Loading...
HomeMy WebLinkAbout2369 N Flower St - 20181589- DL - PlanTHE GULINO MOBILE HOME PHOTOVOLTAIC SOLAR SYSTEM SHEET INDEX T1 - TITLE SHEET ARCHITECTURAL A1 - SITE PLAN ELECTRICAL E1 - ELECTRICAL PLOT PLAN E2 - SINGLE LINE DIAGRAM SIGNAGE E3 - SIGNAGE E4 -BATTERY SIGNAGE STRUCTURAL S1 - TYP. CONNECTION DETAILS 1. EQUIPMENT USED SHALL BE NEW, UNLESS OTHERWISE NOTED. 2. EQUIPMENT USED SHALL BE UL LISTED, UNLESS OTHERWISE NOTED. 3. EQUIPMENT SHALL BE INSTALLED PROVIDING ADEQUATE PHYSICAL WORKING SPACE AROUND THE EQUIPMENT AND SHALL COMPLY WITH NEC. 4. COPPER CONDUCTORS SHALL BE USED AND SHALL HAVE 5. CONDUCTORS SHALL BE SIZED IN ACCORDANCE TO NEC. CONDUCTORS AMPACITY SHALL BE DE-RATED FOR TEMPERATURE INCREASE, CONDUIT FILL AND VOLTAGE DROP. 6. EXPOSED NON-CURRENT CARRYING METAL PARTS SHALL BE GROUNDED AS PER NEC. 7. LOAD SIDE INTER-CONNECTION SHALL COMPLY WITH NEC 8. ALL ELECTRICAL CONDUIT TO BE METAL CONDUIT 9. Panels Tested UL 1703 CLASS A TYPE 2 FIRE RATING 10. INVERTER UL 1741/ IEEE 1547 & CSA C-22.2 N.107.1-01 "ALL CONDUIT SHALL BE PAINTED TO MATCH EXISTING ROOF,TRIM AND/OR SIDING" All shall be installed per manufacturer's installation instructions. Ladders shall be OSHA approved and secured to the structure for inspection purposes. No part of this system encroaches above the Maximum Allowable Height of the lot. SMOKE ALARMS PER CRC R314 CARBON MONOXIDE ALARM PER CRC R315 ALL WORK SHALL COMPLY WITH THE 2022 CALIFORNIA BUILDING CODE, 2022 CALIFORNIA ELECTRICAL CODE, ARTICLE 690, ARTICLE 110 AND ALL MANUFACTURER'S LISTINGS AND INSTALLATION INSTRUCTIONS THE CONTRACTOR SHALL PROVIDE A WRITTEN LETTER TO THE BUILDING INSPECTOR STATING ALL INACCESSIBLE STRUCTURAL CONNECTIONS HAVE BEEN INSTALLED IN CONFORMANCE WITH THE REQUIREMENTS OF THE APPROVED PLANS GENERAL ELECTRICAL NOTES CODE INFORMATION HOME OCCUPANCY GROUP TYPE OF CONSTRUCTION STORIES SQ. FT. R-3 VB 1 ROOFING INFORMATION EXISTING ROOF RAFTER SIZE RAFTER SPACING O.C. RAFTER SPAN WIND SPEED EXPOSURE CATEGORY Comp Shingle 2"X4" 24" 8' 110 C ARRAY INFORMATION MODULE WEIGHT MICRO-INVERTER WEIGHT MODULE LENGTH MODULE WIDTH MODULE DEPTH TOTAL MODULES/MICRO-INVERTERS SUM: MODULE WEIGHT+MICRO-INVERTERs SUM: MOUNTS AND RAIL WEIGHT TOTAL INSTALLATION WEIGHT TOTAL INSTALLATION AREA DISTRIBUTED LOAD 54.90 LBS. 4 LBS. 83.00" 41.30" 1.57" 11/11 647.90 LBS. 55 LBS. 702.90 LBS. 261.85 PHOTOVOLTAIC SOLAR SYSTEM CONSTRUCTION SHALL COMPLY WITH 2022 CBC, CMC, CPC, CRC AND CEC and 2022 California Energy Code, 2022 Fire Code-CFC and CEES and The City of Santa Ana Ordinance Scope of Work: 11 PANELS + 11 MICRO-INVERTERS INSTALLED ON EXISTING ROOF. (1) COMBINER SUBPANEL (1) AC DISCONNECT. (1) 10KWH BATTERY (USED FOR CONSUMPTION USE NOT STORAGE) TENCO SOLAR DC:4.345kW AC:3.920W A single, visible-open, lockable AC disconnect shall be within 3' of the meter on the exterior of the building per fire code(15.24.025 Amendment to the CEC) 18340 YORBA LINDA BLVD#107-497 YORBA LINDA,CA, 92886 PH. (714) 637-6226 MATTHEW MITERA CONTRACTOR C10 C46 11/1/2023 2369 NORTH FLOWER ST SANTA ANA,CA,92706 PAUL GULINO APN#00207213 2369 NOTH FLOWER ST SANTA ANA,CA,92706 TEL(310)-383-6221 9-21 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. BLDG# 101117540 ELECT# 20181589 M.Smith ISSUED: 12/18/2023 2369 N Flower St - 2018158912/18/2023 5*''607/$'4 5+6'2.#0 # PHOTOVOLTAIC SOLAR SYSTEM 0 ( . 1 9 ' 4  5 6  PROPOSED PV SYSTEM ON EXISTING ROOF OF HOUSE/SINGLE FAMILY DWELLING (E) - Single Family Dwelling DRIVEWAY Roof Access, no doors or window underneath TENCO SOLAR MATTHEW MITERA CONTRACTOR C10 C46 "NO VENTS (DORMER, PLUMBING,MECHANICAL) TO BE COVERED OR ROUTED AROUND SOLAR MODULES" ALL EQUIPMENT SHALL BE PAINTED PRIOR TO INSPECTION PR O P E R T Y L I N E PROPERTY LINE 18340 YORBA LINDA BLVD#107-497 YORBA LINDA,CA, 92886 PH. (714) 637-6226 4 PANELS 62/$5$5($)7ð $'8522)$5($)7ð (261.85/1600)X100=16.36% ROOF COVERAGE (E) 200 Service 4:12 $]LPXWKƒ PR O P E R T Y L I N E PROPERTY LINE 12/7/2023 2369 NORTH FLOWER ST SANTA ANA,CA,92706 PAUL GULINO APN#00207213 2369 NOTH FLOWER ST SANTA ANA,CA,92706 TEL(310)-383-6221 )7.+01 4:12 $]LPXWKƒ 4:12 $]LPXWKƒ 3 PANELS 4 PANELS 119'-10 9 16" 68'-77 8" 19'-55 8" 21' 28'-4" 2369 N Flower St - 2018158912/18/2023 STANDARD UNIRAC RAIL UNIRAC FLASH KIT PRO "L" FOOT 3 8"-16 X 3 4" SS HEX BOLT W/ 3 8"-16 FLANGE NUT SOLAR PANEL SOLAR PANEL TOP DOWN END CLAMP 14"-20 T-BOLT (TYP.) SS FLAT WASHER 9 16" WRENCH DUAL FLANGE WATER SEALUNIRAC PRO FLASHING 2X4" RAFTER @ 24"O.C516"X3.5" SS LAG BOLT TOP DOWN MID CLAMP 14"-20 FLANGE NUT (TYP.) 48.00" MAX COMP SHINGLE ROOFING MATERIAL NOTE: CONNECTION SUPPORTS NOT TO SPAN FURTHER THAN 4' (48") MAX. WITH MIN 2.5" PENETRATION INTO R.R.s PHOTOVOLTAIC SOLAR SYSTEM TENCO SOLAR 18340 YORBA LINDA BLVD#107-497 YORBA LINDA,CA, 92886 PH. (714) 637-6226 MATTHEW MITERA CONTRACTOR C10 C46 11/1/2023 2369 NORTH FLOWER ST SANTA ANA,CA,92706 PAUL GULINO APN#00207213 2369 NOTH FLOWER ST SANTA ANA,CA,92706 TEL(310)-383-6221 5" 3" MIN 2.5" 9-21 9-21 2369 N Flower St - 2018158912/18/2023 (N)- ENPHASE COMBINER PANEL (Rapid Shutdown Label ) 1 S1 5*''607/$'4 '.'%64+%#. 2.162.#0 ' (11) CANADIAN SOLAR CS3W-395P PV MODULES & (11) IQ8PLUS-72-2-US MicroInverters, INSTALLED ON EXISTING ROOF ROOFTOP OUTDOOR NEMA 3 JUNCTION BOX TO TRANSITION FROM EXPOSED USE2 TO THWN-2 CONDUCTORS (NOTE: EXACT LOCATION TO VARY) AC CIRCUIT TO RUN ON ROOF AND UNDER EAVES DOES NOT ENTER HOUSING ENVELOPE (NOTE: EXACT LOCATION TO VARY.) PHOTOVOLTAIC SOLAR SYSTEM IMPORTANT: 36 INCH CLEARANCE FOR ELECTRICAL EQUIPMENT PROVIDED *Location of Installation of NEW equipment will be a MIN of 36" away from the Gas Meter **Cables in discontigious groups of panels to be placed in 3/4" EMT Point Load NOT to exceed 40lbs ENPHASE MICROINVERTERS FULLY MEET RAPID SHUTDOWN REQUIREMENTS IN THE NEW CODE WITHOUT THE NEED TO INSTALL ANY ADDITIONAL ELECTRICAL EQUIPMENT (N)-AC DISCONNECT TENCO SOLAR Roof Access, no doors or window underneath 4:12 RI D G E 18340 YORBA LINDA BLVD#107-497 YORBA LINDA,CA, 92886 PH. (714) 637-6226 EXISTING 200A SERVICE EQUIPMENT 50A PV BREAKER MATTHEW MITERA CONTRACTOR C10 C46 (N)- ENPHASE ENCHARGE 10T BATTERY RIDGE 11/27/2023 2369 NORTH FLOWER ST SANTA ANA,CA,92706 PAUL GULINO APN#00207213 2369 NOTH FLOWER ST SANTA ANA,CA,92706 TEL(310)-383-6221 )7.+01 RI D G E 4:12 4:12 1'-6" 1'-6" 7'-11" 1'-6" 12'-2 5 16" No overhead conductors or conduits between the two structures will be permitted. 12" (trenched) 2"PVC SCH80 The grounding for the garage PV panels and equipment must be connected to the garage GEC system. If none exists, it must be installed per CEC 250 Part III. CEC 690.47(A) 2369 N Flower St - 2018158912/18/2023 KWH 200A N N J-Box L1 L2 G L1 L2 G L1 L2 G J-Box 5*''607/$'4 5+0).'.+0' ' PHOTOVOLTAIC SOLAR SYSTEM EXISTING 200A Service Panel NOT CENTER FED Proposed: 40 PV breaker in Service Backfed Breaker to be secured @ opposite (load) end of bus from Main Breaker "New Copper ground rod or irreversibly crimped to building's GEC" ALL PV SYSTEM COMPONENTS SHALL BE PROTECTED FROM PHYSICAL DAMAGE Metal enclosures that are not physically continuous from equipment to the grounding electrode shall be made electrically continuous by bonding each end of the raceway or enclosure to the grounding electrode conductor *Location of Installation of NEW equipment will be a MIN of 36" away from the Gas Meter **Cables in discontigious groups of panels to be placed in 3/4" EMT 29.31A 29.31*1.25=36.63A so 40A PV Breaker o.k Wire Sizing Calculations (N) - ENPHASE IQ COMBINER PANEL (Rapid Shutdown Label) (N) -60A AC Disconnect Visible Blade Lockable in Open Position Rated 60A with Outdoor SQUARE-D (2) Enphase AC Interconnect Cables & (1) #6 AWG Bare Copper EGC (free fom physical damage) in free air (Continuos) (2) #10 AWG THWN-2 Copper & (1) #8 THWN-2 Copper GEC in 3/4" EMT (3) #8 AWG THWN-2 Copper and (1) #8 THWN-2 Copper GEC in 3/4" EMT threnched portion see E1 in 1" SCH80 PVC &RPELQHU3DQHOWR0DLQ6HUYLFH3DQHO$0D[&XUUHQW; &RQWLQXRXV&XUUHQW DPELHQWWHPSFRUUHFWLRP ƒ)  $VR$:* THWN-2 w/ Cond. Ampt Rating of 55A o.k EXISTING BUILDING GROUNDING ELECTRODE UFFER String 1 consists of (7) CANADIAN SOLAR CS3W-395P PV Modules connected to (7) IQ8PLUS-72-2-US MicroInverters (97.6% CEC) The MicroInverters' AC Outputs are connected in Parallel@ 240V Split Phase, (13) Maximum units per branch - PANELS ON HOUSE Ungrounded System: THE DC CIRCUIT MEETS THE REQUIREMENTS. FOR UNGROUNDED PV ARRAYS IN NEC 690.35. EQUIPMENT GROUND IS PROVIDED IN THE ENGAGE CABLE. NO ADDITIONAL GEC OR GROUND IS REQUIRED. GROUND FAULT PRETECTION (GFP) IS INTEGRATED INTO THE MICRO INVERTER ENPHASE MICROINVERTERS FULLY MEET RAPID SHUTDOWN REQUIREMENTS IN THE NEW CODE WITHOUT THE NEED TO INSTALL ANY ADDITIONAL ELECTRICAL EQUIPMENT NEW-MICRO-INVERTER SPECS : INVERTER MANUFACTURER: ENPHASE MODULE MODEL # IQ8PLUS-72-2-US MAX INPUT VOLTAGE: 60V PEAK OUTPUT POWER(AC) : 300W NOMINAL AC VOLTAGE: 240V NOMINAL OUTPUT CURRECT: 1.21A MAX UNITS PER 20A BRANCH: 13 CEC WEIGHTED EFFICIENCY: 97.6% MODULE MANUFACTURER: CANADIAN SOLAR MODULE MODEL# CS3W-395P MAX POWER-POINT CURRENT (Imp): 10.26A MAX POWER-POINT VOLTAGE (Vmp): 38.50V OPEN-CIRCUIT VOLTAGE (Voc): 47.00V SHORT-CIRCUIT CURRENT (Isc): 10.82A MAXIMUM POWER (Pmax): 395W CEC PTC RATING: 365.20W 15A PRE-MANUFACTURED BUILT IN BREAKER FOR MONITORING Tag A: Tag B: B (NOT CENTER FED) ARC FAULT PROTECTION FOR ENPHASE: If existing ufer not found, req'd 5/8" diameter ground rod 8'0" min embedment and req'd 6'-0" apart between 2 groundings" MAX IOUT AC=16A EMBEDDED IQ8X-BAT MICRO-INVERTERS -FOR ON-GRID CONSUMPTION DC:4.345kW AC:3.920W TENCO SOLAR MATTHEW MITERA CONTRACTOR C10 C46 6WULQJ-XQFWLRQ%R[WR6XE3DQHO$0D[&XUUHQW; 1(& %  DPELHQWWHPSWFRUUHFWLRQ ƒ)  $VR$:* THWN-2 w/ Cond. Amp Rating of 40A o.k 15A Solar Breaker 18340 YORBA LINDA BLVD#107-497 YORBA LINDA,CA, 92886 PH. (714) 637-6226 MATTHEW MITERA CONTRACTOR C10 C46 15A Solar Bearker 20A Battery Breaker W/ INTEGRATED ENPHASE MICROINVERTERS AND BATTERY MANAGEMENT UNIT (ONE ENCHARGE 10 HAS THREE ENCHARGE 3 UNITS) WIRELESS COMMUNICATION WITH ENPHASE ENVOY NOTE: UP TO (6) UNITS MAY BE DAISY CHAINED WITHOUT REQUIRING ADDITIONAL AC COMBINER SUBPANEL (N) - 1 ENPHASE ENCHARGE 10T-1P-INT BATTERY A (2)#6AWG THWN-2 Copper & (1) #8THWN-2 Copper in 3 4"EMT 40A DC DISC. SWITCH DC DISC. SWITCH DC DISC. SWITCH 10KAIC 11/1/2023 2369 NORTH FLOWER ST SANTA ANA,CA,92706 PAUL GULINO APN#00207213 2369 NOTH FLOWER ST SANTA ANA,CA,92706 TEL(310)-383-6221 )7.+01 The grounding for the garage PV panels and equipment must be connected to the garage GEC system. If none exists, it must be installed per CEC 250 Part III. CEC 690.47(A) B A String 1 consists of (4) CANADIAN SOLAR CS3W-395P PV Modules connected to (4) IQ8PLUS-72-2-US MicroInverters (97.6% CEC) The MicroInverters' AC Outputs are connected in Parallel@ 240V Split Phase, (13) Maximum units per branch - PANELS ON GARAGE 6WULQJ-XQFWLRQ%R[WR6XE3DQHO$0D[&XUUHQW; 1(& %  DPELHQWWHPSWFRUUHFWLRQ ƒ)  $VR$:* THWN-2 w/ Cond. Amp Rating of 40A o.k (3) #8 AWG THWN-2 Copper and (1) #8 THWN-2 Copper GEC in 3/4" EMT 2369 N Flower St - 2018158912/18/2023 REQUIRED PV SIGNAGE PHOTOVOLTAIC SOLAR SYSTEM ENPHASE MICROINVERTERS FULLY MEET RAPID SHUTDOWN REQUIREMENTS IN THE NEW CODE WITHOUT THE NEED TO INSTALL ANY ADDITIONAL ELECTRICAL EQUIPMENT CAUTION MULTIPLE SOURCES OF POWER DISCONNECTS LOCATED AS SHOWN TENCON SOLAR PH. (949) 795-3472 AC D i s c . SOLAR PANELS COMBINER N TENCO SOLAR 18340 YORBA LINDA BLVD#107-497 YORBA LINDA,CA, 92886 PH. (714) 637-6226 SE R V I C E MATTHEW MITERA CONTRACTOR C10 C46 29.31 SOLAR ELECTRIC PV PANELS BATTERY 3850 ATLANTIC AVE #255 HIGHLAND,CA,92346 WARNING ELECTRIC SHOCK HAZARD TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION N F L O W E R S T NEC 705.10(C) - AT EACH SERVICE EQUIPMENT: CAUTION MULTIPLE SOURCES OF POWER SOURCES INCLUDE: UTILITY, PV SOLAR 11/1/2023 2369 NORTH FLOWER ST SANTA ANA,CA,92706 PAUL GULINO APN#00207213 2369 NOTH FLOWER ST SANTA ANA,CA,92706 TEL(310)-383-6221 NOT APPLICABLE 29.31 240 29.31 240 2369 N Flower St - 2018158912/18/2023 STORAGE SYSTEM LABELS: PHOTOVOLTAIC SOLAR SYSTEM (WHERE APPLICABLE) TENCO SOLAR 18340 YORBA LINDA BLVD#107-497 YORBA LINDA,CA, 92886 PH. (714) 637-6226 MATTHEW MITERA CONTRACTOR C10 C46 11/1/2023 2369 NORTH FLOWER ST SANTA ANA,CA,92706 PAUL GULINO APN#00207213 2369 NOTH FLOWER ST SANTA ANA,CA,92706 TEL(310)-383-6221 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 2369 N Flower St - 2018158912/18/2023 CS3W-395|400|405|410|415|420P MORE POWER 395 W ~ 420 W CANADIAN SOLAR INC. is committed to providing high quality solar products, solar system solutions and services to custo- mers around the world. Canadian Solar was recognized as the No. 1 module supplier for quality and performance/price ratio in the IHS Module Customer Insight Survey, and is a leading PV project developer and manufacturer of solar modules, with over 46 GW deployed around the world since 2001. HiKu HIGH POWER POLY PERC MODULE 24 % higher power than conventional modules Low NMOT: 42 ± 3 °C Low temperature coefficient (Pmax): -0.36 % / °C MORE RELIABLE Up to 4.5 % lower LCOE Up to 2.7 % lower system cost Heavy snow load up to 5400 Pa, wind load up to 3600 Pa* 42°C Better shading tolerance Lower internal current, lower hot spot temperature Minimizes micro-crack impacts CANADIAN SOLAR INC. 545 Speedvale Avenue West, Guelph, Ontario N1K 1E6, Canada, www.csisolar.com, support@csisolar.com IEC 61215 / IEC 61730 / CE / MCS / KS / INMETRO CEC listed (US California) / FSEC (US Florida) UL 61730 / IEC 61701 / IEC 62716 / IEC 60068-2-68 UNI 9177 Reaction to Fire: Class 1 / Take-e-way * As there are different certification requirements in different markets, please contact your local Canadian Solar sales representative for the specific certificates applicable to the products in the region in which the products are to be used. PRODUCT CERTIFICATES* ISO 9001:2015 / Quality management system ISO 14001:2015 / Standards for environmental management system OHSAS 18001:2007 / International standards for occupational health & safety MANAGEMENT SYSTEM CERTIFICATES* *According to the applicable Canadian Solar Limited Warranty Statement. * For detailed information, please refer to Installation Manual. 