Loading...
HomeMy WebLinkAbout2334 N Westwood Ave - PlanPROJECT SCOPE PROJECT DATA NOTES GENERAL PHOTOVOLTAIC NOTES: DRAWING INDEX: M INV SP AC 101 101A SYMBOL LEGEND 1 101 STANDOFF TYPE FLASHING TYPE 1 15# ASTM-1 M1 SEALANT ROOF TYPE CONDITION RACKING GOOD IRON RIDGE ROOF INFORMATION PV-1 TITLE SHEET PV-2 SITE PLAN PV-3 SOLAR MODULE MOUNTING DETAIL PV-4 SINGLE LINE ELECTRICAL PV-5 NEC 690 PLACARDS INSTALLATION OF A GRID-TIED, PHOTOVOLTAIC SYSTEM SECTIONS REVISION TRUE NORTH ADJUSTED FOR MAGNETIC DECLINATION ROOM NUMBER DOOR NUMBER ROOF SLOPE MAIN SERVICE PANEL INVERTER SUB PANEL AC DISCONNECT CHIMNEY PROPERTY LINE LADDER ACCESS POINTS 2 12 CONTRACTOR: SMART SOLAR DESIGN PHONE: 858-243-4059 CLASS B LICENSE #: 1016878 CLASS C-10 LICENSE #: 999378 1. THIS PROJECT SHALL COMPLY WITH THE 2019 CALIFORNIA BUILDING CODE, 2019 CRC/TITLE 24, 2019 UPC, 2019 UMC, 2019 UMC, 2019 CEC AND ALL APPLICABLE JURISDICTION AND MUNICIPAL CODES AND ORDINANCES AND THE CAL FIRE CODES. 2. SOLAR PV MODULES ARE MOUNTED FLUSH TO THE ROOF PLANE UNLESS OTHERWISE NOTED. 3. SOLAR PV MODULES ARE NON-REFLECTIVE IN NATURE. 4. NEC 690.53 COMPLIANCE (SEE SHEET PV-5 FOR PLACARD DETAIL) 5. MAIN SERVICE DISCONNECT MARKING/PLACARDS TO BE INSTALLED AT METER PER NEC 690.56 (SEE SHEET PV-5 FOR DETAIL) 6. X=+-6',-X*X=+-6"- EQUIPMENT SCHEDULE A. I hereby acknowledge that I am the responsible design professional for this project and that I am accountable for knowing and complying with the governing polices, regulations and code requirements applicable to this installation. B. I hereby acknowledge that maintaining my Professional Certification privilege requires accuarte plans and installations on a consistent basis. C. As the responsible professional, I have taken the Professional Certification class and have been placed on the approved list for plan review of Solar PV Professional Certification. D. With this submittal, I confirm that the plans and documents submitted for approval comply with the governing polices, regulations, and code requirements that are applicable to the proposed installation. I understand that, if installation deviates from the requirements inn section IV, a construction change may be required and final approval will be delayed. I also understand that submitting inaccurate plans and installations may result in the revocation of my Professional Certification privelage for one year. E. Certification appliance to certain cities only. CERTIFICATION LANGUAGE Courtland and Anne Alex 2334 N. Westwood Ave. Santa Ana, CA 92706 GRID-TIED ROOF MOUNTED PHOTOVOLTAIC SYSTEM STANDARD PV EQUIPMENT LISTED ON PV-4 OTHER EQUIPMENT: IRON RIDGE XR-10 RAIL W/ IRONRIDGE UFO CLAMPS (A/R) 35mm DWG NO. X: 2022. DATE: DRAWN BY: LKM 0-Title DR A W I N G CO N T R A C T O R CL I E N T / S I T E D A T A AP N : SI Z E RE V I S I O N S TITLE SHEET Ll o y d M i l l s S m a r t S o l a r D e s i g n L I C E N S E D 1016878 999378 G E N E R A L C ON T R A C T O R STATE OF CALIFORNIA DESIGN .BU I LD DESIG N B U I L D.ST ATE OF CALIFORNIA L I C E N SED G E N E R A L C ON T R A C T O R LLOY D P M I LL S LLOY D P M I L L S 12.48kWDC 7.54kWAC 00 . 1 1 7 . 2 2 3 Co u r t l a n d a n d A n n e A l e x 23 3 4 N . W e s t w o o d A v e . Sa n t a A n a , CA 9 2 7 0 6 10/09/2022 SHINGLE ROOF TECH STANDOFF Date Certified and Exp. Date : 3/31/2024 Signed:10/31/2022 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (747) 333-5991 Bldg permit # 101112623 Elect permit # 20177843 Permits issued on 11/10/22 2334 N Westwood Ave11/14/22 Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 2334 N Westwood Ave11/14/22 Expedited Permit Process for PV Systems — Micro-Inverter2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 2334 N Westwood Ave11/14/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan                                                       Smart Solar Design Courtland 2334 N. Westwood Ave. 7.54 2334 N Westwood Ave11/14/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT Enphase Q Cable ` 9 Smart Solar Design Courtland 7.54 2334 N. Westwood Ave. 2334 N Westwood Ave11/14/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone: Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO- INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram Smart Solar Design Courtland 2334 N. Westwood Ave. 7.54 2334 N Westwood Ave11/14/22 9630 Black Mountain Rd Ste H. San Diego, CA 92126 858-243- 4059 7/21/2022 Smart Solar Design is permitted by the homeowner to install solar panels on 2605 N. Westwood Ave Santa Ana, California. Name (Print): ________________________ Signature: ________________________ DocuSign Envelope ID: 644E95D8-842C-408B-9840-8448B30BC332 Carolyn Snyder 10/18/22 2334 N. Westwood Ave. Santa Ana, CA 92706. DocuSign Envelope ID: B992B00C-E9E8-41A7-9BB7-A30083F9E6A3 Courtland Alex 2334 N Westwood Ave11/14/22 Date: 10/31/2022 Job Number: 11051 Prepared for : Lloyd Mills Smart Solar Design, - Project.: Courtland and Anne Alex , 2334 N. Westwood Ave., Santa Ana, CA, 92706 The following calculations are for the structural engineering design of the photovoltaic panels and are valid only for the structural info referenced in the stamped plan set. The verification of such info is the responsibility of others. After review, I certify that the roof structure has sufficient structural capacity for the applied PV loads. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. Engineerinc.io 303 N Glenoaks Blvd Suite 200 Burbank, CA 91502 (747) 333 - 5991 new@engineerinc.io Date Certified and Signed: 10/31/2022 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 2334 N Westwood Ave11/14/22 Solar Module Details Module Type Q-Cell Module Quantity 26 Module Model Number Q.PEAK DUO XL10.3 BFG 480 Design Criteria Code: 2019 California Building Code ASCE 7-16 Live Load (psf)20 Ult Wind Speed (mph)120 Exposure Cat C Ground Snow (psf)5 Structure Geometry Eave Height, he (ft)15 to 20ft Pitch of main roof (deg)20 Building Length, L (ft)110 Building Width, B (ft)70 Roof Area (Module Area) ft2 7700.00 Standoff(i.e., Roof Mount) Spacing Feet 6` Roof Properties Roof Geometry type Mono Slope Roof Roof Type Single Span Rafter Roof Pitch (deg)20 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 2334 N Westwood Ave11/14/22 Roofing Type Comp Shingles Sheathing Type 1/2" OSB Board Wood species No. 2, Douglas Fir-Larch Wood Fb (psf)900 Wood Fv (psf)180 Wood E (psf)1600000 Purlin C/C Spacing (in)12 Rafter C/C. Spacing (in.)24 Purlin Section Thickness, b (in.)2 Section Depth, d (in.)4 Rafter Section Thickness, b (in.)2 Section Depth, d (in.)4 Maximum Rafter Span (ft)7 Factors Cd(wind)1.60 Cd(Snow)1.60 CLS 1.15 CM 1 Ct 1 CL 0.75 CF 1.5 Cfu 1 Cv 1 Cr 1 M allowable_wind 413.44 M allowable_snow 297.16 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 2334 N Westwood Ave11/14/22 Dead Load(psf) Comp Shingles 3.00 psf 1/2" OSB Board 2.00 psf Insulation 2.00 psf Total Roof 1DL 7 psf No. 2, Douglas Fir-Larch 31.00 lb/ft3 Solar Panel DL 3.00 psf Roof 1 Roof_Dist_DL 7.00 psf M_Roof_Dist_DL 4545.73 Def_Roof_Dist_DL 2.71 PV_uni_Dist_DL 3.00 psf M_PV_uni_Dist_DL 10.54 Def_PV_uni_Dist_DL 0.01 Total_Uni_DL 11.00 psf M_Total_DL 4556.27 Def_Total_DL 2.71 Snow Load(psf) Ground Snow Load, pg 5 Importance Factor, Ic 1 Thermal Factor, Ct 1 Exposure Factor, Ce 1 Flat roof snow, pF 5 Slope Factor, Cs 1 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 2334 N Westwood Ave11/14/22 Sloped Row Snow, ps 5 Uni_Dist_S 5.00 M_uni_Dist_s 30.63 Def_uni_Dist_S 0.02 Wind Load Ultimate Wind Speed 120 Directionality Factor,kd 0.85 Topographic factor 1.00 Velocity pressure exposure factor,kz 0.88 Ground Elevation Factor,ke 0.87 Side Wall Width 70 Median Roof Height 95.80 Velocity pressure,qz 27.57 External Pressure Up,GCp_1 -0.596 