Loading...
HomeMy WebLinkAbout2321 W St Anne Pl - PlanVICINITY MAP SCALE: NTS PV SOLAR SYSTEM DETAILS MAIN SERVICE PANEL BUS SIZE: MAIN SERVICE BREAKER SIZE: BUILDING INFORMATION: CONSTRUCTION TYPE: V-B OCCUPANCY: R ROOF: SYSTEM SIZE: DC STC: KW SYSTEM SIZE: AC CEC: KW SOLAR MODULES: ( ) ROOF PLAN SINGLE LINE DIAGRAM ATTACHMENT LAYOUT SIGNAGE ECB DATA SHEET INVERTER DATA SHEET 1 INDEX 2 3.1 4 5 6 7 8 9 10 SITE PLAN MODULE DATA SHEET SATELLITE VIEW SCALE: NTS RACKING DATA SHEET ATTACHMENT DATA SHEET COVER PAGE0 MAIN 3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED 4. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING COMMISSIONING AND ACCEPTANCE WITH THE CLIENT, UTILITY CO. AND CITY INSPECTORS AS NEEDED. 5. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS. 6. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. 7. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING THE EXTRA WEIGHT. 8. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS APPROPRIATE. 9. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS. 10. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS, ETC. SHALL BE HANDED OVER TO OWNER'S REPRESENTATIVE AT THE COMPLETION OF WORK PHOTOVOLTAIC NOTES: 1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED AND IDENTIFIED BY RECOGNIZED ELECTRICAL TESTING LABORATORY 2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL VENTS 3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. 5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS. 4. SOLAR INVERTER SHALL BE LISTED TO UL1741. 6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING SHALL BE PROTECTED FROM PHYSICAL DAMAGE. 7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS OVER 150V TO GROUND SHALL NOT BE ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE ENERGIZED. 8. INVERTER IS EQUIPED WITH INTEGRATED GFDI, THUS PROVIDING GROUND FAULT PROTECTION 9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED 10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY. 11. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING, AC GROUNDING AND BONDING BETWEEN AC AND DC SYSTEMS. 12. NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER. BOND BOTH ENDS OF RACEWAYS. GENERAL NOTES 1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED ELECTRICAL TESTING LABORATORY CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED BY THE MANUFACTURER ATTESTING TO ITS SAFETY 2. OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED OR BETTER FLAT TILE 03/21/2024DATE: Project Name: Alexandra Alejo Property address: 2321 W St Anne Pl, Santa Ana, CA 92704 8.200 5.800 COVER PAGE0 THE INSTALLATION OF SOLAR ARRAYS AND PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH THE FOLLOWING CODES: 2020 NATIONAL ELECTRICAL CODE 2022 CALIFORNIA BUILDING CODE 2022 CALIFORNIA RESIDENTIAL CODE 2022 CALIFORNIA GREEN BUILDING STANDARD CODE 2022 CALIFORNIA PLUMBING CODE 2022 CALIFORNIA MECHANICAL CODE 2022 CALIFORNIA ELECTRICAL CODE 2022 CALIFORNIA FIRE CODE 2022 CALIFORNIA ENERGY CODE 2016 INTERNATIONAL PROPERTY MAINTENANCE CODE ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES MOUNTING SYSTEM: 225A 200A EXISTING HANWHA 410 WATT IRONRIDGE XR10 RAIL ELECTRICAL INFORMATION: 11 BATTERY: (2) Enphase IQ Battery 5P NUMBER OF ESS UNITS: 2 ESS UNIT SIZE (KWH): 3.84 KVA ESS TOTAL SYSTEM SIZE: 2 UNITS AT 7.68 KVA LACoFD NOTES 1. All work shall be in compliance with the most current Los Angeles County FireCode. 2. When ESS is installed inside garage - any planned or existing attached garage shall comply with all applicalbe coces and standards, and with the manufacturer'sinstallation manual(s) to which the equipment has been listed, including requirements pertaining to fire protective features (eg gypsum board, doors, andducts), and to alarm/detector devices. SCOPE OF WORK ESS System Number and type ESS Units: New (2) Existing (0) ESS units capacity (kwh/unit): 5.0 kWh/unit Outdoor in Exterior Walls: (2) Disconnects Minimum number of disconnects required to turn off all power feeding the home: (2) (a) main panel - main breaker (b) AC disconnect MICROINVERTER: ( ) Enphase IQ8+ Microinverter RSD DATA SHEET 12 20 20 : 2 X 4 @ 24" O.C.RAFTER BATTERY DATA SHEET SIGNAGE3.2 13 BATTERY MOUNTING DETAIL 14 EQUIPMENT ELEVATION PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 -219 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg# 101118766 Elec# 20182453 APPROVALS: ELEC - MSmith 2321 W St Anne Pl - 201824535/23/2024 EMT Conduit Solar Module INDEX (N) Junction Box Microinverter Setback MSP JB 03/21/2024DATE: ROOF PLAN1 (E) Main Service Panel (N) AC DisconnectACD Roof Face Area:2835 Total Module Area:440 Roof Coverage:15.52% (N) BatteryBT (N) Enphase Combiner BoxECB Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 Roof access is not located in areas that require placement of ground ladders over exterior wall openings CRC R331.4.1. 18'' fire s e t b a c k 18 ' ' f i r e s e t b a c k 3' fire s e t b a c k a a a a a a a a a a b b b b b b b b b b JB JB Solar PV Array 1 16 - Hanwha 410W Modules 16 - IQ8+ Microinverters Pitch: 18 Deg Orientation: 155 Deg Solar PV Array 2 4 - Hanwha 410W Modules 4 - IQ8+ Microinverters Pitch: 18 Deg Orientation: 245 Deg MSP DISCONNECT 1 OF 2 ECB BT W St An n e P l ACD DISCONNECT 2 OF 2 Roof Access Roof Access 3' f i r e s e t b a c k SCALE: 3/32" = 1'-0" S 180 ° E 90 °W 270 ° N0° PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10-219 2321 W St Anne Pl - 201824535/23/2024 SITE PLAN4 Main Service Panel INDEX MSP 03/21/2024DATE: AC DisconnectACD BatteryBT Enphase Combiner BoxECB Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 1. In the case of emergency, call_____________________at Work Phone #__________________or Home Phone #___________________. 2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum extent practicable. 3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage facilities or adjacent properties via runoff, vehicle tacking, or wind. 4. Appropriate BMP's for construction-related materials, wastes, spills shall be implemented to minimize transport from the site to streets, drainage facilities, or adjoining properties by wind or runoff. 5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce or remove sediment and other pollutants.6. All construction contractor and subcontractor personnel are to be made aware or the required best management practices and good housekeeping measures for the project site and any associated constructionstaging areas. 7. At the end of each day of construction activity all construction debris and waste materials shall be collected and properly disposed in trash or recycle bins. 8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or pollutants off the site. Discharges of material other than stormwater only when necessary forperformance andcompletion of construction practices and where they do not: cause or contribute to a violation of any water quality standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardoussubstance ina quantity reportable under Federal Regulations 40 CFR Parts 117 and 302. 9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paintflakesor stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment wash water and concrete wash water; concrete, detergent or floatable wastes; wastes from anyengine/equipment steam cleaning or chemical degreasing and superchlorinated potable water line flushing. During construction, permittee shall dispose of such materials in a specified and controlled temporaryarea on -site, physically separated from potential stormwater runoff, with ultimate disposal in accordance with local, state and federal requirements. 10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited. Dewatering of non-contaminated groundwater requires a National Pollutant Discharge EliminationSystem Permit from the respective State Regional Water Quality Control Board. 11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each working day. Drainage is to be directed toward desilting facilities. 12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent public trespass onto areas where impounded water creates a hazardous condition. 13. The permittee and contractor shall inspect the erosion control work and insure that the work is in accordance with the approved plans. 14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property owners: that dumping of chemicals into the storm drain system or the watershed is prohibited. 15. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary materials shall be available on site and stockpiled at convenient locations to facilitate rapidconstruction of temporary devices when rain is imminent. 16. All removable erosion protective devices shall be in place at the end of each working day when the 5-Day Rain Probability Forecast exceeds 40%. 17.Sediments from areas disturbed by construction shall beretained on site using an effective combination of erosion and sediment controls to the maximum extent practicable, and stockpiles of soil shall be properly containted to minimize sediment transport from the site tostreets, drainage facilities of adjacent properties via runoff,vehicle tracking, or wind. 18. Appropriate BMPs for construction-related materials, wastes, spills or residues shall be implemented and retained on site to minimize transport from the site to streets, drainage facilities, or adjoining property bywind or runoff 59'-6" 98'-8" 59'-6" 98'-8" 36'-11" 21'-5" 8'-1" 20'-8" Dri v e w a y MSP DISCONNECT 1 OF 2 ECB BT PROPRTY LINE W St An n e P l ACD DISCONNECT 2 OF 2 SCALE: 1/16" = 1'-0" S 180 ° E 90 °W 270 ° N0° PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 -219 2321 W St Anne Pl - 201824535/23/2024 ATTACHMENT LAYOUT5 RAIL ATTACHMENT 2 X 4 @ 24" O.C. 03/21/2024DATE: Racking: IronRidge XR10 Rail Attachment: IronRIdge All Tile Hook (3.8) (7.5) (2.13) (5.51) (7.09) (1.18) 1 3 2 DESCRIPTION ASSY, ALL TILE HOOK BOLT, LAG 5/16 X 4" BASE3 2 1 NO. IRONRIDGE ALL TILE HOOK DETAILS 1. 2. 3. Roof attachment hardware to be mounted to existing structure with O.C. rail spans or less. 4. Lag bolts are 5/16" X 3.5" stainless steel with 2.5" minimum embedment into the center of the roof 5. Roof sheathed with 1/2" plywood and upper surface is faced with felt paper. Finished roof surface is One layer of . MODULE WEIGHT (lbs)45.8 # OF MODULES 20 TOTAL MODULE WEIGHT (lbs)916.0 RACKING WEIGHT (lbs)183.2 MICROINVERTER WEIGHT (lbs)47.6 TOTAL SYSTEM WEIGHT (lbs)1146.8 # OF STANDOFFS (lbs)40 MAX SPAN BETWEEN STANDOFFS (in) LOADING PER STANDOFF (in)28.7 TOTAL AREA (sq.ft.)440.0 LOADING (psf)2.6 48" 48"RAFTER SOLAR MODULE Blocking Maximum 6" 2 X 4 @ 24" O.C. FLAT TILE ROOF SECTION DETAIL RAFTER Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 FLAT TILE 17'-2" 13' PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 -219 2321 W St Anne Pl - 201824535/23/2024 SINGLE LINE DIAGRAM2 PERCENT OF VALUES NUMBER OF CURRENT CARRYING CONDUCTORS IN EMT .80 4-6 .70 7-9 .50 10-20 #ITEM DESCRIPTION QTY 1 PV MODULE 2 1 3 PVC JUNCTION BOX 4"x4"x2" UL LISTED WATER TIGHT NEMA TYPE 3 2 4 MAIN METER 1 5 MAIN SERVICE PANEL 1 6 2 3 1 30 X .71 X 1 = 21.3 >= 15.13 2 03/21/2024DATE: 120/240V 1P,3W BUS CENTER FED MAIN C/B 5 225A 200A EXISTING (E) MAIN SERVICE PANEL & METER BUSBAR & MAIN BREAKER, AND HAS ADDITIONAL 100A SPACE FOR ALTERNATIVE ENERGY INPUT WHICH WILL BE USED FOR SOLAR SYSTEM 225A 200A ROMEX 12/2 WIRE CHART # MAX AMPS X NEC MULT = DESIGN AMPS BREAKER SIZE (A)WIRE TYPE EGC WIRE RATING X TEMP DERATE X CONDUCTOR DERATE = DERATED WIRE CONDUIT SIZE 4 M UTILITY METER 120/240V , 1P, 3W, 8 AC Disconnect 100A 2P BLADE TYPE 240V NON-FUSIBLE AC DISCONNECT 1 100A 8 4 4 --80A MICROINVERTER HANWHA 410W Q.PEAK-DUO-BLK-ML-G10 (410W) Voc = 45.37V, Vmp = 37.61V Isc = 11.20A, Imp = 10.89A 7 3 7 2 3 --20A (2)ROMEX 10/2 BATTERY (N) ENPHASE IQ BATTERY 5P ENPHASE COMBINER BOX (N)ENPHASE IQ COMBINER 5/5C WITH ENVOY 3G PV MONITORING SYSTEM 5C(X-IQ-AM1-240-5C) 120/240V, NEMA 3R 7 3 (N) ENPHASE IQ8+ MICROINVERTERS IQ8PLUS-72-2-US (240V) [SI1]) PEAK PWR TRACKING VOLTAGE: =29-45V CEC EFFICIENCY := 97.0 % ENCLOSURE : NEMA 6 MAXIMUM INPUT CURRENT: = 15 A MAXIMUM OUTPUT CURRENT: = 1.21 A MAXIMUM INPUT POWER: = 235 - 440W+ MAXIMUM OUTPUT POWER: = 290 VA 20 --80A ROMEX 4/3 in attic/walls 20 10X1.25X1.21=15.13A 20A 10X1.25X1.21=15.13A 20A (2)#12AWG, ENPHASE Q CABLE (1) #6 BARE SOLID COPPER GEC 30 X .71 X 1 = 21.3 >= 15.13 IN FREE AIR ... 1 6 String a: (10) Modules, (10) Microinverters a a ...b1 6 String b: (10) Modules, (10) Microinverters b 10X1.25X1.21=15.13A 20A (2)#12AWG, ENPHASE Q CABLE (1) #6 BARE SOLID COPPER GEC 30 X .71 X 1 = 21.3 >= 15.13 IN FREE AIR NOTE:AC Disconnect visible and lockable Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 15A 20A20A LOAD CENTER IQ GATEWAY RECOMMENDED ROUTING FOR ENTHERNET CABLE PV CT MAIN LUG CTRL Board CT ON IQ BATTERY WIFI/ETHERNET & CELLULAR 1 20A ROMEX 4/3 80A PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 in attic/walls in attic/walls in attic/walls 20A 2321 W St Anne Pl - 201824535/23/2024 SIGNAGE3.1 MARKINGS, LABELS AND WIRING SIGNS A. Purpose: Provide emergency responders with appropriate warning and guidance with respect to isolating solar electric system. This can facilitate identifying energized electrical lines that connect solar panels to the inverter, as these should not be cut when venting for smoke removal B. Main Service Disconnect. 1. Residential buildings - The marking may be placed within the main service disconnect. The marking shall be placed outside cover if the main service disconnect is operable with the service panel closed. 2. Commercial buildings - The marking shall be placed adjacent to the main service disconnect clearly visible from the location where the level is operated 3. Markings: Verbiage, Format and Type of Material. a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All letters shall be capitalized. Arial or similar font, non bold. c. Material: Reflective, weather resistant material suitable for the environment (use UL - 969 as standard for weather rating). Durable adhesive materials meet this requirement. C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC combiners and junction boxes: 1. Markings: Verbiage, Format and Type of Material. a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turns, above and for below penetrations, all DC combiners and junction boxes b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall adhere to "V. V-3b, c" of this requirement. c. Inverters are not required to have caution markings 1.Marking is required on all interior and exterior DC conduit raceways,enclosures,cable assemblies,and junction boxes,combiner boxes and disconnects. 2.The materials used for marking shall be reflective,weather resistant material suitable for the environment. Minimum 3/8 "letter height; all upper case letters Arial or similar font; Red background with white lettering. 3.Marking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE. 4.Marking shall be placed adjacent to the main service disconnect in a location clearly visible from the location where the disconnect is operated CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: 03/21/2024DATE: 1 2 (STICKER TO BE LOCATED ON CONDUIT WITH DC CURRENT EVERY 4' HORIZONTALLY OR 10' VERTICALLY AND 1' FROM EACH SIDE OF A BEND) 3 4 10 (TO BE LOCATED ON SUB-PANEL ONLY WHEN SUB-PANEL IS DEDICATED FOR PV ONLY) 5 6 7 8 (STICKER LOCATED INSIDE PANEL NEXT TO SOLAR BREAKER) 9 (STICKER LOCATED INSIDE PANEL BELOW PV BREAKER) PV ARRAY J BOX PV SUB-PANEL * if applicable SUB-PANEL * if applicable AC DISCONNECT * if applicable METER MAIN SERVICE PANEL 2 1 5 6 8 7 9 6 8 7 9 6 6 8 7 9 12 (STICKER LOCATED ON THE PV SUB PANEL) 10 11 (STICKER LOCATED ON THE MAIN SERVICE PANEL) 11 CAUTION AUTHORIZED SOLAR PERSONNAL ONLY! CAUTION SOLAR DC CURRENT PRESENT DURING DAYLIGHT HOURS WARNING! ELECTRIC SHOCK HAZARD. IF GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. WARNING! ELECTRIC SHOCK HAZARD. DO NOT TOUCH THE TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. PV LOAD CENTER SIZED FOR PV BREAKERS ONLY OR RENDERED UNABLE TO ACCEPT ANY ADDITIONAL LOADS. PV SUB-PANEL ONLY AC DISCONNECT AC PHOTOVOLTAIC POWER SOURCE RATED AC OUTPUT CURRENT: MAX NOMINAL AC OPERATING VOLTAGE: Vac THIS PANEL FED BY MULTIPLE SOURCES (UTILITY & SOLAR) SOLAR WARNING! INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUT DOWN 13 (RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM) SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS 240 RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM 30.25A Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 2321 W St Anne Pl,Santa Ana, CA 92704 SERVICE POINT & UTILITY METERING DISCONNECT 1 OF 2 SOLAR PV ARRAY ENPHASE COMBINER BOX BATTERY You Are Here AC DISCONNECT DISCONNECT 2 OF 2 N 0 ° S 180 ° E 90 °W 270 ° PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 2321 W St Anne Pl - 201824535/23/2024 3.2 3.2 SIGNAGE 03/21/2024DATE: SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO OFF POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO OFF POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY NOTE: Project shall comply with the current version of the Department electrical power source disconnect placarding system. PLACARD SCHEDULE PLACARD NUMBER LOCATION 1 OF 1 MAIN SERVICE PANEL Placards shall be 24 inches by 24 inches (610 mm by 610 mm) minimum in size with a red background, white reflective stripes and a white reflective border. The stripes and border shall have a 2-inch (51 mm) minimum stroke.F.D. - ELECTRICAL BLDG DISCONNECT # 1 OF 2 F.D. - ELECTRICAL BLDG DISCONNECT # 2 OF 2 POWER SOURCE DISCONNECT SCHEDULE DISCONNECT NUMBER DISCONNECT TYPE 1 OF 2 UTILITY 2 OF 2 PV AND ESS SYSTEM N 0° S 180 ° E 90 °W 270 ° N 0 ° S 180 ° E 90 °W 270 °2321 W St Anne Pl, Santa Ana, CA 92704 2321 W St Anne Pl, Santa Ana, CA 92704 Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 AC Disconnect Main Service Panel #1 #2 DO NOT RELOCATE THIS OVERCURRENT DEVICE #2#1 SERVICE POINT & UTILITY METERING DISCONNECT 1 OF 2 SOLAR PV ARRAY ENPHASE COMBINER BOX BATTERY You Are Here AC DISCONNECT DISCONNECT 2 OF 2 SERVICE POINT & UTILITY METERING DISCONNECT 1 OF 2 SOLAR PV ARRAY ENPHASE COMBINER BOX BATTERY You Are Here AC DISCONNECT DISCONNECT 2 OF 2 PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 2321 W St Anne Pl - 201824535/23/2024 Certificate Of Completion Envelope Id: B8C0B3C9267D432EB86D08D3576F0F88 Status: Completed Subject: Complete with DocuSign: Santa Ana Authorization Letter.pdf Source Envelope: Document Pages: 1 Signatures: 1 Envelope Originator: Certificate Pages: 4 Initials: 0 Peak Power Solutions, Inc. AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 360 E. 1st St. #947 Tustin, CA 92780 documents@peakpowerus.com IP Address: 72.203.80.105 Record Tracking Status: Original 3/25/2024 12:37:11 PM Holder: Peak Power Solutions, Inc. documents@peakpowerus.com Location: DocuSign Signer Events Signature Timestamp Alexandra Alejo alexandralejo@yahoo.com Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 174.193.192.247 Signed using mobile Sent: 3/25/2024 12:37:34 PM Viewed: 3/25/2024 1:30:08 PM Signed: 3/25/2024 1:30:41 PM Electronic Record and Signature Disclosure: Accepted: 3/25/2024 1:30:08 PM ID: c9471eb0-e305-4c43-8f49-6d83a38aa487 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 3/25/2024 12:37:34 PM Certified Delivered Security Checked 3/25/2024 1:30:08 PM Signing Complete Security Checked 3/25/2024 1:30:41 PM Completed Security Checked 3/25/2024 1:30:41 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure 2321 W St Anne Pl - 201824535/23/2024 ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, DocuSign Ink (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign, Inc. (DocuSign) electronic signing system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the ‘I agree’ button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after signing session and, if you elect to create a DocuSign signer account, you may access them for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign ‘Withdraw Consent’ form on the signing page of a DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures Electronic Record and Signature Disclosure created on: 3/5/2015 2:00:08 PM Parties agreed to: Alexandra Alejo 2321 W St Anne Pl - 201824535/23/2024 electronically from us. How to contact DocuSign Ink: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: documents@peakpowerus.com To advise DocuSign Ink of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at documents@peakpowerus.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in the DocuSign system. To request paper copies from DocuSign Ink To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to documents@peakpowerus.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with DocuSign Ink To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to documents@peakpowerus.com and in the body of such request you must state your e-mail, full name, US Postal Address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows® 2000, Windows® XP, Windows Vista®; Mac OS® X Browsers: Final release versions of Internet Explorer® 6.0 or above (Windows only); Mozilla Firefox 2.0 or above (Windows and Mac); Safari™ 3.0 or above (Mac only) PDF Reader: Acrobat® or similar software may be required to view and print PDF files Screen Resolution: 800 x 600 minimum Enabled Security Settings: Allow per session cookies ** These minimum requirements are subject to change. If these requirements change, you will be asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and browsers are not supported. Acknowledging your access and consent to receive materials electronically 2321 W St Anne Pl - 201824535/23/2024 To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the ‘I agree’ button below. By checking the ‘I agree’ box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify DocuSign Ink as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by DocuSign Ink during the course of my relationship with you. 2321 W St Anne Pl - 201824535/23/2024 Sht # 0.1 of 3 Note to Plan Checker: This calculations package shows the structural calculations of the existing 2x4 stud to support the proposed residential battery/ies (Encharge 5P) that are fixed with 5/16" lag screws, as shown on sheet PV3.1 of the System Design Drawings. 2019-1529 Solar Journey David Lewis - Battery Backup Date: June 4, 2019 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2022-4146 Belmont Energy Collin Vath - Battery Backup Date: October 11, 2022 2022-5205 Magic Solar Miguel Rivera - Battery Backup Date: December 15, 20222022-5296 Future Energy Today Tyler Masters - Battery Backup Date: December 21, 20222023-198 Magic Solar Nikolai Green - Battery Backup Date: January 15, 20232023-565 AV Solar Alma Ventura - Battery Backup Date: February 6, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-1967 Magic Solar Scott Berger Residence Date: June 15, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023­2613 Solar Deployed Lorne Leech Residence2023­1967 Magic Solar Scott Berger Residence Date: July 4, 20232023­3935 Berger Solar Nathan Heit ­ Battery Date: July 4, 20232023­3834 Solar Renewable Energy Amador Medina ­ Battery Date: July 12, 20232023­4478 Solar Deployed David Herrera ­ Battery Date: August 10, 2023LWM SSE 2023­5382 Solar Deployed Maria Viridiana ­ Battery Date: November 4, 20232024­0203 Solar Depoyed Donald Trapp ­ Battery Date: January 22, 20242024­0331 ESP Blanca Ambriz ­ Battery Date: February 6, 20242024­0386 ESP Gustavo Silva Residence Date: February 09, 20242024­0394 Solar Deployed Arlene Twine Residence Date: February 09, 20242024­0396 Smart House Peggy Garcia Date: February 9, 20242024­0466 Solar Deployed Anthony Britt Date: February 20, 20242024­0527 Solar Deployed Bridget Zuniga Date: February 26, 20242024­0428 Papke Designs Carlos Gonzalez Date: February 26, 20242024­0528 Solar Deployed Ricky Desingano Date: February 26, 20242024­0530 Solar Deployed Isenia Isabel Vasquez Date: February 26, 20242024­0562 Solar Deployed Sourivanh Hanemountry Date: February 28, 20242024­0554 ESP Robert Frantz Residence Date: February 28, 20242024­0556 ESP Dominic Accardi Residence Date: February 28, 20242024­0595 ESP David Villanueva ­ Battery Date: March 4, 20242024­0665 ESP Raymond Chavez ­ Battery Date: March 09, 20242024­0694 Effect Energy Allen Ramos ­ Battery Date: March 13, 20242024­0695 Effect Energy Scott Howard ­ Battery Date: March 13, 20242024­0699 Solar Deployed Gurmit Gill ­ Battery Date: March 13, 2024 2024­0713 Solar Deployed Brenda Garcia ­ Battery Date: March 14, 20242024­0763 Solar Deployed Ayub Shokrollahi ­ Battery Date: March 19, 20242024­0764 Solar Deployed Nina Greer ­ Battery Date: March 19, 20242024­0762 Solar Deployed Gary Cokers ­ Battery Date: March 19, 20242024­0772 Effect Energy Lexandra Alejo ­ Battery Date: March 20, 2024 2321 W St Anne Pl - 201824535/23/2024 Structural Calculations for a Residential Battery with Optional Export System for: Applicable Codes: 2022 California Building Code, 2022 California Electric Code, 2022 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7­16 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Constructione, and all other codes which are adopted by reference or enacted by law. Sht # 1 of 3 2020-1158 Solar Journey Craig Larsen - Battery Backup Date: June 4, 2020 