Loading...
HomeMy WebLinkAbout2960 S Greenville St Unit #B - PlanPOINT OF DELIVERY AND INTERCONNECTION 40A N 3 EXISTING 240V/100A MAIN SERVICE PANEL SINGLE PHASE BACKFEED BREAKER M M M M M M 100A (E) 240V/125A SUB SERVICE PANEL SINGLE PHASE (N) VISIBLE LOCKABLE 2 POLE 60A 'KNIFE' AC DISCONNECT AC DISCONNECT TO BE LOCATED WITHIN 10' OF METER 3 EXISTING WIRES N RO O F T OP GR O U N D L E V E L - HOU S E E X T ER I O R 20A 20A N 2 (N) JUNCTION BOX WITH IRREVERSIBLE GROUND SPLICE NOTE: IN BETWEEN EACH ARRAY THE EMT IS USED AS THE GROUNDING / BONDING, GROUND CLAMPS ARE AT EACH END OF THE EMT CONDUIT WITH THE WIRE THEN FREE AIR'D TO THE GROUND CLAMP ON THE RACKING RAIL (N) 100A PV LOAD CENTER (N) (19) SOLAREVER SE-182*91-410M-108 (410W) MODULES WITH (8) AP SYSTEM DS3-L 2 IN 1 MICRO-INVERTER ATTACHED TO THE BACK OF MODULE 112 1 1 PV CIRCUIT 1: 10 MODULES/PARALLEL [(5) AP SYSTEM DS3-L 2 IN 1] PV CIRCUIT 2: 9 MODULES/PARALLEL [(5) AP SYSTEM DS3-L 2 IN 1] 112 10 9 4 3 9 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 2960 S GREENVILLE ST UNIT B, SANTA ANA, CA 92704 APN:93307090 DATE:4/26/2023 PIZANO RESIDENCE License#: C-10 1053344 DESIGNER: OJS CORE ENERGY GROUP. ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 E-1 DESIGN TEMPERATURES ASHRAE EXTREME LOW -1°C ASHRAE 2% HIGH 36°C PV Module Ratings @ STC Module Make/Model SOLAREVER SE-182*91-410M-108 (410W) MODULE Max Power-Point Current (Imp)13.08A Max Power-Point Voltage (Vmp)31.35V Open-Circuit Voltage (Voc)37.12V Short-Circuit Current (Isc)13.96A Max Series Fuse (OCPD)25A Nominal Maximum Power at STC (Pmax)410W Maximum System Voltage 1500V Voc Temperature Coefficient -0.29% /°C Conduit and Conductor Schedule ~ (75°C Copper Column) Tag Description Wire Gauge # of Conductors Conduit Type Conduit Size 1 PV WIRES 12 AWG 2 N/A - Free Air N/A - Free Air 1 Bare Copper Ground (EGC/GEC) 6 AWG 1 N/A - Free Air N/A - Free Air 2 THWN-2 10 AWG 4 EMT 3/4" 2 THWN-2 - Ground 8 AWG 1 EMT 3/4" 3 3 THWN-2 8 AWG 3 EMT 3/4" THWN-2 - Ground 8 AWG 1 EMT 3/4" SUB SERVICE PANEL 240/120V 1Ø, 3W MAIN BUSS: 125A MAX BREAKER SIZE: (125A X 1.2) - 100A = 50A Inverter Ratings Inverter Make/Model AP SYSTEM DS3-L Max DC Volt Rating 60V Peak Output Power 768W Max Nominal Voltage 240V Max AC Current 3.2A Max OCPD Rating 20A METER # 222013 034146 SYSTEM SUMMARY BRANCH #1 INVERTERS PER BRANCH MAX AC CURRENT MAX AC OUTPUT POWER ARRAY STC POWER ARRAY PTC POWER MAX AC CURRENT MAX AC POWER DERATED (CEC) AC POWER BRANCH #2 5 16A 3840W 5 16A 3840W 7790W 7273W 32A 7680W 7018.270W 2960 S Greenville St Unit B - 2017942605/04/23 N 1. NOT ALL PLACARDS SHOWN MAY BE REQUIRED BY LOCAL AHJ. CONTRACTOR TO VERIFY PLACARD REQUIREMENTS WITH LOCAL AHJ BEFORE INSTALLATION. 2. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OF THE CALIFORNIA ELECTRICAL CODE 3. ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC, ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTING COLOR TO THE PLAQUE. THIS PLAQUE WILL BE ATTCHED BY POP RIVETS OR SCREWS OR OTHER APPROVED METHOD. 4. DIRECTORY PLACARD MARKING CONTENT AND FORMAT: RED BACKGROUND, WHITE LETTERING, MINIMUM 3/8" LETTER HIEGHT, ALL CAPITAL LETTERS, ARIAL OR SIMILAR FONT, NON BOLD, REFLECTIVE WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT. PERMANENT SIGNAGE NOTES: WARNING! DO NOT RELOCATE THIS OVERCURRENT DEVICE POWER SOURCE OUTPUT CONNECTION LABEL LOCATION: ADJACENT TO PV BREAKER (IF APPLICABLE). PER CODE(S): CEC 2022: 705.12(B)(3)(2) ! DO NOT ADD LOADS PHOTOVOLTAIC SYSTEM COMBINER PANEL WARNING LABEL LOCATION: PHOTOVOLTAIC AC COMBINER (IF APPLICABLE). PER CODE(S): CEC 2022: 705.12(B)(3)(3) SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY. LABEL LOCATION: ON OR NO MORE THAT 3 M (10 