULES WILL BE INSTALLED FLUSHED TO
EXISTING ROOF SLOPE
STRUCTURAL ONLY
www.vincise.com
S T R U C T U R A L E N G I N E E R S
4.28.2023
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY:RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
AS BUILT REVISION
LAYOUT CHANGE16-30-23
A0
PROJECT INFO
VICINITY MAP
PV NOTES
VICINITY MAP
AERIAL VIEW
PROJECT SITE INFORMATION
NAME: JESUS JIMENEZ
ADDRESS:1919 N SPURGEON ST,
SANTA ANA, CA 92706
PHONE: (714) 651-1532
EMAIL: Jrjimenez190466@gmail.com
APN:
00315357
(ORANGE COUNTY)
UTILITY: SCE
AHJ: SANTA ANA CITY (CA)
BUILDING INFO
OCCUPANCY: R3-SFD CONSTRUCTION TYPE: VB
# OF STORIES: 2 BLDG AREA (SQFT): 1138
SPRINKLERS: NONE ROOF AREA (SQFT): 1348
ENGINEERING CRITERIA FOR RACKING
DESIGN WIND SPEED: 110 MPH
WIND EXPOSURE CATEGORY: B
GROUND SNOW LOAD: O PSF
PROJECT SCOPE
INSTALLATION OF ROOF MOUNT SOLAR PV SYSTEM
PV EQUIPMENT QTY MODEL NO AND MANUFACTURER
MODULES:11 MODEL#: HY-DH108P8-400
400W HYPERION MODULES
OPTIMIZERS:11 S440 SOLAREDGE OPTIMIZERS
AC COMBINER:1 SE3800H-US (240V)
SOLAREDGE HD INVERTER
SYSTEM SIZE:4.400 DC kW RATING
4.048 CEC AC RATING
ARRAY AREA:20.35 SQFT x 11 = 223.90 SQFT
MAIN SERVICE PANEL INFORMATION
UTILITY: SCE
EXISTING: YES UPGRADE: NO
BUS RATING: (E)200A MAIN BREAKER: (E)200A
PHASE: 1PH MB POSITION: END
# OF WIRES: 3 DERATE?: NO
VOLTAGE: 240V DERATE SIZE: N/A
UTILITY FED: OH
METER#: 222010-109642
SHEET INDEX
A0 PROJECT INFO, VICINITY MAP, NOTES
A1 SITE PLAN
A2 MOUNTING ROOF PLAN
E1 SINGLE LINE DIAGRAM
E2 ELECTRICAL CALCULATIONS
E3 - E3.1 REQUIRED SIGNAGE & DIRECTORY
E4 - E4.1 MODULE DATA SHEET & CERTIFICATION
E5 - E5.1 INVERTER DATA SHEET & CERTIFICATION
E6 OPTIMIZER DATA SHEET
S1 - S1.1 STANCHION DATA SHEET
S2 RACKING DATA SHEET
S3 - S3.3 RACKING ENGINEERING
S4 RACKING GROUNDING
S5 RACKING CERTIFICATION
APPLICABLE CODES
ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL COMPLY
WITH THE FOLLOWING 2022 APPLICABLE CODES
2022 CA BUILDING CODES (CBC)
2022 CA RESIDENTIAL CODES (CRC)
2022 CA MECHANICAL CODES (CMC)
2022 CA PLUMBING CODES (CPC)
2022 CA FIRE CODES (CFC)
2022 CA ELECTRICAL CODES (CEC)
2022 CA ENERGY CODES (CEnC)
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGreen)
4.400 DC kW SOLAR PV STRING INVERTER SYSTEM - ROOF MOUNT
1919 N SPURGEON ST, SANTA ANA, CA 92706
JIMENEZ RESIDENCE
SOLAR PHOTOVOLTAIC SYSTEM NOTES
2022 CODE REFERENCE
CEC 110.2
CEC 110.3
ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED TESTING LABORATORY AND INSTALLED PER
THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS
ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND
SWITCHES.
CEC 110.26 WORKING CLEARANCES TO BE PROVIDED AT NEW AND EXISTING ELECTRICAL EQUIPMENT
CEC ARTICLE 250 ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AND BONDED
ALL PV CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE PROTECTION AGAINST OVERCURRENT
CEC 690.13
CEC 690.15
DISCONNECTING MEANS OF THE PV SYSTEM (INCLUDING RAPID SHUTDOWN INITIATION) SHALL BE LOCATED IN
READILY ACCESSIBLE LOCATION NEAR THE EQUIPMENT
CEC 690.12 RAPID SHUTDOWN EQUIPMENT TO COMPLY WITH CEC 690.12.
CEC 705.40
THE UTILITY-INTERACTIVE INVERTERS SHALL AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE CONNECTED
ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THE SYSTEM AND SHALL
REMAIN IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN
RESTORED
CEC 310.10(D)
CEC 690.31(A) TO (F)
ALL CONDUCTORS IN EXPOSED OUTDOOR LOCATIONS SHALL BE LISTED AND IDENTIFIED FOR USE IN DIRECT
SUNLIGHT AND FOR THE APPLICATION.
CEC 690.31(C INSULATION OF EXPOSED CONDUCTORS UNDER THE MODULES SHALL BE USE-2 OR PV-WIRE TYPE FOR PV
SYSTEMS
CEC 110.14 FINE-STRANDED CABLE CONNECTIONS MUST BE MADE IN LUGS AND TERMINALS LISTED AND MARKED FOR THE
USE,
CEC 690.31(B) ALL PV CIRCUIT CONDUCTORS SHALL BE MARKED ON EACH END AND GROUPED FOR UNIQUE IDENTIFICATION
CEC 200.6, CEC
200.7 CEC 400.22
CEC 250.119
CEC 400.23
CEC 310.110(C)
ALL GROUNDED, (NEUTRAL), CONDUCTORS' INSULATION SHALL BE SOLID WHITE, GRAY, OR WITH 3-WHITE
STRIPES, CEC 200.6, 200.7, & 400.22; AND ALL GROUNDING CONDUCTORS SHALL BE OF BARE WIRE WITHOUT
COVERING, OR WITH INSULATION OF GREEN OR GREEN WITH YELLOW STRIPES, CEC 250.119 & 400.23. THE
COLOR OF UNGROUNDED CONDUCTORS SHALL BE OTHER THAN FOR GROUNDED, (NEUTRAL), AND
GROUNDING CONDUCTORS, CEC 310.110(C).
CEC 711.11(C)MAXIMUM CONDUCTOR LENGTH BETWEEN SUPPLY SIDE CONNECTION AND OVERCURRENT PROTECTION IS 10
FEET
CEC 705.12(B)CONNECTIONS ON THE LOAD SIDE OF THE SERVICE DISCONNECTING MEANS OF THE OTHER SOURCE(S) AT ANY
DISTRIBUTION EQUIPMENT ON THE PREMISES
CFC 605.11.2 DC WIRING INSIDE A BUILDING MUST BE IN METALLIC TYPE RACEWAYS, CONDUITS, ENCLOSURES, OR CABLE
SHEATHINGS
CEC 250.97 METALLIC TYPE RACEWAYS, CONDUITS, ENCLOSURES, AND CABLE SHEATHS CONTAINING CIRCUITS OVER
250-VOLTS TO GROUND MUST BE BONDED
CEC 314.15 ALL EXTERIOR CONDUIT, FITTINGS AND BOXES SHALL BE RAIN TIGHT AND APPROVED FOR USE IN WET LOCATIONS
CEC 690.31(C)(5)
CEC 110.14.
FLEXIBLE, FINE-STRANDED CABLES SHALL BE TERMINATED ONLY WITH TERMINALS, LUGS, DEVICES OR
CONNECTOR THAT ARE IDENTIFIED AND LISTED FOR SUCH USE
CEC 690.33 (D)(2)
CONNECTORS SHALL BE OF LATCHING OR LOCKING TYPE. CONNECTORS THAT ARE READILY ACCESSIBLE AND
OPERATING AT OVER 30 VOLTS SHALL REQUIRE TOOL TO OPEN AND MARKED “DO NOT DISCONNECT UNDER
LOAD” OR “NOT FOR CURRENT INTERRUPTING”
CEC 690.45
CEC 250.122
EQUIPMENT GROUNDING CONDUCTOR FOR PV MODULES SMALLER THAN 6 AWG SHALL BE PROTECTED FROM
PHYSICAL DAMAGE BY A RACEWAY OR CABLE ARMOR, CEC 690.46 & 250.120(C).
CEC 705.32 WHERE PROTECTION IS INSTALLED IN ACCORDANCE WITH 230.95, THE OUTPUT OF AN INTERACTIVE SYSTEM
SHALL BE CONNECTED TO THE SUPPLY SIDE OF THE GROUND-FAULT PROTECTION.
