HomeMy WebLinkAbout3510 S Olive St - PlanExpedited Permit Process for PV Systems - Micro-Inverter1
Expedited Permit Process for PV Systems
Micro-Inverter
The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due to their similarity with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of the
installation.
The following pages contain forms for the Micro-Inverter to use with the Expedited Per-
mit Process. The Standard String, AC Module, and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic-
tions that have adopted the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submitted in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
3510 S Olive St
05/30/23
Expedited Permit Process for PV Systems — Micro-Inverter2
Expedited Permit Process for Small-Scale PV Systems
Micro-Inverter
The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations
are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been
suggested to provide as a path to permit approval.
Required Information for Permit:
1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it
should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings
with a 3’ perimeter space at ridge and sides may not need separate fire service review.
2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specification sheets and installation manuals (if available) for all manufactured components including, but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1: Structural Review of PV Array Mounting System
Is the array to be mounted on a defined, permitted roof structure? l Yes l No
If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1.
Roof Information:
1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________
____________________________________________________________________________________________________
If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…).
2. Does the roof have a single roof covering? l Yes l No
If No, submit completed worksheet for roof structure WKS1.
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________
Mounting System Information:
1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap
beneath the module frames? l Yes l No
If No, provide details of structural attachment certified by a design professional.
2. For manufactured mounting systems, fill out information on the mounting system below:
a. Mounting System Manufacturer ___________Product Name and Model#________________________________
b. Total Weight of PV Modules and Rails ___________lbs
c. Total Number of Attachment Points____________
d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1)
e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for
maximum spacing allowed based on maximum design wind speed)
f. Total Surface Area of PV Modules (square feet)_________________ ft 2
g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2
If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1.
Step 2: Electrical Review of PV System (Calculations for Electrical Diagram)
In order for a PV system to be considered for an expedited permit process, the following must apply:
1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,440 Watts or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)).
5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV
system. Interactive PDF diagrams are available at www.solarabcs.org/permitting.
Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant
understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively
communicate, provide an alternative diagram with appropriate detail.
3510 S Olive St
05/30/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
3
Micro-Inverter Site Plan
1
8'
' fire
setbac
k
3' fire setback
a a
a
a
a
a
a
a
b
bb
b
b
b
b
S
O
l
i
v
e
S
t
MSP
AC
ECB
JB
Solar PV Array
15 - Hanwha 400W Modules
15 - IQ8+ Microinverters
Pitch: 4 Deg
Orientation: 270 Deg
3510 S Olive St
05/30/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
Micro-Inverter Electrical Diagram
Contractor Name,
Address and Phone:
One-Line Standard Electrical Diagram
for Micro-Inverter PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
E1.1a
SCALE NTS Date: SHEET
Drawn By:
Checked By:
DESCRIPTION OR CONDUCTOR TYPE
USE-2 or PV WIRE
GEC EGC X ALL THAT APPLY
EXTERIOR CABLE LISTED W/ INV.
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
NO DC GEC IF 690.35 SYSTEM
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
TAG
1
2
3
4
5
CONDUIT AND CONDUCTOR SCHEDULE
COND.
GAUGE
MFG
MFG
NUMBER OF
CONDUCTORS
MFG Cable
MFG Cable
CONDUIT
TYPE
N/A
N/A
N/A
SAME
SAME
CONDUIT
SIZE
N/A
N/A
N/A
SAME
SAME
DESCRIPTION
PV DC or AC MODULE
DC/AC INVERTER (MICRO)
J-BOX (IF USED)
PV ARRAY
AC COMB. PANEL (IF USED)
GEN METER (IF USED)
AC DISCONNECT (IF USED)
SERVICE PANEL
TAG
1
2
3
4
5
6
7
8
PART NUMBER NOTES
FOR UNUSED MODULES
PUT "N/A in BLANK ABOVE
1
1
3
2
3
EQUIPMENT SCHEDULE
2
_____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
J-BOX
4
AC DISCO
M
BUILDING
GROUNDING
ELECTRODE
G
M
UTILITY
SERVICE
MAIN SERVICE PANEL
MAIN
OCPD
INVERTER
OCPD
6
7
8
5
4
5
G
SEE GUIDE APPENDIX D FOR
INFORMATION ON MODULE AND
ARRAY GROUNDING
AC COMBINER
PANEL
G
____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
3510 S Olive St
05/30/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
5
Contractor Name,
Address and Phone:
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
E1.2a
SCALE NTS Date: SHEET
Drawn By:
Checked By:
MAX POWER-POINT CURRENT (IMP)
MAX POWER-POINT VOLTAGE (VMP)
OPEN-CIRCUIT VOLTAGE (VOC)
SHORT-CIRCUIT CURRENT (ISC)
MAX SERIES FUSE (OCPD)
MAXIMUM POWER (P MAX)
MAX VOLTAGE (TYP 600VDC)
VOC TEMP COEFF (mV/oC or %/oC )
IF COEFF SUPPLIED, CIRCLE UNITS
MODULE MAKE
MODULE MODEL
PV MODULE RATINGS @ STC (Guide Section 5)
MAX DC VOLT RATING
MAX POWER @ 40oC
NOMINAL AC VOLTAGE
MAX AC CURRENT
MAX OCPD RATING
INVERTER MAKE
INVERTER MODEL
INVERTER RATINGS (Guide Section 4)
1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YES NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
REQUIREMENT? YES NO N/A
3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX
CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING. (See Guide Section 9)
5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO-
INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR
EXCEPTION IN 690.64(B)(2)(a)? YES NO
NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9):
1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC
2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC
2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED
47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT
LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47oC OR LESS (ALL OF UNITED STATES),
a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER
FUSE.
b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER
FUSE.
NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E):
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODE ®REFERENCES
SHOWN AS (NEC XXX.XX)
NOTES FOR ALL DRAWINGS:
SIGNSSEE GUIDE SECTION 7
SIGN FOR DC DISCONNECT
SIGN FOR INVERTER OCPD AND AC
DISCONNECT (IF USED)
No sign necessary since 690.51
marking on PV module covers
needed information
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
SOLAR PV SYSTEM
AC POINT OF CONNECTION
THIS PANEL FED BY MULTIPLE
SOURCES (UTILITY AND SOLAR)
Notes for Micro-Inverter Electrical Diagram
3510 S Olive St
05/30/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
SINGLE LINE
DIAGRAM120% RULE CALCULATION PER NEC 705.12(D)(2)(3)
MSP BUSBAR RATING:AMPS
MSP BREAKER RATING:AMPS
PV BACKFEDING CURRENT:AMPS
BUSBAR X 120% - MAIN BREAKER = MAX PV BREAKER
270 - =70
AC SYSTEM SIZE CALCULATION
Module PTC
Rating (W)x NO. of
Modules x Average Inverter
CEC Efficiency = AC System Size
x x = 15
(1)#12 AWG CU-THWN-2 EGC
97%
(1)#12 AWG CU-THWN-2 EGC
PERCENT
OF VALUES
NUMBER OF CURRENT
CARRYING CONDUCTORS IN EMT
.80 4-6
.70 7-9
.50 10-20
# ITEM DESCRIPTION QTY
1 PV MODULE
2 PVC JUNCTION BOX (N)4"x4"x2" UL LISTED WATER TIGHT
NEMA TYPE 3 4
7 MAIN SERVICE
PANEL
(N)MAIN SERVICE PANEL
A BUSBAR WITH A MAIN
BREAKER
1
3 MICROINVERTERS
KEY NOTES:
· SOLID BARE G.E.C (FREE-AIR) MOUNTED UNDER ARRAY
· PER NEC ARTICLE 690.35 INVERTER GROUND FAULT PROTECTION PROVIDED
· ALL GROUNDS AND NEUTRALS BONDED TO EXISTING GROUNDING
CONDUCTOR W/IRREVERSIBLE CRIP CONNECTOR,
· BACKFED BREAKERS MUST BE LOCATED @ OPPOSITE END OF BUS BAR
FROM MAIN BREAKER OR MAIN LUG ON GRID SIDE. WHEN A BACKFED
BREAKER IS THE METHOD OF UTILITY INTERCONNECTION, BREAKER SHALL
NOT READ ' LINE OR LOAD'.