External Pressure Up,GCp_2 -0.6 External Pressure Up,GCp_3 -1.196 External Pressure Down,GCp -0.0812 Design Pressure Up,p_1 -13.74 Design Pressure Up,p_2 -13.83 Design Pressure Up,p_3 -27.57 Design Pressure Up,p -1.87 Uni_Dist_W_up -27.57 M_uni_Dist_W_up -168.87 Def_uni_Dist_W_up -0.10 Uni_Dist_W_down -1.87 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 2334 N Westwood Ave11/14/22 M_uni_Dist_W_down -11.45 Def_uni_Dist_W_down -0.01 Lag Screw Uplift Check (ASD) 5/16" Lag Screw Withdrawl value 205.00 lb/in Lag Screw Penetration 2.50 in Roof1 0.6D+0.6W(up z1)3108.828 > 512.5 Roof1 0.6D+0.6W(up z2)3108.774 > 512.5 Framing Check (ASD): Roof1 uni 1.0D+0.6W 4556.27 > 413.44 Lag Screw Penetration 4579.24 > 413.44 Roof1 0.6D+0.6W(up z1)4586.90 > 297.16 Roof1 0.6D+0.6W(up z2)2632.44 > 413.44 Seismic Check: Wood 5.00 psf 2x4 Studs @ 16"2.00 psf Gypsum 3.00 psf Misc(insulatioon,etc)2.00 psf Total wall DL 12.00 psf Total Wall Area (Approx)3290.00 ft2 Total Wall W 39480 lbs Total Roof DL 7.50 psf Total Roof Area (Approx)1787.70 ft2 Total Roof W 13407.75 lbs 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 2334 N Westwood Ave11/14/22 OK PV Panel W 3.00 psf Area of panel 520.00 ft2 Total Roof W 1072.62 lbs % increase=(Wadditional)/Wexisting 2.18% The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. Limits of Scope of Work and Liability Existing structure is assumed to have been designed and constructed following appropriate codes at time of erection, and assumed to have appropriate permits. The calculations produced are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were completed according to generally recognized structural analysis standards and procedures, professional engineering and design experience, opinions and judgements. Existing deficiencies which are unknown or were not observable during time of inspection are not included in this scope of work. All PV modules, racking, and mounting equipment shall be designed and installed per manufacturer's approved installation specifications. The Engineer of Record and Engineerinc assume no responsibility for misuse or improper installation. This analysis is not stamped for water leakage. Framing was determined based on information in provided plans and/or photos, along with engineering judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any concerns prior to starting construction. Prior to the commencement of work, the contractor shall verify the existing roof and framing conditions. Notify Engineerinc and the engineer of record of any Discrepancies prior to starting construction. Prior to the commencement of work, the contractor shall inspect framing for any damage such as water damage, cracked framing, etc. and notify the E.O.R. if any issues are found.These plans/calculations are stamped for structural code compliance of the roof framing supporting the proposed PV installation reference only. These plans/calculations are not stamped for water leakage. PV modules, racking, and attachment components must follow manufacturer guidelines and requirements. 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io 2334 N Westwood Ave11/14/22 Structural Engineering Letter Date: 10/31/2022 Project Name: Courtland and Anne Alex Project Address: 2334 N. Westwood Ave., Santa Ana, CA, 92706 Contractor : Lloyd Mills Smart Solar Design Contractor Address : - Attn : To Whom It May Concern A Field observation of the condition of the existing framing system was performed by an audit team from Lloyd Mills Smart Solar Design. From the Field observation of the property, the existing roof structure observed as follows: Existing roof is supported by 2 x 4 @ 24" rafters at the solar array. The rafters are sloped at approximately 20 degree and have maximum projected horizontal span of 7 feet in between load bearing supports. Design Criteria Applicable codes: 2019 California Building Code ASCE 7-16 Ground Snow Load: 5 psf Roof Dead Load: 20 psf Wind speed: 120 mph Risk Category: II Date Certified and Signed: 10/31/2022 I certify that the capacity of the structural roof framing that directly supports the additional gravity loading due to the solar panel supports and modules had been reviewed and determined to meet or exceed the requirements in accordance with the Design Criteria. If you have any questions or concerns please contact us, Engineerinc.io, 303 N Glenoaks Blvd Suite 200 Burbank, CA 91502 (747) 333 - 5991 new@engineerinc.io 2334 N Westwood Ave11/14/22 BIFACIAL ENERGY YIELD GAIN OF UP TO 20 % Bifacial Q.ANTUM solar cells with zero gap cell layout make efficient use of light shining on the module rear-side for radically improved LCOE. LOW ELECTRICITY GENERATION COSTS Q.ANTUM DUO Z combines cutting edge cell separation and innovative wiring with Q.ANTUM Technology for higher yield per surface area, lower BOS costs, higher power classes, and an efficiency rate of up to 21.4 %. INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields, whatever the weather with excellent low-light and temperature behavior. ENDURING HIGH PERFORMANCE Long-term yield security with Anti LID and Anti PID Technology1, Hot-Spot Protect and Traceable Quality Tra.Q™. FRAME FOR VERSATILE MOUNTING OPTIONS High-tech aluminum alloy frame protects from damage, enables use of a wide range of mounting structures and is certified regarding IEC for high snow (5400 Pa) and wind loads (2400 Pa). A RELIABLE INVESTMENT Double glass module design enables extended lifetime with 12-year product warranty and improved 30-year performance warranty2. 1 APT test conditions according to IEC / TS 62804-1:2015 method B (−1500 V, 168 h) including post treatment according to IEC 61215-1-1 Ed. 2.0 (CD) 2 See data sheet on rear for further information. THE IDEAL SOLUTION FOR: Ground-mounted solar power plants Q.PEAK DUO XL-G10.3 / BFG 475-490 BIFACIAL DOUBLE GLASS MODULE WITH EXCELLENT RELIABILITY AND ADDITIONAL YIELD 2334 N Westwood Ave11/14/22 89.4 in 2270 mm 43.1 in 1095 mm 47.6 in 1210 mm 1975 lbs 896 kg 20 20 29 α [% / K]+0.04 β [% / K] −0.27 γ [% / K]−0.34 NMOT [°F] 108 ± 5.4 (42± 3 °C) [V]1500 Class II [A DC]20 TYPE 294 [lbs/ft2] 75 (3600 Pa) / 33 (1600 Pa)−40 °F up to +185 °F (−40 °C up to +85 °C)[lbs/ft2] 113 (5400 Pa) / 50 (2400 Pa) 3 See Installation Manual 4 New Type is similar to Type 3 but with metallic frame Certified UL 61730 475 480 485 490 BSTC* BSTC* BSTC* BSTC* [W]475 519.6 480 525.0 485 530.5 490 536.0 [A]11.08 12.12 11.12 12.17 11.16 12.21 11.20 12.26 [V]53.15 53.34 53.39 53.58 53.63 53.82 53.86 54.06 [A]10.55 11.54 10.59 11.58 10.63 11.63 10.67 11.67 [V] 45.03 45.02 45.33 45.32 45.63 45.62 45.93 45.92 [%] ≥ 20.5 ≥ 22.4 ≥ 20.7 ≥ 22.7 ≥ 20.9 ≥ 22.9 ≥ 21.2 ≥ 23.1 [W] 357.6 361.4 365.1 368.9 [A]8.92 8.96 8.99 9.02 [V]50.27 50.49 50.72 50.95 [A]8.30 8.34 8.37 8.40 [V] 43.06 43.35 43.63 43.92 Hanwha Q CELLS America Inc. 400 Spectrum Center Drive, Suite 1400, Irvine, CA 92618, USA | TEL +1 949 748 59 96 | EMAIL inquiry@us.q-cells.com | WEB www.q-cells.us 53' 40' HC MECHANICAL SPECIFICATION Format 87.2 in × 41.1 in × 1.38 in (including frame) (2216 mm × 1045 mm × 35 mm) Weight 64.2 lbs (29.1 kg) Front Cover 0.08 in (2.0 mm) thermally pre-stressed glass with anti-reflection technology Back Cover 0.08 in (2.0 mm) semi-tempered glass Frame Anodized aluminum Cell 6 × 26 monocrystalline Q.ANTUM solar half cells Junction Box 2.09-3.98 in × 1.26-2.36 in × 0.59-0.71 in (53-101 mm × 32-60 mm × 15-18 mm), IP67, with bypass diodes Cable 4 mm² Solar cable; (+) ≥ 27.6 in (700 mm), (−) ≥ 13.8 in (350 mm) Connector Stäubli MC4, Stäubli MC4-Evo2, Hanwha Q CELLS HQC4, IP68 Note: Installation instructions must be followed. See the installation and operating manual or contact our technical service department for further information on approved installation and use of this product. Sp e c i f i c a t i o n s s u b j e c t t o t e c h n i c a l c h a n g e s © Q C E L L S Q. P E A K D U O X L - G 1 0 . 