CEC 690.31(G)(4)THE MARKINGS, "WARNING: PHOTOVOLTAIC POWER SOURCE", FOR DC RACEWAYS AND CABLE ASSEMBLIES
MUST BE AT 10' O.C.; AND BENDS, ABOVE OR BELOW PENETRATIONS OF ROOFS, CEILINGS, WALLS, OR BARRIERS
CEC 300.4 CABLES/WIRES THAT ARE SUBJECT TO PHYSICAL DAMAGE, SUCH AS THOSE NOT LOCATED UNDER THE MODULES,
MUST BE PROTECTED
CEC 310.15
WHERE RACEWAYS OR CABLES ARE EXPOSED TO DIRECT SUNLIGHT ON OR ABOVE ROOFTOPS, RACEWAYS OR
CABLES SHALL BE INSTALLED A MINIMUM DISTANCE ABOVE THE ROOF TO THE BOTTOM OF THE RACEWAY OR
CABLE OF 7∕8 IN. WHERE THE DISTANCE ABOVE THE ROOF TO THE BOTTOM OF THE RACEWAY IS LESS THAN 7∕8
IN., A TEMPERATURE ADDER OF 60°F SHALL BE ADDED TO THE OUTDOOR TEMPERATURE TO DETERMINE THE
APPLICABLE AMBIENT TEMPERATURE FOR APPLICATION OF THE CORRECTION FACTORS IN TABLE 310.15(B)(2)(A)
OR TABLE 310.15(B)(2)(B).
CEC 690.56(C)IDENTIFICATION OF POWER SOURCE RAPID SHUTDOWN AND LABELING SHALL BE IN ACCORDANCE WITH CEC
690.56(C).
CEC 690.31(G)(4)LABELS SHALL BE REFLECTIVE, AND ALL LETTERS SHALL BE CAPITALIZED AND SHALL BE A MINIMUM HEIGHT OF 3/8''
IN WHITE ON A RED BACKGROUND. CEC 690.31(G)(4)
690.56(C)IDENTIFICATION OF POWER SOURCE RAPID SHUTDOWN AND LABELING SHALL BE IN ACCORDANCE WITH CEC
690.56(C).
WHEN THE MAIN CIRCUIT BREAKER IS DERATED, A PERMANENT MARKING MUST BE PROVIDED ON THE
PANELBOARD TO INDICATE THAT THE MAIN CIRCUIT BREAKER HAS BEEN DOWNSIZED TO _______ AMPS, DO NOT
UPSIZE IT.
CRC R324.7
CRC R302.1.
GROUND-MOUNTED PV SYSTEMS MUST HAVE A CLEAR, BRUSH-FREE AREA OF 10-FEET AND A FIRE SEPARATION
DISTANCE OF 5-FEET MINIMUM TO OTHER STRUCTURES AND PROPERTY LINES
EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, & VENTILATIONS INTAKE AIR OPENINGS SHALL NOT BE
COVERED OR BLOCKED BY THE SOLAR PHOTOVOLTAIC SYSTEM.
CPC 906.1
EXISTING DWV PLUMBING VENT TERMINATIONS THAT ARE HORIZONTALLY LOCATED CLOSER THAN 12" FROM THE
PROPOSED MODULES, MUST BE REROUTED, OR MUST BE EXTENDED A MINIMUM OF 6" ABOVE THE SURFACE OF
THE MODULES
CMC 802.6.1(1)
CPC 509.6.1(1)
EXISTING B-VENT TERMINATIONS, FOR FUEL BURNING APPLIANCES, WHERE ADJACENT TO THE PROPOSED
MODULES, MUST BE EXTENDED 12" ABOVE THE MODULES' TOP SURFACE, CMC 802.6.1(1) & CPC 509.6.1(1).
CEC 250.52(A)(5)
CEC 250.53(G)
GROUNDING ROD ELECTRODES SHALL BE MINIMUM 5/8’’ IN DIAMETER AND INSTALLED 8’ MINIMUM IN
CONTACT WITH SOIL
CEC 250.104 FOR ELECTRICAL SERVICE REPLACEMENTS, BONDING TO THE METAL PIPES OF NATURAL GAS, HOT WATER, AND
COLD WATER MUST BE PROVIDED
PROPOSED LOCATIONS OF ELECTRICAL SERVICE REPLACEMENTS MUST ALSO BE APPROVED BY THE ELECTRICAL
UTILITY COMPANY.
CRC R314.1
CRC R315.1
APPROVED SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED WITHIN THE DWELLING UNIT AND SHALL
BE FIELD VERIFIED EITHER THROUGH FINAL BUILDING INSPECTION. SMOKE ALARMS ARE REQUIRED TO BE
INSTALLED IN ALL BEDROOMS, OUTSIDE EACH BEDROOM, AND AT LEAST ONE ON EACH FLOOR OF THE HOUSE.
CARBON MONOXIDE ALARMS ARE REQUIRED OUTSIDE EACH BEDROOM AND AT LEAST ONE ON EACH FLOOR
OF THE HOUSE.
CRC R324.3
PHOTOVOLTAIC (PV) SYSTEMS SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTIONS R324.3.1
THROUGH R324.7.1 AND THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE ELECTRICAL PORTION OF
SOLAR PV SYSTEMS SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE CALIFORNIA ELECTRICAL
CODE.
CRC R324.6
ROOF ACCESS, PATHWAYS AND SETBACK REQUIREMENTS SHALL BE PROVIDED IN ACCORDANCE WITH
SECTIONS R324.6.1 THROUGH R324.6.2.1. ACCESS AND MINIMUM SPACING SHALL BE REQUIRED TO PROVIDE
EMERGENCY ACCESS TO THE ROOF, TO PROVIDE PATHWAYS TO SPECIFIC AREAS OF THE ROOF, PROVIDE FOR
SMOKE VENTILATION OPPORTUNITY AREAS, AND TO PROVIDE EMERGENCY EGRESS FROM THE ROOF.
A LADDER MUST BE PROVIDED FOR INSPECTIONS IN ACCORDANCE WITH CAL-OSHA REGULATIONS, SECURED
AND EXTENDING 3' ABOVE THE ROOF. LADDERS SHALL BE OSHA APPROVED AND SECURED TO THE STRUCTURE
FOR INSPECTION PURPOSES.
CONTRACTORS ARE REQUIRED TO BE PRESENT FOR THE FIRST AND/OR FINAL INSPECTIONS.
ALL OF THE REQUIRED MARKINGS, SIGNS, AND LABELS MUST BE INSTALLED ON ALL EQUIPMENT PRIOR TO ANY
INSPECTIONS.
PLAN CHECK AND PERMIT FOR PV SYSTEM AND ASSOCIATED EQUIPMENT ONLY.
ALL PROJECTS SUBJECT TO FIELD VERIFICATION FOR CODE COMPLIANCE.
NOTIFY SERVING UTILITY BEFORE ACTIVATION OF PV SYSTEM.
PROJECT SITE
STRUCTURAL ONLY
www.vincise.com
S T R U C T U R A L E N G I N E E R S
06.30.2023
The scope of the plans is for the installation of the solar photovoltaic
system only and the approval is subject to compliance with all
applicable city and state codes and regulations regarding construction.
The approval of the plans does not constitute any certification of the
accuracy, completeness, or building permit status of the existing
buildings and structures as shown.
REVISION TO
101115455
Issued 06/14/23
101115782
Issued 07/17/23
Change to layout
1919 N Spurgeon St
07/17/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
AS BUILT REVISION
LAYOUT CHANGE16-30-23
SITE PLAN
A1
LEGEND:
(E) - EXISTING
(N) - NEW
(P) - PROPOSED
SITE PLAN
SCALE: 1/16"=1'
(N) 11 -MODEL#: HY-DH108P8-400
400W HYPERION MODULES WITH
S440 SOLAREDGE OPTIMIZERS
(E)2 - STORY
1138 SQ FT
(E) DRIVEWAY
(E) 200A MAIN SERVICE PANEL
SCE METER#: 222010-109642
N
S
P
U
R
G
E
O
N
S
T
(N) SE3800H-US (240V)
SETAPP SOLAREDGE HD
INVERTER
PROPERTY LINE
1
2
(N) 30A AC DISCONNECT
PRO
P
E
R
T
Y LINE
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
5
6
7
4
1
0
1
1
9
8
3 (E) TOOL SHED
W/O ELECTRICAL
1
STRUCTURAL ONLY
www.vincise.com
S T R U C T U R A L E N G I N E E R S
06.30.2023
1919 N Spurgeon
St07/17/23
D INVMSP
JB
1
2
3'3'
18" MIN
18" MIN
3'
3'
2 X 4 RAFTER
@ 24" OC
2 78"
1-5/
8
"
MIN
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R CA L I I N C.
