Loading...
HomeMy WebLinkAbout2402 N Alona St - PlanExpedited Permit Process for PV Systems1 Expedited Permit Process for PV Systems Standard String System The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Standard String System to use with the Expe- dited Permit Process. The Micro-Inverter, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 2402 N Alona St 06/06/23 Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: Expedited Permit Process for PV Systems2 Expedited Permit Process for Small-Scale PV Systems Standard String System The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 2402 N Alona St 06/06/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Standard String System Site Plan 2402 N Alona St 06/06/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Standard String System Electrical Diagram 2402 N Alona St 06/06/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Notes for Standard String System Electrical Diagram Contractor Name, Address and Phone: _________________ _________________ _________________ _________________ Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: __________________________ Site Address: ________________________ System AC Size: ______________________ SIZE FSCM NO DWG NO REV SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (P MAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS A V V A A W V MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING V W V A A INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OCPD(s), ONE FOR EACH INVERTER. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ______oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE _____oC 2.) 2005 ASHRAE FUNDEMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix D): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE® REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) RATED MPP CURRENT RATED MPP VOLTAGE MAX SYSTEM VOLTAGE MAX CIRCUIT CURRENT A V V A PHOTOVOLTAIC POWER SOURCE WARNING: ELECTRICAL SHOCK HAZARD–LINE AND LOAD MAY BE ENERGIZED IN OPEN POSITION AC OUTPUT CURRENT NOMINAL AC VOLTAGE A V SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) 2402 N Alona St 06/06/23 76 North M eadowbrook Drive Scott E. Wyssiing, P E A l p i n e, U T 8 4 0 0 4 Col eman D. Larsen, SE, PE office (201} 8 7 4 -3 4 8 3 Gregory T. Elvestad, P E swyssling@wysstingconsulting.com April 26, 2023 Current Insight 2852 W . Amini W a y South Jordan, UT 84095 Re: Engineering Services Hernandez R esidence 1402 Alona Street, Santa A na C A 7.020 k W System To W h om It M ay Concern: W e have received information regarding solar panel installation on the roof of the above referenced structure. Our evaluation of the structure is to verify the existing capacity of the roof system and its ability to support the additional loads imposed by th e proposed solar system. A. Site A s s e s s m e n t i n f o r m a t i o n 1. Site visit documentation identifying attic information including size and spacing of framing for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information wiil be utilized for approval and construction of the proposed system. B. D es cr i p t i o n o f S t ruct ur e: R o o f F r a m i n g : 2x4 dimensional lumber at 16? on center. R o o f M ateri al : Composite A sp h al t Shingles R o o f S l op e: 19 and 21 degrees A tt i c A c c e s s : Accessible F o u n d a t i o n : ? Permanent C. L o a d i n g Cri teria U s ed «D ead L o a d o Existing Roofing an d framing = 7 psf o N ew Sol ar Panels and Racking = 3 psf o T O T A L = 1 0 PSF e L i v e L o ad = 20 psf (reducible) - 0 p s f at locations of solar panels «*G r o u n d S n o w L oad =0 psf «W i n d L oad based on A S C E 7-16 o Ultimate Wi n d Speed = 95 m p h (based on Risk Category II) o Exposure Category C A n a l y s i s p e r f o r m e d o f t h e e x i s t i n g r o o f s t r u c t u r e util iz ing t h e a b o v e l o a d i n g criteria i s in a c c o r d a n c e w ith t h e 2 0 2 2 C a l i f o r n i a B u i l d i n g C o d e , i n c l u d i n g p r o v i s i o n s a l l o w i n g e x i s t i n g s t r u c t u r e s to n o t r eq u i r e s t r e n g t h e n i n g i f the n e w l o a d s d o n o t e x c e e d e x i s t i n g d e s i g n l o a d s b y 1 0 5 % f o r g r a v i t y e l e m e n t s a n d 1 1 0 % f o r s e i s m i c e l e m e n t s . T h i s a n a l y s i s i n d i c a t e s t h a t t h e ex i s t i n g f r a m i n g w i l l s u p p o r t the a d d i t i o n a l p a n e l l o a d i n g w i t h o u t d a m a g e , i f i n s t al l ed cor r ectl y . 2402 N Alona St 06/06/23 P a g e 2 o f 2 D. S o l ar P a n e l A n c h o r a g e 1. The solar panels shall be mounted in accordance with the m ost recent Unirac instalation manual. If during solar panel installation, the roof framing m em bers ap p ear unstable or deflect non- uniformly, our office should be notified before proceeding with the installation. 2. The max i mum allowable withdrawal force for a 5/16? lag screw is 229 Ibs per inch of penetration as identified in the National Design Standards (N D S } of timber construction specifications. Based on a m i nim um penetration depth of 2/4?, the allowable capacity per connection is greater than the design withdrawal force (demand). Considering the variable factors for the existing roof frami ng and installation tolerances, the connection using one 5/16? diameter lag screw with a m i nim um of 2%" em bedm ent will be adequate and will include a sufficient factor of safety. 