Expedited Permit Process for PV Systems
AC Module
The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due to their similarity with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of the
installation.
The following pages contain forms for the AC Module to use with the Expedited Permit
Process. The Standard String, Micro-Inverter, and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic-
tions that have adopted the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submitted in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
2226 E Santa Clara
Ave04/07/23
Expedited Permit Process for PV Systems2
Expedited Permit Process for Small-Scale PV Systems
AC Module
The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations
are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been
suggested to provide as a path to permit approval.
Required Information for Permit:
1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it
should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings
with a 3’ perimeter space at ridge and sides may not need separate fire service review.
2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specification sheets and installation manuals (if available) for all manufactured components including, but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1: Structural Review of PV Array Mounting System
Is the array to be mounted on a defined, permitted roof structure? l Yes l No
If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1.
Roof Information:
1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________
____________________________________________________________________________________________________
If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…).
2. Does the roof have a single roof covering? l Yes l No
If No, submit completed worksheet for roof structure WKS1.
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________
Mounting System Information:
1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap
beneath the module frames? l Yes l No
If No, provide details of structural attachment certified by a design professional.
2. For manufactured mounting systems, fill out information on the mounting system below:
a.
b.
c.
d. Weight per Attachment Point (b÷c) 32.6____________lbs (if greater than 45 lbs, see WKS1)
e.
maximum spacing allowed based on maximum design wind speed)
f.
g. Distributed Weight of PV Module on Roof (b÷f) ___________ lbs/ft 2
If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1.
Step 2: Electrical Review of PV System (Calculations for Electrical Diagram)
In order for a PV system to be considered for an expedited permit process, the following must apply:
1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,440 Watts or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)).
5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV
system. Interactive PDF diagrams are available at www.solarabcs.org/permitting.
Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant
understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively
communicate, provide an alternative diagram with appropriate detail.
4
Yes
4
flashing
4
______LG285N1C-G3 Mounting System Manufacturer ___________Product Name and Model#
Total Weight of PV Modules and Rails _1031.8_____lbs
Total Number of Attachment Points_ 38_______
Maximum Spacing Between Attachment Points on a Rail___________inches (see product manual for
Total Surface Area of PV Modules (square feet)__491_____________ ft2
__ 2.1
LG285N1C-G3
6
2226 E Santa Clara
Ave04/07/23
E
x
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
3
AC Module Site Plan
Solar Source
03/17/23
SOLAR SOURCE INC
2954 E 14THST,
LONG BEACH, CA 90804 LIC#:925231,
CLASS - C46, C10 LisenseDate 03/31/2023
Site Name :Ron Burkard
Site Address : 2226 E. Santa Clara Ave.,Santa Ana,
CA 92705 System Size AC 2.85kW
2226 E Santa Clara
Ave04/07/23
E
x
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
AC Module Electrical Diagram
One-Line Standard Electrical Diagram
for AC Module PV Systems
SIZE FSCM NO DWG NO REV
SCALE NTS Date:SHEET
Drawn By:
Checked By:
DESCRIPTION OR CONDUCTOR TYPE
USE-2 or PV WIRE
GEC EGC X ALL THAT APPLY
EXTERIOR CABLE LISTED W/ INV.
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
NO DC GEC IF 690.35 SYSTEM
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
TAG
1
2
3
4
5
CONDUIT AND CONDUCTOR SCHEDULE
COND.
