Loading...
HomeMy WebLinkAbout2130 S Kilson Dr - PlanGOVERNING CODES THE INSTALLATION OF SOLAR ARRAYS AND PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH THE FOLLOWING CODES: · 2020 National Electrical Code · 2022 California Building Code · 2022 California Residential Code · 2022 California Green Building Standard Code · 2022 California Plumbing Code · 2022 California Mechanical Code · 2022 California Electrical Code · 2022 California Fire Code · 2022 California Energy Code · 2016 International Property Maintenance Code ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES NEW IRONRIDGE SITE MAP & PV LAYOUT ELECTRICAL 1-LINE DIAGRAM ATTACHMENT LAYOUT SYSTEM LABELING DETAIL RSD DATA SHEET INVERTER DATA SHEET SHEET INDEX PROPERTY PLAN MODULE DATA SHEET RACKING DATA SHEET ATTACHMENT DATA SHEET PV 1.0 PV 2.0 PV 3.0 PV 4.0 PV 5.0 D 6.0 D 7.0 D 8.0 D 9.0 D 10.0 ELECTRICAL INFORMATION MAIN SERVICE PANEL BUS SIZE: MAIN SERVICE BREAKER SIZE: MOUNTING SYSTEM: BUILDING INFORMATION ONE STORY HOUSE CONSTRUCTION TYPE: V-B OCCUPANCY: R-3 ROOF: Truss 2 x 4 @ 24" O.C. COMP. SHINGLE VICINITY MAP (SCALE: NTS) SATELLITE VIEW (SCALE: NTS) GENERAL NOTES 1. All electrical materials shall be new and listed by recognized electrical testing laboratory Custom made equipment shall have complete test data submitted by the manufacturer attesting to its safety 2. Outdoor equipment shall be NEMA 3R rated or equivalent 3. All metallic equipment shall be grounded 4. Contractor shall obtain electrical permits prior to installation and shall coordinate all inspections, testing commissioning and acceptance with the client, utility co. and city inspectors as needed. 5. The electrical contractor shall verify the exact locations of service points and service sizes with the serving utility company and comply with all utility companies requirements. 6. Drawings are diagrammatic only, routing of raceways shall be option of the contractor unless otherwise noted and shall be coordinated with other trades. 7. If the roof material or the roof structure not adequate for PV installation, call the engineer of record prior to installation. The contractor is responsible to verify that the roof is capable of withstanding the extra weight. 8. If the distances for cable runs are different than shown, the contractor shall notify the electrical engineer to validate the wire size. Final drawings will be red-lined and updated as appropriate. 9. Whenever a discrepancy in quality of equipment arises on the drawing or specifications, the contractor shall be responsible for providing and installing all materials and services required by the strictest conditions noted on the drawings or in the specifications to ensure complete compliance and longevity of the operable system required by the engineer of record. PHOTOVOLTAIC NOTES: 1. Rooftop mounted photovoltaic panels and modules shall be tested, listed and identified by recognized testing laboratory 2. Solar system shall not cover any plumbing or mechanical vents 3. Modules and support structures shall be grounded unless racking has integrated ground. 4. Removal of an interactive inverter or other equipment shall not disconnect the bonding connection between the grounding electrode conductor and the photovoltaic source and/or output circuit grounded conductors. 5. All PV modules and associated equipment and wiring shall be protected from physical damage. 