3. Considering the wind speed, roof slopes, size and spacing of framing members, and condition of the roof, the panel supports shall be placed no greater than 72? on center. B a s e d on t h e a b o v e ev al uation , th i s of f i ce certi fies th at w ith t h e rac k i ng a n d m o u n t i n g s p ec i f i ed, the exi sti ng r oo f s y s t e m will a d e q u a t e l y s u p p o r t the additional l o adi ng i m p o s e d by t h e s o l a r s y s t e m . T h i s ev a l u at i on is in c o n f o r m a n c e w i t h t h e 2 0 2 2 C al i f or n i a B uil di ng C o d e , c ur r e n t i n d u s t r y s t an dar ds , a n d is b a s e d on i nfo rm at i on s up p l i ed t o us a t the t i m eo f th is rep or t. Should you have any questions regarding tha above or if you require further information do not hesitate to contact me. Voi truly yours, r £ h 2 Scott E. Wyssling, PI California License No. 2402 N Alona St 06/06/23 Wyssling C on s ul t i n g 76 N. Meadowbrook Drive (201) 874-3483 Alpine, UT 84004 .swyssling@wysslingconsuiting.com G r a v i t y L o a d s E x i s t i n g Hernandez Residence Roof Dead Load 1402 Alona Street 2.0 psf Composite Shingle Santa Ana, CA 1.6 psf 1/2" Plywood Sheathing 12 psf 2x4 @ 16 in. o.c. 1.0 psf Ceiling, Mechanical, Electrical 1.2 psf Miscellaneous 7.0 pst ?TOTAL S econd F l o o r D e a d L o a d O psf Floor Finishes O psf _1 1/8" Subfloor Sheathing Opsf ?_ Joists @ 16'a.c. Opsf Partitions Opsf Ceiling, Mechanical, Electrical sf___Miscellaneous Opsf TOTAL Roof Live Load Floor Live Load 20 psf 0 psf Roof Snow Load Ground SnowLoad= _ 0? psf (to be divided by cosine o f r o o f angle for horizontal projection ASCE 7 Sec. 7.4) pe= 0 . 7 C . C , I p g = O p sf C .=1 ,C ,=1 .1 Flat Roof Snow Load (ASCE 7-16 Eq. 7.3-1) C = 0.89 ASCE 7-16 Figure 7.4-1 Additional Roof Dead Load - New Solar Panels 3 psf Roof Live Load at Solar Panels © psf R oof Snow Load at Solar Panels 0 psf Sloped Roof Snow Load (ASCE 7-16 Eq. 7.4-1) T o t a l Total Existing Roof Load = (DLagor + Max(LLgoor oF $)) Areagoor 65691 Ibs Signed 4 /26 /20 23 Total New RoofLoad = (DLgoor + DLapp + Max(LLgoor oF S)) Areagoor 59514 Ibs Change in Demand= (Total New Roof Load - Existing Roof Load) / Existing R oo f Load 9 . 4 0 % T o t a l N ew G r a v i t y L oads are less t h a n E x i sti n g L oads. O K 2021 IEBC Section 805.2 states: ?Any existing gravity load-carrying structural element for which an alteration causes an increase in design gravity load of more than 5 percent shall be strengthened, supplemented, replaced or otherwise altered as needed to carry the increased gravity load required by this code for new structures.? 2402 N Alona St 06/06/23 W y s s l i n g C o n s u l t i n g 76 N. Meadowbrook Drive (201) 874-3483 Alpine, UT 84004 W i n dU p l if t swyssling@wysslingconsuiting.com R o o f t o p S o l a r P a n e l s P a r a l l e l t o R o o f S u r f a c e ASCE 7-16, Section 29.4.4 V=98 ~?_?_Basic Wind Speed Hernandez Residence Exposure C ASCE 7-16, Section 26.7 1402 Alona Street K,=0.85 Velocity Pressure Coefficient, ASCE 7-16, Figure 26.10-1 Santa Ana, CA Ka=1 Topographic Factor, ASCE 7-16, Section 26.8.2 Ky=0.85 _Directionality Factor, ASCE 7-16, Section 26.6 K,=1.000 ? Ground Elevation Factor, ASCE 7-16, Section 26.9 qu=16.7 psf qy = 0.00256K,K,,KyK,V? (ASCE 7-16 Eq. 26.10-1) RoofAngle= 21 deg Roof Type Gable Smnchor= 72in Horizontal spacingof roof anchors A c = 10.22 sf Panel Area tributary to each roof anchor Gc,External Pressure Coefficient, ASCE 7-16, Figure 30.3-2 RoofZone Zone1 2e 2n 2r 3e 3r +150 +1.50 2.50 +2.50 -2.50 3.36 g.= 0 ,8 0 Pressure Equalization Factor, ASCE 7-16 Figure 29.4.-8 Ge= 1.00 ?_ Edge Array Factor, ASCE 29.4.4 edges < 0.5*building height, and pane! spacing < 4ft. Poe = GxGCy@eQ,= Design Wind Pressure,ASCE 7-16, Equation 29.4-7 Roof Zone 1 2e 2n 2r 3e 3r -20 psf -20 psf -33 psf ?33 psf -33 psf ?«--45 psf Min Pressure = -16 psf Use 20 psf Use 20 psf Use33 psf Use 33 psf Use 33 psf Use 45 psf ULTIMATE x0.6= 16 psf 16 psf 20 psf 20 psf 20 psf 27 psf ALLOWABLE Connection to Existing Roof Framing F.S.= 1 Additional Factor of Safety applied to withdrawl force, i f desired A w = 102 f DLyent= 3 psf Roof Zone 1 2e an 2r 3e 3r Wioin= 20 psf 20 psf 33 psf 33 psf 33 psf 45 psf Roof Zone 1 2e 2n 2r 3e -107.3 Ibs -107.3 b s -188.9 Ibs -188.9 lbs -188.9 Ibs Connection Capacity d,=5/16 in Lag Screw diameter Dpen=2 1/2 in Lag Screw penetration into existing framing member No.of Screws 1 Screws per Connection Spruce-Pine-Fir Species of wood framing C o =1.6 L oad D ur ati on F actor f o r W i n d L oadi n g , N D S T abl e 2.3.2 S i gned 4 /26 /20 23 C =0.7 T em p erature Factor, N D S T abl e 10.3.4 We= 20 5 I b/in W i t h d r a w l Capacity, N D S E q uation 11.2-1 W = C y x C , x W = 229 Ib/in Adjusted withdrawl value Patow =Dpea X W ' = 573 Ibs h i s analysis calculates the capacity oft h e lag screws Roof Zone 1 2e 2n 2r 3e 3r only. For capacityof t h e D E M A N D = 1 0 7 l b s 1 0 7 I b s 1 8 9 lbs) = 1 8 9 I b s = 18 9 Ibs) 2 5 9 I bs complete mounting system, C A P A C I T Y = 5 7 3 ] b s 5 7 3 l b s 5 7 3 l b s 5 7 3 I bs 9573 1bs 5 7 3 I bs __ please see manufacturer's up to72in ok up to72in ok up to72in ok up to72in ok up to72in ok up to72in ok recommendations. 2402 N Alona St 06/06/23 P V M o d u l e R a t i n g s @ S T C S Y S T E M S U M M A R Y I n v e r t e r R a t i n g s ENPHASE °S O L A R I A POWER|B R A N C H #1 B R A N C H # 2 Inverter Make/Model 108M-72-2-US C o m p l e t e S o l a r Module Make/Model I N V E R T E R S P E R B R A N C H 9 9 %-390R (390W) [BLK]Max DC Volt Ratin ABrighter Way. M A X A C C U R R E N T 1 2 .1 5 A 1 2 .1 5 A x DEV ing O V -Max Continuous Output Max Power-Point Current (Imp)12.73A M A X A C O U T P U T P O W E R 2 9 2 5 W 2 9 2 5 W Power 325w Max Power-Point Voltage (Vmp)30.6V A R R A Y S T C P O W E R 7 0 2 0 W Max Nominal Voltage 240V! 3000 EXECUTIVE PKWY, Open-Circuit Voltage (Voc)36.9V A R R A Y P T G P O W E R 6 4 6 9 . 