HomeMy WebLinkAbout524 S Shawnee Dr & Unit# 2 - PlanPREPARED:
ANH PHAN
BLDG# 101120568 & 70
APPROVALS
BLDG - CSG Consultant
PLNG - HJacinto
POLICE - BMartin
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr &
Unit# 22/7/2025
PREPARED:
ANH PHAN
524 S Shawnee Dr &
Unit# 22/7/2025
PREPARED:
ANH PHAN
524 S Shawnee Dr &
Unit# 22/7/2025
PREPARED:
ANH PHAN
524 S Shawnee Dr &
Unit# 22/7/2025
PREPARED:
ANH PHAN
524 S Shawnee Dr &
Unit# 22/7/2025
PREPARED:
ANH PHAN
524 S Shawnee Dr &
Unit# 22/7/2025
PREPARED:
ANH PHAN
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr &
Unit# 22/7/2025
N1
CAL GREEN
REQUIREMENTS
Job #
Sheet No.:
Scale
Date
OWNER:
SEAL:
SHEET DESCRIPTION :
11/30/24
HUNG TRAN AND LISA PHAM
524 S SHAWNEE DR,
SANTA ANA, CA 92704
714 - 260 - 2801
23156
DATE REVISIONSNO:
REVISIONS
9636 GARDEN GROVE BLVD, #7,
GARDEN GROVE, CA 92844
TEL: 714 - 487 - 7926
APDESIGNCA@GMAIL.COM
AP DESIGN
CONSULTING, INC
Pr
o
j
e
c
t
f
o
r
:
NE
W
A
T
T
A
C
H
E
D
A
D
U
52
4
S
S
H
A
W
N
E
E
D
R
A
N
D
52
4
S
S
H
A
W
N
E
E
D
R
,
U
N
I
T
2
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
4
PREPARED:
ANH PHAN
524 S Shawnee Dr &
Unit# 22/7/2025
T24.1
TITLE 24
- ADU
Job #
Sheet No.:
Scale
Date
OWNER:
SEAL:
SHEET DESCRIPTION :
11/30/24
HUNG TRAN AND LISA PHAM
524 S SHAWNEE DR,
SANTA ANA, CA 92704
714 - 260 - 2801
23156
DATE REVISIONSNO:
REVISIONS
9636 GARDEN GROVE BLVD, #7,
GARDEN GROVE, CA 92844
TEL: 714 - 487 - 7926
APDESIGNCA@GMAIL.COM
AP DESIGN
CONSULTING, INC
Pr
o
j
e
c
t
f
o
r
:
NE
W
A
T
T
A
C
H
E
D
A
D
U
52
4
S
S
H
A
W
N
E
E
D
R
A
N
D
52
4
S
S
H
A
W
N
E
E
D
R
,
U
N
I
T
2
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
4
PREPARED:
ANH PHAN
524 S Shawnee Dr &
Unit# 22/7/2025
Job #
Sheet No.:
Scale
Date
OWNER:
SEAL:
SHEET DESCRIPTION :
11/30/24
HUNG TRAN AND LISA PHAM
524 S SHAWNEE DR,
SANTA ANA, CA 92704
714 - 260 - 2801
23156
DATE REVISIONSNO:
REVISIONS
9636 GARDEN GROVE BLVD, #7,
GARDEN GROVE, CA 92844
TEL: 714 - 487 - 7926
APDESIGNCA@GMAIL.COM
AP DESIGN
CONSULTING, INC
Pr
o
j
e
c
t
f
o
r
:
NE
W
A
T
T
A
C
H
E
D
A
D
U
52
4
S
S
H
A
W
N
E
E
D
R
A
N
D
52
4
S
S
H
A
W
N
E
E
D
R
,
U
N
I
T
2
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
4
T24.2
TITLE 24
CONT.
PREPARED:
ANH PHAN
524 S Shawnee Dr &
Unit# 22/7/2025
Geotechnical
Investigation
Investigation and Report
Accessory Dwelling Unit (ADU)
Located at:
524 S Shawnee Dr.
Santa Ana CA 92704
Project No:
24-179
April 23, 2024
Priority
Engineering
Group
Priority Engineering Group
335 E. Blueridge Ave.
Orange CA 92865
949-391-8200
priorityengineeringgroup09@gmai1.corn
524 S Shawnee Dr &
Unit# 22/7/2025
INDEX
INTRODUCTION 1
SITE DESCRIPTION 1
SCOPE OF WORK 1
EXPLORATION AND FIELD INVESTIGATION PROGRAMS 1
LABORATORY TESTING PROGRAM 2
SUMMARY OF SOIL AND DESIGN PROPERTIES 2
BASIC SOIL PROPERTIES 2
MAX DENSITY .. 2
DIRECT SHEAR 2
BEARING VALUE 2
SOIL PRESSURE FACTORS 3
SEISMIC FACTORS 3
SOLUBLE SULFATE 3
EXPANSIVE SOIL 3
GROUNDWATER 4
LIQUEFACTION 4
SHRINKAGE AND SUBSIDENCE 4
SETTLEMENT 5
DRAINAGE 5
CONCRETE SLAB CONSTRUCTION 5
FOOTING DESIGN 5
FOUNDATION 5
PAVED AREAS 5
FLOOR SLABS 6
DRIVEWAYS AND PARKING AREAS 6
UTILITY TRENCHES 6
FILL PLACEMENT & COMPACTION REQUIREMENTS 6
ADDITIONAL SERVICES REQUIRED 7
CONCLUSION 7
INSPECTION 8
SEASONAL LIMITATIONS 8
GENERAL 8
Soil Classification Chart A
A Laboratory Testing Procedures B
P Boring Log C1/C2
P Maximum Density Curve D1/D2
E Direct Shear E1/E2
N Bearing Value F
D Design Maps Summary Report G
I Boring Location H
X Vicinity Map I
Lateral Earth Pressure J
Liquefaction Map K
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr.
Santa Ana CA 92704
INTRODUCTION
Priority Engineering has conducted a site inspection, made a physical test of on-site soils and prepared
the following report of Geotechnical Investigation for the residential property located at 524 S
Shawnee Dr. Santa Ana CA 92704. The investigation was made to provide site evaluation and design
data for the foundation of the proposed new accessory dwelling unit (ADU) to be constructed on the
site.
SITE DESCRIPTION
The site, Assessor Parcel 109-833-17.
Latitude 33.7397766
Longitude -117.9105262
The site is a 6098 Sq ft rectangular shaped lot. The north property line is 100.19 ft long and south
property lines is 85 ft long. The east property line is 58 ft long and west property lines is 61 ft long.
The existing residence is a 3 bedroom, 2 bathroom single family home, 1310 sq ft structure, built in
1961 with an attached garage.
Surrounding houses are composed of single family, wood framed, residential structures on similar size
lots. Rear yard has a perimeter block wall.
SCOPE OF WORK
Our scope of work consists of field and laboratory programs to evaluate the physical and engineering
properties of the onsite soils.
Description of the exploration and laboratory programs are presented below.
EXPLORATION AND FIELD INVESTIGATION PROGRAMS
On April 17, 2024, a field exploration was performed, which consisted of 2 borings, in the
approximate location of the proposed ADU.
Hole #1 was drilled to a depth of 10 ft. Equipment used was a hand operated power auger with
extensions. Moisture tests taken at 28" was 15.8%, at 64" was 24.4% and at 102" was 28.6%.
Ring samples taken at 5ft and bulk sample taken at 10 ft. for laboratory testing.
The soil encountered was brown sandy silt.
The description of the subsurface soil and the depth of boring #1 are shown in Boring Log Cl.
Hole #2 was drilled to a depth of 5 ft. Equipment used was a hand operated power auger with
extensions. Moisture tests taken at 12" was 15.3%, at 36" was 11.3% and at 60% was 25.7%.
Ring samples taken at 3 ft and bulk sample taken at 5 ft. for laboratory testing.
The soil encountered was brown sandy silt.
The description of the subsurface soil and the depth of boring #2 are shown in Boring Log C2.
1
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr.
Santa Ana CA 92704
LABORATORY TESTING PROGRAMS
Samples of the in-situ soils recovered from the borings were used for our visual classification of the
material and further laboratory testing to obtain data for foundation design and site preparation
recommendations.
The laboratory testing consisted of performing classification, strength (shear), determining in-situ dry
density and moisture content; and determining the moisture-density relationship of major soils.
Descriptions of test procedures are included in the Appendix of this report.
The results of the testing are the basis for the conclusions and recommendations in the report.
SUMMARY OF SOIL AND DESIGN PROPERTIES
The following subsections and sections will present our detailed conclusions and recommendations for
the development of the site.
Basic Soil Properties
Maximum Density
The Maximum Density for the brown sandy silt per (ASTM D1557)
Boring #1
Boring #2
117.8 pcf @ 13.2% MC
112.8 pcf @ 14.8% MC
For compaction control during excavation and recompaction of the on-site soils use:
Boring #1
Boring #2
Direct Shear
106.02 pcf @ Optimum moisture
101.52 pcf @ Optimum moisture
The Shear values for the brown sandy silt per (ASTM D3080)
Peak Ultimate Angle
Boring #1 70 80 26°
Boring #2 80 100 27°
Bearing Value
1600 psf For design purposes
2
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr.
Santa Ana CA 92704
Soil Pressure Factors
Earth Pressure Factors
(1) 26
Maximum Dry Density = 117.8 y= 106.02
Active Earth Pressure
Ka= 0.3904617069
Pa= 41.3967501655
Passive Earth Pressure
Kp= 2.5610706048
Pp= 271.5247055208
At Rest
Kat= 0.5616288533
Pat= 59.5438910268
Seismic Factors
Ss 1.311 Smi null Fa 1.2
S1 0.468 SDS 1.049 Fv null
Sms 1.573 Sin null
A full list of Seismic factors is in the Attachment 'G'
PGA 0.559
FPGA 1.2
PGA m 0.671
Soluble Sulfates
The results of the limited in-house laboratory tests indicate that the on-site soils tested contain a
water-soluble sulfate content of .16 by weight. Based on Table 19.3.1.1 of ACI 318-14, the Exposure
Class Si is appropriate for onsite soils. Water cement ratio (0.50) shall be adjusted to produce a low
slump (<3inches>) mix. Concrete specifications may be changed by the Structural Engineer.
Type V cement is not required but is recommended for use. Strength should be 4000 psi.
Expansive Soil
The soil found on this site consists of sandy silt with clumps of clay. The soil found on the site is
expansive. A modified test in the laboratory and the condition of the concrete paving and foundations
on site show low signs of expansive reaction in the soil. Expansion index : 26 low
3
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr.
Santa Ana CA 92704
Groundwater
Groundwater was not encountered within the borings. Groundwater is not expected to be encountered
on this site.
Liquefaction
Potential consequences of liquefaction or secondary liquefaction included hazards generally consist of
differential settlement (vertical deformations), lateral movement/lateral spreading (horizontal defor-
mations), oscillation, and reduction in foundation soil-bearing capacity (bearing failure).
A sloping condition or drainage or stream channel does not exist at the site, therefore, lateral move-
ment/lateral spreading, oscillation, etc, due to potential liquefaction are not anticipated to be credible
hazards for the proposed new structure.
Differential settlement due to liquefaction (and reduction in foundation soil-bearfng capacity) is
roughly estimated to be about 1/4 inch (for a horizontal distance of 40 feet). This is only a rough esti-
mate.
To reduce the potential adverse effects to the new structure due to potential liquefaction induced differ-
ential settlement and/or reduction in foundation soil-bearing capacity, a strengthened foundation sys-
tem with thicker and stronger reinforcement slabs and deeper and wider and stronger reinforcement
footings as compared to a regular foundation system for a residential structure as recommended in this
report should be used for the new structure.
