Loading...
HomeMy WebLinkAbout2421 N Grand Ave - 101115981 & 20180415 - Plan YES NO INSTRUCTIONS: ORAN GE COUNTY FI RE AUTHORI TY Plan Submittal Criteria COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects and RESIDENTIAL TRACT developments • Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place. • Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section. • If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA. • In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations. • Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602. Address Suite City Project Scope/Business Description 1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways, curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within 300 feet of an active or proposed oil well? Fire Master Plan (PR145) 2. Property is adjacent to a wildland area or non-irrigated native vegetation? Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124) 3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170) 4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475) 5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000 sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285) 6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card, button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520) 7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment; industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations? Special Equipment Plan (PR315, PR340-PR382) 8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240) 9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330) 10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335) Initial each of the following two items indicating that you have read and understand the statement: 11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications. 12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327— Initials the building department will determine specific requirements. I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name Signature Phone Number ( ) Date / / Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the appropriate plans and fees for OCFA review. 10-08-14 EE COM 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Referral Form Required for OCFA to review plans upon the request of the Building Department when the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”. City / County Official Requesting Review: City / County Reference #: Date: __________________________________ City / County: _____________________________________ E-Mail: __________________________________ Contact Name: _____________________________________ Phone #: _________________________________ Title: _____________________________________ ** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. ** Reason(s) for Review: Please describe why OCFA Plan Review is or may be required by the City/County : OCFA COMMENTS:  No further action required on this specific plan type, based on information provided on: ____/______/______.  Project to be taken in for OCFA Review. Other: Name: _________________________________________ Contact #: ______________________________________ Date: _________________________________ OCFA Authorization Updated: 06/02/2020 rs 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 Structural Calculations for a Roof Mounted Solar Photovoltaic System for: Narsa LLC 2421 N Grand Ave, Santa Ana, CA 92705 Applicable Codes: 2022 California Building Code, 2022 California Electric Code, 2022 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-22 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Construction, Local Municipal Code, and all other codes which are adopted by reference or enacted by law. Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. Solar Energy Contractor shall make an inspection of the existing roof framing system prior to installation of the roof mounted solar energy system to verify that the existing roof is capable of supporting minimum roof live loads. Assumed Design Parameters: All 2x members are grade Douglas Fir #2 or better All 4X members are grade Douglas Fir #1 or better All Roof Connectors are Simpson Strong­Tie or Equal All Concrete Foundations are f'c = 2500 psi or stronger Original Structure was built to the Type­V Wood Framed Standards of the Applicable Building Code at the time of Construction. Sht # 1 of 72021­072 Ilum Solar Cory Hoffa Residence Date: January 12, 2021 Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. I have reviewed the existing structural system and based upon the field measurements and drawings provided by the contractor, it appears that the roof can support its required live load. 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2023-3630 Axis Solar Narsa LLC Date: June 7, 2023 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 NARSA LLC 2421 N GRAND AVE, SANTA ANA, CA 92705 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 Sht # 2 of 7 Note to Building Official: Based upon a review of the proposed plans I am confident that the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. I have reviewed the existing structural system and based upon the field measurements and drawings provided by the contractor, it appears that the roof can support its required live load. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. (Assume max truss span = 20 ft.) Trusses truss Note to Building Official: Based upon a review of the proposed plans and information, the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. The contractor shall field verify that the existing roof structure is in its original permited condition and verify that it can support the normal code required roof live loads. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. W DL + LL R1 R218.25' Rafters rafter Total load on rafter = 60 plf x 20 ft. = 1,200 lbs w = 30 psf x 2 ft. = 60 plf Total load on rafter = 60 plf x 7.83 ft. = 470 lbs w = 30 psf x 2 ft. = 60 plf Check Existing 2x4 Roof Rafters @ 24" O.C.: * Total load on rafter = 80.1 plf x 18.25 ft. = 1,462 lbs w = 30 psf x 2.67 ft. = 80.1 plf Check Existing 2x12 Roof Rafters @ 32" O.C.: * Total load on joists = 40 plf x 21 ft. = 840 lbs w = 30 psf x 1.33 ft. = 40 plf Check Existing Roof Joists @ 16" O.C.: *Note: Contractor to Field Verify Framing 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 20192020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2158 ilum Solar Paul Kiehn Residence Date: September 13, 20202020­2666 ilum Solar Yvonne Quinones Residence Date: October 16, 20202020­2762 ilum Solar Andre James Residence Date: October 21, 20202020­3084 ilum Solar Christine Quilon Residence Date: October 21, 20202020­3189 ilum Solar Michael Ireland Residence Date: November 12, 20202020­3252 ilum Solar Viorato Residence Date: November 13, 20202021­072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1187 Precis Solar Luis Hutchins Residence Date: April 9, 20212021-2156 Ilum Solar Athena Dejarme Residence Date: June 11, 20212021-2649 Ilum Solar Teresa Gonzales Residence Date: July 9, 20212021-2651 Ilum Solar Karyn McQueen Residence Date: July 9, 20212021-3042 Ilum Solar Bixi Howe Residence Date: August 2, 20212021-4665 Ilum Solar Jerry Vestal Residence Date: October 27, 20212021-4665 Ilum Solar Jerrry Vestal Residence Date: October 27, 20212022-2274 Ilum Solar Gissella Maximo Hernandez Residence Date: May 27, 20222022-3929 Santa Barbara Solar Glenn Veneracion Residence Date: September 28, 20222022-3947 Axis Solar Karen Tom Hume Residence Date: September 29, 20222022-4080 Green Road Solar Robert Owens Residence Date: October 6, 20222022-4447 Precis Solar Michael Telles Residence Date: October 28, 20222022-4542 ESD 22-809 Duane Unzicker Residence Date: November 3, 20222022-4762 ESD 22-982 Adrian Campa Residence Date: November 15, 20222022-4944 ESD 22-1008 Rene Rivas Residence Date: November 30, 20222023-133 Penguin Marc Winger Residence Date: January 11, 20232023-134 Penguin David Wilhelm Residence Date: January 11, 20232023-163 ESD 23-013 Thalia Kirschwehm Residence Date: January 12, 20232023-241 ESD 23-029 Christian Almendares Residence Date: January 18, 20232023-522 ESD 23-070 Rigo Garcia Residence Date: February 2, 20232023-741 ESD 23-124 Jose Alberto Jimenez Residence Date: February 14, 20232023-908 Devil Dog Energy Fidel Lopez Residence Date: February 21, 2023 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 2023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 27, 20232023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 28, 20232023-1154 LA Solar Jose Naranjo Residence Date: March 1, 20232023-3630 Axis Solar Narsa LLC Date: June 7, 2023 (Assume max rafter span = 18.25 ft.) 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 Check Existing 2x12 Roof Rafters @ 32" O.C.: w DL = (Dead + Livereduced) x rafter spacing Sht # 3 of 7 w DL = (10 + 4) x 2.0 w DL = 28 psf OK. per 2013 CBC Vol. 2 Section 3403.3 (ADDITIONS) % CHANGE2,598 LBS ­ 2,400 LBS 2,400 LBSx==8 % ≈ 5% O.K. 