12Years Years 1st year power degradation no more than 2% Subsequent annual power degradation no more than 0.55% Enhanced Product Warranty on Materials and Workmanship* Linear Power Performance Warranty* 2369 N Flower St - 2018158912/18/2023 PARTNER SECTION ELECTRICAL DATA | STC* CS3W 395P 400P 405P 410P 415P 420P Nominal Max. Power (Pmax)395 W 400 W 405 W 410 W 415 W 420 W Opt. Operating Voltage (Vmp)38.5 V 38.7 V 38.9 V 39.1 V 39.3 V 39.5 V Opt. Operating Current (Imp)10.26 A 10.34 A 10.42 A 10.49 A 10.56 A 10.64 A Open Circuit Voltage (Voc)47.0 V 47.2 V 47.4 V 47.6 V 47.8 V 48.0 V Short Circuit Current (Isc)10.82 A 10.90 A 10.98 A 11.06 A 11.14 A 11.26 A Module Efficiency 17.9%18.1%18.3%18.6%18.8%19.0% Operating Temperature -40°C ~ +85°C Max. System Voltage 1500V (IEC/UL) or 1000V (IEC/UL) Module Fire Performance TYPE 1 (UL 61730 1500V) or TYPE 2 (UL 61730 1000V) or CLASS C (IEC 61730) Max. Series Fuse Rating 20 A Application Classification Class A Power Tolerance * Under Standard Test Conditions (STC) of irradiance of 1000 W/m2, spectrum AM 1.5 and cell tempera- ture of 25°C. ELECTRICAL DATA | NMOT* CS3W 395P 400P 405P 410P 415P 420P Nominal Max. Power (Pmax)294 W 298 W 302 W 305 W 309 W 313 W Opt. Operating Voltage (Vmp)35.8 V 36.0 V 36.2 V 36.4 V 36.6 V 36.8 V Opt. Operating Current (Imp)8.21 A 8.27 A 8.33 A 8.39 A 8.45 A 8.51 A Open Circuit Voltage (Voc)44.1 V 44.3 V 44.5 V 44.7 V 44.9 V 45.1 V Short Circuit Current (Isc)8.73 A 8.79 A 8.86 A 8.92 A 8.99 A 9.08 A * Under Nominal Module Operating Temperature (NMOT), irradiance of 800 W/m2, spectrum AM 1.5, ambient temperature 20°C, wind speed 1 m/s. ENGINEERING DRAWING (mm) Rear View Frame Cross Section A-A Mounting Hole 4-10x7 Mounting Hole(tracker) 6-Φ5Grounding Hole 8-14x9 Mounting Hole 180 40 1006 1007 1048 50 40 0 11 5 5 13 0 0 18 0 A A 21 0 8 9 14 R 7 10 R CS3W-400P / I-V CURVES * The specifications and key features contained in this datasheet may deviate slightly from our actual products due to the on-going innovation and product enhancement. Canadian Solar Inc. reserves the right to make necessary adjustment to the information described herein at any time without further notice. Please be kindly advised that PV modules should be handled and installed by qualified people who have professional skills and please carefully read the safety and installation instructions before using our PV modules. CANADIAN SOLAR INC. 545 Speedvale Avenue West, Guelph, Ontario N1K 1E6, Canada, www.csisolar.com, support@csisolar.com MECHANICAL DATA Specification Data Cell Type Poly-crystalline Cell Arrangement 144 [2 X (12 X 6) ] Dimensions 2108 X 1048 X 40 mm (83.0 X 41.3 X 1.57 in) Weight 24.9 kg (54.9 lbs) Front Cover 3.2 mm tempered glass Frame Anodized aluminium alloy, crossbar enhanced J-Box IP68, 3 bypass diodes Cable 4 mm2 (IEC), 12 AWG (UL) Cable Length (Including Connector)500 mm (19.7 in) (+) / 350 mm (13.8 in) (-) or customized length* Connector T4 series or H4 UTX or MC4-EVO2 Per Pallet 27 pieces Per Container (40' HQ)594 pieces * For detailed information, please contact your local Canadian Solar sales and technical representatives. V A 11 10 9 8 7 6 5 4 3 2 1 0 5 10 15 20 25 30 35 40 45 50 V A 5 10 15 20 25 30 35 40 45 50 1000 W/m2 800 W/m2 600 W/m2 400 W/m2 200 W/m2 5°C 25°C 45°C 65°C 11 10 9 8 7 6 5 4 3 2 1 0 TEMPERATURE CHARACTERISTICS Specification Data Temperature Coefficient (Pmax)-0.36 % / °C Temperature Coefficient (Voc)-0.28 % / °C Temperature Coefficient (Isc)0.05 % / °C Nominal Module Operating Temperature 42 ± 3°C 0 ~ + 10 W October 2020. All rights reserved, PV Module Product Datasheet V5.592_EN 2369 N Flower St - 2018158912/18/2023 IQ8 Series Microinverters Our newest IQ8 Microinverters are the industry’s first microgrid-forming, software- defined microinverters with split-phase power conversion capability to convert DC power to AC power efficiently. The brain of the semiconductor-based microinverter is our proprietary application-specific integrated circuit (ASIC) which enables the microinverter to operate in grid-tied or off-grid modes. This chip is built in advanced 55nm technology with high speed digital logic and has super-fast response times to changing loads and grid events, alleviating constraints on battery sizing for home energy systems. Part of the Enphase Energy System, IQ8 Series Microinverters integrate with the Enphase IQ Battery, Enphase IQ Gateway, and the Enphase App monitoring and analysis software. IQ8 Series Microinverters redefine reliability standards with more than one million cumulative hours of power-on testing, enabling an industry- leading limited warranty of up to 25 years. Connect PV modules quickly and easily to IQ8 Series Microinverters using the included Q-DCC-2 adapter cable with plug-n-play MC4 connectors. IQ8 Series Microinverters are UL Listed as PV Rapid Shut Down Equipment and conform with various regulations, when installed according to manufacturer’s instructions. Easy to install • Lightweight and compact with plug-n-play connectors • Power Line Communication (PLC) between components • Faster installation with simple two-wire cabling High productivity and reliability • Produce power even when the grid is down* • More than one million cumulative hours of testing • Class II double-insulated enclosure • Optimized for the latest high- powered PV modules Microgrid-forming • Complies with the latest advanced grid support** • Remote automatic updates for the latest grid requirements • Configurable to support a wide range of grid profiles • Meets CA Rule 21 (UL 1741-SA) requirements © 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ8 Microinverters, and other names are trademarks of Enphase Energy, Inc. Data subject to change. IQ8SE-DS-0001-01-EN-US-2022-03-17 * Only when installed with IQ System Controller 2, meets UL 1741. IQ8H-208V operates only in grid-tied mode. ** IQ8 Series Microinverters supports split phase, 240V. IQ8H-208 supports split phase, 208V only. DATA SHEET 2369 N Flower St - 2018158912/18/2023 (1) The IQ8H-208 variant will be operating in grid-tied mode only at 208V AC. (2) No enforced DC/AC ratio. See the compatibility calculator at https://link.enphase.com/module-compatibility (3) Maximum continuous input DC current is 10.6A (4) Nominal voltage range can be extended beyond nominal if required by the utility. (5) Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. IQ8 Series Microinverters INPUT DATA (DC)IQ8-60-2-US IQ8PLUS-72-2-US IQ8M-72-2-US IQ8A-72-2-US IQ8H-240-72-2-US IQ8H-208-72-2-US 1 Commonly used module pairings2 W 235 – 350 235 – 440 260 – 460 295 – 500 320 – 540+295 – 500+ Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell, 66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 27 – 37 29 – 45 33 – 45 36 – 45 38 – 45 38 – 45 Operating range V 25 – 48 25 – 58 Min/max start voltage V 30 / 48 30 / 58 Max input DC voltage V 50 60 Max DC current3 [module Isc] A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC)IQ8-60-2-US IQ8PLUS-72-2-US IQ8M-72-2-US IQ8A-72-2-US IQ8H-240-72-2-US IQ8H-208-72-2-US 1 Peak output power VA 245 300 330 366 384 366 Max continuous output power VA 240 290 325 349 380 360 Nominal (L-L) voltage/range4 V 240 / 211 – 264 208 / 183 – 250 Max continuous output current A 1.0 1.21 1.35 1.45 1.58 1.73 Nominal frequency Hz 60 Extended frequency range Hz 50 – 68 AC short circuit fault current over 3 cycles Arms 2 4.4 Max units per 20 A (L-L) branch circuit5 16 13 11 11 10 9 Total harmonic distortion <5% Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor (adjustable)0.85 leading – 0.85 lagging Peak efficiency %97.5 97.6 97.6 97.6 97.6 97.4 CEC weighted efficiency %97 97 97 97.5 97 97 Night-time power consumption mW 60 MECHANICAL DATA Ambient temperature range -40ºC to +60ºC (-40ºF to +140ºF) Relative humidity range 4% to 100% (condensing) DC Connector type MC4 Dimensions (HxWxD)212 mm (8.3”) x 175 mm (6.9”) x 30.2 mm (1.2”) Weight 1.08 kg (2.38 lbs) Cooling Natural convection – no fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated, corrosion resistant polymeric enclosure Environ. category / UV exposure rating NEMA Type 6 / outdoor COMPLIANCE Certifications CA Rule 21 (UL 1741-SA), UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according to manufacturer’s instructions. IQ8SE-DS-0001-01-EN-US-2022-03-17 2369 N Flower St - 2018158912/18/2023 IQB-10T-DSH-00085-2.0-EN-US-2023-11-01 The IQ Battery 10T all-in-one AC-coupled storage system is reliable, smart, simple, and safe. It is comprised of three base IQ Battery 3T storage units, has a total usable energy capacity of 10.08 kWh and twelve embedded grid-forming microinverters with 3.84 kW power rating. It provides backup capability, and installers can quickly design the right system size to meet the needs of both new and retrofit solar customers. IQ Battery 10T To learn more about Enphase offerings, visit enphase.com Data Sheet IQ Battery System Reliable • Proven high-reliability IQ Series Microinverters • 15-year limited warranty • Three independent IQ Battery base units • Twelve embedded IQ8X-BAT Microinverters • Passive cooling (no moving parts/fans) • UL Listed • Meets CA Rule 21 (UL 1741-SA) and IEEE 1547:2018 (UL 1741-SB, 3rd Ed.) Smart • Grid-forming capability for backup operation • Remote software and firmware upgrade • Mobile app-based monitoring and control • Support for self-consumption • Utility time of use (TOU) optimization Simple • Fully integrated AC battery system • Quick and easy plug-and-play installation • Interconnects with standard household AC wiring Safe • Safety tested battery cells and module • Lithium iron phosphate (LFP) chemistry for maximum safety and longevity 2369 N Flower St - 2018158912/18/2023 IQB-10T-DSH-00085-2.0-EN-US-2023-11-01 MODEL NUMBER ENCHARGE-10T-1P-NA IQ Battery 10T with integrated IQ Series Microinverters and battery management unit (BMU). Includes: - Three IQ Battery 3T base units (B03-T01-US00-1-3) - One IQ Battery 10T cover kit with cover, wall-mounting bracket, and interconnect cable for wiring between batteries (B10T-C-1290-O) OUTPUT (AC)@ 240 VAC 1 Rated (continuous) output power 3.84 kVA Peak output power 5.76 kVA (10 seconds) Nominal voltage/Range 240/211—264 VAC Nominal frequency/Range 60/57—63 Hz Rated output current 16 A Peak output current 24.6 A (10 seconds) Power factor (adjustable)0.85 leading ... 0.85 lagging Maximum units per 20A branch circuit 1 unit (single-phase) Interconnection Single-phase Maximum AC short-circuit fault current over three cycles 14.4 Arms Round trip efficiency2 89% BATTERY Total capacity 10.5 kWh Usable capacity 10.08 kWh Round trip efficiency 96% Nominal DC voltage 67.2 V Maximum DC voltage 75.6 V Ambient operating temperature range -15ºC to 55ºC (5ºF to 131ºF) non-condensing Optimum operating temperature range 0ºC to 30ºC (32ºF to 86ºF) Chemistry Lithium iron phosphate (LFP) MECHANICAL DATA Dimensions (W × H × D)1283 mm × 775 mm × 188 mm (50.5" × 30.5" × 7.4") Weight Three individual 40.5 kg (89.3 lbs) base units plus 22.1 kg (48.7 lbs) cover and mounting bracket; total 143.6 kg (316.5 lbs) Enclosure Outdoor – NEMA type 3R IQ8X-BAT microinverter enclosure NEMA type 6 Cooling Natural convection – No fans Altitude Up to 2,500 meters (8,200 feet) Mounting Wall mount FEATURES AND COMPLIANCE Compatibility Compatible with grid-tied PV systems. Compatible with M215/M250 and IQ Series Microinverters, IQ System Controller, and IQ Gateway for backup operation. Communication Wireless 2.4 GHz Services Backup, self-consumption, TOU, demand charge, NEM integrity Monitoring Enphase Installer App monitoring options; API integration Compliance CA Rule 21 (UL 1741-SA), IEEE 1547:2018 (UL 1741-SB, 3rd Ed.) CAN/CSA C22.2 No. 107.1-16 UL9540, UL9540A3, UN 38.3, UL 1998, UL 991, NEMA Type 3R, AC156 EMI: 47 CFR, Part 15, Class B, ICES 003 Cell Module: UL 1973, UN 38.3 Inverters: UL 62109-1, IEC 62109-2 1. Supported in both grid-connected and backup operation. 2. AC to Battery to AC at 50% power rating. IQ Battery 10T 2369 N Flower St - 2018158912/18/2023 IQB-10T-DSH-00085-2.0-EN-US-2023-11-01 FIELD REPLACEMENT PARTS 3 B03T-NBC-0160-O IQ Battery 3T/10T battery controller board for field replacement B03T-BMU-0205-O IQ Battery 3T/10T battery management unit board for field replacement B03C-ACIR-0175-O IQ Battery 3/10/3T/10T AC filter board (red connector) for field replacement B03T-ACIB-0175-O IQ Battery 3T/10T AC filter board (black connector) for field replacement B03T-RWSK-2300-O IQ Battery 3T/10T rework spare kit for field repairs LIMITED WARRANTY Limited Warranty4 >60% capacity, up to 15 years or 6,000 cycles5 3. To be replaced by qualified Enphase field service technicians only. 4. When installed with Wall Mount SKUs (B10T-AWM-1280-O & B10T-MWM-1280-O). See IQ Battery 3T/10T Installation Guide for details. 5. Whichever occurs first. Restrictions apply. 2369 N Flower St - 2018158912/18/2023 IQB-10T-DSH-00085-2.0-EN-US-2023-11-01 Revision history REVISION DATE DESCRIPTION DSH-00085-2.0 November 2023 Added the “Replacement Parts” table. DSH-00085-1.0 June 2023 Revised warranty terms. Previous releases. © 2023 Enphase Energy. All rights reserved. Enphase, the e and CC logos, IQ, and certain other marks listed at https://enphase.com/trademark-usage-guidelines are trademarks of Enphase Energy, Inc. in the US and other countries. Data subject to change. 