RE: Solar Array Installation at 3510 S Woodland Pl, Santa Ana, CA 92707, USA
To Whom it May Concern,
CODE REFERENCES:
BUILDING CODE: 2019 CALIFORNIA BUILDING CODE
2018 INTERNATIONAL BUILDING CODE
ASCE 7-16
SCOPE OF WORK:
DESIGN PARAMETERS
RISK CATEGORY :
DESIGN WIND SPEED :mph
WIND EXPOSURE :
GROUND SNOW LOAD :psf
SEISMIC DESIGN CATEGORY :
EXISTING ROOF STRUCTURE
ROOF : 2x6 Rafters @ 24" O.C.
ROOF MATERIAL : Comp Shingle
CONNECTION TO ROOF STRUCTURE
MOUNTING CONNECTION : (1) 5/16" SS LAG BOLT w/ MIN. 2.5" EMBEDMENT INTO (E) 2x FRAMING MEMBER
@ MAX. 72" o.c. ALONG RAILS
(2) RAILS PER ROW OF PANELS, EVENLY SPACED. PANEL LENGTH
PERPENDICULAR TO RAIL NOT TO EXCEED 76.4"
II
95
B
0
*null
Lopez, Byron
PE
13-12-2022
Roof structural framing plan has been reviewed for additional loading due to installation of the roof mounted
solar PV addition. The structural review that follows, including plans and calculations, only apply to the section of
the roof that is directly supporting the solar PV system and its supporting elements.
13 December 2022
Per your request, we have reviewed the existing structure at the above referenced site. The purpose of our review
was to determine the adequacy of the existing structure to support the proposed installation of solar panels on the
roof per layout plan.
3510 S Woodland
Pl02/10/23
OBSERVED CONDITIONS:
CONCLUSIONS:
LIMITATIONS:
Praneet R Erusu, P.E.
Principal Engineer
Erusu Consultants US Inc.
The observed roof framing is described below. If field conditions differ, the contractor shall notify the engineer
prior to starting construction. The roof framing is supported by 2x6 Rafters @ 24" O.C are spanning between
load bearing walls. The maximum allowed clear span of rafter is 12ft, to be verified in field by the contractor.
Based upon our review, we conclude that the existing structure is adequate to support the proposed solar panel
installation. In the area of the solar array, other live loads will not be present or will be greatly reduced (2019 CBC,
Section 1607.13.5). The gravity loads and the stresses of the structural elements, in the area of the solar array are
either decreased or increased by no more than 5%. Therefore, the requirements of Section 503.3 of the 2019
CEBC are met and the structure is permitted to remain unaltered.
The solar array will be flush-mounted (no more than 6" above the roof surface) and parallel to the roof surface.
Thus, we conclude that any additional wind loading on the structure related to the addition of the proposed solar
array is negligible. The attached calculations verify the capacity of the connections of the solar array to the existing
roof against wind (uplift), the governing load case. Regarding seismic loads, we conclude that any additional forces
will be small. Conservatively neglecting the weight of existing wall materials, the installation of the solar panels
represents an increase in the total weight (and resulting seismic load) of 2.8%. Because the increase in lateral
forces is less than 10%, this addition meets the requirements of the exception in Section 503.4 of the 2019 CEBC.
Thus the existing lateral force resisting system is permitted to remain unaltered.
Installation of the solar panels must be performed in accordance with manufacturer recommendations. All work
performed must be in accordance with accepted industry-wide methods and applicable safety standards. Existing
Roof and structural members are assumed to be in good and serviceable condition. The contractor must notify
Erusu Consultants US Inc. should any damage, deterioration or discrepancies between the as-built condition of
the structure and the condition described in this letter be found. The use of solar panel support span tables
provided by others are allowed only where the building type, site conditions, site-specific design parameters, and
solar panel configuration match the description of the span tables. The design of the solar panel racking (mounts,
rails, etc.) and electrical engineering is the responsibility of others. Waterproofing around the roof penetrations is
the responsibility of others. Erusu Consultants US Inc. assumes no responsibility for improper installation of the
solar array.
13 Dec 2022
EXP : 30 Sep 2023
3510 S Woodland
Pl02/10/23
Project :
Project Number:
By :
Date :
Address :
Site Plan:
Lopez, Byron
PE
13-12-2022
3510 S Woodland Pl, Santa Ana, CA 92707, USA
3510 S Woodland
Pl02/10/23
Project :
Project Number:
By :
Date :
Roof Dead Load
Roof Slope =:
Angle =
Roof Live Load
Roof Live Load = psf (Refer ASCE 7-16, Table 4.3-1)
Roof Live Load with PV Array = psf 2019 CBC, Section 1607.13.5
(Ceiling load and MEP is assumed to be not supported by rafter)
20
0
PV Array 3 1.07
2.2 1.07
MEP & Misc.1.5
Comp Shingle 4 1.07
4.4 12
20
Material
Material Weight
(psf)
2.34
1.50
13.00
1/2" Plywood 1.1 1.07
Framing 3 1.07
3.20
1/2" Gypsum Ceiling
Lopez, Byron
PE
13-12-2022
DL =
Increase due to
Roof Slope
Plan Projected Material
Weight (psf)
4.26
1.17
3.20
0.53Insulation0.5 1.07
3510 S Woodland
Pl02/10/23
Project :
Project Number:
By :
Date :
Lopez, Byron
PE
13-12-2022
Summary of Gravity Loads
Dead Load, D =psf
Roof Live Load, Lr =psf
Gravity Load Comparision
(D + Lr)/Cd =psf
(Cd = 0.9 for D, 1.15 for S, 1.25 for Lr)
Max Loading =psf
Proposed to Current Loading Ratio =O.K.
