Loading...
HomeMy WebLinkAbout1915 W Pendleton Ave - Plan1 APT test conditions according to IEC / TS 62804-1:2015, method A (−1500 V, 96 h) 2 See data sheet on rear for further information. THE IDEAL SOLUTION FOR: Rooftop arrays on residential buildings BREAKING THE 20 % EFFICIENCY BARRIER Q.ANTUM DUO Z Technology with zero gap cell layout boosts module efficiency up to 20.9 %. THE MOST THOROUGH TESTING PROGRAMME IN THE INDUSTRY Q CELLS is the first solar module manufacturer to pass the most comprehen- sive quality programme in the industry: The new “Quality Controlled PV” of the independent certification institute TÜV Rheinland. INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields, whatever the weather with excellent low-light and temperature behaviour. ENDURING HIGH PERFORMANCE Long-term yield security with Anti LID Technology, Anti PID Technology1, Hot-Spot Protect and Traceable Quality Tra.Q™. EXTREME WEATHER RATING High-tech aluminium alloy frame, certified for high snow (5400 Pa) and wind loads (4000 Pa). A RELIABLE INVESTMENT Inclusive 25-year product warranty and 25-year linear performance warranty2. Q.PEAK DUO BLK-G10+ 350-370 ENDURING HIGH PERFORMANCE PR E L I M I N A R Y 1915 W Pendleton Ave.04/07/23 BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 Nathan Draeger DESIGNER: DESIGN MGR: Natalia Timoshkina NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 3/13/2023 DATE:TIME: 06:45 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 SYSTEM SIZE: 3,600 DC SYSTEM SIZE 3000 AC CEC POWER OUTPUT: 3320 CEC MODULE INFORMATION MODULE QTY: 10 MODULE MFG: Hanwha Q CELLS MODULE TYPE: Q.Peak Duo BLK-G10+ 360 INVERTER INFORMATION INVERTER QTY: 1 INVERTER MFG: SOLAREDGE INVERTER TYPE: POWER OPTIMIZER INFORMATION OPTIMIZER QTY: 10 OPTIMIZER MFG: SOLAREDGE OPTIMIZER TYPE: S440 PROJECT DETAILS COVER SHEET P1 TABLE OF CONTENTS PAGE NUMBER: PAGE TITLE: P1 COVER SHEET P2 NOTES SHEET P3 SITE PLAN P4 ROOF PLAN P5 RACKING & FRAMING P6 LINE DIAGRAM & DESIGN TABLES P7 PLACARDS & PLACARD MAP P8 OPTIMIZER MAP P9 JOB HAZARD ANALYSIS SS00 SPECIFICATION PAGES RAILING INFORMATION RAILING MFG: UNIRAC RAILING TYPE: Unirac SM Light MOUNTING INFORMATION MOUNT FLASHING QTY: MOUNT FLASHING MFG: UNIRAC MOUNT FLASHING TYPE: 20 Unirac Adj. Cal-Pac Tile Hook EXISTING SOLAR INFORMATION INVERTER QTY: INVERTER MFG & TYPE : MODULE QTY: MODULE MFG & TYPE: 1 12 Power one PVI 3-OUTD Trina 245W BATTERY INFORMATION - N/A ADDITIONAL SCOPE OF WORK JURISDICTION STAMPS: PROPERTY INFORMATION OWNER:Vicente Joel Sanchez PHONE:1714-566-5773 EMAIL:vicentesanchez6625@gmail.com CONTRACTOR:BETTER EARTH ELECTRIC INC. PHONE: (888) 373-9379 AUTHORITIES HAVING JURISDICTION BUILDING: Santa Ana (CA) UTILITY: Southern California Edison DESIGN SPECIFICATIONS OCCUPANCY: R-3/U CONSTRUCTION: V-B NAME: RESIDENTIAL SNOW LOAD: 0 PSF WIND EXPOSURE: C WIND SPEED: 130 MPH ROOF SURFACE: 3048 SQ.FT. NEW PV SQ FOOTAGE: 192.94 SQ.FT. EXISTING PV SQ FOOTAGE: 218.52 SQ.FT. TOTAL PV SQ FOOTAGE: 411.46 SQ.FT. PV COVERAGE: 13.50 % WEIGHT OF EQUIPMENT: 476.9 LBS WEIGHT PER ATTACHMENT: 23.85 LBS DISTRIBUTED WEIGHT: 2.47 PSF NO. OF STORIES: 1 FIRE SPRINKLERS: NO LOT INFORMATION APN: 40843214 LOT AREA: 5963 LIVING AREA: 1381 3000H-US Non-RGM This item has been digitally signed and sealed on Mar 21, 2023 Bldg permit #101114576 Elect permit #20179266 Issued on 4/7/23 1915 W Pendleton Ave.04/07/23 DETAIL A 16 mm 8.5 mm21.25 mm 980 mm 1717 mm 4 × Mounting slots (DETAIL A) Frame 1045 mm 32 mm 8 × Drainage holes 368.5 mm 4 × Grounding points ø 4.5 mm Label ≥ 1150 mm ≥ 1150 mm 1002.5 mm RE L A T I V E E F F I C I E N C Y CO M P A R E D T O N O M I N A L P O W E R [ % ] YEARS Q CELLS Industry standard for linear warranties* *Standard terms of guarantee for the 10 PV companies with the highest production capacity in 2014 (as at: September 2014) 100 95 90 85 80 15 5 25200 10 98 86 200 400 600 800 1000 110 100 90 80 RE L A T I V E E F F I C I E N C Y [ % ] IRRADIANCE [W/m²] α [% / K]+0.04 β [% / K] −0.27 γ [% / K]−0.34 NMOT [°C] 43 ± 3 [V]1000 [A]20 C / TYPE 2 [Pa] 3600 / 2660 −40 °C - +85 °C [Pa] 5400 / 4000 350 355 360 365 370 [W]350 355 360 365 370 [A]10.97 11.00 11.04 11.07 11.10 [V]41.11 41.14 41.18 41.21 41.24 [A]10.37 10.43 10.49 10.56 10.62 [V]33.76 34.03 34.31 34.58 34.84 [%]≥ 19.5 ≥ 19.8 ≥ 20.1 ≥ 20.3 ≥ 20.6 [W]262.6 266.3 270.1 273.8 277.6 [A]8.84 8.87 8.89 8.92 8.95 [V]38.77 38.80 38.83 38.86 38.90 [A]8.14 8.20 8.26 8.31 8.37 [V]32.24 32.48 32.71 32.94 33.17 Hanwha Q CELLS GmbH Sonnenallee 17-21, 06766 Bitterfeld-Wolfen, Germany | TEL +49 (0)3494 66 99-23444 | FAX +49 (0)3494 66 99-23000 | EMAIL sales@q-cells.com | WEB www.q-cells.com Note: Installation instructions must be followed. See the installation and operating manual or contact our technical service department for further information on approved installation and use of this product. Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE At least 98 % of nominal power dur- ing first year. Thereafter max. 0.5 % degradation per year. At least 93.5 % of nominal power up to 10 years. At least 86 % of nominal power up to 25 years. All data within measurement toler- ances. Full warranties in accordance with the warranty terms of the Q CELLS sales organisation of your respective country. Typical module performance under low irradiance conditions in comparison to STC conditions (25 °C, 1000 W/m2). Sp e c i f i c a t i o n s s u b j e c t t o t e c h n i c a l c h a n g e s © Q CE L L S Q. P E A K DU O BL K - G 1 0 + _ 3 5 0 - 3 7 0 _ 2 0 2 1 - 0 8 _ R e v 0 1 _ E N PROPERTIES FOR SYSTEM DESIGN Maximum System Voltage VSYS PV module classification Class II Maximum Reverse Current IR Fire Rating based on ANSI / UL 61730 Max. Design Load, Push / Pull Permitted Module Temperature on Continuous DutyMax. Test Load, Push / Pull ELECTRICAL CHARACTERISTICS POWER CLASS MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC1 (POWER TOLERANCE +5 W / −0 W) Mi n i m u m Power at MPP1 PMPP Short Circuit Current1 ISC Open Circuit Voltage1 VOC Current at MPP IMPP Voltage at MPP VMPP Efficiency1 η MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NMOT2 Mi n i m u m Power at MPP PMPP Short Circuit Current ISC Open Circuit Voltage VOC Current at MPP IMPP Voltage at MPP VMPP 1Measurement tolerances PMPP ± 3 %; ISC; VOC ± 5 % at STC: 1000 W/m2, 25 ± 2 °C, AM 1.5 according to IEC 60904-3 • 2 800 W/m², NMOT, spectrum AM 1.5 MECHANICAL SPECIFICATION Format 1717 mm × 1045 mm × 32 mm (including frame) Weight 19.9 kg Front Cover 3.2 mm thermally pre-stressed glass with anti-reflection technology Back Cover Composite film Frame Black anodised aluminium Cell 6 × 20 monocrystalline Q.ANTUM solar half cells Junction box 53-101 mm × 32-60 mm × 15-18 mm Protection class IP67, with bypass diodes Cable 4 mm² Solar cable; (+) ≥ 1150 mm, (−) ≥ 1150 mm Connector Stäubli MC4; IP68 TEMPERATURE COEFFICIENTS Temperature Coefficient of ISC Temperature Coefficient of VOC Temperature Coefficient of PMPP Nominal Module Operating Temperature QUALIFICATIONS AND CERTIFICATES Quality Controlled PV - TÜV Rheinland; IEC 61215:2016; IEC 61730:2016. This data sheet complies with DIN EN 50380. QCPV Certification ongoing. 1915 W Pendleton Ave.04/07/23 IN V E R T E R S solaredge.com Optimized installation with HD-Wave technology Specifically designed to work with power optimizers Built-in module-level monitoring Optional: Faster installations with built-in consumption metering (1% accuracy) and production revenue grade metering (0.5% accuracy, ANSI C12.20) Record-breaking 99% weighted efficiency Quick and easy inverter commissioning directly from a smartphone using the SolarEdge SetApp Fixed voltage inverter for longer strings UL1741 SA certified, for CPUC Rule 21 grid compliance Integrated arc fault protection and rapid shutdown for NEC 2014, NEC 2017 and NEC 2020 per article 690.11 and 690.12 Small, lightweight, and easy to install both outdoors or indoors Single Phase Inverter with HD-Wave Technology for North America SE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US / SE7600H-US / SE10000H-US / SE11400H-US 12-25 YEAR WARRANTY 1915 W Pendleton Ave.04/07/23 MODEL NUMBER SE3000H-US SE3800H-US SE5000H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US APPLICABLE TO INVERTERS WITH PART NUMBER SEXXXXH-XXXXXBXX4 OUTPUT Rated AC Power Output 3000 3800 @ 240V 3300 @ 208V 5000 6000 @ 240V 5000 @ 208V 7600 10000 11400 @ 240V 10000 @ 208V VA Maximum AC Power Output 3000 3800 @ 240V 3300 @ 208V 5000 6000 @ 240V 5000 @ 208V 7600 10000 11400 @ 240V 10000 @ 208V VA AC Output Voltage Min.-Nom.-Max. (211 - 240 - 264)Vac AC Output Voltage Min.-Nom.-Max. (183 - 208 - 229)- - - -Vac AC Frequency (Nominal)59.3 - 60 - 60.5(1)Hz Maximum Continuous Output Current @240V 12.5 16 21 25 32 42 47.5 A Maximum Continuous Output Current @208V -16 -24 --48.5 A Power Factor 1, Adjustable - 0.85 to 0.85 GFDI Threshold 1 A Utility Monitoring, Islanding Protection, Country Configurable Thresholds Yes INPUT Maximum DC Power @240V 4650 5900 7750 9300 11800 15500 17650 W Maximum DC Power @208V -5100 -7750 --15500 W Transformer-less, Ungrounded Yes Maximum Input Voltage 480 Vdc Nominal DC Input Voltage 380 400 Vdc Maximum Input Current @240V(2)8.5 10.5 13.5 16.5 20 27 30.5 Adc Maximum Input Current @208V(2)-9 -13.5 --27 Adc Max. Input Short Circuit Current 45 Adc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection 600k Sensitivity Maximum Inverter Efficiency 99 99.2 % CEC Weighted Efficiency 99 99 @ 240V 98.5 @ 208V % Nighttime Power Consumption < 2.5 W (1) For other regional settings please contact SolarEdge support (2) A higher current source may be used; the inverter will limit its input current to the values stated SE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US/ SE7600H-US / SE10000H-US / SE11400H-US Single Phase Inverter with HD-Wave Technology for North America 1915 W Pendleton Ave.04/07/23 MODEL NUMBER SE3000H-US SE3800H-US SE5000H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US ADDITIONAL FEATURES Supported Communication Interfaces RS485, Ethernet, ZigBee (optional), Cellular (optional) Revenue Grade Metering, ANSI C12.20 Optional(3) Consumption metering Inverter Commissioning With the SetApp mobile application using Built-in Wi-Fi Access Point for Local Connection Rapid Shutdown - NEC 2014, NEC 2017 and NEC 2020, 690.12 Automatic Rapid Shutdown upon AC Grid Disconnect STANDARD COMPLIANCE Safety UL1741, UL1741 SA, UL1699B, CSA C22.2, Canadian AFCI according to T.I.L. M-07 Grid Connection Standards IEEE1547, Rule 21, Rule 14 (HI) Emissions FCC Part 15 Class B INSTALLATION SPECIFICATIONS AC Output Conduit Size / AWG Range 1'' Maximum / 14-6 AWG 1'' Maximum /14-4 AWG DC Input Conduit Size / # of Strings / AWG Range 1'' Maximum / 1-2 strings / 14-6 AWG 1'' Maximum / 1-3 strings / 14-6 AWG Dimensions with Safety Switch (HxWxD)17.7 x 14.6 x 6.8 / 450 x 370 x 174 21.3 x 14.6 x 7.3 / 540 x 370 x 185 in / mm Weight with Safety Switch 22 / 10 25.1 / 11.4 26.2 / 11.9 38.8 / 17.6 lb / kg Noise < 25 <50 dBA Cooling Natural Convection Operating Temperature Range -40 to +140 / -40 to +60(4)˚F / ˚C Protection Rating NEMA 4X (Inverter with Safety Switch) (3) Inverter with Revenue Grade Meter P/N: SExxxxH-US000BNC4; Inverter with Revenue Grade Production and Consumption Meter P/N: SExxxxH-US000BNI4 . For consumption metering, current transformers should be ordered separately: SEACT0750-200NA-20 or SEACT0750-400NA-20. 