Loading...
HomeMy WebLinkAbout2029 S Cedar - PlanRO O F T OP GR O UN D LE V E L - HO U SE EX T ER IOR 20A N 2 (N) JUNCTION BOX WITH IRREVERSIBLE GROUND SPLICE NOTE: IN BETWEEN EACH ARRAY THE EMT IS USED AS THE GROUNDING / BONDING, GROUND CLAMPS ARE AT EACH END OF THE EMT CONDUIT WITH THE WIRE THEN FREE AIR'D TO THE GROUND CLAMP ON THE RACKING RAIL (N) 100A PV LOAD CENTER 112 112 6 5 (N) (12) SOLAREVER SE-166*83-455M-144 (455W) MODULES WITH (6) AP SYSTEM DS3-L 2 IN 1 MICRO-INVERTER ATTACHED TO THE BACK OF MODULES. PV CIRCUIT 2: 6 MODULES/PARALLEL [(3) AP SYSTEM DS3-L 2 IN 1] PV CIRCUIT 1: 6 MODULES/PARALLEL [(3) AP SYSTEM DS3-L 2 IN 1] 1 1 20A 100A30A BACKFEED BREAKER ALL EXISTING LOADS RELOCATED FROM MAIN SERVICE PANEL TO NEW SUB SERVICE PANEL (N) 240V/125A SUB SERVICE PANEL SINGLE PHASE M POINT OF DELIVERY AND INTERCONNECTION 100A N (E) GROUNDING ELECTRODE OR (UFER) EXISTING 240V/100A MAIN SERVICE PANEL SINGLE PHASE 4 3 N 6 5 AC DISCONNECT TO BE LOCATED WITHIN 10' OF METER (N) VISIBLE LOCKABLE 2 POLE 60A 'KNIFE' A/C DISCONNECT 3 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. MARTINEZ RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ORG CORE ENERGY GROUP. 2029 CEDAR ST, SANTA ANA, CA 92707 APN: 01411247 DATE:10/18/2022 E-1 METER # 222013159246 SYSTEM SUMMARY BRANCH #1 INVERTERS PER BRANCH 3 MAX AC CURRENT 9.6A MAX AC OUTPUT POWER 2304W ARRAY STC POWER 5460W ARRAY PTC POWER 5096.40W MAX AC CURRENT 19.20A MAX AC POWER 4608W DERATED (CEC) AC POWER BRANCH #2 3 9.6A 2304W Inverter Ratings Inverter Make/Model AP SYSTEM DS3-L Max DC Volt Rating 60V Peak Output Power 768W Max Nominal Voltage 240V Max AC Current 3.20A Max OCPD Rating 20A DESIGN TEMPERATURES ASHRAE EXTREME LOW 2°C ASHRAE 2% HIGH 31 °C PV Module Ratings @ STC Module Make/Model SOLAREVER SE-166*83-455M-144 (455W) MODULE Max Power-Point Current (Imp)10.96A Max Power-Point Voltage (Vmp)41.51 V Open-Circuit Voltage (Voc)49.35V Short-Circuit Current (Isc)11.41 A Max Series Fuse (OCPD)20A Nominal Maximum Power at STC (Pmax)455W Maximum System Voltage 1500V Voc Temperature Coefficient -0.29%/°C NOTE:TOTAL AMPERAGE RATING OF ALL OVERCURRENT DEVICES SUMMED UP IN THE MAIN PANEL EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUS BAR NEC 2017 705.12(D)(2)(3)(c) Conduit and Conductor Schedule Tag Description Wire Gauge # of Conductors Conduit Type Conduit Size 1 PV WIRES 10 AWG 2 N/A - Free Air N/A - Free Air 1 Bare Copper Ground (EGC/GEC) 6 AWG 1 N/A - Free Air N/A - Free Air 2 THWN-2 10 AWG 4 EMT 3/4" 2 THWN-2 - Ground 8 AWG 1 EMT 3/4" 3 THWN-2 10 AWG 3 EMT 3 THWN-2 - Ground 8 AWG 1 EMT SUB SERVICE PANEL 240/120V 1Ø, 3W MAIN BUSS: 125A MAX BREAKER SIZE: (125A X 1.2) - 100A = 50A 4 THWN-2 3 AWG 3 EMT THWN-2 - Ground 6 AWG 1 EMT 1-1/4" 1-1/4" 4 3/4" 3/4" 4918W 2029 S Cedar 12/07/22 N 1. NOT ALL PLACARDS SHOWN MAY BE REQUIRED BY LOCAL AHJ. CONTRACTOR TO VERIFY PLACARD REQUIREMENTS WITH LOCAL AHJ BEFORE INSTALLATION. 2. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OF THE CALIFORNIA ELECTRICAL CODE 3. ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC, ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTING COLOR TO THE PLAQUE. THIS PLAQUE WILL BE ATTCHED BY POP RIVETS OR SCREWS OR OTHER APPROVED METHOD. 