HomeMy WebLinkAbout801 E Clemensen Ave - PlanJO
S
E
L
O
P
E
Z
R
E
S
I
D
E
N
C
E
80
1
E
C
L
E
M
E
N
S
E
N
A
V
E
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
5
Project Name &
Address
Sheet Size
Sheet Number
ANSI B
11" X 17"
E 1.1
Sheet Name
DRAWN BY
AP
N
:
3
9
6
4
1
1
1
4
3-LINE
DIAGRAM
G
N
(N) 200A
M
20A
(E) LOADS
G
N
3 EXISTING GROUNDING
ELECTRODE SYSTEM
POINT OF INTERCONNECT, LOAD SIDE
3
THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY
AND SOLAR)
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE 240V
15.73A
Rooftop conductor ampacities designed in compliance with
art. 690.8, Tables 310.15(B)(2)(a), 310.15(B)(3)(a),
310.15(B)(3)(c), 310.15(B)(16), Chapter 9 Table 4, 5, & 9.
Location specific temperature obtained from ASHRAE 2017
data tables
AMBIENT TEMP (HIGH TEMP 2%)
RECORD LOW TEMP 2°
31°
CONDUIT HEIGHT 0.5"
ROOF TOP TEMP 53°
CONDUCTOR TEMPERATURE RATE 90°
ENPHASE Q CABLE TO BE ATTACHED TO
RAIL MIN. 3-1/2" ABOVE ROOF SURFACE
INVERTER SPECIFICATIONS
MANUFACTURER
MAX. POWER AT 40 C
60 VOLTS
NOMINAL AC VOLTAGE
235 WATTS
MAX. AC CURRENT
290 VOLTS
MAX. OCPD RATING
MAX. PANELS/CIRCUIT
SHORT CIRCUIT CURRENT
1.21 AMPS
20 AMPS
MAX. DC VOLT RATING
13
15 AMPS
ENPHASE ENERGY IQ8PLUS-72-2-US
120% RULE
BUS BAR RATING X 120%) - MAIN BREAKER RATING
= MAX. PV OCPD
(200A x 120%) - 200 = 40A
WIRE
QTY
WIRE
TAG #CONDUIT WIRE TYPE INVERTER
QTY:NOC: CONDUIT
FILL:
TEMP
RATING:
WIRE
AMP
TEMP
DE-RATE:
WIRE
OCP:
GRND
SIZE
GRND WIRE
TYPEENPHASE TRUNK CABLE
INCLUDES #12 GROUND
WIRE
GAUGE:
TERMINAL
75°C RATING:NEC:STRING
AMPS
x x = x x =1.25 1.21A 13 #6 SBC19.66A 38.4A 35A90°C
35A x x =1.25 1.21A 13 #8 THWN-219.66A x x = 30.4A90°C
35A x x =1.25 1.21A 13 #8 THWN-219.66A x x = 32.9A75°C
40A #10
40A #10
35A #10
3/4" EMT
3/4" EMT
WIRE FROM - -
JUNCTION BOX TO COMBINER PANEL
COMBINER PANEL TO MSP
ARRAY TO JUNCTION BOX1
2
3
TRUNK CABLE
THWN-2
THWN-2
2 1.00
2 1.00
3 1.00
PV WIRE 0.96
0.76
0.94
PV MODULE RATING @ STC
MANUFACTURER
MAX. POWER-POINT CURRENT (IMP)
MAX. POWER-POINT VOLTAGE (VMP)
OPEN-CIRCUIT VOLTAGE (VOC)
SHORT-CIRCUIT CURRENT (ISC)
9.72 AMPS
37.0 VOLTS
44.0 VOLTS
10.37 AMPS
NOM. MAX. POWER AT STC (PMAX)
MAX. SYSTEM VOLTAGE
VOC TEMPERATURE COEFFICIENT
360 WATT
1000V
-0.24 %/°C
PANASONIC EVPV360K 360W
NEW 240V/200A BUS BAR RATING, MAIN
SERVICE PANEL, SINGLE PHASE, WITH
A 200A MAIN DISCONNECT
UTILITY COMPANY: N/A
UTILITY METER #N/A
SYSTEM SIZE: 4.680 kW DC
3.770 kW AC
MODULE TYPE & AMOUNT: (13) PANASONIC EVPV360K 360W
INVERTER: (13) ENPHASE IQ8PLUS-72-2-US [240V]
13 NEW PANASONIC EVPV360K 360W MODULES WITH
NEW 13 - ENPHASE IQ8PLUS-72-2-US [240V] 240VAC, 1.21A
MAX CEC WEIGHTED EFFICIENCY 97%
NEMA 4R, UL LISTED, INTERNAL GFDI JUNCTION BOX
600 V, NEMA 4
UL LISTED
G
L1L1
L2L2
13 MICRO-INVERTERS IN BRANCH CIRCUIT #1
TERMINATOR CAP ON LAST CABLE
CONNECTOR AC TRUNK CABLE (TYP)
L1
L2
N
G
NG
15A
M* ENVOY-S
COMBINER PANEL ENPHASE IQ
COMBINER 4 (X-IQ- AM1-240-4) 64A/240V
CONTINUOUS, PROTECTION MAX 80A
BREAKER ON SOLAR OUPUT; WITH 10
KAIC CIRCUIT BREAKERS
20A
1 2
(N) 20A BACK FED
BREAKER AT THE OPPOSITE
END OF THE MAIN SERVICE
BUSBAR FROM THE MAIN
OVERCURRENT DEVICE.
(N) LOCKABLE BLADE
TYPE NON-FUSIBLE AC
DISCONNECT NEMA 3R
30A-2P 120/240VAC
801 E Clemensen
Ave02/23/23
M AC C
JO
S
E
L
O
P
E
Z
R
E
S
I
D
E
N
C
E
80
1
E
C
L
E
M
E
N
S
E
N
A
V
E
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
5
Project Name &
Address
Sheet Size
Sheet Number
ANSI B
11" X 17"
E 1.3
Sheet Name
DRAWN BY
AP
N
:
3
9
6
4
1
1
1
4
WARNING
LABELS
CAUTION:
POWER TO THIS BUILDING IS ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
DISCONNECTS LOCATED AS SHOWN
(13) PV MODULES
CLEMENSEN AVE
M
A
C
CO
M
B
I
N
E
R
BO
X
J/B
PV ARRAY
PER CODE(S): NEC 2017: 705.12(B)(2)(3)(b):
WARNING !
DO NOT RELOCATE THIS
OVERCURRENT DEVICE
INVERTER OUTPUT CONNECTION
!
WARNING: PHOTOVOLTAIC
POWER SOURCE
(PER CODE: NEC 690.31(G)(3)(4) & NEC 690.13(G)(4))
PER CODE(S): NEC 2017: 690.13(B)
ELECTRICAL SHOCK HAZARD
DO NOT TOUCH TERMINALS.
TERMINALS ON LINE AND LOAD
SIDES MAY BE ENERGIZED IN
THE OPEN POSITION
WARNING! !
PHOTOVOLTAIC
AC DISCONNECT
(PER CODE: NEC 690.14 (C) (1))
SOLAR PHOTOVOLTAIC
SYSTEMS
(PER CODE: NEC 690)
LABEL LOCATION:
AC DISCONNECT, POINT OF INTERCONNECTION
(PER CODE: NEC 690.54)
PHOTOVOLTAIC SYSTEM AC DISCONNECT
RATED AC OPERATING CURRENT 15.73 AMPS
AC NOMINAL OPERATING VOLTAGE 240 VOLTS
PHOTOVOLTAIC SYSTEM
EQUIPPED WITH
RAPID SHUTDOWN
LABEL LOCATION:
UTILITY SERVICE ENTRANCE/METER, INVERTER/DC DISCONNECT
IF REQUIRED BY LOCAL AHJ, OR OTHER LOCATIONS AS
REQUIRED BY LOCAL AHJ.