3 / B F G _ 4 7 5 - 4 9 0 _ 2 0 2 1 - 0 8 _ R e v 0 1 _ N A Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE At least 98 % of nominal power during first year. Thereafter max. 0.45 % degradation per year. At least 93.95 % of nominal power up to 10 years. At least 84.95 % of nominal power up to 30 years. All data within measurement toleranc- es. Full warranties in accordance with the warranty terms of the Q CELLS sales organisation of your respective country. Typical module performance under low irradiance conditions in comparison to STC conditions (25 °C, 1000 W/m²) TEMPERATURE COEFFICIENTS Temperature Coefficient of ISC Temperature Coefficient of VOC Temperature Coefficient of PMPP Nominal Module Operating Temperature PROPERTIES FOR SYSTEM DESIGN Maximum System Voltage VSYS PV module classification Maximum Series Fuse Rating Fire Rating based on ANSI / UL 61730 Max. Design Load, Push / Pull3 Permitted Module Temperature on Continuous DutyMax. Test Load, Push / Pull3 41.1" (1045 mm) 51.5" (1308 mm) 87.2" (2216 mm) 1.38" (35 mm) 4 × Mounting slots (DETAIL A) 8 × Drainage holes 0.12 × 0.24" (3 × 6 mm) Frame 39.5" (1003 mm) 17.9" (454 mm) Label 4 × Grounding holes, Ø 0.18" (4.5 mm) 15.7" (400 mm) 8 × Mounting slots system Tracker (DETAIL B) DETAIL A 0.63" (16 mm) 0.33" (8.5 mm)0.83" (21 mm) DETAIL B 0.39" (10 mm) 0.28" (7 mm)0.87" (22 mm) 39.4" (1001 mm) 31.2" (790 mm) ≥13.8" (350 mm) ≥27.6" (700 mm) QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION UL 61730, CE-compliant, IEC 61215:2016, IEC 61730:2016, U.S. Patent No. 9,893,215 (solar cells); Certification in process. Horizontal packaging pallets pallets modules ELECTRICAL CHARACTERISTICS POWER CLASS MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC1 AND BSTC1 (POWER TOLERANCE +5 W / −0 W) Mi n i m u m Power at MPP1 PMPP Short Circuit Current1 ISC Open Circuit Voltage1 VOC Current at MPP IMPP Voltage at MPP VMPP Efficiency1 η Bifaciality of PMPP and ISC 70 % ± 5 % • Bifaciality given for rear side irradiation on top of STC (front side) • According to IEC 60904-1-2 1 Measurement tolerances PMPP ± 3 %; ISC, VOC ± 5 % at STC: 1000 W/m²; *at BSTC: 1000 W/m² + φ × 135 W/m², φ = 70 % ± 5 %, 25 ± 2 °C, AM 1.5 according to IEC 60904-3 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NMOT2 Mi n i m u m Power at MPP PMPP Short Circuit Current ISC Open Circuit Voltage VOC Current at MPP IMPP Voltage at MPP VMPP 2800 W/m², NMOT, spectrum AM 1.5 RE L A T I V E E F F I C I E N C Y CO M P A R E D T O N O M I N A L P O W E R [ % ] 100 95 90 85 80 75 15 5 25 200 10 YEARS 98 Q CELLS Industry standard for tiered warranties* Industry standard for linear warranties* *Standard terms of guarantee for the 10 PV companies with the highest production capacity in 2014 (as at: September 2014) 30 RE L A T I V E E F F I C I E N C Y [ % ] IRRADIANCE [W/m²] 200 400 600 800 1000 110 100 90 80 1200 Drawing not to scale 2334 N Westwood Ave11/14/22 IQ8 and IQ8+ Microinverters Our newest IQ8 Microinverters are the industry’s first microgrid-forming, software- defined microinverters with split-phase power conversion capability to convert DC power to AC power efficiently. The brain of the semiconductor-based microinverter is our proprietary application-specific integrated circuit (ASIC) which enables the microinverter to operate in grid-tied or off-grid modes. This chip is built in advanced 55nm technology with high speed digital logic and has super-fast response times to changing loads and grid events, alleviating constraints on battery sizing for home energy systems. Part of the Enphase Energy System, IQ8 Series Microinverters integrate with the Enphase IQ Battery, Enphase IQ Gateway, and the Enphase App monitoring and analysis software. IQ8 Series Microinverters redefine reliability standards with more than one million cumulative hours of power-on testing, enabling an industry- leading limited warranty of up to 25 years. Connect PV modules quickly and easily to IQ8 Series Microinverters using the included Q-DCC-2 adapter cable with plug-n-play MC4 connectors. IQ8 Series Microinverters are UL Listed as PV Rapid Shut Down Equipment and conform with various regulations, when installed according to manufacturer’s instructions. Easy to install • Lightweight and compact with plug-n-play connectors • Power Line Communication (PLC) between components • Faster installation with simple two-wire cabling High productivity and reliability • Produce power even when the grid is down* • More than one million cumulative hours of testing • Class II double-insulated enclosure • Optimized for the latest high- powered PV modules Microgrid-forming • Complies with the latest advanced grid support** • Remote automatic updates for the latest grid requirements • Configurable to support a wide range of grid profiles • Meets CA Rule 21 (UL 1741-SB) requirements © 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ8 Microinverters, and other names are trademarks of Enphase Energy, Inc. Data subject to change. IQ8SP-DS-0002-01-EN-US-2022-08-10 * Only when installed with IQ System Controller 2, meets UL 1741. ** IQ8 and IQ8Plus supports split phase, 240V installations only. DATA SHEET 2334 N Westwood Ave11/14/22 (1) No enforced DC/AC ratio. See the compatibility calculator at https://link.enphase.com/module-compatibility (2) Maximum continuous input DC current is 10.6A (3) Nominal voltage range can be extended beyond nominal if required by the utility. (4) Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. IQ8 and IQ8+ Microinverters INPUT DATA (DC)IQ8-60-2-US IQ8PLUS-72-2-US Commonly used module pairings1 W 235 – 350 235 – 440 Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell, 66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 27 – 37 29 – 45 Operating range V 25 – 48 25 – 58 Min/max start voltage V 30 / 48 30 / 58 Max input DC voltage V 50 60 Max DC current2 [module Isc]A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC)IQ8-60-2-US IQ8PLUS-72-2-US Peak output power VA 245 300 Max continuous output power VA 240 290 Nominal (L-L) voltage/range3 V 240 / 211 – 264 Max continuous output current A 1.0 1.21 Nominal frequency Hz 60 Extended frequency range Hz 50 – 68 AC short circuit fault current over 3 cycles Arms 2 Max units per 20 A (L-L) branch circuit4 16 13 Total harmonic distortion <5% Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor (adjustable)0.85 leading – 0.85 lagging Peak efficiency %97.5 97.6 CEC weighted efficiency %97 97 Night-time power consumption mW 60 MECHANICAL DATA Ambient temperature range -40ºC to +60ºC (-40ºF to +140ºF) Relative humidity range 4% to 100% (condensing) DC Connector type MC4 Dimensions (HxWxD)212 mm (8.3”) x 175 mm (6.9”) x 30.2 mm (1.2”) Weight 1.08 kg (2.38 lbs) Cooling Natural convection – no fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated, corrosion resistant polymeric enclosure Environ. category / UV exposure rating NEMA Type 6 / outdoor COMPLIANCE Certifications CA Rule 21 (UL 1741-SB), UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according to manufacturer’s instructions. IQ8SP-DS-0002-01-EN-US-2022-08-10 2334 N Westwood Ave11/14/22 The Enphase AC Combiner Box™ with Enphase Envoy-S™ consolidates interconnection equipment into a single enclosure and streamlines PV installations by providing a consistent, pre-wired solution for residential applications. Enphase AC Combiner Box To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Networking Smart • Includes Envoy-S for communication and control • Flexible networking supports Wi-Fi, Ethernet, or cellular Simple • Three pre-installed 20 A / 240 VAC circuit breakers • Pre-configured revenue-grade metering available Reliable • Durable NRTL-certified NEMA type 3R enclosure • Five-year warranty 2334 N Westwood Ave11/14/22 To learn more about Enphase offerings, visit enphase.com © 2017 Enphase Energy. All rights reserved. All trademarks or brands in this document are registered by their respective owner. 