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 Rapid shutdown is built-in What’s new in NEC 2014? NEC 2014, Section 690.12 applies to PV conductors over 10 feet from the PV array and requires that the conductors power down to 30 volts and 240 volt-amperes within 10 seconds of rapid shutdown initiation. Enphase® Energy // Rapid Shutdown ® To learn more, visit enphase.com The 2014 edition of the National Electrical Code (NEC 2014) added new rapid shutdown requirements for PV systems installed on buildings. Enphase Microinverters fully meet rapid shutdown requirements in the new code without the need to install any additional electrical equipment. Enphase comes standard with rapid shutdown capability Residential Microinverter Commercial Microinverter All Enphase microin- verters, even those that were previously installed, inherently meet rapid shutdown requirements, no additional equipment or workarounds needed Enphase microinverters can safely shut down automatically, leaving only low-voltage DC electricity isolated to the PV module String inverters require work arounds for rapid shutdown Residential String Inverter Commercial String Inverter Work around. Specialized Rapid Shutdown electrical box installed on the roof within 10 feet of array. Work around. String inverter installed on roof, a hostile environment that string inverters are not built to live in.Work around. Shutoff switch that is easily accessible to first responders on the ground. Work around. Extra conduit in installation. 2369 N Flower St - 2018158912/18/2023 TECHNICAL BRIEF © 2015 Enphase Energy Inc. All rights reserved. January 2015 1 NEC 2014 — Enphase System Code Compliance Overview This technical brief discusses new NEC 2014 requirements that apply to Enphase Microinverter Systems. It is useful for installers, electricians, and electrical inspectors or authorities having jurisdiction (AHJs) in understanding how code-compliance is handled where NEC 2014 is adopted. Main topics discussed in this document are: • NEC 2014 Section 690.12 Rapid Shutdown of PV Systems on Buildings • NEC 2014 Section 705.12 Point of Connection • NEC 2014 Section 690.11 DC Arc-Fault Circuit Protection NEC 2014 Section 690.12 Rapid Shutdown of PV Systems on Buildings Enphase Microinverter Systems fully meet the rapid shutdown requirement without the need to install additional electrical equipment. Properly labeling the PV system power source and rapid shutdown ability is required per NEC Section 690.56 (B) and (C). Solar electric PV systems with Enphase Microinverters have one utility-interactive inverter directly underneath each solar module, converting low voltage DC to utility grid-compliant AC. When the utility grid is available and the sun is shining, each microinverter verifies that the utility grid is operating within the IEEE 1547 requirements. Only then does it export AC power into the electric service for use by loads onsite or export power to the utility grid for others to use. When the utility grid has a failure, or the PV system AC circuits are disconnected from the utility service via an AC breaker, AC disconnect, or removal of the solar or main utility service meter, the microinverters stop producing AC power in fewer than six AC cycles. Enphase Microinverters are not capable of operating as an AC voltage source. This means that without an AC utility source, Enphase Microinverters are not able to energize connected wiring and no AC voltage or current can be injected into the inverter output circuits or the grid. When the AC utility source is removed from the inverter output circuits via any means, such as an AC breaker, AC disconnect or removal of the solar or main utility service meter, this equipment performs the rapid shutdown function per 690.12. With an Enphase Microinverter System this shutdown occurs well within the 690.12 required 10 seconds, and there are no other conductors energized more than 1.5 m (5 ft) in length inside a building or more than 3 m (10 ft) from a PV array. Code Reference 690.12 Rapid Shutdown of PV Systems on Buildings. PV system circuits installed on or in buildings shall include a rapid shutdown function that controls specific conductors in accordance with 690.12(1) through (5) as follows. (1) Requirements for controlled conductors shall apply only to PV system conductors of more than 1.5 m (5 ft) in length inside a building, or more than 3 m (10 ft) from a PV array. (2) Controlled conductors shall be limited to not more than 30 volts and 240 volt-amperes within 10 seconds of rapid shutdown initiation. (3) Voltage and power shall be measured between any two conductors and between any conductor and ground. (4) The rapid shutdown initiation methods shall be labeled in accordance with 690.56(B). (5) Equipment that performs the rapid shutdown shall be listed and identified. 2369 N Flower St - 2018158912/18/2023 NEC 2014 — Enphase System Code Compliance © 2015 Enphase Energy Inc. All rights reserved. January 2015 2 NEC 2014 Section 705.12 Point of Connection (AC Arc-Fault Protection) In this section we explain how to comply with NEC 2014 Section 705.12 Point of Connection when installing Enphase Energy Systems with: • Supply Side Connection • Load-Side Connection to Single-Phase 120/240 Volt Services • Three-Phase 208/120 Volt Services Supply Side Connection Solution: No AC AFCI (Arc-Fault Circuit Interrupter) protection is required. Code Reference 705.12 Point of Connection The output of an interconnected electric power source shall be connected as specified in 705.12(A), (B), (C) or (D). Since the operator “OR” is used to define connection types, the code seems to intend that if one criteria is met, for example (A), the other criteria are not applicable. Code Reference 705.12(A) Supply Side. An electric power production source shall be permitted to be connected to the supply side of the service disconnecting means as permitted in 230.82(6). The sum of the ratings of all overcurrent devices connected to power production sources shall not exceed the rating of the service. 705.12(B) Integrated Electrical Systems. … 705.12(C) Greater Than 100 kW. … 705.12(D) Utility-Interactive Inverters. … 230.82(6) lists solar photovoltaic systems as eligible for equipment permitted to be connected to the supply side of the service disconnecting means. Since Enphase Energy Systems are solar photovoltaic systems, a supply side connection of an Enphase System may be accepted by AHJs to fully meet Code section 705.12. Since 705.12(A) requirements are met, it seems logical that the 705.12(D) requirements for connections to the load-side of the service disconnect means are not applicable. Load-Side Connection to Single-Phase 120/240 Volt Services Solution: Refer to section 90.4 and the previous code edition, NEC 2011. No listed backfeed capable AC AFCI solutions or acceptable equipment to enclose the cable harness exist. Until such products are generally available from manufacturers, when making load side connections, complying with NEC 2014 Section 705.12 (D) (6) is achieved by discretionary guidance per NEC 2014 Section 90.4. This means to refer to the previous code edition NEC 2011 Section 705.12, where AC Arc-Fault Circuit Protection is not a requirement for utility-interactive inverters. NEC 2014 Code Reference 705.12(D) Utility Interactive Inverters. The output of a utility-interactive inverter shall be permitted to be connected to the load side of the service disconnecting means of the other source(s) at any distribution equipment on the premises. Where distribution equipment, including switchgear, switchboards, or panelboards, is fed simultaneously by a primary source(s) of electricity and one or more utility-interactive inverters, and where this distribution equipment is 2369 N Flower St - 2018158912/18/2023 NEC 2014 — Enphase System Code Compliance © 2015 Enphase Energy Inc. All rights reserved. January 2015 3 capable of supplying multiple branch circuits or feeders, or both, the interconnecting provisions for the utility-interactive inverter(s) shall comply with 705.12(D)(1) through (D)(6). 705.12 (D) (4) Suitable for Backfeed. Circuit breakers, if backfed, shall be suitable for such operation. 705.12(D)(6) Wire Harness and Exposed Cable Arc-Fault Protection. A utility-interactive inverter(s) that has a wire harness or cable output circuit rated 240 V, 30 amperes, or less, that is not installed within an enclosed raceway, shall be provided with listed ac AFCI protection. This NEC 2014 code section allows connection of an electric power source to the load side of service disconnect means and requires that the “interconnecting provisions for the utility-interactive inverter(s) shall comply with 705.12(D)(1) through (D)(6)”. Since the Enphase system contains one or more microinverters, which are the utility-interactive inverter(s), this section applies when connecting a system to the load side of a service disconnecting means. 705.12(D)(6) specifically requires that exposed AC cable systems, such as the Enphase Engage Cable, which is not feasibly run in enclosed raceway, to be protected by listed AC Arc-Fault Circuit Interrupter (AC AFCI) functionality. Given that utility-interactive inverters cannot operate without a utility service source, the location of the AC AFCI protecting the cable must logically be applied at the utility source side of the circuit. AC AFCI circuit breakers are the commonly available devices for single-phase branch circuits. No suitable for backfeed AC AFCI circuit breakers exist. Since Enphase Microinverters are utility-interactive inverters that backfeed into the electrical service through the overcurrent protection device, any AC AFCI circuit breakers must be specifically backfeed capable, per 705.12(D)(4). If terminals of circuit breaker AFCIs are marked “Line” and “Load,” then the AFCI product is not backfeed capable. No UL standard for backfeed testing exists for AC AFCI circuit breakers. Furthermore, 705.12(D)(6) requires that ac AFCI protection must be ”listed.” For a product or product category to become “listed,” a standard safety test procedure, such as a UL standard, must exist. The testing standard for AFCI circuit breakers is UL1699, which currently does not have provisions for testing this product category for backfeed applications. It is clear, that the code requirement is ahead of new product availability. Summary Until suitable for backfeed and listed AC AFCI circuit breakers become generally available, an AHJ is permitted to refer to 90.4, i.e., the previous code edition, NEC 2011. Code Reference 90.4 Enforcement. This Code may require new products, constructions, or materials that may not yet be available at the time the Code is adopted. In such event, the authority having jurisdiction may permit the use of the products, constructions, or materials that comply with the most recent previous edition of this Code adopted by the jurisdiction. 2369 N Flower St - 2018158912/18/2023 NEC 2014 — Enphase System Code Compliance © 2015 Enphase Energy Inc. All rights reserved. January 2015 4 Three-Phase 208/120 Volt Services Solution: The compliance solution for systems interconnected to three-phase systems is to defer to NEC 90.4. There are no three-phase AC AFCI detection devices in existence. Until backfeed capable three- phase AC AFCI circuit breakers become generally available, an AHJ is permitted to refer to 90.4, i.e., the previous code edition, NEC 2011. Additionally, the NEC 210.12 code intention for any AC AFCI protection is for single-phase applications in dwellings or dormitory units and not meant for three-phase applications, example: Code Reference 210.12 Arc-Fault Circuit-Interrupter Protection. … 210.12(A) Dwelling Units. All 120-volt, single-phase, 15- and 20-ampere branch circuits….. 210.12(B) Branch Circuit Extensions or Modifications — Dwelling Units. … 210.12(C) Dormitory Units. All 120-volt, single-phase, 15- and 20-ampere branch circuits Although Chapter 7 applies to “Special Conditions,” the industry must be able to supply generally available equipment that is safe to use and meets the requirements for these special applications. For 705.12(D) (6) this is not the case for three-phase applications as there are no listed three-phase AC AFCI detection devices available. NEC 2014 Section 690.11 DC Arc-Fault Circuit Protection This requirement is for direct current (DC) Arc-Fault Circuit protection and only applies to systems with DC voltages above 80 VDC. Enphase Microinverter systems are exempted from this requirement as they always operate well below 80 VDC. The requirement is basically unchanged from the NEC 2011, and it is unnecessary to add DC AFCI to an Enphase Microinverter System installation. Code Reference 690.11 Arc-Fault Circuit Protection (Direct Current). Photovoltaic systems with dc source circuits, dc output circuits, or both, operating at a PV system maximum system voltage of 80 volts or greater, shall be protected by a listed (dc) arc-fault circuit interrupter, PV type, or other system components listed to provide equivalent protection. 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 2369 N Flower St - 2018158912/18/2023 THE COMPLETE ROOF ATTACHMENT SOLUTION FEATURING TECHNOLOGY FLASHKIT PRO is the complete attachment solution for composition shingle roofs. Featuring Unirac’s patented SHED & SEAL technology, a weather proof system which provides the ultimate protection against roof leaks. Kitted in 10 packs for maximum convenience, flashings and hardware are available in Mill or Dark finishes. With FLASHKIT pro, you have everything you need for a quick, professional installation. YOUR COMPLETE SOLUTION Flashings, lags, continuous slot L-Feet and hardware CONVENIENT 10 PACKS Packaged for speed and ease of handling FLASH KIT PRO 25 YEAR FULL-SYSTEM WARRANTY TRUSTED WATER SEAL FLASHINGS FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 2369 N Flower St - 2018158912/18/2023 FASTER INSTALLATION. 