HomeMy WebLinkAbout2505 W St Andrew Pl - 101113436 & 20178397 - PlanPV-1REV: A1 12/24/2022
FLORES, RALPH ANTHONY
2505 WEST SAINT ANDREW PLACE
SANTA ANA, CA 92704
APN # 40808107 TEL #: (714) 925-5990
CLIENT:
COVER SHEET
CSLB # 619149 CLASS: B, C-10
NAME: GARY GIETZ, JACK MCCLARY
SIGNED: 12/24/2022 PHONE 310.904.6139
ENERGY SERVICE PARTNERS
970 W 190TH ST, STE 302
TORRANCE, CA 90502
CONTRACTOR:
VICINITY MAPVICINITY MAP AERIAL MAP
NOTES
SCOPE OF WORK
INSTALLATION OF GRID-TIED SOLAR PHOTOVOLTAIC SYSTEM
17 APTOS SOLAR TECHNOLOGY 440 W DNA-144-MF26-440W SOLAR MODULES
1 SOLAREDGE TECHNOLOGIES 6000 W SE6000H-US (240V) HD WAVE INVERTER
17 SOLAREDGE TECHNOLOGIES 440 W S440 OPTIMIZER
SYSTEM NAMEPLATE POWER 7.480 KW DC
SYSTEM CEC POWER 6.803 KW CEC-AC
CONSTRUCTION TYPE V-B
OCCUPANCY TYPE R-3
SHEET INDEX
1 COVER SHEET
2 SIGNAGE
3 SITE/ROOF PLAN
3.1 STRING MAP
4 STRUCTURAL
5 ELECTRICAL
6 ELECTRICAL
CALCS
· ALL MATERIALS, EQUIPMENT, INSTALLATION AND
WORK SHALL COMPLY WITH THE FOLLOWING
APPLICABLE CODES:
·2019 CBC / 2018 IBC
·2019 CRC / 2018 IRC
·2019 CEC / 2017 NEC
·2019 CMC / 2018 UMC
·2019 CPC / 2018 UPC
·2019 CFC / 2018 IFC
·2019 CA ENERGY CODE
·2019 GREEN CODE
1. ALL WORK TO COMPLY WITH CEC ARTICLE 690
2. UTILITY SHALL BE NOTIFIED BEFORE ACTIVATION
OF PV SYSTEM
3. REMOVAL OF A UTILITY-INTERACTIVE INVERTER
OR OTHER EQUIPMENT SHALL NOT DISCONNECT
THE BUILDING CONNECTION BETWEEN THE
GROUNDING ELECTRODE CONDUCTOR AND THE
PV SOURCE AND/OR OUTPUT CIRCUIT GROUNDED
CONDUCTOR
4. ALL PV SYSTEM COMPONENTS SHALL BE LISTED
BY A RECOGNIZED TESTING AGENCY
5. WIRING MATERIALS SHALL COMPLY WITH MAXIMUM
CONTINUOUS CURRENT OUTPUT AT 25° C; WIRE
SHALL BE WET RATED AT 90°C
6. EXPOSED PHOTOVOLTAIC SYSTEM CONDUCTORS
ON THE ROOF WILL BE USE-2 OR PV TYPE WIRE.
7. ALL EXTERIOR CONDUIT, FITTINGS, AND BOXES
SHALL BE RAIN-TIGHT AND APPROVED FOR USE IN
WET LOCATIONS (CEC 314.15)
8. ALL METALLIC RACEWAYS AND EQUIPMENT SHALL
BE BONDED AND ELECTRICALLY CONTINUOUS
(CEC 250.90, 250.96)
9. FOR UNGROUNDED SYSTEMS, THE PHOTOVOLTAIC
SOURCE AND OUTPUT CIRCUITS SHALL BE
PROVIDED WITH A GROUND-FAULT PROTECTION
DEVICE OR SYSTEM THAT DETECTS A GROUND
FAULT, INDICATES THAT FAULT HAS OCCURED,
AND AUTOMATICALLY DISCONNECTS ALL
CONDUCTORS OR CAUSES THE INVERTER TO
AUTOMATICALLY CEASE SUPPLYING POWER TO
OUTPUT CIRCUITS
10. ANY REQUIRED GROUNDING ELECTRODE
CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR
SPLICES OR JOINTS AT BUSBARS WITHIN LISTED
EQUIPMENT (CEC 250.64C)
11. ALL PV MODULES AND ASSOCIATED EQUIPMENT
SHALL BE PROTECTED FROM ANY PHYSICAL
DAMAGE
12. ALL FIELD-INSTALLED JUNCTION, PULL, AND
OUTLET BOXES SHALL BE LOCATED IN A READILY
ACCESSIBLE LOCATION DIRECTLY OR BY
DISPLACEMENT OF A MODULE SECURED BY
REMOVABLE FASTENERS
13. FOR GROUNDED SYSTEMS, THE INVERTER IS
EQUIPPED WITH GROUND FAULT PROTECTION AND
A GFI FUSE PORT FOR GROUND FAULT INDICATION
14. WHEN BACKFED BREAKER IS THE METHOD OF
UTILITY INTERCONNECTION, THE BREAKERS SHALL
NOT READ "LINE AND LOAD"
15. THE INSTALLED SOLAR SYSTEM HAS A
DISTRIBUTED WEIGHT OF LESS THAN 4 PSF
16. THE CONCENTRATED LOAD FOR EACH VERTICAL
SUPPORT IS LESS THAN 45 LBS
17. AC DISCONNECT IS A "KNIFE BLADE" TYPE
DISCONNECT
18. THE WORKING CLEARANCES AROUND THE
EXISTING ELECTRICAL EQUIPMENT AS WELL AS
THE NEW ELECTRICAL EQUIPMENT WILL BE
MAINTAINED IN ACCORDANCE WITH CEC 110.26
19. THE PHOTOVOLTAIC INVERTER WILL BE LISTED AS
UL 1741 COMPLIANT
20. SMOKE ALARMS AND CARBON MONOXIDE ALARMS
ARE REQUIRED TO BE RETROFITTED ONTO THE
EXISTING DWELLING AS PER THE 2019 CRC.