GAUGE
MFG
MFG
NUMBER OF
CONDUCTORS
MFG Cable
MFG Cable
CONDUIT
TYPE
N/A
N/A
N/A
CONDUIT
SIZE
N/A
N/A
N/A
DESCRIPTIONTAG
1
2
3
4
5
6
7
PART NUMBER NOTES
FOR UNUSED AC MODULES
PUT "N/A in BLANK ABOVE
1
2
2
3
EQUIPMENT SCHEDULE
J-BOX
4
AC DISCO
M
BUILDING
GROUNDING
ELECTRODE
G
M
UTILITY
SERVICE
MAIN SERVICE PANEL
MAIN
OCPD
INVERTER
OCPD
5
6
7
5
3
4
G
SEE GUIDE APPENDIX D FOR
INFORMATION ON MODULE AND
ARRAY GROUNDING
AC COMBINER
PANEL
G
____
AC MODULES
IN BRANCH-
CIRCUIT
MOD
__1__
DC
AC
MOD
__1__
DC
AC
MOD
__1__
DC
AC
____
AC MODULES
IN BRANCH-
CIRCUIT
MOD
__1__
DC
AC
MOD
__1__
DC
AC
MOD
__1__
DC
AC
1
LG285N1C-G3 LG285N1C-G3
2 (N) Junction-Box
Enphase IQ Combiner Box With Enphase Envoy IQ8-60-2-US
(E) 200A Main Service Panel (120/240V, 1, 3W)
Contractor Name,
Address and Phone:
03/17/23
SOLAR SOURCE INC
2954 E 14THST,
LONG BEACH, CA 90804
LIC#:925231 46, C10
Solar Source
Site Name : Ron Burkard
Site Address : 2226 E. Santa Clara Ave.,Santa Ana, CA
92705 System Size AC 2.85kW
2226 E Santa Clara
Ave04/07/23
E
x
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
5
Notes for AC Module Electrical Diagram
Contractor Name,
Address and Phone:
Ted
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
SIZE FSCM NO DWG NO REV
SCALE NTS Date:SHEET
Drawn By:
Checked By:
NOMINAL OPERATING AC VOLTAGE
NOMINAL OPERATING AC FREQUENCY
MAXIMUM AC POWER
MAXIMUM AC CURRENT
MAXIMUM OCPD RATING
AC MODULE MAKE
AC MODULE MODEL
AC MODULE RATINGS (Guide Appendix C)
1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YES NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
REQUIREMENT? YES NO N/A
3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX
CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT (N/A)
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING. (See Guide Section 9)
5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH AC
MODULE CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR
EXCEPTION IN 690.64(B)(2)(a)? YES NO
NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9):
1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC
2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ___oC
2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED
47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR 6 OR LESS
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT
LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47oC OR LESS (ALL OF UNITED STATES),
a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR AC MODULES
INVERTER OUTPUT CIRCUITS WITH 12 AMPS OR LESS WHEN PROTECTED BY A 15-
AMP OR SMALLER OCPD.
b) 10 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR AC MODULES
INVERTER OUTPUT CIRCUITS WITH 16 AMPS OR LESS WHEN PROTECTED BY A 20-
AMP OR SMALLER OCPD.
NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix F):
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODE®REFERENCES
SHOWN AS (NEC XXX.XX)
NOTES FOR ALL DRAWINGS:
SIGNSSEE GUIDE SECTION 7
SIGN FOR DC DISCONNECT
SIGN FOR INVERTER OCPD AND AC
DISCONNECT (IF USED)
N/A since no dc wiring
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
SOLAR PV SYSTEM
AC POINT OF CONNECTION
THIS PANEL FED BY MULTIPLE
SOURCES (UTILITY AND SOLAR)
20
N/A
10
240
Solar Source
03/17/23
Site Name :Ron Burkard
Site Address : 2226 E. Santa Clara Ave.,Santa Ana, CA
92705 System Size AC 2.85kW
SOLAR SOURCE INC
2954 E 14THST,
LONG BEACH, CA 90804
LIC#:925231 46, C10
2226 E Santa Clara
Ave04/07/23
Letter of authorization
I, Ron Burkard, customer of record at authorize Solar Source Inc (License 925231 ) to
get the City Permits and complete the Solar installation on my Behalf .Project address 2226 E.
Santa Clara Ave., Santa Ana, CA 92705
Document Ref: KKUOV-BJ8PX-WT6QQ-QWUTZ Page 1 of 1
Customer : Ron Burkard
Date : 03/17/2023
Signature Ron Burkard
2226 E Santa Clara
Ave04/07/23
Signature Certificate
Document Ref.: KKUOV-BJ8PX-WT6QQ-QWUTZ
Document signed by:
E-mail:
burkard@gmail.com
Signed via link
IP: 91.103.58.19 Date: 17 Mar 2022 12:10:34 UTC
Document completed by all parties
on: 17Mar 2022 12:20:34 UTC
Page 1 of 1
Signed with PandaDoc.com
PandaDoc is a document workflow and certified eSignature
solution trusted by 25,000+ companies worldwide.
2226 E Santa Clara
Ave04/07/23
02/28/2023
RE: Structural Certification for Installation of Residential Solar
Burkard Residence:2226 E. Santa Clara Ave, Santa Ana, CA 92705
Attn: To Whom It May Concern
Design Criteria
Code 2022 California Building Code (ASCE 7-16)
Risk category II Wind Load (component and Cladding)
Roof Dead Load Dr 10 psf V 95 mph
PV Dead Load DPV 3 psf Exposure C
Roof Live Load Lr 20 psf
Ground Snow S 0 psf
If you have any questions on the above, please do not hesitate to call.