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 2019 W DL + LLR1 R2W DL17.5'3.5'11'P P 3'W DL + LLPP 2019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 2019 R1R2 19' 11'8' wLLwDL wLLwDL PPPP 2020­053 Axis Solar Ryerson Residence Date: November 9, 20192020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 2020 w DL + LL = 30 psf x 2 ft. = 60 plfTotal load on truss= 60 plf x 5.5 ft. + 28 plf x 13 ft + ( 4' x 2.75' x 3 psf x 2 ) + ( 4' x 1.65' x 3 psf x 5 )= 859 lbs < 1,110 lbs OKR1R218.5'13'5.5'wLLwDLwLLwDLPPPPPPP 2020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020 Check attachment of Support to Existing Structure for Wind Uplift CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7-22 WIND LOADS ON BUILDING APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2. NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7-22 EFFECTIVE WIND AREA: "FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT BE LESS THAN ONE-THIRD ITS LENGTH." EFFECTIVE AREA = 15 SQ FT 2020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on truss= 60 plf x 3 ft. + 28 plf x 22 ft + ( 4' x 2.75' x 3 psf x 8 ) + ( 4' x 1.65' x 3 psf x 1 ) = 1,060 lbs < 1,500 lbs OK R1R2 25' 22'1.5' wLLwDL wLLwDL PPPPPPPP 1.5' 2020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on rafter = 60 plf x 6 ft. + 28 plf x 11 ft + ( 4' x 2.75' x 3 psf x 4 ) + ( 4' x 1.65' x 3 psf x 4 ) = 800 lbs < 1,020 lbs OK R1 R2 17' 3' w LLwDL 11' P P P P 3' 2020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on rafter = 28 plf x 8 ft + ( 4' x 2.75' x 3 psf x 3 ) + ( 6' x 1.65' x 3 psf x 1 ) = 323 lbs < 480 lbs OK R1 R2 8' w LLwDL P P P 2020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on rafter = 60 plf x 1.5 ft. + 28 plf x 5.5 ft + ( 4' x 2.75' x 3 psf x 2 ) + ( 4' x 1.65' x 3 psf x 4 ) = 310 lbs < 420 lbs OK R1 R2 7' w LLwDL 1.5' P 5.5' P 2020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on rafter = 28 plf x 7.83 ft + ( 4' x 2.75' x 3 psf x 3 ) + ( 6' x 1.65' x 3 psf x 1 ) = 318 lbs < 470 lbs OK R1 R2 7.83' w LLwDL P P P w DL + LL = 30 psf x 2 ft. = 60 plf Total load on truss = 60 plf x 3 ft. + 28 plf x 11 ft + ( 6' x 2.75' x 3 psf x 4 ) + ( 4' x 1.65' x 3 psf x 4 ) = 686 lbs < 840 lbs OK R1 R2 14' w LLwDL 11' P 3' PPP 2020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on rafter = 28 plf x 14.83 ft + ( 6' x 2.75' x 3 psf x 5 ) + ( 6' x 1.65' x 3 psf x 1 ) = 663 lbs < 890 lbs OK R1 R2 14.83' w LLwDL P P P P P 2020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on truss = 60 plf x 3 ft. + 28 plf x 13 ft + ( 4' x 1.65' x 3 psf x 8 ) + ( 4' x 1.65' x 3 psf x 4 ) = 702 lbs < 960 lbs OK R1 R2 16' w LLwDL 13' P 3' PPPPPPP 2020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on truss = 60 plf x 13.5 ft. + 28 plf x 11 ft + ( 4' x 2.75' x 3 psf x 4 ) + ( 4' x 1.65' x 3 psf x 4 ) = 1,250 lbs < 1,470 lbs OK R1 R224.5'w LLwDL 11'4'PP9.5'PP 2020­2158 ilum Solar Paul Kiehn Residence Date: September 13, 20202020­2666 ilum Solar Yvonne Quinones Residence Date: October 16, 20202020­2762 ilum Solar Andre James Residence Date: October 21, 20202020­3084 ilum Solar Christine Quilon Residence Date: October 21, 20202020­3189 ilum Solar Michael Ireland Residence Date: November 12, 20202020­3252 ilum Solar Viorato Residence Date: November 13, 20202020­3243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021­072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 2021 w DL + LL = 30 psf x 2.67 ft. = 80.1 plf Total load on rafter = 80.1 plf x 7 ft + 37.38 plf x 11.25 ft + ( 5.33' x 1.65' x 3 psf x 7 ) + ( 4' x 1.65' x 3 psf x 2 ) = 1,166 lbs < 1,462 lbs OK 2021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1187 Precis Solar Luis Hutchins Residence Date: April 9, 20212021-2649 Ilum Solar Teresa Gonzales Residence Date: July 9, 20212021-2651 Ilum Solar Karyn McQueen Residence Date: July 9, 20212021-3042 Ilum Solar Bixi Howe Residence Date: August 2, 20212021-4665 Ilum Solar Jerry Vestal Residence Date: October 27, 20212021-4665 Ilum Solar Jerrry Vestal Residence Date: October 27, 20212022-2274 Ilum Solar Gissella Maximo Hernandez Residence Date: May 27, 20222022-3929 Santa Barbara Solar Glenn Veneracion Residence Date: September 28, 20222022-3947 Axis Solar Karen Tom Hume Residence Date: September 29, 20222022-4080 Green Road Solar Robert Owens Residence Date: October 6, 20222022-4447 Precis Solar Michael Telles Residence Date: October 28, 2022 R1 R2 18.25' w LLwDL 3.3'4' 2022-4542 ESD 22-809 Duane Unzicker Residence Date: November 3, 20222022-4762 ESD 22-982 Adrian Campa Residence Date: November 15, 20222022-4944 ESD 22-1008 Rene Rivas Residence Date: November 30, 20222023-133 Penguin Marc Winger Residence Date: January 11, 20232023-134 Penguin David Wilhelm Residence Date: January 11, 20232023-163 ESD 23-013 Thalia Kirschwehm Residence Date: January 12, 20232023-241 ESD 23-029 Christian Almendares Residence Date: January 18, 20232023-522 ESD 23-070 Rigo Garcia Residence Date: February 2, 20232023-741 ESD 23-124 Jose Alberto Jimenez Residence Date: February 14, 2023 P 2023-908 Devil Dog Energy Fidel Lopez Residence Date: February 21, 2023 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 2023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 27, 20232023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 28, 20232023-1154 LA Solar Jose Naranjo Residence Date: March 1, 2023 PP 2023-3630 Axis Solar Narsa LLC Date: June 7, 2023 1'1'1'3.3'3.3' 1.35' PP PP 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 Sht # 4 of 7 2'-0" 5'-9" 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 2019 Load per lag screw = 609 lbs / 1 = 609 lbs Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2015 NDS. W ' = W x Cd x Ct Table 10.3.1 2015 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2015 NDS Ct = 1.0 per Table 10.3.4 of 2015 NDS W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 609 lbs OK Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3.5" lag screws per connection minimum. Design (Factored) Uplift at each support = 0.6 x 1,016 lbs = 609 lbs Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max ) Calculate Uplift at each support: Eq'n 30.5­1 ASCE 7­10 Wind Speed 129 mph Exposure C Nominal (Unfactored) Uplift at each support = 61.56 psf x 16.5 sq. ft. = 1,016 lbs pnet = λ Kzt I pnet30 λ =1.35 Kzt =1.0 I = 1.0 pnet30 =­45.6 psf pnet =1.35 x 1.0 x 1.0 x (­45.6 psf) = ­62.8 psf Note: Section 2.4.1 of ASCE 7­10, Basic Load Combinations for Allowable Stress Design. Note: Applicable Load Combination #5 (D + 0.6W) 2019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 20192020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 2020 qh Exp. 3-31-19 No. C58724NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­21 Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.4­7 ASCE 7­16 Kz = velocity pressure coefficient p=qhðGCpÞðγEÞðγaÞð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 7­16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASD = 101 mphTable 1609.3.1 2019 CBC qh=0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p=qhðGCpÞðγEÞðγaÞð qh=20 psf p = 20 psf (­2.0) (1.5) (0.7) = 42 psf Eq'n 26.10­1 ASCE 7­16 GCp = ­2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7ðγaFig. 29.4­8 ASCE 7­16 Nominal (Unfactored) Uplift at each support = 42 psf x 16.5 sq. ft. = 693 lbs Note: Section 2.4.1 of ASCE 7­16 , Basic Load Combinations for Allowable Stress Design. Note: Applicable Load Combination #5 : D + 0.6W Dead Load = 03 psf Wind Load = 42 psf Snow Load = 20.0 psf Check attachment of Support to Existing Structure for Wind Uplift ­ Cont'd 2020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 2020 qh Check attachment of Support to Existing Structure for Wind Uplift ­ Cont'd Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­21 Tributary Area to Each Solar Mount = 6 ft. x 1.65 ft. = 9.9 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.4­7 ASCE 7­16 Kz = velocity pressure coefficient p =qh ðGCp ÞðγE Þðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 7­16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGCp ÞðγE Þðγa Þð qh =20 psf p = 20 psf (­2.0) (1.5) (0.7) = 42 psf Eq'n 26.10­1 ASCE 7­16 GCp = ­2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.4­8 ASCE 7­16 Design (Factored) Uplift at each support = 0.6 x 416 lbs = 249 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 9.9 sq. ft. = 416 lbs Note: Section 2.4.1 of ASCE 7­16, Basic Load Combinations for Allowable Stress Load per lag screw = 249 lbs / 1 = 249 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 2020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020­2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020­2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020­2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020 qh= Note: qh= qh= ðγE ðγa Check attachment of Support to Existing Structure for Wind Uplift ­ Cont'd Tributary Area to Each Solar Mount = 4 ft. x 2.75 ft. = 11 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 110 mph Exposure C): Eq'n 29.4­7 ASCE 7­16 Kz = velocity pressure coefficient p=qhðGCpÞðγEÞðγaÞð 0.00256 Kz Kzt Kd Ke V2 Section 29.10.1 ASCE 7­16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 110 mph ; VASD = 85 mphTable 1609.3.1 2019 CBC 