Loading...
HomeMy WebLinkAbout408 E Civic Center Dr - PlanFR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . D A T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: C O N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 6 4 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 L a s V e g a s , N V 8 9 1 3 1 P : ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m h t t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 GN-1 GENERAL NOTES: 1.The contractor shall verify all dimensions, elevations and site conditions before starting work and the engineer shall be notified in writing immediately of any discrepancies or inconsistencies. In no case shall dimensions be scaled from plans, sections or details on these drawings. these notes shall be considered as part of the written specifications. 2.Any dimensions and/or conflicts between the various elements of the working drawings and/or specifications shall be brought to the attention of the engineer before proceeding with any work so involved. 3.Notes and details on drawings shall take precedence over "General Notes" and typical details. 4.Contractor agrees that he shall assume sole and complete responsibility for job site conditions during the course of construction of this project, including the safety and protection of all persons and property. This requirement shall apply continuously and not be limited to normal working hours. The contractor shall defend, indemnify and hold the owner and the engineer harmless from any or all of the liability in connection with the performance of work on this project, except for liability arising from the sole negligence of the owner, the tenant or the engineer. 5.Existing utilities, whether shown hereon or not are to be protected from damage. The contractor shall be responsible for relocating, as necessary, any and all utilities that may interfere with the installations of the details as shown and the cost of any and all such relocations shall be included in the fixed price cost to perform this work. 6.The contractors shall notify the engineer if conditions encountered are different than indicated. 7.The contractor shall supply and erect all temporary scaffolding, ladders, man-lifts, etc., as required to access all work areas shown on the plans. All scaffolding requirements are to be determined by the contractor during the pre-bid walk-through. 8.Constructions materials shall be spread out if placed on framed floor. Load shall not exceed the design live load per square foot, provide adequate shoring and/or bracing where structure has not attained the design strength or where overload is anticipated. 9.Khatri International shall not have control or charge of and shall not be responsible in any way for construction means, methods, techniques, sequences, or procedures, or for safety or safety precautions and programs in connection with any construction responsibility under the contract for construction. 10.Khatri International shall not be responsible for the contractors schedule or failures to carry out any construction activities in accordance with the contract documents. Khatri International shall not have control over or change of omissions of the contractor, subcontractors or any agents, or employers or any other persons performing portions of any construction activities. 11.The contractor shall allow sufficient time for delivery of special order items in order to complete the installations in a timely manner. 12.Contractor shall coordinate with the building owners requirements for construction schedule, access to the site, contractors field office and utility hookups, use of utility services during construction, location of temporary storage of construction materials and removed items, hours of allowable construction, restrictions on construction activities, etc. prior to beginning construction. 13.Contractor shall protect existing finishes, equipment, and adjacent work which is to remain in place, as well as items which are to be removed and reinstalled, from damage. the contractor shall bear all expenses of repair or replacement of existing structural and nonstructural items damaged in connection with this work. 14.Number and sizes of existing items, (e.g. conduits, pipes, light fixtures, etc.), which may be shown on the drawings are for identification purposes only. Existing items noted may not represent all items interfering with new work nor all items which may need to be removed to access work areas. Contractor shall field verify interfering items and sizes. 15.The contractor shall provide temporary support for items such as electrical panels, suspended ceilings, pipes, etc., which are detached from existing structure but remain in place during installation of retrofits. The contractor shall bear all expense for repair or replacement of these items if they are damaged during retrofit installation. 16.Contractor shall perform periodic and final cleaning of work areas. Occupied areas shall be kept in a condition suitable for use by the owner, unoccupied areas shall be cleaned during the construction to keep work areas free from accumulations of waste material and rubbish. Contractor shall clean spillage, over-spray, heavy collection of dust in occupied areas and those items which may present a hazard, immediately. Final cleaning shall be performed at the completion of the work to return areas to a condition suitable for use by the building owner. Contractor shall comply with all federal state and local codes, ordinances, regulations and antipollution laws. 17.Contractor shall maintain record documents (e.g. drawings, addendum, change orders, reviewed shop drawings, field test records, etc.) at the site as directed by the owners. The contractor shall maintain an accurate record of changes in the documents, and shall transfer the recorded changes to a set of reproducible documents upon completion of the work. 18.Construction shall be carried out in a well organized fashion that does not adversely affect normal operations in the building without prior written authorization from the building owner. 19.The contractor shall develop a construction schedule indicating the order and interdependence of all activities necessary to complete the work and the sequence in which each activity is to be accomplished. 