Sincerely,
Eugene Munyanziza, P.E.Signed 02/28/2023
EV Engineering, LLC
projects@evengineersnet.com
http://www.evengineersnet.com
Exp: 06/30/2024
This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the
PV system to existing roof framing. From the field observation report, the roof is made of Single layer
composition shingle roofing over roof plywood supported by 2X6 Rafters at 24 inches. The slope of the roof was
approximated to be 27 degrees and the allowable maximum rafter span is 8 feet between supports.
After review of the field observation data and based on our structural capacity calculation, the existing roof
framing has been determined to be adequate to support the imposed loads without structural upgrades.
Contractor shall verify that existing framing is consistent with the described above before install. Should they
find any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity
calculations were done in accordance with applicable building codes.
projects@evengineersnet.com
http://www.evengineersnet.com
2226 E Santa Clara
Ave04/07/23
Structural Letter for PV Installation
Date: 02/28/2023
Job Address: 2226 E. Santa Clara Ave
Santa Ana, CA 92705
Job Name: Burkard Residence
Job Number: 230228BR
Scope of Work
Table of Content
Sheet
1 Cover
2 Attachment Uplift checks
3 Roof Framing Check
4 Seismic Check and Scope of work
Engineering Calculations Summary
Code 2022 California Building Code (ASCE 7-16)
Risk category II
Roof Dead Load Dr 10 psf
PV Dead Load DPV 3 psf
Roof Live Load Lr 20 psf
Ground Snow S 0 psf
Wind Load (component and Cladding)
V 95 mph
Exposure C
References
NDS for Wood Construction
Sincerely,
Signed 02/28/2023
Eugene Munyanziza, P.E.
EV Engineering, LLC
projects@evengineersnet.com
http://www.evengineersnet.com Exp: 06/30/2024
This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV
system to existing roof framing. All PV mounting equipment shall be designed and installed per manufacturer's
approved installation specifications.
projects@evengineersnet.com
http://www.evengineersnet.com
2226 E Santa Clara
Ave04/07/23
Wind Load Cont.
95 mph ASCE 7-16 Figure 26.5-1B
C
1.0 ASCE 7-16 Sec 26.8.2
0.85 ASCE 7-16 Table 26.10-1
0.85 ASCE 7-16 Table 26.6-1
0.99 ASCE 7-16 Table 26.9-1
16.58 psf
27.0 Degrees
1.5 Conservatively assuming all exposed
0.8 conservatively assuming 10 ft2 effective area
Uplift (W)Zone(1) Zone(2r) Zone(2e)Zone(3)
Fig. 30-3-2 GCp=-1.8 -2.2 -2.2 -2.1
Eq. 29.4-7 P=qh(GCp)(γE)(γa)=-35.81 -43.77 -43.77 -41.78
GCp=0.7 Figure 30.3-2
P=qh(GCp)(γE)(γa)=10.45 Equation 29.4-7
Rafter Attachments: 0.6D+0.6W (CD=1.6)
Connection Check
Attachment max. spacing= 6 ft
5/16" Lag Screw Withdrawal Value= 266 lbs/in Table 12.2A - NDS
2.5 in DFL Assumed
Prying Coefficient 1.4
Allowable Capacity= 760 lbs
Zone Trib Width Area (ft) Uplift (lbs) Down (lbs)
Zone(1) 6 16.5 288.2 221.8
Zone(2r) 6 16.5 347.3 221.8
Zone(2e) 6 16.5 347.3 221.8
Zone(3) 6 16.5 332.5 221.8
Conservative Max= 347.3 < 760
CONNECTION IS OK
2. Embedment is measured from the top of the framing member to the tapered tip of a lag screw.
Embedment in sheading or other material does not count.