Gravity Loading with PV Array is not stressing the current framing system by more that 5% of the original
configuration. Per Section 503.3 of 2019 California Existing Building Code the structure is allowed to remain
unaltered for gravity loading
30.45 18.00
59% < 105%
30.45 18.00
20.00 0.00
Existing With PV Array
Existing With PV Array
13.00 16.20
3510 S Woodland
Pl02/10/23
Wood Beam
LIC# : KW-06014559, Build:20.22.3.31 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2022
DESCRIPTION: 2x6 Rafters @ 24" o.c. (Wind Condition_Downward) (Strength Check)
Project File: 2x6 Joist @ 24 O.C_ Copy.ec6
Project Title:
Engineer:
Project ID:
Printed: 13 DEC 2022, 1:14PM
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase
Allowable Stress Design
Douglas Fir-Larch
No.2
900.0
900.0
1,350.0
625.0
1,600.0
580.0
180.0
575.0 31.210
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
. Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Load for Span Number 1
Uniform Load : D = 0.00810, Lr = 0.020, W = 0.0160 ksf, Tributary Width = 2.0 ft, (Existing Roof Load)
Load for Span Number 2
Uniform Load : D = 0.00810 ksf, Tributary Width = 2.0 ft, (Existing Roof Dead Load)
Point Load : D = 0.0570, W = 0.3060 k @ 3.10 ft, (Solar Panel Load)
Point Load : D = 0.0570, W = 0.3060 k @ 7.50 ft, (Solar Panel Load)
Uniform Load : Lr = 0.020, W = 0.0160 ksf, Extent = 0.0 -->> 2.10 ft, Tributary Width = 2.0 ft, (Existing Wind & Roof Live Load)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.898: 1
Load Combination +D+0.60W+H
Span # where maximum occurs Span # 2
Location of maximum on span 7.441 ft
71.70 psi=
=
2,152.80 psi
2x6 Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+0.60W+H
=
=
=
288.00 psi==
Section used for this span 2x6
Maximum Shear Stress Ratio 0.249 : 1
2.000 ft=
=
1,933.80 psi
Maximum Deflection
96 >=96
151
Ratio =96 >=95
Max Downward Transient Deflection 0.938 in 153 Ratio =>=96
Max Upward Transient Deflection -0.495 in Ratio =
Max Downward Total Deflection 0.951 in Ratio =>=95
Max Upward Total Deflection -0.496 in
fb: Actual
Fb: Allowable
fv: Actual
Fv: Allowable
Span: 2 : W Only
Span: 2 : Lr Only
Span: 2 : +D+0.60W+H
Span: 1 : +D+0.60W+H
.Maximum Forces & Stresses for Load Combinations
Span #
Moment ValuesLoad Combination
C i C L C C C C F/V m r t d
Shear ValuesMax Stress Ratios
M CV fb M fv F'b V F'vSegment Length
+D+H 0.00 0.00 0.000.00
1.00Length = 2.0 ft 1 0.042 0.176 0.90 1.300 1.15 1.00 1.00 0.03 51.41 1210.95 0.16 162.001.00 28.55
1.00Length = 12.0 ft 2 0.648 0.176 0.90 1.300 1.15 1.00 1.00 0.49 784.98 1210.95 0.16 162.001.00 28.55
1.00+D+L+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.038 0.159 1.00 1.300 1.15 1.00 1.00 0.03 51.41 1345.50 0.16 180.001.00 28.55
1.00Length = 12.0 ft 2 0.583 0.159 1.00 1.300 1.15 1.00 1.00 0.49 784.98 1345.50 0.16 180.001.00 28.55
1.00+D+Lr+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
3510 S Woodland
Pl02/10/23
Wood Beam
LIC# : KW-06014559, Build:20.22.3.31 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2022
DESCRIPTION: 2x6 Rafters @ 24" o.c. (Wind Condition_Downward) (Strength Check)
Project File: 2x6 Joist @ 24 O.C_ Copy.ec6
Project Title:
Engineer:
Project ID:
Printed: 13 DEC 2022, 1:14PM
Project Descr:
Maximum Forces & Stresses for Load Combinations
Span #
Moment ValuesLoad Combination
C i C L C C CCF/V m r td
Shear ValuesMax Stress Ratios
M CV fb M fv F'b V F'vSegment Length
1.00Length = 2.0 ft 1 0.106 0.181 1.25 1.300 1.15 1.00 1.00 0.11 178.35 1681.88 0.22 225.001.00 40.77
1.00Length = 12.0 ft 2 0.470 0.181 1.25 1.300 1.15 1.00 1.00 0.50 790.87 1681.88 0.22 225.001.00 40.77
1.00+D+S+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.033 0.138 1.15 1.300 1.15 1.00 1.00 0.03 51.41 1547.33 0.16 207.001.00 28.55
1.00Length = 12.0 ft 2 0.507 0.138 1.15 1.300 1.15 1.00 1.00 0.49 784.98 1547.33 0.16 207.001.00 28.55
1.00+D+0.750Lr+0.750L+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.087 0.168 1.25 1.300 1.15 1.00 1.00 0.09 146.62 1681.88 0.21 225.001.00 37.72
1.00Length = 12.0 ft 2 0.469 0.168 1.25 1.300 1.15 1.00 1.00 0.50 789.39 1681.88 0.21 225.001.00 37.72
1.00+D+0.750L+0.750S+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.033 0.138 1.15 1.300 1.15 1.00 1.00 0.03 51.41 1547.33 0.16 207.001.00 28.55
1.00Length = 12.0 ft 2 0.507 0.138 1.15 1.300 1.15 1.00 1.00 0.49 784.98 1547.33 0.16 207.001.00 28.55
1.00+D+0.60W+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.052 0.249 1.60 1.300 1.15 1.00 1.00 0.07 112.34 2152.80 0.39 288.001.00 71.70
1.00Length = 12.0 ft 2 0.898 0.249 1.60 1.300 1.15 1.00 1.00 1.22 1,933.80 2152.80 0.39 288.001.00 71.70
1.00+D+0.750Lr+0.750L+0.450W+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.089 0.243 1.60 1.300 1.15 1.00 1.00 0.12 192.32 2152.80 0.39 288.001.00 70.08
1.00Length = 12.0 ft 2 0.765 0.243 1.60 1.300 1.15 1.00 1.00 1.04 1,647.90 2152.80 0.39 288.001.00 70.08
1.00+D+0.750L+0.750S+0.450W+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.045 0.211 1.60 1.300 1.15 1.00 1.00 0.06 97.11 2152.80 0.34 288.001.00 60.91
1.00Length = 12.0 ft 2 0.764 0.211 1.60 1.300 1.15 1.00 1.00 1.04 1,644.20 2152.80 0.34 288.001.00 60.91
1.00+0.60D+0.60W+0.60H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.043 0.209 1.60 1.300 1.15 1.00 1.00 0.06 91.78 2152.80 0.33 288.001.00 60.27
1.00Length = 12.0 ft 2 0.754 0.209 1.60 1.300 1.15 1.00 1.00 1.02 1,623.65 2152.80 0.33 288.001.00 60.27
1.00+D+0.70E+0.60H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.024 0.099 1.60 1.300 1.15 1.00 1.00 0.03 51.41 2152.80 0.16 288.001.00 28.55
1.00Length = 12.0 ft 2 0.365 0.099 1.60 1.300 1.15 1.00 1.00 0.49 784.98 2152.80 0.16 288.001.00 28.55
1.00+D+0.750L+0.750S+0.5250E+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.024 0.099 1.60 1.300 1.15 1.00 1.00 0.03 51.41 2152.80 0.16 288.001.00 28.55
1.00Length = 12.0 ft 2 0.365 0.099 1.60 1.300 1.15 1.00 1.00 0.49 784.98 2152.80 0.16 288.001.00 28.55
1.00+0.60D+0.70E+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.014 0.059 1.60 1.300 1.15 1.00 1.00 0.02 30.85 2152.80 0.09 288.001.00 17.13
1.00Length = 12.0 ft 2 0.219 0.059 1.60 1.300 1.15 1.00 1.00 0.30 470.99 2152.80 0.09 288.001.00 17.13
.
Location in SpanLoad Combination Max. "-" Defl Location in Span Load Combination Span Max. "+" Defl
Overall Maximum Deflections
+D+0.60W+H10.0000 0.000 -0.4961 0.000
+D+0.60W+H 2 0.9506 6.034 0.0000 0.000
.
