HomeMy WebLinkAbout2421 N Grand Ave - 101115981 & 20180415 - Plan
YES NO
INSTRUCTIONS:
ORAN GE COUNTY FI RE AUTHORI TY
Plan Submittal Criteria
COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects
and RESIDENTIAL TRACT developments
• Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place.
• Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section.
• If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA.
• In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations.
• Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding
requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602.
Address Suite City
Project Scope/Business Description
1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways,
curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within
300 feet of an active or proposed oil well? Fire Master Plan (PR145)
2. Property is adjacent to a wildland area or non-irrigated native vegetation?
Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124)
3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from
an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170)
4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving
private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475)
5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000
sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable
to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless
classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration
or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses
where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories
with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285)
6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card,
button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan
depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520)
7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment;
industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible
liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium
ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations?
Special Equipment Plan (PR315, PR340-PR382)
8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft
maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if
H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240)
9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard
commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330)
10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a
commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335)
Initial each of the following two items indicating that you have read and understand the statement:
11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is
required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed
Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications.
12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located
in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327—
Initials the building department will determine specific requirements.
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name Signature
Phone Number ( ) Date / /
Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA
review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the
applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the
appropriate plans and fees for OCFA review. 10-08-14 EE
COM
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
O R A N G E C O U N T Y F I R E A U T H O R I T Y
Plan Referral Form
Required for OCFA to review plans upon the request of the Building Department when
the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”.
City / County Official Requesting Review:
City / County Reference #: Date: __________________________________
City / County: _____________________________________ E-Mail: __________________________________
Contact Name: _____________________________________ Phone #: _________________________________
Title: _____________________________________
** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. **
Reason(s) for Review:
Please describe why OCFA Plan Review is or may be required by the City/County :
OCFA COMMENTS:
No further action required on this specific plan type, based
on information provided on: ____/______/______.
Project to be taken in for OCFA Review.
Other:
Name: _________________________________________
Contact #: ______________________________________ Date: _________________________________
OCFA Authorization
Updated: 06/02/2020 rs
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
Structural Calculations for a Roof Mounted Solar Photovoltaic System for:
Narsa LLC
2421 N Grand Ave,
Santa Ana, CA 92705
Applicable Codes:
2022 California Building Code, 2022 California Electric Code,
2022 California Mechanical Code, American Society of Civil Engineers
Standard ASCE 7-22 Minimum Design Loads for Buildings and Other
Structures, American Wood Council 2018 National Design Specification
for Wood Construction, Local Municipal Code, and all other codes which
are adopted by reference or enacted by law.
Assumed Design Parameters:
The existing structure has been built under a building permit and is in its
original condition. The existing roof structure is capable of its code
required live load and the ability of the roof structure to support live loads
has not been substantially reduced by the age of the structure, termites or
mold, or unauthorized modifications to the existing structure. Solar Energy
Contractor shall make an inspection of the existing roof framing system
prior to installation of the roof mounted solar energy system to verify that
the existing roof is capable of supporting minimum roof live loads.
Assumed Design Parameters:
All 2x members are grade Douglas Fir #2 or better
All 4X members are grade Douglas Fir #1 or better
All Roof Connectors are Simpson StrongTie or Equal
All Concrete Foundations are f'c = 2500 psi or stronger
Original Structure was built to the TypeV Wood Framed Standards
of the Applicable Building Code at the time of Construction.
Sht # 1 of 72021072 Ilum Solar Cory Hoffa Residence Date: January 12, 2021
Assumed Design Parameters:
The existing structure has been built under a building permit and is in its
original condition. The existing roof structure is capable of its code
required live load and the ability of the roof structure to support live loads
has not been substantially reduced by the age of the structure, termites or
mold, or unauthorized modifications to the existing structure. I have reviewed
the existing structural system and based upon the field measurements and
drawings provided by the contractor, it appears that the roof can support its
required live load.
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2023-3630 Axis Solar Narsa LLC Date: June 7, 2023
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-25
NARSA LLC
2421 N GRAND AVE, SANTA
ANA, CA 92705
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
Sht # 2 of 7
Note to Building Official:
Based upon a review of the proposed plans I am confident that the
existing roof framing system is capable of safely supporting the additional
loads caused by the new solar photovoltaic energy system. I have reviewed
the existing structural system and based upon the field measurements and
drawings provided by the contractor, it appears that the roof can support its
required live load. Attached in this package are several calculations showing
that the roof members can support the additional weight of the solar array.
Furthermore, an analysis of the solar array's support for wind forces and a
seismic analysis of the existing structure are also included.
(Assume max truss span = 20 ft.)
Trusses
truss
Note to Building Official:
Based upon a review of the proposed plans and information, the
existing roof framing system is capable of safely supporting the additional
loads caused by the new solar photovoltaic energy system. The contractor
shall field verify that the existing roof structure is in its original permited
condition and verify that it can support the normal code required roof live
loads. Attached in this package are several calculations showing that the roof
members can support the additional weight of the solar array.
Furthermore, an analysis of the solar array's support for wind forces and a
seismic analysis of the existing structure are also included.
W DL + LL
R1 R218.25'
Rafters
rafter
Total load on rafter = 60 plf x 20 ft. = 1,200 lbs
w = 30 psf x 2 ft. = 60 plf
Total load on rafter = 60 plf x 7.83 ft. = 470 lbs
w = 30 psf x 2 ft. = 60 plf
Check Existing 2x4 Roof Rafters @ 24" O.C.: *
Total load on rafter = 80.1 plf x 18.25 ft. = 1,462 lbs
w = 30 psf x 2.67 ft. = 80.1 plf
Check Existing 2x12 Roof Rafters @ 32" O.C.: *
Total load on joists = 40 plf x 21 ft. = 840 lbs
w = 30 psf x 1.33 ft. = 40 plf
Check Existing Roof Joists @ 16" O.C.:
*Note: Contractor to Field Verify Framing
20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020053 Axis Solar Ryerson Residence Date: November 9, 20192020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 202020201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 202020201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 202020201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 202020201674 Sunrise Solar Jose Munoz Residence Date: July 31, 202020201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 202020201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 202020202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 202020202158 ilum Solar Paul Kiehn Residence Date: September 13, 202020202666 ilum Solar Yvonne Quinones Residence Date: October 16, 202020202762 ilum Solar Andre James Residence Date: October 21, 202020203084 ilum Solar Christine Quilon Residence Date: October 21, 202020203189 ilum Solar Michael Ireland Residence Date: November 12, 202020203252 ilum Solar Viorato Residence Date: November 13, 20202021072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1187 Precis Solar Luis Hutchins Residence Date: April 9, 20212021-2156 Ilum Solar Athena Dejarme Residence Date: June 11, 20212021-2649 Ilum Solar Teresa Gonzales Residence Date: July 9, 20212021-2651 Ilum Solar Karyn McQueen Residence Date: July 9, 20212021-3042 Ilum Solar Bixi Howe Residence Date: August 2, 20212021-4665 Ilum Solar Jerry Vestal Residence Date: October 27, 20212021-4665 Ilum Solar Jerrry Vestal Residence Date: October 27, 20212022-2274 Ilum Solar Gissella Maximo Hernandez Residence Date: May 27, 20222022-3929 Santa Barbara Solar Glenn Veneracion Residence Date: September 28, 20222022-3947 Axis Solar Karen Tom Hume Residence Date: September 29, 20222022-4080 Green Road Solar Robert Owens Residence Date: October 6, 20222022-4447 Precis Solar Michael Telles Residence Date: October 28, 20222022-4542 ESD 22-809 Duane Unzicker Residence Date: November 3, 20222022-4762 ESD 22-982 Adrian Campa Residence Date: November 15, 20222022-4944 ESD 22-1008 Rene Rivas Residence Date: November 30, 20222023-133 Penguin Marc Winger Residence Date: January 11, 20232023-134 Penguin David Wilhelm Residence Date: January 11, 20232023-163 ESD 23-013 Thalia Kirschwehm Residence Date: January 12, 20232023-241 ESD 23-029 Christian Almendares Residence Date: January 18, 20232023-522 ESD 23-070 Rigo Garcia Residence Date: February 2, 20232023-741 ESD 23-124 Jose Alberto Jimenez Residence Date: February 14, 20232023-908 Devil Dog Energy Fidel Lopez Residence Date: February 21, 2023
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-25
2023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 27, 20232023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 28, 20232023-1154 LA Solar Jose Naranjo Residence Date: March 1, 20232023-3630 Axis Solar Narsa LLC Date: June 7, 2023
(Assume max rafter span = 18.25 ft.)
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
Check Existing 2x12 Roof Rafters @ 32" O.C.:
w DL = (Dead + Livereduced) x rafter spacing
Sht # 3 of 7
w DL = (10 + 4) x 2.0
w DL = 28 psf
OK. per 2013 CBC Vol. 2 Section 3403.3 (ADDITIONS)
% CHANGE2,598 LBS 2,400 LBS
2,400 LBSx==8 % ≈ 5% O.K.
20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 2019
W DL + LLR1 R2W DL17.5'3.5'11'P P 3'W DL + LLPP
2019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 2019
R1R2
19'
11'8'
wLLwDL
wLLwDL
PPPP
2020053 Axis Solar Ryerson Residence Date: November 9, 20192020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 2020
w DL + LL = 30 psf x 2 ft. = 60 plfTotal load on truss= 60 plf x 5.5 ft. + 28 plf x 13 ft + ( 4' x 2.75' x 3 psf x 2 ) + ( 4' x 1.65' x 3 psf x 5 )= 859 lbs < 1,110 lbs OKR1R218.5'13'5.5'wLLwDLwLLwDLPPPPPPP
2020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020
Check attachment of Support to Existing Structure for Wind Uplift
CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7-22 WIND LOADS ON BUILDING
APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK
ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2.
NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7-22 EFFECTIVE WIND AREA:
"FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS
EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING
CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT
BE LESS THAN ONE-THIRD ITS LENGTH."