II
V=
Exposure =
1. Pv seismic dead weight is negligible to result in significant seismic uplift, therefore the wind uplift
governs
γE=
γa=
KZt =
qh= 0.00256KzKztKdKeV2=
Pitch =
Lag Screw Penetration
Risk Category =
KZ =
Kd =
Ke =
projects@evengineersnet.com
http://www.evengineersnet.com
2226 E Santa Clara
Ave04/07/23
Vertical Load Resisting System Design
Roof Framing Rafters
Snow Load Fully Exposed
pg= 0 psf Ct = 1.1
Ce = 0.9 Is = 1.0
pf = 0 psf
pfmin. = 0.0 psf
ps = 0 psf Conservatively (Cs=1) 0 plf
Max Length, L = 8.0 ft (Rafter maximum Allowable Horizontal Span)
Tributary Width, WT = 24 in
Dr = 10 psf 20 plf
PvDL = 3 psf 18 plf
Load Case: DL+0.75(0.6W+S)
0.75(Pnet+Ps)+ Ppvcos(θ)+PDL= 47 plf
Mdown= 379 lb-ft
Mallowable = Sx x Fb' (wind)= 975 lb-ft > 379 lb-ft OK
Load Case: DL+S
Ps+ Ppvcos(θ)+PDL= 38 plf
Mdown= 304 lb-ft
Mallowable = Sx x Fb' (wind)= 975 lb-ft > 304 lb-ft OK
Load Case: DL+0.6W
Pnet+ Ppvcos(θ)+PDL= 50.5 plf
Max Moment, Mu= 404 lb-ft
Mallowable = Sx x Fb' (wind)= 1357 lb-ft > 404 lb-ft OK
Pv max Shear= 221.8 lbs
Shear, Vu=wL/2+Pv Point Load = 374 lbs
Max Shear, Vu=wL/2+Pv Point Load = 374 lb
Member Capacity
DF-L No.2
2X6 CL CF Ci Cr KF φ λ
Fb = 900 psi 1.0 1.3 1.0 1.15 2.54 0.85 0.8 1346 psi
Fv = 180 psi N/A N/A 1.0 N/A 2.88 0.75 0.8 180 psi
E = 1600000 psi N/A N/A 1.0 N/A N/A N/A N/A 1600000 psi
Emin = 580000 psi N/A N/A 1.0 N/A 1.76 0.85 N/A 580000 psi
Depth, d = 5.5 in
Width, b = 1.5 in
Cross-Sectonal Area, A = 8.25 in2
Moment of Inertia, Ixx = 20.7969 in4
Section Modulus, Sxx = 7.5625 in3
Allowable Moment, Mall = Fb'Sxx = 847.9 lb-ft DCR=Mu/Mall = 0.39 < 1 Satisfactory
Allowable Shear, Vall = 2/3Fv'A = 990.0 lb DCR=Vu/Vall = 0.38 < 1 Satisfactory
Design Value Adjusted Value
projects@evengineersnet.com
http://www.evengineersnet.com
2226 E Santa Clara
Ave04/07/23
Siesmic Loads Check
Roof Dead Load 10 psf
% or Roof with Pv 9%
Dpv and Racking 3 psf
Average Total Dead Load 10.3 psf
Increase in Dead Load 1.1%OK
Limits of Scope of Work and Liability
The increase in seismic Dead weight as a result of the solar system is less than 10% of the existing structure and
therefore no further seismic analysis is required.
We have based our structural capacity determination on information in pictures and a drawing set titled PV plans
-Burkard Residence. The analysis was according to applicable building codes, professional engineering and design
experience, opinions and judgments. The calculations produced for this dwelling's assessment are only for the
proposed solar panel installation referenced in the stamped plan set and were made according to generally
recognized structural analysis standards and procedures.
projects@evengineersnet.com
http://www.evengineersnet.com
2226 E Santa Clara
Ave04/07/23
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Date: February 21, 2023
Project Information
Existing
200A
200A
10
10
LG285N1C-G3
IQ8-60-2-US
COVER
PROJECT NOTES
PROJECT MAP
1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED
AND IDENTIFIED UL 1703.
2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL VENTS
3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED.
4. SOLAR INVERTER MUST HAVE A MANUFACTURE INSTALLED DISCONNECTING MEANS THAT
PREVENTS PARALLEL FEEDING UTILITY LINES DURING POWER OUTAGE.
5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT
THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE
PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS.
6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING SHALL BE PROTECTED FROM
ANY PHYSICAL DAMAGE.
7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS OVER 150V TO GROUND
SHALL NOT BE
ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE ENERGIZED.
8 .INVERTER IS EQUIPPED W/ INTEGRATED GFDI, THUS PROVIDING GROUND FAULT
PROTECTION
9. ALL CONDUCTORS SHALL BE COPPER AND 75 DEG RATED
10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED ELECTRICAL TESTING
LABORATORY OR APPROVED BY THE DEPARTMENT.