20 units per box (4) Full power up to at least 50˚C / 122˚F; for power de-rating information refer to: https://www.solaredge.com/sites/default/files/se-temperature-derating-note-na.pdf Single Phase Inverter with HD-Wave Technology for North America SE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US/ SE7600H-US / SE10000H-US / SE11400H-US How to Enable Consumption Monitoring By simply wiring current transformers through the inverter's existing AC conduits and connecting them to the service panel, homeowners will gain full insight into their household energy usage helping them to avoid high electricity bills © SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: 12/2020/V01/ENG NAM. Subject to change without notice. 1915 W Pendleton Ave.04/07/23 Rapid Shutdown Kit Installation - MAN-01-00186-1.6 1 Rapid Shutdown Kit - Installation and Configuration (Single Phase Inverters) This document describes how to install the rapid shutdown kit in the SolarEdge Safety Switch, and how to enable the rapid shutdown feature in the inverter in order to provide the functionality described in the Rapid Shutdown clause of NEC2014 690.12 (1) through (4). Kit Contents ƒ Rapid shutdown cables ƒMicro-SD card and SD card adapter with firmware files (Note: DO NOT THROW AWAY THE CARD AND THE ADAPTER; keep them for installation of other rapid shutdown kits) Cable Installation Perform this procedure before connecting the strings to the Safety Switch [Chapter 4: Connecting the AC and the Strings to the Safety Switch in the SolarEdge Installation Guide]. 1 Turn the inverter ON/OFF switch to OFF. If installing the kit in an inverter that is already operating, wait until the LCD indicates that the DC voltage is safe (<50V), or wait five minutes before continuing to the next step. 2 Turn the Safety Switch and the AC switch on the main circuit board to OFF. WARNING! If you cannot see the inverter panel, or if a malfunction is indicated on the LCD panel, wait five minutes for the input capacitors of the inverter to discharge. 3 Loosen the four Allen screws on the front cover of the Safety Switch, and open the cover. 4 Carefully disconnect the two DC cables from the left side of the switch and from the DC connection spring clamp terminals, as illustrated below1. Use a standard straight-bladed screwdriver to disconnect the cables from the terminals. Figure 1: Inside the AC/DC Safety Switch 1 The internal components may vary depending on the Safety Switch model; the figures in this documents show the AC/DC Safety Switch for single phase 7.6-11.4 kW inverters. DC connection terminals Disconnect here Disconnect here Switch terminal block Rapid Shutdown Kit - Installation and Configuration (Single Phase Inverters) Rapid Shutdown Kit Installation - MAN-01-00186-1.6 2 5 The rapid shutdown cables have a resistor connected to one end (on the red cable). Connect these ends to the switch, making sure that the red and black cables are reversed relative to the cables connected at the top of the switch (going into the DC side conduit between the inverter and the Safety Switch), as detailed below. Apply a torque of 2 N*m (18 lb*in): ƒ If the cables at the top are red and black from left to right, connect as shown below. Figure 2: Rapid shutdown cable connected – option 1 ƒIf the cables at the top are black and red from left to right, connect as shown below. Figure 3: Rapid shutdown cable connected – option 2 6 Use a standard straight-bladed screwdriver to connect the other end of the rapid shutdown cables to the DC connection spring-clamp terminals: Connect the black cable from the switch to the DC- terminal block, and connect the red cable from the switch to the DC+ terminal block. 7 Check that the cables are located and connected in the correct positions to ensure the rapid shutdown functionality. 8 Close the cover: Attach the switch cover and secure it by tightening the four screws with a torque of 0.9 ft.*lb / 1.2 N*m. Red (+) Black (-) Black (-) DC+ DC- Red (+) with rapid shutdown resistor Black (-) Red (+) Black (-)BlaRed (+) with rapid shutdown resistor DC+ DC- 1915 W Pendleton Ave.04/07/23 solaredge.com Power Optimizer For Residential Installations S440 / S500 / S500B Enabling PV power optimization at the module level Specifically designed to work with SolarEdge residential inverters Detects abnormal PV connector behavior, preventing potential safety issues* Module-level voltage shutdown for installer and firefighter safety Superior efficiency (99.5%) Mitigates all types of module mismatch loss, from manufacturing tolerance to partial shading Faster installations with simplified cable management and easy assembly using a single bolt Flexible system design for maximum space utilization Compatible with bifacial PV modules PO W E R O P T I M I Z E R 2 5 YEAR WARRANTY * Functionality subject to inverter model and firmware version 1915 W Pendleton Ave.04/07/23 © SolarEdge Technologies, Ltd. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: November 8, 2022 DS-000091-ENG. Subject to change without notice. Power Optimizer For Residential Installations S440 / S500 / S500B S440 S500 S500B UNIT INPUT Rated Input DC Power(1) 440 500 W Absolute Maximum Input Voltage (Voc) 60 125 Vdc MPPT Operating Range 8 – 60 12.5 – 105 Vdc Maximum Short Circuit Current (Isc) of Connected PV Module 14.5 15 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.6 % Overvoltage Category II OUTPUT DURING OPERTION Maximum Output Current 15 Adc Maximum Output Voltage 60 80 Vdc OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) Safety Output Voltage per Power Optimizer 1 ± 0.1 Vdc STANDARD COMPLIANCE(2) EMC FCC Part 15 Class B, IEC61000-6-2, IEC61000-6-3, CISPR11, EN-55011 Safety IEC62109-1 (class II safety), UL1741 Material UL94 V-0, UV Resistant RoHS Yes Fire Safety VDE-AR-E 2100-712:2018-12 INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc Dimensions (W x L x H) 129 x 155 x 30 129 x 155 x 45 mm Weight (including cables) 655 gr Input Connector MC4(3) Input Wire Length 0.1 m Output Connector MC4 Output Wire Length (+) 2.3, (-) 0.10 m Operating Temperature Range(4) -40 to +85 ˚C Protection Rating IP68 Relative Humidity 0 – 100 % (1) Rated power of the module at STC will not exceed the Power Optimizer Rated Input DC Power. Modules with up to +5% power tolerance are allowed. (2) For details about CE compliance, see Declaration of Conformity – CE. (3) For other connector types please contact SolarEdge. (4) For ambient temperatures above +70°C power de-rating is applied. Refer to Power Optimizers Temperature De-Rating Technical Note for details. PV System Design Using a SolarEdge Inverter(5) SolarEdge Home Wave Inverter Single Phase SolarEdge Home Short String Inverter Three Phase Three Phase for 230/400V Grid Three Phase for 277/480V Grid Minimum String Length (Power Optimizers) S440, S500 8 9 16 18 S500B 6 8 14 Maximum String Length (Power Optimizers )25 20 50 Maximum Continuous Power per String 5700 5625 11250 12750 W Maximum Allowed Connected Power per String (Permitted only when the power difference between strings is less than 2,000W) See(6)See(6)13500 15000 W Parallel Strings of Different Lengths or Orientations Yes (5) It is not allowed to mix S-series and P-series Power Optimizers in new installations. (6) If the inverter’s rated AC power ≤ maximum nominal power per string, then the maximum power per string will be able to reach up to the inverters maximum input DC power. Refer to Application Note: Single String Design Guidelines. * 45mm for S500B 1915 W Pendleton Ave.04/07/23 THE COMPLETE TILE ROOF SOLUTION UNIRAC Pro Series SOLARHOOKS is a complete line of attachment solutions for tile roofs. Featuring UNIRAC’s exclusive POWERARCH technology which increases strength by up 60% more than traditional tile hooks, SOLARHOOKS are simple to install and designed for maximum convenience. Available in universal designs and in specific shapes for flat, S and W tiles, SOLARHOOKS are kitted with stainless lag bolts and have a bead blasted stainless steel finish. With SOLARHOOKS, you have everything you need for a quick, professional installation. SIMPLE AND VERSATILE Multiple hole patterns and slotted connections provide adjustability. Stainless steel lag bolts bring long term peace of mind. EXTENSIVE ASSORTMENT Available in a variety of universal, flat tile & Spanish tile designs to handle any challenge. FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 UP TO 60% STRONGER Exclusive POWERARCH technology ensures no array rattling or broken tiles during high winds. NEW & IMPROVED PRO SERIES SOLARHOOKS BETTER SOLAR STARTS HERE 1915 W Pendleton Ave.04/07/23 MODEL SOLARHOOK UNIV SIDE MT CT5 SOLARHOOK FLAT SIDE MT AT1 SOLARHOOK SPANISH SIDE MT CT1 SOLARHOOK FLAT SIDE MT ST1 SOLARHOOK FLAT ADJUSTABLE SIDE MT ST1 SOLARHOOK SPANISH SIDE MT CT2 PART NUMBER 004CT5H 004AT1H 004CT1H 004ST1S 004AST1 004CT2H MATERIAL Bead Blasted 304 Stainless Steel Bead Blasted 304 Stainless Steel Bead Blasted 304 Stainless Steel Bead Blasted 304 Stainless Steel Bead Blasted 304 Stainless Steel Bead Blasted 304 Stainless Steel APPLICATION Best in low – med wind / snow regions Best in low – med wind / snow regions Best in low – med wind / snow regions Best in low – med wind / snow regions Best in low – med wind / snow regions Best in low – med wind / snow regions USES EXISTING TILES Yes Yes Yes Yes Yes Yes RAIL OR RAIL-LESS Rail Rail Rail Rail Rail Rail DIRECT MOUNT, NO L-FOOT REQUIRED a a a a a a ADJUSTABLE a a FLAT TILE a a a a S TILE a a a W TILE a a UNIVERSAL TILE a SIMPLE INSTALLATION a a a a a a NO TILE MOD. REQUIRED a a a a a a WARRANTY 25-Year 25-Year 25-Year 25-Year 25-Year 25-Year APPLICATION GUIDE PRO SERIES SOLARHOOKS THE COMPLETE TILE ROOF SOLUTION FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 1915 W Pendleton Ave.04/07/23 SOLARMOUNT is the professionals’ choice for residential PV mounting applications. Every aspect of the system is designed for an easier, faster installation experience. SOLARMOUNT is a complete solution with revolutionary universal clamps, FLASHKIT PRO, full system UL 2703 certification and 25-year warranty. Not only is SOLARMOUNT easy to install, but best-in-class aesthetics make it the most attractive on any block! NOW FEATURING FLASHKIT PRO The Complete Roof Attachment Solution NOW WITH UNIVERSAL MIDCLAMPS Accommodates 30mm-51mm module frames One tool, one-person installs are here! REVOLUTIONARY NEW ENDCLAMPS Concealed design and included End Caps THE PROFESSIONALS’ CHOICE FOR RESIDENTIAL RACKING BEST INSTALLATION EXPERIENCE • CURB APPEAL • COMPLETE SOLUTION • UNIRAC SUPPORT SOLARMOUNT OPTIONAL FRONT TRIM New & Improved: THE PROFESSIONALS’ CHOICE With Superior Aesthetics CONCEALED UNIVERSAL CLAMPS 25 YEAR FULL-SYSTEM WARRANTY FOR QUESTIONS OR CUSTOMER SERVICE VISI T UNIRAC.COM OR CALL (505) 248-2702 1915 W Pendleton Ave.04/07/23 BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 Nathan Draeger DESIGNER: DESIGN MGR: Natalia Timoshkina NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 3/13/2023 DATE:TIME: 06:45 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: NOTES SHEET P2 1. RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURES SPECIFICATIONS AND THE 2022 CALIFORNIA RESIDENTIAL CODE, SECTIONS R314, R909 AND R918, 2022 CALIFORNIA ELECTRICAL CODE AND 2022 CALIFORNIA FIRE CODE. 2. CONTRACTORS SHALL BE PRESENT DURING ALL INSPECTIONS. 3. THE ROOF ACCESS POINT REQUIRING A LADDER SHALL NOT BE LOCATED OVER A WINDOW, DOOR OR LOCATED WHERE IT CONFLICTS WITH OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES OR SIGNS [CRC 324.7.1]. 