0.00256 (0.9) (1.0) (0.85) (1.0) (85)2 p=qhðGCpÞðγEÞðγaÞð 14.15 psf p = 14.15 psf (­2.0) (1.5) (0.7) = 29.7 psf Eq'n 26.10­1 ASCE 7­16 GCp = ­2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5 GCp = Solar Array Pressure Equalization Factor = 0.7Fig. 29.4­8 ASCE 7­16 Nominal (Unfactored) Uplift at each support = 29.7 psf x 11 sq. ft. = 327 lbs Note: Section 2.4.1 of ASCE 7­16 , Basic Load Combinations for Allowable Stress Design. Note: Applicable Load Combination #5 : D + 0.6W Dead Load = 03 psf Wind Load = 29.7 psf Snow Load = 20.0 psf Exp. 3-31-19 No. C58724NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­21 2020­2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020­2434 Mohr Power Thurin Residence Date: October 1, 20202020­2450 ESD 20­579 Sanchez Residence Date: October 2, 20202020­2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020­2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020­2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020­2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020­2495 Penguin Solar German Rios Residence Date: October 6, 20202020­2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020­2507 ESD 20­593 So Residence Date: October 7, 20202020­2515 Penguin Solar Black Annette Residence Date: October 7, 20202020­2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020­2525 New Power William Fuller Residence Date: October 8, 20202020­2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020­2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020­2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020­2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020­2591 ESD 20­590 Supulveda Residence Date: October 13, 20202020­2603 New Power John Yager Residence Date: October 14, 20202020­2603 New Power William Fuller Residence Date: October 14, 20202020­2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020­2652 Axis Solar Marcus Residence Date: October 15, 20202020­2652 Axis Solar Freimanis Residence Date: October 15, 20202020­2674 Complete Solar Dorado Residence Date: October 16, 20202020­2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020­2694 ESD 20­648 Barrera Residence Date: October 17, 20202020­2836 Penguin Solar Kalup Residence Date: October 26, 20202020­2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 20202020­2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020­2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020­2861 New Power Susan Bakken Residence Date: October 27, 20202020­2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020­2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 2020 qh Check attachment of Support to Existing Structure for Wind Uplift ­ Cont'd Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­21 Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.4­7 ASCE 7­16 Kz = velocity pressure coefficient p =qh ðGC p ÞðγE Þðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 7­16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGC p ÞðγE Þðγa Þð qh =20 psf p = 20 psf (­2.0) (1.5) (0.7) = 42 psf Eq'n 26.10­1 ASCE 7­16 GCp = ­2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.4­8 ASCE 7­16 Design (Factored) Uplift at each support = 0.6 x 693 lbs = 416 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 16.5 sq. ft. = 693 lbs Note: Section 2.4.1 of ASCE 7­16, Basic Load Combinations for Allowable Stress Load per lag screw = 416 lbs / 1 = 416 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 2020­2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020­2853 TG Roofing Brown Robert Residence Date: October 27, 20202020­2875 Trinity Power John Mendel Residence Date: October 28, 20202020­2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020­2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020­2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020­2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020­2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020­2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020­2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020­2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020­2915 Complete Solar Ojeda Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Walker Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon Services Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 29, 20202020­2940 Axis Solar Shook Date: October 30, 2020 qh Check attachment of Support to Existing Structure for Wind Uplift ­ Cont'd Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­21 Tributary Area to Each Solar Mount = 5.33 ft. x 2.75 ft. = 14.7 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.4­7 ASCE 7­16 Kz = velocity pressure coefficient p =qh ðGC p ÞðγE Þðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 7­16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGC p ÞðγE Þðγa Þð qh =20 psf p = 20 psf (­2.0) (1.5) (0.7) = 42 psf Eq'n 26.10­1 ASCE 7­16 GCp = ­2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.4­8 ASCE 7­16 Design (Factored) Uplift at each support = 0.6 x 616 lbs = 369 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 14.7 sq. ft. = 616 lbs Note: Section 2.4.1 of ASCE 7­16, Basic Load Combinations for Allowable Stress Load per lag screw = 369 lbs / 3 = 123 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 2020­2963 Axis Solar Luke Ding Residence Date: October 31, 20202020­2959 Penguin Solar Stevens Residence Date: October 31, 20202020­2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020­2939 Mohr Power Pappillion Residence Date: October 31, 20202020­2983 Infinity Solar Gernazio Residence Date: November 3, 20202020­2982 Infinity Solar Luna Residence Date: November 3, 20202020­3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020­3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020­3062 UniverCity Solar Mantri Residence Date: November 6, 20202020­3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020­3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020­3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020­3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020­3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020­3052 ESD 20­747 Perez Residence Date: November 6, 20202020­3065 HPM Solar Torres Residence Date: November 6, 20202020­3085 20­729 Green Residence Date: November 8, 20202020­3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020­3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020­3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020­3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020­3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020­3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020­3235 Infinity Solar Dizon Residence Date: November 16, 20202020­3360 Axis Solar Hogan Residence Date: November 23, 20202020­3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020­3570 ESD 20­917 Hatter Residence Date: December 6, 20202020­3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020­3566 TG Roofing Morff Craig Residence Date: December 6, 20202020­3566 TG Roofing Craig Morff Residence Date: December 6, 20202020­3686 Bratton Solar Love Residence Date: December 14, 20202020­3682 New Power Shawn Johnson Date: December 14, 20202020­3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020­3707 Penguin Solar James Logan Residence Date: December 15, 20202020­3704 New Power Marite Cappelletti Residence Date: December 15, 20202020­3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020­3734 New Power Judith Park Residence Date: December 16, 20202020­3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020­3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020­3759 Mohr Power Smith Residence Date: December 17, 20202020­3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020­3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020­3816 ilum Solar Wolf Residence Date: December 22, 2020 2020­3809 RNR Contreras Residence Date: December 22, 2020 2020­3843 Revamp Energy Kunal Patel Residence Date: December 23, 2020 2020­3842 Solar Deployed Nicholas Glackin Residence Date: December 23, 2020 2020­3841 Penguin Solar Calvillo Maria Residence Date: December 23, 2020 2020­3839 CAD for Cali Wheeler Residence Date: December 23, 2020 2020­3838 Solar Deployed Jaime Marquez Residence Date: December 23, 2020 2020­3853 Infinity Solar Robert Edwards Residence Date: December 23, 2020 2020­3857 Solar Deployed Thomas Cabrera Residence Date: December 28, 2020 2021­007 Sasha Intl Doti Odell Residence Date: January 4, 20212021­034 Silverline Solar Brendetta Bhones Residence Date: January 6, 20212021­030 Mohr Power Carpenter Residence Date: January 6, 20212021­029 Solar Journey Ryan Cai Residence Date: January 6, 20212021­027 Better Earth Cheryl Brady Residence Date: January 6, 20212021­024 Silverline Solar Timothy Corcoran Residence Date: January 6, 20212021­050 Sasha Intl Melissa Taravella Residence Date: January 7, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-266 Penguin Solar Steve Siegel Residence Date: January 23, 20212021-835 Penguin Solar Natalie Cabayan Residence Date: March 11, 20212021-1089 