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. ELECTRICAL SHOCK HAZARD WARNING! LABEL LOCATION: INVERTER(S), AC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2022: 706.15(C)(4) & 690.13(B) TERMINALS ON LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM LABEL LOCATION: UTILITY SERVICE ENTRANCE/METER, INVERTER/DC DISCONNECT IF REQUIRED BY LOCAL AHJ, OR OTHER LOCATIONS AS REQUIRED BY LOCAL AHJ. PER CODE(S): CEC 2022: 690.56(C)(2), CFC 2022: 1204.5.3 POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS AS SHOWN CAUTION: MAXIMUM AC OPERATING CURRENT: NOMINAL OPERATING AC VOLTAGE: 32.0 AMPS 240.0 VAC PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2022: 690.54 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 2960 S GREENVILLE ST UNIT B, SANTA ANA, CA 92704 APN:93307090 DATE:4/26/2023 PIZANO RESIDENCE License#: C-10 1053344 DESIGNER: OJS CORE ENERGY GROUP. ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 E-2 29 6 0 S GR E E N V I LL E S T UN I T B WARNING! THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR. PV INTERCONNECTION POINT. LOCATION OF AC DISCONNECT & PV LOAD CENTER (N) SOLAR PANELS AND MICRO-INVERTERS ON ROOF LOCATION OF METER MAIN COMBO. 2960 S Greenville St Unit B - 2017942605/04/23 3' 3'3' 3' 3' 3' 3' 3' N SCALE: 1/16" = 1'-0" PV SYSTEM SITE PLAN PV SYSTEM SIZE: 7.79 kW DC LEGEND CONSTRUCTION NOTESLOCATION OF METER MAIN COMBO, MOUNTED ON EXTERIOR WALL OF A SINGLE FAMILY RESIDENCE. NEW SOLAR PANELS (19) SOLAREVER SE-182*91-410M-108 (410W) WITH (10) AP SYSTEM DS3-L MICROINVERTERS MOUNTED TO THE BACK OF MODULES MOUNTED ON COMP SHINGLE ROOF 29 6 0 S G R E E N V I L L E S T UN I T B ROOF OBSTRUCTIONS SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 2960 S GREENVILLE ST UNIT B, SANTA ANA, CA 92704 APN:93307090 DATE:4/26/2023 PIZANO RESIDENCE License#: C-10 1053344 DESIGNER: OJS CORE ENERGY GROUP. ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 PV-1 Roof Azimuth: 270 ° Roof Tilt: 18° Roof Section 2 LC LOAD CENTER DRIVEWAY LC LOCATION OF "RAPID SHUTDOWN" AC DISCONNECT CEC 690.12 Roof Azimuth: 90° Roof Tilt: 18° Roof Section 1 ACD AC DISCONNECT M M METER MAIN COMBO CAL-FIRE ROOF LADDER ACCESS POINT CAL-FIRE ROOF LADDER ACCESS POINT 1. SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIAL STRUCTURE. 2. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH THE CBC SECTION 1609 TO WITHSTAND A BASIC WIND SPEED OF 110 MPH (3 SECOND GUST), WIND EXPOSURE C. 3. THE ROOF MEMBERS ARE 2 "X 4" TRUSSES AT 24" ON CENTER. CONNECTION TO STRUCTURE SHALL NOT BE WITHIN 11" OF NAILING PLATES. 4. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 5. ALL CONDUCTORS AND CONDUITS MOUNTED ON ROOF SHALL BE MINIMUM 7/8" ABOVE ROOF SURFACE (INCLUDING CABLES UNDERNEATH MODULES AND RACKING). 6. ROOF ACCESS POINTS SHALL BE PROVIDED PER THE FOLLOWING (CRC R324.7.1, CBC 3111.2.1) 6.1. LOCATED IN AREAS NOT REQUIRING PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS DOORS OR WINDOWS. 6.2. LOCATED AT STRONG POINTS OF CONSTRUCTION IN LOCATIONS WHERE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS: TREES, WIRES, OR SIGNS. 7. SETBACKS AT RIDGES CAN BE REDUCED TO 18 INCHES IN COMPLIANCE WITH 2022 CFC/2021 IFC 1205.2.1.2 TOTAL PLAN VIEW AREA = 5013.8 SQFT TOTAL PV AREA = 19(67.87 IN)(44.64 IN)/(144 IN^2) = 399.75 SQFT =(399.75 SQFT/ 5013.8 SQFT)100 = 7.97% TOTAL PV AREA FOR EXISTING SYSTEM =17(65 IN)(39 IN)/(144 IN^2) = 299.27 SQFT =(299.27 SQFT/ 5013.8 SQFT)100 =9.01% AC D SS P CAL-FIRE ROOF LADDER ACCESS POINT PV INTERCONNECTION POINT. LOCATION OF SUB SERIVCE PANEL,LOAD CENTER & AC DISCONNECT MOUNTED ON INTERIOR WALL OF A SINGLE FAMILY RESIDENCE. 