Loading...
HomeMy WebLinkAbout2826 N Ridgewood St - PlanCOMPLETE SOLAR 3000 EXECUTIVE PKWY,STE 504 SAN RAMON, CA 94583 LICENSE TYPE C10 LICENSE # 961988 PHONE # (877) 299-4943 DESIGNED BY: BRAD NEWMAN SITE INFORMATION: MAX CONTINUOUS AC SYSTEM SIZE: 6.96 kW DC SYSTEM SIZE: 8.4 kW (24) LONGI LR4-60HPB-350M MODULES (24) ENPHASE IQ8PLUS-72-2-US INVERTER(S) MOUNTING EQUIPMENT: UNIRAC SM & UNIRAC - FLASHLOC COMP LOPEZ ROBERTO LOPEZ PROJECT 2826 RIDGEWOOD ST SANTA ANA, CA 92705 LAT , LONG: 33.7761031, -117.8412164 COVER SHEET VICINITY MAP: AERIAL VIEW: SHEET INDEX:GENERAL NOTES: 1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED ELECTRICAL TESTING LABORATORY CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED BY THE MANUFACTURER ATTESTING TO ITS SAFETY 2. OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED 3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED 4. ALL SPECIFIC WIRING IS BASED ON THE USE OF COPPER. 5. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING COMMISSIONING AND ACCEPTANCE WITH THE CLIENT, UTILITY CO. AND CITY INSPECTORS AS NEEDED. 6. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS. IF THE SOLAR BACK FED BREAKER IS VOER THE BUSS SIZE 20% LIMIT, CONTRACTOR SHALL INCLUDE THE COST TO REPLACE MAIN BREAKER OR ENLARGE MAIN CAPACITY. 7. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. 8. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING THE EXTRA WEIGHT. 9. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE SIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS APPROPRIATE. 10. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS. 11. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS, ETC. SHALL BE HANDED OVER TO OWNER'S REPRESENTATIVE AT THE COMPLETION OF WORK GOVERNING CODES: 20 CALIFORNIA ELECTRICAL CODE 20 CALIFORNIA BUILDING CODE (VOL 1 & 2) 20 CALIFORNIA RESIDENTIAL CODE 20 CALIFORNIA FIRE CODE 20 CALIFORNIA GREEN BUILDING STANDARDS CODE 20 CALIFORNIA ENERGY CODE 20 CALIFORNIA MECHANICAL CODE ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES SITE SPECIFICATIONS: ZONING: OCCUPANCY GROUP: CONSTRUCTION TYPE: NUMBER OF STORIES: ROOF LAYERS: FIRE SPRINKLERS PRESENT: THE INSTALLATION OF SOLAR ARRAY AND PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH THE FOLLOWING CODES: AHJ: SANTA ANA SCOPE OF WORK: SYSTEM INFORMATION: EQUIPMENT INFORMATION: DATE: October 24, 2022 PV ROOF MOUNT INSTALLATION OF 24 LONGI LR4-60HPB-350M MODULES, 24 ENPHASE IQ8PLUS-72-2-US INVERTER(S), EXISTING 200A MAIN SERVICE PANEL WITH A MAIN BREAKER (24) LONGI LR4-60HPB-350M MODULES (24) ENPHASE IQ8PLUS-72-2-US INVERTER(S) MOUNTING EQUIPMENT: UNIRAC SM & UNIRAC - FLASHLOC COMP - 72" O.C. DC SYSTEM SIZE: 8.4 kW MAX CONTINUOUS AC SYSTEM SIZE: 6.96 kWR-3 RESIDENTIAL V-B 2 1 N PV-1.0 COMPLETE SOLAR PV-1.0 COVER SHEET PV-2.0 SITE PLAN PV-3.0 ROOF PLAN PV-4.0 ROOF ATTACHMENTS PV-5.0 MOUNTING DETAIL PV-6.0 LINE DIAGRAM PV-7.0 LABELS PV-8.0 PLACARD METER CONNECTION: UNDERGROUND NO TRENCHING UTILITY: SCE (7) ROOFTOP PV J-BOX & (1) NEMA 3R JUNCTION BOX (1) IQ COMBINER 4C (1) 100A LOAD CENTER COMBINER PANEL (1) 60A AC AC DISCONNECT E DIAGRAM BELS ACARRRRRRRRRRRRRRRRRRRRRRRRDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD 10/26/2022 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg#: 101118523 Elec#: 20182301 2826 N Ridgewood St- 101118523 & 201823013/11/2024 COMPLETE SOLAR 3000 EXECUTIVE PKWY,STE 504 SAN RAMON, CA 94583 LICENSE TYPE C10 LICENSE # 961988 PHONE # (877) 299-4943 DESIGNED BY: BRAD NEWMAN GAZEBO MSP M ACC JB JB JB JB JB JB ^/d/E&KZDd/KE͗ DyKEd/EhKh^^z^dD^/͗ ϲ͘ϵϲŬt ^z^dD^/͗ϴ͘ϰŬt ;ϮϰͿ>KE'/>ZϰͲϲϬ,WͲϯϱϬD DKh>^ ;ϮϰͿEW,^/YϴW>h^ͲϳϮͲϮͲh^ /EsZdZ;^Ϳ DKhEd/E'Yh/WDEd͗ hE/Z^DΘhE/ZͲ&>^,>K KDW >KW ZKZdK>KWWZK:d ϮϴϮϲZ/'tKK^d ^EdE͕ϵϮϳϬϱ >d͕>KE'͗ϯϯ͘ϳϳϲϭϬϯϭ͕ Ͳϭϭϳ͘ϴϰϭϮϭϲϰ MOUNTING PLANE #1 AZIMUTH:167° PITCH:18° MOUNTING PLANE #2 AZIMUTH:257° PITCH:18° MOUNTING PLANE #3 AZIMUTH:167° PITCH:18° MOUNTING PLANE #4 AZIMUTH:167° PITCH:18° FRONT O F H O M E RIDGEW O O D S T EQUIPMENT LEGEND:SYSTEM RATING: STC = 8.4 kW PTC = 7.82 kW CEC-AC = 6.96 kWINVERTERAC DISCONNECT METER SOCKET (FOR UTILITY PV METER) UTILITY METER MAIN SERVICE PANEL JB JUNCTION BOX FIRE SETBACK (3' TYP) INV PV AC MSP M IQ COMBINER BOXC SUBPANELSUB B BATTERY DATE: February 26, 2024 STANDOFF RACKING RAIL PROPERTY PLAN FIRE ACCESS PATHWAY FIRE ACCESS PATHWAY PV-2.0 COMPLETE SOLAR CONDUIT PROPERTY LINE RAFTERS EXISTING SOLAR (N) 60A AC DISCO (N) ENPHASE IQ COMBINER 4C (E) 200A MAIN SERVICE PANEL MOUNTING PLANE #5 AZIMUTH:77° PITCH:18° 156'-4" 159'-2" 95'-2" PRO P E R T Y L I N E PRO P E R T Y L I N E PROPERTY LINE PROPERTY LINE Signed 2/27/2024 2826 N Ridgewood St- 101118523 & 201823013/11/2024 COMPLETE SOLAR 3000 EXECUTIVE PKWY,STE 504 SAN RAMON, CA 94583 LICENSE TYPE C10 LICENSE # 961988 PHONE # (877) 299-4943 DESIGNED BY: BRAD NEWMAN MSP M ACC JB JB JB JB JB JB SITE INFORMATION: MAX CONTINUOUS AC SYSTEM SIZE: 6.96 kW DC SYSTEM SIZE: 8.4 kW (24) LONGI LR4-60HPB-350M MODULES (24) ENPHASE IQ8PLUS-72-2-US INVERTER(S) MOUNTING EQUIPMENT: UNIRAC SM & UNIRAC - FLASHLOC