Load Combination Support 1 Support 2 Support 3
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Overall MAXimum 0.531 0.307
Overall MINimum 0.472 0.271
+D+H 0.196 0.145
+D+L+H 0.196 0.145
+D+Lr+H 0.359 0.146
+D+S+H 0.196 0.145
+D+0.750Lr+0.750L+H 0.318 0.145
+D+0.750L+0.750S+H 0.196 0.145
+D+0.60W+H 0.479 0.307
+D+0.750Lr+0.750L+0.450W+H 0.531 0.267
+D+0.750L+0.750S+0.450W+H 0.409 0.267
+0.60D+0.60W+0.60H 0.401 0.249
+D+0.70E+0.60H 0.196 0.145
+D+0.750L+0.750S+0.5250E+H 0.196 0.145
+0.60D+0.70E+H 0.118 0.087
D Only 0.196 0.145
Lr Only 0.163 0.001
W Only 0.472 0.271
H Only
3510 S Woodland
Pl02/10/23
Wood Beam
LIC# : KW-06014559, Build:20.22.3.31 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2022
DESCRIPTION: 2x6 Rafters @ 24" o.c. (Wind Condition_Uplift) (Strength Check)
Project File: 2x6 Joist @ 24 O.C_ Copy.ec6
Project Title:
Engineer:
Project ID:
Printed: 13 DEC 2022, 1:12PM
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase
Allowable Stress Design
Douglas Fir-Larch
No.2
900.0
900.0
1,350.0
625.0
1,600.0
580.0
180.0
575.0 31.210
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
. Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Load for Span Number 1
Uniform Load : D = 0.00810, Lr = 0.020, W = -0.0350 ksf, Tributary Width = 2.0 ft, (Existing Roof Load)
Load for Span Number 2
Uniform Load : D = 0.00810 ksf, Tributary Width = 2.0 ft, (Existing Roof Dead Load)
Point Load : D = 0.0570, W = -0.6730 k @ 3.10 ft, (Solar Panel Load)
Point Load : D = 0.0570, W = -0.6730 k @ 7.50 ft, (Solar Panel Load)
Uniform Load : Lr = 0.020, W = -0.0350 ksf, Extent = 0.0 -->> 2.10 ft, Tributary Width = 2.0 ft, (Existing Wind & Roof Live Load)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.968: 1
Load Combination +0.60D+0.60W+0.60H
Span # where maximum occurs Span # 2
Location of maximum on span 7.508ft
77.69 psi=
=
2,152.80 psi
2x6 Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +0.60D+0.60W+0.60H
=
=
=
288.00 psi==
Section used for this span 2x6
Maximum Shear Stress Ratio 0.270 : 1
2.000 ft=
=
2,083.47 psi
Maximum Deflection
69 >=44
88
Ratio =143 >=88
Max Downward Transient Deflection 1.088 in 44 Ratio =>=44
Max Upward Transient Deflection -2.062 in Ratio =
Max Downward Total Deflection 0.533 in Ratio =>=88
Max Upward Total Deflection -1.005 in
fb: Actual
Fb: Allowable
fv: Actual
Fv: Allowable
Span: 2 : Lr Only
Span: 2 : W Only
Span: 2 : +D+Lr+H
Span: 2 : +0.60D+0.60W+0.60H
.Maximum Forces & Stresses for Load Combinations
Span #
Moment ValuesLoad Combination
C i C L C C C C F/V m r t d
Shear ValuesMax Stress Ratios
M CV fb M fv F'b V F'vSegment Length
+D+H 0.00 0.00 0.000.00
1.00Length = 2.0 ft 1 0.042 0.176 0.90 1.300 1.15 1.00 1.00 0.03 51.41 1210.95 0.16 162.001.00 28.55
1.00Length = 12.0 ft 2 0.648 0.176 0.90 1.300 1.15 1.00 1.00 0.49 784.98 1210.95 0.16 162.001.00 28.55
1.00+D+L+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.038 0.159 1.00 1.300 1.15 1.00 1.00 0.03 51.41 1345.50 0.16 180.001.00 28.55
1.00Length = 12.0 ft 2 0.583 0.159 1.00 1.300 1.15 1.00 1.00 0.49 784.98 1345.50 0.16 180.001.00 28.55
1.00+D+Lr+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
3510 S Woodland
Pl02/10/23
Wood Beam
LIC# : KW-06014559, Build:20.22.3.31 ERUSU CONSULTANTS US (c) ENERCALC INC 1983-2022
DESCRIPTION: 2x6 Rafters @ 24" o.c. (Wind Condition_Uplift) (Strength Check)
Project File: 2x6 Joist @ 24 O.C_ Copy.ec6
Project Title:
Engineer:
Project ID:
Printed: 13 DEC 2022, 1:12PM
Project Descr:
Maximum Forces & Stresses for Load Combinations
Span #
Moment ValuesLoad Combination
C i C L C C CCF/V m r td
Shear ValuesMax Stress Ratios
M CV fb M fv F'b V F'vSegment Length
1.00Length = 2.0 ft 1 0.106 0.181 1.25 1.300 1.15 1.00 1.00 0.11 178.35 1681.88 0.22 225.001.00 40.77
1.00Length = 12.0 ft 2 0.470 0.181 1.25 1.300 1.15 1.00 1.00 0.50 790.87 1681.88 0.22 225.001.00 40.77
1.00+D+S+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.033 0.138 1.15 1.300 1.15 1.00 1.00 0.03 51.41 1547.33 0.16 207.001.00 28.55
1.00Length = 12.0 ft 2 0.507 0.138 1.15 1.300 1.15 1.00 1.00 0.49 784.98 1547.33 0.16 207.001.00 28.55
1.00+D+0.750Lr+0.750L+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.087 0.168 1.25 1.300 1.15 1.00 1.00 0.09 146.62 1681.88 0.21 225.001.00 37.72
1.00Length = 12.0 ft 2 0.469 0.168 1.25 1.300 1.15 1.00 1.00 0.50 789.39 1681.88 0.21 225.001.00 37.72
1.00+D+0.750L+0.750S+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.033 0.138 1.15 1.300 1.15 1.00 1.00 0.03 51.41 1547.33 0.16 207.001.00 28.55
1.00Length = 12.0 ft 2 0.507 0.138 1.15 1.300 1.15 1.00 1.00 0.49 784.98 1547.33 0.16 207.001.00 28.55
1.00+D+0.60W+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.038 0.230 1.60 1.300 1.15 1.00 1.00 0.05 81.88 2152.80 0.36 288.001.00 66.27
1.00Length = 12.0 ft 2 0.824 0.230 1.60 1.300 1.15 1.00 1.00 1.12 1,774.24 2152.80 0.36 288.001.00 66.27
1.00+D+0.750Lr+0.750L+0.450W+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.022 0.112 1.60 1.300 1.15 1.00 1.00 0.03 46.65 2152.80 0.18 288.001.00 32.32
1.00Length = 12.0 ft 2 0.527 0.142 1.60 1.300 1.15 1.00 1.00 0.71 1,133.76 2152.80 0.22 288.001.00 40.83
1.00+D+0.750L+0.750S+0.450W+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.023 0.148 1.60 1.300 1.15 1.00 1.00 0.03 48.56 2152.80 0.23 288.001.00 42.56
1.00Length = 12.0 ft 2 0.528 0.148 1.60 1.300 1.15 1.00 1.00 0.72 1,137.41 2152.80 0.23 288.001.00 42.56
1.00+0.60D+0.60W+0.60H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.048 0.270 1.60 1.300 1.15 1.00 1.00 0.06 102.44 2152.80 0.43 288.001.00 77.69
1.00Length = 12.0 ft 2 0.968 0.270 1.60 1.300 1.15 1.00 1.00 1.31 2,083.47 2152.80 0.43 288.001.00 77.69
1.00+D+0.70E+0.60H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.024 0.099 1.60 1.300 1.15 1.00 1.00 0.03 51.41 2152.80 0.16 288.001.00 28.55
1.00Length = 12.0 ft 2 0.365 0.099 1.60 1.300 1.15 1.00 1.00 0.49 784.98 2152.80 0.16 288.001.00 28.55
1.00+D+0.750L+0.750S+0.5250E+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.024 0.099 1.60 1.300 1.15 1.00 1.00 0.03 51.41 2152.80 0.16 288.001.00 28.55
1.00Length = 12.0 ft 2 0.365 0.099 1.60 1.300 1.15 1.00 1.00 0.49 784.98 2152.80 0.16 288.001.00 28.55
1.00+0.60D+0.70E+H 1.300 1.15 1.00 1.00 0.00 0.00 0.001.00 0.00
1.00Length = 2.0 ft 1 0.014 0.059 1.60 1.300 1.15 1.00 1.00 0.02 30.85 2152.80 0.09 288.001.00 17.13
1.00Length = 12.0 ft 2 0.219 0.059 1.60 1.300 1.15 1.00 1.00 0.30 470.99 2152.80 0.09 288.001.00 17.13
.