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
AS BUILT REVISION
LAYOUT CHANGE16-30-23
MOUNTING PLAN
SOLAR PANEL DEAD WEIGHT CALCULATION
MODULE HYPERION
WIDTH (IN)LENGTH (IN)AREA (SQFT) WEIGHT (LBS) QTY
TOTAL
MODULE
AREA
TOTAL MODULE
WEIGHT
43.23 67.80 20.35 48.50 11 223.90 533.50
RACKING EVEREST
RACKING
WEIGHT
LBS/LNFT
MOUNTING
SYSTEM WEIGHT
TOTAL SYSTEM
WEIGHT
TOTAL
ATTACHMENT
POINTS
POINT LOAD
CALCS DISTRIBUTED LOAD CALCULATION
.75 66.69 600.19 32 18.76 2.68 PSF
NOTE: THE POINT LOADING AND DISTRIBUTED LOADING SHOULD BE MAX 5 LBS/FT2
ROOF COVERAGE
TOTAL MODULE
AREA
ROOF FACE AREA
(SQFT)
ROOF
COVERAGE COMPLIANCE WITH R324.6.2 SET BACK AT RIDGE
223.90 1348 16.61 % </= 33% 18" SET BACK AT RIDGE
ROOF INFORMATION
ROOF TYPE COMP SHINGLE ROOF - 2 LAYERS MAX
RAFTERS TRUSS RAFTER SPACING (IN)ATTACHMENT SPACING
2 X 4 N/A 24" OC 48" OC A2
(N) 3/4" EMT CONDUIT
RUN ABOVE ROOF OR
UNDER EAVES WHERE POSSIBLE
7/8'' MINIMUM ABOVE THE ROOF
CEC 310.15(B)(3)(C)
(N) 32 TOTAL
ATTACHMENTS
@ 4FT ON CENTER
(N) 11 - MODEL#: HY-DH108P8-400
400W HYPERION MODULES WITH
S440 SOLAREDGE OPTIMIZERS
STRING A - 11 MODULES
FIRE ACCESS POINT#2
AREA NOT TO BE OVER
ANY DOORS, WINDOWS
OR OTHER
OBSTRUCTIONS.
FIRE ACCESS POINT#1
AREA NOT TO BE OVER
ANY DOORS, WINDOWS
OR OTHER
OBSTRUCTIONS.
LEGEND
(E) EXISTING
(N) NEW
(P) PROPOSED
CONDUIT RUN
VIF VERIFY IN FIELD
JUNCTION BOX
MAIN SERVICE PANEL
AC COMBINER
INVERTER
AC DISCONNECT
SUBPANEL
SOLAR METER
FIRE ACCESS POINTS
FIRE PATHWAY/SETBACKS
JB
MSP
D
SP
INV
AC
M
x
MOUNTING PLAN
SCALE: 3/32"=1'
NOTE: ALL DIMENSIONS SHOWN
RELATING TO EXISTING
CONSTRUCTION ARE
APPROXIMATE. THE CONTRACTOR
SHALL FIELD VERIFY ALL ACTUAL
DIMENSIONS. DIMENSIONS,
UNLESS NOTED +/- IR VIF (VERIFY
IN FIELD), EXACT LOCATIONS,
DISTANCES, ELEVATIONS AND
SIMILAR DATA SHALL BE
GOVERNED BY ACTUAL FIELD
CONDITIONS.
A
(E) 200A MAIN SERVICE PANEL
SCE METER#: 222010-109642
(N) SE3800H-US (240V)
SETAPP SOLAREDGE HD
INVERTER
(N) 30A AC DISCONNECT
A
A
A
A
A
3FT FIRE PATHWAY
3FT FIRE
PATHWAY
271°
AZIMUTH
20.0°
SLOPE
270°
AZIMUTH
30.0°
SLOPE
90°
AZIMUTH
30.0°
SLOPE
MODULE
EVEREST
CROSSRAIL 44-X
EVEREST SPLICE
FOOT X
END CLAMP
ASSEMBLY
EVEREST K2 SOLAR SEAL
BUTYL PAD
2 - MSX60 SELF-DRILLING
WOOD SCREWS THROUGH
7/16" OSB DIRECTL INTO THE
RAFTER FULLY THREADED,
1-5/8" OF EMBEDMENT INTO
RAFTER
ROOF ATTACHMENT DETAIL
COMP SHINGLE ROOF
SCALE: 2" = 1'-0"
SIDE VIEW
NOTE:
MODULES WILL BE INSTALLED FLUSHED TO
EXISTING ROOF SLOPE
A
A
A
A
A
1
STRUCTURAL ONLY
www.vincise.com
S T R U C T U R A L E N G I N E E R S
06.30.2023
1919 N Spurgeon
St07/17/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
AS BUILT REVISION
LAYOUT CHANGE1 6-30-23
REQUIRED
SIGNAGE
E3.1
MAIN SERVICE
PANEL
SOLAR
ARRAYS
INVERTER
DIRECTORY PLACARD
6"
6"
CAUTION
DR
I
V
E
W
A
Y
ADDRESS: 1919 N SPURGEON ST
N
S
P
U
R
G
E
O
N
S
T
2 LABELING REQUIREMENTS
2022 CODE REFERENCE
CEC 690.13(B)
EACH PV SYSTEM DISCONNECTING MEANS SHALL PLAINLY INDICATE WHETHER IN THE OPEN (OFF) OR CLOSED (ON)
POSITION AND BE PERMANENTLY MARKED "PV SYSTEM DISCONNECT" OR EQUIVALENT. ADDITIONAL MARKINGS SHALL
BE PERMITTED BASED UPON THE SPECIFIC SYSTEM CONFIGURATION. FOR PV SYSTEM DISCONNECTING MEANS WHERE
THE LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION.THE WARNING SIGN(S) OR LABEL(S) SHALL
COMPLY WITH 110.21(B).
CEC 690.56(C)
BUILDINGS WITH PV SYSTEMS SHALL HAVE A PERMANENT LABEL LOCATED AT EACH SERVICE EQUIPMENT LOCATION TO WHICH
THE PV SYSTEMS ARE CONNECTED OR AT AN APPROVED READILY VISIBLE LOCATION AND SHALL INDICATE THE LOCATION OF
RAPID SHUTDOWN INITIATION DEVICES.
CEC 690.31(B)(1)
PV SYSTEM DC CIRCUIT CONDUCTORS SHALL BE IDENTIFIED AT ALL TERMINATION, CONNECTION, AND SPLICE POINTS BY COLOR
CODING, MARKING TAPE, TAGGING, OR OTHER APPROVED MEANS. CONDUCTORS RELYING ON OTHER THAN COLOR
CODING FOR POLARITY IDENTIFICATION SHALL BE IDENTIFIED BY AN APPROVED PERMANENT MARKING MEANS SUCH AS
LABELING, SLEEVING, OR SHRINK-TUBING THAT IS SUITABLE FOR THE CONDUCTOR SIZE.
CEC 690.31(D)(2)
UNLESS LOCATED AND ARRANGED SO THE PURPOSE IS EVIDENT, THE FOLLOWING WIRING METHODS AND
ENCLOSURES THAT CONTAIN PV SYSTEM DC CIRCUIT CONDUCTORS SHALL BE MARKED WITH THE WORDING
PHOTOVOLTAIC POWER SOURCE OR SOLAR PV DC CIRCUIT BY MEANS OF PERMANENTLY AFFIXED LABELS OR OTHER
APPROVED PERMANENT MARKING:
(1) EXPOSED RACEWAYS, CABLE TRAYS, AND OTHER WIRING METHODS
(2) COVERS OR ENCLOSURES OF PULL BOXES AND JUNCTION BOXES
(3) CONDUIT BODIES IN WHICH ANY OF THE AVAILABLE CONDUIT OPENINGS ARE UNUSED.
THE LABELS OR MARKINGS SHALL BE VISIBLE AFTER INSTALLATION. ALL LETTERS SHALL BE CAPITALIZED AND SHALL BE A
MINIMUM HEIGHT OF 9.5 MM (3∕8 IN.) IN WHITE ON A RED BACKGROUND. LABELS SHALL APPEAR ON EVERY SECTION
OF THE WIRING SYSTEM THAT IS SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS. SPACING
BETWEEN LABELS OR MARKINGS, OR BETWEEN A LABEL AND A MARKING, SHALL NOT BE MORE THAN 3 M (10 FT).
LABELS REQUIRED BY THIS SECTION SHALL BE SUITABLE FOR THE ENVIRONMENT WHERE THEY ARE INSTALLED.
CEC 690.31(E)
SOLIDLY GROUNDED BIPOLAR PV SYSTEMS SHALL BE CLEARLY MARKED WITH A PERMANENT, LEGIBLE WARNING
NOTICE INDICATING THAT THE DISCONNECTION OF THE GROUNDED CONDUCTOR(S) MAY RESULT IN OVERVOLTAGE
ON THE EQUIPMENT.
CEC 690.33(D)(2)INTERRUPTION OF CIRCUIT. CONNECTORS SHALL BE A TYPE THAT REQUIRES THE USE OF A TOOL TO OPEN AND
MARKED “DO NOT DISCONNECT UNDER LOAD” OR “NOT FOR CURRENT INTERRUPTING.”
CEC 690.52 ALTERNATING-CURRENT MODULES SHALL BE MARKED WITH IDENTIFICATION OF TERMINALS OR LEADS AND WITH
IDENTIFICATION OF THE FOLLOWING RATINGS.
CEC 690.53
A PERMANENT READILY VISIBLE LABEL INDICATING THE HIGHEST MAXIMUM DC VOLTAGE IN
A PV SYSTEM, CALCULATED IN ACCORDANCE WITH 690.7, SHALL BE PROVIDED BY THE INSTALLER AT ONE OF THE
FOLLOWING LOCATIONS:
(1) DC PV SYSTEM DISCONNECTING MEANS
(2) PV SYSTEM ELECTRONIC POWER CONVERSION EQUIPMENT
(3) DISTRIBUTION EQUIPMENT ASSOCIATED WITH THE PV SYSTEM.