2960 S Greenville St Unit B - 2017942605/04/23 6' 6' 6' N N SCALE: 1/8" = 1'-0" PV SYSTEM MOUNTING DETAILS EVEREST SPLICE FOOT XL FOR COMP SHINGLE @ 72" O.C. MAX PROPOSED EVEREST CROSSRAIL RACKING PROPOSED SOLAREVER SE-182*91-410M-108 (410W) PV SOLAR MODULES EXISTING 2 "X 4" ROOF TRUSSES @ 24"O.C. SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 2960 S GREENVILLE ST UNIT B, SANTA ANA, CA 92704 APN:93307090 DATE:4/26/2023 PIZANO RESIDENCE License#: C-10 1053344 DESIGNER: OJS CORE ENERGY GROUP. ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 PV-2 Roof Azimuth: 270° Roof Tilt: 18° Roof Section 2 EXISTING COMP SHINGLE ROOF Roof Azimuth: 90° Roof Tilt: 18° Roof Section 1 2960 S Greenville St Unit B - 2017942605/04/23 RO O F S L O P E 910 10 6 21 7 S-5 D5 20 11 1214 13 15 18 22 S-5 D4 3 1 5 4 25 24 23 8 26 2 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 2960 S GREENVILLE ST UNIT B, SANTA ANA, CA 92704 APN:93307090 DATE:4/26/2023 PIZANO RESIDENCE License#: C-10 1053344 DESIGNER: OJS CORE ENERGY GROUP. ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 D4 DETAIL (TRANSVERSE) NOT TO SCALE D5 DETAIL (LONGITUDINAL) NOT TO SCALE D1 RACKING DETAIL (TRANSVERSE) NOT TO SCALE D3 RACKING DETAIL (TOP) NOT TO SCALE D2 RACKING DETAIL (LONGITUDINAL) NOT TO SCALE 1. ROOF MATERIAL: COMP SHINGLE 2. ROOF STRUCTURE: TRUSSES 3. ATTACHMENT TYPE: EVEREST SPLICE FOOT XL 4. MODULE MANUFACTURER: SOLAREVER 5. MODULE MODEL: SE-182*91-410M-108 (410W) 6. MODULE LENGTH: 67.87'' 7. MODULE WIDTH: 44.64" 8. MODULE WEIGHT: 47.4 LBS. 9. SEE SHEET S-1 FOR DIMENSION(S) 10. MIN. FIRE OFFSET: 36" 11. TRUSSES SPACING: 24" O.C. 12. TRUSSES SIZE: 2 "X 4" NOMINAL 13. LAG BOLT DIAMETER: 5/16 IN. 14. LAG BOLT EMBEDMENT: 2.5 IN. 15. TOTAL # OF ATTACHMENTS: 35 16. TOTAL AREA: 399.75 SQ. FT. 17. TOTAL WEIGHT: 900.60 LBS. 18. WEIGHT PER ATTACHMENT: 25.73 LBS. 19. DISTRIBUTED LOAD: 2.25 PSF 20. MAX. HORIZONTAL STANDOFF: 72 IN. 21. MAX. VERTICAL STANDOFF: LANDSCAPE: 27 IN., PORTRAIT: 44 IN. 22. STANDOFF STAGGERING: YES 23. RAIL MANUFACTURER AND MODEL (OR EQUIV.):EVEREST CROSSRAIL 24. RAIL WEIGHT: 0.436 PLF. 25. MAX. TRUSSES SPAN: 12 FT. 26. MODULE CLEARANCE: 3 IN. MIN., 6 IN. MAX. PV-3 2960 S Greenville St Unit B - 2017942605/04/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 2960 S GREENVILLE ST UNIT B, SANTA ANA, CA 92704 APN:93307090 DATE:4/26/2023 PIZANO RESIDENCE License#: C-10 1053344 DESIGNER: OJS CORE ENERGY GROUP. ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 S-1 2960 S Greenville St Unit B - 2017942605/04/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 2960 S GREENVILLE ST UNIT B, SANTA ANA, CA 92704 APN:93307090 DATE:4/26/2023 PIZANO RESIDENCE License#: C-10 1053344 DESIGNER: OJS CORE ENERGY GROUP. ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 S-2 2960 S Greenville St Unit B - 2017942605/04/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 2960 S GREENVILLE ST UNIT B, SANTA ANA, CA 92704 APN:93307090 DATE:4/26/2023 PIZANO RESIDENCE License#: C-10 1053344 DESIGNER: OJS CORE ENERGY GROUP. ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 S-3 2960 S Greenville St Unit B - 2017942605/04/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 2960 S GREENVILLE ST UNIT B, SANTA ANA, CA 92704 APN:93307090 DATE:4/26/2023 PIZANO RESIDENCE License#: C-10 1053344 DESIGNER: OJS CORE ENERGY GROUP. ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 S-4 2960 S Greenville St Unit B - 2017942605/04/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2. Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6. Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7. Will the PV system be installed without using any ballast system or counter-weight system? 