Loading...
HomeMy WebLinkAbout917 W McFadden Ave - 101119790 & 20183200 - PlanM 34 ' - 9 " 23 ' - 2 " 6'-11" 10'-4" 11 6 ' - 1 1 " 47'-11" 11 6 ' - 1 1 " 47'-11" 91 7 W M C F A D D E N A V E R E S I D E N C E 91 7 W M C F A D D E N A V E , SA N T A A N A , C A 9 2 7 0 7 Project Name & Address Sheet Size Sheet Number ANSI B 11" X 17" PV 0.0 Sheet Name DRAWN BY AP N : 0 1 0 2 6 3 2 5 SHEET INDEX: COVER SHEET SCALE: NTS 2 SATELLITE VIEW PV 0.0 SCALE: NTS 3 VICINITY MAP PV 0.0 SCALE: 1/16" = 1'-0" 1 PLOT PLAN PV 0.0 GENERAL NOTES: a. INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM SHALL BE IN ACCORDANCE WITH NEC ARTICLE 690, AND ALL OTHER APPLICABLE NEC CODES WHERE NOTED OR EXISTING. b. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL COMPLY WITH NEC ARTICLE 110. c. ALL CONDUCTORS, INCLUDING THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE IN ACCORDANCE WITH NEC ARTICLE 250. d. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE; THIS SYSTEM IS UTILITY INTERACTIVE PER UL 1741 AND ALSO INCLUDE STORAGE BATTERIES OR OTHER ALTERNATIVE STORAGE SOURCES. e. ALL DC WIRES SHALL BE SIZED ACCORDING TO [NEC 690.8] f. DC CONDUCTORS SHALL BE WITHIN PROTECTED RACEWAYS IN ACCORDANCE WITH [NEC 690.31] g. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL JURISDICTIONAL BUILDING CODE. h. PV MODULES TO BE RATED UL 1703 CLASS C FIRE RATING OR BETTER. i. ALL EQUIPMENT TO BE CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY. PROTECTION OF EMERGENCY RESPONDERS ALL SHARP EDGES AND FASTENER TIPS SHALL BE COVERED OR CRIMPED OVER TO ELIMINATE SHARP EDGES, TO MINIMIZE RISK OF INJURY TO EMERGENCY RESPONDERS. ALL ROOF MOUNTED CONDUITS, BOXES, AND EQUIPMENT CROSSING PATHWAYS ARE TO BE CLEARLY IDENTIFIED BY A RED/WHITE REFLECTIVE TAPE OR OTHER APPROVED MATERIAL. ROOF ACCESS POINT ROOF ACCESS POINT SHALL NOT BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IN LOCATIONS WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES OR SIGNS. SYSTEM SIZE: 11.520 kW DC 3.800 kW AC MODULE TYPE & AMOUNT: (32) PANASONIC EVPV360PK 360W MAIN SERVICE PANEL: EXISTING 100A BUS RATED MAIN PANEL INVERTER: (01) SOLAREDGE ENERGY HUB SE3800H-USSNBBL14 [240V] INTERCONNECTION METHOD: LOAD BREAKER PHOTOVOLTAIC SYSTEM WORK SCOPE: PHOTOVOLTAIC ROOF MOUNT SYSTEM 32 MODULES-ROOF MOUNTED - 11.520 kW DC, 3.800 kW AC, 917 W MCFADDEN AVE, SANTA ANA, CA 92707 ROOF ACCESS POINT GOVERNING CODES ALL WORK SHALL CONFORM TO THE FOLLOWING CODES · 2022 CALIFORNIA BUILDING CODE · 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE · 2022 CALIFORNIA EXISTING BUILDINGS CODE · 2022 CALIFORNIA PLUMBING CODE · 2022 CALIFORNIA FIRE CODE · 2022 CALIFORNIA ENERGY CODE · 2022 CALIFORNIA RESIDENTIAL CODE · 2022 CALIFORNIA ELECTRIC CODE · 2020 NATIONAL ELECTRIC CODE EXISTING EXTERIOR MAIN SERVICE PANEL TIED TO EXTERIOR UTILITY METER PV 0.0: COVER SHEET PV 1.0: SITE PLAN S 1.1: MOUNT DETAILS E 1.1: 3-LINE DIAGRAM E 1.2: NOTES E 1.3: WARNING LABELS - EQUIPMENT SPEC SHEET ROOF #1 (11) PANASONIC EVPV360PK 360W SLOPE: 30° AZIM.: 90° GATE MAIN HOUSE FRONT OF HOUSE W MCFADDEN AVE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E PROPERTY LINE DRIVEWAY PA T H W A Y GARAGE FENCE ROOF #2 (6) PANASONIC EVPV360PK 360W SLOPE: 30° AZIM.: 90° ROOF #3 (15) PANASONIC EVPV360PK 360W SLOPE: 30° AZIM.: 270° www. Loyd W Martin .com Solar Structures Engineering #2024-0564 Structural Only April 18, 2024 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg# 101119790 Elec# 20183200 917 W McFadden Ave - 101119790 & 201832007/2/2024 M I 91 7 W M C F A D D E N A V E R E S I D E N C E 91 7 W M C F A D D E N A V E , SA N T A A N A , CA 92 7 0 7 Project Name & Address Sheet Size Sheet Number ANSI B 11" X 17" PV 1.0 Sheet Name DRAWN BY AP N : 01 0 2 6 3 2 5 EQUIPMENT LAYOUT & SITE PLAN SCALE:1/8" = 1'-0" 1 SITE PLAN PV 1.0 ROOF SECTION(S) MODULE, ARRAY WEIGHT (LOAD CALC'S) Number of Modules 32 Module Weight 43.0 LBS Total Module (Array) Weight 1376.00 LBS Number of Attachment point 78 Mounting System Weight (Per Module)1.5 LBS Mounting System Weight 117.00 LBS Total System Weight (Module Weight + Mounting System Weight)1493.00 LBS Weight at Each Attachment Point (Array Weight / Number of Attachment Point)17.64 LBS Module Area (69.1"x40.94")19.65 