Location in SpanLoad Combination Max. "-" Defl Location in Span Load Combination Span Max. "+" Defl
Overall Maximum Deflections
W Only 1 1.0884 0.000 0.0000 0.000
W Only20.0000 0.000 -2.0621 5.966
.
Load Combination Support 1 Support 2 Support 3
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Overall MAXimum -1.037 -0.596
Overall MINimum 0.163 0.001
+D+H 0.196 0.145
+D+L+H 0.196 0.145
+D+Lr+H 0.359 0.146
+D+S+H 0.196 0.145
+D+0.750Lr+0.750L+H 0.318 0.145
+D+0.750L+0.750S+H 0.196 0.145
+D+0.60W+H -0.426 -0.213
+D+0.750Lr+0.750L+0.450W+H -0.148 -0.123
+D+0.750L+0.750S+0.450W+H -0.271 -0.123
+0.60D+0.60W+0.60H -0.505 -0.270
+D+0.70E+0.60H 0.196 0.145
+D+0.750L+0.750S+0.5250E+H 0.196 0.145
+0.60D+0.70E+H 0.118 0.087
D Only 0.196 0.145
Lr Only 0.163 0.001
W Only -1.037 -0.596
H Only
3510 S Woodland
Pl02/10/23
Project :
Project Number:
By :
Date :
Wind Load Calculation
Wind Loads - ASCE 7-16 Chapter 26 & 29
Width of the Building, B = ft (Approximate)
V = mph
Exposure =
Average height of building, z = ft - avg (Approximate)
ft (Refer ASCE 7-16, Table 26.10-1)
α = Zg = ft (Refer ASCE 7-16, Table 26.11-1)
Kh & Kz = 2.01(z/Zg)^(2/α) =
Kzt =(Refer ASCE 7-16, Equation 26.8-1)
Kd =(Refer ASCE 7-16, Table 26.6.1)
Ke =(Refer ASCE 7-16, Table 26.9-1)
qh ='.00256 KzKztKdKeV² =psf (Refer ASCE 7-16, Section 26.10-1)
Building Classification =
Solar Panel
Components and Cladding p C&C = qh(GCp)(ϒe)(ϒa) ASCE 7-16 Chaper 29.4.4
Module Length = in
Module Width = in
Area of Module = ft2
Roof Pitch =:
Slope = degrees
Gable Roof =
ϒe=
ϒa=(Refer ASCE 7-16, Figure 29.4-8)
12
20
21.9
76.4
7° < θ ≤ 20°
1.5
11.29
4.4
41.3
95
B
15
0.57
Enclosed
0.8
zmin = 30
7
1
55.75
1
0.85
Lopez, Byron
PE
13-12-2022
1200
3510 S Woodland
Pl02/10/23
Project :
Project Number:
By :
Date :
Lopez, Byron
PE
13-12-2022
Zone 1 Uplift
External Wind pressure coefficient GCp =
External Wind pressure, qGCp = psf
Zone 2 Uplift
External Wind pressure coefficient GCp =
External Wind pressure, qGCp = psf
All Zone Downward
External Wind pressure coefficient GCp =
External Wind pressure, qGCp = psf
Maximum Uplift Wind Pressure, p = psf
Minimum Downward Wind Pressure ,p = psf
Lag Screw / Bolt Connection Check (ASD)
Tributary Width = in (Max Spacing of fastners along Rails)
Tributary Length = in (Half Panel Length)
Tributary Area = ft2
Lag Screw/Bolt Size =
Cd =(Refer NDS Table 2.3.2)
Embedment = in
Grade of Wood = #2 ( or better)
G =
Capacity = lb/in (Refer NDS Table 12.2A)
Number of Screws in Tension =
Prying Coefficient =
Capacity of Fasteners = lb
Demand
Zone 1
Zone 2 0.53
Pressure ASD (0.6W)(psf)
-16.3
-21.1 19.1 403.6 760
DCR
19.1 310.4 760 0.41
Capacity (lb)Tributary Area (ft2) Uplift (lb) Zone
0.5
266
1
1.4
760
72
0.5
6.8
(Measured from top of the framing member to tapered tip of lag screw,
embedment in sheathing and tapered tip of screw is not included)
DF
-35.21
-2
-27.09
-35.21
16.0
38.2
19.1
5/16
1.6
2.5
-2.6
3510 S Woodland
Pl02/10/23
Project :
Project Number:
By :
Date :
Seismic Ground Motion Values
Lopez, Byron
PE
13-12-2022
3510 S Woodland
Pl02/10/23
Project :
Project Number:
By :
Date :
Seismic Design Force
Seismic Loads - ASCE 7-16 Chapter 13
Seismic Force
Component Amplification Factor, ap= (Refer ASCE 7-16, Table 13.6 -1)
Overstrength Factor, Ωo =(Refer ASCE 7-16, Table 13.6 -1)
Component Importance Factor, Ip=
SDS =
Average roof height of structure,h = ft
z/h = z/h should not exceed 1
Frame Weight Wp = psf
Seismic Design Force on Solar framing structure
Max Fp =1.6 x SDS x Ip X Wp = psf
Min Fp =0.3 x SDS x Ip X Wp = psf
Seismic Design Load Fp = psf
Vertical Seismic Design Load Fp = psf0.65
2.62
5.23
0.98
3.20
F P = ((0.4 x ap x SDS x Wp)/ (Rp / Ip)) x
((1+2(z/h)) =2.62 psf
15
1
Height in structure at point of attachment,
z =
15 ft
1.00
1.50
1.02
1.00
Seismic Coefficients for Mechanical
and Electrical components =
Component Response Modification
Factor, Rp=
1.50
Lopez, Byron
PE
13-12-2022
12 Other mechanical or electrical components.
(Refer ASCE 7-16, Table 13.6 -1)
3510 S Woodland
Pl02/10/23
Project :
Project Number:
By :
Date :
Lopez, Byron
PE
13-12-2022
Check for Increase in overall seismic loads
Array Area = ft2
Number of Arrays =
Total Array Area = ft2
Array Load = psf
Number of Existing Arrays =
Exisitng Area = ft2
Total Array Wt. = lb
Total Roof Area = ft2
DL of Roof = psf
Total Wt of Roof = lb
Increase in Seismic Wt = <
13.00
35204
2.8% 10%
Conservatively the Wt. of the Walls tributary to the roof is not included. Seismic weight increase is less than
10% and no seismic retrofit or evaluation of existing lateral system is required per Section 503.4 of 2019
CEBC.
21.9
15
328.68
2707.3
3.00
986.04
0
0.00
3510 S Woodland
Pl02/10/23
3510 S Woodland
Pl02/10/23
3510 S Woodland
Pl02/10/23
3510 S Woodland
Pl02/10/23
3510 S Woodland
Pl02/10/23
3510 S Woodland
Pl02/10/23
3510 S Woodland
Pl02/10/23
3510 S Woodland
Pl02/10/23
COVER SHEET
PHOTOVOLTAIC ROOF MOUNT SYSTEM
3510 S WOODLAND PL, SANTA ANA, CA 92707 USA
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-0
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.comSYSTEM SUMMARY:DESIGN CRITERIA:GOVERNING CODES:
PROJECT SITE
2 VICINITY MAP
SCALE: NTSPV-0
1 AERIAL PHOTO
SCALE: NTS PV-0
ARRAY LOCATION
GENERAL NOTES
· THE CONTRACTOR/INSTALLER OF THE SOLAR PV SYSTEM
OVER EXISTING ROOF SHALL CONFORM TO OSHA
REQUIREMENTS DURING THE CONSTRUCTION PHASE. JOB
SAFETY AND CONSTRUCTION PROCEDURES ARE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR/INSTALLER.