EFFECTIVE AREA = 15 SQ FT
2020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 2020
w DL + LL = 30 psf x 2 ft. = 60 plf
Total load on truss= 60 plf x 3 ft. + 28 plf x 22 ft + ( 4' x 2.75' x 3 psf x 8 ) +
( 4' x 1.65' x 3 psf x 1 )
= 1,060 lbs < 1,500 lbs OK
R1R2
25'
22'1.5'
wLLwDL
wLLwDL
PPPPPPPP
1.5'
20201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 2020
w DL + LL = 30 psf x 2 ft. = 60 plf
Total load on rafter = 60 plf x 6 ft. + 28 plf x 11 ft + ( 4' x 2.75' x 3 psf x 4 ) +
( 4' x 1.65' x 3 psf x 4 )
= 800 lbs < 1,020 lbs OK
R1 R2
17'
3'
w LLwDL
11'
P P P P
3'
20201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 202020201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 2020
w DL + LL = 30 psf x 2 ft. = 60 plf
Total load on rafter = 28 plf x 8 ft + ( 4' x 2.75' x 3 psf x 3 ) + ( 6' x 1.65' x
3 psf x 1 )
= 323 lbs < 480 lbs OK
R1 R2
8'
w LLwDL
P P P
20201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf
Total load on rafter = 60 plf x 1.5 ft. + 28 plf x 5.5 ft + ( 4' x 2.75' x 3 psf x 2 )
+ ( 4' x 1.65' x 3 psf x 4 )
= 310 lbs < 420 lbs OK
R1 R2
7'
w LLwDL
1.5'
P
5.5'
P
20201674 Sunrise Solar Jose Munoz Residence Date: July 31, 2020
w DL + LL = 30 psf x 2 ft. = 60 plf
Total load on rafter = 28 plf x 7.83 ft + ( 4' x 2.75' x 3 psf x 3 ) + ( 6' x 1.65'
x 3 psf x 1 )
= 318 lbs < 470 lbs OK
R1 R2
7.83'
w LLwDL
P P P
w DL + LL = 30 psf x 2 ft. = 60 plf
Total load on truss = 60 plf x 3 ft. + 28 plf x 11 ft + ( 6' x 2.75' x 3 psf x 4 ) +
( 4' x 1.65' x 3 psf x 4 )
= 686 lbs < 840 lbs OK
R1 R2
14'
w LLwDL
11'
P
3'
PPP
20201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 2020
w DL + LL = 30 psf x 2 ft. = 60 plf
Total load on rafter = 28 plf x 14.83 ft + ( 6' x 2.75' x 3 psf x 5 ) + ( 6' x
1.65' x 3 psf x 1 )
= 663 lbs < 890 lbs OK
R1 R2
14.83'
w LLwDL
P P P P P
20201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 2020
w DL + LL = 30 psf x 2 ft. = 60 plf
Total load on truss = 60 plf x 3 ft. + 28 plf x 13 ft + ( 4' x 1.65' x 3 psf x 8 ) +
( 4' x 1.65' x 3 psf x 4 )
= 702 lbs < 960 lbs OK
R1 R2
16'
w LLwDL
13'
P
3'
PPPPPPP
20202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 2020
w DL + LL = 30 psf x 2 ft. = 60 plf
Total load on truss = 60 plf x 13.5 ft. + 28 plf x 11 ft + ( 4' x 2.75' x 3 psf x 4 )
+ ( 4' x 1.65' x 3 psf x 4 )
= 1,250 lbs < 1,470 lbs OK
R1 R224.5'w LLwDL 11'4'PP9.5'PP
20202158 ilum Solar Paul Kiehn Residence Date: September 13, 202020202666 ilum Solar Yvonne Quinones Residence Date: October 16, 202020202762 ilum Solar Andre James Residence Date: October 21, 202020203084 ilum Solar Christine Quilon Residence Date: October 21, 202020203189 ilum Solar Michael Ireland Residence Date: November 12, 202020203252 ilum Solar Viorato Residence Date: November 13, 202020203243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 2021
w DL + LL = 30 psf x 2.67 ft. = 80.1 plf
Total load on rafter = 80.1 plf x 7 ft + 37.38 plf x 11.25 ft + ( 5.33' x 1.65' x 3 psf x 7 ) +
( 4' x 1.65' x 3 psf x 2 )
= 1,166 lbs < 1,462 lbs OK
2021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1187 Precis Solar Luis Hutchins Residence Date: April 9, 20212021-2649 Ilum Solar Teresa Gonzales Residence Date: July 9, 20212021-2651 Ilum Solar Karyn McQueen Residence Date: July 9, 20212021-3042 Ilum Solar Bixi Howe Residence Date: August 2, 20212021-4665 Ilum Solar Jerry Vestal Residence Date: October 27, 20212021-4665 Ilum Solar Jerrry Vestal Residence Date: October 27, 20212022-2274 Ilum Solar Gissella Maximo Hernandez Residence Date: May 27, 20222022-3929 Santa Barbara Solar Glenn Veneracion Residence Date: September 28, 20222022-3947 Axis Solar Karen Tom Hume Residence Date: September 29, 20222022-4080 Green Road Solar Robert Owens Residence Date: October 6, 20222022-4447 Precis Solar Michael Telles Residence Date: October 28, 2022
R1 R2
18.25'
w LLwDL
3.3'4'
2022-4542 ESD 22-809 Duane Unzicker Residence Date: November 3, 20222022-4762 ESD 22-982 Adrian Campa Residence Date: November 15, 20222022-4944 ESD 22-1008 Rene Rivas Residence Date: November 30, 20222023-133 Penguin Marc Winger Residence Date: January 11, 20232023-134 Penguin David Wilhelm Residence Date: January 11, 20232023-163 ESD 23-013 Thalia Kirschwehm Residence Date: January 12, 20232023-241 ESD 23-029 Christian Almendares Residence Date: January 18, 20232023-522 ESD 23-070 Rigo Garcia Residence Date: February 2, 20232023-741 ESD 23-124 Jose Alberto Jimenez Residence Date: February 14, 2023
P
2023-908 Devil Dog Energy Fidel Lopez Residence Date: February 21, 2023
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-25
2023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 27, 20232023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 28, 20232023-1154 LA Solar Jose Naranjo Residence Date: March 1, 2023
PP
2023-3630 Axis Solar Narsa LLC Date: June 7, 2023
1'1'1'3.3'3.3'
1.35'
PP PP
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
Sht # 4 of 7
2'-0"
5'-9"
20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 2019
Load per lag screw = 609 lbs / 1 = 609 lbs
Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below
according to the 2015 NDS.
W ' = W x Cd x Ct Table 10.3.1 2015 NDS
where:
W = 266 lbs / in. of embedment per Table 12.2a
Cd = 1.6 per Table 2.3.2 of 2015 NDS
Ct = 1.0 per Table 10.3.4 of 2015 NDS
W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 609 lbs OK
Use Support connected to 2x Min. Roof Member
w/ (1) 5/16" x 3.5" lag screws per connection minimum.
Design (Factored) Uplift at each support = 0.6 x 1,016 lbs = 609 lbs
Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max )
Calculate Uplift at each support:
Eq'n 30.51 ASCE 710
Wind Speed 129 mph Exposure C
Nominal (Unfactored) Uplift at each support = 61.56 psf x 16.5 sq. ft. = 1,016 lbs
pnet =
λ
Kzt I pnet30 λ
=1.35
Kzt =1.0
I = 1.0
pnet30 =45.6 psf
pnet =1.35 x 1.0 x 1.0 x (45.6 psf) = 62.8 psf
Note: Section 2.4.1 of ASCE 710, Basic Load Combinations for Allowable Stress
Design. Note: Applicable Load Combination #5 (D + 0.6W)
2019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020053 Axis Solar Ryerson Residence Date: November 9, 20192020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 202020201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 202020201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 2020
qh
Exp. 3-31-19
No. C58724NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
21
Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C):
Eq'n 29.47 ASCE 716
Kz = velocity pressure coefficient
p=qhðGCpÞðγEÞðγaÞð
=0.00256 Kz Kzt Kd Ke V2
Note:
Section 29.10.1 ASCE 716
Kz = 0.9 (Exposure C, Height = 20 ft or less)
Kzt = Topographical Factor = 1.0
Kd = Wind Directionality Factor = 0.85
Ke = Ground Elevation Factor = 1.0
V = 130 mph ; VASD = 101 mphTable 1609.3.1 2019 CBC
qh=0.00256 (0.9) (1.0) (0.85) (1.0) (101)2
p=qhðGCpÞðγEÞðγaÞð
qh=20 psf
p = 20 psf (2.0) (1.5) (0.7) = 42 psf
Eq'n 26.101 ASCE 716
GCp = 2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
GCp = Exposure Factor = 1.5ðγE
GCp = Solar Array Pressure Equalization Factor = 0.7ðγaFig. 29.48 ASCE 716
Nominal (Unfactored) Uplift at each support = 42 psf x 16.5 sq. ft. = 693 lbs
Note: Section 2.4.1 of ASCE 716 , Basic Load Combinations for Allowable Stress
Design. Note: Applicable Load Combination #5 : D + 0.6W
Dead Load = 03 psf
Wind Load = 42 psf
Snow Load = 20.0 psf
Check attachment of Support to Existing Structure for Wind Uplift Cont'd
20201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 202020201674 Sunrise Solar Jose Munoz Residence Date: July 31, 2020
qh
Check attachment of Support to Existing Structure for Wind Uplift Cont'd
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
21
Tributary Area to Each Solar Mount = 6 ft. x 1.65 ft. = 9.9 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C):
Eq'n 29.47 ASCE 716
Kz = velocity pressure coefficient
p =qh ðGCp ÞðγE Þðγa Þð
=0.00256 Kz Kzt Kd Ke V2
Note:
Section 29.10.1 ASCE 716
Kz = 0.9 (Exposure C, Height = 20 ft or less)
Kzt = Topographical Factor = 1.0
Kd = Wind Directionality Factor = 0.85
Ke = Ground Elevation Factor = 1.0
V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC
qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2
p =qh ðGCp ÞðγE Þðγa Þð
qh =20 psf
p = 20 psf (2.0) (1.5) (0.7) = 42 psf
Eq'n 26.101 ASCE 716
GCp = 2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
GCp = Exposure Factor = 1.5ðγE
GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.48 ASCE 716
Design (Factored) Uplift at each support = 0.6 x 416 lbs = 249 lbs
Nominal (Unfactored) Uplift at each support = 42 psf x 9.9 sq. ft. = 416 lbs
Note: Section 2.4.1 of ASCE 716, Basic Load Combinations for Allowable Stress
Load per lag screw = 249 lbs / 1 = 249 lbs
Design. Note: Applicable Load Combination #5 (D + 0.6W)
20201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 202020201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 202020202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 202020202269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 202020202392 UniverCity Solar Debra Enriquez Residence Date: September 29, 202020202390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 202020202437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020
qh=
Note:
qh=
qh=
ðγE
ðγa
Check attachment of Support to Existing Structure for Wind Uplift Cont'd
Tributary Area to Each Solar Mount = 4 ft. x 2.75 ft. = 11 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 110 mph Exposure C):
Eq'n 29.47 ASCE 716
Kz = velocity pressure coefficient
p=qhðGCpÞðγEÞðγaÞð
0.00256 Kz Kzt Kd Ke V2
Section 29.10.1 ASCE 716
Kz = 0.9 (Exposure C, Height = 20 ft or less)
Kzt = Topographical Factor = 1.0
Kd = Wind Directionality Factor = 0.85
Ke = Ground Elevation Factor = 1.0
V = 110 mph ; VASD = 85 mphTable 1609.3.1 2019 CBC
0.00256 (0.9) (1.0) (0.85) (1.0) (85)2
p=qhðGCpÞðγEÞðγaÞð
14.15 psf
p = 14.15 psf (2.0) (1.5) (0.7) = 29.7 psf
Eq'n 26.101 ASCE 716
GCp = 2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
GCp = Exposure Factor = 1.5
GCp = Solar Array Pressure Equalization Factor = 0.7Fig. 29.48 ASCE 716
Nominal (Unfactored) Uplift at each support = 29.7 psf x 11 sq. ft. = 327 lbs
Note: Section 2.4.1 of ASCE 716 , Basic Load Combinations for Allowable Stress
Design. Note: Applicable Load Combination #5 : D + 0.6W
Dead Load = 03 psf
Wind Load = 29.7 psf
Snow Load = 20.0 psf
Exp. 3-31-19
No. C58724NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
21
20202436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 202020202434 Mohr Power Thurin Residence Date: October 1, 202020202450 ESD 20579 Sanchez Residence Date: October 2, 202020202466 Solar Deployed Jose Bautista Residence Date: October 3, 202020202472 Solar Deployed Sava Knezevich Residence Date: October 5, 202020202493 Sunrise Solar Luis Avila Residence Date: October 6, 202020202491 Effect Energy Ana Lopez Residence Date: October 6, 202020202495 Penguin Solar German Rios Residence Date: October 6, 202020202498 Penguin Solar Lisa Bishop Residence Date: October 6, 202020202510 Sasha Intl Mayra Davila Residence Date: October 6, 202020202510 Sasha Intl Mayra Davila Residence Date: October 7, 202020202507 ESD 20593 So Residence Date: October 7, 202020202515 Penguin Solar Black Annette Residence Date: October 7, 202020202531 Solar Journey Charlie Zheng Residence Date: October 8, 202020202525 New Power William Fuller Residence Date: October 8, 202020202545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 202020202565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 202020202564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 202020202576 Sunrise Solar Derrick Darland Residence Date: October 12, 202020202591 ESD 20590 Supulveda Residence Date: October 13, 202020202603 New Power John Yager Residence Date: October 14, 202020202603 New Power William Fuller Residence Date: October 14, 202020202601 TG Roofing Michael Seffintger Residence Date: October 14, 202020202652 Axis Solar Marcus Residence Date: October 15, 202020202652 Axis Solar Freimanis Residence Date: October 15, 202020202674 Complete Solar Dorado Residence Date: October 16, 202020202699 Solar Deployed Daniel Rivera Residence Date: October 17, 202020202694 ESD 20648 Barrera Residence Date: October 17, 202020202836 Penguin Solar Kalup Residence Date: October 26, 202020202832 Grid Alt IE Ana Hernandez Residence Date: October 26, 202020202841 Sunrise Solar Lathan Williams Residence Date: October 26, 202020202862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 202020202861 New Power Susan Bakken Residence Date: October 27, 202020202859 Grid Alt IE Terry McDonnell Residence Date: October 27, 202020202856 Solar Deployed Azsa Villalobos Residence Date: October 27, 2020