THESE SMOKE ALARMS ARE REQUIRED TO BE IN
ALL BEDROOMS, OUTSIDE EACH BEDROOM, AND
AT LEAST ONE ON EACH FLOOR OF THE HOUSE.
CARBON MONOXIDE ALARMS ARE REQUIRED TO
BE RETROFITTED OUTSIDE EACH BEDROOM AND
AT LEAST ONE ON EACH FLOOR OF THE HOUSE.
THESE ALARMS MAY BE SOLELY BATTERY
OPERATED IF THE PHOTOVOLTAIC PROJECT DOES
NOT INVOLVE THE REMOVAL OF INTERIOR WALL
AND CEILING FINISHES INSIDE THE HOME;
OTHERWISE, THE ALARMS MUST BE HARD WIRED
AND INTERCONNECTED. (CRC R314, R315)
21. SMOKE AND CARBON MONOXIDE ALARMS ARE
REQUIRED PER CRC SECTIONS R314 AND 315 TO
BE VERIFIED AND INSPECTED BY THE INSPECTOR
IN THE FIELD.
22. WHEN APPLYING THE 120% RULE OF CEC 705.12(B)
, THE SOLAR BREAKER TO BE POSITIONED AT THE
OPPOSITE END OF THE BUS FROM THE MAIN
BREAKER PER 705.12(B)
23. PLUMBING AND MECHANICAL VENTS THROUGH
THE ROOF SHALL NOT BE COVERED BY SOLAR
MODULES - NO BUILDING, PLUMBING, OR
MECHANICAL VENTS TO BE COVERED OR
OBSTRUCTED
BLDG #101113436 ISS. 1/12/2023
ELEC #20178397 ISS. 1/12/2023
The scope of the plans is for the installation of the solar photovoltaic
system only and the approval is subject to compliance with all applicable
city and state codes and regulations regarding construction. The approval
of the plans does not constitute any certification of the accuracy,
completeness, or building permit status of the existing buildings and
structures as shown.
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
RAIL TO RAIL
BONDING #6 BARE
COPPER WIRE
INV
(IF USED)
MSP
CONTINUOUS
GROUND PER SLD
JBOX
GROUND
BUSHINGS
REQ.
MODULE
RAIL
SOLAR
METER
(IF REQ)
(A)
(1) BOND STRIP GROUNDS RAIL TO
RAIL SPLICES - STAR WASHERS USED
TO BOND RAIL TO BONDING STRIP
(2) SPLICE BAR, SELF-TAP SCREWS
JOIN RAILS. BONDING STRIPS USED
ON RAILS WITH GROUND LUGS.
(1) (2)
(3)
IF SPLICE BAR HAS INTEGRATED
GROUND, BONDING STRIP IS
NOT NECESSARY.
(3) WHERE NEITHER BONDING STRIP, INTEGRATED
GROUNDING SPLICE BAR, OR INTEGRATED
GROUNDING MIDCLAMP ARE USED, UL 2703
APPROVED GROUND LUG WITH #6 BARE COPPER
SHALL BE USED TO GROUND SPLICED RAILS.
USE METHOD (2)
(1)
(C)RAIL SPLICE GROUNDING
(C)
#6 BARE
COPPER
RAIL
1
RAIL
2
EITHER METHOD 1-3 PER MANUFACTURERS INSTALL INSTRUCTIONS
CONDUIT
COMPRESSION
FITTING
LOCK NUT
GROUNDING
BUSHING
WITH LAY-IN LUG
ENCLOSURE
CONTINUOUS
GROUND
STRIP
INSULATION
CONDUIT GROUNDING DETAIL
EQUIPMENT GROUND
BUSHINGS REQ. FOR
SYSTEMS OVER 250V
A GROUNDING MID CLAMP
EACH GROUNDING MID CLAMP PIERCES THROUGH THE
ANODIZED COATINGS OF BOTH THE MODULE FRAME AND
THE MOUNTING RAIL TO FORM SECURE ELECTRICAL BONDS,
WHICH ARE REPEATED THROUGHOUT THE ARRAY AND AT
LEAST TWICE PER PANEL. MODULE SHALL BE GROUNDED
AT LEAST TWICE OVER WITH A MINIMUM OF TWO
MIDCLAMPS.
-EVEREST GROUNDING MID CLAMP WITH SERRATED TEETH
MIDCLAMP TEETH
MODULE PENETRATION MAX. UTILIZATION OF RAIL
WITH 1/4" SPACING
SERRATED T-BOLT BONDS
CLAMP TO RAIL
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
Expedited Permit Process for PV Systems1
Expedited Permit Process for PV Systems
Standard String System
The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due to their similarity with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of the
installation.
The following pages contain forms for the Standard String System to use with the Expe-
dited Permit Process. The Micro-Inverter, AC Module, and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic-
tions that have adopted the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submitted in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
2505 W St Andrew
Pl01/13/23
Expedited Permit Process for PV Systems2
Expedited Permit Process for Small-Scale PV Systems
Standard String System
The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations
are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been
suggested to provide as a path to permit approval.