25-YEAR WARRANTY. FLASH KIT PRO IS THE COMPLETE FLASHING AND ATTACHMENT SOLUTION FOR COMPOSITION ROOFS. FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 PRE-INSTALL • Locate roof rafters and snap chalk lines to mark the installation point for each roof attachment. • Drill a 7/32” pilot hole at each roof attachment. Fill each pilot hole with sealant. STEP 1 INSTALL FLASHKIT PRO FLASHING • Add a U-shaped bead of roof sealant to the underside of the flashing with the open side of the U pointing down the roof slope. Slide the aluminum flashing underneath the row of shingles directly up slope from the pilot hole as shown. Align the indicator marks on the lower end of the flashing with the chalk lines on the roof to center the raised hole in the flashing over the pilot hole in the roof. When installed correctly, the flashing will extend under the two courses of shingles above the pilot hole. STEP 2 INSTALL L-FOOT • Fasten L-foot and Flashing into place by passing the included lag bolt and pre-installed stainless steel-backed EPDM washer through the L-foot EPDM grommet, and the raised hole in the flashing, into the pilot hole in the roof rafter. • Drive the lag bolt down until the L-foot is held firmly in place. It is normal for the EPDM on the underside of the stainless steel backed EPDM washer to compress and expand beyond the outside edge of the steel washer when the proper torque is applied. TIP: • Use caution to avoid over-torqueing the lag bolt if using an impact driver. • Repeat Steps 1 and 2 at each roof attachment point. STEP 3 ATTACH L-FOOT TO RAIL • Insert the included 3/8"-16 T-bolts into the lower slot on the Rail (sold separately), spacing the bolts to match the spacing between the roof attachments. • Position the Rail against the L-Foot and insert the threaded end of the T-Bolt through the continuous slot in the L-Foot. Apply anti-seize to bolt threads to prevent galling of the T-bolt and included 3/8” serrated flange nut. Place the 3/8” flange nut on the T-bolt and finger tighten. Repeat STEP 3 until all L-Feet are secured to the Rail with a T-bolt. Adjust the level and height of the Rail and torque each bolt to 30ft-lbs. INSTALL FLASHKIT PRO FLASHING STEP 1 STEP 2 STEP 3 INSTALL L-FOOT ATTACH L-FOOT TO RAIL FLASH KIT PRO INSTALLATION GUIDE 2369 N Flower St - 2018158912/18/2023 Structural Calculations for a Roof Mounted Solar Photovoltaic System for: Paul Gulino Residence 2369 N Flower St., Santa Ana, CA 92706 Applicable Codes: 2022 California Building Code, 2022 California Electric Code, 2022 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-16 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Construction, Local Municipal Code, and all other codes which are adopted by reference or enacted by law. Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. Solar Energy Contractor shall make an inspection of the existing roof framing system prior to installation of the roof mounted solar energy system to verify that the existing roof is capable of supporting minimum roof live loads. Assumed Design Parameters: All 2x members are grade Douglas Fir #2 or better All 4X members are grade Douglas Fir #1 or better All Roof Connectors are Simpson Strong­Tie or Equal All Concrete Foundations are f'c = 2500 psi or stronger Original Structure was built to the Type­V Wood Framed Standards of the Applicable Building Code at the time of Construction. Sht # 1 of 72020­3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2020­3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212023-5449 Tenco Solar Paul Gulino Residence Date: November 08, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2369 N Flower St - 2018158912/18/2023 Sht # 2 of 7 Note to Building Official: Based upon a review of the proposed plans and information, the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. The contractor shall field verify that the existing roof structure is in its original permited condition and verify that it can support the normal code required roof live loads. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. W DL + LL R1 R2 7.8' Total load on rafter = 61.6 plf x 7.8 ft. = 480 lbs w = 30.8 psf x 2 ft. = 61.6 plf Check Existing 2x4 Roof Rafters @ 24" O.C.: * *Note: Contractor to Field Verify Framing 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 20192020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020­2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020­2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020­2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020­2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020­2434 Mohr Power Thurin Residence Date: October 1, 20202020­2450 ESD 20­579 Sanchez Residence Date: October 2, 20202020­2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020­2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020­2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020­2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020­2495 Penguin Solar German Rios Residence Date: October 6, 20202020­2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020­2507 ESD 20­593 So Residence Date: October 7, 20202020­2515 Penguin Solar Black Annette Residence Date: October 7, 20202020­2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020­2525 New Power William Fuller Residence Date: October 8, 20202020­2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020­2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020­2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020­2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020­2591 ESD 20­590 Supulveda Residence Date: October 13, 20202020­2603 New Power John Yager Residence Date: October 14, 20202020­2603 New Power William Fuller Residence Date: October 14, 20202020­2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020­2652 Axis Solar Marcus Residence Date: October 15, 20202020­2652 Axis Solar Freimanis Residence Date: October 15, 20202020­2674 Complete Solar Dorado Residence Date: October 16, 20202020­2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020­2694 ESD 20­648 Barrera Residence Date: October 17, 20202020­2836 Penguin Solar Kalup Residence Date: October 26, 20202020­2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 20202020­2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020­2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020­2861 New Power Susan Bakken Residence Date: October 27, 20202020­2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020­2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020­2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020­2853 TG Roofing Brown Robert Residence Date: October 27, 20202020­2875 Trinity Power John Mendel Residence Date: October 28, 20202020­2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020­2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020­2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020­2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020­2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020­2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020­2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020­2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020­2915 Complete Solar Ojeda Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Walker Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon Services Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 30, 20202020­2938 ESD 20­610 Sisto ­ RNR Date: October 30, 20202020­2940 Axis Solar Shook Date: October 30, 20202020­2963 Axis Solar Luke Ding Residence Date: October 31, 20202020­2959 Penguin Solar Stevens Residence Date: October 31, 20202020­2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020­2939 Mohr Power Pappillion Residence Date: October 31, 20202020­2983 Infinity Solar Gernazio Residence Date: November 3, 20202020­2982 Infinity Solar Luna Residence Date: November 3, 20202020­3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020­3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020­3062 UniverCity Solar Mantri Residence Date: November 6, 20202020­3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020­3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020­3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020­3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020­3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020­3052 ESD 20­747 Perez Residence Date: November 6, 20202020­3065 HPM Solar Torres Residence Date: November 6, 20202020­3085 20­729 Green Residence Date: November 8, 20202020­3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020­3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020­3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020­3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020­3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020­3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020­3235 Infinity Solar Dizon Residence Date: November 16, 20202020­3360 Axis Solar Hogan Residence Date: November 23, 20202020­3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020­3570 ESD 20­917 Hatter Residence Date: December 6, 20202020­3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020­3566 TG Roofing Morff Craig Residence Date: December 6, 20202020­3566 TG Roofing Craig Morff Residence Date: December 6, 20202020­3686 Bratton Solar Love Residence Date: December 14, 20202020­3682 New Power Shawn Johnson Date: December 14, 20202020­3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020­3707 Penguin Solar James Logan Residence Date: December 15, 20202020­3704 New Power Marite Cappelletti Residence Date: December 15, 20202020­3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020­3734 New Power Judith Park Residence Date: December 16, 20202020­3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020­3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020­3759 Mohr Power Smith Residence Date: December 17, 20202020­3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020­3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020­3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020­3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020­3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020­3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021­056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021­147 Better Earth Paul Garcia Residence Date: January 14, 20212021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1214 Better Earth Brian Cook Residence Date: April 13, 20212021-1434 Asgard Electric Sanjay Rupani Residence Date: April 29, 2021 ( Assume max rafter span = 7.8 ft. ) 2021-2052 Green Conception Mike Lagrosas Residence Date: June 05, 20212022-051 Green Road Solar Shane Myers Residence Date: January 6, 20212022-3538 Solar Survey Pro 4566 W 118th Date: September 01, 20222023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-797 HPM Solar Micah Williams Residence Date: February 16, 20232023-1868 Solar Survey Ichiro Yamazaki Residence Date: March 24, 20232023-4228 Solar Survey Pro1653 South Mayland Residence Date: July 22, 20232023-4230 TG Roofing Nora Johnston Residence Date: July 22, 20232023-5449 Tenco Solar Paul Gulino Residence Date: November 08, 2023 2369 N Flower St - 2018158912/18/2023 Check Existing 2x4 Roof Rafters @ 24" O.C.: Sht # 3 of 7 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 20192020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020 Check attachment of Support to Existing Structure for Wind Uplift CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7-16 WIND LOADS ON BUILDING APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2. NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7-16 EFFECTIVE WIND AREA: "FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT BE LESS THAN ONE-THIRD ITS LENGTH." EFFECTIVE AREA = 15 SQ FT 2020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020­2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020­2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020­2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020­2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020­2434 Mohr Power Thurin Residence Date: October 1, 20202020­2450 ESD 20­579 Sanchez Residence Date: October 2, 20202020­2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020­2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020­2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020­2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020­2495 Penguin Solar German Rios Residence Date: October 6, 20202020­2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020­2507 ESD 20­593 So Residence Date: October 7, 20202020­2515 Penguin Solar Black Annette Residence Date: October 7, 20202020­2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020­2525 New Power William Fuller Residence Date: October 8, 20202020­2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020­2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020­2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020­2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020­2591 ESD 20­590 Supulveda Residence Date: October 13, 20202020­2603 New Power John Yager Residence Date: October 14, 20202020­2603 New Power William Fuller Residence Date: October 14, 20202020­2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020­2652 Axis Solar Marcus Residence Date: October 15, 20202020­2652 Axis Solar Freimanis Residence Date: October 15, 20202020­2674 Complete Solar Dorado Residence Date: October 16, 20202020­2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020­2694 ESD 20­648 Barrera Residence Date: October 17, 20202020­2836 Penguin Solar Kalup Residence Date: October 26, 20202020­2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 20202020­2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020­2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020­2861 New Power Susan Bakken Residence Date: October 27, 20202020­2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020­2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020­2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020­2853 