qh
Check attachment of Support to Existing Structure for Wind Uplift Cont'd
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
21
Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C):
Eq'n 29.47 ASCE 716
Kz = velocity pressure coefficient
p =qh ðGC p ÞðγE Þðγa Þð
=0.00256 Kz Kzt Kd Ke V2
Note:
Section 29.10.1 ASCE 716
Kz = 0.9 (Exposure C, Height = 20 ft or less)
Kzt = Topographical Factor = 1.0
Kd = Wind Directionality Factor = 0.85
Ke = Ground Elevation Factor = 1.0
V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC
qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2
p =qh ðGC p ÞðγE Þðγa Þð
qh =20 psf
p = 20 psf (2.0) (1.5) (0.7) = 42 psf
Eq'n 26.101 ASCE 716
GCp = 2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
GCp = Exposure Factor = 1.5ðγE
GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.48 ASCE 716
Design (Factored) Uplift at each support = 0.6 x 693 lbs = 416 lbs
Nominal (Unfactored) Uplift at each support = 42 psf x 16.5 sq. ft. = 693 lbs
Note: Section 2.4.1 of ASCE 716, Basic Load Combinations for Allowable Stress
Load per lag screw = 416 lbs / 1 = 416 lbs
Design. Note: Applicable Load Combination #5 (D + 0.6W)
20202854 Solar Deployed Deilar Aguilera Residence Date: October 27, 202020202853 TG Roofing Brown Robert Residence Date: October 27, 202020202875 Trinity Power John Mendel Residence Date: October 28, 202020202874 Solar Deployed Jesse Haynes Residence Date: October 28, 202020202873 Solar Deployed Elward Beyerle Residence Date: October 28, 202020202887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 202020202907 Solar Deployed Rudy Valdez Residence Date: October 29, 202020202905 Sasha Intl Susan Driggs Residence Date: October 29, 202020202904 HPM Solar Leona Sankhla Residence Date: October 29, 202020202904 HPM Solar Leona Fisher Residence Date: October 29, 202020202918 Precis Solar Humberto Lemus Residence Date: October 29, 202020202915 Complete Solar Ojeda Residence Date: October 29, 202020202936 ESD 20614 2892 Walker Residence Date: October 29, 202020202936 ESD 20614 2892 Falcon Services Date: October 29, 202020202936 ESD 20614 2892 Falcon Walker Date: October 29, 202020202940 Axis Solar Shook Date: October 30, 2020
qh
Check attachment of Support to Existing Structure for Wind Uplift Cont'd
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
21
Tributary Area to Each Solar Mount = 5.33 ft. x 2.75 ft. = 14.7 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C):
Eq'n 29.47 ASCE 716
Kz = velocity pressure coefficient
p =qh ðGC p ÞðγE Þðγa Þð
=0.00256 Kz Kzt Kd Ke V2
Note:
Section 29.10.1 ASCE 716
Kz = 0.9 (Exposure C, Height = 20 ft or less)
Kzt = Topographical Factor = 1.0
Kd = Wind Directionality Factor = 0.85
Ke = Ground Elevation Factor = 1.0
V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC
qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2
p =qh ðGC p ÞðγE Þðγa Þð
qh =20 psf
p = 20 psf (2.0) (1.5) (0.7) = 42 psf
Eq'n 26.101 ASCE 716
GCp = 2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
GCp = Exposure Factor = 1.5ðγE
GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.48 ASCE 716
Design (Factored) Uplift at each support = 0.6 x 616 lbs = 369 lbs
Nominal (Unfactored) Uplift at each support = 42 psf x 14.7 sq. ft. = 616 lbs
Note: Section 2.4.1 of ASCE 716, Basic Load Combinations for Allowable Stress
Load per lag screw = 369 lbs / 3 = 123 lbs
Design. Note: Applicable Load Combination #5 (D + 0.6W)
20202963 Axis Solar Luke Ding Residence Date: October 31, 202020202959 Penguin Solar Stevens Residence Date: October 31, 202020202954 Solar Deployed Edith Vigil Residence Date: October 31, 202020202939 Mohr Power Pappillion Residence Date: October 31, 202020202983 Infinity Solar Gernazio Residence Date: November 3, 202020202982 Infinity Solar Luna Residence Date: November 3, 202020203021 TG Roofing Jeff Costa Residence Date: November 4, 202020203033 Penguin Solar Christina Cvek Residence Date: November 5, 202020203062 UniverCity Solar Mantri Residence Date: November 6, 202020203059 Solar Deployed Joshua Bethmann Residence Date: November 6, 202020203058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 202020203057 Future Energy Rebecca Jamison Residence Date: November 6, 202020203056 Penguin Solar David Esqueda Residence Date: November 6, 202020203055 Solar Journey Darren Misaresh Residence Date: November 6, 202020203052 ESD 20747 Perez Residence Date: November 6, 202020203065 HPM Solar Torres Residence Date: November 6, 202020203085 20729 Green Residence Date: November 8, 202020203083 HPM Solar Lisa Morales Residence Date: November 8, 202020203076 V's Solar Alberto Valadez Residence Date: November 8, 202020203249 Penguin Solar Scantlin Mark Residence Date: November 13, 202020203249 Penguin Solar Christina Cvek Residence Date: November 13, 202020203248 Penguin Solar Al Timpson Residence Date: November 13, 202020203255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 202020203235 Infinity Solar Dizon Residence Date: November 16, 202020203360 Axis Solar Hogan Residence Date: November 23, 202020203457 Solar Deployed Quyen Tran Residence Date: November 30, 202020203570 ESD 20917 Hatter Residence Date: December 6, 202020203567 Infinity Solar Wittenberg Residence Date: December 6, 202020203566 TG Roofing Morff Craig Residence Date: December 6, 202020203566 TG Roofing Craig Morff Residence Date: December 6, 202020203686 Bratton Solar Love Residence Date: December 14, 202020203682 New Power Shawn Johnson Date: December 14, 202020203681 Solar Deployed Javier Barragan Residence Date: December 14, 202020203695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 202020203695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 202020203695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 202020203707 Penguin Solar James Logan Residence Date: December 15, 202020203704 New Power Marite Cappelletti Residence Date: December 15, 202020203735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 202020203734 New Power Judith Park Residence Date: December 16, 202020203729 ilum Solar Jack Weddle Residence Date: December 16, 202020203738 Sasha Intl Amita Seth Residence Date: December 16, 202020203759 Mohr Power Smith Residence Date: December 17, 202020203793 Valley Solar Magdalena Corona Residence Date: December 21, 202020203792 Mohr Power Stansfield Residence Date: December 21, 2020 20203816 ilum Solar Wolf Residence Date: December 22, 2020 20203809 RNR Contreras Residence Date: December 22, 2020 20203843 Revamp Energy Kunal Patel Residence Date: December 23, 2020 20203842 Solar Deployed Nicholas Glackin Residence Date: December 23, 2020 20203841 Penguin Solar Calvillo Maria Residence Date: December 23, 2020 20203839 CAD for Cali Wheeler Residence Date: December 23, 2020 20203838 Solar Deployed Jaime Marquez Residence Date: December 23, 2020 20203853 Infinity Solar Robert Edwards Residence Date: December 23, 2020 20203857 Solar Deployed Thomas Cabrera Residence Date: December 28, 2020 2021007 Sasha Intl Doti Odell Residence Date: January 4, 20212021034 Silverline Solar Brendetta Bhones Residence Date: January 6, 20212021030 Mohr Power Carpenter Residence Date: January 6, 20212021029 Solar Journey Ryan Cai Residence Date: January 6, 20212021027 Better Earth Cheryl Brady Residence Date: January 6, 20212021024 Silverline Solar Timothy Corcoran Residence Date: January 6, 20212021050 Sasha Intl Melissa Taravella Residence Date: January 7, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-266 Penguin Solar Steve Siegel Residence Date: January 23, 20212021-835 Penguin Solar Natalie Cabayan Residence Date: March 11, 20212021-1089 Precis Solar Phillip Llamas Residence Date: April 1, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021
qh
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Tributary Area to Each Solar Mount = 5.33 ft. x 1.65 ft. = 8.8 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C):
Eq'n 29.4-7 ASCE 7-22
Kz = velocity pressure coefficient
p =qh ðGC p ÞðγE Þðγa Þð
=0.00256 Kz Kzt Kd Ke V2
Note:
Section 29.10.1 ASCE 7-22
Kz = 0.9 (Exposure C, Height = 20 ft or less)
Kzt = Topographical Factor = 1.0
Kd = Wind Directionality Factor = 0.85
Ke = Ground Elevation Factor = 1.0
V = 130 mph ; VASB = 101 mph Table 1609.3.1 2022 CBC
qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2
p =qh ðGC p ÞðγE Þðγa Þð
qh =20 psf
p = 20 psf (-2.0) (1.5) (0.7) = 42 psf
Eq'n 26.10-1 ASCE 7-22
GCp = -2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
GCp = Exposure Factor = 1.5ðγE
GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.4-8 ASCE 7-22
Design (Factored) Uplift at each support = 0.6 x 370 lbs = 222 lbs
Nominal (Unfactored) Uplift at each support = 42 psf x 8.8 sq. ft. = 370 lbs
Note: Section 2.4.1 of ASCE 7-22, Basic Load Combinations for Allowable Stress
Load per lag screw = 222 lbs / 1 = 222 lbs
Design. Note: Applicable Load Combination #5 (D + 0.6W)
2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3226 A1 Sun Inc Gary Wiskind Residence Date: August 10, 2022 2022-3230 BVI Solar Bart Cooper Residence Date: August 10, 2022 2022-3237 Solar Deployed Mario Giampa Residence Date: August 10, 2022 2022-3260 Solar Deployed Cort Collins Residence Date: August 11, 2022 2022-3814 Measure The Sun Rachel Edwards Residence Date: September 21, 2022 2022-3819 Solar Draft Jean Pak Residence Date: September 21, 2022 2022-3896 PowerTown Solar Chantelle Ho Residence Date: September 27, 2022 2022-3913 Pure Gold Solar Rick Jill Burgess Residence Date: September 27, 2022 2022-3935 Solar Outsource David Ross Residence Date: September 28, 2022 2022-3950 Solar Plan Design Kiera Woodson Residence Date: September 29, 20222022-4007 Solar Depoyed Nathan Dean Wilder Residence Date: October 4, 20222022-4041 Sun Green Systems Kiera James Kingdom Residence Date: October 5, 20222022-4082 BVI Solar Bill Faust Residence Date: October 6, 20222022-4423 Sun Dollar Solar Norm Fort Residence Date: October 27, 20222022-4521 Solar Survey Pro 11918 Lambert Ave Residence Date: November 2, 20222023-2023-102 HPM Solar Duke Draeger Residence Date: January 10, 20232023-104 Solar Deployed Emilio Romero Residence Date: January 10, 20232023-160 Green Road Solar Sonny Pulley Residence Date: January 12, 20232023-180 Solar Outsource Joven Tolentino Residence Date: January 13, 20232023-243 ESD 23-032 Thomas Chaiping Residence Date: January 18, 20232023-523 ESD 23-077 Richard Soliven Residence Date: February 2, 20232023-831 Solar Deployed Francisco Arreola Residence Date: February 17, 2023
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-25
2023-906 Devil Dog Energy Daniel Noblitt Residence Date: February 21, 20232023-911 Sun Dollar Solar Visant Sanathara Residence Date: February 21, 20232023-912 CV Solar Larry Heitman Residence Date: February 21, 20232023-1092 Solar Deployed Eric Kirkhuff Residence Date: February 27, 20232023-1662 Infinity Solar Marc Roudanez_ Residence Date: March 27, 20232023-1662 Infinity Solar Marc Roudanez Residence Date: March 27, 20232023-2051 Infinity Solar Eddie Kim Residence Date: March 29, 20232023-2153 ESD 23-421 Duane Kubischta Residence Date: March 31, 20232023-3630 Axis Solar Narsa LLC Date: June 7, 2023
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
Sht # 5 of 7
20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020053 Axis Solar Ryerson Residence Date: November 9, 20192020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 202020201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 202020201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 202020201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 202020201674 Sunrise Solar Jose Munoz Residence Date: July 31, 202020201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 202020201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 202020202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 202020202269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 202020202392 UniverCity Solar Debra Enriquez Residence Date: September 29, 202020202390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 202020202437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020
Check attachment of Support to Existing Structure for Wind Uplift Cont'd
Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below
according to the 2018 NDS.
