Loading...
HomeMy WebLinkAbout801 E Clemensen Ave - PlanJO S E L O P E Z R E S I D E N C E 80 1 E C L E M E N S E N A V E , SA N T A A N A , C A 9 2 7 0 5 Project Name & Address Sheet Size Sheet Number ANSI B 11" X 17" E 1.1 Sheet Name DRAWN BY AP N : 3 9 6 4 1 1 1 4 3-LINE DIAGRAM G N (N) 200A M 20A (E) LOADS G N 3 EXISTING GROUNDING ELECTRODE SYSTEM POINT OF INTERCONNECT, LOAD SIDE 3 THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) AC OUTPUT CURRENT NOMINAL AC VOLTAGE 240V 15.73A Rooftop conductor ampacities designed in compliance with art. 690.8, Tables 310.15(B)(2)(a), 310.15(B)(3)(a), 310.15(B)(3)(c), 310.15(B)(16), Chapter 9 Table 4, 5, & 9. Location specific temperature obtained from ASHRAE 2017 data tables AMBIENT TEMP (HIGH TEMP 2%) RECORD LOW TEMP 2° 31° CONDUIT HEIGHT 0.5" ROOF TOP TEMP 53° CONDUCTOR TEMPERATURE RATE 90° ENPHASE Q CABLE TO BE ATTACHED TO RAIL MIN. 3-1/2" ABOVE ROOF SURFACE INVERTER SPECIFICATIONS MANUFACTURER MAX. POWER AT 40 C 60 VOLTS NOMINAL AC VOLTAGE 235 WATTS MAX. AC CURRENT 290 VOLTS MAX. OCPD RATING MAX. PANELS/CIRCUIT SHORT CIRCUIT CURRENT 1.21 AMPS 20 AMPS MAX. DC VOLT RATING 13 15 AMPS ENPHASE ENERGY IQ8PLUS-72-2-US 120% RULE BUS BAR RATING X 120%) - MAIN BREAKER RATING = MAX. PV OCPD (200A x 120%) - 200 = 40A WIRE QTY WIRE TAG #CONDUIT WIRE TYPE INVERTER QTY:NOC: CONDUIT FILL: TEMP RATING: WIRE AMP TEMP DE-RATE: WIRE OCP: GRND SIZE GRND WIRE TYPEENPHASE TRUNK CABLE INCLUDES #12 GROUND WIRE GAUGE: TERMINAL 75°C RATING:NEC:STRING AMPS x x = x x =1.25 1.21A 13 #6 SBC19.66A 38.4A 35A90°C 35A x x =1.25 1.21A 13 #8 THWN-219.66A x x = 30.4A90°C 35A x x =1.25 1.21A 13 #8 THWN-219.66A x x = 32.9A75°C 40A #10 40A #10 35A #10 3/4" EMT 3/4" EMT WIRE FROM - - JUNCTION BOX TO COMBINER PANEL COMBINER PANEL TO MSP ARRAY TO JUNCTION BOX1 2 3 TRUNK CABLE THWN-2 THWN-2 2 1.00 2 1.00 3 1.00 PV WIRE 0.96 0.76 0.94 PV MODULE RATING @ STC MANUFACTURER MAX. POWER-POINT CURRENT (IMP) MAX. POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) 9.72 AMPS 37.0 VOLTS 44.0 VOLTS 10.37 AMPS NOM. MAX. POWER AT STC (PMAX) MAX. SYSTEM VOLTAGE VOC TEMPERATURE COEFFICIENT 360 WATT 1000V -0.24 %/°C PANASONIC EVPV360K 360W NEW 240V/200A BUS BAR RATING, MAIN SERVICE PANEL, SINGLE PHASE, WITH A 200A MAIN DISCONNECT UTILITY COMPANY: N/A UTILITY METER #N/A SYSTEM SIZE: 4.680 kW DC 3.770 kW AC MODULE TYPE & AMOUNT: (13) PANASONIC EVPV360K 360W INVERTER: (13) ENPHASE IQ8PLUS-72-2-US [240V] 13 NEW PANASONIC EVPV360K 360W MODULES WITH NEW 13 - ENPHASE IQ8PLUS-72-2-US [240V] 240VAC, 1.21A MAX CEC WEIGHTED EFFICIENCY 97% NEMA 4R, UL LISTED, INTERNAL GFDI JUNCTION BOX 600 V, NEMA 4 UL LISTED G L1L1 L2L2 13 MICRO-INVERTERS IN BRANCH CIRCUIT #1 TERMINATOR CAP ON LAST CABLE CONNECTOR AC TRUNK CABLE (TYP) L1 L2 N G NG 15A M* ENVOY-S COMBINER PANEL ENPHASE IQ COMBINER 4 (X-IQ- AM1-240-4) 64A/240V CONTINUOUS, PROTECTION MAX 80A BREAKER ON SOLAR OUPUT; WITH 10 KAIC CIRCUIT BREAKERS 20A 1 2 (N) 20A BACK FED BREAKER AT THE OPPOSITE END OF THE MAIN SERVICE BUSBAR FROM THE MAIN OVERCURRENT DEVICE. (N) LOCKABLE BLADE TYPE NON-FUSIBLE AC DISCONNECT NEMA 3R 30A-2P 120/240VAC 801 E Clemensen Ave02/23/23 M AC C JO S E L O P E Z R E S I D E N C E 80 1 E C L E M E N S E N A V E , SA N T A A N A , C A 9 2 7 0 5 Project Name & Address Sheet Size Sheet Number ANSI B 11" X 17" E 1.3 Sheet Name DRAWN BY AP N : 3 9 6 4 1 1 1 4 WARNING LABELS CAUTION: POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN (13) PV MODULES CLEMENSEN AVE M A C CO M B I N E R BO X J/B PV ARRAY PER CODE(S): NEC 2017: 705.12(B)(2)(3)(b): WARNING ! DO NOT RELOCATE THIS OVERCURRENT DEVICE INVERTER OUTPUT CONNECTION ! WARNING: PHOTOVOLTAIC POWER SOURCE (PER CODE: NEC 690.31(G)(3)(4) & NEC 690.13(G)(4)) PER CODE(S): NEC 2017: 690.13(B) ELECTRICAL SHOCK HAZARD DO NOT TOUCH TERMINALS. TERMINALS ON LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING! ! PHOTOVOLTAIC AC DISCONNECT (PER CODE: NEC 690.14 (C) (1)) SOLAR PHOTOVOLTAIC SYSTEMS (PER CODE: NEC 690) LABEL LOCATION: AC DISCONNECT, POINT OF INTERCONNECTION (PER CODE: NEC 690.54) PHOTOVOLTAIC SYSTEM AC DISCONNECT RATED AC OPERATING CURRENT 15.73 AMPS AC NOMINAL OPERATING VOLTAGE 240 VOLTS PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN LABEL LOCATION: UTILITY SERVICE ENTRANCE/METER, INVERTER/DC DISCONNECT IF REQUIRED BY LOCAL AHJ, OR OTHER LOCATIONS AS REQUIRED BY LOCAL AHJ. PER CODE(S): NEC 2017: ARTICLE 690.56(C) SOLAR PHOTOVOLTAIC SYSTEMS (PER CODE: NEC 690) SOLAR PHOTOVOLTAIC SYSTEMS (PER CODE: NEC 690) ELECTRICAL SHOCK HAZARD DO NOT TOUCH TERMINALS. TERMINALS ON LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING! LABEL LOCATION: INVERTER(S), AC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): NEC 2017: 690.17(4) DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM WARNING! POINT OF INTERCONNECTION NEC 705.12(D)(3) & NEC 690.64 A SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS AT INVERTER [IFC 605.11.3.1(1) & 690.56(C)(1)(a)] PER CODE: NEC 2017 AC COMBINER PANEL UTILITY METER & MAIN SERVICE PANEL AC DISCONNECT 801 E Clemensen Ave02/23/23 801 E Clemensen Ave02/23/23 Certificate Of Completion Envelope Id: 9FD6E2C382194D3FB752D5762B3A5043 Status: Completed Subject: Complete with DocuSign: Letter to the city.pdf Source Envelope: Document Pages: 2 Signatures: 1 Envelope Originator: Certificate Pages: 4 Initials: 0 Anat Barashy AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 8510 Balboa Blvd Suite 220 Los Angeles, CA 91325 pm11@greenhomesystems.com IP Address: 75.82.0.173 Record Tracking Status: Original 1/11/2023 8:54:15 AM Holder: Anat Barashy pm11@greenhomesystems.com Location: DocuSign Signer Events Signature Timestamp Jose Lopez jrlopez_1@yahoo.