· PER CEC 250.65(C): CONDUCTOR SPLICES ONLY ALLOWED WITH
COMPRESSION CONNECTORS OR EXOTHERMIC WELDING
· ALL GROUNDS AND NEUTRALS BONDED TO EXISTING GROUNDING
CONDUCTOR W/IRREVERSIBLE CRIP CONNECTOR,
· VERIFY (E) UFER GROUND NEAR MSP. IF (E) UFER IS NOT ACCESSIBLE OR
VERIFIABLE, INSTALL A NEW 5/8" Ø X 8' LONG GROUNDING ROD AND BOND
SOLAR SYSTEM EQUIPMENT GROUNDING ACCORDINGLY.
2
2
WIRE CHART
#
MODULE QTY x NEC MULT
x MICROINV. OUTPUT
AMPS = DESIGN AMPS
BREAKER
SIZE (A)WIRE TYPE EGC
WIRE RATING X TEMP DERATE X
CONDUCTOR DERATE =
DERATED WIRE
CONDUIT SIZE
2 (4)#10 AWG, CU-THWN-2 40 X .71 X .8 = 22.72>= 12.1 3/4" EMT
3 15 X 1.25 X 1.21 = (3)#10 AWG, CU-THWN-2 40 X .91 X 1 = 36.4 >= 3/4" EMT
1a 1
3
Branch Circuit a: (8) Modules
(8)Microinverters
15
15
4
20A
4 ENPHASE
COMBINER BOX 1
(N)ENPHASE IQ COMBINER 3
120/240V,
NEMA 3R
15A
5 ENPHASE
MONITORING 1(N)ENVOY 3G PV MONITORING
SYSTEM
6
AC DISCONNECT (N)30A 2P BLADE TYPE 240V
NON-FUSIBLE AC DISCONNECT
Enphase
5
6 1
3
SYSTEM SIZE: DC STC:
SYSTEM SIZE: AC CEC:
3
1b1
3
Branch Circuit b: (7) Modules
(7)Microinverters
20A
1b 7 X 1.25 X 1.21 =10.58 A (2)#12 AWG, ENPHASE Q CABLE (1)#6 BARE SOLID COPPER GEC 30 X .71 X 1 = 21.3 >= 10.58 IN FREE AIR
8 X 1.25 X 1.21 =12.1 A
NEW UPGRADE
120/240V
1P,3W
A BUS
TOP FED
MAIN C/B
7
22.68 22.68
20
20
30
30
225
6.00 KW
5.45 KW
5.45 KW
200
374.95
(N)Hanwha Q-Cells
Q.PEAK DUO BLK ML-G10+400
Voc = 45.30V, Vmp = 37.13V
Isc = 11.14A, Imp = 10.77A
(N)ENPHASE IQ8+ MICROINVERTERS
IQ8PLUS-72-2-US (240V) [SI1])
OPERATING RANGE: = 16V-60V
PEAK PWR TRACKING VOLTAGE: =27-45V
CEC EFFICIENCY : = 97.0 %
ENCLOSURE : NEMA 6
MAXIMUM INPUT CURRENT: = 15 A
MAXIMUM OUTPUT CURRENT: = 1.21 A
MAXIMUM INPUT POWER: = 235 - 440W+
MAXIMUM OUTPUT POWER: = 290 VA
30
20
0
225
NOTE: AC DISCONNECT IS VISIBLE & LOCKABLE
225
200
200
1a (2)#12 AWG, ENPHASE Q CABLE (1)#6 BARE SOLID COPPER GEC IN FREE AIR20 8 X 1.25 X 1.21 =12.1 A 30 X .71 X 1 = 21.3 >= 12.1
E-1
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
VICINITY MAP
SCALE: NTS
PV SOLAR SYSTEM DETAILS
ELECTRICAL INFORMATION:
NEW
MAIN SERVICE PANEL BUS SIZE: A
MAIN SERVICE BREAKER : A
MOUNTING SYSTEM:
BUILDING INFORMATION:
CONSTRUCTION TYPE: V-B
OCCUPANCY: R3
ROOF:
SYSTEM SIZE: DC STC:
SYSTEM SIZE: AC CEC:
SOLAR MODULES: ( )
SATELLITE VIEW
SCALE: NTS
MAIN
3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED
4. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO
INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING
COMMISSIONING AND ACCEPTANCE WITH THE CLIENT,
UTILITY CO. AND CITY INSPECTORS AS NEEDED.
5. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF
SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY
AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS.
6. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL
BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL
BE COORDINATED WITH OTHER TRADES.
7. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV
INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS
RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING
THE EXTRA WEIGHT.
8. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE
CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE
WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS
APPROPRIATE.
9. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE
DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED
BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE
SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF
THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS.
10. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS,
ETC. SHALL BE HANDED OVER TO OWNER'S REPRESENTATIVE AT THE
COMPLETION OF WORK
PHOTOVOLTAIC NOTES:
1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL
BE TESTED, LISTED AND IDENTIFIED BY RECOGNIZED ELECTRICAL
TESTING LABORATORY
2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL
VENTS
3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED.
5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL
NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING
ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR
OUTPUT CIRCUIT GROUNDED CONDUCTORS.
4. SOLAR INVERTER SHALL BE LISTED TO UL1741.
6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND
WIRING SHALL BE PROTECTED FROM PHYSICAL DAMAGE.
7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT
CIRCUITS OVER 150V TO GROUND SHALL NOT BE
ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE
ENERGIZED.
8. INVERTER IS EQUIPED WITH INTEGRATED GFDI, THUS
PROVIDING GROUND FAULT PROTECTION
9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG
RATED
10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A
RECOGNIZED ELECTRICAL TESTING LABORATORY.
11. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE
USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC
GROUNDING, AC GROUNDING AND BONDING BETWEEN
AC AND DC SYSTEMS.
12. NON-CURRENT CARRYING METAL PARTS OF
EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER.
BOND BOTH ENDS OF RACEWAYS.