2 W Max AC Current 1.358]S T E 504 SAN R A M O N , [Short-Circuit Current (Isc)13.52A M A X A C C U R R E N T 2 4 .3 0 A Max OCPD Rating 208 C A 94583 Max Series Fuse (OCPD)2 5 A M A X A C P O W E R B B 5 0 W D E S I G N T E M P E R A T U R E S LICENSE TYPE C10 Nominal Maximum Power at STC (Pmax)390W A S H R A E E X T R E M E LOW °C PHONE# ( 8 7 7 ) 299-4943 D E R A T E D (C E C ) A C P O W E R 6 2 7 5 .1 2 W| ? [ASHRAE 2% HIGH a r Maximum System Voltage 1000V Voc Temperature Coefficient -0.28%/°C S C o n d u i t a n d C o n d u c t o r S ch e d u l e Tag Description Wire Gauge |#of Conductors! Conduit Type Conduit Size 1 |Enphase Q cable - THWN-2 10 AWG 2 NA-Free Air | N/A- Free Air 1 [Bare Copper Ground {EGC/GEC}| B AWG 1 NA-Free Air | N/A- Free Air 2 |THWN-2 10 AWG 4 EMT 3a" 2 |THWN-2- Ground 10 AWG 1 EMT 3a" 20 |THWN2 10 AWG 3 NA-Free Air | N/A- Free Air M E T E R # 2 2 2 0 1 2 7 8 0 2 1 9 3 |THWN-2 8 AWG 3 EMT 34 M A I N S E R V I C E P A N E L 3. |THWN-2- Ground 10 AWG 1 EMT 3a"2 4 0 / 1 2 0 V 1 8 , 3 W M A I N B U S S : 2 0 0 A (N) 1254/240V AG M A X B R E A K E R S I Z E : COMBINER BOX WITH - =ENPHASE IQ ENVOY ( 2 0 0 A X 1 . 2 ) « 2 O 0 A= 4 0 . 0 A D E S I G N E R : O D J COMM. GATEWAY D E L I V E R Y AND I N T E R C ON N E C T I ON (N) 18 SOLARIA POWER X-390R (390W) [BLK] MODULES:(N) VISIBLE M A R I A WITH AN ENPHASE IQ8M-72-2-US MICRO-INVERTER LOCKABLEATTACHEDTO.THe BACK OF EVERY MODULE.2 POLE 60A H E R N A N D E Z PY CIRCUIT 2: 9 MODULES/PARALLEL L i D O O RNNGT NEW R E S l D E N Cc E o - e e l _ o oO ( 1 )1 ? 240V/200A 2 4 0 2 A L O N A ST, w a e = z =200A MAIN SERVICE PANEL ?????????_?a |4 ae BACKFEED SINGLE PHASE a o e PV CIRCUIT 4: 9 MODULES/PARALLEL O y :208 BREAKER©e e l @ ©1 :?208 E m y H Z | H Z ):fm](N)SURGE A P N : 0 0 1 0 6 1 0 6t t t q < ? .PROTECTION DEVICE =w e p e m t =TYPE 4 D A T E : 4 / 2 1 / 2 0 2 3 INOTE: tN BETWEEN EACH ARRAY THE EMT |S USED AS THE DISCONNECT a GROUNDING /BONDING,GROUND CLAMPS ARE AT EACH c »T tENDOFTHEEMTCONDUITWITHTHEWIRETHENFREEOO M e e 2 3 TO BE LOCATED 3 e n e Na AIR'D TO THE GROUND CLAMP ON THE RACKING RAIL GROUND SPLICE 3 ) WITHIN 10°OF 3 ) (UFER S H E E T METER E-1 ELECTRICAL DIAGRAM 2402 N Alona St 06/06/23 C A U T I O N : CompleteSolar TERMINALS ONLINEAND LOAD P O W E R T O T H I S B U I L D I N G I S ABrighter Way. S E EOPEN POSITION.A L S O S U P P L I E D F R O M T H E 3000 EXECUTIVE PKWY, LABEL LOGATION:F O L L O W I N G S O U R C E S W I T H STE 504 SAN RAMON, INVERTER(S), AG DISCONNECT(S), AC C A 94583 SER CODERSe CEC 20s. 650 1318)&D I S C O N N E C T S A S S H O W N LICENSE TYPE C10PER CODE(S):CEC 2022:690.13(B)&: LICENSE # 961988CEC 2022: 706.15(C)(4) 2 4 0 2 A L O N A S T (N) S O L A R P A N E L S A N D P H O N E # (87 7 ) 2 9 9 - 4 9 4 3 M I C R O - I N V E R T E R S O N R O O F NOT ADD LOA K A t v LABEL L OCATI ON PHOTOVOLTAIC AC C O M B I N E R (IF APPLICABLE).LABEL LOCATION: UTILITY SERVICE ENTRANCE/METER, INVERTER/DC DISCONNECT IF REQUIRED BY LOCAL AHJ, OR OTHER LOCATIONS AS REQUIRED BY LOCAL AHV./ PER CODE(S): CEC 2022: 690.56(C)(2),Y CFC 2022: 1204.5.3 P H O T O V O L T A I C A C DI SCONNECT S I i e ) S e a 5 7 0 1 )e re a e ] M y c sam Z ORO ZLed LABEL LOCATION:W A R N I N G b AG DISCONNECT(S}, PHOTOVOLTAIC SYSTEM POINT OF POWER SOURCE OUTPUT CONNECTION INTERCONNECTION.J DO NOT RELOCATE THIS PER CODE(S): GEC 2022: 690.54 PV INTERCONNECTION POINT OVERCURRENT DEVICE LOCATION OF METER MAIN COMBO, AC DISCONNECT & COMBINER BOX.LABEL LOCATION: ADJACENT TO PV BREAKER {IF APPLICABLE). PER CODE(S): CEG 2022: 705.12(B)(3\(2) D E S I G N E R : O D JSOLAR PV SYSTEM EQUIPPED WITH RAPID S H U T D O W N TURN RAPID SHUTDOWN SWITCH TO THE "OFF"2 4 0 2 A L O N A ST, POSITION TO SHUT DOWN S A N T A A N A , PV SYSTEM AND REDUCE PERMANENT SIGNAGE NOTES:C A 9 2 7 0 6 SHOCK HAZARD IN THE 1. NOT ALL PLACARDS SHOWN MAY BE REQUIRED BY LOCALAHJ,CONTRACTOR TO VERIFY PLACARD A R R A Y .REQUIREMENTS WITH LOCAL AHJ BEFORE INSTALLATION.A P N : 0 0 1 0 6 1 0 6 2. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OF THE CALIFORNIA ELECTRICAL CODE . 3.ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC, ENGRAVED OR MACHINE D A T E : 4 / 2 1 / 2 0 2 3 PRINTED LETTERS IN A CONTRASTING COLOR TO THE PLAQUE. THIS PLAQUE WILL BE ATTCHED BY POP RIVETS OR SCREWS OR OTHER APPROVED METHOD. LABEL LOCATION:4,DIRECTORY PLACARD MARKING CONTENT AND FORMAT: RED BACKGROUND, WHITE LETTERING, Seee S O C A N MINIMUM 3/8" LETTER HIEGHT. ALL CAPITAL LETTERS. ARIAL OR SIMILAR FONT, NON BOLD, REFLECTIVE ON OR NO MORE THAT 3 M (10 FT) FROM THE SERVICE WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT. S H E E TDISCONNECTING MEANS TO W H I C H THE PV S YS T E M S A R E C O N N E C T E D .E-2WARNING LABELS 2402 N Alona St 06/06/23 _ _ _ LINE CONSTRUCTION NOTES ? a4 2 3 1.SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON C o m p l e t e S o l a r 3 3 RESIDENTIAL STRUCTURE..r t t ABrighter Way.q {€)STRUCTURE ON PROPERTY a 2. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE 4 a WITH THE CBC SECTION 1609 TO WITHSTANDA BASIC, <2 WIND EXPOSURE C. 3 )i S 3. THE ROOF MEMBERS ARE 2"X 4" TRUSSES AT 16" ONmizZCENTER. CONNECTION TO STRUCTURE SHALL NOT BE 3000 EXECUTIVE PKWY, WITHIN 11? OF NAILING PLATES.STE 504 SAN RAMON, 4. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT CA 94583PVINTERCONNECTION POINT. i PYINTERCONNEGTION POINT. \OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING LICENSE TYPE C10 AG DISCONNECT & COMBINER BOX ROOF VENTS. PV SYSTEM SIZE:MOUNTEDON EXTERIOR WALLOF A 5.ALL CONDUCTORS AND CONDUITS MOUNTED ON ROOF LICENSE #961988 7.02 kW Di *-SHALL BE MINIMUM 7/8" ABOVE ROOF SURFACE PHONE # (877)299-49430 Cc t ee AASONTECY cee m o e 1 (INCLUDING CABLES UNDERNEATH MODULES AND.(877) RACKING). () conburr RUN 6. ROOF ACCESS POINTS SHALL BE PROVIDED PER THE FOLLOWING (CRC R324,7.1, CBC 3111.2.1)5 ( 1 6.1. LOCATED IN AREAS NOT REQUIRING PLACEMENT (@) SERVICE DROP OF GROUND LADDERS OVER OPENINGS SUCH AS " =DOORS OR WINDOWS. Lr 6.2. LOCATED AT STRONG POINTS OF CONSTRUCTION IN t o 'LOCATIONS WHERE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS: TREES, WIRES, OR SIGNS. 7.SETBACKS AT RIDGES CAN BE REDUCED TO 18 INCHES ' !IN COMPLIANCE WITH CFG/ IFC 1205.2.1.2 ° O °TOTAL PLAN VIEW AREA = 2433.28 SQFT TOTAL PV AREA = 18(67.8 IN}(44,7 IN)/(144 IN42) = 378.83 SQFT \ 6%\(378.83 SQFT/ 2433.28 SQFT)100 = 15.57% TOTAL PV Roof Section 2 o °AREA POPULATES 15.57% OF TOTAL PLAN VIEW Rootemu 2 « OA |AREA AND IS NOT WITHIN THE 33% REQUIREMENT.RootTae 21°ao Zs ° t Aree ° t 18" Roof Section 3 r o ° | RoofAzimuth:212° Rook 187 y t DESIGNER: ODJ |yj | 3 't .M A R I A ?