Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
3717 S Olive St - Plan
PR O J E C T : DRAWN BY: DATE: E1 SHEET NUMBER: REV DATE: REV NO:0 CORRECTED BY:---- 10/26/23 SU N T E R N A L C O N S T R U C T I O N I N C 56 7 1 S A N T A T E R E S A B L V D ST E 1 0 5 SA N J O S E , C A 9 5 1 2 3 Li c e n s e # 1 0 3 6 5 3 6 - B PR O J E C T : DRAWN BY: DATE: E1 SHEET NUMBER: REV DATE: REV NO:0 CORRECTED BY:---- 10/26/23 SU N T E R N A L C O N S T R U C T I O N I N C 56 7 1 S A N T A T E R E S A B L V D ST E 1 0 5 SA N J O S E , C A 9 5 1 2 3 Li c e n s e # 1 0 3 6 5 3 6 - B Ro s a F o n s e c a (7 1 4 ) 3 1 5 - 9 8 6 4 37 1 7 S o u t h O l i v e S t r e e t Sa n t a A n a , C a l i f o r n i a 9 2 7 0 7 NTS SHEET INDEX:VICINITY MAP SCOPE OF WORK: INSTALLATION OF (16) QCELL DUO BLK ML-G10 400W & (16) ENPHASE IQ8PLUS-72-2-US, (6.4 KW DC PHOTOVOLTAIC SYSTEM) Main Panel Upgrade: YES OCCUPANCY TYPE: R-3 CONSTRUCTION TYPE: V-B UNSPRINKLERED AHJ: CITY OF Rosa Fonseca 6.4 kW DC SOLAR PHOTOVOLTAIC SYSTEM 3717 South Olive Street Santa Ana, California 92707 E1 - COVER AND NOTES E2 - LABELS AND PLACARD E3 - PROPERTY PLAN E4- ROOF PLAN AND STRUCTURE E5 - ELECTRICAL SLD E5.1 ELECTRICAL CALC E6- GROUNDING SPECS GENERAL NOTES: 1. THIS SYSTEM COMPLIES WITH THE 2022 CRC, 2022 CBC, 2022 CFC, AND THE 2022 CEC. 2. THE SYSTEM WILL NOT BE TURNED-ON UNTIL THE SERVING UTILITY COMPANY HAS BEEN NOTIFIED. 3. THE INSTALLED SOLAR SYSTEM HAS A DISTRIBUTED WEIGHT LESS THAN 4 PSF. 4. THE CONCENTRATED LOAD FOR EACH VERTICAL SUPPORT IS LESS THAN 40 LBS. 5. ALL PV EQUIPMENT IS LISTED BY A RECOGNIZED TESTING LAB. INVERTERS ARE UL 1741 COMPLIANT. 6. THE BACKFED BREAKER WILL BE LOCATED AS FAR AS POSSIBLE FROM MAIN BREAKER ON THE BUS 7. CONDUCTORS ARE 75° C RATED . 8. ANY CONDUCTORS EXPOSED TO SUNLIGHT ARE LISTED AS SUNLIGHT RESISTANT. 9. IF DC CONDUCTORS ARE RUN INSIDE THE BUILDING, THEY WILL BE CONTAINED IN A METAL RACEWAY. 10. ANY CONDUCTORS BETWEEN SEPARATE ARRAYS ON THE ROOF WILL BE PROTECTED IN CONDUIT. 11. THE EQUIPMENT GROUNDING CONDUCTOR ON THE ROOF WILL BE PROTECTED FROM PHYSICAL DAMAGE. IT WILL BE TUCKED NEATLY UNDER THE MODULES AND RAILS AND SECURED IN PLACE. 12. THE MODULES WILL BE ATTACHED TO THE EQUIPMENT GROUNDING CONDUCTOR IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. 13. ALL EXTERIOR CONDUIT, FITTINGS AND BOXES ARE RAIN-TIGHT AND APPROVED FOR USE IN WET LOCATIONS. 14. CLEARANCES AROUND ALL ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH CEC 110.26. 15. SOLAR MODULES WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL OR BUILDING ROOF VENTS. 16. IN EXISTING ELECTRICAL SYSTEMS THAT USE ONLY ONE GROUNDING ( NOT UFER ) ELECTRODE ROD, AN ADDITIONAL GROUNDING ELECTRODE (I.E. DRIVEN ROD) SHALL BE PROVIDED PER (NEC 250.50) .GROUNDING ELECTRODE SYSTEM INSTALLATION PER 250.53(B )IF DRIVEN ROD. IF COLD WATER BONDING IS AVAILABLE WITHIN 5' FEET FROM POINT OF ENTRANCE TO THE BUILDING, THEN COLD WATER BONDING SHALL BE PERMITTED TO BE USED AS A CONDUCTOR TO INTERCONNECT ELECTRODES THAT ARE PART OF THE GROUNDING ELECTRODE SYSTEM. 250.68 (C)(1 .17A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH CAL-OSHA REGULATIONS. Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 www. Loyd W Martin .com Solar Structures Engineering #2024-0199 Structural Only January 20, 2024 Bldg#: 101118640 Elec#: 20182388 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 3717 S Olive St- 101118640 & 20182388 4/2/2024 MPACCB ---- Sa n t a A n a , C a l i f o r n i a 9 2 7 0 7 37 1 7 S o u t h O l i v e S t r e e t (7 1 4 ) 3 1 5 - 9 8 6 4 E3.0 SHEET NUMBER: DRAWN BY: DATE:10/26/23 Ro s a F o n s e c a PR O J E C T : SU N T E R N A L C O N S T R U C T I O N I N C 56 7 1 S A N T A T E R E S A B L V D ST E 1 0 5 SA N J O S E , C A 9 5 1 2 3 Li c e n s e # 1 0 3 6 5 3 6 - B EXISTING HOUSE SCALE: 3/32" = 1'-0" PROPERTY PLAN 37 1 7 S o u t h O l i v e S t r e e t (N) MAIN SERVICE PANEL DISCONNECT#1 (N)AC DISCONNECT DISCONNECT#2 CONDUIT TO BE RUN ON CONDUIT BLOCKS MIN. 1" ABOVE ROOF SURFACE AND UNDER EAVES; CONDUIT TO BE PAINTED TO MATCH EXTERIOR/EXISTING BACKGROUND COLOR OF ITS LOCATION; CONDUIT TO BE LABELED AT MAX 10' INTERVALS. CONDUIT RUN(S) AND JUNCTION BOX(S) LOCATIONS MAY CHANGE DUE TO FIELD CONDITIONS. CONDUIT TO BE INSTALLED PER CRC R331.3 Handled AC disconnect is required and "must" be located within 8 feet of main service panel.No part of the structure can be over 18" in height from the roof without an Professional Engineer's stamp. No structure may increase the height of the building by 10% of it's original height. FIRE SETBACKS REQUIRED: to the ridge on all sides of each roof slope where panels/modules are located, Fire department does not count the gable eaves as part of the 3' fire pathway. 3' pathway must be measured from the exterior bearing wall (applies FOR 2:12 ROOFS NOTE: TO PROTECT EMT CONDUIT FROM WEATHER CORROSION USE Paints approved for the purpose. Zinc-rich paints or acrylic, urethane or weather stable epoxy-based resins are frequently used. Oil-based or alkyd paints should not be used. Surface preparation is important for proper adherence. For best results, the conduit / EMT should be washed, rinsed and dried. It should not be abraded, scratched or blasted since these processes could compromise the protective zinc layer. A compatible paint primer or two coats of paint adds protection 3' FIRE SETBACK ON VERY WELL STRUCTURED AREA .WITH NO OVER HANG ( 16 ) (N) QCELL DUO BLK ML-G10 400W INSTALLED FLUSHED ON ROOF WITH TILT 22° AND 270° AZ, . 337.92 FT² OVER SINGLE STORY HOUSE WITH COMP SHINGLE ROOF . PROPERTY LINE DRIVE WAY (N)COMBINER BOX ROOF AREA : 3335.99 SQ.FT ARRAY AREA : 337.92 SQ.FT (10% OF ROOF AREA ) 11'-8" 5' - 8 " 4' - 7 " 18'-2" 21 ' - 6 " 3' 3' 3' 5' EXTERIOR LOAD BEARING WALL EXTERIOR LOAD BEARING WALL Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 www. Loyd W Martin .com Solar Structures Engineering #2024-0199 Structural Only January 20, 2024 3717 S Olive St- 101118640 & 20182388 4/2/2024 ---- Sa n t a A n a , C a l i f o r n i a 9 2 7 0 7 37 1 7 S o u t h O l i v e S t r e e t (7 1 4 ) 3 1 5 - 9 8 6 4 E4 SHEET NUMBER: DRAWN BY: DATE:10/26/23 Ro s a F o n s e c a PR O J E C T : SU N T E R N A L C O N S T R U C T I O N I N C 56 7 1 S A N T A T E R E S A B L V D ST E 1 0 5 SA N J O S E , C A 9 5 1 2 3 Li c e n s e # 1 0 3 6 5 3 6 - B SCALE: 1/8" = 1'-0" ROOF STRUCTURE NOTES *ROOF IS COMP SHINGLE *MODULES FLUSHED ON ROOF 3" HEIGHT FORM ROOF SURFACE *RAFTERS 2x4@ 24"O.C. *ATTACHMENT SPAN 72" MAX SPAN installer to check all Roof structure info and condition, and insulation for no leak prior to installation ATTACHMENTS DETAIL 12'-4" 27 ' - 5 " 3' Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 www. Loyd W Martin .com Solar Structures Engineering #2024-0199 Structural Only January 20, 2024 72” Max Attachment Span 48 ” Ma x R a i l S p a n RACKING DETAILS NOTE: Engineer of Record assumes that all structural components of the existing building were permitted and met the requirements of the Building Code at the time of construction. Solar Contractor shall field verify that the roof framing is in its existing permitted condition and capable of supporting required live loads. Framing specified on solar plans shall be assumed to be minimum size and spacing, actual framing may be different. 3717 S Olive St- 101118640 & 20182388 4/2/2024 End Clamp Grounding Mid Clamp Ground Lug Internal Splice (Rail Connection) Fault Current Ground Path Minimum 10 AWG Copper Wire ---- Sa n t a A n a , C a l i f o r n i a 9 2 7 0 7 37 1 7 S o u t h O l i v e S t r e e t (7 1 4 ) 3 1 5 - 9 8 6 4 E6 SHEET NUMBER: DRAWN BY: DATE:10/26/23 Ro s a F o n s e c a PR O J E C T : SU N T E R N A L C O N S T R U C T I O N I N C 56 7 1 S A N T A T E R E S A B L V D ST E 1 0 5 SA N J O S E , C A 9 5 1 2 3 Li c e n s e # 1 0 3 6 5 3 6 - B GROUNDING DETAIL Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 www. Loyd W Martin .com Solar Structures Engineering #2024-0199 Structural Only January 20, 2024 3717 S Olive St- 101118640 & 20182388 4/2/2024 MPMP AC CB ---- Sa n t a A n a , C a l i f o r n i a 9 2 7 0 7 37 1 7 S o u t h O l i v e S t r e e t (7 1 4 ) 3 1 5 - 9 8 6 4 E2 SHEET NUMBER: DRAWN BY: DATE:10/26/23 Ro s a F o n s e c a PR O J E C T : SU N T E R N A L C O N S T R U C T I O N I N C 56 7 1 S A N T A T E R E S A B L V D ST E 1 0 5 SA N J O S E , C A 9 5 1 2 3 Li c e n s e # 1 0 3 6 5 3 6 - B SIGNAGE FORMAT: ALL LETTERS SHALL BE CAPITALIZED, 3/8" WHITE LETTERING ON RED BACKGROUND, ARIAL OR SIMILAR FONT, NON-BOLD; REFLECTIVE, ON WEATHER- RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT (USE UL-969 AS STANDARD FOR WEATHER RATING) WILL BE USED; DURABLE ADHESIVE MATERIALS MEET THIS REQUIREMENT. CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: To be installed adjacent to the main electrical service: apply only where the jurisdiction require it Santa Ana, California 92707 3717 South Olive Street To be installed adjacent to the main electrical service: AC DISCONNECT Main Service Panel SOLAR PANELS M MSPACJ/BARRAY MAIN SERVICE PANEL`AC DISCONNECTJUNCTION BOXEMT CONDUIT RACEWAYS WARNING PHOTOVOLTAIC POWER SOURCE 5 3 4" X 1 18" WARNING PHOTOVOLTAIC POWER SOURCE 5 3 4" X 1 18" 4" X 3/4" DC JUNCTION BOX 240 19.36 COMBINER BOX Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 www. Loyd W Martin .com Solar Structures Engineering #2024-0199 Structural Only January 20, 2024 3717 S Olive St- 101118640 & 20182388 4/2/2024 (E) GEC 240V From Utility GEC IN AC EQUIPMENT GROUNDING BUS, IRREVERSIBLY SPLICED TO EXISTING GEC OR BONDED DIRECTLY TO EXISTING GROUNDING ELECTRODE (E)100 MAIN SERVICE PANEL FED FROM UNDERGROUND WILL BE UPGRADED TO (N)200A MAIN SERVICE PANEL (N)200A MAIN BREAKER END FED (N)30A/2P PV BREAKER TO BE INSTALLED ON THE OPPOSITE END OF MAIN BREAKER CONFIRM ON SITE UFER GROUNDING OR) SHOULD BE TWO SEPARATE GROUND RODS MIN 6'-00" IN BETWEEN (N)30A/2P PV BREAKER -+-+-+-+ STRING 2 MODULES ==== ENVOY COMBINER BOX A 2P PV BACKFEED (N) A 2P PV BACKFEED (N) ~ = ~ = ~ = ~ WEATHERPROOF J-BOX/ WIRE TRANSITION POINT NEMA 4X Wires in free air (2) #12 AWG THWN-2 Wire & (1) #6 BARE COPPER [A] [B] 3/4" EMT Conduit (4) #10 AWG THWN-2 Wire (1) #8 AWG THWN-2 EGC/GEC -+-+-+-+ STRING 1 MODULES ==== ~ = ~ = ~ = ~ MONITORING (N) [A] Rooftop Array ENPHASE IQ7PLUS-72-2-US QCELL DUO BLK ML-G10 400W (C) MIN. 3/4" EMT (3) THWN-2 #8 OR EQ (1) GEC/EGC THWN-2 #8 60A NON-FUSED AC DISCONNECT 15A/2P 08 15 15 08 (E) LOADS (E) LOADS (E) LOADS Rooftop Array ENPHASE IQ7PLUS-72-2-US QCELL DUO BLK ML-G10 400W 200A/2P ---- Sa n t a A n a , C a l i f o r n i a 9 2 7 0 7 37 1 7 S o u t h O l i v e S t r e e t (7 1 4 ) 3 1 5 - 9 8 6 4 E5 SHEET NUMBER: DRAWN BY: DATE:10/26/23 Ro s a F o n s e c a PR O J E C T : SU N T E R N A L C O N S T R U C T I O N I N C 56 7 1 S A N T A T E R E S A B L V D ST E 1 0 5 SA N J O S E , C A 9 5 1 2 3 Li c e n s e # 1 0 3 6 5 3 6 - B ELECTRICAL LINE DIAGRAM 3717 S Olive St- 101118640 & 20182388 4/2/2024 Structural Calculations for a Roof Mounted Solar Photovoltaic System for: Rosa Fonseca Residence 3717 S Olive St, Santa Ana, CA 92707 Applicable Codes: 2022 California Building Code, 2022 California Electric Code, 2022 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-16 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Construction, Local Municipal Code, and all other codes which are adopted by reference or enacted by law. Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. Solar Energy Contractor shall make an inspection of the existing roof framing system prior to installation of the roof mounted solar energy system to verify that the existing roof is capable of supporting minimum roof live loads. Assumed Design Parameters: All 2x members are grade Douglas Fir #2 or better All 4X members are grade Douglas Fir #1 or better All Roof Connectors are Simpson StrongTie or Equal All Concrete Foundations are f'c = 2500 psi or stronger Original Structure was built to the TypeV Wood Framed Standards of the Applicable Building Code at the time of Construction. Sht # 1 of 72021072 Ilum Solar Cory Hoffa Residence Date: January 12, 2021 Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. I have reviewed the existing structural system and based upon the field measurements and drawings provided by the contractor, it appears that the roof can support its required live load. 9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212024-0199 Solar Outsource Rosa Fonseca Residence Date: January 20, 2024 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 Santa Ana, California 92707 3717 South Olive Street (714) 315-9864 Rosa Fonseca 3717 S Olive St- 101118640 & 201823884/2/2024 Sht # 2 of 7 Note to Building Official: Based upon a review of the proposed plans I am confident that the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. I have reviewed the existing structural system and based upon the field measurements and drawings provided by the contractor, it appears that the roof can support its required live load. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. (Assume max truss span = 20 ft.) Trusses truss Note to Building Official: Based upon a review of the proposed plans and information, the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. The contractor shall field verify that the existing roof structure is in its original permited condition and verify that it can support the normal code required roof live loads. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. W DL + LL R1 R27.83' Rafters rafter Total load on rafter = 60 plf x 20 ft. = 1,200 lbs w = 30 psf x 2 ft. = 60 plf Total load on rafter = 60 plf x 7.83 ft. = 470 lbs w = 30 psf x 2 ft. = 60 plf Check Existing 2x4 Roof Rafters @ 24" O.C.: * Total load on Rafter = 60 plf x 7.83 ft. = 470 lbs w = 30 psf x 2 ft. = 60 plf Check Existing 2x4 Roof Rafters @ 24" O.C.: * Total load on joists = 40 plf x 21 ft. = 840 lbs w = 30 psf x 1.33 ft. = 40 plf Check Existing Roof Joists @ 16" O.C.: *Note: Contractor to Field Verify Framing 20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020053 Axis Solar Ryerson Residence Date: November 9, 20192020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 202020201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 202020201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 202020201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 202020201674 Sunrise Solar Jose Munoz Residence Date: July 31, 202020201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 202020201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 202020202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 202020202158 ilum Solar Paul Kiehn Residence Date: September 13, 202020202666 ilum Solar Yvonne Quinones Residence Date: October 16, 202020202762 ilum Solar Andre James Residence Date: October 21, 202020203084 ilum Solar Christine Quilon Residence Date: October 21, 202020203189 ilum Solar Michael Ireland Residence Date: November 12, 202020203252 ilum Solar Viorato Residence Date: November 13, 20202021072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021 2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3226 A1 Sun Inc Gary Wiskind Residence Date: August 10, 2022 2022-3230 BVI Solar Bart Cooper Residence Date: August 10, 2022 2022-3237 Solar Deployed Mario Giampa Residence Date: August 10, 2022 2022-3260 Solar Deployed Cort Collins Residence Date: August 11, 2022 2022-3814 Measure The Sun Rachel Edwards Residence Date: September 21, 2022 2022-3819 Solar Draft Jean Pak Residence Date: September 21, 2022 2022-3896 PowerTown Solar Chantelle Ho Residence Date: September 27, 2022 2022-3913 Pure Gold Solar Rick Jill Burgess Residence Date: September 27, 2022 2022-3935 Solar Outsource David Ross Residence Date: September 28, 2022 2022-3950 Solar Plan Design Kiera Woodson Residence Date: September 29, 20222022-4007 Solar Depoyed Nathan Dean Wilder Residence Date: October 4, 20222022-4041 Sun Green Systems Kiera James Kingdom Residence Date: October 5, 2022 (Assume max rafter span = 7.83 ft.) 2022-4082 BVI Solar Bill Faust Residence Date: October 6, 20222022-4423 Sun Dollar Solar Norm Fort Residence Date: October 27, 20222022-4521 Solar Survey Pro 11918 Lambert Ave Residence Date: November 2, 20222023-2023-102 HPM Solar Duke Draeger Residence Date: January 10, 20232023-104 Solar Deployed Emilio Romero Residence Date: January 10, 20232023-160 Green Road Solar Sonny Pulley Residence Date: January 12, 20232023-180 Solar Outsource Joven Tolentino Residence Date: January 13, 20232023-243 ESD 23-032 Thomas Chaiping Residence Date: January 18, 20232023-523 ESD 23-077 Richard Soliven Residence Date: February 2, 20232023-831 Solar Deployed Francisco Arreola Residence Date: February 17, 2023 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 2023-906 Devil Dog Energy Daniel Noblitt Residence Date: February 21, 20232023-911 Sun Dollar Solar Visant Sanathara Residence Date: February 21, 20232023-983 Devil Dog Energy Tim Garcia Residence Date: February 23, 20232023-1030 LA Solar Atlean Stepney Residence Date: February 24, 20232023-1149 Axis Solar Coffey Residence Date: March 1, 20232023-1271 ESD 23-200 Eva Boyd Residence Date: March 6, 20232023-1837 ESD 23-278 Marlene Hurtado Residence Date: March 23, 20232023-4155 ESD 23-592 Anni Zhou Residence Date: July 18, 20232023-4181 Solar Deployed Marciano Duran Residence Date: July 19, 20232023-4219 Devil Dog Energy Jorge Calvillo Residence Date: July 21, 20232023-4643 Mohr Angle Gee Residence Date: August 25, 20232023-5143 Green Mile Energy Sandra Michaels Residence Date: October 14, 20232023-5313 Jarco Roofing Solar Clearwater Building Date: October 28, 20232023-5446 Solar Deployed Francisco Garcia Date: November 7, 20232023-5446 Solar Deployed Francisco Garcia Residence Date: November 7, 20232023-5581 Super Solar Anne Romero Residence Date: November 18, 20232023-5699 Precis Solar Michael Lucas Residence Date: December 6, 20232023-5743 Diamond Solar Jason Juae Kim Residence Date: December 7, 20232023-5832 LA Solar Deployed Tony Ara Residence Date: December 15, 2023 2024-0062 Energy Planner Srivats Ravichandran Residence Date: January 9, 2024 2024-0100 Solar Deployed Hadi Janbakhzadeh Residence Date: January 11, 2024 2024-0199 Solar Outsource Rosa Fonseca Residence Date: January 20, 2024 3717 S Olive St- 101118640 & 201823884/2/2024 Check Existing 2x4 Roof Rafters @ 24" O.C.: w DL = (Dead + Livereduced) x rafter spacing Sht # 3 of 7 w DL = (10 + 4) x 2.0 w DL = 28 psf OK. per 2013 CBC Vol. 2 Section 3403.3 (ADDITIONS) % CHANGE2,598 LBS 2,400 LBS 2,400 LBSx==8 % ≈ 5% O.K. 20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 2019 W DL + LLR1 R2W DL17.5'3.5'11'P P 3'W DL + LLPP 2019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 2019 R1R2 19' 11'8' wLLwDL wLLwDL PPPP 2020053 Axis Solar Ryerson Residence Date: November 9, 20192020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 2020 w DL + LL = 30 psf x 2 ft. = 60 plfTotal load on truss= 60 plf x 5.5 ft. + 28 plf x 13 ft + ( 4' x 2.75' x 3 psf x 2 ) + ( 4' x 1.65' x 3 psf x 5 )= 859 lbs < 1,110 lbs OKR1R218.5'13'5.5'wLLwDLwLLwDLPPPPPPP 2020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020 Check attachment of Support to Existing Structure for Wind Uplift CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7-16 WIND LOADS ON BUILDING APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2. NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7-16 EFFECTIVE WIND AREA: "FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT BE LESS THAN ONE-THIRD ITS LENGTH." EFFECTIVE AREA = 15 SQ FT 2020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on truss= 60 plf x 3 ft. + 28 plf x 22 ft + ( 4' x 2.75' x 3 psf x 8 ) + ( 4' x 1.65' x 3 psf x 1 ) = 1,060 lbs < 1,500 lbs OK R1R2 25' 22'1.5' wLLwDL wLLwDL PPPPPPPP 1.5' 20201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on rafter = 60 plf x 6 ft. + 28 plf x 11 ft + ( 4' x 2.75' x 3 psf x 4 ) + ( 4' x 1.65' x 3 psf x 4 ) = 800 lbs < 1,020 lbs OK R1 R2 17' 3' w LLwDL 11' P P P P 3' 20201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 202020201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on rafter = 28 plf x 8 ft + ( 4' x 2.75' x 3 psf x 3 ) + ( 6' x 1.65' x 3 psf x 1 ) = 323 lbs < 480 lbs OK R1 R2 8' w LLwDL P P P 20201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on rafter = 60 plf x 1.5 ft. + 28 plf x 5.5 ft + ( 4' x 2.75' x 3 psf x 2 ) + ( 4' x 1.65' x 3 psf x 4 ) = 310 lbs < 420 lbs OK R1 R2 7' w LLwDL 1.5' P 5.5' P 20201674 Sunrise Solar Jose Munoz Residence Date: July 31, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on rafter = 28 plf x 7.83 ft + ( 4' x 2.75' x 3 psf x 3 ) + ( 6' x 1.65' x 3 psf x 1 ) = 318 lbs < 470 lbs OK R1 R2 7.83' w LLwDL P P P w DL + LL = 30 psf x 2 ft. = 60 plf Total load on truss = 60 plf x 3 ft. + 28 plf x 11 ft + ( 6' x 2.75' x 3 psf x 4 ) + ( 4' x 1.65' x 3 psf x 4 ) = 686 lbs < 840 lbs OK R1 R2 14' w LLwDL 11' P 3' PPP 20201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on rafter = 28 plf x 14.83 ft + ( 6' x 2.75' x 3 psf x 5 ) + ( 6' x 1.65' x 3 psf x 1 ) = 663 lbs < 890 lbs OK R1 R2 14.83' w LLwDL P P P P P 20201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on truss = 60 plf x 3 ft. + 28 plf x 13 ft + ( 4' x 1.65' x 3 psf x 8 ) + ( 4' x 1.65' x 3 psf x 4 ) = 702 lbs < 960 lbs OK R1 