HomeMy WebLinkAbout2321 W St Anne Pl - PlanVICINITY MAP
SCALE: NTS
PV SOLAR SYSTEM DETAILS
MAIN SERVICE PANEL BUS SIZE:
MAIN SERVICE BREAKER SIZE:
BUILDING INFORMATION:
CONSTRUCTION TYPE: V-B
OCCUPANCY: R
ROOF:
SYSTEM SIZE: DC STC: KW
SYSTEM SIZE: AC CEC: KW
SOLAR MODULES: ( )
ROOF PLAN
SINGLE LINE DIAGRAM
ATTACHMENT LAYOUT
SIGNAGE
ECB DATA SHEET
INVERTER DATA SHEET
1
INDEX
2
3.1
4
5
6
7
8
9
10
SITE PLAN
MODULE DATA SHEET
SATELLITE VIEW
SCALE: NTS
RACKING DATA SHEET
ATTACHMENT DATA SHEET
COVER PAGE0
MAIN
3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED
4. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO
INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING
COMMISSIONING AND ACCEPTANCE WITH THE CLIENT,
UTILITY CO. AND CITY INSPECTORS AS NEEDED.
5. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF
SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY
AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS.
6. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL
BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL
BE COORDINATED WITH OTHER TRADES.
7. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV
INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS
RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING
THE EXTRA WEIGHT.
8. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE
CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE
WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS
APPROPRIATE.
9. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE
DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED
BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE
SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF
THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS.
10. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS,
ETC. SHALL BE HANDED OVER TO OWNER'S REPRESENTATIVE AT THE
COMPLETION OF WORK
PHOTOVOLTAIC NOTES:
1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL
BE TESTED, LISTED AND IDENTIFIED BY RECOGNIZED ELECTRICAL
TESTING LABORATORY
2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL
VENTS
3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED.
5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL
NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING
ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR
OUTPUT CIRCUIT GROUNDED CONDUCTORS.
4. SOLAR INVERTER SHALL BE LISTED TO UL1741.
6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING
SHALL BE PROTECTED FROM PHYSICAL DAMAGE.
7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS
OVER 150V TO GROUND SHALL NOT BE
ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE
ENERGIZED.
8. INVERTER IS EQUIPED WITH INTEGRATED GFDI, THUS PROVIDING
GROUND FAULT PROTECTION
9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED
10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A
RECOGNIZED ELECTRICAL TESTING LABORATORY.
11. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO
PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING, AC
GROUNDING AND BONDING BETWEEN AC AND DC SYSTEMS.
12. NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL
BE EFFECTIVELY BONDED TOGETHER. BOND BOTH ENDS OF
RACEWAYS.
GENERAL NOTES
1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED
ELECTRICAL TESTING LABORATORY
CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED
BY THE MANUFACTURER ATTESTING TO ITS SAFETY
2. OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED OR BETTER
FLAT TILE
03/21/2024DATE:
Project Name:
Alexandra Alejo
Property address:
2321 W St Anne Pl,
Santa Ana, CA 92704
8.200
5.800
COVER PAGE0
THE INSTALLATION OF SOLAR ARRAYS AND
PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH
THE FOLLOWING CODES:
2020 NATIONAL ELECTRICAL CODE
2022 CALIFORNIA BUILDING CODE
2022 CALIFORNIA RESIDENTIAL CODE
2022 CALIFORNIA GREEN BUILDING STANDARD CODE
2022 CALIFORNIA PLUMBING CODE
2022 CALIFORNIA MECHANICAL CODE
2022 CALIFORNIA ELECTRICAL CODE
2022 CALIFORNIA FIRE CODE
2022 CALIFORNIA ENERGY CODE
2016 INTERNATIONAL PROPERTY MAINTENANCE CODE
ALL OTHER ORDINANCE ADOPTED BY THE LOCAL
GOVERNING AGENCIES
MOUNTING SYSTEM:
225A
200A
EXISTING
HANWHA 410 WATT
IRONRIDGE XR10 RAIL
ELECTRICAL INFORMATION:
11
BATTERY: (2) Enphase IQ Battery 5P
NUMBER OF ESS UNITS: 2
ESS UNIT SIZE (KWH): 3.84 KVA
ESS TOTAL SYSTEM SIZE: 2 UNITS AT 7.68 KVA
LACoFD NOTES
1. All work shall be in compliance with the most current Los
Angeles County FireCode.