PER CODE(S): NEC 2017: ARTICLE 690.56(C)
SOLAR PHOTOVOLTAIC
SYSTEMS
(PER CODE: NEC 690)
SOLAR PHOTOVOLTAIC
SYSTEMS
(PER CODE: NEC 690)
ELECTRICAL SHOCK HAZARD
DO NOT TOUCH TERMINALS.
TERMINALS ON LINE AND LOAD
SIDES MAY BE ENERGIZED IN
THE OPEN POSITION
WARNING!
LABEL LOCATION:
INVERTER(S), AC DISCONNECT(S), AC
COMBINER PANEL (IF APPLICABLE).
PER CODE(S): NEC 2017: 690.17(4)
DUAL POWER SOURCE
SECOND SOURCE IS PHOTOVOLTAIC SYSTEM
WARNING!
POINT OF INTERCONNECTION
NEC 705.12(D)(3) & NEC 690.64
A
SOLAR PV SYSTEM
EQUIPPED WITH RAPID
SHUTDOWN
TURN RAPID
SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SHUTDOWN PV
SYSTEM AND
REDUCE
SHOCK HAZARD
IN THE ARRAY
SOLAR
ELECTRIC
PV PANELS
AT INVERTER [IFC 605.11.3.1(1) & 690.56(C)(1)(a)]
PER CODE: NEC 2017
AC COMBINER PANEL
UTILITY METER &
MAIN SERVICE PANEL
AC DISCONNECT
801 E Clemensen
Ave02/23/23
801 E Clemensen
Ave02/23/23
Certificate Of Completion
Envelope Id: 9FD6E2C382194D3FB752D5762B3A5043 Status: Completed
Subject: Complete with DocuSign: Letter to the city.pdf
Source Envelope:
Document Pages: 2 Signatures: 1 Envelope Originator:
Certificate Pages: 4 Initials: 0 Anat Barashy
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
8510 Balboa Blvd
Suite 220
Los Angeles, CA 91325
pm11@greenhomesystems.com
IP Address: 75.82.0.173
Record Tracking
Status: Original
1/11/2023 8:54:15 AM
Holder: Anat Barashy
pm11@greenhomesystems.com
Location: DocuSign
Signer Events Signature Timestamp
Jose Lopez
jrlopez_1@yahoo.com
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 104.34.208.191
Sent: 1/11/2023 8:55:24 AM
Viewed: 1/11/2023 1:36:41 PM
Signed: 1/11/2023 1:37:50 PM
Electronic Record and Signature Disclosure:
Accepted: 1/11/2023 1:36:41 PM
ID: f3915984-cbc8-4340-b481-5cc11aa96ab1
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 1/11/2023 8:55:24 AM
Certified Delivered Security Checked 1/11/2023 1:36:41 PM
Signing Complete Security Checked 1/11/2023 1:37:50 PM
Completed Security Checked 1/11/2023 1:37:50 PM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
801 E Clemensen
Ave02/23/23
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, Green Solar Technologies (we, us or Company) may be required by law to
provide to you certain written notices or disclosures. Described below are the terms and
conditions for providing to you such notices and disclosures electronically through the
DocuSign, Inc. (DocuSign) electronic signing system. Please read the information below
carefully and thoroughly, and if you can access this information electronically to your
satisfaction and agree to these terms and conditions, please confirm your agreement by clicking
the I agree button at the bottom of this document.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. You will have the ability to download and print documents we send
to you through the DocuSign system during and immediately after signing session and, if you
elect to create a DocuSign signer account, you may access them for a limited period of time
(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to
send you paper copies of any such documents from our office to you, you will be charged a
$0.00 per-page fee. You may request delivery of such paper copies from us by following the
procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign Withdraw Consent form on the signing page of a
DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your
consent to receive required notices and disclosures electronically from us and you will no longer
be able to use the DocuSign system to receive required notices and consents electronically from
us or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through the DocuSign system all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or
made available to you during the course of our relationship with you. To reduce the chance of
you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
Electronic Record and Signature Disclosure created on: 4/28/2015 1:11:25 PM
Parties agreed to: Jose Lopez
801 E Clemensen
Ave02/23/23
electronically from us.
How to contact Green Solar Technologies:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by phone call: (844) 765-8324
To contact us by email send messages to: nicki@greensoltech.com
To contact us by paper mail, please send correspondence to:
Green Solar Technologies
6400 Laurel Canyon Blvd.
Suite 400
North Hollywood, CA 91606
To advise Green Solar Technologies of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at nicki@greensoltech.com and in
the body of such request you must state: your previous e-mail address, your new e-mail address.
We do not require any other information from you to change your email address..
In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in the DocuSign system.
To request paper copies from Green Solar Technologies
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an e-mail to nicki@greensoltech.com and in the
body of such request you must state your e-mail address, full name, US Postal address, and
telephone number. We will bill you for any fees at that time, if any.
To withdraw your consent with Green Solar Technologies
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign session, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to nicki@greensoltech.com and in the body of such request you must
state your e-mail, full name, US Postal Address, and telephone number. We do not need
any other information from you to withdraw consent.. The consequences of your
withdrawing consent for online documents will be that transactions may take a longer time
to process..
Required hardware and software
Operating Systems:Windows® 2000, Windows® XP, Windows
Vista®; Mac OS® X
Browsers:Final release versions of Internet Explorer® 6.0
or above (Windows only); Mozilla Firefox 2.0
or above (Windows and Mac); Safari 3.0 or
above (Mac only)
PDF Reader:Acrobat® or similar software may be required
to view and print PDF files
Screen Resolution:800 x 600 minimum
801 E Clemensen
Ave02/23/23
Enabled Security Settings: Allow per session cookies
** These minimum requirements are subject to change. If these requirements change, you will be
asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and
browsers are not supported.
Acknowledging your access and consent to receive materials electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please verify that you were
able to read this electronic disclosure and that you also were able to print on paper or
electronically save this page for your future reference and access or that you were able to e-mail
this disclosure and consent to an address where you will be able to print on paper or save it for
your future reference and access. Further, if you consent to receiving notices and disclosures
exclusively in electronic format on the terms and conditions described above, please let us know
by clicking the I agree button below.
By checking the I agree box, I confirm that:
I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and
I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
Until or unless I notify Green Solar Technologies as described above, I consent to receive
from exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to me by Green Solar Technologies during the course of my relationship with
you.
801 E Clemensen
Ave02/23/23
801 E. Clemensen Ave
SANTA ANA, CA 92705
Jan 10, 2023
To whom it may concern,
I, Jose Lopez, residing at 801 E.Clemensen Ave. Santa Ana CA 92705 allows
Green Home Systems to install solar panels on my home.
Sincerely,
Jose Lopez
DocuSign Envelope ID: 9FD6E2C3-8219-4D3F-B752-D5762B3A5043
1/11/2023
801 E Clemensen
Ave02/23/23
DocuSign Envelope ID: 9FD6E2C3-8219-4D3F-B752-D5762B3A5043
801 E Clemensen
Ave02/23/23
9-23
BLDG # 101113663 ISS. 2/10/2023
ELEC # 20178580 ISS. 02/13/2023
The scope of the plans is for the installation of the solar photovoltaic system only and
the approval is subject to compliance with all applicable city and state codes and
regulations regarding construction. The approval of the plans does not constitute any
certification of the accuracy, completeness, or building permit status of the existing
buildings and structures as shown.