4. DIRECTORY PLACARD MARKING CONTENT AND FORMAT: RED BACKGROUND, WHITE LETTERING, MINIMUM 3/8" LETTER HIEGHT, ALL CAPITAL LETTERS, ARIAL OR SIMILAR FONT, NON BOLD, REFLECTIVE WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT. PERMANENT SIGNAGE NOTES: WARNING! DO NOT RELOCATE THIS OVERCURRENT DEVICE POWER SOURCE OUTPUT CONNECTION LABEL LOCATION: ADJACENT TO PV BREAKER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(b) ! DO NOT ADD LOADS PHOTOVOLTAIC SYSTEM COMBINER PANEL WARNING LABEL LOCATION: PHOTOVOLTAIC AC COMBINER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(c), SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY. LABEL LOCATION: ON OR NO MORE THAT 3 M (10 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. ELECTRICAL SHOCK HAZARD WARNING! LABEL LOCATION: INVERTER(S), AC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2019: 690.13(B) TERMINALS ON LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION 5$3,' 6+87'2:1 6: ,7&+ )25 62/$5 39 6<67(0 LABEL LOCATION: UTILITY SERVICE ENTRANCE/METER, INVERTER/DC DISCONNECT IF REQUIRED BY LOCAL AHJ, OR OTHER LOCATIONS AS REQUIRED BY LOCAL AHJ. PER CODE(S): CEC 2019: 690.56(C)(3), CFC 2019: 1204.5.3 32:(5727+,6%8,/',1*,6 $/626833/,(')5207+( )2//2:,1*6285&(6:,7+ ',6&211(&76$66+2:1 &$8 7,21 (N) SOLAR PANELS AND MICRO-INVERTERS ON ROOF MAXIMUM AC OPERATING CURRENT: NOMINAL OPERATING AC VOLTAGE: 19.2 AMPS 240.0 VAC PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2019: 690.54 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. MARTINEZ RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ORG CORE ENERGY GROUP. 2029 CEDAR ST, SANTA ANA, CA 92707 APN: 01411247 DATE:10/18/2022 E-2 WARNING! THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR. PV INTERCONNECTION POINT. LOCATION OF SUB SERVICE PANEL, AC DISCONNECT & PV LOAD CENTER . LOCATION OF METER MAIN COMBO 2029 CEDAR ST 2029 S Cedar 12/07/22 NOT FOR PERMITTING USE. FOR INSTALLATION USE ONLY 2 1 4 3 6 5 8 7 10 9 12 11 14 13 16 15 18 17 20 19 22 21 24 23 26 25 28 27 30 29 32 31 34 33 36 35 38 37 40 39 42 41 44 43 7473 7271 7069 6867 6665 6463 6261 6059 5857 5655 5453 5251 5049 4847 4645 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. MARTINEZ RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ORG CORE ENERGY GROUP. 2029 CEDAR ST, SANTA ANA, CA 92707 APN: 01411247 DATE:10/18/2022 INSTALL 2029 S Cedar 12/07/22 To whom it may concern, This letter serves to confirm I have chosen to have my system installed by Solgen Construction LLC. You have my express permission to move forward with the solar permit applied for by Solgen Construction LLC for my property at 2029 Cedar St, Santa Ana, CA 92707. Thank you, Jose Hernandez Martinez DocuSign Envelope ID: 5AFFEF76-57BB-4DD8-84F3-1ABDDD484625 2029 S Cedar 12/07/22 2029 S Cedar 12/07/22 2029 S Cedar 12/07/22 2029 S Cedar 12/07/22 2029 S Cedar 12/07/22 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 1053344 Solgen Construction, LLC Cole Farmer Permits@CoreEnergyGroup.com 559-462-6009 2029 Cedar St, Santa Ana, CA 92707 10/27/2022 2029 S Cedar 12/07/22 10/18/2022 RE: Structural Certification for Installation of Residential Solar JOSE HERNANDEZ MARTINEZ:2029 CEDAR ST, SANTA ANA, CA 92707 Attn: To Whom It May Concern Design Criteria Code 2019 California Building Code (ASCE 7-16) Risk category II Wind Load (component and Cladding) Roof Dead Load Dr 10 psf V 110 mph PV Dead Load DPV 3 psf Exposure C Roof Live Load Lr 20 psf Ground Snow S 0 psf If you have any questions on the above, please do not hesitate to call. Sincerely, Eugene Munyanziza, P.E. EV Engineering, LLC projects@evengineersnet.com http://www.evengineersnet.com Exp: 06/30/2024 This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing. From