GENERAL NOTES
1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED
ELECTRICAL TESTING LABORATORY
CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED
BY THE MANUFACTURER ATTESTING TO ITS SAFETY
2. OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED OR BETTER
15
: 2 X 4 @ 24" O.C.
ROLLED COMP & COMP SHINGLE
INVERTERS: ( )
ROOF PLAN
SINGLE LINE DIAGRAM
ATTACHMENT LAYOUT
SIGNAGE
RSD DATA SHEET
INVERTER DATA SHEET
1
INDEX
2
3
4
5
6
7
8
9
10.1
SITE PLAN
MODULE DATA SHEET
RACKING DATA SHEET
ATTACHMENT DATA SHEET11.1
ECB DATA SHEET
THE INSTALLATION OF SOLAR ARRAYS AND
PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH
THE FOLLOWING CODES:
2020 National Electrical Code
2022 California Building Code
2022 California Residential Code
2022 California Green Building Standard Code
2022 California Plumbing Code
2022 California Mechanical Code
2022 California Electrical Code
2022 California Fire Code
2022 California Energy Code
2016 International Property Maintenance Code
ALL OTHER ORDINANCE ADOPTED BY THE LOCAL
GOVERNING AGENCIES
12
13 RACKING CLASSIFICATION
MONITORING PAGE
15
6.00 KW
5.45 KW
225
200
RAFTER
Hanwha 400 watt
Enphase IQ8+ Microinverters
IRONRIDGE
10.2 RACKING DATA SHEET
ATTACHMENT DATA SHEET11.2
Date Certified and
Exp. Date : 3/31/2024
Signed: 07/26/2023
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024
The scope of the plans is for the installation of the solar photovoltaic system only
and the approval is subject to compliance with all applicable city and state codes
and regulations regarding construction. The approval of the plans does not
constitute any certification of the accuracy, completeness, or building permit
status of the existing buildings and structures as shown.
Revision to
Bldg# 101114926
Issued 05/30/23
Bldg# 101116033
Issued 08/01/23
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
ROOF PLANPV-1
INDEX
(N)Main Service Panel
Roof Face Area:1808
Total Module Area: 270
14.93% of Roof Coverage
(N)AC Disconnect
(N)Enphase Combiner Box
(N) Junction Box
(N)Microinverter
(N) Solar Module
Conduit
Setback
MSP
AC
ECB
JB
18
'
' fire
se
t
ba
ck
3' fire setback
S
O
l
i
v
e
S
t
MSP
AC
ECB
JB
Solar PV Array 2
4 - Hanwha 400W Modules
4 - IQ8+ Microinverters
Pitch: 18 Deg
Orientation: 90 Deg
3' fire setback
Solar PV Array 1
11 - Hanwha 400W Modules
11 - IQ8+ Microinverters
Roof Pitch: 4 Deg
Module Pitch: 14 Deg
Orientation: 270 Deg
a
a
a
a
a
a
a
a
b
b
b
b
b
b
b
3' fire setback
JB
JB
JB
SCALE: 1/8" = 1'-0"
S
180 °
E
90 °
W
270 °
N
0°
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
SIGNAGEPV-2
1
2
(STICKER TO BE LOCATED ON
CONDUIT WITH DC CURRENT
EVERY 4' HORIZONTALLY OR
10' VERTICALLY AND 1' FROM
EACH SIDE OF A BEND)
3
4
10
(TO BE LOCATED ON
SUB-PANEL ONLY
WHEN SUB-PANEL IS
DEDICATED FOR PV ONLY)
5
6
7
8
(STICKER LOCATED
INSIDE PANEL
NEXT TO SOLAR BREAKER)
9
(STICKER LOCATED
INSIDE PANEL
BELOW PV BREAKER)
PV ARRAY
J BOX
PV SUB-PANEL
*if applicable
SUB-PANEL
*if applicable
AC
DISCONNECT
*if applicable
METER
MAIN SERVICE
PANEL
2
1
5
6
8
7
9
6
8
7
9
6
6
8
7
9
12
(STICKER LOCATED
ON THE PV SUB PANEL)
10
11
(STICKER LOCATED
ON THE MAIN SERVICE PANEL)
11
CAUTION
AUTHORIZED SOLAR
PERSONNAL ONLY!
CAUTION
SOLAR DC CURRENT PRESENT
DURING DAYLIGHT HOURS
WARNING!
ELECTRIC SHOCK HAZARD.
IF GROUND FAULT IS INDICATED,
NORMALLY GROUNDED
CONDUCTORS MAY BE
UNGROUNDED AND ENERGIZED.
WARNING!
ELECTRIC SHOCK HAZARD.
DO NOT TOUCH THE TERMINALS.
TERMINALS ON BOTH THE LINE AND
LOAD SIDES MAY BE ENERGIZED IN
THE OPEN POSITION.
PV LOAD CENTER SIZED FOR PV
BREAKERS ONLY OR RENDERED UNABLE
TO ACCEPT ANY ADDITIONAL LOADS.
PV SUB-PANEL ONLY
AC DISCONNECT
AC PHOTOVOLTAIC POWER SOURCE
RATED AC OUTPUT CURRENT: MAX
NOMINAL AC OPERATING VOLTAGE: Vac
THIS PANEL FED BY
MULTIPLE SOURCES
(UTILITY & SOLAR)
SOLAR
WARNING!
INVERTER OUTPUT CONNECTION. DO NOT
RELOCATE THIS OVERCURRENT DEVICE
PHOTOVOLTAIC SYSTEM
EQUIPPED WITH
RAPID SHUT DOWN
Permanent directory or plaque
providing location of service
disconnecting means and
photovoltaic system disconnecting
means, if not located at the same
location. (Plaques shall be metal or
plastic, with engraved or machine
printed letters, or electro-photo plating,
in a contrasting color to the plaque.
Plaques shall be permanently attached
to the equipmenq or in the required
location using an approved method that
is suitable to withstand the environment
to which it is exposed. Plaques and
signage shall meet legibility,
defacemet, exposure and adhesion
requirements of Underwriters
Laboratories marking and labeling
system 969(UL969).
MARKINGS, LABELS AND WIRING SIGNS
A. Purpose: Provide emergency responders with appropriate warning and guidance with
respect to isolating solar electric system.
This can facilitate identifying energized electrical lines that connect solar panels to the
inverter, as these should not be cut when venting for smoke removal
B. Main Service Disconnect.
1. Residential buildings - The marking main be placed within the main service
disconnect. The marking shall be placed
outside cover if the main service disconnect is operable with the service panel closed.
2. Commercial buildings - Tha marking shall be placed adjacent to the main service
disconnect clearly visible from the location where the level is operated
3. Markings: Verbiage, Format and Type of Material.
a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED
b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All
letters shall be capitalized. Arial or similar font, non bold.
c. Material: Reflective, weather resistant material suitable for the environment (use UL -
969 as standard for weather rating). Durable adhesive materials meet this requirement.