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2020-1527 Solar Journey Johnathan Valdivia - Battery Backup Date: June 14, 20202020-1697 Sasha Intl Jill Black Zalben - Battery Backup Date: August 3, 20202020-2940 Axis Solar Shook - Battery Backup Date: October 30, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 5, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 10, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 14, 20202021-005 A1 Sun Inc Bissell & Hall - Battery Backup Date: January 05, 20212021-1084 A1 Sun Inc Christoph Dankert - Battery Backup Date: April 01, 20212021-1420 Altadena Solar Gregg & Deborah Vane - Battery Date: May 11, 20212021-2209 Axis Solar Dave Sabey - Battery Date: June 15, 20212021-2256 Solar Journey Ciro Mejia - Battery Date: June 17, 20212021-2339 Infinity Solar Jason Stokes - Battery Date: June 22, 20212021-1010 Skytech Solar Claudia Schweikert - Battery Backup Date: July 12, 20212022-1140 Future Energy Mary Black - Battery Backup Date: March 15, 20222022-1135 Ameco Solar Sherry Dibble - Battery Backup Date: March 15, 20222022-1417 Skytech Solar Richard Elder - Battery Backup Date: March 28, 20222022-2462 Nexa Solar Eric Kahn - Battery Backup Date: June 10, 2022 2022-2739 Sungreen Systems Johnny Lay - Battery Backup Date: July 1, 2022 2022-2829 Plug It In Solar Maria Cousineau - Battery Backup Date: July 11, 2022 2022-3074 Next Solar Leah Bernthal - Battery Backup Date: July 28, 2022 2022-3192 Next Solar Gaylord Naraja - Battery Backup Date: August 6, 2022 2022-3628 Power Town Solar Skylar Brown - Battery Backup Date: September 07, 20222022-3687 Plug It In Solar Corey Udkoff - Battery Backup Date: September 12, 20222022-3873 Magic Solar Harpeet Ghattaura - Battery Backup Date: September 26, 20222023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 2023 Scott Berger Residence 5 Ponte Bianco, Lake Elsinore, CA 92532 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 Lexandra Alejo Residence 2321 W St Anne Pl., Santa Ana, CA 92704 2023­5069 Devil Dog Energy Ralph Gillespie ­ Battery Date: October 07, 20232024­0772 Effect Energy Lexandra Alejo ­ Battery Date: March 20, 2024 2321 W St Anne Pl - 201824535/23/2024 Loading Diagram Sht # 2 of 3 Determine Applied Loads F y = Weight of Equipment = 174 lbs 2019-1529 Solar Journey David Lewis - Battery Backup Date: June 4, 2019 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2020-1158 Solar Journey Craig Larsen - Battery Backup Date: June 4, 20202020-1527 Solar Journey Johnathan Valdivia - Battery Backup Date: June 14, 20202020-1697 Sasha Intl Jill Black Zalben - Battery Backup Date: August 3, 20202020-2940 Axis Solar Shook - Battery Backup Date: October 30, 2020 Check attachment of Support to (E) 2x4 Stud for Seismic Load F x =F p F p =0.4 ap SDS Wp Rp / Ip [1 + 2(z/h)]x ap SDS =1.0 =(2/3) SMS ; SMS = Fa Ssx ; Fa =1.0 ; Ss =1.25 SMS = 1.25 SDS =(2/3) 1.25 =0.83 Wp =174 lbs Rp =2.5 [Table 13.6­1 ASCE 7­16] [Table 13.6­1 ASCE 7­16] ; Ip =1.0 ; z / h =1.0 Total Fy Total Fx R1x R2x 3.75" 16.75" 2020-2940 Axis Solar Shook - Battery Backup Date: December 5, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 10, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 14, 20202021-005 A1 Sun Inc Bissell & Hall - Battery Backup Date: January 05, 20212021-1084 A1 Sun Inc Christoph Dankert - Battery Backup Date: April 01, 20212021-1420 Altadena Solar Gregg & Deborah Vane - Battery Date: May 11, 20212021-2209 Axis Solar Dave Sabey - Battery Date: June 15, 20212021-2256 Solar Journey Ciro Mejia - Battery Date: June 17, 20212021-2339 Infinity Solar Jason Stokes - Battery Date: June 22, 20212021-1010 Skytech Solar Claudia Schweikert - Battery Backup Date: July 12, 20212022-1140 Future Energy Mary Black - Battery Backup Date: March 15, 20222022-1135 Ameco Solar Sherry Dibble - Battery Backup Date: March 15, 20222022-1417 Skytech Solar Richard Elder - Battery Backup Date: March 28, 2022 16.75" 2022-2462 Nexa Solar Eric Kahn - Battery Backup Date: June 10, 2022 2022-2739 Sungreen Systems Johnny Lay - Battery Backup Date: July 1, 2022 2022-2829 Plug It In Solar Maria Cousineau - Battery Backup Date: July 11, 2022 2022-3074 Next Solar Leah Bernthal - Battery Backup Date: July 28, 2022 2022-3192 Next Solar Gaylord Naraja - Battery Backup Date: August 6, 2022 2022-3628 Power Town Solar Skylar Brown - Battery Backup Date: September 07, 20222022-3687 Plug It In Solar Corey Udkoff - Battery Backup Date: September 12, 20222022-3873 Magic Solar Harpeet Ghattaura - Battery Backup Date: September 26, 20222022-4146 Belmont Energy Collin Vath - Battery Backup Date: October 11, 2022 2022-5205 Magic Solar Miguel Rivera - Battery Backup Date: December 15, 20222022-5296 Future Energy Today Tyler Masters - Battery Backup Date: December 21, 20222023-198 Magic Solar Nikolai Green - Battery Backup Date: January 15, 20232023-565 AV Solar Alma Ventura - Battery Backup Date: February 6, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023­1967 Magic Solar Scott Berger Residence Date: March 28, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-1967 Magic Solar Scott Berger Residence Date: June 15, 20232023­2613 Solar Deployed Lorne Leech Residence2023­1967 Magic Solar Scott Berger Residence Date: July 4, 20232023­3935 Berger Solar Nathan Heit ­ Battery Date: July 4, 20232023­3834 Solar Renewable Energy Amador Medina ­ Battery Date: July 12, 20232023­4478 Solar Deployed David Herrera ­ Battery Date: August 10, 20232023­5069 Devil Dog Energy Ralph Gillespie ­ Battery Date: October 07, 2023LWM SSE 2023­5382 Solar Deployed Maria Viridiana ­ Battery Date: November 4, 20232024­0203 Solar Depoyed Donald Trapp ­ Battery Date: January 22, 20242024­0331 ESP Blanca Ambriz ­ Battery Date: February 6, 20242024­0386 ESP Gustavo Silva Residence Date: February 09, 20242024­0394 Solar Deployed Arlene Twine Residence Date: February 09, 20242024­0396 Smart House Peggy Garcia Date: February 9, 20242024­0466 Solar Deployed Anthony Britt Date: February 20, 20242024­0527 Solar Deployed Bridget Zuniga Date: February 26, 20242024­0428 Papke Designs Carlos Gonzalez Date: February 26, 20242024­0528 Solar Deployed Ricky Desingano Date: February 26, 20242024­0530 Solar Deployed Isenia Isabel Vasquez Date: February 26, 20242024­0562 Solar Deployed Sourivanh Hanemountry Date: February 28, 20242024­0554 ESP Robert Frantz Residence Date: February 28, 20242024­0556 ESP Dominic Accardi Residence Date: February 28, 20242024­0595 ESP David Villanueva ­ Battery Date: March 4, 20242024­0665 ESP Raymond Chavez ­ Battery Date: March 09, 20242024­0694 Effect Energy Allen Ramos ­ Battery Date: March 13, 20242024­0695 Effect Energy Scott Howard ­ Battery Date: March 13, 20242024­0699 Solar Deployed Gurmit Gill ­ Battery Date: March 13, 2024 2024­0713 Solar Deployed Brenda Garcia ­ Battery Date: March 14, 20242024­0763 Solar Deployed Ayub Shokrollahi ­ Battery Date: March 19, 20242024­0764 Solar Deployed Nina Greer ­ Battery Date: March 19, 20242024­0762 Solar Deployed Gary Cokers ­ Battery Date: March 19, 20242024­0772 Effect Energy Lexandra Alejo ­ Battery Date: March 20, 2024 2321 W St Anne Pl - 201824535/23/2024 Sht # 3 of 3 2019-1529 Solar Journey David Lewis - Battery Backup Date: June 4, 2019 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2020-1158 Solar Journey Craig Larsen - Battery Backup Date: June 4, 20202020-1527 Solar Journey Johnathan Valdivia - Battery Backup Date: June 14, 20202020-1697 Sasha Intl Jill Black Zalben - Battery Backup Date: August 3, 20202020-2940 Axis Solar Shook - Battery Backup Date: October 30, 2020 Load per bolt per strut P = Rx / 2 P = 54.6 lbs / 2 = 27.3 lbs Determine Applied Loads (cont...) Fpmax =1.6 SDS Ip Wp =231 lbs Fpmin =0.3 SDS Ip Wp =43 lbs Fpmin <Fp <Fpmax OK F p =0.4 (1.0) (0.83) (174 lbs) (2.5 / 1) [1 + 2(1)]x F p =70 lbs R1x (33.5") ­ F y (3.75") ­ Fp (16.75") = 0 Check Moment at R2: R1x = (Fp x 16.75" + Fy x 3.75") / 33.5" R1x = (1,172.5 lbf-in + 656 lbf-in) / 33.5 in R1x = 54.6 lbs Determine allowable load per 5/16" lag screw w/ 3" min. embedment into 2x4 stud per 2018 NDS. W ' = W x Cd x Ct Table 10.3.1 2018 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2018 NDS Ct = 1.0 per Table 10.3.4 of 2018 NDS W ' = 266 lbs/ in. x 3 in. x 1.6 x 1.0 = 1,277 lbs > 27.3 lbs OK Check for withdrawal of each bolt: 2020-2940 Axis Solar Shook - Battery Backup Date: December 5, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 10, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 