the field observation report, the roof is made of Composition shingle roofing over roof plywood supported by 2X4 Trusses at 24 inches. The slope of the roof was approximated to be 27 degrees and the allowable maximum rafter span is 6 feet between supports. After review of the field observation data and based on our structural capacity calculation, the existing roof framing has been determined to be adequate to support the imposed loads without structural upgrades. Contractor shall verify that existing framing is consistent with the described above before install. Should they find any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity calculations were done in accordance with applicable building codes. projects@evengineersnet.com http://www.evengineersnet.com 2029 S Cedar 12/07/22 Structural Letter for PV Installation Date: 10/18/2022 Job Address: 2029 CEDAR ST SANTA ANA, CA 92707 Job Name: JOSE HERNANDEZ MARTINEZ Job Number: 221018JHM Scope of Work Table of Content Sheet 1 Cover 2 Attachment Uplift checks 3 Roof Framing Check 4 Seismic Check and Scope of work Engineering Calculations Summary Code 2019 California Building Code (ASCE 7-16) Risk category II Roof Dead Load Dr 10 psf PV Dead Load DPV 3 psf Roof Live Load Lr 20 psf Ground Snow S 0 psf Wind Load (component and Cladding) V 110 mph Exposure C References NDS for Wood Construction Sincerely, Eugene Munyanziza, P.E. EV Engineering, LLC projects@evengineersnet.com http://www.evengineersnet.com Exp: 06/30/2024 This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. projects@evengineersnet.com http://www.evengineersnet.com 2029 S Cedar 12/07/22 Wind Load Cont. 110 mph ASCE 7-16 Figure 26.5-1B C 1.0 ASCE 7-16 Sec 26.8.2 0.93 ASCE 7-16 Table 26.10-1 0.85 ASCE 7-16 Table 26.6-1 1.00 ASCE 7-16 Table 26.9-1 24.39 psf 27.0 Degrees 1.5 Conservatively assuming all exposed 0.8 conservatively assuming 10 ft2 effective area Uplift (W)Zone(1) Zone(2r) Zone(2e)Zone(3) Fig. 30-3-2 GCp=-1.8 -2.2 -2.2 -2.1 Eq. 29.4-7 P=qh(GCp)(γE)(γa)=-52.69 -64.40 -64.40 -61.47 GCp=0.7 Figure 30.3-2 P=qh(GCp)(γE)(γa)=11.46 Equation 29.4-7 Rafter Attachments: 0.6D+0.6W (CD=1.6) Connection Check Attachment max. spacing= 6 ft 5/16" Lag Screw Withdrawal Value= 266 lbs/in Table 12.2A - NDS 2.5 in DFL Assumed Prying Coefficient 1.4 Allowable Capacity= 760 lbs Zone Trib Width Area (ft) Uplift (lbs) Down (lbs) Zone(1) 6 16.5 308.4 238.6 Zone(2r) 6 16.5 373.3 238.6 Zone(2e) 6 16.5 373.3 238.6 Zone(3) 6 16.5 357.0 238.6 Conservative Max= 373.3 < 760 CONNECTION IS OK Risk Category = KZ = Kd = Ke = 2. Embedment is measured from the top of the framing member to the tapered tip of a lag screw. Embedment in sheading or other material does not count. II V= Exposure = 1. Pv seismic dead weight is negligible to result in significant seismic uplift, therefore the wind uplift governs γE= γa= KZt = qh= 0.00256KzKztKdKeV2= Pitch = Lag Screw Penetration projects@evengineersnet.com http://www.evengineersnet.com 2029 S Cedar 12/07/22 Vertical Load Resisting System Design Roof Framing Trusses Snow Load Fully Exposed pg= 0 psf Ct = 1.1 Ce = 0.9 Is = 1.0 pf = 0 psf pfmin. = 0.0 psf ps = 0 psf Conservatively (Cs=1) 0 plf Max Length, L = 6.0 ft (Rafter maximum Allowable Horizontal Span) Tributary Width, WT = 24 in Dr = 10 psf 20 plf PvDL = 3 psf 18 plf Load Case: DL+0.75(0.6W+S) 0.75(Pnet+Ps)+ Ppvcos(θ)+PDL= 48 plf Mdown= 145 lb-ft Mallowable = Sx x Fb' (wind)= 456 lb-ft > 145 lb-ft OK Load