Required Information for Permit:
1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it
should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings
with a 3’ perimeter space at ridge and sides may not need separate fire service review.
2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specification sheets and installation manuals (if available) for all manufactured components including, but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1: Structural Review of PV Array Mounting System
Is the array to be mounted on a defined, permitted roof structure? l Yes l No
If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1.
Roof Information:
1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________
____________________________________________________________________________________________________
If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…).
2. Does the roof have a single roof covering? l Yes l No
If No, submit completed worksheet for roof structure WKS1.
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________
Mounting System Information:
1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap
beneath the module frames? l Yes l No
If No, provide details of structural attachment certified by a design professional.
2. For manufactured mounting systems, fill out information on the mounting system below:
a. Mounting System Manufacturer ___________Product Name and Model#________________________________
b. Total Weight of PV Modules and Rails ___________lbs
c. Total Number of Attachment Points____________
d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1)
e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for
maximum spacing allowed based on maximum design wind speed)
f. Total Surface Area of PV Modules (square feet)_________________ ft 2
g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2
If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1.
Step 2: Electrical Review of PV System (Calculations for Electrical Diagram)
In order for a PV system to be considered for an expedited permit process, the following must apply:
1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,440 Watts or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)).
5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV
system. Interactive PDF diagrams are available at www.solarabcs.org/permitting.
Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant
understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively
communicate, provide an alternative diagram with appropriate detail.
2505 W St Andrew
Pl01/13/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
3
Standard String System Site Plan
Energy Service Partners
970 W 190th Street FLORES RECIDENCE
Torrance, CA 90502
2505 W SAINT ANDREW PLACE, SANTA ANA, CA 92704
permits@joinesp.com
6.803KW-CEC AC
2505 W St Andrew
Pl01/13/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
Standard String System Electrical Diagram
Energy Service Partners
970 W 190th Street FLORES RECIDENCE
Torrance, CA 90502
2505 W SAINT ANDREW PLACE, SANTA ANA, CA 92704
permits@joinesp.com
6.803KW-CEC AC
2505 W St Andrew
Pl01/13/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
5
Notes for Standard String System Electrical Diagram
Contractor Name,
Address and Phone:
_________________
_________________
_________________
_________________
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
Site Name: __________________________
Site Address: ________________________
System AC Size: ______________________
SIZE FSCM NO DWG NO REV
SCALE NTS Date: SHEET
Drawn By:
Checked By:
MAX POWER-POINT CURRENT (IMP)
MAX POWER-POINT VOLTAGE (VMP)
OPEN-CIRCUIT VOLTAGE (VOC)
SHORT-CIRCUIT CURRENT (ISC)
MAX SERIES FUSE (OCPD)
MAXIMUM POWER (PMAX)
MAX VOLTAGE (TYP 600VDC)
VOC TEMP COEFF (mV/oC or %/oC )
IF COEFF SUPPLIED, CIRCLE UNITS
A
V
V
A
A
W
V
MODULE MAKE
MODULE MODEL
PV MODULE RATINGS @ STC (Guide Section 5)
MAX DC VOLT RATING
MAX POWER @ 40oC
NOMINAL AC VOLTAGE
MAX AC CURRENT
MAX OCPD RATING
V
W
V
A
A
INVERTER MAKE
INVERTER MODEL
INVERTER RATINGS (Guide Section 4)
1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YES NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
REQUIREMENT? YES NO N/A
3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX
CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING. (See Guide Section 9)
5) TOTAL OF ______ INVERTER OCPD(s), ONE FOR EACH INVERTER. DOES TOTAL
SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)?
YES NO
NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9):
1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ______oC
2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE _____oC
2.) 2005 ASHRAE FUNDEMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED
47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT
LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47oC OR LESS (ALL OF UNITED STATES),
a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER
FUSE.
b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER
FUSE.
NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix D):
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODE ® REFERENCES
SHOWN AS (NEC XXX.XX)
NOTES FOR ALL DRAWINGS:
SIGNSSEE GUIDE SECTION 7
SIGN FOR DC DISCONNECT
SIGN FOR INVERTER OCPD AND
AC DISCONNECT (IF USED)
RATED MPP CURRENT
RATED MPP VOLTAGE
MAX SYSTEM VOLTAGE
MAX CIRCUIT CURRENT
A
V
V
A
PHOTOVOLTAIC POWER SOURCE
WARNING: ELECTRICAL SHOCK
HAZARDLINE AND LOAD MAY BE
ENERGIZED IN OPEN POSITION
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
A
V
SOLAR PV SYSTEM
AC POINT OF CONNECTION
THIS PANEL FED BY MULTIPLE
SOURCES (UTILITY AND SOLAR)
Energy Service Partners
970 W 190th Street FLORES RECIDENCE
Torrance, CA 90502
2505 W SAINT ANDREW PLACE, SANTA ANA, CA 92704
permits@joinesp.com
6.803KW-CEC AC
2505 W St Andrew
Pl01/13/23
Rev: 7/15/2021
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
SOL-01 CBC 2019
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1. Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2. Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3. Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4. Will the PV system weigh maximum 4 pounds per square feet or less?
5. Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6. Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7. Will the PV system be installed without using any ballast system or counter-weight
system?