· REFER TO ELECTRICAL DRAWING PV-5 FOR PANEL DETAILED
INFORMATION.
· IN CASE OF CONFLICT BETWEEN STRUCTURAL DRAWINGS
AND ELECTRICAL DRAWINGS, THE MOST RIGID
REQUIREMENTS SHALL GOVERN.
· THE CONTRACTOR/INSTALLER SHALL VERIFY ALL EXISTING
BUILDING INFORMATION SHOWN (DIMENSIONS, ROOF TOP
PROJECTIONS, ETC.) AND NOTIFY THE ENGINEER OF ANY
DISCREPANCIES PRIOR TO INSTALLATIONS OF PV SYSTEM.
· THE CONTRACTOR/INSTALLER SHALL VERIFY AND
COORDINATE EXISTING OPENINGS, ROOF TOP UNITS, VENT
PIPES, ETC. SHOWN ON DRAWINGS. IF THERE IS A
DISCREPANCY BETWEEN DRAWINGS, IT IS THE
CONTRACTORS/INSTALLER'S RESPONSIBILITY TO NOTIFY
ENGINEER PRIOR TO PERFORMING THE WORK.
· ALL CONSTRUCTION IS TO BE PERFORMED IN STRICT
CONFORMANCE WITH ALL APPLICABLE TOWN, COUNTY &
STATE REGULATIONS AND/OR ANY OTHER GOVERNING
BODIES.
· DO NOT SCALE THESE DRAWINGS, USE DIMENSIONS.
CONTRACTOR MUST CONDUCT ROOF SURVEY TO VERIFY
DIMENSIONS SHOWN ON PLAN PRIOR TO INSTALLATION. IF
THERE IS A DISCREPANCY IT IS CONTRACTOR/INSTALLER'S
RESPONSIBILITY TO NOTIFY THE ENGINEER IMMEDIATELY.
· LOCATED IN AREAS NOT REQUIRING PLACEMENT OF GROUND
LADDERS OVER OPENINGS SUCH AS DOORS OR WINDOWS.
· LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION
IN LOCATIONS WHERE ACCESS POINT DOES NOT CONFLICT
WITH OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS,
WIRES, OR SIGNS.
· DISCONNECT MEANS MUST HAVE DEDICATED CLEAR
UNOBSTRUCTED WORKING SPACE NOT LESS THAN 3' DEEP
BY 2.5' WIDE TO NOT LESS THAN 6.5' ABOVE WALKABLE
SURFACES IN FRONT OF DISTRIBUTION PANEL.
· ALL SOLAR MODULES, EQUIPMENT, AND METALLIC
COMPONENTS TO BE BONDED.
·PV ARRAY NOT TO EXCEED HIGHEST POINT OF THE ROOF.
·RAPID SHUTDOWN IS ACTIVED AT THE INVERTER BY THE AC
DISCONNECT.
PV-0 COVER SHEET
PV-1 SITE PLAN WITH ROOF PLAN
PV-2 ROOF PLAN WITH MODULES
PV-3 ATTACHMENT DETAILS
PV-4 BRANCH LAYOUT
PV-5 ELECTRICAL LINE DIAGRAM
PV-6 ELECTRICAL CALCULATION
PV-7 PLACARDS & WARNING LABELS
PV-8 ADDITIONAL NOTES
PV-9+ EQUIPMENT SPEC SHEETS
SHEET INDEX
(N) 15 - CANADIAN SOLAR CS3N-395MS (395W) MODULES
(N) 15 - ENPHASE ENERGY IQ8PLUS-72-2-US MICRO-INVERTERS
(N) JUNCTION BOX
(N) 225A MAIN SERVICE PANEL WITH (N) 200A MAIN BREAKER
(N) 30A NON FUSED AC DISCONNECT
(N) ENPHASE COMBINER BOX 4
2019 CALIFORNIA ELECTRICAL CODE (CEC)
2019 CALIFORNIA BUILDING CODE (CBC)
2019 CALIFORNIA RESIDENTIAL CODE (CRC)
2019 CALIFORNIA GREEN CODE (CGC)
2019 CALIFORNIA MECHANICAL CODE (CMC)
2019 CALIFORNIA PLUMBING CODE (CPC)
2019 CA FIRE CODE TITLE 24 SUPPLEMENT
ANY OTHER LOCAL AMENDMENTS
15 MODULES-ROOF MOUNTED - 5.93 kWDC, 5.37 CEC kW AC
ROOF TYPE: - COMP SHINGLE
NUMBER OF LAYERS:-01
ROOF FRAME: - 2"X6" RAFTERS @24" O.C.
STORY: - ONE STORY
SNOW LOAD : - 0 PSF
WIND SPEED :- 95 MPH
WIND EXPOSURE:- B
RISK CATEGORY:- II
COORDINATE:- 33.700847, -117.876447
MSP UPGRADE: YES (225A/200A)
STRUCTURAL ONLY
13 Dec 2022
EXP : 30 Sep 2023
***The scope of the plans is for
the installation of the solar
photovoltaic system only and
the approval is subject to
compliance with all applicable
city and state codes and
regulations regarding
construction. The approval of
the plans does not constitute
any certification of the
accuracy, completeness, or
building permit status of the
existing buildings and
structures as shown.***
Bldg permit #101113703
Elect permit #20178613
Issued on 2/2/23
3510 S Woodland Pl
02/10/23
CBMSPUMACD
JB
~100.47'~6
.
4
2
'
~5
3
.
5
9
'
~101.01'
~6
0
.
0
0
'
3'
-
1
"
26'-10"
21'-9"
1'
-
2
"
SITE PLAN WITH ROOF PLAN
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-1
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
SITE PLAN WITH
ROOF PLAN
1 SCALE: 3/32" = 1'-0"
NOTE:
A. ALL ELECTRICAL EQUIPMENT, INVERTERS,
DISCONNECTS, MAIN SERVICE PANELS, ETC. SHALL
NOT BE INSTALLED WITHIN 3’ OF THE GAS METERS’
SUPPLY OR DEMAND PIPING.
ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE
THE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS
OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IN
LOCATIONS WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD
OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES OR SIGNS.
LEGEND
UTILITY METER
AC DISCONNECT
JUNCTION BOX
UM
ACD
JB
MSP MAIN SERVICE PANEL
GATE
FENCE
CONDUIT
VENT, ATTIC FAN
(ROOFOBSTRUCTION)
CHIMNEY
ENPHASE IQ COMBINER 4CB ROOF DESCRIPTION
ROOF TYPE COMP SHINGLE
ROOF
ROOF
ARRAY
ROOF
TILT AZIMUTH PV AREA
(SQ.FT.)
NO. OF
MODULE
#1 20° 270° 328.68 15
S
W
O
O
D
L
A
N
D
P
L
(E) TREE (TYP.)