SqFt Total Array Area 628.66 SqFt Distributed Load (Total System Weight / Total Array Area)2.27 Per SqFt Total Roof Area 1571 SqFt Total Percentage or Roof Covered Total Array Area / Total Roof Area)*100 40.02% SYSTEM SIZE: 11.520 kW DC 3.800 kW AC MODULE TYPE & AMOUNT:(32) PANASONIC EVPV360PK 360W MODULE DIMENSIONS:(L/W/H) 69.1"/40.94"/1.2" INVERTER:(01) SOLAREDGE ENERGY HUB SE3800H-USSNBBL14 [240V] PHOTOVOLTAIC SYSTEM WORK SCOPE:SYSTEM LEGEND EXISTING EXTERIOR MAIN SERVICE PANEL & POINT OF INTERCONNECTION. TIED TO EXTERIOR UTILITY METER. M NEW 01 - SOLAREDGE ENERGY HUB SE3800H-USSNBBL14 [240V] INVERTER.I = ATTACHMENT POINTS = RAFTERS = ROOF OBSTRUCTIONS = FIRE PATHWAY = RACKING SYSTEM 32 NEW PANASONIC EVPV360PK 360W MODULES WITH SOLAREDGE OPTIMIZER MOUNTED ON THE BACK OF EACH MODULES. STRING #1 - 16 MODULES STRING(S) EXISTING EXTERIOR MAIN SERVICE PANEL & POINT OF INTERCONNECTION. TIED TO EXTERIOR UTILITY METER MODULE - 15 SLOPE - 30° AZIMUTH - 270° MATERIAL - COMP. SHINGLE RAFTER SIZE & SPACING - 2"X4" @ 24" O.C. MODULE - 6 SLOPE - 30° AZIMUTH - 90° MATERIAL - COMP. SHINGLE RAFTER SIZE & SPACING - 2"X4" @ 24" O.C. MODULE - 11 SLOPE - 30° AZIMUTH - 90° MATERIAL - COMP. SHINGLE RAFTER SIZE & SPACING - 2"X4" @ 24" O.C. ROOF #01 ROOF #02 ROOF #03 NEW SOLAREDGE ENERGY HUB SE3800H-USSNBBL14 [240V] INVERTER BILL OF MATERIALS NUMBER OF MODULES 32 PANASONIC EVPV360PK 360W NUMBER OF INVERTER 01 SOLAREDGE ENERGY HUB SE3800H-USSNBBL14 [240V] OPTIMIZER 32 SOLAREDGE S500 OPTIMIZER NUMBER OF ATTACHMENTS 78 UNIRAC FLASHKIT PRO ATTACHMENTS RAILS 21 UNIRAC SM LIGHT RAIL RAIL SPLICE 8 SPLICE KIT MID CLAMPS 36 MID CLAMPS END CLAMPS 56 END CLAMPS / STOPPER SLEEVE GROUNDING LUG 14 GROUNDING LUG 18 " F I R E S E T B A C K 18 " F I R E S E T B A C K NE W P V A T T A C H M E N T AT 6 ' - 0 " O . C . FRONT OF HOUSE W MCFADDEN AVE RO O F # 0 1 36" FIRE SETBACK STRING #2 - 16 MODULES RO O F # 0 3 RO O F # 0 2 36" FIRE SETBACK 36" FIRE SETBACK 18 " F I R E S E T B A C K 18 " F I R E S E T B A C K www. Loyd W Martin .com Solar Structures Engineering #2024-0564 Structural Only April 18, 2024 NOTE: Engineer of Record assumes that all structural components of the existing building were permitted and met the requirements of the Building Code at the time of construction. Solar Contractor shall field verify that the roof framing is in its existing permitted condition and capable of supporting required live loads. Framing specified on solar plans shall be assumed to be minimum size and spacing, actual framing may be different. 917 W McFadden Ave - 101119790 & 201832007/2/2024 91 7 W M C F A D D E N A V E R E S I D E N C E 91 7 W M C F A D D E N A V E , SA N T A A N A , CA 92 7 0 7 Project Name & Address Sheet Size Sheet Number ANSI B 11" X 17" S 1.1 Sheet Name DRAWN BY AP N : 01 0 2 6 3 2 5 MOUNT DETAIL SCALE: NTS 2 ATTACHMENT DETAIL ENLARGED VIEW S 1.1 SCALE: NTS 1 ATTACHMENT DETAIL (SIDE VIEW) S 1.1 NOTE: 1.SOLAR INSTALLER MUST VERIFY AND CONFIRM ROOF SUPPORT IS SUFFICIENT PRIOR TO PV INSTALLATION SCALE: NTS 1 ATTACHMENT DETAIL (SIDE VIEW) S 1.1 POINT OF PENETRATIONMID CLAMPEND CLAMP MAX CANTILEVER 33% RAIL SPAN 6'-0" L ( L X 2 5 % ) M A X GENERAL STRUCTURAL NOTES: 1.THE SOLAR PANELS ARE TO BE MOUNTED TO THE ROOF FRAMING USING THE UNIRAC SM LIGHT RACKING SYSTEM WITH UNIRAC FLASHKIT PRO ATTACHMENTS. THE MOUNTING FEET ARE TO BE SPACED AS SHOWN IN THE DETAILS, AND MUST BE STAGGERED TO ADJACENT FRAMING MEMBERS TO SPREAD OUT THE ADDITIONAL LOAD. 2.UNLESS NOTED OTHERWISE, MOUNTING ANCHORS SHALL BE 5/16" LAG SCREWS WITH A MINIMUM OF 2-1/2" PENETRATION INTO ROOF FRAMING. 3.THE PROPOSED PV SYSTEM ADDS 2.6 PSF TO THE ROOF FRAMING SYSTEM. 4.ROOF LIVE LOAD = 20 PSF TYPICAL, 0 PSF UNDER NEW PV SYSTEM. 