8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10. Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Phone Number: Date:
Email Address:
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
ESP Contracting
(B/C-10) 619149
x
x
x
x
x
x
x
x
x
x
Juan M Sanchez
(424) 358 3768
permits@joinesp.com
2505 W St Andrew Pl
01/09/23
2505 W St Andrew
Pl01/13/23
SOLAREDGE
S440 OPTIMIZER
J-BOX
NEMA3R
A B
+-
DC
DC
+-
DC
DC
INTEGRATED
DC DISCONNECT & AFCI
AC
DC
SOLAREDGE TECHNOLOGIES
SE6000H-US (240V)
HD WAVE INVERTER
STRING 1:
(9) APTOS SOLAR TECHNOLOGY
(DNA-144-MF26-440W) 440 WATT
SOLAR MODULES PAIRED WITH
(9) S440 OPTIMIZERS IN
(1) SERIES STRING
STRING 2:
(8) APTOS SOLAR TECHNOLOGY
(DNA-144-MF26-440W) 440 WATT
SOLAR MODULES PAIRED WITH
(8) S440 OPTIMIZERS IN
(1) SERIES STRING
SOLAREDGE
S440 OPTIMIZER
(N) LOCKABLE
BLADE TYPE
NON-FUSIBLE
AC DISCONNECT
NEMA 3R
C
EXISTING 200A
MAIN BREAKER
(CENTER FED)
EXISTING 200A
MAIN PANEL
40A PV BREAKER
INSTALLED AT OPPOSITE END OF
BUSBAR FROM MAIN BREAKER
40A-2P
200A
M
(E)GROUND
120/240 VAC
SINGLE PHASE SERVICE
(OVERHEAD)
60A-2P
120/240VAC
PV-5REV: A1 12/24/2022
FLORES, RALPH ANTHONY
2505 WEST SAINT ANDREW PLACE
SANTA ANA, CA 92704
APN # 40808107 TEL #: (714) 925-5990
CLIENT:
ELECTRICAL
CSLB # 619149 CLASS: B, C-10
NAME: GARY GIETZ, JACK MCCLARY
SIGNED: 12/24/2022 PHONE 310.904.6139
ENERGY SERVICE PARTNERS
970 W 190TH ST, STE 302
TORRANCE, CA 90502
CONTRACTOR:
ELECTRICAL
∆
TAG CONDUCTOR CONDUCTOR
SIZE
NUMBER OF
CONDUCTORS
CONDUIT/CABLE
TYPE CONDUIT SIZE
A PV-WIRE 10 AWG 4
FREE AIR N/A
EGC/GEC: BARE COPPER 6 AWG 1
B THHN/THWN-2 10 AWG 4
EMT 3/4"
EGC/GEC: THHN/THWN-2 8 AWG 1
C LINE:THHN/THWN-2 8 AWG 2
EMT 3/4"NEUTRAL: THHN/THWN-2 8 AWG 1
EGC/GEC: THHN/THWN-2 8 AWG 1
EVEREST INTEGRATED GROUNDING & LAY-IN LUGS ARE UL2703 LISTEDGROUNDING DETAIL
scale: NTS
RAILS MODULES
EVEREST RAIL
PV MODULE FRAME
EVEREST GROUNDING PIERCES
THROUGH ANODIZED COATINGS
OF MODULE FRAMES AND RAILS
EVEREST UNIVERSAL
FASTENING OBJECT
LAY-IN LUG TERMINAL
AL/CU DUAL RATED
(TIN PLATED CU)
SS SET SCREW INCLUDED
EVEREST RAIL
#10-24 SS LOCK NUT
6 AWG BARE CU WIRE
TE#10-24 X 3/4" SS HCS BOLT
#10 SS EXTERNAL TOOTH
LOCK (STAR) WASHER
SOLAREDGE NOTES:
1. STRING OPERATING VOLTAGE IS CONTROLLED BY INVERTER AND MAINTAINED AT NOMINAL 380 VDC.
2. STRING VOLTAGE IS LIMITED BY INVERTER TO A MAXIMUM OF 480VDC
3. SOLAREDGE DC/DC OPTIMIZERS ARE ALL RUN IN SERIES PER STRING (FIXED SOURCE CIRCUIT VOLTAGE - DC/DC CONVERTERS)
4. STRING CURRENT IS CONTROLLED BY OPTIMIZERS AND IS LIMITED TO 15ADC MAX (PER STRING).
5. INTEGRATED SOLAREDGE DC SWITCH DISCONNECTS BOTH POSITIVE AND NEGATIVE CONDUCTORS AS REQUIRED.
6. SOLAREDGE INVERTERS ARE ALL RAPID SHUTDOWN READY PER CEC 690.12
7. SOLAREDGE INVERTER IS SMART INVERTER COMPLIANT PER CALIFORNIA RULE 21.
8. SOLAREDGE INVERTERS ARE UL1699B CERTIFIED, PROVIDING CEC 2019 690.11 COMPLIANCE
SYSTEM NOTES:
1. PV SYSTEM IS UNGROUNDED
2. MODULES ARE BONDED TO RAIL USING EVEREST GROUNDING.
3. RAILS ARE BONDED USING UL 2703 RATED LAY-IN LUGS
4. BARE COPPER IS TRANSITIONED TO THHN/THWN-2 VIA IRREVERSIBLE CRIMP; GEC TO
BE CONTINUOUS PER CEC 250.64(C)
ALL TERMINALS
ARE 75° CELSIUS
RATED
SOLAR PV CIRCUIT BREAKER
MAIN SERVICE BUS RATING
PER CEC 705.12(B)(2)(3)(d)
200A x 120% = 240A
TOTAL BUS LOAD = (25A x 1.25) + 200A
TOTAL SYSTEM
TOTAL NUMBER OF MODULES 17
TOTAL NUMBER OF OPTIMIZERS 17
2505 W St Andrew
Pl01/13/23
PV-6REV: A1 12/24/2022
FLORES, RALPH ANTHONY
2505 WEST SAINT ANDREW PLACE
SANTA ANA, CA 92704
APN # 40808107 TEL #: (714) 925-5990
CLIENT:
CALCS
CSLB # 619149 CLASS: B, C-10
NAME: GARY GIETZ, JACK MCCLARY
SIGNED: 12/24/2022 PHONE 310.904.6139
ENERGY SERVICE PARTNERS
970 W 190TH ST, STE 302
TORRANCE, CA 90502
CONTRACTOR:
ELECTRICAL CALCULATIONS
INVERTER CHARACTERISTICS - SOLAREDGE SE6000H-US
MAX OUTPUT POWER 6000 W
SYSTEM OPERATING VOLTAGE 380 V
MAX CONTINOUS OUTPUT CURRENT 25 A
MAX INPUT VOLTAGE 480 V
SYSTEM SHORT CIRCUIT CURRENT 30 A
CEC MAX EFFICIENCY 99 %
DC DISCONNECT VALUES
RATED MAX POWER-POINT CURRENT (IMP) 19.68 A
RATED MAX POWER-POINT VOLTAGE (VMP)380 V
MAX SYSTEM VOLTAGE (VOC)480.00 V
MAX SHORT CIRCUIT CURRENT (ISC)30 A
SYSTEM CHARACTERISTICS CALCULATIONS
VMP Inverter Fixed String Voltage 380 V 380 V
VOC Max Inverter System Voltage 480 V 480 V
IMP (DC System Size)/ VMP 7480 W / 380 V 19.68 A
ISC (Optimizer Max Output Current) x (# Strings)15 A x 2 30 A
AC WIRE SIZING CALCULATIONS
AFTER INVERTER Wire = 8 AWG, 55 A @ 90⁰C
MAX AC OUTPUT CURRENT (Max Inverter Output) x (Continuous Load)[690.8(B)(1)]25 A X 1.25 31.25 A
TOTAL AMPACITY (High Temp)[Table 310(B)(2)(A) x (Conductor Ampacity)[Table
310.15(B)(16)] x (Conduit Fill)[Table 310.15(B)(3)(a)]0.82 X 55 A X 1 45.10 A
31.25 A ---> 45.10 A Therefore 8 AWG OK
MAX AC OUTPUT CURRENT (Max Inverter Output) x (Continuous Load)[690.8(B)(1)]25 A X 1.25 31.25 A
31.25 ---> 40 A Overcurrent Protection
TEMPERATURE ADDERS
CONDUIT TO BE INSTALLED
MIN. OF 7 8" ABOVE ROOF
HIGH TEMPERATURE 47 °C
LOW TEMPERATURE -2 °C
TEMP ADDER FOR ROOF RUN 0 °C
TEMP ADDER FOR ATTIC RUN 7 °C
DC WIRE SIZING CALCULATIONS
AT ARRAY Max Optimizer Current = 15 A, Wire = 10 AWG, 40 A @ 90⁰C
125% MAX CURRENT (Max Optimizer Current) x (Continuous Load)[690.8(A)]15 A X 1.25 18.75 A Per 690.8(B)(1) 40 A > 18.75 A
DERATED AMPACITY (High Temp)[Table 310(B)(2)(A) x (Conductor Ampacity)[Table
310.15(B)(16)] x (Conduit Fill)[Table 310.15(B)(3)(a)]0.82 X 40 A X 1 32.80 A Per. 690.8(B)(2) 32.80 A > 18.75 A
10 AWG PV WIRE OK
DC WIRE SIZING CALCULATIONS
AT JBOX Max Optimizer Current = 15 A, Wire = 10 AWG, 40 A @ 90⁰C
125% MAX CURRENT (Max Optimizer Current) x (Continuous Load)[690.8(A)]15 A X 1.25 18.75 A Per 690.8(B)(1) 40 A > 18.75 A
DERATED AMPACITY (High Temp)[Table 310(B)(2)(A) x (Conductor Ampacity)[Table
310.15(B)(16)] x (Conduit Fill)[Table 310.15(B)(3)(a)]0.82 X 40 A X 0.80 26.24 A Per. 690.8(B)(2) 26.24 A > 18.75 A
10 AWG PV WIRE OK
OPTIMIZER CHARACTERISTICS - S440
RATED INPUT DC POWER 440 W
MAX INPUT VOLTAGE 60 V
MAX INPUT CURRENT 14.5 A
MAX OUTPUT VOLTAGE 60 V
MAX OUTPUT CURRENT 15 A
SAFETY OUTPUT VOLTAGE/OPTIMIZER 1 V
MIN/MAX STRING LENGTH 8 / 25
MAX POWER PER STRING [HD-WAVE] 5700 W
MODULE CHARACTERISTICS - APTOS DNA-144-MF26-440W [BLK]
MAX POWER (PMAX) @ STC 440 W
OPEN CIRCUIT VOLTAGE (VOC)49.9 V
SHORT CIRCUIT CURRENT (ISC)11.33 A
MAX POWER VOLTAGE (VMP)41.0 V
MAX POWER CURRENT (IMP)10.74 A
SERIES FUSE RATING 20 A
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
2505 W St Andrew
Pl01/13/23
December 29, 2022
To Whom it May Concern,
I, Ralph Anthony Flores, homeowner of 2505 West Saint Andrew Place, Santa Ana, California
92704, authorize Energy Service Partners DBA ESP Contracting to install solar panels and pull
the necessary permits needed to complete my solar project.