CEC 690.54
ALL INTERACTIVE SYSTEM(S) POINTS OF INTERCONNECTION WITH OTHER SOURCES SHALL BE MARKED AS AN
ACCESSIBLE LOCATION AT THE DISCONNECTING MEANS AS A POWER SOURCE AND WITH THE RATED AC OUTPUT
CURRENT AND THE NOMINAL OPERATING AC VOLTAGE.
CEC 690.55 THE PV SYSTEM OUTPUT CIRCUIT CONDUCTORS SHALL BE MARKED TO INDICATE POLARITY WHERE CONNECTED TO
ENERGY STORAGE SYSTEMS.
CEC 690.56(B) PLAQUES OR DIRECTORIES SHALL BE INSTALLED IN ACCORDANCE WITH 705.10 AND 712.10.
CEC 690.56(C) THE TYPE OF PV SYSTEM IS SHOWN IN FIGURE 690.56 (C).
CEC 690.56(C)(2)
A RAPID SHUTDOWN INITIATION DEVICE SHALL HAVE A LABEL LOCATED ON OR NO MORE
THAN 1 M (3 FT) FROM THE INITIATION DEVICE THAT INCLUDES THE FOLLOWING WORDING:
RAPID SHUTDOWN FOR SOLAR PV SYSTEM
THE LABEL SHALL BE REFLECTIVE, WITH ALL LETTERS CAPITALIZED AND HAVING A
MINIMUM HEIGHT OF 9.5 MM (3∕8 IN.), IN WHITE ON RED BACKGROUND.
CEC 690.59 PV SYSTEMS CONNECTED TO OTHER SOURCES SHALL BE INSTALLED IN ACCORDANCE WITH PARTS I AND II OF ARTICLE
705.
CEC 705.12(B)(3)(3)
THE SUM OF THE AMPERE RATINGS OF ALL OVERCURRENT DEVICES ON PANELBOARDS,
BOTH LOAD AND SUPPLY DEVICES, EXCLUDING THE RATING OF THE OVERCURRENT DEVICE PROTECTING THEBUSBAR,
SHALL NOT EXCEED THE AMPACITY OF THE BUSBAR. THE RATING OF THE OVERCURRENT DEVICEPROTECTING THE
BUSBAR SHALL NOT EXCEED THE RATING OF THE BUSBAR. PERMANENT WARNING LABELSSHALL BE APPLIED TO
DISTRIBUTION EQUIPMENT DISPLAYING THE FOLLOWING OR EQUIVALENT WORDING:
WARNING: THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL
OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICESHALL NOT
EXCEED AMPACITY OF BUSBAR.
CEC 705.12(D)SUITABLE FOR BACKFEED. FUSED DISCONNECTS, UNLESS OTHERWISE MARKED, SHALL BE
CONSIDERED SUITABLE FOR BACKFEED.
CEC 706.15(C)
EACH ESS DISCONNECTING MEANS SHALL PLAINLY INDICATE WHETHER IT IS IN THE
OPEN (ON) OR CLOSED (OFF) POSITION AND BE PERMANENTLY MARKED
“ENERGY STORAGE SYSTEM DISCONNECT"
THE DISCONNECTING MEANS SHALL BE LEGIBLY MARKED IN THE FIELD TO INDICATE THE FOLLOWING:
NOMINAL ESS AC VOLTAGE AND MAXIMUM ESS DC VOLTAGE
AVAILABLE FAULT CURRENT DERIVED FROM THE ESS
AN ARC-FLASH LABEL APPLIED IN ACCORDANCE WITH ACCEPTABLE INDUSTRY PRACTICE
DATA CALCULATION WAS PERFORMED.
CEC 110.27(C)
ENTRANCES TO ROOMS OR OTHER GUARDED LOCATIONS THAT CONTAIN EXPOSED LIVE
PARTS SHALL BE MARKED WITH CONSPICUOUS WARNING SIGNS FORBIDDING UNQUALIFIED PERSONS TO
ENTER.
CEC 705.10
A PERMANENT PLAQUE OR DIRECTORY SHALL BE INSTALLED AT A BUILDING SUPPLIED BY A STAND-ALONE
SYSTEM AT EACH SERVICE EQUIPMENT LOCATION, OR AT AN APPROVED READILY VISIBLE LOCATION.
THE PLAQUE OR DIRECTORY SHALL DENOTE THE LOCATION OF EACH POWER SOURCE DISCONNECTING
MEANS FOR THE PREMISES OR BE GROUPED WITH OTHER PLAQUES OR DIRECTORIES FOR OTHER ON-SITE
SOURCES. THE
MARKING SHALL COMPLY WITH 110.21(B).
CEC 705.12(C)
EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR
CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES SHALL BE MARKED TO INDICATE THE PRESENCE
OF ALL SOURCES.
CEC 705.12(B)(3)(3)
PERMANENT WARNING LABELS SHALL BE APPLIED TO DISTRIBUTION EQUIPMENT DISPLAYING THE FOLLOWING
OR EQUIVALENT WORDING: THIS EQUIPMENT FED BY MULTIPLE SOURCES: TOTAL RATING OF ALL
OVERCURRENT DEVICES EXCLUDING MAIN
POWER SUPPLY SHALL NOT EXCEED AMPACITY OF BUSBAR.
CEC 705.12(B)(3)(2)
A PERMANENT WARNING LABEL SHALL BE APPLIED TO THE DISTRIBUTION EQUIPMENT ADJACENT TO THE
BACK-FED BREAKER FROM THE INVERTER POWER SOURCE THAT DISPLAYS THE FOLLOWING OR EQUIVALENT
WORDING:
“WARNING: POWER OUTPUT CONNECTION.
DO NOT RELOCATE THIS OVERCURRENT DRIVE.”
CEC 705.10 & 690.56(A)(B)
705.10 IDENTIFICATION OF POWER SOURCES
A PERMANENT PLAQUE OR DIRECTORY SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION, OR AT AN APPROVED READILY VISIBLE LOCATION. THE
PLAQUE OR DIRECTORY SHALL DENOTE THE LOCATION OF EACH POWER SOURCE DISCONNECTING MEANS FOR THE BUILDING OR STRUCTURE AND BE
GROUPED WITH OTHER PLAQUES OR DIRECTORIES FOR OTHER ON-SITE SOURCES. THE PLAQUE OR DIRECTORY SHALL BE MARKED WITH THE WORDING
"CAUTION: MULTIPLE SOURCES OF POWER."
ANY POSTED DIAGRAMS SHALL BE CORRECTLY ORIENTED WITH RESPECT TO THE DIAGRAM'S LOCATION. THE MARKING SHALL COMPLY WITH 110.21(B).
EXCEPTION: INSTALLATIONS WITH MULTIPLE CO-LOCATED POWER PRODUCTION SOURCES SHALL BE PERMITTED TO BE IDENTIFIED AS A GROUP(S). THE PLAQUE
OR DIRECTORY SHALL NOT BE REQUIRED TO IDENTIFY EACH POWER SOURCE INDIVIDUALLY.
MULTIPLE SOURCES OF POWER
AC DISCO
1
1919 N Spurgeon
St07/17/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
ELECTRICAL
LINE DIAGRAM
(N) SE3800H-US (240V)
SOLAREDGE HD INVERTER(N) 11 - MODEL#: HY-DH108P8-400
400W HYPERION MODULES WITH
S440 SOLAREDGE OPTIMIZERS (N)JBOX
NEMA 3R
...