2017-04-14 MODEL NUMBERS XAM1-120-B (880-00834) or XAM1-120 (880-00211) AC Combiner with Enphase Envoy-S Metered™ for integrated revenue grade PV production metering (ANSI C12.20 +/- 0.5%) and optional consumption monitoring (+/- 2.5%). ACCESSORIES (order separately) Enphase Mobile Connect™ CELLMODEM-01 (3G) or CELLMODEM-03 (4G) Plug and play industrial grade cellular modem with five-year data plan for systems up to 60 microinverters. (Available in the US, Canada, Mexico, Puerto Rico, and the US Virgin Islands, where there is adequate cellular service in the installation area.) Consumption Monitoring CT CT-200-SPLIT Split core current transformers enable whole home consumption metering (+/- 2.5%). ELECTRICAL SPECIFICATIONS Rating Continuous duty Solar branch circuit breakers Three 2-pole 20 A / 240 VAC DIN rail-mounted breakers Maximum system voltage 240 VAC Rated output current 48 A Rated input current, each input 16 A Maximum fuse/circuit breaker rating (output) 60 A Production Metering CT 200 A solid core pre-installed on solar busbar and wired to Envoy-S MECHANICAL DATA Dimensions (WxHxD) 38.0 x 38.7 x 20.3 cm (15.0” x 15.3” x 8.0”) Weight 5.1 kg (11.2 lbs) Ambient temperature range -40º C to +46º C (-40º to 115º F) Cooling Vented, natural convection, plus heat shield Enclosure environmental rating Outdoor, NRTL-certified, NEMA type 3R, polycarbonate construction Altitude To 2000 meters (6,560 feet) Wire size: Model XAM1-120-B Model XAM1-120 Follow local code requirements for conductor sizing. • 14 to 6 AWG copper conductors for branch inputs. • 14 to 4 AWG copper conductors for combined output. • 12 to 6 AWG copper conductors for branch inputs. • 12 to 4 AWG copper conductors for combined output. INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b/g/n Ethernet 802.3, Cat5E (or Cat 6) UTP Ethernet cable - (not included) Cellular Optional, CELLMODEM-01 (3G) or CELLMODEM-03 (4G) - (not included) COMPLIANCE Compliance, Combiner Box UL 1741 Compliance, Envoy-S UL 916 CAN/CSA C22.2 No. 61010-1 47 CFR, Part 15, Class B, ICES 003 IEC/EN 61010-1:2010, EN50065-1, EN61000-4-5, EN61000-6-1, EN61000-6-2 Metering: ANSI C12.20 accuracy class 0.5 Enphase AC Combiner Box 2334 N Westwood Ave11/14/22 INSTALLATION MANUAL FLUSH MOUNT INSTALLATION MANUAL 2334 N Westwood Ave11/14/22 CONTeNTS FLUSH MOUNT INSTALLATION MANUAL - 1© 2019 IRONRIDGE, INC. VERSION 2.0 DISCLAIMeR 1 RATINGS 2 MARKINGS 2 CHeCKLIST 3 1. ATTACH BASeS 4 2. PLACe RAILS 4 3. SeCURe LUGS 5 4. SeCURe MODULeS 5 CAMO 6 eXPANSION JOINTS 7 eLeCTRICAL DIAGRAM 7 FLASHFOOT2 8 ALL TILe HOOK 8 KNOCKOUT TILe 8 FLAT ROOF ATTACHMeNT 9 eND CAPS 9 WIRe CLIPS 9 FLUSH STANDOFFS 9 MICROINVeRTeR KITS 10 SYSTeMS USING eNPHASe MICROINVeRTeRS OR SUNPOWeR AC MODULeS 10 SYSTeMS USING PHAZR MICROSTORAGe PRODUCTS 10 FRAMeLeSS MODULe KITS 11 MODULe COMPATIBILITY 11 DISCLAIMeR This manual describes proper installation procedures and provides necessary standards required for product reliability. Warranty details are available on website. All installers must thoroughly read this manual and have a clear understanding of the installation procedures prior to installation. Failure to follow these guidelines may result in property damage, bodily injury or even death. IT IS THe INSTALLeR’S ReSPONSIBILITY TO: • Ensure safe installation of all electrical aspects of the array. All electrical installation and procedures should be conducted by a licensed and bonded electrician or solar contractor. Routine maintenance of a module or panel shall not involve breaking or disturbing the bonding path of the system. All work must comply with national, state and local installation procedures, product and safety standards. • Comply with all applicable local or national building and fire codes, including any that may supersede this manual. • Ensure all products are appropriate for the installation, environment, and array under the site’s loading conditions. • Use only IronRidge parts or parts recommended by IronRidge; substituting parts may void any applicable warranty. • Review the Design Assistant and Certification Letters to confirm design specifications. • Ensure provided information is accurate. Issues resulting from inaccurate information are the installer’s responsibility. • Ensure bare copper grounding wire does not contact aluminum and zinc-plated steel components, to prevent risk of galvanic corrosion. • If loose components or loose fasteners are found during periodic inspection, re-tighten immediately. If corrosion is found, replace affected components immediately. • Provide an appropriate method of direct-to-earth grounding according to the latest edition of the National Electrical Code, including NEC 250: Grounding and Bonding, and NEC 690: Solar Photovoltaic Systems. • Disconnect AC power before servicing or removing modules, AC modules, microinverters and power optimizers. • Review module manufacturer’s documentation for compatibility and compliance with warranty terms and conditions. 2334 N Westwood Ave11/14/22 FLUSH MOUNT INSTALLATION MANUAL - 2© 2019 IRONRIDGE, INC. VERSION 2.0 RATINGS Product markings are located on the 3/8" flange hex nut or Grounding Lug bolt head. MARKINGS UL 2703 LISTeD • Conforms to STD UL 2703 (2015) Standard for Safety First Edition: Mounting Systems, Mounting Devices, Clamping/ Retention Devices, and Ground Lugs for Use with Flat-Plate Photovoltaic Modules and Panels. • Max Overcurrent Protective Device (OCPD) Rating: 25A • Max Module Size: 24ft² • Module Orientation: Portrait or Landscape • CAMO Specific Allowable Design Load Rating: 50 PSF downward, 50 PSF upward, 15 PSF lateral • System Level Allowable Design Load Rating: meets minimum requirements of the standard (10 PSF downward, 5 PSF upward, 5 PSF lateral). Actual system structural capacity is defined by PE stamped certification letters. CLASS A SYSTeM FIRe RATING PeR UL 1703 • Any Roof Slope with Module Types 1, 2, and 3 • Any module-to-roof gap is permitted, with no perimeter guarding required. This rating is applicable with any third-party attachment. • Class A rated PV systems can be installed on Class A, B, and C roofs without affecting the roof fire rating. WATeR SeAL RATINGS: UL 441 & TAS 100(A)-95 (FLASHFOOT2, ALL TILe HOOK, KNOCKOUT TILe) • Tested and evaluated without sealant. • Any roofing manufacturer approved sealant is allowed. Ratings applicable for roof slopes between 2:12 and 12:12 STRUCTURAL CeRTIFICATION • Designed and Certified for Compliance with the International Building Code & ASCE/SEI-7 Marking can be on front or side of nut. #5003807 2334 N Westwood Ave11/14/22 FLUSH MOUNT INSTALLATION MANUAL - 11© 2019 IRONRIDGE, INC. VERSION 2.0 FRAMeLeSS MODULe KITS Insert Frameless Kit T-bolt in top rail slot. Place star washer over T-bolt, allowing it to rest on top of rail. Secure module clamps with a hex nut and torque to 80 in-lbs. í Tested or evaluated module clamps: • Sunforson silver or black SFS-UTMC-200(B) mid and SFS- UTEC-200(B) end clamps. • Sunpreme silver or black mid and end clamps with part numbers 7500105X where "X" is 1, 5, 6 or 7. • IronRidge silver or black mid and end clamps with part numbers FMLS-XC-001-Y where "X" is E or M and "Y" is B or blank. í Follow module manufacturer's installation instructions to install the module clamps. í Frameless modules require using a Grounding Lug on every rail. í