20.The contractor shall not disconnect any fire alarm, fire alarm pull box emergency light, electrical panel, electrical conduit, pipe HVAC duct, etc. Without first notifying the owner in writing and obtaining approval. Contractor shall transfer services to new electrical panels, transformers, etc., prior to disconnection from existing panels, transformers, etc., if required by new owner to maintain continuous operation. Notify Fire Department of any disconnection to fire alarm. 21.Dust control shall be performed on a continuing basis as the work proceeds and whenever a dust nuisance or hazard occurs. Contractor shall provide dust barriers constructed of materials acceptable to the building owner and dust control measures (e.g. sprinkling). 22.Contractor shall maintain noise levels within the limits and times directed by the building owner. Contractor shall take all precautions necessary to prevent fires caused by welding. These precautions shall include but not be limited to containing spark in the immediate area surrounding the welding, etc. And other requirements imposed by the owner, contractor shall construct barriers as required to protect existing adjacent items from damage (and to screen welding operations from view, if directed by owner). Contractor shall adequately ventilate areas where welding is taking place as required. 23.Contractor shall see that all his vehicle and stationery piston engine powered equipment are equipped with well maintained emission control systems in conformance with federal, state, and local regulations. Transfer and storage systems shall be constructed and operated to minimize escape of vapor and particular and shall comply in this regard with the regulations of the state of California. The contractor shall operate engine powered equipment inside the building only with written approval of the building owner and shall ventilate the building as required by the owner. 24.Contractor shall store construction materials, removed items, etc., in areas designated by the owner, materials shall be stored in such a manner as to prevent damage, soiling, weathering, etc. STRUCTURAL & MISC STEEL: 1.Structural steel shall be detailed, fabricated and erected in accordance with the AISC Specification For The Design, Fabrication and Erection of Structural Steel for Buildings (Latest Edition and Supplements) 2.All structural steel shall conform to the ASTM designation A36 unless otherwise noted. 3.Wide flange "W" sections shall be Grade 50 [Fy = 50 Ksi] and conform to ASTM A992. HSS Sections shall be either : a.HSS 10x10x3/4 [A500] b.HSS 10x10x5/8 [A1085] 4.Pipe columns shall conform to ASTM A53, Grade B. 5.Steel fabricator shall be approved by the building department of the city jurisdiction. Offsite welding shall be performed within a licensed welding shop. 6.Bolt holes shall be 1/16" in diameter larger than the nominal size of bolt used, unless noted otherwise. 7.Gauge metal shall conform to ASTM A245. 8.All substitutions are subject to approval of Authority Having Jurisdiction (AHJ). 9.All structural steel surfaces that are encased in concrete or masonry or are encased by building finish shall be primed only. 10.All field welding and all multi-pass and groove welds shall have continuous inspection. Welding shall conform to latest edition of AWS D1.1. Welding electrodes shall have a minimum Charpy Vee notch toughness of 20 ft.-lbs. Welding shall be performed with arc-welding electrodes 8E70XX in compliance with AWS 5.1. 11.Weld lengths called for on plans are the net effective length required. 12.Fillet welds noted are for design loads. For welds to heavier sections use or increase weld size per AISC specifications. 13.Special inspections are required for all field welding per 2020 Los Angeles Building Code, Section 1705.2.2.1. ANCHORS 1.The sill plate of all exterior, bearing and shear walls shall be secured to the foundation with anchor bolts. 2.Bolts to be embedded into single pour foundations shall be 5/8“ø x 12” long unless noted otherwise. Bolts to be embedded into two pour foundations shall be 5/8“ø unless noted otherwise and sufficient length for bolts to be embedded a minimum of 7” into first pour. 3.Anchor bolts shall not be “stabbed” into place after the concrete has been poured. 4.Space bolts at 4’-0” oc maximum unless noted otherwise. Provide one bolt no more than 12” and no less than 7 bolt diameters of each plate end and corners of walls. Provide two bolts minimum per plate. 5.The maximum slope of cuts and fills is 2:1 for buildings, structures, foundations and retaining walls. 6.Plate washers shall used with all anchor bolts. 5/8“ø ab 3” sq. x 0.229” plate washer 3/4“ø ab 3” sq. x 0.313” plate washer 7/8“ø ab 3” sq. x 0.375” plate washer. HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . D A T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: C O N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 6 4 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 L a s V e g a s , N V 8 9 1 3 1 P : ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m h t t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 GN-2 HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . D A T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: C O N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 6 4 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 L a s V e g a s , N V 8 9 1 3 1 P : ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m h t t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 GN-3 HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . D A T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: C O N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 6 4 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 L a s V e g a s , N V 8 9 1 3 1 P : ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m h t t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 GN-4 City of Santa Ana Citation: HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . D A T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: C O N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 6 4 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 L a s V e g