14, 20202021-005 A1 Sun Inc Bissell & Hall - Battery Backup Date: January 05, 20212021-1084 A1 Sun Inc Christoph Dankert - Battery Backup Date: April 01, 20212021-1420 Altadena Solar Gregg & Deborah Vane - Battery Date: May 11, 20212021-2209 Axis Solar Dave Sabey - Battery Date: June 15, 20212021-2256 Solar Journey Ciro Mejia - Battery Date: June 17, 20212021-2339 Infinity Solar Jason Stokes - Battery Date: June 22, 20212021-1010 Skytech Solar Claudia Schweikert - Battery Backup Date: July 12, 20212022-1140 Future Energy Mary Black - Battery Backup Date: March 15, 20222022-1135 Ameco Solar Sherry Dibble - Battery Backup Date: March 15, 20222022-1417 Skytech Solar Richard Elder - Battery Backup Date: March 28, 20222022-2462 Nexa Solar Eric Kahn - Battery Backup Date: June 10, 2022 2022-2739 Sungreen Systems Johnny Lay - Battery Backup Date: July 1, 2022 2022-2829 Plug It In Solar Maria Cousineau - Battery Backup Date: July 11, 2022 2022-3074 Next Solar Leah Bernthal - Battery Backup Date: July 28, 2022 2022-3192 Next Solar Gaylord Naraja - Battery Backup Date: August 6, 2022 2022-3628 Power Town Solar Skylar Brown - Battery Backup Date: September 07, 20222022-3687 Plug It In Solar Corey Udkoff - Battery Backup Date: September 12, 20222022-3873 Magic Solar Harpeet Ghattaura - Battery Backup Date: September 26, 20222022-4146 Belmont Energy Collin Vath - Battery Backup Date: October 11, 2022 2022-5205 Magic Solar Miguel Rivera - Battery Backup Date: December 15, 20222022-5296 Future Energy Today Tyler Masters - Battery Backup Date: December 21, 20222023-198 Magic Solar Nikolai Green - Battery Backup Date: January 15, 20232023-565 AV Solar Alma Ventura - Battery Backup Date: February 6, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023­1967 Magic Solar Scott Berger Residence Date: March 28, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-1967 Magic Solar Scott Berger Residence Date: June 15, 20232023­2613 Solar Deployed Lorne Leech Residence2023­1967 Magic Solar Scott Berger Residence Date: July 4, 20232023­3935 Berger Solar Nathan Heit ­ Battery Date: July 4, 20232023­3834 Solar Renewable Energy Amador Medina ­ Battery Date: July 12, 20232023­4478 Solar Deployed David Herrera ­ Battery Date: August 10, 20232023­5069 Devil Dog Energy Ralph Gillespie ­ Battery Date: October 07, 2023LWM SSE 2023­5382 Solar Deployed Maria Viridiana ­ Battery Date: November 4, 20232024­0203 Solar Depoyed Donald Trapp ­ Battery Date: January 22, 20242024­0331 ESP Blanca Ambriz ­ Battery Date: February 6, 20242024­0386 ESP Gustavo Silva Residence Date: February 09, 20242024­0394 Solar Deployed Arlene Twine Residence Date: February 09, 20242024­0396 Smart House Peggy Garcia Date: February 9, 20242024­0466 Solar Deployed Anthony Britt Date: February 20, 20242024­0527 Solar Deployed Bridget Zuniga Date: February 26, 20242024­0428 Papke Designs Carlos Gonzalez Date: February 26, 20242024­0528 Solar Deployed Ricky Desingano Date: February 26, 20242024­0530 Solar Deployed Isenia Isabel Vasquez Date: February 26, 20242024­0562 Solar Deployed Sourivanh Hanemountry Date: February 28, 20242024­0554 ESP Robert Frantz Residence Date: February 28, 20242024­0556 ESP Dominic Accardi Residence Date: February 28, 20242024­0595 ESP David Villanueva ­ Battery Date: March 4, 20242024­0665 ESP Raymond Chavez ­ Battery Date: March 09, 20242024­0694 Effect Energy Allen Ramos ­ Battery Date: March 13, 20242024­0695 Effect Energy Scott Howard ­ Battery Date: March 13, 20242024­0699 Solar Deployed Gurmit Gill ­ Battery Date: March 13, 2024 2024­0713 Solar Deployed Brenda Garcia ­ Battery Date: March 14, 20242024­0763 Solar Deployed Ayub Shokrollahi ­ Battery Date: March 19, 20242024­0764 Solar Deployed Nina Greer ­ Battery Date: March 19, 20242024­0762 Solar Deployed Gary Cokers ­ Battery Date: March 19, 20242024­0772 Effect Energy Lexandra Alejo ­ Battery Date: March 20, 2024 2321 W St Anne Pl - 201824535/23/2024 Structural Calculations for a Roof Mounted Solar Photovoltaic System for: Alexandra Alejo Residence 2321 W St Anne Pl., Santa Ana, CA 92704 Applicable Codes: 2022 California Building Code, 2022 California Electric Code, 2022 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-16 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Construction, Local Municipal Code, and all other codes which are adopted by reference or enacted by law. Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. Solar Energy Contractor shall make an inspection of the existing roof framing system prior to installation of the roof mounted solar energy system to verify that the existing roof is capable of supporting minimum roof live loads. Assumed Design Parameters: All 2x members are grade Douglas Fir #2 or better All 4X members are grade Douglas Fir #1 or better All Roof Connectors are Simpson Strong-Tie or Equal All Concrete Foundations are f'c = 2500 psi or stronger Original Structure was built to the Type-V Wood Framed Standards of the Applicable Building Code at the time of Construction. Sht # 1 of 72020-3796 Solar DeployeNicolas Glackin Residen ce Date: December 29, 2020 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­21Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­23 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2321 W St Anne Pl - 201824535/23/2024 Sht # 2 of 7 Note to Building Official: Based upon a review of the proposed plans and information, the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. The contractor shall field verify that the existing roof structure is in its original permited condition and verify that it can support the normal code required roof live loads. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. W DL + LL R1 R2 7.8' Total load on rafter = 60 plf x 7.8 ft. = 468 lbs w = 30 psf x 2 ft. = 60 plf Check Existing 2x4 Roof Rafters @ 24" O.C.: * *Note: Contractor to Field Verify Framing 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20190192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 202019­3009 Axis Solar Design Appleba Date: September 11, 2192020­053 Axis Solar Ryerson Residence Date: November 9, 20192020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 2020002020­1806 ilum Solar Jus Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­21 2020­2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020­2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020­2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020­2591 ESD 20­590 Supulveda Residence Date: October 13, 20202020­2603 New Power John Yager Residence Date: October 14, 20202020­2603 New Power William Fuller Residence Date: October 14, 20202020­2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020­2652 Axis Solar Marcus Residence Date: October 15, 20202020­2652 Axis Solar Freimanis Residence Date: October 15, 20202020­2674 Complete Solar Dorado Residence Date: October 16, 20202020­2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020­2694 ESD 20­648 Barrera Residence Date: October 17, 20202020­2836 Penguin Solar Kalup Residence Date: October 26, 20202020­2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 20202020­2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020­2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020­2861 New Power Susan Bakken Residence Date: October 27, 20202020­2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020­2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020­2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020­2853 TG Roofing Brown Robert Residence Date: October 27, 20202020­2875 Trinity Power John Mendel Residence Date: October 28, 20202020­2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020­2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020­2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020­2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020­2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020­2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020­2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020­2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon Services Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 30, 20202020­2938 ESD 20­610 Sisto ­ RNR Date: October 30, 20202020­2940 Axis Solar Shook Date: October 30, 20202020­2963 Axis Solar Luke Ding Residence Date: October 31, 20202020­2959 Penguin Solar Stevens Residence Date: October 31, 20202020­2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020­2939 Mohr Power Pappillion