COMP LOPEZ ROBERTO LOPEZ PROJECT 2826 RIDGEWOOD ST SANTA ANA, CA 92705 LAT , LONG: 33.7761031, -117.8412164 ROOF PLAN PERCENTAGE OF COVERED AREA:16% MOUNTING PLANE #1 AZIMUTH:167° PITCH:18° MOUNTING PLANE #2 AZIMUTH:257° PITCH:18° MOUNTING PLANE #3 AZIMUTH:167° PITCH:18°MOUNTING PLANE #4 AZIMUTH:167° PITCH:18° MOUNTING PLANE #5 AZIMUTH:77° PITCH:18° ASCE 7-16 WIND SPEED:95 mph SNOW LOAD:0 psf DATE:October 24, 2022 EQUIPMENT LEGEND: INVERTERAC DISCONNECT METER SOCKET (FOR UTILITY PV METER) UTILITY METER MAIN SERVICE PANEL JB JUNCTION BOX FIRE SETBACK (3' TYP) INV PV AC MSP M IQ COMBINER BOXC SUBPANELSUB B BATTERY STANDOFF RACKING RAIL ROOF AREA CALCULATIONS TOTAL ROOF AREA (SQ. FT): 3022 SOLAR AREA (SQ. FT): 470.60 CONDUIT PROPERTY LINE RAFTERS EXISTING SOLAR FRONT OF HOME PV-3.0 COMPLETE SOLAR 3'-0" 1'-6" PIT H 1 10/26/202 2826 N Ridgewood St- 101118523 & 201823013/11/2024 PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA:MOUNTING EQUIPMENT:ROOF & FRAMING INFORMATION: ROOF ATTACHMENT COUNT: 52 ROOF ATTACHMENT COUNT: 52 ROOF TYPE:Comp Shingle PV MODULE COUNT:24 PV MODULE COUNT:24 FRAMING TYPE:Manufactured Truss ARRAY AREA:MODULE COUNT * 19.61 = 470.6 SPLICE COUNT:2 RAFTER SIZE:2x4 ROOF AREA: 3022 ft² MID CLAMP COUNT:24 RAFTER SPACING:24" PERCENT OF ROOF COVERED:16%END CLAMP COUNT: 48 ARRAY WEIGHT: MODULE COUNT * 42.99lbs = 1031.76 ATTACHMENT SPACING: 72" O.C. DISTRIBUTED LOAD: ARRAY LBS/ATTACHMENTS = 19.84 POINT LOAD: (lbs/ ft²) (ARRAY) WEIGHT/AREA = 2.19 lbs/ ft² COMPLETE SOLAR 3000 EXECUTIVE PKWY,STE 504 SAN RAMON, CA 94583 LICENSE TYPE C10 LICENSE # 961988 PHONE # (877) 299-4943 DESIGNED BY: BRAD NEWMAN MSP M ACC JB JB JB JB JB JB SITE INFORMATION: MAX CONTINUOUS AC SYSTEM SIZE: 6.96 kW DC SYSTEM SIZE: 8.4 kW (24) LONGI LR4-60HPB-350M MODULES (24) ENPHASE IQ8PLUS-72-2-US INVERTER(S) MOUNTING EQUIPMENT: UNIRAC SM & UNIRAC - FLASHLOC COMP LOPEZ ROBERTO LOPEZ PROJECT 2826 RIDGEWOOD ST SANTA ANA, CA 92705 LAT , LONG: 33.7761031, -117.8412164 DATE:October 24, 2022 RACKING RAIL ATTACHMENT POINT PV MODULE TRUSSES @ 24" O.C. PV-4.0 COMPLETE SOLAR ROOF ATTACHMENTS 6'-0" 10/26/202 2826 N Ridgewood St- 101118523 & 201823013/11/2024 COMPLETE SOLAR 3000 EXECUTIVE PKWY,STE 504 SAN RAMON, CA 94583 LICENSE TYPE C10 LICENSE # 961988 PHONE # (877) 299-4943 DESIGNED BY: BRAD NEWMAN RAIL FLASHLOC ATTACHMENT (E) ROOF FRAMING 5/16" STAINLESS STEEL LAG-BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER FLASHING PV MODULE (E) COMP SHINGLE ROOF (1 LAYER) RAIL END CLAMP PV MODULE MID CLAMP PV MODULE 4" 2 12" MIN. DEPTH RAIL RAIL FLASHLOC ATTACHMENT 2'-8" MIN - 3'-10" MAX 3 RAIL PV MODULE " MAX."1'-8" MAX. 21 10" MIN - 1'-4" MAX 2'-8" MIN - 3'-10" MAX 10" MIN - 1'-4" MAX (E) RAFTER/TOP CHORDS (E) RAFTER/TOP CHORD 1 DETAIL, MOUNTING AND FLASHING SIDE VIEW FRONT VIEW 2 3END CLAMP DETAILS MID CLAMP DETAILS PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA:MOUNTING EQUIPMENT:ROOF & FRAMING INFORMATION: ROOF ATTACHMENT COUNT: 52 ROOF ATTACHMENT COUNT: 52 ROOF TYPE:Comp Shingle PV MODULE COUNT:24 PV MODULE COUNT:24 FRAMING TYPE:Manufactured Truss ARRAY AREA:MODULE COUNT * 19.61 = 470.6 SPLICE COUNT:2 RAFTER SIZE:2x4 ROOF AREA: 3022 ft² MID CLAMP COUNT:24 RAFTER SPACING:24" PERCENT OF ROOF COVERED:16%END CLAMP COUNT: 48 ARRAY WEIGHT: MODULE COUNT * 42.99lbs = 1031.76 ATTACHMENT SPACING: 72" O.C. DISTRIBUTED LOAD: ARRAY LBS/ATTACHMENTS = 19.84 POINT LOAD: (lbs/ ft²) (ARRAY) WEIGHT/AREA = 2.19 lbs/ ft² SITE INFORMATION: MAX CONTINUOUS AC SYSTEM SIZE: 6.96 kW DC SYSTEM SIZE: 8.4 kW (24) LONGI LR4-60HPB-350M MODULES (24) ENPHASE IQ8PLUS-72-2-US INVERTER(S) MOUNTING EQUIPMENT: UNIRAC SM & UNIRAC - FLASHLOC COMP LOPEZ ROBERTO LOPEZ PROJECT 2826 RIDGEWOOD ST SANTA ANA, CA 92705 LAT , LONG: 33.7761031, -117.8412164 MOUNTING DETAIL DATE:October 24, 2022 PV-5.0 COMPLETE SOLAR 10/26/202 2826 N Ridgewood St- 101118523 & 201823013/11/2024 G EXISTING GROUNDING ELECTRODE SYSTEM N (E) 200A-2P (N) 40A-2P (E) 200A MAIN SERVICE PANEL (E) 200A / 2P MAIN BREAKER (E) LOADS 4 INTERCONNECTION NOTES: 1. INTERCONNECTION SIZING, LIMITATIONS AND COMPLIANCE DETERMINED IN ACCORDANCE WITH [CEC 705.12], AND [CEC 690.64]. 3. GROUND FAULT PROTECTION IN ACCORDANCE WITH [CEC 215.9], [CEC 230.95] AND [CEC 690.5] 4. ALL EQUIPMENT TO BE RATED FOR BACKFEEDING. 5. PV BREAKER TO BE POSITIONED AT THE OPPOSITE END OF THE BUSBAR RELATIVE TO THE MAIN BREAKER. DISCONNECT NOTES 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS) 2. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH N G BRANCH CIRCUIT (1): 12 MODULES NEMA 3 JUNCTION BOX BRANCH CIRCUIT (2): 12 MODULES DC AC DC AC DC AC DC AC DC AC DC AC 1 2 1 2 3 JUNCTION BOX JUNCTION BOX ENPHASE IQ8PLUS-72-2-US MICROINVERTER(S) (N) ENVOY BREAKER THIS BREAKER MAY BE 10A OR 15A AS PER MANUFACTURER, THIS BREAKER ENERGIZES THE ENVOY INSTALLED BY MANUFACTURER (N) 125A IQ COMBINER NEW (2) 20A-2P 4 PV AC DISCONNECT VISIBLE, LOCKABLE, LABELED, OPEN 60A, 240V, 2-POLE M (E) UTILITY METER COMPLETE SOLAR 3000 EXECUTIVE PKWY,STE 504 SAN RAMON, CA 94583 LICENSE TYPE C10 LICENSE # 961988 PHONE # (877) 299-4943 DESIGNED BY: BRAD NEWMAN SITE INFORMATION: MAX CONTINUOUS AC SYSTEM SIZE: 6.96 kW DC SYSTEM SIZE: 8.4 kW (24) LONGI LR4-60HPB-350M MODULES (24) ENPHASE IQ8PLUS-72-2-US INVERTER(S) MOUNTING EQUIPMENT: UNIRAC SM & UNIRAC - FLASHLOC COMP LOPEZ ROBERTO LOPEZ PROJECT 2826 RIDGEWOOD ST SANTA ANA, CA 92705 LAT , LONG: 33.7761031, -117.8412164 LINE DIAGRAM VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF THE UTILITY METER CALCULATIONS: PER CEC 690.80, "WHERE A SINGLE OVERCURRENT DEVICE IS USED TO PROTECT A SET OF TWO OR MORE PARALLEL-CONNECTED MODULE CIRCUITS, THE AMPACITY OF EACH OF THE MODULE INTERCONNECTION CONDUCTORS SHALL NOT BE LESS THAN THE SUM OF THE RATING OF THE SINGLE FUSE PLUS 125 PERCENT OF THE SHORT-CIRCUIT CURRENT FORM THE OTHER PARALLEL-CONNECTED MODULES." MODULE COUNT(24) * MICROINVERTER MAX OUTPUT CURRENT(1.21) * (1.25) = 36.30A < 40A '$7(2FWREHU Wire Tag # 1 (1) 12 - 2 TC - ER, THWN-2, COPPER,(OR CODE APPROVED EQUIVALENT), (1) 6 AWG BARE, COPPER (GROUND) 2 (1) 10 AWG THWN - 2, OR THHN, COPPER - (POSITIVE),(1) 10 AWG THWN - 2, OR THHN, COPPER - (NEGATIVE),(1) 10 AWG THHN/THWN, COPPER - (GROUND),(1) 3/4"EMT 3 (2)10 AWG THHN/THWN-2,COPPER -(L1), (2)10 AWG THHN/THWN-2,COPPER -(L2), (1) 10 AWG THHN/THWN-2 (GROUND), CONDUIT: 3/4" EMT 4 (1) 8 AWG THWN-2 COPPER - (L1), (1) 8 AWG THWN-2 COPPER - (L2), (1) 8 AWG THWN-2 COPPER - (NEUTRAL), (1) 10 AWG THWN-2 COPPER - (GROUND),(1) CONDUIT: 3/4" EMT String1:12 String2:12 String3:0 String4:0 String5:0 String6:0 Scope of Work: (24) LONGI LR4-60HPB-350M (24) ENPHASE IQ8PLUS-72-2-US INVERTER(S) PV-6.0 COMPLETE SOLAR 2826 N Ridgewood St- 101118523 & 201823013/11/2024 COMPLETE SOLAR 3000 EXECUTIVE PKWY,STE 504 SAN RAMON, CA 94583 LICENSE TYPE C10 LICENSE # 961988 PHONE # (877) 299-4943 DESIGNED BY: BRAD NEWMAN SITE INFORMATION: MAX CONTINUOUS AC SYSTEM SIZE: 6.96 kW DC SYSTEM SIZE: 8.4 kW (24) LONGI LR4-60HPB-350M MODULES (24) ENPHASE IQ8PLUS-72-2-US INVERTER(S) MOUNTING EQUIPMENT: UNIRAC SM & UNIRAC - FLASHLOC COMP LOPEZ ROBERTO LOPEZ PROJECT 2826 RIDGEWOOD ST SANTA ANA, CA 92705 LAT , LONG: 33.7761031, -117.8412164 LABELS DATE:October 24, 2022 THE EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR LABELING NOTES: 1. LABELING REQUIREMENTS BASED ON THE 2020 CALIFORNIA ELECTRIC CODE, OSHA STANDARD 19010.145, ANSI Z535. 2. MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 3. LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED [CEC 110.21] 4. LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND; REFLECTIVE, AND PERMANENTLY AFFIXED [IFC 605.11.1.1] PERMANENT WARNING LABELS SHALL BE APPLIED TO DISTRIBUTION EQUIPMENT FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: THE TITLE “SOLAR PV SYSTEM IS EQUIPPED WITH RAPID SHUTDOWN” SHALL UTILIZE CAPITALIZED CHARACTERS WITH A MINIMUM HEIGHT OF 3/8 IN. IN BLACK ON YELLOW BACKGROUND, AND THE REMAINING CHARACTERS SHALL BE CAPITALIZED WITH A MINIMUM HEIGHT OF 3/16 IN. IN BLACK ON WHITE BACKGROUND. [CEC 690.56(C)(1)(A)] A PERMANENT WARNING LABEL SHALL BE APPLIED TO THE DISTRIBUTION EQUIPMENT ADJACENT TO THE BACK-FED BREAKER FROM THE INVERTER. [CEC 705.12(D)(2)(3)(b)] RAPID SHUTDOWN SWITCH FOR SOLAR PV A RAPID SHUTDOWN SWITCH SHALL HAVE A LABEL LOCATED ON OR NO MORE THAN 3 FT FROM THE SWITCH THAT INCLUDES THIS WORDING. THE LABEL SHALL BE REFLECTIVE, WITH ALL LETTERS CAPITALIZED AND HAVING A MINIMUM HEIGHT OF 3/8 IN., IN WHITE ON RED BACKGROUND.[CEC 690.56(C)(2)] AT POINT OF INTERCONNECTION, MARKED AT DISCONNECTING MEANS [CEC 690.54] SECOND SOURCE IS PHTOVOLTAIC SYSTEM AT POINT OF INTERCONNECTION. [CEC 705.12(D)(3)] MAXIMUM AC OPERATING CURRENT: PHOTOVOLTAIC AT EACH DC DISCONNECTING MEANS [CEC 690.13(B)] AT EACH AC DISCONNECTING MEANS [CEC 690.13(B)] AT EXPOSED RACEWAYS, CABLE TRAYS, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 10FT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS [CEC 690.31(G)(3)] WARNING: PHOTOVOLTAIC POWER SOURCE PHOTOVOLTAIC AC DISCONNECT DUAL POWER SOURCE NOMINAL OPERATING AC VOLTAGE: DC DISCONNECT EACH PV SYSTEM DISCONNECTING MEANS SHALL PLAINLY INDICATE WHETHER IN THE OPEN (OFF) OR CLOSED (ON) POSITION AND BE PERMANENTLY MARKED [CEC. 690.13(B)] MAIN PHOTOVOLTAIC SYSTEM DISCONNECT AT BUILDING OR STRUCTURE MAIN DISCONNECTING MEANS. [CEC 690.12(E), CEC 690.15]WARNING ELECTRICAL SHOCK HAZARD DO NO TOUCH TERMINALS TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING! INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE WARNING! TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS ! WARNING! 