Sincerely,
Ralph Anthony Flores
(714) 925-5990
2505 West Saint Andrew Place,
Santa Ana, California 92704
Doc ID: 25ce38eba9b115d5b23b9f95feb15ae882632312
2505 W St Andrew
Pl01/13/23
Permit Authorization
Ralph Anthony Flo...Authorization.pdf
25ce38eba9b115d5b23b9f95feb15ae882632312
MM / DD / YYYY
Signed
12 / 30 / 2022
02:21:26 UTC
Sent for signature to Ralph Anthony Flores
(ralph.flores94@yahoo.com) from contract@joinesp.com
IP: 174.205.97.166
12 / 30 / 2022
05:32:00 UTC
Viewed by Ralph Anthony Flores (ralph.flores94@yahoo.com)
IP: 166.137.163.9
12 / 30 / 2022
05:32:53 UTC
Signed by Ralph Anthony Flores (ralph.flores94@yahoo.com)
IP: 166.137.163.9
The document has been completed.12 / 30 / 2022
05:32:53 UTC
2505 W St Andrew
Pl01/13/23
PV-2REV: A1 12/24/2022
FLORES, RALPH ANTHONY
2505 WEST SAINT ANDREW PLACE
SANTA ANA, CA 92704
APN # 40808107 TEL #: (714) 925-5990
CLIENT:
SIGNAGE
CSLB # 619149 CLASS: B, C-10
NAME: GARY GIETZ, JACK MCCLARY
SIGNED: 12/24/2022 PHONE 310.904.6139
ENERGY SERVICE PARTNERS
970 W 190TH ST, STE 302
TORRANCE, CA 90502
CONTRACTOR:
WEATHER RESISTANT PLASTIC PLACARD
PLACEMENT: MAIN PANEL (COVER)
POWER TO THIS BUILDING IS ALSO
SUPPLIED FROM THE FOLLOWING
SOURCES WITH DISCONNECTS AS SHOWN
CAUTION:
SIGNAGE
LABEL LOCATION:
INVERTER, JUNCTION BOXES (ROOF), AC DISCONNECT
(PER CODE: CEC690.13 & CEC 690.13)
WARNING
POWER SOURCE OUTPUT CONNECTION DO
NOT RELOCATE THIS OVERCURRENT DEVICE
CAUTION: SOLAR ELECTRIC
SYSTEM CONNECTED
CAUTION: SOLAR CIRCUIT
WARNING DUAL POWER SOURCE
SECOND SOURCE IS PHOTOVOLTAIC SYSTEM
!
WARNING
ELECTRIC SHOCK HAZARD
TERMINALS ON BOTH LINE AND
LOAD SIDES MAY BE ENERGIZED
IN THE OPEN POSITION
DC VOLTAGE IS ALWAYS PRESENT
WHEN SOLAR MODULES ARE
EXPOSED TO SUNLIGHT
WARNING: PHOTOVOLTAIC
POWER SOURCE
WARNING
ELECTRIC SHOCK HAZARD
TERMINALS ON BOTH LINE AND
LOAD SIDES MAY BE ENERGIZED
IN THE OPEN POSITION
! !
AC SYSTEM DISCONNECT
FOR UTILITY OPERATION
LABEL LOCATION:
UTILITY DISCONNECT
LABEL LOCATION:
POINT OF INTERCONNECTION
(PER CODE: CEC 705.12(B)(3-4))
LABEL LOCATION:
MARKINGS PLACED ON ALL INTERIOR AND EXTERIOR DC/AC CONDUIT, RACEWAYS,
ENCLOSURES, AND CABLE ASSEMBLIES AT LEAST EVERY 1O FT, AT TURNS AND
ABOVE/BELOW PENETRATIONS AND ALL COMBINER/JUCTION BOXES.