DC1
WITH INTEGRATED DC DISCONNECT
AND AUTOMATIC RAPID SHUTDOWN
UPON AC GRID DISCONNECT
DC
AC
N
G
OPTIMIZER ISC CALCULATION
MAX# OF MODULES X MODULE WATTAGE 4400 = 11.00 AMPSNOMIMAL DC INPUT VOLTAGE OF INVERTER 400
(OPTIMIZER MAX OUTPUT CURRENT) [CEC 690.8]15 > 11.00 = OK
AMPS AMPS
13.79A (MODULE ISC) </= 14.50A (OPTIMIZER ISC) = OK
OPTIMIZER VOC CALCULATION
LARGEST MODULE VOC FOR SINGLE-MODULE DC/DC CONVERTER CONFIGURATIONS (WITH 80V AFCI CAP)
(CEC 690.7 and 690.11)
MODULE VOC ____ X # OF MODULES PER CONVERTER ___X CF = V
MODULE VOC 37.07 TL IS GREATER THAN OR EQUAL TO
-5°C, CF 1.12
MODULES PER OPTIMIZER 1.00
VOLTS 41.52
THE VALUE CALCULATED MUST BE LESS THAN OPTIMIZERS
MAX DC INPUT VOLTAGE 60V > 41.52 OK
OPTIMIZER SPECIFICATION
MAKE SOLAREDGE S440
MAXIMUM INPUT DC POWER 440
MAX INPUT VOLTAGE (VOC)60 V
SHORT CIRCUIT CURRENT (ISC)14.50 A
MAX OUTPUT CURRENT 15 A
MAX OUTPUT VOLTAGE 60 V
MODULE SPECIFICATION
MANUFACTURER HYPERION
MODEL NO.HY-DH108P8-400
PEAK POWER 400 W
RATED VOLTAGE (Vmp)31.01 V
RATED CURRENT (Imp)12.90 A
OPEN CIRCUIT VOLTAGE (Voc)37.07 V
SHORT CIRCUIT CURRENT (Isc)13.79 A
INVERTER SPECIFICATION
INVERTER MAKE SOLAREDGE
INVERTER MODEL NO.SE3800H-US (240V)
MAX INPUT VOLTAGE 480 V
MAX INPUT CURRENT 10.5 A
NOMIMAL AC VOLTAGE 240 V
MAX AC CURRENT 16 A
THIS DISCONNECT WILL BE THE RAPID
SHUTDOWN INITIATION DEVICE TO
COMPLY WITH CEC 690.12 (C)
STRING A - 11
G
E1
DC2
AC1
AC2
EATON DG221URB
30A, 2P, 240V, TYPE DG,
NON-FUSIBLE, NEMA 3R
(N) 30A AC
DISCONNECT
WIRE/CONDUIT SCHEDULE
NOTE: TERMINATE LUGS AT 75°. WIRING/CONDUIT RACEWAY WILL BE MIN 7/8'' ABOVE THE ROOF
TAG DESCRIPTION &21'8&725 7<3(6,=(48$17,7<CONDUIT
SIZE/TYPE
DC1 ARRAY TO JBOX
2 #10 AWG 1+ & 1- PV WIRE
FREE AIR
1 #6 AWG GND- BARE COPPER
DC2 JBOX TO INVERTER
2 #10 AWG 1+ & 1- THWN-2
3/4" EMT
1 #8 AWG GND THWN-2
AC1 INVERTER TO AC
DISCONNECT
3 #10 AWG L1, L2 & N THWN-2
3/4" EMT
1 #8 AWG GND THWN-2
AC2 AC DISCONNECT TO
MAIN SERVICE PANEL
3 #10 AWG L1, L2 & N THWN-2
3/4" EMT
1 #8 AWG GND THWN-2
INTERCONNECTION COMPLIANCE PER 705 CODE
MAX AC OUTPUT OF INVERTER WITH 125%
MAX AC OUTPUT (AMPS) TOTAL # INVERTER TOTAL MAX AC
OUTPUT 125% RESULT (AMPS)OCPD
SIZE
16.00 1 16.00 1.25 20.00 20A
SERVICE PANEL CALCULATIONS WITH 120%
BUS RATING SIZE MUTIPLIER (120%)RESULT MAIN
BREAKER
INVERTER AC
OUTPUT+125%RESULT
200 1.20 240 200 20.00 220.00
240.00 >/=220.00 = OK
INTERCONNECTION COMPLIANCE CODE REFERENCE:
705.12(B)(3)BUSBARS
(2) Where two sources, one a primary power source and the other another power source, are
located at opposite ends of a busbar that contains loads, the sum of 125 percent of the
power-source(s) output circuit current and the rating of the overcurrent device protecting the
busbar shall not exceed 120 percent of the ampacity of the busbar. The busbar shall be sized for the
loads connected in accordance with Article 220. A permanent warning label shall be applied to the
distribution equipment adjacent to the back-fed breaker from the power source that displays the
following or equivalent wording:
WARNING:
POWER SOURCE OUTPUT CONNECTION
DO NOT RELOCATE THIS OVERCURRENT DEVICE.
The warning sign(s) or label(s) shall comply with 110.21(B).
NOTE:
1) PV BREAKER MUST BE INSTALLED AT THE
FARTHEST, OPPOSITE END OF MAIN
BREAKER
2) SOLAR GROUND TYING INTO THE UFER
GROUND POINT
M
G
N
(E)200A
(N)20A
MCB
PV OCPD
SCE
METER#
222010-
109642
EARTH
GROUND
EXISTING
200A MAIN SERVICE PANEL
240V, 1-PHASE, 3W
END FED
1919 N Spurgeon
St06/15/23
ELECTRICAL
CALCULATIONS
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
E2
MODULE SPECIFICATION INVERTER SPECIFICATION LOCATION INFORMATION
MANUFACTURER HYPERION INVERTER MAKE SOLAREDGE NEC TABLE 310.15 (B)(2)(a)-TEMP CORRECTION FACTORS
MODEL NO.HY-DH108P8-400 INVERTER MODEL NO.SE3800H-US (240V)HIGH TEMP 39
PEAK POWER 400 WATTS MAX INPUT VOLTAGE 480 VOLTS LOW TEMP -7
MPP VOLTAGE (VMPP)31.01 VOLTS MAX INPUT CURRENT 10.5 AMPS VOLTAGE CORRECTION FACTOR 1.12
MPP CURRENT (IMPP)12.90 AMPS NOMIMAL AC VOLTAGE 240 VOLTS ROOF TEMP + 33°-IF RACEWAY CONDUIT IS LESS THAN 7/8" ABOVE ROOF 72
OPEN CIRCUIT VOLTAGE (VOC)37.07 VOLTS MAX AC CURRENT 16 AMPS TEMP CORRECTION FACTOR (EXPOSED)0.50
SHORT CIRCUIT CURRENT (ISC)13.79 AMPS TEMP CORRECTION FACTOR (INSIDE CONDUIT)0.91
OPTIMIZER SPECIFICATION
MAKE SOLAREDGE
MODEL NUMBER S440
MAXIMUM INPUT DC POWER 440 WATTS
ABSOLUTE MAX INPUT VOLTAGE (VOC)60 VDC
MAX SHORT CIRCUIT CURRENT (ISC)14.50 ADC
MAX OUTPUT CURRENT 15 ADC
MAX OUTPUT VOLTAGE 60 VDC
DC CONDUCTOR AMPACITY CALCULATIONS
ARRAY STRING TO JBOX TO INVERTER
AC CONDUCTOR AMPACITY CALCULATIONS
BETWEEN INVERTER TO POINT OF CONNECTION AND/OR MAIN SERVICE PANEL
EXPECTED WIRE TEMPERATURE (FREE AIR)39 CELSIUS AMBIENT TEMPERATURE ADJUSTMENT EXPOSED CONDUIT 39 CELSIUS
ADD 33°C FOR CONDUITS EXPOSED TO SUNLIGHT
ON OR ABOVE ROOF 72 CELSIUS TEMPERATURE CORRECTION FACTOR 0.91
TEMPERATURE CORRECTION FACTOR
CEC TABLE 310.15 (B)(2)(A)0.91 # OF CURRENT CARRYING CONDUCTORS 2
# OF CURRENT CARRYING CONDUCTORS 2 CONDUIT FILL CORRECTION 1.00 1.00 (3 WIRES) .80 (4-6 WIRES)
.70 (7-9 WIRES) .50 (10-20 WIRES)
CONDUIT FILL CORRECTION 1.00 1.00 (3 WIRES) .80 (4-6 WIRES)
.70 (7-9 WIRES) .50 (10-20 WIRES)CIRCUIT CONDUCTOR SIZE #10 AWG
CIRCUIT CONDUCTOR SIZE #10 AWG CIRCUIT CONDUCTOR AMPACITY @ 90°40 AMPS
CIRCUIT CONDUCTOR AMPACITY@75°35 AMPS INVERTER'S MAXIMUM AC OUPUT CURRENT 16 AMPS
REQUIRED CIRCUIT CONDUCTOR AMPACITY 18.75 AMPS (P401 ISC X 1.25) REQUIRED AC CONDUCTOR AMPACITY 20.00 AMPS
DERATED AMPACITY OF CIRCUIT CONDUCTOR 31.85 AMPS DERATED AMPACITY OF CIRCUIT CONDUCTORS 36.40 AMPS
NOTE: DERATED AMPACITY OF CIRCUIT CONDUCTOR MUST BE
LARGER THAN REQUIRED CIRCUIT CONDUCTOR AMPACITY 31.85 >/= 18.75 NOTE: DERATED AMPACITY OF CIRCUIT CONDUCTOR MUST BE LARGER THAN
REQUIRED CIRCUIT CONDUCTOR AMPACITY 36.40 >/= 20.00
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
REQUIRED
SIGNAGE
E3
PV ARRAY
JBOX
1
5
INVERTER
DC
DISCO
3
4
4
AC
DISCO M
MAIN SERVICE
PANEL
2
6
7
SEE PAGE E3.1
1 COMBINER BOX/CIRCUITS/
CONDUIT COMBINER
BOX/ENCLOSURES/EMT
ENCLOSURE
WARNING!
TERMINALS ON THE LINE AND
LOAD SIDES MAY BE ENERGIZED
IN THE OPEN POSITION
ELECTRICAL SHOCK HAZARD
CEC 706.15(C)(4) and CEC 690.13(B)
CEC 110.27(C) & OSHA 1910.145(f)(7)
WARNING!
TURN OFF PHOTOVOLTAIC
AC DISCONNECT PRIOR TO
WORKING I NSIDE PANEL
2 BUILDING/STRUCTURE
CAUTION
POWER TO THIS SERVICE IS ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
DISCONNECTS LOCATED AS SHOWN
AC DISCONNECT
INVERTER
PV ARRAY
UTILITY
AC DISCONNECT
NORTH
CEC 705.10 & 690.56(A)(B)
3 EMT/CONDUIT RACEWAYS
4
CEC 690.31(O)(2)
CEC 690.31(O)(2)
SOLAR PV DC CIRCUIT
PHOTOVOLTAIC POWER SOURCE
DC DISCONNECT
SOLAR PV SYSTEM EQUIPPED
WI TH RAPI D SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SHUTDOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD
IN THE ARRAY
SOLAR ELECTRIC
PV PANELS
IFC 605.11.3.1(1) & CEC 690.56(C)
RAPID SHUTDOWN FOR
SOLAR PV SYSTEM
CEC 690.56(C)(2))
PHOTOVOLTAIC
DC DISCONNECT
CEC 690.13(B)
MAIN SERVICE DISCONNECT
WARNING!