29.04 240 PHOTOVOLTAIC AC DISCONNECT !! PV-7.0 COMPLETE SOLAR 2826 N Ridgewood St- 101118523 & 201823013/11/2024 MSP M ACC JB JB JB JB JB JB COMPLETE SOLAR 3000 EXECUTIVE PKWY,STE 504 SAN RAMON, CA 94583 LICENSE TYPE C10 LICENSE # 961988 PHONE # (877) 299-4943 DESIGNED BY: BRAD NEWMAN SITE INFORMATION: MAX CONTINUOUS AC SYSTEM SIZE: 6.96 kW DC SYSTEM SIZE: 8.4 kW (24) LONGI LR4-60HPB-350M MODULES (24) ENPHASE IQ8PLUS-72-2-US INVERTER(S) MOUNTING EQUIPMENT: UNIRAC SM & UNIRAC - FLASHLOC COMP LOPEZ ROBERTO LOPEZ PROJECT 2826 RIDGEWOOD ST SANTA ANA, CA 92705 LAT , LONG: 33.7761031, -117.8412164 PLACARD CAUTION DUAL POWER SOURCES.THIS BUILDING IS ALSO SUPPLIED WITH PV SOLAR WITH DISCONNECTS LOCATED AS SHOWN: PV DISCONNECTING MEANS SHALL BE INSTALLED AT A READILY AVAILABE LOCATION EITHER OUTSIDE OF A BUILDING OR STRUCTURE OR INSIDE THE NEAREST POINT OF ENTRANCE OF THE SYSTEM CONDUCTORS PER THE REQUIREMENTS OF CEC ARTICLE 690.14 SYSTEM UTILIZES MICROINVERTERS LOCATED UNDER EACH SOLAR MODULE SOLAR ARRAY ON ROOFTOP DATE:October 24, 2022 PV-8.0 COMPLETE SOLAR YOU ARE HERE MAIN SERVICE PANEL AC DISCONNECT UTILITY METER COMBINER BOX 2826 N Ridgewood St- 101118523 & 201823013/11/2024 2826 N Ridgewood St- 101118523 & 201823013/11/2024 SM SOLAR MOUNT System Certification PAGE APPENDIX A C • Unless otherwise noted, all modules listed above include all wattages and specific models within that series. Variable wattages are represented as "xxx" • Items in parenthesis are those that may or may not be present in a compatible module's model ID • Slashes "/" between one or more items indicates that either of those items may be the one that is present in a module's model ID • The frame profile must not have any feature that might interfere with the bonding devices that are integrated into the racking system • Use with a maximum over current protection device OCPD of 30A • Please see the SM UL2703Construction Data Report at Unirac.com to ensure the exact solar module selected is approved for use with SM •Listed models can be used to achieve a Class A fire system rating for steep slope applications. See Appendix A, page A Manufacture Module Model / Series Manufacture Module Model / Series Electrical Bonding and Grounding Test Modules The list below is not exhaustive of compliant modules but shows those that have been evaluated and found to be electrically compatible with the SOLARMOUNT system. LONGi LR4-60(HPB/HPH) LR4-72(HPH) LR6-60 LR6-60(BK/HPB/HPH/HV/PB/PE/PH) LR6-72 LR6-72(BK/HV/PB/PE/PH) RealBlack LR4-60HPB RealBlack LR6-60HPB Mission Solar Energy MSE Mono, MSE Perc Mitsubishi MJE & MLE Series Neo Solar Power Co. D6M Series Panasonic VBHNxxxSA06/SA06B/SA11/SA11B VBHNxxxSA15/SA15B/SA16/SA16B, VBHNxxxKA, VBHNxxxKA03/04, VBHNxxxSA17/SA17G/SA17E/SA18/SA18E, VBHNxxxZA01/ZA02/ZA03/VBHNxxxZA04 EVPV Peimar SGxxxM (FB/BF) SMxxxM Phono Solar PSxxxM1-20/U PSxxxM1H-20/U PSxxxM1-20UH PSxxxM1H-20UH PSxxxM1-20/UH PSxxxM1H-20/UH PSxxxM-24/T PSxxxMH-24/T PSxxxM-24/TH PSxxxMH-24/TH Prism Solar P72 Series Manufacture Module Model / Series Q.Cells Plus, Pro, Peak, G3, G4, Peak G5(SC) , G6(+)(SC)(AC), G7, G8(+), Plus, Pro, Peak L-G2, L-G4, L-G5 Peak L-G5, L-G6, L-G7, L-G8(BFF) Q.Cells (cont.) Q.PEAK DUO( BLK)-G6+ Q.PEAK DUO BLK-G6+/TS Q.PEAK DUO (BLK) G8(+) Q.PEAK DUO L-(G8.1/G8.2/G8.3) Q.PEAK DUO L-G8.3 BFF Q.PEAK DUO (BLK) ML-G9(+) Q.PEAK DUO XL-(G9/G9.2/G9.3) Q.PEAK DUO (BLK) ML-G10(+) REC RECxxxAA (BLK/Pure) RECxxxNP (N-PEAK) RECxxxNP2 (Black) RECxxxPE, RECxxxPE72 RECxxxTP, RECxxxTP72 RECxxxTP2(M/BLK2) RECxxxTP2S(M)72 RECxxxTP3M (Black) RECxxxTP4 (Black) Renesola All 60-cell modules Risen RSM Series S-Energy SN72 & SN60 Series Seraphim SEG-(6PA/6PB/6MA/6MA-HV/6MB/E01/E11) SRP-(6QA/6QB) SRP-xxx-6MB-HV, SRP-320-375-BMB-HV, SRP-xxx-BMC-HV, SRP-390-450-BMA-HV, SRP-xxx-BMZ-HV, SRP-390-405-BMD-HV Sharp NU-SA & NU-SC Series Silfab SLA-M, SLA-P, SLG-M, SLG-P & BC Series SILxxx(BL/NL/NT/HL/ML/BK/NX/NU/HC) Solaria PowerXT-xxxR-(AC/PD/BD) PowerXT-xxxC-PD PowerXT-xxxR-PM (AC) Solartech STU HJT, STU PERC & Quantum PERC SolarWorld Sunmodule Protect, Sunmodule Plus/Pro Suntech STP Suniva MV Series & Optimus Series (35mm) Sun Edison F-Series, R-Series SunPower AC, X-Series, E-Series & P-Series Talesun TP572, TP596, TP654, TP660 TP672, Hipor M, Smart Tesla SC, SC B, SC B1, SC B2, TxxxS Trina PA05, PD05, DD05, DD06, DE06 PD14, PE14, DD14, DE14, DE15 TSMC TS-150C2 CIGSw Upsolar UP-MxxxP, UP-MxxxM(-B) URECO D7Kxxx(H7A/H8A), D7Mxxx(H7A/H8A) FAKxxx(C8G/E8G), FAMxxxE7G-BB FAMxxxE8G(-BB) Vikram Eldora, Somera, Ultima VSUN VSUNxxx-60M-BB, VSUNxxx-72MH VSUN4xx-144BMH 2826 N Ridgewood St- 101118523 & 201823013/11/2024                                  !"   #"  $ %&                       '#(")             *  %&        +                           ,    %-  .. ((       ./ .0.#      %(                                  1+ %"  -2 3 4  (       !""1     "5   %(     677 -28 (! .3                  % 9:;<=>?@;=:AAB7        B-  7 "   '-7")   BC          D?EFGH>IJK=?L?=<:@IHMA?:N?A?=<B-       B          B"      B  ,    -2 O?KH>EH?IPQ>HR?@EB"      B8      3 B"          B "#81S'67ST5S(#) 3 U1V1S.. %#   %..          4 ..  %! W   %(-!(VVV1VS.X6(1V1SSVSY Z[\[]^__\ 'S)X  !"`#"  %(      a`` 4%% `    '1) b     !"   SV%c#'d)X      b      3    %'5)7   %8    3               % efgh\Z[\[iZjk elmnopnqnh] elmgrh]nsqnqnh]"    tu 1d+vd+V 1d+v55V     cV `S1V  cV `S1V T1 `S55  --&  w 1TvdT 1Yv5+   w 1+v5 1+v+ `b  w dV`5 dV`+ b !" w +V cV b!"  xy  z[S+   !" !"   4  {[V-2     SbS6  |X   !"     