2. When ESS is installed inside garage - any planned or
existing attached garage shall comply with all applicalbe coces
and standards, and with the manufacturer'sinstallation
manual(s) to which the equipment has been listed, including
requirements pertaining to fire protective features (eg gypsum
board, doors, andducts), and to alarm/detector devices.
SCOPE OF WORK
ESS System
Number and type ESS Units: New (2) Existing (0)
ESS units capacity (kwh/unit): 5.0 kWh/unit
Outdoor in Exterior Walls: (2)
Disconnects
Minimum number of disconnects required to turn off all power
feeding the home: (2)
(a) main panel - main breaker
(b) AC disconnect
MICROINVERTER: ( ) Enphase IQ8+ Microinverter
RSD DATA SHEET
12
20
20
: 2 X 4 @ 24" O.C.RAFTER
BATTERY DATA SHEET
SIGNAGE3.2
13 BATTERY MOUNTING DETAIL
14 EQUIPMENT ELEVATION
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
-219
The scope of the plans is for the installation of the solar photovoltaic
system only and the approval is subject to compliance with all
applicable city and state codes and regulations regarding construction.
The approval of the plans does not constitute any certification of the
accuracy, completeness, or building permit status of the existing
buildings and structures as shown.
Bldg# 101118766
Elec# 20182453
APPROVALS:
ELEC - MSmith
2321 W St Anne Pl -
201824535/23/2024
EMT Conduit
Solar Module
INDEX
(N) Junction Box
Microinverter
Setback
MSP
JB
03/21/2024DATE:
ROOF PLAN1
(E) Main Service Panel
(N) AC DisconnectACD
Roof Face Area:2835
Total Module Area:440
Roof Coverage:15.52%
(N) BatteryBT
(N) Enphase Combiner BoxECB
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
Roof access is not located in areas that
require placement of ground ladders over
exterior wall openings CRC R331.4.1.
18'' fire
s
e
t
b
a
c
k
18
'
'
f
i
r
e
s
e
t
b
a
c
k
3' fire s
e
t
b
a
c
k
a
a
a
a
a
a
a
a
a
a b
b
b
b
b b
b
b
b
b
JB
JB
Solar PV Array 1
16 - Hanwha 410W Modules
16 - IQ8+ Microinverters
Pitch: 18 Deg
Orientation: 155 Deg
Solar PV Array 2
4 - Hanwha 410W Modules
4 - IQ8+ Microinverters
Pitch: 18 Deg
Orientation: 245 Deg
MSP
DISCONNECT 1 OF 2
ECB
BT
W St An
n
e
P
l
ACD
DISCONNECT 2 OF 2
Roof Access
Roof Access 3' f
i
r
e
s
e
t
b
a
c
k
SCALE: 3/32" = 1'-0"
S
180 °
E
90 °W
270 °
N0°
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10-219
2321 W St Anne Pl -
201824535/23/2024
SITE PLAN4
Main Service Panel
INDEX
MSP
03/21/2024DATE:
AC DisconnectACD
BatteryBT
Enphase Combiner BoxECB
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
1. In the case of emergency, call_____________________at Work Phone
#__________________or Home Phone #___________________.
2. Sediment from areas disturbed by construction shall be retained on site using structural
controls to the maximum extent
practicable.
3. Stockpiles of soil shall be properly contained to minimize sediment transport from the
site to streets, drainage facilities or adjacent properties via runoff, vehicle tacking, or wind.
4. Appropriate BMP's for construction-related materials, wastes, spills shall
be implemented to minimize transport from the site to streets, drainage facilities, or
adjoining properties by wind or runoff.