TERMINALS ON THE LINE AND
LOAD SIDES MAY BE ENERGIZED
IN THE OPEN POSITION
ELECTRICAL SHOCK HAZARD
CEC 706.15(C)(4) and CEC 690.13(B)
CEC 110.27(C) & OSHA 1910.145(f)(7)
WARNING!
TURN OFF PHOTOVOLTAIC
AC DISCONNECT PRIOR TO
WORKING I NSIDE PANEL
DO NOT DISCONNECT
UNDER LOAD
CEC 690.15 (B) & CEC 690.33(D)(2)
WARNING !DUAL POWER SOURCE
SECOND SOURCE I S PHOTOVOLTAIC SYSTEM
CEC 705.12(C) & NEC 690.59
MAIN PHOTOVOLTAIC
SYSTEM DISCONNECT
PHOTOVOLTAIC AC DISCONNECT
RATED AC OUTPUT CURRENT
NORMAL OPERATING VOLTAGE
A
V
16
240
CEC 690.54
CEC 690.13(B)
POWER S OURCE OUTPUT
CONNECTI ON. DO NOT
RELOCATE T HI S
OVERCURRENT DEVI CE.
WARNING!
CEC 705.12 (B)(3)(2MAXIMUM DC VOLTAGE
OF PV SYSTEM
CEC 690.13(B)
480 V
WARNING!
THE DISCONNECTIO N O F THE
GROUNDED CONDUCTOR(S)
MAY RESULT I N OVERVOLTAGE
ON THE EQUIPMENT
CEC 690.31(E)
WARNING!
TER MIN A LS ON THE L IN E A ND
LOAD SID ES MAY BE ENER GIZED
IN THE OPEN POSITION
ELECTR IC A L SHOCK HA ZARD
DC VOLTAGE I S ALWAYS PRESENT
W HEN SOLAR MODULES
ARE EXP OSED TO SUNLIGHT
CEC 690.13(B)
PHOTOVOLTAIC AC DISCONNECT
RATED AC OUTPUT CURRENT
NORMAL OPERATING VOLTAGE
A
V
16
240
CEC 690.54
5 INVERTER
6 7AC DISCONNECT/BREAKER/
POINTS OF CONNECTION
PHOTOVOLTAIC
AC DISCONNECT
WARNING!
TERMINALS ON THE LINE AND
LOAD SIDES MAY BE ENERGIZED
IN THE OPEN POSITION
ELECTRICAL SHOCK HAZARD
CEC 706.15(C)(4) and CEC 690.13(B)
CEC 690.13(B)
PHOTOVOLTAIC AC DISCONNECT
RATED AC OUTPUT CURRENT
NORMAL OPERATING VOLTAGE
A
V
16
240
CEC 690.54
WARNING!
THIS EQUIPMENT FED BY
MULTIPLE SOURCES:
TOTAL RATING OF ALL OVERCURRENT
DEVICES EXCLUDING MAIN SUPPLY
OVERCURRENT DEVICES EXCLUDING
MAIN POWER SHALL NOT EXCEED
AMPACITY OF BUSBAR.
CEC 705.12(B)(3)(3)
RAPID SHUTDOWN FOR
SOLAR PV SYSTEM
CEC 690.56(C)(2))
RAPID SHUTDOWN FOR
SOLAR PV SYSTEM
CEC 690.56(C)(2))
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
REQUIRED
SIGNAGE
E3.1
MAIN SERVICE
PANEL
SOLAR
ARRAYS
INVERTER
DIRECTORY PLACARD
6"
6"
CAUTION
DR
I
V
E
W
A
Y
ADDRESS: 1919 N SPURGEON ST
N
S
P
U
R
G
E
O
N
S
T
2 LABELING REQUIREMENTS
2022 CODE REFERENCE
CEC 690.13(B)
EACH PV SYSTEM DISCONNECTING MEANS SHALL PLAINLY INDICATE WHETHER IN THE OPEN (OFF) OR CLOSED (ON)
POSITION AND BE PERMANENTLY MARKED "PV SYSTEM DISCONNECT" OR EQUIVALENT. ADDITIONAL MARKINGS SHALL
BE PERMITTED BASED UPON THE SPECIFIC SYSTEM CONFIGURATION. FOR PV SYSTEM DISCONNECTING MEANS WHERE
THE LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION.THE WARNING SIGN(S) OR LABEL(S) SHALL
COMPLY WITH 110.21(B).
CEC 690.56(C)
BUILDINGS WITH PV SYSTEMS SHALL HAVE A PERMANENT LABEL LOCATED AT EACH SERVICE EQUIPMENT LOCATION TO WHICH
THE PV SYSTEMS ARE CONNECTED OR AT AN APPROVED READILY VISIBLE LOCATION AND SHALL INDICATE THE LOCATION OF
RAPID SHUTDOWN INITIATION DEVICES.
CEC 690.31(B)(1)
PV SYSTEM DC CIRCUIT CONDUCTORS SHALL BE IDENTIFIED AT ALL TERMINATION, CONNECTION, AND SPLICE POINTS BY COLOR
CODING, MARKING TAPE, TAGGING, OR OTHER APPROVED MEANS. CONDUCTORS RELYING ON OTHER THAN COLOR
CODING FOR POLARITY IDENTIFICATION SHALL BE IDENTIFIED BY AN APPROVED PERMANENT MARKING MEANS SUCH AS
LABELING, SLEEVING, OR SHRINK-TUBING THAT IS SUITABLE FOR THE CONDUCTOR SIZE.
CEC 690.31(D)(2)
UNLESS LOCATED AND ARRANGED SO THE PURPOSE IS EVIDENT, THE FOLLOWING WIRING METHODS AND
ENCLOSURES THAT CONTAIN PV SYSTEM DC CIRCUIT CONDUCTORS SHALL BE MARKED WITH THE WORDING
PHOTOVOLTAIC POWER SOURCE OR SOLAR PV DC CIRCUIT BY MEANS OF PERMANENTLY AFFIXED LABELS OR OTHER
APPROVED PERMANENT MARKING:
(1) EXPOSED RACEWAYS, CABLE TRAYS, AND OTHER WIRING METHODS
(2) COVERS OR ENCLOSURES OF PULL BOXES AND JUNCTION BOXES
(3) CONDUIT BODIES IN WHICH ANY OF THE AVAILABLE CONDUIT OPENINGS ARE UNUSED.
THE LABELS OR MARKINGS SHALL BE VISIBLE AFTER INSTALLATION. ALL LETTERS SHALL BE CAPITALIZED AND SHALL BE A
MINIMUM HEIGHT OF 9.5 MM (3∕8 IN.) IN WHITE ON A RED BACKGROUND. LABELS SHALL APPEAR ON EVERY SECTION
OF THE WIRING SYSTEM THAT IS SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS. SPACING
BETWEEN LABELS OR MARKINGS, OR BETWEEN A LABEL AND A MARKING, SHALL NOT BE MORE THAN 3 M (10 FT).
LABELS REQUIRED BY THIS SECTION SHALL BE SUITABLE FOR THE ENVIRONMENT WHERE THEY ARE INSTALLED.
CEC 690.31(E)
SOLIDLY GROUNDED BIPOLAR PV SYSTEMS SHALL BE CLEARLY MARKED WITH A PERMANENT, LEGIBLE WARNING
NOTICE INDICATING THAT THE DISCONNECTION OF THE GROUNDED CONDUCTOR(S) MAY RESULT IN OVERVOLTAGE
ON THE EQUIPMENT.
CEC 690.33(D)(2)INTERRUPTION OF CIRCUIT. CONNECTORS SHALL BE A TYPE THAT REQUIRES THE USE OF A TOOL TO OPEN AND
MARKED “DO NOT DISCONNECT UNDER LOAD” OR “NOT FOR CURRENT INTERRUPTING.”
CEC 690.52 ALTERNATING-CURRENT MODULES SHALL BE MARKED WITH IDENTIFICATION OF TERMINALS OR LEADS AND WITH
IDENTIFICATION OF THE FOLLOWING RATINGS.
CEC 690.53
A PERMANENT READILY VISIBLE LABEL INDICATING THE HIGHEST MAXIMUM DC VOLTAGE IN
A PV SYSTEM, CALCULATED IN ACCORDANCE WITH 690.7, SHALL BE PROVIDED BY THE INSTALLER AT ONE OF THE
FOLLOWING LOCATIONS:
(1) DC PV SYSTEM DISCONNECTING MEANS
(2) PV SYSTEM ELECTRONIC POWER CONVERSION EQUIPMENT
(3) DISTRIBUTION EQUIPMENT ASSOCIATED WITH THE PV SYSTEM.