Case: DL+S Ps+ Ppvcos(θ)+PDL= 38 plf Mdown= 114 lb-ft Mallowable = Sx x Fb' (wind)= 456 lb-ft > 114 lb-ft OK Load Case: DL+0.6W Pnet+ Ppvcos(θ)+PDL= 51.8 plf Max Moment, Mu= 155 lb-ft Mallowable = Sx x Fb' (wind)= 634 lb-ft > 155 lb-ft OK Pv max Shear= 238.6 lbs Shear, Vu=wL/2+Pv Point Load = 353 lbs Max Shear, Vu=wL/2+Pv Point Load = 353 lb Member Capacity DF-L No.2 2X4 CL CF Ci Cr KF φ λ Fb = 900 psi 1.0 1.5 1.0 1.15 2.54 0.85 0.8 1553 psi Fv = 180 psi N/A N/A 1.0 N/A 2.88 0.75 0.8 180 psi E = 1600000 psi N/A N/A 1.0 N/A N/A N/A N/A 1600000 psi Emin = 580000 psi N/A N/A 1.0 N/A 1.76 0.85 N/A 580000 psi Depth, d = 3.5 in Width, b = 1.5 in Cross-Sectonal Area, A = 5.25 in2 Moment of Inertia, Ixx = 5.35938 in4 Section Modulus, Sxx = 3.0625 in Allowable Moment, M all = Fb'Sxx = 396.2 lb-ft DCR=Mu/Mall = 0.32 < 1 Satisfactory Allowable Shear, Vall = 2/3Fv'A = 630.0 lb DCR=Vu/Vall = 0.56 < 1 Satisfactory Design Value Adjusted Value projects@evengineersnet.com http://www.evengineersnet.com 2029 S Cedar 12/07/22 Siesmic Loads Check Roof Dead Load 10 psf % or Roof with Pv 15% Dpv and Racking 3 psf Average Total Dead Load 10.5 psf Increase in Dead Load 1.8%OK Limits of Scope of Work and Liability The increase in seismic Dead weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. We have based our structural capacity determination on information in pictures and a drawing set titled PV plans - JOSE HERNANDEZ MARTINEZ. The analysis was according to applicable building codes, professional engineering and design experience, opinions and judgments. The calculations produced for this dwelling's assessment are only for the proposed solar panel installation referenced in the stamped plan set and were made according to generally recognized structural analysis standards and procedures. projects@evengineersnet.com http://www.evengineersnet.com 2029 S Cedar 12/07/22 3' 3' N 1'-6" SCALE: 3/32" = 1'-0" PV SYSTEM SITE PLAN PV SYSTEM SIZE: 5.46 kW DC LOCATION OF METER MAIN COMBO LEGEND M CONSTRUCTION NOTES M PV INTERCONNECTION POINT. LOCATION OF SUB SERVICE PANEL, AC DISCONNECT & PV LOAD CENTER MOUNTED ON EXTERIOR WALL OF A SINGLE FAMILY RESIDENCE. NEW SOLAR PANELS DRIVEWAY (12) SOLAREVER SE-166*83-455M-144 (455W) WITH (6) AP SYSTEM DS3-L MICRO-INVERTERS MOUNTED TO THE BACK OF MODULES MOUNTED ON COMP SHINGLE ROOF 2029 CEDAR ST ROOF OBSTRUCTIONS SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. MARTINEZ RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ORG CORE ENERGY GROUP. 2029 CEDAR ST, SANTA ANA, CA 92707 APN: 01411247 DATE:10/18/2022 PV-1 (E) SERVICE DROP Roof Azimuth: 180° Roof Tilt: 27° Roof Section 1 ACD AC DISCONNECT LC PV LOAD CENTER 1. SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIAL STRUCTURE. 2. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH THE CBC SECTION 1609 TO WITHSTAND A BASIC WIND SPEED OF 110 MPH (3 SECOND GUST), WIND EXPOSURE C. 3. THE ROOF MEMBERS ARE 2 "X 4" TRUSSES AT 24" ON CENTER. CONNECTION TO STRUCTURE SHALL NOT BE WITHIN 11" OF NAILING PLATES. 4. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 5. ALL CONDUCTORS AND CONDUITS MOUNTED ON ROOF SHALL BE MINIMUM 7/8" ABOVE ROOF SURFACE (INCLUDING CABLES UNDERNEATH MODULES AND RACKING). 6. ROOF ACCESS POINTS SHALL BE PROVIDED PER THE FOLLOWING (CRC R324.7.1, CBC 3111.2.1) 6.1. LOCATED IN AREAS NOT REQUIRING PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS DOORS OR WINDOWS. 