6. Live parts of PV source circuits and PV output circuits over 150v to ground shall not be accessible to other than qualified persons while energized. 7. Inverter is equipped with integrated DC disconnect, thus providing ground fault protection 8. All conductors shall be copper and 75 deg rated 9. A single conductor shall be permitted to be used to perform the multiple functions of dc grounding, AC grounding and bonding between AC and DC systems. 10.Non-current carrying metal parts of equipment shall be effectively bonded together. Bond both ends of raceways. 125A 100A ECB DATA SHEET D 11.0 TITLE SHEET PV 0.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Arnuelo Osorio 2130 S Kilson Dr, Santa Ana, CA 92707 CONTRACTOR Drawn by:New@engineerinc.io 05/26/2023DATE: Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com TITLE SHEET PV 0.0 NEW EQUIPMENT SUMMARY 27 CANADIAN SOLAR 395 WATT MODULES WITH IQ8+ MICROINVERTERS NEW SYSTEM RATING DC 10.665KW STC AC 9.729KW STC Date Certified and Exp. Date : 3/31/2024 Signed: 06/02/2023 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (747) 333-5991 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg# 101115367 Elec# 20179828 Issued 06/07/23 2130 S Kilson Dr. 06/07/23 SOLAR MODULES ___ Canadian Solar 395 Watt Model #CS3N-395MS EMT type Conduit Solar Module (N)Junction Box Fire Setback Line JB ....................... ........................ ..................... ............. ............. 27 INDEX (N)Microinverter 27 INVERTER INVERTER TYPE: Micro: ___ Enphase IQ8+ Model # IQ8PLUS-72-2-US(240V) SITE MAP & PV LAYOUT PV 1.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Arnuelo Osorio 2130 S Kilson Dr, Santa Ana, CA 92707 ECB (N) Enphase Combiner Box.... CONTRACTOR Drawn by:New@engineerinc.io 05/26/2023DATE: MSP (N) Main Service Panel125A Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com *Roof access is not located in areas that require placement of ground ladders over exterior wall openings CRC R331.4.1. Romex............................... NOTE: Romex in attic shall be minimum 18 inches from roof sheating Total Roof Area: 1490 Total Module Area: 594 39.87% of Coverage TOT Tota Tota 35.8 Solar PV Array 1 13 - Canadian Solar 395W Modules 13 - IQ8+ Microinverters Pitch: 21 Deg Orientation: 180 Deg 3' fire setback 3' fire setback 3' fire setback 3' fire setback 3' f ir e s e t ba c k 3' f ir e s e t ba c k 3' f ir e s e t ba c k ECB JB MSP JB JB a a a a a a a a a b b b b bc bb b b c c c c c c c c S K i l s o n D r Solar PV Array 2 3 - Canadian Solar 395W Modules 3 - IQ8+ Microinverters Pitch: 21 Deg Orientation: 0 Deg Solar PV Array 3 11 - Canadian Solar 395W Modules 11 - IQ8+ Microinverters Pitch: 21 Deg Orientation: 0 Deg MAIN HOUSE SCALE: 1/8" = 1'-0" 180 ° 90 ° 270 ° 0° S W N E Exp. Date : 3/31/2024 Date Certified and Signed: 06/02/2023 2130 S Kilson Dr. 06/07/23 PV 2.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Arnuelo Osorio 2130 S Kilson Dr, Santa Ana, CA 92707 ELECTRICAL 1-LINE DIAGRAM Drawn by:New@engineerinc.io 05/26/2023DATE: 100A CANADIAN SOLAR 395W MODULES27 1 BR A N C H CI R C U I T - C ENPHASE Q CABLE (2)#12 AWG PV WIRE (1)#6 AWG EGC FREE IN THE AIR 27 ENPHASE IQ8+ MICROINVERTERS INSTALL (3) 20A PV 2-POLE C/B PV MONITORING DEVICE (3)#8 AWG THWN/THWN-2 (1)#8 AWG GND 3/4'' EMT, 2 FEET ENPHASE IQ COMBINER 4 120/240V, NEMA 3R (2)#14 AWG THWN/ THWN-2 15A 2-POLE NEW NON CENTER _____ MAIN C/B NOTE: Service Panel does not contain center fed Main Breaker: NEW UPGRADED ______ MAIN