Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2406 W Mark St Unit# 2 - Plan
INSTALL A 2.40 KW PV ARRAY THAT INCLUDES 6 ROOF MOUNTED SOLAR PANELS. MODULE MODEL : SILFAB SOLAR SIL-400 HC+ MODULES MODULE MAX POWER (P/MAX): 400W INVERTER MODEL : ENPHASE IQ8PLUS-72-2-US [SI1] 240V INVERTER QTY : [6] ROOF AREA : 980 SQ. FT. ROOF PITCH : 20° PV ARRAY PITCH : 20° PV ARRAY AREA : 128.06 SQ. FT. AZIMUTH: (6) MODULES @ 180 ° ROOF TYPE: ASPHALT SHINGLE ROOF LAYER(S): 01 RAFTERS: 2x6 [16"] ON CENTER ELECTRIC UTILITY COMPANY: SCE MAIN SERVICE AMPERAGE: 100A 2.40kW DC SOLAR ELECTRIC SYSTEM AC :1.74kW ONE STORY HOUSE T1-TITLE PLAN, GENERAL NOTES PV SYSTEM SUMMARY A1-SITE PLAN / A1.1-SYSTEM INFORMATION A2-PANEL AND RACKING LAYOUT / A3-GENERAL DETAIL E1-SINGLE LINE DIAGRAM / E2-LABELS AND PLACARD ES-MANUFACTURER SPEC SHEETS VICINITY MAP SCALE: NTS SHEET INDEX SCOPE OF WORK CODE SUMMARY: 1. ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES: 2022 CA BUILDING CODE, PART 2 2022 CA RESIDENTIAL CODE PART, 2.5 2022 CA MECHANICAL CODE, PART 4 2022 CA ELECTRICAL CODE, PART 3 2022 CA PLUMBING CODE, PART 5 2022 CA EXISTING BUILDING CODE, PART 10 2022 CA GREEN BUILDING STANDARDS CODE, PART 11 2022 CA REFERENCE STANDARDS CODE, PART 12 2022 CA FIRE CODE 2. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, VENTILATION'S INTAKE AIR OPENINGS SHALL NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC SYSTEM. 3. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY AND INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. [NEC 690.4(D)] 4. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND SWITCHES. 5. PAINT PV CONDUIT TO MATCH THE DWELLING EXTERIOR. 6. CONTACT THE SERVICING UTILITY BEFORE POWERING ON THE PHOTOVOLTAIC SYSTEM 1A. ALL ELECTRICAL WORK SHALL BE DESIGNED PER 2022 LOS ANGELES COUNTY ELECTRICAL CODE, 2022 CALIFORNIA ELECTRICAL CODE, AND 2020 NATIONAL ELECTRICAL CODE AND 2022 BUILDING ENERGY EFFICIENCY STANDARDS. 2B. 110.2 APPROVAL; ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION. AERIAL MAP SCALE: NTS HO M E O W N E R : P A U L D I NH AD D R E S S : LI C E N S E # CO N T R A C T O R : T o a n D a o B- 1 0 9 1 6 1 7 24 0 6 W E S T M A R K S T R E E T , U N I T 2 SI G N A T U R E : _ _ _ _ _ _ _ _ _ _ SH E E T T I T L E : S I T E P L A N SA N T A A N A , C A 9 2 7 0 3 JOB#: PVD-6075 REVISIONS DATE REV. SOLAR PERMIT PACKAGE DATE: 7/10/2023 AP N : 1 0 9 - 66 4 - 3 2 PAPER SIZE: 11"X17" SCALE: NTS T1 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg#: 101120674 Elec#: 20183874 2406 W Mark St Unit# 29/9/2024 MIN.18" CLEAR SETBACK FROM RIDGES TO MODULES, MIN.36" ACCESS PATHWAYS. R324.6 Roof access point shall be located in areas that do not require the placement of ground ladders over openings such as windows or doors,and located at strong points of building construction in locations where the access point does not conflict with overhead obstructions such as tree limbs, wires or signs. ROOF PITCH 20° TYP. HO M E O W N E R : PA U L D I N H AD D R E S S : LI C E N S E # CO N T R A C T O R : T o a n D a o B- 1 0 9 1 6 1 7 24 0 6 W E S T M A R K S T R E E T , U N I T 2 SI G N A T U R E : _ _ _ _ _ _ _ _ _ _ SH E E T T I T L E : S I T E P L A N SA N T A A N A , C A 9 2 7 0 3 JOB#: PVD-6075 REVISIONS DATE REV. SOLAR PERMIT PACKAGE DATE: 7/10/2023 AP N : 10 9 - 6 6 4 - 3 2 PAPER SIZE: 11"X17" SCALE: 1/16" = 1'-0" A1 (E) GATE (E) PROPERTY LINE (E) MAIN RESIDENCE (N)ADU, UNIT# 2 (E) UTILITY METER (N) 100A MAIN SERVICE PANEL NEW PROPOSED PV ARRAY LOCATION (6) SILFAB SIL-400 HC+ MODULES & (6) ENPHASE IQ8PLUS-72-2-US MICRO-INVERTERS (N) AC DISCONNECT (N) IQ COMBINER BOX IQ COMBINER 5/5C (N) JUNCTION BOX 36" FIRE SETBACK NEW EMT CONDUIT (MIN.7/8" ABOVE ROOF) PER310.15(3)(C) ALL EXPOSED CONDUITS WIRING,MOUNTING HARDWARE,EMT MUST BE PAINTED TO MATCH THE COLOR OF THE ROOF/FACADE RESPECTIVELY. (E) FENCE WARD ST. JB (N) 100A SUB PANEL 2406 W Mark St Unit# 29/9/2024 1.Equipment Location Scale: N/A ·ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS. ·WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE. ·ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT ·ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL. ·ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE 2. Interconnection Notes Scale: N/A ·THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING. ·WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD. ·AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVER CURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. ·SUPPLY SIDE TAP INTERCONNECTION WITH SERVICE ENTRANCE CONDUCTORS BACK FEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING. 3. General Notes Scale: N/A ·MODULES ARE LISTED UNDER UL 1703 AND CONFORM TO THE STANDARDS. ·INVERTERS ARE LISTED UNDER UL 1741 AND CONFORM TO THE STANDARDS. ·DRAWINGS ARE DIAGRAMMATIC, INDICATING GENERAL ARRANGEMENT OF THE PV SYSTEM AND THE ACTUAL SITE CONDITION MIGHT VARY. ·WORKING CLEARANCES AROUND THE ELECTRICAL EQUIPMENT WILL BE MAINTAINED. ·ALL GROUND WIRING CONNECTED TO THE MAIN SERVICE GROUNDING IN MAIN SERVICE PANEL/ SERVICE EQUIPMENT. ·ALL CONDUCTORS SHALL BE 600V, 90°C STANDARD COPPER UNLESS OTHERWISE NOTED. ·WHEN REQUIRED, A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. ·THE SYSTEM WILL NOT BE INTERCONNECTED BY THE CONTRACTOR UNTIL APPROVAL FROM THE LOCAL JURISDICTION AND/OR THE UTILITY. ·ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREES, WIRES OR SIGNS. ·PV ARRAY COMBINER/JUNCTION BOX PROVIDES TRANSITION FROM ARRAY WIRING TO CONDUIT WIRING 4. Wiring & Conduit Notes Scale: N/A ·ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. ·DC WIRING LIMITED TO MODULE FOOTPRINT. MICRO INVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. ·AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: 1-PHASE A OR L1- BLACK 2-PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE 3-PHASE C OR L3- BLUE, YELLOW, ORANGE*, OR OTHER CONVENTION 4-NEUTRAL- WHITE OR GREY IN WIRE DELTA CONNECTED SYSTEMS THE 8. Structural Notes Scale: N/A ·RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER'S INSTRUCTIONS. ·JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. ·ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. ·ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 5. Grounding Notes Scale: N/A ·GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. ·PV EQUIPMENT SHALL BE GROUNDED METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES. ·EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO MICRO INVERTER MANUFACTURER'S INSTRUCTIONS. ·THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. ·GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER. ·IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED. 6. Conduit Run Details Scale: N/A 7. Grounding Details Scale: N/A 9. Disconnection & OCPD Notes Scale: N/A ·DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED, THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). ·DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH ·RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS ≤30V AND ≤240VA. LOCATION OF LABEL ACCORDING TO AHJ. ·IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION. HO M E O W N E R : PA U L D I N H AD D R E S S : LI C E N S E # CO N T R A C T O R : T o a n D a o B- 1 0 9 1 6 1 7 24 0 6 W E S T M A R K S T R E E T , U N I T 2 SI G N A T U R E : _ _ _ _ _ _ _ _ _ _ SH E E T T I T L E : S I T E P L A N SA N T A A N A , C A 9 2 7 0 3 JOB#: PVD-6075 REVISIONS DATE REV. SOLAR PERMIT PACKAGE DATE: 7/10/2023 AP N : 10 9 - 6 6 4 - 3 2 PAPER SIZE: 11"X17" SCALE: 1"=1'-0" A1.1 2406 W Mark St Unit# 29/9/2024 DUAL RACK LITE FLASH L KIT ATTACHMENT SPACING TYP. @ [48" MAX.][MIN. 24"] A R ROOF MATERIAL: COMP. SHINGLE [TYP.] [01 LAYER] ·20% MAX. RAIL FREE SPAN [TYP.] ·ROOF AREA: 980 SQ. FT. ·PV ARRAY AREA: 128.06 SQ. FT. HO M E O W N E R : PA U L D I N H AD D R E S S : LI C E N S E # CO N T R A C T O R : T o a n D a o B- 1 0 9 1 6 1 7 24 0 6 W E S T M A R K S T R E E T , U N I T 2 SI G N A T U R E : _ _ _ _ _ _ _ _ _ _ SH E E T T I T L E : S I T E P L A N SA N T A A N A , C A 9 2 7 0 3 JOB#: PVD-6075 REVISIONS DATE REV. SOLAR PERMIT PACKAGE DATE: 7/10/2023 AP N : 10 9 - 6 6 4 - 3 2 PAPER SIZE: 11"X17" SCALE: 1/8" = 1'-0" A2 R A 2x6 RAFTERS @ 16"O.C DUAL RACK RAIL (E) MAIN RESIDENCE (N) ADU, UNIT# 2 2406 W Mark St Unit# 29/9/2024 DUAL RACK LITE FLASH L KIT ·SUPPORT RAIL PLACEMENT SHALL NOT EXCEED 20% OF MODULE LENGTH FROM THE EDGE ·PV MODULES SHALL HAVE MIN. 3.5" ABOVE ROOF ·THE MAXIMUM DISTANCE FROM THE TOP OF THE MODULE TO THE ROOF PLANE IS LESS THAN 18 INCHES. HO M E O W N E R : PA U L D I N H AD D R E S S : LI C E N S E # CO N T R A C T O R : T o a n D a o B- 1 0 9 1 6 1 7 24 0 6 W E S T M A R K S T R E E T , U N I T 2 SI G N A T U R E : _ _ _ _ _ _ _ _ _ _ SH E E T T I T L E : S I T E P L A N SA N T A A N A , C A 9 2 7 0 3 JOB#: PVD-6075 REVISIONS DATE REV. SOLAR PERMIT PACKAGE DATE: 7/10/2023 AP N : 10 9 - 6 6 4 - 3 2 PAPER SIZE: 11"X17" SCALE: NTS A3 ASPHALT SHINGLE RAFTERS 2X6 @ 16" O.C. [TYP.] END CLAMP MODULE DUAL RACK LITE FLASH L KIT 3/8" LAG BOALT SCREW(MIN 2.5" EMBED) TYP. DUAL RACK RAIL 2406 W Mark St Unit# 29/9/2024 === 2#10 AWG THWN-2@3/4" EMT CONDUIT #8 AWG THWN-2 EGC GA T E W A Y JUNCTION BOX 6" X 6" X 4" UL LISTED, WATER-TIGHT NEMA TYPE 3 AC NEUTRAL (N) 1X20A/2P NEW ENPHASE AC COMBINER BOX WITH IQ+ CONSOLIDATES INTERCONNECTION INTO A SINGLE ENCLOSED STREAMLINE (E) MAIN 2#12 AWG LUG PV WIRE @FREE AIR (BRANCH 1) 1 STRING OF 6 PV MODULES@SILFAB SOLAR SIL-400 HC+ (N) 15A/2P (N) 100A/2P "MSB" (N) MAIN SERVICE PANEL 100A BUS BAR 100AMP MAIN BREAKER TOP FED POINT OF CONNECTION LOAD SIDE 705.12(B)(2)(3)(b) Ground Rod GROUNDING ELECTRODE 20A/2P (N) 30A Utility AC Disconnect , 2 Pole,PV BREAKER Knife-Blade Type, 240V, Lockable, Visible, Rated NEMA 3R "THWN-2"-3-#10 #8,EGC CU "THWN-2"-3-#10 #8,EGC CU PV BREAKER WILL BE INSTALLED ON THE OPPOSITE SIDE OF THE BUS BAR AWAY FROM THE MAIN BREAKER. WIRE TYPE-QTY-SIZE CONDUIT - ABOVE ROOF MIN.7/8" WIRE AMP. 30A TEMP. CORRECTION CURRENT 0.96 28.8A > 10.9A GRD-SIZE #6,BARE CU "THWN-2"-2-#10 #8,EGC CU 40A TERMINAL RATING 90°C 90°C 0.96 38.4A >20A AMP.ADJ C.C.C N/A HI TEMP. = 31°C LOW TEMP. = 2°C (1*L1,1*L2) "Q CABLE "-2#12 (L1,L2) "THWN-2"-3-#10 #8,EGC CU 35A 75°C N/A 32.9A > 20A(L1, L2, N) EMT.3/4"0.94 EMT.3/4"MIN.7/8"N/A MODULE MFR: SILFAB SOLAR MODEL: SIL-400 HC+ VOC = 43.02V VMP = 36.05V ISC = 11.58A IMP = 11.1A MAX DC OUTPUT = 400W * 6 = 2.40kW 374W PTC * 6 = 2.24kW 2.20* 0.97 INV.= 2.188kW INVERTER MODEL&MFR: ENPHASE IQ8PLUS-72-2-US [SI1] 240V AC MAX OUTPUT POWER @ 240V = 290 VA AC NOMINAL OUTPUT CURRENT@240V = 1.21A STRING = 1.21A * 1.25 * 6[e] = 9.07A MIN (OCPD) = 20A, TERMINALS RATED @ 75°C PV SYSTEM OUTPUT INVERTER MODULE @ STC ALL ELECTRICAL INSTALLATIONS MUST BE CARRIED OUT IN ACCORDANCE WITH THE LOCALLY APPLICABLE ELECTRICAL STANDARDS AND THE NATIONAL ELECTRICAL CODE PV COMBINER BOX RATING NEW COMBINER BOX, SPLIT PHASE 3W 120/240V IQ Combiner 5/5C MAX PV OUTPUT CURRENT = INVERTER IMAX * # OF INVERTERS * 125%NEC STRING = 1.21A * 1.25 * 6 [e] = 9.07A MIN (OCPD) = 20A, TERMINALS RATED @ 75°C TERMINALS RATED @ 75°C IN: 1* 20A PV BACKFEED BREAKERS OUT: MAIN LUG CONNECTED TO 20A BREAKER @ MAIN SERVICE PANEL 120%RULE@MAIN SERVICE: 705.12(B)(2)(3)(b) NEW & UPGRADED BUS BAR RATING = 100A = 1.2 *100A BUS BAR = 120A TOTAL FEED = 100A "MSB" BREAKER + 20A = (120A = 120A)MAX PER CEC TOP FED MAIN BREAKER 705.12(B)(2)(3)(b) MSP BUS BAR = 100A 100Ax1.2=120A LARGEST OCPD : 120A-100A= 20A ALL METALLIC RACEWAYS AND EQUIPMENT SHALL BE BONDED AND ELECTRICALLY CONTINUOUS(NEC 250.90,250.96) GROUNDING BUSHINGS ARE REQUIRED AROUND PREPUNCHED CONCENTRIC KNOCKOUTS ON THE DC SIDE OF THE SYSTEM(NEC 250.97) THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS,EXPECT FOR SPLICES OR JOINTS AT BUSBAR WITHIN LISTED EQUIPMENT. (NEC250.64) THE EQUIPMENT GROUNDING CONDUCTOR MAY BE USED AS A GROUNDING ELECTRODE CONDUCTOR.