TG Roofing Brown Robert Residence Date: October 27, 20202020­2875 Trinity Power John Mendel Residence Date: October 28, 20202020­2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020­2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020­2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020­2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020­2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020­2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020­2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020­2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020­2915 Complete Solar Ojeda Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Walker Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon Services Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 30, 20202020­2938 ESD 20­610 Sisto ­ RNR Date: October 30, 20202020­2940 Axis Solar Shook Date: October 30, 20202020­2963 Axis Solar Luke Ding Residence Date: October 31, 20202020­2959 Penguin Solar Stevens Residence Date: October 31, 20202020­2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020­2939 Mohr Power Pappillion Residence Date: October 31, 20202020­2983 Infinity Solar Gernazio Residence Date: November 3, 20202020­2982 Infinity Solar Luna Residence Date: November 3, 20202020­3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020­3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020­3062 UniverCity Solar Mantri Residence Date: November 6, 20202020­3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020­3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020­3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020­3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020­3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020­3052 ESD 20­747 Perez Residence Date: November 6, 20202020­3065 HPM Solar Torres Residence Date: November 6, 20202020­3085 20­729 Green Residence Date: November 8, 20202020­3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020­3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020­3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020­3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020­3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020­3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020­3235 Infinity Solar Dizon Residence Date: November 16, 20202020­3360 Axis Solar Hogan Residence Date: November 23, 20202020­3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020­3570 ESD 20­917 Hatter Residence Date: December 6, 20202020­3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020­3566 TG Roofing Morff Craig Residence Date: December 6, 20202020­3566 TG Roofing Craig Morff Residence Date: December 6, 20202020­3686 Bratton Solar Love Residence Date: December 14, 20202020­3682 New Power Shawn Johnson Date: December 14, 20202020­3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020­3707 Penguin Solar James Logan Residence Date: December 15, 20202020­3704 New Power Marite Cappelletti Residence Date: December 15, 20202020­3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020­3734 New Power Judith Park Residence Date: December 16, 20202020­3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020­3738 Sasha Intl Amita Seth Residence Date: December 16, 2020 w DL + LL = 30.8 psf x 2 ft. = 61.6 plf Total load on rafter = 61.6 plf x 1.5 ft + 21.6 plf x 6.3 ft + ( 4' x 2.75' x 3 psf x 2 ) = 294 lbs < 480 lbs OK 2020­3759 Mohr Power Smith Residence Date: December 17, 20202020­3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020­3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020­3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020­3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021­056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021­147 Better Earth Paul Garcia Residence Date: January 14, 2021 R1 R2 7.8' w LLwDL 2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 20212021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1214 Better Earth Brian Cook Residence Date: April 13, 20212021-1434 Asgard Electric Sanjay Rupani Residence Date: April 29, 20212021-2052 Green Conception Mike Lagrosas Residence Date: June 05, 2021 w DL = 10.8 psf x 2 ft. = 21.6 plf 1.5'6.3' 2022-051 Green Road Solar Shane Myers Residence Date: January 6, 2021 P 2022-3538 Solar Survey Pro 4566 W 118th Date: September 01, 20222023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-797 HPM Solar Micah Williams Residence Date: February 16, 2023 P 2023-1868 Solar Survey Ichiro Yamazaki Residence Date: March 24, 20232023-4228 Solar Survey Pro1653 South Mayland Residence Date: July 22, 20232023-4230 TG Roofing Nora Johnston Residence Date: July 22, 20232023-5449 Tenco Solar Paul Gulino Residence Date: November 08, 2023 2369 N Flower St - 2018158912/18/2023 Sht # 4 of 7 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 20192020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020­2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020­2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020­2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020­2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020­2434 Mohr Power Thurin Residence Date: October 1, 20202020­2450 ESD 20­579 Sanchez Residence Date: October 2, 20202020­2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020­2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020­2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020­2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020­2495 Penguin Solar German Rios Residence Date: October 6, 20202020­2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020­2507 ESD 20­593 So Residence Date: October 7, 20202020­2515 Penguin Solar Black Annette Residence Date: October 7, 20202020­2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020­2525 New Power William Fuller Residence Date: October 8, 20202020­2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020­2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020­2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020­2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020­2591 ESD 20­590 Supulveda Residence Date: October 13, 20202020­2603 New Power John Yager Residence Date: October 14, 20202020­2603 New Power William Fuller Residence Date: October 14, 20202020­2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020­2652 Axis Solar Marcus Residence Date: October 15, 20202020­2652 Axis Solar Freimanis Residence Date: October 15, 20202020­2674 Complete Solar Dorado Residence Date: October 16, 20202020­2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020­2694 ESD 20­648 Barrera Residence Date: October 17, 20202020­2836 Penguin Solar Kalup Residence Date: October 26, 20202020­2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 20202020­2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020­2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020­2861 New Power Susan Bakken Residence Date: October 27, 20202020­2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020­2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020­2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020­2853 TG Roofing Brown Robert Residence Date: October 27, 20202020­2875 Trinity Power John Mendel Residence Date: October 28, 20202020­2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020­2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020­2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020­2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020­2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020­2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020­2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020­2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020­2915 Complete Solar Ojeda Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Walker Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon Services Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 29, 20202020­2940 Axis Solar Shook Date: October 30, 20202020­2963 Axis Solar Luke Ding Residence Date: October 31, 20202020­2959 Penguin Solar Stevens Residence Date: October 31, 20202020­2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020­2939 Mohr Power Pappillion Residence Date: October 31, 20202020­2983 Infinity Solar Gernazio Residence Date: November 3, 20202020­2982 Infinity Solar Luna Residence Date: November 3, 20202020­3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020­3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020­3062 UniverCity Solar Mantri Residence Date: November 6, 20202020­3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020­3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020­3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020­3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020­3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020­3052 ESD 20­747 Perez Residence Date: November 6, 20202020­3065 HPM Solar Torres Residence Date: November 6, 20202020­3085 20­729 Green Residence Date: November 8, 20202020­3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020­3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020­3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020­3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020­3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020­3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020­3235 Infinity Solar Dizon Residence Date: November 16, 20202020­3360 Axis Solar Hogan Residence Date: November 23, 20202020­3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020­3570 ESD 20­917 Hatter Residence Date: December 6, 20202020­3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020­3566 TG Roofing Morff Craig Residence Date: December 6, 20202020­3566 TG Roofing Craig Morff Residence Date: December 6, 20202020­3686 Bratton Solar Love Residence Date: December 14, 20202020­3682 New Power Shawn Johnson Date: December 14, 20202020­3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020­3707 Penguin Solar James Logan Residence Date: December 15, 20202020­3704 New Power Marite Cappelletti Residence Date: December 15, 20202020­3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020­3734 New Power Judith Park Residence Date: December 16, 20202020­3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020­3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020­3759 Mohr Power Smith Residence Date: December 17, 20202020­3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020­3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020­3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020­3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020­3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020­3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021­056 Solar Deployed Daphne Phung Residence Date: January 8, 2021 qh Check attachment of Support to Existing Structure for Wind Uplift ­ Cont'd Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­21 Tributary Area to Each Solar Mount = 4 ft. x 2.75 ft. = 11 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.4-7 ASCE 7-16 Kz = velocity pressure coefficient p =qh ðGC p ÞðγE Þðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 7-16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2022 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGC p ÞðγE Þðγa Þð qh =20 psf p = 20 psf (­2.0) (1.5) (0.7) = 42 psf Eq'n 26.10-1 ASCE 7-16 GCp = ­2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.4-8 ASCE 7-16 Design (Factored) Uplift at each support = 0.6 x 462 lbs = 277 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 11 sq. ft. = 462 lbs Note: Section 2.4.1 of ASCE 7-16, Basic Load Combinations for Allowable Stress Load per lag screw = 277 lbs / 1 = 277 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021­147 Better Earth Paul Garcia Residence Date: January 14, 20212021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 20212021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1214 Better Earth Brian Cook Residence Date: April 13, 20212021-1434 Asgard Electric Sanjay Rupani Residence Date: April 29, 20212021-2052 Green Conception Mike Lagrosas Residence Date: June 05, 20212022-051 Green Road Solar Shane Myers Residence Date: January 6, 20212022-3538 Solar Survey Pro 4566 W 118th Date: September 01, 20222023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-797 HPM Solar Micah Williams Residence Date: February 16, 20232023-1868 Solar Survey Ichiro Yamazaki Residence Date: March 24, 20232023-4228 Solar Survey Pro1653 South Mayland Residence Date: July 22, 20232023-4230 TG Roofing Nora Johnston Residence Date: July 22, 20232023-5449 Tenco Solar Paul Gulino Residence Date: November 08, 2023 2369 N Flower St - 2018158912/18/2023 Sht # 5 of 7 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 20192020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020­2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020­2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020­2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020 Check attachment of Support to Existing Structure for Wind Uplift ­ Cont'd Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2018 NDS. W ' = W x Cd x Ct Table 10.3.1 2018 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2018 NDS Ct = 1.0 per Table 10.3.4 of 2018 NDS W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 277 lbs OK Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3.5" lag screws per connection minimum. 