a s , N V 8 9 1 3 1 P : ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m h t t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 GN-5 FLAMEOFF COATINGS, INC ICC REPORT: HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . D A T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: C O N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 6 4 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 L a s V e g a s , N V 8 9 1 3 1 P : ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m h t t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 GN-6 HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 CI VI C CE N T ER DR . E MORTIMER ST. N. MINTER ST. FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . DA T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: CO N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 64 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 La s V e g a s , N V 8 9 1 3 1 P: ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m ht t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 T-1 408 E. CIVIC CENTER DR. SANTA ANA, CA 92701 CODE COMPLIANCE GENERAL NOTES PROJECT INFORMATION VICINITY: SITE LOCATION:N.T.S. (REFERENCE ONLY) N.T.S. (REFERENCE ONLY) SCOPE OF WORK 1. THE CONSTRUCTION SHALL NOT RESTRICT A FIVE FOOT CLEAR AND UNOBSTRUCTED ACCESS TO ANY WATER OR POWER DISTRIBUTION FACILITIES (POWER POLES, TRANSFORMERS, METERS, PULL BOXES, PUMPS, VALVES AND APPURTENANCES, ETC.) OR TO THE LOCATION OF THE HOOKUP. THE CONSTRUCTION SHALL NOT BE WITHIN TEN FEET OF ANY POWER LINES WHETHER THE POWER LINES ARE LOCATED ON THE PROPERTY OR NOT. FAILURE TO COMPLY MAY CAUSE CONSTRUCTION DELAYS AND/OR ADDITIONAL EXPENSE. 2. NO CHANGES TO THE STRUCTURE OR ANY FIRE RESISTANCE PROPERTIES. ANY STUCCO PENETRATION SHALL BE REPLACED AND RESTORED TO ITS ORIGINAL STATE. 3. CONTRACTOR IS REQUIRED TO EXERCISE EXTREME CAUTION AND SAFETY PROCEDURES IN REMOVING STRUCTURE IN THIS AREA. CONTRACTOR IS RESPONSIBLE FOR SAFE MEANS METHODS TO REMOVE EQUIPMENT AND THE STRUCTURAL ELEMENTS IN THIS ZONE. CONTRACTOR SHALL IMPLEMENT APPROPRIATE SAFETY PROCEDURES AND TEMPORARY SHORING AS NECESSARY TO INSURE THE SAFETY OF WORKERS, OCCUPANTS AND EQUIPMENT DURING THE OPERATION. 4. ALL CONCRETE AND REINFORCEMENT STEEL SHALL BE PROCURED FROM AN APPROVED FABRICATOR WITH CURRENT CERTIFICATIONS. PLOT PLAN N.T.S. (REFERENCE ONLY) CONCRETE COLUMN REPAIR PLAN 1. THIS PROJECT IS A REPAIR OF CONCRETE COLUMNS IN THE PARKING STRUCTURE. 2. THESE PLANS ARE PREPARED UNDER STANDARD PROFESSIONAL INDUSTRY PRACTICES. NO WARRANTIES ARE PROVIDED, EITHER EXPRESSED OR IMPLIED. 3. CONTRACTOR SHALL EMPLOY THEIR OWN MEANS AND METHODS TO IMPLEMENT THESE SEISMIC RETROFIT PLANS. THIS SHALL INCLUDE, BUT NOT LIMITED TO SAFETY PRECAUTION, PROTECTION OF THE STRUCTURE AND WORKERS. 4. NO CHANGE TO PARKING LOCATIONS, SIZE, NOR QUANTITY IS BEING MADE 5. NUMBER OF COLUMNS NEEDING REPAIR: 3 THIS PLAN ADDRESSES THE CITY OF SANTA ANA CITATION NOTICE GIVEN ON 02/29/2021 ON SHEET GN-4. THERE ARE ADDITIONAL REPAIRS TO BE PERFORMED BY OTHER. NO PUBLIC FUNDS WILL BE USED. NO REMOVAL OF OAK, SYCAMORE, OR BAY LAUREL TREES ARE PART OF THIS PLAN. FRENCH PARK PLAZA HOA OWNER: OWNER: NAME: REGISTERED DESIGN PROF. /ENGR OF RECORD: KHATRI INTERNATIONAL INC. R.C.E # 40833, SE # 4391 6440 Sky Pointe Dr., Suite 140-299 Las Vegas, NV 89131 (626) 351-4830 DILIP KHATRI dkhatri@aol.com JURISDICTION: ............................................ BUILDING AREA:.......................................... LOT AREA:................................................... CURRENT ZONING:....................................... CONSTRUCTION TYPE:................................ OCCUPANCY GROUP:.................................... SPRINKLERS:.............................................. NO. OF STORIES:........................................ HEIGHT:....................................................... APN:............................................................ NO. OF DWELLING UNITS:............................ YEAR BUILT:................................................ LEGAL DESCRIPTION: TRACT:............................................ BLOCK:............................................ LOT:................................................. PROPERTY INFORMATION: ADDRESS: CITY, STATE, ZIP EMAIL ADDRESS: CITY, STATE, ZIP PHONE: FRENCH PARK PLAZA HOA C/O: MONICA SANDOVAL TRITZ PROFESSIONAL MANAGEMENT SERVICES 1525 E. 17TH STREET, SUITE A SANTA ANA, CA 92705 monica@tpms.net CITY OF SANTA ANA 32,328 SQ FT NO 3 14 FT 398-238-12 1976 TRACT NO. 10427 1 1 POINT OF CONTACT: NAME: ADDRESS: CITY, STATE, ZIP PHONE: EMAIL: JESSICA ACEVEDO, PROJECT ENGINEER 6440 SKY POINTE DR., SUITE #140-299 LAS VEGAS NV 89131 (626) 379-4417 JESSICAACEVEDO.KH@GMAIL.COM ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING AUTHORITIES. NOTHING IN THESE PLANS IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THE LATEST EDITIONS OF THE FOLLOWING CODES. 1. 2022 CALIFORNIA BUILDING CODE 2. 2022 CALIFORNIA RESIDENTIAL CODE 3. 2022 CALIFORNIA ELECTRICAL CODE 4. 2022 CALIFORNIA ENERGY CODE 5. 2022 CALIFORNIA MECHANICAL CODE 6. 2022 CALIFORNIA PLUMBING CODE 7. 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE 8. 2022 CALIFORNIA FIRE CODE DESCRIPTIONSHEET SHEET INDEX W SN E W SN E W SN E AREA OF WORK T-1 GN-1 GN-2 GN-3 GN-4 GN-5 GN-6 C-1 C-2 C-3 C-4 C-5 C-6 D-1 TITLE PAGE GENERAL NOTES STRUCTURAL OBSERVATION REPORT STRUCTURAL OBSERVATION REPORT CITY OF SANTA ANA CITATION NOTICE FLAMEOFF COATINGS, INC ICC REPORT FRENCH PARK PLAZA HOA RELEASE LETTER SITE PLAN ELEVATIONS ELEVATIONS AS-BUILT GARAGE FLOOR PLAN AS-BUILT GARAGE BEAM PLAN PHOTOS DETAILS Bldg# 102119284 APPROVALS: PLNG - ASevilla BLDG - TLe HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 CI V I C C E N T E R D R . E MORTIMER ST. N. MINTER ST. ⅊ ⅊⅊ ⅊ FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . D A T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: C O N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 6 4 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 L a s V e g a s , N V 8 9 1 3 1 P : ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m h t t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 C-1 W SN E SITE PLAN SCALE: 1/32" = 1'-0" AREA OF