(NEC 250.121 EXCEPTION.INSTALLED PER 250.B(A),II,III,VI) HO M E O W N E R : PA U L D I N H AD D R E S S : LI C E N S E # CO N T R A C T O R : T o a n D a o B- 1 0 9 1 6 1 7 24 0 6 W E S T M A R K S T R E E T , U N I T 2 SI G N A T U R E : _ _ _ _ _ _ _ _ _ _ SH E E T T I T L E : S I T E P L A N SA N T A A N A , C A 9 2 7 0 3 JOB#: PVD-6075 REVISIONS DATE REV. SOLAR PERMIT PACKAGE DATE: 7/10/2023 AP N : 10 9 - 6 6 4 - 3 2 PAPER SIZE: 11"X17" SCALE: NTS E1 ALONG THE WALL (N) 100A/2P "MSB" INCOMING UTILITY SERVICE SCE 120/240V 1-PH, 3W M NEW 100A SUB PANEL 2406 W Mark St Unit# 29/9/2024 NOTE: PANEL DISTANCE APART 10" MIN TO 5'-0" MAX AND 4'-0" MIN TO 6'-0" MAX HIGH FROM GROUND. PERIMETER WORK SPACE SHALL BE MAINTAINED (NEC 110.26)-WEST SIDE OF THE WALL MAIN SERVICE PANEL AC DISCONNECT EMT CONDUIT TO THE PV ARRAY COMBINER BOX (UNLESS BUSBAR IS FULLY RATED) (CEC 705.12) WHITE LETTERS WITH RED BACKGROUND M ARRAY J/B CEC 690.31(G)(3)(4) & CEC 690.13(G)(4) TO BE PLACED AT LEAST EVERY 10FT WHITE LETTERS WITH RED BACKGROUND CEC 690.56 (C)(3) WHITE LETTERS WITH RED BACKGROUND RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE CEC 690.13.G.3 & CEC 690.13.G.4 WHITE LETTERS WITH RED BACKGROUND CEC 690.15, 690.13(B) BLACK TEXT WITH YELLOW BACKGROUND CEC 690.54 WHITE LETTERS WITH RED BACKGROUND CEC 690.17(E) WARNING ELECTRIC SHOCK HAZARD TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT ! PHOTOVOLTAIC SYSTEM AC DISCONNECT RATED AC OPERATING CURRENT 7.26 AMPS AC NOMINAL OPERATING VOLTAGE 240 VOLTS CEC 690.13(B) WHITE LETTERS WITH RED BACKGROUND BLACK OUTLINE WITH BLACK TEXT / WARNING IS IN BLACK TEXT AND ORANGE BACKGROUND SUB PANEL CEC 705.12 BLACK LETTERS WITH ORANGE BACKGROUND ! SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN CEC 690.56(C)(1)(A) BLACK OUTLINE WITH BLACK TEXT AND WHITE BACKGROUND / NOTE ON TOP IS IN BLACK TEXT AND YELLOW BACKGROUND SOLAR ELECTRIC PV PANELS !TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY NOTES: 1. BACKGROUND RED AND BLK ON YELLOW MINIMUM HEIGHT: 3/8”. 2. LETTERS: WHITE. 3.FONT: ARIAL OR SIMILAR NON-BOLD. 4. ALL LABELS SHALL HAVE CAPITAL LETTERS. 5.MINIMUM HEIGHT: 3/16” FOR REMAINING CHARACTERS. 6.ALL LABELS SHALL BE WEATHER RESISTANT MATERIAL AND MATERIAL SUITABLE FOR EXTERIOR USE. 7. ALL SYSTEMS LABELS AND WARNINGS TO BE INSTALLED AT THE SITE AND THEIR LOCATIONS IN ACCORDANCE WITH ARTICLE 690 OF THE 2017 NEC ,ARTICLE 110.21(B) ,AND THE OCFA GUIDELINES. 8.THE ABOVE LABELS SHALL BE PLACED EXACTLY AS NOTED.WEST MARK STREET, UNIT 2 POWER TO THE BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN PLACARD CAUTION HO M E O W N E R : PA U L D I N H AD D R E S S : LI C E N S E # CO N T R A C T O R : T o a n D a o B- 1 0 9 1 6 1 7 24 0 6 W E S T M A R K S T R E E T , U N I T 2 SI G N A T U R E : _ _ _ _ _ _ _ _ _ _ SH E E T T I T L E : S I T E P L A N SA N T A A N A , C A 9 2 7 0 3 JOB#: PVD-6075 REVISIONS DATE REV. SOLAR PERMIT PACKAGE DATE: 7/10/2023 AP N : 10 9 - 6 6 4 - 3 2 PAPER SIZE: 11"X17" SCALE: NTS E2 MAIN SERVICE PANEL PROPOSED PV ARRAY LOCATION (6) MISSION SOLAR MSE395SX9R MODULES 2.4KW DC AC DISCONNECT IQ COMBINER BOX SUB PANEL ADU, UNIT# 2 MAIN RESIDENCE 2406 W Mark St Unit# 29/9/2024 CERTIFICATE OF COMPLIANCE Certificate Number 20211109-E341165 Report Reference E341165-20210317 Issue Date 2021-11-09 Issued to: Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954-6515 This is to certify that Grid Support, Utility Interactive Sup porting Energy Storage, representative samples of Multimode, Bi-directional Microinverters Models IQ8-60, IQ8PLUS-72, IQ8M-72, IQ8A-72, IQSH-208-72, IQSH-240-72, may be f/b -2, -5, -E, or -M, may be fib -ACM, f/b -US, may be f/b -NM, may be f/b - RMA, may be f/b -&, where "&" designates additional characters. Has been investigated by UL in accordance with the Standard(s) indicated on this Certificate. Standard(s) for Safety: See Page 2 Additional Information: See the UL Online Certifications Directory at www.ul.com/database for additional information This Certificate of Compliance is provided as a courtesy to help our customers communicate product compliance information, as documented in our UL Follow-Up Services procedure. This Certificate of Compliance does not provide authorization to apply the UL Mark. Only the UL Follow-Up Services Procedure provides authorization to apply the UL Mark. Only those products bearing the UL Mark shall be considered as being UL Certified and covered under UL's Follow-Up Services. Look for the UL Certification Mark on the product. Any information and documentation involving UL Mark services are provided on behalf of UL LLC (UL) or any authorized licensee of UL. Bruce M11hrenholz, Director North American Certification Program UL Ll.C Any information and documentation involving UL Maril services are provided on behalf of UL LLC (UL) or any autholized licensee of UL. For questions, please contact a local UL Customer Service Representative ot bttp·{lyl comfat>oututnocatioOs/ Page 1 of 9 CERTIFICATE OF COMPLIANCE Certificate Number 20211109-E341165 Report Reference E341165-20210317 Issue Date 2021-11-09 This is to certify that representative samples of the product as specified on this certificate were tested according to