2020­2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020­2434 Mohr Power Thurin Residence Date: October 1, 20202020­2450 ESD 20­579 Sanchez Residence Date: October 2, 20202020­2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020­2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020­2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020­2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020­2495 Penguin Solar German Rios Residence Date: October 6, 20202020­2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020­2507 ESD 20­593 So Residence Date: October 7, 20202020­2515 Penguin Solar Black Annette Residence Date: October 7, 20202020­2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020­2525 New Power William Fuller Residence Date: October 8, 20202020­2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020­2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020­2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020­2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020­2591 ESD 20­590 Supulveda Residence Date: October 13, 20202020­2603 New Power John Yager Residence Date: October 14, 20202020­2603 New Power William Fuller Residence Date: October 14, 20202020­2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020­2652 Axis Solar Marcus Residence Date: October 15, 20202020­2652 Axis Solar Freimanis Residence Date: October 15, 20202020­2674 Complete Solar Dorado Residence Date: October 16, 20202020­2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020­2694 ESD 20­648 Barrera Residence Date: October 17, 20202020­2836 Penguin Solar Kalup Residence Date: October 26, 20202020­2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 20202020­2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020­2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020­2861 New Power Susan Bakken Residence Date: October 27, 20202020­2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020­2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020­2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020­2853 TG Roofing Brown Robert Residence Date: October 27, 20202020­2875 Trinity Power John Mendel Residence Date: October 28, 20202020­2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020­2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020­2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020­2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020­2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020­2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020­2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020­2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020­2915 Complete Solar Ojeda Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Walker Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon Services Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 29, 20202020­2940 Axis Solar Shook Date: October 30, 20202020­2963 Axis Solar Luke Ding Residence Date: October 31, 20202020­2959 Penguin Solar Stevens Residence Date: October 31, 20202020­2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020­2939 Mohr Power Pappillion Residence Date: October 31, 20202020­2983 Infinity Solar Gernazio Residence Date: November 3, 20202020­2982 Infinity Solar Luna Residence Date: November 3, 20202020­3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020­3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020­3062 UniverCity Solar Mantri Residence Date: November 6, 20202020­3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020­3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020­3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020­3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020­3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020­3052 ESD 20­747 Perez Residence Date: November 6, 20202020­3065 HPM Solar Torres Residence Date: November 6, 20202020­3085 20­729 Green Residence Date: November 8, 20202020­3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020­3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020­3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020­3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020­3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020­3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020­3235 Infinity Solar Dizon Residence Date: November 16, 20202020­3360 Axis Solar Hogan Residence Date: November 23, 20202020­3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020­3570 ESD 20­917 Hatter Residence Date: December 6, 20202020­3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020­3566 TG Roofing Morff Craig Residence Date: December 6, 20202020­3566 TG Roofing Craig Morff Residence Date: December 6, 20202020­3686 Bratton Solar Love Residence Date: December 14, 20202020­3682 New Power Shawn Johnson Date: December 14, 20202020­3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020­3707 Penguin Solar James Logan Residence Date: December 15, 20202020­3704 New Power Marite Cappelletti Residence Date: December 15, 20202020­3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020­3734 New Power Judith Park Residence Date: December 16, 20202020­3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020­3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020­3759 Mohr Power Smith Residence Date: December 17, 20202020­3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020­3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020­3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020­3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020­3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020­3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021­056 Solar Deployed Daphne Phung Residence Date: January 8, 2021 Note: Zone 2 2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021­147 Better Earth Paul Garcia Residence Date: January 14, 20212021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 20212021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1214 Better Earth Brian Cook Residence Date: April 13, 20212021-1434 Asgard Electric Sanjay Rupani Residence Date: April 29, 20212021-2052 Green Conception Mike Lagrosas Residence Date: June 05, 20212022-051 Green Road Solar Shane Myers Residence Date: January 6, 20212022-3538 Solar Survey Pro 4566 W 118th Date: September 01, 20222023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-797 HPM Solar Micah Williams Residence Date: February 16, 20232023-1868 Solar Survey Ichiro Yamazaki Residence Date: March 24, 20232023-4228 Solar Survey Pro1653 South Mayland Residence Date: July 22, 20232023-4230 TG Roofing Nora Johnston Residence Date: July 22, 20232023-5449 Tenco Solar Paul Gulino Residence Date: November 08, 2023 2369 N Flower St - 2018158912/18/2023 Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Effective Existing Seismic Weight Area of (E) Building =Approximately 1,900 Sq. ft. Approximate Effective Seismic Weight =1,900 sq. ft. x 30 psf ave. = 57,000 LBS DETERMINE BASE SHEAR V = Cs W Cs = SDS R Ie R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2­1 R = 6.5 WOOD SHEAR WALLS Ie = 1.0 IMPORTANCE FACTOR SDS = 2/3 x SMS SMS = FA x SS SMS = 1.2 x 1.5 = 1.8 SDS = 2/3 x 1.8 = 1.2 Cs = 1.2 6.5 1 = 0.185 Sht # 6 of 7 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8-1 ASCE 7-16 EQ'N 12.8-2 ASCE 7-16 EQ'N 11.4-3 ASCE 7-16 EQ'N 11.4-1 ASCE 7-16 EQ'N 12.8-2 ASCE 7-16 2020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020­2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020­2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020­2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020­2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020­2434 Mohr Power Thurin Residence Date: October 1, 20202020­2450 ESD 20­579 Sanchez Residence Date: October 2, 20202020­2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020­2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020­2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020­2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020­2495 Penguin Solar German Rios Residence Date: October 6, 20202020­2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020­2507 ESD 20­593 So Residence Date: October 7, 20202020­2515 Penguin Solar Black Annette Residence Date: October 7, 20202020­2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020­2525 New Power William Fuller Residence Date: October 8, 20202020­2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020­2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020­2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020­2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020­2591 ESD 20­590 Supulveda Residence Date: October 13, 20202020­2603 New Power John Yager Residence Date: October 14, 20202020­2603 New Power William Fuller Residence Date: October 14, 20202020­2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020­2652 Axis Solar Marcus Residence Date: October 15, 20202020­2652 Axis Solar Freimanis Residence Date: October 15, 20202020­2674 Complete Solar Dorado Residence Date: October 16, 20202020­2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020­2694 ESD 20­648 Barrera Residence Date: October 17, 20202020­2836 Penguin Solar Kalup Residence Date: October 26, 20202020­2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 20202020­2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020­2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020­2861 New Power Susan Bakken Residence Date: October 27, 20202020­2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020­2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020­2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020­2853 TG Roofing Brown Robert Residence Date: October 27, 20202020­2875 Trinity Power John Mendel Residence Date: October 28, 20202020­2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020­2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020­2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020­2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020­2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020­2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020­2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020­2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020­2915 Complete Solar Ojeda Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Walker Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon Services Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 30, 20202020­2938 ESD 20­610 Sisto ­ RNR Date: October 30, 20202020­2940 Axis Solar Shook Date: October 30, 20202020­2963 Axis Solar Luke Ding Residence Date: October 31, 20202020­2959 Penguin Solar Stevens Residence Date: October 31, 20202020­2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020­2939 Mohr Power Pappillion Residence Date: October 31, 20202020­2983 Infinity Solar Gernazio Residence Date: November 3, 20202020­2982 Infinity Solar Luna Residence Date: November 3, 20202020­3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020­3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020­3062 UniverCity Solar Mantri Residence Date: November 6, 20202020­3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020­3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020­3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020­3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020­3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020­3052 ESD 20­747 Perez Residence Date: November 6, 20202020­3065 HPM Solar Torres Residence Date: November 6, 20202020­3085 20­729 Green Residence Date: November 8, 20202020­3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020­3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020­3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020­3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020­3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020­3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020­3235 Infinity Solar Dizon Residence Date: November 16, 20202020­3360 Axis Solar Hogan Residence Date: November 23, 20202020­3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020­3570 ESD 20­917 Hatter Residence Date: December 6, 20202020­3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020­3566 TG Roofing Morff Craig Residence Date: December 6, 20202020­3566 TG Roofing Craig Morff Residence Date: December 6, 20202020­3686 Bratton Solar Love Residence Date: December 14, 20202020­3682 New Power Shawn Johnson Date: December 14, 20202020­3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020­3707 Penguin Solar James Logan Residence Date: December 15, 20202020­3704 New Power Marite Cappelletti Residence Date: December 15, 20202020­3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020­3734 New Power Judith Park Residence Date: December 16, 20202020­3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020­3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020­3759 Mohr Power Smith Residence Date: December 17, 20202020­3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020­3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020­3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020­3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020­3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020­3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021­056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021­147 Better Earth Paul Garcia Residence Date: January 14, 20212021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 20212021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1214 Better Earth Brian Cook Residence Date: April 13, 20212021-1434 Asgard Electric Sanjay Rupani Residence Date: April 29, 20212021-2052 Green Conception Mike Lagrosas Residence Date: June 05, 20212022-051 Green Road Solar Shane Myers Residence Date: January 6, 20212022-3538 Solar Survey Pro 4566 W 118th Date: September 01, 20222023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-797 HPM Solar Micah Williams Residence Date: February 16, 20232023-1868 Solar Survey Ichiro Yamazaki Residence Date: March 24, 20232023-4228 Solar Survey Pro1653 South Mayland Residence Date: July 22, 20232023-4230 TG Roofing Nora Johnston Residence Date: July 22, 20232023-5449 Tenco Solar Paul Gulino Residence Date: November 08, 2023 2369 N Flower St - 2018158912/18/2023 V = 0.185 x 57,000 