SERVICE PANEL 120/240V, 1P, 3W GEC(N)GROUNDING ELECTRODE SYSTEM MAIN METER 125A INSTALL ____ 2P CB(PV) INSTALL AT OPPOSITE END OF BUS FROM MAIN FEEDER CB 50A CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com (6)#12/2 ROMEX 23 FEET IN ATTIC J BOX NEMA3R 1 2 BR A N C H CI R C U I T - C PV ARRAY RATING WIRE SIZE CALCULATION BRANCH CIRCUIT - A BRANCH CIRCUIT - A Number Modules 9 Type Canadian Solar 395 Watt CS3N-395MS Number OF Microinverters in Circuit 9 Number MicroInverters 9 Type Enphase IQ8+ Microinverters IQ8Plus-72-2-US(240V) Microinverter Maximum Output Current (A)1.21 Total DC Wattage (Watts) Watts STC, (Watts/Module) 9 * 395 = 3555 Branch Circuit Total Current (A)9 * 1.21 * 1.25 = 13.6125 Array Currents I-SC 11.44 A I-MP 10.68 A Breaker Size Per Branch Circuit (A)20 Module Voltage V-OC 44.3 V V-MP 37 V BRANCH CIRCUIT - B BRANCH CIRCUIT - B Number Modules Type Number OF Microinverters in Circuit Number MicroInverters Type Enphase IQ8+ Microinverters IQ8Plus-72-2-US(240V) Microinverter Maximum Output Current (A)1.21 Total DC Wattage (Watts) Branch Circuit Total Current (A) Array Currents I-SC A I-MP A Breaker Size Per Branch Circuit (A)20 Module Voltage V-OC V V-MP V FROM JBOX TO ENPHASE COMBINER BOX Maximum Continius Current (A) 13.6125 More Than 3 CCC Adjist. Factor 0.8 Adjusted Conductor Ampacity(A)13.6125 / 0.8 = 17.016 Raceway Height From Roof (Temp 39+22=61C) 3 1/2" # of wire( # BC *2) 4 Ambiend Tem Factor Per NEC Table 310.15(b)(2)(a)0.71 Temp. Derate Factor (max. continous current divided ambient tem. Factor (A) 17.016 / 0.71 = 23.97 Wire Size from NEC Table 310.15(b)16 10 AWG FROM ENPHASE COMBINER BOX TO MAIN PANEL Total Number Of Microinverters 27 Total Amps From All Microinverters (A)27 * 1.21 = 32.67 Consider Continuous (A)32.67 * 1.25 = 40.8375 Temp. Derate Factor(0.91 at wall of the Building) (A)40.8375 / 0.91 = 44.88 Wire Size from NEC Table 310.15(b)16 8 AWG Ambiend Tem Factor Per NEC Table 310.15(b)(2)(a)0.91 MAIN PANEL PV Backfeed Breaker Size (A) 50 Main Breaker (A) 100 Main Bus Rating (A) 125 Total Amps On Bus (A) 120% 100 + 50 = 150 <= 150(A) J BOX NEMA3R 1 2 BR A N C H CI R C U I T - A 9 Canadian Solar 395 Watt CS3N-395MS 11.44 10.68 44.3 37 2 4 J BOX NEMA3R 1 2 BR A N C H CI R C U I T - C 9 9 Watts STC, (Watts/Module) 9 * 395 = 3555 9 9 * 1.21 * 1.25 = 13.6125 3 (2)#12/2 ROMEX 15 FEET IN ATTIC 1 2 BR A N C H CI R C U I T - B 9 BRANCH CIRCUIT - C BRANCH CIRCUIT - C Number Modules Type Number OF Microinverters in Circuit Number MicroInverters Type Enphase IQ8+ Microinverters IQ8Plus-72-2-US(240V) Microinverter Maximum Output Current (A)1.21 Total DC Wattage (Watts) Branch Circuit Total Current (A) Array Currents I-SC A I-MP A Breaker Size Per Branch Circuit (A)20 Module Voltage V-OC V V-MP V Canadian Solar 395 Watt CS3N-395MS 11.44 10.68 44.3 37 9 9 Watts STC, (Watts/Module) 9 * 395 = 3555 9 9 * 1.21 * 1.25 = 13.6125 (4)#12/2 ROMEX 15 FEET IN ATTIC (2)#12/2 ROMEX 15 FEET IN ATTIC Exp. Date : 3/31/2024 Date Certified and Signed: 06/02/2023 2130 S Kilson Dr. 06/07/23 CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: SYSTEM LABELING DETAIL (STICKER TO BE LOCATED ON CONDUIT WITH DC CURRENT EVERY 4' HORIZONTALLY OR 10' VERTICALLY AND 1' FROM EACH SIDE OF A BEND) (TO BE LOCATED ON SUB-PANEL ONLY WHEN SUB-PANEL IS DEDICATED FOR PV ONLY) (STICKER LOCATED INSIDE PANEL NEXT TO SOLAR BREAKER) (STICKER LOCATED INSIDE PANEL BELOW PV BREAKER) PV ARRAY J BOX INVERTER INTEGRATED