Precis Solar Phillip Llamas Residence Date: April 1, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021 qh Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Tributary Area to Each Solar Mount = 5.33 ft. x 1.65 ft. = 8.8 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.4-7 ASCE 7-22 Kz = velocity pressure coefficient p =qh ðGC p ÞðγE Þðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 7-22 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2022 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGC p ÞðγE Þðγa Þð qh =20 psf p = 20 psf (-2.0) (1.5) (0.7) = 42 psf Eq'n 26.10-1 ASCE 7-22 GCp = -2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.4-8 ASCE 7-22 Design (Factored) Uplift at each support = 0.6 x 370 lbs = 222 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 8.8 sq. ft. = 370 lbs Note: Section 2.4.1 of ASCE 7-22, Basic Load Combinations for Allowable Stress Load per lag screw = 222 lbs / 1 = 222 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3226 A1 Sun Inc Gary Wiskind Residence Date: August 10, 2022 2022-3230 BVI Solar Bart Cooper Residence Date: August 10, 2022 2022-3237 Solar Deployed Mario Giampa Residence Date: August 10, 2022 2022-3260 Solar Deployed Cort Collins Residence Date: August 11, 2022 2022-3814 Measure The Sun Rachel Edwards Residence Date: September 21, 2022 2022-3819 Solar Draft Jean Pak Residence Date: September 21, 2022 2022-3896 PowerTown Solar Chantelle Ho Residence Date: September 27, 2022 2022-3913 Pure Gold Solar Rick Jill Burgess Residence Date: September 27, 2022 2022-3935 Solar Outsource David Ross Residence Date: September 28, 2022 2022-3950 Solar Plan Design Kiera Woodson Residence Date: September 29, 20222022-4007 Solar Depoyed Nathan Dean Wilder Residence Date: October 4, 20222022-4041 Sun Green Systems Kiera James Kingdom Residence Date: October 5, 20222022-4082 BVI Solar Bill Faust Residence Date: October 6, 20222022-4423 Sun Dollar Solar Norm Fort Residence Date: October 27, 20222022-4521 Solar Survey Pro 11918 Lambert Ave Residence Date: November 2, 20222023-2023-102 HPM Solar Duke Draeger Residence Date: January 10, 20232023-104 Solar Deployed Emilio Romero Residence Date: January 10, 20232023-160 Green Road Solar Sonny Pulley Residence Date: January 12, 20232023-180 Solar Outsource Joven Tolentino Residence Date: January 13, 20232023-243 ESD 23-032 Thomas Chaiping Residence Date: January 18, 20232023-523 ESD 23-077 Richard Soliven Residence Date: February 2, 20232023-831 Solar Deployed Francisco Arreola Residence Date: February 17, 2023 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 2023-906 Devil Dog Energy Daniel Noblitt Residence Date: February 21, 20232023-911 Sun Dollar Solar Visant Sanathara Residence Date: February 21, 20232023-912 CV Solar Larry Heitman Residence Date: February 21, 20232023-1092 Solar Deployed Eric Kirkhuff Residence Date: February 27, 20232023-1662 Infinity Solar Marc Roudanez_ Residence Date: March 27, 20232023-1662 Infinity Solar Marc Roudanez Residence Date: March 27, 20232023-2051 Infinity Solar Eddie Kim Residence Date: March 29, 20232023-2153 ESD 23-421 Duane Kubischta Residence Date: March 31, 20232023-3630 Axis Solar Narsa LLC Date: June 7, 2023 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 Sht # 5 of 7 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 20192020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020­2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020­2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020­2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020 Check attachment of Support to Existing Structure for Wind Uplift ­ Cont'd Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2018 NDS. W ' = W x Cd x Ct Table 10.3.1 2018 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2018 NDS Ct = 1.0 per Table 10.3.4 of 2018 NDS W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 222 lbs OK Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3" lag screws per connection minimum. 2020­2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020­2434 Mohr Power Thurin Residence Date: October 1, 20202020­2450 ESD 20­579 Sanchez Residence Date: October 2, 20202020­2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020­2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020­2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020­2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020­2495 Penguin Solar German Rios Residence Date: October 6, 20202020­2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020­2507 ESD 20­593 So Residence Date: October 7, 20202020­2515 Penguin Solar Black Annette Residence Date: October 7, 20202020­2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020­2525 New Power William Fuller Residence Date: October 8, 20202020­2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020­2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020­2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020­2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020­2591 ESD 20­590 Supulveda Residence Date: October 13, 20202020­2603 New Power John Yager Residence Date: October 14, 20202020­2603 New Power William Fuller Residence Date: October 14, 20202020­2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020­2652 Axis Solar Marcus Residence Date: October 15, 20202020­2652 Axis Solar Freimanis Residence Date: October 15, 20202020­2674 Complete Solar Dorado Residence Date: October 16, 20202020­2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020­2694 ESD 20­648 Barrera Residence Date: October 17, 20202020­2836 Penguin Solar Kalup Residence Date: October 26, 20202020­2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 20202020­2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020­2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020­2861 New Power Susan Bakken Residence Date: October 27, 20202020­2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020­2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020­2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020­2853 TG Roofing Brown Robert Residence Date: October 27, 20202020­2875 Trinity Power John Mendel Residence Date: October 28, 20202020­2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020­2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020­2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020­2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020­2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020­2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020­2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020­2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020­2915 Complete Solar Ojeda Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Walker Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon Services Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 29, 20202020­2940 Axis Solar Shook Date: October 30, 2020 Free Body Diagram of Reverse­tilt Sub Array m of Reverse­tilt Sub Array Shear Reaction Uplift ReactionUplift Reaction Shear Reaction = (6 ft x 5.5 ft x 42 psf x sin 15) = 359 lbs Allowable lateral Load at 5/16" diameter lag screw w/ 2.5" embedment Allowable Load = 200 lbs x 1.6 x 2 = 640 lbs > 359 lbs OK (Note: Angle between Roof and Panels is 15 degrees) See plans for connection details. Note: Zone 2 2020­2963 Axis Solar Luke Ding Residence Date: October 31, 20202020­2959 Penguin Solar Stevens Residence Date: October 31, 20202020­2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020­2939 Mohr Power Pappillion Residence Date: October 31, 20202020­2983 Infinity Solar Gernazio Residence Date: November 3, 20202020­2982 Infinity Solar Luna Residence Date: November 3, 20202020­3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020­3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020­3062 UniverCity Solar Mantri Residence Date: November 6, 20202020­3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020­3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020­3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020­3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020­3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020­3052 ESD 20­747 Perez Residence Date: November 6, 20202020­3065 HPM Solar Torres Residence Date: November 6, 20202020­3085 20­729 Green Residence Date: November 8, 20202020­3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020­3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020­3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020­3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020­3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020­3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020­3235 Infinity Solar Dizon Residence Date: November 16, 20202020­3360 Axis Solar Hogan Residence Date: November 23, 20202020­3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020­3570 ESD 20­917 Hatter Residence Date: December 6, 20202020­3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020­3566 TG Roofing Morff Craig Residence Date: December 6, 20202020­3566 TG Roofing Craig Morff Residence Date: December 