C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC
combiners and junction boxes:
1. Markings: Verbiage, Format and Type of Material.
a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC
conduits, raceways, enclosures, and cable assemblies,
at turns, above and for below penetrations, all DC combiners and junction boxes
b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall
adhere to "V. V-3b, c" of this requirement.
c. Inverters are not required to have caution markings
1.Marking is required on all interior and exterior DC conduit raceways,enclosures,cable
assemblies,and junction boxes,combiner boxes and disconnects.
2.The materials used for marking shall be reflective,weather resistant material suitable
for the environment.
Minimum 3/8 "letter height; all upper case letters Arial or similar font; Red background
with white lettering.
3.Marcking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE.
4.Marking shall be placed adjacent to the main service disconnect in a location clearly
visible from the location where the disconnect is operated
CAUTION
POWER TO THIS BUILDING IS ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
DISCONNECTS LOCATED AS SHOWN:
N
0°
S
180 °
E
90 °
W
270 °
13
(RAPID SHUTDOWN SWITCH FOR
SOLAR PV SYSTEM)
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SHUT DOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD
IN THE ARRAY
SOLAR ELECTRIC
PV PANELS
22.68
240
SERVICE POINT &
UTILITY METERING
AC DISCONNECT ENPHASE COMBINER
SOLAR PV ARRAY
You Are
Here
3510 S Olive St
08/01/23
MONITORING
PAGE
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
PV.3
270°, 90° AZIMUTH
±14°, ±18° SLOPE
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
SITE PLANS-1
INDEX
(N)Solar Module
(N) AC DisconnectAC
(N) Enphase Combiner BoxECB
(N) Main Service PanelMSP
89'-1"
63'-1"
89'-1"
63'-1"
Driveway
S
O
l
i
v
e
S
t
MSP
AC
ECB
PROPERTY LINE
9'-1"
30'-10"
26'-7"
37'-5"
SCALE: 3/32" = 1'-0"
S
180 °
E
90 °
W
270 °
N
0°
Date Certified and
Exp. Date : 3/31/2024
Signed: 07/26/2023
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
ATTACHMENT
LAYOUTS-2
1.
2.
3. Roof attachment hardware to be mounted to existing structure
( ) with 48" O.C.rail spans less.
4. Lag bolts are 5/16" X 3.5" stainless steel with 2.5" minimum embedment into the center of the roof
5. Roof sheathed with 1/2" plywood and upper surface is faced with felt paper.
Finished roof surface is One layer of .
2 X 4 @ 24" O.C.
ROLLED COMP & COMP SHINGLE
RAIL
ATTACHMENT
MODULE WEIGHT (lbs)
# OF MODULES
TOTAL MODULE WEIGHT (lbs)
RACK WEIGHT (lbs)
TOTAL SYSTEM WEIGHT (lbs)
# OF STANDOFFS
MAX SPAN BETWEEN STANDOFFS (in)
LOADING PER STANDOFF (lbs)
TOTAL AREA (sq.ft.)
LOADING (PSF)
727.5
145.5
908.7
36
48
25.24
3.36
270
MICROINVERTERS WEIGHT (lbs)35.7
15
Roof Face Area:1808
Total Module Area: 270
14.93% of Roof Coverage
RAFTER
RAFTER
48.5 Ironridge Racking & Ironridge Tilt Leg Systems
IronRidge FlashFoot 2 Attachment & Ironridge Tilt Leg With Chem Curb
PV MODULE FRAME
IRONRIDGE RAIL
DETAIL, END CLAMP FRONT B
IRONRIDGE STOPPER SLEEVE
IRONRIDGE UNIVERSAL
FASTENING OBJECT
PV MODULE FRAME
IRONRIDGE RAIL
DETAIL, END CLAMP PLANB
IRONRIDGE STOPPER
SLEEVE
IRONRIDGE UNIVERSAL
FASTENING OBJECT
PV MODULE FRAME
IRONRIDGE RAIL
DETAIL, MID CLAMP FRONT C
IRONRIDGE UNIVERSAL
FASTENING OBJECT
PV MODULE FRAME
DETAIL, MID CLAMP PLANC
IRONRIDGE UNIVERSAL
FASTENING OBJECT
IRONRIDGE RAIL
IRONRIDGE FLASHFOOT2
A
IRONRIDGE RAIL
PV MODULE
CB D
IRONRIDGE STOPPER SLEEVE
IRONRIDGE UNIVERSAL
FASTENING OBJECT
IRONRIDGE FLASHFOOT2
IRONRIDGE UNIVERSAL
FASTENING OBJECT
(E) ROOF
MEMBRANE
IRONRIDGE
FLASHFOOT2
IRONRIDGE
RAIL
PV MODULE,
BY OTHERS
(E) BUILDING
STRUCTURE
(E) ROOF
MEMBRANE
IRONRIDGE
FLASHFOOT2
IRONRIDGE
RAIL
PV MODULE,
BY OTHERS
(E) BUILDING
STRUCTURE
DETAIL, FLASHFOOT2 SIDEA
DETAIL, FLASHFOOT2 FRONTD
5/16" STAINLESS STEEL LAG SCREW
MIN. 2.5" EMBED INTO FRAMING MEMBER
FRONT VIEW
SIDE VIEW
(E) RAFTERS
3.0
12.0
4.50
9.0
3.67
3.56 1.02
IRONRIDGE ATTACHMENT AND RACKING DETAILS
SOLAR MODULE
Blocking
Maximum 6"
2 X 4 @ 24" O.C.
Rolled Comp
Comp Shingle
Ironridge Tilt Leg System
SOLAR MODULE
Ironridge 10° Tilt Kit With Chem Curb
IronRidge
FlashFoot 2
IronRidge Rail
SOLAR MODULE
14°
4°
10°
IRONRIDGE TILT LEG DETAILS
CHEM CURB DETAILS
Date Certified and
Exp. Date : 3/31/2024
Signed: 07/26/2023
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
INVERTER
DATA SHEET7
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
8 MODULE
DATA SHEET
3510 S Olive St
08/01/23
RSD
DATA SHEET
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
9
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
10.1 RACKING
DATA SHEET
Date Certified and
Exp. Date : 3/31/2024
Signed: 07/26/2023
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
10.2 RACKING
DATA SHEET
Date Certified and
Exp. Date : 3/31/2024
Signed: 07/26/2023
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
11.1 ATTACHMENT
DATA SHEET
Date Certified and
Exp. Date : 3/31/2024
Signed: 07/26/2023
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
11.2 ATTACHMENT
DATA SHEET
Date Certified and
Exp. Date : 3/31/2024
Signed: 07/26/2023
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
12 ECB
DATA SHEET
3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE: 07/26/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
RACKING
CLASSIFICATION13
Date Certified and
Exp. Date : 3/31/2024
Signed: 07/26/2023
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024 3510 S Olive St
08/01/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
SINGLE LINE
DIAGRAM120% RULE CALCULATION PER NEC 705.12(D)(2)(3)
MSP BUSBAR RATING:AMPS
MSP BREAKER RATING:AMPS
PV BACKFEDING CURRENT:AMPS
BUSBAR X 120% - MAIN BREAKER = MAX PV BREAKER
270 - =70
AC SYSTEM SIZE CALCULATION
Module PTC
Rating (W)x NO. of
Modules x Average Inverter
CEC Efficiency = AC System Size
x x = 15
(1)#12 AWG CU-THWN-2 EGC
97%
(1)#12 AWG CU-THWN-2 EGC
PERCENT
OF VALUES
NUMBER OF CURRENT
CARRYING CONDUCTORS IN EMT
.80 4-6
.70 7-9
.50 10-20
# ITEM DESCRIPTION QTY
1 PV MODULE
2 PVC JUNCTION BOX (N)4"x4"x2" UL LISTED WATER TIGHT
NEMA TYPE 3 1
7 MAIN SERVICE
PANEL
(N)MAIN SERVICE PANEL
A BUSBAR WITH A MAIN
BREAKER
1
3 MICROINVERTERS
KEY NOTES:
· SOLID BARE G.E.C (FREE-AIR) MOUNTED UNDER ARRAY
· PER NEC ARTICLE 690.35 INVERTER GROUND FAULT PROTECTION PROVIDED
· ALL GROUNDS AND NEUTRALS BONDED TO EXISTING GROUNDING
CONDUCTOR W/IRREVERSIBLE CRIP CONNECTOR,
· BACKFED BREAKERS MUST BE LOCATED @ OPPOSITE END OF BUS BAR
FROM MAIN BREAKER OR MAIN LUG ON GRID SIDE. WHEN A BACKFED
BREAKER IS THE METHOD OF UTILITY INTERCONNECTION, BREAKER SHALL
NOT READ ' LINE OR LOAD'.