3 |#"     3 b1V#     }h\gh\Z[\[i[jk elmnopnqnh] elmgrh]nsqnqnh]-4   w[15+ dVV b      w[15V 1YVX  '77) ` ~w 15V`1SSv1c5 b      [S%V S%1SX   3 ^cV.b 3  ^+Vvc b  1V#'77)    €Sc Sd&        +‚   #" #"   4  {[dV-     S%V0      'W ) V%+ vV%+ -4$  ƒYT%+ YT%c"." $  ƒYT YTX      {u cV„_j^[fej[rZ[\[#     5V…" cV…"'5V…C S5V…C)8    5‚ SVV‚'  )!""    "5!  '†b‡b!) 1S1'%dˆ)bST+'c%Yˆ)bdV%1'S%1ˆ)‡ S%V4'1%d )"  X    v #    ‰#   S cV/#-   -!d.    "            . %  `62b     X. #&c`  j}„gre[fj_"    "#81S'67ST5S(#)67c1SVYS67ST5S`...S+5TC""- S+"/".(VVVd"/"#X`"(#"11%1X%SVT%SVS&    677 -28 (! .3    X."1VS5X."1VSTX."1V1V  cYV%S1"11%S1VS8c51S8 (  -2( #"!"              %(-!(VVV1VS.X6(1V1SSVSY 2826 N Ridgewood St- 101118523 & 201823013/11/2024 X-IQ-AM1-240-4 The Enphase IQ Combiner 4/4C with Enphase IQ Gateway and integrated LTE-M1 cell modem (included only with IQ Combiner 4C) consolidates interconnection equipment into a single enclosure and streamlines IQ microinverters and storage installations by providing a consistent, pre-wired solution for residential applications. It offers up to four 2-pole input circuits and Eaton BR series busbar assembly. Enphase IQ Combiner 4/4C X-IQ-AM1-240-4 X-IQ-AM1-240-4C To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Networking Smart • Includes IQ Gateway for communication and control • Includes Enphase Mobile Connect cellular modem (CELLMODEM-M1-06-SP-05), included only with IQ Combiner 4C • Includes solar shield to match Enphase IQ Battery aesthetics and deflect heat • Flexible networking supports Wi-Fi, Ethernet, or cellular • Optional AC receptacle available for PLC bridge • Provides production metering and consumption monitoring Simple • Centered mounting brackets support single stud mounting • Supports bottom, back and side conduit entry • Up to four 2-pole branch circuits for 240 VAC plug-in breakers (not included) • 80A total PV or storage branch circuits Reliable • Durable NRTL-certified NEMA type 3R enclosure • Five-year limited warranty • Two years labor reimbursement program coverage included for both the IQ Combiner SKU's • UL listed X-IQ-AM1-240-4C To learn more about Enphase offerings, visit enphase.com © 2021 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ Combiner 4/4C, and other names are trademarks of Enphase Energy, Inc. Data subject to change. 10-21-2021 MODEL NUMBER IQ Combiner 4 (X-IQ-AM1-240-4) IQ Combiner 4 with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20 +/- 0.5%) and consumption monitoring (+/- 2.5%). Includes a silver solar shield to match the IQ Battery system and IQ System Controller 2 and to deflect heat. IQ Combiner 4C (X-IQ-AM1-240-4C) IQ Combiner 4C with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20 +/- 0.5%) and consumption monitoring (+/- 2.5%). Includes Enphase Mobile Connect cellular modem (CELLMODEM-M1-06-SP-05), a plug-and-play industrial-grade cell modem for systems up to 60 microinverters. (Available in the US, Canada, Mexico, Puerto Rico, and the US Virgin Islands, where there is adequate cellular service in the installation area.) Includes a silver solar shield to match the IQ Battery and IQ System Controller and to deflect heat. ACCESSORIES AND REPLACEMENT PARTS (not included, order separately) Ensemble Communications Kit COMMS-CELLMODEM-M1-06 CELLMODEM-M1-06-SP-05 CELLMODEM-M1-06-AT-05 - Includes COMMS-KIT-01 and CELLMODEM-M1-06-SP-05 with 5-year Sprint data plan for Ensemble sites - 4G based LTE-M1 cellular modem with 5-year Sprint data plan - 4G based LTE-M1 cellular modem with 5-year AT&T data plan Circuit Breakers BRK-10A-2-240V BRK-15A-2-240V BRK-20A-2P-240V BRK-15A-2P-240V-B BRK-20A-2P-240V-B Supports Eaton BR210, BR215, BR220, BR230, BR240, BR250, and BR260 circuit breakers. Circuit breaker, 2 pole, 10A, Eaton BR210 Circuit breaker, 2 pole, 15A, Eaton BR215 Circuit breaker, 2 pole, 20A, Eaton BR220 Circuit breaker, 2 pole, 15A, Eaton BR215B with hold down kit support Circuit breaker, 2 pole, 20A, Eaton BR220B with hold down kit support EPLC-01 Power line carrier (communication bridge pair), quantity - one pair XA-SOLARSHIELD-ES Replacement solar shield for IQ Combiner 4/4C XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 4/4C (required for EPLC-01) XA-ENV-PCBA-3 Replacement IQ Gateway printed circuit board (PCB) for Combiner 4/4C X-IQ-NA-HD-125A Hold down kit for Eaton circuit breaker with screws. ELECTRICAL SPECIFICATIONS Rating Continuous duty System voltage 120/240 VAC, 60 Hz Eaton BR series busbar rating 125 A Max. continuous current rating 65 A Max. continuous current rating (input from PV/storage) 64 A Max. fuse/circuit rating (output) 90 A Branch circuits (solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation (DG) breakers only (not included) Max. total branch circuit breaker rating (input) 80A of distributed generation / 95A with IQ Gateway breaker included Production metering CT 200 A solid core pre-installed and wired to IQ Gateway Consumption monitoring CT (CT-200-SPLIT) A pair of 200 A split core current transformers MECHANICAL DATA Dimensions (WxHxD)37.5 x 49.5 x 16.8 cm (14.75” x 19.5” x 6.63”). Height