For Sunpreme Modules Only: If required to use slide prevention hardware, see Module Slide Prevention Addendum (Version 1.10). Place Star Washer Module Clamp (80 in-lbs) Grounding Lugs Required on Every Rail MODULe COMPATIBILITY The Flush Mount System may be used to ground and/or mount a PV module complying with UL 1703 only when the specific module has been evaluated for grounding and/or mounting in compliance with the included instructions. Unless otherwise noted, “xxx” refers to the module power rating and both black and silver frames are included in the certification. MAKe MODeLS Amerisolar Modules with 35, 40 and 50mm frames and model identifier ASbYxxxZ; where "b" can be 5 or 6; "Y" can be M, P, M27, P27, M30, or P30; and "Z" can be blank, W or WB. Astronergy Solar Modules with 35, 40, and 45mm frames and model identifier aaSM66yyPzz-xxx; where “aa” can be CH or A; “yy” can be either 10 or 12; and “zz” can be blank, HV, (BF) or (BL). Frameless modules with model identifier CHSM6610P(DG)-xxx. Auxin Modules with 40mm frames and model identifier AXN6y6zAxxx; where "y" can be M or P; "z" can be 08, 09, 10, 11, or 12; and "A" can be F or T. Axitec Modules with 35 and 40mm frames and model identifier AC-xxxY/aa-ZZ; where "Y" can be M or P; "aa" can be 125 or 156; and "ZZ" can be 54S, 60S or 72S. Boviet Modules with 40mm frames and model identifier BVM66aaYY-xxx; where "aa" can be 9, 10 or 12; and "YY" is M or P. BYD Modules with 35mm frames and model identifier BYDxxxAY-ZZ; where "A" can be M6, P6, or PH; "Y" can be C or K; and "ZZ" can be 30 or 36. Canadian Solar Modules with 30, 35 and 40mm frames and model identifier CSbY-xxxZ; where “b” can be 1, 3 or 6; “Y” can be H, K, P, U, V, or X; and “Z” can be M, P, MS, PX, M-SD, P-AG, P-SD, MB-AG, PB-AG, MS-AG, or MS-SD. Frameless modules with model identifier CSbY-xxx-Z; where “b” can be 3 or 6; “Y” is K, P, U, or X; and “Z” can be M-FG, MS-FG, P-FG, MB-FG, or PB-FG. CertainTeed Modules with 35 and 40mm frames and model identifier CTxxxYZZ-AA; where "Y" can be M or P; "ZZ" can be 00,01, 10, or 11; and "AA" can be 01, 02 or 03. CSUN Modules with 35 and 40mm frames and model identifier YYxxx-zzAbb; where "YY" is CSUN or SST; "zz" is blank, 60, or 72; "A" is blank, P or M; and "bb" is blank, BB, BW, or ROOF. Ecosolargy Modules with 35, 40, and 50mm frames and model identifier ECOxxxYzzA-bbD; where "Y" can be A, H, S, or T; "zz" can be 125 or 156; "A" can be M or P; "bb" can be 60 or 72; and "D" can be blank or B. ET Solar Modules with 35, 40, or 50mm frames and model identifier ET-Y6ZZxxxAA; where "Y" is P, L, or M; "ZZ" is 60 or 72; and "AA" is WB, WW, BB, WBG, WWG, WBAC, WBCO, WWCO, WWBCO or BBAC. 2334 N Westwood Ave11/14/22 FLUSH MOUNT INSTALLATION MANUAL - 12© 2019 IRONRIDGE, INC. VERSION 2.0 MODULe COMPATIBILITY Flex Modules with 35, 40, or 50mm frames and model identifier FXS-xxxYY-ZZ; where "xxx" is the module power rating; "YY" is BB or BC; and "ZZ" is MAA1B, MAA1W, MAB1W, SAA1B, SAA1W, SAC1B, SAC1W, SAD1W, SBA1B, SBA1W, SBC1B, or SBC1W. GCL Modules with 35 and 40mm frames and and model identifier GCL-a6/YY xxx; where "a" can be M or P; and "YY" can be 60, 72, or 72H. GigaWatt Solar Modules with 40mm frames and model identifier GWxxxYY; where “YY” is either PB or MB. Hansol Modules with 35 and 40mm frames and model identifier HSxxxYY-zz; where "YY" can be TB, TD, UB or UD; and "zz" can be AN1, AN3, AN4. Hanwha Solar Modules with 40, 45, or 50mm frames and model identifier HSLaaP6-YY-1-xxxZ; where "aa" is either 60 or 72; "YY" is PA or PB; and "Z" is blank or B. Hanwha Q CELLS Modules with 32, 35, 40, and 42mm frames and model identifier aaYY-ZZ-xxx; where “aa” can be Q. or B.; “YY” can be PLUS, PRO, PEAK, LINE PRO, LINE PLUS, or PEAK DUO; and “ZZ” can be G3, G3.1, G4, G4.1, L-G2, L-G2.3, L-G3, L-G3.1, L-G3y, L-G4, L-G4.2, L-G4y, LG4.2/TAA, BFR-G3, BLK-G3, BFR-G3.1, BLK-G3.1, BFR-G4, BFR-G4.1, BFR G4.3, BLK-G4.1, G4/SC, G4.1/SC, G4.1/TAA, G4.1/ MAX, BFR G4.1/TAA, BFR G4.1/MAX, BLK G4.1/TAA, BLK G4.1/SC, EC-G4.4, G5, BLK-G5, L-G5, L-G5.1, L-G5.2, L-G5.2/H, L-G5.3, G6, BLK-G6, L-G6, LG6.1, LG6.2, or LG6.3. Heliene Modules with 40mm frames and model identifier YYZZxxx; where "YY" is 36, 60, 72, or 96; and "ZZ" is M, P, or MBLK. Hyundai Modules with 35, 40 and 50mm frames and model identifier HiS-YxxxZZ; where "Y" can be M or S; and "ZZ" can be KI, MI, MF, MG, SG, RI, RG(BF), RG(BK), TI, or TG. Itek Modules with 40 or 50mm frames and model identifier IT-xxx-YY; where "YY" is blank, HE, or SE, or SE72. JA Solar Modules with 35, 40 and 45mm frames and model identifier JAyyzz-bb-xxx/aa; where “yy” can be M, P, M6 or P6; “zz” can be blank, (K), (L), (R), (V), (BK), (FA), (TG), (FA)(R), (L)(BK), (L)(TG), (R)(BK), (R) (TG), (V)(BK), (BK)(TG), or (L)(BK)(TG); “bb” can be 48, 60, 72, 60S01, 60S02, 60S03, 72S01, 72S02, 72S03; and “aa” can be MP, SI, SC, PR, PR/1500V, 3BB, 4BB, 4BB/RE, 4BB/1500V, 5BB. Jinko Modules with 35 and 40mm frames and model identifier JKMYxxxZZ-aa; where “Y” can either be blank or S; “ZZ” can be P, PP, M; and “aa” can be blank, 60, 60B, 60H, 60L, 60BL, 60HL, 60HBL, 60-J4, 60B- J4, 60B-EP, 60(Plus), 60-V, 60-MX, 72, 72-V, 72H-V, 72L-V, 72HL-V or 72-MX. Frameless modules with model identifier JKMxxxPP-DV. Kyocera Modules with 46mm frames and model identifier KYxxxZZ-AA; where “Y” is D or U; “ZZ” is blank, GX, or SX; and “AA” is LPU, LFU, UPU, LPS, LPB, LFB, LFBS, LFB2, LPB2, 3AC, 3BC, 3FC, 4AC, 4BC, 4FC, 4UC, 5AC, 5BC, 5FC, 5UC, 6BC, 6FC, 8BC, 6MCA, or 6MPA. LG Modules with 35, 40, and 46mm frames LGxxxYaZ-bb; where “Y” can be A, E, N, Q, S; “a” can be 1 or 2; “Z” can be C, K, T, or W; and “bb” can be A3, A5, B3, G3, G4, K4, or V5. Longi Modules with 40 and 45mm frames and model identifier LR6-YYZZ-xxxM; where "YY" can be 60 or 72; and "ZZ" can be BK, BP, HV, PB, PE, or PH. Mission Solar Modules with 40mm frames and model identifier MSExxxZZaa; where “ZZ” can be MM, SE, SO or SQ; and “aa” can be 1J, 4J, 4S, 5K, 5T, 6J, 6S, 6W, 8K, 8T, or 9S. Mitsubishi Modules with 46mm frames and model identifier PV-MYYxxxZZ; where "YY" is LE or JE; and "ZZ" is either HD, HD2, or FB. Motech IM and XS series modules with 40, 45, or 50mm frames. Neo Solar Power Modules with 35mm frames and model identifier D6YxxxZZaa; where "Y" can be M or P; "ZZ" can be B3A, B4A, E3A, E4A, H3A, H4A; and "aa" can be blank, (TF), ME or ME (TF). Panasonic Modules with 35 and 40mm frames and model identifier VBHNxxxYYzzA; where “YY” can be either SA or KA; “zz” can be either 01, 02, 03, 04, 06, 06B, 11, 11B, 15, 15B, 16, 16B, 17, or 18; and “A” can be blank, E or G. Peimar Modules with 40mm frames and model identifier SGxxxYzz; where "Y" can be M or P; and "zz" can be blank, (BF), or (FB). Phono Solar Modules with 35, 40, or 45mm frames and model identifier PSxxxY-ZZ/A; where "Y" is M or P; "ZZ" is 20 or 24; and "A" is F, T or U. 2334 N Westwood Ave11/14/22 FLUSH MOUNT INSTALLATION MANUAL - 13© 2019 IRONRIDGE, INC. VERSION 2.0 MODULe COMPATIBILITY Prism Solar Frameless modules with model identifier BiYY-xxxBSTC; where "YY" can be 48, 60, 60S, 72 or 72S. REC Solar Modules with 30, 38 and 45mm frames and model identifier RECxxxYYZZ; where “YY” can be M, NP, PE, TP, TP2, TP2M, TP2SM, or TP2S; and “ZZ” can be blank, Black, BLK, BLK2, SLV, or 72. Renesola Modules with 35, 40 or 50mm frames and model identifier JCxxxY-ZZ; where "Y" is F, M or S; and "ZZ" is Ab, Ab-b, Abh, Abh-b, Abv, Abv-b, Bb, Bb-b, Bbh, Bbh-b, Bbv, Bbv-b, Db, or Db-b. Renogy Modules with 40 or 50mm frames and model identifier RNG-xxxY; where “Y” is D or P. S-Energy Modules with 40mm frames and model identifier SNxxxY-ZZ; where "Y" is M or P; and "ZZ" is 10, or 15. Seraphim Energy Group Modules with 40mm frames and model identifier