R2 16' w LLwDL 13' P 3' PPPPPPP 20202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 2020 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on truss = 60 plf x 13.5 ft. + 28 plf x 11 ft + ( 4' x 2.75' x 3 psf x 4 ) + ( 4' x 1.65' x 3 psf x 4 ) = 1,250 lbs < 1,470 lbs OK R1 R224.5'w LLwDL 11'4'PP9.5'PP 20202158 ilum Solar Paul Kiehn Residence Date: September 13, 202020202666 ilum Solar Yvonne Quinones Residence Date: October 16, 202020202762 ilum Solar Andre James Residence Date: October 21, 202020203084 ilum Solar Christine Quilon Residence Date: October 21, 202020203189 ilum Solar Michael Ireland Residence Date: November 12, 202020203252 ilum Solar Viorato Residence Date: November 13, 202020203243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 2021 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on Rafter = 60 plf x 3 ft + 28 plf x 4.83 ft + ( 6' x 2.75' x 3 psf x 2 ) + (4' x 1.65' x 3 psf x 2 ) = 414 lbs < 470 lbs OK 2021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021 2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3226 A1 Sun Inc Gary Wiskind Residence Date: August 10, 2022 2022-3230 BVI Solar Bart Cooper Residence Date: August 10, 2022 2022-3237 Solar Deployed Mario Giampa Residence Date: August 10, 2022 2022-3260 Solar Deployed Cort Collins Residence Date: August 11, 2022 2022-3814 Measure The Sun Rachel Edwards Residence Date: September 21, 2022 2022-3819 Solar Draft Jean Pak Residence Date: September 21, 2022 2022-3896 PowerTown Solar Chantelle Ho Residence Date: September 27, 2022 2022-3913 Pure Gold Solar Rick Jill Burgess Residence Date: September 27, 2022 2022-3935 Solar Outsource David Ross Residence Date: September 28, 2022 2022-3950 Solar Plan Design Kiera Woodson Residence Date: September 29, 20222022-4007 Solar Depoyed Nathan Dean Wilder Residence Date: October 4, 20222022-4041 Sun Green Systems Kiera James Kingdom Residence Date: October 5, 20222022-4082 BVI Solar Bill Faust Residence Date: October 6, 20222022-4423 Sun Dollar Solar Norm Fort Residence Date: October 27, 20222022-4521 Solar Survey Pro 11918 Lambert Ave Residence Date: November 2, 20222023-2023-102 HPM Solar Duke Draeger Residence Date: January 10, 20232023-104 Solar Deployed Emilio Romero Residence Date: January 10, 20232023-160 Green Road Solar Sonny Pulley Residence Date: January 12, 20232023-180 Solar Outsource Joven Tolentino Residence Date: January 13, 20232023-243 ESD 23-032 Thomas Chaiping Residence Date: January 18, 20232023-523 ESD 23-077 Richard Soliven Residence Date: February 2, 20232023-831 Solar Deployed Francisco Arreola Residence Date: February 17, 2023 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 2023-906 Devil Dog Energy Daniel Noblitt Residence Date: February 21, 20232023-911 Sun Dollar Solar Visant Sanathara Residence Date: February 21, 20232023-983 Devil Dog Energy Tim Garcia Residence Date: February 23, 20232023-1030 LA Solar Atlean Stepney Residence Date: February 24, 20232023-1149 Axis Solar Coffey Residence Date: March 1, 20232023-1271 ESD 23-200 Eva Boyd Residence Date: March 6, 20232023-1837 ESD 23-278 Marlene Hurtado Residence Date: March 23, 20232023-4155 ESD 23-592 Anni Zhou Residence Date: July 18, 20232023-4181 Solar Deployed Marciano Duran Residence Date: July 19, 20232023-4219 Devil Dog Energy Jorge Calvillo Residence Date: July 21, 20232023-4643 Mohr Angle Gee Residence Date: August 25, 20232023-5143 Green Mile Energy Sandra Michaels Residence Date: October 14, 20232023-5313 Jarco Roofing Solar Clearwater Building Date: October 28, 20232023-5446 Solar Deployed Francisco Garcia Date: November 7, 20232023-5446 Solar Deployed Francisco Garcia Residence Date: November 7, 20232023-5581 Super Solar Anne Romero Residence Date: November 18, 20232023-5699 Precis Solar Michael Lucas Residence Date: December 6, 20232023-5743 Diamond Solar Jason Juae Kim Residence Date: December 7, 20232023-5832 LA Solar Deployed Tony Ara Residence Date: December 15, 2023 2024-0062 Energy Planner Srivats Ravichandran Residence Date: January 9, 2024 2024-0100 Solar Deployed Hadi Janbakhzadeh Residence Date: January 11, 2024 2024-0199 Solar Outsource Rosa Fonseca Residence Date: January 20, 2024 R1 R2 7.83' w LLwDL 4.83' P P 3' 3717 S Olive St- 101118640 & 201823884/2/2024 Sht # 4 of 7 2'-0" 5'-9" 20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 2019 Load per lag screw = 609 lbs / 1 = 609 lbs Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2015 NDS. W ' = W x Cd x Ct Table 10.3.1 2015 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2015 NDS Ct = 1.0 per Table 10.3.4 of 2015 NDS W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 609 lbs OK Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3.5" lag screws per connection minimum. Design (Factored) Uplift at each support = 0.6 x 1,016 lbs = 609 lbs Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max ) Calculate Uplift at each support: Eq'n 30.51 ASCE 710 Wind Speed 129 mph Exposure C Nominal (Unfactored) Uplift at each support = 61.56 psf x 16.5 sq. ft. = 1,016 lbs pnet = λ Kzt I pnet30 λ =1.35 Kzt =1.0 I = 1.0 pnet30 =45.6 psf pnet =1.35 x 1.0 x 1.0 x (45.6 psf) = 62.8 psf Note: Section 2.4.1 of ASCE 710, Basic Load Combinations for Allowable Stress Design. Note: Applicable Load Combination #5 (D + 0.6W) 2019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020053 Axis Solar Ryerson Residence Date: November 9, 20192020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 202020201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 202020201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 2020 qh Exp. 3-31-19 No. C58724NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 21 Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.47 ASCE 716 Kz = velocity pressure coefficient p=qhðGCpÞðγEÞðγaÞð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 716 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASD = 101 mphTable 1609.3.1 2019 CBC qh=0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p=qhðGCpÞðγEÞðγaÞð qh=20 psf p = 20 psf (2.0) (1.5) (0.7) = 42 psf Eq'n 26.101 ASCE 716 GCp = 2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7ðγaFig. 29.48 ASCE 716 Nominal (Unfactored) Uplift at each support = 42 psf x 16.5 sq. ft. = 693 lbs Note: Section 2.4.1 of ASCE 716 , Basic Load Combinations for Allowable Stress Design. Note: Applicable Load Combination #5 : D + 0.6W Dead Load = 03 psf Wind Load = 42 psf Snow Load = 20.0 psf Check attachment of Support to Existing Structure for Wind Uplift Cont'd 20201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 202020201674 Sunrise Solar Jose Munoz Residence Date: July 31, 2020 qh Check attachment of Support to Existing Structure for Wind Uplift Cont'd Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 21 Tributary Area to Each Solar Mount = 6 ft. x 1.65 ft. = 9.9 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.47 ASCE 716 Kz = velocity pressure coefficient p =qh ðGCp ÞðγE Þðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 716 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGCp ÞðγE Þðγa Þð qh =20 psf p = 20 psf (2.0) (1.5) (0.7) = 42 psf Eq'n 26.101 ASCE 716 GCp = 2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.48 ASCE 716 Design (Factored) Uplift at each support = 0.6 x 416 lbs = 249 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 9.9 sq. ft. = 416 lbs Note: Section 2.4.1 of ASCE 716, Basic Load Combinations for Allowable Stress Load per lag screw = 249 lbs / 1 = 249 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 20201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 202020201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 202020202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 202020202269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 202020202392 UniverCity Solar Debra Enriquez Residence Date: September 29, 202020202390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 202020202437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020 qh= Note: qh= qh= ðγE ðγa Check attachment of Support to Existing Structure for Wind Uplift Cont'd Tributary Area to Each Solar Mount = 4 ft. x 2.75 ft. = 11 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 110 mph Exposure C): Eq'n 29.47 ASCE 716 Kz = velocity pressure coefficient p=qhðGCpÞðγEÞðγaÞð 0.00256 Kz Kzt Kd Ke V2 Section 29.10.1 ASCE 716 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 110 mph ; VASD = 85 mphTable 1609.3.1 2019 CBC 0.00256 (0.9) (1.0) (0.85) (1.0) (85)2 p=qhðGCpÞðγEÞðγaÞð 14.15 psf p = 14.15 psf (2.0) (1.5) (0.7) = 29.7 psf Eq'n 26.101 ASCE 716 GCp = 2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5 GCp = Solar Array Pressure Equalization Factor = 0.7Fig. 29.48 ASCE 716 Nominal (Unfactored) Uplift at each support = 29.7 psf x 11 sq. ft. = 327 lbs Note: Section 2.4.1 of ASCE 716 , Basic Load Combinations for Allowable Stress Design. Note: Applicable Load Combination #5 : D + 0.6W Dead Load = 03 psf Wind Load = 29.7 psf Snow Load = 20.0 psf Exp. 3-31-19 No. C58724NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 21 20202436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 202020202434 Mohr Power Thurin Residence Date: October 1, 202020202450 ESD 20579 Sanchez Residence Date: October 2, 202020202466 Solar Deployed Jose Bautista Residence Date: October 3, 202020202472 Solar Deployed Sava Knezevich Residence Date: October 5, 202020202493 Sunrise Solar Luis Avila Residence Date: October 6, 202020202491 Effect Energy Ana Lopez Residence Date: October 6, 202020202495 Penguin Solar German Rios Residence Date: October 6, 202020202498 Penguin Solar Lisa Bishop Residence Date: October 6, 202020202510 Sasha Intl Mayra Davila Residence Date: October 6, 202020202510 Sasha Intl Mayra Davila Residence Date: October 7, 202020202507 ESD 20593 So Residence Date: October 7, 202020202515 Penguin Solar Black Annette Residence Date: October 7, 202020202531 Solar Journey Charlie Zheng Residence Date: October 8, 202020202525 New Power William Fuller Residence Date: October 8, 202020202545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 202020202565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 202020202564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 202020202576 Sunrise Solar Derrick Darland Residence Date: October 12, 202020202591 ESD 20590 Supulveda Residence Date: October 13, 202020202603 New Power John Yager Residence Date: October 14, 202020202603 New Power William Fuller Residence Date: October 14, 202020202601 TG Roofing Michael Seffintger Residence Date: October 14, 202020202652 Axis Solar Marcus Residence Date: October 15, 202020202652 Axis Solar Freimanis Residence Date: October 15, 202020202674 Complete Solar Dorado Residence Date: October 16, 202020202699 Solar Deployed Daniel Rivera Residence Date: October 17, 202020202694 ESD 20648 Barrera Residence Date: October 17, 202020202836 Penguin Solar Kalup Residence Date: October 26, 202020202832 Grid Alt IE Ana Hernandez Residence Date: October 26, 202020202841 Sunrise Solar Lathan Williams Residence Date: October 26, 202020202862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 202020202861 New Power Susan Bakken Residence Date: October 27, 202020202859 Grid Alt IE Terry McDonnell Residence Date: October 27, 202020202856 Solar Deployed Azsa Villalobos Residence Date: October 27, 2020 qh Check attachment of Support to Existing Structure for Wind Uplift Cont'd Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 21 Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.47 ASCE 716 Kz = velocity pressure coefficient p =qh ðGC p ÞðγE Þðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 716 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGC p ÞðγE Þðγa Þð qh =20 psf p = 20 psf (2.0) (1.5) (0.7) = 42 psf Eq'n 26.101 ASCE 716 GCp = 2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.48 ASCE 716 Design (Factored) Uplift at each support = 0.6 x 693 lbs = 416 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 16.5 sq. ft. = 693 lbs Note: Section 2.4.1 of ASCE 716, Basic Load Combinations for Allowable Stress Load per lag screw = 416 lbs / 1 = 416 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 20202854 Solar Deployed Deilar Aguilera Residence Date: October 27, 202020202853 TG Roofing Brown Robert Residence Date: October 27, 202020202875 Trinity Power John Mendel Residence Date: October 28, 202020202874 Solar Deployed Jesse Haynes Residence Date: October 28, 202020202873 Solar Deployed Elward Beyerle Residence Date: October 28, 202020202887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 202020202907 Solar Deployed Rudy Valdez Residence Date: October 29, 202020202905 Sasha Intl Susan Driggs Residence Date: October 29, 202020202904 HPM Solar Leona Sankhla Residence Date: October 29, 202020202904 HPM Solar Leona Fisher Residence Date: October 29, 202020202918 Precis Solar Humberto Lemus Residence Date: October 29, 202020202915 Complete Solar Ojeda Residence Date: October 29, 202020202936 ESD 20614 2892 Walker Residence Date: October 29, 202020202936 ESD 20614 2892 Falcon Services Date: October 29, 202020202936 ESD 20614 2892 Falcon Walker Date: October 29, 202020202940 Axis Solar Shook Date: October 30, 2020 qh Check attachment of Support to Existing Structure for Wind Uplift Cont'd Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 21 Tributary Area to Each Solar Mount = 5.33 ft. x 2.75 ft. = 14.7 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.47 ASCE 716 Kz = velocity pressure coefficient p =qh ðGC p ÞðγE Þðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 716 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGC p ÞðγE Þðγa Þð qh =20 psf p = 20 psf (2.0) (1.5) (0.7) = 42 psf Eq'n 26.101 ASCE 716 GCp = 2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.48 ASCE 716 Design (Factored) Uplift at each support = 0.6 x 616 lbs = 369 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 14.7 sq. ft. = 616 lbs Note: Section 2.4.1 of ASCE 716, Basic Load Combinations for Allowable Stress Load per lag screw = 369 lbs / 3 = 123 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 20202963 Axis Solar Luke Ding Residence Date: October 31, 202020202959 Penguin Solar Stevens Residence Date: October 31, 202020202954 Solar Deployed Edith Vigil Residence Date: October 31, 202020202939 Mohr Power Pappillion Residence Date: October 31, 202020202983 Infinity Solar Gernazio Residence Date: November 3, 202020202982 Infinity Solar Luna Residence Date: November 3, 202020203021 TG Roofing Jeff Costa Residence Date: November 4, 202020203033 Penguin Solar Christina Cvek Residence Date: November 5, 202020203062 UniverCity Solar Mantri Residence Date: November 6, 202020203059 Solar Deployed Joshua Bethmann Residence Date: November 6, 202020203058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 202020203057 Future Energy Rebecca Jamison Residence Date: November 6, 202020203056 Penguin Solar David Esqueda Residence Date: November 6, 202020203055 Solar Journey Darren Misaresh Residence Date: November 6, 202020203052 ESD 20747 Perez Residence Date: November 6, 202020203065 HPM Solar Torres Residence Date: November 6, 202020203085 20729 Green Residence Date: November 8, 202020203083 HPM Solar Lisa Morales Residence Date: November 8, 202020203076 V's Solar Alberto Valadez Residence Date: November 8, 202020203249 Penguin Solar Scantlin Mark Residence Date: November 13, 202020203249 Penguin Solar Christina Cvek Residence Date: November 13, 202020203248 Penguin Solar Al Timpson Residence Date: November 13, 202020203255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 202020203235 Infinity Solar Dizon Residence Date: November 16, 202020203360 Axis Solar Hogan Residence Date: November 23, 202020203457 Solar Deployed Quyen Tran Residence Date: November 30, 202020203570 ESD 20917 Hatter Residence Date: December 6, 202020203567 Infinity Solar Wittenberg Residence Date: December 6, 202020203566 TG Roofing Morff Craig Residence Date: December 6, 202020203566 TG Roofing Craig Morff Residence Date: December 6, 202020203686 Bratton Solar Love Residence Date: December 14, 202020203682 New Power Shawn Johnson Date: December 14, 202020203681 Solar Deployed Javier Barragan Residence Date: December 14, 202020203695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 202020203695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 202020203695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 202020203707 Penguin Solar James Logan Residence Date: December 15, 202020203704 New Power Marite Cappelletti Residence Date: December 15, 202020203735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 202020203734 New Power Judith Park Residence Date: December 16, 202020203729 ilum Solar Jack Weddle Residence Date: December 16, 202020203738 Sasha Intl Amita Seth Residence Date: December 16, 202020203759 Mohr Power Smith Residence Date: December 17, 202020203793 Valley Solar Magdalena Corona Residence Date: December 21, 202020203792 Mohr Power Stansfield Residence Date: December 21, 2020 20203816 ilum Solar Wolf Residence Date: December 22, 2020 20203809 RNR Contreras Residence Date: December 22, 2020 20203843 Revamp Energy Kunal Patel Residence Date: December 23, 2020 20203842 Solar Deployed Nicholas Glackin Residence Date: December 23, 2020 20203841 Penguin Solar Calvillo Maria Residence Date: December 23, 2020 20203839 CAD for Cali Wheeler Residence Date: December 23, 2020 20203838 Solar Deployed Jaime Marquez Residence Date: December 23, 2020 20203853 Infinity Solar Robert Edwards Residence Date: December 23, 2020 20203857 Solar Deployed Thomas Cabrera Residence Date: December 28, 2020 2021007 Sasha Intl Doti Odell Residence Date: January 4, 20212021034 Silverline Solar Brendetta Bhones Residence Date: January 6, 20212021030 Mohr Power Carpenter Residence Date: January 6, 20212021029 Solar Journey Ryan Cai Residence Date: January 6, 20212021027 Better Earth Cheryl Brady Residence Date: January 6, 20212021024 Silverline Solar Timothy Corcoran Residence Date: January 6, 20212021050 Sasha Intl Melissa Taravella Residence Date: January 7, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-266 Penguin Solar Steve Siegel Residence Date: January 23, 20212021-835 Penguin Solar Natalie Cabayan Residence Date: March 11, 20212021-1089 Precis Solar Phillip Llamas Residence Date: April 1, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021 qh Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.4-7 ASCE 7-16 Kz = velocity pressure coefficient p =qh ðGC p ÞðγE Þðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 7-16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2022 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGC p ÞðγE Þðγa Þð qh =20 psf p = 20 psf (-2.0) (1.5) (0.7) = 42 psf Eq'n 26.10-1 ASCE 7-16 GCp = -2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7ðγa Fig. 29.4-8 ASCE 7-16 Design (Factored) Uplift at each support = 0.6 x 693 lbs = 416 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 16.5 sq. ft. = 693 lbs Note: Section 2.4.1 of ASCE 7-16, Basic Load Combinations for Allowable Stress Load per lag screw = 416 lbs / 1 = 416 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3226 A1 Sun Inc Gary Wiskind Residence Date: August 10, 2022 2022-3230 BVI Solar Bart Cooper Residence Date: August 10, 2022 2022-3237 Solar Deployed Mario Giampa Residence Date: August 10, 2022 2022-3260 Solar Deployed Cort Collins Residence Date: August 11, 2022 2022-3814 Measure The Sun Rachel Edwards Residence Date: September 21, 2022 2022-3819 Solar Draft Jean Pak Residence Date: September 21, 2022 2022-3896 PowerTown Solar Chantelle Ho Residence Date: September 27, 2022 2022-3913 Pure Gold Solar Rick Jill Burgess Residence Date: September 27, 2022 2022-3935 Solar Outsource David Ross Residence Date: September 28, 2022 2022-3950 Solar Plan Design Kiera Woodson Residence Date: September 29, 20222022-4007 Solar Depoyed Nathan Dean Wilder Residence Date: October 4, 20222022-4041 Sun Green Systems Kiera James Kingdom Residence Date: October 5, 20222022-4082 BVI Solar Bill Faust Residence Date: October 6, 20222022-4423 Sun Dollar Solar Norm Fort Residence Date: October 27, 20222022-4521 Solar Survey Pro 11918 Lambert Ave Residence Date: November 2, 20222023-2023-102 HPM Solar Duke Draeger Residence Date: January 10, 20232023-104 Solar Deployed Emilio Romero Residence Date: January 10, 20232023-160 Green Road Solar Sonny Pulley Residence Date: January 12, 20232023-180 Solar Outsource Joven Tolentino Residence Date: January 13, 20232023-243 ESD 23-032 Thomas Chaiping Residence Date: January 18, 20232023-523 ESD 23-077 Richard Soliven Residence Date: February 2, 20232023-831 Solar Deployed Francisco Arreola Residence Date: February 17, 2023 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 2023-906 Devil Dog Energy Daniel Noblitt Residence Date: February 21, 20232023-911 Sun Dollar Solar Visant Sanathara Residence Date: February 21, 20232023-983 Devil Dog Energy Tim Garcia Residence Date: February 23, 20232023-1030 LA Solar Atlean Stepney Residence Date: February 24, 20232023-1149 Axis Solar Coffey Residence Date: March 1, 20232023-1271 ESD 23-200 Eva Boyd Residence Date: March 6, 20232023-1837 ESD 23-278 Marlene Hurtado Residence Date: March 23, 20232023-4155 ESD 23-592 Anni Zhou Residence Date: July 18, 