W ' = W x Cd x Ct Table 10.3.1 2018 NDS
where:
W = 266 lbs / in. of embedment per Table 12.2a
Cd = 1.6 per Table 2.3.2 of 2018 NDS
Ct = 1.0 per Table 10.3.4 of 2018 NDS
W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 222 lbs OK
Use Support connected to 2x Min. Roof Member
w/ (1) 5/16" x 3" lag screws per connection minimum.
20202436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 202020202434 Mohr Power Thurin Residence Date: October 1, 202020202450 ESD 20579 Sanchez Residence Date: October 2, 202020202466 Solar Deployed Jose Bautista Residence Date: October 3, 202020202472 Solar Deployed Sava Knezevich Residence Date: October 5, 202020202493 Sunrise Solar Luis Avila Residence Date: October 6, 202020202491 Effect Energy Ana Lopez Residence Date: October 6, 202020202495 Penguin Solar German Rios Residence Date: October 6, 202020202498 Penguin Solar Lisa Bishop Residence Date: October 6, 202020202510 Sasha Intl Mayra Davila Residence Date: October 6, 202020202510 Sasha Intl Mayra Davila Residence Date: October 7, 202020202507 ESD 20593 So Residence Date: October 7, 202020202515 Penguin Solar Black Annette Residence Date: October 7, 202020202531 Solar Journey Charlie Zheng Residence Date: October 8, 202020202525 New Power William Fuller Residence Date: October 8, 202020202545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 202020202565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 202020202564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 202020202576 Sunrise Solar Derrick Darland Residence Date: October 12, 202020202591 ESD 20590 Supulveda Residence Date: October 13, 202020202603 New Power John Yager Residence Date: October 14, 202020202603 New Power William Fuller Residence Date: October 14, 202020202601 TG Roofing Michael Seffintger Residence Date: October 14, 202020202652 Axis Solar Marcus Residence Date: October 15, 202020202652 Axis Solar Freimanis Residence Date: October 15, 202020202674 Complete Solar Dorado Residence Date: October 16, 202020202699 Solar Deployed Daniel Rivera Residence Date: October 17, 202020202694 ESD 20648 Barrera Residence Date: October 17, 202020202836 Penguin Solar Kalup Residence Date: October 26, 202020202832 Grid Alt IE Ana Hernandez Residence Date: October 26, 202020202841 Sunrise Solar Lathan Williams Residence Date: October 26, 202020202862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 202020202861 New Power Susan Bakken Residence Date: October 27, 202020202859 Grid Alt IE Terry McDonnell Residence Date: October 27, 202020202856 Solar Deployed Azsa Villalobos Residence Date: October 27, 202020202854 Solar Deployed Deilar Aguilera Residence Date: October 27, 202020202853 TG Roofing Brown Robert Residence Date: October 27, 202020202875 Trinity Power John Mendel Residence Date: October 28, 202020202874 Solar Deployed Jesse Haynes Residence Date: October 28, 202020202873 Solar Deployed Elward Beyerle Residence Date: October 28, 202020202887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 202020202907 Solar Deployed Rudy Valdez Residence Date: October 29, 202020202905 Sasha Intl Susan Driggs Residence Date: October 29, 202020202904 HPM Solar Leona Sankhla Residence Date: October 29, 202020202904 HPM Solar Leona Fisher Residence Date: October 29, 202020202918 Precis Solar Humberto Lemus Residence Date: October 29, 202020202915 Complete Solar Ojeda Residence Date: October 29, 202020202936 ESD 20614 2892 Walker Residence Date: October 29, 202020202936 ESD 20614 2892 Falcon Services Date: October 29, 202020202936 ESD 20614 2892 Falcon Walker Date: October 29, 202020202940 Axis Solar Shook Date: October 30, 2020
Free Body Diagram of Reversetilt Sub Array
m of Reversetilt Sub Array
Shear Reaction
Uplift ReactionUplift Reaction
Shear Reaction = (6 ft x 5.5 ft x 42 psf x sin 15) = 359 lbs
Allowable lateral Load at 5/16" diameter lag screw w/ 2.5" embedment
Allowable Load = 200 lbs x 1.6 x 2 = 640 lbs > 359 lbs OK
(Note: Angle between Roof and Panels is 15 degrees)
See plans for connection details.
Note: Zone 2
20202963 Axis Solar Luke Ding Residence Date: October 31, 202020202959 Penguin Solar Stevens Residence Date: October 31, 202020202954 Solar Deployed Edith Vigil Residence Date: October 31, 202020202939 Mohr Power Pappillion Residence Date: October 31, 202020202983 Infinity Solar Gernazio Residence Date: November 3, 202020202982 Infinity Solar Luna Residence Date: November 3, 202020203021 TG Roofing Jeff Costa Residence Date: November 4, 202020203033 Penguin Solar Christina Cvek Residence Date: November 5, 202020203062 UniverCity Solar Mantri Residence Date: November 6, 202020203059 Solar Deployed Joshua Bethmann Residence Date: November 6, 202020203058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 202020203057 Future Energy Rebecca Jamison Residence Date: November 6, 202020203056 Penguin Solar David Esqueda Residence Date: November 6, 202020203055 Solar Journey Darren Misaresh Residence Date: November 6, 202020203052 ESD 20747 Perez Residence Date: November 6, 202020203065 HPM Solar Torres Residence Date: November 6, 202020203085 20729 Green Residence Date: November 8, 202020203083 HPM Solar Lisa Morales Residence Date: November 8, 202020203076 V's Solar Alberto Valadez Residence Date: November 8, 202020203249 Penguin Solar Scantlin Mark Residence Date: November 13, 202020203249 Penguin Solar Christina Cvek Residence Date: November 13, 202020203248 Penguin Solar Al Timpson Residence Date: November 13, 202020203255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 202020203235 Infinity Solar Dizon Residence Date: November 16, 202020203360 Axis Solar Hogan Residence Date: November 23, 202020203457 Solar Deployed Quyen Tran Residence Date: November 30, 202020203570 ESD 20917 Hatter Residence Date: December 6, 202020203567 Infinity Solar Wittenberg Residence Date: December 6, 202020203566 TG Roofing Morff Craig Residence Date: December 6, 202020203566 TG Roofing Craig Morff Residence Date: December 6, 202020203686 Bratton Solar Love Residence Date: December 14, 202020203682 New Power Shawn Johnson Date: December 14, 202020203681 Solar Deployed Javier Barragan Residence Date: December 14, 202020203695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 202020203695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 202020203695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 202020203707 Penguin Solar James Logan Residence Date: December 15, 202020203704 New Power Marite Cappelletti Residence Date: December 15, 202020203735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 202020203734 New Power Judith Park Residence Date: December 16, 202020203729 ilum Solar Jack Weddle Residence Date: December 16, 202020203738 Sasha Intl Amita Seth Residence Date: December 16, 202020203759 Mohr Power Smith Residence Date: December 17, 202020203793 Valley Solar Magdalena Corona Residence Date: December 21, 202020203792 Mohr Power Stansfield Residence Date: December 21, 2020 20203816 ilum Solar Wolf Residence Date: December 22, 2020 20203809 RNR Contreras Residence Date: December 22, 2020 20203843 Revamp Energy Kunal Patel Residence Date: December 23, 2020 20203842 Solar Deployed Nicholas Glackin Residence Date: December 23, 2020 20203841 Penguin Solar Calvillo Maria Residence Date: December 23, 2020 20203839 CAD for Cali Wheeler Residence Date: December 23, 2020 20203838 Solar Deployed Jaime Marquez Residence Date: December 23, 2020 20203853 Infinity Solar Robert Edwards Residence Date: December 23, 2020 20203857 Solar Deployed Thomas Cabrera Residence Date: December 28, 2020 2021007 Sasha Intl Doti Odell Residence Date: January 4, 20212021034 Silverline Solar Brendetta Bhones Residence Date: January 6, 20212021030 Mohr Power Carpenter Residence Date: January 6, 20212021029 Solar Journey Ryan Cai Residence Date: January 6, 20212021027 Better Earth Cheryl Brady Residence Date: January 6, 20212021024 Silverline Solar Timothy Corcoran Residence Date: January 6, 20212021050 Sasha Intl Melissa Taravella Residence Date: January 7, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-266 Penguin Solar Steve Siegel Residence Date: January 23, 20212021-835 Penguin Solar Natalie Cabayan Residence Date: March 11, 20212021-1089 Precis Solar Phillip Llamas Residence Date: April 1, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021 2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3226 A1 Sun Inc Gary Wiskind Residence Date: August 10, 2022 2022-3230 BVI Solar Bart Cooper Residence Date: August 10, 2022 2022-3237 Solar Deployed Mario Giampa Residence Date: August 10, 2022 2022-3260 Solar Deployed Cort Collins Residence Date: August 11, 2022 2022-3814 Measure The Sun Rachel Edwards Residence Date: September 21, 2022 2022-3819 Solar Draft Jean Pak Residence Date: September 21, 2022 2022-3896 PowerTown Solar Chantelle Ho Residence Date: September 27, 2022 2022-3913 Pure Gold Solar Rick Jill Burgess Residence Date: September 27, 2022 2022-3935 Solar Outsource David Ross Residence Date: September 28, 2022 2022-3950 Solar Plan Design Kiera Woodson Residence Date: September 29, 20222022-4007 Solar Depoyed Nathan Dean Wilder Residence Date: October 4, 20222022-4041 Sun Green Systems Kiera James Kingdom Residence Date: October 5, 20222022-4082 BVI Solar Bill Faust Residence Date: October 6, 20222022-4423 Sun Dollar Solar Norm Fort Residence Date: October 27, 20222022-4521 Solar Survey Pro 11918 Lambert Ave Residence Date: November 2, 20222023-2023-102 HPM Solar Duke Draeger Residence Date: January 10, 20232023-104 Solar Deployed Emilio Romero Residence Date: January 10, 20232023-160 Green Road Solar Sonny Pulley Residence Date: January 12, 20232023-180 Solar Outsource Joven Tolentino Residence Date: January 13, 20232023-243 ESD 23-032 Thomas Chaiping Residence Date: January 18, 20232023-523 ESD 23-077 Richard Soliven Residence Date: February 2, 20232023-831 Solar Deployed Francisco Arreola Residence Date: February 17, 20232023-906 Devil Dog Energy Daniel Noblitt Residence Date: February 21, 20232023-911 Sun Dollar Solar Visant Sanathara Residence Date: February 21, 20232023-912 CV Solar Larry Heitman Residence Date: February 21, 20232023-1092 Solar Deployed Eric Kirkhuff Residence Date: February 27, 20232023-1662 Infinity Solar Marc Roudanez_ Residence Date: March 27, 20232023-1662 Infinity Solar Marc Roudanez Residence Date: March 27, 20232023-2051 Infinity Solar Eddie Kim Residence Date: March 29, 20232023-2153 ESD 23-421 Duane Kubischta Residence Date: March 31, 20232023-3630 Axis Solar Narsa LLC Date: June 7, 2023
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
Check Seismic load due to added dead load of photovoltaic system.
Determine Seismic Weight of Existing Building:
Effective Existing Seismic Weight
Area of (E) Building =Approximately 5,900 Sq. ft.