Residence Date: October 31, 20202020­2983 Infinity Solar Gernazio Residence Date: November 3, 20202020­2982 Infinity Solar Luna Residence Date: November 3, 20202020­3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020­3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020­3062 UniverCity Solar Mantri Residence Date: November 6, 20202020­3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020­3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020­3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020­3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020­3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020­3052 ESD 20­747 Perez Residence Date: November 6, 20202020­3065 HPM Solar Torres Residence Date: November 6, 20202020­3085 20­729 Green Residence Date: November 8, 20202020­3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020­3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020­3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020­3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020­3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020­3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020­3235 Infinity Solar Dizon Residence Date: November 16, 20202020­3360 Axis Solar Hogan Residence Date: November 23, 20202020­3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020­3570 ESD 20­917 Hatter Residence Date: December 6, 20202020­3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020­3566 TG Roofing Morff Craig Residence Date: December 6, 20202020­3566 TG Roofing Craig Morff Residence Date: December 6, 20202020­3686 Bratton Solar Love Residence Date: December 14, 20202020­3682 New Power Shawn Johnson Date: December 14, 20202020­3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020­3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020­3707 Penguin Solar James Logan Residence Date: December 15, 20202020­3704 New Power Marite Cappelletti Residence Date: December 15, 20202020­3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020­3734 New Power Judith Park Residence Date: December 16, 20202020­3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020­3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020­3759 Mohr Power Smith Residence Date: December 17, 20202021­056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021­147 Better Earth Paul Garcia Residence Date: January 14, 20212021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­23 2023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 20232023-448 HPM Solar Orellana Roberta Residence Date: January 31, 20232023-528 Magic Solar Jocelyn Gomez Residence Date: February 03, 20232023-538 Next Solar Amit Patil Residence Date: February 03, 20232023-587 LA Solar Jorge Carollo Residence Date: February 03, 20232023-784 LA Solar Jose Ernesto Fierros Rojo Residence Date: February 15, 20232023-812 LA Solar Gerald Chua Residence Date: February 16, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-847 LA Anna Galstyan Residence Date: February 18, 2023 w = 30 psf x 2 ft. = 60 plf 2023-847 LA Anna Galstyan Residence Date: February 18, 20232023-1643 Revolt Electric Job Stevenson Residence Date: March 17, 20232024-0437 Energy Planner Christine Sullivan Residence Date: February 15, 2024 ( Assume max rafter span = 7.8 ft. ) 2024-0772 Effect Energy Lexandra Alejo Residence Date: March 20, 2024 2321 W St Anne Pl - 201824535/23/2024 Check Existing 2x4 Roof Rafters @ 24" O.C.: Sht # 3 of 7 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 20192020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020 Check attachment of Support to Existing Structure for Wind Uplift CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7-16 WIND LOADS ON BUILDING APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2. NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7-16 EFFECTIVE WIND AREA: "FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT BE LESS THAN ONE-THIRD ITS LENGTH." EFFECTIVE AREA = 15 SQ FT 2020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 202 002020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202 2020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 20202020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020­2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020­2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020­2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020­2436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 20202020­2434 Mohr Power Thurin Residence Date: October 1, 20202020­2450 ESD 20­579 Sanchez Residence Date: October 2, 20202020­2466 Solar Deployed Jose Bautista Residence Date: October 3, 20202020­2472 Solar Deployed Sava Knezevich Residence Date: October 5, 20202020­2493 Sunrise Solar Luis Avila Residence Date: October 6, 20202020­2491 Effect Energy Ana Lopez Residence Date: October 6, 20202020­2495 Penguin Solar German Rios Residence Date: October 6, 20202020­2498 Penguin Solar Lisa Bishop Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 6, 20202020­2510 Sasha Intl Mayra Davila Residence Date: October 7, 20202020­2507 ESD 20­593 So Residence Date: October 7, 20202020­2515 Penguin Solar Black Annette Residence Date: October 7, 20202020­2531 Solar Journey Charlie Zheng Residence Date: October 8, 20202020­2525 New Power William Fuller Residence Date: October 8, 20202020­2545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 20202020­2565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 20202020­2564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 20202020­2576 Sunrise Solar Derrick Darland Residence Date: October 12, 20202020­2591 ESD 20­590 Supulveda Residence Date: October 13, 20202020­2603 New Power John Yager Residence Date: October 14, 20202020­2603 New Power William Fuller Residence Date: October 14, 20202020­2601 TG Roofing Michael Seffintger Residence Date: October 14, 20202020­2652 Axis Solar Marcus Residence Date: October 15, 20202020­2652 Axis Solar Freimanis Residence Date: October 15, 20202020­2674 Complete Solar Dorado Residence Date: October 16, 20202020­2699 Solar Deployed Daniel Rivera Residence Date: October 17, 20202020­2694 ESD 20­648 Barrera Residence Date: October 17, 20202020­2836 Penguin Solar Kalup Residence Date: October 26, 20202020­2832 Grid Alt IE Ana Hernandez Residence Date: October 26, 20202020­2841 Sunrise Solar Lathan Williams Residence Date: October 26, 20202020­2862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 20202020­2861 New Power Susan Bakken Residence Date: October 27, 20202020­2859 Grid Alt IE Terry McDonnell Residence Date: October 27, 20202020­2856 Solar Deployed Azsa Villalobos Residence Date: October 27, 20202020­2854 Solar Deployed Deilar Aguilera Residence Date: October 27, 20202020­2853 TG Roofing Brown Robert Residence Date: October 27, 20202020­2875 Trinity Power John Mendel Residence Date: October 28, 20202020­2874 Solar Deployed Jesse Haynes Residence Date: October 28, 20202020­2873 Solar Deployed Elward Beyerle Residence Date: October 28, 20202020­2887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 20202020­2907 Solar Deployed Rudy Valdez Residence Date: October 29, 20202020­2905 Sasha Intl Susan Driggs Residence Date: October 29, 20202020­2904 HPM Solar Leona Sankhla Residence Date: October 29, 20202020­2904 HPM Solar Leona Fisher Residence Date: October 29, 20202020­2918 Precis Solar Humberto Lemus Residence Date: October 29, 20202020­2915 Complete Solar Ojeda Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Walker Residence Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon Services Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 29, 20202020­2936 ESD 20­614 2892 Falcon ­ Walker Date: October 30, 20202020­2938 ESD 20­610 Sisto ­ RNR Date: October 30, 20202020­2940 Axis Solar Shook Date: October 30, 20202020­2963 Axis Solar Luke Ding Residence Date: October 31, 20202020­2959 Penguin Solar Stevens Residence Date: October 31, 20202020­2954 Solar Deployed Edith Vigil Residence Date: October 31, 20202020­2939 Mohr Power Pappillion Residence Date: October 31, 20202020­2983 Infinity Solar Gernazio Residence Date: November 3, 20202020­2982 Infinity Solar Luna Residence Date: November 3, 20202020­3021 TG Roofing Jeff Costa Residence Date: November 4, 20202020­3033 Penguin Solar Christina Cvek Residence Date: November 5, 20202020­3062 UniverCity Solar Mantri Residence Date: November 6, 20202020­3059 Solar Deployed Joshua Bethmann Residence Date: November 6, 