During our research, and in conversations with other Engineers and Contractors, it was discovered
many of the new residences in the area have been designed and constructed with regular, shallow foot-
ings with slabs on grade, not with strengthened foundation supports.
Our belief is if the area would be liquefied due to a very strong earthquake, the potential for damage to
the proposed new structure which will be structurally designed in accordance with new building codes,
if any, would be much less severe than the existing on-site structure and existing homes in the vicinity.
These homes were built and designed structurally based on old building codes.
It should be noted that in accordance with SP117A, a detailed site-specific liquefaction study is
not required since the proposed new structure is less than three stories and less than four units.
Shrinkage and Subsidence
Based on the in-place densities of the natural soil and assuming an average fi ll density of 92 percent
relative compaction, calculations indicate that there will be a 5 percent decrease in volume between the
cut and fill operations. In addition, it is estimated that there will be 0.15 of a foot of subsidence due to
reworking the surface soils.
4
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr.
Santa Ana CA 92704
Settlement
When constructed in accordance with the specifications in this report, total settlement is estimated to
be 0.25 inch and differential settlement over a 20 foot span less than 0.25 inch.
Drainage
According to CBC 2022, Chapter 18, 1804.4, Site Grading, the ground immediately adjacent to the
foundation shall be sloped away from the building at a slope of not less than one unit vertical in 20
units horizontal (5 percent slope) for a minimum distance of 10 feet measured perpendicular to the
face of the wall. If physical obstructions of lot lines prohibit 10 ft of horizontal distance, a 5 percent
slope shall be provided at an approved alternative method of diverting water away from the
foundation. Swales used for this purpose shall be sloped a minimum of 2 percent within 10 feet of the
building foundation. Impervious surfaces within 10 feet of the building foundation shall be sloped a
minimum of 2 percent away from the building.
Concrete Slab Construction
Footing Design
Exterior and interior footings for a single story structure should be found 16 inches below the lowest
adjacent grade with a minimum width of 12 inches.
Two story structures shall have footings 24 inches below the lowest adjacent grade with a minimum
width of 12 inches. Reinforcement should consist of four #4 reinforcing bars placed two at the top and
two at the bottom of the footing. These reinforcing bars shall be positioned with minimum cover of 2
inches at the center of all continuous footings, properly lapped and tied.
Foundation
Over excavate all building areas three feet and three feet beyond foundation dimension, or to compe-
tent insitu soils as determined by field test during excavation, whichever is deeper. Scarify exposed
subgrade 8 inches and moisturize to optimum moisture content. Compact to minimum 90% density
and replace soil in 8 inch lifts, moisturize and compact to minimum 90% of maximum density.
Paved Areas- General
Paved areas consist of concrete patios, sidewalks and driveways. There are different requirements for
the preparation of each of these areas.
Concrete patios are generally adjacent to the building itself. Proper preparation of the area for con-
crete patios is extremely important. Improper compaction or preparation will permit cracks and settle-
ment of the paving that are not acceptable. It is required that all areas for concrete patios be excavated
12 inches and recompacted to the proper density as described above.
5
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr.
Santa Ana CA 92704
Floor Slabs
The concrete slab design shall be in accordance with the provisions of Cal Green 2022.
It is recommended that concrete floor slabs in areas to be covered with moisture sensitive coverings,
be constructed over a 10 mil plastic membrane. The plastic membrane should be properly lapped,
sealed, and protected with 2 inches of sand.
At a minimum, the floor slab shall be reinforced with # 4 reinforcing bars placed 18 inches on center
throughout the entire slab and shall be placed in the center of a 5 inch slab. The subgrade soils tend to
dry out prior to placing the floor slab, therefore, prior to placing concrete, the sub-grade soils shall be
remoisturized to 90 % of optimum moisture to a depth of 12 inches.
Driveways and Parking Areas
Asphalt paving shall be a minimum of 2 inches of 1/2 inch maximum aggregate asphalt over 4 inches of
3/4 inch crushed rock, gravel or miscellaneous base. The sub grade shall be compacted to 95%
minimum and the aggregate base shall be compacted to 90% of maximum density minimum.
Concrete driveways and parking areas shall be constructed a minimum of 4 inches thick with
construction joints at a maximum of 10 feet. Minimum reinforcement shall consist of #3 reinforcing
bars crossing at 24 inches on center and placed in the center of the slab. The driveway shall be
constructed over a minimum of 3 inches of crushed rock, gravel or miscellaneous base. Prior to
placing concrete, the driveway sub-grade shall be saturated to 100% of optimum moisture to a depth of
12 inches.
Utility Trenches
The development of the site will obviously require utility trenches. Although these trenches are limited
in scope, they present significant problems when they are not properly dug and properly backfilled.
On site material may be used for utility line backfill. The backfill shall be compacted to 90% of max
density.
Fill placement and compaction requirements
Material for engineered fill should be select free of organic material, debris, ad other deleterious sub-
stances, and should not contain fragments greater than 3 inches in maximum dimension. On-site exca-
vated soils that meet these requirements may be used to backfill the excavated Residential Building
area.
All fill should be placed in 6 inch thick maximum lifts, watered or air dried as necessary to achieve
near optimum moisture conditions, and then compacted in place to a maximum relative compaction of
90%. The laboratory maximum dry density and optimum moisture content for each change in soil type
should be determined in accordance with Test Method ASTM D 1557. A representative of the project
consultant should be present on-site during grading operations to verify proper placement and compac-
tion of all fill, as well as to verify compliance with the other geotechnical recommendations presented
herein.
6
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr.
Santa Ana CA 92704
Additional Services Required
Priority Engineering Group shall be called to provide the following services.
All earthwork to be performed under the observation and testing of the Geotechnical Engineer or
Engineering personnel reporting to the Geotechnical Engineer. All earthworks, including excavation,
backfill and preparation of subgrade, should be performed in accordance with the geotechnical recom-
mendations presented in this report. All import fi ll material to be approved by Geotechnical Engineer
prior to importing to the site for use as compacted fill.
Conclusion
Development of the site, as proposed, is considered feasible from a Geotechnical Engineering perspec-
tive, assuming the recommendations in this report are incorporated in the design and implemented in
the field.
When constructed in accordance with the specifications in this report the site will be safe and adequate
for the intended use.
7
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr.
Santa Ana CA 92704
Inspection
The Soils Engineer shall provide inspection for the site clearing and grading in order to certify that the
grading was done in accordance with the approved plans and grading specifications.
Seasonal Limitations
No fi ll shall be placed, spread, or rolled during unfavorable weather conditions. When work is inter-
rupted by heavy rains, fi ll operations shall not resume until the field tests by the Soils Engineer indi-
cate the moisture content and density of the fi ll are as previously specified.
General
The recommendations contained in this report are based on the results of field investigation and labor-
atory testing and represent our best engineering judgment. When prepared in accordance with the rec-
ommendations, the site will be suitable and acceptable and safe and adequate for the proposed con-
struction.
It should be understood that subsurface conditions can and will vary throughout the site. Before
providing bids, contractors shall make thorough explorations and findings. If soil conditions encoun-
tered during grading differ substantially from those described in this report, this office should be noti-
fied immediately so that appropriate recommendations can be made. This consultant is not responsible
for any financial gains or losses accrued by persons/firms or any third party in this report.
This report is issued with the understanding that it is the responsibility of the owner, or his/her
representative, to ensure that the information and recommendations contained herein are called to the
attention of the Project Architect and Engineer and are incorporated into the plans and specifications and
that the necessary steps are taken to see that the Contractors and Subcontractors carry out such
recommendations.
Respectfully submitted,
Priority Engineering Group
George Bach
RCE 11092 / GE 107
* Exp. 1N20./ 3111 /02902
8
524 S Shawnee Dr &
Unit# 22/7/2025
,)EN IX
524 S Shawnee Dr &
Unit# 22/7/2025
UNIFIED SOIL CLASSIFICATION SYSTEM
UNIFIED SOIL CLASSIFICATION AND SYMBOL CHART
COARSE-GRAIN ED SOILS
(more than 50% of material is larger than No. 200 sieve size.
Clean Gravels (Less than 5% fines)
,..„„,
GRAVELS •,,*(.1--,
Well-graded gravels, gravel-sand
mixtures, little or no fines
-
More than 50% .. Gp
of coarse 111..,,,.-,.
fraction larger Gravels
Poorly-graded gravels, gravel-sand
mixtures, little or no fines
with fines (More than 12% fines)
than No. 4 7iFFr . sieve size 'ti,-; GM Silty gravels, gravel-sand-silt mixtures
%c
Aq
,„
vk...
Clayey gravels, gravel-sand-clay
mixtures
Clean Sands (Less than 5% fines)
• SW
SANDS
—
Well-graded sands, gravelly sands,
little or no fines
50% or more
of coarse
SP Poorly graded sands, gravelly sands,
little or no fines
fraction smaller
than No. 4
sieve size
Sands
SM
with fines (More than 12% fines,)
Silty sands, sand-silt mixtures
SC Clayey sands, sand-clay mixtures
(50% or more of
FINE-GRAINED
material
SOILS
is smaller than No. 200 sieve size.)
SILTS
AND
ML
Inorganic silts and very fine sands, rock
flour, silty of clayey fine sands or clayey
silts with slight plasticity
CLAYS
Liquid limit
less than
50%
CL
-,
OL
Inorganic clays of low to medium
plasticity, gravelly clays, sandy clays,
silty clays, lean clays
Organic silts and organic silty clays of
low plasticity
SILTS
AND
CLAYS
Liquid limit
50%
mH
CH
Inorganic silts, micaceous or
diatomaceous fine sandy or silty soils,
elastic silts
Inorganic clays of high plasticity, fat
clays
or greater
OH Organic clays of medium to high
plasticity, organic silts
HIGHLY
ORGANIC
SOILS
PT Peat and other highly organic soils
LABORATORY CLASSIFICATION CRITERIA
GW
D60 D 30 C Cc between 1 3 - greater than 4' = and u - n D10 x D60 '10
GP Not meeting all gradation requirements for GW
GM Atterberg limits below "A"
line or P.I. less than 4 Above "A" line with Pi between
4 and 7 are borderline cases
requiring use of dual symbols GC Atterberg limits above "A"
line with P.I. greater than 7
SW
060 D30
Cu than 4: C, between 1 and 3 = greater =
D 10 D10 x D60
SP Not meeting all gradation requirements for GW
SM Atterberg limits below "A"
line or P.I. less than 4
Limits plotting in shaded zone
with P.I. between 4 and 7 are
borderline cases requiring use
of dual symbols. SC Atterberg limits above "A"
line with P.I. greater than 7
Determine percentages of sand and gravel from grain-size curve. Depending
on percentage of fines (fraction smaller than No. 200 sieve size).
coarse-grained soils are classified as follows:
Less than 5 percent GW, GP, SW, SP
More than 12 percent GM, GC, SM, SC
5 to 12 percent Borderline cases requiring dual symbols
PLASTICITY CHART
PL
A
S
T
I
C
I
T
Y
IN
D
E
X
(P
I
)
(%
)
60
50
40
30
20
10
CH
CL
A LINE
PI = 0.73(LL-20)
MH&OH
CLOAL
0 0
ML&OL
10 20 30 40 50 60 70
LIQUID UMIT (LL) (%)
80 90 100
524 S Shawnee Dr Santa Ana Ca 92704 Soil Classification A
524 S Shawnee Dr &
Unit# 22/7/2025
Moisture/Density <ASTM D2216>
The filed density of the soils was detenniried by splittarrel sampling. The sampler was
Equipped trvitrh 2 %" brass rings and was driven manually.
Settlement <ASTM DE3080>
The settlement caracteristics of the in-situ soil we dotennineid by perkwming standard
Consolidation tests on undisturbed specimens The samples we tested in the original
Sampler liner ring and the increment loads for consolidation we applied for periods
Of 24 hrs by means of a single counterbalance lever systent. The pressure settlement
Curves are ShOWII on the attached plates.
