Loading...
HomeMy WebLinkAbout711 S Shannon St - Plan(N) (33) VSUN405-108BMH MODULES WITH SOLAREDGE S440 POWER OPTIMIZERS ATTACHED TO EACH MODULE (N) JUNCTION BOX WITH IRREVERSIBLE GROUND SPLICE BR A N C H # 1 BR A N C H # 2 BR A N C H # 3 11 MODULES IN BRANCH #1 11 MODULES IN BRANCH #2 11 MODULES IN BRANCH #3 2 G L1 L2 N SOLAREDGE SE10000H-US [SI1-JUN22] INVERTER G NOTE: IN BETWEEN EACH ARRAY THE EMT IS USED AS THE GROUNDING / BONDING, GROUND CLAMPS ARE AT EACH END OF THE EMT CONDUIT WITH THE WIRE THEN FREE AIR'D TO THE GROUND CLAMP ON THE RACKING RAIL 1 M POINT OF DELIVERY AND INTERCONNECTION 60A 150A N 3 (E) GROUNDING ELECTRODE OR (UFER) BACKFEED BREAKER (N) VISIBLE LOCKABLE SQUARE D DU222RB 2 POLE 60A 'KNIFE' AC DISCONNECT 3 AC DISCONNECT TO BE LOCATED WITHIN 10' OF METER NEW 240V/200A MAIN SERVICE PANEL SINGLE PHASE SPD (N) SURGE PROTECTOR DEVICE 10' SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 E-1 MAIN SERVICE PANEL 240/120V 1Ø, 3W MAIN BUSS: 200A MAX BREAKER SIZE: (200A X 1.2) - 150A = 90.0A METER # SCE222013568783 Inverter Ratings Inverter Make/Model SOLAREDGE SE10000H-US [SI1-JUN22] INVERTER Max DC Volt Rating 480V Peak Output Power 10000W Max Nominal Voltage 240V Max AC Current 42A Max OCPD Rating 60A DESIGN TEMPERATURES ASHRAE EXTREME LOW 2°C ASHRAE 2% HIGH 31°C PV Module Ratings @ STC Module Make/Model VSUN SOLAR VSUN405-108BMH Max Power-Point Current (Imp)12.92A Max Power-Point Voltage (Vmp)31.36V Open-Circuit Voltage (Voc)37.36V Short-Circuit Current (Isc)13.78A Max Series Fuse (OCPD)30A Nominal Maximum Power at STC (Pmax)405W Maximum System Voltage 1500V Voc Temperature Coefficient -0.27%/°C ELECTRICAL DIAGRAM Conduit and Conductor Schedule Tag Description Wire Gauge # of Conductors Conduit Type Conduit Size 1 10 AWG 6 N/A - Free Air N/A - Free Air 1 Bare Copper Ground (EGC/GEC) 6 AWG 1 N/A - Free Air N/A - Free Air 2 THWN-2 10 AWG 6(+3V,-3V)EMT 3/4" 2 THWN-2 - Ground 8 AWG 1 EMT 3/4" 3 THWN-2 6 AWG 3 EMT 3/4" 3 THWN-2 - Ground 8 AWG 1 EMT 3/4" PV CABLE 705.12(D)(2)(3)(b) CALC FOR MAIN SERVICE PANEL 200A BUSBAR X 1.2 = 240A PV BACKFEED: (10000/240)*1.25 = 52.08A 150A+52.08A= 202.08A < 240A THEREFORE OK SYSTEM SUMMARY OPTIMIZER SHORT CIRCUIT CURRENT NO.OF MODULES PER STRING ARRAY STC POWER ARRAY PTC POWER MAX AC CURRENT MAX AC POWER DERATED (CEC) AC POWER BRANCH #1 BRANCH #2 15 11 11 A A BRANCH #3 13365W 42A 10000W 12027.86W 11 A 12464.1W 15 15 711 S Shannon St - 2018052908/17/23 N 1. NOT ALL PLACARDS SHOWN MAY BE REQUIRED BY LOCAL AHJ. CONTRACTOR TO VERIFY PLACARD REQUIREMENTS WITH LOCAL AHJ BEFORE INSTALLATION. 2. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OF THE CALIFORNIA ELECTRICAL CODE 3. ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC, ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTING COLOR TO THE PLAQUE. THIS PLAQUE WILL BE ATTCHED BY POP RIVETS OR SCREWS OR OTHER APPROVED METHOD. 4. DIRECTORY PLACARD MARKING CONTENT AND FORMAT: RED BACKGROUND, WHITE LETTERING, MINIMUM 3/8" LETTER HIEGHT, ALL CAPITAL LETTERS, ARIAL OR SIMILAR FONT, NON BOLD, REFLECTIVE WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT. PERMANENT SIGNAGE NOTES: SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 E-2 WARNING LABELS-1 (N) SOLAR PANELS AND OPTIMIZERS ON ROOF 711 S SHANNON ST PV INTERCONNECTION POINT. LOCATION OF UTILITY METER,MAIN SERVICE PANEL,AC DISCONNECT & STRING INVERTER. POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTING MEANS LOCATED AS SHOWN CAUTION: PERMANENT SIGNAGE NOTES: 1. NOT ALL PLACARDS SHOWN ARE REQUIRED BY LOCAL AHJ. CONTRACTOR TO VERIFY PLACARD REQUIREMENTS WITH LOCAL AHJ BEFORE INSTALLATION. 