the current UL requirements. Standards for Safety: UL 62109-1, STANDARD FOR SAFETY OF POWER CONVERTERS FOR USE IN PHOTOVOLTAIC POWER SYSTEMS -PART 1: GENERAL REQUIREMENTS, Edition 1, Revision Date 04/30/2019 IEC 62109-2, SAFETY OF POWER CONVERTERS FOR USE IN PHOTOVOLTAIC POWER SYSTEMS -PART 2: PARTICULAR REQUIREMENTS FOR INVERTERS, Edition 1, Issue Date 06/2011 UL 1741, Inverters, Converters, Controllers and Interconnection System Equipment for Use With Distributed Energy Resources, Edition 2, Revision Date 06/10/2021, including the requirements in UL 17 41 Supplement SA, sections as noted in the Technical considerations. IEEE 1547, IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems. IEEE 1547.1, IEEE Standard for Conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power Systems. CSA C22.2 No. 62109-1, Safety of Power Converters for Use in Photovoltaic Power Systems - Part 1: General Requirements, Edition 1, Issue Date 07/2016 CSA C22.2 No. 62109-2, Safety of Power Converters for Use in Photovoltaic Power Systems - Part 2: Particular Requirements for Inverters, Edition 1, Issue Date 07/2016 Bruce Mahrenholz, Director North American Certification Program ULLLC Any information and documentation involving UL Mark services are provided on behalf of UL LLC (UL) or any 111.1thorized licensee of UL. For questions, please contact a local UL Customer Service Representative at flttp:J/ul.comlaboutulflocations/ Page 2 of 9 2406 W Mark St Unit# 29/9/2024 Data Sheet Enphase Networking IQ Combiner 4/4C X-IQ-AM1-240-4C LISTED '") EN PHASE l X-IQ-AM1-240-4 • X2-IQ-AM1-240-4 (IEEE 1547:2018) To learn more about Enphase offerings, visit enphase.com IQ-C-4-4C-DS-0103-EN-US-12-29-2022 The IQ Combiner 4/4C with IQ Gateway and integrated LTE-M1 cell modem (included only with IQ Combiner 4C) consolidates interconnection equipment into a single enclosure. It streamlines IQ Microinverters and storage installations by providing a consistent, pre-wired solution for residential applications. It offers up to four 2-pole input circuits and Eaton BR series busbar assembly. Smart Includes IQ Gateway for communication and control Includes Mobile Connect cellular modem (C ELLMOD EM-Ml-06-SP-05), included only with IQ Combiner 4C Includes solar shield to match Enphase IQ Battery aesthetics and deflect heat Supports Wi-Fi, Ethernet, or cellular connectivity Optional AC receptacle available for PLC bridge Provides production metering and consumption monitoring Simple Mounts on single stud with centered brackets Supports bottom, back and side conduit entry Allows up to four 2-pole branch circuits for 240VAC plug-in breakers (not included) 80A total PV or storage branch circuits Reliable Durable NRTL-certified NEMA type 3R enclosure Five-year limited warranty Two years labor reimbursement program coverage included for both the IQ Combiner SKU's UL listed •X2-IQ-AM1-240-4 and X2-IQ-AM1 -240-4C comply with IEEE 1547:2 018 (UL 1741-SB, 3,d Ed.) 9ENPHASE. IQ Combiner 4/4C MODEL NUMBER IQ Combiner 4 X-IQ-AM1-240-4 X2-IQ-AM1-240-4 (IEEE 1547:2018) IQ Combiner 4C X-IQ-AM1-240-4C X2-IQ-AM1-240-4C (IEEE 1547:2018) ACCESSORIES AND REPLACEMENT PARTS Supported microinverters Communications Kit COMMS-CELLMODEM-Ml-06 CELLMODEM-Ml-06-SP-05 CELLMODEM-Ml-06-AT-05 Circuit Breakers BRK-1 OA-2-240V BRK-15A-2-240V BRK-20A-2P-240V BRK-15A-2P-240V-B BRK-20A-2P-240V-B XA-SOL ARSHIELD-ES XA-PLUG-120-3 X-IQ-NA-HD-125A Consumption monitoring CT (CT-200-SPLIT/CT -200-CLAMP) ELECTRICAL SPECIFICATIONS Rating System voltage Eaton BR series busbar rating Max. continuous current rating Max. continuous current rating (input from PV/storage) Max. fuse/circuit rating (output) Branch circuits (solar and/or storage) Max. total bra nch circuit breaker rating (input) IQ Gateway breaker Production metering CT MECHANICAL DATA Dimensions (WxHxD) Weight Ambient temperature range Cooling Enclosure environmental rating Wire sizes Altitude INTERNET CONNECTION OPTIONS Integrated Wi-Fi Cellular Ethernet COMPLIANCE Compliance, IQ Combiner Compliance, IQ Gateway IQ Combiner 4 with IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20 ± 0.5%) and consumption monitoring (± 2.5%). Includes a silver solar shield to match the IQ Battery and IQ System Controller 2 and to deflect heat. IQ Combiner 4C with IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20 ± 0.5%) and consumption monitoring(± 2.5%). Includes Mobile Connect cellular modem (CELLMODEM-M1-06-SP-05), a plug-and-play industrial-grade cell modem for systems up to 60 microinverters. (Available in the US, Canada, Mexico, Puerto Rico, and the US Virgin Islands, where there is adequate cellular service in the installation area.) Includes a silver solar shield to match the IQ Battery and IQ System Controller and to deflect heat. (not included, order separately) IQ6, IQ7, and IQB. (Do not mix IQ6/7 Microinverters with IQB) -Includes COMMS-KIT-01 and CELLMODEM-Ml-06-SP-05 with 5-year Sprint data plan - 4G based LTE-M1 cellular modem with 5-year Sprint data plan - 4G based LTE-M1 cellular modem with 5-year AT&T data plan Supports Eaton BR210, BR215, BR220, BR230, BR240, BR250, and BR260 circuit breakers. Circuit breaker, 2 pole, 10A, Eaton BR210 Circuit breaker, 2 pole, 15A, Eaton BR215 Circuit breaker, 2 pole, 20A, Eaton BR220 Circuit breaker, 2 pole, 15A, Eaton BR215B with hold down kit support Circuit breaker, 2 pole, 20A, Eaton BR220B with hold down kit support Replacement solar shield for IQ Combiner 4/4C Accessory receptacle for Power Line Carrier in IQ Combiner 4/4C (required for EPLC-01) Hold-down kit for Eaton circuit breaker with screws A pair of 200A split core current trans formers Continuous duty 120/240VAC, 60 Hz 125A 65A 64A 90A Up to four 2-pole Eaton BR series Distributed Generation (DG) breakers only (not included) BOA of distributed generation/95A with IQ Gateway breaker included 10A or 15A rating GE/Siemens/Eaton included 200A solid core pre-installed and wired to IQ Gateway 37.5 cm x 49.5 cm x 16.8 cm (14.75 in x 19.5 in x 6.63 in). Height is 53.5 cm (21.06 in) with mounting brackets. 