5.GROUND SNOW LOAD = 0 PSF 6.WIND SPEED = 95 MPH 7.EXPOSURE CATEGORY = B 8.RISK CATEGORY = II GREEN FASTEN GF1 FLASHING 5/16" EPDM BONDED 304-18.8 SS WASHER LAG BOLT, 5/16" UNIRAC FLASHKIT PRO UNIRAC END / MID CLAMP 2"X4" RAFTER @ 24" OC SEE (2/S 1.1) FOR ENLARGED VIEW PV MODULE (E) COMP. SHINGLE ROOF 2"X4" RAFT E R @ 24" OC PV MODULES UNIRAC SM LIGHT RAIL 6" 1.2 " 6" 1.2 " www. Loyd W Martin .com Solar Structures Engineering #2024-0564 Structural Only April 18, 2024 (1) 5/16" x 3.5" SS LAG SCREWS WITH 2.5" MIN EMBEDMENT INTO WOOD 917 W McFadden Ave - 101119790 & 201832007/2/2024 91 7 W M C F A D D E N A V E R E S I D E N C E 91 7 W M C F A D D E N A V E , SA N T A A N A , CA 92 7 0 7 Project Name & Address Sheet Size Sheet Number ANSI B 11" X 17" E 1.1 Sheet Name DRAWN BY AP N : 01 0 2 6 3 2 5 3-LINE DIAGRAM 3800W Rooftop conductor ampacities designed in compliance with art. 690.8, Tables 310.15(B)(2)(a), 310.15(B)(3)(a), 310.15(B)(3)(c), 310.15(B)(16), Chapter 9 Table 4, 5, & 9. Location specific temperature obtained from ASHRAE 2017 data tables AMBIENT TEMP (HIGH TEMP 2%) RECORD LOW TEMP 2°C 31°C CONDUIT HEIGHT 0.5"C ROOF TOP TEMP 53°C CONDUCTOR TEMPERATURE RATE 90°C PHOTOVOLTAIC SYSTEM DC SYSTEM SIZE (WATTS) NOMINAL AC VOLTAGE 240V 11520W AC SYSTEM SIZE (WATTS) TOTAL NUMBER OF MODULES 32 120% RULE BUS BAR RATING X 120%) - MAIN BREAKER RATING =MAX. PV OCPD (100A x 120%) - 100A = 20A PV MODULE RATING @ STC MANUFACTURER MAX. POWER-POINT CURRENT (IMP) MAX. POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) 10.62 AMPS 33.9 VOLTS 40.6 VOLTS 11.26 AMPS NOM. MAX. POWER AT STC (PMAX) MAX. SYSTEM VOLTAGE VOC TEMPERATURE COEFFICIENT 360 WATT 1000V -0.26 %/°C SYSTEM SIZE: 11.520 kW DC 3.800 kW AC MODULE:(32) PANASONIC EVPV360PK 360W INVERTER:(01) SOLAREDGE ENERGY HUB SE3800H-USSNBBL14 [240V] INVERTER CHARACTERISTICS - SOLAREDGE SE 3800H-US MAX OUTPUT POWER 3800 W SYSTEM OPERATING VOLTAGE 380 V MAX CONTINOUS OUTPUT CURRENT 16 A MAX INPUT VOLTAGE 480 V SYSTEM SHORT CIRCUIT CURRENT 15 A MAX EFFICIENCY 99 % PANASONIC EVPV360PK 360W WIRE QTY WIRE TAG #CONDUIT WIRE TYPE STRING WATTAGE OPERATING VOLTAGE CONDUIT FILL: TEMP RATING: WIRE AMP TEMP DE-RATE: WIRE OCP: MAX SYSTEM VOLTAGE GRND SIZE WIRE GAUGE: TERMINAL 75°C RATING:NEC:MAX AMPS x x =/x =1.25380V5760W 18.95A30.72A 35A90°C 35A /x =1.25380V5760W 18.95Axx=24.32A90°C 35A /x =1.25 20.00Axx=32.9A75°C 40A#10 40A#10 35A#10 3/4" EMT 3/4" EMT WIRE FROM - - JUNCTION BOX TO INVERTER INVERTER TO MSP ARRAY TO JUNCTION BOX1 2 3 PV WIRE THWN-2 THWN-2 4 0.80 3 1.00 IN AIR / = = = =STRING AMPS 15.16A 15.16A 16A x =GRND WIRE TYPE 480V 480V 240V #8 #8 THWN-2 THWN-2 0.96 0.76 0.94 #6 SBC40.80 3 = AC SOLAREDGE ENERGY HUB SE3800H-USSNBBL14 [240V] INVERTER OUTPUT: 240VAC, 16A 99% CEC WEIGHTED EFFICIENCY NEMA 3R, UL LISTED, INTERNAL GFDI WITH INTEGRATED DC DISCONNECT DC 32 NEW PANASONIC EVPV360PK 360W MODULES WITH SOLAREDGE OPTIMIZER MOUNTED ON THE BACK OF EACH MODULES. (N) SOLAREDGE S500 OPTIMIZERS JUNCTION BOX 600 V, NEMA 4 UL LISTED 1 2 -+ + -+ ++--- = = = = = = -+ 2 161 -+ + -+ ++--- = = = = = = -+ 2 161 MANUFACTURER DC INPUT POWER 500W SOLAREDGE S500 DC MAX INPUT VOLTAGE DC MAX INPUT CURRENT DC MAX OUTPUT CURRENT 60V 15A 15A MAX INPUT VOLTAGE 480A OPTIMIZER SPECIFICATIONS (N) 20A FEEDER BREAKER AT THE OPPOSITE END OF THE MAIN SERVICE BUSBAR FROM THE MAIN OVERCURRENT DEVICE. G N EXISTING GROUNDING ELECTRODE SYSTEM 100A M 20A (E) LOADS POINT OF INTERCONNECT, LOAD SIDE EXISTING 240V/100A BUS BAR RATING, MAIN SERVICE PANEL, SINGLE PHASE, WITH A 100A MAIN DISCONNECT 917 W McFadden Ave - 101119790 & 201832007/2/2024 91 7 W M C F A D D E N A V E R E S I D E N C E 91 7 W M C F A D D E N A V E , SA N T A A N A , CA 92 7 0 7 Project Name & Address Sheet Size Sheet Number ANSI B 11" X 17" E 1.2 Sheet Name DRAWN BY AP N : 01 0 2 6 3 2 5 NOTES SITE NOTES: 1.A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2.THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 3.THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 4.PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 5.ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. EQUIPMENT LOCATIONS: 1.ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. 2.WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C). 3.JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC 690.34. 4.ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 2.2.6 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 5.ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. STRUCTURAL NOTES: 1.RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUB ARRAY, ACCORDING TO RAI MANUFACTURER’S INSTRUCTIONS. 2.JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. 3.ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED W/ APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 4.ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 2.3.6 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. WIRING & CONDUIT NOTES: 1.ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 2.CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. 3.VOLTAGE DROP LIMITED TO 1.5%. 4.DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. 5.AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [NEC 110.15]. GROUNDING NOTES: 1.GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 2.PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC TABLE 250.122. 3.METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 4.EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45 AND MICROINVERTER MANUFACTORERS’ INSTRUCTIONS. 5.EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 6.THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 7.GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] 8.THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 AND AHJ. 9.GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.41(B)(1) AND (2) TO REDUCE FIRE HAZARDS DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 1.DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 2.DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 3.PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY RESPONDERS IN ACCORDANCE WITH 690.12(A) THROUGH (D). 4.ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND 240. 5.MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). 6.IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO NEC 690.11 AND UL1699B. INTERCONNECTION NOTES: 1.LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 705.12 (B)] 2.THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS OUTPUT MAY NOT EXCEED 120% OF BUSBAR RATING [NEC 705.12(D)(2)(3)]. 3.THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR, PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(B)(2)(3)]. 4.AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC 705.12 (B)(2)(3)(C). 5.FEEDER TAP INTERCONECTION (LOADSIDE) ACCORDING TO NEC 705.12 (B)(2)(1) 6.SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 2.7.8BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [NEC 705.12 (B)(5)]. 917 W McFadden Ave - 101119790 & 201832007/2/2024 M I 91 7 W M C F A D D E N A V E R E S I D E N C E 91 7 W M C F A D D E N A V E , SA N T A A N A , CA 92 7 0 7 Project Name & Address Sheet Size Sheet Number ANSI B 11" X 17" E 1.3 Sheet Name DRAWN BY AP N : 01 0 2 6 3 2 5 WARNING LABELS (32) PV MODULES INVERTER UTILITY METER & MAIN SERVICE PANEL W M C F A D D E N A V E SOLAR PHOTOVOLTAIC SYSTEMS (PER CODE: NEC 690) A SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS AT INVERTER [IFC 605.11.3.1(1) & 690.56(C)] PER CODE: NEC 2020 ELECTRICAL SHOCK HAZARD TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING! LABEL LOCATION: WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, A WARNING SIGN SHALL BE MOUNTED ON OR ADJACENT TO THE DISCONNECTING MEANS. PER CODE(S): NEC 2020: NEC 706.15(C)(4) and NEC 690.13(B) WARNING!DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM LABEL LOCATION: PRODUCTION / NET METER (BI-DIRECTIONAL) NEC: 2020 NEC 690.59, 705.12(D)(3) WARNING: PHOTOVOLTAIC POWER SOURCE MAIN PHOTOVOLTAIC SYSTEM DISCONNECT LABEL LOCATION: MAIN SERVICE DISCONNECT, NEC 2020, 690.13(B) POWER SOURCE OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE. WARNING! LABEL LOCATION: MAIN SERVICE DISCONNECT NEC: 2020, 705.12(B)(3)(2) LABEL LOCATION: PERMANENT WARNING LABELS SHALL BE APPLIED TO DISTRIBUTION EQUIPMENT, AC DISCONNECT NEC: 2020, PER CODE: 705.12(B)(3)(3) PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT, NEC: 2020, (NEC 690.13(B) PHOTOVOLTAIC DC DISCONNECT LABEL LOCATION: DC DISCONNECT (NEC 690.13(B) M A C IN V E R T E R J/B PV ARRAY WARNING: PHOTOVOLTAIC POWER SOURCE LABEL LOCATION : EXPOSED RACEWAY, CABLE TRAYS, JUNCTION BOX NEC: 2020, PER CODE: NEC 690.31(D)(2) LABEL LOCATION: AC DISCONNECT, POINT OF INTERCONNECTION NEC: 2020 (PER CODE: NEC 690.54) PHOTOVOLTAIC SYSTEM AC DISCONNECT RATED AC OPERATING CURRENT 16 AMPS AC NOMINAL OPERATING VOLTAGE 240 VOLTS PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN LABEL LOCATION: UTILITY SERVICE