2. ALL PLACARDS AND SIGNAGE REQUIRED BY THE LATEST EDITION OF THE CALFORNIA ELECTRICAL CODE WILL BE INSTALLED AS REQUIRED. 3. ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC, ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTING COLOR TO THE PLAQUE. THIS PLAQUE WILL BE ATTACHED BY POP RIVETS OR SCREWS OR OTHER APPROVED METHOD. 4. DIRECTORY PLACARD MARKING CONTENT AND FORMAT: RED BACKGROUND, WHITE LETTERING, MINIMUM 3/8" LETTER HEIGHT, ALL CAPITAL LETTERS, ARIAL OR SIMILAR FONT, NON BOLD, REFLECTIVE WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT. LABELING NOTES 1.1 LABELING REQUIREMENTS BASED ON THE 2022 CALIFORNIA ELECTRICAL CODE, INTERNATIONAL FIRE CODE 605.11, OSHA STANDARD 1910.145, ANSI Z535 1.2 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 1.3 LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. 1.4 LABELS TO BE A MINIMUM LETTER HEIGHT OF 3 8" AND PERMANENTLY AFFIXED. 1.5 ALERTING WORDS TO BE COLORED CODED "DANGER" WILL HAVE RED BACKGROUND; "WARNING" WILL HAVE ORANGE BACKGROUND; "CAUTION" WILL HAVE YELLOW BACKGROUND . [ANSI Z535] 711 S Shannon St - 2018052908/17/23 SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 E-2.1 WARNING LABELS-2 PHOTOVOLTAIC AC DISCONNECT AT EACH AC DISCONNECTING PHOTOVOLTAIC AC AMPERAGE OPERATING CURRENT: OPERATING VOLTAGE: 42.00A AC 240V AC AT POINT OF INTERCONNECTION, MARKED AT AC DISCONNECTING MEANS ! WARNING! PHOTOVOLTAIC POWER SOURCE MAIN PV SOLAR ARRAY JBOX 16.5A DC 380V DC 480V DC 30A DC LABELING NOTES 1. LABELING REQUIREMENTS BASED ON THE 2022 CALIFORNIA ELECTRICAL CODE, INTERNATIONAL FIRE CODE 605.11, OSHA STANDARD 1910.145, ANSI Z535 2. MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 3. LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. 4. LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8” AND PERMANENTLY AFFIXED. 5. PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECTING MEANS IF NOT IN THE SAME LOCATION [NEC 690.56(B)]WHERE THE INVERTERS ARE REMOTELY LOCATED FROM EACH OTHER, A DIRECTORY IN ACCORDANCE WITH 705.10 SHALL BE INSTALLED AT EACH DC PV SYSTEM DISCONNECTING MEANS, AT EACH AC DISCONNECTING MEANS, AND AT THE MAIN SERVICE DISCONNECTING MEANS SUBPANEL/ LOAD CENTER (IF APPLICABLE) PV SOLAR BREAKER OVERCURRENT DEVICE AT POINT OF INTERCONNECTION OVERCURRENT DEVICE DISCO AC SERVICE PANEL EQUIPMENT MAY VARY FOR EACH APPLICATION (NOT ALL APPLICABLE) SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY. LABEL LOCATION: ON OR NO MORE THAT 3 M (10 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM LABEL LOCATION: UTILITY SERVICE ENTRANCE/METER, INVERTER/DC DISCONNECT IF REQUIRED BY LOCAL AHJ, OR OTHER LOCATIONS AS REQUIRED BY LOCAL AHJ. PER CODE(S): CEC 2022: 690.56(C)(3), CFC 2022: 1204.5.3 PV METER (IF APPLICABLE) MAXIMUM AC OPERATING CURRENT: NOMINAL OPERATING AC VOLTAGE: 42.0 AMPS 240.0 VAC PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2022: 690.54 WARNING TURN OFF PHOTOVOLTAIC AC DISCONNECT PRIOR TO WORKING INSIDE PANEL COMBINER PANEL/ INVERTER ELECTRICAL SHOCK HAZARD WARNING! LABEL LOCATION: INVERTER(S), AC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2022: 690.13(B) TERMINALS ON LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION ! DO NOT ADD LOADS PHOTOVOLTAIC SYSTEM COMBINER PANEL WARNING LABEL LOCATION: PHOTOVOLTAIC AC COMBINER (IF APPLICABLE). PER CODE(S): CEC 2022: 705.12(B)(2)(3)(c), 60A M WARNING SOLAR ELECTRIC CIRCUIT BREAKER IS BACKFED DO NOT RELOCATE THIS 711 S Shannon St - 2018052908/17/23 SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 E-2.2 