7.5 kg (16.5 lbs) -40°C to +46°C (-40°F to 115°F) Natural convection, plus heat shield Outdoor, NRTL-certifled, NEMA type 3R, polycarbonate construction • 20A to 50A breaker inputs: 14 to 4 AWG copper conductors • 60A breaker branch input: 4 to 1/0 AWG copper conductors • Main lug combined output: 10 to 2/0 AWG copper conductors • Neutral and ground: 14 to 1/0 copper conductors • Always follow local code requirements for conductor sizing. Up to 3,000 meters (9,842 feet) IEEE 802.11b/g/n CELLMODEM-M1-06-SP-05, CELLMODEM-M1-06-AT-05 (4G based LTE-M1 cellular modem). Note that an Mobile Connect cellular modem is required for all En phase Energy System installations. Optional, IEEE 802.3, Cat5E (or Cat6) UTP Ethernet cable (not included) CA Rule 21 (UL 1741-SA) IEEE 1547:2018 -UL 1741-SB, 3'' Ed. (X2-IQ-AM1-240-4 and X2-IQ-AM1-240-4C) CAN/CSA C22.2 No. 107.1, Title 47 CFR, Part 15, Class B, ICES 003 Production metering: ANSI C12.20 accuracy class 0.5 (PV production) Consumption metering: accuracy class 2.5 UL 60601-1/CANCSA 22.2 No. 61010-1 © 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ Combiner 4/4C, and other names are trademarks of Enphase Energy, Inc. Data subject to change. IQ-C-4-4C-DS-0103-EN-US-12-29-2022 2406 W Mark St Unit# 29/9/2024 Dual Rack l'V HO NTING SYSTEMS STANDARD RAIL Dual Rack rails were designe d to be customized for solar PV arrays on res idential and commercial projects. They are engineered for strength and durability and tested for spans of up to eight feet. Installers prefe r Dual Rack rai ls because they are strong, reliable, time saving, and available at the best price in the marketplace. ADVANTAGES Orderin Specifics Standard PackagingDimension Weight 5 pcs 144'/ 168'/ 204" 0.68 lbs,,ft COl\11\IERCIA� I Rail Span (ft 1) EXP B I C I \Nind Speed M�110 � 130 --140 ,-.--...-.--150 160 170 180 110 --'---120 Zone 1 Srow Load (p_�0,._____��-�---10.0 10.0 I 20]T" 30.0 40.0 50.0 Bi 7.0 I 6.0 I 5.0 U 4.0 8.o 1.0 I 6.0 5_.0_1--'_4._5_�_4_.o----<8.0 7.0 I 6,0 I ___gJ .l 4.5 4.0 s.o � T�o 5.o 4.-5-41i" fs ---1-.0-�1-6.o 5.o 4.5 �7.0 _ 7.0 J.6.0 5.0 4.5 4.0fa 7.0 f 6.0 5.0 4.5 -4.0 -� 6.5 I ¥o-l-5.0 I 4.5 4.0 -::�----,---'�-� -! �:� I �:��·� -::-� -13_0_ 7.5 7.0 I 6.0 j 5.0 1-----:\:5 -4.□-----,;jo-_ -_-=""1 .0:------+---=-1.o I iQ 1 50Q 4,..,,_5-+---,--:4 .01so 6.5 6,5 I 5.5 I s.o 4.5 4.o1606.0 6.0 I 5.5 5.0,---+l --4_5--+--4-.0 -----l 110 ._El 5.5 I 5.5 L �o 4.5 4.o180 5.5 f 5.5 I 5.5 I 5.0 4.5 4.0 A. Toe- tl.ble aiove ONLY 11dl.l!es Du� Rad< raJ capa:Jty data. It does not 110000 roof attachment data or roofloal capaply, B. W11d ris1<. categO<Y 11 per /\SC E7-10. c. T�ic1act<r, kzt ls 1.0. D, Mal<i!Tnrn rreamoof reiglltls 3011. E. ,'<1�• l"'rapetlleigliisO tt. F �p,tdl is between 7 degrees arc! 27deqoos. G, Maxinlfll �a-JEflB 11eigltis 50 lbs•. -H. Heiglltof solar panel is lletweei 'land 1f}'frm, root "See Zone 2 8. 3 span table calculatfon in Installation Manual/P.E. certification. Advanced Dual Rack design - PE Certified in 16 states - No speci al training required - Save time and money on installations -Less parts, two ways to install - 3 sizes available: 12', 14' & 17' in silver & black - 10 year limited warranty -Conforms to UL STD 2703 and Class A Fire Rated. Product Line Item# Product Name ST-144-C Standard Rail 144· - aear ST-168-C S1andard Rail 168" - aear ST-204-C Slandard Rail 204· -Dear ST-144-B Standard Rail 144" - Black ST-168-B Standard Rail 168" -Black ST-204-B Standard Rail 204" -Black I] :www.DnalRack.net ETl ClASSIAED lntertek 6000799 Ccw,form■ lo UL SUB l7G3 Dual Rack l'V MOUNTING SYSTEMS Standard Rail Installation Guide Du al Rack is a robust, long-life phot ovoltaic (PV) module mount ing system for both flat and pitched roofs. It consists of aluminum rails, roof attachments and all the necessary components to ensure a safe and sturdy installation. Dual Rack allows modules to be mounted in both landscape and portrait orientations. •Dual Rack technology can be installed in two different ways: Top down attachment style and L-Foot style. TOP DOWN Contact Info Dual Rack Inc. • Measure and mark the location of each standoff to roof connection. •Drill 3/8" hcie lhrough Dual Rack standard rail for each standoff locaUon. •Attach s1andoff!o roof with 5/16" lag screw. Attach Dual Rack s1andard rail to standoff with 3/8" bolt and washer. 2290 Agate ct. Unit A-B. Simi Valley, CA, 93065 www.DualRack.ne! Email: info@DualRack.net Phone:+1 (805) 254 -2250 L-FOOT STYLE •After securely installing standoff to rafter, attach L-foot with 318" bolt and nut to Dual Rack standard rail at desired height •Dual Rack L-foot enables height adjustment up to 1.1 inches. www.DnalRack.net 2406 W Mark St Unit# 29/9/2024 Dual ltack PV MOUNTING SYSTEMS Product Line Product Name Item# DR-CLFLK-01 DR-CLFLK-02 DR-BLFLK-01 DR-BLFLK-02 Lite Flash L Kit-12.0" x 9.0" -clear Lite Flash L Kil-12.0" x 12.0" • dear Lite Flash L Kil-12.0" x 9.