(18) SOLARIA POWER X-990R (990W) BLK] M WITH AN ENPHASE 08M-72.2-US|L A a E E R E nes H E R N A N D E Z UY,EACH MODULE MOUNTED ON COMP Si \ t Ke R E S I D E N C E po Roof Section 4 CAL-IREROOF LADDER Peete J 2402 ALONA ST,reg SANTA ANA, L Z CA 92706 LEGEND |i |1 7 za L Z )_ sev sounranes ay {APN:00106106 CAL-FIRE ROOF LADDER FIRE SETRAGKS n ACCESS PONT Signed 4/26/2023 DATE:4/21/20232WALKWAYix3Roof Section 1 a METER WAIN COMBO aa Foot Amu: 212°i z WAYcomnaneon|DRIVE!E P V S Y S T E M S I T E P L A N SHEET c :=pe visconnect \2 4 0 2 A L O N A S T iS SCALE: 3/32" = 1'-0"P V - 1 i im SITE PLAN LAYOUT 2402 N Alona St 06/06/23 EXISTING COMP SH ING L E R O O F NY R o o f S e c t i o n 1 Roof Azimuth: 212° Roof Tilt: 21° Roof Azimuth: 122° Roof Tilt 21° P R O P O SE D UNIRAC S O L A R M O U N T R A C K ING ?Ny R o o f S e c t i o n 3 Ro o f Azimuth: 212° RoofTi l t 19° U NIR A C F L A SH K IT P R O FOR C O M P ? ? ! SH ING L E @ 72" 0 .C . M A X > R o o f S e c t i o n 4 R o o f Azimuth: 32° Roof Tilt 21° E XISTING 2 °X 4" R O O F R o o f S e c t i o n 2 R A F TE R S @ 16°0.C. C o m p l e t e So l a r ° ABrighter Way. josef 3000 EXECUTIVE PKWY, STE 504 SAN R A M O N, C A 94583 LICENSE TYPE C10 LICENSE # 961988 P H O NE # (877) 299-4943 D E S I G N E R : O D J P R O P O SE D S O L A R I A P O W E R X-390R (3 9 0 W ) (BLK] PV SOLAR: M O D U L E S S i g n e d 4 / 2 6 / 2 0 2 3 PV SY STE M M O U N TI N G D E TA IL S M A R I A H E R N A N D E Z R E S I D E N C E 2402 ALONA ST, SANTA ANA, CA 92706 APN:0 0 1 0 61 0 6 DATE:4/21/2023 SCALE: 1/8? = 1'-0" SHEET PY-2 ATTACHMENT DETAILS 2402 N Alona St 06/06/23 NOT TO SCALE © D3 RACKING DETAIL (TOP) NOT TO SCALE S S S S S D4 DETAIL (TRANSVERSE) NOT TO SCALE D1 RACKING DETAIL(TRANSVERSE) D2 RACKING DETAIL (LONGITUDINAL) NOT TO SCALE RSezeRecezeNarel om setecaveneceteney. S S S O S C D5 DETAIL (LONGITUDINAL) NOT TO SCALE ROOF MATERIAL: COMP SHINGLE ROOF STRUCTURE: RAFTERS ATTACHMENT TYPE: UNIRAC FLASHKIT PRO MODULE MANUFACTURER: SOLARIA MODULE MODEL: POWER X-390R (390W) [BLK] MODULE LENGTH: 67.8" MODULE WIDTH: 44. MODULE WEIGHT: 48.7 LBS. SEE SHEET S-1 FOR DIMENSION(S) MIN. FIRE OFFSET: 18" RAFTERS SPACING: 16"0.C. RAFTERS SIZE: 2"X 4" NOMINAL LAG BOLT DIAMETER: 5/16 IN. LAG BOLT EMBEDMENT: 2.5 iN. TOTAL # OF ATTACHMENTS: 49 TOTAL AREA: 598.30 SQ. FT. TOTAL WEIGHT: 2386.30 LBS. WEIGHT PER ATTACHMENT: 17.89 LBS. DISTRIBUTED LOAD: 2.31 PSF MAX. HORIZONTAL STANDOFF: 72 IN. MAX. VERTICAL STANDOFF: LANDSCAPE: 26 IN., PORTRAIT: 39 IN. STANDOFF STAGGERING: YES RAIL MANUFACTURER AND MODEL {OR EQUIV.):UNIRAC SOLARMOUNT RAIL WEIGHT: 0.436 PLF. MAX. TRUSSES SPAN: 1 2 FT. MODULE CLEARANCE: 3 IN. MIN., 6 S i g n e d 4 / 2 6 / 2 0 2 3 peed CompleteSolar ABrighter Way. 3000 EXECUTIVE PKWY, S T E 504 SAN RAMON, CA 94583 LICENSE TYPE C10 LICENSE # 961988 PHONE # (877) 299-4943 D E S I G N E R : ODJ M A R I A H E R N A N D E Z R E S I D E N C E 2402 ALONA ST, SANTA ANA, CA 92706 APN:00106106 DATE:4/21/2023 SHEET PV- MOUNTING DETAILS 2402 N Alona St 06/06/23 C o m p l e t e S o l a r ABrighter Way. S 0 L A R | A Solaria PowerX | DC Panel S O L A R | K Solaria Powerx400R sano executive p u r r S T E 5 0 4 S A N R A M O N , C A 9 4 5 8 3E o n S e S O )( e e e o l a r i a P o w e r X - 4 0 0 R P e r f o r m a n c e S e r i Solaia P o w e r 35h AOR Ce l l Type MonociystalineSicon L I C E N S E T Y P E C 1 0 MaxPower (Pmar)Mw 395 400 Dimenseans (L x Wx H}678 x44 x14 L I C E N S E # 9 6 1 9 8 8 Efficiency fs)20.2 20.5 1723mm x 1134mm x 35mm Open Circuit Voltage (Voc)wi 3 7 1 3 7 3 Weight 22.1kg 48,7 Ibs P H O N E# (8 7 7 ) 2 9 9 - 4 9 4 3 Achieving over 20 $* efficiency, Solaria PowerX Performance solar panels feature ?Short Circurt Current (Ise)f a l 13.60 © 13.6B Gtass Type / Thickness AR Coated, Tempered / 3 2mm lt Technol fering high ve black:Max PowerVoltage (Vmp)(v)308 Ho Frame Type Black Anodized Aluminum s o nascere caltcuttng ec n o ogy. of r n igherpow anda t a a 0 o MaxPomer Cuttent (in)fal 8 2 1 2 9 CableType / Length 1 2 AWG PV Wire (UL) /1100mm, black aesthetics Compared to Conventiona ?solar panels Salaria has been the market Power Tolerance fal 093 ona Connector Type Mca header in cut cell technologies fo" over a decade Wilh a comprehensive 25 year Junction Box 1P68/3 diodes wattanty, Powerx delivers the tatest in power and reliability for homeowners n e e e e u e e n )Front Load $400 Pa 113 psi? Max Power :max)wl 290 293 297 Rear Load 2400 Pa / 50 psf¥ Open Cucurt Voltage (Yee)M0 3 0 S a ?etn Setontnitanontarstordet i i i Short Circutt Current (Ise)[al Wor 11.19 11,89 C a sH i g h Efficiency,H i g hP o w e r Max Power Vottage (Vmp)Ml 28.50 28.60 28.76 At 400 watts and 20 5%efficiency, Solaria PowerX solar panels Max Power Current (Imp)(al 10.20, 1026 10.32 Certthcations UL67730 / IEC 61215 / IEC 61730 ate one of the highest pawer residential panels available9 Temperature Characteristics Fire Type (UL 1703)2 NOCT Fee]48472 fomer. Parts Labor 25 years* e A ili %lyHighlityand Reliabili Temp Coeff of Pra: [me °C}036 1 igh Quality and Reliability Temp.Coett.of V r ieveq)028 avert ha a ame cove aco State < atirg tech? zy and advanced panel Temp Coeffo f Isc [es ec}0.088 Packaging construction ensure that Powerx aanels ate highly rehable Stacking Method Vertical / PallenzedCsang Me ; and des.gnec to tat exceed the incustry leading 25-year p e s t s " na ienger a .Panels: Pallet 31 warranty Operating teneerature vel Ato +85 Pallet Dims (Lx Wx H) 69.9" 44.3"49.9" Ha Easter Hovage "1900 760mm x 1125mm x 1253mm ax Fuse Rating (4)25 Pallet Weight 7 4 5kg/ 1642 Ibs All Black Aesthetics Bypass Diodes ta 3 Pallets / a0-ft Container 2% Comps BY ?