CEC 690.54
ALL INTERACTIVE SYSTEM(S) POINTS OF INTERCONNECTION WITH OTHER SOURCES SHALL BE MARKED AS AN
ACCESSIBLE LOCATION AT THE DISCONNECTING MEANS AS A POWER SOURCE AND WITH THE RATED AC OUTPUT
CURRENT AND THE NOMINAL OPERATING AC VOLTAGE.
CEC 690.55 THE PV SYSTEM OUTPUT CIRCUIT CONDUCTORS SHALL BE MARKED TO INDICATE POLARITY WHERE CONNECTED TO
ENERGY STORAGE SYSTEMS.
CEC 690.56(B) PLAQUES OR DIRECTORIES SHALL BE INSTALLED IN ACCORDANCE WITH 705.10 AND 712.10.
CEC 690.56(C) THE TYPE OF PV SYSTEM IS SHOWN IN FIGURE 690.56 (C).
CEC 690.56(C)(2)
A RAPID SHUTDOWN INITIATION DEVICE SHALL HAVE A LABEL LOCATED ON OR NO MORE
THAN 1 M (3 FT) FROM THE INITIATION DEVICE THAT INCLUDES THE FOLLOWING WORDING:
RAPID SHUTDOWN FOR SOLAR PV SYSTEM
THE LABEL SHALL BE REFLECTIVE, WITH ALL LETTERS CAPITALIZED AND HAVING A
MINIMUM HEIGHT OF 9.5 MM (3∕8 IN.), IN WHITE ON RED BACKGROUND.
CEC 690.59 PV SYSTEMS CONNECTED TO OTHER SOURCES SHALL BE INSTALLED IN ACCORDANCE WITH PARTS I AND II OF ARTICLE
705.
CEC 705.12(B)(3)(3)
THE SUM OF THE AMPERE RATINGS OF ALL OVERCURRENT DEVICES ON PANELBOARDS,
BOTH LOAD AND SUPPLY DEVICES, EXCLUDING THE RATING OF THE OVERCURRENT DEVICE PROTECTING THEBUSBAR,
SHALL NOT EXCEED THE AMPACITY OF THE BUSBAR. THE RATING OF THE OVERCURRENT DEVICEPROTECTING THE
BUSBAR SHALL NOT EXCEED THE RATING OF THE BUSBAR. PERMANENT WARNING LABELSSHALL BE APPLIED TO
DISTRIBUTION EQUIPMENT DISPLAYING THE FOLLOWING OR EQUIVALENT WORDING:
WARNING: THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL
OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICESHALL NOT
EXCEED AMPACITY OF BUSBAR.
CEC 705.12(D)SUITABLE FOR BACKFEED. FUSED DISCONNECTS, UNLESS OTHERWISE MARKED, SHALL BE
CONSIDERED SUITABLE FOR BACKFEED.
CEC 706.15(C)
EACH ESS DISCONNECTING MEANS SHALL PLAINLY INDICATE WHETHER IT IS IN THE
OPEN (ON) OR CLOSED (OFF) POSITION AND BE PERMANENTLY MARKED
“ENERGY STORAGE SYSTEM DISCONNECT"
THE DISCONNECTING MEANS SHALL BE LEGIBLY MARKED IN THE FIELD TO INDICATE THE FOLLOWING:
NOMINAL ESS AC VOLTAGE AND MAXIMUM ESS DC VOLTAGE
AVAILABLE FAULT CURRENT DERIVED FROM THE ESS
AN ARC-FLASH LABEL APPLIED IN ACCORDANCE WITH ACCEPTABLE INDUSTRY PRACTICE
DATA CALCULATION WAS PERFORMED.
CEC 110.27(C)
ENTRANCES TO ROOMS OR OTHER GUARDED LOCATIONS THAT CONTAIN EXPOSED LIVE
PARTS SHALL BE MARKED WITH CONSPICUOUS WARNING SIGNS FORBIDDING UNQUALIFIED PERSONS TO
ENTER.
CEC 705.10
A PERMANENT PLAQUE OR DIRECTORY SHALL BE INSTALLED AT A BUILDING SUPPLIED BY A STAND-ALONE
SYSTEM AT EACH SERVICE EQUIPMENT LOCATION, OR AT AN APPROVED READILY VISIBLE LOCATION.
THE PLAQUE OR DIRECTORY SHALL DENOTE THE LOCATION OF EACH POWER SOURCE DISCONNECTING
MEANS FOR THE PREMISES OR BE GROUPED WITH OTHER PLAQUES OR DIRECTORIES FOR OTHER ON-SITE
SOURCES. THE
MARKING SHALL COMPLY WITH 110.21(B).
CEC 705.12(C)
EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR
CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES SHALL BE MARKED TO INDICATE THE PRESENCE
OF ALL SOURCES.
CEC 705.12(B)(3)(3)
PERMANENT WARNING LABELS SHALL BE APPLIED TO DISTRIBUTION EQUIPMENT DISPLAYING THE FOLLOWING
OR EQUIVALENT WORDING: THIS EQUIPMENT FED BY MULTIPLE SOURCES: TOTAL RATING OF ALL
OVERCURRENT DEVICES EXCLUDING MAIN
POWER SUPPLY SHALL NOT EXCEED AMPACITY OF BUSBAR.
CEC 705.12(B)(3)(2)
A PERMANENT WARNING LABEL SHALL BE APPLIED TO THE DISTRIBUTION EQUIPMENT ADJACENT TO THE
BACK-FED BREAKER FROM THE INVERTER POWER SOURCE THAT DISPLAYS THE FOLLOWING OR EQUIVALENT
WORDING:
“WARNING: POWER OUTPUT CONNECTION.
DO NOT RELOCATE THIS OVERCURRENT DRIVE.”
CEC 705.10 & 690.56(A)(B)
705.10 IDENTIFICATION OF POWER SOURCES
A PERMANENT PLAQUE OR DIRECTORY SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION, OR AT AN APPROVED READILY VISIBLE LOCATION. THE
PLAQUE OR DIRECTORY SHALL DENOTE THE LOCATION OF EACH POWER SOURCE DISCONNECTING MEANS FOR THE BUILDING OR STRUCTURE AND BE
GROUPED WITH OTHER PLAQUES OR DIRECTORIES FOR OTHER ON-SITE SOURCES. THE PLAQUE OR DIRECTORY SHALL BE MARKED WITH THE WORDING
"CAUTION: MULTIPLE SOURCES OF POWER."
ANY POSTED DIAGRAMS SHALL BE CORRECTLY ORIENTED WITH RESPECT TO THE DIAGRAM'S LOCATION. THE MARKING SHALL COMPLY WITH 110.21(B).
EXCEPTION: INSTALLATIONS WITH MULTIPLE CO-LOCATED POWER PRODUCTION SOURCES SHALL BE PERMITTED TO BE IDENTIFIED AS A GROUP(S). THE PLAQUE
OR DIRECTORY SHALL NOT BE REQUIRED TO IDENTIFY EACH POWER SOURCE INDIVIDUALLY.
MULTIPLE SOURCES OF POWER
AC DISCO
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
MODULE
DATA SHEET
E4
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
MODULE
CERTIFICATION
E4.1
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
INVERTER
DATA SHEET
E5
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
INVERTER
CERTIFICATION
E5.1
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
OPTIMIZER
DATA SHEET
E6
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
S1
STANCHION
DATA SHEET
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
S1.1
STANCHION
ENGINEERING
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
RACKING
DATA SHEET
S2
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
RACKING
ENGINEERING
S3
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
RACKING
ENGINEERING
S3.1
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
RACKING
ENGINEERING
S3.2
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
RACKING
ENGINEERING
S3.3
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
GROUNDING
DATA SHEET
S4
1919 N Spurgeon
St06/15/23
PROJECT NAME
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
JOBSITE ADDRESS
JIMENEZ
RESIDENCE
4.400 DC kW
4.048 KW CEC-AC RATING
STRING INVERTER SYSTEM
1919
N SPURGEON ST,
SANTA ANA, CA
92706
CONTRACTOR
TITAN SOLAR POWER CA INC
525 W BASELINE ROAD
MESA, AZ 85210
(855) 729-7652
WWW.TITANSOLARPOWER.COM
PROJECT ID# TSP157692
DATE DESCRIPTION
REVISION
DATE
DRAWN04-20-23 REVISION
DESIGN BY: RD
CAD
F O R C A L I I N C .
SHELLEY V CALUAG
cadforcali@gmail.com
323-698-4207
SP: Ascend Energy
CRCR106 & Business and
Professions Code 5536.2
RACKING
CERTIFICATION
S5
FIRE CLASSIFICATION NOTES:
Per the UL certification attached, the EVEREST Racking is certified for UL 2703 Class A rating.
Hyperion HY-DH108P8-400 module also has a fire rating of Class A noted on Page E4- Module
Data sheet. Module Certification in compliance with UL1703 and UL 61730-2 provided on Page
E4.1
· UL1703
1 Scope
1.1 These requirements cover flat-plate photovoltaic modules and panels intended for
installation on or integral with buildings, or to be freestanding (that is, not attached to
buildings), in accordance with the National Electrical Code, NFPA 70, and Model Building
Codes.