801 E Clemensen
Ave02/23/23
9-23
801 E Clemensen
Ave02/23/23
9-23
801 E Clemensen
Ave02/23/23
JO
S
E
L
O
P
E
Z
R
E
S
I
D
E
N
C
E
80
1
E
C
L
E
M
E
N
S
E
N
A
V
E
,
SA
N
T
A
A
N
A
,
C
A
9
2
7
0
5
Project Name &
Address
Sheet Size
Sheet Number
ANSI B
11" X 17"
E 1.2
Sheet Name
DRAWN BY
AP
N
:
3
9
6
4
1
1
1
4
NOTES
SITE NOTES:
1. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA
REGULATIONS.
2. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A
UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES.
3. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL,
OR BUILDING ROOF VENTS.
4. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED
ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26.
5. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN
ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S
INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE
BUILDING OR STRUCTURE.
EQUIPMENT LOCATIONS:
1. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26.
2. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED
OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLES
310.15 (B)(2)(A) AND 310.15 (B)(3)(C).
3. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES
ACCORDING TO NEC 690.34.
4. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT
WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 2.2.6 ALL EQUIPMENT SHALL BE
INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC
APPLICABLE CODES.
5. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR
USAGE WHEN APPROPRIATE.
STRUCTURAL NOTES:
1. RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO
CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED
SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE
BEYOND EITHER EDGE OF THE ARRAY/SUB ARRAY, ACCORDING TO RAI
MANUFACTURER’S INSTRUCTIONS.
2. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF
ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL
REQUIREMENTS.
3. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED W/
APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR.
4. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE
SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 2.3.6 WHEN
POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED
AMONGST THE ROOF FRAMING MEMBERS.
WIRING & CONDUIT NOTES:
1. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE.
CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE
REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING.
2. CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7.
3. VOLTAGE DROP LIMITED TO 1.5%.
4. DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING
SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE
WIRING CLIPS.
5. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK
PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3-
BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY
IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO
BE MARKED ORANGE [NEC 110.15].
GROUNDING NOTES:
1. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND
GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH
USE.
2. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM
NEC TABLE 250.122.
3. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES
CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A).
4. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC
690.45 AND MICROINVERTER MANUFACTORERS’ INSTRUCTIONS.
5. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN
MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE
NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED
GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION
REQUIREMENTS.
6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT
THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO
ANOTHER MODULE.
7. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED
GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119]
8. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50
THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A
GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47
AND AHJ.
9. GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.41(B)(1) AND (2) TO
REDUCE FIRE HAZARDS
DISCONNECTION AND OVER-CURRENT PROTECTION NOTES:
1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS
OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE
TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS).
2. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE
LOCKABLE, AND BE A VISIBLE-BREAK SWITCH
3. PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID
SHUTDOWN FUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY
RESPONDERS IN ACCORDANCE WITH 690.12(A) THROUGH (D).
4. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND
240.
5. MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED
FUSES IN ACCORDANCE WITH NEC 110.3(B).
6. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION
ACCORDING TO NEC 690.11 AND UL1699B.
INTERCONNECTION NOTES:
1. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 705.12 (B)]
2. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS OUTPUT MAY NOT
EXCEED 120% OF BUSBAR RATING [NEC 705.12(D)(2)(3)].
3. THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT
AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL
NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR, PV DEDICATED
BACKFEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE
UTILITY SOURCE OCPD [NEC 705.12(B)(2)(3)].
4. AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL
RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF
BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED
ACCORDING TO NEC 705.12 (B)(2)(3)(C).
5. FEEDER TAP INTERCONECTION (LOADSIDE) ACCORDING TO NEC 705.12 (B)(2)(1)
6. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH
SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42
2.7.8BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT
FROM ADDITIONAL FASTENING [NEC 705.12 (B)(5)].
801 E Clemensen
Ave02/23/23
801 E Clemensen
Ave02/23/23
801 E Clemensen
Ave02/23/23
801 E Clemensen
Ave02/23/23
801 E Clemensen
Ave02/23/23
801 E Clemensen
Ave02/23/23
801 E Clemensen
Ave02/23/23
Expedited Permit Process for PV Systems - Micro-Inverter1
Expedited Permit Process for PV Systems
Micro-Inverter
The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due to their similarity with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of the
installation.
The following pages contain forms for the Micro-Inverter to use with the Expedited Per-
mit Process. The Standard String, AC Module, and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic-
tions that have adopted the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submitted in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
801 E Clemensen
Ave02/23/23
Expedited Permit Process for PV Systems Micro-Inverter2
Expedited Permit Process for Small-Scale PV Systems
Micro-Inverter
The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations
are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been
suggested to provide as a path to permit approval.
Required Information for Permit:
1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it
should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings
with a 3 perimeter space at ridge and sides may not need separate fire service review.
2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specification sheets and installation manuals (if available) for all manufactured components including, but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1: Structural Review of PV Array Mounting System
Is the array to be mounted on a defined, permitted roof structure? l Yes l No
If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1.
Roof Information:
1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc )__________________________
____________________________________________________________________________________________________
If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc ).
2. Does the roof have a single roof covering? l Yes l No
If No, submit completed worksheet for roof structure WKS1.
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________
Mounting System Information:
1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18 gap
beneath the module frames? l Yes l No
If No, provide details of structural attachment certified by a design professional.
2. For manufactured mounting systems, fill out information on the mounting system below:
a. Mounting System Manufacturer ___________Product Name and Model#________________________________
b. Total Weight of PV Modules and Rails ___________lbs
c. Total Number of Attachment Points____________
d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1)
e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for
maximum spacing allowed based on maximum design wind speed)
f. Total Surface Area of PV Modules (square feet)_________________ ft2
g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2
If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1.
Step 2: Electrical Review of PV System (Calculations for Electrical Diagram)
In order for a PV system to be considered for an expedited permit process, the following must apply:
1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,440 Watts or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)).
5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV
system. Interactive PDF diagrams are available at www.solarabcs.org/permitting.
Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant
understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively
communicate, provide an alternative diagram with appropriate detail.
801 E Clemensen
Ave02/23/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
MICRO-INVERTER SITE PLAN
Contractor Name,
Address and Phone:Site Plan
for Small-Scale, Single-Phase PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
SCALE NTS Date: SHEET
Drawn By:
Checked By:
ADAM MENDOZA
2203 FREEMAN ST, SANTA ANA, CA 92706
8.410 KW AC
801 E Clemensen
Ave02/23/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
4
MICRO-INVERTER ELECTRICAL DIAGRAM
Contractor Name,
Address and Phone:One-Line Standard Electrical Diagram
for Micro-Inverter PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
SCALE NTS Date: SHEET
Drawn By:
Checked By:
DESCRIPTION OR CONDUCTOR TYPE
USE-2 or PV WIRE
GEC EGC X ALL THAT APPLY
EXTERIOR CABLE LISTED W/ INV.
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
NO DC GEC IF 690.35 SYSTEM
THWN-2 or XHHW-2 or RHW-2
GEC EGC X ALL THAT APPLY
TAG
1
2
3
4
5
CONDUIT AND CONDUCTOR SCHEDULE
COND.