Shear Strength <ASTM 03080>
The shear strength of the soil is determined by performing direct shear tests and
Unconfined compression tests.
The direct shear tests are performed on both undisturbed specimens and on samples
Remolded to 90% of ASTM: D-1557-(Current Version) Method A. The samples are either
Tested at in-situ moisture or are saturated to simulate the troorst field condition and
Sheared at a constant rate of 0.1 inches per minute. The relationship between normal
Stress is shown on the attached Direct Shear Summary.
The unconfined shear strength of selected undisturbed specimens and is determined in
accordance with ASTM:DE-2166. These tests we perfonned at the existing moisture
Content. The results of the tests are shown on the Boring Logs.
Maximum Density/Optimum Moisture<ASPA D1557>
The maximum density relationship to optimum moisture was determined in accordance
With ASTM:D1557-(Current Version) Method A(5 layer method).
Exparisivi Index <ASTM D4829>
The expansive potential was determined in accordance with the "Expansion Index Test".
Samples are remolded at 49% to 51% saturation using a specific gravity of 2.7. A total load of
12.63 lbs is applied to the sample and allowed to consolidate for 10 mine. The sample is then
saturated with distilled water and allowed to swell for a minimum of 24hrs.
Soluble Sulfate Content <ACI 318> <ASTNIC 1580>
The concentration of soluble sulfates in the soils is determined by meastring the optical
density of a barium sulfate precipitate. The precipitate results from a reaction of
Barium chkwide with water extractions from the soil samples. The measured optical density is
correlated with a calibration curve obtained from readings on precipitates of known sulfate
concentrations.
Particle Size Analysis of Soils <ASTM D 422>
The method covers the quantitative determination of the distribution of particle sizes in soils.
The distribution of particle sizes retained on the No. 200 sieve-is determined by sieving while
the distribution by a sedimentation process, using a hydrometer to secure the necessary data.
524 S Shawnee Dr Santa Ana Ca 92704 Laboratory Testing Procedures 13
524 S Shawnee Dr &
Unit# 22/7/2025
A I B c o l
1 Surface Elevation Comments
—2--
-3-
-4-
7-7 --1 0-10-
1-6--- Brown silty loam
/ non sticky, slight plastic, very ine roots
8 moist
9
10
11 15.8 -4••••••••••••• Moisture 0.:1 28 P5.8u/o
12
1
14 ' 10"-4I"
IS Brown sandy silt some plastic some sticky
lb ........ slight moist
1/
18
19 42"-b5"
20 an tine sand, clumps ot clay
21 slight plastic, slight sticky
22
23 Ring sample g 610"
24 (i)
25 24.4 ' Moisture g 64" 24.4%
26
2/
28 1.—. 65"-92"
29 4—Brown sandy clay, reddish mottles
30 some plastic, some sticky, moist
31
-Sr
33 '
34
35
36 Y2"-1L0"
3/ Brown sandy clay, reddish mottles,
38 plastic, sticky, moist, moderately hard
39
40 18.6 -Moisture €3) 101 - 18.6%
41
42
4,3 lu
•
bulk sample g 1110"
44 end ot boring 110"
45
46 ...--. 47
41r
49
50 ___
52 Drilled by: - Ariel Logged by: Richard
53
Re
l
a
t
i
v
e
Co
m
p
a
c
t
i
o
n
0/0
Ma
x
De
n
s
i
t
y
(P
c
f
)
Dr
y
De
n
s
i
t
y
(p
c
Mo
i
s
t
u
r
e
(°
/
0
)
Pe
n
e
t
r
a
t
i
o
n
(N
)
De
p
t
h
(f
t
.
)
Ma
t
e
r
i
a
l
Sy
m
b
o
l
Date Drilled 4/17/2024 Boring Diameter 6"
54 Date Backfilled 4/17/2024 Drill Type gas auger
55 Groundwater none Max. Depth 10'
56 2.5 ring 1 set Boring # 1 . . .
524 S Shawnee Dr Santa Ana Ca 92704 Boring Log Cl
524 S Shawnee Dr &
Unit# 22/7/2025
I A I B I C I D E F G H J K L
1 Surface Elevation Comments , _7—I —3--
-4-
-5---A.
6 _
/
-8-4 /5.3 —r—Moisture (c.i) 11" - 15.3%
9
10 0-18
Err 'Brown silty loam, moist, non Kicky 1
12 4 ---.--- non plastic, very tine roots
13
14
-'13-
16 4--.).— 18-36"
17 I Brown clayey sandy silt
18 some sticky, some plastic, moist
'19 '
ar
21
22
23
24 ,
--1173----
7 -r ...A Ring sample
25 Moisture (g) 36" - 11.3%
26
27 36-51
28 -Brown tine silty sand, sott
29
...............
slight plastic, non sticky
30
31
32 1----4--,
AIIIMMIMIIIIMI. 33 '
34 51-60"
35 Dark brown sancy clay, redchsi mottles
36 some plastic, some sticky, mo St
3/
38 .---.439
40
,•-Moisture
bulk sample (g) 60"
41 . si) 6(1 - 25.1%
41
43
-44--r
45 'end of boring 60
45
47 —6--- 48 I
- A
,
49 .._ 50
0, 1 ,
52
" Drilled by:
.
Ariel Logged by: Richard ,
53 ?,.' ›..
u
Q. 2 Date Drilled 4/17/2024 Boring Diameter 6" 1
54 g >. .,,
o
-": 0 "---
c
. 0
—
•,-, Date Backf lied 4/17/2024 Drill Type gas auger
>t
a
z it
,,
" ,..._, 0 47; t -c
48-
--6
c -0 Groundwater none Max. Depth 5'
56
E
ec) 6 )
x t-
i ° a
>,
:
...ui c
Z
,
et)
Q.)
CD
B E
ID >,
Z cn 2.5 ring 1 set Boring # 2
524 S Shawnee Dr Santa Ana Ca 92704 Boring Log C2
524 S Shawnee Dr &
Unit# 22/7/2025
PROJECT: Priority Engineering SAMPLE ID: $06341
PROJECT NO.: AL2022 DATE: April 22 2024
TESTED BY: Eric Y. CHECKED BY: Edward T.
SAMPLE DESCRIPTION: Brown Sandy Silt
LOCATION: 524 S Shawnee Dr. Santa Ana CA 92704
A) WATER ADDED
B) MOLD TARE WEIGHT
C) WEIGHT OF WET SOIL AND MOLD
D) WET SOIL WEIGHT (C - B)
E) WET DENSITY (D / V)
F) DRY DENSITY (E / [(L/100) +1])
G) TARE WEIGHT
H) WEIGHT OF WET SOIL AND TARE
I) WEIGHT OF DRY SOIL AND TARE
J) WEIGHT OF WATER (H - I)
K) DRY WEIGHT OF SOIL (I - G)
L) MOISTURE CONTENT (J / K )* 100)
DR
Y
DE
N
S
I
T
Y
(p
c
f
)
135
130
125
120
115
110
105
100
Method: Mechanical 0 ManualD Hammer: 101b.0 5.5 IbEi
0 -2 -4 -6 %
1929.5 1929.5 1929.5 1929.5 grams
3944.1 3947.3 3885.8 3801.5 grams
2014.6 2017.8 1956.3 1872.0 grams
133.1 133.3 129.2 123.6 pcf
115.5 117.7 116.2 113.3 pcf
230.2 224.5 235.1 234.8 grams
1320.5 1341.6 1375.6 1367.5 grams
grams 1176.8 1211.3 1260.9 1272.4
143.7 130.3 114.7 95.1 grams
946.6 986.8 1025.8 1037.6 grams
15.2 13.2 _ 11.2 9.2 1 _ percent
-
_
-
-Gs=2.6
-- -Gs=2.7
Gs=2.8
Poly.
‘,.
' •
, (
ZERO AIR VOIDS
t
,
‘ ‘ ISeries11
/
. .
r -\---N-• • - ••„ , %, , \
. \
•,, ,,
\
. . . . - - • " " - • - •
5 10 15 20
WATER CONTENT (/o)
25 30
4 inch: V= 15.14 pcf/gm
6 inch: V= 33.98 pcf/gm
METHOD USED
.(A,B or CI
4 inch MOLD
USED
15.14 MOLD VOLUME
CORRECTION (V)
-3/8" SIEVE
NUMBER
PERCENT
RETAINED
WITH ROCK CORRECTION
MAXIMUM
DENSITY [PCF]
' OPTIMUM
MOISTURE rid
WITHOUT ROCK CORRECTION
MAXIMUM
DENSITY [PCF]
13.2 OPTIMUM
MOISTURE [%]
524 S Shawnee Dr Santa Ana Ca 92704 Maximum Density D1
524 S Shawnee Dr &
Unit# 22/7/2025
PROJECT: Priority Engineering SAMPLE ID: S06256
PROJECT NO.: AL2022 DATE: April 22, 2024
TESTED BY: Eric Y. CHECKED BY: Edward T.
SAMPLE DESCRIPTION: Brown Sandy Silt
LOCATION: 524 S Shawnee Dr. Santa Ana CA 92704
Method: MechanicaIL ManualD Hammer: 10Ib.e 5.5 Ibi3
A) WATER ADDED
B) MOLD TARE WEIGHT
C) WEIGHT OF WET SOIL AND MOLD
D) WET SOIL WEIGHT (C - B)
E) WET DENSITY (D / V)
F) DRY DENSITY (E / [(L/100) + 1))
G) TARE WEIGHT
H) WEIGHT OF WET SOIL AND TARE
I) WEIGHT OF DRY SOIL AND TARE
J) WEIGHT OF WATER (H I)
K) DRY WEIGHT OF SOIL (I - G)
L) MOISTURE CONTENT (J / K)' 100)
DR
Y
DE
N
S
I
T
Y
(p
c
f
)
130
125
120
115
110
105
100
95
0 2 4 -2 %
1931.0 1931,0 1931.0 1931.0 grams
3835.7 3893.7 3852,4 3760.8 grams
1904.7 1962.7 1921.4 1829.8 grams
125.8 129.6 126.9 120.9 pcf
111.4 112.7 _ 108.3 108.9 _ pcf
131.4 228.6 229.2 228.4 grams
1157.8 1397.6 1228.5 1246.3 grams
1040.0 1245.1 1082.3 1145.7 grams
117.8 152.5 146 2 100.6 grams
908.6 1016.5 853.1 917.3 grams
13.0 , 15.0 , 17.1 A 11.0 1 i
,
1 percent ,
I
' I i
'_....f._; - 1 1 -
--1"-7.-1 .
L.4 -, -
\
t i___H 1__._
- - -
Gs-2.G
- -Gs=2.7
Gs=2.8
Poly. 'i---1
1:--
'ZERO AIR VOIDS \
..
1,, Fr,
'. 'N (Series1) , \ s,
. N
-j i -
' 1 -
4.--4---t-J-
; \ ,
. . .
• 1
.--••••••••••
. . . . ---i f--- , .