6.2. LOCATED AT STRONG POINTS OF CONSTRUCTION IN LOCATIONS WHERE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS: TREES, WIRES, OR SIGNS. 7. SETBACKS AT RIDGES CAN BE REDUCED TO 18 INCHES IN COMPLIANCE WITH 2019 CFC/2018 IFC 1204.2.1.2 TOTAL PLAN VIEW AREA = 1834 SQFT TOTAL PV AREA = 12(82.44 IN)(40.86 IN)/(144 IN^2) = 280.71 SQFT (280.71 SQFT/ 1834 SQFT)100 = 15.31 % TOTAL PV AREA POPULATES 15.31 % OF TOTAL PLAN VIEW AREA AND IS WITHIN THE 33% REQUIREMENT. LC LOCATION OF "RAPID SHUTDOWN" AC DISCONNECT NEC 690.12 METER MAIN COMBO CAL-FIRE ROOF LADDER ACCESS POINT SS P SSP SUB SERVICE PANEL PROPERTY LINEPROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E CAL-FIRE ROOF LADDER ACCESS POINT (E) STRUCTURE ON PROPERTY AC D Structural Only BLDG# 101112853 ISS. 12/07/2022 ELEC# 20178018 ISS. 12/07/2022 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 2029 S Cedar 12/07/22 6' 6' 6' 6' N SCALE: 3/16" = 1'-0" PV SYSTEM MOUNTING DETAILS EXISTING COMP SHINGLE ROOF EVEREST SPLICE FOOT XL FOR COMP SHINGLE @ 72" O.C. MAX PROPOSED EVEREST CROSSRAIL RACKING PROPOSED SOLAREVER SE-166*83-455M-144 (455W) PV SOLAR MODULES EXISTING 2 "X 4" ROOF TRUSSES @ 24"O.C. SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. MARTINEZ RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ORG CORE ENERGY GROUP. 2029 CEDAR ST, SANTA ANA, CA 92707 APN: 01411247 DATE:10/18/2022 PV-2 Roof Azimuth: 180° Roof Tilt: 27° Roof Section 1 Structural Only 2029 S Cedar 12/07/22 RO O F S L O P E 910 10 6 21 7 S-5 D5 20 11 1214 13 15 18 22 S-5 D4 3 1 5 4 25 24 23 8 26 2 ''(7$ ,/  75$169(56( 127 72 6&$/( ''(7$ ,/  /21*,78',1$/ 127 72 6&$/( '5$&. ,1* '(7$ ,/  75$169(56( 127 72 6&$/( '5$&. ,1* '(7$ ,/  723 127 72 6&$/( '5$&. ,1* '(7$ ,/  /21*,78',1$/ 127 72 6&$/( SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. MARTINEZ RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ORG CORE ENERGY GROUP. 2029 CEDAR ST, SANTA ANA, CA 92707 APN: 01411247 DATE:10/18/2022 1. ROOF MATERIAL: COMP SHINGLE 2. ROOF STRUCTURE: TRUSSES 3. ATTACHMENT TYPE: EVEREST SPLICE FOOT XL 4. MODULE MANUFACTURER: SOLAREVER 5. MODULE MODEL: SE-166*83-455M-144 (455W) 6. MODULE LENGTH: 82.44'' 7. MODULE WIDTH: 40.86" 8. MODULE WEIGHT: 51.8 LBS. 9. SEE SHEET S-1 FOR DIMENSION(S) 10. MIN. FIRE OFFSET: 18" 11. TRUSSES SPACING: 24" O.C. 12. TRUSSES SIZE: 2 "X 4" NOMINAL 13. LAG BOLT DIAMETER: 5/16 IN. 14. LAG BOLT EMBEDMENT: 2.5 IN. 15. TOTAL # OF ATTACHMENTS: 24 16. TOTAL AREA: 280.71 SQ. FT. 17. TOTAL WEIGHT: 621.60 LBS. 18. WEIGHT PER ATTACHMENT: 25.90 LBS. 19. DISTRIBUTED LOAD: 2.21 PSF 20. MAX. HORIZONTAL STANDOFF: 72 IN. 21. MAX. VERTICAL STANDOFF: LANDSCAPE: 26 IN., PORTRAIT: 39 IN. 22. STANDOFF STAGGERING: YES 23. RAIL MANUFACTURER AND MODEL (OR EQUIV.):EVEREST CROSSRAIL 24. RAIL WEIGHT: 0.436 PLF. 25. MAX. TRUSSES SPAN: 12 FT. 26. MODULE CLEARANCE: 3 IN. MIN., 6 IN. MAX. PV-3 Structural Only 2029 S Cedar 12/07/22 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. MARTINEZ RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ORG CORE ENERGY GROUP. 2029 CEDAR ST, SANTA ANA, CA 92707 APN: 01411247 DATE:10/18/2022 S-1 2029 S Cedar 12/07/22 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. MARTINEZ RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ORG CORE ENERGY GROUP. 2029 CEDAR ST, SANTA ANA, CA 92707 APN: 01411247 DATE:10/18/2022 S-2 2029 S Cedar 12/07/22 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. MARTINEZ RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ORG CORE ENERGY GROUP. 