WORK (GARAGE LEVEL ONLY) HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 THIRD FLOOR 22'-4" SECOND FLOOR: 13'-5" FIRST FLOOR: 4'-4" GROUND LEVEL: 0'-0" ROOF LEVEL: 31'-6" B D FCE G H I 2 2 2 2 THIRD FLOOR 22'-4" SECOND FLOOR: 13'-5" FIRST FLOOR: 4'-4" GROUND LEVEL: 0'-0" ROOF LEVEL: 31'-6" 1.1 2 3 4 5 6 7 8 9 10 11 11.9 FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . D A T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: C O N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 6 4 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 L a s V e g a s , N V 8 9 1 3 1 P : ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m h t t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 C-2 EAST ELEVATION SCALE: 1/8" = 1'-0" NORTH ELEVATION SCALE: 1/4" = 1'-0" NOTE: NO WORK ON EXTERIOR ELEVATIONS NOTE: NO WORK ON EXTERIOR ELEVATIONS HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 THIRD FLOOR 22'-4" SECOND FLOOR: 13'-5" FIRST FLOOR: 4'-4" GROUND LEVEL: 0'-0" ROOF LEVEL: 31'-6" 1.1 2 3 4 5 6 7 8 9 10 11 11.9 FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . D A T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: C O N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 6 4 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 L a s V e g a s , N V 8 9 1 3 1 P : ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m h t t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 C-3 WEST ELEVATION SCALE: 1/8" = 1'-0" NOTE: NO WORK ON EXTERIOR ELEVATIONS HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 W SN E A 1 2 3 4 5 6 7 8 9 B C E D F G H I J K L N M 10 11 1220'-5" 5' - 1 1 " 23'-5"19'-11"28'27'-11"28'27'-7"20'-5"23'-4"14'-8"5'-7" 3' 15 ' - 8 " 7' 1' - 1 1 " 9' - 1 0 " 9' - 2 " 3' - 2 " 15 ' - 8 " 4' 22 ' - 1 1 " 1' - 2 " 17 ' - 9 " 32 6 36 4248 33 7 35 49 34 931 47 41 37 10 30 50 46 43 40 6 11 29 51 52 45 44 39 38 12 4 5 27 25 23 21 19 17 16 13 2 28 26 24 22 20 18 15 14 1 3 EXISTING CMU PERIMETER WALL, TYP EXISTING CMU PERIMETER WALL, TYP EXISTING CMU PERIMETER WALL, TYP 8 3 D-1 4 D-1 2 D-1 2 D-1 1 D-1 1 D-1 20 ' C L R EXISTING CONCRETE COLUMN REQUIRING REPAIR EXISTING CMU WALL, TYP EXISTING CMU COLUMN REQUIRING REPAIR EXISTING CMU WALL, TYP EXISTING CONCRETE COLUMN REQUIRING REPAIR (N) 12X12X3/4" HSS COLUMN, TYP (N) 12X12X3/4" HSS COLUMN, TYP (N) 12X12X3/4" HSS COLUMN, TYP (E) 2'-0"X2'-0" GRADE BEAM, GC TO VERIFY (E) 2'-0"X2'-0" GRADE BEAM, GC TO VERIFY (N) 12X12X3/4" HSS COLUMN, TYP 16 ' - 8 " C L R 16 ' - 7 " C L R 20 ' - 7 " C L R FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . D A T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: C O N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 6 4 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 L a s V e g a s , N V 8 9 1 3 1 P : ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m h t t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 C-4 PARKING GARAGE AS-BUILT FLOOR PLAN SCALE: 3/32" = 1'-0" HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 A 1 2 3 4 5 6 7 8 9 B C E D F G H I J K L N M 10 11 1220'-5" 5' - 1 1 " 23'-5"19'-11"28'27'-11"28'27'-7"20'-5"23'-4"14'-8"5'-7" 3' 15 ' - 8 " 7' 1' - 1 1 " 9' - 1 0 " 9' - 2 " 3' - 2 " 15 ' - 8 " 4' 22 ' - 1 1 " 1' - 2 " 17 ' - 9 " EXISTING CMU PERIMETER WALL, TYP EXISTING CMU PERIMETER WALL, TYP EXISTING CMU PERIMETER WALL, TYP EXISTING CMU PERIMETER WALL, TYP EXISTING CMU WALL, TYP EXISTING CMU WALL, TYP W SN E 1 D-1 TYP. 1 D-1 TYP. EXISTING CMU WALL, TYP EXISTING 20"X20" CONC BEAM EXISTING 20"X20" CONC BEAM EXISTING 20"X20" CONC BEAM EXISTING 20"X20" CONC BEAM EXISTING 20"X20" CONC BEAM EXISTING 20"X20" CONC BEAM EXISTING 20"X20" CONC BEAM 4 D-1 2 D-1 (N) HSS COLUMN BELOW PER PLAN 2 D-1 (N) HSS COLUMN BELOW PER PLAN (N) HSS COLUMN BELOW PER PLAN FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . D A T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: C O N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 6 4 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 L a s V e g a s , N V 8 9 1 3 1 P : ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m h t t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 C-5 PARKING GARAGE AS-BUILT BEAM PLAN SCALE:3/32" = 1'-0" HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . D A T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: C O N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 6 4 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 L a s V e g a s , N V 8 9 1 3 1 P : ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m h t t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 C-6 COLUMN: 11 COLUMN: 21 COLUMN: 52 HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 1'-0"(E)12"x12" CONC. COLUMN 3" M I N . E D G E DI S T A N C E 1' - 0 " A (6) 3/4" Ø THREADED RODS W/ HILTI HIT-HY 270 ADHESIVE W/ 3" EFFECT. EMBED @ EA PLATE TOP & BOTTOM 1" (N) 1" STL. PLATE AROUND COLUMN A (E) CMU COLUMN 5" M I N A (6) 3/4" Ø THREADED RODS W/ HILTI HIT-HY 270 ADHESIVE W/ 4.5" EFFECT. EMBED @ EA PLATE TOP & BOTTOM (N) 1" STL. PLATE AROUND COLUMN A 1' - 4 " 1" 3" M I N (E) CMU WALL (E) CONCRETE BEAM (N) 12x12x3/4" HSS TUBE AA 2' - 0 " 2' - 0 " REPAIRED CONCRETE COLUMN PER PLAN SECTION A-A 7' - 0 " 4" 8" 8" 4" (E) CONCRETE COLUMN REPAIR PER MAIN DETAIL 1' - 8 " 2" MIN, TYP AA 1'-8" (N) 3/4" STL. BASE PL. W/(4) 3/4" Ø HILTI KB-TZ2 ANCHORS W/ 3.75" EFFECT. & 4.5" NOM. EMBED TOP & BOTTOM (ESR-4266) 31 2" 2' - 0 " M I N G R A D E BE A M G C T O V I F NOTE: NEW STEEL HSS COLUMNS TO BE FIRE PROOFED USING FLAMEOFF COATINGS ESR-3874 (N) 12x12x3/4" HSS TUBE AA 2' - 0 " 2' - 0 " 312" 1'-8" 2" MIN, TYP (N) 3/4" STL. BASE PL. W/(4) 3/4" Ø HILTI KB-TZ2 ANCHORS W/ 3.75" EFFECT. & 4.5" NOM. EMBED TOP & BOTTOM (ESR-4266) REPAIRED CMU COLUMN PER PLAN SECTION A-A 7' - 0 " 4" 8" 8" 4" (E) CMU COLUMN REPAIR PER MAIN DETAIL (E) CONCRETE BEAM AA 2' - 0 " M I N G R A D E BE A M G C T O V I F NOTE: NEW STEEL HSS COLUMNS TO BE FIRE PROOFED USING FLAMEOFF COATINGS ESR-3874 FILL EXISTING CRACK W/ SIMPSON CI-LPL STRUCTURAL EPOXY, TYP AT ALL CRACKS 1' - 8 " FR E N C H P A R K PL A Z A H O A 40 8 E . C I V I C C E N T E R D R . SA N T A A N A , C A 9 2 7 0 5 NO . DA T E K ST A M P : KH A T R I I N T E R N A T I O N A L , I N C . PR O J E C T : DATE ISSUED: CL I E N T : DRAWN BY: JA SHEET NO: CO N S U L T I N G C I V I L & S T R U C T U R A L E N G I N E E R S R. C . E . # 4 0 8 3 3 , S E # 4 3 9 1 64 4 0 S k y P o i n t e D r . , S u i t e 1 4 0 - 2 9 9 La s V e g a s , N V 8 9 1 3 1 P: ( 6 2 6 ) 3 5 1 - 4 8 3 0 dk h a t r i @ a o l . c o m ht t p : / / w w w . k h a t r i n t e r n a t i o n a l . c o m SEPTEMBER 5, 2024 FR E N C H P A R K P L A Z A H O A C/ O : M O N I C A S A N D O V A L TR I T Z P R O F E S S I O N A L MA N A G E M E N T S E R V I C E S 15 2 5 E . 