ENTRANCE/METER, INVERTER/DC DISCONNECT IF REQUIRED BY LOCAL AHJ, OR OTHER LOCATIONS AS REQUIRED BY LOCAL AHJ. PER CODE(S): NEC 2020: ARTICLE 690.56(C) SOLAR PHOTOVOLTAIC SYSTEMS (PER CODE: NEC 690) PHOTOVOLTAIC DC DISCONNECT MAXIMUM SYSTEM VOLTAGE: MAXIMUM CIRCUIT CURRENT: MAX RATED OUTPUT CURRENT OF THE CHARGE CONTROLLER OR DC-TO-DC CONVERTER (IF INSTALLED): VDC ADC ADC 480 30.32 15 INVERTER #1 (SOLAREDGE ENERGY HUB SE3800H-USSNBBL14 [240V]) LABEL LOCATION: INVERTER(S), DC DISCONNECT(S). PER CODE(S): NEC 2020, PER CODE: 690.53 THIS EQUIPMENT FED BY MULTIPLE SOURCES, TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR. WARNING! CAUTION MULTIPLE SOURCES OF POWER N 917 W McFadden Ave - 101119790 & 201832007/2/2024 www. Loyd W Martin .com Solar Structures Engineering #2024-0564 Structural Only June 5, 2024 917 W McFadden Ave - 101119790 & 201832007/2/2024 www. Loyd W Martin .com Solar Structures Engineering #2024-0564 Structural Only June 5, 2024 917 W McFadden Ave - 101119790 & 201832007/2/2024 www. Loyd W Martin .com Solar Structures Engineering #2024-0564 Structural Only June 5, 2024 917 W McFadden Ave - 101119790 & 201832007/2/2024 www. Loyd W Martin .com Solar Structures Engineering #2024-0564 Structural Only June 5, 2024 917 W McFadden Ave - 101119790 & 201832007/2/2024 www. Loyd W Martin .com Solar Structures Engineering #2024-0564 Structural Only June 5, 2024 917 W McFadden Ave - 101119790 & 201832007/2/2024 www. Loyd W Martin .com Solar Structures Engineering #2024-0564 Structural Only June 5, 2024 917 W McFadden Ave - 101119790 & 201832007/2/2024 www. Loyd W Martin .com Solar Structures Engineering #2024-0564 Structural Only June 5, 2024 917 W McFadden Ave - 101119790 & 201832007/2/2024 Certificate Of Completion Envelope Id: 8259DD555C6B40FFA5C51BDC6FC60C5F Status: Completed Subject: Complete with DocuSign: Lettter to City of Santa Ana.pdf Source Envelope: Document Pages: 1 Signatures: 2 Envelope Originator: Certificate Pages: 5 Initials: 0 Michelle Griffin AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) michelle@gtechsmartremodeling.com IP Address: 63.47.105.145 Record Tracking Status: Original 5/8/2024 9:04:40 PM Holder: Michelle Griffin michelle@gtechsmartremodeling.com Location: DocuSign Signer Events Signature Timestamp Ariel Yemini Ariel@SolarPriceDiscovery.com CEO X Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 99.10.72.187 Signed using mobile Sent: 5/8/2024 9:04:52 PM Resent: 5/8/2024 9:30:57 PM Viewed: 5/8/2024 9:33:48 PM Signed: 5/8/2024 9:33:56 PM Electronic Record and Signature Disclosure: Accepted: 5/8/2024 9:33:48 PM ID: a4fd13cd-d8fe-421c-b80c-a74de4700502 Jenny E Garcia jenny_gar_1@hotmail.com Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 104.58.251.222 Signed using mobile Sent: 5/8/2024 9:04:52 PM Resent: 5/8/2024 9:30:57 PM Viewed: 5/8/2024 10:13:50 PM Signed: 5/8/2024 10:14:41 PM Electronic Record and Signature Disclosure: Accepted: 5/8/2024 9:16:36 PM ID: 755a8b2d-2570-423d-adb9-ca2de751c5d0 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 5/8/2024 9:04:53 PM Envelope Updated Security Checked 5/8/2024 9:30:42 PM Envelope Updated Security Checked 5/8/2024 9:30:42 PM 917 W McFadden Ave - 101119790 & 201832007/2/2024 Envelope Summary Events Status Timestamps Certified Delivered Security Checked 5/8/2024 10:13:50 PM Signing Complete Security Checked 5/8/2024 10:14:41 PM Completed Security Checked 5/8/2024 10:14:41 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure 917 W McFadden Ave - 101119790 & 201832007/2/2024 ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, sahar amstat (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request deliver y of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 3/22/2023 10:59:42 AM Parties agreed to: Ariel Yemini, Jenny E Garcia 917 W McFadden Ave - 101119790 & 201832007/2/2024 Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact sahar amstat: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: financing@gtechsmartremodeling.com To advise sahar amstat of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at financing@gtechsmartremodeling.com and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from sahar amstat To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to