11. CONDUITS SHOULD BE PAINTED TO MATCH EXISTING ROOF AND WALL COLORS
12.ALL WORK SHALL BE IN ACCORD WITH THE 2022 CBC, 2022 CEC AND 2020 NEC WITH
SPECIAL EMPHASIS ON ARTICLE 690
13. THE OUTPUT OF A UTILITY INTERACTIVE-INVERTER SHALL BE PERMITTED TO BE
CONNECTED TO THE SUPPLY SIDE OF THE SERVICE DISCONNECTING
MEANS AS PER 230.82(6)
14. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO PERFORM THE MULTIPLE
FUNCTIONS OF DC GROUNDING, AC GROUNDING
AND BONDING BETWEEN AC AND DC SYSTEMS AS PER NEC 690.47(C) AND SIZED AS PER SEC
250.122
15. EQUIPMENT GROUND CONDUCTOR REQUIRED IN RACEWAYS SIZED PER CEC 250-122.
16. PER ART 250.92. NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL BE
EFFECTIVELY BONDED TOGETHER. BOND BOTH ENDS OF RACEWAYS
GENERAL NOTES:
THIS INSTALLATION SHALL COMPLY WITH THE FOLLOWING CODES:
2022 CALIFORNIA ELECTRICAL CODE
2022 CALIFORNIA RESIDENTIAL CODE
2022 CALIFORNIA BUILDING CODE
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE
2022 CALIFORNIA ENERGY CODE
2022 CALIFORNIA MECHANICAL CODE
2022 CALIFORNIA PLUMBING CODE
2022 CALIFORNIA FIRE CODE
ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES
project description
DC SOLAR PHOTOVOLTAIC SYSTEM
NUMBER OF SOLAR ARRAYS
TYPE OF INVERTERS
MAIN SERVICE PANEL
CONDUCTORS TYPE
CONDUITS TYPE ON ROOF
CONDUITS TYPE FROM EQUIPMENT
ROOF TYPE
ROOF RAFTERS
additional system info
AC CEC SOLAR SYSTEM SIZE
NUMBER OF SOLAR MODULES
NUMBER OF INVERTERS
SOLAR PANEL MODEL NUMBER
INVERTERS MODEL NUMBER
ADDITIONAL DC OPTIMIZER
MAIN SERVICE PANEL BUS
MAIN SERVICE PANEL MAIN C/B
NUMBER OF ROOF STORY
MAIN C/B LOCATION
PROPERTY DETAILS
APN
LIVING AREA
LOT AREA
PROPERTY TYPE
TYPE OF CONSTRUCTION
OCCUPANCY GROUP
code summary
additional notes space (if needed)
SPACE FOR STAMP
AND ADDITIONAL NOTES
FROM PLAN CHECK
N
FROM JUNCTION BOX TO ROOF EAVE
EMT TYPE CONDUIT WILL RUN OVER
THE ROOF AT 3 1/2" HEIGHT, THEN
UNDER THE EAVE TO PV EQUIPMENT
Roof access points shall be located in
areas that do not require the
placement of ground ladders over
openings such as window or doors,
and located at strong points of
building construction in locations
where the access point does not
conflict with overhead obstructions
such as tree limbs, wires, or signs.
2.850kW 2,593kW
1
1
MICRO
THWN-2
EMT
EMT
39628118
1,897 sqft
0.5 Acres
RESIDENTIAL
V-B
R-3
20ATOTAL PV SIZE
NON CENTER2"x6" 24"O/C
SHINGLE
IRONRIDGEMOUNTING SYSTEM
N/A
Signed: 03/20/2023
Structural
Only
Bldg permit #101114581
Elect permit #20179271
Issued on 4/7/23
2226 E Santa Clara
Ave04/07/23
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Project Information
SOLAR RACKING
DATASHEET
Structural
Only
Signed: 03/20/2023
2226 E Santa Clara
Ave04/07/23
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Project Information
SOLAR
GROUNDING
Structural
Only
Signed: 03/20/2023
2226 E Santa Clara
Ave04/07/23
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Project Information
SOLAR
ATTACHMENT
Structural
Only
Signed: 03/20/2023
2226 E Santa Clara
Ave04/07/23
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Project Information
certifications
Structural
Only
Signed: 03/20/2023
2226 E Santa Clara
Ave04/07/23
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Project Information
MODULE
COMPATIBILITY
Structural
Only
Signed: 03/20/2023
2226 E Santa Clara
Ave04/07/23
1'-6"
3'3'
ARRAY 1
(E) DRIVEWAY(E) PROPERTY LINE
MAIN HOUSE
ACD
(E)MSP
Underground trenching 80ft
26'-11"
159'-7"
34'
4'-10"
10'-11"
42'
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Date: February 21, 2023
Project Information
Existing 200A 200A
10 10 LG285N1C-G3 IQ8-60-2-US
IQ8-60-2-US
LG285N1C-G3
PLOT PLAN
Scale: 1/16" = 1'-0"
PV-1
PLOT PLAN
Site Plan
N
PV ARRAY INFORMATION
ROOF COVERAGE
TOTAL ROOF AREA (SQ.FT.) -2085
SOLAR AREA (SQ.FT.) - 181
% OF COVERED AREA - 8.7%
MAIN SERVICE PANEL-<MSP
PV COMBINER BOX-<PCB
MAIN AND PV EQUIPMENT INFORMATION (LEGEND)