OPTIMIZER MAP PAGE NOT FOR PERMITTING USE. FOR INSTALLATION USE ONLY 4 3 6 5 8 7 10 9 12 11 14 13 16 15 18 17 20 19 22 21 24 23 26 25 28 27 30 29 32 31 34 33 36 35 38 37 40 39 42 41 44 43 7271 7069 6867 6665 6463 6261 6059 5857 5655 5453 5251 5049 4847 4645 21 711 S Shannon St - 2018052908/17/23 To the City of Santa Ana building department, I, Steven Le, homeowner of 711 S Shannon Street, Santa Ana, CA 92704, hereby authorize contractor Green Day Power, CA license# 1038673, to pull permits related to my solar project. I approve of the plans that are submitted and to install solar on my residence. Please contact me for any questions. Steven Le 714-725-1858 stevenle200119@gmail.com Steven Le (Aug 8, 2023 22:11 PDT) 711 S Shannon St - 2018052908/17/23 Homeowner letter of approval Final Audit Report 2023-08-09 Created:2023-08-03 By:Nai Saetern (nsaetern@greendaypower.com) Status:Signed Transaction ID:CBJCHBCAABAAC2vXr_VnEFJhPM8wRZRGquZbzJZSunmT "Homeowner letter of approval" History Document created by Nai Saetern (nsaetern@greendaypower.com) 2023-08-03 - 4:59:23 PM GMT- IP address: 75.217.206.102 Document emailed to stevenle200119@gmail.com for signature 2023-08-03 - 4:59:52 PM GMT Email viewed by stevenle200119@gmail.com 2023-08-03 - 4:59:54 PM GMT- IP address: 66.249.89.35 Signer stevenle200119@gmail.com entered name at signing as Steven Le 2023-08-09 - 5:11:53 AM GMT- IP address: 172.56.185.75 Document e-signed by Steven Le (stevenle200119@gmail.com) Signature Date: 2023-08-09 - 5:11:55 AM GMT - Time Source: server- IP address: 172.56.185.75 Agreement completed. 2023-08-09 - 5:11:55 AM GMT 711 S Shannon St - 2018052908/17/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.Will the PV system weigh maximum 4 pounds per square feet or less? 5.Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of module s and the surface of the roof? 7.Will the PV system be installed without using any ballast system or counter-weight system? 8.Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.Will the minimum 5/16” lag screws be installed with a minimum of 2 -1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 711 S Shannon St. Santa Ana, CA 92704 Green Day Power 1038673 Nai Saetern 916-296-6238 7/10/23 permits@greendaypower.com 711 S Shannon St - 2018052908/17/23 3' 1'-6" 1'-6" 3' 3' 3' 1'-6" 1'-6" 3' 3' N SCALE: 1/16" = 1'-0" PV SYSTEM SITE PLAN PV SYSTEM SIZE: 13.365 kW DC CONSTRUCTION NOTES Roof Azimuth: 161 ° Roof Tilt: 20° Roof Section 3 ROOF OBSTRUCTIONS SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 PV-1 Roof Azimuth: 251° Roof Tilt: 20° Roof Section 1 SITE PLAN LAYOUT 1. SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIAL STRUCTURE. 2. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH THE CBC SECTION 1609 TO WITHSTAND A BASIC WIND SPEED OF 95 MPH (3 SECOND GUST), WIND EXPOSURE C. 3. THE ROOF MEMBERS ARE 2 "X 6" RAFTERS AT 24" ON CENTER. CONNECTION TO STRUCTURE SHALL NOT BE WITHIN 11" OF NAILING PLATES. 4. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 5. ALL CONDUCTORS AND CONDUITS MOUNTED ON ROOF SHALL BE MINIMUM 7/8" ABOVE ROOF SURFACE (INCLUDING CABLES UNDERNEATH MODULES AND RACKING). 6. ROOF ACCESS POINTS SHALL BE PROVIDED PER THE FOLLOWING (CRC R324.7.1, CBC 3111.2.1) 6.1. LOCATED IN AREAS NOT REQUIRING PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS DOORS OR WINDOWS. 6.2. LOCATED AT STRONG POINTS OF CONSTRUCTION IN LOCATIONS WHERE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS: TREES, WIRES, OR SIGNS. 