20202020­3058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 20202020­3057 Future Energy Rebecca Jamison Residence Date: November 6, 20202020­3056 Penguin Solar David Esqueda Residence Date: November 6, 20202020­3055 Solar Journey Darren Misaresh Residence Date: November 6, 20202020­3052 ESD 20­747 Perez Residence Date: November 6, 20202020­3065 HPM Solar Torres Residence Date: November 6, 20202020­3085 20­729 Green Residence Date: November 8, 20202020­3083 HPM Solar Lisa Morales Residence Date: November 8, 20202020­3076 V's Solar Alberto Valadez Residence Date: November 8, 20202020­3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020­3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020­3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020­3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020­3235 Infinity Solar Dizon Residence Date: November 16, 20202020­3360 Axis Solar Hogan Residence Date: November 23, 20202020­3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020­3570 ESD 20­917 Hatter Residence Date: December 6, 20202020­3567 Infinity Solar Wittenberg Residence Date: December 6, 20202020­3566 TG Roofing Morff Craig Residence Date: December 6, 20202020­3566 TG Roofing Craig Morff Residence Date: December 6, 20202020­3686 Bratton Solar Love Residence Date: December 14, 20202020­3682 New Power Shawn Johnson Date: December 14, 20202020­3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020­3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020­3707 Penguin Solar James Logan Residence Date: December 15, 20202020­3704 New Power Marite Cappelletti Residence Date: December 15, 20202020­3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020­3734 New Power Judith Park Residence Date: December 16, 20202020­3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020­3738 Sasha Intl Amita Seth Residence Date: December 16, 2020 Total load on rafter = 60 plf x 1.5 ft + 28 plf x 6.3 ft + ( 4' x 2.75' x 3 psf x 2 ) = 332 lbs < 468 lbs OK 2020­3759 Mohr Power Smith Residence Date: December 17, 20202020­3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020­3792 Mohr Power Stansfield Residence Date: December 21, 2020 2021­056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021­147 Better Earth Paul Garcia Residence Date: January 14, 2021 R1 R2 7.8' w LLwDL 2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 20212021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1Residence Date: June 05, 2021 1.5' 2022-051 Green Road Solar Shane Myers Residence Date: January 6, 20212022-3538 Solar Survey Pro 4566 W 118th Date: September 01, 20222023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 20232023-448 HPM Solar Orellana Roberta Residence Date: January 31, 20232023-528 Magic Solar Jocelyn Gomez Residence Date: February 03, 20232023-538 Next Solar Amit Patil Residence Date: February 03, 2023 6.3' 2023-587 LA Solar Jorge Carollo Residence Date: February 03, 20232023-784 LA Solar Jose Ernesto Fierros Rojo Residence Date: February 15, 20232023-812 LA Solar Gerald Chua Residence Date: February 16, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-847 LA Anna Galstyan Residence Date: February 18, 20232023-847 LA Anna Galstyan Residence Date: February 18, 2023 w DL + LL = 30 psf x 2 ft. = 60 plf 2023-1643 Revolt Electric Job Stevenson Residence Date: March 17, 20232023-4261 Precis Solar Steven Kent Phillips Residence Date: July 25, 2023 P 2023-4321 Precis Solar Michael Plotkowski Residence Date: July 29, 20232023-4350 Precis Solar Lawrence Henderson Residence Date: August 01, 20232023-4355 Precis Solar George Christison Residence Date: August 01, 20232023-4367 Precis Solar Debra L Beltran Residence Date: August 01, 2023 P 2023-4446 Precis Solar Ahmed Hamed Residence Date: August 09, 20232023-4820 Precis Solar Tommy Harris Residence Date: September 13, 20232023-5231 Precis Solar Dennis Averyt Residence Date: October 21, 20232024-0437 Energy Planner Christine Sullivan Residence Date: February 15, 20242024-0772 Effect Energy Lexandra Alejo Residence Date: March 20, 2024 2321 W St Anne Pl - 201824535/23/2024 Sht # 4 of 7 2017­3570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018­2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018­3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018­3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018­3831 ESD 18­795 Pacheco Residence Date: December 12, 20182018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192018­3831 ESD 18­795 Pacheco Residence Date: January 23, 20192019­292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019­489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 20192019­2865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 20192019­3009 Axis Solar Design Applebaum Date: September 11, 20192019­3922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020­053 Axis Solar Ryerson Residence Date: November 9, 20192020­126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020­131 Axis Solar Law Residence Date: January 16, 20202020­268 Axis Solar Yragui ­ Ecoforce Residence Date: January 31, 20202020­279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020­450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020­473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020­602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020­640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­678 ESD 20­119 Barile Residence Date: March 16, 20202020­780 ESD 20­136 Gutierrez Residence Date: April 1, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­844 ESD 20­164 Azim Residence Date: April 14, 20202020­1052 ESD 20­206 Sarkissian Residence Date: May 15, 20202020­1088 ESD 20­216 Yocum Residence Date: May 22, 20202020­1096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 20202020­1102 Papke Designs Olvera Residence Date: May 27, 20202020­1100 HPM Solar Oscar Residence Date: May 27, 20202020­1110 ilum Solar Enrique Escontrias Residence Date: May 28, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: May 29, 20202020­1119 ilum Solar Aaron Gonzalez Residence Date: June 9, 20202020­1286 ilum Solar David Harski Residence Date: June 18, 20202020­1408 ilum Solar Antonio Escarzaga Residence Date: June 30, 20202020­1438 ilum Solar Thomas Aucoin Residence Date: July 2, 20202020­1437 ilum Solar Heliezer Espinoza Residence Date: July 2, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1626 ilum Solar Josh Tobar­Hanavan Residence Date: July 25, 20202020­1643 Grid Alt IE Enrique Munoz Residence Date: July 28, 20202020­1667 UniverCity Solar Jenny Swanson Residence Date: July 30, 20202020­1674 Sunrise Solar Jose Munoz Residence Date: July 31, 20202020­1696 ACS Workman Residence Date: August 3, 20202020­1694 ACS Sing Residence Date: August 3, 20202020­1691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 20202020­1689 New Power Joel Garcia Residence Date: August 3, 20202020­1704 Solar Journey Nisal Samarasena Residence Date: August 4, 20202020­1724 Grid Alt IE Efren Salgado Residence Date: August 5, 20202020­1723 Grid Alt IE Sandra West Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1722 HPM Solar Xavier Monge Residence Date: August 5, 20202020­1718 ilum Solar Mejia Emerson Residence Date: August 5, 2020 qh = Note: qh = qh = ðγE ðγa Check attachment of Support to Existing Structure for Wind Uplift ­ Cont'd Tributary Area to Each Solar Mount = 4 ft. x 2.75 ft. = 11 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 110 mph Exposure C): Eq'n 29.4-7 ASCE 7-16 Kz = velocity pressure coefficient p =qh ðGC p ÞðγE Þðγa Þð 0.00256 Kz Kzt Kd Ke V2 Section 29.10.1 ASCE 7-16 Kz = 0.9 (Exposure C, Height = 20 ft or less) Kzt =Topographical Factor = 1.0 Kd =Wind Directionality Factor = 0.85 Ke =Ground Elevation Factor = 1.0 V = 110 mph ; VASD = 85 mph Table 1609.3.1 2022 CBC 0.00256 (0.9) (1.0) (0.85) (1.0) (85)2 p =qh ðGC p ÞðγE Þðγa Þð 14.15 psf p =14.15 psf (­2.0) (1.5) (0.7) = 29.7 psf Eq'n 26.10-1 ASCE 7-16 GCp = ­2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) GCp =Exposure Factor = 1.5 GCp =Solar Array Pressure Equalization Factor = 0.7 Fig. 29.4-8 ASCE 7-16 Nominal (Unfactored) Uplift at each support = 29.7 psf x 11 sq. ft. = 327 lbs Note: Section 2.4.1 of ASCE 7-16 , Basic Load Combinations for Allowable Stress Design. Note: Applicable Load Combination #5 : D + 0.6W Dead Load = 03 psf Wind Load = 29.7 psf Snow Load = 20.0 psf 2020­1806 ilum Solar Justice Lloyd Residence Date: August 13, 20202020­1804 ilum Solar Joshua