Loading...
HomeMy WebLinkAbout2118 N Williams St - PlanPROJECT NAME:Phillip & Chandni Rodriguez SUBJECT:ELECTRICAL RENEW EPI DATE:02-16-2023 STATE:CA 1 UNKNOWN 20 1 3840 3840 2 UNKNOWN 20 1 3840 3840 3 UNKNOWN 20 1 3840 3840 4 UNKNOWN 60 1 11520 11520 5 UNKNOWN 20 1 1920 1920 6 UNKNOWN 20 1 1920 1920 7 UNKNOWN 15 1 1440 1440 8 UNKNOWN 20 1 3840 3840 9 UNKNOWN 15 1 1440 1440 10 UNKNOWN 20 1 1920 1920 11 UNKNOWN 20 1 3840 3840 12 UNKNOWN 20 1 3840 3840 13 UNKNOWN 20 1 3840 3840 14 15 16 17 18 18 18 18 18 18 19 20 21 22 23 24 25 200 PROJECT:-Phillip & Chandni Rodriguez PROJECT:-Phillip & Chandni Rodriguez ESTIMATED LOAD CALCULATION HENCE OK, WE CAN DERATE MAIN BREAKER TO 175A BUS BAR RATING(A)200 SYSTEM VOLTAGE PHASE (V) TOTAL DEMAND(A) MAIN BREAKER SIZE(A) 240 143.07 BREAKER SIZE 34337 SR.NO UNIT QUANTITY SIZE PER UNIT(VA)SUM(VA) TOTAL DEMAND(VA) 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM S-1 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM S-2 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM S-3 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM S-4 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM S-5 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM S-6 2118 N Williams St - 2017898303/20/23 PROJECT INFORMATION PROPERTY OWNER NAME:PHILLIP & CHANDNI RODRIGUEZ PHONE:- CONTRACTOR NAME:ILUM SOLAR PHONE:1-888-696-4586 DESIGN SPECIFICATIONS OCCUPANCY: R-3 CONSTRUCTION TYPE: SINGLE FAMILY RESIDENCE ZONING: RESIDENTIAL GROUND SNOW LOAD: 0 PSF WIND EXPOSURE: B WIND SPEED: 95 MPH APPLICABLE CODES & STANDARDS 2022 CALIFORNIA RESIDENTIAL CODE (CRC) 2022 CALIFORNIA BUILDING CODE (CBC) 2022 CALIFORNIA MECHANICAL CODE (CMC) 2022 CALIFORNIA ELECTRICAL CODE (CEC) 2022 CALIFORNIA PLUMBING CODE (CPC) 2022 CALIFORNIA ENERGY CODE (ENERGY) 2022 CALIFORNIA GREEN BUILDING CODE (CALGREEN) 2020 NATIONAL ELECTRICAL CODE (NEC) 2022 CALIFORNIA FIRE CODE (CFC) SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM T-1 TYPE OF INTERCONNECTION: BACKFEED BREAKER IN THE MMC SCOPE OF WORK SYSTEM SIZE: STC: 28 X 400W = 11.200kW PTC: 28 X 381.49W = 10.682kW (28)REC ALPHA REC400AA PURE BLK (400W) SOLAR MODULES (28)ENPHASE IQ8PLUS-72-2-US MICROINVERTERS (1)125A ENPHASE IQ COMBINER 4/4C BOX (1)60A KNIFE AC DISCONNECT MSP UPGRADE: NO MAIN BREAKER DERATE: YES, TO 175A RACKING & MOUNTING PV ATTACHMENT TYPE: UNIRAC FLASHKIT PRO FOR ASPHALT COMP SHINGLE ROOF RACKING TYPE: UNIRAC SM- ROOF MOUNT RACKING HARDWARE RODRIGUEZ RESIDENCE NEW PHOTOVOLTAIC SYSTEM PROJECT - 11.200 kW COORDINATES: 33.764631, -117.839457 AERIAL VIEW SHEET # T-1 T-2 PV-1 PV-2 PV-3 E-1 E-2 E-3 S-1 S-2 S-3 S-4 S-5 S-6 SHEET NAME COVER SHEET PLAN NOTES SITE PLAN LAYOUT ATTACHMENT DETAILS MOUNTING DETAILS ELECTRICAL DIAGRAM ELECTRICAL CALCULATIONS WARNING LABELS SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET 6LJQHG 4USVDUVSBM 0OMZ The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg# 101114221 Elec# 20178983 Issued 03/17/23 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM S-2 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM S-3 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM S-4 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM S-5 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM S-6 2118 N Williams St - 2017898303/20/23 1.1. PROJECT NOTES: 1.2. THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE NATIONAL ELECTRICAL CODE (NEC) ARTICLE 690, ALL MANUFACTURERS’S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. 