7. SETBACKS AT RIDGES CAN BE REDUCED TO 18 INCHES IN COMPLIANCE WITH 2022 CFC/2021 IFC 1205.2.1.2 TOTAL PLAN VIEW AREA = 2296.6 SQFT TOTAL PV AREA = 33(67.83 IN)(44.6 IN)/(144 IN^2) = 693.28 SQFT (693.28 SQFT/ 2296.6 SQFT)100 = 30.19% TOTAL PV AREA POPULATES 30.19% OF TOTAL PLAN VIEW AREA AND IS WITHIN THE 33% REQUIREMENT. CAL-FIRE ROOF LADDER ACCESS POINT CAL-FIRE ROOF LADDER ACCESS POINT PR O P E R T Y LI NE NEW SOLAR PANELS LEGEND INV INVERTER PROPERTY LINE PROPE R T Y L I N E DR I V E W A Y ACD AC DISCONNECT M AC D IN V Roof Azimuth: 71 ° Roof Tilt: 20° Roof Section 2 PV INTERCONNECTION POINT. LOCATION OF METER MAIN COMBO, STRING INVERTER & AC DISCONNECT MOUNTED ON EXTERIOR WALL OF A SINGLE FAMILY RESIDENCE. LOCATION OF "RAPID SHUTDOWN" DISCONNECT NEC 690.12 (E) SERVICE DROP PROPE R T Y LINE PROPERTY LINE PR O P E R T Y LINE PR O P E R T Y L I N E 71 1 S S H A N N O N S T M METER MAIN COMBO CAL-FIRE ROOF LADDER ACCESS POINT CAL-FIRE ROOF LADDER ACCESS POINT CAL-FIRE ROOF LADDER ACCESS POINT Signed: 07/03/2023 Structural Only 711 S Shannon St - 2018052908/17/23 6' 6' 6' 6' 6' 6' 6' 6' 6' N N N 6' 6' 6' SCALE: 1/8" = 1'-0" PV SYSTEM MOUNTING DETAILS EXISTING ASPHALT SHINGLE ROOF PROPOSED IRONRIDGE XR10 RAIL RACKING PROPOSED VSUN SOLAR VSUN405-108BMH PV SOLAR MODULES EXISTING 2 "X 6" ROOF RAFTERS @ 24"O.C. SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 Roof Azimuth: 161° Roof Tilt: 20° Roof Section 3 PV-2 Roof Azimuth: 251° Roof Tilt: 20° Roof Section 1 IRONRIDGE FLASHFOOT-2 FOR ASPHALT SHINGLE @ 72" O.C. MAX ATTACHMENT DETAILS Roof Azimuth: 71° Roof Tilt: 20° Roof Section 2 Signed: 07/03/2023 Structural Only 711 S Shannon St - 2018052908/17/23 RO O F S L O P E 910 10 6 21 7 S-5 D5 20 11 1214 13 15 18 22 S-5 D4 3 1 5 4 25 24 23 8 26 2 D4 DETAIL (TRANSVERSE) NOT TO SCALE D5 DETAIL (LONGITUDINAL) NOT TO SCALE D1 RACKING DETAIL (TRANSVERSE) NOT TO SCALE D3 RACKING DETAIL (TOP) NOT TO SCALE D2 RACKING DETAIL (LONGITUDINAL) NOT TO SCALE SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 1. ROOF MATERIAL: ASPHALT SHINGLE 2. ROOF STRUCTURE: RAFTERS 3. ATTACHMENT TYPE: IRONRIDGE FLASHFOOT-2 4. MODULE MANUFACTURER: VSUN SOLAR 5. MODULE MODEL: VSUN405-108BMH 6. MODULE LENGTH: 67.83'' 7. MODULE WIDTH: 44.6" 8. MODULE WEIGHT: 48.06 LBS. 9. SEE SHEET S-1 FOR DIMENSION(S) 10. MIN. FIRE OFFSET: 18" 11. RAFTERS SPACING: 24" O.C. 12. RAFTERS SIZE: 2 "X 6" NOMINAL 13. LAG BOLT DIAMETER: 5/16 IN. 14. LAG BOLT EMBEDMENT: 2.5 IN. 15. TOTAL # OF ATTACHMENTS: 61 16. TOTAL AREA: 693.28 SQ. FT. 17. TOTAL WEIGHT: 1585.98 LBS. 18. WEIGHT PER ATTACHMENT: 26.00 LBS. 19. DISTRIBUTED LOAD: 2.29 PSF 20. MAX. HORIZONTAL STANDOFF: 72 IN. 21. MAX. VERTICAL STANDOFF: LANDSCAPE: 26 IN., PORTRAIT: 39 IN. 22. STANDOFF STAGGERING: YES 23. RAIL MANUFACTURER AND MODEL (OR EQUIV.):IRONRIDGE XR10 RAIL 24. RAIL WEIGHT: 0.436 PLF. 25. MAX. RAFTERS SPAN: 12 FT. 26. MODULE CLEARANCE: 3 IN. MIN., 6 IN. MAX. PV-3 MOUNTING DETAILS Signed: 07/03/2023 Structural Only 711 S Shannon St - 2018052908/17/23 711 S Shannon St - 2018052908/17/23 SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 S-1 SPEC SHEET 711 S Shannon St - 2018052908/17/23 SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 S-2 SPEC SHEET 711 S Shannon St - 2018052908/17/23 SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 S-3 SPEC SHEET 711 S Shannon St - 2018052908/17/23 SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 S-4 SPEC SHEET 711 S Shannon St - 2018052908/17/23 SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 S-5 SPEC SHEET 711 S Shannon St - 2018052908/17/23 CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 SHEET S-5.1 SPEC SHEET 711 S