financing@gtechsmartremodeling.com and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with sahar amstat To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: 917 W McFadden Ave - 101119790 & 201832007/2/2024 i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to financing@gtechsmartremodeling.com and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:  You can access and read this Electronic Record and Signature Disclosure; and  You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and  Until or unless you notify sahar amstat as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by sahar amstat during the course of your relationship with sahar amstat. 917 W McFadden Ave - 101119790 & 201832007/2/2024 Expedited Permit Process for PV Systems 1 Expedited Permit Process for PV Systems Standard String System The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Standard String System to use with the Expe- dited Permit Process. The Micro-Inverter, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 917 W McFadden Ave - 101119790 & 201832007/2/2024 Expedited Permit Process for PV Systems 2 Expedited Permit Process for Small-Scale PV Systems Standard String System The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 917 W McFadden Ave - 101119790 & 201832007/2/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Standard String System Site Plan               917 W McFadden Ave - 101119790 & 201832007/2/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Standard String System Electrical Diagram                                                                                                            917 W McFadden Ave - 101119790 & 201832007/2/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Notes for Standard String System Electrical Diagram Contractor Name, Address and Phone: _________________ _________________ _________________ _________________ Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: __________________________ Site Address: ________________________ System AC Size: ______________________ SIZE FSCM NO DWG NO REV SCALE NTS Date:SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS A V V A A W V MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING V W V A A INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THEREQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THEREQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAXCURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTEROCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OCPD(s), ONE FOR EACH INVERTER. DOES TOTALSUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)?YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEANEXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TOINSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ______oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHESTMONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TOINSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE _____oC 2.) 2005 ASHRAE FUNDEMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1oC). FOR LESS THAN 9CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT ATLEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULESWITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLERFUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULESWITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLERFUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix D): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE® REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) RATED MPP CURRENT RATED MPP VOLTAGE MAX SYSTEM VOLTAGE MAX CIRCUIT CURRENT A V V A PHOTOVOLTAIC POWER SOURCE WARNING: ELECTRICAL SHOCK HAZARD–LINE AND LOAD MAY BE ENERGIZED IN OPEN POSITION AC OUTPUT CURRENT NOMINAL AC VOLTAGE A V SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) 917 W McFadden Ave - 101119790 & 201832007/2/2024 Dear City of Santa Ana, I, _____________, am the legal owner of the property located at __________________________________, and I hereby authorize Ariel Yemeni and the Solar Price Discovery team to act on my behalf in matters strictly related to the installation of the solar system at the aforementioned property. This authorization is limited to: Consulting with me before making any decisions that involve a financial commitment over$2,000.00. Obtaining my written approval for any repairs or renovations related to the property that exceed routine maintenance. Providing weekly updates on the status of the project, including any communications with city oAicials, contractors, or other relevant parties. I understand that this authorization is valid until ______________ or until further notice in writing from me. I reserve the right to revoke this authorization at any time. I am responsible for any actions taken by Ariel Yemeni or the Solar Price Discovery Team on my behalf, within the bounds of the limitations specified above. Homeowner Signature: ___________________________ Date: _______________ Printed Name: ____________________ Date: _______________ Contractor Signature: ___________________________ Date:________________ DocuSign Envelope ID: 8259DD55-5C6B-40FF-A5C5-1BDC6FC60C5F Ariel Yemini 5/8/2024 Jenny E Garcia 05/08/2025 917 W. McFadden ave. Santa Ana 5/8/2024 5/8/2024 Jenny E Garcia 917 W McFadden Ave - 101119790 & 201832007/2/2024 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2. Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6. Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7. Will the PV system be installed without using any ballast system or counter-weight system? 8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 917 W McFadden Ave, Santa Ana, CA 92707 Solar Discovery C10 1014977 x x x x x x x x x x Ariel Yemeni 818-925-1252 x 1 Production@solarpricediscovery.com 3/4/2024 917 W McFadden Ave - 101119790 & 201832007/2/2024 Structural Calculations for a Roof Mounted Solar Photovoltaic System for: 917 W McFadden Ave Santa Ana, CA 92707 Applicable Codes: 2022 California Building Code, 2022 California Electric Code, 2022 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-16 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Construction, Local Municipal Code, and all other codes which are adopted by reference or enacted by law. Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. Solar Energy Contractor shall make an inspection of the existing roof framing system prior to installation of the roof mounted solar energy system to verify that the existing roof is capable of supporting minimum roof live loads. Assumed Design Parameters: All 2x members are grade Douglas Fir #2 or better All 4X members are grade Douglas Fir #1 or better All Roof Connectors are Simpson Strong-Tie or Equal All Concrete Foundations are f'c = 2500 psi or stronger Sht # 1 of 7 2024-0564 Solar Survey Pro 917 W McFadden Ave April 18, 2024       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Original Structure was built to the Type-V Wood Framed Standards of the Applicable Building Code at the time of Construction. 917 W McFadden Ave - 101119790 & 201832007/2/2024 Note to Building Official: Based upon a review of the proposed plans I am confident that the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. The contractor shall field verify that the existing roof structure is in its original permited condition and verify that it can support the normal code required roof live loads. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. Check Existing 2X4 Roof Rafters @ 24" O.C.: (Assume max rafters span = 7.83 ft.) w =30 psf x 2 ft. = 60 plf Total load on rafters = 60 plf x 7.83 ft. = 470 lbs Sht # 2 of 7 2024-0564 Solar Survey Pro 917 W McFadden Ave April 18, 2024       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com 7.83' 917 W McFadden Ave - 101119790 & 201832007/2/2024 Check Existing 2X4 Roof Rafters @ 24" O.C.: Snow Load =0 psf Dead Load =14 psf Live Load =16 psf WDL + LL =30 psf x 2 ft. = 60 plf WDL =14 psf x 2 ft. = 28 plf w =30 psf x 2 ft. = 60 plf Total load on rafters =( 60 plf x 1.5 ft ) + ( 28 plf x 6.33 ft ) + ( 6' x 1.7' x 3 psf x 4 ) =390 lbs < 470 lbs OK OK. Per 2022 California Existing Building Code Section 503.3 Alterations Check attachment of Support to Existing Structure for Wind Uplift CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7-16 WIND LOADS ON BUILDING APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2. NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7-16 