6, 20202020­3686 Bratton Solar Love Residence Date: December 14, 20202020­3682 New Power Shawn Johnson Date: December 14, 20202020­3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020­3707 Penguin Solar James Logan Residence Date: December 15, 20202020­3704 New Power Marite Cappelletti Residence Date: December 15, 20202020­3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020­3734 New Power Judith Park Residence Date: December 16, 20202020­3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020­3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020­3759 Mohr Power Smith Residence Date: December 17, 20202020­3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020­3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020­3816 ilum Solar Wolf Residence Date: December 22, 2020 2020­3809 RNR Contreras Residence Date: December 22, 2020 2020­3843 Revamp Energy Kunal Patel Residence Date: December 23, 2020 2020­3842 Solar Deployed Nicholas Glackin Residence Date: December 23, 2020 2020­3841 Penguin Solar Calvillo Maria Residence Date: December 23, 2020 2020­3839 CAD for Cali Wheeler Residence Date: December 23, 2020 2020­3838 Solar Deployed Jaime Marquez Residence Date: December 23, 2020 2020­3853 Infinity Solar Robert Edwards Residence Date: December 23, 2020 2020­3857 Solar Deployed Thomas Cabrera Residence Date: December 28, 2020 2021­007 Sasha Intl Doti Odell Residence Date: January 4, 20212021­034 Silverline Solar Brendetta Bhones Residence Date: January 6, 20212021­030 Mohr Power Carpenter Residence Date: January 6, 20212021­029 Solar Journey Ryan Cai Residence Date: January 6, 20212021­027 Better Earth Cheryl Brady Residence Date: January 6, 20212021­024 Silverline Solar Timothy Corcoran Residence Date: January 6, 20212021­050 Sasha Intl Melissa Taravella Residence Date: January 7, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-266 Penguin Solar Steve Siegel Residence Date: January 23, 20212021-835 Penguin Solar Natalie Cabayan Residence Date: March 11, 20212021-1089 Precis Solar Phillip Llamas Residence Date: April 1, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021 2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3226 A1 Sun Inc Gary Wiskind Residence Date: August 10, 2022 2022-3230 BVI Solar Bart Cooper Residence Date: August 10, 2022 2022-3237 Solar Deployed Mario Giampa Residence Date: August 10, 2022 2022-3260 Solar Deployed Cort Collins Residence Date: August 11, 2022 2022-3814 Measure The Sun Rachel Edwards Residence Date: September 21, 2022 2022-3819 Solar Draft Jean Pak Residence Date: September 21, 2022 2022-3896 PowerTown Solar Chantelle Ho Residence Date: September 27, 2022 2022-3913 Pure Gold Solar Rick Jill Burgess Residence Date: September 27, 2022 2022-3935 Solar Outsource David Ross Residence Date: September 28, 2022 2022-3950 Solar Plan Design Kiera Woodson Residence Date: September 29, 20222022-4007 Solar Depoyed Nathan Dean Wilder Residence Date: October 4, 20222022-4041 Sun Green Systems Kiera James Kingdom Residence Date: October 5, 20222022-4082 BVI Solar Bill Faust Residence Date: October 6, 20222022-4423 Sun Dollar Solar Norm Fort Residence Date: October 27, 20222022-4521 Solar Survey Pro 11918 Lambert Ave Residence Date: November 2, 20222023-2023-102 HPM Solar Duke Draeger Residence Date: January 10, 20232023-104 Solar Deployed Emilio Romero Residence Date: January 10, 20232023-160 Green Road Solar Sonny Pulley Residence Date: January 12, 20232023-180 Solar Outsource Joven Tolentino Residence Date: January 13, 20232023-243 ESD 23-032 Thomas Chaiping Residence Date: January 18, 20232023-523 ESD 23-077 Richard Soliven Residence Date: February 2, 20232023-831 Solar Deployed Francisco Arreola Residence Date: February 17, 20232023-906 Devil Dog Energy Daniel Noblitt Residence Date: February 21, 20232023-911 Sun Dollar Solar Visant Sanathara Residence Date: February 21, 20232023-912 CV Solar Larry Heitman Residence Date: February 21, 20232023-1092 Solar Deployed Eric Kirkhuff Residence Date: February 27, 20232023-1662 Infinity Solar Marc Roudanez_ Residence Date: March 27, 20232023-1662 Infinity Solar Marc Roudanez Residence Date: March 27, 20232023-2051 Infinity Solar Eddie Kim Residence Date: March 29, 20232023-2153 ESD 23-421 Duane Kubischta Residence Date: March 31, 20232023-3630 Axis Solar Narsa LLC Date: June 7, 2023 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Effective Existing Seismic Weight Area of (E) Building =Approximately 5,900 Sq. ft. Approximate Effective Seismic Weight =5,900 sq. ft. x 30 psf ave. = 177,000 LBS DETERMINE BASE SHEAR V = Cs W Cs = SDS R Ie R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2­1 R = 4.0 ORDINARY CONCRETE SHEAR WALLS Ie = 1.0 IMPORTANCE FACTOR SDS = 2/3 x SMS SMS = FA x SS SMS = 1.2 x 1.5 = 1.8 SDS = 2/3 x 1.8 = 1.2 Cs = 1.2 4.0 1 = 0.3 Sht # 6 of 7 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8-1 ASCE 7-22 EQ'N 12.8-2 ASCE 7-22 EQ'N 11.4-3 ASCE 7-16 EQ'N 11.4-1 ASCE 7-16 EQ'N 12.8-2 ASCE 7-22 2020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2158 ilum Solar Paul Kiehn Residence Date: September 13, 20202020­2666 ilum Solar Yvonne Quinones Residence Date: October 16, 20202020­2762 ilum Solar Andre James Residence Date: October 21, 20202020­3084 ilum Solar Christine Quilon Residence Date: October 21, 20202020­3189 ilum Solar Michael Ireland Residence Date: November 12, 20202020­3252 ilum Solar Viorato Residence Date: November 13, 20202020­3243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021­072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1187 Precis Solar Luis Hutchins Residence Date: April 9, 20212021-2156 Ilum Solar Athena Dejarme Residence Date: June 11, 20212021-2649 Ilum Solar Teresa Gonzales Residence Date: July 9, 20212021-2651 Ilum Solar Karyn McQueen Residence Date: July 9, 20212021-3042 Ilum Solar Bixi Howe Residence Date: August 2, 20212021-4665 Ilum Solar Jerry Vestal Residence Date: October 27, 20212021-4665 Ilum Solar Jerrry Vestal Residence Date: October 27, 20212022-2274 Ilum Solar Gissella Maximo Hernandez Residence Date: May 27, 20222022-3929 Santa Barbara Solar Glenn Veneracion Residence Date: September 28, 20222022-3947 Axis Solar Karen Tom Hume Residence Date: September 29, 20222022-4080 Green Road Solar Robert Owens Residence Date: October 6, 20222022-4447 Precis Solar Michael Telles Residence Date: October 28, 20222022-4542 ESD 22-809 Duane Unzicker Residence Date: November 3, 20222022-4762 ESD 22-982 Adrian Campa Residence Date: November 15, 20222022-4944 ESD 22-1008 Rene Rivas Residence Date: November 30, 20222023-133 Penguin Marc Winger Residence Date: January 11, 20232023-134 Penguin David Wilhelm Residence Date: January 11, 20232023-163 ESD 23-013 Thalia Kirschwehm Residence Date: January 12, 20232023-241 ESD 23-029 Christian Almendares Residence Date: January 18, 20232023-522 ESD 23-070 Rigo Garcia Residence Date: February 2, 20232023-741 ESD 23-124 Jose Alberto Jimenez Residence Date: February 14, 20232023-908 Devil Dog Energy Fidel Lopez Residence Date: February 21, 2023 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 2023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 27, 20232023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 28, 20232023-1573 ESD 23-224 Marvin Webster Residence Date: March 15, 20232023-1575 ESD 23-165 My Hanh Nguyen Residence Date: March 15, 20232023-2662 ESD 23-491 Corinne Dossett Residence Date: April 18, 20232023-2663 ESD 23-454 Hector Paniagua Residence Date: April 18, 20232023-3511 Unique Solar Atria Bonita Residence Date: May 30, 20232023-3630 Axis Solar Narsa LLC Date: June 7, 2023 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 V = 0.3 x 177,000 LBS = 53,100 LBS DETERMINE NEW BASE SHEAR EXISTING BASE SHEAR Determine Seismic Weight of Building with Solar Array: EXISTING SEISMIC WEIGHT =177,000 LBS NEW SOLAR ARRAY =3 PSF x 97 PANELS x 3.3' x 5.5' = 5,282 LBS NEW SEISMIC WEIGHT =177,000 LBS + 5,282 LBS = 182,282 LBS THEREFORE NEW BASE SHEAR: V = 0.3 x 182,282 = 54,684 LBS % CHANGE =54,684 LBS - 53,100 LBS 53,100 LBS x 100 =3 % < 10% OK EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE. "Alterations are permitted to be made to any structure without requiring the existing structure to comply with this standard provided the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10 percent or decrease the design strength of any existing structural element to resist seismic forces by more than 10 percent shall not be permitted unless the entire seismic force­resisting system is determined to comply with this standard for a new structure." End of Calculations Sht # 7 of 7 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8-1 ASCE 7-22 EQ'N 12.8-1 ASCE 7-22 OK. PER ASCE 7-22 SECTION 11.B.3 ALTERATIONS 2020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2158 ilum Solar Paul Kiehn Residence Date: September 13, 20202020­2666 ilum Solar Yvonne Quinones Residence Date: October 16, 20202020­2762 ilum Solar Andre James Residence Date: October 21, 20202020­3084 ilum Solar Christine Quilon Residence Date: October 21, 20202020­3189 