· PER CEC 250.65(C): CONDUCTOR SPLICES ONLY ALLOWED WITH
COMPRESSION CONNECTORS OR EXOTHERMIC WELDING
· ALL GROUNDS AND NEUTRALS BONDED TO EXISTING GROUNDING
CONDUCTOR W/IRREVERSIBLE CRIP CONNECTOR,
· VERIFY (E) UFER GROUND NEAR MSP. IF (E) UFER IS NOT ACCESSIBLE OR
VERIFIABLE, INSTALL A NEW 5/8" Ø X 8' LONG GROUNDING ROD AND BOND
SOLAR SYSTEM EQUIPMENT GROUNDING ACCORDINGLY.
2
2
WIRE CHART
#
MODULE QTY x NEC MULT
x MICROINV. OUTPUT
AMPS = DESIGN AMPS
BREAKER
SIZE (A)WIRE TYPE EGC
WIRE RATING X TEMP DERATE X
CONDUCTOR DERATE =
DERATED WIRE
CONDUIT SIZE
2 (4)#10 AWG, CU-THWN-2 40 X .71 X .8 = 22.72>= 12.1 3/4" EMT
3 15 X 1.25 X 1.21 = (3)#10 AWG, CU-THWN-2 40 X .91 X 1 = 36.4 >= 3/4" EMT
1a 1
3
Branch Circuit a: (8) Modules
(8)Microinverters
15
15
4
20A
4 ENPHASE
COMBINER BOX 1
(N)ENPHASE IQ COMBINER 3
120/240V,
NEMA 3R
15A
5 ENPHASE
MONITORING 1(N)ENVOY 3G PV MONITORING
SYSTEM
6
AC DISCONNECT (N)30A 2P BLADE TYPE 240V
NON-FUSIBLE AC DISCONNECT
Enphase
5
6 1
3
SYSTEM SIZE: DC STC:
SYSTEM SIZE: AC CEC:
3
1b1
3
Branch Circuit b: (7) Modules
(7)Microinverters
20A
1b 7 X 1.25 X 1.21 =10.58 A (2)#12 AWG, ENPHASE Q CABLE (1)#6 BARE SOLID COPPER GEC 30 X .71 X 1 = 21.3 >= 10.58 IN FREE AIR
8 X 1.25 X 1.21 =12.1 A
NEW UPGRADE
120/240V
1P,3W
A BUS
TOP FED
MAIN C/B
7
22.68 22.68
20
20
30
30
225
6.00 KW
5.45 KW
5.45 KW
200
374.95
(N)Hanwha Q-Cells
Q.PEAK DUO BLK ML-G10+400
Voc = 45.30V, Vmp = 37.13V
Isc = 11.14A, Imp = 10.77A
(N)ENPHASE IQ8+ MICROINVERTERS
IQ8PLUS-72-2-US (240V) [SI1])
OPERATING RANGE: = 16V-60V
PEAK PWR TRACKING VOLTAGE: =27-45V
CEC EFFICIENCY : = 97.0 %
ENCLOSURE : NEMA 6
MAXIMUM INPUT CURRENT: = 15 A
MAXIMUM OUTPUT CURRENT: = 1.21 A
MAXIMUM INPUT POWER: = 235 - 440W+
MAXIMUM OUTPUT POWER: = 290 VA
30
20
0
225
NOTE: AC DISCONNECT IS VISIBLE & LOCKABLE
225
200
200
1a (2)#12 AWG, ENPHASE Q CABLE (1)#6 BARE SOLID COPPER GEC IN FREE AIR20 8 X 1.25 X 1.21 =12.1 A 30 X .71 X 1 = 21.3 >= 12.1
E-1
3510 S Olive St
05/30/23
Structural Engineering Letter
Date: 04/14/2023
Project Name: Daniel Atwell
Project Address: 3510 S Olive St, Santa Ana, CA, 92707
Contractor : Vibe Solar
Contractor Address : 1206 Commerce Center Dr #103 Lancaster, CA 93534
Attn : To Whom It May Concern
A Field observation of the condition of the existing framing system was performed by an audit team from
Vibe Solar. From the Field observation of the property, the existing roof structure observed as follows:
Existing roof is supported by 2 x 4 @ 24" rafters at the solar array. The rafters are sloped at
approximately 4 degree and have maximum projected horizontal span of 7 feet in between
load bearing supports.
Design Criteria
Applicable codes: 2022 California Building Code ASCE
7-16
Ground Snow Load: 20 psf
Roof Dead Load: 20 psf
Wind speed: 110 mph
Risk Category: II
Date Certified and
Signed: 04/14/2023
I certify that the capacity of the structural roof framing that directly supports the additional gravity loading
due to the solar panel supports and modules had been reviewed and determined to meet or exceed the
requirements in accordance with the Design Criteria.
If you have any questions or concerns please contact us,
Engineerinc.io,
303 N Glenoaks Blvd Suite 200
Burbank, CA 91502
(747) 333 - 5991
new@engineerinc.io
3510 S Olive St
05/30/23
Date: 04/14/2023
Job Number: 13510
Prepared for : Vibe Solar, 1206 Commerce Center Dr #103 Lancaster, CA 93534
Project.: Daniel Atwell , 3510 S Olive St, Santa Ana, CA, 92707
The following calculations are for the structural engineering design of the photovoltaic panels and are
valid only for the structural info referenced in the stamped plan set. The verification of such info is the
responsibility of others. After review, I certify that the roof structure has sufficient structural capacity for
the applied PV loads. All PV mounting equipment shall be designed and installed per manufacturer's
approved installation specifications.