Approximate
Effective
Seismic Weight
=5,900 sq. ft. x 30 psf ave. = 177,000 LBS
DETERMINE BASE SHEAR
V = Cs W
Cs =
SDS
R
Ie
R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.21
R = 4.0 ORDINARY CONCRETE SHEAR WALLS
Ie = 1.0 IMPORTANCE FACTOR
SDS =
2/3 x SMS
SMS =
FA x SS
SMS =
1.2 x 1.5 = 1.8
SDS =
2/3 x 1.8 = 1.2
Cs =
1.2
4.0
1
=
0.3
Sht # 6 of 7
20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020053 Axis Solar Ryerson Residence Date: November 9, 2019
EQ'N 12.8-1 ASCE 7-22
EQ'N 12.8-2 ASCE 7-22
EQ'N 11.4-3 ASCE 7-16
EQ'N 11.4-1 ASCE 7-16
EQ'N 12.8-2 ASCE 7-22
2020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 202020201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 202020201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 202020201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 202020201674 Sunrise Solar Jose Munoz Residence Date: July 31, 202020201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 202020201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 202020202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 202020202158 ilum Solar Paul Kiehn Residence Date: September 13, 202020202666 ilum Solar Yvonne Quinones Residence Date: October 16, 202020202762 ilum Solar Andre James Residence Date: October 21, 202020203084 ilum Solar Christine Quilon Residence Date: October 21, 202020203189 ilum Solar Michael Ireland Residence Date: November 12, 202020203252 ilum Solar Viorato Residence Date: November 13, 202020203243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1187 Precis Solar Luis Hutchins Residence Date: April 9, 20212021-2156 Ilum Solar Athena Dejarme Residence Date: June 11, 20212021-2649 Ilum Solar Teresa Gonzales Residence Date: July 9, 20212021-2651 Ilum Solar Karyn McQueen Residence Date: July 9, 20212021-3042 Ilum Solar Bixi Howe Residence Date: August 2, 20212021-4665 Ilum Solar Jerry Vestal Residence Date: October 27, 20212021-4665 Ilum Solar Jerrry Vestal Residence Date: October 27, 20212022-2274 Ilum Solar Gissella Maximo Hernandez Residence Date: May 27, 20222022-3929 Santa Barbara Solar Glenn Veneracion Residence Date: September 28, 20222022-3947 Axis Solar Karen Tom Hume Residence Date: September 29, 20222022-4080 Green Road Solar Robert Owens Residence Date: October 6, 20222022-4447 Precis Solar Michael Telles Residence Date: October 28, 20222022-4542 ESD 22-809 Duane Unzicker Residence Date: November 3, 20222022-4762 ESD 22-982 Adrian Campa Residence Date: November 15, 20222022-4944 ESD 22-1008 Rene Rivas Residence Date: November 30, 20222023-133 Penguin Marc Winger Residence Date: January 11, 20232023-134 Penguin David Wilhelm Residence Date: January 11, 20232023-163 ESD 23-013 Thalia Kirschwehm Residence Date: January 12, 20232023-241 ESD 23-029 Christian Almendares Residence Date: January 18, 20232023-522 ESD 23-070 Rigo Garcia Residence Date: February 2, 20232023-741 ESD 23-124 Jose Alberto Jimenez Residence Date: February 14, 20232023-908 Devil Dog Energy Fidel Lopez Residence Date: February 21, 2023
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-25
2023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 27, 20232023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 28, 20232023-1573 ESD 23-224 Marvin Webster Residence Date: March 15, 20232023-1575 ESD 23-165 My Hanh Nguyen Residence Date: March 15, 20232023-2662 ESD 23-491 Corinne Dossett Residence Date: April 18, 20232023-2663 ESD 23-454 Hector Paniagua Residence Date: April 18, 20232023-3511 Unique Solar Atria Bonita Residence Date: May 30, 20232023-3630 Axis Solar Narsa LLC Date: June 7, 2023
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
V = 0.3 x 177,000 LBS = 53,100 LBS
DETERMINE NEW BASE SHEAR
EXISTING BASE SHEAR
Determine Seismic Weight of Building with Solar Array:
EXISTING
SEISMIC
WEIGHT
=177,000 LBS
NEW SOLAR
ARRAY =3 PSF x 97 PANELS x 3.3' x 5.5' = 5,282 LBS
NEW
SEISMIC
WEIGHT
=177,000 LBS + 5,282 LBS = 182,282 LBS
THEREFORE NEW BASE SHEAR:
V = 0.3 x 182,282 = 54,684 LBS
% CHANGE =54,684 LBS - 53,100 LBS
53,100 LBS x 100 =3 % < 10% OK
EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT
FROM ANALYSIS SINCE NEW SEISMIC FORCE IS
LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE.
"Alterations are permitted to be made to any structure without requiring the
existing structure to comply with this standard provided the alterations comply
with the requirements for a new structure. Alterations that increase the
seismic force in any existing structural element by more than 10 percent or
decrease the design strength of any existing structural element to resist
seismic forces by more than 10 percent shall not be permitted unless the
entire seismic forceresisting system is determined to comply with this
standard for a new structure."
End of Calculations
Sht # 7 of 7
20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020053 Axis Solar Ryerson Residence Date: November 9, 2019
EQ'N 12.8-1 ASCE 7-22
EQ'N 12.8-1 ASCE 7-22
OK. PER ASCE 7-22 SECTION 11.B.3 ALTERATIONS
2020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 202020201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 202020201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 202020201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 202020201674 Sunrise Solar Jose Munoz Residence Date: July 31, 202020201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 202020201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 202020202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 202020202158 ilum Solar Paul Kiehn Residence Date: September 13, 202020202666 ilum Solar Yvonne Quinones Residence Date: October 16, 202020202762 ilum Solar Andre James Residence Date: October 21, 202020203084 ilum Solar Christine Quilon Residence Date: October 21, 202020203189 ilum Solar Michael Ireland Residence Date: November 12, 202020203252 ilum Solar Viorato Residence Date: November 13, 202020203243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1187 Precis Solar Luis Hutchins Residence Date: April 9, 20212021-2156 Ilum Solar Athena Dejarme Residence Date: June 11, 20212021-2649 Ilum Solar Teresa Gonzales Residence Date: July 9, 20212021-2651 Ilum Solar Karyn McQueen Residence Date: July 9, 20212021-3042 Ilum Solar Bixi Howe Residence Date: August 2, 20212021-4665 Ilum Solar Jerry Vestal Residence Date: October 27, 20212021-4665 Ilum Solar Jerrry Vestal Residence Date: October 27, 20212022-2274 Ilum Solar Gissella Maximo Hernandez Residence Date: May 27, 20222022-3929 Santa Barbara Solar Glenn Veneracion Residence Date: September 28, 20222022-3947 Axis Solar Karen Tom Hume Residence Date: September 29, 20222022-4080 Green Road Solar Robert Owens Residence Date: October 6, 20222022-4447 Precis Solar Michael Telles Residence Date: October 28, 20222022-4542 ESD 22-809 Duane Unzicker Residence Date: November 3, 20222022-4762 ESD 22-982 Adrian Campa Residence Date: November 15, 20222022-4944 ESD 22-1008 Rene Rivas Residence Date: November 30, 20222023-133 Penguin Marc Winger Residence Date: January 11, 20232023-134 Penguin David Wilhelm Residence Date: January 11, 20232023-163 ESD 23-013 Thalia Kirschwehm Residence Date: January 12, 20232023-241 ESD 23-029 Christian Almendares Residence Date: January 18, 20232023-522 ESD 23-070 Rigo Garcia Residence Date: February 2, 20232023-741 ESD 23-124 Jose Alberto Jimenez Residence Date: February 14, 20232023-908 Devil Dog Energy Fidel Lopez Residence Date: February 21, 2023
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-25
2023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 27, 20232023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 28, 20232023-1573 ESD 23-224 Marvin Webster Residence Date: March 15, 20232023-1575 ESD 23-165 My Hanh Nguyen Residence Date: March 15, 20232023-2662 ESD 23-491 Corinne Dossett Residence Date: April 18, 20232023-2663 ESD 23-454 Hector Paniagua Residence Date: April 18, 20232023-3511 Unique Solar Atria Bonita Residence Date: May 30, 20232023-3630 Axis Solar Narsa LLC Date: June 7, 2023
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
GENERAL NOTES PROJECT SCOPE:DRAWING INDEX PERMITTING / PLANNING NOTES:
VICINITY MAP ADDRESS MAP: PROJECT TEAM:
THIS INSTALLATION CONSISTS OF A NEW ROOF MOUNTED PHOTOVOLTAIC (PV)
SYSTEM. THE PV SYSTEM IS STATIC MOUNTED.
THIS SYSTEM WILL BE INTERCONNECTED TO AND WILL BE OPERATED IN PARALLEL
WITH THE CORRESPONDING ELECTRIC GRID PER THE REQUIREMENTS OF THE
NATIONAL ELECTRICAL CODE AND UTILITY INTERCONNECT AGREEMENT
CONDITIONS OF APPROVAL:
1. ALL CONSTRUCTION SHALL OCCUR BETWEEN THE HOURS OF 7AM & 7PM, EXCEPT
FOR THE PURPOSE OF EMERGENCIES.
1. THIS PV SYSTEM INSTALLATION IS SUBJECT TO INSPECTION BY THE AUTHORITY HAVING
JURISDICTION AND
2. THIS PROJECT SHALL CONFORM TO THE FOLLOWING CODE VERSIONS:
2022 CALIFORNIA BUILDING CODE (CBC 2022)
2022 CALIFORNIA ELECTRIC CODE (CEC 2022)
2022 CALIFORNIA FIRE CODE (CFC 2022)
2022 CALIFORNIA ENERGY CODE (CEnC 2022)
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CGBSG 2022)
2022 CALIFORNIA PLUMBING CODE (CPC 2022)
2022 CALIFORNIA MECHANICAL CODE (CMC 2022)
AUTHORITY HAVING JURISDICTION
3. ROOFTOP MOUNTED PV SYSTEM MEETS FIRE CLASSIFICATION PER CBC 1509.7 AND
1505.9 CLASS "A". PV SYSTEM AND ASSOCIATED RACKING SYSTEM ARE TESTED AND
IDENTIFIED WITH FIRE CLASSIFICATION IN ACCORDANCE WITH UL 1703.
4. SYSTEM UTILIZES RAPID SHUTDOWN DEVICES WHICH MEET 690.12 MODULE LEVEL
RAPID SHUTDOWN REQUIREMENTS.
5. ALL ELECTRICAL WORK SHALL BE DESIGNED PER 2022 CALIFORNIA ELECTRICAL CODE
6. 110.2 APPROVAL: ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR
CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED
BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION
SITE CONTACT:
CONTRACTOR:
THIS DOCUMENT CONTAINS PROPRIETARY
INFORMATION. REPRODUCTION, DISCLOSURE, OR
USE WITHOUT SPECIFIC WRITTEN
AUTHORIZATION OF CONTRACTOR
IS STRICTLY FORBIDDEN.
DA
T
E
:
1. ALL MATERIAL AND WORKMANSHIP SHALL CONFORM TO THE 2022 TITLE 24 OF THE
CALIFORNIA BUILDING CODE, CMC,CPC. CEC AND ALL APPLICABLE LOCAL CODES,
ORDINANCES, AND STATE AMENDMENTS.
2. THE CONTRACTOR SHALL CHECK ALL DRAWINGS IMMEDIATELY UPON THEIR RECEIPT
AND SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS BEFORE STARTING WORK.
ALL ARCHITECTS AND ENGINEERS SHALL BE NOTIFIED OF ANY DISCREPANCIES.
3. NO STRUCTURAL MEMBER SHALL BE CUT OR NOTCHED UNLESS SPECIFICALLY
SHOWN, NOTED, OR APPROVED BY ALL. NOTCH DETAILS, IF PROVIDED ARE FOR
GENERAL GUIDANCE ONLY. ALL SHALL BE CONTACTED TO APPROVE LOCATIONS OF
PROPOSED NOTCHES.
4. CONNECTIONS AND IMPLIED CONSTRUCTION ASSEMBLIES THAT ARE NOT SPECIFICALLY
DESCRIBED OR DETAILED SHALL BE CONSTRUCTED USING STANDARD CONSTRUCTION
PRACTICES IN COMPLIANCE WITH THE GOVERNING CODES AND ORDINANCES.
5. WHEN DETAILS LABELED "TYPICAL OR "SIMILAR" ARE GIVEN ON DRAWINGS, THE
CONTRACTOR SHALL APPLY THE INTENT OF THE DETAIL TO THAT SPECIFIC CONDITION.
6. WRITTEN INFORMATION AND DIMENSIONS SHALL HAVE PRECEDENCE OVER GRAPHIC
INFORMATION. DO NOT SCALE.