GAUGE
#10
NUMBER OF
CONDUCTORS
6
CONDUIT
TYPE
EMT
CONDUIT
SIZE
3/4"
DESCRIPTION
PV DC or AC MODULE
DC/AC INVERTER (MICRO)
J-BOX (IF USED)
PV ARRAY
AC COMB. PANEL (IF USED)
GEN METER (IF USED)
AC DISCONNECT (IF USED)
SERVICE PANEL
TAG
1
2
3
4
5
6
7
8
PART NUMBER NOTES
FOR UNUSED MODULES
PUT "N/A” in BLANK ABOVE
1
1 3
2
3
EQUIPMENT SCHEDULE
2
_____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
MOD
____
DC
AC
J-BOX
4
AC DISCO
M
BUILDING
GROUNDING
ELECTRODE
G
M
UTILITY
SERVICE
MAIN SERVICE PANEL
MAIN
OCPD
INVERTER
OCPD
6
7
8
5
4
5
G
SEE GUIDE APPENDIX D FOR
INFORMATION ON MODULE AND
ARRAY GROUNDING
AC COMBINER
PANEL
G
____
MICRO-INVERTERS
IN BRANCH-
CIRCUIT
29
29
1
3
1
0
1
1
CANADIAN SOLAR CS3N-400MS 400W
JUNCTION BOX 600V, NEMA 4 UL LISTED
COMBINER PANEL ENPHSE IQ COMBINER 4 (X-IQ-AM1-240-4)
LOCABLE BLADE TYPE NON-FUSIBLE AC DISCONNECT NEMA 3R 60A-2P 120/240VAC
225A MAIN SERVICE PANEL WITH 200A MAIN BREAKER
1 2
1 2
14
15
ADAM MENDOZA
2203 FREEMAN ST, SANTA ANA, CA 92706
8.410 KW AC
#6
#10
#10
#8
#8
#6
#8
1
6
6
1
1
3
1
EMT
EMT
EMT
EMT
EMT
EMT
EMT
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
801 E Clemensen
Ave02/23/23
Ex
p
e
d
i
t
e
d
P
e
r
m
i
t
P
r
o
c
e
s
s
f
o
r
P
V
S
y
s
t
e
m
s
5
Contractor Name,
Address and Phone:
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
Site Name:
Site Address:
System AC Size:
SIZE FSCM NO DWG NO REV
SCALE NTS Date: SHEET
Drawn By:
Checked By:
MAX POWER-POINT CURRENT (IMP)
MAX POWER-POINT VOLTAGE (VMP)
OPEN-CIRCUIT VOLTAGE (VOC)
SHORT-CIRCUIT CURRENT (ISC)
MAX SERIES FUSE (OCPD)
MAXIMUM POWER (PMAX)
MAX VOLTAGE (TYP 600VDC)
VOC TEMP COEFF (mV/oC or %/oC )
IF COEFF SUPPLIED, CIRCLE UNITS
MODULE MAKE
MODULE MODEL
PV MODULE RATINGS @ STC (Guide Section 5)
MAX DC VOLT RATING
MAX POWER @ 40oC
NOMINAL AC VOLTAGE
MAX AC CURRENT
MAX OCPD RATING
INVERTER MAKE
INVERTER MODEL
INVERTER RATINGS (Guide Section 4)
1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YES NO N/A
2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE
REQUIREMENT? YES NO N/A
3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX
CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING. (See Guide Section 9)
5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO-
INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR
EXCEPTION IN 690.64(B)(2)(a)? YES NO
NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9):
1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC
2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC
2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED
47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1oC). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT
LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47oC OR LESS (ALL OF UNITED STATES),
a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER
FUSE.
b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER
FUSE.
NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E):
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODE® REFERENCES
SHOWN AS (NEC 7085.12 (B)(2)(3)(b))
NOTES FOR ALL DRAWINGS:
SIGNS-SEE GUIDE SECTION 7
SIGN FOR DC DISCONNECT
SIGN FOR INVERTER OCPD AND AC
DISCONNECT (IF USED)
No sign necessary since 690.51
marking on PV module covers
needed information
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
SOLAR PV SYSTEM
AC POINT OF CONNECTION
THIS PANEL FED BY MULTIPLE
SOURCES (UTILITY AND SOLAR)
NOTES FOR MICRO-INVERTER ELECTRICAL DIAGRAM
ADAM MENDOZA
2203 FREEMAN ST, SANTA ANA, CA 92706
8.410 KW AC
CANADIAN SOLAR
CS3N-400MS 400W
10.76 AMPS
37.2 VOLTS
44.5 VOLTS
11.50 AMPS
20 AMPS
400 WATT
1500 VOLTS
-0.26 %/°C
ENPHASE IQ 8 SERIES
ENPHASE IQ 8PLUS-72-2-US
60 VOLTS
60 VOLTS
235 WATTS
1.21 AMPS
20 AMPS
35.09A
240 V
801 E Clemensen
Ave02/23/23
801 E Clemensen
Ave02/23/23
Rev: 7/15/2021
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
SOL-01 CBC 2019
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1. Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2. Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3. Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4. Will the PV system weigh maximum 4 pounds per square feet or less?
5. Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6. Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7. Will the PV system be installed without using any ballast system or counter-weight
system?
8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10. Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Phone Number: Date:
Email Address:
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
801 E Clemensen
Ave02/23/23
Structural Calculations for a Roof Mounted Solar Photovoltaic System for:
Jose Lopez Residence
801 Clemensen Ave.,
Santa Ana, CA 92705
Applicable Codes:
2019 California Building Code, 2019 California Electric Code,
2019 California Mechanical Code, American Society of Civil Engineers
Standard ASCE 7-16 Minimum Design Loads for Buildings and Other
Structures, American Wood Council 2018 National Design Specification
for Wood Construction, Local Municipal Code, and all other codes which
are adopted by reference or enacted by law.
Assumed Design Parameters:
The existing structure has been built under a building permit and is in its
original condition. The existing roof structure is capable of its code
required live load and the ability of the roof structure to support live loads
has not been substantially reduced by the age of the structure, termites or
mold, or unauthorized modifications to the existing structure. Solar Energy
Contractor shall make an inspection of the existing roof framing system
prior to installation of the roof mounted solar energy system to verify that
the existing roof is capable of supporting minimum roof live loads.
Assumed Design Parameters:
All 2x members are grade Douglas Fir #2 or better
All 4X members are grade Douglas Fir #1 or better
All Roof Connectors are Simpson Strong-Tie or Equal
All Concrete Foundations are f'c = 2500 psi or stronger
Original Structure was built to the Type-V Wood Framed Standards
of the Applicable Building Code at the time of Construction.
Sht # 1 of 7
2021-323 Better Earth Paulina Aviles Residence Date: January 29, 2021
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
801 E Clemensen
Ave02/23/23
Sht # 2 of 7
Note to Building Official:
Based upon a review of the proposed plans and information, the
existing roof framing system is capable of safely supporting the additional
loads caused by the new solar photovoltaic energy system. The contractor
shall field verify that the existing roof structure is in its original permited
condition and verify that it can support the normal code required roof live
loads. Attached in this package are several calculations showing that the roof
members can support the additional weight of the solar array.
Furthermore, an analysis of the solar array's support for wind forces and a
seismic analysis of the existing structure are also included.