SEG-6YY-xxxZZ; where "YY" can be MA, MB, PA, PB; and "ZZ" can be BB, WB, or WW. Seraphim USA Modules with 40 and 50mm frames and model identifier SRP-xxx-6YY; where "YY" can be MA, MB, PA, PB, QA-XX-XX, and QB-XX-XX. Sharp Modules with 35 or 40mm frames and model identifier NUYYxxx; where “YY” is SA or SC. Silfab Modules with 38mm frames and model identifier SYY-Z-xxx; where “YY” is SA or LA; SG or LG; and “Z” is M, P, or X. Solaria Modules with 40mm frames and model identifier PowerXT xxxY-ZZ; where "Y" can be R or C; and "ZZ" can be AC, BD, BX, BY, PD, PX, PZ, WX or WZ. SolarTech Modules with 42mm frames and model identifier STU-xxxYY; where "YY" can be PERC or HJT. SolarWorld AG / Industries GmbH SolarWorld Sunmodule Plus, Protect, Bisun, XL, Bisun XL, may be followed by mono, poly, duo, black, bk, or clear; modules with 31, 33 or 46mm frames and model identifier SW-xxx. SolarWorld Americas Inc.SolarWorld Sunmodule Plus, Protect, Bisun, XL, Bisun XL, may be followed by mono, poly, duo, black, bk, or clear; modules with 33mm frames and model identifier SWA-xxx. Stion Thin film modules with 35mm frames and model identifier STO-xxx or STO-xxxA. Thin film frameless modules with model identifier STL-xxx or STL-xxxA. SunEdison Modules with 35, 40, or 50mm frames and model identifier SE-YxxxZABCDE; where "Y" is B, F, H, P, R, or Z; "Z" is 0 or 4; "A" is B, C, D, E, H, I, J, K, L, M, or N; "B" is B or W; "C" is A or C; "D" is 3, 7, 8, or 9; and "E" is 0, 1 or 2. Suniva Modules with 35, 38, 40, 46, or 50mm frames and model identifiers OPTxxx-AA-B-YYY-Z or MVXxxx-AA-B-YYY-Z; where "AA" is either 60 or 72; "B" is either 4 or 5; "YYY" is either 100,101,700,1B0, or 1B1; and "Z" is blank or B. Sunpower Modules with standard (G3 or G4) or InvisiMount (G5) 40 and 46mm frames with model identifier SPR-Zb-xxx-YY; where “Z” is either A, E, P or X; “b” can be blank, 17, 18, 19, 20, 21, or 22; and “YY” can be blank, NE, BLK, COM, C-AC, D-AC, E-AC, BLK-C-AC, or BLK-D-AC. Sunpreme Sunpreme modules with 35 and 40mm frames and model identifier SNPM-AxB-xxxYzz; where "A" can be G or H; "Y" can be blank or T; and "zz" can be blank, 4BB, SM or 4BB SM. Frameless modules with model identifier SNPM-GxB-xxxZZ; where "ZZ" can be blank, 4BB, SM or 4BB SM. Sunspark Modules with 40mm frames and model identifier SYY-xxZ; where "YY" can be MX or ST; and "Z" can be P or W. Suntech Vd, Vem, Wdb, Wde, and Wd series modules with 35, 40, or 50mm frames. Talesun Modules with 35 and 40mm frames and model identifier TP6yyZxxx-A; where "yy" can be 60, 72, H60 or H72; "Z" can be M, or P; and "A" can be blank, B, or T. Trina Modules with 35, 40 or 46mm frames and model identifier TSM-xxxYYZZ; where “YY” is PA05, PC05, PD05, PA14, PC14, PD14, PE14, or DD05; and “ZZ” is blank, A, A.05, A.08, A.10, A.18, .05, .08, .10, .18, .08D, .18D, 0.82, A.082(II), .002, .00S, 05S, 08S, A(II), A.08(II), A.05(II), A.10(II), or A.18(II). Frameless modules with model identifier TSM-xxxYY; and “YY” is either PEG5, PEG5.07, PEG14, DEG5(II), DEG5.07(II), or DEG14(II). Winaico Modules with 35 or 40mm frames and model identifier Wsy-xxxz6; where "y" is either P or T; and ""z"" is either M or P. Yingli Panda, YGE, and YGE-U series modules with 35, 40, or 50 mm frames. 2334 N Westwood Ave11/14/22 Tech Brief Class A Fire Rating Background All roofing products are tested and classified for their ability to resist fire. Recently, these fire resistance standards were expanded to include solar equipment as part of the roof system. Specifically, this requires the modules, mounting hardware and roof covering to be tested together as a system to ensure they achieve the same fire rating as the original roof covering. Adoption of these new requirements will begin in California in 2015 and extend to the rest of the country in 2016. IronRidge Certification In August 2014, IronRidge was the first company to receive a Class A Fire Rating— the highest possible rating—from Intertek Group plc., a Nationally Recognized Testing Laboratory. IronRidge Roof Mount products were tested on flat and sloped roofs in accordance with the new UL 1703 & UL 2703 test standards. The testing evaluated the system’s ability to resist flame spread, burning material and structural damage to the roof. Refer to the table below to determine the requirements for achieving a Class A Fire Rating on your next project. Test Setup Solar Modules Solar modules are given a Type classification based on their materials and construction. Mounting System Mounting is tested as part of a system that includes type-tested modules and fire-rated roof covering. Roof Covering Roof covering products are given a Fire Class Rating of A, B or C based on their tested fire resistance. A burning wooden block is placed on module as a fan blows at 12 mph. Flame cannot be seen on underside of roof within 90 minutes. Burning Brand Test Flame at southern edge of roof is aimed up the roof as a fan blows at 12 mph. The flame cannot spread 6 feet or more in 10 minutes. Spread of Flame Test Fire Testing Process Roof Slope Mount Module Fire Rating* Steep Slope (≥ 9.5 degrees) Flush Type 1, 2, & 3 Class A Tilt Type 1 & 2 Class A Low Slope (< 9.5 degrees) Flush Type 1, 2, & 3 Class A Tilt Type 1, 2, & 3 Class A *Class A rated PV systems can be installed on Class A, B, and C roofs. 2334 N Westwood Ave11/14/22 Tech Brief © 2015 IronRidge, Inc. All rights reserved. Visit www.ironridge.com or call 1-800-227-9523 for more information. Version 1.12 More Resources Fire Rating Certificate Visit our website to download the official UL 2703 certification document. Go to IronRidge.com Engineering Certification Letters We offer complete engineering resources and pre-stamped certification letters. Go to IronRidge.com Frequently Asked Questions What is a “module type”? The new UL1703 standard introduces the concept of a PV module type, based on 4 construction parameters and 2 fire performance parameters. The purpose of this classification is to certify mounting systems without needing to test it with every module. What roofing materials are covered? All fire rated roofing materials are covered within this certification including composition shingle, clay and cement tile, metal, and membrane roofs. What if I have a Class C roof, but the jurisdiction now requires Class A or B? Generally, older roofs will typically be “grandfathered in”, and will not require re-roofing. However, if 50% or more of the roofing material is replaced for the solar installation the code requirement will be enforced. Where is the new fire rating requirement code listed? 2012 IBC: 1509.7.2 Fire classification. Rooftop mounted photovoltaic systems shall have the same fire classification as the roof assembly required by Section 1505. Where is a Class A Fire Rating required? The general requirement for roofing systems in the IBC refers to a Class C fire rating. Class A or B is required for areas such as Wildland Urban Interface areas (WUI) and for very high fire severity areas. Many of these areas are found throughout the western United States. California has the most Class A and B roof fire rating requirements, due to wild fire concerns. Are standard mid clamps covered? Mid clamps and end clamps are considered part of the PV “system”, and are covered in the certification. What attachments and flashings are deemed compatible with Class A? Attachments and their respective flashings are not constituents of the rating at this time. All code-compliant flashing methods are acceptable from a fire rating standpoint. What mounting height is acceptable? UL fire testing was performed with a gap of 5”, which is considered worst case in the standard. Therefore, the rating is applicable to any module to roof gap. Am I required to install skirting to meet the fire code? No, IronRidge achieved a Class A fire rating without any additional racking components. What determines Fire Classification? Fire Classification refers to a fire-resistance rating system for roof covering materials based on their ability to withstand fire exposure. Class A - effective against severe fire exposure Class B - effective against moderate fire exposure Class C - effective against light fire exposure What if the roof covering is not Class A rated? The IronRidge Class A rating will not diminish the fire rating of the roof, whether Class A, B, or C. What tilts is the tilt mount system fire rated for? The tilt mount system is rated for 1 degrees and up and any roof to module gap, or mounting height. 