@ A ?onsent..? « ,anels, Solaria PowerX panels IY Curves vs. Irradiance (400W Panel}Panels / 40-ft Contaner 806. %have a more un form all black appearance . =a Best System Value Solar ¢ Pr werk sciar panels produce more power per square meter atea Ths ?educes mstallalion costsdue t o fewer D E S I G N E R : O D JF balance of system components a e e =M A R I A Improved Shading Tolerance vo.tact v1 Sub st e y pare?les ?rectedmparallel, which dramatically semnrey amnien gone amare r s {H E R N A N D E Z wk 9 ?gyyi ERC 4 a .j R E S I D E N C E : 25 year Pome, Parsand {bor omSolana igh e y + . Typical Ter Tandustywarramy fl o t e ,2 4 0 2 A L O N A ST, L o w Light P e rfo rm a n c e - e .Powerk eraintains * 3 #c e r c y at low irradiance further °ensuaing maximumenergy yield SANTA ANA, C A 92706 APN:00106106 DATE:4/21/2023A G I PTD wa solsnacor t e wal a r n Feat ors ae SUDIECE RE Pangealbgt ante Pepeet seg Fant bon posi, gers a n a c a c m SHEET S-1 SPEC SHEET 2402 N Alona St 06/06/23 S ENPHASE 1Q8 S e r i e s M i c r o i n v e r t e r s (Our newest [ 8 Microinverters are the industry's first microgrid-forming, software- defined microinverters with split-phase power conversion capability to convert DC power to AC power efficiently. The brain of the semiconductor-based microinverter is our proprietary application-spacific integrated circuit (ASIC) which enables the microinverter to operate in grid-tied or off-grid modes. This chip is bullt In advanced S5nm technology with high speed digital logic and has super-fast response times to changing loads and grid events, alleviating constraints an battery sizing for home: energy systems, ; | Part of tha Engnase Energy System, IG Sarton 10 Ser Mic romvertors redefinerekabaity Micronvertors integrate with the Enphase IQ Battery, standards with more than onemilloncumedative Enphase 10 Gateway, andthe Enphase Apa monitoring hours of power-on tasting, anabinng an axdustry- ?and aneiyei oftware. leading imitedwarrantyo l u p t o25yeast. CERTIFIED e r a ?ConnectPYmodules quickly and easily 19108 Sarles 108 Sere Micromverters arg UL Luted as Micronnvertera using thetncluded Q-DCC-2 adapter PV Rapid Smut Down Equipmentandconformwth?cable with plug-tplay MC4 connectors.vantous r e g u l a t i o n s .when instaled according to manufacturer's instructions. (©2022 Enphase Energy. All rights reserved. Enphase, the Enphexe logo, (08 Microinverters,andlether ?namae ara teadlemarksofEnchase Energy, Inc. Date s u b j e c tto change. IQ6SE-DS-000F01-£N-US-2022-03-17 Eany toinstall + Lightweight and compact with plug-n-play connectors + Power Line Communication (PLC) between components + Faster installation with simple two-wire cabling High productivity and reliability * Produce power even when the grid is down" + Mora than one million cumulative hours of testing + Ciass il double-insulated enclosure + O p t i m i z e d for the latest high- powered PV modules. Microgrid-forming + Complies with the latest advanced grid support** + Ramote automatic updates for the latest grid requirements +Configurable to support a wide range of grid profiles + Moots CA Rule 21(UL 1741-SA) requirements *Onty whan installed with 1 System Controller 2,meets UL 1941. 1QBH-208¥operates only n grid-tied mode. 108Series Micronverters supports salt phaee. 240¥. YO8H-208 supports spit phase, 208¥ only 1Q8 Se ri e s M i c r o i n v e r t e r s C o m m e n l y usedmoduieparings? = W 235-350 258-400 260- 460 298 $00 320- 840+ 298 -500+ Module compatibiity 80-cel/120 hall-cal 80-cel/20hal-col, 86-col/132halt-calland 72-call/14d nalf-coll MPT voltage range,¥9-45 we 38-43 38-43 4 8 Operating range ¥25-58 Min/mas start vohaga ?30788 Max put DC voltage ¥0 Max DCeurrent® [module Io]»6 ?Overvottage classDCport a DC port backtoed current me ° P¥array ¢-nhguration 1x1 Ungroundad aeeay: No additional DC side protectionrequred: AC aude protection requltes max Z0A per branch ovrcust t o n e wom sares-n0 womens 1 a ee e e .? commen wa feomannerecceow .? cenoncetoAS e m c e e 8 : ..:manensaneen »onomenrtons : comers ot > c e eGrid-tiedpower factor (adjustable)0.88l o a d i n g- 0.85l a g g in g Ambient temperature range 40°C to +60°C (-40°F to 40°F) Relate numicity range 4% 10 100% (condensing) DC Connector ype ace Dimensions(HaWeD)22rm (8314178men 169) 4 302menL T Weight 1O6tg (2380) Covtng Nature convecton «90 tare Approved for wet locations Yes Pullyoon degree Pps Encloture Cage 1 double-Insulated. corrosion resistant polymeric enclosure Enwron. category / UY exposure rating NEMAType 6 /outdoor (CA Rule 21(UL.1741SA), UL 621094, ULITAV/IEEETSA7, FCG Pan 18 Glass B, ICES-0003 Glass 8, CAN/CSA-C222 NO, 107-01 ?Centfications This product fs UL Listed as PV Rapid Shut Down Equipmentandconlorma with NEC 20%, NEC 2017, and NEC 2020 section {890312 and C22:-2018 Rule 64-218 Rapid Shutdownof PY Systema, for AC andOC conductors, when installedaccording to manufacturer's instructions. €) Tha 1084-208 variam wi ba operating mn grd-tod mode anly at 208VAC. (2) No enforced DCZAC rata. So@ the companity calculator ethttps:/7iunk onchase.com/medule-compatibiity (3) Maximum comtnvous mot OC currents 10.64 (4) Normal voltage range can be extended beyand nominal # requred by the utaty (6) LLervta may vary Refer tolocalrequvements to definethe number of microinveriera per branch m your area. 1OSSE-DS-COOFOVEN-US-2022-0347 C o m p l e t e S o l a r ABrighter Way. 3000 EXECUTIVE PKWY, S T E 5 0 4 S AN R AM O N , C A 94583 LICENSE T Y PE C10 LICENSE # 961988 PHONE # (877) 299-4943 J D E S I G N E R : O D J M A R I A H E R N A N D E Z R E S I D E N C E 2402 ALONA ST, SANTA ANA, CA 92706 APN:00106106 DATE:4/21/2023 SHEET $-2SPEC SHEET 2402 N Alona St 06/06/23 1 Enphase Networking E n p h a s e 1 Q C o m b i n e r 4 / 4 C X-1Q-AM1-240-4 X-1Q-AM1-240-4C ?Qanewase X4Q-AMT-240-aC @ KelIQ-AM-240 a LISTED To learn more about Enphase offerings, visit enphase.com The Enphase IQ Combiner 4/4C with Enphase 1Q Gateway and integrated LTE-M1 cell modem (included only with {Q Combiner 4C) consolidates interconnection equipment into a single enclosure and streamlines IQ mucroinverters and storage installations by providing a consistent, pre-wired solution for residential applications 1t offers up to four 