1.3. THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION 1.4. GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH NEC 690.5(A) 1.5. ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC 690.4 & NEC 690.60: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY 1.6. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO NEC 690.7. 1.7. ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING [NEC 110.3]. 1.8. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE NEC AND AHJ. 1.9. SCOPE OF WORK: 1.10. PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT. 1.11. WORK INCLUDES: 1.12. PV ROOF ATTACHMENTS - UNIRAC FLASHKIT PRO FOR ASPHALT COMP SHINGLE ROOF 1.13. PV RACKING SYSTEM INSTALLATION - UNIRAC SM ROOF MOUNT RACKING HARDWARE 1.14. PV MODULE AND INVERTER INSTALLATION - REC ALPHA REC400AA PURE BLK (400W) MODULES / ENPHASE IQ8PLUS-72-2-US MICROINVERTERS 1.15. PV EQUIPMENT GROUNDING 1.16. PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX 1.17. PV LOAD CENTERS (IF INCLUDED) 1.18. PV METERING/MONITORING (IF INCLUDED) 1.19. PV DISCONNECTS 1.20. PV GROUNDING ELECTRODE & BONDING TO (E) GEC 1.21. PV FINAL COMMISSIONING 1.22. (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV 1.23. SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE 1.24. SITE NOTES: 1.25. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 1.26. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 1.27. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 1.28. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 1.29. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. 1.30. EQUIPMENT LOCATIONS: 1.31. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. 1.32. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C) 1.33. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC 690.34. 1.34. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 1.35. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 1.36. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. 1.37. STRUCTURAL NOTES: 1.38. RACKING SYSTEM 1.39. PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND 1.40. A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. 1.41. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED SEALED PER LOCAL REQUIREMENTS. 1.42. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 1.43. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 1.44. WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. 1.45. WIRING & CONDUIT NOTES: 1.46. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 1.47. CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. 1.48. VOLTAGE DROP LIMITED TO 1.5%. 1.49. DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. 1.50. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [NEC 110.15 1.51. GROUNDING NOTES: 1.52. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 1.53. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC TABLE 250.122. 1.54. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 1.55. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45 AND MICROINVERTER MANUFACTURERS’ INSTRUCTIONS. 1.56. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 1.57. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 1.58. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] 1.59. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 AND AHJ. 1.60. GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.5 IN GENERAL AND NEC 690.5 (A)(1) SPECIFICALLY. 1.61. DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 1.62. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 1.63. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 1.64. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS ≤30V AND ≤240VA [NEC 690.12]. LOCATION OF LABEL ACCORDING TO AHJ 1.65. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND 240. 1.66. MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). 1.67. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO NEC 690.11 AND UL1699B. 1.68. INTERCONNECTION NOTES: 1.69. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 690.64 (B)] 1.70. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING [NEC 705.12(D)(2)(3)]. 1.71. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(D)(2)(3)]. 1.72. AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC 705.12 (D)(2)(3)(C). 1.73. FEEDER TAP INTERCONNECTION (LOAD SIDE) ACCORDING TO NEC 705.12 (D)(2)(1) 1.74. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 1.75. BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [NEC 705.12 (D)(5)]. SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM T-2 2118 N Williams St - 2017898303/20/23 1'-6" 1'-6" 3' 3' 1'-6" N 3' 3' SCALE: 3/32" = 1'-0" PV SYSTEM SITE PLAN PV SYSTEM SIZE: 11.2 kW DC LEGEND M METER MAIN COMBO CONSTRUCTION NOTES PV INTERCONNECTION POINT. LOCATION OF METER MAIN COMBO, AC DISCONNECT & COMBINER BOX MOUNTED ON EXTERIOR WALL OF A SINGLE FAMILY RESIDENCE. NEW SOLAR PANELS 21 1 8 N W I L L I A M S S T ROOF OBSTRUCTIONS SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM PV-1 CB COMBINER BOX (28) REC ALPHA REC400AA PURE BLK (400W) SOLAR MODULES WITH AN ENPHASE IQ8PLUS-72-2-US MICRO-INVERTERS MOUNTED TO THE BACK OF EACH MODULE MOUNTED ON ASPHALT COMP SHINGLE ROOF DRIVEWAY Roof Section 1 Roof Azimuth: 180° Roof Tilt: 16° Roof Section 2 1. SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIAL STRUCTURE. 2. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH THE CBC SECTION 1609 TO WITHSTAND A BASIC WIND SPEED OF 95 MPH (3 SECOND GUST), WIND EXPOSURE B. 3. THE ROOF MEMBERS ARE 2 "X 6" RAFTERS AT 16" ON CENTER. CONNECTION TO STRUCTURE SHALL NOT BE WITHIN 11" OF NAILING PLATES. 4. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 5. ALL CONDUCTORS AND CONDUITS MOUNTED ON ROOF SHALL BE MINIMUM 7/8" ABOVE ROOF SURFACE (INCLUDING CABLES UNDERNEATH MODULES AND RACKING). 6. ROOF ACCESS POINTS SHALL BE PROVIDED PER THE FOLLOWING (CRC R324.7.1, CBC 3111.2.1) 6.1. LOCATED IN AREAS NOT REQUIRING PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS DOORS OR WINDOWS. 6.2. LOCATED AT STRONG POINTS OF CONSTRUCTION IN LOCATIONS WHERE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS: TREES, WIRES, OR SIGNS. 