W DL + LL
R1 R2
7.8'
Total load on rafter = 60 plf x 7.8 ft. = 468 lbs
w = 30 psf x 2 ft. = 60 plf
Check Existing 2x4 Roof Rafter @ 24" O.C.: *
*Note: Contractor to Field Verify Framing
2017-3974 Solar Outsource 20347 Umbria Way Residence Date: October 12, 20172018-1482 Solar Outsource David Asuncion Residence Date: May 17, 20182018-2634 Solar Outsource Bryan George Residence Date: September 5, 20182018-2831 Solar Outsource Dr Farhad Partovi Residence Date: September 18, 20182018-3263 Solar Outsource Jeff Larson Residence Date: October 25, 2018
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-3263 Solar Outsource Jeff Larson Residence Date: December 20, 2018
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2019-1295 Solar Outsource Raul Tadle Residence Date: May 1, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1710 Solar Outsource William Martin Residence Date: June 4, 20192019-1864 Solar Outsource Yvan Ayaay Residence Date: June 17, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 21, 20192019-2437 Solar Outsource Reisha & Ralph Navarro Residence Date: August 1, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 9, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 23, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: January 5, 20202019-2841 Solar Outsource Thomas Lucas Residence Date: January 7, 20202020-188 Solar Outsource Bubno Residence Date: January 24, 2020 2020-182 Precis Solar Harris Residence Date: January 24, 20202020-182 Precis Solar Harris Residence Date: January 24, 20202020-183 Precis Solar Schutz Residence Date: January 24, 2020 2020-298 Precis Solar Cynthia Martin Narine Residence Date: February 5, 20202020-398 Precis Solar Mark Anderson Residence Date: February 14, 20202020-398 Precis Solar Mark Anderson Residence Date: March 11, 2020 2020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-714 Solar Deployed Gloria Lifschutz Residence Date: March 19, 20202020-729 Solar Deployed Scott McLeod Residence Date: March 24, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 6, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: June 29, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: August 13, 20202020-1988 Solar Deployed Ryan Mock Residence Date: August 29, 20202020-2065 Solar Deployed Russell Wong Residence Date: September 5, 20202020-2248 Solar Deployed Jim Keokanock Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: October 9, 20202020-2744 Solar Deployed Ronald Gomez Residence Date: October 20, 20202020-2871 Solar Deployed Gary Mather Residence Date: October 28, 20202020-3060 Solar Deployed Bob Wielenga Residence Date: November 6, 20202020-3136 Solar Deployed Riad Abdelkarim Residence Date: November 11, 20202020-3340 Solar Deployed Jasmin Lu Residence Date: November 20, 20202020-3458 Solar Deployed Lorenz Siongco Residence Date: November 30, 20202020-3568 Solar Deployed Michael Alcaraz Residence Date: December 6, 20202020-3680 Solar Deployed Josh Dale Residence Date: December 14, 20202020- 3692 Solar Deployed David Robinson Residence Date: December 14, 20202021-115 Better Earth John Burns Residence Date: January 13, 20212021-157 Better Earth Kerrie Mayer Residence Date: January 15, 20212021-157 Better Earth Maria Villasenor Date: January 17, 20212021-180 Better Earth Maria Villasenor Date: January 17, 20212021-268 Better Earth Felipe Garnica Residence Date: January 23, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-329 Better Earth Jesus Zuniga Residence Date: January 29, 2021 2021-506 Better Earth Sherrell Draves Residence Date: February 13, 20212021-568 Better Earth Jerry Ernst Residence Date: February 18, 20212021-757 Better Earth Martha Hondoy Residence Date: March 05, 20212021-865 Better Earth Mike Prenovost Residence Date: March 16, 2021 2021-867 Better Earth Nelson Smith Residence Date: March 16, 2021 2021-991 Better Earth Antonio Alba Residence Date: March 26, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1122 Better Earth Mohammad Javad Haji Tehrani Residence Date: April 06, 20212021-1232 Silverline Luz Rodriguez Residence Date: April 14, 20212021-2382 Clean Tech Energy Peter Schueller Residence Date: June 24, 2021
( Assume max rafter span = 7.8 ft. )
2021-2884 CAD Cali Joshua Melendez Residence Date: July 22, 20212021-2969 CAD Cali Jordan Nelson Residence Date: July 28, 20212022-273 Guasti Construction Hector Ramos Residence Date: January 25, 20222022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022
801 E Clemensen
Ave02/23/23
Check Existing 2x4 Roof Rafter @ 24" O.C.:
2017-3974 Solar Outsource 20347 Umbria Way Residence Date: October 12, 20172018-1482 Solar Outsource David Asuncion Residence Date: May 17, 20182018-2634 Solar Outsource Bryan George Residence Date: September 5, 20182018-2831 Solar Outsource Dr Farhad Partovi Residence Date: September 18, 20182018-3263 Solar Outsource Jeff Larson Residence Date: October 25, 2018
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-3263 Solar Outsource Jeff Larson Residence Date: December 20, 20182019-1295 Solar Outsource Raul Tadle Residence Date: May 1, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1710 Solar Outsource William Martin Residence Date: June 4, 20192019-1864 Solar Outsource Yvan Ayaay Residence Date: June 17, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 21, 20192019-2437 Solar Outsource Reisha & Ralph Navarro Residence Date: August 1, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 9, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 23, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: January 5, 20202019-2841 Solar Outsource Thomas Lucas Residence Date: January 7, 20202020-188 Solar Outsource Bubno Residence Date: January 24, 2020 2020-182 Precis Solar Harris Residence Date: January 24, 20202020-182 Precis Solar Harris Residence Date: January 24, 20202020-183 Precis Solar Schutz Residence Date: January 24, 2020 2020-298 Precis Solar Cynthia Martin Narine Residence Date: February 5, 20202020-398 Precis Solar Mark Anderson Residence Date: February 14, 20202020-398 Precis Solar Mark Anderson Residence Date: March 11, 2020 2020-699 Precis Solar Matthew Clark Residence Date: March 17, 2020
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
Check attachment of Support to Existing Structure for Wind Uplift
CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7- 16 WIND LOADS ON BUILDING
APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK
ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2.
NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7- 16 EFFECTIVE WIND AREA:
"FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS
EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING
CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT
BE LESS THAN ONE-THIRD ITS LENGTH."