2-pole input circuits and Eaton BR series busbar assembly ?Smart + Includes 10 Gateway for communication and control +Includes Enphase Mobite Connect cellular mademn {CELLMODEM-M1-06 SP-05), included only with IO Combiner ac + Includes solar shietd to match Enphase IQ Battery aesthetics and deflect heat + Flenible networking supports WHF), Ethernet. of cellular + Optional AC receptacle available for PLC bridge +Provides production metering and consumption monitoring Simple +Centered mounting brackets support single stud mounting + Supports bottom, back and side condutt entry +Upto four 2-pole branch cxrcuits for 240 VAC lug-in breakers (701 inchided) +BOA total PY or storage branch excurts Reiiabie + Durable NRTL-certified NEMA type 3R enclosure +Five-year limited warranty +Two years labor reimbursement program coverage included for both the 1 Combiner SKU's +UListed O ENPHASE E n p h a s e IQ C o m b i n e r 4 / 4 C MOOEL SUMGER WOComt ws 4 (19 AMT 240 AT No ccert ed RPAME ca a ?ACCESSORIES AND REPLACEMENT PARTS Enuembie Commune ahons Ke COMMS CELLMODEM 4 06 CELL MODEM MT OF Se CS CELL MODENA MY 09 AT O5 cae GAR 108? ba0v BAR ISA 40v Rm 24 c40¥ @Rn sae vaav Ru 204 2 MOVE EPIC oF KAS basen XAPLUG1703 KORE HS HQNAO 1254 19 Combe4 wathEnphane (0Gateway printed cca bod lor n e g a t e d?reenu grace PY ptonkat n metering [ANSY C1226 2 SNrand contumotea momtonegie 2 S lovhadesasaves solar suekdtormuatch the Ballery system ard HO Spetees Controbee and ty defi | Beat Wee oer daa gtae P e T G te retinal ae gee gay tCANS704OSA amt g h e e SAP neato SonaseMaule nner g h + teen CCELUMGEMOMT OBSE aetna et p a t e ae : Gyatabiew MeUS Carats Mees Barta De a n g I N e DSPage bat Ane pte gate e p ueracen the mtalaton area }NCIuceS 2 iver Solar sels 10match the IQ Battery and 1Q Syslem Controller and todeflectheat (not included, order Separately) includes COMMS KIT 01 and CELLMODEN-MI08-5P-08 nih 5 year Sprint data plan for Ensemble sites AGbased LTE MY celta AGdesea LTE MA ceil moder with § peat Sprint a modem mith 5 year ATAT data plan BRS HAS he f e Bde HBLISD ana 8 Benatar 1 2pote TOA Eaton BRIO Cucus reaker 2 pore 158 Later i t 15 Gueat eeaer 2 pote 208 Fat HRD Cec at ee p o t eISAEst R158 with hold dowa tel support Cucasr amet 2 pode 208 Fata BH 208 wth Mold down bit support Powe? ine cartier commumcalion bridge pawl quantity one pas! Repracement sola smeld #2110 Combines 4 4 Accessory r e c e p t a c t e for Power Line Carnes in iQ C o m b m e r 4/4C (requred tot EPLC-O1} Mold downt t for CatonciteunBeeaet with screws ELECTRICAL SPECIFICATIONS Ravng Sytem ttage Eaton BA serves bushar cating Mar cece coer naten {Max coreruoscaent rating input from PYsixage) M o t e a a Branch cwcuts (solar andor storage! Man to39 bearih ot teranes rating aut) Production metering CT Cons oret se mae tse eg T C T266 SPLOT Contewous duty 125.48 rors o a Upto four 2-pote Eaton 8A senes Distributed Generation (DG) breakersoniy (not mchxled) ACAst avetutwd generation 244 am IQ Gatemay Breaber nchuded 200 A sold cove pre installed and wired to Ki Gatewey Apart TAG a8 ent nant mers MECHANICAL DATA Dimensions (Watts vege! Aminer temperature range Coots Enclosure enneonmentat cating Wee Attase INTERNET CONNECTION OPTIONS, 3751 49 Sx 16 A.cm (14 757 x 19 S*£6 63") H e i g h t 2106" (53 Sem)with mounting brockets Tag t e8 ns: ?40° C10 +468 C(-40°to115°F) Satis ce a neat smeld vigor, NATL certified,NEMA type DR.polycarbonate constuction POS AR SEA eater e p s EE ESA peer cereto + O O Abreaker Bran h sour at toe ete e s + Mainiug combinedoutput 161 ls epper cardvetors + Neultal and ground 1410}G.copper conductors Almay fallon local?i e 165,remness tar voids te S09 To 2000 meters6 500 feet! Integrated Fi 202 11b 9.1 Cotata Fant eMue o t te SEM c e t modem. Notematan bpnane Ethernet Optional RO? 3 PatSE 10¢ Cat)UTPE t h e r n e table inot included COMPLIANCE G o r t »og cambiner UL! S a h ak DETER baer Sane E 5 0 8 Prody..tige meteringANSILT! 20 accutan eclaae G § Fyprada Tony Consumation metering accutacy clase? § Constr es a t m VL ACBET ANGE et To lear more about Enphase offerings, visit enphase.com SO ENPHASE C o m p l e t e S o l a r ABrighter Way. 3000 EXECUTIVE PKWY, S T E 5 0 4 S A N R AM O N , C A 94583 LICENSE T Y P E C10 LICENSE # 961988 PHONE # (877) 299-4943 J D E S I G N E R : O D J M A R I A H E R N A N D E Z R E S I D E N C E 2402 ALONA ST, SANTA ANA, CA 92706 APN:00106106 DATE:4/21/2023 SHEET -3 SPEC SHEET 2402 N Alona St 06/06/23 SOLARMOUNT = UNIRAC SOLARMOUNT defined the standard in solar racking. Features are designed to get installers off the roof faster. Qur grounding & bonding process eliminates copper wire and grounding straps to reduce costs. Systems can be configured with standard or light rail ta meet your design requirements at the lowest cost possible. The superior aesthetics package provides a streamlined clean edge for enhanced curb appeal, with no special brackets required for installation. Now Featuring: THE NEW FACE OF SOLAR RACKING a Superior Aesthetics Package i f e ] e n p h a s e LOSE ALL OF THE COPPER & LUGS SMALL IS THE NEXT NEW BIG THING ENHANCED DESIGN & LAYOUT TOOLS System grounding thegh Empase merarvesters aut tskcables Light Rail 1s fully Compatitle with all SM Components Featuring Google Map Capabiities within UBurider eae e e e e r e s te i y e r r yED a FAST INSTALLATION. SUPERIOR AESTHETICS s c ~e o C o m p l e t e S o l a r . ABrighter Way. 3000 EXECUTIVE PKWY, S T E 5 04 S A N R A M O N , C A 94583 LICENSE T Y P E C10 LICENSE # 961988 PHONE # (877) 299-4943 J D E S I G N E R : O D J M A R I A H E R N A N D E Z R E S I D E N C E 2402 ALONA ST, SANTA ANA, CA 92706 APN:00106106 DATE:4/21/2023 SHEET 5-4 SPEC SHEET 2402 N Alona St 06/06/23 UNIRAC eeatuning @ SHED ¢ S E A L reunovoor FLASHKIT PRO FLASHKIT PRO is the complete attachment solution for composition shingle roofs. Featuring Unirac?s patented SHED & SEAL technology, a weather proof system which provides the ultimate protection against