EFFECTIVE WIND AREA: FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT BE LESS THAN ONE-THIRD ITS LENGTH. EFFECTIVE AREA = 15 SQ FT Sht # 3 of 7 2024-0564 Solar Survey Pro 917 W McFadden Ave April 18, 2024       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com % CHANGE =390 lbs - 470 lbs x 100 =-17% < 5% OK470 lbs 917 W McFadden Ave - 101119790 & 201832007/2/2024 Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Tributary Area to Each Solar Mount = 6 ft. x 2.9 ft. = 17.4 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): p = q h (GC p )(γ E )(γ a )Eq'n 29.4-7 ASCE 7-16 q h = 0.00256 K z K zt K d K e V 2 Eq'n 26.10-1 ASCE 7-16 Note: K z =velocity pressure coefficient Section 29.10.1 ASCE 7-16 K z =0.9 (Exposure C, Height = 20 ft or less) K zt =Topographical Factor = 1.0 K d =Wind Directionality Factor = 0.85 K e =Ground Elevation Factor = 1.0 V =130 mph ;VASB =101 mph q h =0.00256 (0.9) (1.0) (0.85) (1.0) (101)² q h =19.98 psf GC p =-2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) γ E =Exposure Factor = 1.5 γ a =Solar Array Pressure Equalization Factor = 0.7 Fig. 29.4-8 ASCE 7-16 p = q h (GC p )(γ E )(γ a ) p = 19.98 psf (-2.0) (1.5) (0.7) = 42 psf Sht # 4 of 7 2024-0564 Solar Survey Pro 917 W McFadden Ave April 18, 2024       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com 917 W McFadden Ave - 101119790 & 201832007/2/2024 Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Nominal (Unfactored) Uplift at each support = 42 psf x 17.4 sq. ft. = 730.8 lbs Note: Section 2.4.1 of ASCE 7-16, Basic Load Combinations for Allowable Stress Design. Note: Applicable Load Combination #5 (D + 0.6W) Design (Factored) Uplift at each support = 0.6 x 730.8 lbs = 438 lbs Load per lag screw = 438 lbs / 1 = 438 lbs Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2018 NDS. W ' = W x Cd x Ct Table 10.3.1 2018 NDS where W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2018 NDS Ct = 1.0 per Table 2.3.3 of 2018 NDS W' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 438 lbs OK Sht # 5 of 7 2024-0564 Solar Survey Pro 917 W McFadden Ave April 18, 2024       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3.5" lag screws per connection minimum. 917 W McFadden Ave - 101119790 & 201832007/2/2024 Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Effective Existing Seismic Weight Area of (E) Building =Approximately 1,500 Sq. ft Approximate Effective =1,500 sq. ft. x 30 psf ave. = 45,000 LBS Seismic Weight DETERMINE BASE SHEAR V = Cs W EQ'N 12.8-1 ASCE 7-16 EQ'N 12.8-2 ASCE 7-16 R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1 R =6.5 WOOD SHEAR WALLS Ie = 1.0 IMPORTANCE FACTOR SDS = 2/3 x SMS SMS = FA x SS SMS = 1.2 x 1.5 = 1.8 SDS = 2/3 x 1.8 = 1.2 Cs ==0.185 EQ'N 12.8-2 ASCE 7-16 Sht # 6 of 7 2024-0564 Solar Survey Pro 917 W McFadden Ave April 18, 2024       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Cs =SDS R Ie SDS R Ie 917 W McFadden Ave - 101119790 & 201832007/2/2024 EXISTING BASE SHEAR V = 0.185 x 45,000 LBS = 8,325 LBS DETERMINE NEW BASE SHEAR Determine Seismic Weight of Building with Solar Array: EXISTING SEISMIC =45,000 LBS WEIGHT NEW SOLAR ARRAY =3 PSF x 32 PANELS x 5.8' x 3.4' = 1,894 LBS NEW SEISMIC =45,000 LBS + 1,894 LBS = 46,894 LBS WEIGHT THEREFORE NEW BASE SHEAR: V = 0.185 x 46,894 = 8,676 LBS EQ'N 12.8-1 ASCE 7-16 OK. PER ASCE 7-16 SECTION 11B.4 ALTERATIONS EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE Sht # 7 of 7 2024-0564 Solar Survey Pro 917 W McFadden Ave April 18, 2024       Loyd W. Martin Professional Engineer, Inc.       9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 "Alterations may be made to any structure without requiring the existing structure to comply with this standard, provided that the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10% or decrease the design strength of any existing structural element to resist seismic forces by more than 10% shall not be permitted unless the entire seismic force-resisting system is determined to comply with this standard for a new structure." End of Calculations Email: loydwmartin@gmail.com www.loydwmartin.com % CHANGE =8,676 LBS - 8,325 LBS x 100 = 4.2 % < 10 % OK8,325 LBS 917 W McFadden Ave - 101119790 & 201832007/2/2024