5. Runoff from equipment and vehicle washing shall be contained at construction sites
unless treated to reduce or remove sediment and
other pollutants.6. All construction contractor and subcontractor personnel are to be made
aware or the required best management practices and good housekeeping measures for
the project site and any associated constructionstaging areas.
7. At the end of each
day of construction activity all construction debris and waste materials shall be collected
and properly disposed in trash or recycle bins.
8. Construction sites shall be maintained in such a condition that an anticipated storm
does not carry wastes or pollutants off
the site. Discharges of material other than stormwater only when necessary
forperformance andcompletion of construction practices and where they do not: cause or
contribute to a violation of any water quality standard; cause or threaten to cause
pollution,
contamination, or nuisance; or contain a hazardoussubstance ina quantity reportable under
Federal Regulations 40 CFR Parts 117 and 302.
9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes
from paints, stains, sealants, glues,
limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers,
paintflakesor stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery
fluids; fertilizers, vehicle/equipment wash water and concrete wash water; concrete,
detergent or
floatable wastes; wastes from anyengine/equipment steam cleaning or chemical degreasing
and superchlorinated potable water line flushing. During construction, permittee shall
dispose of such materials in a specified and controlled temporaryarea on -site, physically
separated from potential stormwater runoff, with ultimate disposal in accordance with local,
state and federal requirements.
10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface
erosion is prohibited. Dewatering of
non-contaminated groundwater requires a National Pollutant Discharge EliminationSystem
Permit from the respective State Regional Water Quality Control Board.
11. Graded areas on the permitted area perimeter must drain away from the face of
slopes at the
conclusion of each working day. Drainage is to be directed toward desilting facilities.
12. The permittee and contractor shall be responsible and shall take necessary
precautions to prevent public trespass onto areas where impounded water creates a
hazardous
condition.
13. The permittee and contractor shall inspect the erosion control work and insure that
the work is in accordance with the approved plans.
14. The permittee shall notify all general contractors, subcontractors, material suppliers,
lessees, and property
owners: that dumping of chemicals into the storm drain system or the watershed is
prohibited.
15. Equipment and workers for emergency work shall be made available at all times
during the rainy season. Necessary materials shall be available on site and
stockpiled at convenient locations to facilitate rapidconstruction of temporary devices when
rain is imminent.
16. All removable erosion protective devices shall be in place at the end of each working
day when the 5-Day Rain Probability Forecast exceeds 40%.
17.Sediments from areas disturbed by construction shall beretained on site using an
effective combination of erosion and sediment controls to the maximum extent practicable,
and stockpiles of soil shall be properly containted to minimize sediment transport from the
site tostreets, drainage facilities of adjacent properties via runoff,vehicle tracking, or wind.
18. Appropriate BMPs for construction-related materials, wastes, spills or residues shall be
implemented and retained on site to minimize transport from the site to streets,
drainage facilities, or adjoining property bywind or runoff
59'-6"
98'-8"
59'-6"
98'-8"
36'-11"
21'-5"
8'-1"
20'-8"
Dri
v
e
w
a
y
MSP
DISCONNECT 1 OF 2
ECB
BT
PROPRTY LINE
W St An
n
e
P
l
ACD
DISCONNECT 2 OF 2
SCALE: 1/16" = 1'-0"
S
180 °
E
90 °W
270 °
N0°
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
-219
2321 W St Anne Pl -
201824535/23/2024
ATTACHMENT
LAYOUT5
RAIL
ATTACHMENT
2 X 4 @ 24" O.C.
03/21/2024DATE:
Racking: IronRidge XR10 Rail
Attachment: IronRIdge All Tile Hook
(3.8)
(7.5)
(2.13)
(5.51)
(7.09)
(1.18)
1
3
2
DESCRIPTION
ASSY, ALL TILE HOOK
BOLT, LAG 5/16 X 4"
BASE3
2
1
NO.
IRONRIDGE ALL TILE HOOK DETAILS
1.
2.