ilum Solar Michael Ireland Residence Date: November 12, 20202020­3252 ilum Solar Viorato Residence Date: November 13, 20202020­3243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021­072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1187 Precis Solar Luis Hutchins Residence Date: April 9, 20212021-2156 Ilum Solar Athena Dejarme Residence Date: June 11, 20212021-2649 Ilum Solar Teresa Gonzales Residence Date: July 9, 20212021-2651 Ilum Solar Karyn McQueen Residence Date: July 9, 20212021-3042 Ilum Solar Bixi Howe Residence Date: August 2, 20212021-4665 Ilum Solar Jerry Vestal Residence Date: October 27, 20212021-4665 Ilum Solar Jerrry Vestal Residence Date: October 27, 20212022-2274 Ilum Solar Gissella Maximo Hernandez Residence Date: May 27, 20222022-3929 Santa Barbara Solar Glenn Veneracion Residence Date: September 28, 20222022-3947 Axis Solar Karen Tom Hume Residence Date: September 29, 20222022-4080 Green Road Solar Robert Owens Residence Date: October 6, 20222022-4447 Precis Solar Michael Telles Residence Date: October 28, 20222022-4542 ESD 22-809 Duane Unzicker Residence Date: November 3, 20222022-4762 ESD 22-982 Adrian Campa Residence Date: November 15, 20222022-4944 ESD 22-1008 Rene Rivas Residence Date: November 30, 20222023-133 Penguin Marc Winger Residence Date: January 11, 20232023-134 Penguin David Wilhelm Residence Date: January 11, 20232023-163 ESD 23-013 Thalia Kirschwehm Residence Date: January 12, 20232023-241 ESD 23-029 Christian Almendares Residence Date: January 18, 20232023-522 ESD 23-070 Rigo Garcia Residence Date: February 2, 20232023-741 ESD 23-124 Jose Alberto Jimenez Residence Date: February 14, 20232023-908 Devil Dog Energy Fidel Lopez Residence Date: February 21, 2023 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 2023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 27, 20232023-1120 ESD 23-157 Aleisha Andreasen Residence Date: February 28, 20232023-1573 ESD 23-224 Marvin Webster Residence Date: March 15, 20232023-1575 ESD 23-165 My Hanh Nguyen Residence Date: March 15, 20232023-2662 ESD 23-491 Corinne Dossett Residence Date: April 18, 20232023-2663 ESD 23-454 Hector Paniagua Residence Date: April 18, 20232023-3511 Unique Solar Atria Bonita Residence Date: May 30, 20232023-3630 Axis Solar Narsa LLC Date: June 7, 2023 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 GENERAL NOTES PROJECT SCOPE:DRAWING INDEX PERMITTING / PLANNING NOTES: VICINITY MAP ADDRESS MAP: PROJECT TEAM: THIS INSTALLATION CONSISTS OF A NEW ROOF MOUNTED PHOTOVOLTAIC (PV) SYSTEM. THE PV SYSTEM IS STATIC MOUNTED. THIS SYSTEM WILL BE INTERCONNECTED TO AND WILL BE OPERATED IN PARALLEL WITH THE CORRESPONDING ELECTRIC GRID PER THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE AND UTILITY INTERCONNECT AGREEMENT CONDITIONS OF APPROVAL: 1. ALL CONSTRUCTION SHALL OCCUR BETWEEN THE HOURS OF 7AM & 7PM, EXCEPT FOR THE PURPOSE OF EMERGENCIES. 1. THIS PV SYSTEM INSTALLATION IS SUBJECT TO INSPECTION BY THE AUTHORITY HAVING JURISDICTION AND 2. THIS PROJECT SHALL CONFORM TO THE FOLLOWING CODE VERSIONS: 2022 CALIFORNIA BUILDING CODE (CBC 2022) 2022 CALIFORNIA ELECTRIC CODE (CEC 2022) 2022 CALIFORNIA FIRE CODE (CFC 2022) 2022 CALIFORNIA ENERGY CODE (CEnC 2022) 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CGBSG 2022) 2022 CALIFORNIA PLUMBING CODE (CPC 2022) 2022 CALIFORNIA MECHANICAL CODE (CMC 2022) AUTHORITY HAVING JURISDICTION 3. ROOFTOP MOUNTED PV SYSTEM MEETS FIRE CLASSIFICATION PER CBC 1509.7 AND 1505.9 CLASS "A". PV SYSTEM AND ASSOCIATED RACKING SYSTEM ARE TESTED AND IDENTIFIED WITH FIRE CLASSIFICATION IN ACCORDANCE WITH UL 1703. 4. SYSTEM UTILIZES RAPID SHUTDOWN DEVICES WHICH MEET 690.12 MODULE LEVEL RAPID SHUTDOWN REQUIREMENTS. 5. ALL ELECTRICAL WORK SHALL BE DESIGNED PER 2022 CALIFORNIA ELECTRICAL CODE 6. 110.2 APPROVAL: ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION SITE CONTACT: CONTRACTOR: THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION. REPRODUCTION, DISCLOSURE, OR USE WITHOUT SPECIFIC WRITTEN AUTHORIZATION OF CONTRACTOR IS STRICTLY FORBIDDEN. DA T E : 1. ALL MATERIAL AND WORKMANSHIP SHALL CONFORM TO THE 2022 TITLE 24 OF THE CALIFORNIA BUILDING CODE, CMC,CPC. CEC AND ALL APPLICABLE LOCAL CODES, ORDINANCES, AND STATE AMENDMENTS. 2. THE CONTRACTOR SHALL CHECK ALL DRAWINGS IMMEDIATELY UPON THEIR RECEIPT AND SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS BEFORE STARTING WORK. ALL ARCHITECTS AND ENGINEERS SHALL BE NOTIFIED OF ANY DISCREPANCIES. 3. NO STRUCTURAL MEMBER SHALL BE CUT OR NOTCHED UNLESS SPECIFICALLY SHOWN, NOTED, OR APPROVED BY ALL. NOTCH DETAILS, IF PROVIDED ARE FOR GENERAL GUIDANCE ONLY. ALL SHALL BE CONTACTED TO APPROVE LOCATIONS OF PROPOSED NOTCHES. 4. CONNECTIONS AND IMPLIED CONSTRUCTION ASSEMBLIES THAT ARE NOT SPECIFICALLY DESCRIBED OR DETAILED SHALL BE CONSTRUCTED USING STANDARD CONSTRUCTION PRACTICES IN COMPLIANCE WITH THE GOVERNING CODES AND ORDINANCES. 5. WHEN DETAILS LABELED "TYPICAL” OR "SIMILAR" ARE GIVEN ON DRAWINGS, THE CONTRACTOR SHALL APPLY THE INTENT OF THE DETAIL TO THAT SPECIFIC CONDITION. 6. WRITTEN INFORMATION AND DIMENSIONS SHALL HAVE PRECEDENCE OVER GRAPHIC INFORMATION. DO NOT SCALE. 7. DRAWINGS AND SPECIFICATIONS FOR THIS WORK HAVE BEEN PREPARED IN ACCORDANCE WITH GENERALLY ACCEPTED STANDARDS OF PRACTICE TO MEET THE MINIMUM REQUIREMENTS DF THE CURRENT EDITION DF THE CBC. ANY DISCREPANCIES ON THE PLANS OR ANY DE\/IATIONS FROM THE PLANS WHICH ARE NECESSITATED BY FIELD CONDITIONS OR ANY CONDITION DIFFERENT FROM THOSE INDICATED ON THE PLANS SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER. ALL WORK IS TO BE COORDINATED SO THAT COOPERATION BETWEEN THE TRADES WHERE REQUIRED IS ACCOMPLISHED. 8. CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE FOR THE ORDER AND MEANS DF CONSTRUCTION AND ALL TEMPORARY BRACING AND ERECTION DURING CONSTRUCTION. 9. APPROVALS BY BUILDING INSPECTORS SHALL NOT CONSTITUTE AUTHORITY TO DEVIATE FROM THE PLANS AND SPECIFICATIONS 1O. ALL WORK SHALL CONFORM TO TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR) 11.GRADING PLANS, DRAINAGE IMPROVEMENTS, ROAD AND ACCESS REQUIREMENTS AND ENVIRONMENTAL HEALTH CONSIDERATIONS SHALL COMPLY WITH ALL LOCAL ORDINANCES. X_____________________________ AERIAL PHOTO: X_________________________ Confidentiality Statement: 9/ 6 / 2 0 2 3 3 : 3 8 : 3 4 P M NA R S A L L C 24 2 1 N G R A N D A V E , S A N T A A N A , C A 9 2 7 0 5 NARSA LLC 2421 N GRAND AVE, SANTA ANA, CA 92705 NARSA LLC SOLAR ELECTRIC SYSTEM THIS PROJECT ENTAILS THE INSTALLATION OF A PHOTOVOLTAIC SYSTEM AT NARSA LLC THE SYSTEM WILL NOT BE A NET ELECTRICITY EXPORTER TO THE UTILITY GRID. SUNGRID SOLAR 18271 W MCDURMOTT UNIT E IRVINE, CA 92614 TEL: 949 229 5977 LIC # B, C10: 1037212 T101 Ti t l e S h e e t SUNGRID SOLAR B, C10: 1037212 3/31/24 SUNGRID SOLAR SOLAR ELECTRIC SYSTEM PROJECT: 38.8kW DCstc / 34.785kW ACcec SUNGRID SOLAR 18271 W MCDURMOTT UNIT E IRVINE, CA 92614 949-309-2453 This drawing is the property of SUNGRID SOLAR. This information is confidential and is to be used only in connection with work described by SUNGRID SOLAR. No part is to be discolosed to others without written permission from SUNGRID SOLAR SUNGRID SOLAR LIC # B, C10: 1037212 EXP: 3/31/24Sheet #Sheet Name T101 Title Sheet T102 Notes A100 Site Plan A101 Array Layout E101 Electrical Layout E201 Interconnection SLD E301 Signage SP101 Spec Sheets SP102 Spec Sheets ELECTRICAL: AXIS SOLAR DESIGN 27281 LAS RAMBLAS, SUITE 200 MISSION VIEJO, CA 92691 TEL: 323-484-2947 CHAD BUCCINE LICENSE# E20115 No . De sc ri pt ion Da t e 1 AH J C O R R E C T I O N 9/ 0 7 / 2 3 PROJECT LOCATION DETAILS NARSA LLC 2421 N GRAND AVE SANTA ANA, CA 92705 BUILDING INFO: APN: 396-361-06 METER #259000-043781 OCCUPANCY: A-3 CONSTRUCTION TYPE: V-N ONE STORY PROJECT TOTAL: SYSTEM SIZE: 38.8 kW STC DC 34.785 kW CEC AC PANEL SPECS: (97) UNITED RENEWABLE ENERGY CO., LTD., FBM400MFG-BB MODULES INVERTER SPECS: (2) SOLAREDGE TECHNOLOGIES LTD., SE17.3KUS [208V] OPTIMIZER / RAPID SHUTDOWN SPECS: (49) SOLAREDGE TECHNOLOGIES, P1101 1 Exp. 3-31-19 No. C58724 NITRA MW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 www. Loyd W Martin .com Solar Structures Engineering #2023-3630 Structural Only September 7, 2023 Bldg# 101115981 Elec# 20180415 APPROVALS: PLNG - HJacinto BLDG - JLo ELEC - MSmith 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 E2. THE LAYOUT OF CONDUIT SHOWN IN THESE PLANS IS DIAGRAMTIC & SHOWS DESIGN INTENT. CONTRACTOR SHALL ROUTE AND LOCATE THE CONDUITS TO SUIT SITE CONDITIONS BUT SHALL NOT EXCEED THE MIZIMUM CONDUCTOR LENGTHS INDENTIFIED ON THE WIRE SCHEDULE. CONTRACTOR WILL COORDINATE ALL CHANGES IN WIRING AND CONDUIT WITH THE ENGINEER. To scale on 24x36 paper X_________________________ Confidentiality Statement: 6/7/2023 1:15:30 AM Notes NA R S A L L C 24 2 1 N G R A N D A V E , S A N T A AN A , C A 9 2 7 0 5 T102 SUNGRID SOLAR 18271 W MCDURMOTT UNIT E IRVINE, CA 92614 949-309-2453 This drawing is the property of SUNGRID SOLAR. This information is confidential and is to be used only in connection with work described by SUNGRID SOLAR. No part is to be discolosed to others without written permission from SUNGRID SOLAR SUNGRID SOLAR LIC # B, C10: 1037212 EXP: 3/31/24 SUNGRID SOLAR ABBREVIATIONS ALTERNATING CURRENT APPROXIMATE AMERICAN WIRE GUAGE CENTER LINE COMBINER BOX DIRECT CURRENT DROP INLET DISCONNECT ELECTRICAL METALLIC TUBING (EXISTING) ELEVATION EQUAL INSIDE DIAMETER JUNCTION BOX MAIN COMBINER BOX MANUFACTURER MINIMUM MISCELLANEOUS (NEW) OR APPROVED EQUAL ON CENTER OUTSIDE DIAMETER POINT OF COMMON COUPLING PHOTOVOLTAIC PROPERTY LINE STORM DRAIN SQUARE FOOT/FEET SIMILAR TO BE DETERMINED TOP OF FOOTING TYPICAL UNLESS OTHERWISE NOTED VERIFY IN FIELD TRANSFORMER NOTESSYMBOLS AC APPROX AWG CL CB DC DI DISC EMT (E) EL EQ ID JB MCB MFR MIN MISC (N) OAE OC OD POCC PV PL SD SF SIM TBD TOF TYP UON VIF XFMR No. Description Date 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 ELECTRICAL AREA (E) MAIN SERVICE (N) AC DISCONNECT FOR UTILITY OPERATIONS (N) SOLAREDGE SE17.3KUS INVERTER 12° 41' 22" 146.72' S E 90° 00' 00" 276.16' N W 0° 0 0 ' 0 0 " 14 3 . 