7. SETBACKS AT RIDGES CAN BE REDUCED TO 18 INCHES IN COMPLIANCE WITH 2022 CFC/2021 IFC 1204.2.1.2 TOTAL PLAN VIEW AREA = 2174 SQFT TOTAL PV AREA = 28(71.7 IN)(40 IN)/(144 IN^2) = 557.67 SQFT (557.67 SQFT/ 2174 SQFT)100 = 25.65% TOTAL PV AREA POPULATES 25.65% OF TOTAL PLAN VIEW AREA AND IS WITHIN THE 33% REQUIREMENT. (E) STRUCTURE ON PROPERTY CAL-FIRE ROOF LADDER ACCESS POINT Roof Section 3 M ACD PR O P E R T Y LI NE CAL-FIRE ROOF LADDER ACCESS POINT CB LOCATION OF "RAPID SHUTDOWN" DISCONNECT NEC 690.12 PROPERTY LINEPROPERTY LINE PROP E R T Y LINE PROP E R T Y L I NE ACD AC DISCONNECT Roof Section 4 6LJQHG 4USVDUVSBM 0OMZ 2118 N Williams St - 2017898303/20/23 5'-4" 5'-4" 5'-4" 5'-4" 5'-4" 5'-4" 5'-4" 5'-4" 5'-4"5'-4" 5'-4" N N N N SCALE: 1/8" = 1'-0" PV SYSTEM MOUNTING DETAILS UNIRAC FLASHKIT PRO FOR ASPHALT COMP SHINGLE @ 64" O.C. MAX PROPOSED UNIRAC SM RACKING PROPOSED REC ALPHA REC400AA PURE BLK (400W) PV SOLAR MODULES SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM PV-2 Roof Section 1 Roof Azimuth: 180° Roof Tilt: 16° Roof Section 2 Roof Section 3 EXISTING ASPHALT COMP SHINGLE ROOF Roof Section 4 EXISTING 2 "X 6" ROOF RAFTERS @ 16"O.C. 6LJQHG 4USVDUVSBM 0OMZ 2118 N Williams St - 2017898303/20/23 RO O F S L O P E 910 10 6 21 7 S-5 D5 20 11 1214 13 15 18 22 S-5 D4 3 1 5 4 25 24 23 8 26 2 D4 DETAIL (TRANSVERSE) NOT TO SCALE D5 DETAIL (LONGITUDINAL) NOT TO SCALE D1 RACKING DETAIL (TRANSVERSE) NOT TO SCALE D3 RACKING DETAIL (TOP) NOT TO SCALE D2 RACKING DETAIL (LONGITUDINAL) NOT TO SCALE SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM PV-3 ASPHALT COMP SHINGLE 1. ROOF MATERIAL: ASPHALT COMP SHINGLE 2. ROOF STRUCTURE: RAFTERS 3. ATTACHMENT TYPE: UNIRAC FLASHKIT PRO 4. MODULE MANUFACTURER: REC ALPHA 5. MODULE MODEL: REC400AA PURE BLK (400W) SOLAR MODULES 6. MODULE LENGTH: 71.7'' 7. MODULE WIDTH: 40" 8. MODULE WEIGHT: 45 LBS. 9. SEE SHEET S-1 FOR DIMENSION(S) 10. MIN. FIRE OFFSET: 18" 11. RAFTERS SPACING: 16" O.C. 12. RAFTERS SIZE: 2 "X 6" NOMINAL 13. LAG BOLT DIAMETER: 5/16 IN. 14. LAG BOLT EMBEDMENT: 2.5 IN. 15. TOTAL # OF ATTACHMENTS: 60 16. TOTAL AREA: 557.67 SQ. FT. 17. TOTAL WEIGHT: 1260.00 LBS. 18. WEIGHT PER ATTACHMENT: 21.00 LBS. 19. DISTRIBUTED LOAD: 2.26 PSF 20. MAX. HORIZONTAL STANDOFF: 64 IN. 21. MAX. VERTICAL STANDOFF: LANDSCAPE: 26 IN., PORTRAIT: 39 IN. 22. STANDOFF STAGGERING: NO 23. RAIL MANUFACTURER AND MODEL (OR EQUIV.):UNIRAC SM 24. RAIL WEIGHT: 0.436 PLF. 25. MAX. RAFTERS SPAN: 12 FT. 26. MODULE CLEARANCE: 3 IN. MIN., 6 IN. MAX. 6LJQHG 4USVDUVSBM 0OMZ 2118 N Williams St - 2017898303/20/23 10 PV CIRCUIT 1: 10 MODULES/PARALLEL RO O F TOP GR O U N D L E VE L - HO U S E E X T E R I O R 9 PV CIRCUIT 2: 9 MODULES/PARALLEL 1 2 12 9 PV CIRCUIT 3: 9 MODULES/PARALLEL 1 2 1 1 1 (N) JUNCTION BOX WITH IRREVERSIBLE GROUND SPLICE 2 20A 20A N 15A 20A (N) 28 REC ALPHA REC400AA PURE BLK (400W) SOLAR MODULES WITH AN ENPHASE IQ8PLUS-72-2-US MICRO-INVERTER ATTACHED TO THE BACK OF EVERY MODULE. (N) 125A/240V AC COMBINER BOX WITH ENPHASE IQ ENVOY COMM. GATEWAY EN P H A S E I Q EN V O Y CO M M U N I C A T I O N S GA T E W A Y NOTE: IN BETWEEN EACH ARRAY THE EMT IS USED AS THE GROUNDING / BONDING, GROUND CLAMPS ARE AT EACH END OF THE EMT CONDUIT WITH THE WIRE THEN FREE AIR'D TO THE GROUND CLAMP ON THE RACKING RAIL M POINT OF DELIVERY AND INTERCONNECTION 50A 175A N 3 (E) GROUNDING ELECTRODE OR (UFER) BACKFEED BREAKER (N) VISIBLE LOCKABLE 2 POLE 60A 'KNIFE' AC DISCONNECT 3 EXISTING 240V/200A METER MAIN COMBO SINGLE PHASE (N) MAIN BREAKER DERATE TO 175A SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM E-1 MAIN SERVICE PANEL 240/120V 1Ø, 3W MAIN BUSS: 200A MAX BREAKER SIZE: (200A X 1.2) - 175A = 65.0A 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM E-2 Conduit and Conductor Schedule Tag Description Wire Gauge # of Conductors Conduit Type Conduit Size 1 Enphase Q