DC DISCONNECT PV SUB-PANEL *if applicable SUB-PANEL *if applicable AC DISCONNECT *if applicable METER MAIN SERVICE PANEL *if applicable (STICKER LOCATED ON THE PV SUB PANEL) CAUTION AUTHORIZED SOLAR PERSONNAL ONLY! CAUTION SOLAR DC CURRENT PRESENT DURING DAYLIGHT HOURS WARNING! ELECTRIC SHOCK HAZARD. IF GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. DC DISCONNECT DC PHOTOVOLTAIC POWER SOURCE RATED MAX POWER POINT CURRENT- AMPS RATED MAX POWER POINT VOLTAGE- VOLTS MAXIMUM SYSTEM VOLTAGE- VOLTS SHORT CIRCUIT CURRENT- AMPS WARNING! ELECTRIC SHOCK HAZARD. DO NOT TOUCH THE TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. PV LOAD CENTER SIZED FOR PV BREAKERS ONLY OR RENDERED UNABLE TO ACCEPT ANY ADDITIONAL LOADS. PV SUB-PANEL ONLY AC DISCONNECT AC PHOTOVOLTAIC POWER SOURCE RATED AC OUTPUT CURRENT: A MAX NOMINAL AC OPERATING VOLTAGE: 240 Vac THIS PANEL FED BY MULTIPLE SOURCES (UTILITY & SOLAR) SOLAR WARNING! INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE Permanent directory or plaque providing location of service disconnecting means and photovoltaic system disconnecting means, if not located at the same location. (Plaques shall be metal or plastic, with engraved or machine printed letters, or electro-photo plating, in a contrasting color to the plaque. Plaques shall be permanently attached to the equipmenq or in the required location using an approved method that is suitable to withstand the environment to which it is exposed. Plaques and signage shall meet legibility, defacemet, exposure and adhesion requirements of Underwriters Laboratories marking and labeling system 969(UL969). 40.838 LABEL 1 LABEL 2 LABEL 3 LABEL 4 LABEL 5 LABEL 6 LABEL 7 LABEL 8 LABEL 9 LABEL 10 LABEL 11 LABEL 12 87 109 12 7 7 9 8 10 7 7 9 8 1011 7 4 51 2 DIRECTORY MARKINGS, LABELS AND WIRING SIGNS A. Purpose: Provide emergency responders with appropriate warning and guidance with respect to isolating solar electric system. This can facilitate identifying energized electrical lines that connect solar panels to the inverter, as these should not be cut when venting for smoke removal B. Main Service Disconnect. 1. Residential buildings - The marking main be placed within the main service disconnect. The marking shall be placed outside cover if the main service disconnect is operable with the service panel closed. 2. Commercial buildings - Tha marking shall be placed adjacent to the main service disconnect clearly visible from the location where the level is operated 3. Markings: Verbiage, Format and Type of Material. a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All letters shall be capitalized. Arial or similar font, non bold. c. Material: Reflective, weather resistant material suitable for the environment (use UL - 969 as standard for weather rating). Durable adhesive materials meet this requirement. C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC combiners and junction boxes: 1. Markings: Verbiage, Format and Type of Material. a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turns, above and for below penetrations, all DC combiners and junction boxes b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall adhere to "V. V-3b, c" of this requirement. c. Inverters are not required to have caution markings 1.Marking is required on all interior and exterior DC conduit raceways,enclosures,cable assemblies,and junction boxes,combiner boxes and disconnects. 