1 7 T H S T R E E T , S U I T E A SA N T A A N A , C A 9 2 7 0 5 D-1 1 CONCRETE COLUMN REPAIR DETAIL SCALE: 1"=1'-0" NOTE: GC. TO SCAN COLUMN AND BEAM FOR REBAR BEFORE ANCHORAGE INSTALLATION. 2 HSS COLUMN AT CONCRETE COLUMN DETAIL SCALE: 1"=1'-0" NOTE: ALL PLATES TO BE MADE OF EITHER STAINLESS STEEL OR ZINC GALVANIZED. 3 CMU COLUMN REPAIR DETAIL SCALE: 1"=1'-0" HSS COLUMN AT CMU COLUMN DETAIL SCALE: 1"=1'-0"4 STRUCTURAL OBSERVATION + INSPECTION NOTES 1. STRUCTURAL ENGINEER SHALL PERFORM A SITE OBSERVATION AT THE INSTALLATION OF THE NEW MEMBERS TO VERIFY THAT THE CONSTRUCTION WORK COMPLIES WITH THE DESIGN PLANS. 2. SPECIAL INSPECTION REQUIRED FOR ANCHORAGE OF STEEL PLATES AND FIRE PROOFING OF NEW HSS POSTS. 3. ANY DEVIATIONS IN THE CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING BEFORE ANY CHANGES ARE MADE. HILTI HIT-HY 200-R V3 HOLD- 408 E Civic Center Dr - 102119284 9/24/2024 K KHATRI INTERNATIONAL, INC STRUCTURAL & CIVIL ENGINEERS R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR # 555505 6440 Sky Pointe Dr., Las Vegas http://www.khatrinternational.com - dkhatri@aol.com Tel. (626) 351-4830 Fax (626) 351-4339 MEMO 2024-08-13: French Park Plaza HOA Column Repair Phase 1 CODES: California Building Code 2022 ASCE 7-16 SCOPE OF WORK: Structural calculations address the City of Santa Ana citation notice given on 02/29/2021. There are additional repairs to be performed by others. These calculations are provided with a design plan and specifications. No Foundation is a part of the scope of work. The scope of this project pertains to the parking garage as shown on the design plans. CLIENT: French Park Plaza HOA PROJECT ADDRESS: 409 E. Civic Drive, Santa Ana, CA 92701 Page 1 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ A) LOCATION MAP: Figure 1: Location of property in Santa Ana Page 2 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ Figure 2: Location of property Page 3 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ Figure 3: Parking Garage Page 4 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ Figure 4: Parking Garage Page 5 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ Figure 5: City of Santa Ana Citation Page 6 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ Figure 6: City of Santa Ana Citation Page 7 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ Figure 7: City of Santa Ana Citation Page 8 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ Figure 8: City of Santa Ana Citation Page 9 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ Figure 9: City of Santa Ana Citation Page 10 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ 1. Loading Figure 1: Loading Diagram Page 11 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ 1.1 Existing Concrete Beam Normal weight concrete = 150 pcf Height = 21 inch Width = 24 inch 1.2 Existing Concrete Slab Normal weight concrete = 150 pcf Thickness = 15 inch 1.3 Existing Loading per Floor Level 1.3.A – Level 1: Dead Load = 10psf + WT of Slab = 10𝑝𝑠𝑓+(150𝑝𝑐𝑓 𝑥 15 𝑖𝑛𝑐ℎ 12𝑖𝑛𝑐ℎ 𝑓𝑜𝑜𝑡 ) = 197.5psf Live Load = 40psf 1.3.B – Level 2: Dead Load = 25psf Live Load = 40 psf 1.3.C – Level 3: Dead Load = 25psf Live Load = 40 psf 1.3.D – Roof Level: Dead Load = 15psf Live Load = 20 psf Page 12 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ 2. Column Repair Design 2.1 Existing Loading per Column Total Dead Load = 262.5psf Concrete Beam Dead Load = 525plf Total Live Load = 20psf +40psf + 40psf+ 40psf = 140psf Beam Tributary Width = 28𝑓𝑡 (𝑊𝑜𝑟𝑠𝑡 𝐶𝑎𝑠𝑒 𝑎𝑡 𝐺𝑟𝑖𝑑𝑙𝑖𝑛𝑒𝑠 4 −6) Total Distrib Load = 1.2 [(262.5𝑝𝑠𝑓 𝑥 28𝑓𝑡)+525𝑝𝑙𝑓]+1.6(140𝑝𝑠𝑓 𝑥 28𝑓𝑡) =15,722𝑝𝑙𝑓 Beam Length 1: 22’-11” (Worst Case at Gridlines K - L) Beam Length 2: 19’-0” (Worst Case at Gridlines L – N) Axial Load at Column =𝑤𝑙 2 =((15.72𝑘𝑙𝑓 𝑥 22.91𝑓𝑡) 2 + (15.72𝑘𝑙𝑓 𝑥 19𝑓𝑡) 2 )= 329.42 𝑘𝑖𝑝𝑠 2.2 Existing Loading per Column # of Beams per Column =2 Axial Load per Column = 329.42 𝑘𝑖𝑝𝑠 2 =164.71 𝑘𝑖𝑝𝑠 Column Length: Axial loading at 12x12X3/4” HSS Column: 164.71 Kips The HSS post is designed for worst case scenario, axial load is calculated using half the load as the beams are sliced. See RISA check attached for check on axial loading. Page 13 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 This output has been based on IBC 2021. The EOR has reviewed it and made any necessary revisions in order to conform to the CBC 2022 and its relevant adoptions & amendments. Steel Column LIC# : KW-06011819, Build:20.24.07.24 Khatri International Inc. (c) ENERCALC INC 1983-2023 DESCRIPTION:French Park Plaza HSS Post Project Title:French Park Plaza Engineer:Jessica Acevedo Project ID: Project Descr: .Code References Calculations per AISC 360-16, IBC 2021, ASCE 7-16 Load Combinations Used : ASCE 7-16 General Information Steel Stress Grade Top Free, Bottom FixedAnalysis Method : 7.0Overall Column Height Top & Bottom FixityLoad Resistance Factor Fy : Steel Yield ksi29,000.0 ksi Steel Section Name :HSS12x12x3/4 36.0 ft E : Elastic Bending Modulus Unbraced Length for buckling ABOUT X-X Axis = 7.0 ft, K = 1.0 Fully braced against buckling ABOUT Y-Y Axis Brace condition : .Applied Loads Service loads entered. Load Factors will be applied for calculations. Column self weight included : 769.37 lbs * Dead Load Factor AXIAL LOADS . . . Axial Load at 7.0 ft, D = 99.010, L = 65.690 k BENDING LOADS . . . Wind Load: Lat. Uniform Load creating Mx-x, W = 0.1860 k/ft .DESIGN SUMMARY PASS Max. Axial+Bending Stress Ratio =0.2332 Location of max.above base 0.0 ft 224.839 k 964.34 k 0.0 k-ft Load Combination +1.20D+1.60L Load Combination +1.20D+L+W 342.90 k-ft Bending & Shear Check Results PASS Maximum Shear Stress Ratio = 1.302 k 0.005813 : 1 Location of max.above base 0.0 ft At maximum location values are . . . : 1 At maximum