20232023-4181 Solar Deployed Marciano Duran Residence Date: July 19, 20232023-4219 Devil Dog Energy Jorge Calvillo Residence Date: July 21, 20232023-4643 Mohr Angle Gee Residence Date: August 25, 20232023-5143 Green Mile Energy Sandra Michaels Residence Date: October 14, 20232023-5313 Jarco Roofing Solar Clearwater Building Date: October 28, 20232023-5446 Solar Deployed Francisco Garcia Date: November 7, 20232023-5446 Solar Deployed Francisco Garcia Residence Date: November 7, 20232023-5581 Super Solar Anne Romero Residence Date: November 18, 20232023-5699 Precis Solar Michael Lucas Residence Date: December 6, 20232023-5743 Diamond Solar Jason Juae Kim Residence Date: December 7, 20232023-5832 LA Solar Deployed Tony Ara Residence Date: December 15, 2023 2024-0062 Energy Planner Srivats Ravichandran Residence Date: January 9, 2024 2024-0100 Solar Deployed Hadi Janbakhzadeh Residence Date: January 11, 2024 2024-0199 Solar Outsource Rosa Fonseca Residence Date: January 20, 2024 3717 S Olive St- 101118640 & 201823884/2/2024 Sht # 5 of 7 20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020053 Axis Solar Ryerson Residence Date: November 9, 20192020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 202020201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 202020201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 202020201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 202020201674 Sunrise Solar Jose Munoz Residence Date: July 31, 202020201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 202020201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 202020202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 202020202269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 202020202392 UniverCity Solar Debra Enriquez Residence Date: September 29, 202020202390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 202020202437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020 Check attachment of Support to Existing Structure for Wind Uplift Cont'd Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2018 NDS. W ' = W x Cd x Ct Table 10.3.1 2018 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2018 NDS Ct = 1.0 per Table 10.3.4 of 2018 NDS W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 416 lbs OK Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3.5" lag screws per connection minimum. 20202436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 202020202434 Mohr Power Thurin Residence Date: October 1, 202020202450 ESD 20579 Sanchez Residence Date: October 2, 202020202466 Solar Deployed Jose Bautista Residence Date: October 3, 202020202472 Solar Deployed Sava Knezevich Residence Date: October 5, 202020202493 Sunrise Solar Luis Avila Residence Date: October 6, 202020202491 Effect Energy Ana Lopez Residence Date: October 6, 202020202495 Penguin Solar German Rios Residence Date: October 6, 202020202498 Penguin Solar Lisa Bishop Residence Date: October 6, 202020202510 Sasha Intl Mayra Davila Residence Date: October 6, 202020202510 Sasha Intl Mayra Davila Residence Date: October 7, 202020202507 ESD 20593 So Residence Date: October 7, 202020202515 Penguin Solar Black Annette Residence Date: October 7, 202020202531 Solar Journey Charlie Zheng Residence Date: October 8, 202020202525 New Power William Fuller Residence Date: October 8, 202020202545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 202020202565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 202020202564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 202020202576 Sunrise Solar Derrick Darland Residence Date: October 12, 202020202591 ESD 20590 Supulveda Residence Date: October 13, 202020202603 New Power John Yager Residence Date: October 14, 202020202603 New Power William Fuller Residence Date: October 14, 202020202601 TG Roofing Michael Seffintger Residence Date: October 14, 202020202652 Axis Solar Marcus Residence Date: October 15, 202020202652 Axis Solar Freimanis Residence Date: October 15, 202020202674 Complete Solar Dorado Residence Date: October 16, 202020202699 Solar Deployed Daniel Rivera Residence Date: October 17, 202020202694 ESD 20648 Barrera Residence Date: October 17, 202020202836 Penguin Solar Kalup Residence Date: October 26, 202020202832 Grid Alt IE Ana Hernandez Residence Date: October 26, 202020202841 Sunrise Solar Lathan Williams Residence Date: October 26, 202020202862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 202020202861 New Power Susan Bakken Residence Date: October 27, 202020202859 Grid Alt IE Terry McDonnell Residence Date: October 27, 202020202856 Solar Deployed Azsa Villalobos Residence Date: October 27, 202020202854 Solar Deployed Deilar Aguilera Residence Date: October 27, 202020202853 TG Roofing Brown Robert Residence Date: October 27, 202020202875 Trinity Power John Mendel Residence Date: October 28, 202020202874 Solar Deployed Jesse Haynes Residence Date: October 28, 202020202873 Solar Deployed Elward Beyerle Residence Date: October 28, 202020202887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 202020202907 Solar Deployed Rudy Valdez Residence Date: October 29, 202020202905 Sasha Intl Susan Driggs Residence Date: October 29, 202020202904 HPM Solar Leona Sankhla Residence Date: October 29, 202020202904 HPM Solar Leona Fisher Residence Date: October 29, 202020202918 Precis Solar Humberto Lemus Residence Date: October 29, 202020202915 Complete Solar Ojeda Residence Date: October 29, 202020202936 ESD 20614 2892 Walker Residence Date: October 29, 202020202936 ESD 20614 2892 Falcon Services Date: October 29, 202020202936 ESD 20614 2892 Falcon Walker Date: October 29, 202020202940 Axis Solar Shook Date: October 30, 2020 Free Body Diagram of Reversetilt Sub Array m of Reversetilt Sub Array Shear Reaction Uplift ReactionUplift Reaction Shear Reaction = (6 ft x 5.5 ft x 42 psf x sin 15) = 359 lbs Allowable lateral Load at 5/16" diameter lag screw w/ 2.5" embedment Allowable Load = 200 lbs x 1.6 x 2 = 640 lbs > 359 lbs OK (Note: Angle between Roof and Panels is 15 degrees) See plans for connection details. Note: Zone 2 20202963 Axis Solar Luke Ding Residence Date: October 31, 202020202959 Penguin Solar Stevens Residence Date: October 31, 202020202954 Solar Deployed Edith Vigil Residence Date: October 31, 202020202939 Mohr Power Pappillion Residence Date: October 31, 202020202983 Infinity Solar Gernazio Residence Date: November 3, 202020202982 Infinity Solar Luna Residence Date: November 3, 202020203021 TG Roofing Jeff Costa Residence Date: November 4, 202020203033 Penguin Solar Christina Cvek Residence Date: November 5, 202020203062 UniverCity Solar Mantri Residence Date: November 6, 202020203059 Solar Deployed Joshua Bethmann Residence Date: November 6, 202020203058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 202020203057 Future Energy Rebecca Jamison Residence Date: November 6, 202020203056 Penguin Solar David Esqueda Residence Date: November 6, 202020203055 Solar Journey Darren Misaresh Residence Date: November 6, 202020203052 ESD 20747 Perez Residence Date: November 6, 202020203065 HPM Solar Torres Residence Date: November 6, 202020203085 20729 Green Residence Date: November 8, 202020203083 HPM Solar Lisa Morales Residence Date: November 8, 202020203076 V's Solar Alberto Valadez Residence Date: November 8, 202020203249 Penguin Solar Scantlin Mark Residence Date: November 13, 202020203249 Penguin Solar Christina Cvek Residence Date: November 13, 202020203248 Penguin Solar Al Timpson Residence Date: November 13, 202020203255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 202020203235 Infinity Solar Dizon Residence Date: November 16, 202020203360 Axis Solar Hogan Residence Date: November 23, 202020203457 Solar Deployed Quyen Tran Residence Date: November 30, 202020203570 ESD 20917 Hatter Residence Date: December 6, 202020203567 Infinity Solar Wittenberg Residence Date: December 6, 202020203566 TG Roofing Morff Craig Residence Date: December 6, 202020203566 TG Roofing Craig Morff Residence Date: December 6, 202020203686 Bratton Solar Love Residence Date: December 14, 202020203682 New Power Shawn Johnson Date: December 14, 202020203681 Solar Deployed Javier Barragan Residence Date: December 14, 202020203695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 202020203695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 202020203695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 202020203707 Penguin Solar James Logan Residence Date: December 15, 202020203704 New Power Marite Cappelletti Residence Date: December 15, 202020203735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 202020203734 New Power Judith Park Residence Date: December 16, 202020203729 ilum Solar Jack Weddle Residence Date: December 16, 202020203738 Sasha Intl Amita Seth Residence Date: December 16, 202020203759 Mohr Power Smith Residence Date: December 17, 202020203793 Valley Solar Magdalena Corona Residence Date: December 21, 202020203792 Mohr Power Stansfield Residence Date: December 21, 2020 20203816 ilum Solar Wolf Residence Date: December 22, 2020 20203809 RNR Contreras Residence Date: December 22, 2020 20203843 Revamp Energy Kunal Patel Residence Date: December 23, 2020 20203842 Solar Deployed Nicholas Glackin Residence Date: December 23, 2020 20203841 Penguin Solar Calvillo Maria Residence Date: December 23, 2020 20203839 CAD for Cali Wheeler Residence Date: December 23, 2020 20203838 Solar Deployed Jaime Marquez Residence Date: December 23, 2020 20203853 Infinity Solar Robert Edwards Residence Date: December 23, 2020 20203857 Solar Deployed Thomas Cabrera Residence Date: December 28, 2020 2021007 Sasha Intl Doti Odell Residence Date: January 4, 20212021034 Silverline Solar Brendetta Bhones Residence Date: January 6, 20212021030 Mohr Power Carpenter Residence Date: January 6, 20212021029 Solar Journey Ryan Cai Residence Date: January 6, 20212021027 Better Earth Cheryl Brady Residence Date: January 6, 20212021024 Silverline Solar Timothy Corcoran Residence Date: January 6, 20212021050 Sasha Intl Melissa Taravella Residence Date: January 7, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-140 Sasha Intl Anna Marie Chin Residence Date: January 14, 20212021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-199 Solar Journey Terri Shaw Residence Date: January 19, 20212021-266 Penguin Solar Steve Siegel Residence Date: January 23, 20212021-835 Penguin Solar Natalie Cabayan Residence Date: March 11, 20212021-1089 Precis Solar Phillip Llamas Residence Date: April 1, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021 2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3226 A1 Sun Inc Gary Wiskind Residence Date: August 10, 2022 2022-3230 