4. A LADDER SHALL BE PROVIDED AND SECURED TO THE STRUCTURE AT THE APPROVED ROOF ACCESS POINT PER NOT "C" ABOVE WITH A CAL OSHA APPROVED DEVICE DURING ALL INSPECTIONS. 5. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, VENTILATION'S INTAKE AIR OPENINGS SHALL NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC SYSTEM. 6. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY AND INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. [NEC 690.4(D)] 7. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND SWITCHES. 8. CONTACT THE SERVICING UTILITY BEFORE POWERING ON THE PHOTOVOLTAIC SYSTEM 9. ALL WORK SHALL COMPLY WITH APPLICABLE, LOCAL, MUNICIPAL CODES, AND TO MANUFACTURERS' LISTINGS AND INSTALLATION INSTRUCTIONS. THE PV SOLAR SYSTEM WILL BE INTERCONNECTED AND OPERATED IN PARALLEL WITH THE UTILITY ELECTRICAL GRID PER THE REQUIREMENTS OF THE UTILITY AND APPLICABLE CODES. THE PV SOLAR SYSTEM IS DESIGNED IN COMPLIANCE WITH CEC 690.12 (RAPID SHUTDOWN). JURISDICTION NOTES ELECTRICAL NOTES CONSTRUCTION NOTES UTILITY NOTES 1. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 2. ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING. 3. ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. 4. THE SOLAR INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING OR MECHANICAL VENTS. 5. A LADDER WILL BE IN PLACE FOR INSPECTIONS IN COMPLIANCE WITH CAL OSHA REGULATIONS. 6. MODULE MOUNTING STRUCTURE WILL BE TIED DIRECTLY INTO STRUCTURAL ELEMENTS OF SINGLE FAMILY DWELLING ROOF TRUSSES / RAFTERS OR BEAMS ACCORDING TO MOUNTING STRUCTURE DIRECTIONS. 7. ROOF COVERING PENETRATIONS SHALL BE DESIGNED, INSTALLED AND MAINTAINED IN ACCORDANCE WITH BUILDING CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERINGS SHALL SERVE TO PROTECT THE BUILDING STRUCTURE. 8. CONDUIT, WIRING SYSTEMS AND RACEWAYS FOR PHOTOVOLTAIC CIRCUITS SHALL BE LOCATED AS CLOSE AS POSSIBLE TO THE RIDGE, HIP, OR VALLEY AS DIRECTLY AS POSSIBLE TO POSSIBLE TO AN OUTSIDE WALL TO REDUCE TRIP HAZARDS AND MAXIMIZE VENTILATION OPPORTUNITIES. 9. WE WILL MAINTAIN 6" CLEARANCE FROM ALL VENTS AND OBSTRUCTIONS. 10. CONDUIT RUNS TO BE DETERMINED IN FIELD 1. PV SOURCE CIRCUIT(S) ARE TO BE SUNLIGHT-RESISTANT PV-WIRE AS PERMITTED BY CEC 690.31(B). 2. ALL DIRECT CURRENT CIRCUITS ARE TO BE INSTALLED IN METAL RACEWAY FROM THE POINT OF PENETRATION OF THE SURFACE OF THE BUILDING OR STRUCTURE TO THE MAIN SERVICE PANEL AS MANDATED BY CEC 690.31(E). 3. WEATHERPROOF J-BOX – NEMA 3R. 4. ROOFTOP CONDUIT SHALL BE A MINIMUM OF 1" ABOVE THE ROOF SURFACE. 5. ALL WORK SHALL COMPLY WITH THE 2022 CALIFORNIA ELECTRICAL CODE (C.E.C.) AND ALL OTHER LOCAL CODES AS APPROVED BY THE AUTHORITY HAVING JURISDICTION. CODE REFERENCES · 2022 CALIFORNIA BUILDING CODE · 2022 CALIFORNIA RESIDENTIAL CODE · 2022 CALIFORNIA ELECTRICAL CODE · 2022 CALIFORNIA FIRE CODE · 2022 CALIFORNIA MECHANICAL CODE · 2022 CALIFORNIA GREEN CODE · 2022 CALIFORNIA PLUMBING CODE · 2022 CALIFORNIA ENERGY CODE · ANY OTHER LOCAL AND MUNICIPAL CODES 1. ALL EXPOSED ROOF WIRING SHALL BE USE-2 TYPE RATED FOR (90 DEGREE C) WET CONDITIONS. OTHER OUTDOOR WIRING SHALL BE COPPER THWN-2 TYPE RATED FOR (90 DEGREE C) APPLICATION IN EMT CONDUIT. 2. WHERE METALLIC CONDUIT CONTAINING DC CONDUCTORS IS USED INSIDE THE BUILDING, IT SHALL BE IDENTIFIED AS "CAUTION: SOLAR CIRCUIT" EVERY 5 FEET. 3. A DC DISCONNECTING MEANS SHALL BE INSTALLED AT A READILY ACCESSIBLE LOCATION EITHER OUTSIDE OF THE BUILDING OR STRUCTURE OR INSIDE NEAREST TO THE POINT OF ENTRANCE OF THE SYSTEM CONDUCTORS AS PER SECTION 690-14 OF THE CEC. 4. HEIGHT OF INTEGRATED AC/DC DISCONNECT SHALL NOT EXCEED 6'-7" PER NEC240.24 5. WORKING CLEARANCE AROUND THE EXISTING ELECTRICAL EQUIPMENT AS WELL AS THE NEW ELECTRICAL EQUIPMENT WILL BE IN ACCORDANCE WITH NEC 1010.26 6. WHERE DC CONDUCTORS ARE RUN INSIDE THE BUILDING (OR ATTIC). THEY SHALL BE CONTAINED IN A METAL RACEWAY. (NEC 690.31E) 7. MAKE SURE TO MEASURE THE LINE-TO-LINE AND THE LINE-TO-NEUTRAL VOLTAGE OF ALL SERVICE ENTRANCE CONDUCTORS PRIOR TO INSTALLING ANY SOLAR EQUIPMENT. 8. (WIRE NUT ARE NOT ALLOWED ANY WHERE IN THE PV SYSTEM PER INSTALLATION GUIDE AND CEC SECTION 110.3[8]. 9. AII PLAQUES AND SIGNAGE SHALL BE INSTALLED PER 2013 CEC AND 2011 NEC. 10. AS PER CEC 705.10 "A PERMANENT PLAQUE OR DIRECTORY, DENOTING ALL ELECTRICAL POWER SOURCES ON THE PREMISES, SHALL BE INSTALLED AT BEACH SERVICE EQUIPMENT LOCATION AND AT LOCATIONS OF ALL ELECTRICAL POWER PRODUCTION SOURCES CAPABLE OF BEING INTERCONNECTED 11. THE GEC/EGC SHALL BE CONTINUOUS, OR WHEN SPLICED, THE SPLICE SHALL BE MADE BY IRREVERSIBLE CRIMP. 12. EQUIPMENT GROUNDING CONDUCTORS AND DEVICES SHALL COMPLY WITH CEC 690.43(A)-(F). EXPOSED NON-CURRENT-CARRYING METAL PARTS OF A MODULE FRAMES, EQUIPMENT AND CONDUCTOR ENCLOSES SHALL BE GROUNDED IN ACCORDANCE WITH CEC 250.134 OR CEC 250.136(A). 13. BONDING BUSHINGS WILL BE LOCATED AT EQUIPMENT ENCLOSURES. 14. 1NTERIOR CONDUIT TO BE RAN A MINIMUM 18 INCHES BELOW ROOF DECKING. GENERAL NOTES UTILITY HAS 24 HR UNRESTICTED ACCESS TO ALL PHOTOVOLTAIC SYSTEM COMPONENTS LOCATED AT SERVICE ENTRANCE WORKSPACE IN FRONT OF AC ELECTRICAL SYSTEM COMPONENTS SHALL BE IN ACCORDANCE WITH APS AND NEC REQUIREMENTS. FOR APS REQUIREMENTS, REFERENCE SECTION 300 OF THE APS ESRM AND SECTION 8.2 OF THE APS INTERCONNECTION REQUIREMENTS REFERENCE SECTION 301.15 OF THE APS ESMR FOR ELECTRIC METER SEPERATION BETWEEN WATER AND GAS JURISDICTION STAMPS: This item has been digitally signed and sealed on Mar 21, 2023 1915 W Pendleton Ave.04/07/23 UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORT ENGINEERING EXCELLENCE UNMATCHED EXPERIENCE PERMIT DOCUMENTATION DESIGN TOOLS CERTIFIED QUALITY BANKABLE WARRANTY BETTER DESIGNS TRUST THE INDUSTRY’S BEST DESIGN TOOL Start the design process for every project in our U-Builder on-line design tool. It’s a great way to save time and money. BETTER SYSTEMS ONE SYSTEM - MANY APPLICATIONS Quickly set modules flush to the roof on steep pitched roofs. Orient a large variety of modules in Portrait or Landscape. Tilt the system up on flat or low slow roofs. Components available in mill, clear, and dark finishes to optimize your design financials and aesthetics. BETTER RESULTS MAXIMIZE PROFITABILITY ON EVERY JOB Trust Unirac to help you minimize both system and labor costs from the time the job is quoted to the time your teams get off the roof. Faster installs. Less Waste. More Profits. BETTER SUPPORT WORK WITH THE INDUSTRIES MOST EXPERIENCED TEAM Professional support for professional installers and designers. You have access to our technical support and training groups. Whatever your support needs, we’ve got you covered. Visit Unirac.com/solarmount for more information. UNIVERSAL SELF STANDING MIDCLAMPS U-BUILDER ONLINE DESIGN TOOL SAVES TIME & MONEY Visit design.unirac.com BANKABLE WARRANTY Don’t leave your project to chance, Unirac has the financial strength to back our products and reduce your risk. Have peace of mind knowing you are providing products of exceptional quality. SOLARMOUNT is covered by a 25 year limited product warranty and a 5 year limited finish warranty. TECHNICAL SUPPORT Unirac’s technical support team is dedicated to answering questions & addressing issues in real time. An online library of documents including engineering reports, stamped letters and technical data sheets greatly simplifies your permitting and project planning process. CERTIFIED QUALITY PROVIDER Unirac is the only PV mounting vendor with ISO certifications for 9001:2008, 14001:2004 and OHSAS 18001:2007, which means we deliver the highest standards for fit, form, and function. These certifications demonstrate our excellence and commitment to first class business practices. UL2703BONDING & GROUNDING MECHANICAL LOADING SYSTEM FIRE CLASSIFICATIONL I S T E D SOLARMOUNT CONCEALED UNIVERSAL ENDCLAMPS END CAPS INCLUDED WITH EVERY ENDCLAMP ENHANCE YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAIN FOR Q UE S TI ON S OR C US TOME R S E R VI C E VI S I T UN I R A C . C OM OR C A LL (5 0 5 ) 2 48 -2 7 0 2PUB2018AUG31 – PRINTED UPDATE 1915 W Pendleton Ave.04/07/23 MM IN V AC L IN V AC SUB PV BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 SITE PLAN N (E) 100A MAIN SERVICE PANEL (E) 30A AC DISCONNECT (N) SOLAREDGE 3000H-US Non-RGM INVERTER (N) 125A SUB PANEL (E) PRODUCTION METER (N) AC LOAD CENTER ROOF ACCESS POINT PER CRC 2022 (R324.7.1) ARRAY 1 - (N) 10 Hanwha Q CELLS MODULES TILT: 23° AZIMUTH: 268° P3 Nathan Draeger DESIGNER: DESIGN MGR: Natalia Timoshkina NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 3/13/2023 DATE:TIME: 06:45 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: 1915 W PENDLETON AVE, SANTA ANA, CA 92704 ###### JURISDICTION STAMPS: FIRE CODE PATHWAY BACKUP INTERFACE BACKUP GATEWAYBG BI MODULE STRINGING 3 4" EMT CONDUIT OPTIMIZER JB JUNCTION BOX LEGEND CALLOUTS: 1 1 4" PVC TRENCH COMBO METER/MAINMM UTILITY METERUM MAIN SERVICE PANEL PV METER MSP PV INVERTER SUB PANEL INV SUB AC DISCONNECT AC COMBINER PANELACL AC EV CHARGER BATTERY BACKUP EV BB (E) DRIVEWAY (E) PROPERTY LINE EXISTING PV SYSTEM (E) 12 Trina 245W MODULES (E) Power one PVI 3-OUTD INVERTER This item has been digitally signed and sealed on Mar 21, 2023 1915 W Pendleton Ave.04/07/23 4/28/2023 Santa Ana Engineering building plan review Re: Plan Review Comments Project Address: 1915 W Pendleton Ave, Santa Ana, CA 92704 Dear Plan Reviewer, This letter is intended to address the request for the changes that occurred on our plan set. 1. I’ve Updated the Layout and Module Type to Reflect As Built Revision. (See Clouding for details) If you have any additional questions or concerns, please do not hesitate to contact me directly. Sincerely, Xavier Zavala QA Designer xavier.za@betterearth.solar 1915 W Pendleton Ave.05/11/23 MM INV AC L IN V AC SU B PV BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 Nathan Draeger DESIGNER: DESIGN MGR: Natalia Timoshkina NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 3/13/2023 DATE:TIME: 06:45 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE:3/32" = 1' N ARRAY 1: MODULE QTY: 10 TILT: 23° AZIMUTH: 268° MATERIAL: Stone Coated Metal Tile REQUIRED ROOF ACCESS POINT PER CRC 2022 SECTION R324. LADDER ACCESS SHALL BE AT STRONG POINT OF ROOF AND NOT OVER REQUIRED WINDOW OPENINGS. ROOF PLAN P4 ROOF DETAILS:JURISDICTION STAMPS: FIRE CODE PATHWAY BACKUP INTERFACE BACKUP GATEWAYBG BI MODULE STRINGING 3 4" EMT CONDUIT OPTIMIZER JB JUNCTION BOX LEGEND CALLOUTS: 1 1 4" PVC TRENCH COMBO METER/MAINMM UTILITY METERUM MAIN SERVICE PANEL PV METER MSP PV INVERTER SUB PANEL INV SUB AC DISCONNECT AC COMBINER PANELACL AC EV CHARGER BATTERY BACKUP EV BB CONDUIT RUN TO BE DETERMINED IN FIELD 27 ' - 1 0 " 1'-6" 3' - 0 " 1'-6" 3'-0" 1' - 6 " This item has been digitally signed and sealed on Mar 21, 2023 1915 W Pendleton Ave.04/07/23 48" FLUSH MOUNT SOLAR MODULES ATTACHED TO ROOF SURFACE Cal-Pac 2x6 TRUSS @24" O.C. METAL SHINGLE FRAMING UNIRAC STANDARD RAIL 7/16 X 3/4" NUT, FLANGE SOLAR MOD U L E S PLACE SEALANT AROUND LAG BOLT AND UNDER STANDOFF BASE PREDRILLED 3/16" HOLE (2) 5/16" LAG BOLT 2-1/2" MIN. EMBEDMENT 3/8" HEX BOLT 7/16 X 3/4" NUT, FLANGE METAL SHINGLE UNIRAC TILE HOOK E 2x6 TRUSS TYPICAL WITH PRONGED TRUSS PLATE EITHER SIDE OF ALL JOINTS TYPICAL SOLA R M O D U L E S BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 Nathan Draeger DESIGNER: DESIGN MGR: Natalia Timoshkina NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 3/13/2023 DATE:TIME: 06:45 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: RACKING & FRAMING DETAILS P5 TYPICAL