3. Roof attachment hardware to be mounted to existing structure
with O.C. rail spans or less.
4. Lag bolts are 5/16" X 3.5" stainless steel with 2.5" minimum embedment
into the center of the roof
5. Roof sheathed with 1/2" plywood and upper surface is faced with felt
paper. Finished roof surface is One layer of .
MODULE WEIGHT (lbs)45.8
# OF MODULES 20
TOTAL MODULE WEIGHT (lbs)916.0
RACKING WEIGHT (lbs)183.2
MICROINVERTER WEIGHT (lbs)47.6
TOTAL SYSTEM WEIGHT (lbs)1146.8
# OF STANDOFFS (lbs)40
MAX SPAN BETWEEN STANDOFFS (in)
LOADING PER STANDOFF (in)28.7
TOTAL AREA (sq.ft.)440.0
LOADING (psf)2.6
48"
48"RAFTER
SOLAR MODULE
Blocking
Maximum 6"
2 X 4 @ 24" O.C.
FLAT TILE
ROOF SECTION DETAIL
RAFTER
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
FLAT TILE
17'-2"
13'
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
-219
2321 W St Anne Pl -
201824535/23/2024
SINGLE LINE
DIAGRAM2
PERCENT OF
VALUES
NUMBER OF CURRENT
CARRYING CONDUCTORS IN EMT
.80 4-6
.70 7-9
.50 10-20
#ITEM DESCRIPTION QTY
1 PV MODULE
2 1
3 PVC JUNCTION BOX 4"x4"x2" UL LISTED WATER TIGHT
NEMA TYPE 3 2
4 MAIN METER 1
5 MAIN SERVICE
PANEL
1
6
2
3
1 30 X .71 X 1 = 21.3 >= 15.13
2
03/21/2024DATE:
120/240V
1P,3W
BUS
CENTER FED
MAIN C/B
5
225A
200A
EXISTING
(E) MAIN SERVICE PANEL & METER
BUSBAR & MAIN BREAKER, AND HAS
ADDITIONAL 100A SPACE FOR ALTERNATIVE
ENERGY INPUT WHICH WILL BE USED FOR
SOLAR SYSTEM
225A 200A
ROMEX 12/2
WIRE CHART
#
MAX AMPS X NEC
MULT = DESIGN
AMPS
BREAKER
SIZE (A)WIRE TYPE EGC
WIRE RATING X TEMP
DERATE X CONDUCTOR
DERATE = DERATED WIRE
CONDUIT SIZE
4
M
UTILITY METER
120/240V , 1P, 3W,
8 AC Disconnect 100A 2P BLADE TYPE 240V
NON-FUSIBLE AC DISCONNECT 1
100A
8 4
4 --80A
MICROINVERTER
HANWHA 410W
Q.PEAK-DUO-BLK-ML-G10 (410W)
Voc = 45.37V, Vmp = 37.61V
Isc = 11.20A, Imp = 10.89A
7
3
7 2
3 --20A (2)ROMEX 10/2
BATTERY (N) ENPHASE IQ BATTERY 5P
ENPHASE
COMBINER BOX
(N)ENPHASE IQ COMBINER 5/5C
WITH ENVOY 3G PV MONITORING
SYSTEM
5C(X-IQ-AM1-240-5C)
120/240V, NEMA 3R
7
3
(N) ENPHASE IQ8+ MICROINVERTERS
IQ8PLUS-72-2-US (240V) [SI1])
PEAK PWR TRACKING VOLTAGE: =29-45V
CEC EFFICIENCY := 97.0 %
ENCLOSURE : NEMA 6
MAXIMUM INPUT CURRENT: = 15 A
MAXIMUM OUTPUT CURRENT: = 1.21 A
MAXIMUM INPUT POWER: = 235 - 440W+
MAXIMUM OUTPUT POWER: = 290 VA
20
--80A ROMEX 4/3 in attic/walls
20
10X1.25X1.21=15.13A 20A
10X1.25X1.21=15.13A 20A (2)#12AWG, ENPHASE Q CABLE (1) #6 BARE SOLID COPPER GEC 30 X .71 X 1 = 21.3 >= 15.13 IN FREE AIR
...