2334 N Westwood Ave11/14/22 2334 N Westwood Ave11/14/22 2334 N Westwood Ave11/14/22 2334 N Westwood Ave11/14/22 2334 N Westwood Ave11/14/22 2334 N Westwood Ave11/14/22 Cut Sheet 4.00 .26 5/16 THD 7/16" HEAD .63 .81 5/16-18 THD .39 7/16" .75 5/16-18 THD 1.96 1.10 2.13 5.51 2.13 4.02 1.0 7.50 4.96 1.18 .83 2.37 4) Arm, Clear 3) Base, Clear 1) Bolt Lag, 5/16 X 4" 2) Bolt, Carriage 5/16 X 1" Items 1 & 2 Property Value Material 300 Series Stainless Steel Finish Clear Items 3 & 4 Property Value Material 300 Series Stainless Steel Finish Clear v1.0 2334 N Westwood Ave11/14/22 Cut Sheet v1.0 See Description / Length 1.75 .46 .58 1.00 .62 1.33 1.67 XR10 Rail 2334 N Westwood Ave11/14/22 www.roof-tech.us info@roof-tech.us RT-MINI Self-flashing base for asphalt & metal roof-top PV mounting systems Dual bolt design: M8 or 5/16” for L-Foot & 1/4” for EMC 1/4” Hex Bolt upper channel Easy tapping screw guide M8 or 5/16” Hex Bolt bottom channel Flat lip for PV Cable clips RT-MINI is suitable for mounting any rail system with a conventional L-Foot. ICC ESR 3575 Installation Manual 2334 N Westwood Ave11/14/22 RT-MINI Flexible Flashing certified by the International Code Council (ICC) Components RT2-00-MINIBK MINI base : 20 ea. Screw : 40 ea. Extra RT-Butyl : 10 ea. RT-Butyl is Roof Tech s flexible flashing used in one million residential PV systems for the last 26 years. It is the first PV mounting system with Flexible Flashing certified by the ICC. Engineered to withstand wind speeds up to 180 mph and ground snow up to 90 psf. ICC ESR-3575 ASTM2140 testing UV testing (7500 hrs.) www.roof-tech.us info@roof-tech.us 10620 Treena Street, Suite 230, San Diego, CA 92131 858.935.6064 Roof Tech Inc. Flexible Flashing 100% Waterproof Metal Flashing Retrofit Shedding water? Rafter installation Deck installation ’ P.E. Stamped Letters available at www.roof-tech.us/support Pat e n t #D82 2 4 5 9 S Dimensions in (mm) Optional item 5 x 60mm Mounting screw (RT2-04-SD5-60) : 100 ea./Bag 5/16” Hex bolt, washer & nut set (RT-04-BN30SL-US) : 100 ea./Bag RT-Butyl (RT2-04-BUTYLT) : 10 ea./Box March 2020 Engineered to ASTM D 1761 (Standard Test Methods for Mechanical Fasteners in Wood) TAS 100 A on metal and asphalt roof. 4 ( 1 0 0 ) 3/ 4 ( 1 9 ) 3 1/2 ( 90 ) 2 ( 50 ) 2334 N Westwood Ave11/14/22 DATE: DRAWN BY: LKM E1.0 DR A W I N G CO N T R A C T O R CL I E N T / S I T E D A T A AP N : SI Z E RE V I S I O N S Ll o y d M i l l s S m a r t S o l a r D e s i g n L I C E N S E D 1016878 999378 GE N E R A L C ON T R A C T O R STATE OF CALIFORNIA DESIG N . B U I L D DESIGN B U I LD.ST ATE OF CALIFORNIA L I C E N S E D GE N E R A L C ON T R A C T O R LLOY D P MI L L S LLOY D P MI LL S SINGLE LINE ELECTRICAL EQUIPMENT SCHEDULE 1 SOLAR PV MODULE Q.PEAK DUO XL10.3 BFG 480 QTY: 26 2 MICROINVERTER ENPHASE IQ8A QTY: 26 3 JUNCTION BOX(ES)BELL 5323-0 OR EQUIVALENT AS REQ 4 SOLAR LOAD CENTER IQ COMBINER 4 QTY: 1 5 PERFORMANCE METER N/A N/A 6 UTILITY EXTERNAL DISCONNECT SWITCH N/A N/A 7 MAIN ELECTRICAL SERVICE PANEL EXISTING PER CEC250.120 FOR EGC INSTALLATION & TABLE 250.122 FOR SIZING. PV BRANCH 2 M M PV BRANCH 3 PV BRANCH 4 PV BRANCH 1 1 2 3 4 5 6 7 (E) SERVICE GEC UFER OR 5 8 X 8' GEC G A B C MAIN OCPD SIZE: 200 MAIN BUS BAR RATING: 200 MAX PV: 40 (E)MAIN SERVICE PANEL OCPD BRANCH CIRCUIT OCPD BRANCH 1 OCPD 20AMP BRANCH 2 OCPD 20 AMP BRANCH 3 OCPD N/A BRANCH 4 OCPD N/A SOLAR COMBINER BUS 125A TAG Description and Conductor Type: (Table 3) mmbCurrent-Carrying Conductors: (for each branch circuit) A B EGC: GEC (when required): Current-Carrying Conductors: EGC: GEC (when required): 10 6 6 8 3 1 EMT 3/4" Conductor Size 10 2 Conductor, Cable and Conduit Schedule Number of Conductors 2 Conduit/ Conductor/ Cable Type EMT Conduit Size 3/4" 13 13 12.48kWDC 7.54kWAC 00 . 1 1 7 . 2 2 3 Co u r t l an d a n d A n n e A l e x 23 3 4 N . W e s t w o o d A v e . Sa n t a A n a , C A 9 2 7 0 6 10/9/2022 SOLAR MAIN IS 40AMPS 2334 N Westwood Ave11/14/22 GENERAL NOTES: 1. 2. 3. 4. 5. SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON A RESIDENTIAL STRUCTURE. DESIGN SHALL COMPLY WITH THE 2019 CALIFORNIA ELECTRIC CODE, NEC, AND ALL LOCAL ORDINANCES AND POLICIES. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH THE CBC SECTION 1609 TO WITHSTAND A MINIMUM OF 110 MPH WIND LOAD. THIS SYSTEM WILL NOT BE INTERCONNECTED UNTIL APPROVAL FROM THE LOCAL JURISDICTION AND THE UTILITY IS OBTAINED. WHEN A STORAGE BATTERY IS PROVIDED, THIS SYSTEM SHALL BE AN UTILITY INTERACTIVE SYSTEM WITH LISTED STORAGE BATTERIES PER CEC ARTIVLE 706, AND CRC SECTION R3327 REQUIREMENTS. STATIONARY STORAGE BATTERIES SYSTEMS SHALL COMPLY CFC, AND HAVING CAPACITIES NOT EXCEEDING THE BALUES SHOWN IN TABLE 608.1 2016 CFC. 6. 7. THE SOLAR PHOTOVOLTAIC INSTALLATIONO SHALL NOT OBSTRUCT ANY PLUMBING, OR MECHANICAL VENTS. IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE A VERIFIABLE GROUNDING ELECTRODE, IT IS THE CONTRACTORS RESPONSIBILITY TO INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE. 8. 9. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH CAL-OSHA REGULATIONS AND PER CITY REQUIREMENTS . PROPER ACCESS AND WORKING CLEARANCE WILL BE PROVIDED PER SECTION 11026 CEC. PL PL PL PL DATE: DRAWN BY: LKM PV 1.0 DR A W I N G CO N T R A C T O R CL I E N T / S I T E D A T A AP N : SI Z E RE V I S I O N S SITE PLAN Ll o y d M i l l s S m a r t S o l a r D e s i g n L I C E N SE D 1016878 999378 G E N E R A L C ON T R A C T O R STATE OF CALIFORNIA DESIG N . B U I L D DESIGN B UI L D. STATE OF CALIFORNIA L I C E N S E D G E N E R A L C ON T R A C T O R LLOY D P M I LL S LLOY D P M I LL S 12.48kWDC 7.54kWAC 00 . 1 1 7 . 2 2 3 Co u r t l an d a n d An n e A l ex 23 3 4 N . W e s t w o o d A v e . Sa n t a An a , C A 9 2 7 0 6 10/11/2022 CAL FIRE SET BACK 18" PATHWAY CAL FIRE SET BACK 36" PATHWAY ROOF ACCESS ROOF ACCESS PROPOSED INSTALLATION OF PANELS AND ENPHASE IQ8+ MICRO-INVERTERS M EXISTING 200A MAIN SERVICE PANEL W/ 200A OCPD IQ COMBINER 23 3 4 N . W e s t w o o d A v e . Date Certified and Exp. Date : 3/31/2024 Signed:10/31/2022 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (747) 333-5991 2334 N Westwood Ave11/14/22 DATE: DRAWN BY: LKM PV-2.0 DR A W I N G CO N T R A C T O R CL I E N T / S I T E D A T A AP N : SI Z E RE V I S I O N S Ll o y d M i l l s S m a r t S o l a r D e s i g n L I C E N S E D 1016878 999378 GE N E R A L C ON T R A C T O R STATE OF CALIFORNIA DESIGN . BU I L D DESIGN B U I L D. STATE OF CALIFORNIA L I C E N S E D GE N E R A L C ON T R A C T O R LLOY D P MI LL S LLOYD P MI LL S SOLAR MODULE MOUNTING DETAIL SS BOLT ILSCO GBL-4DBT TIN PLATED LAY IN GROUNDING LUG SS STAR WASHER RAIL FRAME SS HEX NUT TOOTH WASHER 1 GROUNDING LUG DETAIL INSTALLATION NOTES: 1. SOLAR ROOF TILE HOOK MOUNTED VIA 5 16" X 3 1 2" STAINLESS STEEL LAG SCREW, MINIMUM THREAD EMBEDMENT OF 2 1 2" TYPICAL. QTY 2 2. MAXIMUM STANDOFF RAIL SPAN IS 6' IN FIELD 2" X 4" RAFTERS, 24" ON CENTER, TYPICAL 16' 18' 3' SOLAR MODULE MODULE MID/END CLAMPS IRONRIDGE RAIL SOLAR ROOF HOOK "Q-BOLT" 5 16" X 3-1 2" LAG SCREW INTO EXISTING 2" X 4" TRUSS MIN. 2-1 2" EMBEDMENT QTY 2 CHEMLINK M-1 TO BE USED PER ASTMC920 12.48kWDC 7.54kWAC 00 . 