roof leaks. Kitted in 10 packs for maximum convenience, flashings and hardware are available in Mill or Dark finishes. With FLASHKIT pro, you have everything you need for a quick, professional installation. P i d c e t i TRUSTED WATER SEAL FLASHINGS YOUR COMPLETE SOLUTION CONVENIENT 10 PACKS ratuanc Q SHED 5 SEAL rrcnmorocy Flashings. lags, continuous slot L-Feet and hardware Packaged for speed and ease ef handling UNIRAC s ta t o rs @ S H E D 6S E A L trennorocr FLASHKIT PRO INSTALLATION GUIDE FLASHKIT PRO IS THE COMPLETE FLASHING AND ATTACHMENT SOLUTION FOR COMPOSITION ROOFS. INSTALL FEASH4IT PR0 FLASHING INSTALL LFOOT PRE-INSTALL Locale tua? rafters and snap chalk nes to mark the installation paint for cach roof attachment ATTACH LFOOT TG Rau, = Drive the lag bolt down until the | foot 1s held firmly im place tis rotmal for the EPDM on the underside of the staitess steel backed [POM washer to compress. and expasi teyond! the oufside ede of the steel washer when the proper torque 1s ai r l + Dull a 2/32. prlal bole at each soof atlachment Full each pilot hole Te: with sealant STEP 1 INSTALL FLASHKIT PRO FLASHING + Add aU shaped bead al roof sealant to the underside of the ashing with the open side of Inc U pomting down the toot slope Shde the alumunum flashing underneath the raw of shingles directly up slope {rom the pulot hole as shawn Align the indicator marks on the lower end of the flashing with the chalk lines an the roof to center the raised hole in the flz,hing aver the pilut hole in the roof When installed cere: t l ,"ang will extend under the two coursesof shingles a i e the p e w + Use caution to avad over torquemng the lagbolt using a mpact der + Repeal Stops1 and 2 at each root attachment pant STEP 3 ATTACH LFOOTTO RAIL +Insert the included 3/8 16 1 bolts into the lower slot on the Rail (sold separately) spacing the bolts to match the spacing between the roof att- ments, + Position the Rav agaist the L Foot and insert the threaded end of theT Boll fhraueh the cantinyous stat in the L Foot Apply anti sexe lo bolt tneads to pre rat pulling of the 7 bolt and si: tuged 3 8 sealed flange nul Fact: the ( f l a n g e nul on the T bolt and fhaget lighten Repeat SILP 3 untu a L Feet are secured la the RailSTEP 2 INSTALL L-FOOT walla T bolt Adust the level and height ofthe Rai and orque eact + Fasten L toot and flasting into place by passing the included lag belt to 301 Ibs boll and pre installed stainless steel backed EPDM washer through the | fout EPDM grommet. and the saised hole in the flashing. «nto Tbe pi vi tivle: on the roof rafter C o m p l e t e S o l a r . ABrighter Way. 3000 EXECUTIVE PKWY, S T E 5 0 4 S A N R A M O N , C A 94583 LICENSE T Y P E C10 LICENSE # 961988 PHONE # (877) 299-4943 J D ES I G N ER : O D J M A R I A H E R N A N D E Z R E S I D EN C E 2402 ALONA ST, SANTA ANA, CA 92706 APN:00106106 DATE:4/21/2023 SHEET 8-5 SPEC SHEET 2402 N Alona St 06/06/23 2402 N Alona St 06/06/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.Will the PV system weigh maximum 4 pounds per square feet or less? 5.Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.Will the PV system be installed without using any ballast system or counter-weight system? 8.Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M -19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 2402 N Alona St 06/06/23 SHEET N A M E C OVER SHEET PLAN NOTES SITE PLAN LAYOUT A T T A C H M EN T DETAILS MOUNTING DETAILS ELECTRICAL DIAGRAM WA RNING LABELS SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET SHEET # e r o u s c r w r o r m a r o n M A R I A H E R N A N D E Z R E S I D E N C E | # # " * PROPERTY OWNER N E W P H O T O V O L T A I C S Y S T E M PVv-t NAME:MARIA HERNANDEZ Pv-2 PHONE P R O J E C T - 7 . 0 2 0 k W D C /e e CONTRACTOR F-2 PONE COMPLETE SOLAR 5 . 8 5 0 k W A C s t DESIGN SPECIFICATIONS 33 OCCUPANCY: R-3 $-4 CONSTRUCTION TYPE: SINGLE FAMILY RESIDENCE ZONING: RESIDENTIAL S-5 WIND EXPOSURE: c APPLICABLE CODES & STANDARDS COORDINATES: 2022 CALIFORNIA RESIDENTIAL CODE (CRC)3 3 . 7 6 8 2 9 1 , - 1 1 7 . 8 9 0 5 8 6 A E R I A L V I E W 2 0 2 2 C A L I F O R N I A B U I L D I N G C O D E ( C B C } 2 0 2 2 C A L I F O R N I A M E C H A N I C A L C O D E ( C M C ) 2 0 2 2 C A L I F O R N I A E L E C T R I C A L C O D E ( C E C } 2 0 2 2 C A L I F O R N I A P L U M B I N G C O D E ( C P C ) 2 0 2 2 C A L I F O R N I A E N E R G Y C O D E { E N E R G Y } 2 0 2 2 C A L I F O R N I A G R E E N B U I L D I N G C O D E ( C A L G R E E N ) 2 0 2 0 N A T I O N A L E L E C T R I C A L C O D E ( N E C ) 2 0 2 2 C A L I F O R N I A F I R E C O D E ( C F C ) T Y P E O F I N T E R C O N N E C T I O N : B A C K F E E D B R E A K E R IN T H E M S P S C O P E O F W O R K S Y S T E M S I Z E: S T C : 18 X 3 9 0 W =7 . 0 2 0 k W P T C : 18 X 3 5 9 . 4 W = 6 . 4 6 9 k W (18) S O L A R I A P O W E R X - 3 9 0 R ( 3 9 0 W ) [ BL K ] M O D U L E S (18) E N P H A S E I Q 8 M - 7 2 - 2 - U S M I C R O I N V E R T E R S (1) 1 2 5 4 E N P H A S E IQ C O M B I N E R 4 / 4 C B O X (1) 6 0 A K N I F E A C D I S C O N N E C T M S P U P G R A D E : M A I N S E R V I C E P A N E L U P G R A D E T O 2 0 0 A B U S B A R R A T I N G W I T H 2 0 0 A M A I N B R E A K E R M A I N B R E A K E R D E R A T E : N O R A C K I N G & M O U N T I N G P V A T T A C H M E N T T Y P E : U N I R A C F L A S H K I T P R O F O R C O M P S H I N G L E R O O F R A C K I N G T Y P E : U N I R A C S O L A R M O U N T - R O O F M O U N T R A C K I N G H A R D W A R E CompleteSolar? ABrighter Way. 3000 EXECUTIVE PKWY, S T E 504 SAN R A M O N , C A 94583 LICENSE TYPE C10 LICENSE # 961988 PHONE# (877) 299-4943 S i g n e d 4 / 2 6 / 2 0 2 3 D ES I G N E R : O D J M A R I A H E R N A N D E Z R ES I D EN C E 2402 ALONA ST, SANTA ANA, CA 92706 APN:00106106 DATE:4/21/2023 SHEET T-1 COVER SHEET Bldg# 101115268 Issued 06/02/23 Elec# 20179762 Issued 05/31/23 Elec# 20179808 Issued 06/06/23 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 2402 N Alona St 06/06/23 1.3. 