7. DRAWINGS AND SPECIFICATIONS FOR THIS WORK HAVE BEEN PREPARED IN
ACCORDANCE WITH GENERALLY ACCEPTED STANDARDS OF PRACTICE TO MEET THE
MINIMUM REQUIREMENTS DF THE CURRENT EDITION DF THE CBC. ANY DISCREPANCIES
ON THE PLANS OR ANY DE\/IATIONS FROM THE PLANS WHICH ARE NECESSITATED BY
FIELD CONDITIONS OR ANY CONDITION DIFFERENT FROM THOSE INDICATED ON THE
PLANS SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER. ALL WORK IS TO BE
COORDINATED SO THAT COOPERATION BETWEEN THE TRADES WHERE REQUIRED IS
ACCOMPLISHED.
8. CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE FOR THE ORDER AND
MEANS DF CONSTRUCTION AND ALL TEMPORARY BRACING AND ERECTION DURING
CONSTRUCTION.
9. APPROVALS BY BUILDING INSPECTORS SHALL NOT CONSTITUTE AUTHORITY TO
DEVIATE FROM THE PLANS AND SPECIFICATIONS
1O. ALL WORK SHALL CONFORM TO TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR)
11.GRADING PLANS, DRAINAGE IMPROVEMENTS, ROAD AND ACCESS REQUIREMENTS AND
ENVIRONMENTAL HEALTH CONSIDERATIONS SHALL COMPLY WITH ALL LOCAL
ORDINANCES.
X_____________________________
AERIAL PHOTO:
X_________________________
Confidentiality Statement:
9/
6
/
2
0
2
3
3
:
3
8
:
3
4
P
M
NA
R
S
A
L
L
C
24
2
1
N
G
R
A
N
D
A
V
E
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
5
NARSA LLC
2421 N GRAND AVE, SANTA ANA, CA 92705
NARSA LLC
SOLAR ELECTRIC SYSTEM
THIS PROJECT ENTAILS THE INSTALLATION OF A PHOTOVOLTAIC SYSTEM AT NARSA LLC THE
SYSTEM WILL NOT BE A NET ELECTRICITY EXPORTER TO THE UTILITY GRID.
SUNGRID SOLAR
18271 W MCDURMOTT
UNIT E
IRVINE, CA 92614
TEL: 949 229 5977
LIC # B, C10: 1037212
T101
Ti
t
l
e
S
h
e
e
t
SUNGRID SOLAR
B, C10: 1037212
3/31/24
SUNGRID SOLAR
SOLAR ELECTRIC SYSTEM PROJECT: 38.8kW DCstc / 34.785kW ACcec
SUNGRID SOLAR
18271 W MCDURMOTT UNIT E
IRVINE, CA 92614
949-309-2453
This drawing is the property of SUNGRID SOLAR. This information is
confidential and is to be used only in connection with work described
by SUNGRID SOLAR. No part is to be discolosed to others without
written permission from SUNGRID SOLAR
SUNGRID SOLAR
LIC # B, C10: 1037212
EXP: 3/31/24Sheet #Sheet Name
T101 Title Sheet
T102 Notes
A100 Site Plan
A101 Array Layout
E101 Electrical Layout
E201 Interconnection SLD
E301 Signage
SP101 Spec Sheets
SP102 Spec Sheets
ELECTRICAL:
AXIS SOLAR DESIGN
27281 LAS RAMBLAS, SUITE 200
MISSION VIEJO, CA 92691
TEL: 323-484-2947
CHAD BUCCINE
LICENSE# E20115
No
.
De
sc
ri
pt
ion
Da
t
e
1
AH
J
C
O
R
R
E
C
T
I
O
N
9/
0
7
/
2
3
PROJECT LOCATION DETAILS
NARSA LLC
2421 N GRAND AVE
SANTA ANA, CA 92705
BUILDING INFO:
APN: 396-361-06
METER #259000-043781
OCCUPANCY: A-3
CONSTRUCTION TYPE: V-N
ONE STORY
PROJECT TOTAL:
SYSTEM SIZE:
38.8 kW STC DC
34.785 kW CEC AC
PANEL SPECS:
(97) UNITED RENEWABLE ENERGY CO., LTD., FBM400MFG-BB MODULES
INVERTER SPECS:
(2) SOLAREDGE TECHNOLOGIES LTD., SE17.3KUS [208V]
OPTIMIZER / RAPID SHUTDOWN SPECS:
(49) SOLAREDGE TECHNOLOGIES, P1101
1
Exp. 3-31-19
No. C58724
NITRA MW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-25
www. Loyd W Martin .com
Solar Structures Engineering
#2023-3630 Structural Only
September 7, 2023
Bldg# 101115981
Elec# 20180415
APPROVALS:
PLNG - HJacinto
BLDG - JLo
ELEC - MSmith
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
E2. THE LAYOUT OF CONDUIT SHOWN IN THESE PLANS IS
DIAGRAMTIC & SHOWS DESIGN INTENT. CONTRACTOR
SHALL ROUTE AND LOCATE THE CONDUITS TO SUIT SITE
CONDITIONS BUT SHALL NOT EXCEED THE MIZIMUM
CONDUCTOR LENGTHS INDENTIFIED ON THE WIRE
SCHEDULE. CONTRACTOR WILL COORDINATE ALL CHANGES
IN WIRING AND CONDUIT WITH THE ENGINEER.
To scale on 24x36 paper
X_________________________
Confidentiality Statement:
6/7/2023 1:15:30 AM
Notes
NA
R
S
A
L
L
C
24
2
1
N
G
R
A
N
D
A
V
E
,
S
A
N
T
A
AN
A
,
C
A
9
2
7
0
5
T102
SUNGRID SOLAR
18271 W MCDURMOTT
UNIT E
IRVINE, CA 92614
949-309-2453
This drawing is the property of SUNGRID SOLAR. This information is
confidential and is to be used only in connection with work described
by SUNGRID SOLAR. No part is to be discolosed to others without
written permission from SUNGRID SOLAR
SUNGRID SOLAR
LIC # B, C10: 1037212
EXP: 3/31/24
SUNGRID SOLAR
ABBREVIATIONS
ALTERNATING CURRENT
APPROXIMATE
AMERICAN WIRE GUAGE
CENTER LINE
COMBINER BOX
DIRECT CURRENT
DROP INLET
DISCONNECT
ELECTRICAL METALLIC
TUBING
(EXISTING)
ELEVATION
EQUAL
INSIDE DIAMETER
JUNCTION BOX
MAIN COMBINER BOX
MANUFACTURER
MINIMUM
MISCELLANEOUS
(NEW)
OR APPROVED EQUAL
ON CENTER
OUTSIDE DIAMETER
POINT OF COMMON
COUPLING
PHOTOVOLTAIC
PROPERTY LINE
STORM DRAIN
SQUARE FOOT/FEET
SIMILAR
TO BE DETERMINED
TOP OF FOOTING
TYPICAL
UNLESS OTHERWISE NOTED
VERIFY IN FIELD
TRANSFORMER
NOTESSYMBOLS
AC
APPROX
AWG
CL
CB
DC
DI
DISC
EMT
(E)
EL
EQ
ID
JB
MCB
MFR
MIN
MISC
(N)
OAE
OC
OD
POCC
PV
PL
SD
SF
SIM
TBD
TOF
TYP
UON
VIF
XFMR
No.
Description
Date
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
ELECTRICAL AREA
(E) MAIN SERVICE
(N) AC DISCONNECT FOR
UTILITY OPERATIONS
(N) SOLAREDGE
SE17.3KUS INVERTER
12° 41' 22"
146.72'
S
E
90° 00' 00"
276.16'
N W
0°
0
0
'
0
0
"
14
3
.
1
4
'
N
E
90° 00' 00"
243.93'
S E
GRA
ND AVE
OBSTRUCTION TYP
ROOF ACESS
(N) DEDICATED PV
COMBINER PANEL
ROOF ACESS
13
'
-
5
"
85' - 4"
66
'
-
6
"
69' - 9"
ARRAY 1
T: 10°
Az:180°
ARRAY 2
T: 32°
Az:180°
ARRAY 3
T: 32°
Az:270°
ARRAY 5
T: 10°
Az:180°
ARRAY 4
T: 32°
Az:270°
ARRAY 6
T: 10°
Az:180°
To scale on 24x36 paper
X_________________________
Confidentiality Statement:
9/6/2023 3:36:44 PM
Site Plan
NA
R
S
A
L
L
C
24
2
1
N
G
R
A
N
D
A
V
E
,
S
A
N
T
A
AN
A
,
C
A
9
2
7
0
5
A100
SUNGRID SOLAR
18271 W MCDURMOTT
UNIT E
IRVINE, CA 92614
949-309-2453
This drawing is the property of SUNGRID SOLAR. This information is
confidential and is to be used only in connection with work described
by SUNGRID SOLAR. No part is to be discolosed to others without
written permission from SUNGRID SOLAR
SUNGRID SOLAR
LIC # B, C10: 1037212
EXP: 3/31/24
SUNGRID SOLAR
1" = 10'-0"1 Site Plan
CANADIAN SOLAR, 540W
Array Name Tilt° Azimuth
Module
Count SIZE kW
ARRAY 1 10 180 44 23.76
ARRAY 2 32 180 23 12.42
ARRAY 3 32 270 9 4.86
ARRAY 4 32 270 12 6.48
ARRAY 5 10 180 6 3.24
ARRAY 6 10 180 3 1.62
97 52.38
No.