EX
I
S
T
I
N
G
DR
I
VE
W
A
Y
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
ONE- STORY
HOUSE
(E) STRUCTURE
(E
)
P
A
T
I
O
(E) FENCE
ROOF ACCESS POINT
ROOF #1
(15) CANADIAN SOLAR CS3N-395MS
(395W) MODULES
(E) UTILITY METER
(N) 225A MAIN SERVICE PANEL
WITH (N) 200A MAIN BREAKER
(N) 30A NON FUSED AC DISCONNECT
(N) ENPHASE IQ COMBINER BOX 4
(N) 3/4" OR GREATER EMT CONDUIT
RUN (7/8 INCHES ABOVE ROOF)
(N) JUNCTION BOX
FL
O
W
E
R
S
I
D
E
P
A
T
H
(E) STRUCTURE
STRUCTURAL ONLY
13 Dec 2022
EXP : 30 Sep 2023
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-10
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
SPEC SHEETS
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-11
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
SPEC SHEETS
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-12
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
SPEC SHEETS
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-13
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
SPEC SHEETS
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-14
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
SPEC SHEETS
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-15
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
SPEC SHEETS
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-16
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
SPEC SHEETS
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-17
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
SPEC SHEETS
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-18
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
SPEC SHEETS
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-19
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
SPEC SHEETS
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-3
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
ATTACHMENT
DETAIL
(E) 2"X6"
RAFTE
R
S
@24" O.C
ENLARGED VIEW
(N) PV MODULES
~5
"
(N) PV MODULES
(N) UNIRAC SM LIGHT RAIL
L-FOOT
5/16" STAINLESS STEEL LAG BOLT
WITH 2-1/2" MIN. EMBEDMENT AND
SS EPDM WASHER
(N) UNIRAC FLASH LOC
BUILDING STRUCTURE
ROOF / DECK MEMBRANE
2.5" MIN.
EMBEDMENT
~5
"
(E) COMP SHINGLE ROOF
(E) COMP SHINGLE ROOF
1
.
3
8
"
1.38
"
ATTACHMENT DETAIL
SCALE: NTS1
ATTACHMENT DETAIL (ENLARGED VIEW)
SCALE: NTS2
NOTE: ACTUAL ROOF CONDITIONS AND RAFTERS (OR SEAM)
LOCATIONS MAY VARY. INSTALL PER MANUFACTURER(S)
INSTALLATION GUIDELINES AND ENGINEERED SPANS FOR
ATTACHMENTS
STRUCTURAL ONLY
13 Dec 2022
EXP : 30 Sep 2023
NOTE TO INSTALLER: VERIFY THE ROOF FRAMING INFO
BEFORE INSTALLATION AND NOTIFY EOR IF THERE IS
ANY INCONSISTENCY BETWEEN SITE VERIFICATION
AND THE FOLLOWING: 2X6 RAFTERS @24" O.C. WITH
MAX UNSUPPORTED SPAN EQUAL OR LESS THAN 12 FT.
3510 S Woodland
Pl02/10/23
CBMSPUMACD
JB
7"
16'-4"3'-1"
26
'
-
1
1
"
24
'
-
7
"
2'
-
2
"
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-2
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
ROOF PLAN WITH
MODULES
ROOF PLAN WITH MODULES
SCALE: 1/8" = 1'-0"1
MODULE TYPE, DIMENSIONS & WEIGHT
NUMBER OF MODULES = 15 MODULES
MODULE TYPE = CANADIAN SOLAR CS3N-395MS (395W) MODULES
MODULE WEIGHT = 49.6 LBS / 22.5 KG.
MODULE DIMENSIONS = 76.4"X 41.3" = 21.91 SF
UNIT WEIGHT OF ARRAY = 2.26 PSF
ARRAY AREA & ROOF AREA CALC'S
ROOF # OF
MODULES
ARRAY
AREA
(Sq. Ft.)
ROOF
AREA
(Sq. Ft.)
ROOF
AREA
COVERED BY
ARRAY (%)
#1 15 328.68 744.11 44.17
ROOF DESCRIPTION
ROOF TYPE COMP SHINGLE ROOF
ROOF ROOF
TILT AZIMUTH RAFTERS
SIZE
RAFTERS
SPACING
#1 20°270° 2"x6" 24" O.C.
NOTE: ACTUAL ROOF CONDITIONS AND
RAFTERS (OR SEAM) LOCATIONS MAY
VARY. INSTALL PER MANUFACTURER(S)
INSTALLATION GUIDELINES AND
ENGINEERED SPANS FOR
ATTACHMENTS
LEGEND
UTILITY METER
AC DISCONNECT
JUNCTION BOX
UM
ACD
JB
MSP MAIN SERVICE PANEL
CONDUIT
VENT, ATTIC FAN
(ROOFOBSTRUCTION)
CHIMNEY
ENPHASE IQ COMBINER 4CB
RAFTERS
ROOF ATTACHMENT
· PLUMBING VENTS, SKYLIGHTS AND MECHANICAL VENTS SHALL
NOT BE COVERED, MOVED, RE-ROUTED OR RE-LOCATED.
R324.6.2 - PROVING ARRAYS TAKE
LESS THAN 33% OF TOTAL ROOF
AREA.WHEN THE ARRAYS TAKE LESS
THAN 33% WE CAN JUSTIFY AN 18"
SETBACK ON BOTH SIDES OF THE
RIDGE. WHEN IT TAKES MORE THAN
33% OF THE ROOF AREA WE MUST
USE A 3' SETBACKS AT THE RIDGE.
TOTAL ROOF AREA:
2707.34 sqft
(NEW)
AREA OF ARRAYS:
76.4"X 41.3" ( PANEL DIMENSIONS)
76.4"X 41.3" = 21.91 sqft (PER PANEL)
21.91 sqft
panel X 15 panels = 328.68 sqft
(TOTAL PANEL AREA)
PERCENTAGE OF TOTAL ROOF AREA:
(328.68 sqft / 2707.34 sqft)(100)=12.90%
∴ THE PANELS USE 12.90% OF
THE TOTAL ROOF AREA
76.4"
41
.
3
"
PHOTOVOLTAIC MODULES
CANADIAN SOLAR CS3N-395MS (395W)
S WOODLAND PL
FRONT YARD
S
W
O
O
D
L
A
N
D
P
L
FR
O
N
T
Y
A
R
D
RE
A
R
Y
A
R
D
36" FIRE PATHWAY
36
"
FI
R
E
P
A
T
H
W
A
Y
18" FIRE PATHWAY
18" FIRE PATHWAY
1
8
"
F
I
R
E
P
A
T
H
W
A
Y
1
8
"
F
I
R
E
P
A
T
H
W
A
Y
(E) CHIMNEY, (TYP.)
(E) 2"X6" RAFTERS @ 24" O.C. (TYP.)
(N) UNIRAC SM LIGHT RAIL
(N) (24) UNIRAC FLASH LOC ATTACHMENTS
SPACED AT 72'' O.C.
(E) COMP SHINGLE ROOF (TYP.)
ROOF #1
(15) CANADIAN SOLAR CS3N-395MS
(395W) MODULES
(N) 3/4" OR GREATER EMT CONDUIT
RUN (7/8 INCHES ABOVE ROOF)
(N) JUNCTION BOX
(E) UTILITY METER
(N) 225A MAIN SERVICE PANEL
WITH (N) 200A MAIN BREAKER
(N) 30A NON FUSED AC DISCONNECT
(N) ENPHASE IQ COMBINER BOX 4
ROOF #1
TILT - 20
AZIMUTH - 270
BILL OF MATERIALS
EQUIPMENT QTY DESCRIPTION
RAIL 09 UNIRAC SM LIGHT RAIL 168" DARK
SPLICE 04 BND SPLICE BAR PRO SERIES DRK
MID CLAMP 24 UNIVERSAL AF SERIES MID CLAMP
END CLAMP 12 UNIVERSAL AF SERIES END CLAMP
ATTACHMENT 24 UNIRAC FLASH LOC
GROUNDING LUG 03 GROUND LUG
STRUCTURAL ONLY
13 Dec 2022
EXP : 30 Sep 2023
NOTE:CONTRACTOR TO VERIFY
EXISTING FRAMING AND
STRUCTURAL LETTER NOTIFY
EOR INCASE OF DISCRIPENCIES
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-20
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
SPEC SHEETS
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-4
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
BRANCH LAYOUT
BRANCH LAYOUT
SCALE: 1/8" = 1'-0"1
(15) CANADIAN SOLAR CS3N-395MS (395W) MODULES
(15) ENPHASE ENERGY IQ8PLUS-72-2-US MICRO-INVERTERS
(01) BRANCH OF 08 MODULES
(01) BRANCH OF 07 MODULES CONNECTED IN PARALLEL PER BRANCH
18" RIDGE &
36" FIRE PATHWAY
76.4"
41
.