1.4. 15. 1.6. 47. 18. 19. 1.10. 4.11, 1.12. 1.13. 1.14, 1.15. 1.16. 4.17. 1.18. 1.19. 1.20. 1.21. 1.22. 1.23. 1.24, 1.25. 1.26. 1.27. 1.28. 1.29. PROJECT NOTES: THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE 2022 CALIFORNIA ELECTRICAL CODE (CEC) ARTICLE 690, ALL MANUFACTURER'S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION'S (AHJ) APPLICABLE CODES. THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PY SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION GROUND FAULT DETECTION AND INTERRUPTION (GFDI} DEVICE IS INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH 2022 GEC 690.41(B) ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY 2022 CEC 690.4 PY MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 GLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO 2022 CEC 690.7. ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS. FROM LISTING OR LABELING { 2022 CEC 110.3). ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING GODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL 8E INSTALLED AS REQUIRED BY THE CEC AND AHJ. SCOPE OF WORK: PRIME CONTRACTOR {S RESPONSIBLE FOR THE DESIGN AND. SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT. WORK INCLUDES: PV ROOF ATTACHMENTS - UNIRAC FLASHKIT PRO FOR COMP SHINGLE ROOF PV RACKING SYSTEM INSTALLATION - UNIRAC SOLARMOUNT ROOF MOUNT RACKING HARDWARE PV MODULE AND INVERTER iNSTALLATION - SOLARIA POWER X-390R (390W) {BLK] {BLK] MODULES / ENPHASE !Q8M-72-2-US M{CROINVERTERS PV EQUIPMENT GROUNDING PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX PV LOAD CENTERS (IF INCLUDED) PV METERING/MONITORING (IF INCLUDED) PV DISCONNECTS PV GROUNDING ELECTRODE & BONDING TO (E) GEC PV FINAL COMMISSIONING. (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE SITE NOTES: A LADDER WILL BE IN PLACE FOR INSPECTION !N COMPLIANCE WITH OSHA REGULATIONS. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM |S A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION 2022 CEC 110.26. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S, INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. 1.30. 1.31. 1.32. 1.33. 1.34, 1.35. 1.36. 1.37. 1.38. 1.39, 1.40. 1.41. 1.42. 1.43. 1.44, 1.45. 1.48. 1.47. 1.48. 1.49. 1.50. 1.51. 1.52. 1.53. 1.54, 1.55. EQUIPMENT LOCATIONS: ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY 2022 CEG 110.26. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY 2022 CEC 690.31 (A),(C) AND CEC TABLES 310.15 (B)(2)(A) AND 310.15 (BX3XC) JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO 2022 CEC 690.34. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT . ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO 2022 CEC APPLICABLE CODES. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. STRUCTURAL NOTES: RACKING SYSTEM PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER'S INSTRUCTIONS. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED SEALED PER LOCAL REQUIREMENTS. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WiLL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. WIRING & CONDUIT NOTES: ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. CONDUCTORS SIZED ACCORDING TO 2022 CEC 690.8, 2022 CEC 690.7. VOLTAGE DROP LIMITED TO 1.5%. DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE (2022 CEC 110.15 GROUNDING NOTES: GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO 2022 CEC 690.43 AND MINIMUM 2022 CEC TABLE 250.122. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORDING WITH 2022 GEG 250.134 AND 2022 250.136(). EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO CEC 690.45 AND MIGROINVERTER MANUFACTURER'S INSTRUCTIONS. 1.56. 1.57. 1.58. 1.59. 1.60. 1.61. 1.62. 1.63. 1.64. 1.65. 1.66. 1.67. 1.68. 1.69. 1.70. 171, 172. 1.73. 1.74, EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS. SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS? INSTALLATION REQUIREMENTS. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING. CONDUCTOR TO ANOTHER MODULE. GROUNDING AND BONDING CONDUCTORS, iF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN iF #4 AWG OR LARGER [2022 CEC 250.119] THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH CEC 690.47 AND CEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM iS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO CEC 250, CEC 690.47 AND AHJ. GROUND-FAULT DETECTION SHALL COMPLY WITH CEC 690.41 IN GENERAL AND CEC 690.41 (A}(t)SPECIFICALLY. DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED ?LINE SIDE? (TYPICALLY THE UPPER TERMINALS). DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 14 FT OF PV ARRAY OR5 F T INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS <30V AND <240VA [CEC 690.12(B)].LOCATION OF LABEL. ACCORDING TO AHJ ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO CEC 690.8, 690.9, AND 240. EQUIPMENT THAT !S LISTED, LABELED, OR BOTH SHALL BE INSTALLED AND USED IN ACCORDANCE WITH ANY INSTRUCTIONS INCLUDED iN THE LISTING OR LABELING. CEC 110.3(B). IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO CEC 690.11 AND UL16998. INTERCONNECTION NOTES: LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [2022 CEC 705.12 THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING {2022 CEC 705.12(8)(3)(2)] WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [2022 CEG 705.12(B)(3)(2)]. AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO 2022 CEC 705.12 (8)(3)(3). SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO 2022 CEC 705.11 WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH 2022 CEC 230.42 BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [2022 GEG 705.12(E)]. S i g n e d 4 / 2 6 / 2 0 2 3 C o m p l e t e S o l a r ° ABrighter Way. 3000 EXECUTIVE PKWY, S T E 504 SAN R A M O N , C A 94583 LICENSE TYPE C10 LICENSE # 961988 P H O N E# (877) 299-4943 josef D E S I G N E R : O D J M A R I A H E R N A N D E Z - R E S I D E N C E 2402 ALONA ST, SANTA ANA, C A 92706 APN:0 0 1 0 6 1 0 6 DATE:4/21/2023 SHEET T~2 PLAN NOTES 2402 N Alona St 06/06/23