1.2 These requirements cover modules and panels intended for use in systems with a maximum
system voltage of 1500 V or less.
1.3 These requirements also cover components intended to provide electrical connection to
and mounting facilities for flat-plate photovoltaic modules and panels.
1.4 These requirements do not cover:
a) Equipment intended to accept the electrical output from the array, such as power
conditioning units (inverters) and batteries;
b) Any tracking mechanism;
c) Cell assemblies intended to operate under concentrated sunlight;
d) Optical concentrators; or
e) Combination photovoltaic-thermal modules or panels.
· UL 61730-2
1 Scope
The scope of IEC 61730-1 is also applicable to this part of IEC 61730. While IEC 61730-1 outlines
the requirements of construction, this part of the standard lists the tests a PV module is
required to fulfill for safety qualification. IEC 61730-2 is applied for safety qualification only in
conjunction with IEC 61730-1.
The sequence of tests required in this standard may not test for all possible safety aspects
associated with the use of PV modules in all possible applications. This standard utilizes the
best sequence of tests available at the time of its writing. There are some issues – such as the
potential danger of electric shock posed by a broken PV module in a high voltage system –
that should be addressed by the system design, location, restrictions on access and
maintenance procedures.
The objective of this standard is to provide the testing sequence intended to verify the safety
of PV modules whose construction has been assessed by IEC 61730-1. The test sequence
and pass criteria are designed to detect the potential breakdown of internal and external
components of PV modules that would result in fire, electric shock, and/or personal injury.
The standard defines the basic safety test requirements and additional tests that are a
function of the PV module end-use applications. Test categories include general inspection,
electrical shock hazard, fire hazard, mechanical stress, and environmental stress.
The additional testing requirements outlined in relevant ISO standards, or the national or local
codes which govern the installation and use of these PV modules in their intended locations,
should be considered in addition to the requirements contained within this standard.
1919 N Spurgeon
St06/15/23
Rev: 7/15/2021
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
SOL-01 CBC 2019
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1. Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2. Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3. Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4. Will the PV system weigh maximum 4 pounds per square feet or less?
5. Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6. Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7. Will the PV system be installed without using any ballast system or counter-weight
system?
8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10. Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Phone Number: Date:
Email Address:
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M -19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
1919 North Spurgeon Street Santa Ana CA 92706
Titan Solar Power
1062072
Alex Aldama - Titan Solar Power
714-797-0616 5/25/23
capermitting@titansolarpower.com
1919 N Spurgeon
St06/15/23
Expedited Permit Process for PV Systems - Micro-Inverter1
Expedited Permit Process for PV Systems
Micro-Inverter
The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due to their similarity with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of the
installation.
The following pages contain forms for the Micro-Inverter to use with the Expedited Per-
mit Process. The Standard String, AC Module, and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic-
tions that have adopted the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submitted in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
1919 N Spurgeon
St06/15/23
Expedited Permit Process for PV Systems — Micro-Inverter2
Expedited Permit Process for Small-Scale PV Systems
Micro-Inverter
The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations
are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been
suggested to provide as a path to permit approval.
Required Information for Permit:
1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it
should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings
with a 3’ perimeter space at ridge and sides may not need separate fire service review.
2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specification sheets and installation manuals (if available) for all manufactured components including, but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1: Structural Review of PV Array Mounting System
Is the array to be mounted on a defined, permitted roof structure? l Yes l No
If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1.
Roof Information:
1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________
____________________________________________________________________________________________________
If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…).
2. Does the roof have a single roof covering? l Yes l No
If No, submit completed worksheet for roof structure WKS1.
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________
Mounting System Information:
1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap
beneath the module frames? l Yes l No
If No, provide details of structural attachment certified by a design professional.
2. For manufactured mounting systems, fill out information on the mounting system below:
a. Mounting System Manufacturer ___________Product Name and Model#________________________________
b. Total Weight of PV Modules and Rails ___________lbs
c. Total Number of Attachment Points____________
d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1)
e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for
maximum spacing allowed based on maximum design wind speed)
f. Total Surface Area of PV Modules (square feet)_________________ ft 2
g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2
If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1.
Step 2: Electrical Review of PV System (Calculations for Electrical Diagram)
In order for a PV system to be considered for an expedited permit process, the following must apply:
1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,440 Watts or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)).
5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV
system. Interactive PDF diagrams are available at www.solarabcs.org/permitting.
Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant
understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively
communicate, provide an alternative diagram with appropriate detail.
comp shingle
Caulk
K-2 Splice foot X, Crossrail 44-X
600.19
34
17.65
48
223.90
2.68
1919 N Spurgeon
St06/15/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
3
Micro-Inverter Site Plan
Jimenez Residence
1919 N. Spurgeon St, Santa Ana CA 92706
4.400 DC Kw / 4.048 KW CEC-AC
1919 N Spurgeon
St06/15/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
Micro-Inverter Electrical Diagram
Contractor Name,
Address and Phone:
One-Line Standard Electrical Diagram
for Micro-Inverter PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
E1.1a
SCALE NTS Date: SHEET
Drawn By:
Checked By:
DESCRIPTION OR CONDUCTOR TYPE
USE-2 or PV WIRE
GEC EGC X ALL THAT APPLY
EXTERIOR CABLE LISTED W/ INV.
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
NO DC GEC IF 690.35 SYSTEM
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
TAG
1
2
3
4
5
CONDUIT AND CONDUCTOR SCHEDULE
COND.
GAUGE
MFG
MFG
NUMBER OF
CONDUCTORS
MFG Cable
MFG Cable
CONDUIT
TYPE
N/A
N/A
N/A
SAME
SAME
CONDUIT
SIZE
N/A
N/A
N/A
SAME
SAME
DESCRIPTION
PV DC or AC MODULE
DC/AC INVERTER (MICRO)
J-BOX (IF USED)
PV ARRAY
AC COMB. PANEL (IF USED)
GEN METER (IF USED)
AC DISCONNECT (IF USED)
SERVICE PANEL
TAG
1
2
3
4
5
6
7
8
PART NUMBER NOTES
FOR UNUSED MODULES
PUT "N/A in BLANK ABOVE
1
1
3
2
3
EQUIPMENT SCHEDULE
2
_____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
J-BOX
4
AC DISCO
M
BUILDING
GROUNDING
ELECTRODE
G
M
UTILITY
SERVICE
MAIN SERVICE PANEL
MAIN
OCPD
INVERTER
OCPD
6
7
8
5
4
5
G
SEE GUIDE APPENDIX D FOR
INFORMATION ON MODULE AND
ARRAY GROUNDING
AC COMBINER
PANEL
G
____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
Jimenez Residence
1919 N. Spurgeon St, Santa Ana CA 92706
4.400 DC Kw / 4.048 KW CEC-AC
HY-DH108P8-400
SE3800H-US
NEMA 3R
DG221URB
11
FREE
N/A N/A
#10 3 3/4" EMT 3/4" EMT
#8 1
1919 N Spurgeon
St06/15/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
5
Contractor Name,
Address and Phone:
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
E1.2a
SCALE NTS Date: SHEET
Drawn By:
Checked By:
MAX POWER-POINT CURRENT (IMP)
MAX POWER-POINT VOLTAGE (VMP)
OPEN-CIRCUIT VOLTAGE (VOC)
SHORT-CIRCUIT CURRENT (ISC)
MAX SERIES FUSE (OCPD)
MAXIMUM POWER (P MAX)
MAX VOLTAGE (TYP 600VDC)
VOC TEMP COEFF (mV/oC or %/oC )
IF COEFF SUPPLIED, CIRCLE UNITS
MODULE MAKE
MODULE MODEL
PV MODULE RATINGS @ STC (Guide Section 5)
MAX DC VOLT RATING
MAX POWER @ 40oC
NOMINAL AC VOLTAGE
MAX AC CURRENT
MAX OCPD RATING
INVERTER MAKE
INVERTER MODEL
INVERTER RATINGS (Guide Section 4)
1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YES NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
REQUIREMENT? YES NO N/A
3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX
CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING. (See Guide Section 9)
5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO-
INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR
EXCEPTION IN 690.64(B)(2)(a)? YES NO
NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9):
1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC
2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC
2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED
47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT
LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47oC OR LESS (ALL OF UNITED STATES),
a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER
FUSE.
b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER
FUSE.
NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E):
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODE ®REFERENCES
SHOWN AS (NEC XXX.XX)
NOTES FOR ALL DRAWINGS:
SIGNSSEE GUIDE SECTION 7
SIGN FOR DC DISCONNECT
SIGN FOR INVERTER OCPD AND AC
DISCONNECT (IF USED)
No sign necessary since 690.51
marking on PV module covers
needed information
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
SOLAR PV SYSTEM
AC POINT OF CONNECTION
THIS PANEL FED BY MULTIPLE
SOURCES (UTILITY AND SOLAR)
Notes for Micro-Inverter Electrical Diagram
Jimenez Residence
1919 N. Spurgeon St, Santa Ana CA 92706
4.400 DC Kw / 4.048 KW CEC-AC
HYPERION
HY-DH108P8-400
12.90
31.01
37.07
13.79
30A
400
-0.27
SOLAREDGE
SE3800H-US
3800
240
16
480
20
16
240
-7
39
1
1919 N Spurgeon