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 104.34.208.191 Sent: 1/11/2023 8:55:24 AM Viewed: 1/11/2023 1:36:41 PM Signed: 1/11/2023 1:37:50 PM Electronic Record and Signature Disclosure: Accepted: 1/11/2023 1:36:41 PM ID: f3915984-cbc8-4340-b481-5cc11aa96ab1 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 1/11/2023 8:55:24 AM Certified Delivered Security Checked 1/11/2023 1:36:41 PM Signing Complete Security Checked 1/11/2023 1:37:50 PM Completed Security Checked 1/11/2023 1:37:50 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure 801 E Clemensen Ave02/23/23 ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Green Solar Technologies (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign, Inc. (DocuSign) electronic signing system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the ‘I agree’ button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after signing session and, if you elect to create a DocuSign signer account, you may access them for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign ‘Withdraw Consent’ form on the signing page of a DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures Electronic Record and Signature Disclosure created on: 4/28/2015 1:11:25 PM Parties agreed to: Jose Lopez 801 E Clemensen Ave02/23/23 electronically from us. How to contact Green Solar Technologies: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by phone call: (844) 765-8324 To contact us by email send messages to: nicki@greensoltech.com To contact us by paper mail, please send correspondence to: Green Solar Technologies 6400 Laurel Canyon Blvd. Suite 400 North Hollywood, CA 91606 To advise Green Solar Technologies of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at nicki@greensoltech.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in the DocuSign system. To request paper copies from Green Solar Technologies To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to nicki@greensoltech.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with Green Solar Technologies To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to nicki@greensoltech.com and in the body of such request you must state your e-mail, full name, US Postal Address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems:Windows® 2000, Windows® XP, Windows Vista®; Mac OS® X Browsers:Final release versions of Internet Explorer® 6.0 or above (Windows only); Mozilla Firefox 2.0 or above (Windows and Mac); Safari™ 3.0 or above (Mac only) PDF Reader:Acrobat® or similar software may be required to view and print PDF files Screen Resolution:800 x 600 minimum 801 E Clemensen Ave02/23/23 Enabled Security Settings: Allow per session cookies ** These minimum requirements are subject to change. If these requirements change, you will be asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and browsers are not supported. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the ‘I agree’ button below. By checking the ‘I agree’ box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify Green Solar Technologies as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by Green Solar Technologies during the course of my relationship with you. 801 E Clemensen Ave02/23/23 801 E. Clemensen Ave SANTA ANA, CA 92705 Jan 10, 2023 To whom it may concern, I, Jose Lopez, residing at 801 E.Clemensen Ave. Santa Ana CA 92705 allows Green Home Systems to install solar panels on my home. Sincerely, Jose Lopez DocuSign Envelope ID: 9FD6E2C3-8219-4D3F-B752-D5762B3A5043 1/11/2023 801 E Clemensen Ave02/23/23 DocuSign Envelope ID: 9FD6E2C3-8219-4D3F-B752-D5762B3A5043 801 E Clemensen Ave02/23/23 9-23 BLDG # 101113663 ISS. 2/10/2023 ELEC # 20178580 ISS. 02/13/2023 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 801 E Clemensen Ave02/23/23 9-23 801 E Clemensen Ave02/23/23 9-23 801 E Clemensen Ave02/23/23 JO S E L O P E Z R E S I D E N C E 80 1 E C L E M E N S E N A V E , SA N T A A N A , C A 9 2 7 0 5 Project Name & Address Sheet Size Sheet Number ANSI B 11" X 17" E 1.2 Sheet Name DRAWN BY AP N : 3 9 6 4 1 1 1 4 NOTES SITE NOTES: 1. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 3. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 4. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 5. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. EQUIPMENT LOCATIONS: 1. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. 2. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C). 3. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC 690.34. 4. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 2.2.6 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 5. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. STRUCTURAL NOTES: 1. RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUB ARRAY, ACCORDING TO RAI MANUFACTURER’S INSTRUCTIONS. 2. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. 3. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED W/ APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 4. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 2.3.6 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. WIRING & CONDUIT NOTES: 1. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 2. CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. 3. VOLTAGE DROP LIMITED TO 1.5%. 4. DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. 5. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [NEC 110.15]. GROUNDING NOTES: 1. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 2. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC TABLE 250.122. 3. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 4. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45 AND MICROINVERTER MANUFACTORERS’ INSTRUCTIONS. 5. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 7. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] 8. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 AND AHJ. 9. GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.41(B)(1) AND (2) TO REDUCE FIRE HAZARDS DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 2. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 3. PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY RESPONDERS IN ACCORDANCE WITH 690.12(A) THROUGH (D). 4. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND 240. 5. MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). 6. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO NEC 690.11 AND UL1699B. INTERCONNECTION NOTES: 1. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 705.12 (B)] 2. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS OUTPUT MAY NOT EXCEED 120% OF BUSBAR RATING [NEC 705.12(D)(2)(3)]. 3. THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR, PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(B)(2)(3)]. 4. AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC 705.12 (B)(2)(3)(C). 5. FEEDER TAP INTERCONECTION (LOADSIDE) ACCORDING TO NEC 705.12 (B)(2)(1) 6. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 2.7.8BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [NEC 705.12 (B)(5)]. 801 E Clemensen Ave02/23/23 801 E Clemensen Ave02/23/23 801 E Clemensen Ave02/23/23 801 E Clemensen Ave02/23/23 801 E Clemensen Ave02/23/23 801 E Clemensen Ave02/23/23 801 E Clemensen Ave02/23/23 Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 801 E Clemensen Ave02/23/23 Expedited Permit Process for PV Systems — Micro-Inverter2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 801 E Clemensen Ave02/23/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 MICRO-INVERTER SITE PLAN Contractor Name, Address and Phone:Site Plan for Small-Scale, Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV SCALE NTS Date: SHEET Drawn By: Checked By: ADAM MENDOZA 2203 FREEMAN ST, SANTA ANA, CA 92706 8.410 KW AC 801 E Clemensen Ave02/23/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 MICRO-INVERTER ELECTRICAL DIAGRAM Contractor Name, Address and Phone:One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE #10 NUMBER OF CONDUCTORS 6 CONDUIT TYPE EMT CONDUIT SIZE 3/4" DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT 29 29 1 3 1 0 1 1 CANADIAN SOLAR CS3N-400MS 400W JUNCTION BOX 600V, NEMA 4 UL LISTED COMBINER PANEL ENPHSE IQ COMBINER 4 (X-IQ-AM1-240-4) LOCABLE BLADE TYPE NON-FUSIBLE AC DISCONNECT NEMA 3R 60A-2P 120/240VAC 225A MAIN SERVICE PANEL WITH 200A MAIN BREAKER 1 2 1 2 14 15 ADAM MENDOZA 2203 FREEMAN ST, SANTA ANA, CA 92706 8.410 KW AC #6 #10 #10 #8 #8 #6 #8 1 6 6 1 1 3 1 EMT EMT EMT EMT EMT EMT EMT 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 801 E Clemensen Ave02/23/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone: Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO- INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE® REFERENCES SHOWN AS (NEC 7085.12 (B)(2)(3)(b)) NOTES FOR ALL DRAWINGS: SIGNS-SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) NOTES FOR MICRO-INVERTER ELECTRICAL DIAGRAM ADAM MENDOZA 2203 FREEMAN ST, SANTA ANA, CA 92706 8.410 KW AC CANADIAN SOLAR CS3N-400MS 400W 10.76 AMPS 37.2 VOLTS 44.5 VOLTS 11.50 AMPS 20 AMPS 400 WATT 1500 VOLTS -0.26 %/°C ENPHASE IQ 8 SERIES ENPHASE IQ 8PLUS-72-2-US 60 VOLTS 60 VOLTS 235 WATTS 1.21 AMPS 20 AMPS 35.09A 240 V 801 E Clemensen Ave02/23/23 801 E Clemensen Ave02/23/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 801 E Clemensen Ave02/23/23 Structural Calculations for a Roof Mounted Solar Photovoltaic System for: Jose Lopez Residence 801 Clemensen Ave., Santa Ana, CA 92705 Applicable Codes: 2019 California Building Code, 2019 California Electric Code, 2019 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-16 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Construction, Local Municipal Code, and all other codes which are adopted by reference or enacted by law. Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. Solar Energy Contractor shall make an inspection of the existing roof framing system prior to installation of the roof mounted solar energy system to verify that the existing roof is capable of supporting minimum roof live loads. Assumed Design Parameters: All 2x members are grade Douglas Fir #2 or better All 4X members are grade Douglas Fir #1 or better All Roof Connectors are Simpson Strong-Tie or Equal All Concrete Foundations are f'c = 2500 psi or stronger Original Structure was built to the Type-V Wood Framed Standards of the Applicable Building Code at the time of Construction. Sht # 1 of 7 2021-323 Better Earth Paulina Aviles Residence Date: January 29, 2021 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 801 E Clemensen Ave02/23/23 Sht # 2 of 7 Note to Building Official: Based upon a review of the proposed plans and information, the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. The contractor shall field verify that the existing roof structure is in its original permited condition and verify that it can support the normal code required roof live loads. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. W DL + LL R1 R2 7.8' Total load on rafter = 60 plf x 7.8 ft. = 468 lbs w = 30 psf x 2 ft. = 60 plf Check Existing 2x4 Roof Rafter @ 24" O.C.: * *Note: Contractor to Field Verify Framing 2017-3974 Solar Outsource 20347 Umbria Way Residence Date: October 12, 20172018-1482 Solar Outsource David Asuncion Residence Date: May 17, 20182018-2634 Solar Outsource Bryan George Residence Date: September 5, 20182018-2831 Solar Outsource Dr Farhad Partovi Residence Date: September 18, 20182018-3263 Solar Outsource Jeff Larson Residence Date: October 25, 2018 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-3263 Solar Outsource Jeff Larson Residence Date: December 20, 2018 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2019-1295 Solar Outsource Raul Tadle Residence Date: May 1, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1710 Solar Outsource William Martin Residence Date: June 4, 20192019-1864 Solar Outsource Yvan Ayaay Residence Date: June 17, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 21, 20192019-2437 Solar Outsource Reisha & Ralph Navarro Residence Date: August 1, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 9, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 23, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: January 5, 20202019-2841 Solar Outsource Thomas Lucas Residence Date: January 7, 20202020-188 Solar Outsource Bubno Residence Date: January 24, 2020 2020-182 Precis Solar Harris Residence Date: January 24, 20202020-182 Precis Solar Harris Residence Date: January 24, 20202020-183 Precis Solar Schutz Residence Date: January 24, 2020 2020-298 Precis Solar Cynthia Martin Narine Residence Date: February 5, 20202020-398 Precis Solar Mark Anderson Residence Date: February 14, 20202020-398 Precis Solar Mark Anderson Residence Date: March 11, 2020 2020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-714 Solar Deployed Gloria Lifschutz Residence Date: March 19, 20202020-729 Solar Deployed Scott McLeod Residence Date: March 24, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 6, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: June 29, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: August 13, 20202020-1988 Solar Deployed Ryan Mock Residence Date: August 29, 20202020-2065 Solar Deployed Russell Wong Residence Date: September 5, 20202020-2248 Solar Deployed Jim Keokanock Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: October 9, 20202020-2744 Solar Deployed Ronald Gomez Residence Date: October 20, 20202020-2871 Solar Deployed Gary Mather Residence Date: October 28, 20202020-3060 Solar Deployed Bob Wielenga Residence Date: November 6, 20202020-3136 Solar Deployed Riad Abdelkarim Residence Date: November 11, 20202020-3340 Solar Deployed Jasmin Lu Residence Date: November 20, 20202020-3458 Solar Deployed Lorenz Siongco Residence Date: November 30, 20202020-3568 Solar Deployed Michael Alcaraz Residence Date: December 6, 20202020-3680 Solar Deployed Josh Dale Residence Date: December 14, 20202020- 3692 Solar Deployed David Robinson Residence Date: December 14, 20202021-115 Better Earth John Burns Residence Date: January 13, 20212021-157 Better Earth Kerrie Mayer Residence Date: January 15, 20212021-157 Better Earth Maria Villasenor Date: January 17, 20212021-180 Better Earth Maria Villasenor Date: January 17, 20212021-268 Better Earth Felipe Garnica Residence Date: January 23, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-329 Better Earth Jesus Zuniga Residence Date: January 29, 2021 2021-506 Better Earth Sherrell Draves Residence Date: February 13, 20212021-568 Better Earth Jerry Ernst Residence Date: February 18, 20212021-757 Better Earth Martha Hondoy Residence Date: March 05, 20212021-865 Better Earth Mike Prenovost Residence Date: March 16, 2021 2021-867 Better Earth Nelson Smith Residence Date: March 16, 2021 