EFFECTIVE AREA = 15 SQ FT
2020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-714 Solar Deployed Gloria Lifschutz Residence Date: March 19, 20202020-729 Solar Deployed Scott McLeod Residence Date: March 24, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 6, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: June 29, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: August 13, 20202020-1988 Solar Deployed Ryan Mock Residence Date: August 29, 20202020-2065 Solar Deployed Russell Wong Residence Date: September 5, 2020 2020-2248 Solar Deployed Jim Keokanock Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: September 18, 20202020-2245 Solar Deployed Jonathan Sepulveda Residence Date: October 9, 20202020-2744 Solar Deployed Ronald Gomez Residence Date: October 20, 20202020-2871 Solar Deployed Gary Mather Residence Date: October 28, 20202020-3060 Solar Deployed Bob Wielenga Residence Date: November 6, 20202020-3136 Solar Deployed Riad Abdelkarim Residence Date: November 11, 20202020-3340 Solar Deployed Jasmin Lu Residence Date: November 20, 20202020-3458 Solar Deployed Lorenz Siongco Residence Date: November 30, 20202020-3568 Solar Deployed Michael Alcaraz Residence Date: December 6, 20202020-3680 Solar Deployed Josh Dale Residence Date: December 14, 20202020- 3692 Solar Deployed David Robinson Residence Date: December 14, 20202021-115 Better Earth John Burns Residence Date: January 13, 2021
w DL + LL = 30 psf x 2 ft. = 60 plf
Total load on rafter = 60 plf x 2.5 ft. + 28 plf x 5.3 ft. + ( 4' x 2.75' x 3 psf x 2 )
= 364 lbs < 468 lbs OK
R1 R2
7.8'
w LLw DL
2021-157 Better Earth Kerrie Mayer Residence Date: January 15, 20212021-157 Better Earth Maria Villasenor Date: January 17, 20212021-180 Better Earth Maria Villasenor Date: January 17, 20212021-268 Better Earth Felipe Garnica Residence Date: January 23, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-329 Better Earth Jesus Zuniga Residence Date: January 29, 2021 2021-506 Better Earth Sherrell Draves Residence Date: February 13, 20212021-568 Better Earth Jerry Ernst Residence Date: February 18, 20212021-757 Better Earth Martha Hondoy Residence Date: March 05, 2021
2.5'5.3'
2021-865 Better Earth Mike Prenovost Residence Date: March 16, 2021 2021-867 Better Earth Nelson Smith Residence Date: March 16, 20212021-991 Better Earth Antonio Alba Residence Date: March 26, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
Sht # 3 of 7
2021-1122 Better Earth Mohammad Javad Haji Tehrani Residence Date: April 06, 20212021-1232 Silverline Luz Rodriguez Residence Date: April 14, 2021
P
2021-2382 Clean Tech Energy Peter Schueller Residence Date: June 24, 20212021-2884 CAD Cali Joshua Melendez Residence Date: July 22, 20212021-2969 CAD Cali Jordan Nelson Residence Date: July 28, 20212022-273 Guasti Construction Hector Ramos Residence Date: January 25, 20222022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022
P
801 E Clemensen
Ave02/23/23
Sht # 4 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 2020 2020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 2020 2020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 2020 2020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 2020 2020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 2020 2020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 20202020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 2021
qh
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
Tributary Area to Each Solar Mount = 4 ft. x 2.75 ft. = 11 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C):
Eq'n 29.4- 7 ASCE 7- 16
Kz = velocity pressure coefficient
p =qh ðGCp ÞðγEÞðγa Þð
=0.00256 Kz Kzt Kd Ke V2
Note:
Section 29.10.1 ASCE 7- 16
Kz = 0.9 (Exposure C, Height = 20 ft or less)
Kzt = Topographical Factor = 1.0
Kd = Wind Directionality Factor = 0.85
Ke = Ground Elevation Factor = 1.0
V = 130 mph ; VASB = 101 mph Table 1609.3.1 2019 CBC
qh =0.00256 (0.9) (1.0) (0.85) (1.0) (101)2
p =qh ðGCp ÞðγEÞðγa Þð
qh =20 psf
p = 20 psf (- 2.0) (1.5) (0.7) = 42 psf
Eq'n 26.10- 1 ASCE 7- 16
GCp = - 2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
GC p = Exposure Factor = 1.5ðγE
GCp = Solar Array Pressure Equalization Factor = 0.7 ðγa Fig. 29.4- 8 ASCE 7- 16
Design (Factored) Uplift at each support = 0.6 x 462 lbs = 277 lbs
Nominal (Unfactored) Uplift at each support = 42 psf x 11 sq. ft. = 462 lbs
Note: Section 2.4.1 of ASCE 7- 16, Basic Load Combinations for Allowable Stress
Load per lag screw = 277 lbs / 1 = 277 lbs
Design. Note: Applicable Load Combination #5 (D + 0.6W)
2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 20212021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 2021 2021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-329 Better Earth Jesus Zuniga Residence Date: January 29, 20212021-506 Better Earth Sherrell Draves Residence Date: February 13, 20212021-568 Better Earth Jerry Ernst Residence Date: February 18, 20212021-757 Better Earth Martha Hondoy Residence Date: March 05, 20212021-865 Better Earth Mike Prenovost Residence Date: March 16, 20212021-867 Better Earth Nelson Smith Residence Date: March 16, 20212021-991 Better Earth Antonio Alba Residence Date: March 26, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1122 Better Earth Mohammad Javad Haji Tehrani Residence Date: April 06, 2021 2021-1232 Silverline Luz Rodriguez Residence Date: April 14, 20212021-2382 Clean Tech Energy Peter Schueller Residence Date: June 24, 20212021-2884 CAD Cali Joshua Melendez Residence Date: July 22, 20212021-2969 CAD Cali Jordan Nelson Residence Date: July 28, 20212022-273 Guasti Construction Hector Ramos Residence Date: January 25, 20222022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022
801 E Clemensen
Ave02/23/23
Sht # 5 of 7
2017-3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 20182018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192018-3831 ESD 18-795 Pacheco Residence Date: January 23, 20192019-292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019-489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019-2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019-3009 Axis Solar Design Applebaum Date: September 11, 20192019-3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020-053 Axis Solar Ryerson Residence Date: November 9, 20192020-126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020-131 Axis Solar Law Residence Date: January 16, 20202020-268 Axis Solar Yragui - Ecoforce Residence Date: January 31, 20202020-279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020-450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020-473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020-602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020-640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-678 ESD 20-119 Barile Residence Date: March 16, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-780 ESD 20-136 Gutierrez Residence Date: April 1, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-844 ESD 20-164 Azim Residence Date: April 14, 20202020-1052 ESD 20-206 Sarkissian Residence Date: May 15, 20202020-1088 ESD 20-216 Yocum Residence Date: May 22, 20202020-1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020-1102 Papke Designs Olvera Residence Date: May 27, 20202020-1100 HPM Solar Oscar Residence Date: May 27, 20202020-1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020-1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020-1286 ilum Solar David Harski Residence Date: June 18, 20202020-1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020-1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020-1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1626 ilum Solar Josh Tobar-Hanavan Residence Date: July 25, 20202020-1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020-1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020-1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020-1696 ACS Workman Residence Date: August 3, 20202020-1694 ACS Sing Residence Date: August 3, 20202020-1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020-1689 New Power Joel Garcia Residence Date: August 3, 20202020-1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020-1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020-1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020-1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020-1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020-1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020-1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020-1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020-2114 ilum Solar Mike Rich Residence Date: September 10, 2020 2020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 2020
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below
according to the 2018 NDS.
W ' = W x Cd x Ct Table 10.3.1 2018 NDS
where:
W = 266 lbs / in. of embedment per Table 12.2a
Cd = 1.6 per Table 2.3.2 of 2018 NDS
Ct = 1.0 per Table 10.3.4 of 2018 NDS
W ' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 277 lbs OK
Use Support connected to 2x Min. Roof Member
w/ (1) 5/16" x 3" lag screws per connection minimum.