(l" -black Lite Flash L Kil-12.0" x 12.0"- black LITE FLASH L-Kit Dual Ra ck LRe Flash L-Kit is designed in both 12.0" x 12.0" and 9.0" x 12.0" sizes and comes complete with all necessary components for a quick and weatherproof installation. Standard packs include a kitted set of 10 in clear or black finish options. Our best-in-class design delivers an efficient and cost-effective solar attachment solution for composition/asphalt shingle roofs. It is compatible wRh all Dual Rack rails and there's no ne,ed to cut shingles on your install. ADVANTAGES •Creates a weatherproofing seal every time. •Install easily, quickly, and with confidence. •All Aluminum 9.0" x 12.0" or 12.0" x 12.0" flashing. • 10 Year Limited Warranty.Product Line Product Name Component List Material Aluminum Flashing LBase 5116" x4" S.S Lag Boll 3/8" Sealing Washer 3/8" x 1.5" S.S T Bolt 318" Flange Nut EPDM Washer Ordering Specifics Product Net Weight Standard Pack S!andard Pack Dimension Standard Pack Weigh! Big Pack Big Pack Weight QTY 01 01 01 01 01 01 01 DR-CLRLK-01 / DR-BLFLK-01 0.85 lbs/ set 10 set/ box 14.0' (L) X 13.0" (W) X 3.5" (H) 8.5 lbsl box 4 Pa ck,<l of 1 O = Set of 40/Box 34-.0 lbs' box •Stainless steel hardware included. •Meets or exceeds roofing industry best practices • 100% IBC Compliant. •No shingle cutting necessary. DR-CLFLK-01 DR-CLFLK-02 DR-BLFLK-01 DR-BLFLK-02 Ute Flash L Kit -12 O" x 9.0" - Clear Ute Flash L Kil -12.0" x 12.0" -Clear Ute Flash L Kil -12 O" X 9.0'' -Black Ute Flash L Kil -12.0" x 12.0" -Black 2290 Agate ct, Unit A-B, Simi Valley, CA, 93065 www.DnalRack.net DR-CLFLK-02 / DR-BLFLK--02 1.02 lbsl-set 10 setl box 14.0" (L) X 13.0" 0f'J) X 3.5" (H) 10.2 lbs/ box 4 Packs of 1 O = Set of 40/Box 40.8 lbs/ box lntertek 500079, C<Wlforma lo UL SUB 1.703 Dual ltack l'V JOUNTlNG SYSTEMS LITE FLASH L-KIT Installation Guide OR-CLFLK-02 DR-BLFLK-02 For detailed instructions �ease refer to the Dual Rack installation guide 1.Locate, choose and mark center of the rafter for racking installation. Select the courses of shingles where mounts will be placed. '" --=-,,._, � � ...... �, ' ��-I 5.Screw the 5116" lag bolt into the rafter embedded a min.of 2.5"_ 0 (Tightening torque is dependent on lhe roofing material.)Contact Info Dual Rack Inc. 2. Geritly break seal between shingles and remove any nails. Slide mount up under shingles, 'Mth flashing lined up with raher center for drill in . '.:!>,-:;,!· a-::a::i:t:iEtt. ... ._--..,J 6.You are now ready to attach the rail. Slide the 3/8" T bolt through the rail groove. 2290 Agate cl Unit A-B. Simi Valley, CA, 93065 www.DualRack.net Email: info@OualRacknet Phone:+1 (805) 254 -2250 3. Put 5/16" x 4" lag bolt through L-foot Next. slide the EPDM washer up onto the lag bolt. 7.Attach the rail to the L-base using 3/8" T bolt and mtt. .,.,-.,--rr ............ COl\11\IE"RGIAI.c -CLFLK-01 DR-BLFLK-01 ■■■■ 4.Secure L-foot onto Flash L Base and rooftop (lightening torque ol 14 lbs-ft). 8.Secure the ¾" T bolt 'Mlh the nut (Tightening torque 14Jbs-ft). 2290 Agate ct. UnitA-B, Simi Valley, CA, 93065 www.DualRack.net 2406 W Mark St Unit# 29/9/2024 SILFAB PRIME SIL-400HC+ .: RELIABLE ENERGY. DIRECT FROM THE SOURCE. Designed to outperform. Dependable, durable, high-performance solar panels engineered for North American homeowners. SILFABSOLAR.COM .,ei.fti<o-9.., ._(i ,t. � � PV "Ol>U�f. llfl lAllll lfY i.ta:=-r,t.t.lln CE [Q] IEC � FraunhoferN • ••• ••••• SILFAB ••• • SOL AR• CHUBB ELECTRICAL SPECIFICATIONS •ooTut C ondltiol'IS m >'OCT Module Power (Pm;u) Wp .,. ,,. M�mum power Yohgc (\'pm� V lG.OS 33.SO M�mum power tlKl'Cfl' Opm� A 11.10 8.90 0pM tirtuit Yobgc (Voe) V 43.00. "·" S-hort circuit UlfTCnt (be) A 11.53 '·"' Module cfficiMcy "' ,..,,. 1U9. M�mum systcmvolt:igc (VO(.) V 1000 Series fu se n,ting A ,. Po wct Totcranoe Vlp Oto•IC l«-"5Uttffl(!l'll t.olld111on s: STC 1000 WJm1 , AJ-1 l .S • lCfflP'Qlv� 2S 'C • NOCl 800 w;rd • AM I.S • �WttmMt lln«!l'b!ftty s l* S11nsam11l.1torohbQl llon irdt-«! nv:,,:Mts fromfr,u-1h� lns.111:utc>. ElwinQ1 d'illt'3t ttnm«mqY¥'Jby JS'lf>,1/ld� byO IO• IO'W. MECHANICAL PROPERTIES/ COMPONENTS METRIC IMPERIAL Modulc�llt OimCflsions (H x Lx 0) --+--''='·=""'"' .0.2k g l'.114 mm• t03Gmm•lSmm 471bst-0.4!bs 1$.l SI •40.8 in• l.31 SI M�mum wrf;xc lo11d (,'lind/"'o-N)' S400 P11 rc:ir I� / 5400 Pa ftont lo11d o 2S mm 111 83 km/h 11.2.8 lb/ft• re.1r 103d / 111.il lb/fl' frOllt 103d o l inatS1.6mph H11il imp:,ttrMistancc Cells Cw, 132 H:i!f cells• Si mono PERC 9budl:ir•8lxt66mm l.2 mm high trl!iumittanoe, tcnv,cted, DSM �tireftt"t"tive to.1ti n g 132 Hllll cdls-Si m ono PERC !I busb:11 • 3.26• 6.Sli n 0.126 i n high tQll$mitt.:mce, t emper e d, DSM llntirdlcdivc c�ting Cable s llnd ton�ors (refct to inst3'11.1tionm�u.10Q __ -+_l _l_SO_mm, o S.1 mm, MC4 from St:iu'bli S3 in, oO.ll SI (12A'I/G), MC4 from St.3u'bli B11ckshect Fr:imc High durability, superios hydrolysis and lN resi sl.3nc:e, multi•l.1yct dielectric fim, fluotW1e-fr ce PY b.1c luhC'et AnodindAluminum (Sllltkl Byp;,.u di o des Junction Box l di odcs-:!OSQ04ST 14SV fl\3J( OC blodlingvoltage, lQAm.,,. for\'Qld rKtified tuttCilt) UL 31:!0CMifie d, IEC 62190Cettified, tP68me d TEMPERATURE RATINGS --,--Temperlltute Co efficient be Temperlltlrr e Co efficient \'oc Temperlltute Co efficient Pm .,,. HOCT (&2'() Op�ting temperllture --f--C-<)J)64%/'( -0.28� -+-'°=·"-•S'( ·40/.aS 'C WARRANTIES Module p!Odutt wostuna n�ipWllftll n ty line:11 power pe rformanoegu�tce 2S f\"MS"' ,.,,.,, �!n.1�end h-tyr � !U.M6 end 12th y, � 85..1� end 25th yr � al.a end 30th y, CERTIFICATIONS SHIPPING SPECS Pro duct hcto:y UL 61215·1.:2017 £d.l, UL 61215·2:2017 Ed.l , UL 61730·1:2011 Ed.l, Ul.61131). 2:2011 Ed.t, CSAC22.2k617Xl·l:2019 Ed.2, C:SAC22..211617l0·2:201!1 Ed.2, IEC 6lllS-l:2016 Ed.l, IEC 61215-2:2016 Ed.l, IEC 617l0·1:2016 Ed.2, l(C 61730-2:2016 Ed.2. !EC 6t 1-01.:202C (Slltt Mist Corrosi on), IEC 62716:2013 (Amm011il1 Co1 r osi011), UL fire Rllting: Ty-pe 2. CEC Li sted . 1S09001.:201S A W;)mtn:g. Rud the Slrlc,iy .,d lnst-,U-,b'.On Manubl for mo11ni1t1:g sp«rlia,11ons .,d bc,fo,c h-,ndklg, inst.alwl:g ,1/ld opc,rM1ng mocMu .. U ye. euendllbl c to 2S)'C'-,, s� bjttt 10 ,q;l$/lf-'b0f'I .,d c:ondltJOns OI.I 1llncd 11nclcr •w.,-,11ty· M s11bbsoi11r .co m . 