Engineerinc.io
303 N Glenoaks Blvd Suite 200
Burbank, CA 91502
(747) 333 - 5991
new@engineerinc.io
Date Certified and
Signed: 04/14/2023
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io
3510 S Olive St
05/30/23
Solar Module Details
Module Type Hanwha
Module Quantity 15
Module Model Number 400 watt
Design Criteria
Code: 2022 California Building Code ASCE 7-16
Live Load (psf)20
Ult Wind Speed (mph)110
Exposure Cat C
Ground Snow (psf)20
Structure Geometry
Eave Height, he (ft)15 to 20ft
Pitch of main roof (deg)4
Building Length, L (ft)70
Building Width, B (ft)50
Roof Area (Module Area) ft2 3500.00
Standoff(i.e., Roof Mount) Spacing Feet 4`
Roof Properties
Roof Geometry type Gable Roof
Roof Type Truss
Roof Pitch (deg)4
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io
3510 S Olive St
05/30/23
Roofing Type Rolled Comp / Membranes
Sheathing Type 1/2" OSB Board
Wood species No. 2, Douglas Fir-Larch
Wood Fb (psf)900
Wood Fv (psf)180
Wood E (psf)1600000
Purlin C/C Spacing (in)12
Rafter C/C. Spacing (in.)24
Purlin
Section Thickness, b (in.)2
Section Depth, d (in.)4
Rafter
Section Thickness, b (in.)2
Section Depth, d (in.)4
Maximum Rafter Span (ft)7
Factors
Cd(wind)1.60
Cd(Snow)1.60
CLS 1.15
CM 1
Ct 1
CL 0.75
CF 1.5
Cfu 1
Cv 1
Cr 1
M allowable_wind 413.44
M allowable_snow 297.16
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io
3510 S Olive St
05/30/23
Dead Load(psf)
Rolled Comp / Membranes 3.00 psf
1/2" OSB Board 2.00 psf
Insulation 2.00 psf
Total Roof 1DL 7 psf
No. 2, Douglas Fir-Larch 31.00 lb/ft3
Solar Panel DL 3.00 psf
Roof 1
Roof_Dist_DL 7.00 psf
M_Roof_Dist_DL 2904.23
Def_Roof_Dist_DL 1.73
PV_uni_Dist_DL 3.00 psf
M_PV_uni_Dist_DL 10.54
Def_PV_uni_Dist_DL 0.01
Total_Uni_DL 11.00 psf
M_Total_DL 2914.77
Def_Total_DL 1.73
Snow Load(psf)
Ground Snow Load, pg 20
Importance Factor, Ic 1
Thermal Factor, Ct 1
Exposure Factor, Ce 1
Flat roof snow, pF 20
Slope Factor, Cs 1
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io
3510 S Olive St
05/30/23
Sloped Row Snow, ps 20
Uni_Dist_S 20.00
M_uni_Dist_s 122.50
Def_uni_Dist_S 0.07
Wind Load
Ultimate Wind Speed 110
Directionality Factor,kd 0.85
Topographic factor 1.00
Velocity pressure exposure factor,kz 0.88
Ground Elevation Factor,ke 1.08
Side Wall Width 50
Median Roof Height 75.39
Velocity pressure,qz 23.17
External Pressure Up,GCp_1 -1.3
External Pressure Up,GCp_2 -1.3
External Pressure Up,GCp_3 -1.3
External Pressure Down,GCp -1.3
Design Pressure Up,p_1 -25.18
Design Pressure Up,p_2 -25.18
Design Pressure Up,p_3 -25.18
Design Pressure Up,p -25.18
Uni_Dist_W_up -25.18
M_uni_Dist_W_up -154.23
Def_uni_Dist_W_up -0.09
Uni_Dist_W_down -25.18
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io
3510 S Olive St
05/30/23
M_uni_Dist_W_down -154.23
Def_uni_Dist_W_down -0.09
Lag Screw Uplift Check (ASD)
5/16" Lag Screw Withdrawl value 205.00 lb/in
Lag Screw Penetration 2.50 in
Roof1 0.6D+0.6W(up z1)1976.364 > 512.5
Roof1 0.6D+0.6W(up z2)1976.364 > 512.5
Framing Check (ASD):
Roof1 uni 1.0D+0.6W 2914.77 > 413.44
Lag Screw Penetration 3006.65 > 413.44
Roof1 0.6D+0.6W(up z1)3037.27 > 297.16
Roof1 0.6D+0.6W(up z2)1656.32 > 413.44
Seismic Check:
Wood 5.00 psf
2x4 Studs @ 16"2.00 psf
Gypsum 3.00 psf
Misc(insulatioon,etc)2.00 psf
Total wall DL 12.00 psf
Total Wall Area (Approx)2590.00 ft2
Total Wall W 31080 lbs
Total Roof DL 7.50 psf
Total Roof Area (Approx)1202.93 ft2
Total Roof W 9021.975 lbs
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io
3510 S Olive St
05/30/23
OK
PV Panel W 3.00 psf
Area of panel 300.00 ft2
Total Roof W 538.79 lbs
% increase=(Wadditional)/Wexisting 1.43%
The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further
seismic analysis is required.
Limits of Scope of Work and Liability
Existing structure is assumed to have been designed and constructed following appropriate codes at
time of erection, and assumed to have appropriate permits. The calculations produced are only for the
roof framing supporting the proposed PV installation referenced in the stamped planset and were
completed according to generally recognized structural analysis standards and procedures, professional
engineering and design experience, opinions and judgements. Existing deficiencies which are unknown
or were not observable during time of inspection are not included in this scope of work. All PV modules,
racking, and mounting equipment shall be designed and installed per manufacturer's approved
installation specifications. The Engineer of Record and Engineerinc assume no responsibility for misuse
or improper installation. This analysis is not stamped for water leakage. Framing was determined based
on information in provided plans and/or photos, along with engineering judgement. Prior to
commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the
stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any
discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing
that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the
Engineer of Record of any concerns prior to starting construction. Prior to the commencement of work,
the contractor shall verify the existing roof and framing conditions. Notify Engineerinc and the engineer of
record of any Discrepancies prior to starting construction. Prior to the commencement of work, the
contractor shall inspect framing for any damage such as water damage, cracked framing, etc. and notify
the E.O.R. if any issues are found.These plans/calculations are stamped for structural code compliance
of the roof framing supporting the proposed PV installation reference only. These plans/calculations are
not stamped for water leakage. PV modules, racking, and attachment components must follow
manufacturer guidelines and requirements.
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io
3510 S Olive St
05/30/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
VICINITY MAP
SCALE: NTS
PV SOLAR SYSTEM DETAILS
ELECTRICAL INFORMATION:
NEW
MAIN SERVICE PANEL BUS SIZE: A
MAIN SERVICE BREAKER : A
MOUNTING SYSTEM:
BUILDING INFORMATION:
CONSTRUCTION TYPE: V-B
OCCUPANCY: R3
ROOF:
SYSTEM SIZE: DC STC:
SYSTEM SIZE: AC CEC:
SOLAR MODULES: ( )
SATELLITE VIEW
SCALE: NTS
MAIN
3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED
4. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO
INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING
COMMISSIONING AND ACCEPTANCE WITH THE CLIENT,
UTILITY CO. AND CITY INSPECTORS AS NEEDED.
5. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF
SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY
AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS.
6. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL
BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL
BE COORDINATED WITH OTHER TRADES.
7. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV
INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS
RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING
THE EXTRA WEIGHT.
8. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE
CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE
WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS
APPROPRIATE.
9. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE
DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED
BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE
SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF
THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS.
10. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS,
ETC. SHALL BE HANDED OVER TO OWNER'S REPRESENTATIVE AT THE
COMPLETION OF WORK
PHOTOVOLTAIC NOTES:
1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL
BE TESTED, LISTED AND IDENTIFIED BY RECOGNIZED ELECTRICAL
TESTING LABORATORY
2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL
VENTS
3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED.
5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL
NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING
ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR
OUTPUT CIRCUIT GROUNDED CONDUCTORS.
4. SOLAR INVERTER SHALL BE LISTED TO UL1741.
6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND
WIRING SHALL BE PROTECTED FROM PHYSICAL DAMAGE.
7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT
CIRCUITS OVER 150V TO GROUND SHALL NOT BE
ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE
ENERGIZED.
8. INVERTER IS EQUIPED WITH INTEGRATED GFDI, THUS
PROVIDING GROUND FAULT PROTECTION
9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG
RATED
10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A
RECOGNIZED ELECTRICAL TESTING LABORATORY.
11. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE
USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC
GROUNDING, AC GROUNDING AND BONDING BETWEEN
AC AND DC SYSTEMS.
12. NON-CURRENT CARRYING METAL PARTS OF
EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER.
BOND BOTH ENDS OF RACEWAYS.
GENERAL NOTES
1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED
ELECTRICAL TESTING LABORATORY
CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED
BY THE MANUFACTURER ATTESTING TO ITS SAFETY
2. OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED OR BETTER
15
: 2 X 4 @ 24" O.C.
ROLLED COMP
INVERTERS: ( )
ROOF PLAN
SINGLE LINE DIAGRAM
ATTACHMENT LAYOUT
SIGNAGE
RSD DATA SHEET
INVERTER DATA SHEET
1
INDEX
2
3
4
5
6
7
8
9
10
SITE PLAN
MODULE DATA SHEET
RACKING DATA SHEET
ATTACHMENT DATA SHEET11
ECB DATA SHEET
THE INSTALLATION OF SOLAR ARRAYS AND
PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH
THE FOLLOWING CODES:
2020 National Electrical Code
2022 California Building Code
2022 California Residential Code
2022 California Green Building Standard Code
2022 California Plumbing Code
2022 California Mechanical Code
2022 California Electrical Code
2022 California Fire Code
2022 California Energy Code
2016 International Property Maintenance Code
ALL OTHER ORDINANCE ADOPTED BY THE LOCAL
GOVERNING AGENCIES
12
13 RACKING CLASSIFICATION
MONITORING PAGE
15
6.00 KW
5.45 KW
225
200
RAFTER
Hanwha 400 watt
Enphase IQ8+ Microinverters
IRONRIDGE
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024 Date Certified and
Exp. Date : 3/31/2024
Signed:04/14/2023
PV.0
Cover
Page
The scope of the plans is for the installation of the solar
photovoltaic system only and the approval is subject to
compliance with all applicable city and state codes and
regulations regarding construction. The approval of the
plans does not constitute any certification of the
accuracy, completeness, or building permit status of the
existing buildings and structures as shown.
Bldg# 101114926
Elec# 20179515
Issued 05/30/23
3510 S Olive St
05/30/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
ROOF PLANPV.1
INDEX
(N)Main Service Panel
Roof Face Area:1808
Total Module Area: 270
14.93% of Roof Coverage
(N)AC Disconnect
(N)Enphase Combiner Box
(N)Junction Box
(N)Microinverter
(N)Solar Module
Conduit
Setback
MSP
AC
ECB
JB
18
'
'
fi
r
e
se
t
b
a
c
k
3' fire setback
a a
a
a
a
a
a
a
b
bb
b
b
b
b
S
O
l
i
v
e
S
t
MSP
AC
ECB
JB
Solar PV Array
15 - Hanwha 400W Modules
15 - IQ8+ Microinverters
Pitch: 4 Deg
Orientation: 270 Deg
SCALE: 1/8" = 1'-0"
S
180 °
E
90 °
W
270 °
N
0°
Patio
Patio
3510 S Olive St
05/30/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
SIGNAGEPV.2
1
2
(STICKER TO BE LOCATED ON
CONDUIT WITH DC CURRENT
EVERY 4' HORIZONTALLY OR
10' VERTICALLY AND 1' FROM
EACH SIDE OF A BEND)
3
4
10
(TO BE LOCATED ON
SUB-PANEL ONLY
WHEN SUB-PANEL IS
DEDICATED FOR PV ONLY)
5
6
7
8
(STICKER LOCATED
INSIDE PANEL
NEXT TO SOLAR BREAKER)
9
(STICKER LOCATED
INSIDE PANEL
BELOW PV BREAKER)
PV ARRAY
J BOX
PV SUB-PANEL
*if applicable
SUB-PANEL
*if applicable
AC
DISCONNECT
*if applicable
METER
MAIN SERVICE
PANEL
2
1
5
6
8
7
9
6
8
7
9
6
6
8
7
9
12
(STICKER LOCATED
ON THE PV SUB PANEL)
10
11
(STICKER LOCATED
ON THE MAIN SERVICE PANEL)
11
CAUTION
AUTHORIZED SOLAR
PERSONNAL ONLY!
CAUTION
SOLAR DC CURRENT PRESENT
DURING DAYLIGHT HOURS
WARNING!
ELECTRIC SHOCK HAZARD.
IF GROUND FAULT IS INDICATED,
NORMALLY GROUNDED
CONDUCTORS MAY BE
UNGROUNDED AND ENERGIZED.
WARNING!
ELECTRIC SHOCK HAZARD.
DO NOT TOUCH THE TERMINALS.
TERMINALS ON BOTH THE LINE AND
LOAD SIDES MAY BE ENERGIZED IN
THE OPEN POSITION.
PV LOAD CENTER SIZED FOR PV
BREAKERS ONLY OR RENDERED UNABLE
TO ACCEPT ANY ADDITIONAL LOADS.
PV SUB-PANEL ONLY
AC DISCONNECT
AC PHOTOVOLTAIC POWER SOURCE
RATED AC OUTPUT CURRENT: MAX
NOMINAL AC OPERATING VOLTAGE: Vac
THIS PANEL FED BY
MULTIPLE SOURCES
(UTILITY & SOLAR)
SOLAR
WARNING!
INVERTER OUTPUT CONNECTION. DO NOT
RELOCATE THIS OVERCURRENT DEVICE
PHOTOVOLTAIC SYSTEM
EQUIPPED WITH
RAPID SHUT DOWN
Permanent directory or plaque
providing location of service
disconnecting means and
photovoltaic system disconnecting
means, if not located at the same
location. (Plaques shall be metal or
plastic, with engraved or machine
printed letters, or electro-photo plating,
in a contrasting color to the plaque.