10 15 20
WATER CONTENT (%)
524 S Shawnee Dr Santa Ana Ca 92704
25 30
4 Inch: V= 15.14 pcf/gm
6 inch: V= 33.98 pcf/gm
A METHOD USED
(A, B or C)
4 inch MOLD
USED
15.14 MOLD VOLUME
CORRECTION (V)
#4 SIEVE
NUMBER
PERCENT
RETAINED
WITH ROCK CORRECTION
MAXIMUM
DENSITY [PCP]
OPTIMUM
A MOISTURE [%]
WITHOUT ROCK CORRECTION
MAXINIU1101
DENSITY (PC9
OPTIMUM
MOISTURE ral
Maximum Density D2
•
524 S Shawnee Dr &
Unit# 22/7/2025
4.0
3.0
2.0
1.0
0.0
4.0
0.0
0.00 0.05 0.10 0.15 0.20 0.25 0.30
Horizontal Deformation (inch)
0.0 10 20 30 40 5.0 60 70 80 90 10.0
Normal Stress (ksf)
Ultimate: 0 I Shear Type: Saturated Undisturbed I Peak: •
0.35 0.40 0.45
Boring No. : 1 • Strength Intercept (C) :
0.07 (ksf)
Peak
0.08 (Ion
Ultimate Sample No. : 3.45 (kPa) 4.02 (kPa)
Depth (Wm) : • Friction Angle ( 4 ) : 28.90 Degree 26.75 Degree
Description : Brown Sandy Silt Shear Rate (inch/minute) : 0.0004
SYMBOL
MOISTURE
CONTENT (%)
DRY DENSITY VOID
RATIO
NORMAL STRESS PEAK STRESS ULTIMATE STRESS
(pct) (M tn) (ksf) (kPa) (ksf) (kPa) (ksf) (kPa)
• .. 29.82 89.05 14.02 0.89 1 00 47.88 0.62 29.88 0.59 - 28.15
. 29.59 91.19 14.35 0.85 • 2.00 95.76 1.18 56.31 1.09 52.28
A 29.48 91.80 14 45 0.84 400 191.52 2.28 109.17 2.10 100.55
524 S Shawnee Dr &
Unit# 22/7/2025
. „
Sh
e
a
r
St
r
e
s
s
in
(k
s
f
)
--
k
N)
(4
..
t
,
o
o
o
c
,
•
.
.
_
••
•
•
•
•••
•
0.0
0.0 1.0 2.0 30 40 50 60 70 80 90 10.0
Normal Stress (ksf)
. _ ...
Ultimate : Shear Type: Saturated econs t u e ea R:
40
3.0
0.0
0.00 0.05 0.10 0.15 0.20 0.25 0.30
Horizontal Deformation (inch)
0.35 0.40 0.45
Boring No. : 2
Strength Intercept (C) .
0.08 (ksf)
Peak
0.10 (ksf)
Ultimate Sample No. : 3.73 (kPa) 4.60 (kPa)
Depth (ft/m) : Friction Angle ( 4 ) : 29.76 Degree 27.83 Degree
Description : Brown Sandy Silt Shear Rate (inch/minute) : 0.0004
SYMBOL
MOISTURE
CONTENT (%)
DRY DENSITY VOID
RATIO
NORMAL STRESS PEAK STRESS ULTIMATE STRESS
(pcf) (kNhn3) (ksf) (kPa) (ksf) (kPa) (ksf) (kPa)
29.64 89.61 14 11 0.88 ? uu 47 88 065 31.03 ._ 29.88
. 27.88 92.36 14.54 0.82 2.00 95.76 1 22 58.61 1.15 55.16
A 24.79 96.11 15.13 0.75 4.00 191.52 2.36 113.19 2.21 105.72
524 S Shawnee Dr Santa Ana Ca 92704 Direct Shear E2
524 S Shawnee Dr &
Unit# 22/7/2025
'= 111 96 F.S.= 3
Ng= 17 Ky= 17 hic= 26
( 80 26 ) + (106.02x 17 ) = 4,783.51
+ 3 = 1,594.5
Use: 1600 Ibif t 2
BEARIN. VALUE
40
0
, --"%. Nig rC N isrr N
t I
1
I' , -
k I 1 d',
•
, ..
. I
,
, i , . ., . ,
. i
a
I .
1 ,
.
1
.,
• 11.
,.
, ,
!El 60 50 40 30 2/3 1D 20 40 60 80 100 12
Val ues of Nc and Ng
1.1c=. NY
Values of Ni
go = N + Cl\lc + 'Y D Nq2 I.
width + cohesion + surcharge
B=1 D= 1 c=80 0=26
(106.02
—2— X 17
Test Pit results
DEPTH: 10'
SOIL TYPE: Sandy Silt
524 S Shawnee Dr Santa Ma Ca 92704 Bearing Value
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr, Santa Ana, CA 92704, USA
Latitude, Longitude: 33.7397766, -117.9105262
Tacos Pepe Et
"P-Ire Truck -
W Camile St
9Russell Elementary
School j Santa Ana River Trail-
mile marker eight
W James Ave 85
Googlei ma-add, 4'e z
Date 4/15/2024, 1:12:24 PM
Design Code Reference Document ASCE7-16
Risk Category II
Site Class 0- Default (See Section 11.4.3)
Type Value Description
Ss 1.311 MCER ground motion. (for 0.2 second period)
S1 0.468 MCER ground motion. (for 1.0s period)
Sms 1.573 Site-modified spectral acceleration value
Smi null -See Section 11.4.8 Site-modified spectral acceleration value
SDS 1.049 Numeric seismic design value at 0.2 second SA
S01 null -See Section 11.4.8 Numeric seismic design value at 1.0 second SA
Map de
Type Value Description
SDC null -See Section 11.4.8 Seismic design category
F a 1.2 Site amplification factor at 0.2 second
F, null -See Section 11.4.8 Site amplification factor at 1.0 second
PGA 0.559 MCEG peak ground acceleration
FpGA 1.2 Site amplification factor at PGA
PGAm 0.671 Site modified peak ground acceleration
TL 8 Long-period transition period in seconds
SsRT 1.311 Probabilistic risk -targeted ground motion. (0.2 second)
SsUH 1.419 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration
SsD 1.705 Factored deterministic acceleration value. (0.2 second)
S1RT 0.468 Probabilistic risk-targeted ground motion. (1.0 second)
S1UH 0.507 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration.
S1D 0.6 Factored deterministic acceleration value. (1.0 second)
PGAd 0.704 Factored deterministic acceleration value. (Peek Ground Acceleration)
PGAuH 0.859 Uniform-hazard (2% probability of exceedance in 50 years) Peak Ground Acceleration
CRS 0.924 Mapped value of the risk coefficient at short periods
CF21 0.923 Mapped value of the risk coeffident at a period of 1 s
Cv 1.362 Vertical coefficient
524 S Shawnee Dr Santa Ana Ca 92704 Design Maps Report
-111••••••-••••••••
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr &
Unit# 22/7/2025
Soil Pressure Factors
Earth Pressure Calculations
(I) 26°
Maximum Dry Density = 117.8 y = 106.02 pcf
Active Earth Pressure
Ka= 0.3904617069
Pa= 41.3967501655
Passive Earth Pressure
Kp= 2.5610706048
Pp= 271.5247055208
At Rest
524 S Shawnee Dr Santa Arta Ca 92704
Kat= 0.5616288533
Pat= 59.5438910268
Lateral Earth Pressure
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr, Santa Ana, C X
ow search results for 524 S Shawn...
Address: 524 S SHAWNEE DR
APN 109-833-17
City SANTA ANA
Address 524 S SHAWNEE DR
Fault Zone This parcel is NOT WITHIN an
Earthquake Fault Zone.
Liquefaction All or a portion of this parcel
Zone LIES WITHIN a Liquefaction
Zone.
Landslide This parcel is NOT WITHIN a
Zone Landslide Zone.
Zoom to
524 S Shawnee Dr Santa Ana Ca 92704 Liquefaction Map
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering, Inc.
7661 GARDEN GROVE BLVD. , GARDEN GROVE, CA 92841
Office: (714) 617-5979
Email: info@dongengineering.com
DATE:4/22/2024
CLIENT:
JOB NO.:240168
Project:
ADU
STRUCTURAL CALCULATIONS FOR THE BUILDING AT:
524 S.SHAWNEE DR UNIT 2,
SANTA ANA, CA 92704
Page 1 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU Job#: 240168
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704 Date: 4/22/2024
ROOF:SHINGLE
Slope 3:12
Live Load 20 psf
Roof'g Material 3 psf
Sheathing 2.0 psf
Trusses / Rafters 2.0 psf
Ceiling Joists 2.0 psf
Drywall 2.0 psf
Sprinkler 0.5 psf
Solar 4.0 psf
Miscellaneous 1.5 psf
Total D.L.17 psf
Total Load 37 psf
EXTERIOR WALL:INTERIOR WALL:
EXTERIOR:9 DRYWALL:3
DRYWALL:3.0 DRYWALL:3.0
STUDS:2.0 STUDS:2.0
MISC.:1.0 MISC.:2.0
DL=15.0 PSF DL=10.0 PSF
REVISIONS:
1 Sheets:Date:
Init:Remark:
2 Sheets:Date:
Init:Remark:
3 Sheets:Date:
Init:Remark:
4 Sheets:Date:
Init:Remark:
5 Sheets:Date:
Init:Remark:
6 Sheets:Date:
Init:Remark:
LOADING CONDITIONS
Page 2 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
USGS web services were down for some period of time and as a result this tool wasn't operational, resulting in timeout error.
USGS web services are now operational so this tool should work as expected.
524 S Shawnee Dr #2, Santa Ana, CA 92704, USA
Latitude, Longitude: 33.7397766, -117.9105262
Date 4/15/2024, 8:30:35 PM
Design Code Reference Document ASCE7-16
Risk Category II
Site Class D - Default (See Section 11.4.3)
Type Value Description
SS 1.311 MCER ground motion. (for 0.2 second period)
S1 0.468 MCER ground motion. (for 1.0s period)
SMS 1.573 Site-modified spectral acceleration value
SM1 null -See Section 11.4.8 Site-modified spectral acceleration value
SDS 1.049 Numeric seismic design value at 0.2 second SA
SD1 null -See Section 11.4.8 Numeric seismic design value at 1.0 second SA
Type Value Description
SDC null -See Section 11.4.8 Seismic design category
Fa 1.2 Site amplification factor at 0.2 second
Fv null -See Section 11.4.8 Site amplification factor at 1.0 second
PGA 0.559 MCEG peak ground acceleration
FPGA 1.2 Site amplification factor at PGA
PGAM 0.671 Site modified peak ground acceleration
TL 8 Long-period transition period in seconds
SsRT 1.311 Probabilistic risk-targeted ground motion. (0.2 second)
SsUH 1.419 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration
SsD 1.705 Factored deterministic acceleration value. (0.2 second)
S1RT 0.468 Probabilistic risk-targeted ground motion. (1.0 second)
S1UH 0.507 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration.
S1D 0.6 Factored deterministic acceleration value. (1.0 second)
PGAd 0.704 Factored deterministic acceleration value. (Peak Ground Acceleration)
PGAUH 0.559 Uniform-hazard (2% probability of exceedance in 50 years) Peak Ground Acceleration
CRS 0.924 Mapped value of the risk coefficient at short periods
CR1 0.923 Mapped value of the risk coefficient at a period of 1 s
CV 1.362 Vertical coefficient Page 3 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
DISCLAIMER
While the information presented on this website is believed to be correct, SEAOC /OSHPD and its sponsors and contributors assume no
responsibility or liability for its accuracy. The material presented in this web application should not be used or relied upon for any specific
application without competent examination and verification of its accuracy, suitability and applicability by engineers or other licensed
professionals. SEAOC / OSHPD do not intend that the use of this information replace the sound judgment of such competent professionals,
having experience and knowledge in the field of practice, nor to substitute for the standard of care required of such professionals in
interpreting and applying the results of the seismic data provided by this website. Users of the information from this website assume all liability
arising from such use. Use of the output of this website does not imply approval by the governing building code bodies responsible for
building code approval and interpretation for the building site described by latitude/longitude location in the search results of this website.
Page 4 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
(E) LIVING
8'-0'' CLG
(E) BED #1
8'-0'' CLG
(E) BED #2
8'-0'' CLG
(E
)
C
L
O
S
E
T
LOSET
CL
O
S
E
T
CAST IRONSINKSBROOKFIELDK-5942-5
CLOSET
STACK
W/D
10'-0" CLG
CAST IRONSINKSBROOKFIELDK-5942-5
(N) BED #2
10'-0" CLG
(N) BED #1
10'-0" CLG
(N) BA #1
10'-0" CLG
(N) BA #2
10'-0" CLG
CAST IRONSINKSBROOKFIELDK-5942-5
K-1147SYSTEM BASIC 6040BATHACRYLIC
REF
(N) LIVING
10'-0" CLG
(N) KITCHEN
10'-0" CLG
7.75" MAX.