1
6
String a: (10) Modules, (10) Microinverters
a
a
...b1
6
String b: (10) Modules, (10) Microinverters
b 10X1.25X1.21=15.13A 20A (2)#12AWG, ENPHASE Q CABLE (1) #6 BARE SOLID COPPER GEC 30 X .71 X 1 = 21.3 >= 15.13 IN FREE AIR
NOTE:AC Disconnect visible and lockable
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
15A
20A20A
LOAD CENTER
IQ GATEWAY
RECOMMENDED ROUTING FOR
ENTHERNET CABLE
PV CT
MAIN LUG
CTRL Board
CT ON IQ BATTERY
WIFI/ETHERNET
& CELLULAR
1
20A
ROMEX 4/3
80A
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
in attic/walls
in attic/walls
in attic/walls
20A
2321 W St Anne Pl -
201824535/23/2024
SIGNAGE3.1
MARKINGS, LABELS AND WIRING SIGNS
A. Purpose: Provide emergency responders with appropriate warning and guidance with
respect to isolating solar electric system.
This can facilitate identifying energized electrical lines that connect solar panels to the
inverter, as these should not be cut when venting for smoke removal
B. Main Service Disconnect.
1. Residential buildings - The marking may be placed within the main service disconnect.
The marking shall be placed
outside cover if the main service disconnect is operable with the service panel closed.
2. Commercial buildings - The marking shall be placed adjacent to the main service
disconnect clearly visible from the location where the level is operated
3. Markings: Verbiage, Format and Type of Material.
a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED
b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All
letters shall be capitalized. Arial or similar font, non bold.
c. Material: Reflective, weather resistant material suitable for the environment (use UL -
969 as standard for weather rating). Durable adhesive materials meet this requirement.
C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC
combiners and junction boxes:
1. Markings: Verbiage, Format and Type of Material.
a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC
conduits, raceways, enclosures, and cable assemblies,
at turns, above and for below penetrations, all DC combiners and junction boxes
b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall
adhere to "V. V-3b, c" of this requirement.
c. Inverters are not required to have caution markings
1.Marking is required on all interior and exterior DC conduit raceways,enclosures,cable
assemblies,and junction boxes,combiner boxes and disconnects.
2.The materials used for marking shall be reflective,weather resistant material suitable
for the environment.
Minimum 3/8 "letter height; all upper case letters Arial or similar font; Red background
with white lettering.
3.Marking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE.
4.Marking shall be placed adjacent to the main service disconnect in a location clearly
visible from the location where the disconnect is operated
CAUTION
POWER TO THIS BUILDING IS ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
DISCONNECTS LOCATED AS SHOWN:
03/21/2024DATE:
1
2
(STICKER TO BE LOCATED ON
CONDUIT WITH DC CURRENT
EVERY 4' HORIZONTALLY OR
10' VERTICALLY AND 1' FROM
EACH SIDE OF A BEND)
3
4
10
(TO BE LOCATED ON
SUB-PANEL ONLY
WHEN SUB-PANEL IS
DEDICATED FOR PV ONLY)
5
6
7
8
(STICKER LOCATED
INSIDE PANEL
NEXT TO SOLAR BREAKER)
9
(STICKER LOCATED
INSIDE PANEL
BELOW PV BREAKER)
PV ARRAY
J BOX
PV SUB-PANEL
* if applicable
SUB-PANEL
* if applicable
AC
DISCONNECT
* if applicable
METER
MAIN SERVICE
PANEL
2
1
5
6
8
7
9
6
8
7
9
6
6
8
7
9
12
(STICKER LOCATED
ON THE PV SUB PANEL)
10
11
(STICKER LOCATED
ON THE MAIN SERVICE PANEL)
11
CAUTION
AUTHORIZED SOLAR
PERSONNAL ONLY!