BVI Solar Bart Cooper Residence Date: August 10, 2022 2022-3237 Solar Deployed Mario Giampa Residence Date: August 10, 2022 2022-3260 Solar Deployed Cort Collins Residence Date: August 11, 2022 2022-3814 Measure The Sun Rachel Edwards Residence Date: September 21, 2022 2022-3819 Solar Draft Jean Pak Residence Date: September 21, 2022 2022-3896 PowerTown Solar Chantelle Ho Residence Date: September 27, 2022 2022-3913 Pure Gold Solar Rick Jill Burgess Residence Date: September 27, 2022 2022-3935 Solar Outsource David Ross Residence Date: September 28, 2022 2022-3950 Solar Plan Design Kiera Woodson Residence Date: September 29, 20222022-4007 Solar Depoyed Nathan Dean Wilder Residence Date: October 4, 20222022-4041 Sun Green Systems Kiera James Kingdom Residence Date: October 5, 20222022-4082 BVI Solar Bill Faust Residence Date: October 6, 20222022-4423 Sun Dollar Solar Norm Fort Residence Date: October 27, 20222022-4521 Solar Survey Pro 11918 Lambert Ave Residence Date: November 2, 20222023-2023-102 HPM Solar Duke Draeger Residence Date: January 10, 20232023-104 Solar Deployed Emilio Romero Residence Date: January 10, 20232023-160 Green Road Solar Sonny Pulley Residence Date: January 12, 20232023-180 Solar Outsource Joven Tolentino Residence Date: January 13, 20232023-243 ESD 23-032 Thomas Chaiping Residence Date: January 18, 20232023-523 ESD 23-077 Richard Soliven Residence Date: February 2, 20232023-831 Solar Deployed Francisco Arreola Residence Date: February 17, 20232023-906 Devil Dog Energy Daniel Noblitt Residence Date: February 21, 20232023-911 Sun Dollar Solar Visant Sanathara Residence Date: February 21, 20232023-983 Devil Dog Energy Tim Garcia Residence Date: February 23, 20232023-1030 LA Solar Atlean Stepney Residence Date: February 24, 20232023-1149 Axis Solar Coffey Residence Date: March 1, 20232023-1271 ESD 23-200 Eva Boyd Residence Date: March 6, 20232023-1837 ESD 23-278 Marlene Hurtado Residence Date: March 23, 20232023-4155 ESD 23-592 Anni Zhou Residence Date: July 18, 20232023-4181 Solar Deployed Marciano Duran Residence Date: July 19, 20232023-4219 Devil Dog Energy Jorge Calvillo Residence Date: July 21, 20232023-4643 Mohr Angle Gee Residence Date: August 25, 20232023-5143 Green Mile Energy Sandra Michaels Residence Date: October 14, 20232023-5313 Jarco Roofing Solar Clearwater Building Date: October 28, 20232023-5446 Solar Deployed Francisco Garcia Date: November 7, 20232023-5446 Solar Deployed Francisco Garcia Residence Date: November 7, 20232023-5581 Super Solar Anne Romero Residence Date: November 18, 20232023-5699 Precis Solar Michael Lucas Residence Date: December 6, 20232023-5743 Diamond Solar Jason Juae Kim Residence Date: December 7, 20232023-5832 LA Solar Deployed Tony Ara Residence Date: December 15, 2023 2024-0062 Energy Planner Srivats Ravichandran Residence Date: January 9, 2024 2024-0100 Solar Deployed Hadi Janbakhzadeh Residence Date: January 11, 2024 2024-0199 Solar Outsource Rosa Fonseca Residence Date: January 20, 2024 3717 S Olive St- 101118640 & 201823884/2/2024 Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Effective Existing Seismic Weight Area of (E) Building =Approximately 1,400 Sq. ft. Approximate Effective Seismic Weight =1,400 sq. ft. x 30 psf ave. = 42,000 LBS DETERMINE BASE SHEAR V = Cs W Cs = SDS R Ie R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.21 R = 6.5 WOOD SHEAR WALLS Ie = 1.0 IMPORTANCE FACTOR SDS = 2/3 x SMS SMS = FA x SS SMS = 1.2 x 1.5 = 1.8 SDS = 2/3 x 1.8 = 1.2 Cs = 1.2 6.5 1 = 0.185 Sht # 6 of 7 20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8-1 ASCE 7-16 EQ'N 12.8-2 ASCE 7-16 EQ'N 11.43 ASCE 716 EQ'N 11.41 ASCE 716 EQ'N 12.8-2 ASCE 7-16 2020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 202020201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 202020201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 202020201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 202020201674 Sunrise Solar Jose Munoz Residence Date: July 31, 202020201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 202020201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 202020202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 202020202158 ilum Solar Paul Kiehn Residence Date: September 13, 202020202666 ilum Solar Yvonne Quinones Residence Date: October 16, 202020202762 ilum Solar Andre James Residence Date: October 21, 202020203084 ilum Solar Christine Quilon Residence Date: October 21, 202020203189 ilum Solar Michael Ireland Residence Date: November 12, 202020203252 ilum Solar Viorato Residence Date: November 13, 202020203243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021 2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3226 A1 Sun Inc Gary Wiskind Residence Date: August 10, 2022 2022-3230 BVI Solar Bart Cooper Residence Date: August 10, 2022 2022-3237 Solar Deployed Mario Giampa Residence Date: August 10, 2022 2022-3260 Solar Deployed Cort Collins Residence Date: August 11, 2022 2022-3814 Measure The Sun Rachel Edwards Residence Date: September 21, 2022 2022-3819 Solar Draft Jean Pak Residence Date: September 21, 2022 2022-3896 PowerTown Solar Chantelle Ho Residence Date: September 27, 2022 2022-3913 Pure Gold Solar Rick Jill Burgess Residence Date: September 27, 2022 2022-3935 Solar Outsource David Ross Residence Date: September 28, 2022 2022-3950 Solar Plan Design Kiera Woodson Residence Date: September 29, 20222022-4007 Solar Depoyed Nathan Dean Wilder Residence Date: October 4, 20222022-4041 Sun Green Systems Kiera James Kingdom Residence Date: October 5, 20222022-4082 BVI Solar Bill Faust Residence Date: October 6, 20222022-4423 Sun Dollar Solar Norm Fort Residence Date: October 27, 20222022-4521 Solar Survey Pro 11918 Lambert Ave Residence Date: November 2, 20222023-2023-102 HPM Solar Duke Draeger Residence Date: January 10, 20232023-104 Solar Deployed Emilio Romero Residence Date: January 10, 20232023-160 Green Road Solar Sonny Pulley Residence Date: January 12, 20232023-180 Solar Outsource Joven Tolentino Residence Date: January 13, 20232023-243 ESD 23-032 Thomas Chaiping Residence Date: January 18, 20232023-523 ESD 23-077 Richard Soliven Residence Date: February 2, 20232023-831 Solar Deployed Francisco Arreola Residence Date: February 17, 2023 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 2023-906 Devil Dog Energy Daniel Noblitt Residence Date: February 21, 20232023-911 Sun Dollar Solar Visant Sanathara Residence Date: February 21, 20232023-983 Devil Dog Energy Tim Garcia Residence Date: February 23, 20232023-1030 LA Solar Atlean Stepney Residence Date: February 24, 20232023-1149 Axis Solar Coffey Residence Date: March 1, 20232023-1271 ESD 23-200 Eva Boyd Residence Date: March 6, 20232023-1837 ESD 23-278 Marlene Hurtado Residence Date: March 23, 20232023-4155 ESD 23-592 Anni Zhou Residence Date: July 18, 20232023-4181 Solar Deployed Marciano Duran Residence Date: July 19, 20232023-4219 Devil Dog Energy Jorge Calvillo Residence Date: July 21, 20232023-4643 Mohr Angle Gee Residence Date: August 25, 20232023-5143 Green Mile Energy Sandra Michaels Residence Date: October 14, 20232023-5313 Jarco Roofing Solar Clearwater Building Date: October 28, 20232023-5446 Solar Deployed Francisco Garcia Date: November 7, 20232023-5446 Solar Deployed Francisco Garcia Residence Date: November 7, 20232023-5581 Super Solar Anne Romero Residence Date: November 18, 20232023-5699 Precis Solar Michael Lucas Residence Date: December 6, 20232023-5743 Diamond Solar Jason Juae Kim Residence Date: December 7, 20232023-5832 LA Solar Deployed Tony Ara Residence Date: December 15, 2023 2024-0062 Energy Planner Srivats Ravichandran Residence Date: January 9, 2024 2024-0100 Solar Deployed Hadi Janbakhzadeh Residence Date: January 11, 2024 2024-0199 Solar Outsource Rosa Fonseca Residence Date: January 20, 2024 3717 S Olive St- 101118640 & 201823884/2/2024 V = 0.185 x 42,000 LBS = 7,770 LBS DETERMINE NEW BASE SHEAR EXISTING BASE SHEAR Determine Seismic Weight of Building with Solar Array: EXISTING SEISMIC WEIGHT =42,000 LBS NEW SOLAR ARRAY =3 PSF x 16 PANELS x 3.3' x 5.5' = 871 LBS NEW SEISMIC WEIGHT =42,000 LBS + 871 LBS = 42,871 LBS THEREFORE NEW BASE SHEAR: V = 0.185 x 42,871 = 7,931 LBS % CHANGE =7,931 LBS - 7,770 LBS 7,770 LBS x 100 =2.1 % < 10% OK EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE. "Alterations may be made to any structure without requiring the existing structure to comply with this standard, provided that the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10% or decrease the design strength of any existing structural element to resist seismic forces by more than 10% shall not be permitted unless the entire seismic force-resisting system is determined to comply with this standard for a new structure." End of Calculations Sht # 7 of 7 20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020053 Axis Solar Ryerson Residence Date: November 9, 2019 EQ'N 12.8-1 ASCE 7-16 EQ'N 12.8-1 ASCE 7-16 OK. PER ASCE 7-16 SECTION 11.B.4 ALTERATIONS 2020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 202020201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 202020201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 202020201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 202020201674 Sunrise Solar Jose Munoz Residence Date: July 31, 202020201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 202020201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 202020202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 202020202158 ilum Solar Paul Kiehn Residence Date: September 13, 202020202666 ilum Solar Yvonne Quinones Residence Date: October 16, 202020202762 ilum Solar Andre James Residence Date: October 21, 202020203084 ilum Solar Christine Quilon Residence Date: October 21, 202020203189 ilum Solar Michael Ireland Residence Date: November 12, 202020203252 ilum Solar Viorato Residence Date: November 13, 202020203243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 20212021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1095 Sunrise Solar Kayla Lutz Residence Date: April 1, 20212021-1234 Ilum Solar Aaron Mendoza Residence Date: April 14, 2021 2021-1272 Penguin Solar Vivian Moniz Residence Date: April 17, 2021 2021-1274 Penguin Solar Christopher Foster Residence Date: April 17, 2021 2021-1275 Penguin Solar Jose Cano Residence Date: April 17, 2021 2021-1301 Penguin Solar John Lacivita Residence Date: April 20, 2021 2021-1409 Better Earth Steve Katz Residence Date: April 27, 2021 2021-1453 Better Earth Kyle Scott Residence Date: April 29, 2021 2021-1801 Better Earth June Webb Residence Date: May 21, 2021 2021-2568 Better Earth Bryce Blake Residence Date: July 