8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M -19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 1053344 Solgen Construction, LLC Cole Farmer Permits@CoreEnergyGroup.com 559-462-6009 2960 S Greenville St, Unit B Santa Ana, CA 92704 04/27/2023 2960 S Greenville St Unit B - 2017942605/04/23 76 North Meadowbrook Drive Scott E. Wyssling, PE Alpine, UT 84004 Cole D. Larsen, SE, PE office (201) 874-3483 Gregory T. Elvestad, PE swyssling@wysslingconsulting.com March 31, 2023 Green World Renewable Energy 4408 Ritchie Highway Baltimore, MD 21225 Re: Engineering Services Pizano Residence 2960 S Greenville Street, UNIT B, Santa Ana, CA 9.216 kW System To Whom It May Concern: We have received information regarding solar panel installation on the roof of the above referenced structure. Our evaluation of the structure is to verify the existing capacity of the roof system and its ability to support the additional loads imposed by the proposed solar system. A. Site Assessment Information 1. Site visit documentation identifying attic information including size and spacing of framing for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information will be utilized for approval and construction of the proposed system. B. Description of Structure: Roof Framing: Assumed prefabricated wood trusses at 24” on center. All truss members are constructed of 2x4 dimensional lumber. Roof Material: Composite Asphalt Shingles Roof Slopes: 18 degrees Attic Access: Inaccessible Foundation: Permanent C. Loading Criteria Used • Dead Load o Existing Roofing and framing = 7 psf o New Solar Panels and Racking = 3 psf o TOTAL = 10 PSF •Live Load = 20 psf (reducible) – 0 psf at locations of solar panels • Ground Snow Load = 0 psf •Wind Load based on ASCE 7-16 o Ultimate Wind Speed = 110 mph (based on Risk Category II) o Exposure Category C Analysis performed of the existing roof structure utilizing the above loading criteria is in accordance with the 2022 California Residential Code, including provisions allowing existing structures to not require strengthening if the new loads do not exceed existing design loads by 105% for gravity elements and 110% for seismic elements. This analysis indicates that the existing framing will support the additional panel loading without damage, if installe d correctly. 2960 S Greenville St Unit B - 2017942605/04/23 Page 2 of 2 D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent K2 Systems installation manual. If during solar panel installation, the roof framing members appear unstable or deflect non - uniformly, our office should be notified before proceeding with the installation. 2. The maximum allowable withdrawal force for a 5/16” lag screw is 298 lbs per inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications. Based on two screws with a minimum penetration depth of 2½”, the allowable capacity per connection is greater than the design withdrawal force (demand). Considering the variable factors for the existing roof framing and installation tolerances, the connection using two 5/16” diameter lag screw with a minimum of 2½” embedment will be adequate and will include a sufficient factor of safety. 3. Considering the wind speed, roof slopes, size and spacing of framing members, and condition of the roof, the panel supports shall be placed no greater than 72” on center. Based on the above evaluation, this office certifies that with the racking and mounting specified, the existing roof system will adequately support the additional loading imposed by the solar system. This evaluation is in conformance with the 2022 CRC, current industry standards and practice, and is based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. Very truly yours, Scott E. Wyssling, PE California License No. 83664 2960 S Greenville St Unit B - 2017942605/04/23 