CAUTION
SOLAR DC CURRENT PRESENT
DURING DAYLIGHT HOURS
WARNING!
ELECTRIC SHOCK HAZARD.
IF GROUND FAULT IS INDICATED,
NORMALLY GROUNDED
CONDUCTORS MAY BE
UNGROUNDED AND ENERGIZED.
WARNING!
ELECTRIC SHOCK HAZARD.
DO NOT TOUCH THE TERMINALS.
TERMINALS ON BOTH THE LINE AND
LOAD SIDES MAY BE ENERGIZED IN
THE OPEN POSITION.
PV LOAD CENTER SIZED FOR PV
BREAKERS ONLY OR RENDERED UNABLE
TO ACCEPT ANY ADDITIONAL LOADS.
PV SUB-PANEL ONLY
AC DISCONNECT
AC PHOTOVOLTAIC POWER SOURCE
RATED AC OUTPUT CURRENT: MAX
NOMINAL AC OPERATING VOLTAGE: Vac
THIS PANEL FED BY
MULTIPLE SOURCES
(UTILITY & SOLAR)
SOLAR
WARNING!
INVERTER OUTPUT CONNECTION. DO NOT
RELOCATE THIS OVERCURRENT DEVICE
PHOTOVOLTAIC SYSTEM
EQUIPPED WITH
RAPID SHUT DOWN
13
(RAPID SHUTDOWN SWITCH FOR
SOLAR PV SYSTEM)
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SHUT DOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD
IN THE ARRAY
SOLAR ELECTRIC
PV PANELS
240
RAPID SHUTDOWN SWITCH
FOR SOLAR PV SYSTEM
30.25A
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
2321 W St Anne Pl,Santa Ana, CA 92704
SERVICE POINT &
UTILITY METERING
DISCONNECT 1 OF 2
SOLAR PV ARRAY
ENPHASE COMBINER BOX
BATTERY
You Are
Here
AC DISCONNECT
DISCONNECT 2 OF 2
N
0 °
S
180 °
E
90 °W
270 °
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
2321 W St Anne Pl -
201824535/23/2024
3.2
3.2
SIGNAGE
03/21/2024DATE:
SOLAR PV SYSTEM
EQUIPPED WITH RAPID
SHUTDOWN
TURN RAPID SHUTDOWN SWITCH TO OFF
POSITION TO SHUT DOWN PV SYSTEM AND REDUCE
SHOCK HAZARD IN ARRAY
SOLAR PV SYSTEM
EQUIPPED WITH RAPID
SHUTDOWN
TURN RAPID SHUTDOWN SWITCH TO OFF
POSITION TO SHUT DOWN PV SYSTEM AND REDUCE
SHOCK HAZARD IN ARRAY
NOTE: Project shall comply with the current version of the Department electrical power source disconnect placarding system.
PLACARD SCHEDULE
PLACARD NUMBER LOCATION
1 OF 1 MAIN SERVICE PANEL
Placards shall be 24 inches by 24 inches (610 mm by 610 mm) minimum in
size with a red background, white reflective stripes and a white reflective
border. The stripes and border shall have a 2-inch (51 mm) minimum stroke.F.D. - ELECTRICAL
BLDG DISCONNECT
# 1 OF 2
F.D. - ELECTRICAL
BLDG DISCONNECT
# 2 OF 2
POWER SOURCE DISCONNECT SCHEDULE
DISCONNECT NUMBER DISCONNECT TYPE
1 OF 2 UTILITY
2 OF 2 PV AND ESS SYSTEM
N
0°
S
180 °
E
90 °W
270 °
N
0 °
S
180 °
E
90 °W
270 °2321 W St Anne Pl,
Santa Ana, CA 92704
2321 W St Anne Pl,
Santa Ana, CA 92704
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
AC
Disconnect
Main
Service
Panel
#1 #2
DO NOT RELOCATE
THIS OVERCURRENT
DEVICE
#2#1
SERVICE POINT &
UTILITY METERING
DISCONNECT 1 OF 2
SOLAR PV ARRAY
ENPHASE COMBINER BOX
BATTERY
You Are
Here
AC DISCONNECT
DISCONNECT 2 OF 2
SERVICE POINT &
UTILITY METERING
DISCONNECT 1 OF 2
SOLAR PV ARRAY
ENPHASE COMBINER BOX
BATTERY
You Are
Here
AC DISCONNECT
DISCONNECT 2 OF 2
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
2321 W St Anne Pl -
201824535/23/2024
Certificate Of Completion
Envelope Id: B8C0B3C9267D432EB86D08D3576F0F88 Status: Completed
Subject: Complete with DocuSign: Santa Ana Authorization Letter.pdf
Source Envelope:
Document Pages: 1 Signatures: 1 Envelope Originator:
Certificate Pages: 4 Initials: 0 Peak Power Solutions, Inc.