cable - THWN-2 12 AWG 3 N/A - Free Air N/A - Free Air 1 Bare Copper Ground (EGC/GEC) 6 AWG 1 N/A - Free Air N/A - Free Air 2 THWN-2 12 AWG 6 EMT 3/4" 2 THWN-2 - Ground 10 AWG 1 EMT 3/4" 3 THWN-2 8 AWG 3 EMT 3/4" 3 THWN-2 - Ground 8 AWG 1 EMT 3/4" Inverter Ratings Inverter Make/Model ENPHASE IQ8PLUS-72-2-US Max DC Volt Rating 60V Max con output Power 290W Max Nominal Voltage 240V Max AC Current 1.21A Max OCPD Rating 20A DESIGN TEMPERATURES ASHRAE EXTREME LOW 2°C ASHRAE 2% HIGH 31°C PV Module Ratings @ STC Module/Make/Model REC ALPHA REC400AA PURE BLK (400W) SOLAR MODULES Max Power-Point Current (Imp)9.51A Max Power-Point Voltage (Vmp)42.1V Open-Circuit Voltage (Voc)48.8V Short-Circuit Current (Isc)10.10A Max Series Fuse (OCPD)25A Nominal Maximum Power at STC (Pmax)400W Maximum System Voltage 1000V Voc Temperature Coefficient -0.24%/°C SYSTEM SUMMARY BRANCH #1 BRANCH #2 BRANCH #3 INVERTERS PER BRANCH 10 9 9 MAX AC CURRENT 12.10A 10.89A 10.89A MAX AC OUTPUT POWER 2900W 2610W 2610W ARRAY STC POWER 11200W MAX AC CURRENT 33.88A MAX AC POWER 8120W 2118 N Williams St - 2017898303/20/23 N 1. NOT ALL PLACARDS SHOWN MAY BE REQUIRED BY LOCAL AHJ. CONTRACTOR TO VERIFY PLACARD REQUIREMENTS WITH LOCAL AHJ BEFORE INSTALLATION. 2. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OF THE CALIFORNIA ELECTRICAL CODE 3. ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC, ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTING COLOR TO THE PLAQUE. THIS PLAQUE WILL BE ATTCHED BY POP RIVETS OR SCREWS OR OTHER APPROVED METHOD. 4. DIRECTORY PLACARD MARKING CONTENT AND FORMAT: RED BACKGROUND, WHITE LETTERING, MINIMUM 3/8" LETTER HIEGHT, ALL CAPITAL LETTERS, ARIAL OR SIMILAR FONT, NON BOLD, REFLECTIVE WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT. PERMANENT SIGNAGE NOTES: WARNING! DO NOT RELOCATE THIS OVERCURRENT DEVICE LABEL LOCATION: ADJACENT TO PV BREAKER (IF APPLICABLE). PER CODE(S): CEC 2022: 705.12(B)(2)(3)(b) ! DO NOT ADD LOADS PHOTOVOLTAIC SYSTEM COMBINER PANEL WARNING LABEL LOCATION: PHOTOVOLTAIC AC COMBINER (IF APPLICABLE). PER CODE(S): CEC 2022: 705.12(B)(2)(3)(c), SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS LABEL LOCATION: ON OR NO MORE THAT 3 M (10 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. ELECTRICAL SHOCK HAZARD WARNING! LABEL LOCATION: INVERTER(S), AC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2022: 690.13(B) LABEL LOCATION: UTILITY SERVICE ENTRANCE/METER, INVERTER/DC DISCONNECT IF REQUIRED BY LOCAL AHJ, OR OTHER LOCATIONS AS REQUIRED BY LOCAL AHJ. PER CODE(S): CEC 2022: 690.56(C)(3), CFC 2022: 1204.5.3 POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS AS SHOWN CAUTION: (N) SOLAR PANELS AND MICRO-INVERTERS ON ROOF 33.88 PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2022: 690.54 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM E-3 21 1 8 N W I LL I AM S ST PV INTERCONNECTION POINT. LOCATION OF METER MAIN COMBO, AC DISCONNECT & COMBINER BOX. 2118 N Williams St - 2017898303/20/23 SHEET CONTRACTOR ILUM SOLAR 2118 N WILLIAMS ST, SANTA ANA CA 92705 APN:39610214 DATE:1/27/2023 RODRIGUEZ RESIDENCE License#:1092865, C-46 ADDRESS: 4135 NORTHGATE BLVD SUITE 9, SACRAMENTO, CA 95834, USA DESIGNER: OSM S-1 2118 N Williams St - 2017898303/20/23 2118 N Williams St - 2017898303/20/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 2118 N Williams St - 2017898303/20/23