1 1 7 . 2 2 3 Co u r t l an d a n d A n n e A l ex 23 3 4 N . W e s t w o o d A v e . Sa n t a An a , C A 9 2 7 0 6 10/09/2022 Date Certified and Exp. Date : 3/31/2024 Signed:10/31/2022 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (747) 333-5991 2334 N Westwood Ave11/14/22 NEC 690 MARKING DETAIL NEC PLACARD DETAIL NTS FIRE DEPARTMENT NOTES: THIS SYSTEM IS DESIGNED TO MEET THE REQUIREMENTS OF THE CAL-FIRE SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINES AND ARTICLE 690 OF THE NATIONAL ELECTRIC CODE (NEC NFPA 70). MARKINGS WILL BE PROVIDED IN ACCORDANCE WITH THE CAL-FIRE SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE. MATERIALS USED FOR MARKING MUST BE WEATHER RESISTANT. IT IS RECOMMENDED THAT THE UNDERWRITERS LABORATORIES MARKING AND LABELING SYSTEM 969 (UL 969) BE USED AS A STANDARD TO DETERMINE WEATHER RATING. PLANS WILL SHOW: MARK "CAUTION SOLAR SYSTEM CONNECTED" AT THE MAIN SERVICE DISCONNECT. PLANS WILL SHOW: MARK "CAUTION SOLAR CIRCUIT" FOR THE DIRECT CURRENT CONDUIT, RACEWAYS, ENCLOSURES, CABLE ASSEMBLIES, AND JUNCTION BOXES. PLANS WILL INDICATE THE FOLLOWING DETAILS ABOUT THE MARKINGS: RED BACKGROUND MINIMUM 3 8" HEIGHT ALL CAPITAL LETTERS ARIAL OF SIMILAR FONT, NON BOLD, REFLECTIVE, WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT. (DURABLE ADHESIE MATERIALS MAY MEET THIS REQUIREMENT). FIRE DEPARTMENT NOTES (CONTINUED): MARKING REQUIRED ON ALL INTERIOR AND EXTERIOR DC CONDUIT, RACEWAYS, ENCLOSURES, CABLE ASSEMBLIES, AND JUNCTION BOXES TO ALERT THE FIRE DEPARTMENT TO AVOID CUTTING THEM. MARKINGS SHOULD BE PLACED ON ALL INTERIOR DC CONDUITS, RACEWAYS, ENCLOSURES, AND CABLE ASSEMBLIES, EVERY 10', AT TURNS AND ABOVE AND/OR BELOW ALL PENETRATIONS AND ALL DC COMBINER AND JUNCTION BOXES. REVISED PLANS WILL SHOW EACH PLACE WHERE MARKINGS WILL BE PROVIDED AND BE PROVIDED. ANY REQUIRED SIGNS THAT SHOW MAPS OR SITE LAYOURS SHOULD INCLUDE A NORTH ARROW. SOLAR PHOTOVOLTAIC POWER SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH CA FIRE CODE SECTIOINS 605.11.1 THROUGH 605.11.4. CONDUIT SHALL BE MARKED: "WARNING PHOTOVOLTAIC POWER SOURCE"ENGRAVED METER PLACARD 6 1 2" X 6 1 2", MOUNTED CENTERED ON LOAD CENTER (CIRCUIT BREAKER COVER) AT UTILITY SERVICE POINT (NEC 690.56) PLACARD NOTES: 1. ALL PLACARDS EXCEPT METER PLACARD PRINTED ON UL 969 RATED, WEATHER RESISTANT, TWO COLOR PLASTIC; RED BACKGROUND WITH WHITE LETTERS, 1 4" ARIAL, NON BOLD FONT. 2. METER PLACARD RIVETED IN PLACE USING 1 8" ALUMINUM POP RIVETS. 3. ALL CONDUIT LABELED USING UV RESISTANT UL 969 WEATHER RATED PLASTIC ADHESIVE LABELS, 3 8" WHITE ARIAL NON-BOLD FONT ON RED BACKGROUND READING: "WARNING: PHOTOVOLTAIC POWER SOUCE." DATE: DRAWN BY: LKM PV-5 DR A W I N G CO N T R A C T O R CL I E N T / S I T E D A T A AP N : SI Z E RE V I S I O N S Llo y d M i l l s S m a r t S o l a r D e s i g n L I C E N S E D 1016878 999378 G E N E R A L C ON T R A C T O R STATE OF CALIFORNIA DESIGN . B U I LD DESIGN B U I LD.STATE OF CALIFORNIA L I C E N S E D G E N E R A L C ON T R A C T O R LLOY D P M I LLS LLOY D P M I LLS NEC 690 PLACARDS CAL FIRE SET BACK 18" PATHWAY CAL FIRE SET BACK 36" PATHWAY ROOF ACCESS ROOF ACCESS PROPOSED INSTALLATION OF PANELS AND ENPHASE IQ8+ MICRO-INVERTERS M EXISTING 200A MAIN SERVICE PANEL W/ 200A OCPD IQ COMBINER 12.48kWDC 7.54kWAC 00 . 1 1 7 . 2 2 3 Co u r t l an d a n d A n n e A l ex 23 3 4 N . W e s t w o o d A v e . Sa n t a A n a , C A 9 2 7 0 6 10/11/2022 3 2334 N Westwood Ave11/14/22 DATE: DRAWN BY: LKM S1.0 DR A W I N G CO N T R A C T O R CL I E N T / S I T E D A T A AP N : SI Z E RE V I S I O N S Ll o y d M i l l s S m a r t S o l a r D e s i g n L I C E N SE D 1016878 999378 GE N E R A L C ON T R A C T O R STATE OF CALIFORNIA DESIGN . BU I L D DESIG N B U I L D.STATE OF CALIFORNIA L I C E N SED GE N E R A L C ON T R A C T O R LLOY D P MI LL S LLOY D P MI LL S SINGLE LINE ELECTRICAL 12.48kWDC 7.54kWAC 00 . 1 1 7 . 2 2 3 Co u r t l an d a n d A n n e A l ex 23 3 4 N . W e s t w o o d A v e . Sa n t a A n a , C A 9 2 7 0 6 10/9/2022 1.PLAN VIEW TOTAL ROOF AREA= 3126 SQFT 2.PV ARRAY AREA = 538 SQFT THE VALUE OF 2 OVER 1. EQUALS 17% AND IS LESS THAN 33% TO ALLOW 18" CLEAR SETBACKS Date Certified and Exp. Date : 3/31/2024 Signed:11/01/2022 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (747) 333-5991 STRUCTURAL 2334 N Westwood Ave11/14/22 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 2334 N. Westwood Ave. Smart Solar Design 1016878 Logan Mills 858-753-3533 10/22/2022 Lmills@smartsolarsocal.com 2334 N Westwood Ave11/14/22 Certificate Of Completion Envelope Id: B992B00CE9E841A79BB7A30083F9E6A3 Status: Completed Subject: Complete with DocuSign: homeowner_Installation_authorization (1).pdf Source Envelope: Document Pages: 1 Signatures: 1 Envelope Originator: Certificate Pages: 5 Initials: 0 Lloyd Mills AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 9630 Black Mountain Road San Diego, CA 92126 dr.lloydmills@smartsolarsocal.com IP Address: 172.117.162.54 Record Tracking Status: Original 10/18/2022 10:16:20 AM Holder: Lloyd Mills dr.lloydmills@smartsolarsocal.com Location: DocuSign Signer Events Signature Timestamp Courtland Alex courtlandalex@gmail.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 70.168.146.99 Sent: 10/18/2022 10:23:46 AM Viewed: 10/18/2022 10:34:23 AM Signed: 10/18/2022 10:34:43 AM Electronic Record and Signature Disclosure: Accepted: 10/18/2022 10:34:23 AM ID: b5758a40-2dd0-4b8f-932f-7b2ddfc7107c In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Karen Edgington supportspecialist@smartsolarsocal.com Security Level: Email, Account Authentication (None) Sent: 10/18/2022 10:23:46 AM Electronic Record and Signature Disclosure: Accepted: 9/8/2022 2:39:26 PM ID: 38f4f7f2-6784-4d3f-9072-5eccafd8d799 Logan Mills lmills@smartsolarsocal.com Security Level: Email, Account Authentication (None) Sent: 10/18/2022 10:23:46 AM Viewed: 10/18/2022 10:55:49 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp 2334 N Westwood Ave11/14/22 Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 10/18/2022 10:23:46 AM Certified Delivered Security Checked 10/18/2022 10:34:23 AM Signing Complete Security Checked 10/18/2022 10:34:43 AM Completed Security Checked 10/18/2022 10:34:43 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure 2334 N Westwood Ave11/14/22 ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Smart Solar (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 11/20/2018 9:00:43 AM Parties agreed to: Courtland Alex, Karen Edgington 2334 N Westwood Ave11/14/22 Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact Smart Solar: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: dr.lloydmills@smartsolarsocal.com To advise Smart Solar of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at dr.lloydmills@smartsolarsocal.com and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from Smart Solar To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to dr.lloydmills@smartsolarsocal.com and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with Smart Solar To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: 2334 N Westwood Ave11/14/22 i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to dr.lloydmills@smartsolarsocal.com and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that: You can access and read this Electronic Record and Signature Disclosure; and You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and  Until or unless you notify Smart Solar as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by Smart Solar during the course of your relationship with Smart Solar. 2334 N Westwood Ave11/14/22