3
"
PHOTOVOLTAIC SOLAR MODULES
CANADIAN SOLAR CS3N-395MS
(395W)
S
W
O
O
D
L
A
N
D
P
L
FR
O
N
T
Y
A
R
D
RE
A
R
Y
A
R
D
36" FIRE PATHWAY
36
"
F
I
R
E
P
A
T
H
W
A
Y
18" FIRE PATHWAY
18" FIRE PATHWAY
1
8
"
F
I
R
E
P
A
T
H
W
A
Y
1
8
"
F
I
R
E
P
A
T
H
W
A
Y
36" FIRE PATHWAY
(15) ENPHASE ENERGY
IQ8PLUS-72-2-US
MICRO-INVERTERS
ROOF #1
(15) CANADIAN SOLAR CS3N-395MS
(395W) MODULES
BRANCH #1
BRANCH #2
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-5
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
ELECTRICAL LINE
DIAGRAM
ELECTRICAL LINE DIAGRAM
SCALE: NTS1
BILL OF MATERIALS
EQUIPMENT QTY DESCRIPTION
SOLAR PV MODULE 15 CANADIAN SOLAR CS3N-395MS (395W) MODULES
INVERTER 15 ENPHASE ENERGY IQ8PLUS-72-2-US MICRO-INVERTERS
JUNCTION BOX 1 600V, 55A MAX, 4 INPUTS, MOUNTED ON ROOF FOR WIRE & CONDUIT TRANSITION
COMBINER BOX 1 ENPHASE IQ COMBINER BOX 4
AC DISCONNECT 1 240VAC, 30A NON FUSED AC DISCONNECT, NEMA 3R, UL LISTED AC DISCONNECT
UTILITY PROVIDER:
MAIN SERVICE VOLTAGE:
MAIN PANEL BRAND:
MAIN SERVICE PANEL:
MAIN CIRCUIT BREAKER RATING:
MAIN SERVICE LOCATION:
SERVICE FEED SOURCE:
SCE
240V
N/A
(N) 225A
(N) 200 A
NORTH
UNDERGROUND
CHANGE AS PER YOUR REQUIREMENT
SERVICE INFO.
SYSTEM SIZE:- 15 x 395W = 5.93 kWDC
SYSTEM SIZE:- 15 x 290W = 5.37 CEC kW AC
INTERCONNECTION
120% RULE - CEC 705.12(B)(2)(3)(b)
UTILITY FEED + SOLAR BACKFEED
200A + 30A = 230A
BUSS RATING x 120%
225A x 120% = 270A
MSP UPGRADE: YES (225A/200A)
(15) CANADIAN SOLAR CS3N-395MS (395W) MODULES
(15) ENPHASE ENERGY IQ8PLUS-72-2-US MICRO-INVERTERS
(01) BRANCH OF 08 MODULES
(01) BRANCH OF 07 MODULES CONNECTED IN PARALLEL PER BRANCH
SYSTEM SIZE:- 15 x 290W = 4.35 kWAC
G
N N
L2
L1
L2
L1
L
200A
EXISTING
GROUNDING
SYSTEM
BI-DIRECTIONAL
UTILITY METER
1-PHASE, 3-W,
120V/240V, 60Hz
(N) MAIN BREAKER
200A/2P, 240V
30A/2P
(N) 30A/2P PV
BREAKER
(N) MAIN SERVICE PANEL,
225A RATED, 120/240V
(3) #10 AWG THWN
(1) #8 AWG THWN CU GND
3/4" EMT CONDUIT
(15) ENPHASE ENERGY
IQ8PLUS-72-2-US
MICRO-INVERTERS (240V)
(LOCATED UNDER EACH PANEL)
(N) JUNCTION BOX
07 MICRO-INVERTERS IN BRANCH #2
G
L1L1
L2L2
(2) Q-CABLES
(1) #6 BARE CU GND
N
20A
G
(4) #10 AWG THWN-2
(1) #8 AWG THWN-2 GND
IN 3/4" EMT CONDUIT
BRANCH TERMINATOR Q-TERM
FOR IQ SERIES (TYP.)
15A
M*IQ-GATE
WAY
20A
08 MICRO-INVERTERS IN BRANCH #1
L1L1
L2L2
(N) ENPHASE
COMBINER BOX 4
(N) AC DISCONNECT
30A NON FUSED,
240 VAC
METER NUMBER: 222013-505271
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-6
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
ELECTRICAL
CALCULATION
SOLAR MODULE SPECIFICATIONS
MANUFACTURER / MODEL #Canadian Solar CS3N-395MS (395W)
MODULES
VMP 37.0
IMP 10.68
VOC 44.3
ISC 11.44
MODULE DIMENSION 76.4"L x 41.3"W x 1.38"D (In Inch)
INVERTER SPECIFICATIONS
MANUFACTURER / MODEL #ENPHASE ENERGY IQ8PLUS-72-2-US
NOMINAL OUTPUT VOLTAGE 240 VAC
NOMINAL OUTPUT CURRENT 1.21A
AMBIENT TEMPERATURE SPECS
WEATHER STATION: TUSTIN MCAF
RECORD LOW TEMP 2°
AMBIENT TEMP (HIGH TEMP 2%)31°
CONDUIT HEIGHT (ABOVE ROOF)7/8"
ROOF TOP TEMP 31°
CONDUCTOR TEMPERATURE RATE (ON ROOF)90°
CONDUCTOR TEMPERATURE RATE (OFF ROOF)75°
MODULE TEMPERATURE COEFFICIENT OF Voc -0.26%/°C
PERCENT OF VALUES NUMBER OF CURRENT
CARRYING CONDUCTORS IN EMT
.80 4-6
.70 7-9
.50 10-20
ELECTRICAL CALCULATION
SCALE: NTS1
ELECTRICAL NOTES
1.) ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION.
2.) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90 DEGREE C WET ENVIRONMENT.
3.) WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY.
4.) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH CEC 110.26.
5.) DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, FITTINGS AND ACCESSORIES TO FULFILL
APPLICABLE CODES AND STANDARDS.
6.) WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY.
7.) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE.
8.) MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURER'S INSTRUCTION.
9.) MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C. VIA WEEB LUG OR ILSCO GBL-4DBT LAY-IN LUG.