2021-991 Better Earth Antonio Alba Residence Date: March 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1122 Better Earth Mohammad Javad Haji Tehrani Residence Date: April 06, 20212021-1232 Silverline Luz Rodriguez Residence Date: April 14, 20212021-2382 Clean Tech Energy Peter Schueller Residence Date: June 24, 2021 ( Assume max rafter span = 7.8 ft. ) 2021-2884 CAD Cali Joshua Melendez Residence Date: July 22, 20212021-2969 CAD Cali Jordan Nelson Residence Date: July 28, 20212022-273 Guasti Construction Hector Ramos Residence Date: January 25, 20222022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022 801 E Clemensen Ave02/23/23 Check Existing 2x4 Roof Rafter @ 24" O.C.: 2017-3974 Solar Outsource 20347 Umbria Way Residence Date: October 12, 20172018-1482 Solar Outsource David Asuncion Residence Date: May 17, 20182018-2634 Solar Outsource Bryan George Residence Date: September 5, 20182018-2831 Solar Outsource Dr Farhad Partovi Residence Date: September 18, 20182018-3263 Solar Outsource Jeff Larson Residence Date: October 25, 2018 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-3263 Solar Outsource Jeff Larson Residence Date: December 20, 20182019-1295 Solar Outsource Raul Tadle Residence Date: May 1, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1710 Solar Outsource William Martin Residence Date: June 4, 20192019-1864 Solar Outsource Yvan Ayaay Residence Date: June 17, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 21, 20192019-2437 Solar Outsource Reisha & Ralph Navarro Residence Date: August 1, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 9, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 23, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: January 5, 20202019-2841 Solar Outsource Thomas Lucas Residence Date: January 7, 20202020-188 Solar Outsource Bubno Residence Date: January 24, 2020 2020-182 Precis Solar Harris Residence Date: January 24, 20202020-182 Precis Solar Harris Residence Date: January 24, 20202020-183 Precis Solar Schutz Residence Date: January 24, 2020 2020-298 Precis Solar Cynthia Martin Narine Residence Date: February 5, 20202020-398 Precis Solar Mark Anderson Residence Date: February 14, 20202020-398 Precis Solar Mark Anderson Residence Date: March 11, 2020 2020-699 Precis Solar Matthew Clark Residence Date: March 17, 2020 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 Check attachment of Support to Existing Structure for Wind Uplift CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7- 16 WIND LOADS ON BUILDING APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2. NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7- 16 EFFECTIVE WIND AREA: "FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT BE LESS THAN ONE-THIRD ITS LENGTH." EFFECTIVE AREA = 15 SQ FT 2020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-714 Solar Deployed Gloria Lifschutz Residence Date: March 19, 20202020-729 Solar Deployed Scott McLeod Residence Date: March 24, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 6, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: June 29, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: August 13, 20202020-1988 Solar Deployed Ryan Mock Residence Date: August 29, 20202020-2065 Solar Deployed Russell Wong Residence Date: September 5, 2020 2020-2248 Solar Deployed Jim Keokanock Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: September 18, 20202020-2245 Solar Deployed Jonathan Sepulveda Residence Date: October 9, 20202020-2744 Solar Deployed Ronald Gomez Residence Date: October 20, 20202020-2871 Solar Deployed Gary Mather Residence Date: October 28, 20202020-3060 Solar Deployed Bob Wielenga Residence Date: November 6, 20202020-3136 Solar Deployed Riad Abdelkarim Residence Date: November 11, 20202020-3340 Solar Deployed Jasmin Lu Residence Date: November 20, 20202020-3458 Solar Deployed Lorenz Siongco Residence Date: November 30, 20202020-3568 Solar Deployed Michael Alcaraz Residence Date: December 6, 20202020-3680 Solar Deployed Josh Dale Residence Date: December 14, 20202020- 3692 Solar Deployed David Robinson Residence Date: December 14, 20202021-115 Better Earth John Burns Residence Date: January 13, 2021 w DL + LL = 30 psf x 2 ft. = 60 plf Total load on rafter = 60 plf x 2.5 ft. + 28 plf x 5.3 ft. + ( 4' x 2.75' x 3 psf x 2 ) = 364 lbs < 468 lbs OK R1 R2 7.8' w LLw DL 2021-157 Better Earth Kerrie Mayer Residence Date: January 15, 20212021-157 Better Earth Maria Villasenor Date: January 17, 20212021-180 Better Earth Maria Villasenor Date: January 17, 20212021-268 Better Earth Felipe Garnica Residence Date: January 23, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-329 Better Earth Jesus Zuniga Residence Date: January 29, 2021 2021-506 Better Earth Sherrell Draves Residence Date: February 13, 20212021-568 Better Earth Jerry Ernst Residence Date: February 18, 20212021-757 Better Earth Martha Hondoy Residence Date: March 05, 2021 2.5'5.3' 2021-865 Better Earth Mike Prenovost Residence Date: March 16, 2021 2021-867 Better Earth Nelson Smith Residence Date: March 16, 20212021-991 Better Earth Antonio Alba Residence