Gould Residence Date: August 13, 20202020­1803 ilum Solar Lloyd Harmon Residence Date: August 13, 20202020­1958 ilum Solar Deane Martinez Residence Date: August 27, 20202020­2114 ilum Solar Mike Rich Residence Date: September 10, 20202020­2159 ilum Solar Norman Allen Residence Date: September 13, 20202020­2158 ilum Solar Paul Kiehn Residence Date: September 13, 20202020­2666 ilum Solar Yvonne Quinones Residence Date: October 16, 20202020­2762 ilum Solar Andre James Residence Date: October 21, 20202020­3084 ilum Solar Christine Quilon Residence Date: October 21, 20202020­3189 ilum Solar Michael Ireland Residence Date: November 12, 20202020­3252 ilum Solar Viorato Residence Date: November 13, 20202020­3243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021­072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 2021 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 2021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1155 Better Earth Maria Jimenez Residence Date: April 8, 20212021-1202 Better Earth John Boozer Residence Date: April 12, 20212021-1388 Better Earth Omar Camacho Residence Date: April 27, 20212022-004 Better Earth Rick Kelleher Residence Date: January 4, 20222022-003 Better Earth Henry Arevalo Residence Date: January 4, 20222022-006 Better Earth Jesus Hernandez Residence Date: January 4, 20222022-683 Better Earth Mayra Padilla Residence Date: February 19, 20222023-537 Effect Energy Jeff Blaxland Residence Date: February 03, 20222023-587 LA Solar Jorge Carollo Residence Date: February 03, 20232023-784 LA Solar Jose Ernesto Fierros Rojo Residence Date: February 15, 20232023-812 LA Solar Gerald Chua Residence Date: February 16, 2023 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-847 LA Anna Galstyan Residence Date: February 18, 20232023-847 LA Anna Galstyan Residence Date: February 18, 20232023-1643 Revolt Electric Job Stevenson Residence Date: March 17, 20232023-4261 Precis Solar Steven Kent Phillips Residence Date: July 25, 20232023-4321 Precis Solar Michael Plotkowski Residence Date: July 29, 20232023-4350 Precis Solar Lawrence Henderson Residence Date: August 01, 20232023-4355 Precis Solar George Christison Residence Date: August 01, 20232023-4367 Precis Solar Debra L Beltran Residence Date: August 01, 20232023-4446 Precis Solar Ahmed Hamed Residence Date: August 09, 20232023-4820 Precis Solar Tommy Harris Residence Date: September 13, 20232023-5231 Precis Solar Dennis Averyt Residence Date: October 21, 20232024-0437 Energy Planner Christine Sullivan Residence Date: February 15, 20242024-0772 Effect Energy Lexandra Alejo Residence Date: March 20, 2024 2321 W St Anne Pl - 201824535/23/2024 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. Check attachment of Support to Existing Structure for Wind Uplift ­ Cont'd where: Y = Distance between 2 lag screws X = 1.2" Y' = Moment arm to 1st lag screw X = 5.6" Design (Factored) Load at each support: 3 psf + (0.6 x 29.7 psf) = 20.8 psf Moment due to Load = (20.8 psf x 11 sq. ft.) x 5.6 inches Determine allowable load per 5/16" lag screw w/ 3.25" embedment into wood below according to the 2018 NDS. W ' = W x Cd x Ct Table 10.3.1 2018 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2018 NDS Ct = 1.0 per Table 10.3.4 of 2018 NDS W ' = 266 lbs/ in. x 3.25 in. x 1.6 x 1.0 = 1,383 lbs > 1,280 lbs OK OK. Use Tile Hooks with (2) 5/16" x 3.5" Lag Screws with 3.25" min. embedment into wood, at 48" O.C. max, as per Plans to Manufacturer's instructions. Moment due to Load = 1,281 in-lb Load to lag screw = 1,281 in-lb / 1.2 in Load to lag screw = 1,280 lbs Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL -23 YY' AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2321 W St Anne Pl - 201824535/23/2024 Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Effective Existing Seismic Weight Area of (E) Building =Approximately 1,300 Sq. ft. Approximate Effective Seismic Weight =1,300 sq. ft. x 30 psf ave. = 39,000 LBS DETERMINE BASE SHEAR V = Cs W Cs =SDS R Ie R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1 R = 6.5 WOOD SHEAR WALLS Ie = 1.0 IMPORTANCE FACTOR SDS =2/3 x SMS SMS =FA x SS SMS =1.2 x 1.5 = 1.8 SDS =2/3 x 1.8 = 1.2 Cs =1.2 6.5 1 =0.185 Residence Date: September 16, 2017 9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018 EQ'N 12.8-1 ASCE 7-16 EQ'N 12.8-2 ASCE 7-16 EQ'N 11.4-3 ASCE 7-16 EQ'N 11.4-1 ASCE 7-16 EQ'N 12.8-2 ASCE 7-16 2020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­21 2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 20202020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­23 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 2023-4820 Precis Solar Tommy Harris Residence Date: September 13, 20232023-5231 Precis Solar Dennis Averyt Residence Date: October 21, 2023 2321 W St Anne Pl - 201824535/23/2024 V = 0.185 x 39,000 LBS = 7,215 LBS DETERMINE NEW BASE SHEAR EXISTING BASE SHEAR Determine Seismic Weight of Building with Solar Array: EXISTING SEISMIC WEIGHT =39,000 LBS NEW SOLAR ARRAY =3 PSF x 20 PANELS x 3.3' x 5.5' = 1,089 LBS NEW SEISMIC WEIGHT =39,000 LBS + 1,089 LBS = 40,089 LBS THEREFORE NEW BASE SHEAR: V = 0.185 x 40,089 = 7,416 LBS % CHANGE =7,416 LBS - 7,215LBS 7,215 LBS x 100 =2.8 % < 10% OK 9924 Universal Boulevard #224­406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. EQ'N 12.8-1 ASCE 7-16 EQ'N 12.8-1 ASCE 7-16 OK. PER ASCE 7-16 SECTION 11.B.3 ALTERATIONS 2020­3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021­056 Solar Deployed Daphne Phung Residence Date: January 8, 2021 AG Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL ­215 OK. PER ASCE 7-16 SECTION 11B.4 ALTERATIONS EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE "Alterations may be made to any structure without requiring the existing structure to comply with this standard, provided that the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10% or decrease the design strength of any existing structural element to resist seismic forces by more than 10% shall not be permitted unless the entire seismic force-resisting system is determined to comply with this standard for a new structure." 2321 W St Anne Pl - 201824535/23/2024 360 E. 1st Street #947 Tustin, CA 92780 Phone (714) 258-3900 C10-973253 Attention: Santa Ana Building & Safety On March 11, 2024, I, Alexandra, entered a binding contract with & Peak Power Solutions. This contract is to install a new solar system at 2321 W St Anne Place Santa Ana, CA 92704. I give permission to Peak Power Solutions, Inc. to pull a building permit on my behalf. Should you have any questions, please contact me at (714) 795-4106 Thank you, __________________________ Date__________________ Alexandra Alejo DocuSign Envelope ID: B8C0B3C9-267D-432E-B86D-08D3576F0F88 3/25/2024 2321 W St Anne Pl - 201824535/23/2024 INVERTER DATA SHEET6 03/21/2024DATE: Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 2321 W St Anne Pl - 201824535/23/2024 MODULE DATA SHEET7 03/21/2024DATE: Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 2321 W St Anne Pl - 201824535/23/2024 8 ECB DATA SHEET 03/21/2024DATE: Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 2321 W St Anne Pl - 201824535/23/2024 RACKING DATA SHEET 03/21/2024DATE: 9 Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 -219 2321 W St Anne Pl - 201824535/23/2024 10 ATTACHMENT DATA SHEET 03/21/2024DATE: Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 -219 2321 W St Anne Pl - 201824535/23/2024 11 03/21/2024DATE: RSD DATA SHEET Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 2321 W St Anne Pl - 201824535/23/2024 12 03/21/2024DATE: BATTERY DATA SHEET Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 2321 W St Anne Pl - 201824535/23/2024 13 03/21/2024DATE: BATTERY MOUNTING DETAIL Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 2321 W St Anne Pl - 201824535/23/2024 EQUIPOMENT ELEVATION 03/21/2024DATE: NOTE :ESS UNIT WILL NOT BE INSTALLED WITHIN 5' IN ANY DIRECTION OF ANY WINDOWS, DOORS AND HVAC INLETS NOTE :ESS UNIT WILL BE INSTALLED NO LESS THAN 3' FROM OTHER ESS UNITS 14 Project Name: Alexandra Alejo Property address:2321 W St Anne Pl, Santa Ana, CA 92704 3' ECB AC DISCONNECT 2 OF 2 Encharge Battery Encharge Battery Main Service Panel MSP DISCONNECT 1 OF 2 OUTSIDE POWER SOURCE DISCONNECT SCHEDULE DISCONNECT NUMBER DISCONNECT TYPE 1 OF 2 UTILITY 2 OF 2 PV AND ESS SYSTEM PEAK POWER SOLUTIONS 360 E 1ST STREET #947, TUSTIN, CA 92780 Phone: 714-258-3900 License # 973253 C10 2321 W St Anne Pl - 201824535/23/2024