10.) THE POLARITY OF THE GROUNDED CONDUCTORS IS NEGATIVE
AC CONDUCTOR AMPACITY CALCULATIONS:
FROM JUNCTION BOX TO COMBINER BOX:
AMBIENT TEMPERATURE ADJUSTMENT FOR EXPOSED CONDUIT
PER CEC 310.15(B)(3)(c): (7/8"RULE)
EXPECTED WIRE TEMP (°C): 31°
TEMP CORRECTION PER TABLE 310.15(B)(2)(a): 0.96
# OF CURRENT CARRYING CONDUCTORS: 4
CONDUIT FILL CORRECTION PER CEC 310.15(B)(3)(a): 0.80
CIRCUIT CONDUCTOR SIZE: 10 AWG
CIRCUIT CONDUCTOR AMPACITY: 40A
REQUIRED CIRCUIT CONDUCTOR AMPACITY PER CEC 690.8(A&B):
1.25 X # MICRO-INVERTERS (MAX. BRANCH LENGTH) X MAX OUTPUT
CURRENT
1.25 X 08 X 1.21A = 12.10A
DERATED AMPACITY OF CIRCUIT CONDUCTOR PER CEC TABLE
310.15(B)(2)(a)
TEMP CORR. PER CEC TABLE 310.15(B)(2)(a) X
CONDUIT FILL CORR. PER CEC 310.15(B)(3)(a) X
CIRCUIT CONDUCTOR AMPACITY =
0.96 X 0.80 X 40 = 30.72A
AC CONDUCTOR AMPACITY CALCULATIONS:
FROM COMBINER BOX TO INTERCONNECTION:
# OF INVERTERS: 15
EXPECTED WIRE TEMP (°C): 31°
TEMP CORRECTION PER TABLE 310.15(B)(2)(a): 0.94
# OF CURRENT CARRYING CONDUCTORS: 3
CONDUIT FILL PER CEC 310.15(B)(3)(a): 1.0
CIRCUIT CONDUCTOR SIZE: 10 AWG
CIRCUIT CONDUCTOR AMPACITY: 35 A
REQUIRED CIRCUIT CONDUCTOR AMPACITY PER CEC 690.8(B):
1.25 X # MICRO-INVERTERS X MAX OUTPUT CURRENT =
1.25 X 15 X 1.21 = 22.69A
DERATED AMPACITY OF CIRCUI T CONDUCTORS PER CEC TABLE 310.16:
TEMP CORR. PER CEC TABLE 310.15(B)(2)(a) X
CONDUIT FILL CORR. PER CEC 310.15(B)(3)(a) X
CIRCUIT CONDUCTOR AMPACITY =
0.94 X 1.0 X 35= 32.9 A
RESULT SHOULD BE GREATER THAN (12.10A) OTHERWISE LESS THE
ENTRY FOR CIRCUIT CONDUCTOR SIZE AND AMPACITY
RESULT SHOULD BE GREATER THAN (22.69A) OTHERWISE LESS THE
ENTRY FOR CIRCUIT CONDUCTOR SIZE AND AMPACITY
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-7
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
WARNING LABELS &
PLACARD
WARNING
DUAL POWER SOURCES
SECOND SOURCE IS
PHOTOVOLTAIC SYSTEM
WARNING
POWER SOURCE OUTPUT
CONNECTION - DO NOT RELOCATE
THIS OVERCURRENT DEVICE.
REQ'D BY & 705.12 (B)(3)
APPLY TO:
MAIN SERVICE PANEL
LOAD CENTER
COMBINER BOX
INVERTER
AT EACH AC DISCONNECTS MEANS
[CEC 690.13(B) AND 690.54]
AT POINT OF INTERCONNECTION
OVERCURRENT DEVICE
REQ'D BY CEC 705.12 (B)(2)(3)(B)
PHOTOVOLTAIC SYSTEM AC DISCONNECT
RATED AC OPERATING CURRENT 18.15 AMPS
AC NOMINAL OPERATING VOLTAGE 240 VOLTS
LABEL LOCATION:
CONDUIT, RACEWAYS, AND J-BOXES
(LABELED EVERY 10')
(PER CODE: CEC690.31(G)(3)
WARNING:PHOTOVOLTAIC
POWERSOURCE
RAPID SHUTDOWN SWITCH
FOR SOLAR PV SYSTEM
LABEL LOCATION:
RAPID SHUTDOWN
(PER CODE: CEC 690.56(C)(3)
CAUTION
PHOTOVOLTAIC SYSTEM
CIRCUIT IS BACKFED
LABEL LOCATION:
AT MAIN SERVICE PANEL, PULL
BOXES [CEC 705.12(B)(3)]
AT RAPID SHUTDOWN SYSTEM
[CEC 690.56(C)(1)(A)]
LABEL LOCATION
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
SOLAR ELECTRIC
PV PANELS
TURN RAPID SHUTDOWN
SWITCH TO THE "OFF"
POSITION TO SHUT DOWN
PV SYSTEM AND REDUCE
SHOCK HAZARD IN THE
ARRAY.
CAUTION !
POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE
FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN
AT: MAIN SERVICE PANEL & UTILITY METER,
AC DISCONNECT & COMBINER BOX
35
1
0
S
W
O
O
D
L
A
N
D
P
L
(N) 225A MAIN SERVICE PANEL
WITH (N) 200A MAIN BREAKER
(E) UTILITY METER
(N) PV MODULES
(N) AC NON FUSED DISCONNECT
(N) COMBINER BOX
3510 S Woodland
Pl02/10/23
REV
SHEET NAME
SHEET NUMBER
DATE DESCRIPTION
VERSION
PV-8
PROJECT NAME
UR11/22/2022 INITIAL RELEASE
LO
P
E
Z
,
B
Y
R
O
N
35
1
0
S
W
O
O
D
L
A
N
D
P
L
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
7
U
S
A
AP
N
#
4
1
0
1
9
3
2
1
UT
I
L
I
T
Y
:
S
C
E
AH
J
:
C
I
T
Y
O
F
S
A
N
T
A
A
N
A
SHEET SIZE
ANSI B
11" X 17"
ENERGY RENOVATION CENTER
11731 Sterling Avenue, Unit G
Riverside, CA 92503
LIC:- 1009326
PH:- 8886040226
pm@energyrenovationcenter.com
ADDITIONAL NOTES
1. EACH MODULE TO BE GROUNDED USING THE SUPPLIED CONNECTION POINT PER
MANUFACTURER'S REQUIREMENTS. ALL SOLAR MODULES, EQUIPMENT, AND
METALLIC COMPONENTS ARE TO BE BONDED. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE.
2. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OF NATIONAL
ELECTRICAL CODE. LABEL SHALL BE METALLIC OR PLASTIC, ENGRAVED OR
MACHINE PRINTED IN A CONTRASTING COLOR TO THE PLAQUE. PLAQUE SHALL
BE UV RESISTANT IF EXPOSED TO SUNLIGHT.
3. AC/DC SOLAR FED CONDUCTORS SHALL BE RUN IN EMT AND SHALL BE LABELED,
PER CEC690.31(G)(3).
4. EXPOSED NON-CURRENT CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT
SHALL BE GROUNDED IN ACCORDANCE WITH 250.134 OR 250.136(A).
5. CONFIRM LINE SIDE VOLTAGE AT ELECTRIC UTILITY SERVICE PRIOR TO
CONNECTING INVERTER. VERIFY SERVICE VOLTAGE IS WITHIN INVERTER
VOLTAGE OPERATIONAL RANGE.
6. OUTDOOR EQUIPMENT SHALL BE NEMA-3R RATED OR BETTER.
7. ELECTRICAL CONTRACTOR TO PROVIDE CONDUIT EXPANSION JOINTS AND
ANCHOR CONDUIT RUNS AS REQUIRED PER CEC.
8. ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL
MEANS DESIGNED AND LISTED FOR SUCH USE, AND FOR ROOF-MOUNTED
SYSTEMS, PV WIRING MUST BE SECURED AND PROPERLY MANAGED, NOT IN
CONTACT WITH ROOF SURFACE. CEC 110.2 - 110.4 / 300.4. WIRE IN CONDUIT NEEDS
TO BE MOUNTED > 3.5 IN ABOVE ROOF SURFACE TO MAINTAIN TEMPERATURE
DERATE VALUES.