2.The materials used for marking shall be reflective,weather resistant material suitable for the environment. Minimum 3/8 "letter height; all upper case letters Arial or similar font; Red background with white lettering. 3.Marcking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE. 4.Marking shall be placed adjacent to the main service disconnect in a location clearly visible from the location where the disconnect is operated PV 3.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Arnuelo Osorio 2130 S Kilson Dr, Santa Ana, CA 92707 Drawn by:New@engineerinc.io 05/26/2023DATE: SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS 180 ° 90 ° 270 ° 0° S W N E CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com SERVICE POINT & UTILITY METERING ENPHASE COMBINER BOX You Are Here PV SOLAR ARRAY Exp. Date : 3/31/2024 Date Certified and Signed: 06/02/2023 2130 S Kilson Dr. 06/07/23 PROPERTY PLAN LEGEND MSP Main Service Panel................ PV 4.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Arnuelo Osorio 2130 S Kilson Dr, Santa Ana, CA 92707 Enphase Combiner BoxECB.......... Drawn by:New@engineerinc.io 05/26/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com ECB MSP PROPERTY LINE GATE FENCE Driveway 51'-6" 103'-8" 32'-3" 13'-7" 34'-3" 6'-4" S K i l s o n D r GARAGE MAIN HOUSE SCALE: 1/16" = 1'-0" 180 ° 90° 270 ° 0° S W N E Date Certified and Exp. Date : 3/31/2024 Signed: 06/02/2023 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (747) 333-5991 2130 S Kilson Dr. 06/07/23 ATTACHMENT LAYOUT DESIGN CRITERIA Modules: Max Distributed Load: 3 PSF POINT LOAD CALCULATION PER ARRAY Module Weight (lbs) # Of Modules 49.6 Total Module Weight (lbs) Rack Weight (lbs) Microinverters Weight (lbs) Total System Weight (lbs) # Of Standoffs Max Span Between Standoffs (in) Loading Per Standoff (lbs) Total Area (sq.ft.) Loading (PSF) 1339.2 267.84 64.26 1671.3 48 72 34.82 594 2.81 RAIL ATTACHMENT Truss 2 x 4 @ 24" O.C. 27 27 PV 5.0 PV SYSTEM AS INDICATED Scale: Project: Project Name: Property Adress: Arnuelo Osorio 2130 S Kilson Dr, Santa Ana, CA 92707 Drawn by:New@engineerinc.io 05/26/2023DATE: Prior to the commencement of work, the contractor shall verify the existing roof and framing conditions. Notify New@engineerinc.io of any Discrepancies prior to starting construction. Prior to the commencement of work, the contractor shall inspect framing for any damage such as water damage, cracked framing, etc. and notify New@engineerinc.io if any issues are found. These Plans are stamped for structural code compliance of the roof framing supporting the proposed PV installation reference only. These plans are not stamped for water leakage. PV modules, racking, and attachment components must follow manufacturer guidelines and requirements. Attachments to be installed in a staggered orientation to properly distribute loads. Blocking DF#2 2 x 6 1 Layer of . Plywood & Building Felt Solar Module 6" Attachment ROOF SECTION DETAIL Truss 2 x 4 @ 24" O.C. COMP. SHINGLE CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com UNIRAC FLASHLOC DUO ATTACHMENT DETAILS PART TABLE P N DESCRIPTION 004275M FLASHLOC DUO MILL, 20 PACK 004275D FLASHLOC DUO DARK, 20 PACK BND T-BOLT & NUT 3 8´x1´ SS SS SERRATED FLANGE NUT FLASHLOC DTD MILL OR DARK 12-14 SCREW, HWH, SS, SELF-DR W 12 EPDM WASHER 512" 312" 258" 438" Wind Speed: 110 mph 16'-3" 12'-9" Date Certified and Exp. Date : 3/31/2024 Signed: 06/02/2023 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (747) 333-5991 2130 S Kilson Dr. 06/07/23 INVERTER DATA SHEET D 6.