SHEET # T-1 T-2 PV-1 PV-2 PV-3 E-1 E-2 S-1 S-2 S-3 S-4 SHEET NAME COVER SHEET PLAN NOTES SITE PLAN LAYOUT ATTACHMENT DETAILS MOUNTING DETAILS ELECTRICAL DIAGRAM WARNING LABELS SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET PROJECT INFORMATION PROPERTY OWNER NAME:LUIS PIZANO PHONE:- CONTRACTOR NAME:SOLGEN CONSTRUCTION PHONE:(559)442-9887 DESIGN SPECIFICATIONS OCCUPANCY: R-3 CONSTRUCTION TYPE: SINGLE FAMILY RESIDENCE ZONING: RESIDENTIAL GROUND SNOW LOAD: 0 PSF WIND EXPOSURE: C WIND SPEED: 110 MPH APPLICABLE CODES & STANDARDS 2022 CALIFORNIA RESIDENTIAL CODE (CRC) 2022 CALIFORNIA BUILDING CODE (CBC) 2022 CALIFORNIA MECHANICAL CODE (CMC) 2022 CALIFORNIA ELECTRICAL CODE (CEC) 2022 CALIFORNIA PLUMBING CODE (CPC) 2022 CALIFORNIA ENERGY CODE (ENERGY) 2022 CALIFORNIA GREEN BUILDING CODE (CALGREEN) 2022 CALIFORNIA FIRE CODE (CFC) COORDINATES: 33.707375,-117.905653 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 2960 S GREENVILLE ST UNIT B, SANTA ANA, CA 92704 APN:93307090 DATE:4/26/2023 PIZANO RESIDENCE License#: C-10 1053344 DESIGNER: OJS CORE ENERGY GROUP. ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 T-1 AERIAL VIEW PIZANO RESIDENCE NEW PHOTOVOLTAIC SYSTEM PROJECT - 7.790 kW DC / 9.216 kW AC TYPE OF INTERCONNECTION: BACKFEED BREAKER IN THE SSP SCOPE OF WORK SYSTEM SIZE: STC: 19 X 410W = 7.790kW PTC: 19 X 382.78W = 7.273kW (19)SOLAREVER SE-182*91-410M-108 (410W) MODULES (10)AP SYSTEM DS3-L MICROINVERTERS (1)60A KNIFE AC DISCONNECT MSP UPGRADE: NO MAIN BREAKER DERATE: NO RACKING & MOUNTING PV ATTACHMENT TYPE: EVEREST SPLICE FOOT XL FOR COMP SHINGLE ROOF RACKING TYPE: EVEREST CROSSRAIL- ROOF MOUNT RACKING HARDWARE Bldg# 101114835 Elec# 20179426 Approved by M Smith 05/01/23 Issued 05/03/23 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 2960 S Greenville St Unit B - 2017942605/04/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 2960 S GREENVILLE ST UNIT B, SANTA ANA, CA 92704 APN:93307090 DATE:4/26/2023 PIZANO RESIDENCE License#: C-10 1053344 DESIGNER: OJS CORE ENERGY GROUP. ADDRESS: 2072 N MAIN ST FL 2, LOGAN UT 84341-1993 CSLB#: 1053344 T-2 1.1. PROJECT NOTES: 1.2. THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE 2022 CALIFORNIA ELECTRICAL CODE (CEC) ARTICLE 690, ALL MANUFACTURER’S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. 1.3. THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION 1.4. GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH 2022 CEC 690.41(B) 1.5. ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY 2022 CEC 690.4 PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY 1.6. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO 2022 CEC 690.7. 1.7. ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING [ 2022 CEC 110.3]. 1.8. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE CEC AND AHJ. 1.9. SCOPE OF WORK: 1.10. PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT. 1.11. WORK INCLUDES: 1.12. PV ROOF ATTACHMENTS - EVEREST SPLICE FOOT XL FOR COMP SHINGLE ROOF 1.13. PV RACKING SYSTEM INSTALLATION - EVEREST CROSSRAIL ROOF MOUNT RACKING HARDWARE 1.14. PV MODULE AND INVERTER INSTALLATION - SOLAREVER SE-182*91-410M-108 (410W) MODULES / AP SYSTEM DS3-L MICROINVERTERS 1.15. PV EQUIPMENT GROUNDING 1.16. PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX 1.17. PV LOAD CENTERS (IF INCLUDED) 1.18. PV METERING/MONITORING (IF INCLUDED) 1.19. PV DISCONNECTS 1.20. PV GROUNDING ELECTRODE & BONDING TO (E) GEC 1.21. PV FINAL COMMISSIONING 1.22. (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV 1.23. SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE 1.24. SITE NOTES: 1.25. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 1.26. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 1.27. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 1.28. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION 2022 CEC 110.26. 1.29. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. 1.30. EQUIPMENT LOCATIONS: 1.31. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY 2022 CEC 110.26. 1.32. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY 2022 CEC 690.31 (A),(C) AND CEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C) 1.33. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO 2022 CEC 690.34. 1.34. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT . 1.35. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO 2022 CEC APPLICABLE CODES. 1.36. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. 1.37. STRUCTURAL NOTES: 1.38. RACKING SYSTEM 1.39. PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND 1.40. A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. 1.41. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED SEALED PER LOCAL REQUIREMENTS. 1.42. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 1.43. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 1.44. WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. 1.45. WIRING & CONDUIT NOTES: 1.46. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 1.47. CONDUCTORS SIZED ACCORDING TO 2022 CEC 690.8, 2022 CEC 690.7. 1.48. VOLTAGE DROP LIMITED TO 1.5%. 1.49. DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. 1.50. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [2022 CEC 110.15 1.51. GROUNDING NOTES: 1.52. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 1.53. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO 2022 CEC 690.43 AND MINIMUM 2022 CEC TABLE 250.122. 1.54. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORDING WITH 2022 CEC 250.134 AND 2022 250.136(A). 1.55. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO CEC 690.45 AND MICROINVERTER MANUFACTURER'S INSTRUCTIONS. 1.56. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 1.57. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 1.58. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [2022 CEC 250.119] 1.59. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH CEC 690.47 AND CEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO CEC 250, CEC 690.47 AND AHJ. 1.60. GROUND-FAULT DETECTION SHALL COMPLY WITH CEC 690.41 IN GENERAL AND CEC 690.41 (A)(1) SPECIFICALLY. 1.61. DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 1.62. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 1.63. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 1.64. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 1 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS ≤30V AND ≤240VA [CEC 690.12(B)]. LOCATION OF LABEL ACCORDING TO AHJ 1.65. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO CEC 690.8, 690.9, AND 240. 1.66. EQUIPMENT THAT IS LISTED, LABELED, OR BOTH SHALL BE INSTALLED AND USED IN ACCORDANCE WITH ANY INSTRUCTIONS INCLUDED IN THE LISTING OR LABELING. CEC 110.3(B). 1.67. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO CEC 690.11 AND UL1699B. 1.68. INTERCONNECTION NOTES: 1.69. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [2022 CEC 705.12] 1.70. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING [2022 CEC 705.12(B)(3)(2)] 1.71. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [2022 CEC 705.12(B)(3)(2)]. 1.72. AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO 2022 CEC 705.12 (B)(3)(3). 1.73. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO 2022 CEC 705.11 WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH 2022 CEC 230.42 1.74. BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [2022 CEC 705.12(E)]. 2960 S Greenville St Unit B - 2017942605/04/23