location values are . . . k Pu 0.9 * Pn Mu-x Vu : Applied Vn * Phi : Allowable 0.9 * Mn-x : 0.9 * Mn-y : Mu-y 342.90 k-ft 0.0 k-ft Maximum Load Reactions . . Top along X-X 0.0 k Bottom along X-X 0.0 k Top along Y-Y 0.0 k Bottom along Y-Y 1.302 k Maximum Load Deflections . . . Along Y-Y 0.005249 in at 7.0ft above base for load combination :W Only Along X-X 0.0 in at 0.0ft above base for load combination : 224.026 . Maximum Axial + Bending Stress Ratios Maximum Shear Ratios Load Combination Stress Ratio Location Stress Ratio Status LocationStatus Load Combination Results Cbx Cby KxLx/Rx KyLy/Ry +1.40D PASS PASS0.00 0.000 0.00 ftft0.145 2.33 1.00 18.42 0.00 +1.20D+1.60L PASS PASS0.00 0.000 0.00 ftft0.233 2.33 1.00 18.42 0.00 +1.20D+L PASS PASS0.00 0.000 0.00 ftft0.192 2.33 1.00 18.42 0.00 +1.20D+0.50W PASS PASS0.00 0.003 0.00 ftft0.069 2.33 1.00 18.42 0.00 +1.20D+L+W PASS PASS0.00 0.006 0.00 ftft0.109 2.33 1.00 18.42 0.00 +0.90D+W PASS PASS0.00 0.006 0.00 ftft0.060 2.33 1.00 18.42 0.00 +0.90D PASS PASS0.00 0.000 0.00 ftft0.093 2.33 1.00 18.42 0.00 . k k-ft Note: Only non-zero reactions are listed. Load Combination X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top@ Base @ Base @ Top Maximum Reactions @ Base @ Base@ Top @ Top Mx - End Moments My - End Moments D Only 99.779 +D+L 165.469 +D+0.750L 149.047 +D+0.60W 99.779 0.781 -2.735 +D+0.750L+0.450W 149.047 0.586 -2.051 +0.60D+0.60W 59.868 0.781 -2.735 +0.60D 59.868 Page 14 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 This output has been based on IBC 2021. The EOR has reviewed it and made any necessary revisions in order to conform to the CBC 2022 and its relevant adoptions & amendments. Steel Column LIC# : KW-06011819, Build:20.24.07.24 Khatri International Inc. (c) ENERCALC INC 1983-2023 DESCRIPTION:French Park Plaza HSS Post Project Title:French Park Plaza Engineer:Jessica Acevedo Project ID: Project Descr: k k-ft Note: Only non-zero reactions are listed. Load Combination X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top@ Base @ Base @ Top Maximum Reactions @ Base @ Base@ Top @ Top Mx - End Moments My - End Moments L Only 65.690 W Only 1.302 -4.558 k k-ft Item X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top@ Base @ Base @ Top Extreme Reactions Extreme Value @ Base @ Base@ Top @ Top Mx - End Moments My - End Moments MaximumAxial @ Base 165.469 Minimum" 1.302 -4.558 MaximumReaction, X-X Axis Base 99.779 Minimum" 99.779 MaximumReaction, Y-Y Axis Base 1.302 -4.558 Minimum" 99.779 MaximumReaction, X-X Axis Top 99.779 Minimum" 99.779 MaximumReaction, Y-Y Axis Top 99.779 Minimum" 99.779 MaximumMoment, X-X Axis Base 99.779 Minimum" 1.302-4.558 -4.558 MaximumMoment, Y-Y Axis Base 99.779 Minimum" 99.779 MaximumMoment, X-X Axis Top 99.779 Minimum" 99.779 MaximumMoment, Y-Y Axis Top 99.779 Minimum" 99.779 .Maximum Deflections for Load Combinations Max. Deflection in X dir Max. Deflection in Y dir DistanceLoad Combination Distance D Only 0.0000 0.000 0.000 ftft inin 0.000 +D+L 0.0000 0.000 0.000 ftft inin 0.000 +D+0.750L 0.0000 0.000 0.000 ftft inin 0.000 +D+0.60W 0.0000 0.003 7.000 ftft inin 0.000 +D+0.750L+0.450W 0.0000 0.002 7.000 ftft inin 0.000 +0.60D+0.60W 0.0000 0.003 7.000 ftft inin 0.000 +0.60D 0.0000 0.000 0.000 ftft inin 0.000 L Only 0.0000 0.000 0.000 ftft inin 0.000 W Only 0.0000 0.005 6.953 ftft inin 0.000 .Steel Section Properties :HSS12x12x3/4 R xx = 4.560 in Depth = 12.000 in R yy = 4.560 in J = 1030.000 in^4 Width = 12.000 in Wall Thick = 0.750 in Zx = 127.000 in^3 Area = 30.300 in^2 Weight = 109.910 plf I xx = 631.00 in^4 S xx = 105.00 in^3Design Thick = 0.698 in I yy = 631.000 in^4 C = 177.000 in^3 S yy = 105.000 in^3 Ycg = 0.000 in Page 15 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 This output has been based on IBC 2021. The EOR has reviewed it and made any necessary revisions in order to conform to the CBC 2022 and its relevant adoptions & amendments. Steel Column LIC# : KW-06011819, Build:20.24.07.24 Khatri International Inc. (c) ENERCALC INC 1983-2023 DESCRIPTION:French Park Plaza HSS Post Project Title:French Park Plaza Engineer:Jessica Acevedo Project ID: Project Descr: Sketches Page 16 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 This output has been based on IBC 2021. The EOR has reviewed it and made any necessary revisions in order to conform to the CBC 2022 and its relevant adoptions & amendments. Steel Base Plate LIC# : KW-06011819, Build:20.24.07.24 Khatri International Inc. (c) ENERCALC INC 1983-2023 DESCRIPTION:Base Plate Check Project Title:French Park Plaza Engineer:Jessica Acevedo Project ID: Project Descr: Code References Calculations per AISC Design Guide # 1, IBC 2021, ASCE 7-16, AISC 360-16 Load Combination Set : ASCE 7-16 General Information Material Properties Load Resistance Factor Design Concrete Support f'c 3 ksi Nominal Bearing Fp per J8 2.550 ksi : LRFD Resistance Factorc 0.65 Steel Plate Fy = 50.0 ksi Assumed Bearing Area :Full Bearing = AISC Design Method Column Properties Steel Section :HSS12x12x3/4 Depth 0.698 in in in^230.312Area Width along "X" 20.0 in Length along "Z' 20.0 in Support Dimensions Column assumed welded to base plate. Width 12 in Flange Thickness Ixx in^4 in^4 Web Thickness in Plate Dimensions N : Length 20.0 in B : Width 20.0 in Thickness 0.750 in Iyy Column & Plate Applied Loads 99.010 65.690 " P " = Gravity load, "+" sign is downward. k k P-Y k k k k k "+" Moments create higher soil pressure at +Z edge. M-X k-ft k-ft k-ft k-ft k-ft k-ft k-ft V-Z D : Dead Load L : Live Lr : Roof Live S : Snow W : Wind E : Earthquake k H : Lateral Earth k k k k k k "+" Shears push plate towards +Z edge. Anchor Bolts 1 1/2" 2 1.0 Anchor Bolt or Rod Description Number of Bolts in each Row................... k Number of Bolt Rows........................ Max of Tension or Pullout Capacity........... Shear Capacity.........................................k 2.0 inEdge distance : bolt to plate................... Page 17 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 This output has been based on IBC 2021. The EOR has reviewed it and made any necessary revisions in order to conform to the CBC 2022 and its relevant adoptions & amendments. Steel Base Plate LIC# : KW-06011819, Build:20.24.07.24 Khatri International Inc. (c) ENERCALC INC 1983-2023 DESCRIPTION:Base Plate Check Project Title:French Park Plaza Engineer:Jessica Acevedo Project ID: Project Descr: GOVERNING DESIGN LOAD CASE SUMMARY Plate Design Summary Fp : Allowable : 1.658 ksi Bearing Stress OK Bearing Stress Ratio 0.818 fu : Max. Plate Bearing Stress ....0.560 ksi Design Method Load Resistance Factor Design +1.20D+1.60L Governing Load Case TypeAxial Load Only Design Plate Size 1'-8" x 1'-8" x 0 -3/4" Pu : Axial ......... 0.000 k Mu : Moment ........ 0.000 k-ft Mu : Max. Moment ..................... 5.175 k-in Governing Load Combination fb : Max. Bending Stress ............... 36.802 ksi Fb : Allowable : Fy * Phi 45.000 ksi Bending Stress OK Bending Stress Ratio 0.338 Governing STRESS RATIO0.8178 Axial Load Only, No MomentLoad Comb. : +1.40D Loading Bearing Stresses Pu : Axial .........138.614 k A1 : Plate Area .........400.000 in^2 A2: Support Area ..................400.000 in^2 sqrt( A2/A1 ) 1.000 Fp : Allowable ............................... 1.658 ksi fb : Actual ................................ Distance for Moment Calculation Stress Ratio .....................0.506 " m " ..................... 4.300 in Design Plate Width .........20.000 in Stress Ratio .......................0.209 X ..............................0.000 in^2 Lambda ...................... 0.000 n' ........................................ 0.000 in n' * Lambda .................................. 0.000 in fu : Max. Bearing Pressure 0.347 ksi ksi L = max(m, n, n'') ......................... 4.300 in Will be different from entry if partial bearing used.Plate Bending Stresses Design Plate Height .........20.000 in " n " ..................... 4.300 in Mmax = Fu * L^2 / 2 ................... 3.204 k-in on 1" strip) Fb : Allowable .............................. 45.000 ksi 22.782 Axial Load Only, No MomentLoad Comb. : +1.20D+1.60L Loading Bearing Stresses Pu : Axial .........223.916 k A1 : Plate Area .........400.000 in^2 A2: Support Area ..................400.000 in^2 sqrt( A2/A1 ) 1.000 Fp : Allowable ............................... 1.658 ksi fb : Actual ................................ Distance for Moment Calculation Stress Ratio .....................0.818 " m " ..................... 4.300 in Design Plate Width .........20.000 in Stress Ratio .......................0.338 X ..............................0.000 in^2 Lambda ...................... 0.000 n' ........................................ 0.000 in n' * Lambda .................................. 0.000 in fu : Max. Bearing Pressure 0.560 ksi ksi L = max(m, n, n'') ......................... 4.300 in Will be different from entry if partial bearing used.Plate Bending Stresses Design Plate Height .........20.000 in " n " ..................... 4.300 in Mmax = Fu * L^2 / 2 ................... 5.175 k-in on 1" strip) Fb : Allowable .............................. 45.000 ksi 36.802 Page 18 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 This output has been based on IBC 2021. The EOR has reviewed it and made any necessary revisions in order to conform to the CBC 2022 and its relevant adoptions & amendments. Steel Base Plate LIC# : KW-06011819, Build:20.24.07.24 Khatri International Inc. (c) ENERCALC INC 1983-2023 DESCRIPTION:Base Plate Check Project Title:French Park Plaza Engineer:Jessica Acevedo Project ID: Project Descr: Axial Load Only, No MomentLoad Comb. : +1.20D+L Loading Bearing Stresses Pu : Axial .........184.502 k A1 : Plate Area .........400.000 in^2 A2: Support Area ..................400.000 in^2 sqrt( A2/A1 ) 1.000 Fp : Allowable ............................... 1.658 ksi fb : Actual ................................ Distance for Moment Calculation Stress Ratio .....................0.674 " m " ..................... 4.300 in Design Plate Width .........20.000 in Stress Ratio .......................0.278 X ..............................0.000 in^2 Lambda ...................... 0.000 n' ........................................ 0.000 in n' * Lambda .................................. 0.000 in fu : Max. Bearing Pressure 0.461 ksi ksi L = max(m, n, n'') ......................... 4.300 in Will be different from entry if partial bearing used.Plate Bending Stresses Design Plate Height .........20.000 in " n " ..................... 4.300 in Mmax = Fu * L^2 / 2 ................... 4.264 k-in on 1" strip) Fb : Allowable .............................. 45.000 ksi 30.324 Axial Load Only, No MomentLoad Comb. : +1.20D Loading Bearing Stresses Pu : Axial .........118.812 k A1 : Plate Area .........400.000 in^2 A2: Support Area ..................400.000 in^2 sqrt( A2/A1 ) 1.000 Fp : Allowable ............................... 1.658 ksi fb : Actual ................................ Distance for Moment Calculation Stress Ratio .....................0.434 " m " ..................... 4.300 in Design Plate Width .........20.000 in Stress Ratio .......................0.179 X ..............................0.000 in^2 Lambda ...................... 0.000 n' ........................................ 0.000 in n' * Lambda .................................. 0.000 in fu : Max. Bearing Pressure 0.297 ksi ksi L = max(m, n, n'') ......................... 4.300 in Will be different from entry if partial bearing used.Plate Bending Stresses Design Plate Height .........20.000 in " n " ..................... 4.300 in Mmax = Fu * L^2 / 2 ................... 2.746 k-in on 1" strip) Fb : Allowable .............................. 45.000 ksi 19.527 Axial Load Only, No MomentLoad Comb. : +0.90D Loading Bearing Stresses Pu : Axial .........89.109 k A1 : Plate Area .........400.000 in^2 A2: Support Area ..................400.000 in^2 sqrt( A2/A1 ) 1.000 Fp : Allowable ............................... 1.658 ksi fb : Actual ................................ Distance for Moment Calculation Stress Ratio .....................0.325 " m " ..................... 4.300 in Design Plate Width .........20.000 in Stress Ratio .......................0.134 X ..............................0.000 in^2 Lambda ...................... 0.000 n' ........................................ 0.000 in n' * Lambda .................................. 0.000 in fu : Max. Bearing Pressure 0.223 ksi ksi L = max(m, n, n'') ......................... 