AC DISCONNECT-<ACD
SOLAR MODULES AND INVERTER
NEW
BUS
3' working clearance
in front of equipment
is required by CEC 110.26
MAIN BREAKER
PERFORMANCE METER-<PM N/A
RAFTER SIZE 2"x6" 24"O/C ROOF TYPE SHINGLE
ARRAY #1
PITCH
AZIMUTH
PANEL MODEL
ADDITIONAL
EQUIPMENT
10
10
27 deg
180 deg
FIRE SETBACK'S
E. Santa Clara Ave.
N/A
ROOF ACCESS
JBOX
Signed: 03/20/2023
Structural
Only
2226 E Santa Clara
Ave04/07/23
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Project Information
10
PV-2.1
STRINGING LAYOUT
N
B.CIRCUIT
#1
2226 E Santa Clara
Ave04/07/23
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Project Information
(N) PV BREAKER
installed in slot
furthest from main breaker
#4 FACILITY
GROUND
AMP
NON CENTER
MAIN BREAKER
MAIN SERVICE PANEL 120/240V,
SINGLE PHASE SERVICE
MAIN PANEL BUS
MAIN BREAKER
UTILITY
METER
20A
8' minimum embedment rod at 6'
from equipment ground conductor unless
existing ground is UFER.
200A
200A
200A
200A
Existing
Existing
3/4" EMT CONDUIT
(2) #10 AWG THWN-2 Conductors
(1) #8 AWG THWN-2 Ground
20
FEET
J BOX
NEMA 3R
WIRES EXPOSED TO FREE AIR UNDER ARRAY
Enphase Q-Cable
(2) #12 AWG Conductors
(1) #6 AWG Bare Copper Ground
BRANCH #1
3/4" EMT CONDUIT
(2) #10 AWG THWN-2 Conductors
(1) #8 AWG THWN-2 Ground
1 FEET
1" PVC CONDUIT
(2) #10 AWG THWN-2 Conductors
(1) #8 AWG THWN-2 Ground
(N) AC wiring ~80 feet
Underground run
1" Schedule # 40 PVC
Pipe18" Min depth
TRE
N
C
H
I
N
G
3/4" EMT CONDUIT
(2) #10 AWG THWN-2 Conductors
(1) #8 AWG THWN-2 Ground
8
FEET
AC DISCONNECT
30A FUSED,
With 2x20A FUSES
NEMA 3R
lockable, visible
IQ8-60-2-US
LG285N1C-G3 10
PV-2.2
SINGLE LINE
DIAGRAM
1)Equipment is "New" unless otherwise noted.
All PV system wires shall be protected against physical damage
2)Terminations shall be rated 75 degree
PV PANEL AND EQUIPMENT MODEL NUMBER,QUANTITY
B.CIRCUIT
#1
ADDITIONAL NOTES
2226 E Santa Clara
Ave04/07/23
ROOF ATTACHMENT
ROOF SURFACE
per attachment detail
PV MODULE
4''X12'' Blocking
2" ROOF SUPPORT
RAFTERS
.2"x6" 24"O/C
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Project Information
RAFTER
3/8" X 3/4"
SS Hex Bolt
3/8" SS
Flat Washer
1 Layer of
5/16"SS Lag Bolt Min 2.5"
Embed into framing Member
Threaded Fast
Jack BaseRAFTERS
.2"x6" 24"O/C
SHINGLE
PV-3
ARRAY LAYOUT
& DETAILS
ARRAY LAYOUT
Scale: 1/8" = 1'-0" N
ARRAY MOUNTING CROSS SECTION
ROOF ATTACHMENT NOTE: Footing placement is estimated.
Exact footing placement tbd by installers at time of install.