LBS = 10,545 LBS DETERMINE NEW BASE SHEAR EXISTING BASE SHEAR Determine Seismic Weight of Building with Solar Array: EXISTING SEISMIC WEIGHT =57,000 LBS NEW SOLAR ARRAY =3 PSF x 7 PANELS x 3.3' x 5.5' = 381 LBS NEW SEISMIC WEIGHT =57,000 LBS + 381 LBS = 57,381 LBS THEREFORE NEW BASE SHEAR: V = 0.185 x 57,381 = 10,616 LBS % CHANGE =10,616 LBS - 10,545 LBS 10,545 LBS x 100 =1.0 % < 10% OK Sht # 6.1 of 7 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8-1 ASCE 7-16 EQ'N 12.8-1 ASCE 7-16 OK. PER ASCE 7-22 SECTION 11.B.3 ALTERATIONS 2020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020­2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020­2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020­2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020­2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020­2434 Mohr Power Thurin Residence Date: October 1, 20202020­2450 ESD 20­579 Sanchez Residence Date: October 2, 20202020­2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020­2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020­2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020­2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020­2495 Penguin Solar German Rios Residence Date: October 6, 20202020­2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020­2507 ESD 20­593 So Residence Date: October 7, 20202020­2515 Penguin Solar Black Annette Residence Date: October 7, 20202020­2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020­2525 New Power William Fuller Residence Date: October 8, 20202020­2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020­2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020­2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020­2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020­2591 ESD 20­590 Supulveda Residence Date: October 13, 20202020­2603 New Power John Yager Residence Date: October 14, 20202020­2603 New Power William Fuller Residence Date: October 14, 20202020­2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020­2652 Axis Solar Marcus Residence Date: October 15, 20202020­2652 Axis Solar Freimanis Residence Date: October 15, 20202020­2674 Complete Solar Dorado Residence Date: October 16, 20202020­2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020­2694 ESD 20­648 Barrera Residence Date: October 17, 20202020­2836 Penguin Solar Kalup Residence Date: October 26, 20202020­2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 20202020­2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020­2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020­2861 New Power Susan Bakken Residence Date: October 27, 20202020­2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020­2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020­2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020­2853 TG Roofing Brown Robert Residence Date: October 27, 20202020­2875 Trinity Power John Mendel Residence Date: October 28, 20202020­2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020­2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020­2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020­2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020­2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020­2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020­2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020­2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020­2915 Complete Solar Ojeda Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Walker Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon Services Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 30, 20202020­2938 ESD 20­610 Sisto ­ RNR Date: October 30, 20202020­2940 Axis Solar Shook Date: October 30, 20202020­2963 Axis Solar Luke Ding Residence Date: October 31, 20202020­2959 Penguin Solar Stevens Residence Date: October 31, 20202020­2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020­2939 Mohr Power Pappillion Residence Date: October 31, 20202020­2983 Infinity Solar Gernazio Residence Date: November 3, 20202020­2982 Infinity Solar Luna Residence Date: November 3, 20202020­3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020­3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020­3062 UniverCity Solar Mantri Residence Date: November 6, 20202020­3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020­3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020­3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020­3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020­3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020­3052 ESD 20­747 Perez Residence Date: November 6, 20202020­3065 HPM Solar Torres Residence Date: November 6, 20202020­3085 20­729 Green Residence Date: November 8, 20202020­3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020­3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020­3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020­3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020­3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020­3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020­3235 Infinity Solar Dizon Residence Date: November 16, 20202020­3360 Axis Solar Hogan Residence Date: November 23, 20202020­3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020­3570 ESD 20­917 Hatter Residence Date: December 6, 20202020­3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020­3566 TG Roofing Morff Craig Residence Date: December 6, 20202020­3566 TG Roofing Craig Morff Residence Date: December 6, 20202020­3686 Bratton Solar Love Residence Date: December 14, 20202020­3682 New Power Shawn Johnson Date: December 14, 20202020­3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020­3707 Penguin Solar James Logan Residence Date: December 15, 20202020­3704 New Power Marite Cappelletti Residence Date: December 15, 20202020­3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020­3734 New Power Judith Park Residence Date: December 16, 20202020­3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020­3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020­3759 Mohr Power Smith Residence Date: December 17, 20202020­3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020­3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020­3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020­3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020­3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021­056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021­147 Better Earth Paul Garcia Residence Date: January 14, 20212021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 20212021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1214 Better Earth Brian Cook Residence Date: April 13, 20212021-1434 Asgard Electric Sanjay Rupani Residence Date: April 29, 20212021-2052 Green Conception Mike Lagrosas Residence Date: June 05, 20212022-051 Green Road Solar Shane Myers Residence Date: January 6, 20212022-3538 Solar Survey Pro 4566 W 118th Date: September 01, 20222023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-797 HPM Solar Micah Williams Residence Date: February 16, 20232023-1868 Solar Survey Ichiro Yamazaki Residence Date: March 24, 20232023-4228 Solar Survey Pro1653 South Mayland Residence Date: July 22, 2023 OK. PER ASCE 7-16 SECTION 11B.4 ALTERATIONS EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE "Alterations may be made to any structure without requiring the existing structure to comply with this standard, provided that the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10% or decrease the design strength of any existing structural element to resist seismic forces by more than 10% shall not be permitted unless the entire seismic force-resisting system is determined to comply with this standard for a new structure." 2023-4230 TG Roofing Nora Johnston Residence Date: July 22, 20232023-5449 Tenco Solar Paul Gulino Residence Date: November 08, 2023 2369 N Flower St - 2018158912/18/2023 Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Detached Structure Effective Existing Seismic Weight Area of (E) Building =Approximately 300 Sq. ft. Approximate Effective Seismic Weight =300 sq. ft. x 20 psf ave. = 6,000 LBS DETERMINE BASE SHEAR V = Cs W Cs = SDS R Ie R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2­1 R = 6.5 WOOD SHEAR WALLS Ie = 1.0 IMPORTANCE FACTOR SDS = 2/3 x SMS SMS = FA x SS SMS = 1.2 x 1.5 = 1.8 SDS = 2/3 x 1.8 = 1.2 Cs = 1.2 6.5 1 = 0.185 Sht # 6.2 of 7 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8-1 ASCE 7-16 EQ'N 12.8-2 ASCE 7-16 EQ'N 11.4-3 ASCE 7-16 EQ'N 11.4-1 ASCE 7-16 EQ'N 12.8-2 ASCE 7-16 2020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020­2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020­2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020­2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020­2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020­2434 Mohr Power Thurin Residence Date: October 1, 20202020­2450 ESD 20­579 Sanchez Residence Date: October 2, 20202020­2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020­2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020­2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020­2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020­2495 Penguin Solar German Rios Residence Date: October 6, 20202020­2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020­2507 ESD 20­593 So Residence Date: October 7, 20202020­2515 Penguin Solar Black Annette Residence Date: October 7, 20202020­2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020­2525 New Power William Fuller Residence Date: October 8, 20202020­2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020­2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020­2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020­2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020­2591 ESD 20­590 Supulveda Residence Date: October 13, 20202020­2603 New Power John Yager Residence Date: October 14, 20202020­2603 New Power William Fuller Residence Date: October 14, 20202020­2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020­2652 Axis Solar Marcus Residence Date: October 15, 20202020­2652 Axis Solar Freimanis Residence Date: October 15, 20202020­2674 Complete Solar Dorado Residence Date: October 16, 20202020­2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020­2694 ESD 20­648 Barrera Residence Date: October 17, 20202020­2836 Penguin Solar Kalup Residence Date: October 26, 20202020­2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 20202020­2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020­2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020­2861 New Power Susan Bakken Residence Date: October 27, 20202020­2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020­2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020­2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020­2853 TG Roofing Brown Robert Residence Date: October 27, 20202020­2875 Trinity Power John Mendel Residence Date: October 28, 20202020­2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020­2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020­2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020­2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020­2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020­2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020­2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020­2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020­2915 Complete Solar Ojeda Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Walker Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon Services Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 30, 20202020­2938 ESD 20­610 Sisto ­ RNR Date: October 30, 20202020­2940 Axis Solar Shook Date: October 30, 20202020­2963 Axis Solar Luke Ding Residence Date: October 31, 20202020­2959 Penguin Solar Stevens Residence Date: October 31, 20202020­2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020­2939 Mohr Power Pappillion Residence Date: October 31, 20202020­2983 Infinity Solar Gernazio Residence Date: November 3, 20202020­2982 Infinity Solar Luna Residence Date: November 3, 20202020­3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020­3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020­3062 UniverCity Solar Mantri Residence Date: November 6, 20202020­3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020­3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020­3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020­3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020­3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020­3052 ESD 20­747 Perez Residence Date: November 6, 20202020­3065 HPM Solar Torres Residence Date: November 6, 20202020­3085 20­729 Green Residence Date: November 8, 20202020­3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020­3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020­3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020­3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020­3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020­3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020­3235 Infinity Solar Dizon Residence Date: November 16, 20202020­3360 Axis Solar Hogan Residence Date: November 23, 20202020­3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020­3570 ESD 20­917 Hatter Residence Date: December 6, 20202020­3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020­3566 TG Roofing Morff Craig Residence Date: December 6, 20202020­3566 TG Roofing Craig Morff Residence Date: December 6, 20202020­3686 Bratton Solar Love Residence Date: December 14, 20202020­3682 New Power Shawn Johnson Date: December 14, 20202020­3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020­3707 Penguin Solar James Logan Residence Date: December 15, 20202020­3704 New Power Marite Cappelletti Residence Date: December 15, 