4.300 in Will be different from entry if partial bearing used.Plate Bending Stresses Design Plate Height .........20.000 in " n " ..................... 4.300 in Mmax = Fu * L^2 / 2 ................... 2.060 k-in on 1" strip) Fb : Allowable .............................. 45.000 ksi 14.646 Page 19 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ 2.3 Steel Plates Wrapped Around Columns - Compression Check: Number of Plates per Column = 6 (Minimum) Compression Load at Column = 329.42 𝑘𝑖𝑝𝑠 Plate thickness = 1in Compression strength check on Singular Plate: An = 𝑡𝑝𝑙𝑡(𝑤−3𝑑ℎ)=1𝑖𝑛(12𝑖𝑛−(3 𝑥 0.875) )=9.4𝑖𝑛2 Pc = 𝐹𝑐𝑟𝐴𝑛=50𝑘𝑠𝑖 𝑥 9.4𝑖𝑛2 =470 𝑘𝑖𝑝𝑠 per plate Design Compression Strength: ∅𝑃𝑐=0.9 𝑥 470𝑘𝑖𝑝𝑠=423 𝑘𝑖𝑝𝑠≫329.42 𝑘𝑖𝑝𝑠 O.K. Therefore, one single plate can take the load. 2.4 Steel Plates Wrapped Around Columns – Tension Check: Plate thickness = 1in Pt = 𝐹𝑦𝐴𝑠=60𝑘𝑠𝑖 𝑥 (1 𝑥 12)𝑖𝑛2 =720 𝑘𝑖𝑝𝑠 ≫329.42 𝑘𝑖𝑝𝑠 O.K. Therefore, one single plate can take the load. Page 20 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 KHATRI INTERNATIONAL, INC. STRUCTURAL & CIVIL ENGINEERS 409 E. Civic Center Dr. R.C.E. # 40833, SE #4391, GENERAL CONTRACTOR #B555505 Santa Ana, CA 6440 Sky Pointe Dr., #140-299, Las Vegas, NV 89131 August 13, 2024 www.khatrinternational.com , dkhatri@aol.com Tel. (626) 351-4830; FAX (702) 441-7356 ____________________________________________________________________________________________ 3. Summary and Conclusions Column repair calculations are completed using LRFD per ASCE 7-16 and compliant with Concrete Code and Steel Code specifications. The vertical concrete and masonry columns are cracking due to lack if confinement steel. This is likely due to lack of hoop steel, or none. The repair plan provides two mitigations: 1. Steel plates wrapped around the existing affected columns with epoxy injection at cracks. The plates serve as confinement steel to add circumferential reinforcement and prevent the column from bursting due to the compression load. 2. New HSS columns per plan. As an added security measure, the HSS column will provide support to the beams in the event the damaged columns fail. This serves as another level of insurance in the event of column failure, the new posts will prevent the slab from failing in this one location. Page 21 of 21 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 YES NO INSTRUCTIONS: ORAN GE COUNTY FI RE AUTHORI TY Plan Submittal Criteria COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects and RESIDENTIAL TRACT developments ·Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place. ·Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section. ·If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA. ·In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations. ·Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602. Address Suite City Project Scope/Business Description 1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways, curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within 300 feet of an active or proposed oil well? Fire Master Plan (PR145) 2. Property is adjacent to a wildland area or non-irrigated native vegetation? Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124) 3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170) 4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475) 5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000 sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285) 6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card, button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520) 7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment; industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations? Special Equipment Plan (PR315, PR340-PR382) 8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240) 9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330) 10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335) Initial each of the following two items indicating that you have read and understand the statement: 11.*Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications. 12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327— Initials the building department will determine specific requirements. I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name Signature Phone Number ( )Date / / Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the appropriate plans and fees for OCFA review. 10-08-14 EE COM Dilip Khatri 626 351-4830 5 14 2024 HOLD- 408 E Civic Center Dr - 1021192849/24/2024 O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Referral Form Required for OCFA to review plans upon the request of the Building Department when the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”. City / County Official Requesting Review: City / County Reference #: Date: __________________________________ City / County: _____________________________________ E-Mail: __________________________________ Contact Name: _____________________________________ Phone #: _________________________________ Title: _____________________________________ ** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. ** Reason(s) for Review: Please describe why OCFA Plan Review is or may be required by the City/County : OCFA COMMENTS:  No further action required on this specific plan type, based on information provided on: ____/______/______.  Project to be taken in for OCFA Review. Other: Name: _________________________________________ Contact #: ______________________________________ Date: _________________________________ OCFA Authorization Updated: 06/02/2020 rs HOLD- 408 E Civic Center Dr - 1021192849/24/2024 Rayco Exteriors | www.raycoexteriors.com | Phone: 888.317.2423 September 19, 2024 City of Santa Ana, California Building Department Re: French Park Plaza To Whom It May Concern: French Park Plaza, located at 408 Civic Center Drive #E, Santa Ana, CA 92701, has contracted with Rayco Exteriors to perform repair and maintenance services on the property. We authorize Jahre Cheeseman (Project Manager, Rayco Exteriors) to obtain any necessary records, plans and permits for planning and execution of repairs on behalf of the French Park Plaza Association. Sincerely, Gabriel Cooley President Rayco Exteriors HOLD- 408 E Civic Center Dr - 1021192849/24/2024