Date: March 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 Sht # 3 of 7 2021-1122 Better Earth Mohammad Javad Haji Tehrani Residence Date: April 06, 20212021-1232 Silverline Luz Rodriguez Residence Date: April 14, 2021 P 2021-2382 Clean Tech Energy Peter Schueller Residence Date: June 24, 20212021-2884 CAD Cali Joshua Melendez Residence Date: July 22, 20212021-2969 CAD Cali Jordan Nelson Residence Date: July 28, 20212022-273 Guasti Construction Hector Ramos Residence Date: January 25, 20222022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022 P 801 E Clemensen Ave02/23/23 Sht # 4 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 2020 2020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 2020 2020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 2020 2020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 2020 2020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 2020 2020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 20202020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 2021 qh Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 Tributary Area to Each Solar Mount = 4 ft. x 2.75 ft. = 11 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): Eq'n 29.4- 7 ASCE 7- 16 Kz = velocity pressure coefficient p =qh ðGCp ÞðγEÞðγa Þð =0.00256 Kz Kzt Kd Ke V2 Note: Section 29.10.1 ASCE 7- 16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 p =qh ðGCp ÞðγEÞðγa Þð qh =20 psf p = 20 psf (- 2.0) (1.5) (0.7) = 42 psf Eq'n 26.10- 1 ASCE 7- 16 GCp = - 2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GC p = Exposure Factor = 1.5ðγE GCp = Solar Array Pressure Equalization Factor = 0.7 ðγa Fig. 29.4- 8 ASCE 7- 16 Design (Factored) Uplift at each support = 0.6 x 462 lbs = 277 lbs Nominal (Unfactored) Uplift at each support = 42 psf x 11 sq. ft. = 462 lbs Note: Section 2.4.1 of ASCE 7- 16, Basic Load Combinations for Allowable Stress Load per lag screw = 277 lbs / 1 = 277 lbs Design. Note: Applicable Load Combination #5 (D + 0.6W) 2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 20212021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 2021 2021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-329 Better Earth Jesus Zuniga Residence Date: January 29, 20212021-506 Better Earth Sherrell Draves Residence Date: February 13, 20212021-568 Better Earth Jerry Ernst Residence Date: February 18, 20212021-757 Better Earth Martha Hondoy Residence Date: March 05, 20212021-865 Better Earth Mike Prenovost Residence Date: March 16, 20212021-867 Better Earth Nelson Smith Residence Date: March 16, 20212021-991 Better Earth Antonio Alba Residence Date: March 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1122 Better Earth Mohammad Javad Haji Tehrani Residence Date: April 06, 2021 2021-1232 Silverline Luz Rodriguez Residence Date: April 14, 20212021-2382 Clean Tech Energy Peter Schueller Residence Date: June 24, 20212021-2884 CAD Cali Joshua Melendez Residence Date: July 22, 20212021-2969 CAD Cali Jordan Nelson Residence Date: July 28, 20212022-273 Guasti Construction Hector Ramos Residence Date: January 25, 20222022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022 801 E Clemensen Ave02/23/23 Sht # 5 of 7 2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020 Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2018 NDS. W ' = W x Cd x Ct Table 10.3.1 2018 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2018 NDS Ct = 1.0 per Table 10.3.4 of 2018 NDS W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 277 lbs OK Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3" lag screws per connection minimum. 2020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 2020 2020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 2020 2020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 2020 2020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 2020 2020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 2020 2020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 20202020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 2021 Note: Zone 2 2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 2021 2021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-329 Better Earth Jesus Zuniga Residence Date: January 29, 20212021-506 Better Earth Sherrell Draves Residence Date: February 13, 20212021-568 Better Earth Jerry Ernst Residence Date: February 18, 20212021-757 Better Earth Martha Hondoy Residence Date: March 05, 20212021-865 Better Earth Mike Prenovost Residence Date: March 16, 20212021-867 Better Earth Nelson Smith Residence Date: March 16, 20212021-991 Better Earth Antonio Alba Residence Date: March 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1122 Better Earth Mohammad Javad Haji Tehrani Residence Date: April 06, 2021 2021-1232 Silverline Luz Rodriguez Residence Date: April 14, 20212021-2382 Clean Tech Energy Peter Schueller Residence Date: June 24, 20212021-2884 CAD Cali Joshua Melendez Residence Date: July 22, 20212021-2969 CAD Cali Jordan Nelson Residence Date: July 28, 20212022-273 Guasti Construction Hector Ramos Residence Date: January 25, 