5, 2021 2021-3488 Better Earth Juan Garcia Residence Date: August 27, 2021 2021-4627 Better Earth Gary Krogstad Residence Date: October 26, 2021 2022-2248 ESD 22-171 Schoennauer Residence Date: May 25,2022 2022-3226 A1 Sun Inc Gary Wiskind Residence Date: August 10, 2022 2022-3230 BVI Solar Bart Cooper Residence Date: August 10, 2022 2022-3237 Solar Deployed Mario Giampa Residence Date: August 10, 2022 2022-3260 Solar Deployed Cort Collins Residence Date: August 11, 2022 2022-3814 Measure The Sun Rachel Edwards Residence Date: September 21, 2022 2022-3819 Solar Draft Jean Pak Residence Date: September 21, 2022 2022-3896 PowerTown Solar Chantelle Ho Residence Date: September 27, 2022 2022-3913 Pure Gold Solar Rick Jill Burgess Residence Date: September 27, 2022 2022-3935 Solar Outsource David Ross Residence Date: September 28, 2022 2022-3950 Solar Plan Design Kiera Woodson Residence Date: September 29, 20222022-4007 Solar Depoyed Nathan Dean Wilder Residence Date: October 4, 20222022-4041 Sun Green Systems Kiera James Kingdom Residence Date: October 5, 20222022-4082 BVI Solar Bill Faust Residence Date: October 6, 20222022-4423 Sun Dollar Solar Norm Fort Residence Date: October 27, 20222022-4521 Solar Survey Pro 11918 Lambert Ave Residence Date: November 2, 20222023-2023-102 HPM Solar Duke Draeger Residence Date: January 10, 20232023-104 Solar Deployed Emilio Romero Residence Date: January 10, 20232023-160 Green Road Solar Sonny Pulley Residence Date: January 12, 20232023-180 Solar Outsource Joven Tolentino Residence Date: January 13, 20232023-243 ESD 23-032 Thomas Chaiping Residence Date: January 18, 20232023-523 ESD 23-077 Richard Soliven Residence Date: February 2, 20232023-831 Solar Deployed Francisco Arreola Residence Date: February 17, 2023 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 2023-906 Devil Dog Energy Daniel Noblitt Residence Date: February 21, 20232023-911 Sun Dollar Solar Visant Sanathara Residence Date: February 21, 20232023-983 Devil Dog Energy Tim Garcia Residence Date: February 23, 20232023-1030 LA Solar Atlean Stepney Residence Date: February 24, 20232023-1149 Axis Solar Coffey Residence Date: March 1, 20232023-1271 ESD 23-200 Eva Boyd Residence Date: March 6, 20232023-1837 ESD 23-278 Marlene Hurtado Residence Date: March 23, 20232023-4155 ESD 23-592 Anni Zhou Residence Date: July 18, 20232023-4181 Solar Deployed Marciano Duran Residence Date: July 19, 20232023-4219 Devil Dog Energy Jorge Calvillo Residence Date: July 21, 20232023-4643 Mohr Angle Gee Residence Date: August 25, 20232023-5143 Green Mile Energy Sandra Michaels Residence Date: October 14, 20232023-5313 Jarco Roofing Solar Clearwater Building Date: October 28, 20232023-5446 Solar Deployed Francisco Garcia Date: November 7, 20232023-5446 Solar Deployed Francisco Garcia Residence Date: November 7, 20232023-5581 Super Solar Anne Romero Residence Date: November 18, 20232023-5699 Precis Solar Michael Lucas Residence Date: December 6, 20232023-5743 Diamond Solar Jason Juae Kim Residence Date: December 7, 20232023-5832 LA Solar Deployed Tony Ara Residence Date: December 15, 2023 2024-0062 Energy Planner Srivats Ravichandran Residence Date: January 9, 2024 2024-0100 Solar Deployed Hadi Janbakhzadeh Residence Date: January 11, 2024 2024-0199 Solar Outsource Rosa Fonseca Residence Date: January 20, 2024 3717 S Olive St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live St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g\hijklm``cnoiap[gpqZnr[\s}x~|€vx |€y x‚€x ƒ„xz~…vvx z||†uvz‡vzxˆ‰Šxu‰‹|•– —˜™š›”“œ œ›šœ ‘” — ‘”“žŸ‘ —š“– —˜™’“’ ¡ œ¢Ÿ£’’“ œ“£’Ÿ“œ‘–“‘œ’¤¥¦§¨HO""V (&/,+(&0(&R©'ª-"$,"'&" 3+(&0(&$%'" #/3$&%+3&-«S¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬µ¹º»·»¼½°¾¿²À»»·®°¾¾°°®²·¾³¸·³¾»ÁÂÃÄů°ÆÀ»ÇÈɵDz°Ê¾É±²ºÇ·»±»·¸ËÌÍ#""!%5%' (+#""!-"5# (ωŠxu‰‹|µ¹º»·»¼½°¾¿²À»»·®°¾¾°°®²·¾³¸·³¾»ÁÂÃÄÍ$&"*% *&/,"!0%&#,#""V (#""!, &#%&" 'R7(7Ð%' (3-%)+9S7¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬KGHIJEKLMDJHO") & ('&#)-&)#% ( #*,#"*)-&*'( *&"$") &12$"*)+'0& "$"#&% % &$"*)+!#%$'ωŠxu‰‹|»·Ç¶º²°®²·¾³¸·³¾ÇºÇ··Ç¸Àµ»Ê·¸»¾·¶Ø»¼´ÉǼ»²¶Ùʹ¾°®»²²¶°ÊÇºÍ )!%-&)#*$") & ('/'&$'3V++")& !"#$%&" " &$") & ('/'&$4+"0ÚÛ") & (Q/'&$Û% )!%-&)##¬¬¬¬¬¬¬¬¬¬¬1#"*)-&Ü%$% *Û"*+ݬ¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬"&%+Þ(&"!12Û"*)+'% *ß%+'¬¬¬¬¬¬¬¬¬¬¬+4'"&%+Ü)$4#"!à&&%-$ &1" &'¬¬¬¬¬¬¬¬¬¬¬¬Þ(&,#à&&%-$ &1" &R4á-S¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬+4'R!(#%&#&% â:+4'3'ÞãQPSÛ%6$)$Q,%- (ä&0 à&&%-$ &1" &'" %ß%+¬¬¬¬¬¬¬¬¬¬¬¬¬¬ -'R',#"*)-&$$%6$)$',%- (%++"0*4%'*" $%6$)$*'( 0 *',*S"&%+Q)#!%-à#%"!12Û"*)+'R'Y)%#!&S¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬!&WÎ')&*Þ(&"!12Û"*)+" ß""!R4á!S¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬+4'å!&W®¼¶²·¾¶´³·»¼½»¶ÙÀ·°®·À»æç²É²·»µ¶²Ù¾»Ç·»¾·ÀÇÊ躴²é®·ê±²»»ÁÂÃÄëg\hijklZnr[\sîïcdbadc[giprji`íd\b[`gbcdðgcq`csñóu{uvx~v|}x‡|€u… xzx †|zy€xô„x …vx „xz~…v„z|‡xuuƒvwx†|õõ|ö…€÷~uvy„„õ{ø*)+'3)&+&/= &#%-&5 5#&#'3% *-"$4 #4"6'%#* &V*!"#)' 12'/'&$'7%##%/'-"$,"'*"!â'#''&# ('"#+'',# 5#%+ 5#&#-%,%-&/%'%-" & )")'%-,"0#")&,)&PT3ââ;Þ%&&'"#+'' &#-" -&" ," &'" &+"%*'*"!'#5-*'-" -& ($% 'R ;7 âRäSS7 "!&'&% *%#*+-&#-%+*%(#%$'RXP7P3XP7P%3XP7P43"#XP7P-S-% 4)'*&"%--)#%&+/#,#' &&12'/'&$78 &#%-&51Î?*%(#%$'%#%5%+%4+ ¶ºº°³··À»²·ÇʼǾ¼»º»¸·¾¶¸Çº¼¶Çپǵ¸°µ¹º»·»ºÉÍÙ³¶¼»·°·À»»º»¸·¾¶¸Çº¼¶Çپǵ¶²¹¾°È¶¼»¼·°À»º¹·À»Ç¹¹º¶¸ÇÊ·³Ê¼»¾²·Çʼ»Ç¸À´ºÇÊ¿·°Øºº¶ÊÍ®·À»»º»¸·¾¶¸Çº²É²·»µ¶²µ°¾»¸°µ¹º»·ÀÇÊ·À»²·ÇʼǾ¼»º»¸·¾¶¸Çº¼¶Çپǵ¸ÇÊ»®®»¸·¶È»ºÉ¸°µµ³Ê¶¸Ç·»±¹¾°È¶¼»ÇÊǺ·»¾ÊÇ·¶È»¼¶Çپǵ½¶·Àǹ¹¾°¹¾¶Ç·»¼»·Ç¶ºÍ !"#$%&' Ironridge XR10 24 910.08 37.92 72 337.92 2.69 3717 S Olive St- 101118640 & 201823884/2/2024 !"#$% &'$((#)$%!*$%&!+,-.!!/ %!0"12.3+!4$%5#67+.89 9-.-$:;"'1 5!!6!5#678-3-<3=>,=,><337 +?-,+@AB6#CD!""$ '1%8E8-E838< 3717 S Olive St- 101118640 & 201823884/2/2024 !"# !$"%&'())!&**")+,&-.&/01&2 ")"!)34&# !1#"4517!81#!/9:&! &!+;2<* &%21 &$"%&-21 &())!&**-2<* &%(21=&->?@AB>CDEFGHIEFJAKALMLN>COPA EQ>GNRST>UAAQGVNWXYZTC[S\]S^YZT532_9+`9.$._.$5a`._`b+3a23/c!+;d9_3e33ef(00`g(`(++0b3f`3_9._(h03092`35di9$;j`gd$/c!fggd/c!_gd/ce33ef(00`g(`(++0b$.5e39klmnjop2b2`38`gd$/c!fggd/c!_gd/ce33ef(00`g(`(++0bICFEGu?QOEGCFEGuCQFJ>CUAGuPA.$5je(ae38ke8ke$a8h3_.k.$5a`._28ke"v4&8ke"v4&.$5a9``b+3$i($i($i(2(832(83.$5a9`29w3$i($i($i(2(832(83 532_9+`9.$+;5!(8.5a035i(9$;3_`3_x89_.yz/h.fx9ka235y+;(__(b(.8hj+($30x9ka235ye3$83`3_x9ka235y(592.$$3`x9ka235y23_;93+($30OI+(_`$a8h3_$.`32 k._a$a2358.5a032+a`~$i(1h0($€(h.;3 ‚ƒ‚ A„u?…DAEQ>CUAGuPA †††††89_./9$;3_`3_29$h_($g/9_a9`DFG‡‡‡‡5(DFG‡‡‡‡5(DFG‡‡‡‡5(DFG‡‡‡‡5(DFG‡‡‡‡5(DFG‡‡‡‡5(ˆ‰YFŠ‹OCG?>CFD ha9059$ee_.a$59$e303`_.53I DuQ?P?QŒ>AJK?CA DO?E>AJK?CA…OEAPDO?EFC…G?EKAJQAJFC…G Ž ‹ I 233ea953(++3$59f5k._9$k._8(`9.$.$8.5a03($5(__(be_.a$59$e OCCFDY?EAJ…OEAP I††††89_./9$;3_`3_29$h_($g/9_a9` ‘’“”•–—˜™š˜›˜–— œš‘’“”•–—˜™š˜›˜–— ›žŸ ¡¢£¤¥““¦¤˜‘’˜œ›¬˜š¦˜¦¯°œ¨«ššš–±£›£§š¦”²š£³´ §µ¶¡·š°š”² ¸µ¹º»µ·¸¼½“¬¾“ —¿·¶¸ ·µ¼š¡·À¶ ¿Ÿ¶ž¡·••šÁ¾™¬—µ·¶µ³¸ ¸Àµ£¼Â¹¬Á—µ·¢¡À¸ÃšœÄÁ¬šÅ ±¡Àµ´¡·À¸ŸµÁ½™¾ÁƮǜšÈÅ™¬™—¡¿¶É©¼žÂ¸—¶ ¸¸¶Ã—µ·¶µœ·µÃšœÄ𙙦“˜¾“¾˜¦Ä›µ¼¼¡ ž¸—¶¸Â¸·À ¾½¦š°š™°šš¦ 3717 S Olive St- 101118640 & 201823884/2/2024 !! "#$!%&'()* +,-).%*).,'"#!"/*0!*)$*) !!$*0!*)1$234562789:;<=9:>5?5@ABC27DE59F2;CGHI2J55F;KCLMNOI7PHQRHSNOI TU"&V+W'"&XYZWW+Y[XT"\TU"&V+W'"&XY/&(Y]+[/T"\&"+'XWZXY/&(Y]+[/&\*^&WY'XWZXYZWW+Y[X*\TU*+WX+*_Z*+[&"-\TUXTZT"&V+W["TU\TU/&(Y]+[Y`"abb/-\/&Y+T"&+__[/cdc\X_&+__*Z""(X+-XW(+ZXY* 8:;eE58Df58:;eE58:;5E8:;eE5>DF39=2h2F7i=jkSH2HQGklMmn TU-/&(YWYX]TU"&V+Wopb&TX(/&(Y]+TUZWW+YTU&"-WYX]39?5>F5>8Df539?5>F5>8:;5E39?5>F5>>DF39=2i=jkSH2HQGklMqn r\X_ZYX(XY`W+sZXW+*/X*Xt(+'tW+u*VXY^-&+*Y^X**VXY^T++YY^+W+sZXW+T+Yv`+* & cw\X_]++WYX&T+Y+WW+sZXW+--&+*Y^X*T+Y+W*&u+YT++YY^+W+sZXW+T+Yv`+* & cx\*Xy+"^&Y&/&(YX"&V+W*&ZW+[-\&-ZY&W*t*+-&TUZWW+Y&+azb{|x*X]&W&"-WYX]Y-X*&+Yp\*Xy+X/+WY+W&ZY"ZYXWZXY[\&-ZY&W*&W-X]Y&X/+WY+W&"-T"+W+WYX]{[*]}) *)z\|\Y&Y(&_~~~~~~X/+WY+W&ZY"ZYXWZXY&"-[!\&+_&W+^TXW&'X/+WY+WXWZXY{-&+*Y&Y(*Z""(`tW+u+W*&T"(`VXY^rwbdtZ*tW+U+"YX&Xazb{ap[t\[w\[\v`+* &&Y+*_&WX/+WY+WXWZXY*[]}) *) z\$r{\(&V+*Y+U"+YTtX+YY+T"+WYZW+t*+-&*^W+TXXTZTT++UYW+T+-W`tZ(tY+T"+WYZW+_&W*^W+(&YX&T&*Y*XTX(WY&X*Y((YX&(&YX&{(&V+*Y+U"+Y+-TtX+YY+T"~~~~w{\^X]^+*Y&YXZ&Z*TtX+YY+T"+WYZW+t*+-&*^W+^X]^+*YT&Y^wd-W`tZ(tY+T"+WYZW+_&W*^W+(&YX&T&*Y*XTX(WY&X*Y((YX&(&YX&{^X]^+*Y&YXZ&Z*Y+T"+WYZW+~~~~w{\wbbz*^W+_Z-T+Y(*wd-+*X]Y+T"+WYZW+*-&&Y+U++-p€XY^+ZXY+-*YY+*["(T*"WX]*X*pp{r\{_&W(+**Y^zZWW+Y'WW`X]&-ZY&W*XW&&_'T&ZY+-*Z(XY&-ZXYY(+*Yb{| t&/+W&&_-Z*X]Y^+&ZY-&&W-+*X]Y+T"+WYZW+&_p€&W(+**[((&_ZXY+-*YY+*\\rwV]zb&-ZY&W*W+]++W((`+"Yt(+_&WT&-Z(+*VXY^X!&_€{aT"*&W(+**V^+"W&Y+Y+-t`rw'T"&W*T((+W_Z*+{‚\rbV]zb&-ZY&W*W+]++W((`+"Yt(+_&WT&-Z(+*VXY^X!&_z{aT"*&W(+**V^+"W&Y+Y+-t`r|'T"&W*T((+W_Z*+{ &Y+*_&WWW`XWZXYVXWX][]}) *)a ƒƒ )„+\$ &"-…&/+WZWW+Y"W&Y+YX&-+/X+YX&(+(+YWX(&-+†W+_+W++**^&V*‡ˆ‰Š‹‹‹Œ‹‹ &Y+*_&W((-WVX]*$23=92Ž255=e3;5257F3:9 23=96:>;7;327:9957F23=96:>39?5>F5>:7g;D9;D7;327:9957Fi36e25;n!).!!0!)azb{|r )."/ },‘! )%)D7:eFgeF7e>>59F9:839DED7?:EFD=5*&(W"/*`*Y+T"&XY&_&+YX&Y^X*"+(_+-t`TZ(YX"(+*&ZW+*[ZYX(XY`-*&(W\ ’ “ ”•–— ˜ ™˜š™› ™œšžŸ ¡¢£¤œ¥Ÿ¦¦¢£¤§¦¡¨¦©ª«¬¬¬®«¬š¯¯°¯š«°±š°¬««š««± °²±®Ÿ³´µ¶·¸œ²ž¦£¹©¯º©º©£¹»¬¼º««©º»¼«¯š°¬ °¬ «ºš« ¬½½»¬«»½¹¾³¿¸À³¶Á¥Â³·¿À¾Ã¿Ä³¦¦¥±»¯«¹¶³¿¶Å¸À¸·¶§ÁÆÇ«¬±¹¶³È·¸É¥ ²±«º°¬Ê©»Ê»©¬¬²Ë·¶Ì³·¸Ã¶°¯«¯¹Â¾¿µ¤ÁÄÆ¸¹¿À¸¸¿É¹¶³¿¶ ³¶É¥ ²º¯¬¯±š¯»±Í®Î ¥Ï¨¶ÁÁÂÀĸ¹¿¸Æ¸³·»šºÐº¯Ðº¬º 3717 S Olive St- 101118640 & 201823884/2/2024 To whomever it may concern, I give permission to Sunternal Construction Inc., to perform the installation of solar panels at my residence, 3717 South Olive Street, Santa Ana, CA 92707. Thank you, Rosa Fonseca 01 / 26 / 2024 Doc ID: 4dcfe2c1fd9eda699c8d4bdbca02ffe1d709ec8c 3717 S Olive St- 101118640 & 201823884/2/2024 Rosa Fonseca - Homeowners Authorization Form Rosa Fonseca Sola...tion for AHJ .pdf 4dcfe2c1fd9eda699c8d4bdbca02ffe1d709ec8c MM / DD / YYYY Signed 01 / 26 / 2024 18:37:22 UTC Sent for signature to Rosa Fonseca (little_wizards_daycare@yahoo.com) from m.stevens@sunternalsolar.com IP: 67.166.144.251 01 / 26 / 2024 21:49:33 UTC Viewed by Rosa Fonseca (little_wizards_daycare@yahoo.com) IP: 99.189.110.160 01 / 26 / 2024 21:52:18 UTC Signed by Rosa Fonseca (little_wizards_daycare@yahoo.com) IP: 99.189.110.160 The document has been completed.01 / 26 / 2024 21:52:18 UTC 3717 S Olive St- 101118640 & 201823884/2/2024 3717 S Olive St- 101118640 & 201823884/2/2024 3717 S Olive St- 101118640 & 201823884/2/2024 IQ8 Series Microinverters Our newest IQ8 Microinverters are the industry’s first microgrid-forming, software- defined microinverters with split-phase power conversion capability to convert DC power to AC power efficiently. The brain of the semiconductor-based microinverter is our proprietary application-specific integrated circuit (ASIC) which enables the microinverter to operate in grid-tied or off-grid modes. This chip is built in advanced 55nm technology with high speed digital