LANDING
1H
R
.
F
I
R
E
RA
T
E
D
W
A
L
L
1Y
1X
1 2
A
B
ROOF SHEARWALL LAYOUT
Page 5 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job#: 240168
Date: 4/22/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1X
Number of Story: 1 Section width: 20(ft)Section length: 46.5(ft)
Base height: 0.5(ft)Slope roof height: 13.5(ft)Gable mean roof height: 12(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 20(ft), L = 46.5(ft), H = 12(ft)-->L/B = 2.33, H/L = 0.26
Wall coefficient: Cpw = 0.8, Cpl = -0.28, Roof coefficient: Cpw = (0.12;-0.37), Cpl = -0.57
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2,01*(15/zg)^(2/anpha)qz = 0,00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Rx = 6.5, Site class :D, SDS = 2FaSs/3 =1.049, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Rx = 0.7*1.049*1*W/6.5 = 0.113*W
Total Seismic Load = 112.69 = 112.69 PLF
Redistrib: 997.5*10 = 9975 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 160.99 x 14 / (2 x 46.5) = 24.24 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 160.99 x 14^2 / (8 x 46.5) = 84.82 LBS
Splice w/ min. (1) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (15, 0.85, 22.35, 20.59)
ROOF
Roof = 15*46.5 = 697.5 PLF
Wall = 15*2*5 + 10*3*5 = 300 PLF
Shear = 0.113(697.5+300) = 0.113*997.5 = 112.72 PLF
Plate height: ROOF = 10(ft)
SHEAR ROOF = 112.69*997.5*10/9975 = 112.69 PLF
SHEAR ROOF = 0.6*W = 89.36(plf)
ROOF 112.69 PLF SEISMIC GOVERN
Page 6 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job#: 240168
Date: 4/22/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1Y
Number of Story: 1 Section width: 46.5(ft)Section length: 20(ft)
Base height: 0.5(ft)Slope roof height: 13.5(ft)Gable mean roof height: 12(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 46.5(ft), L = 20(ft), H = 12(ft)-->L/B = 0.43, H/L = 0.6
Wall coefficient: Cpw = 0.8, Cpl = -0.5, Roof coefficient: Cpw = (-0.09;-0.57), Cpl = -0.58
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2,01*(15/zg)^(2/anpha)qz = 0,00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.049, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.049*1*W/6.5 = 0.113*W
Total Seismic Load = 56.48 = 56.48 PLF
Redistrib: 500*10 = 5000 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 80.69 x 46.5 / (2 x 20) = 93.8 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 80.69 x 46.5^2 / (8 x 20) = 1090.45 LBS
Splice w/ min. (6) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (15, 0.85, 22.35, 24.7); (15, 0.85, 22.35, 15.2)
ROOF
Roof = 15*20 = 300 PLF
Wall = 15*2*5 + 10*1*5 = 200 PLF
Shear = 0.113(300+200) = 0.113*500 = 56.5 PLF
Plate height: ROOF = 10(ft)
SHEAR ROOF = 56.48*500*10/5000 = 56.48 PLF
SHEAR ROOF = 0.6*W = 66.6(plf)
ROOF 66.6 PLF WIND GOVERN
Page 7 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job#: 240168
Date: 4/22/2024
PLAN: 1
CODE: CBC 2022
Max panel deflection: = 0.04" | 4*d*1.4 = 0.21" < 0.02 x 120 = 2.4"
1.50 4.00 2.00 3.25 2.00
OVERTURN ANALYSIS
Left Side
Hold Down HDU2
Post Size 4x4
Tension (kips)2.7
Com. (kips)3.5
Right Side
Hold Down HDU2
Post Size 4x4
Tension (kips)2.7
Com. (kips)3.5
Anchor Bolt
5/8"x12"[2]spaced equally
4.00
P2
Drag Force:
A: Simpson MSTA30 (1880LB) - Alt one row (9) #16 ea. side of splice
Framing Clips Spacing See Shear Wall Schedule
10
.
0
0
f
t
LINE 1 (Direction: Y) @ FIRST FLOOR | Wind: 1549lbs | Seismic:1313lbs | Shear Panel Type: C | (þ = 1)
Total Length = 20.5 ft | Total Shear Wall Length = 5.25 ft | Shear Diaphragm = 92 plf | Design Shear Wall = 295 plf (Wind) / 250 plf (Seismic)
Seismic Load Combination: (1.0 + 0.14SDS)D + H + F + 0.7QE (Compression) | Load Combination Use: (0.6 - 0.14SDS)D + H + 0.7QE (Tension)
Wind Load Combination: D + 0.75L + 0.75(0.6W) (Compression) | Load Combination Use: 0.6D + H + 0.6W (Tension)
Seismic Capacity: P1(1.3/1.3) + P2(0.8/0.8) = 2.1kips (Sect. 4.3.3.4.1)
Wind Capacity: P1(1.9/1.9) + P2(1.2/1.2) = 3.1kips (Sect. 4.3.3.4.1)
3.75
P1
1030
d = 8𝑣ℎ3
𝐸𝐴𝑏 + 𝑣ℎ
1000𝐺𝑎
+ ℎ
𝑏∆𝑎
Page 8 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job#: 240168
Date: 4/22/2024
PLAN: 1
CODE: CBC 2022
Max panel deflection: = 0.1" | 4*d*1.4 = 0.58" < 0.02 x 120 = 2.4"
0.25 8.00 3.25
OVERTURN ANALYSIS
Left Side
Hold Down HDU2
Post Size 4x4
Tension (kips)1.7
Com. (kips)2.5
Right Side
Hold Down HDU2
Post Size 4x4
Tension (kips)1.7
Com. (kips)2.5
Anchor Bolt
5/8"x12"[2]spaced equally
2.50
Drag Force:
A: Simpson MSTA30 (1880LB) - Alt one row (9) #16 ea. side of splice
Framing Clips Spacing See Shear Wall Schedule
10
.
0
0
f
t
LINE 2 (Direction: Y) @ FIRST FLOOR | Wind: 1549lbs | Seismic:1313lbs | Shear Panel Type: A | (þ = 1)
Total Length = 14 ft | Total Shear Wall Length = 8 ft | Shear Diaphragm = 134 plf | Design Shear Wall = 194 plf (Wind) / 164 plf (Seismic)
Seismic Load Combination: (1.0 + 0.14SDS)D + H + F + 0.7QE (Compression) | Load Combination Use: (0.6 - 0.14SDS)D + H + 0.7QE (Tension)
Wind Load Combination: D + 0.75L + 0.75(0.6W) (Compression) | Load Combination Use: 0.6D + H + 0.6W (Tension)
Seismic Capacity: P1(1.8/1.8) = 1.8kips (Sect. 4.3.3.4.1)
Wind Capacity: P1(2.5/2.5) = 2.5kips (Sect. 4.3.3.4.1)
P1
34
-770
d = 8𝑣ℎ3
𝐸𝐴𝑏 + 𝑣ℎ
1000𝐺𝑎
+ ℎ
𝑏∆𝑎
Page 9 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job#: 240168
Date: 4/22/2024
PLAN: 1
CODE: CBC 2022
Max panel deflection: = 0.09" | 4*d*1.4 = 0.5" < 0.02 x 120 = 2.4"
3.00 5.50 3.00 3.00 5.25 8.25
OVERTURN ANALYSIS
Left Side
Hold Down HDU2 HDU2
Post Size 4x4 4x4
Tension (kips)0.9 0.9
Com. (kips)1.7 1.6
Right Side
Hold Down HDU2 HDU2
Post Size 4x4 4x4
Tension (kips)0.9 0.9
Com. (kips)1.7 1.6
Anchor Bolt
5/8"x12"[2][2]spaced equally
4.502.00 4.25
P2
4.25
P1
4.25
Drag Force:
A: Simpson MSTA30 (1880LB) - Alt one row (9) #16 ea. side of splice
Framing Clips Spacing See Shear Wall Schedule
10
.
0
0
f
t
LINE A (Direction: X) @ FIRST FLOOR | Wind: 894lbs | Seismic:1127lbs | Shear Panel Type: A | (þ = 1)
Total Length = 47.25 ft | Total Shear Wall Length = 10.75 ft | Shear Diaphragm = 34 plf | Design Shear Wall = 83 plf (Wind) / 105 plf (Seismic)
Seismic Load Combination: (1.0 + 0.14SDS)D + H + F + 0.7QE (Compression) | Load Combination Use: (0.6 - 0.14SDS)D + H + 0.7QE (Tension)
Wind Load Combination: D + 0.75L + 0.75(0.6W) (Compression) | Load Combination Use: 0.6D + H + 0.6W (Tension)
Seismic Capacity: P1(1.2/1.2) + P2(1.2/1.2) = 2.4kips (Sect. 4.3.3.4.1)
Wind Capacity: P1(1.7/1.7) + P2(1.6/1.6) = 3.3kips (Sect. 4.3.3.4.1)
247
-434
d = 8𝑣ℎ3
𝐸𝐴𝑏 + 𝑣ℎ
1000𝐺𝑎
+ ℎ
𝑏∆𝑎
Page 10 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job#: 240168
Date: 4/22/2024
PLAN: 1
CODE: CBC 2022
Max panel deflection: = 0.01" | 4*d*1.4 = 0.08" < 0.02 x 120 = 2.4"
17.00 2.75 3.25 12.00 6.75
OVERTURN ANALYSIS
Left Side
Hold Down No Uplift
Post Size
Tension (kips)
Com. (kips)
Right Side
Hold Down No Uplift
Post Size
Tension (kips)
Com. (kips)
Anchor Bolt
5/8"x12"[2]spaced equally
4.00
Drag Force:
A: Simpson MSTA30 (1880LB) - Alt one row (9) #16 ea. side of splice
Framing Clips Spacing See Shear Wall Schedule
10
.
0
0
f
t
LINE B (Direction: X) @ FIRST FLOOR | Wind: 894lbs | Seismic:1127lbs | Shear Panel Type: A | (þ = 1)
Total Length = 45.75 ft | Total Shear Wall Length = 12 ft | Shear Diaphragm = 35 plf | Design Shear Wall = 75 plf (Wind) / 94 plf (Seismic)
Seismic Load Combination: (1.0 + 0.14SDS)D + H + F + 0.7QE (Compression) | Load Combination Use: (0.6 - 0.14SDS)D + H + 0.7QE (Tension)
Wind Load Combination: D + 0.75L + 0.75(0.6W) (Compression) | Load Combination Use: 0.6D + H + 0.6W (Tension)
Seismic Capacity: P1(2.6/2.6) = 2.6kips (Sect. 4.3.3.4.1)
Wind Capacity: P1(3.7/3.7) = 3.7kips (Sect. 4.3.3.4.1)
P1
950
-238
d = 8𝑣ℎ3
𝐸𝐴𝑏 + 𝑣ℎ
1000𝐺𝑎
+ ℎ
𝑏∆𝑎
Page 11 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job#: 240168
Date: 4/22/2024
PLAN: 1
CODE: CBC 2022
Wind =
Seismic =
A B C D
E F
G H
I J K L
3.25 2.00
Design Force =
Wall Height =
Wall Length =
Window size =
Bottom header =
Top of window sill =
Force Above Window (B & C)=1313 x (10 - 6.5 + 3 / 2) / 9.25 = 710 lbs
Shear =710 / (10 - 6.5) = 203 plf
Force Below Window (J & K)=1313 x (6.5 - 3 / 2) / 9.25 = 710 lbs
Shear =710 / (6.5 - 3) = 203 plf
Force on Left pier (E & G)=1313 x (3.25 + 4 / 2) / 9.25 = 745 lbs
Shear =745 / 3.25 = 229 plf
Force on Right pier (F & H)=1313 x (2 + 4 / 2) / 9.25 = 568 lbs
Shear =568 / 2 = 284 plf
Drag force at header =203 x 4 / 2 = 406 lbs
Drag force at window sill =203 x 4 / 2 = 406 lbs
Upper left sub panel shear (A)=(745 - 406) / 3.25 = 104 plf
Upper right sub panel shear (D)=(568 - 406) / 2 = 81 plf
Lower left sub panel shear (I)=(1419 - 1054) / 3.5 = 104 plf
Lower right sub panel shear (L)=(1419 - 1054) / 3.5 = 104 plf
Maximum sub panel shear =284 plf => USE TYPE C
Maximum drag force =406 lbs => USE DRAG (1)CS16
Shear Wall With Opening: Shear Wall # 1 @ P1 & P2
3.50 ft
10
.