11)\H ,..,_ gcnc1,11cd from 3rd p,1rty pcrlo rm,1nc:c d,1t,1 ,� ,1-..-,11-,blc for dov.flt0.1d M. silh1bsol,1r.to,nJ6ownto11d.f.. ModulC'!S Per P.,lk-t: ModulC!S Per Tnick 26 or 26(Ca!lfo tr1i.1) :!2 or 3C(Californ ill) 832 os 1SO (Calitomill) • _j ill I 1 ¥ l .J 75.3" 11914mm] 12 1� f307mm] I . "-Mounting Hole (x4) 1.4� (35mm) I I l OCr:.oo· l1.SmmJ 1/rainagE Hde (XS) .I 2.4" (60mm] S1 2 (1300mm) 12 r(307mmJ � (t) /-I11 =/ o.�- (12mm] �OJ • 'e -□.., E' I0�"' -o_ S3.1S .. r-r-(1350mm) (J, ::c Cable Length <D �� � :c !f.s· f200mmJ I I� "I -., I I I � g_ .. lit 'J I SILFAB SOLAR INC. 800 CotnwallAve Se\llnghar'n WA 98225 USA T ♦} 360.569.4733 itifO@sllfabsolar.co,"n SIL FA.BSOl Alt.COM lTTOPortOrlve SurUng:ton WA 982)3 USA T ♦} 360.569.4733 240 COI.Jitneypark Otivt East Misslu.auga OH lST 2'() Canada T ♦} 905.2$5.2501 F ♦l 90$.696.0267 Si!f.,,b • SIL•400•HC••20'230S26 llo�UClOtlof-ll,d<0•1owtd•....._,. IM"""" ....... o•u...;,,..,....._,. ...... ,,_ .....ir .... -wd>ct.<, ....... es...w .. 1nc-. lOU� ..... Sot.,,•,.•,,.�l<�al s.,i-w.w. I 2406 W Mark St Unit# 29/9/2024 9ENPHASE. 108 and 108+ Microinverters Our newest 108 Microinverters are the industry's first microgrid-forming, software defined microinverters with split-phase power conversion capability to convert DC power to AC power efficiently. The brain of the semiconductor-based microinverter is our proprietary application-specific integrated circuit (ASIC) which enables the microinverter to operate in grid-tied or off-grid modes. This chip is built in advanced 55nm technology with high speed digital logic and has super-fast response times to changing loads and grid events, alleviating constraints on battery sizing for home energy systems. Part of the Enphase Energy System, 108 Series Microinverters integrate with the Enphase IQ Battery, Enphase IQ Gateway, and the Enphase App monitoring and analysis software. Connect PV modules quickly and easily to 108 Series Microinverters using the included Q-DCC-2 adapter cable with plug-n-play MC4 connectors. 108 Series Microinverters redefine reliability standards with more than one million cumulative hours of power-on testing, enabling an industry leading limited warranty of up to 25 years. • 108 Series Microinverters are UL Listed as PV Rapid Shut Down Equipment and conform with various regulations, when installed according to manufacturer1s instructions. @ 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, 108 Microlnverters, and other names are trademarks of Enphase Energy, Inc. Data subject to change. IQ8SP-DS-000 2-01-EN-US-2022-08-10 iafil'iihiii Easy to install Lightweight and compact with plug-n-play connectors Power Line Communication (PLC) between components Faster installation with simple two-wire cabling High productivity and reliability Produce power even when the grid is down* More than one million cumulative hours of testing Class II double-insulated en closure Optimized for the latest high powered PV modules Microgrid-forming Complies with the latest advanced grid support** Remote automatic updates for the latest grid requirements Configurable to support a wide range of grid profiles Meets CA Rule 21 (UL 1741-SB) requirements • Only when installed with IQ System Controller 2, meets UL 1741. •• Iaa and IQ8Plus supports split phase, 240V installations only. 108 and 108+ Microinverters INPUT DATA IDCI 108-60-2-US IOSPLUS-72-2-US Commonly used module pairings1 w Module compatibility MPPT voltage range V Operating range V Min/max start voltage V Max input DC voltage V Max DC current' [module lsc] A Overvoltage class DC port DC port backfeed current mA PV array configuration 235-350 60-cell/120 half-cell 27-37 25-48 30/ 48 50 235-440 60-cell/120 half-cell, 66-cell/132 half-cell and 72-cell/144 half-cell 29-45 25-58 30/58 60 1x1 Ungrounded array; No additional DC side protection req ired; AC side protection requires max 20A per branch circuit OUTPUT DATA IACI 108-60-2-US IOBPLUS-72-2-US Peak output power Max continuous output power Nominal (L-Ll voltage/range• Max continuous output current Nominal frequency Extended frequency range AC short circuit fault current over 3 cycles Max units per 20 A (L-Ll branch circuit' Total harmonic distortion Overvoltage class AC port AC port backfeed current Power factor setting Grid-tied power factor (adjustable) Peak efficiency CEC weighted efficiency Night-time power consumption MECHANICAL DATA Ambient temperature range Relative humidity range DC Connector type Dimensions (HxWxD) Weight Cooling Approved for wet locations Pollution degree Enclosure Environ. category I UV exposure rating COMPLIANCE Certifications VA VA V A Hz Hz Arms mA 'I, 'I, mW 245 240 1.0 16 97.5 97 240/ 11-264 0 50 68 < % 0 1 0 0.85 leading 0.85 lagging 0 -40°C to +60°C (-40°F to +140 °F) 4% to 100% (condensing) MC4 212 mm (8.3") x 175 mm (6.9") x 30.2 mm (1.2") 1.08 kg (2.38 lbs) Natural convection -no fans Yes PD3 300 290 1.21 13 97.6 97 Class II double-insulated, corrosion resistant polymeric enclosure NEMA Type 6 / outdoor CA Rule 21 (UL 1741-SB), UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 N0.