logic and has super-fast response times to changing loads and grid events, alleviating constraints on battery sizing for home energy systems. Part of the Enphase Energy System, IQ8 Series Microinverters integrate with the Enphase IQ Battery, Enphase IQ Gateway, and the Enphase App monitoring and analysis software. IQ8 Series Microinverters redefine reliability standards with more than one million cumulative hours of power-on testing, enabling an industry-leading limited warranty of up to 25 years. Connect PV modules quickly and easily to IQ8 Series Microinverters using the included Q-DCC-2 adapter cable with plug-n-play MC4 connectors. IQ8 Series Microinverters are UL Listed as PV Rapid Shut Down Equipment and conform with various regulations, when installed according to manufacturer’s instructions. Easy to install • Lightweight and compact with plug-n-play connectors • Power Line Communication (PLC) between components • Faster installation with simple two-wire cabling High productivity and reliability • Produce power even when the grid is down • More than one million cumulative hours of testing • Class II double-insulated enclosure • Optimized for the latest high- powered PV modules Microgrid-forming • Complies with the latest advanced grid support • Remote automatic updates for the latest grid requirements • Configurable to support a wide range of grid profiles • Meets CA Rule 21 (UL 1741-SA) requirements © 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ8 microinverters, and other names are trademarks of Enphase Energy, Inc. Data subject to change. IQ8SE-DS-0001-01-EN-US-2022-03-01 DATA SHEET 3717 S Olive St- 101118640 & 201823884/2/2024 (1) The IQ8H-208 variant will be operating in grid-tied mode only at 208V AC. (2) No enforced DC/AC ratio. See the compatibility calculator at https://link.enphase.com/module-compatibility (3) Maximum continuous input DC current is 10.6A (4) Nominal voltage range can be extended beyond nominal if required by the utility. (5) Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. IQ8 Series Microinverters INPUT DATA (DC)IQ8-60-2-US IQ8PLUS-72-2-US IQ8M-72-2-US IQ8A-72-2-US IQ8H-240-72-2-US IQ8H-208-72-2-US 1 Commonly used module pairings2 W 235 – 350 235 – 440 260 – 460 295 – 500 320 – 540+295 – 500+ Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell, 66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 27 – 37 29 – 45 33 – 45 36 – 45 38 – 45 38 – 45 Operating range V 25 – 48 25 – 58 Min/max start voltage V 30 / 48 30 / 58 Max input DC voltage V 50 60 Max DC current3 [module Isc] A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC)IQ8-60-2-US IQ8PLUS-72-2-US IQ8M-72-2-US IQ8A-72-2-US IQ8H-240-72-2-US IQ8H-208-72-2-US Peak output power VA 245 300 330 366 384 366 Max continuous output power VA 240 290 325 349 380 360 Nominal (L-L) voltage/range4 V 240 / 211 – 264 208 / 183 – 250 Max continuous output current A 1.0 1.21 1.35 1.45 1.58 1.73 Nominal frequency Hz 60 Extended frequency range Hz 50 – 68 Max units per 20 A (L-L) branch circuit5 16 13 11 11 10 9 Total harmonic distortion <5% Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor (adjustable)0.85 leading – 0.85 lagging Peak efficiency %97.5 97.6 97.6 97.6 97.6 97.4 CEC weighted efficiency %97 97 97 97.5 97 97 Night-time power consumption mW 60 MECHANICAL DATA Ambient temperature range -40ºC to +60ºC (-40ºF to +140ºF) Relative humidity range 4% to 100% (condensing) DC Connector type MC4 Dimensions (HxWxD)212 mm (8.3”) x 175 mm (6.9”) x 30.2 mm (1.2”) Weight 1.08 kg (2.38 lbs) Cooling Natural convection – no fans Approved for wet locations Yes Acoustic noise at 1 m <60 dBA Pollution degree PD3 Enclosure Class II double-insulated, corrosion resistant polymeric enclosure Environ. category / UV exposure rating NEMA Type 6 / outdoor COMPLIANCE Certifications CA Rule 21 (UL 1741-SA), UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according to manufacturer’s instructions. IQ8SE-DS-0001-01-EN-US-2022-03-01 3717 S Olive St- 101118640 & 201823884/2/2024 X-IQ-AM1-240-4 The Enphase IQ Combiner 4/4C with Enphase IQ Gateway and integrated LTE-M1 cell modem (included only with IQ Combiner 4C) consolidates interconnection equipment into a single enclosure and streamlines IQ microinverters and storage installations by providing a consistent, pre-wired solution for residential applications. It offers up to four 2-pole input circuits and Eaton BR series busbar assembly. Enphase IQ Combiner 4/4C X-IQ-AM1-240-4 X-IQ-AM1-240-4C To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Networking Smart • Includes IQ Gateway for communication and control • Includes Enphase Mobile Connect cellular modem (CELLMODEM-M1-06-SP-05), included only with IQ Combiner 4C • Includes solar shield to match Enphase IQ Battery aesthetics and deflect heat • Flexible networking supports Wi-Fi, Ethernet, or cellular • Optional AC receptacle available for PLC bridge • Provides production metering and consumption monitoring Simple • Centered mounting brackets support single stud mounting • Supports bottom, back and side conduit entry • Up to four 2-pole branch circuits for 240 VAC plug-in breakers (not included) • 80A total PV or storage branch circuits Reliable • Durable NRTL-certified NEMA type 3R enclosure • Five-year limited warranty • Two years labor reimbursement program coverage included for both the IQ Combiner SKU's • UL listed X-IQ-AM1-240-4C 3717 S Olive St- 101118640 & 201823884/2/2024 To learn more about Enphase offerings, visit enphase.com © 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ Combiner 4/4C, and other names are trademarks of Enphase Energy, Inc. Data subject to change. 02-14-2022 MODEL NUMBER IQ Combiner 4 (X-IQ-AM1-240-4)IQ Combiner 4 with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20 +/- 0.5%) and consumption monitoring (+/- 2.5%). Includes a silver solar shield to match the IQ Battery system and IQ System Controller 2 and to deflect heat. IQ Combiner 4C (X-IQ-AM1-240-4C)IQ Combiner 4C with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20 +/- 0.5%) and consumption monitoring (+/- 2.5%). Includes Enphase Mobile Connect cellular modem (CELLMODEM-M1-06-SP-05), a plug-and-play industrial-grade cell modem for systems up to 60 microinverters. (Available in the US, Canada, Mexico, Puerto Rico, and the US Virgin Islands, where there is adequate cellular service in the installation area.) Includes a silver solar shield to match the IQ Battery and IQ System Controller and to deflect heat. ACCESSORIES AND REPLACEMENT PARTS (not included, order separately) Ensemble Communications Kit COMMS-CELLMODEM-M1-06 CELLMODEM-M1-06-SP-05 CELLMODEM-M1-06-AT-05 - Includes COMMS-KIT-01 and CELLMODEM-M1-06-SP-05 with 5-year Sprint data plan for Ensemble sites - 4G based LTE-M1 cellular modem with 5-year Sprint data plan - 4G based LTE-M1 cellular modem with 5-year AT&T data plan Circuit Breakers BRK-10A-2-240V BRK-15A-2-240V BRK-20A-2P-240V BRK-15A-2P-240V-B BRK-20A-2P-240V-B Supports Eaton BR210, BR215, BR220, BR230, BR240, BR250, and BR260 circuit breakers. Circuit breaker, 2 pole, 10A, Eaton BR210 Circuit breaker, 2 pole, 15A, Eaton BR215 Circuit breaker, 2 pole, 20A, Eaton BR220 Circuit breaker, 2 pole, 15A, Eaton BR215B with hold down kit support Circuit breaker, 2 pole, 20A, Eaton BR220B with hold down kit support EPLC-01 Power line carrier (communication bridge pair), quantity - one pair XA-SOLARSHIELD-ES Replacement solar shield for IQ Combiner 4/4C XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 4/4C (required for EPLC-01) XA-ENV-PCBA-3 Replacement IQ Gateway printed circuit board (PCB) for Combiner 4/4C X-IQ-NA-HD-125A Hold down kit for Eaton circuit breaker with screws. ELECTRICAL SPECIFICATIONS Rating Continuous duty System voltage 120/240 VAC, 60 Hz Eaton BR series busbar rating 125 A Max. continuous current rating 65 A Max. continuous current rating (input from PV/storage)64 A Max. fuse/circuit rating (output)90 A Branch circuits (solar and/or storage)Up to four 2-pole Eaton BR series Distributed Generation (DG) breakers only (not included) Max. total branch circuit breaker rating (input)80A of distributed generation / 95A with IQ Gateway breaker included Envoy breaker 10A or 15A rating GE/Siemens/Eaton included Production metering CT 200 A solid core pre-installed and wired to IQ Gateway Consumption monitoring CT (CT-200-SPLIT)A pair of 200 A split core current transformers MECHANICAL DATA Dimensions (WxHxD)37.5 x 49.5 x 16.8 cm (14.75” x 19.5” x 6.63”). Height is 21.06" (53.5 cm) with mounting brackets. Weight 7.5 kg (16.5 lbs) Ambient temperature range -40º C to +46º C (-40º to 115º F) Cooling Natural convection, plus heat shield Enclosure environmental rating Outdoor, NRTL-certified, NEMA type 3R, polycarbonate construction Wire sizes • 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors • 60 A breaker branch input: 4 to 1/0 AWG copper conductors • Main lug combined output: 10 to 2/0 AWG copper conductors • Neutral and ground: 14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Altitude To 2000 meters (6,560 feet) INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b/g/n Cellular CELLMODEM-M1-06-SP-05, CELLMODEM-M1-06-AT-05 (4G based LTE-M1 cellular modem). Note that an Enphase Mobile Connect cellular modem is required for all Ensemble installations. Ethernet Optional, 802.3, Cat5E (or Cat 6) UTP Ethernet cable (not included) COMPLIANCE Compliance, IQ Combiner UL 1741, CAN/CSA C22.2 No. 107.1, 47 CFR, Part 15, Class B, ICES 003 Production metering: ANSI C12.20 accuracy class 0.5 (PV production) Consumption metering: accuracy class 2.5 Compliance, IQ Gateway UL 60601-1/CANCSA 22.2 No. 61010-1 Enphase IQ Combiner 4/4C 3717 S Olive St- 101118640 & 201823884/2/2024 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 www. Loyd W Martin .com Solar Structures Engineering #2024-0199 Structural Only January 20, 2024 3717 S Olive St- 101118640 & 20182388 4/2/2024 1 2 4 3 5 6 7 .30 3.28 3.71 12.00 12.00 3.00 6.00 THIS EDGE TOWARDS ROOF RIDGE ITEM NO.QTY 1 1 2 1 3 1 4 1 5 1 6 1 7 DESCRIPTION LAG BOLT 5/16”- 4 1/2” 18.8 SS 5/16” EPDM BONDED WASHER 18.8 SS SCL-101-3 IR-GF-FLASHING IR-GF-SUPPORT BOLT, 3/8-16 X 1" HEX CS SS NUT, FLANGE HEX 3/8-16 SS 1 KIT, IRONRIDGE FLASH FOOT(L-FOOT INCLUDED) RF-FLSH-001 SCALE:1:4 SIZE PART NO.A REV. DO NOT SCALE DRAWING DRAWN CHECKED ENG APPR. MFG APPR. Q.A. SHEET 1 OF 1WEIGHT: COMMENTS: -- SM SO JA -- -- 11-19-2013 11-26-2013 11-16-2013 -- -- Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -25 www. Loyd W Martin .com Solar Structures Engineering #2024-0199 Structural Only January 20, 2024 3717 S Olive St- 101118640 & 20182388 4/2/2024