1 4 ' N E 90° 00' 00" 243.93' S E GRA ND AVE OBSTRUCTION TYP ROOF ACESS (N) DEDICATED PV COMBINER PANEL ROOF ACESS 13 ' - 5 " 85' - 4" 66 ' - 6 " 69' - 9" ARRAY 1 T: 10° Az:180° ARRAY 2 T: 32° Az:180° ARRAY 3 T: 32° Az:270° ARRAY 5 T: 10° Az:180° ARRAY 4 T: 32° Az:270° ARRAY 6 T: 10° Az:180° To scale on 24x36 paper X_________________________ Confidentiality Statement: 9/6/2023 3:36:44 PM Site Plan NA R S A L L C 24 2 1 N G R A N D A V E , S A N T A AN A , C A 9 2 7 0 5 A100 SUNGRID SOLAR 18271 W MCDURMOTT UNIT E IRVINE, CA 92614 949-309-2453 This drawing is the property of SUNGRID SOLAR. This information is confidential and is to be used only in connection with work described by SUNGRID SOLAR. No part is to be discolosed to others without written permission from SUNGRID SOLAR SUNGRID SOLAR LIC # B, C10: 1037212 EXP: 3/31/24 SUNGRID SOLAR 1" = 10'-0"1 Site Plan CANADIAN SOLAR, 540W Array Name Tilt° Azimuth Module Count SIZE kW ARRAY 1 10 180 44 23.76 ARRAY 2 32 180 23 12.42 ARRAY 3 32 270 9 4.86 ARRAY 4 32 270 12 6.48 ARRAY 5 10 180 6 3.24 ARRAY 6 10 180 3 1.62 97 52.38 No. Description Date Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­25 www. Loyd W Martin .com Solar Structures Engineering #2023-3630 Structural Only September 7, 2023 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 ELECTRICAL AREA (E) MAIN SERVICE (N)AC DISCONNECT FOR UTILITY OPERATIONS (N) SOLAREDGE SE17.3KUS INVERTER (N)DEDICATED PV COMBINER PANEL A101 4 HIP RIDGE CURB RI D G E HIP VAL LEY HIP RIDGE TR A S I T I O N T O F L A T EDGE FLAT ED G E F L A T ED G E F L A T ED G E F L A T EDGE FLAT ED G E F L A T ED G E F L A T EDG E F L AT RIDGE RI D G E CURB CURB CU R B CU R B ED G E F L A T TR A S I T I O N T O F L A T EDGE FLAT EDGE FLAT TRASITION TO FLAT EDGE FLAT ED G E F L A T ED G E F L A T EAVE EA V E EA V E EA V E EA V E EAVE EAVE EAVE EAVE EAVE RA K E HIP SLOPE SL O P E SL O P E SLOPE SL O P E SLOPE SL O P E FLAT FLAT FLAT FLAT FLAT RIDGE RI D G E RI D G E FLAT FLAT ARRAY 2 T: 32° Az:180° ARRAY 3 T: 32° Az:270° ARRAY 4 T: 32° Az:270°ARRAY 5 T: 10° Az:180° 48" FIRE ACCESS PERIMETER 48 " F I R E A C C E S S P E R I M E T E R 48 " F I R E A C C E S S P E R I M E T E R 48 " F I R E A C C E S S P E R I M E T E R 48" FIRE ACCESS PERIMETER 48" FIRE ACCESS PERIMETER 48" FIRE ACCESS PERIMETER 48" FIRE ACCESS PERIMETER 48 " F I R E A C C E S S P E R I M E T E R 48 " F I R E A C C E S S P E R I M E T E R 48" FIRE ACCESS PERIMETER 48" FIRE ACCES S PERIMETER 48" FIRE ACCES S PERIMETER 48 " F I R E A C C E S S P E R I M E T E R 48" FIRE ACCESS PERIMETER 48" FIRE ACCESS PERIMETER 48 " F I R E A C C E S S PE R I M E T E R MAX TYP 5' - 4" 39' - 4"63' - 6" 108' - 1" 8' - 4"29' - 11"1' - 2"7' - 0"48' - 7"7' - 11" 2' - 3 " 14 ' - 1 1 " 10 ' - 8 " 27 ' - 6 " 12 ' - 9 " 27 ' - 1 1 " 68 ' - 2 " 3' - 0 " 14 ' - 1 1 " 9' - 7 " TYP 2' - 0" 6' - 6" 28' - 5" 4' - 0" 38' - 11" 68' - 8" 4' - 0"22' - 5"6' - 5" 7' - 9" 5' - 8" 4' - 0" ARRAY 6 T: 10° Az:180° 4' - 0"11' - 2"6' - 10" 22' - 0" 7' - 0" 5' - 8" 4' - 0" 16' - 8" 48" FIRE ACCESS PERIMETER 48 " F I R E A C C E S S PE R I M E T E R 48" FIRE ACCESS PERIMETER EA V E 12" REAR FAST JACK W/ CHEMLINK ECURB @ FLAT ROOFS TYP IRONRIDGE XR100 RACKING TYP IRONRIDGE FLASHFOOT2 @ SLOPED ROOFS TYP IRONRIDGE XR100 RACKING TYP 4.5" FRONT FAST JACK W/ CHEMLINK ECURB @ FLAT ROOFS TYP 3/4" PLYWOOD DECKING (1) 5/16" x 3" LAG SCREW (2.5" PENETRATION MIN) FRAMING TYP QUICK MOUNT L-MOUNT XR100 RAIL SOLAR MODULE 1 LAYER OF COMPOSITE SHINGLE MODULE CLAMP 3/8" -16 HARDWARE TO ATTACH RAIL TO LFOOT (204 IN-LBS) 0' - 3" 2X12 RAFTERS - 32" O.C. TYP SOLAR MODULES PRO SOLAR 4.5"/12" FASTJACK (E)ROOF FRAMING TYP (1) 5/16" LAG BOLT 2-1/2" MIN. EMBEDMENT PLACE SEALANT AROUND LAG BOLT AND UNDER STANDOFF BASE (E)ROOF SHEATHING TYP CHEM LINK ECURB FLASHING To scale on 24x36 paper X_________________________ Confidentiality Statement: 9/6/2023 3:36:44 PM Array Layout NA R S A L L C 24 2 1 N G R A N D A V E , S A N T A AN A , C A 9 2 7 0 5 A101 SUNGRID SOLAR 18271 W MCDURMOTT UNIT E IRVINE, CA 92614 949-309-2453 This drawing is the property of SUNGRID SOLAR. This information is confidential and is to be used only in connection with work described by SUNGRID SOLAR. No part is to be discolosed to others without written permission from SUNGRID SOLAR SUNGRID SOLAR LIC # B, C10: 1037212 EXP: 3/31/24 SUNGRID SOLAR CANADIAN SOLAR, 540W Array Name Tilt° Azimuth Module Count SIZE kW ARRAY 1 10 180 44 23.76 ARRAY 2 32 180 23 12.42 ARRAY 3 32 270 9 4.86 ARRAY 4 32 270 12 6.48 ARRAY 5 10 180 6 3.24 ARRAY 6 10 180 3 1.62 97 52.38 No. Description Date 1 Interconnection REV 9/14/18 3/16" = 1'-0"1 Array Overview 1 1/2" = 1'-0"3 Roof Standoff - IronRidge Flash L Foot 1/4" = 1'-0"4 Rafter - Callout 3" = 1'-0"5 Roof Standoff -Prosolar 4.5" 12" 1 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­25 www. Loyd W Martin .com Solar Structures Engineering #2023-3630 Structural Only September 7, 2023 72” Max Attachment Span 48 ” Ma x R a i l S p a n RACKING DETAILS NOTE: Engineer of Record assumes that all structural components of the existing building were permitted and met the requirements of the Building Code at the time of construction. Solar Contractor shall field verify that the roof framing is in its existing permitted condition and capable of supporting required live loads. Framing specified on solar plans shall be assumed to be minimum size and spacing, actual framing may be different. 64" 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 (E) MAIN SERVICE SWITCHBOARD (N) PV DISCONNECT FOR UTLITY OPERATION GROUND LEVEL OUTSIDE IN V E R T E R 1 S E 1 7 . 3 K U S S T R I N G 1 22 M O D U L E S 1 1 P 1 1 0 1 O P T I M I Z E R S INVERTER 1 SE17.3KUS STRING 2 22 MODULES 11 P1101 OPTIMIZERS INVERTER 2 SE17.3KUS STRING 1 27 MODULES 14 P1101 OPTIMIZERS INVERTER 2 SE17.3KUS STRING 2 26 MODULES 13 P1101 OPTIMIZERS (N)DEDICATED PV COMBINER PANEL (N)SE17.3KUS SOLAR INVERTER - --- REPRESENTATIVE CONDUCTORS CONDUIT COMPRESSION FITTING LOCK NUT ENCLOSURE WALL CONTINUOUS GROUND STRIP INSULATION AT LUG GROUND BUSHING WITH LAY-IN LUG 10-24 SS BOLT TORQUE TO 18 FT-LBS 10-24 SS NUT /W STAR WASHER RAIL FRAME ILSCO #4 LAY IN LUG TINNED STAR WASHER To scale on 24x36 paper X_________________________ Confidentiality Statement: 9/6/2023 3:36:46 PM Electrical Layout NA R S A L L C 24 2 1 N G R A N D A V E , S A N T A AN A , C A 9 2 7 0 5 E101 SUNGRID SOLAR 18271 W MCDURMOTT UNIT E IRVINE, CA 92614 949-309-2453 This drawing is the property of SUNGRID SOLAR. This information is confidential and is to be used only in connection with work described by SUNGRID SOLAR. No part is to be discolosed to others without written permission from SUNGRID SOLAR SUNGRID SOLAR LIC # B, C10: 1037212 EXP: 3/31/24 SUNGRID SOLAR CANADIAN SOLAR, 540W Array Name Tilt° Azimuth Module Count SIZE kW ARRAY 1 10 180 44 23.76 ARRAY 2 32 180 23 12.42 ARRAY 3 32 270 9 4.86 ARRAY 4 32 270 12 6.48 ARRAY 5 10 180 6 3.24 ARRAY 6 10 180 3 1.62 97 52.38 3/16" = 1'-0"1 Array Wiring 6" = 1'-0"2 Detail Grounding Conduit Body No. Descrip tion Date6" = 1'-0"3 Detail Grounding Lay-in Lug CONDUIT RUN ON ROOF (ACTUAL PLACEMENT TO BE DETERMINED ON SITE) 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 1 (1) #6 AWG CU SOLID CU EGC (2) #10 AWG CU PV WIRE DISTANCE: 1 FT, 0.1% VDROP 2 (1) #6 AWG CU SOLID CU EGC (2) #10 AWG CU PV WIRE DISTANCE: 10 FT, 0.09% VDROP 3 (1) #10 AWG CU THWN-2 EGC (4) #10 AWG CU THWN-2 FILL: 0.1055 IN^2 0.75" EMT ON STRUCTURES, 20% FILL DISTANCE: 150 FT, 1.37% VDROP 4 (1) #10 AWG CU THWN-2 EGC (1) #4 AWG CU THWN-2 NEUT (3) #4 AWG CU THWN-2 FILL: 0.3507 IN^2 1.25" EMT ON STRUCTURES, 23% FILL 1.25" PVC IN TRENCHES, 28% FILL DISTANCE: 10 FT, 0.14% VDROP 5 (1) #6 AWG CU THWN-2 EGC (1) #1/O AWG CU THWN-2 NEUT (3) #1/O AWG CU THWN-2 FILL: 0.7927 IN^2 1.5" EMT ON STRUCTURES, 39% FILL 2" PVC IN TRENCHES, 28% FILL DISTANCE: 10 FT, 0.11% VDROP 5 (1) #6 AWG CU THWN-2 EGC (1) #1/O AWG CU THWN-2 NEUT (3) #1/O AWG CU THWN-2 FILL: 0.7927 IN^2 1.5" EMT ON STRUCTURES, 39% FILL 2" PVC IN TRENCHES, 28% FILL DISTANCE: 10 FT, 0.11% VDROP NOTES: 1. PROVIDE CONTINUOUS PATH FOR