0
0
f
t
4.00
1549 lbs
1313 lbs
1313 lbs
10.00 ft
9.25 ft
4ft x 3ft
6.50 ft
Page 12 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job#: 240168
Date: 4/22/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (X-X Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
A 1 1X 20 89 113 10 10.75 105 A
B 1 1X 20 89 113 10 12 94 A
v(plf) = V/L
V2 = Seismic*Span/2 + Added Vseismic
Line shear V = Maximum(V1;V2)
V1 = Wind*Span/2 + Added Vwind
SUMMARY SHEAR WALL
Page 13 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job#: 240168
Date: 4/22/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (Y-Y Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
1 1 1Y 46.5 67 56 10 5.25 295 C
2 1 1Y 46.5 67 56 10 8 194 A
v(plf) = V/L
Line shear V = Maximum(V1;V2)
SUMMARY SHEAR WALL
V1 = Wind*Span/2 + Added Vwind
V2 = Seismic*Span/2 + Added Vseismic
Page 14 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job#: 240168
Date: 4/22/2024
PLAN: 1
CODE: CBC 2022
Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic
(#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb)
1 :Wind = 1549(lb), Seismic = 1313(lb)
1 1Y 1 66.6 56.5 46.5 1548 1313 l---------------46.5(ft)---------------l
2 :Wind = 1549(lb), Seismic = 1313(lb)
2 1Y 1 66.6 56.5 46.5 1548 1313 l---------------46.5(ft)---------------l
A :Wind = 894(lb), Seismic = 1127(lb)
A 1X 1 89.4 112.7 20 894 1127 l---------------20.0(ft)---------------l
B :Wind = 894(lb), Seismic = 1127(lb)
B 1X 1 89.4 112.7 20 894 1127 l---------------20.0(ft)---------------l
#N/A #N/A
#N/A #N/A
#N/A #N/A
Description
V_(lb)=v_(plf)*Span*Span/2/(Span+Offset)
LATERAL
p Factor: X Direction: p=1; Y Direction: p=1
Page 15 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job #: 240168
Date : 04/22/2024
Plan : 1
BEAM : 1 - HIP @ LIVING ROOM
Loads(Downward+)
Beam Weight 5.5 plf from 0 ft to 12.25 ft
Roof Rafter: (11+20)(8~0) = (DL=88~0PLF; LLr=160~0PLF) form 0 to 12.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1046/1046 0
2 540/540 0
USE 2-2 x 8
Critcal Shear = 1046 LB @0' 1.5xV/(F'v x A)= 0.31
F'v = 225, A = 22.5
Critcal Moment = 2488 LB-FT @5.25' M/(F'b x S)= 0.72
F'b = 1462, S = 28.12
Critical Deflection for TL = -0.391 INCH @ 6 L/240 = 0.612"
Critical Deflection for LL = -0.242 INCH @ 6 L/360 = 0.408"
1 2
Moment
Shear
Deflection
12.25'
BEAM : 2 - VALLEY @ BEDROOM
Loads(Downward+)
Beam Weight 5.5 plf from 0 ft to 10 ft
Roof Rafter: (11+20)(0.8~4.2) = (DL=8.2~46.8PLF; LLr=15~85PLF) form 0 to 10
Roof Rafter: (11+20)(0~3.5) = (DL=0~38.5PLF; LLr=0~70PLF) form 0 to 10
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 505/505 0
2 867/867 0
USE 2-2 x 8
Critcal Shear = -867 LB @10' 1.5xV/(F'v x A)= 0.25
F'v = 225, A = 22.5
Critcal Moment = 1743 LB-FT @5.75' M/(F'b x S)= 0.51
F'b = 1462, S = 28.12
Critical Deflection for TL = -0.182 INCH @ 5.25 L/240 = 0.5"
Critical Deflection for LL = -0.113 INCH @ 5.25 L/360 = 0.333"
1 2
Moment
Shear
Deflection
10'
Page 16 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job #: 240168
Date : 04/22/2024
Plan : 1
BEAM : 3 - HIP @ BATH#1
Loads(Downward+)
Beam Weight 2.7 plf from 0 ft to 9.75 ft
Roof Rafter: (11+20)(6.5~0) = (DL=71.5~0PLF; LLr=130~0PLF) form 0 to 9.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 668/668 0
2 340/341 0
USE 2 x 8
Critcal Shear = 668 LB @0' 1.5xV/(F'v x A)= 0.41
F'v = 225, A = 10.88
Critcal Moment = 1259 LB-FT @4.25' M/(F'b x S)= 0.85
F'b = 1350, S = 13.14
Critical Deflection for TL = -0.278 INCH @ 4.75 L/240 = 0.488"
Critical Deflection for LL = -0.175 INCH @ 4.75 L/360 = 0.325"
1 2
Moment
Shear
Deflection
9.75'
BEAM : 4 - CLG @ LIVING ROOM
Loads(Downward+)
Beam Weight 10.1 plf from 0 ft to 13.25 ft
Ceiling Joist DL: (4)(4) = (DL=16PLF) form 0 to 13.25
Ceiling Joist : (4+10)(4.2) = (DL=17PLF; LLr=42.5PLF) form 8 to 13.25
Point load @ 7.75 : Load from beam 1 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 669/669 0
2 1035/1035 0
USE 6 x 8
Critcal Shear = -1035 LB @13.25' 1.5xV/(F'v x A)= 0.17
F'v = 212, A = 41.25
Critcal Moment = 4400 LB-FT @7.75' M/(F'b x S)= 0.6
F'b = 1688, S = 51.56
Critical Deflection for TL = -0.375 INCH @ 7 L/240 = 0.662"
Critical Deflection for LL = -0.202 INCH @ 7 L/360 = 0.442"
1 2
P1
Moment
Shear
Deflection
13.25'
Page 17 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job #: 240168
Date : 04/22/2024
Plan : 1
BEAM : 5 - CLG @ BEDROOM
Loads(Downward+)
Beam Weight 5.5 plf from 0 ft to 13.25 ft
Ceiling Joist DL: (4)(1.3) = (DL=5.3PLF) form 0 to 13.25
Point load @ 6.5 : Load from beam 2 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 329/329 0
2 319/320 0
USE 2-2 x 8
Critcal Shear = 329 LB @0' 1.5xV/(F'v x A)= 0.09
F'v = 225, A = 22.5
Critcal Moment = 1910 LB-FT @6.5' M/(F'b x S)= 0.55
F'b = 1462, S = 28.12
Critical Deflection for TL = -0.295 INCH @ 6.5 L/240 = 0.662"
Critical Deflection for LL = -0.153 INCH @ 6.5 L/360 = 0.442"
1 2
P1
Moment
Shear
Deflection
13.25'
BEAM : 6 - CLG @ BED ROOM #1
Loads(Downward+)
Beam Weight 10.1 plf from 0 ft to 13.25 ft
Ceiling Joist DL: (4)(1.3) = (DL=5.3PLF) form 0 to 13.25
Point load @ 6.5 : Load from beam 3 at Support 1(P1)
Point load @ 6.5 : Load from beam 3 at Support 1(P2)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 783/783 0
2 758/758 0
USE 6 x 8
Critcal Shear = 782 LB @0' 1.5xV/(F'v x A)= 0.13
F'v = 212, A = 41.25
Critcal Moment = 4762 LB-FT @6.5' M/(F'b x S)= 0.65
F'b = 1688, S = 51.56
Critical Deflection for TL = -0.396 INCH @ 6.5 L/240 = 0.662"
Critical Deflection for LL = -0.228 INCH @ 6.5 L/360 = 0.442"
1 2
P1P2
Moment
Shear
Deflection
13.25'
Page 18 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job #: 240168
Date : 04/22/2024
Plan : 1
BEAM : C1 - C.J. 2X6 DFL#2 @ 16" O.C.
Loads(Downward+)
Ceiling Joist : (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 143/143 0
2 143/143 0
USE 2 x 6
Critcal Shear = 142 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 8.25
Critcal Moment = 543 LB-FT @7.62' M/(F'b x S)= 0.51
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.684 INCH @ 7.63 L/240 = 0.762"
Critical Deflection for LL = -0.488 INCH @ 7.63 L/360 = 0.508"
1 2
Moment
Shear
Deflection
15.25'
BEAM : C2 - C.J. 2X8 DFL#2 @ 16" O.C.
Loads(Downward+)
Ceiling Joist : (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 20.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 189/189 0
2 189/189 0
USE 2 x 8
Critcal Shear = 189 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 10.88
Critcal Moment = 958 LB-FT @10.12' M/(F'b x S)= 0.56
F'b = 1552, S = 13.14
Critical Deflection for TL = -0.928 INCH @ 10.12 L/240 = 1.012"
Critical Deflection for LL = -0.663 INCH @ 10.12 L/360 = 0.675"
1 2
Moment
Shear
Deflection
20.25'
Page 19 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job #: 240168
Date : 10/16/2024
Plan : 1
BEAM : R1 - R.R. 2X6 DFL#2 @ 16" O.C. TYP.
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 248/248 0
2 248/248 0
USE 2 x 6
Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2
F'v = 225, A = 8.25
Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
BEAM : R2 - R.R. 2X6 DFL#2 @ 16" O.C. TYP.
Loads(Downward+)
Beam Weight 2.1 plf from 0 ft to 11.5 ft
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 11.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 360/359 0
2 140/141 0
USE 2 x 6
Critcal Shear = 207 LB @3.5' 1.5xV/(F'v x A)= 0.16
F'v = 225, A = 8.25
Critcal Moment = -266 LB-FT @3.5' M/(F'b x S)= 0.25
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.063 INCH @ 7.75 L/240 = 0.4"
Critical Deflection for LL = -0.039 INCH @ 7.75 L/360 = 0.267"
1 2
Moment
Shear
Deflection
3.5'8'
Page 20 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
Dong Engineering Inc.
ADU
524 S.SHAWNEE DR UNIT 2, SANTA ANA, CA 92704
Job#: 240168
Date: 4/23/2024
PLAN: 1
CODE: CBC 2022
1600 psf
Trib Trib Wall Height
DL(psf) LL(psf) roof(ft) DL(psf) LL(psf) floor(ft) DL(psf) wall(ft)
15 20 10 15 10
Roof: (DL+LL) (Trib) = 350 plf
Floor: (DL+LL) (Trib) = 0 plf
Wall: DL (Height)= 150 plf
500 plf
500 /(12"/12) = 500 psf< 1600 psf
P(allowable)
P allowable = 6,400 #
24 in
FOUNDATION - 1-STORY
Allowable soil bearing value:
Roof Floor
use 12" wide cont. ftg w/ 2-#4 top & bott.