2020-2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020-2434 Mohr Power Thurin Residence Date: October 1, 2020 2020-2450 ESD 20-579 Sanchez Residence Date: October 2, 20202020-2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020-2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020-2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020-2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020-2495 Penguin Solar German Rios Residence Date: October 6, 20202020-2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020-2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020-2507 ESD 20-593 So Residence Date: October 7, 20202020-2515 Penguin Solar Black Annette Residence Date: October 7, 20202020-2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020-2525 New Power William Fuller Residence Date: October 8, 20202020-2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020-2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020-2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020-2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020-2591 ESD 20-590 Supulveda Residence Date: October 13, 2020 2020-2603 New Power John Yager Residence Date: October 14, 20202020-2603 New Power William Fuller Residence Date: October 14, 20202020-2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020-2652 Axis Solar Marcus Residence Date: October 15, 20202020-2652 Axis Solar Freimanis Residence Date: October 15, 20202020-2674 Complete Solar Dorado Residence Date: October 16, 20202020-2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020-2694 ESD 20-648 Barrera Residence Date: October 17, 2020 2020-2836 Penguin Solar Kalup Residence Date: October 26, 20202020-2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 2020 2020-2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020-2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020-2861 New Power Susan Bakken Residence Date: October 27, 20202020-2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020-2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020-2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020-2853 TG Roofing Brown Robert Residence Date: October 27, 20202020-2875 Trinity Power John Mendel Residence Date: October 28, 20202020-2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020-2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020-2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 2020 2020-2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020-2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020-2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020-2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020-2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020-2915 Complete Solar Ojeda Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Walker Residence Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon Services Date: October 29, 20202020-2936 ESD 20-614 2892 Falcon - Walker Date: October 29, 2020 2020-2940 Axis Solar Shook Date: October 30, 20202020-2963 Axis Solar Luke Ding Residence Date: October 31, 20202020-2959 Penguin Solar Stevens Residence Date: October 31, 20202020-2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020-2939 Mohr Power Pappillion Residence Date: October 31, 20202020-2983 Infinity Solar Gernazio Residence Date: November 3, 2020 2020-2982 Infinity Solar Luna Residence Date: November 3, 2020 2020-3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020-3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020-3062 UniverCity Solar Mantri Residence Date: November 6, 2020 2020-3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020-3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 2020 2020-3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020-3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020-3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020-3052 ESD 20-747 Perez Residence Date: November 6, 2020 2020-3065 HPM Solar Torres Residence Date: November 6, 2020 2020-3085 20-729 Green Residence Date: November 8, 2020 2020-3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020-3076 V's Solar Alberto Valadez Residence Date: November 8, 2020 2020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 2020 2020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 2020 2020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 20202020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3567 Infinity Solar Wittenberg Residence Date: December 6, 2020 2020-3566 TG Roofing Morff Craig Residence Date: December 6, 20202020-3566 TG Roofing Craig Morff Residence Date: December 6, 20202020-3686 Bratton Solar Love Residence Date: December 14, 2020 2020-3682 New Power Shawn Johnson Date: December 14, 2020 2020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020- 3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 20202021-056 Solar Deployed Daphne Phung Residence Date: January 8, 2021
Note: Zone 2
2021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021-147 Better Earth Paul Garcia Residence Date: January 14, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2021-154 Better Earth Marcos Ramirez Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 15, 20212021-182 Better Earth Carlos Boozer Residence Date: January 17, 2021 2021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-329 Better Earth Jesus Zuniga Residence Date: January 29, 20212021-506 Better Earth Sherrell Draves Residence Date: February 13, 20212021-568 Better Earth Jerry Ernst Residence Date: February 18, 20212021-757 Better Earth Martha Hondoy Residence Date: March 05, 20212021-865 Better Earth Mike Prenovost Residence Date: March 16, 20212021-867 Better Earth Nelson Smith Residence Date: March 16, 20212021-991 Better Earth Antonio Alba Residence Date: March 26, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1122 Better Earth Mohammad Javad Haji Tehrani Residence Date: April 06, 2021 2021-1232 Silverline Luz Rodriguez Residence Date: April 14, 20212021-2382 Clean Tech Energy Peter Schueller Residence Date: June 24, 20212021-2884 CAD Cali Joshua Melendez Residence Date: July 22, 20212021-2969 CAD Cali Jordan Nelson Residence Date: July 28, 20212022-273 Guasti Construction Hector Ramos Residence Date: January 25, 20222022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022
801 E Clemensen
Ave02/23/23
Check Seismic load due to added dead load of photovoltaic system.
Determine Seismic Weight of Existing Building:
Effective Existing Seismic Weight
Area of (E) Building = Approximately 1,900 Sq. ft.
Approximate
Effective
Seismic Weight
= 1,900 sq. ft. x 30 psf ave. = 57,000 LBS
DETERMINE BASE SHEAR
V = Cs W EQ'N 12.8-1 ASCE 7-16
Cs =
SDS
R
Ie
EQ'N 12.8-2 ASCE 7-16
R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1
R = 6.5 WOOD SHEAR WALLS
Ie = 1.0 IMPORTANCE FACTOR
SDS =
2/3 x SMS EQ'N 11.4-3 ASCE 7-16
SMS =
FA x SS EQ'N 11.4-1 ASCE 7-16
SMS =
1.2 x 1.5 = 1.8
SDS =2/3 x 1.8 = 1.2
Cs =
1.2
6.5
1
= 0.185 EQ'N 12.8-2 ASCE 7-16
Sht # 6 of 7
2017-3974 Solar Outsource 20347 Umbria Way Residence Date: October 12, 20172018-1482 Solar Outsource David Asuncion Residence Date: May 17, 20182018-2634 Solar Outsource Bryan George Residence Date: September 5, 20182018-2831 Solar Outsource Dr Farhad Partovi Residence Date: September 18, 20182018-3263 Solar Outsource Jeff Larson Residence Date: October 25, 2018
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-3263 Solar Outsource Jeff Larson Residence Date: December 20, 2018
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2019-1295 Solar Outsource Raul Tadle Residence Date: May 1, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1710 Solar Outsource William Martin Residence Date: June 4, 20192019-1864 Solar Outsource Yvan Ayaay Residence Date: June 17, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 21, 20192019-2437 Solar Outsource Reisha & Ralph Navarro Residence Date: August 1, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 9, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 23, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: January 5, 20202019-2841 Solar Outsource Thomas Lucas Residence Date: January 7, 20202020-188 Solar Outsource Bubno Residence Date: January 24, 2020 2020-182 Precis Solar Harris Residence Date: January 24, 20202020-182 Precis Solar Harris Residence Date: January 24, 20202020-183 Precis Solar Schutz Residence Date: January 24, 2020 2020-298 Precis Solar Cynthia Martin Narine Residence Date: February 5, 20202020-398 Precis Solar Mark Anderson Residence Date: February 14, 20202020-398 Precis Solar Mark Anderson Residence Date: March 11, 2020 2020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-714 Solar Deployed Gloria Lifschutz Residence Date: March 19, 20202020-729 Solar Deployed Scott McLeod Residence Date: March 24, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 6, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: June 29, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: August 13, 20202020-1988 Solar Deployed Ryan Mock Residence Date: August 29, 20202020-2065 Solar Deployed Russell Wong Residence Date: September 5, 20202020-2248 Solar Deployed Jim Keokanock Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: October 9, 20202020-2744 Solar Deployed Ronald Gomez Residence Date: October 20, 20202020-2871 Solar Deployed Gary Mather Residence Date: October 28, 20202020-3060 Solar Deployed Bob Wielenga Residence Date: November 6, 20202020-3136 Solar Deployed Riad Abdelkarim Residence Date: November 11, 20202020-3340 Solar Deployed Jasmin Lu Residence Date: November 20, 20202020-3458 Solar Deployed Lorenz Siongco Residence Date: November 30, 20202020-3568 Solar Deployed Michael Alcaraz Residence Date: December 6, 20202020-3680 Solar Deployed Josh Dale Residence Date: December 14, 20202020- 3692 Solar Deployed David Robinson Residence Date: December 14, 20202021-115 Better Earth John Burns Residence Date: January 13, 20212021-157 Better Earth Kerrie Mayer Residence Date: January 15, 20212021-157 Better Earth Maria Villasenor Date: January 17, 20212021-180 Better Earth Maria Villasenor Date: January 17, 20212021-268 Better Earth Felipe Garnica Residence Date: January 23, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-329 Better Earth Jesus Zuniga Residence Date: January 29, 2021 2021-506 Better Earth Sherrell Draves Residence Date: February 13, 20212021-568 Better Earth Jerry Ernst Residence Date: February 18, 20212021-757 Better Earth Martha Hondoy Residence Date: March 05, 20212021-865 Better Earth Mike Prenovost Residence Date: March 16, 2021 2021-867 Better Earth Nelson Smith Residence Date: March 16, 2021 2021-991 Better Earth Antonio Alba Residence Date: March 26, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1122 Better Earth Mohammad Javad Haji Tehrani Residence Date: April 06, 20212021-1232 Silverline Luz Rodriguez Residence Date: April 14, 20212021-2382 Clean Tech Energy Peter Schueller Residence Date: June 24, 20212021-2884 CAD Cali Joshua Melendez Residence Date: July 22, 20212021-2969 CAD Cali Jordan Nelson Residence Date: July 28, 20212022-273 Guasti Construction Hector Ramos Residence Date: January 25, 20222022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022
801 E Clemensen
Ave02/23/23
V = 0.185 x 57,000 LBS = 10,545 LBS EQ'N 12.8-1 ASCE 7-16
DETERMINE NEW BASE SHEAR
EXISTING BASE SHEAR
Determine Seismic Weight of Building with Solar Array:
EXISTING
SEISMIC
WEIGHT
= 57,000 LBS
NEW SOLAR
ARRAY = 3 PSF x 13 PANELS x 3.3' x 5.5' = 708 LBS
NEW
SEISMIC
WEIGHT
= 57,000 LBS + 708 LBS = 57,708 LBS
THEREFORE NEW BASE SHEAR:
V = 0.185 x 57,708 = 10,676 LBS EQ'N 12.8-1 ASCE 7-10
% CHANGE =10,676 LBS - 10,545 LBS
10,545 LBS x 100 = 1.2 % < 10% OK
OK. PER ASCE 7-16 SECTION 11.B.3 ALTERATIONS
EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT
FROM ANALYSIS SINCE NEW SEISMIC FORCE IS
LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE.