LABEL LOCATION:
PER CEC 705.12(B)(2)(3)(B)
[OR (C) IF PANELBOARD IS RATED NOT LESS THAN SUM OF AMPERE
RATINGS OF ALL OVERCURRENT DEVICES SUPPLYING IT]
LABEL LOCATION:
WEATHER RESISTANT MATERIAL, DURABLE ADHESIVE, UL969 AS STANDARD TO
WEATHER RATING (UL LISTING OF MARKINGS NOT REQUIRED), MIN 3 8" LETTER HEIGHT
ARIAL OR SIMILAR FONT NON-BOLD, PLACED WITHIN THE MAIN SERVICE DISCONNECT,
PLACED ON THE OUTSIDE OF THE COVER WHEN DISCONNECT IS OPERABLE WITH
SERVICE PANEL CLOSED. (PER CODE: CEC690.15, 690.13(B))
LABEL LOCATION:
DC DISCONNECT, INVERTER
(PER CODE: CEC 690.13(B))
[To be used when inverter is ungrounded]
LABEL LOCATION:
AC DISCONNECT, POINT OF
INTERCONNECTION
(PER CODE: CEC 690.53)
PHOTOVOLTAIC SYSTEM
EQUIPPED WITH RAPID SHUTDOWN
LABEL LOCATION:
WEATHER RESISTANT MATERIAL, DURABLE PLAQUE, UL969 AS STANDARD TO WEATHER RATING (UL
LISTING OF MARKINGS NOT REQUIRED), MIN 3 8" LETTER HEIGHT ARIAL OR SIMILAR FONT NON-BOLD,
PLACED WITHIN THE MAIN SERVICE DISCONNECT, PLACED ON THE OUTSIDE OF THE COVER WHEN
DISCONNECT IS OPERABLE WITH SERVICE PANEL CLOSED. (PER CODE: CEC690.12, 690.56(C))
INVERTER
LABEL LOCATION:
DC DISCONNECT, INVERTER
(PER CODE: CEC690.53)
LABEL LOCATION:
RAPID SHUTDOWN OR ON INVERTER IF RSD IS
INTEGRATED
CEC 690.56(C)(3)
RAPID SHUTDOWN SWITCH FOR
SOLAR PV SYSTEM
2505 WEST SAINT ANDREW PLACE
SANTA ANA, CA 92704
LABEL LOCATION:
AC DISCONNECT, INVERTER, POINT OF INTERCONNECTION
(PER CODE: CEC 690.54)
MAXIMUM SYSTEM VOLTAGE (VOC)
MAXIMUM CIRCUIT CURRENT (ISC)
MAX RATED OUTPUT CURRENT OF
THE CHARGE CONTROLLER OR
DC-TO-DC CONVERTER
480
30
15
SIGNAGE REQUIREMENTS:
· RED BACKGROUND
· WHITE LETTERING
· MINIMUM 3/8" LETTER HEIGHT
· ALL CAPITAL LETTERS
· ARIAL OR SIMILAR FONT, NON-BOLD
· REFLECTIVE WEATHER RESISTANT
MATERIAL SUITABLE FOR THE
ENVIRONMENT (DURABLE ADHESIVE
MATERIALS MUST MEET THIS
REQUIREMENT)
ADHESIVE FASTENED SIGNS:
· THE LABEL SHALL BE SUITABLE FOR
THE ENVIRONMENT WHERE IT IS
INSTALLED.
· WHERE REQUIRED ELSEWHERE IN
THIS CODE, ALL FIELD APPLIED
LABELS, WARNINGS, AND MARKINGS
SHOULD COMPLY WITH ANSI Z535.4
[CEC 110.21(B) FIELD MARKING].
· ADHESIVE FASTENED SIGNS MAY BE
ACCEPTABLE IF PROPERLY
ADHERED. VINYL SIGNS SHALL BE
WEATHER RESISTANT
PHOTOVOLTAIC SYSTEM AC DISCONNECT
RATED AC OPERATING CURRENT 25 AMPS
AC NOMINAL OPERATING VOLTAGE 240 VOLTS
!
LABEL LOCATION:
SERVICE DISCONNECTING MEANS
(PER CODE: CEC 690.56(C)(1)(A))
SOLAR PV SYSTEM
EQUIPPED WITH RAPID
SHUTDOWN
TURN RAPID
SHUTDOWN
SWITCH TO THE
"OFF" POSITION
TO
SHUTDOWN PV
SYSTEM AND
REDUCE
SHOCK HAZARD
IN THE ARRAY
SOLAR
ELECTRIC
PV PANELS
AC DISCONNECT+
INVERTER
SOLAR ARRAY
MAIN PANEL
2505 W St Andrew
Pl01/13/23
26'-11"
PV-3REV: A1
FLORES, RALPH ANTHONY
2505 WEST SAINT ANDREW PLACE
SANTA ANA, CA 92704
APN # 40808107 TEL #: (714) 925-5990
CLIENT:
SITE PLAN
CSLB # 619149 CLASS: B, C-10
NAME: GARY GIETZ, JACK MCCLARY
SIGNED: 12/24/2022 PHONE 310.904.6139
ENERGY SERVICE PARTNERS
970 W 190TH ST, STE 302
TORRANCE, CA 90502
CONTRACTOR:
ROOF
PITCH
(DEG)
AZIMUTH
(DEG)
PV AREA
(SQ. FT)
NO. OF
MODS
ARRAY 1 13⁰ 270⁰141 6
ARRAY 2 13⁰ 270⁰47 2
ARRAY 3 13⁰90⁰70 3
ARRAY 4 13⁰90⁰23 1
ARRAY 5 13⁰0⁰117 5
CONDUIT NOTES
CONDUIT TO BE RUN ON CONDUIT BLOCKS MIN. 1" ABOVE ROOF SURFACE AND
UNDER EAVES; AND CLOSE TO RIDGELINES, LABELED AT MAX. 10' INTERVALS.
CONDUIT TO BE PAINTED TO MATCH EXTERIOR/EXISTING BACKGROUND COLOR OF
ITS LOCATION
SITE PLAN
scale: 1/16" = 1'-0"
CLIENT:
DOOR
AC DISCONNECT+INVERTER
MAIN
SERVICE
PANEL
EQUIPMENT DETAIL
SCALE: NTS
12/24/2022
NOTE:
· WIRES UNDER PV SHALL NOT HANG
OR TOUCH THE ROOF PER CEC 110.12
MODULE APTOS DNA-144-MF26-440W [BLK]
MODULE DIMENSIONS 82.48" X 40.91" X 1.57"
MODULE WEIGHT 53.13 LBS
TOTAL ARRAY AREA 398 SQ. FT.