20222022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022 801 E Clemensen Ave02/23/23 Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Effective Existing Seismic Weight Area of (E) Building = Approximately 1,900 Sq. ft. Approximate Effective Seismic Weight = 1,900 sq. ft. x 30 psf ave. = 57,000 LBS DETERMINE BASE SHEAR V = Cs W EQ'N 12.8-1 ASCE 7-16 Cs = SDS R Ie EQ'N 12.8-2 ASCE 7-16 R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1 R = 6.5 WOOD SHEAR WALLS Ie = 1.0 IMPORTANCE FACTOR SDS = 2/3 x SMS EQ'N 11.4-3 ASCE 7-16 SMS = FA x SS EQ'N 11.4-1 ASCE 7-16 SMS = 1.2 x 1.5 = 1.8 SDS =2/3 x 1.8 = 1.2 Cs = 1.2 6.5 1 = 0.185 EQ'N 12.8-2 ASCE 7-16 Sht # 6 of 7 2017-3974 Solar Outsource 20347 Umbria Way Residence Date: October 12, 20172018-1482 Solar Outsource David Asuncion Residence Date: May 17, 20182018-2634 Solar Outsource Bryan George Residence Date: September 5, 20182018-2831 Solar Outsource Dr Farhad Partovi Residence Date: September 18, 20182018-3263 Solar Outsource Jeff Larson Residence Date: October 25, 2018 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-3263 Solar Outsource Jeff Larson Residence Date: December 20, 2018 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2019-1295 Solar Outsource Raul Tadle Residence Date: May 1, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1710 Solar Outsource William Martin Residence Date: June 4, 20192019-1864 Solar Outsource Yvan Ayaay Residence Date: June 17, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 21, 20192019-2437 Solar Outsource Reisha & Ralph Navarro Residence Date: August 1, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 9, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 23, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: January 5, 20202019-2841 Solar Outsource Thomas Lucas Residence Date: January 7, 20202020-188 Solar Outsource Bubno Residence Date: January 24, 2020 2020-182 Precis Solar Harris Residence Date: January 24, 20202020-182 Precis Solar Harris Residence Date: January 24, 20202020-183 Precis Solar Schutz Residence Date: January 24, 2020 2020-298 Precis Solar Cynthia Martin Narine Residence Date: February 5, 20202020-398 Precis Solar Mark Anderson Residence Date: February 14, 20202020-398 Precis Solar Mark Anderson Residence Date: March 11, 2020 2020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-714 Solar Deployed Gloria Lifschutz Residence Date: March 19, 20202020-729 Solar Deployed Scott McLeod Residence Date: March 24, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 6, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: June 29, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: August 13, 20202020-1988 Solar Deployed Ryan Mock Residence Date: August 29, 20202020-2065 Solar Deployed Russell Wong Residence Date: September 5, 20202020-2248 Solar Deployed Jim Keokanock Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: October 9, 20202020-2744 Solar Deployed Ronald Gomez Residence Date: October 20, 20202020-2871 Solar Deployed Gary Mather Residence Date: October 28, 20202020-3060 Solar Deployed Bob Wielenga Residence Date: November 6, 20202020-3136 Solar Deployed Riad Abdelkarim Residence Date: November 11, 20202020-3340 Solar Deployed Jasmin Lu Residence Date: November 20, 20202020-3458 Solar Deployed Lorenz Siongco Residence Date: November 30, 20202020-3568 Solar Deployed Michael Alcaraz Residence Date: December 6, 20202020-3680 Solar Deployed Josh Dale Residence Date: December 14, 20202020- 3692 Solar Deployed David Robinson Residence Date: December 14, 20202021-115 Better Earth John Burns Residence Date: January 13, 20212021-157 Better Earth Kerrie Mayer Residence Date: January 15, 20212021-157 Better Earth Maria Villasenor Date: January 17, 20212021-180 Better Earth Maria Villasenor Date: January 17, 20212021-268 Better Earth Felipe Garnica Residence Date: January 23, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-329 Better Earth Jesus Zuniga Residence Date: January 29, 2021 2021-506 Better Earth Sherrell Draves Residence Date: February 13, 20212021-568 Better Earth Jerry Ernst Residence Date: February 18, 20212021-757 Better Earth Martha Hondoy Residence Date: March 05, 20212021-865 Better Earth Mike Prenovost Residence Date: March 16, 2021 2021-867 Better Earth Nelson Smith Residence Date: March 16, 2021 2021-991 Better Earth Antonio Alba Residence Date: March 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1122 Better Earth Mohammad Javad Haji Tehrani Residence Date: April 06, 20212021-1232 Silverline Luz Rodriguez Residence Date: April 14, 20212021-2382 Clean Tech Energy Peter Schueller Residence Date: June 24, 20212021-2884 CAD Cali Joshua Melendez Residence Date: July 22, 20212021-2969 CAD Cali Jordan Nelson Residence Date: July 28, 20212022-273 Guasti Construction Hector Ramos Residence Date: January 25, 20222022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022 801 E Clemensen Ave02/23/23 V = 0.185 x 57,000 LBS = 10,545 LBS EQ'N 12.8-1 ASCE 7-16 DETERMINE NEW BASE SHEAR EXISTING BASE SHEAR Determine Seismic Weight of Building with Solar Array: EXISTING SEISMIC WEIGHT = 57,000 LBS