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according to manufacturer's instructions. (1) No enforced DC/AC ratio. See the compatibility calculator at https://link.enphase.com/module-compatibility (2) Maximum continuous input DC current is 10.6A (3) Nominal voltage range can be extended beyond nominal if required by the utility. (4) Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. IQSSP-DS-000 2-01-EN-U S-202 2-08-10 2406 W Mark St Unit# 29/9/2024 Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 2406 W Mark St Unit# 29/9/2024 Expedited Permit Process for PV Systems — Micro-Inverter 2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 4 4 4 COMPOSITION SHINGLE FLASHING SNAPNRACK ST-144-C 306 12 25.5 48 126 2.43 2406 W Mark St Unit# 29/9/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan Myers Electric Company Dinh Residence575 West Birch Court, Suite A Coltom, CA 92324 2406 West Mark Street, Unit 2 951-205-2056 1.74 2406 W Mark St Unit# 29/9/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone:One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT SIL-400 HC+ IQ8PLUS-72-2-US NEMA 3R rated 6x modules Combiner 4/4C N/A 30A (E) 1 2 6 x x x #6 Myers Electric Companybare copper 575 West Birch Court, Suite A Coltom, CA 92324#10 THWN-2 EMT 3/4" Dinh Residence #8 1.74THWN-2 2406 West Mark Street, Unit 2 951-205-2056 #10 THWN-2 EMT 3/4" #8 THWN-2 2406 W Mark St Unit# 29/9/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone:Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO-INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE.b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram SILFAB SOLAR SIL-400 HC+ 11.1 36.05 43.02 11.58 20 400 1000 -.28 ENPHASE IQ8PLUS-72-2-US 60 290 240 1.21 20 7.26 240 7 n n 40 1 n Myers Electric Company 575 West Birch Court, Suite A Coltom, CA 92324 951-205-2056 Dinh Residence 2406 West Mark Street, Unit 2 1.74 2406 W Mark St Unit# 29/9/2024 5/10/2023 RE: Structural Certification for Installation of Residential solar Paul Dinh; 2406 West Mark Street, Unit 2, Santa Ana, CA 92703 Attn: To Whom It May Concern This letter is for the existing roof framing which supports the new PV modules. As well as the attachment of the PV system to existing roof framing. From the field observation report, the roof is made of Composition Shingle over roof plywood supported by 2 x 6 Rafter @ 16 Inch spacing. The slope of the roof was approximately 20 degrees. After review of the field observation data and based on our structural capacity calculation, the existing roof framing has been determined to be adequate to support the imposed loads without structural upgrades. Contractor shall verify that existing framing is consistent with the described above before install. Should they find any discrepancies, a writer's approval from the SEOR is mandatory before proceeding with install. Capacity calculations were done in accordance with applicable building codes. If you have any questions on the above, please do not hesitate to call us for further support. Sincerely, Jin Byon Registered Professional Engineer Irfan Engineering LLC design@irfanengineering.com design@irfanengineering.com Irfan Engineering LLC 2406 W Mark St Unit# 29/9/2024 Structural Letter for PV Installation Date: 5/10/2023 Job Address: 2406 West Mark Street, Unit 2, Santa Ana, CA 92703 Job Name: Paul Dinh Job Number: 1061 Scope of Work This letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV system to existing roof framing. All PV mounting equipment shall be designed and installed per manufacturer’s approved installation specifications. Table of Contents Sheet 1 Cover 2 Scope of Work 3 Roof Framing Check 4 Wind Load And Seismic Load Check Sincerely, Jin Byon Registered Professional Engineer Irfan Engineering LLC design@irfanengineering.com design@irfanengineering.com Irfan Engineering LLC 2406 W Mark St Unit# 29/9/2024 20.00 3.00 10.00 0.00 33.00 2 X 6 7.56 16.00 5.00 103.10 1.40 design@irfanengineering.com Irfan Engineering LLC 2406 W Mark St Unit# 29/9/2024 Seismic Load Check (max) Sds = 2.0 I = 1.0 Non Structural Components (ASCE 7-16, TABLE 13.6-1) (Rp = 1.5, ap = 1.0) ….. Mechanical or electrical components Fp = (0.4 x ap x Sds x Ip / Rp) x (1 + 2 x z / h) x Wp = (0.4 x 1.0 x Sds x 1.0 / 1.5) x (1 + 2 x z / h) x Wp = 0.8 x Sds x Wp = 0.8 x 2.0 x Wp = 1.6 x Wp … Governs Fp (min) = 0.3 x Sds x Wp, Fp(max) = 1.6 x Sds x Wp Design Load = 1.6 Wp x 0.7 = 1.12 Wp (allowable stress design) Fp (shear force per lag screw) = 1.12 x 3.0 psf x 11 sq.ft = 37 lbs < Fpallow = 130 Seismic Load Check O.K. Check Seismic Force Increase Due to Solar Panel Weight: CBC Sec. 3404.A4 V (base shear) = Sds x I / R x W = CW Unit Seismic Load (w) = C (15 psf + 15 psf / 2 x 2) = C x 30 psf when there are no solar panels. Unit Seismic Load (w’) = C (15 psf + 3 psf + 15 psf / 2 x 2) = C x 33 psf when there are solar panels. Increase Ratio = C x 33 / C x 30 = 1.1 Max 10% increase when entire roof is covered with solar panels However, not entire roof is covered with solar panels Therefore, the increase of seismic force due to solar panel weight is less than 10% – O.K. design@irfanengineering.com Irfan Engineering LLC 2406 W Mark St Unit# 29/9/2024 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2. Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6. Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7. Will the PV system be installed without using any ballast system or counter-weight system? 8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 2406 West Mark Street, Unit 2 Toan Dao 1091617 Toan Dao 6263917341 permit@irfanengineering.com 5/13/24 2406 W Mark St Unit# 29/9/2024 2406 W Mark St Unit# 29/9/2024 To whom it may concern, this letter is to notify that l,Paul Dinh authorize Toan Dao (#1091617)to installsolar PV panels on my home at: 2406 West Mark Unit 2 I also authorize them to pull the permit, install the required wall mounted equipment on my exterior wall, and perform the final inspection of the system with the AHJ. Homeowner Name Paul Dinh Homeowner Sig A^t 5l13l% Toan Dao CSLB. #1091617; Class B 1621 East Palas Road Anaheim, CA 92802 2406 W Mark St Unit# 29/9/2024