20202020­3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020­3734 New Power Judith Park Residence Date: December 16, 20202020­3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020­3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020­3759 Mohr Power Smith Residence Date: December 17, 20202020­3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020­3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020­3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020­3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020­3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020­3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021­056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021­147 Better Earth Paul Garcia Residence Date: January 14, 20212021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 20212021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1214 Better Earth Brian Cook Residence Date: April 13, 20212021-1434 Asgard Electric Sanjay Rupani Residence Date: April 29, 20212021-2052 Green Conception Mike Lagrosas Residence Date: June 05, 20212022-051 Green Road Solar Shane Myers Residence Date: January 6, 20212022-3538 Solar Survey Pro 4566 W 118th Date: September 01, 20222023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-797 HPM Solar Micah Williams Residence Date: February 16, 20232023-1868 Solar Survey Ichiro Yamazaki Residence Date: March 24, 20232023-4228 Solar Survey Pro1653 South Mayland Residence Date: July 22, 20232023-4230 TG Roofing Nora Johnston Residence Date: July 22, 20232023-5449 Tenco Solar Paul Gulino Residence Date: November 08, 2023 2369 N Flower St - 2018158912/18/2023 V = 0.185 x 6,000 LBS = 1,110 LBS DETERMINE NEW BASE SHEAR EXISTING BASE SHEAR Determine Seismic Weight of Building with Solar Array: EXISTING SEISMIC WEIGHT =6,000 LBS NEW SOLAR ARRAY =3 PSF x 4 PANELS x 3.3' x 5.5' = 218 LBS NEW SEISMIC WEIGHT =6,000 LBS + 218 LBS = 6,218 LBS THEREFORE NEW BASE SHEAR: V = 0.185 x 6,218 = 1,150 LBS % CHANGE =1,150 LBS - 1,110 LBS 1,110 LBS x 100 =1.0 % < 10% OK End of Calculations Sht # 7 of 7 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8-1 ASCE 7-16 EQ'N 12.8-1 ASCE 7-16 OK. PER ASCE 7-22 SECTION 11.B.3 ALTERATIONS 2020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020­2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020­2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020­2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020­2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020­2434 Mohr Power Thurin Residence Date: October 1, 20202020­2450 ESD 20­579 Sanchez Residence Date: October 2, 20202020­2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020­2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020­2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020­2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020­2495 Penguin Solar German Rios Residence Date: October 6, 20202020­2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020­2507 ESD 20­593 So Residence Date: October 7, 20202020­2515 Penguin Solar Black Annette Residence Date: October 7, 20202020­2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020­2525 New Power William Fuller Residence Date: October 8, 20202020­2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020­2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020­2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020­2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020­2591 ESD 20­590 Supulveda Residence Date: October 13, 20202020­2603 New Power John Yager Residence Date: October 14, 20202020­2603 New Power William Fuller Residence Date: October 14, 20202020­2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020­2652 Axis Solar Marcus Residence Date: October 15, 20202020­2652 Axis Solar Freimanis Residence Date: October 15, 20202020­2674 Complete Solar Dorado Residence Date: October 16, 20202020­2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020­2694 ESD 20­648 Barrera Residence Date: October 17, 20202020­2836 Penguin Solar Kalup Residence Date: October 26, 20202020­2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 20202020­2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020­2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020­2861 New Power Susan Bakken Residence Date: October 27, 20202020­2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020­2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020­2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020­2853 TG Roofing Brown Robert Residence Date: October 27, 20202020­2875 Trinity Power John Mendel Residence Date: October 28, 20202020­2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020­2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020­2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020­2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020­2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020­2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020­2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020­2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020­2915 Complete Solar Ojeda Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Walker Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon Services Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 30, 20202020­2938 ESD 20­610 Sisto ­ RNR Date: October 30, 20202020­2940 Axis Solar Shook Date: October 30, 20202020­2963 Axis Solar Luke Ding Residence Date: October 31, 20202020­2959 Penguin Solar Stevens Residence Date: October 31, 20202020­2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020­2939 Mohr Power Pappillion Residence Date: October 31, 20202020­2983 Infinity Solar Gernazio Residence Date: November 3, 20202020­2982 Infinity Solar Luna Residence Date: November 3, 20202020­3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020­3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020­3062 UniverCity Solar Mantri Residence Date: November 6, 20202020­3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020­3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020­3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020­3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020­3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020­3052 ESD 20­747 Perez Residence Date: November 6, 20202020­3065 HPM Solar Torres Residence Date: November 6, 20202020­3085 20­729 Green Residence Date: November 8, 20202020­3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020­3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020­3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020­3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020­3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020­3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020­3235 Infinity Solar Dizon Residence Date: November 16, 20202020­3360 Axis Solar Hogan Residence Date: November 23, 20202020­3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020­3570 ESD 20­917 Hatter Residence Date: December 6, 20202020­3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020­3566 TG Roofing Morff Craig Residence Date: December 6, 20202020­3566 TG Roofing Craig Morff Residence Date: December 6, 20202020­3686 Bratton Solar Love Residence Date: December 14, 20202020­3682 New Power Shawn Johnson Date: December 14, 20202020­3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020­3707 Penguin Solar James Logan Residence Date: December 15, 20202020­3704 New Power Marite Cappelletti Residence Date: December 15, 20202020­3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020­3734 New Power Judith Park Residence Date: December 16, 20202020­3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020­3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020­3759 Mohr Power Smith Residence Date: December 17, 20202020­3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020­3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020­3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020­3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020­3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021­056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021­147 Better Earth Paul Garcia Residence Date: January 14, 20212021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 20212021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1173 Better Earth Julian Gomez Residence Date: April 09, 20212021-1214 Better Earth Brian Cook Residence Date: April 13, 20212021-1434 Asgard Electric Sanjay Rupani Residence Date: April 29, 20212021-2052 Green Conception Mike Lagrosas Residence Date: June 05, 20212022-051 Green Road Solar Shane Myers Residence Date: January 6, 20212022-3538 Solar Survey Pro 4566 W 118th Date: September 01, 20222023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-797 HPM Solar Micah Williams Residence Date: February 16, 20232023-1868 Solar Survey Ichiro Yamazaki Residence Date: March 24, 20232023-4228 Solar Survey Pro1653 South Mayland Residence Date: July 22, 2023 OK. PER ASCE 7-16 SECTION 11B.4 ALTERATIONS EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE "Alterations may be made to any structure without requiring the existing structure to comply with this standard, provided that the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10% or decrease the design strength of any existing structural element to resist seismic forces by more than 10% shall not be permitted unless the entire seismic force-resisting system is determined to comply with this standard for a new structure." 2023-4230 TG Roofing Nora Johnston Residence Date: July 22, 20232023-5449 Tenco Solar Paul Gulino Residence Date: November 08, 2023 2369 N Flower St - 2018158912/18/2023 Sht #R1 Determine Loading on Roof Rafters Dead Loads with Panels: Comp. Shingle Roofing =4.0 psf 1/2 Sheathing =1.5 psf =0.7 psf 5/8" Drywall =3.1 psf Misc. / Insul =1.0 psf Dead Load w/ DL Corr. (1.05) =10.3 psf =10.8 psf Total Load =10.8 psf Solar Array = 3.0 psf (Note: Solar Loads are point loads on members) 2x4 Rafters @ 24" O.C. Total Load with Solar Array =13.8 psf < 30.8 psf OK Dead and Live Loads without Panels: Comp. Shingle Roofing =4.0 psf 1/2 Sheathing =1.5 psf =0.7 psf 5/8" Drywall =3.1 psf Misc. / Insul =1.0 psf Dead Load w/ DL Corr. (1.05) =10.3 psf =10.8 psf Live Load =20.0 psf Total Load =30.8 psf 2x4 Rafters @ 24" O.C. 2018­242 Complete Solar Rosa N Nolasco Residence Date: January 26, 20182018­385 Sungrade Solar Schuyler Wrobel Residence Date: February 8, 20182018­385 Sungrade Solar Schuyler Wrobel Residence Date: February 8, 20182019­2397 Sunrise Solar Design Sau Chy Residence Date: July 29, 2019 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2019­3033 ilum Solar Davila Residence Date: September 12, 20192019­3361 HPM Solar Soto Residence Date: October 3, 20192019­3361 HPM Solar Tat Mau Residence Date: October 5, 20192019­4096 HPM Kerley Residence Date: November 18, 20192019­4094 ESD 19­899 Zellner Residence Date: November 18, 20192019­4094 ESD 19­899 Zellner Residence Date: January 13, 20202020­426 Precis Solar Daniel Moreno Residence Date: February 19, 20202020­494 TG Roofing Venegas Residence Date: February 26, 20202020­731 Sasha Intl Basil Younes Residence Date: March 24, 20202020­731 Sasha Intl Basil Younes Residence Date: March 24, 20202020­770 TG Roofing Gil Ramirez Residence Date: March 31, 20202020­879 Solar Journey Ryan Rouzan Residence Date: April 20, 20202020­983 Solar Journey Leah Carlo Noble Residence Date: May 7, 20202020­1124 HPM Solar Bishara Residence Date: May 29, 20202020­1177 Solar Journey Chase Madrid Residence Date: June 8, 20202020­1256 Precis Solar Don Schultz Residence Date: June 16, 20202020­1311 Precis Solar Mike Hansen Residence Date: June 20, 20202020­1311 Precis Solar Mike Hansen Residence Date: June 20, 20202020­1461 NRG Clean Power Chin Residence Date: July 7, 20202020­1541 TG Roofing David Gongora Residence Date: July 15, 20202020­1693 ACS Landaverde Residence Date: August 3, 20202020­2180 Precis Solar Espinoza Residence Date: September 15, 20202020­2315 HPM Solar Dan Moncayo Residence Date: September 23, 20202020­2313 Precis Solar Divine Delarea Residence Date: September 23, 20202020­2452 HPM Solar Andersen Residence Date: October 2, 20202020­2511 Cali Solar Group Joshua Hillmer Residence Date: October 7, 20202020­2671 HPM Solar Hernandez Residence Date: October 16, 20202020­2695 ESD 20­651 Davey Residence Date: October 17, 20202020­3833 Infinity Solar Diane & Hilda Koch Residence Date: December 23, 20202020­3893 ESD 20­962 Bak Residence Date: December 30, 20202020­3892 ESD 20­1007 Cho Residence Date: December 30, 20202020­3892 ESD 20­1007 Cho Residence Date: December 30, 20202020­3892 ESD 20­1007 Cho Residence Date: December 30, 20202021­051 Precis Solar Juan Guzman Residence Date: January 7, 20212021­147 Better Earth Paul Garcia Residence Date: January 14, 20212021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-593 Better Earth Jason Esposito Residence Date: February 20, 20212021-724 Better Earth Donna Moore Residence Date: March 03, 20212021-809 Better Earth Francesco Signorini Residence Date: March 10, 20212021-1096 Solar Deployed Sonjia Mata Residence Date: April 02, 20212021-1434 Asgard Electric Sanjay Rupani Residence Date: April 29, 20212021-2052 Green Conception Mike Lagrosas Residence Date: June 05, 20212022-051 Green Road Solar Shane Myers Residence Date: January 6, 20212022-3538 Solar Survey Pro 4566 W 118th Date: September 01, 20222023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-797 HPM Solar Micah Williams Residence Date: February 16, 20232023-1868 Solar Survey Ichiro Yamazaki Residence Date: March 24, 20232023-4228 Solar Survey Pro1653 South Mayland Residence Date: July 22, 20232023-4230 TG Roofing Nora Johnston Residence Date: July 22, 20232023-5449 Tenco Solar Paul Gulino Residence Date: November 08, 2023 2369 N Flower St - 2018158912/18/2023