is 21.06" (53.5 cm) with mounting brackets. Weight 7.5 kg (16.5 lbs) Ambient temperature range -40º C to +46º C (-40º to 115º F) Cooling Natural convection, plus heat shield Enclosure environmental rating Outdoor, NRTL-certified, NEMA type 3R, polycarbonate construction Wire sizes • 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors • 60 A breaker branch input: 4 to 1/0 AWG copper conductors • Main lug combined output: 10 to 2/0 AWG copper conductors • Neutral and ground: 14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Altitude To 2000 meters (6,560 feet) INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b/g/n Cellular CELLMODEM-M1-06-SP-05, CELLMODEM-M1-06-AT-05 (4G based LTE-M1 cellular modem). Note that an Enphase Mobile Connect cellular modem is required for all Ensemble installations. Ethernet Optional, 802.3, Cat5E (or Cat 6) UTP Ethernet cable (not included) COMPLIANCE Compliance, IQ Combiner UL 1741, CAN/CSA C22.2 No. 107.1, 47 CFR, Part 15, Class B, ICES 003 Production metering: ANSI C12.20 accuracy class 0.5 (PV production) Consumption metering: accuracy class 2.5 Compliance, IQ Gateway UL 60601-1/CANCSA 22.2 No. 61010-1 Enphase IQ Combiner 4/4C 2826 N Ridgewood St- 101118523 & 201823013/11/2024                              !    "              "       !  $   % !    "   &       '    !        ( "     %    ) .- /,,- D E#$ !    F  !'       * .- -G -H I*E .*EJ K  $ L!  "  #M L!  -./-N N-*E D O   P M L   " QRS  -N/,) *U - )  /V*EW   X , **[-N /,- 3926A=>267 \09739A ] 1=6^>::64\?67 1>=2:L!     R !   !_        '  !    "        !    "         `!      Q_  !'   ! "  " ! !        Y- ** O096 1=07C82 ^ 4>9@ >11?38>2309:a$   !              L !         "     ' $  ! !    ( "       W'  !(      _      ! $ `          -N N-*E 76:3A9 1?>2b0=4 >2 @0C= :6=<386L     !   `  "  "$ " QRS (  "       !         !   ! $ ! #' ! $        (         `  !$ "  $   c " `$  $   `  " ! d   e            ( `     * -E -N IN*E *N/, * -E -N IN*E ,*/- I * -E -N IN*E*/*Y- -  fg H*- E-- * -E -N IN*Eh) fg hI IVI- H Oijklm nopqo rjst utjvowm mj wxpkwoy zk{tpw xp| mxo }kpkw{pn           $  ~'   ! " $    '      €spn{mr ‚ƒ„…†‡ƒzˆ‰ {| wjqotoŠ ‹r p mŒokmr }qo Ž ropt n{‘{moŠ utjŠswm Œpttpkmr pkŠ p }qo ropt n{‘{moŠ }k{|x Œpttpkmr -/.*/ ,, Qe      !    "  %           !  W  $  !       ( !           $ |{‘un{}o| rjst uot‘{mm{k’ pkŠ utjvowm unpkk{k’ utjwo|| ST—˜TP  PKQT—˜TPMFL~WT˜LWJ JW—˜TP#c#&FM ˜KF LJW##˜˜LW&˜T™š› œ š ž /- *)*-N Z* O ,Y*N-zk{tpw {| mxo jknr Ÿ  ‘jskm{k’ qokŠjt Œ{mx ¡‚ƒ wotm{}wpm{jk| ¢jt £¤¤¥¦Ž¤¥ y ¥§¤¤¥¦Ž¤¥ pkŠ ƒ¨‚…‚ ¥©¤¤¥¦Ž¤¤ªy Œx{wx ‘opk| Œo Šon{qot mxo x{’xo|m |mpkŠptŠ| ¢jt }my ¢jt‘y pkŠ ¢skwm{jk ‰xo|o wotm{}wpm{jk| Šo‘jk|mtpmo jst o«wonnokwo pkŠ wj‘‘{m‘okm mj }t|m wnp|| ‹s|{ko|| utpwm{wo| Ÿz¬Ž¤¥ª­®¬Ž© ¯ Ÿ†¡ˆ‰®i 2826 N Ridgewood St- 101118523 & 201823013/11/2024                                  !  "      !       # "  $   &     %  '    ()*+ #+,  "  $        -      .  -  % !  !  -  /   0' &  $ - ! 12 34 5647 : :; 911)      -     -    ! "      12 1A: B:;9C     D      E    F   % G    #  "  $  HIIJ -    ,-" K -LMN8;;O LP:# "  $  %  &      Q         ,-" K -G E QD :;:;O :1 :NDaa BLPO O9Lb;P 9LP :;: PO AQQD 9LP :;:efghgijklmnolpqqprsjtg uv?w>==>wuxv yzu{|:;8 D} ;2A9;*  $    -   -   ,         -     *   %    -         0 $  %     ~"  X+   +*0Y     -  -  / %"       -  -   €  89;NLP:#         -     !    H ‚^ƒ %-                    ,   !    `‚ ]ƒ          ! % ! -!   X/ ! „,.U) , *) …+# C)… #+,,XX+ #     "     ~   :;8 E} ;)    WX)(, $       )&    / % $  U-   '     U-   '  -        !   %  "   !        - $  % X+ C     $  % -  %  $  &  ! ~ ‚&  -  % -         A; 1PT APL92 8891b;O ;P:}    0  [I!    YH! † ^[II!  † #^?|>=>vw y>‡ ˆ‰Š‹Œ 2826 N Ridgewood St- 101118523 & 201823013/11/2024 76 North Meadowbrook Drive Scott E. Wyssling, PE Alpine, UT 84004 Coleman D. Larsen, SE, PE office (201) 874-3483 Gregory T. Elvestad, PE swyssling@wysslingconsulting.com October 26, 2022 Current Insight 2852 W. Amini Way South Jordan, UT 84095 Re: Engineering Services Lopez Residence 2826 Ridge Wood Street, Santa Ana, CA 8.400 kW System To Whom It May Concern: We have received information regarding solar panel installation on the roof of the above referenced structure. Our evaluation of the structure is to verify the existing capacity of the roof system and its ability to support the additional loads imposed by the proposed solar system. A.Site Assessment Information 1.Site visit documentation identifying attic information including size and spacing of framing for the existing roof structure. 2.Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information will be utilized for approval and construction of the proposed system. B.Description of Structure: Roof Framing: Prefabricated wood trusses at 24” on center. All truss members are constructed of 2x4 dimensional lumber. Roof Material: Composite Asphalt Shingles Roof Slope: 18 degrees Attic Access: Accessible Foundation: Permanent C.Loading Criteria Used •Dead Load o Existing Roofing and framing = 7 psf o New Solar Panels and Racking = 3 psf o TOTAL = 10 PSF •Dead Load o Existing Roofing and framing = 7 psf o New Solar Panels and Racking = 3 psf o TOTAL = 10 psf •Live Load = 20 psf (reducible) – 0 psf at locations of solar panels •Ground Snow Load = 0 psf •Wind Load based on ASCE 7-16 o Ultimate Wind Speed = 95 mph (based on Risk Category II) o Exposure Category C Analysis performed of the existing roof structure utilizing the above loading criteria is in accordance with the 2022 California Building Code, including provisions allowing existing structures to not require strengthening if the new loads do not exceed existing design loads by 105% for gravity 2826 N Ridgewood St- 101118523 & 201823013/11/2024 Page 2 of 2 elements and 110% for seismic elements. This analysis indicates that the existing framing will support the additional panel loading without damage, if installed correctly. D.Solar Panel Anchorage 1.The solar panels shall be mounted in accordance with the most recent Unirac installation manual. If during solar panel installation, the roof framing members appear unstable or deflect non - uniformly, our office should be notified before proceeding with the installation. 2.The maximum allowable withdrawal force for a 5/16” lag screw is 235 lbs per inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications. Based on a minimum penetration depth of 2½”, the allowable capacity per connection is greater than the design withdrawal force (demand). Considering the variable factors for the existing roof framing and installation tolerances, the connection using one 5/16” diameter lag screw with a minimum of 2½” embedment will be adequate and will include a sufficient factor of safety. 3.Considering the wind speed, roof slopes, size and spacing of framing members, and condition of the roof, the panel supports shall be placed no greater than 72” on centers. 4.Panel supports connections shall be staggered to distribute load to adjacent framing members. Based on the above evaluation, this office certifies that with the racking and mounting specified, the existing roof system will adequately support the additional loading imposed by the solar system. This evaluation is in conformance with the 2022 California Building Code, current industry standards, and is based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. 2826 N Ridgewood St- 101118523 & 201823013/11/2024 Wyssling Consulting 76 N. Meadowbrook Drive Alpine, UT 84004 (201) 874-3483 swyssling@wysslingconsulting.com Existing Lopez Residence Roof Dead Load 2826 Ridge Wood Street 2.0 psf Composite Shingle Santa Ana, CA 1.4 psf 7/16" Plywood Sheathing 2.3 psf 2x4 Trusses @ 24 in. o.c. 1.0 psf Ceiling, Mechanical, Electrical 5.8 psf Stucco Ceiling 12.5 psf TOTAL Second Floor Dead Load 0 psf Floor Finishes 0 psf 1 1/8" Subfloor Sheathing 0 psf Joists @ 16' o.c. 0 psf Partitions 0 psf Ceiling, Mechanical, Electrical 0 psf Miscellaneous 0 psf TOTAL Roof Live Load Floor Live Load 20 psf 0 psf Roof Snow Load Ground SnowLoad=0 psf (to be divided by cosine of roof angle for horizontal projection ASCE 7 Sec. 7.4) pf = 0.7 Ce Ct I pg =0 psf Ce = 1, Ct = 1.1 Flat Roof Snow Load (ASCE 7-16 Eq. 7.3-1) Cs =0.95 ASCE 7-16 Figure 7.4-1 Additional Roof Dead Load - New Solar Panels 2 psf Roof Live Load at Solar Panels 0 psf Roof Snow Load at Solar Panels 0 psf Sloped Roof Snow Load (ASCE 7-16 Eq. 7.4-1) Total Total Existing Roof Load = (DLROOF + Max(LLROOF or S)) AreaROOF 98215 lbs Total New Roof Load = (DLROOF + DLADD + Max(LLROOF or S)) AreaROOF 89976 lbs Change in Demand = (Total New Roof Load - Existing Roof Load) / Existing Roof Load -8.39% 2018 IEBC Section 807.4 states: "Existing structural elements supporting any additional gravity loads as a result of the alterations, including the effects of snow drift , shall comply with the International Building Code. EXCEPTION: 1. Structural elements whose stress is not increased by more than 5%." Gravity Loads Total New Gravity Loads are less than Existing Loads. OK 10/26/2022 2826 N Ridgewood St- 101118523 & 201823013/11/2024 Wyssling Consulting 76 N. Meadowbrook Drive Alpine, UT 84004 (201) 874-3483 swyssling@wysslingconsulting.com V =95 Basic Wind Speed Lopez Residence Exposure C ASCE 7-16, Section 26.7 2826 Ridge Wood Street Kz =0.85 Velocity Pressure Coefficient, ASCE 7-16, Figure 26.10-1 Santa Ana, CA Kzt =1 Topographic Factor, ASCE 7-16, Section 26.8.2 Kd =0.85 Directionality Factor, ASCE 7-16, Section 26.6 Ke =0.996 Ground Elevation Factor, ASCE 7-16, Section 26.9 qh =16.6 psf qh = 0.00256KzKztKdKeV2 (ASCE 7-16 Eq. 26.10-1) Roof Angle =18 deg Roof Type Gable sanchor =72 in Horizontal spacing of roof anchors Atrib =17.27 sf Panel Area tributary to each roof anchor GCp External Pressure Coefficient, ASCE 7-16, Figure 30.3-2 Roof Zone Zone 1 2e 2n 2r 3e 3r -2.00 -2.00 -2.94 -2.94 -2.94 -3.45 ga =0.77 Pressure Equalization Factor, ASCE 7-16 Figure 29.4.