Description
Date
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
25
www. Loyd W Martin .com
Solar Structures Engineering
#2023-3630 Structural Only
September 7, 2023
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
ELECTRICAL AREA
(E) MAIN SERVICE
(N)AC DISCONNECT FOR
UTILITY OPERATIONS
(N) SOLAREDGE
SE17.3KUS INVERTER
(N)DEDICATED PV
COMBINER PANEL
A101
4
HIP
RIDGE
CURB
RI
D
G
E
HIP
VAL
LEY
HIP
RIDGE
TR
A
S
I
T
I
O
N
T
O
F
L
A
T
EDGE FLAT
ED
G
E
F
L
A
T
ED
G
E
F
L
A
T
ED
G
E
F
L
A
T
EDGE FLAT
ED
G
E
F
L
A
T
ED
G
E
F
L
A
T
EDG
E
F
L
AT
RIDGE
RI
D
G
E
CURB
CURB
CU
R
B
CU
R
B
ED
G
E
F
L
A
T
TR
A
S
I
T
I
O
N
T
O
F
L
A
T
EDGE FLAT
EDGE FLAT
TRASITION TO FLAT
EDGE FLAT
ED
G
E
F
L
A
T
ED
G
E
F
L
A
T
EAVE
EA
V
E
EA
V
E
EA
V
E
EA
V
E
EAVE
EAVE
EAVE
EAVE
EAVE
RA
K
E
HIP
SLOPE
SL
O
P
E
SL
O
P
E
SLOPE
SL
O
P
E
SLOPE
SL
O
P
E
FLAT
FLAT
FLAT
FLAT
FLAT
RIDGE
RI
D
G
E
RI
D
G
E
FLAT
FLAT
ARRAY 2
T: 32°
Az:180°
ARRAY 3
T: 32°
Az:270°
ARRAY 4
T: 32°
Az:270°ARRAY 5
T: 10°
Az:180°
48" FIRE ACCESS PERIMETER
48
"
F
I
R
E
A
C
C
E
S
S
P
E
R
I
M
E
T
E
R
48
"
F
I
R
E
A
C
C
E
S
S
P
E
R
I
M
E
T
E
R
48
"
F
I
R
E
A
C
C
E
S
S
P
E
R
I
M
E
T
E
R
48" FIRE ACCESS PERIMETER
48" FIRE ACCESS PERIMETER
48" FIRE ACCESS PERIMETER
48" FIRE ACCESS PERIMETER
48
"
F
I
R
E
A
C
C
E
S
S
P
E
R
I
M
E
T
E
R
48
"
F
I
R
E
A
C
C
E
S
S
P
E
R
I
M
E
T
E
R
48" FIRE ACCESS PERIMETER
48" FIRE ACCES
S PERIMETER
48" FIRE ACCES
S PERIMETER
48
"
F
I
R
E
A
C
C
E
S
S
P
E
R
I
M
E
T
E
R
48" FIRE ACCESS PERIMETER
48" FIRE ACCESS PERIMETER
48
"
F
I
R
E
A
C
C
E
S
S
PE
R
I
M
E
T
E
R
MAX TYP
5' - 4"
39' - 4"63' - 6"
108' - 1"
8' - 4"29' - 11"1' - 2"7' - 0"48' - 7"7' - 11"
2'
-
3
"
14
'
-
1
1
"
10
'
-
8
"
27
'
-
6
"
12
'
-
9
"
27
'
-
1
1
"
68
'
-
2
"
3'
-
0
"
14
'
-
1
1
"
9'
-
7
"
TYP
2' - 0"
6' - 6"
28' - 5"
4' - 0"
38' - 11"
68' - 8"
4' - 0"22' - 5"6' - 5"
7' - 9"
5' -
8"
4' - 0"
ARRAY 6
T: 10°
Az:180°
4' - 0"11' - 2"6' - 10"
22' - 0"
7' - 0"
5' - 8"
4' - 0"
16' - 8"
48" FIRE ACCESS PERIMETER
48
"
F
I
R
E
A
C
C
E
S
S
PE
R
I
M
E
T
E
R
48" FIRE ACCESS PERIMETER
EA
V
E
12" REAR FAST JACK
W/ CHEMLINK ECURB
@ FLAT ROOFS TYP
IRONRIDGE XR100
RACKING TYP
IRONRIDGE FLASHFOOT2 @ SLOPED ROOFS TYP
IRONRIDGE XR100 RACKING TYP
4.5" FRONT FAST JACK
W/ CHEMLINK ECURB
@ FLAT ROOFS TYP
3/4" PLYWOOD
DECKING
(1) 5/16" x 3" LAG SCREW
(2.5" PENETRATION MIN)
FRAMING TYP
QUICK MOUNT
L-MOUNT
XR100 RAIL
SOLAR MODULE
1 LAYER OF COMPOSITE
SHINGLE
MODULE CLAMP 3/8" -16 HARDWARE TO
ATTACH RAIL TO LFOOT
(204 IN-LBS)
0' - 3"
2X12 RAFTERS -
32" O.C. TYP
SOLAR MODULES
PRO SOLAR 4.5"/12" FASTJACK
(E)ROOF FRAMING TYP
(1) 5/16" LAG BOLT
2-1/2" MIN. EMBEDMENT
PLACE SEALANT AROUND LAG
BOLT AND UNDER STANDOFF
BASE
(E)ROOF SHEATHING TYP
CHEM LINK ECURB FLASHING
To scale on 24x36 paper
X_________________________
Confidentiality Statement:
9/6/2023 3:36:44 PM
Array Layout
NA
R
S
A
L
L
C
24
2
1
N
G
R
A
N
D
A
V
E
,
S
A
N
T
A
AN
A
,
C
A
9
2
7
0
5
A101
SUNGRID SOLAR
18271 W MCDURMOTT
UNIT E
IRVINE, CA 92614
949-309-2453
This drawing is the property of SUNGRID SOLAR. This information is
confidential and is to be used only in connection with work described
by SUNGRID SOLAR. No part is to be discolosed to others without
written permission from SUNGRID SOLAR
SUNGRID SOLAR
LIC # B, C10: 1037212
EXP: 3/31/24
SUNGRID SOLAR
CANADIAN SOLAR, 540W
Array Name Tilt° Azimuth
Module
Count SIZE kW
ARRAY 1 10 180 44 23.76
ARRAY 2 32 180 23 12.42
ARRAY 3 32 270 9 4.86
ARRAY 4 32 270 12 6.48
ARRAY 5 10 180 6 3.24
ARRAY 6 10 180 3 1.62
97 52.38
No.
Description
Date
1
Interconnection
REV
9/14/18
3/16" = 1'-0"1 Array Overview
1 1/2" = 1'-0"3 Roof Standoff - IronRidge Flash L Foot
1/4" = 1'-0"4 Rafter - Callout
3" = 1'-0"5 Roof Standoff -Prosolar 4.5" 12"
1
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
25
www. Loyd W Martin .com
Solar Structures Engineering
#2023-3630 Structural Only
September 7, 2023
72”
Max Attachment Span
48
”
Ma
x
R
a
i
l
S
p
a
n
RACKING DETAILS
NOTE:
Engineer of Record assumes that all structural components of the existing
building were permitted and met the requirements of the Building Code at
the time of construction. Solar Contractor shall field verify that the roof
framing is in its existing permitted condition and capable of supporting
required live loads. Framing specified on solar plans shall be assumed to be
minimum size and spacing, actual framing may be different.
64"
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
(E) MAIN SERVICE SWITCHBOARD
(N) PV DISCONNECT FOR UTLITY OPERATION
GROUND LEVEL OUTSIDE
IN
V
E
R
T
E
R
1
S
E
1
7
.
3
K
U
S
S
T
R
I
N
G
1
22
M
O
D
U
L
E
S
1
1
P
1
1
0
1
O
P
T
I
M
I
Z
E
R
S
INVERTER 1 SE17.3KUS STRING 2
22 MODULES 11 P1101 OPTIMIZERS
INVERTER 2 SE17.3KUS STRING 1
27 MODULES 14 P1101 OPTIMIZERS
INVERTER 2 SE17.3KUS STRING 2
26 MODULES 13 P1101 OPTIMIZERS
(N)DEDICATED PV COMBINER PANEL
(N)SE17.3KUS SOLAR INVERTER
-
---
REPRESENTATIVE
CONDUCTORS
CONDUIT
COMPRESSION
FITTING
LOCK NUT
ENCLOSURE WALL
CONTINUOUS
GROUND STRIP
INSULATION AT LUG
GROUND BUSHING
WITH LAY-IN LUG
10-24 SS BOLT TORQUE
TO 18 FT-LBS
10-24 SS NUT
/W STAR
WASHER
RAIL FRAME
ILSCO #4 LAY
IN LUG TINNED
STAR WASHER
To scale on 24x36 paper
X_________________________
Confidentiality Statement:
9/6/2023 3:36:46 PM
Electrical Layout
NA
R
S
A
L
L
C
24
2
1
N
G
R
A
N
D
A
V
E
,
S
A
N
T
A
AN
A
,
C
A
9
2
7
0
5
E101
SUNGRID SOLAR
18271 W MCDURMOTT
UNIT E
IRVINE, CA 92614
949-309-2453
This drawing is the property of SUNGRID SOLAR. This information is
confidential and is to be used only in connection with work described
by SUNGRID SOLAR. No part is to be discolosed to others without
written permission from SUNGRID SOLAR
SUNGRID SOLAR
LIC # B, C10: 1037212
EXP: 3/31/24
SUNGRID SOLAR
CANADIAN SOLAR, 540W
Array Name Tilt° Azimuth
Module
Count SIZE kW
ARRAY 1 10 180 44 23.76
ARRAY 2 32 180 23 12.42
ARRAY 3 32 270 9 4.86
ARRAY 4 32 270 12 6.48
ARRAY 5 10 180 6 3.24
ARRAY 6 10 180 3 1.62
97 52.38
3/16" = 1'-0"1 Array Wiring
6" = 1'-0"2 Detail Grounding Conduit Body
No.
Descrip
tion
Date6" = 1'-0"3 Detail Grounding Lay-in Lug
CONDUIT RUN ON ROOF
(ACTUAL PLACEMENT TO
BE DETERMINED ON SITE)
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
1
(1) #6 AWG CU SOLID CU EGC
(2) #10 AWG CU PV WIRE
DISTANCE: 1 FT, 0.1% VDROP
2
(1) #6 AWG CU SOLID CU EGC
(2) #10 AWG CU PV WIRE
DISTANCE: 10 FT, 0.09% VDROP
3
(1) #10 AWG CU THWN-2 EGC
(4) #10 AWG CU THWN-2
FILL: 0.1055 IN^2
0.75" EMT ON STRUCTURES, 20% FILL
DISTANCE: 150 FT, 1.37% VDROP
4
(1) #10 AWG CU THWN-2 EGC
(1) #4 AWG CU THWN-2 NEUT
(3) #4 AWG CU THWN-2
FILL: 0.3507 IN^2
1.25" EMT ON STRUCTURES, 23% FILL
1.25" PVC IN TRENCHES, 28% FILL
DISTANCE: 10 FT, 0.14% VDROP
5
(1) #6 AWG CU THWN-2 EGC
(1) #1/O AWG CU THWN-2 NEUT
(3) #1/O AWG CU THWN-2
FILL: 0.7927 IN^2
1.5" EMT ON STRUCTURES, 39% FILL
2" PVC IN TRENCHES, 28% FILL
DISTANCE: 10 FT, 0.11% VDROP
5
(1) #6 AWG CU THWN-2 EGC
(1) #1/O AWG CU THWN-2 NEUT
(3) #1/O AWG CU THWN-2
FILL: 0.7927 IN^2
1.5" EMT ON STRUCTURES, 39% FILL
2" PVC IN TRENCHES, 28% FILL
DISTANCE: 10 FT, 0.11% VDROP
NOTES:
1. PROVIDE CONTINUOUS PATH FOR GROUND CONDUCTOR FROM THE INVERTER TO THE EXISTING MAIN SERVICE SWITCHBOARD
GROUND BUS. GROUNDING ELECTRODE CONDUCTOR TO SERVE AS EQUIPMENT GROUND. PROVIDE LAY-IN LUGS TO BOND ALL
EQUIPMENT ALONG THIS PATH TO THE GROUNDING ELECTRODE CONDUCTOR TO ALLOW FOR CONTINUOUS RUN.
KEY
PANELS PER
STRING
STRINGS PER INPUT
ARRAY
X1 TO INPUT 217
X1 TO INPUT 1 18
PROJECT SYSTEM SIZE
TOTAL SYSTEM SIZE: 38.8 kW DC, 34.785 kW ACcec
PANEL SPECS:
(97)UNITED RENEWABLE ENERGY CO., LTD.,
FBM400MFG-BB MODULES
MODULE AMPERAGE: 12.84 IMP, 13.68 ISC
MODULE VOLTAGE: 31.17 VMP, 37.2 VOC
TEMP. COEFFICIENTS OF Voc: -0.27%/°C
STC: 400 W, PTC: 367.8 W
INVERTER SPECS:
(1)SOLAREDGE TECHNOLOGIES LTD., SE17.3KUS [208V]
208/120V, 3PH, 4W, MAX OUTPUT CURRENT = 48.25A
CEC WEIGHTED EFFICIENCEY: 97.5%
OPTIMIZER / RAPID SHUTDOWN SPECS:
(97) MODULE PER P1101 OPTIMIZER
(2) MODULES CONNECTED TO EACH OPTIMIZER
RATED INPUT DC POWER = 1100W
MAX OUTPUT CURRENT = 18A
MAXIMUM OUTPUT VOLTAGE = 80V
MAX SYSTEM VOLTAGE = 1000V
690.12 MODULE LEVEL RAPID SHUTDOWN
SEE SPEC SHEET FOR ELECTRICAL PARAMETERS AND
WARRANTY INFO
TUSTIN MCAF:
COLD DESIGN TEMP = 2°C
HOT DESIGN TEMP = 31°C
INVERTER NUMBER
INVERTER SIZE (kW)
X
G
G
INV
DC
DC
SOLAREDGE P1101
POWER OPTIMIZER
(2) MODULES PER
INVERTER
INTEGRATED DC
DISCONNECT, 600VDC
XX.X
(E) 400A MAIN SERVICE PANEL
120/208V, 3PH, 4W, 400A
GRD
(E) GROUND
SYSTEM
M
UTILITY
CUSTOMER
(N) 350A MAIN
BREAKER
(N) AC DISCONNECT
FOR UTILITY OPERATION
& RAPID SHUTDOWN
INITIATION
208V, 3P, 200A, NEMA 3R
FROM UTILITY FEED
MISC
FACILITY
LOADS
G
G
INV
DC
DC
JBOX
1
17.3ROOF ARRAY (51) MODULES:
INVERTER 1 17.3kW (51) MODULES EACH
STRING 1 (26) MODULES (13) OPTIMIZERS
STRING 2 (25) MODULES (13) OPTIMIZERS
26 x1
25 x1 (N) 125A PV
BREAKER
PER STRING:
PER STRING:
G
G
INV
DC
DC
JBOX
2
17.3ROOF ARRAY (46) MODULES:
INVERTER 2 17.3kW (46) MODULES EACH
STRING 1&2 (23) MODULES (12) OPTIMIZERS
23 x2
(N) 125A COMBINER PANEL
120/208V, 3PH, 4W, NEMA 3R, MLO
GRD
(N) 60A PV
BREAKER
(N) 60A PV
BREAKER
NOTE: EXISTING BREAKER
TO BE DERATED TO 350A
TO MAKE BACKFEED FOR
NEW 125A PV BREAKER
120% RULE 705.12(D)(2)(3)(B)
MAIN BUS: 400A
MAIN BREAKER: 350A
SOLAR OUTPUT: 96.5A (MAX SOLAR OUTPUT)
400A BUS X 120% -350A MAIN >96.5A X 125%
130A >121A --> 125A NEW BACKFED BREAKER O.K.