Plaques shall be permanently attached
to the equipmenq or in the required
location using an approved method that
is suitable to withstand the environment
to which it is exposed. Plaques and
signage shall meet legibility,
defacemet, exposure and adhesion
requirements of Underwriters
Laboratories marking and labeling
system 969(UL969).
MARKINGS, LABELS AND WIRING SIGNS
A. Purpose: Provide emergency responders with appropriate warning and guidance with
respect to isolating solar electric system.
This can facilitate identifying energized electrical lines that connect solar panels to the
inverter, as these should not be cut when venting for smoke removal
B. Main Service Disconnect.
1. Residential buildings - The marking main be placed within the main service
disconnect. The marking shall be placed
outside cover if the main service disconnect is operable with the service panel closed.
2. Commercial buildings - Tha marking shall be placed adjacent to the main service
disconnect clearly visible from the location where the level is operated
3. Markings: Verbiage, Format and Type of Material.
a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED
b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All
letters shall be capitalized. Arial or similar font, non bold.
c. Material: Reflective, weather resistant material suitable for the environment (use UL -
969 as standard for weather rating). Durable adhesive materials meet this requirement.
C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC
combiners and junction boxes:
1. Markings: Verbiage, Format and Type of Material.
a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC
conduits, raceways, enclosures, and cable assemblies,
at turns, above and for below penetrations, all DC combiners and junction boxes
b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall
adhere to "V. V-3b, c" of this requirement.
c. Inverters are not required to have caution markings
1.Marking is required on all interior and exterior DC conduit raceways,enclosures,cable
assemblies,and junction boxes,combiner boxes and disconnects.
2.The materials used for marking shall be reflective,weather resistant material suitable
for the environment.
Minimum 3/8 "letter height; all upper case letters Arial or similar font; Red background
with white lettering.
3.Marcking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE.
4.Marking shall be placed adjacent to the main service disconnect in a location clearly
visible from the location where the disconnect is operated
CAUTION
POWER TO THIS BUILDING IS ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
DISCONNECTS LOCATED AS SHOWN:
N
0°
S
180 °
E
90 °
W
270 °
13
(RAPID SHUTDOWN SWITCH FOR
SOLAR PV SYSTEM)
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SHUT DOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD
IN THE ARRAY
SOLAR ELECTRIC
PV PANELS
22.68
240
SERVICE POINT &
UTILITY METERING
AC DISCONNECT ENPHASE COMBINER
SOLAR PV ARRAY
You Are
Here
3510 S Olive St
05/30/23
MONITORING
PAGE
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
PV.3
270°AZIMUTH
±4° SLOPE
3510 S Olive St
05/30/23
Rev: 7/15/2021
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
SOL-01 CBC 2019
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1.Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2.Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3.Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4.Will the PV system weigh maximum 4 pounds per square feet or less?
5.Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6.Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7.Will the PV system be installed without using any ballast system or counter-weight
system?
8.Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9.Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10. Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Date:
Email Address:
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M -19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
Vibe Solar
1036012
Ani Quintanilla
ani@vibesolar.com
Phone Number:(818) 625-5896
3510 S Olive St, Santa Ana, CA 92707
4/20/23
3510 S Olive St
05/30/23
3510 S Olive St
05/30/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
SITE PLANS-1
INDEX
(N)Solar Module
(N) AC DisconnectAC
(N) Enphase Combiner BoxECB
(N) Main Service PanelMSP
89'-1"
63'-1"
89'-1"
63'-1"
6'-7"
41'-2"
26'-5"
37'-1"
Driveway
S
O
l
i
v
e
S
t
MSP
AC
ECB
PROPERTY LINE
SCALE: 3/32" = 1'-0"
S
180 °
E
90 °
W
270 °
N
0°
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991
Date Certified and
Exp. Date : 3/31/2024
Signed:04/14/2023
3510 S Olive St
05/30/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
ATTACHMENT
LAYOUTS-2
1.
2.
3. Roof attachment hardware to be mounted to existing structure
( ) with 48" O.C.rail spans less.
4. Lag bolts are 5/16" X 3.5" stainless steel with 2.5" minimum embedment into the center of the roof
5. Roof sheathed with 1/2" plywood and upper surface is faced with felt paper.
Finished roof surface is One layer of .
2 X 4 @ 24" O.C.
ROLLED COMP
RAIL
ATTACHMENT
MODULE WEIGHT (lbs)
# OF MODULES
TOTAL MODULE WEIGHT (lbs)
RACK WEIGHT (lbs)
TOTAL SYSTEM WEIGHT (lbs)
# OF STANDOFFS
MAX SPAN BETWEEN STANDOFFS (in)
LOADING PER STANDOFF (lbs)
TOTAL AREA (sq.ft.)
LOADING (PSF)
727.5
145.5
908.7
30
48
30.26
3.36
270
MICROINVERTERS WEIGHT (lbs)35.7
15
SOLAR MODULE
Blocking
Maximum 6"
2 X 4 @ 24" O.C.
Roof Face Area:1808
Total Module Area: 270
14.93% of Roof Coverage
RAFTER
RAFTER
48.5 Ironridge Racking System
Unirac FlashLoc Attachment
UNIRAC FLASHLOC ATTACHMENT DETAILS
5/16" x 4" SS LAG BOLT W/SS EPDM BONDED WASHER
2 1/4"
3 1/2"
6 7/8"
3' 3/4"
SS SERRATED T-BOLT
SS SERRATED FLANGE NUT
FLASHLOC BASE
MILL OR DARK
PART TABLE
FLASHLOC COMP KIT MILL, 20 PACK
DESCRIPTION
FLASHLOC COMP KIT DARK, 20 PACK
P/N
004085M
004085D
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991 Date Certified and
Exp. Date : 3/31/2024
Signed:04/14/2023
3510 S Olive St
05/30/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
INVERTER
DATA SHEET7
3510 S Olive St
05/30/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
8 MODULE
DATA SHEET
3510 S Olive St
05/30/23
RSD
DATA SHEET
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
9
3510 S Olive St
05/30/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
10 RACKING
DATA SHEET
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991
Date Certified and
Exp. Date : 3/31/2024
Signed:05/08/2023
3510 S Olive St
05/30/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
11 ATTACHMENT
DATA SHEET
Professional Certification. I hereby certify that these documents
were prepared or approved by me, and that I am a duly licensed
professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________ 88083 03/31/2024
Engineerinc.io,
303 N Glenoaks Blvd
Burbank, CA 91502
(747) 333-5991
Date Certified and
Exp. Date : 3/31/2024
Signed:05/08/2023
3510 S Olive St
05/30/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
12 ECB
DATA SHEET
3510 S Olive St
05/30/23
Project Name:
Daniel Atwell
Property address:
3510 S Olive St,
Santa Ana, CA 92707
APN:41008317
DATE:03/28/2023
CONTRACTOR
Vibe Solar
Lic #: 1036012
Lic class: C-10
Address: 1206 Commerce Center Dr
#103 Lancaster, CA 93534
Phone number: (661) 485-5000
E-mail: xiomara@vibesolar.com
RACKING
CLASSIFICATION13
3510 S Olive St