-8 gE =1.00 Edge Array Factor, ASCE 29.4.4 edges < 0.5*building height, and panel spacing < 4ft. pnet = qhGCpgEga =Design Wind Pressure, ASCE 7-16, Equation 29.4-7 Roof Zone 1 2e 2n 2r 3e 3r -26 psf -26 psf -38 psf -38 psf -38 psf -44 psf Min Pressure = -16 psf Use 26 psf Use 26 psf Use 38 psf Use 38 psf Use 38 psf Use 44 psf ULTIMATE x 0.6 =16 psf 16 psf 23 psf 23 psf 23 psf 26 psf ALLOWABLE Connection to Existing Roof Framing F.S. =1 Additional Factor of Safety applied to withdrawl force, if desired Atrib =17.3 ft2 DLpanel =2 psf Roof Zone 1 2e 2n 2r 3e 3r Wuplift =26 psf 26 psf 38 psf 38 psf 38 psf 44 psf Plag = F.S. x Atrib x (0.6D - 0.6W) =Withdrawl force for each roof anchor Roof Zone 1 2e 2n 2r 3e 3r -238.7 lbs -238.7 lbs -362.9 lbs -362.9 lbs -362.9 lbs -431.1 lbs Connection Capacity db =5/16 in Lag Screw diameter Dpen =2 1/2 in Lag Screw penetration into existing framing member No. of Screws 1 Screws per Connection Species of wood framing CD =1.6 Load Duration Factor for Wind Loading, NDS Table 2.3.2 Ct =0.7 Temperature Factor, NDS Table 10.3.4 W =266 lb/in Withdrawl Capacity, NDS Equation 11.2-1 W' = CD x Ct x W =298 lb/in Adjusted withdrawl value Pallow = Dpen x W' =745 lbs Roof Zone 1 2e 2n 2r 3e 3r DEMAND =239 lbs 239 lbs 363 lbs 363 lbs 363 lbs 431 lbs CAPACITY =745 lbs 745 lbs 745 lbs 745 lbs 745 lbs 745 lbs up to72in ok up to72in ok up to72in ok up to72in ok up to72in ok up to72in ok This analysis calculates the capacity of the lag screws only. For capacity of the complete mounting system, please see manufacturer's recommendations. Douglas Fir-Larch Wind Uplift Rooftop Solar Panels Parallel to Roof Surface ASCE 7-16, Section 29.4.4 10/26/2022 2826 N Ridgewood St- 101118523 & 201823013/11/2024 To: City of Palmdale Project name: Anthony Garcia Project Address: 38962 Edgemont Drive RESPONSE SHEET 1. Added note: All work done in a neat and workmanlike manner. (CEC 110.12) PV-2 2. Specified AC disconnect is rapid shutdown. PV-2 3. Specified green line is conduit run. No expansion fittings will be installed. PV-3 4. Corrected size of main breaker. Interconnection to be load side breaker. MPU to 150A busbar with 100A main breaker. PV-6 5. Added note: Main panel will be installed at the opposite end of the busbar from the main breaker PV-6 6. Added note: Warning inverter output connection. Do not relocate this overcurrent device. (CEC 705.12 D7) PV-6 7. Provided photo of existing panel PV-9 Thank you Complete Solar 3000 Executive Pkwy Suite #504 San Ramon, CA 94583 Phone Number: (877) 299-4943 Signature: Email: Roberto Lopez (May 9, 2023 20:15 PDT) 2826 N Ridgewood St- 101118523 & 201823013/11/2024 1683230394-needdocu-signedRobertoLopez (1) Interim Agreement Report 2023-05-24 Created:2023-05-09 By:Complete solar (salessupport@completesolar.com) Status:Out for Signature Transaction ID:CBJCHBCAABAAW1RUC9ng70TOsP8OIbxLWcsE8EAtDrcE Agreement History Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will be generated when the agreement is complete. "1683230394-needdocu-signedRobertoLopez (1)" History Document created by Complete solar (salessupport@completesolar.com) 2023-05-09 - 11:08:58 PM GMT- IP address: 186.77.205.88 Document emailed to esmelopez24@yahoo.com for signature 2023-05-09 - 11:11:04 PM GMT Email viewed by esmelopez24@yahoo.com 2023-05-10 - 3:09:36 AM GMT- IP address: 104.28.85.113 Signer esmelopez24@yahoo.com entered name at signing as Roberto Lopez 2023-05-10 - 3:15:39 AM GMT- IP address: 104.34.211.3 Document e-signed by Roberto Lopez (esmelopez24@yahoo.com) Signature Date: 2023-05-10 - 3:15:41 AM GMT - Time Source: server- IP address: 104.34.211.3 Document emailed to sperez@completesolar.com for signature 2023-05-10 - 3:15:42 AM GMT Email viewed by sperez@completesolar.com 2023-05-10 - 5:48:16 PM GMT- IP address: 66.249.83.202 2826 N Ridgewood St- 101118523 & 201823013/11/2024 Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 2826 N Ridgewood St- 101118523 & 201823013/11/2024 Expedited Permit Process for PV Systems — Micro-Inverter 2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 2826 N Ridgewood St- 101118523 & 201823013/11/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan             2826 N Ridgewood St- 101118523 & 201823013/11/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone:One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT 2826 N Ridgewood St- 101118523 & 201823013/11/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone:Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO-INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE.b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram 2826 N Ridgewood St- 101118523 & 201823013/11/2024 2826 N Ridgewood St- 101118523 & 201823013/11/2024 I, Roberto Lopez, the homeowner at (2826 Ridgewood St Santa Ana, CA 92705), am writing this letter to inform you that we have elected to cancel our agreement with (Any other solar company) and moving forward with Complete Solar as my Solar Contractor. Please cancel the existing solar permit that was originally applied for by (The other solar company) and accept the application from Complete Solar. Roberto Lopez __________________ 10/28/2022 2826 N Ridgewood St- 101118523 & 201823013/11/2024