ROOF ATTACHMENT PLAN ATTACHMENT DETAILFRONT VIEW TYP FRAMING DETAIL JURISDICTION STAMPS: This item has been digitally signed and sealed on Mar 21, 2023 1915 W Pendleton Ave.04/07/23 (E) GROUNDING ELECTRODE (COPPER) GROUND ROD STRING 1: (10x) Hanwha Q CELLS Q.Peak Duo BLK-G10+ 360 PV MODULES WITH 10 S440 SE POWER OPTIMIZERS 1 JUNCTION BOX - NEMA 3R AS REQUIRED 2 INVERTER SOLAREDGE SE3000H-US NON-RGM WITH DC DISCONNECT PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN PER NEC 690.12 3+ - + - + - + - + - + - 1021 DC AC METER NUMBER: 222013-463237 (N) 40A MA I N ( E ) 10 0 A M BI-DIRECTIONAL UTILITY METER 1PH/240V (E) 100A/100A MAIN SERVICE PANEL 240/120v 1-PH, 3-W SOLAR BREAKER LOCATED AT THE FURTHEST END OF BUS BAR FROM THE MAIN BREAKER MAIN BONDING JUMPER TO UTILITY GRID (Overhead) (N) AC COMBINER PANEL 240/120 V 1Ø, 3W MAX MAIN BUS: 125A (N) 20A (E) 20A TO (E) SOLAR SYSTEM 4 (N) 35A (N) 125A SUB PANEL 120/240V NEMA 3R UL LISTED 4 POINT OF INTERCONNECTION LOAD SIDE 705.12(B)(3)(2) MAX BREAKER CALC.: 125A X 1.2 - 40A = 110A (E) 20A (E) 20A (E) 20ARELOCATING THESE LOADS TO THE (N) 125A SUB PANEL: 1) (1) 20A-2P BREAKER 2) (2) 20A-1P BREAKER TO (E) SOLAR BREAKER EXISTING PV SYSTEM DETAILS(12) Trina 245W MODULES (1) Power one PVI 3-OUTD (240) INVERTER ROOFTOP JUNCTION BOX INVERTERS PRODUCTION METER 30A NON-FUSED AC DISCONNECT CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS ID CONDUCTOR CONDUIT CURRENT-CARRYING CONDUCTORS IN CONDUIT EGC TEMP. CORR. FACTOR CONT. CURRENT MAX. CURRENT (125%) BASE AMP. DERATED AMP. TERM. TEMP. RATING 1 2 3 4 #10 PV Wire, in open air 3/4" EMT N/A #6 51 15 18.75 40 38.4 90 #10 THWN-2, in conduit 3/4" EMT 2 #8 51 15 18.75 40 38.4 75 #10 THWN-2, in conduit 3/4" EMT 3 #8 32 12.5 16 40 38.4 75 #8 THWN, in conduit 3/4" EMT 3 #8 32 27 33.75 55 50.5 75 ASHRAE EXTREME LOW DESIGN TEMPERATURES ASHRAE 2% HIGH 32°C 32°C INVERTER 1 SPECS SOLAREDGE 3000H-US_Non-RGM AC VOLTAGE (V) 240 GROUND 0.99 MAX OCPD (A) 20 RATED POWER (W) 3000 MAX OUTPUT (A) 13 MAX INPUT (A) 9 MAX INPUT (V) 480 EFFICIENCY (CEC) 0.99 POWERBOX MAX OUTPUT CURRENT OPTIMIZERS IN SERIES NOMINAL STRING VOLTAGE ARRAY OPERATING CURRENT STRING DETAILS INVERTER 1 STRING CALCULATIONS STRING 1 15A 10 380V 13A SYSTEM SUMMARY ARRAY STC POWER 3600W ARRAY PTC POWER 3320W MAX AC CURRENT 12.5A MAX AC POWER 3000W INVERTER 1MODULE SPECS Hanwha Q CELLS Q.Peak Duo BLK-G10+ 360 PMAX (W) 360 PTC (W) 332 ISC (A) 11 IMP (A) 10 VOC (V) 41 VMP (V) 34 TEMP. COEFF. OF VOC -0.122 POWER OPTIMIZERS RATED INPUT (W) MAX INPUT ISC (A) WEIGHTED EFFICIENCY MAX OUTPUT(A) MAX DC (V) SOLAREDGE S440 Optimizer 440 15 98.6 15 60 BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 Nathan Draeger DESIGNER: DESIGN MGR: Natalia Timoshkina NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 3/13/2023 DATE:TIME: 06:45 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: LINE DIAGRAM & DESIGN TABLES P6 JURISDICTION STAMPS: EQUIPMENT SPECS NOTES: This item has been digitally signed and sealed on Mar 21, 2023 1915 W Pendleton Ave.04/07/23 POWER TO THIS BUILDING ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN CAUTION SERVICE BY QUALIFIED PERSONNEL ONLY N1915 W PENDLETON AVE, SANTA ANA, CA 92704 Nathan Draeger DESIGNER: DESIGN MGR: Natalia Timoshkina NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 3/13/2023 DATE:TIME: 06:45 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: ROOFTOP PV ARRAY UTILITY METER AND MAIN SERVICE PANEL INVERTER YOU ARE HERE PLACARD & PLACARD MAP P7 LABELING PLAN PROPERTY MAP NOTES: FORMAT 1. WHITE LETTERING ON A RED BACKGROUND 2. MINIMUM 3/8 INCHES LETTER HEIGHT 3. ALL LETTERS SHALL BE CAPITALIZED 4. ARIAL OR SIMILAR FONT (NON-BOLD) 6"X6" DISCONNECT DIRECTORY PLAQUE INSTALL AT MAIN SERVICE PANEL MATERIAL REFLECTIVE, WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT (USE UL-969 AS STANDARD FOR WEATHER RATING). DURABLE ADHESIVE MATERIALS JURISDICTION STAMPS: INVERTER SUBPANEL AC DISCONNECT PV METER AC LOAD CENTER STICKER LOCATED INSIDE PANEL NEXT TO PV BREAKER 11 [CEC 690.14(C)(2)] PLACE ON AC DISCONNECT 8 9 [CEC 705.12(B)(2)(3)(C)] PLACE THIS LABEL AT P.O.C. TO SERVICE DISTRIBUTION EQUIPMENT LABELING NOTES: 1.1 LABELING REQUIREMENTS BASED ON THE NATIONAL ELECTRICAL CODE, INTERNATIONAL FIRE CODE 605.11, OSHA STANDARD 1910.145, ANSI Z535. 1.2 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 1.3 LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. 1.4 LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8” AND PERMANENTLY AFFIXED. PHOTOVOLTAIC SOLAR BREAKER PHOTOVOLTAIC AC DISCONNECT ! WARNING THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS 10 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [CEC 690.56(C)(1)(A)] 2 3 [CEC 690.53] AT EACH DC DISCONNECT MEANS [CEC 690.5(C)] PLACE THIS LABEL ON ALL DISCONNECTING MEANS WHERE ENERGIZED IN AN OPEN POSITION 1 [CEC 690.31(G)3 & 4] PLACE ON JUNCTION BOXES AND CONDUIT EVERY 10' WARNING: PHOTOVOLTAIC POWER SOURCE ! MAXIMUM VOLTAGE PHOTOVOLTAIC SYSTEM DC DISCONNECT ! MAX CIRCUIT CURRENT 15 AMPS ! TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION ELECTRIC SHOCK HAZARD WARNING MAX RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER OR DC-DC CONVERTER 4 [CEC 690.12(5)] PLACE ON INVERTER PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN 7 6 5 [CEC 690.54] PLACE LABEL AT "INTERACTIVE POINT OF INTERCONNECTION" (AT MAIN SERVICE PANEL AND SUBPANEL IF APPLICABLE) [CEC 690.64(B)(4)] PLACE LABEL ON ALL EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTORS SUPPLIED FROM MULTIPLE SOURCES ! SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM DUAL POWER SUPPLY WARNING ! RATED AC OUTPUT CURRENT NOMINAL OPERATING AC VOLTAGE 240 V PHOTOVOLTAIC SYSTEM AC DISCONNECT ! ! DO NOT RELOCATE THIS OVERCURRENT DEVICE INVERTER OUTPUT CONNECTION WARNING 13A 480 VDC 13 AMPS CEC 705.12(B)(2)(3)(B) PLACE THIS LABEL AT P.O.C. TO SERVICE DISTRIBUTION EQUIPMENT (I.E. MAIN PANEL AND SUBPANEL IF APPLICABLE) SUB PANEL 5 6 JUNCTION BOX METER MAIN SERVICE PANEL 1 7 6 8 10 9 INVERTER INTEGRATED DC DISCONNECT 4 2 3 1 WHEN APPLICABLE AC DISCONNECT PRODUCTION METER AC DISCONNECT ROOFTOP ARRAY AC LOAD CENTER 73 5 8 3 5 83 5 5 11 WHEN APPLICABLE WHEN APPLICABLE WHEN APPLICABLE WHEN APPLICABLE PRODUCTION METER WHEN APPLICABLE BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 This item has been digitally signed and sealed on Mar 21, 2023 1915 W Pendleton Ave.04/07/23 BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 Nathan Draeger DESIGNER: DESIGN MGR: Natalia Timoshkina NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 3/13/2023 DATE:TIME: 06:45 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 42 34 43 35 44 36 45 37 46 38 47 39 48 40 49 41 50 OPTIMIZER MAP P8 SYSTEM SIZE 3600 W DC MODULE TYPE Hanwha Q CELLS Q.Peak Duo BLK-G10+ 360 MODULE QTY 10 INVERTER TYPE SOLAREDGE 3000H-US Non-RGM INVERTER INVERTER QTY 1 POWER OPTIMIZER TYPE SOLAREDGE S440 POWER OPTIMIZER POWER OPTIMIZER QTY 10 SYSTEM DETAILS 52 53 54 56 57 58 60 61 62 64 65 66 68 69 70 71 72 73 74 75 76 77 78 51 55 59 63 67 1915 W Pendleton Ave.04/07/23 BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 H HAZARD A ANCHOR POINT LEGEND L LADDER E ENTRY / EXIT WORK ANGLE ELECTRICAL ZONE WORK ZONE JOB HAZARD ANALYSIS Use the space below to draft a JHA. Be sure to include all indicators found in the Legend. (E) ENTRANCE NEAREST MEDICAL FACILITY: NAME: PHONE: ADDRESS: 1 1 4" PVC TRENCH Nathan Draeger DESIGNER: DESIGN MGR: Natalia Timoshkina NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 3/13/2023 DATE:TIME: 06:45 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: JOB HAZARD ANALYSIS P9 CREW LEAD: CREW: 1915 W PENDLETON AVE, SANTA ANA, CA 92704 (E) DRIVEWAY 1915 W Pendleton Ave.04/07/23 BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 Nathan Draeger DESIGNER: DESIGN MGR: Nathan Draeger NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 5/31/2023 DATE:TIME: 06:04 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 SYSTEM SIZE: 3,600 DC SYSTEM SIZE 3000 AC CEC POWER OUTPUT: 3364 CEC MODULE INFORMATION MODULE QTY: 10 MODULE MFG: Longi MODULE TYPE: LR4-60HPB-360M INVERTER INFORMATION INVERTER QTY: 1 INVERTER MFG: SOLAREDGE INVERTER TYPE: POWER OPTIMIZER INFORMATION OPTIMIZER QTY: 10 OPTIMIZER MFG: SOLAREDGE OPTIMIZER TYPE: S440 PROJECT DETAILS COVER SHEET P1 TABLE OF CONTENTS PAGE NUMBER: PAGE TITLE: P1 COVER SHEET P2 NOTES SHEET P3 SITE PLAN P4 ROOF PLAN P5 RACKING & FRAMING P6 LINE DIAGRAM & DESIGN TABLES P7 PLACARDS & PLACARD MAP P8 OPTIMIZER MAP P9 JOB HAZARD ANALYSIS P10 ELEC. LOAD CALCS SS00 SPECIFICATION PAGES RAILING INFORMATION RAILING MFG: UNIRAC RAILING TYPE: Unirac SM Light MOUNTING INFORMATION MOUNT FLASHING QTY: MOUNT FLASHING MFG: UNIRAC MOUNT FLASHING TYPE: 20 Unirac Adj. Cal-Pac Tile Hook EXISTING SOLAR INFORMATION INVERTER QTY: INVERTER MFG & TYPE : MODULE QTY: MODULE MFG & TYPE: 1 12 Power one PVI 3-OUTD Trina 245W BATTERY INFORMATION - N/A ADDITIONAL SCOPE OF WORK JURISDICTION STAMPS: PROPERTY INFORMATION OWNER:Vicente Joel Sanchez PHONE:1714-566-5773 EMAIL:vicentesanchez6625@gmail.com CONTRACTOR:BETTER EARTH ELECTRIC INC. PHONE:(888) 373-9379 AUTHORITIES HAVING JURISDICTION BUILDING: Santa Ana (CA) UTILITY: Southern California Edison DESIGN SPECIFICATIONS OCCUPANCY: R-3/U CONSTRUCTION: V-B NAME: RESIDENTIAL SNOW LOAD: 0 PSF WIND EXPOSURE: C WIND SPEED: 130 MPH ROOF SURFACE: 3048 SQ.FT. NEW PV SQ FOOTAGE: 1969 SQ.FT. EXISTING PV SQ FOOTAGE: 218.52 SQ.FT. TOTAL PV SQ FOOTAGE: 2187.52 SQ.FT. PV COVERAGE: 71.77 % WEIGHT OF EQUIPMENT: 476.9 LBS WEIGHT PER ATTACHMENT: 23.85 LBS DISTRIBUTED WEIGHT: 2.43 PSF NO. OF STORIES: 1 FIRE SPRINKLERS: NO LOT INFORMATION APN: 40843214 LOT AREA: 5963 LIVING AREA: 1381 3000H-US Non-RGM Revision: Only showed one relocated breaker on subpanel on sheet P10. . Attached load calculations on sheet P10 Revision to Elec# 20179266 Issued 20179266 Elec# 20179877 Issued 07/31/23 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 1915 W Pendleton Ave - 2017987708/01/23 © SolarEdge Technologies, Ltd. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: November 8, 2022 DS-000091-ENG. Subject to change without notice. Power Optimizer For Residential Installations S440 / S500 / S500B S440 S500 S500B UNIT INPUT Rated Input DC Power(1) 440 500 W Absolute Maximum Input Voltage (Voc) 60 125 Vdc MPPT Operating Range 8 – 60 12.5 – 105 Vdc Maximum Short Circuit Current (Isc) of Connected PV Module 14.5 15 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.6 % Overvoltage Category II OUTPUT DURING OPERTION Maximum Output Current 15 Adc Maximum Output Voltage 60 80 Vdc OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) Safety Output Voltage per Power Optimizer 1 ± 0.1 Vdc STANDARD COMPLIANCE(2) EMC FCC Part 15 Class B, IEC61000-6-2, IEC61000-6-3, CISPR11, EN-55011 Safety IEC62109-1 (class II safety), UL1741 Material UL94 V-0, UV Resistant RoHS Yes Fire Safety VDE-AR-E 2100-712:2018-12 INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc Dimensions (W x L x H) 129 x 155 x 30 129 x 155 x 45 mm Weight (including cables) 655 gr Input Connector MC4(3) Input Wire Length 0.1 m Output Connector MC4 Output Wire Length (+) 2.3, (-) 0.10 m Operating Temperature Range(4) -40 to +85 ˚C Protection Rating IP68 Relative Humidity 0 – 100 % (1) Rated power of the module at STC will not exceed the Power Optimizer Rated Input DC Power. Modules with up to +5% power tolerance are allowed. (2) For details about CE compliance, see Declaration of Conformity – CE. (3) For other connector types please contact SolarEdge. (4) For ambient temperatures above +70°C power de-rating is applied. Refer to Power Optimizers Temperature De-Rating Technical Note for details. PV System Design Using a SolarEdge Inverter(5) SolarEdge Home Wave Inverter Single Phase SolarEdge Home Short String Inverter Three Phase Three Phase for 230/400V Grid Three Phase for 277/480V Grid Minimum String Length (Power Optimizers) S440, S500 8 9 16 18 S500B 6 8 14 Maximum String Length (Power Optimizers)25 20 50 Maximum Continuous Power per String 5700 5625 11250 12750 W Maximum Allowed Connected Power per String (Permitted only when the power difference between strings is less than 2,000W) See(6)See(6)13500 15000 W Parallel Strings of Different Lengths or Orientations Yes (5) It is not allowed to mix S-series and P-series Power Optimizers in new installations. (6) If the inverter’s rated AC power ≤ maximum nominal power per string, then the maximum power per string will be able to reach up to the inverters maximum input DC power. Refer to Application Note: Single String Design Guidelines. * 45mm for S500B 1915 W Pendleton Ave - 2017987708/01/23 (E) GROUNDING ELECTRODE (COPPER) GROUND ROD STRING 1: (10x) Longi LR4-60HPB-360M PV MODULES WITH 10 S440 SE POWER OPTIMIZERS 1 JUNCTION BOX - NEMA 3R AS REQUIRED 2 INVERTER SOLAREDGE SE3000H-US NON-RGM WITH DC DISCONNECT PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN PER NEC 690.12 3+ - + - + - + - + - + - 1021 DC AC (N) AC COMBINER PANEL 240/120 V 1Ø, 3W MAX MAIN BUS: 125A (N) 20A (E) 20A TO (E) SOLAR SYSTEM 4 5 TO (E) SOLAR BREAKER EXISTING PV SYSTEM DETAILS(12) Trina 245W MODULES (1) Power one PVI 3-OUTD (240) INVERTER ROOFTOP JUNCTION BOX INVERTERS PRODUCTION METER 30A NON-FUSED AC DISCONNECT (N) 35A (N) 125A SUB PANEL 120/240V NEMA 3R UL LISTED MAX BREAKER CALC.: 125A X 1.2 - 40A = 110A MAIN (E) 100A (N) 100A M BI-DIRECTIONAL UTILITY METER 1PH/240V SOLAR BREAKER LOCATED AT THE FURTHEST END OF BUS BAR FROM THE MAIN BREAKER MAIN BONDING JUMPER TO UTILITY GRID (OVERHEAD) MAX BREAKER CALC.: 100A X 1.2 - 100A = 20A (E) 100A/100A MAIN SERVICE PANEL 240/120v 1-PH, 3-W ALL BREAKERS TO BE RELOCATED TO NEW SUB PANEL DO NOT INSTALL ANY ADDITIONAL BREAKERS IN PANEL WARNING MAIN SERVICE PANEL COMPLIES WITH 705.12(B)(3)(3) IF RELOCATING CIRCUITS MORE THAN 6' AFCI PROTECTION REQUIRED CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS ID CONDUCTOR CONDUIT CURRENT-CARRYING CONDUCTORS IN CONDUIT EGC TEMP. CORR. FACTOR CONT. CURRENT MAX. CURRENT (125%) BASE AMP. DERATED AMP. TERM. TEMP. RATING 1 2 3 4 #10 PV Wire, in open air 3/4" EMT N/A #6 51 15 18.75 40 38.4 90 #10 THWN-2, in conduit 3/4" EMT 2 #8 51 15 18.75 40 38.4 75 #10 THWN-2, in conduit 3/4" EMT 3 #8 32 12.5 16 40 38.4 75 #8 THWN, in conduit 3/4" EMT 3 #8 32 27 33.75 55 50.5 75 CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS(ALL REMAINING LOADS IN MSP)TYPICAL CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS(LOADS IN NEW SUBPANEL) #10 THWN-2, in conduit 3/4" EMT 3 #8 32 12.5 16 40 38.4 75 #8 THWN, in conduit 3/4" EMT 3 #8 32 27 33.75 55 50.5 75 14 1 #3 THWN-2, in conduit 3/4" EMT 3 31 - - #8 130 122.2 751 #3 THWN-2, in conduit 3/4" EMT 3 31 - - #8 130 122.2 755 ASHRAE EXTREME LOW DESIGN TEMPERATURES ASHRAE 2% HIGH 32°C 32°C INVERTER 1 SPECS SOLAREDGE 3000H-US_Non-RGM AC VOLTAGE (V) 240 GROUND 0.99 MAX OCPD (A) 20 RATED POWER (W) 3000 MAX OUTPUT (A) 13 MAX INPUT (A) 9 MAX INPUT (V) 480 EFFICIENCY (CEC) 0.99 POWERBOX MAX OUTPUT CURRENT OPTIMIZERS IN SERIES NOMINAL STRING VOLTAGE ARRAY OPERATING CURRENT STRING DETAILS INVERTER 1 STRING CALCULATIONS STRING 1 15A 10 380V 13A SYSTEM SUMMARY ARRAY STC POWER 3600W ARRAY PTC POWER 3364W MAX AC CURRENT 12.5A MAX AC POWER 3000W INVERTER 1MODULE SPECS Longi LR4-60HPB-360M PMAX (W) 360 PTC (W) 336.4 ISC (A) 11.33 IMP (A) 10.35 VOC (V) 40.8 VMP (V) 34.8 TEMP. COEFF. OF VOC -0.122 POWER OPTIMIZERS RATED INPUT (W) MAX INPUT ISC (A) WEIGHTED EFFICIENCY MAX OUTPUT(A) MAX DC (V) SOLAREDGE S440 Optimizer 440 15 98.6 15 60 BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 Nathan Draeger DESIGNER: DESIGN MGR: Nathan Draeger NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 6/30/2023 DATE:TIME: 06:04 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: LINE DIAGRAM & DESIGN TABLES P6 JURISDICTION STAMPS: EQUIPMENT SPECS NOTES: 1915 W Pendleton Ave - 2017987708/01/23 THE COMPLETE TILE ROOF SOLUTION UNIRAC Pro Series SOLARHOOKS is a complete line of attachment solutions for tile roofs. Featuring UNIRAC’s exclusive POWERARCH technology which increases strength by up 60% more than traditional tile hooks, SOLARHOOKS are simple to install and designed for maximum convenience. Available in universal designs and in specific shapes for flat, S and W tiles, SOLARHOOKS are kitted with stainless lag bolts and have a bead blasted stainless steel finish. With SOLARHOOKS, you have everything you need for a quick, professional installation. SIMPLE AND VERSATILE Multiple hole patterns and slotted connections provide adjustability. Stainless steel lag bolts bring long term peace of mind. EXTENSIVE ASSORTMENT Available in a variety of universal, flat tile & Spanish tile designs to handle any challenge. FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 UP TO 60% STRONGER Exclusive POWERARCH technology ensures no array rattling or broken tiles during high winds. NEW & IMPROVED PRO SERIES SOLARHOOKS BETTER SOLAR STARTS HERE 1915 W Pendleton Ave - 2017987708/01/23 MODEL SOLARHOOK UNIV SIDE MT CT5 SOLARHOOK FLAT SIDE MT AT1 SOLARHOOK SPANISH SIDE MT CT1 SOLARHOOK FLAT SIDE MT ST1 SOLARHOOK FLAT ADJUSTABLE SIDE MT ST1 SOLARHOOK SPANISH SIDE MT CT2 PART NUMBER 004CT5H 004AT1H 004CT1H 004ST1S 004AST1 004CT2H MATERIAL Bead Blasted 304 Stainless Steel Bead Blasted 304 Stainless Steel Bead Blasted 304 Stainless Steel Bead Blasted 304 Stainless Steel Bead Blasted 304 Stainless Steel Bead Blasted 304 Stainless Steel APPLICATION Best in low – med wind / snow regions Best in low – med wind / snow regions Best in low – med wind / snow regions Best in low – med wind / snow regions Best in low – med wind / snow regions Best in low – med wind / snow regions USES EXISTING TILES Yes Yes Yes Yes Yes Yes RAIL OR RAIL-LESS Rail Rail Rail Rail Rail Rail DIRECT MOUNT, NO L-FOOT REQUIRED a a a a a a ADJUSTABLE a a FLAT TILE a a a a S TILE a a a W TILE a a UNIVERSAL TILE a SIMPLE INSTALLATION a a a a a a NO TILE MOD. REQUIRED a a a a a a WARRANTY 25-Year 25-Year 25-Year 25-Year 25-Year 25-Year APPLICATION GUIDE PRO SERIES SOLARHOOKS THE COMPLETE TILE ROOF SOLUTION FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 1915 W Pendleton Ave - 2017987708/01/23 SOLARMOUNT is the professionals’ choice for residential PV mounting applications. Every aspect of the system is designed for an easier, faster installation experience. SOLARMOUNT is a complete solution with revolutionary universal clamps, FLASHKIT PRO, full system UL 2703 certification and 25-year warranty. Not only is SOLARMOUNT easy to install, but best-in-class aesthetics make it the most attractive on any block! NOW FEATURING FLASHKIT PRO The Complete Roof Attachment Solution NOW WITH UNIVERSAL MIDCLAMPS Accommodates 30mm-51mm module frames One tool, one-person installs are here! REVOLUTIONARY NEW ENDCLAMPS Concealed design and included End Caps THE PROFESSIONALS’ CHOICE FOR RESIDENTIAL RACKING BEST INSTALLATION EXPERIENCE • CURB APPEAL • COMPLETE SOLUTION • UNIRAC SUPPORT SOLARMOUNT OPTIONAL FRONT TRIM New & Improved: THE PROFESSIONALS’ CHOICE With Superior Aesthetics CONCEALED UNIVERSAL CLAMPS 25 YEAR FULL-SYSTEM WARRANTY FOR QUESTIONS OR CUSTOMER SERVICE VISI T UNIRAC.COM OR CALL (505) 248-2702 1915 W Pendleton Ave - 2017987708/01/23 UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORT ENGINEERING EXCELLENCE UNMATCHED EXPERIENCE PERMIT DOCUMENTATION DESIGN TOOLS CERTIFIED QUALITY BANKABLE WARRANTY BETTER DESIGNS TRUST THE INDUSTRY’S BEST DESIGN TOOL Start the design process for every project in our U-Builder on-line design tool. It’s a great way to save time and money. BETTER SYSTEMS ONE SYSTEM - MANY APPLICATIONS Quickly set modules flush to the roof on steep pitched roofs. Orient a large variety of modules in Portrait or Landscape. Tilt the system up on flat or low slow roofs. Components available in mill, clear, and dark finishes to optimize your design financials and aesthetics. BETTER RESULTS MAXIMIZE PROFITABILITY ON EVERY JOB Trust Unirac to help you minimize both system and labor costs from the time the job is quoted to the time your teams get off the roof. Faster installs. Less Waste. More Profits. BETTER SUPPORT WORK WITH THE INDUSTRIES MOST EXPERIENCED TEAM Professional support for professional installers and designers. You have access to our technical support and training groups. Whatever your support needs, we’ve got you covered. Visit Unirac.com/solarmount for more information. UNIVERSAL SELF STANDING MIDCLAMPS U-BUILDER ONLINE DESIGN TOOL SAVES TIME & MONEY Visit design.unirac.com BANKABLE WARRANTY Don’t leave your project to chance, Unirac has the financial strength to back our products and reduce your risk. Have peace of mind knowing you are providing products of exceptional quality. SOLARMOUNT is covered by a 25 year limited product warranty and a 5 year limited finish warranty. TECHNICAL SUPPORT Unirac’s technical support team is dedicated to answering questions & addressing issues in real time. An online library of documents including engineering reports, stamped letters and technical data sheets greatly simplifies your permitting and project planning process. CERTIFIED QUALITY PROVIDER Unirac is the only PV mounting vendor with ISO certifications for 9001:2008, 14001:2004 and OHSAS 18001:2007, which means we deliver the highest standards for fit, form, and function. These certifications demonstrate our excellence and commitment to first class business practices. UL2703BONDING & GROUNDING MECHANICAL LOADING SYSTEM FIRE CLASSIFICATIONL I S T E D SOLARMOUNT CONCEALED UNIVERSAL ENDCLAMPS END CAPS INCLUDED WITH EVERY ENDCLAMP ENHANCE YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAIN FOR Q UE S TI ON S OR C US TOMER S ER VI C E V I S I T UNI R A C .C OM OR C A LL (5 0 5 ) 2 48 -2 7 0 2PUB2018AUG31 – PRINTED UPDATE 1915 W Pendleton Ave - 2017987708/01/23 BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 Nathan Draeger DESIGNER: DESIGN MGR: Nathan Draeger NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 5/31/2023 DATE:TIME: 06:04 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: ELEC LOAD CALCS ELECTRICAL LOAD CALCULATIONS JURISDICTION STAMPS: P10 1915 W Pendleton Ave - 2017987708/01/23 1915 W Pendleton Ave - 2017987708/01/23 1915 W Pendleton Ave - 2017987708/01/23 IN V E R T E R S solaredge.com Optimized installation with HD-Wave technology Specifically designed to work with power optimizers Built-in module-level monitoring Optional: Faster installations with built-in consumption metering (1% accuracy) and production revenue grade metering (0.5% accuracy, ANSI C12.20) Record-breaking 99% weighted efficiency Quick and easy inverter commissioning directly from a smartphone using the SolarEdge SetApp Fixed voltage inverter for longer strings UL1741 SA certified, for CPUC Rule 21 grid compliance Integrated arc fault protection and rapid shutdown for NEC 2014, NEC 2017 and NEC 2020 per article 690.11 and 690.12 Small, lightweight, and easy to install both outdoors or indoors Single Phase Inverter with HD-Wave Technology for North America SE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US / SE7600H-US / SE10000H-US / SE11400H-US 12-25 YEAR WARRANTY 1915 W Pendleton Ave - 2017987708/01/23 MODEL NUMBER SE3000H-US SE3800H-US SE5000H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US APPLICABLE TO INVERTERS WITH PART NUMBER SEXXXXH-XXXXXBXX4 OUTPUT Rated AC Power Output 3000 3800 @ 240V 3300 @ 208V 5000 6000 @ 240V 5000 @ 208V 7600 10000 11400 @ 240V 10000 @ 208V VA Maximum AC Power Output 3000 3800 @ 240V 3300 @ 208V 5000 6000 @ 240V 5000 @ 208V 7600 10000 11400 @ 240V 10000 @ 208V VA AC Output Voltage Min.