Shannon St - 2018052908/17/23 CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 SHEET S-5.2 SPEC SHEET 711 S Shannon St - 2018052908/17/23 SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 S-6 SPEC SHEET 711 S Shannon St - 2018052908/17/23 SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 S-7 SPEC SHEET 711 S Shannon St - 2018052908/17/23 SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 S-8 SPEC SHEET PARTS ORDER STEVEN LE Description Quantity Ironridge XR10-14' Rail-Black 17 Ironrdge XR10 Splice 10 Ironridge XR10 Square Bolt 61 Ironridge UFO-Black 78 Ironridge Stopper-35mm-Black 26 Ironridge Optimizer Hardware 33 Ironridge FLASHFOOT-2 61 Ironridge Ground Lugs 7 Solaredge Inverter SOLAREDGE SE10000H-US [SI1-JUN22] INVERTER Solaredge Optimizers (33) S440 AC DISCO 60A NONFUSED SQUARE D DU222RB Ironridge End Caps 13R 13L Solar Breaker CUTLER HAMMER 60A, 2P 711 S Shannon St - 2018052908/17/23 05/10/2023 RE: Structural Certification for Installation of Residential Solar STEVEN LE:711 S SHANNON ST, SANTA ANA, CA 92704 Attn: To Whom It May Concern Design Criteria Code 2022 California Building Code (ASCE 7-16) Risk category II Wind Load (component and Cladding) Roof Dead Load Dr 10 psf V 95 mph PV Dead Load DPV 3 psf Exposure C Roof Live Load Lr 20 psf Ground Snow S 0 psf If you have any questions on the above, please do not hesitate to call. Sincerely, Eugene Munyanziza, P.E.Signed 05/10/2023 EV Engineering, LLC projects@evengineersnet.com http://www.evengineersnet.com Exp: 06/30/2024 This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing. From the field observation report, the roof is made of Asphalt Shingles roofing over roof plywood supported by 2X6 Rafters at 24 inches. The slope of the roof was approximated to be 20 degrees. After review of the field observation data and based on our structural capacity calculation, the existing roof framing has been determined to be adequate to support the imposed loads without structural upgrades. Contractor shall verify that existing framing is consistent with the described above before install. Should they find any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity calculations were done in accordance with applicable building codes. projects@evengineersnet.com http://www.evengineersnet.com 711 S Shannon St - 2018052908/17/23 Structural Letter for PV Installation Date: 05/10/2023 Job Address: 711 S SHANNON ST SANTA ANA, CA 92704 Job Name: STEVEN LE Job Number: 230510SL Scope of Work Table of Content Sheet 2 Cover 3 Attachment Uplift checks 4 Roof Framing Check 5 Seismic Check and Scope of work Engineering Calculations Summary Code 2022 California Building Code (ASCE 7-16) Risk category II Roof Dead Load Dr 10 psf PV Dead Load DPV 3 psf Roof Live Load Lr 20 psf Ground Snow S 0 psf Wind Load (component and Cladding) V 95 mph Exposure C References NDS for Wood Construction Sincerely, Signed 05/10/2023 Eugene Munyanziza, P.E. EV Engineering, LLC projects@evengineersnet.com http://www.evengineersnet.com Exp: 06/30/2024 This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. projects@evengineersnet.com http://www.evengineersnet.com 711 S Shannon St - 2018052908/17/23 Wind Load Cont. 95 mph ASCE 7-16 Figure 26.5-1B C 1.0 ASCE 7-16 Sec 26.8.2 0.85 ASCE 7-16 Table 26.10-1 0.85 ASCE 7-16 Table 26.6-1 1.00 ASCE 7-16 Table 26.9-1 16.65 psf 20.0 Degrees 1.5 Conservatively assuming all exposed 0.8 conservatively assuming 10 ft2 effective area Uplift (W)Zone(1,2e) Zone(2r, 2n) Zone(3e)Zone(3r) Fig. 30-3-2 GCp=-1.1 -2 -2 -2.4 Eq. 29.4-7 P=qh(GCp)(γE)(γa)=-21.98 -39.97 -39.97 -47.96 GCp=0.5 Figure 30.3-2 P=qh(GCp)(γE)(γa)=5.50 Equation 29.4-7 Rafter Attachments: 0.6D+0.6W (CD=1.6) Connection Check Attachment max. spacing= 6 ft 5/16" Lag Screw Withdrawal Value= 266 lbs/in Table 12.2A - NDS 2.5 in DFL Assumed Prying Coefficient 1.4 Allowable Capacity= 760 lbs Zone Trib Width Area (ft) Uplift (lbs) Down (lbs) Zone(1,2e) 6 16.5 136.0 140.2 Zone(2r, 2n) 6 16.5 234.0 140.2 Zone(3e) 6 16.5 234.0 140.2 Zone(3r) 6 16.5 277.5 140.2 Conservative Max= 277.5 < 760 CONNECTION IS OK 2. Embedment is measured from the top of the framing member to the tapered tip of a lag screw. Embedment in sheading or other material does not count. II V= Exposure = 1. Pv seismic dead weight is negligible to result in significant seismic uplift, therefore the wind uplift governs γE= γa= KZt = qh= 0.00256KzKztKdKeV2 = Pitch = Lag Screw Penetration Risk Category = KZ = Kd = Ke = projects@evengineersnet.com http://www.evengineersnet.com 711 S Shannon St - 2018052908/17/23 Vertical Load Resisting System Design Roof Framing Rafters Snow Load Fully Exposed pg= 0 psf Ct = 1.1 Ce = 0.9 Is = 1.0 pf = 0 psf pfmin. = 0.0 psf ps = 0 psf Conservatively (Cs=1) 0 plf Max Length, L = 10.0 ft (Rafter maximum Allowable Horizontal Span) Tributary Width, WT = 24 in Dr = 10 psf 20 plf PvDL = 3 psf 18 plf Load Case: DL+0.75(0.6W+S) 0.75(Pnet+Ps)+ Ppvcos(θ)+PDL= 43 plf Mdown= 537 lb-ft Mallowable = Sx x Fb' (wind)= 975 lb-ft > 537 lb-ft OK Load Case: DL+S Ps+ Ppvcos(θ)+PDL= 38 plf Mdown= 475 lb-ft Mallowable = Sx x Fb' (wind)= 975 lb-ft > 475 lb-ft OK Load Case: DL+0.6W Pnet+ Ppvcos(θ)+PDL= 44.6 plf Max Moment, Mu= 557 lb-ft Mallowable = Sx x Fb' (wind)= 1357 lb-ft > 557 lb-ft OK Pv max Shear= 140.2 lbs Shear, Vu=wL/2+Pv Point Load = 330 lbs Max Shear, Vu=wL/2+Pv Point Load = 330 lb Member Capacity DF-L No.2 2X6 CL CF C i Cr KF φ λ Fb = 900 psi 1.0 1.3 1.0 1.15 2.54 0.85 0.8 1346 psi Fv = 180 psi N/A N/A 1.0 N/A 2.88 0.75 0.8 180 psi E = 1600000 psi N/A N/A 1.0 N/A N/A N/A N/A 1600000 psi Emin = 580000 psi N/A N/A 1.0 N/A 1.76 0.85 N/A 580000 psi Depth, d = 5.5 in Width, b = 1.5 in Cross-Sectonal Area, A = 8.25 in2 Moment of Inertia, Ixx = 20.7969 in4 Section Modulus, Sxx = 7.5625 in3 Allowable Moment, Mall = Fb'Sxx = 847.9 lb-ft DCR=Mu/Mall = 0.55 < 1 Satisfactory Allowable Shear, Vall = 2/3Fv'A = 990.0 lb DCR=Vu/Vall = 0.33 < 1 Satisfactory Design Value Adjusted Value projects@evengineersnet.com http://www.evengineersnet.com 711 S Shannon St - 2018052908/17/23 Siesmic Loads Check Roof Dead Load 10 psf % or Roof with Pv 30% Dpv and Racking 3 psf Average Total Dead Load 10.9 psf Increase in Dead Load 3.6%OK Limits of Scope of Work and Liability The increase in seismic Dead weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. We have based our structural capacity determination on information in pictures and a drawing set titled PV plans -STEVEN LE. The analysis was according to applicable building codes, professional engineering and design experience, opinions and judgments. The calculations produced for this Structure's assessment are only for the proposed solar panel installation referenced in the stamped plan set and were made according to generally recognized structural analysis standards and procedures. projects@evengineersnet.com http://www.evengineersnet.com 711 S Shannon St - 2018052908/17/23 SHEET # T-1 T-2 PV-1 PV-2 PV-3 E-1 E-2 S-1 S-2 S-3 S-4 S-5 S-6 S-7 SHEET NAME COVER SHEET PLAN NOTES SITE PLAN LAYOUT ATTACHMENT DETAILS MOUNTING DETAILS ELECTRICAL DIAGRAM WARNING LABELS SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET PROJECT