27°
MODULE HEIGHT FROM ROOF TO PV PANEL IS 6"
Roof Attachment
FAST JACK
on 24" O.C. Rafters
PV Railing
72" Max Rail Span
24" Max Rail Cantilever
Signed: 03/20/2023
Structural
Only
2226 E Santa Clara
Ave04/07/23
PHOTOVOLTAIC SYSTEM AC DISCONNECT
RATED AC OPERATING CURRENT 10 AMP AC
NOMINAL OPERATING VOLTAGE 240 VOLTS
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Project Information
DUAL POWER SUPPLY
SOURCES:
UTILITY GRID
AND
PV SOLAR ELECTRIC SYSTEM
All system labels and warnings to be installed at the site
and their locations in accordance with Article 690 of the
2022 California Electric Code and the Fire Department
having jurisdiction Guidelines. The following labeling
requirements apply to the "Rapid Shutdown" equipment.
690.56 Identification of Power Sources.
(C) Facilities with Rapid Shutdown.
Buildings or structures with both utility service and a PV
system, complying with 690.12, shall have a permanent
plaque or directory including the following wording:
PHOTOVOLTAIC SYSTEM EQUIPPED WITH
RAPID SHUTDOWN
The plaque or directory shall be reflective, with all
letters capitalized and having a minimum height of 9.5mm,
in white on red background.
Permanent directory or plaque providing location of service
disconnecting means and photovoltaic system disconnecting means, if
not located at the same location. Plaques shall be metal or plastic, with
engraved or machine printed letters, or electro-photo plating, in a
contrasting color to the plaque. Plaques shall be permanently
attached to the equipment or in the required location using an approved
method that is suitable to withstand the environment to which it is
exposed. Plaques and signage shall meet legibility, defacement,
exposure, and adhesion requirements of Underwriters Laboratories
marking and labeling system 969(UL969).
Plaques will have red background with white lettering.
MARKINGS, LABELS, AND WIRING SIGNS
A. Purpose: Provide emergency responders with appropriate warning
and guidance with respect to isolating solar electric system.
B. Main Service Disconnect
1. Residential buildings - The marking shall be placed within the main
service disconnect. The marking shall be placed outside cover if
the main service disconnect is operable with the service panel
closed.
2. Commercial buildings - The marking shall be placed adjacent to
the main service disconnect clearly visible from the location
where the level is operated.
3. Markings: Verbiage, Format, and Type of Material
a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED
b. Format: White lettering on a red background. Min 3/8" letter
height. All letters capitalized. Arial or similar font, non bold.
c. Material: Reflective, weather resistant material suitable for
the environment (as per UL-969). Durable adhesive materials
meet this requirement.
C. Marking requirements on DC conduit, raceways, enclosures, cable
assemblies, DC combiners, and junction boxes:
1. Markings: Verbiage, Format, and Type of Material.
a. Placement: Markings shall be placed every 10 feet on all interior
and exterior DC conduits, raceways, enclosures, and cable
assemblies, at turns, above and below penetrations, all DC
combiners and junction boxes.
b. Verbiage: CAUTION: SOLAR CIRCUIT (Note: the format and type
of material shall adhere to "V. V-3b, c" of this requirement.)
c. Inverters are not required to have caution markings.
2. Marking is required on all interior and exterior DC conduit,
raceways, enclosures, cable assemblies, and junction boxes,
combiner boxes, and disconnects. CFC 605.11.1
3. The materials used for marking shall be reflective, weather
reflective, weather resistant materials suitable for the
environment. Minimum 3/8" letter height; all upper case, Arial or
similar font; Red background with white lettering. CFC 605.11.1
4. Marking shall contain the words: WARNING: PHOTOVOLTAIC POWER
SOURCE. CFC 605.11.1.2
5. Marking shall be placed adjacent to the main service disconnect in
a location clearly visible from the location where the disconnect
is operated. CFC 605.11.1.3
AC DISCONNECT
if applicable
SUB-PANEL
if applicable
PV SUB-PANEL
if applicable
DC DISCONNECT
if applicable
INVERTER
if applicable
J BOX
PV ARRAY
MAIN SERVICE PANEL
STICKER MAP
PV-4
CODE REQUIRED
PV SIGNAGE
1
5
6
7
4
1
4
2
3 4
5 6
8
4
5 6
7
5
5 6
7
9
1
N
FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY
AND CONDUCTORS LEAVING THE ARRAY: SIGH TO
BE LOCATED ON OR NO MORE THAN 3 FT AWAY
FROM SERVICE DISCONNECTING MEANS TO WHICH
THE PV SYSTEMS ARE CONNECTED AND SHALL
INDICATE THE LOCATION OF ALL IDENTIFIED RAPID
SHUTDOWN SWITCHES IF NOT AT THE SAME
LOCATION. [CEC 690.56(C)(1)(A)]
CAUTION
POWER TO THIS BUILDING IS ALSO SUPPLIED FROM
THE FOLLOWING SOURCES WITH PV EQUIPMENT LOCATED AS SHOWN
MAIN SERVICE PANEL
YOU ARE HERE 10
(UNLESS BUSBAR IS FULLY RATED) (NEC 705.12(D)(2)(3)(B) WHITE LETTERS WITH RED BACKGROUND)
WARNING
INVERTER OUTPUT CONNECTION. DO NOT
RELOCATE THIS OVERCURRENT DEVICE.