-Nom.-Max. (211 - 240 - 264)Vac AC Output Voltage Min.-Nom.-Max. (183 - 208 - 229)- - - -Vac AC Frequency (Nominal)59.3 - 60 - 60.5(1)Hz Maximum Continuous Output Current @240V 12.5 16 21 25 32 42 47.5 A Maximum Continuous Output Current @208V -16 -24 --48.5 A Power Factor 1, Adjustable - 0.85 to 0.85 GFDI Threshold 1 A Utility Monitoring, Islanding Protection, Country Configurable Thresholds Yes INPUT Maximum DC Power @240V 4650 5900 7750 9300 11800 15500 17650 W Maximum DC Power @208V -5100 -7750 --15500 W Transformer-less, Ungrounded Yes Maximum Input Voltage 480 Vdc Nominal DC Input Voltage 380 400 Vdc Maximum Input Current @240V(2)8.5 10.5 13.5 16.5 20 27 30.5 Adc Maximum Input Current @208V(2)-9 -13.5 --27 Adc Max. Input Short Circuit Current 45 Adc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection 600k Sensitivity Maximum Inverter Efficiency 99 99.2 % CEC Weighted Efficiency 99 99 @ 240V 98.5 @ 208V % Nighttime Power Consumption < 2.5 W (1) For other regional settings please contact SolarEdge support (2) A higher current source may be used; the inverter will limit its input current to the values stated SE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US/ SE7600H-US / SE10000H-US / SE11400H-US Single Phase Inverter with HD-Wave Technology for North America 1915 W Pendleton Ave - 2017987708/01/23 (E) GROUNDING ELECTRODE (COPPER) GROUND ROD STRING 1: (10x) Longi LR4-60HPB-360M PV MODULES WITH 10 S440 SE POWER OPTIMIZERS 1 JUNCTION BOX - NEMA 3R AS REQUIRED 2 INVERTER SOLAREDGE SE3000H-US NON-RGM WITH DC DISCONNECT PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN PER NEC 690.12 3+ - + - + - + - + - + - 1021 DC AC (N) AC COMBINER PANEL 240/120 V 1Ø, 3W MAX MAIN BUS: 125A (N) 20A (E) 20A TO (E) SOLAR SYSTEM 4 5 TO (E) SOLAR BREAKER EXISTING PV SYSTEM DETAILS(12) Trina 245W MODULES (1) Power one PVI 3-OUTD (240) INVERTER ROOFTOP JUNCTION BOX INVERTERS PRODUCTION METER 30A NON-FUSED AC DISCONNECT (N) 35A (N) 125A SUB PANEL 120/240V NEMA 3R UL LISTED MAX BREAKER CALC.: 125A X 1.2 - 40A = 110A MAIN (E) 100A (N) 100A M BI-DIRECTIONAL UTILITY METER 1PH/240V SOLAR BREAKER LOCATED AT THE FURTHEST END OF BUS BAR FROM THE MAIN BREAKER MAIN BONDING JUMPER TO UTILITY GRID (OVERHEAD) MAX BREAKER CALC.: 100A X 1.2 - 100A = 20A (E) 100A/100A MAIN SERVICE PANEL 240/120v 1-PH, 3-W ALL BREAKERS TO BE RELOCATED TO NEW SUB PANEL DO NOT INSTALL ANY ADDITIONAL BREAKERS IN PANEL WARNING MAIN SERVICE PANEL COMPLIES WITH 705.12(B)(3)(3) IF RELOCATING CIRCUITS MORE THAN 6' AFCI PROTECTION REQUIRED CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS ID CONDUCTOR CONDUIT CURRENT-CARRYING CONDUCTORS IN CONDUIT EGC TEMP. CORR. FACTOR CONT. CURRENT MAX. CURRENT (125%) BASE AMP. DERATED AMP. TERM. TEMP. RATING 1 2 3 4 #10 PV Wire, in open air 3/4" EMT N/A #6 51 15 18.75 40 38.4 90 #10 THWN-2, in conduit 3/4" EMT 2 #8 51 15 18.75 40 38.4 75 #10 THWN-2, in conduit 3/4" EMT 3 #8 32 12.5 16 40 38.4 75 #8 THWN, in conduit 3/4" EMT 3 #8 32 27 33.75 55 50.5 75 CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS(ALL REMAINING LOADS IN MSP)TYPICAL CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS(LOADS IN NEW SUBPANEL) #10 THWN-2, in conduit 3/4" EMT 3 #8 32 12.5 16 40 38.4 75 #8 THWN, in conduit 3/4" EMT 3 #8 32 27 33.75 55 50.5 75 14 1 #3 THWN-2, in conduit 3/4" EMT 3 31 - - #8 130 122.2 751 #3 THWN-2, in conduit 3/4" EMT 3 31 - - #8 130 122.2 755 ASHRAE EXTREME LOW DESIGN TEMPERATURES ASHRAE 2% HIGH 32°C 32°C INVERTER 1 SPECS SOLAREDGE 3000H-US_Non-RGM AC VOLTAGE (V) 240 GROUND 0.99 MAX OCPD (A) 20 RATED POWER (W) 3000 MAX OUTPUT (A) 13 MAX INPUT (A) 9 MAX INPUT (V) 480 EFFICIENCY (CEC) 0.99 POWERBOX MAX OUTPUT CURRENT OPTIMIZERS IN SERIES NOMINAL STRING VOLTAGE ARRAY OPERATING CURRENT STRING DETAILS INVERTER 1 STRING CALCULATIONS STRING 1 15A 10 380V 13A SYSTEM SUMMARY ARRAY STC POWER 3600W ARRAY PTC POWER 3364W MAX AC CURRENT 12.5A MAX AC POWER 3000W INVERTER 1MODULE SPECS Longi LR4-60HPB-360M PMAX (W) 360 PTC (W) 336.4 ISC (A) 11.33 IMP (A) 10.35 VOC (V) 40.8 VMP (V) 34.8 TEMP. COEFF. OF VOC -0.122 POWER OPTIMIZERS RATED INPUT (W) MAX INPUT ISC (A) WEIGHTED EFFICIENCY MAX OUTPUT(A) MAX DC (V) SOLAREDGE S440 Optimizer 440 15 98.6 15 60 BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 Nathan Draeger DESIGNER: DESIGN MGR: Nathan Draeger NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 6/30/2023 DATE:TIME: 06:04 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: LINE DIAGRAM & DESIGN TABLES P6 JURISDICTION STAMPS: EQUIPMENT SPECS NOTES: 1915 W Pendleton Ave - 2017987708/01/23 MODEL NUMBER SE3000H-US SE3800H-US SE5000H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US ADDITIONAL FEATURES Supported Communication Interfaces RS485, Ethernet, ZigBee (optional), Cellular (optional) Revenue Grade Metering, ANSI C12.20 Optional(3) Consumption metering Inverter Commissioning With the SetApp mobile application using Built-in Wi-Fi Access Point for Local Connection Rapid Shutdown - NEC 2014, NEC 2017 and NEC 2020, 690.12 Automatic Rapid Shutdown upon AC Grid Disconnect STANDARD COMPLIANCE Safety UL1741, UL1741 SA, UL1699B, CSA C22.2, Canadian AFCI according to T.I.L. M-07 Grid Connection Standards IEEE1547, Rule 21, Rule 14 (HI) Emissions FCC Part 15 Class B INSTALLATION SPECIFICATIONS AC Output Conduit Size / AWG Range 1'' Maximum / 14-6 AWG 1'' Maximum /14-4 AWG DC Input Conduit Size / # of Strings / AWG Range 1'' Maximum / 1-2 strings / 14-6 AWG 1'' Maximum / 1-3 strings / 14-6 AWG Dimensions with Safety Switch (HxWxD)17.7 x 14.6 x 6.8 / 450 x 370 x 174 21.3 x 14.6 x 7.3 / 540 x 370 x 185 in / mm Weight with Safety Switch 22 / 10 25.1 / 11.4 26.2 / 11.9 38.8 / 17.6 lb / kg Noise < 25 <50 dBA Cooling Natural Convection Operating Temperature Range -40 to +140 / -40 to +60(4)˚F / ˚C Protection Rating NEMA 4X (Inverter with Safety Switch) (3) Inverter with Revenue Grade Meter P/N: SExxxxH-US000BNC4; Inverter with Revenue Grade Production and Consumption Meter P/N: SExxxxH-US000BNI4 . For consumption metering, current transformers should be ordered separately: SEACT0750-200NA-20 or SEACT0750-400NA-20. 20 units per box (4) Full power up to at least 50˚C / 122˚F; for power de-rating information refer to: https://www.solaredge.com/sites/default/files/se-temperature-derating-note-na.pdf Single Phase Inverter with HD-Wave Technology for North America SE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US/ SE7600H-US / SE10000H-US / SE11400H-US How to Enable Consumption Monitoring By simply wiring current transformers through the inverter's existing AC conduits and connecting them to the service panel, homeowners will gain full insight into their household energy usage helping them to avoid high electricity bills © SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: 12/2020/V01/ENG NAM. Subject to change without notice. 1915 W Pendleton Ave - 2017987708/01/23 MULTIPLE SOURCES OF POWER CAUTION: SERVICE BY QUALIFIED PERSONNEL ONLY N1915 W PENDLETON AVE, SANTA ANA, CA 92704 Nathan Draeger DESIGNER: DESIGN MGR: Nathan Draeger NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 6/30/2023 DATE:TIME: 06:04 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: ROOFTOP PV ARRAY MAIN SERVICE PANEL INVERTER YOU ARE HERE PLACARD & PLACARD MAP P7 LABELING PLAN PROPERTY MAP NOTES: FORMAT 1. WHITE LETTERING ON A RED BACKGROUND 2. MINIMUM 3/8 INCHES LETTER HEIGHT 3. ALL LETTERS SHALL BE CAPITALIZED 4. ARIAL OR SIMILAR FONT (NON-BOLD) 6"X6" DISCONNECT DIRECTORY PLAQUE INSTALL AT MAIN SERVICE PANEL MATERIAL REFLECTIVE, WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT (USE UL-969 AS STANDARD FOR WEATHER RATING). DURABLE ADHESIVE MATERIALS JURISDICTION STAMPS: INVERTER AC DISCONNECT STICKER LOCATED INSIDE PANEL NEXT TO PV BREAKER 11 [CEC 690.14(C)(2)] PLACE ON AC DISCONNECT 8 9 [CEC 705.12(B)(2)(3)(C)] PLACE THIS LABEL AT P.O.C. TO SERVICE DISTRIBUTION EQUIPMENT LABELING NOTES: 1.1 LABELING REQUIREMENTS BASED ON THE NATIONAL ELECTRICAL CODE, INTERNATIONAL FIRE CODE 605.11, OSHA STANDARD 1910.145, ANSI Z535. 1.2 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 1.3 LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. 1.4 LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8” AND PERMANENTLY AFFIXED. PHOTOVOLTAIC SOLAR BREAKER PHOTOVOLTAIC AC DISCONNECT WARNING THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS 10 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [CEC 690.56(C)(1)(A)] 2 3 [CEC 690.53] AT EACH DC DISCONNECT MEANS [CEC 690.5(C)] PLACE THIS LABEL ON ALL DISCONNECTING MEANS WHERE ENERGIZED IN AN OPEN POSITION 1 [CEC 690.31(G)3 & 4] PLACE ON JUNCTION BOXES AND CONDUIT EVERY 10' WARNING: PHOTOVOLTAIC POWER SOURCE MAXIMUM VOLTAGE PHOTOVOLTAIC SYSTEM DC DISCONNECT MAX CIRCUIT CURRENT 15 AMPS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION ELECTRIC SHOCK HAZARD WARNING MAX RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER OR DC-DC CONVERTER 4 [CEC 690.12(5)] PLACE ON INVERTER PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN 7 6 5 [CEC 690.54] PLACE LABEL AT "INTERACTIVE POINT OF INTERCONNECTION" (AT MAIN SERVICE PANEL AND SUBPANEL IF APPLICABLE) [CEC 690.64(B)(4)] PLACE LABEL ON ALL EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTORS SUPPLIED FROM MULTIPLE SOURCES SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM DUAL POWER SUPPLY WARNING RATED AC OUTPUT CURRENT NOMINAL OPERATING AC VOLTAGE 240 V PHOTOVOLTAIC SYSTEM AC DISCONNECT DO NOT RELOCATE THIS OVERCURRENT DEVICE INVERTER OUTPUT CONNECTION WARNING 13A 480 VDC 13 AMPS CEC 705.12(B)(2)(3)(B) PLACE THIS LABEL AT P.O.C. TO SERVICE DISTRIBUTION EQUIPMENT (I.E. MAIN PANEL AND SUBPANEL IF APPLICABLE) SUB PANEL 5 6 JUNCTION BOX METER MAIN SERVICE PANEL 1 7 6 8 10 9 INVERTER INTEGRATED DC DISCONNECT 4 2 3 1 WHEN APPLICABLE AC DISCONNECT PRODUCTION METER AC DISCONNECT ROOFTOP ARRAY AC LOAD CENTER 73 5 8 3 5 83 5 5 11 WHEN APPLICABLE WHEN APPLICABLE WHEN APPLICABLE WHEN APPLICABLE PRODUCTION METER WHEN APPLICABLE BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 1915 W Pendleton Ave - 2017987708/01/23 Rapid Shutdown Kit Installation - MAN-01-00186-1.6 1 Rapid Shutdown Kit - Installation and Configuration (Single Phase Inverters) This document describes how to install the rapid shutdown kit in the SolarEdge Safety Switch, and how to enable the rapid shutdown feature in the inverter in order to provide the functionality described in the Rapid Shutdown clause of NEC2014 690.12 (1) through (4). Kit Contents ƒRapid shutdown cables ƒMicro-SD card and SD card adapter with firmware files (Note: DO NOT THROW AWAY THE CARD AND THE ADAPTER; keep them for installation of other rapid shutdown kits) Cable Installation Perform this procedure before connecting the strings to the Safety Switch [Chapter 4: Connecting the AC and the Strings to the Safety Switch in the SolarEdge Installation Guide]. 