INFORMATION PROPERTY OWNER NAME:STEVEN LE PHONE:- CONTRACTOR NAME:GREEN DAY POWER PHONE:- DESIGN SPECIFICATIONS OCCUPANCY: R-3 CONSTRUCTION TYPE: SINGLE FAMILY RESIDENCE ZONING: RESIDENTIAL GROUND SNOW LOAD: 0 PSF WIND EXPOSURE: C WIND SPEED: 95 MPH BUILDING STORIES: 1 APPLICABLE CODES & STANDARDS 2022 CALIFORNIA RESIDENTIAL CODE (CRC) 2022 CALIFORNIA BUILDING CODE (CBC) 2022 CALIFORNIA MECHANICAL CODE (CMC) 2022 CALIFORNIA ELECTRICAL CODE (CEC) 2022 CALIFORNIA PLUMBING CODE (CPC) 2022 CALIFORNIA ENERGY CODE (ENERGY) 2022 CALIFORNIA GREEN BUILDING CODE (CALGREEN) 2022 CALIFORNIA FIRE CODE (CFC) 2020 NATIONAL ELECTRICAL CODE (NEC) COORDINATES: 33.737848, -117.924102 SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 T-1 AERIAL VIEW STEVEN LE RESIDENCE NEW PHOTOVOLTAIC SYSTEM PROJECT - 13.365 kW DC / 10.000 kW AC COVER SHEET TYPE OF INTERCONNECTION: BACKFEED BREAKER IN MSP SCOPE OF WORK SYSTEM SIZE: STC: 33 X 405W = 13.365kW PTC: 33 X 377.7W = 12.464kW (33) VSUN SOLAR VSUN405-108BMH MODULES (1) SOLAREDGE SE10000H-US [SI1-JUN22] INVERTER (33) SOLAREDGE S440 POWER OPTIMIZERS (1) 60A KNIFE AC DISCONNECT MSP UPGRADE: YES TO 200A MAIN BREAKER DERATE: NO RACKING & MOUNTING PV ATTACHMENT TYPE: IRONRIDGE FLASHFOOT-2 FOR ASPHALT SHINGLE RACKING TYPE: IRONRIDGE XR10 RAIL- ROOF MOUNT RACKING HARDWARE E-2.1 WARNING LABELS-2 E-2.2 INVERTER MAP S-8 SPEC SHEET Signed: 07/03/2023 Structural Only The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg# 101116147 Elec# 20180529 MS Issued 08/16/23 711 S Shannon St - 2018052908/17/23 SHEET CONTRACTOR GREEN DAY POWER ADDRESS: 9745 BUSINESS PARK DRIVE SACRAMENTO, CA 95827 LE RESIDENCE DESIGNER: OSM License#: 1038673 711 S SHANNON ST, SANTA ANA, CA 92704 DATE:7/1/2023 APN: 10860106 T-2 PLAN NOTES 1.1. PROJECT NOTES: 1.2. THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE 2022 CALIFORNIA ELECTRICAL CODE (CEC) ARTICLE 690, ALL MANUFACTURER’S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. 1.3. THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION 1.4. GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS INTEGRATED WITH THE INVERTER IN ACCORDANCE WITH 2022 CEC 690.41(B) 1.5. ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY 2022 CEC 690.4 PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY 1.6. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO 2022 CEC 690.7. 1.7. ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING [ 2022 CEC 110.3]. 1.8. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE CEC AND AHJ. 1.9. SCOPE OF WORK: 1.10. PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT. 1.11. WORK INCLUDES: 1.12. PV ROOF ATTACHMENTS - IRONRIDGE FLASHFOOT-2 FOR ASPHALT SHINGLE ROOF 1.13. PV RACKING SYSTEM INSTALLATION - IRONRIDGE XR10 RAIL ROOF MOUNT RACKING HARDWARE 1.14. PV MODULE AND INVERTER INSTALLATION - VSUN SOLAR VSUN405-108BMH MODULES / SOLAREDGE SE10000H-US [SI1-JUN22] INVERTER 1.15. PV EQUIPMENT GROUNDING 1.16. PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX 1.17. PV LOAD CENTERS (IF INCLUDED) 1.18. PV METERING/MONITORING (IF INCLUDED) 1.19. PV DISCONNECTS 1.20. PV GROUNDING ELECTRODE & BONDING TO (E) GEC 1.21. PV FINAL COMMISSIONING 1.22. (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV 1.23. SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE 1.24. SITE NOTES: 1.25. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 1.26. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 1.27. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 1.28. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION 2022 CEC 110.26. 1.29. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. 1.30. EQUIPMENT LOCATIONS: 1.31. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY 2022 CEC 110.26. 1.32. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY 2022 CEC 690.31 (A),(C) AND CEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C) 1.33. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO 2022 CEC 690.34. 1.34. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT . 1.35. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO 2022 CEC APPLICABLE CODES. 1.36. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. 1.37. STRUCTURAL NOTES: 1.38. RACKING SYSTEM 1.39. PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND 1.40. A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. 1.41. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED SEALED PER LOCAL REQUIREMENTS. 1.42. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 1.43. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 1.44. WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. 1.45. WIRING & CONDUIT NOTES: 1.46. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 1.47. CONDUCTORS SIZED ACCORDING TO 2022 CEC 690.8, 2022 CEC 690.7. 1.48. VOLTAGE DROP LIMITED TO 1.5%. 1.49. DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. 1.50. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [2022 CEC 110.15 1.51. GROUNDING NOTES: 1.52. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 1.53. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO 2022 CEC 690.43 AND MINIMUM 2022 CEC TABLE 250.122. 1.54. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORDING WITH 2022 CEC 250.134 AND 2022 250.136(A). 1.55. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO CEC 690.45 AND INVERTER MANUFACTURER'S INSTRUCTIONS. 1.56. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 1.57. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 1.58. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [2022 CEC 250.119] 1.59. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH CEC 690.47 AND CEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO CEC 250, CEC 690.47 AND AHJ. 1.60. GROUND-FAULT DETECTION SHALL COMPLY WITH CEC 690.41 IN GENERAL AND CEC 690.41 (A)(1) SPECIFICALLY. 1.61. DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 1.62. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 1.63. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 1.64. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 1 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS ≤30V AND ≤240VA [CEC 690.12(B)]. LOCATION OF LABEL ACCORDING TO AHJ 1.65. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO CEC 690.8, 690.9, AND 240. 1.66. EQUIPMENT THAT IS LISTED, LABELED, OR BOTH SHALL BE INSTALLED AND USED IN ACCORDANCE WITH ANY INSTRUCTIONS INCLUDED IN THE LISTING OR LABELING. CEC 110.3(B). 1.67. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO CEC 690.11 AND UL1699B. 1.68. INTERCONNECTION NOTES: 1.69. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [2022 CEC 705.12] 1.70. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING [2022 CEC 705.12(B)(3)(2)]. 1.71. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [2022 CEC 705.12(B)(3)(2)]. 1.72. AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO 2022 CEC 705.12 (B)(3)(3). 1.73. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO 2022 CEC 705.11 WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH 2022 CEC 230.42 1.74. BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [2022 CEC 705.12(E)]. Signed: 07/03/2023 Structural Only 711 S Shannon St - 2018052908/17/23