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Arnuelo Osorio 2130 S Kilson Dr, Santa Ana, CA 92707 Drawn by:New@engineerinc.io 05/26/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Exp. Date : 3/31/2024 Date Certified and Signed: 06/02/2023 2130 S Kilson Dr. 06/07/23 ENPHASE RAPID SHUTDOWN, COMPATIBILITY WITH PV D 7.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Arnuelo Osorio 2130 S Kilson Dr, Santa Ana, CA 92707 Drawn by:New@engineerinc.io 05/26/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Exp. Date : 3/31/2024 Date Certified and Signed: 06/02/2023 2130 S Kilson Dr. 06/07/23 MODULE DATA SHEET D 8.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Arnuelo Osorio 2130 S Kilson Dr, Santa Ana, CA 92707 Drawn by:New@engineerinc.io 05/26/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Exp. Date : 3/31/2024 Date Certified and Signed: 06/02/2023 2130 S Kilson Dr. 06/07/23 RACKING DATA SHEET D 9.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Arnuelo Osorio 2130 S Kilson Dr, Santa Ana, CA 92707 Drawn by:New@engineerinc.io 05/26/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Date Certified and Exp. Date : 3/31/2024 Signed: 06/02/2023 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (747) 333-5991 Exp. Date : 3/31/2024 Date Certified and Signed: 06/02/2023 2130 S Kilson Dr. 06/07/23 ATTACHMENT DATA SHEET D 10.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Arnuelo Osorio 2130 S Kilson Dr, Santa Ana, CA 92707 Drawn by:New@engineerinc.io 05/26/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Date Certified and Exp. Date : 3/31/2024 Signed: 06/02/2023 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (747) 333-5991 Exp. Date : 3/31/2024 Date Certified and Signed: 06/02/2023 2130 S Kilson Dr. 06/07/23 D 11.0 PV SYSTEM AS INDICATED Scale:Project: Project Name: Property Adress: Arnuelo Osorio 2130 S Kilson Dr, Santa Ana, CA 92707 ENPHASE AC COMBINER BOX DATASHEET Drawn by:New@engineerinc.io 05/26/2023DATE: CONTRACTOR Green Day Power Address: 9745 Business Park Dr Sacramento, CA 95827 Phone number: 916-758-8030 E-mail: hello@greendaypower.com Exp. Date : 3/31/2024 Date Certified and Signed: 06/02/2023 2130 S Kilson Dr. 06/07/23 Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 2130 S Kilson Dr. 06/07/23 Expedited Permit Process for PV Systems — Micro-Inverter2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 2130 S Kilson Dr. 06/07/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan 2130 S Kilson Dr. 06/07/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT 2130 S Kilson Dr. 06/07/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone: Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/ o C or %/ o C ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO- INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____ oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE ®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram 2130 S Kilson Dr. 06/07/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.Will the PV system weigh maximum 4 pounds per square feet or less? 5.Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.Will the PV system be installed without using any ballast system or counter-weight system? 8.Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M -19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 2130 S Kilson Dr. 06/07/23 2130 S Kilson Dr. 06/07/23