1 Turn the inverter ON/OFF switch to OFF. If installing the kit in an inverter that is already operating, wait until the LCD indicates that the DC voltage is safe (<50V), or wait five minutes before continuing to the next step. 2 Turn the Safety Switch and the AC switch on the main circuit board to OFF. WARNING! If you cannot see the inverter panel, or if a malfunction is indicated on the LCD panel, wait five minutes for the input capacitors of the inverter to discharge. 3 Loosen the four Allen screws on the front cover of the Safety Switch, and open the cover. 4 Carefully disconnect the two DC cables from the left side of the switch and from the DC connection spring clamp terminals, as illustrated below1. Use a standard straight-bladed screwdriver to disconnect the cables from the terminals. Figure 1: Inside the AC/DC Safety Switch 1 The internal components may vary depending on the Safety Switch model; the figures in this documents show the AC/DC Safety Switch for single phase 7.6-11.4 kW inverters. DC connection terminals Disconnect here Disconnect here Switch terminal block Rapid Shutdown Kit - Installation and Configuration (Single Phase Inverters) Rapid Shutdown Kit Installation - MAN-01-00186-1.6 2 5 The rapid shutdown cables have a resistor connected to one end (on the red cable). Connect these ends to the switch, making sure that the red and black cables are reversed relative to the cables connected at the top of the switch (going into the DC side conduit between the inverter and the Safety Switch), as detailed below. Apply a torque of 2 N*m (18 lb*in): ƒ If the cables at the top are red and black from left to right, connect as shown below. Figure 2: Rapid shutdown cable connected – option 1 ƒIf the cables at the top are black and red from left to right, connect as shown below. Figure 3: Rapid shutdown cable connected – option 2 6 Use a standard straight-bladed screwdriver to connect the other end of the rapid shutdown cables to the DC connection spring-clamp terminals: Connect the black cable from the switch to the DC- terminal block, and connect the red cable from the switch to the DC+ terminal block. 7 Check that the cables are located and connected in the correct positions to ensure the rapid shutdown functionality. 8 Close the cover: Attach the switch cover and secure it by tightening the four screws with a torque of 0.9 ft.*lb / 1.2 N*m. Red (+) Black (-) Black (-) DC+ DC- Red (+) with rapid shutdown resistor Black (-) Red (+) Black (-)BlaRed (+) with rapid shutdown resistor DC+ DC- 1915 W Pendleton Ave - 2017987708/01/23 solaredge.com Power Optimizer For Residential Installations S440 / S500 / S500B Enabling PV power optimization at the module level Specifically designed to work with SolarEdge residential inverters Detects abnormal PV connector behavior, preventing potential safety issues* Module-level voltage shutdown for installer and firefighter safety Superior efficiency (99.5%) Mitigates all types of module mismatch loss, from manufacturing tolerance to partial shading Faster installations with simplified cable management and easy assembly using a single bolt Flexible system design for maximum space utilization Compatible with bifacial PV modules PO W E R O P T I M I Z E R 25 YEAR WARRANTY * Functionality subject to inverter model and firmware version 1915 W Pendleton Ave - 2017987708/01/23 Date_____________ To Whom it May Concern, I ______________________________ , the owner of the property located at, Property Owner Name ADDRESS:_________________________________________ I Have hired, Better Earth Electric Inc, State Lic #1024460, to install a PV Solar System: __________________________________________________________________ __________________________________________________________________ __________________________________________________________________ Kind Regards , ________________________________ Signature ________________________________ Print Name Better Earth Electric Inc. 1815 E Wilshire Ave. St., 908/909, Santa Ana CA 92705 888-373-9379 SantaAnaPermits@Betterearth.solar 3/3/2023 VICENTE JOEL SANCHEZ 1915 W PENDLETON AVE ROOF MOUNTED PV SYSTEM SIZE OF 3000AC WITH 10 MODULES OPTIMIZERS 1 INVERTER NEW SUBPANEL 125A, EXSISTING PV SYSTEM SIZE 2.8 VICENTE JOEL SANCHEZ 1915 W Pendleton Ave.04/07/23 Signature Certificate Reference number: ONRAE-XWDBY-XCMZD-OCAIL Document completed by all parties on: 03 Mar 2023 03:45:56 UTC Page 1 of 1 Signer Timestamp Signature Vicente Joel Sanchez Email: vicentesanchez6625@gmail.com Recipient Verification: Sent:03 Mar 2023 03:26:59 UTC Viewed:03 Mar 2023 03:27:02 UTC Signed:03 Mar 2023 03:45:56 UTC ✔Email verified 03 Mar 2023 03:27:02 UTC IP address: 172.56.185.240 Location: Los Angeles, United States Signed with PandaDoc PandaDoc is a document workflow and certified eSignature solution trusted by 40,000+ companies worldwide. 1915 W Pendleton Ave.04/07/23 MM IN V AC L IN V AC SUB PV BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 SITE PLAN N (E) 100A MAIN SERVICE PANEL (E) 30A AC DISCONNECT (N) SOLAREDGE 3000H-US Non-RGM INVERTER (N) 125A SUB PANEL (E) PRODUCTION METER (N) AC LOAD CENTER ROOF ACCESS POINT PER CRC 2022 (R324.7.1) ARRAY 1 - (N) 10 Longi MODULES TILT: 23° AZIMUTH: 268° P3 Nathan Draeger DESIGNER: DESIGN MGR: Nathan Draeger NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 4/28/2023 DATE:TIME: 06:04 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: 1915 W PENDLETON AVE, SANTA ANA, CA 92704 ###### JURISDICTION STAMPS: FIRE CODE PATHWAY BACKUP INTERFACE BACKUP GATEWAYBG BI MODULE STRINGING 3 4" EMT CONDUIT OPTIMIZER JB JUNCTION BOX LEGEND CALLOUTS: 1 1 4" PVC TRENCH COMBO METER/MAINMM UTILITY METERUM MAIN SERVICE PANEL PV METER MSP PV INVERTER SUB PANEL INV SUB AC DISCONNECT AC COMBINER PANELACL AC EV CHARGER BATTERY BACKUP EV BB (E) DRIVEWAY (E) PROPERTY LINE EXISTING PV SYSTEM (E) 12 Trina 245W MODULES (E) Power one PVI 3-OUTD INVERTER 1 Revision to 101114576 - approved on 5/9/23 Rev #101115002 issued on 5/9/23 1915 W Pendleton Ave.05/11/23 MM INV AC L IN V AC SU B PV BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 Nathan Draeger DESIGNER: DESIGN MGR: Nathan Draeger NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 4/28/2023 DATE:TIME: 06:04 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE:3/32" = 1' N ARRAY 1: MODULE QTY: 10 TILT: 23° AZIMUTH: 268° MATERIAL: Stone Coated Metal Tile REQUIRED ROOF ACCESS POINT PER CRC 2022 SECTION R324. LADDER ACCESS SHALL BE AT STRONG POINT OF ROOF AND NOT OVER REQUIRED WINDOW OPENINGS. ROOF PLAN P4 ROOF DETAILS:JURISDICTION STAMPS: FIRE CODE PATHWAY BACKUP INTERFACE BACKUP GATEWAYBG BI MODULE STRINGING 3 4" EMT CONDUIT OPTIMIZER JB JUNCTION BOX LEGEND CALLOUTS: 1 1 4" PVC TRENCH COMBO METER/MAINMM UTILITY METERUM MAIN SERVICE PANEL PV METER MSP PV INVERTER SUB PANEL INV SUB AC DISCONNECT AC COMBINER PANELACL AC EV CHARGER BATTERY BACKUP EV BB CONDUIT RUN TO BE DETERMINED IN FIELD 27 ' - 1 0 " 1'-6" 3' - 0 " 1'-6" 3'-0" 1' - 6 " 1 1915 W Pendleton Ave.05/11/23 (E) GROUNDING ELECTRODE (COPPER) GROUND ROD STRING 1: (10x) Longi LR4-60HPB-360M PV MODULES WITH 10 S440 SE POWER OPTIMIZERS 1 JUNCTION BOX - NEMA 3R AS REQUIRED 2 INVERTER SOLAREDGE SE3000H-US NON-RGM WITH DC DISCONNECT PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN PER NEC 690.12 3+ - + - + - + - + - + - 1021 DC AC METER NUMBER: 222013-463237 (N) 40A MA I N ( E ) 10 0 A M BI-DIRECTIONAL UTILITY METER 1PH/240V (E) 100A/100A MAIN SERVICE PANEL 240/120v 1-PH, 3-W SOLAR BREAKER LOCATED AT THE FURTHEST END OF BUS BAR FROM THE MAIN BREAKER MAIN BONDING JUMPER TO UTILITY GRID (Overhead) (N) AC COMBINER PANEL 240/120 V 1Ø, 3W MAX MAIN BUS: 125A (N) 20A (E) 20A TO (E) SOLAR SYSTEM 4 (N) 40A (N) 125A SUB PANEL 120/240V NEMA 3R UL LISTED 4 POINT OF INTERCONNECTION LOAD SIDE 705.12(B)(3)(2) MAX BREAKER CALC.: 125A X 1.2 - 40A = 110A (E) 20A (E) 20A (E) 20ARELOCATING THESE LOADS TO THE (N) 125A SUB PANEL: 1) (1) 20A-2P BREAKER 2) (2) 20A-1P BREAKER TO (E) SOLAR BREAKER EXISTING PV SYSTEM DETAILS(12) Trina 245W MODULES (1) Power one PVI 3-OUTD (240) INVERTER ROOFTOP JUNCTION BOX INVERTERS PRODUCTION METER 30A NON-FUSED AC DISCONNECT CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS ID CONDUCTOR CONDUIT CURRENT-CARRYING CONDUCTORS IN CONDUIT EGC TEMP. CORR. FACTOR CONT. CURRENT MAX. CURRENT (125%) BASE AMP. DERATED AMP. TERM. TEMP. RATING 1 2 3 4 #10 PV Wire, in open air 3/4" EMT N/A #6 51 15 18.75 40 38.4 90 #10 THWN-2, in conduit 3/4" EMT 2 #8 51 15 18.75 40 38.4 75 #10 THWN-2, in conduit 3/4" EMT 3 #8 32 12.5 16 40 38.4 75 #8 THWN, in conduit 3/4" EMT 3 #8 32 27 33.75 55 50.5 75 ASHRAE EXTREME LOW DESIGN TEMPERATURES ASHRAE 2% HIGH 32°C 32°C INVERTER 1 SPECS SOLAREDGE 3000H-US_Non-RGM AC VOLTAGE (V) 240 GROUND 0.99 MAX OCPD (A) 20 RATED POWER (W) 3000 MAX OUTPUT (A) 13 MAX INPUT (A) 9 MAX INPUT (V) 480 EFFICIENCY (CEC) 0.99 POWERBOX MAX OUTPUT CURRENT OPTIMIZERS IN SERIES NOMINAL STRING VOLTAGE ARRAY OPERATING CURRENT STRING DETAILS INVERTER 1 STRING CALCULATIONS STRING 1 15A 10 380V 13A SYSTEM SUMMARY ARRAY STC POWER 3600W ARRAY PTC POWER 3364W MAX AC CURRENT 12.5A MAX AC POWER 3000W INVERTER 1MODULE SPECS Longi LR4-60HPB-360M PMAX (W) 360 PTC (W) 336.4 ISC (A) 11.33 IMP (A) 10.35 VOC (V) 40.8 VMP (V) 34.8 TEMP. COEFF. OF VOC -0.122 POWER OPTIMIZERS RATED INPUT (W) MAX INPUT ISC (A) WEIGHTED EFFICIENCY MAX OUTPUT(A) MAX DC (V) SOLAREDGE S440 Optimizer 440 15 98.6 15 60 BETTER EARTH ELECTRIC INC. 16720 MARQUARDT AVE CERRITOS CERRITOS, CA 90703 PHONE #: (888) 373-9379 LIC #: C10-1024460 Nathan Draeger DESIGNER: DESIGN MGR: Nathan Draeger NEW PV SYSTEM: 3,600 DC / 3000 AC Vicente Joel Sanchez 1915 W Pendleton Ave, Santa Ana, CA 92704 APN: 40843214 4/28/2023 DATE:TIME: 06:04 PM REVISION:DATE:DESCRIPTION: DRAWING TITLE: DRAWING PAGE: SCALE: LINE DIAGRAM & DESIGN TABLES P6 JURISDICTION STAMPS: EQUIPMENT SPECS NOTES: 1 1915 W Pendleton Ave.05/11/23 PCC-13 Rev. 06-17-2019 White-Plan Check Yellow-Applicant REVISION /SUPPLEMENTAL PLAN CHECK REQUEST PCC-13 CBC 2019 Rev 4/2022 Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org Project Address: _________________________________________ Suite #_______________________________ New Plan Check No.____________________________________________________________________________ Original Plan Check No.:__________________________________ Permit Issuance Date:____________________ Original Plan Checker: __________________________________________________________________________ Amount Paid: $__________________________________________ Misc. Receipt #: ________________________ Processed by: ___________________________________________ Date: ________________________________ Plan Checker Approval: ___________________________________ Date: ________________________________ Additional Hours:________________________________________ @ $247.72 = $ _________________________ Print Name:_____________________________________________ Signature: ____________________________ Representing: ________________________________________________________________________________ Telephone: ( ) ____________________________________ Fax: ( ) __________________________________ Contact Person: ________________________________________ Telephone: ( ) ________________________ E-mail (Strongly Recommended): _________________________________________________________________ PLANS PREPARED BY AN ARCHITECT OR ENGINEER MUST BE SIGNED BY THE PROFESSIONAL WHO PREPARES THEM. PLEASE WRITE A BRIEF DESCRIPTION OF THE REVISION/SUPPLEMENT AND IF POSSIBLE AREA OF WORK. ALL REVI- SIONS ARE TO BE CLOUDED AND PROPERLY IDENTIFIED: (i.e. Deltas, Sheet Numbers, etc.). Electrical, Plumbing and/or Mechanical plans – stamped job set shall accompany revised plans. ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ 1915 W PENDLETON AVE 4/10/2023 VICTORIA RUIZ BETTER EARTH 888 373-9379 VICTORIA RUIZ 323 398-9324 VICTORIA.R@BETTEREARTH.SOLAR REVISION: Updated the Layout and Module Type to Reflect As Built Revision. 1915 W Pendleton Ave.05/11/23 Rev: 8/29/19 SOL-01 CBC 2016 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2. Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6. Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7. Will the PV system be installed without using any ballast system or counter-weight system? 8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M -19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org RESIDENTIAL PHOTOVOLTAIC CHECKLIST BETTER EARTH ELECTRIC INC 1024460 VICTORIA RUIZ 323-398-9324 VICTORIA.R@BETTEREARTH.SOLAR 4/4/2023 1915 W PENDLETON AVE 1915 W Pendleton Ave.04/07/23 Expedited Permit Process for PV Systems1 Expedited Permit Process for PV Systems Standard String System The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Standard String System to use with the Expe- dited Permit Process. The Micro-Inverter, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 1915 W Pendleton Ave.04/07/23 Expedited Permit Process for PV Systems2 Expedited Permit Process for Small-Scale PV Systems Standard String System The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 1915 W Pendleton Ave.04/07/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Standard String System Site Plan 1915 W Pendleton Ave.04/07/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Standard String System Electrical Diagram 1915 W Pendleton Ave.04/07/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Notes for Standard String System Electrical Diagram Contractor Name, Address and Phone: _________________ _________________ _________________ _________________ Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: __________________________ Site Address: ________________________ System AC Size: ______________________ SIZE FSCM NO DWG NO REV SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS A V V A A W V MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING V W V A A INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OCPD(s), ONE FOR EACH INVERTER. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ______oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE _____oC 2.) 2005 ASHRAE FUNDEMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a)12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b)10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix D): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE® REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) RATED MPP CURRENT RATED MPP VOLTAGE MAX SYSTEM VOLTAGE MAX CIRCUIT CURRENT A V V A PHOTOVOLTAIC POWER SOURCE WARNING: ELECTRICAL SHOCK HAZARD–LINE AND LOAD MAY BE ENERGIZED IN OPEN POSITION AC OUTPUT CURRENT NOMINAL AC VOLTAGE A V SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) 1915 W Pendleton Ave.04/07/23 Digitally sealed by RJM on Date: Job #: 23-05275 E.O.R.: Ryan McPherson, P.E. 9240 Limonite Ave Jurupa Valley, CA 92509 Mobile: (909) 566-0066 Email: SE@mcpe.group 3/21/23 Structural Analysis Report For Photovoltaic System Addition to Existing Structure At The Sanchez Residence 1915 W Pendleton Ave Santa Ana, CA 92704 3/21/23 Designed in Accordance with CBC 2022, ASCE 7-16 3/21/2023 4:38 PM 1 of 7 ©McPherson Engineering 1915 W Pendleton Ave.04/07/23 McPherson Engineering By: T.C. Date: 3/21/23 Project Info 3 Gravity Loads 4 Lateral Loads 5 Wind Uplift Design 6 Summary 7 Table Of Contents *Note: This engineering report is limited to the information presented to Engineer via plans, site information, photos, and written correspondence as provided by Client. On-site structural observations and verification of site conditions are not included herein. Engineering for manufactured products such as photovoltaic modules or racking systems is excluded from this report. Please refer to the manufacturer's specifications, certifications, and pre-engineered packages for product engineering. Installations of solar modules and related equipment must be performed in accordance with manufacturer recommendations, local codes, local regulations, industry best practices, and applicable safety standards. Owner and/or Contractor shall notify Engineer should any damage, deterioration, or descrepancies between current condition of the structure or otherwise as this letter describes before proceding with construction. This letter applies only to regions of the structure where solar modules will be supported and the supporting elements. 3/21/2023 4:38 PM 2 of 7 ©McPherson Engineering 1915 W Pendleton Ave.04/07/23 McPherson Engineering By: T.C. Date: 3/21/23 Location: 1915 W Pendleton Ave Santa Ana, CA 92704 Existing Structure Info: Number of Stories = 1 Aroof = 3048 sq. ft. Roof Square Footage A3rd_flr = 0 sq. ft. Third Floor Square Footage (if applicable) A2nd_flr = 0 sq. ft.Second Floor Square Footage (if applicable) Site Properties: Lattitude = Longitude = Ss = 1.293 S1 = 0.463 Exposure Category = C Ult. Wind Speed = 130 m.p.h. P.V. Array Info: Model = HANWHA Q.PEAK DUO BLK-G10+/AC 360W Height of Panel = 67.60 in. Width of Panel = 41.10 in. Area of Panel = 19.3 ft.2 Number of New Panels = 10 Number of Exis. Panels = 12 Total Area of Array = 424.5 ft.2 Spacing of Anchors = 4.0 ft. max. on center rows of racks per panel = 2 Panel Tilt = 7-27 deg 33.716058 -117.894098 Project Info 3/21/2023 4:38 PM 3 of 7 ©McPherson Engineering 1915 W Pendleton Ave.04/07/23 McPherson Engineering By: T.C. Date: 3/21/23 Existing Loads: Roof Design Loads: Roofing = 2.0 p.s.f.Metal Shingles roofing Sheathing = 1.5 p.s.f.1/2" Plywood Framing = 1.5 p.s.f.2x Framing Misc = 1.0 p.s.f. DLr1 = 6.0 p.s.f.Roofing Dead Load (applied to top of rafters/trusses only) Ceiling = 2.0 p.s.f. Drywall and framing DLr2 = 8.0 p.s.f. Total Existing Roof Dead Load LLr = 20.0 p.s.f. Roof Live Load (Per C.B.C, Table 1607.1) SL = 0.0 p.s.f.Snow Load Floor Design Loads: (if applicable) Flooring = 10.0 p.s.f.Weight of floor finish Sheathing = 2.2 p.s.f.3/4" plywood Framing = 2.0 p.s.f.2x framing or manufactured floor truss Interior Partitions = 15.0 p.s.f.2x framed walls with drywall finish each side Ceiling = 5.0 p.s.f.Drywall ceiling finish below Misc. = 0.8 p.s.f. DLf = 35.0 p.s.f.Total Existing Floor Dead Load Proposed Loads: Panels = 2.9 p.s.f. weight of panels including rack system DLr1_proposed = 8.9 p.s.f. Proposed Roof Dead Load (applied to top only) DLr2_proposed = 10.9 p.s.f.Total Proposed Roof Dead Load LLr_proposed = 0.0 p.s.f. Check Proposed Gravity Loads: Total Existing Roof Load Wex = (DLr1 + LLr) (Aroof) = 79.2 kips Total Proposed Roof Load Wprop = (DLr1 + LLr) (Aroof - Aarray) + (DLr1_proposed + LLr_proposed) (Aarray) = 72.0 kips Proposed Load Demand Gravity Loads Roof Live Loads need not be applied to the area covered with by PV panel where the clear space between the panels and the roof sureface is 24in or less, 1607.13.5.1 item 1 Exception Wprop - Wex = -9.16% TOTAL DECREASE IN GRAVITY LOADS, PANELS OK! Wex 3/21/2023 4:38 PM 4 of 7 ©McPherson Engineering 1915 W Pendleton Ave.04/07/23 McPherson Engineering By: T.C. Date: 3/21/23 Seismic Design Parameters Risk Category = 2 Per Table 1-5-1 R = 6.5 Response Modification Factor (Table 12-2.1) Site Class = D Per 11.4.2 Ie = 1 Seismic Importance Factor (Table 1.5-2) Ss = 1.29 Short Period P.G.A. S1 = 0.46 1-Sec Period P.G.A. S.D.C. = D Seismic Design Category Per 11.6 Fa = 1.20 Site Coefficient per Table 11.4-1 ASCE 7-16 Supplement #1 Tables used for Fa and Fv Fv = 1.70 Site Coefficient per Table 11.4-2 (note: section 11.4.8 Exception #2 calc used) SMS = SDS Fa = 1.55 Short Period M.C.E. Per Eq. 11.4-1 SM1 = SD1 Fv = 0.79 1-Sec Period M.C.E. Per Eq. 11.4-2 SDS = 2/3 (SMS) = 1.03 Short Period Design Parameter Per Eq 11.4-3 SD1 = 2/3 (SM1) = 0.52 1-Sec Period Design Parameter Per Eq 11.4-4 Approximate Fundamental Period (Per 12.8.2.1) per Eq. 12.8-7 hn = 15 ft Ct = 0.02 (per table 12.8-2) x = 0.75 (per table 12.8-2) T = 0.15 sec Approximate Fundamental Period TL = 8 sec Long-Period Transition Period per Figure 22-12 Seismic Response Coefficient (Per 12.8.1.1) CS = (SDS Ie)/R = 0.16 Seismic Response Coefficient Per Eq. 12.8-2 Cs1 = 1.5*(SD1 Ie)/R T = 0.79 Max. Seismic Response Coefficient Per Eq. 12.8-3 if T ≤ TL Cs2 = 0.01 Min. Seismic Response Coefficient Per Eq. 12.8-5 Cs2 = 0.044 SDS Ie = 0.05 Min. Seismic Response Coefficient Per Eq. 12.8-5 Cs3 = 0.5 S1 Ie/R = 0.04 Min. Seismic Response Coefficient Per Eq. 12.8-6 if S 1 ≥ 0.6g CS = 0.16 Design Seismic Coefficient Check Additional Base Shear Wexisting = 24.4 kips Weight of Existing Structure Wpanels = 1.2 kips Weight of Proposed Panels Vexisting = Cs Wexisting = 3.9 kips Roof Level Shear of Existing Structure Vpanels = Cs Wpanels = 0.2 kips Additional Roof Level Shear of Proposed Panels Vpanels Vexisting Lateral Loads T = Ct (hn) x = 5.05% < 10%PER C.E.B.C. 502.5 EXCEPTION, STRUCTURE DOES NOT REQUIRE SEISMIC RETROFIT, PANELS OK! 3/21/2023 4:38 PM 5 of 7 ©McPherson Engineering 1915 W Pendleton Ave.04/07/23 McPherson Engineering By: T.C. Date: 3/21/23 Rooftop Solar Panels Wind Pressures (Section 29.4, ASCE 7-16) Vult = 130 mph Kzt = 1.00 (sec 26.8.2) h = 15 ft Exposure Category = C Kz = 0.85 (sec 26.10.1) Roof Zone = 2 Kd = 0.85 (sec 26.6) Roof θ = 7-27 deg Ke = 1.00 (sec 26.9) qh = 0.00256 Kz Kzt Kd Ke V 2 qh = 31.26 (eq. 26.10-1) GPp = -2 uplift γE = 1.5 (sec 29.4.4) γa = 0.78 (fig 29.4-8) γE = 1.5 FIG 29.4-7)γc = 0.94 (fig 29.4-7) hpt = 0 γa = 0.78 (fig 29.4-8)γp = 0.9 (fig 29.4-7)ω = 0.00 deg (panel tilt) GPp = -2 uplift GCrm = 1.4 uplift p = qh (GPp) γE γa (eq 29.4-7)p = qh (GCrn) γE γC γp (eq 29.4-6) p = -73.1 p.s.f.p = 55.4 p.s.f. Check Anchorage to Existing Structure 0.6DL - 0.6W controlling load combination (eq. 16-15 for ASD) DL = 2.9 p.s.f.dead load of panel (inlcuding rack system) W = 73.1 p.s.f.wind load normal to face of panel Arealag = 11.3 sq. ft.area tributary to each anchor SPanc = 4.0 ft.spacing of anchors Puplift = Arealag (0.6DL - 0.6W) = 474.4 lbs total uplift on anchor Material = DFL lumber anchor material Dialag = 5/16 in. diameter of screw Penlag = 2.5 in. min. penetration to existing framing Wlag = 266 lb/in. withdrawal load per in. of penetration per NDS Table 11.2A CD = 1.6 load duration factor for wind per NDS Table 2.3.2 Ct = 0.8 temperature factor per NDS Table 2.3.3 Noscrews = 2 number of screws in withdrawal Pallow = Penlag (Wlag CD Ct) * Noscrews = 1702.4 lbs total allowable withrawal on anchor Puplift Pallow Anchorage = USE (2) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION Wind Uplift Anchorage Flush Mounted Panels - ASCE Section 29.4.4 (where applicable) Flat Roof Panels - ASCE Section 29.4.3 (where applicable) = 0.28 < 1.00 Anchor is OK! 3/21/2023 4:38 PM 6 of 7 ©McPherson Engineering 1915 W Pendleton Ave.04/07/23 McPherson Engineering By: T.C. Date: 3/21/23 Gravity Loads: DEMAND DECREASED BY 9.16% = OK! Lateral Loads: DEMAND INCREASED BY 5.05% < 10% = OK! Anchorage: DEMAND OF 474.4LB. < CAPACITY OF 1702.4LB. = OK! USE (2) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION Summary: STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY ANCHORS ON EAVES/OVERHANGS ARE OK! Summary 3/21/2023 4:38 PM 7 of 7 ©McPherson Engineering 1915 W Pendleton Ave.04/07/23