To scale on 24x36 paper
X_________________________
Confidentiality Statement:
6/13/2023 2:24:15 PM
Interconnection SLD
NA
R
S
A
L
L
C
24
2
1
N
G
R
A
N
D
A
V
E
,
S
A
N
T
A
AN
A
,
C
A
9
2
7
0
5
E201
SUNGRID SOLAR
18271 W MCDURMOTT
UNIT E
IRVINE, CA 92614
949-309-2453
This drawing is the property of SUNGRID SOLAR. This information is
confidential and is to be used only in connection with work described
by SUNGRID SOLAR. No part is to be discolosed to others without
written permission from SUNGRID SOLAR
SUNGRID SOLAR
LIC # B, C10: 1037212
EXP: 3/31/24
SUNGRID SOLAR
NTS1SLD
No.
Descrip
tion
Date
WIRING CHART
Ca
l
l
o
u
t
#
Am
p
s
I
s
c
NE
C
M
u
l
t
Am
p
s
M
a
x
Pa
r
a
l
l
e
l
R
u
n
s
Nu
m
b
e
r
C
o
n
d
u
c
t
o
r
s
Si
z
e
C
o
n
d
u
c
t
o
r
Co
n
d
u
c
t
o
r
M
a
t
l
In
s
u
l
a
t
i
o
n
C
o
n
d
u
c
t
o
r
Si
z
e
N
e
u
t
r
a
l
Si
z
e
G
r
o
u
n
d
Co
n
d
u
i
t
Q
t
y
Wi
r
e
T
e
m
p
R
a
t
i
n
g
Wi
r
e
A
m
b
T
e
m
p
Wi
r
e
R
o
o
f
T
e
m
p
Wi
r
e
T
e
m
p
T
o
t
a
l
Co
n
d
u
c
t
o
r
s
C
u
r
r
e
n
t
C
a
r
r
y
i
n
g
.
.
1 13.68 1.56 21 1 2 #10 AWG CU PV WIRE NA #6 AWG 1 90 31 0 31 2
2 18 1.25 23 1 2 #10 AWG CU PV WIRE NA #6 AWG 1 90 31 0 31 2
3 18 1.25 23 1 4 #10 AWG CU THWN-2 NA #10 AWG 1 90 31 0 31 4
4 48.25 1.25 60 1 3 #4 AWG CU THWN-2 #4 AWG #10 AWG 1 90 31 0 31 3
5 96.5 1.25 121 1 3 #1/O AWG CU THWN-2 #1/O AWG #6 AWG 1 90 31 0 31 3
WIRE RATING CHART
Pa
r
a
l
l
e
l
R
u
n
s
Wi
r
e
A
m
p
R
a
t
i
n
g
Wi
r
e
T
e
m
p
D
e
r
a
t
e
Wi
r
e
C
o
n
d
u
c
t
o
r
D
e
r
a
t
e
Derated Wire Rating >= Amps Max .
.
1 40 0.96 1 1 X 40A X 0.96 X 1 = 38 >= 21
1 40 0.96 1 1 X 40A X 0.96 X 1 = 38 >= 23
1 40 0.96 0.8 1 X 40A X 0.96 X 0.8 = 31 >= 23
1 95 0.96 1 1 X 95A X 0.96 X 1 = 91 >= 60
1 170 0.96 1 1 X 170A X 0.96 X 1 = 163 >= 121
TERMINATION...
Te
r
m
T
e
m
p
R
a
t
i
n
g
Term Amp
Rating
>=Amps Max
.
.
60 30 >=21
60 30 >=23
60 30 >=23
60 70 >=60
60 125 >=121
VOLTAGE DROP CHART
Vd
r
o
p
A
m
p
s
I
m
p
Vd
r
o
p
V
m
p
Vd
r
o
p
D
i
s
t
a
n
c
e
Vd
r
o
p
P
e
r
c
e
n
t
.
.
12.84 31.17 1 0.1
18 490 10 0.09
18 490 150 1.37
48.25 208 10 0.14
96.5 208 10 0.11
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
CAUTION
POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES
WITH DISCONNECT(S) LOCATED AS SHOWN. DANGEROUS VOLTAGE MAY BE
PRESENT AT ALL TIMES.
"WARNING"
PHOTOVOLTAIC ARRAY
DISCONNECTION OF NEUTRAL OR GROUNDED CONDUCTORS MAY RESULT IN
OVERVOLTAGE ON ARRAY OR INVERTER
6"X8" TYP -CEC 705.10
12
NOTES
1. ARTICLES 690 AND 705 MARKINGS SHOWN HEREON
2. ALL MARKINGS SHALL CONSIST OF THE FOLLOWING:
A. UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR MACHINE PRINTED
LETTERS OR ELECTRO-PLATING
B. RED BACKGROUND COLOR WITH WHITE TEXT AND LINE WORK UON
C. ARIAL FONT
3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN THE
LOCATIONS SPECIFIED.
4. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT USING
PERMANENT ADHESIVE, POP-RIVETS, OR SCREWS
M
JBOX OR
COMBINER
600V
INVERTER
WARNING
ELECTRICAL SHOCK HAZARD
TERMINALS ON THE LINE AND
LOAD SIDES MAY BE ENERGIZED
IN THE OPEN POSITION
!
ORANGE WARNING AREA, 690.13(B)
WARNING
TURN OFF PHOTOVOLTAIC AC
DISCONNECT PRIOR TO
WORKING INSIDE PANEL
!
ORANGE WARNING AREA, 110.27(C)
WARNING
ELECTRICAL SHOCK HAZARD
TERMINALS ON THE LINE AND
LOAD SIDES MAY BE ENERGIZED
IN THE OPEN POSITION
!
ORANGE WARNING AREA, 690.13(B)
DC VOLTAGE IS ALWAYS
PRESENT WHEN SOLAR
MODULES ARE EXPOSED TO
SUNLIGHT
PHOTOVOLTAIC
690.13(B)
DC DISCONNECT
MAXIMUM VOLTAGE
MAXIMUM CIRCUIT
CURRENT
MAX RATED OUTPUT
CURRENT OF THE CHARGE
CONTROLLER OR DC-TO-DC
CONVERTER (IF INSTALLED)
690.53
WARNING: PHOTOVOLTAIC
POWER SOURCE
REFLECTIVE STICKER, 690.31(G)(3)(4)
WARNING!
DUAL POWER SOURCE
SECOND SOURCE IS
PHOTOVOLTAIC SYSTEM
ORANGE WARNING AREA, 705.12(B)(3)
PHOTOVOLTAIC
AC DISCONNECT
690.13(B), 690.54
RATED AC OUTPUT
CURRENT
NOMINAL OPERATING
AC VOLTAGE
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE "OFF"
POSITION TO SHUTDOWN PV
SYSTEM AND REDUCE SHOCK
HAZARD IN THE ARRAY
The title “SOLAR PV SYSTEM IS EQUIPPED WITH
RAPID SHUTDOWN” shall utilize capitalized characters with
a minimum height of 9.5 mm (3⁄8 in.) in black on yellow background
and the remaining characters shall be capitalized with
a minimum height of 4.8 mm (3⁄16 in.) in black on white background.
690.56(C)(1)(a)
PV
ARRAY
DC
DISCONNECT
1
2
3
4
5
6
7
8
10
1
6
34
2
10
12
7
18A
18A
5
208V
96.5A
2
6
PV SUB PANEL
11
690.56(C)(3)
RAPID SHUTDOWN SWITCH
FOR SOLAR PV SYSTEM
AC
DISCONNECT82111
1
721
WARNING!
POWER SOURCE OUTPUT
CONNECTION. DO NOT
RELOCATE THIS OVERCURRENT
DEVICE.
ORANGE WARNING AREA, 705.12(B)(2)(3)(b)
9
9
(E) MAIN SERVICE
PANEL
(N) PV DISCONNECT FOR
UTLITY OPERATION
PV ARRAYS
To scale on 24x36 paper
X_________________________
Confidentiality Statement:
6/13/2023 2:24:16 PM
Signage
NA
R
S
A
L
L
C
24
2
1
N
G
R
A
N
D
A
V
E
,
S
A
N
T
A
AN
A
,
C
A
9
2
7
0
5
E301
SUNGRID SOLAR
18271 W MCDURMOTT
UNIT E
IRVINE, CA 92614
949-309-2453
This drawing is the property of SUNGRID SOLAR. This information is
confidential and is to be used only in connection with work described
by SUNGRID SOLAR. No part is to be discolosed to others without
written permission from SUNGRID SOLAR
SUNGRID SOLAR
LIC # B, C10: 1037212
EXP: 3/31/24
SUNGRID SOLAR
12" = 1'-0"1 Signage - Central
No.
Descrip
tion
Date
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
To scale on 24x36 paper
X_________________________
Confidentiality Statement:
6/13/2023 2:24:24 PM
Spec Sheets
NA
R
S
A
L
L
C
24
2
1
N
G
R
A
N
D
A
V
E
,
S
A
N
T
A
AN
A
,
C
A
9
2
7
0
5
SP101
SUNGRID SOLAR
18271 W MCDURMOTT
UNIT E
IRVINE, CA 92614
949-309-2453
This drawing is the property of SUNGRID SOLAR. This information is
confidential and is to be used only in connection with work described
by SUNGRID SOLAR. No part is to be discolosed to others without
written permission from SUNGRID SOLAR
SUNGRID SOLAR
LIC # B, C10: 1037212
EXP: 3/31/24
SUNGRID SOLAR
12" = 1'-0"2 Spec Sheet Module
12" = 1'-0"3 Spec Sheet Optimizer
12" = 1'-0"1 Spec Sheet Inverter
No.
Descrip
tion
Date
2421 N Grand Ave - 101115981 &
20180415
3/4/2024
THIS DOCUMENT CONTAINS PROPRIETARY
INFORMATION. REPRODUCTION, DISCLOSURE, OR
USE WITHOUT SPECIFIC WRITTEN
AUTHORIZATION OF CONTRACTOR
IS STRICTLY FORBIDDEN.
DA
T
E
:
X_____________________________
X_________________________
Confidentiality Statement:
6/
7
/
2
0
2
3
1
:
1
3
:
4
4
A
M
NA
R
S
A
L
L
C
24
2
1
N
G
R
A
N
D
A
V
E
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
5
SP102
Sp
e
c
S
h
e
e
t
s
SUNGRID SOLAR
B, C10: 1037212
3/31/24
SUNGRID SOLAR
18271 W MCDURMOTT UNIT E
IRVINE, CA 92614
949-309-2453
This drawing is the property of SUNGRID SOLAR. This information is
confidential and is to be used only in connection with work described
by SUNGRID SOLAR. No part is to be discolosed to others without
written permission from SUNGRID SOLAR
SUNGRID SOLAR
LIC # B, C10: 1037212
EXP: 3/31/24
12" = 1'-0"3 Spec Sheet Iron Ridge Railing
12" = 1'-0"4 Spec Sheet Prosolar FastJack E-Series1
No.
Description
Date
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-25
www. Loyd W Martin .com
Solar Structures Engineering
#2023-3630 Structural Only
June 7, 2023
2421 N Grand Ave - 101115981 &
20180415
3/4/2024