45
Page 21 of 21
524 S Shawnee Dr &
Unit# 22/7/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:ADU Calculation Date/Time:2024-07-30T22:26:29-07:00 (Page 1 of 10)
Calculation Description:Title 24 Analysis Input File Name:23156 - ADU.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-30 22:26:38
GENERAL INFORMATION
01 Project Name ADU
02 Run Title Title 24 Analysis
03 Project Location 524 S Shawnee Dr, Unit 2
04 City Santa Ana 05 Standards Version 2022
06 Zip code 92704 07 Software Version EnergyPro 9.2
08 Climate Zone 8 09 Front Orientation (deg/ Cardinal)180
10 Building Type Single family 11 Number of Dwelling Units 1
12 Project Scope Newly Constructed Addition 13 Number of Bedrooms 5
14 Addition Cond. Floor Area (ft2)749 15 Number of Stories 1
16 Existing Cond. Floor Area (ft2)1326 17 Fenestration Average U-factor 0.3
18 Total Cond. Floor Area (ft2)2075 19 Glazing Percentage (%)14.69%
20 ADU Bedroom Count 2 21 ADU Conditioned Floor Area 749
22 Fuel Type Natural gas 23 No Dwelling Unit:No
ADDITION ALONE - Project Analysis Parameters
01 02 03 04 05 06
Existing Area (excl. new addition)
(ft2)
Addition Area (excl. existing)
(ft2)Total Area (ft2)Existing Bedrooms Addition Bedrooms Total Bedrooms
1326 749 2075 3 2 5
ADDITION ALONE - ACCESSORY DWELLING UNIT (ADU) PROJECT ANALYSIS PARAMETERS
01 02 03 04 05 06 07 08
Zone Name Existing Area (excl.
new addition) (ft2)
ADU Area (excl.
existing) (ft2)Total Area (ft2)Existing Bedrooms Addition Bedrooms Total Bedrooms Attached vs. Detached
Living 1326 749 2075 3 2 5 Attached
424-P010149163A-000-000-0000000-0000 07/30/2024 22:28 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
524 S Shawnee Dr &
Unit# 22/7/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:ADU Calculation Date/Time:2024-07-30T22:26:29-07:00 (Page 2 of 10)
Calculation Description:Title 24 Analysis Input File Name:23156 - ADU.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-30 22:26:38
COMPLIANCE RESULTS
01 Building Complies with Computer Performance
02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03 This building incorporates one or more Special Features shown below
424-P010149163A-000-000-0000000-0000 07/30/2024 22:28 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
524 S Shawnee Dr &
Unit# 22/7/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:ADU Calculation Date/Time:2024-07-30T22:26:29-07:00 (Page 3 of 10)
Calculation Description:Title 24 Analysis Input File Name:23156 - ADU.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-30 22:26:38
ENERGY USE SUMMARY
Energy Use Standard Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Standard Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Proposed Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Proposed Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Compliance
Margin (EDR1)
Compliance
Margin (EDR2)
Space Heating 0 2.84 0 4.81 0 -1.97
Space Cooling 0 26.59 0 32.47 0 -5.88
IAQ Ventilation 0 4.9 0 4.9 0 0
Water Heating 0 44.23 0 35.83 0 8.4
Self
Utilization/Flexibility
Credit
Efficiency Compliance
Total 0 78.56 0 78.01 0 0.55
Photovoltaics 0 0
Battery 0
Flexibility
Indoor Lighting 0 6.55 0 6.55
Appl. & Cooking 0 46.05 0 46.04
Plug Loads 0 61.76 0 61.76
Outdoor Lighting 0 4.51 0 4.51
TOTAL COMPLIANCE 0 197.43 0 196.87
424-P010149163A-000-000-0000000-0000 07/30/2024 22:28 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
524 S Shawnee Dr &
Unit# 22/7/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:ADU Calculation Date/Time:2024-07-30T22:26:29-07:00 (Page 4 of 10)
Calculation Description:Title 24 Analysis Input File Name:23156 - ADU.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-30 22:26:38
ENERGY USE INTENSITY
Standard Design (kBtu/ft2 - yr )Proposed Design (kBtu/ft2 - yr )Compliance Margin (kBtu/ft2 - yr )Margin Percentage
Gross EUI1 32.53 30.66 1.87 5.75
Net EUI2 32.53 30.66 1.87 5.75
Notes
1. Gross EUI is Energy Use Total (not including PV) / Total Building Area.
2. Net EUI is Energy Use Total (including PV) / Total Building Area.
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
•Insulation below roof deck
•Variable capacity heat pump compliance option (verification details from VCHP Staff report, Appendix B, and RA3)
HERS FEATURE SUMMARY
The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional
detail is provided in the building tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry
•Quality insulation installation (QII)
•Indoor air quality ventilation
•Kitchen range hood
•Verified Refrigerant Charge
•Airflow in habitable rooms (SC3.1.4.1.7)
•Verified heat pump rated heating capacity
•Wall-mounted thermostat in zones greater than 150 ft2 (SC3.4.5)
•Ductless indoor units located entirely in conditioned space (SC3.1.4.1.8)
ZONE INFORMATION
01 02 03 04 05 06 07
Zone Name Zone Type HVAC System Name Zone Floor Area (ft2)Avg. Ceiling Height Water Heating System 1 Status
Living Conditioned HVAC1 749 10 DHW Sys 1 New
424-P010149163A-000-000-0000000-0000 07/30/2024 22:28 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
524 S Shawnee Dr &
Unit# 22/7/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:ADU Calculation Date/Time:2024-07-30T22:26:29-07:00 (Page 5 of 10)
Calculation Description:Title 24 Analysis Input File Name:23156 - ADU.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-30 22:26:38
OPAQUE SURFACES
01 02 03 04 05 06 07 08 09 10
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)Wall Exceptions Status
EAST WALL 2X4 Living R-15 Wall 90 Right 293 8 90 none New
SOUTH WALL 2X4 Living R-15 Wall 180 Front 200 48 90 none New
WEST WALL 2X4 Living R-15 Wall 270 Left 463 64 90 none New
NORTH WALL 2X4 Living R-15 Wall 0 Back 200 10 90 none New
ADJACENT TO
MAIN HOUSE Living R-15 Wall1 n/a n/a 170 0 n/a New
Roof Living R-30 + R-13 Roof Attic n/a n/a 749 n/a n/a New
ATTIC
01 02 03 04 05 06 07 08
Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof
Attic Living Attic RoofLiving Ventilated 4 0.1 0.85 No No
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W4020 Window EAST WALL 2X4 Right 90 1 8 0.3 NFRC 0.23 NFRC Bug Screen
W4040 Window SOUTH WALL
2X4 Front 180 1 16 0.3 NFRC 0.23 NFRC Bug Screen
W4030 Window SOUTH WALL
2X4 Front 180 1 12 0.3 NFRC 0.23 NFRC Bug Screen
W4040 2 Window WEST WALL
2X4 Left 270 1 16 0.3 NFRC 0.23 NFRC Bug Screen
424-P010149163A-000-000-0000000-0000 07/30/2024 22:28 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
524 S Shawnee Dr &
Unit# 22/7/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:ADU Calculation Date/Time:2024-07-30T22:26:29-07:00 (Page 6 of 10)
Calculation Description:Title 24 Analysis Input File Name:23156 - ADU.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-30 22:26:38
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W4040 3 Window WEST WALL
2X4 Left 270 1 16 0.3 NFRC 0.23 NFRC Bug Screen
W4040 4 Window WEST WALL
2X4 Left 270 1 16 0.3 NFRC 0.23 NFRC Bug Screen
W4040 5 Window WEST WALL
2X4 Left 270 1 16 0.3 NFRC 0.23 NFRC Bug Screen
W2020 Window NORTH WALL
2X4 Back 0 1 4 0.3 NFRC 0.23 NFRC Bug Screen
W3020 Window NORTH WALL
2X4 Back 0 1 6 0.3 NFRC 0.23 NFRC Bug Screen
OPAQUE DOORS
01 02 03 04
Name Side of Building Area (ft2)U-factor
D3068 SOUTH WALL 2X4 20 0.5
SLAB FLOORS
01 02 03 04 05 06 07 08
Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value
and Depth
Edge Insul. R-value
and Depth Carpeted Fraction Heated
Slab-on-Grade Living 749 132.5 none 0 80%No
424-P010149163A-000-000-0000000-0000 07/30/2024 22:28 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
524 S Shawnee Dr &
Unit# 22/7/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:ADU Calculation Date/Time:2024-07-30T22:26:29-07:00 (Page 7 of 10)
Calculation Description:Title 24 Analysis Input File Name:23156 - ADU.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-30 22:26:38
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
R-15 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-15 None / None 0.095
Inside Finish: Gypsum Board
Cavity / Frame: R-15 / 2x4
Exterior Finish: 3 Coat Stucco
R-15 Wall1 Interior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-15 None / None 0.086
Inside Finish: Gypsum Board
Cavity / Frame: R-15 / 2x4
Other Side Finish: Gypsum Board
Attic RoofLiving Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
R-30 + R-13 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-30 None / None 0.032
Over Ceiling Joists: R-20.9 insul.
Cavity / Frame: R-9.1 / 2x4
Inside Finish: Gypsum Board
BUILDING ENVELOPE - HERS VERIFICATION
01 02 03 04 05
Quality Insulation Installation (QII)High R-value Spray Foam Insulation Building Envelope Air Leakage CFM50 CFM50
Required Not Required N/A n/a n/a
WATER HEATING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Distribution Type Water Heater Name Number of Units Solar Heating
System
Compact
Distribution HERS Verification Water Heater
Name (#)
DHW Sys 1 Domestic Hot
Water (DHW)Standard DHW Heater 1 1 n/a None n/a DHW Heater 1 (1)
424-P010149163A-000-000-0000000-0000 07/30/2024 22:28 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
524 S Shawnee Dr &
Unit# 22/7/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:ADU Calculation Date/Time:2024-07-30T22:26:29-07:00 (Page 8 of 10)
Calculation Description:Title 24 Analysis Input File Name:23156 - ADU.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-30 22:26:38
WATER HEATERS
01 02 03 04 05 06 07 08 09 10 11 12 13
Name
Heating
Element
Type
Tank Type # of Units Tank Vol.
(gal)
Heating
Efficiency
Type
Efficiency Rated Input
Type
Input Rating
or Pilot
Tank
Insulation
R-value
(Int/Ext)
Standby Loss
or Recovery
Eff
1st Hr. Rating
or Flow Rate
Tank
Location
DHW
Heater 1 Gas
Consumer
Instantaneo
us
1 0 UEF 0.97 Btu/Hr 200000 0 n/a n/a
WATER HEATING - HERS VERIFICATION
01 02 03 04 05 06 07
Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution
Type Recirculation Control Shower Drain Water Heat
Recovery
DHW Sys 1 - 1/1 Not Required Not Required Not Required None Not Required Not Required
SPACE CONDITIONING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Heating Unit Name Heating Equipment
Count Cooling Unit Name Cooling Equipment
Count Fan Name Distribution Name Required
Thermostat Type
HVAC1 Heat pump
heating cooling
Heat Pump System
1 1 Heat Pump System
1 1 n/a n/a Setback
424-P010149163A-000-000-0000000-0000 07/30/2024 22:28 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
524 S Shawnee Dr &
Unit# 22/7/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:ADU Calculation Date/Time:2024-07-30T22:26:29-07:00 (Page 9 of 10)
Calculation Description:Title 24 Analysis Input File Name:23156 - ADU.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-30 22:26:38
HVAC - HEAT PUMPS
01 02 03 04 05 06 07 08 09 10 11 12 13
Name System Type Number of
Units
Heating Cooling
Zonally
Controlled
Compressor
Type HERS VerificationHeating
Efficiency
Type
HSPF/HS
PF2/COP Cap 47 Cap 17
Cooling
Efficiency
Type
SEER/SE
ER2
EER/EER
2/CEER
Heat Pump
System 1 VCHP-ductless 1 HSPF 8 24000 22000 EERSEER 14 11 Not Zonal Single
Speed
Heat Pump System
1-hers-htpump
HVAC HEAT PUMPS - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Verified Airflow Airflow Target Verified EER/EER2 Verified
SEER/SEER2
Verified Refrigerant
Charge
Verified
HSPF/HSPF2
Verified Heating
Cap 47
Verified Heating
Cap 17
Heat Pump System
1-hers-htpump Not Required 0 Not Required Not Required Yes No Yes Yes
VARIABLE CAPACITY HEAT PUMP COMPLIANCE OPTION - HERS VERIFICATION
01 02 03 04 05 06 07 08 09 10
Name
Certified
Low-Static
VCHP System
Airflow to
Habitable
Rooms
Ductless Units
in Conditioned
Space
Wall Mount
Thermostat
Air Filter Sizing
& Pressure
Drop Rating
Low Leakage
Ducts in
Conditioned
Space
Minimum
Airflow per
RA3.3 and
SC3.3.3.4.1
Certified
non-continuous
Fan
Indoor Fan not
Running
Continuously
Heat Pump System 1 Not required Required Required Required Not required Not required Not required Not required Not required
INDOOR AIR QUALITY (IAQ) FANS
01 02 03 04 05 06 07 08 09
Dwelling Unit Airflow (CFM)Fan Efficacy
(W/CFM)IAQ Fan Type
Includes
Heat/Energy
Recovery?