SOLAR ELECTRIC
PV PANELS
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH ON THE
"OFF" POSITION TO
SHUTDOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD
IN ARRAY
IFC 605.11.3.1(1) & 690.56(C)(1)(a)
NEC 690.31(G)(3)(4) & NEC 690.13(G)(4)
TO BE PLACED AT LEAST EVERY 10FT
WHITE LETTERS WITH RED BACKGROUND
WARNING
PHOTOVOLTAIC POWER
SOURCE
ELECTRIC SHOCK HAZARD
DO NOT TOUCH TERMINALS
TERMINALS ON BOTH LINE AND
LOAD SIDES MAY BE ENERGIZED IN
THE OPEN POSITION
WARNING2
!
NEC 690.17(E), CB
BLACK OUTLINE WITH BLACK TEXT /
WARNING IS IN
BLACK TEXT AND ORANGE BACKGROUND
NEC 690.56 C
WHITE LETTERS WITH RED BACKGROUND
PHOTOVOLTAIC SYSTEM
EQUIPPED WITH RAPID
SHUTDOWN
2
CAUTION:
SOLAR ELECTRIC SYSTEM CONNECTED
NEC 690.15, 690.13(B)
BLACK TEXT WITH YELLOW BACKGROUND
2
ELECTRIC SHOCK HAZARD.
IF GROUND FAULT IS INDICATED,
NORMALLY GROUNDED
CONDUCTORS MAY BE
UNGROUNDED AND ENERGIZED
WARNING!!
NEC 690.54
WHITE LETTERS WITH RED BACKGROUND
8
PV SUB PANEL ONLY
NEC 690.17(E)
BLACK OUTLINE WITH BLACK TEXT / WARNING IS IN
BLACK TEXT AND ORANGE BACKGROUND
690.56(C)(3) Rapid Shutdown Switch. A rapid
shutdown switch shall have a label located on or
no more than 1 m (3 ft) from the switch that
includes the following wording
9
11
11
11
E. Santa Clara Ave.
AC DISCONNECT
2226 E Santa Clara
Ave04/07/23
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Project Information
STICKER
STICKER MAP
installer use only
PV SUPERVISOR STICKER
N
2226 E Santa Clara
Ave04/07/23
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Project Information
SOLAR MODULE
DATASHEET
2226 E Santa Clara
Ave04/07/23
Burkard Residence
SHEET INDEX
PV-1 Plot Plan
PV-2.1 Stringing
PV-2.2 Single line diagram
PV-3 Array Layout
PV-4 Signage
Sheet
5-13 Additional Information
Data sheets,
Certifications...
SOLAR SOURCE INC 2954 E 14TH
ST, LONG BEACH, CA 90804 LIC#:
925231, CLASS - C46, C10 Lisense
Date 03/31/2023
2226 E. Santa Clara Ave.,
Santa Ana, CA 92705
Project Information
INVERTER
DATASHEET
2226 E Santa Clara
Ave04/07/23
Rev: 7/15/2021
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
SOL-01 CBC 2019
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1.Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2.Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3.Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4.Will the PV system weigh maximum 4 pounds per square feet or less?
5.Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6.Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7.Will the PV system be installed without using any ballast system or counter-weight
system?
8.Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9.Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10.Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Phone Number: Date:
Email Address:
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M -19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
2226 E. Santa Clara Ave., Santa Ana, CA 92705
SOLAR SOURCE INC
925231
V
V
v
V
V
V
V
V
V
V
4/4/23
Sona Hovsepyan
833-219-1020
ankyesayan@gmail.com
2226 E Santa Clara
Ave04/07/23