GROUND CONDUCTOR FROM THE INVERTER TO THE EXISTING MAIN SERVICE SWITCHBOARD GROUND BUS. GROUNDING ELECTRODE CONDUCTOR TO SERVE AS EQUIPMENT GROUND. PROVIDE LAY-IN LUGS TO BOND ALL EQUIPMENT ALONG THIS PATH TO THE GROUNDING ELECTRODE CONDUCTOR TO ALLOW FOR CONTINUOUS RUN. KEY PANELS PER STRING STRINGS PER INPUT ARRAY X1 TO INPUT 217 X1 TO INPUT 1 18 PROJECT SYSTEM SIZE TOTAL SYSTEM SIZE: 38.8 kW DC, 34.785 kW ACcec PANEL SPECS: (97)UNITED RENEWABLE ENERGY CO., LTD., FBM400MFG-BB MODULES MODULE AMPERAGE: 12.84 IMP, 13.68 ISC MODULE VOLTAGE: 31.17 VMP, 37.2 VOC TEMP. COEFFICIENTS OF Voc: -0.27%/°C STC: 400 W, PTC: 367.8 W INVERTER SPECS: (1)SOLAREDGE TECHNOLOGIES LTD., SE17.3KUS [208V] 208/120V, 3PH, 4W, MAX OUTPUT CURRENT = 48.25A CEC WEIGHTED EFFICIENCEY: 97.5% OPTIMIZER / RAPID SHUTDOWN SPECS: (97) MODULE PER P1101 OPTIMIZER (2) MODULES CONNECTED TO EACH OPTIMIZER RATED INPUT DC POWER = 1100W MAX OUTPUT CURRENT = 18A MAXIMUM OUTPUT VOLTAGE = 80V MAX SYSTEM VOLTAGE = 1000V 690.12 MODULE LEVEL RAPID SHUTDOWN SEE SPEC SHEET FOR ELECTRICAL PARAMETERS AND WARRANTY INFO TUSTIN MCAF: COLD DESIGN TEMP = 2°C HOT DESIGN TEMP = 31°C INVERTER NUMBER INVERTER SIZE (kW) X G G INV DC DC SOLAREDGE P1101 POWER OPTIMIZER (2) MODULES PER INVERTER INTEGRATED DC DISCONNECT, 600VDC XX.X (E) 400A MAIN SERVICE PANEL 120/208V, 3PH, 4W, 400A GRD (E) GROUND SYSTEM M UTILITY CUSTOMER (N) 350A MAIN BREAKER (N) AC DISCONNECT FOR UTILITY OPERATION & RAPID SHUTDOWN INITIATION 208V, 3P, 200A, NEMA 3R FROM UTILITY FEED MISC FACILITY LOADS G G INV DC DC JBOX 1 17.3ROOF ARRAY (51) MODULES: INVERTER 1 17.3kW (51) MODULES EACH STRING 1 (26) MODULES (13) OPTIMIZERS STRING 2 (25) MODULES (13) OPTIMIZERS 26 x1 25 x1 (N) 125A PV BREAKER PER STRING: PER STRING: G G INV DC DC JBOX 2 17.3ROOF ARRAY (46) MODULES: INVERTER 2 17.3kW (46) MODULES EACH STRING 1&2 (23) MODULES (12) OPTIMIZERS 23 x2 (N) 125A COMBINER PANEL 120/208V, 3PH, 4W, NEMA 3R, MLO GRD (N) 60A PV BREAKER (N) 60A PV BREAKER NOTE: EXISTING BREAKER TO BE DERATED TO 350A TO MAKE BACKFEED FOR NEW 125A PV BREAKER 120% RULE 705.12(D)(2)(3)(B) MAIN BUS: 400A MAIN BREAKER: 350A SOLAR OUTPUT: 96.5A (MAX SOLAR OUTPUT) 400A BUS X 120% -350A MAIN >96.5A X 125% 130A >121A --> 125A NEW BACKFED BREAKER O.K. To scale on 24x36 paper X_________________________ Confidentiality Statement: 6/13/2023 2:24:15 PM Interconnection SLD NA R S A L L C 24 2 1 N G R A N D A V E , S A N T A AN A , C A 9 2 7 0 5 E201 SUNGRID SOLAR 18271 W MCDURMOTT UNIT E IRVINE, CA 92614 949-309-2453 This drawing is the property of SUNGRID SOLAR. This information is confidential and is to be used only in connection with work described by SUNGRID SOLAR. No part is to be discolosed to others without written permission from SUNGRID SOLAR SUNGRID SOLAR LIC # B, C10: 1037212 EXP: 3/31/24 SUNGRID SOLAR NTS1SLD No. Descrip tion Date WIRING CHART Ca l l o u t # Am p s I s c NE C M u l t Am p s M a x Pa r a l l e l R u n s Nu m b e r C o n d u c t o r s Si z e C o n d u c t o r Co n d u c t o r M a t l In s u l a t i o n C o n d u c t o r Si z e N e u t r a l Si z e G r o u n d Co n d u i t Q t y Wi r e T e m p R a t i n g Wi r e A m b T e m p Wi r e R o o f T e m p Wi r e T e m p T o t a l Co n d u c t o r s C u r r e n t C a r r y i n g . . 1 13.68 1.56 21 1 2 #10 AWG CU PV WIRE NA #6 AWG 1 90 31 0 31 2 2 18 1.25 23 1 2 #10 AWG CU PV WIRE NA #6 AWG 1 90 31 0 31 2 3 18 1.25 23 1 4 #10 AWG CU THWN-2 NA #10 AWG 1 90 31 0 31 4 4 48.25 1.25 60 1 3 #4 AWG CU THWN-2 #4 AWG #10 AWG 1 90 31 0 31 3 5 96.5 1.25 121 1 3 #1/O AWG CU THWN-2 #1/O AWG #6 AWG 1 90 31 0 31 3 WIRE RATING CHART Pa r a l l e l R u n s Wi r e A m p R a t i n g Wi r e T e m p D e r a t e Wi r e C o n d u c t o r D e r a t e Derated Wire Rating >= Amps Max . . 1 40 0.96 1 1 X 40A X 0.96 X 1 = 38 >= 21 1 40 0.96 1 1 X 40A X 0.96 X 1 = 38 >= 23 1 40 0.96 0.8 1 X 40A X 0.96 X 0.8 = 31 >= 23 1 95 0.96 1 1 X 95A X 0.96 X 1 = 91 >= 60 1 170 0.96 1 1 X 170A X 0.96 X 1 = 163 >= 121 TERMINATION... Te r m T e m p R a t i n g Term Amp Rating >=Amps Max . . 60 30 >=21 60 30 >=23 60 30 >=23 60 70 >=60 60 125 >=121 VOLTAGE DROP CHART Vd r o p A m p s I m p Vd r o p V m p Vd r o p D i s t a n c e Vd r o p P e r c e n t . . 12.84 31.17 1 0.1 18 490 10 0.09 18 490 150 1.37 48.25 208 10 0.14 96.5 208 10 0.11 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECT(S) LOCATED AS SHOWN. DANGEROUS VOLTAGE MAY BE PRESENT AT ALL TIMES. "WARNING" PHOTOVOLTAIC ARRAY DISCONNECTION OF NEUTRAL OR GROUNDED CONDUCTORS MAY RESULT IN OVERVOLTAGE ON ARRAY OR INVERTER 6"X8" TYP -CEC 705.10 12 NOTES 1. ARTICLES 690 AND 705 MARKINGS SHOWN HEREON 2. ALL MARKINGS SHALL CONSIST OF THE FOLLOWING: A. UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR MACHINE PRINTED LETTERS OR ELECTRO-PLATING B. RED BACKGROUND COLOR WITH WHITE TEXT AND LINE WORK UON C. ARIAL FONT 3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN THE LOCATIONS SPECIFIED. 4. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT USING PERMANENT ADHESIVE, POP-RIVETS, OR SCREWS M JBOX OR COMBINER 600V INVERTER WARNING ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION ! ORANGE WARNING AREA, 690.13(B) WARNING TURN OFF PHOTOVOLTAIC AC DISCONNECT PRIOR TO WORKING INSIDE PANEL ! ORANGE WARNING AREA, 110.27(C) WARNING ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION ! ORANGE WARNING AREA, 690.13(B) DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT PHOTOVOLTAIC 690.13(B) DC DISCONNECT MAXIMUM VOLTAGE MAXIMUM CIRCUIT CURRENT MAX RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER OR DC-TO-DC CONVERTER (IF INSTALLED) 690.53 WARNING: PHOTOVOLTAIC POWER SOURCE REFLECTIVE STICKER, 690.31(G)(3)(4) WARNING! DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM ORANGE WARNING AREA, 705.12(B)(3) PHOTOVOLTAIC AC DISCONNECT 690.13(B), 690.54 RATED AC OUTPUT CURRENT NOMINAL OPERATING AC VOLTAGE SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY The title “SOLAR PV SYSTEM IS EQUIPPED WITH RAPID SHUTDOWN” shall utilize capitalized characters with a minimum height of 9.5 mm (3⁄8 in.) in black on yellow background and the remaining characters shall be capitalized with a minimum height of 4.8 mm (3⁄16 in.) in black on white background. 690.56(C)(1)(a) PV ARRAY DC DISCONNECT 1 2 3 4 5 6 7 8 10 1 6 34 2 10 12 7 18A 18A 5 208V 96.5A 2 6 PV SUB PANEL 11 690.56(C)(3) RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM AC DISCONNECT82111 1 721 WARNING! POWER SOURCE OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE. ORANGE WARNING AREA, 705.12(B)(2)(3)(b) 9 9 (E) MAIN SERVICE PANEL (N) PV DISCONNECT FOR UTLITY OPERATION PV ARRAYS To scale on 24x36 paper X_________________________ Confidentiality Statement: 6/13/2023 2:24:16 PM Signage NA R S A L L C 24 2 1 N G R A N D A V E , S A N T A AN A , C A 9 2 7 0 5 E301 SUNGRID SOLAR 18271 W MCDURMOTT UNIT E IRVINE, CA 92614 949-309-2453 This drawing is the property of SUNGRID SOLAR. This information is confidential and is to be used only in connection with work described by SUNGRID SOLAR. No part is to be discolosed to others without written permission from SUNGRID SOLAR SUNGRID SOLAR LIC # B, C10: 1037212 EXP: 3/31/24 SUNGRID SOLAR 12" = 1'-0"1 Signage - Central No. Descrip tion Date 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 To scale on 24x36 paper X_________________________ Confidentiality Statement: 6/13/2023 2:24:24 PM Spec Sheets NA R S A L L C 24 2 1 N G R A N D A V E , S A N T A AN A , C A 9 2 7 0 5 SP101 SUNGRID SOLAR 18271 W MCDURMOTT UNIT E IRVINE, CA 92614 949-309-2453 This drawing is the property of SUNGRID SOLAR. This information is confidential and is to be used only in connection with work described by SUNGRID SOLAR. No part is to be discolosed to others without written permission from SUNGRID SOLAR SUNGRID SOLAR LIC # B, C10: 1037212 EXP: 3/31/24 SUNGRID SOLAR 12" = 1'-0"2 Spec Sheet Module 12" = 1'-0"3 Spec Sheet Optimizer 12" = 1'-0"1 Spec Sheet Inverter No. Descrip tion Date 2421 N Grand Ave - 101115981 & 20180415 3/4/2024 THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION. REPRODUCTION, DISCLOSURE, OR USE WITHOUT SPECIFIC WRITTEN AUTHORIZATION OF CONTRACTOR IS STRICTLY FORBIDDEN. DA T E : X_____________________________ X_________________________ Confidentiality Statement: 6/ 7 / 2 0 2 3 1 : 1 3 : 4 4 A M NA R S A L L C 24 2 1 N G R A N D A V E , S A N T A A N A , C A 9 2 7 0 5 SP102 Sp e c S h e e t s SUNGRID SOLAR B, C10: 1037212 3/31/24 SUNGRID SOLAR 18271 W MCDURMOTT UNIT E IRVINE, CA 92614 949-309-2453 This drawing is the property of SUNGRID SOLAR. This information is confidential and is to be used only in connection with work described by SUNGRID SOLAR. No part is to be discolosed to others without written permission from SUNGRID SOLAR SUNGRID SOLAR LIC # B, C10: 1037212 EXP: 3/31/24 12" = 1'-0"3 Spec Sheet Iron Ridge Railing 12" = 1'-0"4 Spec Sheet Prosolar FastJack E-Series1 No. Description Date Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 www. Loyd W Martin .com Solar Structures Engineering #2023-3630 Structural Only June 7, 2023 2421 N Grand Ave - 101115981 & 20180415 3/4/2024