IAQ Recovery
Effectiveness -
SRE/ASRE
Includes Fault
Indicator Display?HERS Verification Status
SFam ADU
IAQVentRpt 45 0.35 Exhaust No n/a / n/a No Yes
424-P010149163A-000-000-0000000-0000 07/30/2024 22:28 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
524 S Shawnee Dr &
Unit# 22/7/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:ADU Calculation Date/Time:2024-07-30T22:26:29-07:00 (Page 10 of 10)
Calculation Description:Title 24 Analysis Input File Name:23156 - ADU.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-30 22:26:38
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:Documentation Author Signature:
Company:Signature Date:
Address:CEA/ HERS Certification Identification (If applicable):
City/State/Zip:Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets,
calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name:Responsible Designer Signature:
Company:Date Signed:
Address:License:
City/State/Zip:Phone:
Anh Phan
AP DESIGN CONSULTING, INC 07/30/2024
9636 Garden Grove Blvd, Ste #7
Garden Grove, CA 92844 714-487-7926
Anh Phan
AP DESIGN CONSULTING, INC 07/30/2024
9636 Garden Grove Blvd, Ste #7 N/A
Garden Grove, CA 92844 714-487-7926
424-P010149163A-000-000-0000000-0000 07/30/2024 22:28 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
524 S Shawnee Dr &
Unit# 22/7/2025
SANTA ANA CITY COUNCIL
Mayor
vamezcua@santa-ana.org
Mayor Pro Tem, Ward 1
tphan@santa-ana.org
Ward 2
bvazquez@santa-ana.org
Ward 3
jessielopez@santa-ana.org
Ward 4
pbacerra@santa-ana.org
Ward 5
jryanhernandez@santa-ana.org
Ward 6
dpenaloza@santa-ana.org
MAYOR
Valerie Amezcua
MAYOR PRO TEM
Thai Viet Phan
COUNCILMEMBERS
Phil Bacerra
Johnathan Ryan Hernandez
Jessie Lopez
David Penaloza
Benjamin Vazquez
CITY OF SANTA ANA
PLANNING AND BUILDING AGENCY
20 Civic Center Plaza ● P.O. Box 1988
Santa Ana, California 92702
www.santa-ana.org
INTERIM CITY MANAGER
Tom Hatch
CITY ATTORNEY
Sonia R. Carvalho
CITY CLERK
Jennifer L. Hall
March 25, 2024
Also sent via email to: xuanhungus@yahoo.com
Hung Tran
Lisa Pham
524 S Shawnee Drive
Santa Ana, CA. 92704
Subject: Address Assignment for a new Accessory Dwelling Unit located at 524 South
Shawnee Drive and (APN: 109-833-17) in Santa Ana, CA
Dear Hung & Lisa,
The City of Santa Ana Planning and Building Agency (PBA) is the responsible agency for legal
addressing within the City of Santa Ana’s jurisdiction. This letter confirms the address assignment
for a new Accessory Dwelling Unit located at 524 South Shawnee Drive and (APN: 109-833-17).
Notice is hereby given that the following assigned address(es) shall be posted onsite per the
approved address plan, attached hereto as Exhibit A.
Address(es) to be Activated/Posted
To subdivide commercial and/or residential units into multiple units, a building permit (and all other
associated permits), plans, and inspection approvals by the PBA are required. Address(es) will
be verified during inspections by the Building Safety Division.
Please update your records accordingly. Should you have any questions, feel free to contact me
by phone at (714) 667-2709 or by email at ASevilla@santa-ana.org.
Sincerely,
Alexis Sevilla
Planning Technician
Reviewed by: Jerry Guevara, Senior Planner
524 S Shawnee Dr &
Unit# 22/7/2025
Address Letter for 524 S Shawnee Drive
Page 2 of 2
Exhibit A – Address Plan
c:
Vencent Quaglia, United States Post Office
Chris Tuiolosega, United States Post Office
Cipriano Corona, Marketing Manager, United States Post Office
Alex Alvarez, Postmaster Santa Ana, United States Post Office
Federal Express, Administration
Cathy Joseph, Garden Grove Unified School District
Christine Hy, Garden Grove Unified School District
Cathy Slader, Orange Unified School District
Orin Williams, Santa Ana Unified School District
Yvette Miranda, Santa Ana Unified School District
Cristina Bernal, Tustin Unified School District
Mishele Richards, Orange County Fire Authority, GEO Files Coordinator
Orange County Fire Authority
Neal Kelly, Registrar of Voters
Members, Board of Supervisors
Southern California Gas Company
Southern California Edison Company
Claude Parrish, County Assessor's Office
SAG, AT&T
UPS, Administration
City Manager’s Office
Beverly Martin, Police Community Services Specialist
Boris Duran, Police Systems Manager
Jennifer Mendoza, Police Communications Manager
Chris Hubbard, Police Systems Support Analyst
Alejandra Gutierrez, Treasury & Customer Services Manager
Hector Jimenez, Revenue Supervisor
Alfonso Chavez, Utilities Customer Services Supervisor
Judson Brown, Housing & Neighborhood Development Manager
Rudy Rosas, Principal Civil Engineer
Zdenek (Zed) Kekula, Principal Civil Engineer
Jason Kwak, Building Safety Manager
Evelyn LaRocca, Permit Supervisor
Kathy Hernandez, Permit Technician
Julie Amsden, Permit Technician
Ali Pezeshkpour, Planning Manager
Jerry Guevara, Senior Planner
Alvaro Nunez, PBA Assistant Director and Code Enforcement Manager
524 S Shawnee Dr &
Unit# 22/7/2025
EXHIBIT A - ADDRESS PLAN
(E) 524 S SHAWNEE DR
(N) 524 S SHAWNEE DR UNIT 2
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr &
Unit# 22/7/2025
524 S Shawnee Dr &
Unit# 22/7/2025
Planning & Building Agency
Building and Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714)-647-5800
www.santa-ana.org
DETACHED ADU -
GRADING PERMIT EXEMPTION
CHECKLIST
PCC-16
REV: 09/03/2020 Page 1 of 1
THIS FORM SHALL BE COMPLETED BY A CALIFORNIA REGISTERED CIVIL ENGINEER.
Instructions: In order to qualify for the grading permit exemption for detached Accessory
Dwelling Unit (ADU) projects per handout PCC-15, the registered civil engineer of record shall
complete all sections, check all boxes and sign the certification section below. A copy of this
checklist shall be attached to each of TWO sets of plans. If answering NO to any of the
questions, a grading permit shall be required.
Project Address:
Yes No
1. ☐ ☐ I have provided two sets of site drainage plans that is stamped, signed and
dated by a California professional civil engineer, to be submitted with the
building submittal package.
2. ☐ ☐ I have calculated the total amount of soil being cut or filled on this project is less
than 50 cubic yards.
3. ☐ ☐
The site drainage plans include the following, but not limited to, location of all
existing and proposed structures, property lines, right-of-way lines, and
easements, including dimensions and setbacks; drainage slopes and flow
patterns, drainage systems such as swales, french drains, water collection and
disposal systems, etc.
4. ☐ ☐ I have designed drainage such that surface water flows away from buildings and
adjoining property lines, in accordance with all applicable codes.
5. ☐ ☐ I have designed grading such that it will not adversely affect the adjoining
properties.
6. ☐ ☐
I have designed the grade to fall not fewer than 6 inches within the first 10 feet
from the foundation walls. Where lot lines, walls, slopes or other physical
barriers prohibit 6 inches of fall within 10 feet, I have designed drains or swale to
ensure drainage away from the structure. I have designed any impervious
surfaces within 10 feet of the building foundation to be sloped not less than 2
percent away from the building.
7. ☐ ☐ I will provide a final certification letter stating that the grades were constructed
per the approved site drainage plan, and will submit this certification letter to the
building inspector prior to final inspection.
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Licensed Number: Date:
Phone Number: Email Address:
524 S SHAWNEE DR, UNIT 2, SANTA ANA, CA 92704
X
X
X
X
X
X
X
TRUONG DONG
C33642
714-204-2874
6/29/2024
TRUONGDONG@GMAIL.COM
524 S Shawnee Dr &
Unit# 22/7/2025
O R A N G E C O U N T Y F I R E A U T H O R I T Y
Plan Submittal Criteria Form
Required for Single Family or Duplex Residences
(Use Commercial form for lots with 3+ dwelling units or new residential tracts)
Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification.
Project Information
New Single Family Residence/Duplex Addition/Remodel ADU Other
Address:
Unit #: City or Unincorporated County Area: ZIP:
Scope of Work:
Existing
Area:
Area to
be Added:
Total Resulting
Area:
Stories: Area Added in Past 2 Years
(excluding this project):
Yes No Questionnaire OCFA Plan Type if “Yes”
1. New – Is this a new single family residence or duplex? *(PR160) Residential Site
with Water Availability
(PR400-402) Fire Sprinkler
2. ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has
fire sprinklers or a house that will have fire sprinklers added as part of this project?
(PR400-402) Fire Sprinkler
3. Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire
sprinkler retrofit based on a threshold set by local ordinance?
(PR400-402) Fire Sprinkler
4. Distance – Is the most remote portion of the addition, ADU or other detached structure greater than
140-feet from the fire access roadway?
*(PR160) Residential Site
5. Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non-
sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all
enclosed spaces, such as garages, stairs, and detached structures separated by less than 10-feet?
*(PR160) Residential Site
with Water Availability
6. Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or
removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed
contractor to determine if a fire sprinkler modification is needed.
(PR400-402) Fire Sprinkler
7. Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a
garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold
set by local ordinance?
*(PR160) Residential Site
(PR400-402) Fire Sprinkler
8. Gate – Is a gate being installed across a driveway or road that is designated as a fire department
access roadway, or a driveway or road that serves more than a single home/duplex?
(PR180) Gate
9. Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal
Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas
seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only
applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000
sf, and ADU’s).
*(PR160) Residential Site
*(PR172-174) Methane
Test/Mitigation Plans
10. Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to
slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation,
or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as
defined by the State, or (D) near an area that could be affected by a wildfire in the open space.
*(PR125) Fuel Modification
(PR182) Accessory
Structure
*OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals.
Applicant Certification
I certify, under penalty of perjury, under the laws of the State of California, that the information above is true:
Print Name:_______________________________________ Signature:___________________________________________ Date:______________
Phone Number:_____________________________________________ Email:_____________________________________________________________
Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a
written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required.
______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes”
and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral
Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination.
For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100
SFR