"Alterations are permitted to be made to any structure without requiring the
existing structure to comply with this standard provided the alterations comply
with the requirements for a new structure. Alterations that increase the
seismic force in any existing structural element by more than 10 percent or
decrease the design strength of any existing structural element to resist
seismic forces by more than 10 percent shall not be permitted unless the
entire seismic force-resisting system is determined to comply with this
standard for a new structure."
End of Calculations
Sht # 7 of 7
2017-3974 Solar Outsource 20347 Umbria Way Residence Date: October 12, 20172018-1482 Solar Outsource David Asuncion Residence Date: May 17, 20182018-2634 Solar Outsource Bryan George Residence Date: September 5, 20182018-2831 Solar Outsource Dr Farhad Partovi Residence Date: September 18, 20182018-3263 Solar Outsource Jeff Larson Residence Date: October 25, 2018
9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-3263 Solar Outsource Jeff Larson Residence Date: December 20, 2018
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-21
2019-1295 Solar Outsource Raul Tadle Residence Date: May 1, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1595 Solar Outsource Andrew Smith Residence Date: May 22, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1709 Solar Outsource Carmela Aquino Residence Date: June 4, 20192019-1710 Solar Outsource William Martin Residence Date: June 4, 20192019-1864 Solar Outsource Yvan Ayaay Residence Date: June 17, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 19, 20192019-1902 Solar Outsource Michael Sanchez Residence Date: June 21, 20192019-2437 Solar Outsource Reisha & Ralph Navarro Residence Date: August 1, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: August 28, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 9, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: December 23, 20192019-2841 Solar Outsource Thomas Lucas Residence Date: January 5, 20202019-2841 Solar Outsource Thomas Lucas Residence Date: January 7, 20202020-188 Solar Outsource Bubno Residence Date: January 24, 2020 2020-182 Precis Solar Harris Residence Date: January 24, 20202020-182 Precis Solar Harris Residence Date: January 24, 20202020-183 Precis Solar Schutz Residence Date: January 24, 2020 2020-298 Precis Solar Cynthia Martin Narine Residence Date: February 5, 20202020-398 Precis Solar Mark Anderson Residence Date: February 14, 20202020-398 Precis Solar Mark Anderson Residence Date: March 11, 2020 2020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-699 Precis Solar Matthew Clark Residence Date: March 17, 20202020-714 Solar Deployed Gloria Lifschutz Residence Date: March 19, 20202020-729 Solar Deployed Scott McLeod Residence Date: March 24, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-797 Solar Deployed David Irish Residence Date: April 3, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 6, 20202020-806 Solar Deployed Mario Herrera Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-889 Solar Deployed Brett Hornstein Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: April 20, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: June 29, 20202020-888 Solar Deployed Craig Vossekuil Residence Date: August 13, 20202020-1988 Solar Deployed Ryan Mock Residence Date: August 29, 20202020-2065 Solar Deployed Russell Wong Residence Date: September 5, 20202020-2248 Solar Deployed Jim Keokanock Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: September 18, 2020 2020-2245 Solar Deployed Jonathan Sepulveda Residence Date: October 9, 20202020-2744 Solar Deployed Ronald Gomez Residence Date: October 20, 20202020-2871 Solar Deployed Gary Mather Residence Date: October 28, 20202020-3060 Solar Deployed Bob Wielenga Residence Date: November 6, 20202020-3136 Solar Deployed Riad Abdelkarim Residence Date: November 11, 20202020-3340 Solar Deployed Jasmin Lu Residence Date: November 20, 20202020-3458 Solar Deployed Lorenz Siongco Residence Date: November 30, 20202020-3568 Solar Deployed Michael Alcaraz Residence Date: December 6, 20202020-3680 Solar Deployed Josh Dale Residence Date: December 14, 20202020- 3692 Solar Deployed David Robinson Residence Date: December 14, 20202021-115 Better Earth John Burns Residence Date: January 13, 20212021-157 Better Earth Kerrie Mayer Residence Date: January 15, 20212021-157 Better Earth Maria Villasenor Date: January 17, 20212021-180 Better Earth Maria Villasenor Date: January 17, 20212021-268 Better Earth Felipe Garnica Residence Date: January 23, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-323 Better Earth Paulina Aviles Residence Date: January 29, 20212021-329 Better Earth Jesus Zuniga Residence Date: January 29, 2021 2021-506 Better Earth Sherrell Draves Residence Date: February 13, 20212021-568 Better Earth Jerry Ernst Residence Date: February 18, 20212021-757 Better Earth Martha Hondoy Residence Date: March 05, 20212021-865 Better Earth Mike Prenovost Residence Date: March 16, 2021 2021-867 Better Earth Nelson Smith Residence Date: March 16, 2021 2021-991 Better Earth Antonio Alba Residence Date: March 26, 2021
Exp. 3-31-19
No. C58724
NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1122 Better Earth Mohammad Javad Haji Tehrani Residence Date: April 06, 20212021-1232 Silverline Luz Rodriguez Residence Date: April 14, 20212021-2382 Clean Tech Energy Peter Schueller Residence Date: June 24, 20212021-2884 CAD Cali Joshua Melendez Residence Date: July 22, 20212021-2969 CAD Cali Jordan Nelson Residence Date: July 28, 20212022-273 Guasti Construction Hector Ramos Residence Date: January 25, 20222022-5265 Solar Survey Pro Jose Lopez Residence Date: December 20, 2022
801 E Clemensen
Ave02/23/23