TOTAL ROOF AREA 2270 SQ. FT
ROOF TYPE 1 LAYER COMP SHINGLE
NO. OF STORIES 1
ROOF COVERAGE 17.5 %
SPRINKLER SYSTEM
INSTALLED (CFC
903.3.1.3)
NO
WEST-WALL NORTH-WALL
(N)ARRAY 1
(N)ARRAY 2
(N)ARRAY 3
(N)ARRAY 4
(N)ARRAY 5
(E)RESIDENCE
W ST ANDREW PL
DRIVEWAY
(E)FENCE + GATE
PROPERTY LINE
(E)CHIMNEY
(N)J BOX
(N)AC DISCONNECT+
(N)INVERTER
(N)CONDUIT RUN
(E)MAIN PANEL AND
SERVICE ENTRANCE
FIRE PATHWAY
18''
18''
3'
18''18''
3'
3'
18''
18''
3'
28'-10"
25'-11"
5'-9"
7'-4"
3'
This item has been digitally signed
and sealed on Dec 29, 2022
2505 W St Andrew
Pl01/13/23
PV-3.1REV: A1 12/24/2022
FLORES, RALPH ANTHONY
2505 WEST SAINT ANDREW PLACE
SANTA ANA, CA 92704
APN # 40808107 TEL #: (714) 925-5990
CLIENT:
STRING MAP
CSLB # 619149 CLASS: B, C-10
NAME: GARY GIETZ, JACK MCCLARY
SIGNED: 12/24/2022 PHONE 310.904.6139
ENERGY SERVICE PARTNERS
970 W 190TH ST, STE 302
TORRANCE, CA 90502
CONTRACTOR:
STRING MAP
scale: 1/8" = 1'-0"
STRING MAP
INVERTER SE6000H-US
1 - STRING 1
2 - STRING 2
1 1
1 1 1
1
1
1 2
1
2
2
2
2 2
2
2
2505 W St Andrew
Pl01/13/23
PV-4REV: A1 12/24/2022
FLORES, RALPH ANTHONY
2505 WEST SAINT ANDREW PLACE
SANTA ANA, CA 92704
APN # 40808107 TEL #: (714) 925-5990
CLIENT:
ROOF PLAN
CSLB # 619149 CLASS: B, C-10
NAME: GARY GIETZ, JACK MCCLARY
SIGNED: 12/24/2022 PHONE 310.904.6139
ENERGY SERVICE PARTNERS
970 W 190TH ST, STE 302
TORRANCE, CA 90502
CONTRACTOR:
ROOF PLAN
scale: 1/8" = 1'-0"
ROOF FRAMING SECTION
scale: NTS
ROOF
PITCH
(DEG)
AZIMUTH
(DEG)
PV AREA
(SQ. FT)
NO. OF
MODS ROOF TYPE ROOF ATTACHMENT ROOF
HEIGHT EXPOSURE MATERIAL CONSTRUCTION RAFTER
SIZE
RAFTER
SPAN
RAIL ATTACHMENT
SPACING
MAX
CANTILEVER
LENGTH
ARRAY 1 13⁰ 270⁰ 141 6 1 LAYER COMP SHINGLE K2 FLASH COMP KIT 1 - STORY ATTIC WOOD RAFTER 2X6 14' - 0"48" OC 1' - 4"
ARRAY 2 13⁰ 270⁰ 47 2 1 LAYER COMP SHINGLE K2 FLASH COMP KIT 1 - STORY ATTIC WOOD RAFTER 2X6 14' - 0"48" OC 1' - 4"
ARRAY 3 13⁰ 90⁰70 3 1 LAYER COMP SHINGLE K2 FLASH COMP KIT 1 - STORY ATTIC WOOD RAFTER 2X6 14' - 0"48" OC 1' - 4"
ARRAY 4 13⁰ 90⁰23 1 1 LAYER COMP SHINGLE K2 FLASH COMP KIT 1 - STORY ATTIC WOOD RAFTER 2X6 14' - 0"48" OC 1' - 4"
ARRAY 5 13⁰ 0⁰117 5 1 LAYER COMP SHINGLE K2 FLASH COMP KIT 1 - STORY ATTIC WOOD RAFTER 2X6 14' - 0"48" OC 1' - 4"
BILL OF MATERIAL
OBJECTS COUNT
END CLAMPS 28
MID CLAMPS 20
RAILS (166")10
RAIL SPLICES 02
FOOTINGS 51
#ROWS OF MODULES 07
MODULES 17
MODULE CLAMP
ATTACHMENT
MODULE
EVEREST
CROSSRAIL 44-x
K2 FLASH
COMP KIT
5/16" X 3-1/2"
SS LAG SCREW
MINIMUM 2-1/2" EMBEDMENTSTRUCTURAL ATTACHMENT
@ MAX 48" OC
ALUMINUM
L-FOOT
5"
TYPICAL ELEVATION DETAIL
scale: NTS
MODULE APTOS DNA-144-MF26-440W [BLK]
MODULE DIMENSIONS 82.48" X 40.91" X 1.57"
MODULE WEIGHT 53.13 LBS
TOTAL ARRAY AREA 398 SQ. FT.
TOTAL ROOF AREA 2270 SQ. FT.
ROOF TYPE 1 LAYER COMP SHINGLE
MAX DISTRIBUTED LOAD 3 PSF
SNOW LOAD 0 PSF
WIND SPEED 110 MPH, 3 SEC GUST
WIND EXPOSURE C
MODULE STRUCTURAL
ATTACHMENT
2X6 RAFTER @ 24"OC
1'-6" EAVE OVERHANG
(N)ARRAY 1
(N)ARRAY 2 (N)ARRAY 3
(N)ARRAY 4(N)ARRAY 5
CROSSRAIL
44-X
K2 FLASH
COMP KIT
This item has been digitally signed
and sealed on Dec 29, 2022
2505 W St Andrew
Pl01/13/23