2029 CEDAR ST, SANTA ANA, CA 92707 APN: 01411247 DATE:10/18/2022 S-3 2029 S Cedar 12/07/22 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. MARTINEZ RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ORG CORE ENERGY GROUP. 2029 CEDAR ST, SANTA ANA, CA 92707 APN: 01411247 DATE:10/18/2022 S-4 2029 S Cedar 12/07/22 SHEET # T-1 T-2 PV-1 PV-2 PV-3 E-1 E-2 S-1 S-2 S-3 S-4 SHEET NAME COVER SHEET PLAN NOTES SITE PLAN LAYOUT ATTACHMENT DETAILS MOUNTING DETAILS ELECTRICAL DIAGRAM WARNING LABELS SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET PROJECT INFORMATION PROPERTY OWNER NAME: JOSE HERNANDEZ MARTINEZ PHONE:- CONTRACTOR NAME:SOLGEN CONSTRUCTION PHONE:(559) 442-9887 DESIGN SPECIFICATIONS OCCUPANCY: R-3 CONSTRUCTION TYPE: SINGLE FAMILY RESIDENCE ZONING: RESIDENTIAL GROUND SNOW LOAD: 0 PSF WIND EXPOSURE: C WIND SPEED: 110 MPH APPLICABLE CODES & STANDARDS 2019 CALIFORNIA RESIDENTIAL CODE (CRC) 2019 CALIFORNIA BUILDING CODE (CBC) 2019 CALIFORNIA MECHANICAL CODE (CMC) 2019 CALIFORNIA ELECTRICAL CODE (CEC) 2019 CALIFORNIA PLUMBING CODE (CPC) 2019 CALIFORNIA ENERGY CODE (ENERGY) 2019 CALIFORNIA GREEN BUILDING CODE (CALGREEN) 2017 NATIONAL ELECTRICAL CODE (NEC) 2019 CALIFORNIA FIRE CODE (CFC) COORDINATES: 33.721487, -117.858455 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. MARTINEZ RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ORG CORE ENERGY GROUP. 2029 CEDAR ST, SANTA ANA, CA 92707 APN: 01411247 DATE:10/18/2022 T-1 AERIAL VIEW TYPE OF INTERCONNECTION: BACKFEED BREAKER IN THE SSP SCOPE OF WORK SYSTEM SIZE: STC: 12 X 455W = 5.460kW PTC: 12 X 424.7W = 5.096kW (12) SOLAREVER SE-166*83-455M-144 (455W) MODULES (6) AP SYSTEM DS3-L MICROINVERTERS (1)100A PV LOAD CENTER (1) 125A SUB SERVICE PANEL (1) 60A KNIFE AC DISCONNECT MSP UPGRADE: NO MAIN BREAKER DERATE: NO RACKING & MOUNTING PV ATTACHMENT TYPE: EVEREST SPLICE FOOT XL FOR COMP SHINGLE ROOF RACKING TYPE: EVEREST CROSSRAIL- ROOF MOUNT RACKING HARDWARE MARTINEZ RESIDENCE NEW PHOTOVOLTAIC SYSTEM PROJECT - 5.460 kW DC / 4.608 kW AC Structural Only 2029 S Cedar 12/07/22 1.1. PROJECT NOTES: 1.2. THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE NATIONAL ELECTRICAL CODE (NEC) ARTICLE 690, ALL MANUFACTURERS’S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. 1.3. THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION 1.4. GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH NEC 690.5(A) 1.5. ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC 690.4 & NEC 690.60: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY 1.6. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO NEC 690.7. 1.7. ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING [NEC 110.3]. 1.8. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE NEC AND AHJ. 1.9. SCOPE OF WORK: 1.10. PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT. 1.11. WORK INCLUDES: 1.12. PV ROOF ATTACHMENTS - EVEREST SPLICE FOOT XL FOR COMP SHINGLE 1.13. PV RACKING SYSTEM INSTALLATION - EVEREST CROSSRAIL ROOF MOUNT RACKING HARDWARE 1.14. PV MODULE AND INVERTER INSTALLATION - SOLAREVER SE-166*83-455M-144 (455W) MODULES / AP SYSTEM DS3-L MICROINVERTERS 1.15. PV EQUIPMENT GROUNDING 1.16. PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX 1.17. PV LOAD CENTERS (IF INCLUDED) 1.18. PV METERING/MONITORING (IF INCLUDED) 1.19. PV DISCONNECTS 1.20. PV GROUNDING ELECTRODE & BONDING TO (E) GEC 1.21. PV FINAL COMMISSIONING 1.22. (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV 1.23. SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE 1.24. SITE NOTES: 1.25. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 1.26. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 1.27. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 1.28. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 1.29. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. 1.30. EQUIPMENT LOCATIONS: 1.31. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. 1.32. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C) 1.33. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC 690.34. 1.34. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 1.35. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 1.36. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. 1.37. STRUCTURAL NOTES: 1.38. RACKING SYSTEM 1.39. PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND 1.40. A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. 1.41. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED SEALED PER LOCAL REQUIREMENTS. 1.42. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 1.43. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 1.44. WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. 1.45. WIRING & CONDUIT NOTES: 1.46. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 1.47. CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. 1.48. VOLTAGE DROP LIMITED TO 1.5%. 1.49. DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. 1.50. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [NEC 110.15 1.51. GROUNDING NOTES: 1.52. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 1.53. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC TABLE 250.122. 1.54. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 1.55. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45 AND MICROINVERTER MANUFACTORERS’ INSTRUCTIONS. 1.56. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 1.57. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 1.58. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] 1.59. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 AND AHJ. 1.60. GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.5 IN GENERAL AND NEC 690.5 (A)(1) SPECIFICALLY. 1.61. DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 1.62. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 1.63. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 1.64. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS ≤30V AND ≤240VA [NEC 690.12]. LOCATION OF LABEL ACCORDING TO AHJ 1.65. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND 240. 1.66. MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). 1.67. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO NEC 690.11 AND UL1699B. 1.68. INTERCONNECTION NOTES: 1.69. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 690.64 (B)] 1.70. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING [NEC 705.12(D)(2)(3)]. 1.71. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(D)(2)(3)]. 1.72. AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC 705.12 (D)(2)(3)(C). 1.73. FEEDER TAP INTERCONECTION (LOAD SIDE) ACCORDING TO NEC 705.12 (D)(2)(1) 1.74. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 1.75. BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [NEC 705.12 (D)(5)]. SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. MARTINEZ RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ORG CORE ENERGY GROUP. 2029 CEDAR ST, SANTA ANA, CA 92707 APN: 01411247 DATE:10/18/2022 T-2 2029 S Cedar 12/07/22