NEW SOLAR ARRAY = 3 PSF x 13 PANELS x 3.3' x 5.5' = 708 LBS NEW SEISMIC WEIGHT = 57,000 LBS + 708 LBS = 57,708 LBS THEREFORE NEW BASE SHEAR: V = 0.185 x 57,708 = 10,676 LBS EQ'N 12.8-1 ASCE 7-10 % CHANGE =10,676 LBS - 10,545 LBS 10,545 LBS x 100 = 1.2 % < 10% OK OK. PER ASCE 7-16 SECTION 11.B.3 ALTERATIONS EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE. "Alterations are permitted to be made to any structure without requiring the existing structure to comply with this standard provided the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10 percent or decrease the design strength of any existing structural element to resist seismic forces by more than 10 percent shall not be permitted unless the entire seismic force-resisting system is determined to comply with this standard for a new structure." End of Calculations Sht # 7 of 7 2017-3974 Solar Outsource 20347 Umbria Way Residence Date: October 12, 20172018-1482 Solar Outsource David Asuncion Residence Date: May 17, 20182018-2634 Solar Outsource Bryan George Residence Date: September 5, 20182018-2831 Solar Outsource Dr Farhad Partovi Residence Date: September 18, 20182018-3263 Solar Outsource Jeff Larson Residence Date: October 25, 2018 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-3263 Solar Outsource Jeff Larson Residence Date: December 20, 2018 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -21 2019-1295 Solar Outsource Raul Tadle Residence Date: May 1, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1710 Solar Outsource William Martin Residence Date: June 4, 20192019-1864 Solar Outsource Yvan Ayaay Residence Date: June 17, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 21, 20192019-2437 Solar Outsource Reisha & Ralph Navarro Residence Date: August 1, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 9, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 23, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: January 5, 20202019-2841 Solar Outsource Thomas Lucas Residence Date: January 7, 20202020-188 Solar Outsource Bubno Residence Date: January 24, 2020 2020-182 Precis Solar Harris Residence Date: January 24, 20202020-182 Precis Solar Harris Residence Date: January 24, 20202020-183 Precis Solar Schutz Residence Date: January 24, 2020 2020-298 Precis Solar Cynthia Martin Narine Residence Date: February 5, 20202020-398 Precis Solar Mark Anderson Residence Date: February 14, 20202020-398 Precis Solar Mark Anderson Residence Date: March 11, 2020 2020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-714 Solar Deployed Gloria Lifschutz Residence Date: March 19, 20202020-729 Solar Deployed Scott McLeod Residence Date: March 24, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 6, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: June 29, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: August 13, 20202020-1988 Solar Deployed Ryan Mock Residence Date: August 29, 20202020-2065 Solar Deployed Russell Wong Residence Date: September 5, 20202020-2248 Solar Deployed Jim Keokanock Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: October 9, 20202020-2744 Solar Deployed Ronald Gomez Residence Date: October 20, 20202020-2871 Solar Deployed Gary Mather Residence Date: October 28, 20202020-3060 Solar Deployed Bob Wielenga Residence Date: November 6, 20202020-3136 Solar Deployed Riad Abdelkarim Residence Date: November 11, 20202020-3340 Solar Deployed Jasmin Lu Residence Date: November 20, 20202020-3458 Solar Deployed Lorenz Siongco Residence Date: November 30, 20202020-3568 Solar Deployed Michael Alcaraz Residence Date: December 6, 20202020-3680 Solar Deployed Josh Dale Residence Date: December 14, 20202020- 3692 Solar Deployed David Robinson Residence Date: December 14, 20202021-115 Better Earth John Burns Residence Date: January 13, 20212021-157 Better Earth Kerrie Mayer Residence Date: January 15, 20212021-157 Better Earth Maria Villasenor Date: January 17, 20212021-180 Better Earth Maria Villasenor Date: January 17, 20212021-268 Better Earth Felipe Garnica Residence Date: January 23, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-329 Better Earth Jesus Zuniga Residence Date: January 29, 2021 2021-506 Better Earth Sherrell Draves Residence Date: February 13, 20212021-568 Better Earth Jerry Ernst Residence Date: February 18, 20212021-757 Better Earth Martha Hondoy Residence Date: March 05, 20212021-865 Better Earth Mike Prenovost Residence Date: March 16, 2021 2021-867 Better Earth Nelson Smith Residence Date: March 16, 2021 2021-991 Better Earth Antonio Alba Residence Date: March 26, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1122 Better Earth Mohammad Javad Haji Tehrani Residence Date: April 06, 20212021-1232 Silverline Luz Rodriguez Residence Date: April 14, 20212021-2382 Clean Tech Energy Peter Schueller Residence Date: June 24, 20212021-2884 CAD Cali Joshua Melendez Residence Date: July 22, 20212021-2969 CAD Cali Jordan Nelson Residence Date: July 28, 20212022-273 Guasti Construction Hector Ramos Residence Date: January 25, 20222022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022 801 E Clemensen Ave02/23/23