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
360 E. 1st St. #947
Tustin, CA 92780
documents@peakpowerus.com
IP Address: 72.203.80.105
Record Tracking
Status: Original
3/25/2024 12:37:11 PM
Holder: Peak Power Solutions, Inc.
documents@peakpowerus.com
Location: DocuSign
Signer Events Signature Timestamp
Alexandra Alejo
alexandralejo@yahoo.com
Security Level: Email, Account Authentication
(None)
Signature Adoption: Drawn on Device
Using IP Address: 174.193.192.247
Signed using mobile
Sent: 3/25/2024 12:37:34 PM
Viewed: 3/25/2024 1:30:08 PM
Signed: 3/25/2024 1:30:41 PM
Electronic Record and Signature Disclosure:
Accepted: 3/25/2024 1:30:08 PM
ID: c9471eb0-e305-4c43-8f49-6d83a38aa487
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 3/25/2024 12:37:34 PM
Certified Delivered Security Checked 3/25/2024 1:30:08 PM
Signing Complete Security Checked 3/25/2024 1:30:41 PM
Completed Security Checked 3/25/2024 1:30:41 PM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
2321 W St Anne Pl -
201824535/23/2024
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, DocuSign Ink (we, us or Company) may be required by law to provide to you
certain written notices or disclosures. Described below are the terms and conditions for
providing to you such notices and disclosures electronically through the DocuSign, Inc.
(DocuSign) electronic signing system. Please read the information below carefully and
thoroughly, and if you can access this information electronically to your satisfaction and agree to
these terms and conditions, please confirm your agreement by clicking the ‘I agree’ button at the
bottom of this document.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. You will have the ability to download and print documents we send
to you through the DocuSign system during and immediately after signing session and, if you
elect to create a DocuSign signer account, you may access them for a limited period of time
(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to
send you paper copies of any such documents from our office to you, you will be charged a
$0.00 per-page fee. You may request delivery of such paper copies from us by following the
procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. To indicate to us that you are changing your mind, you must
withdraw your consent using the DocuSign ‘Withdraw Consent’ form on the signing page of a
DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your
consent to receive required notices and disclosures electronically from us and you will no longer
be able to use the DocuSign system to receive required notices and consents electronically from
us or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through the DocuSign system all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or
made available to you during the course of our relationship with you. To reduce the chance of
you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
Electronic Record and Signature Disclosure created on: 3/5/2015 2:00:08 PM
Parties agreed to: Alexandra Alejo 2321 W St Anne Pl -
201824535/23/2024
electronically from us.
How to contact DocuSign Ink:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: documents@peakpowerus.com
To advise DocuSign Ink of your new e-mail address
To let us know of a change in your e-mail address where we should send notices and disclosures
electronically to you, you must send an email message to us at documents@peakpowerus.com
and in the body of such request you must state: your previous e-mail address, your new e-mail
address. We do not require any other information from you to change your email address..
In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected
in your DocuSign account by following the process for changing e-mail in the DocuSign system.
To request paper copies from DocuSign Ink
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an e-mail to documents@peakpowerus.com and in
the body of such request you must state your e-mail address, full name, US Postal address, and
telephone number. We will bill you for any fees at that time, if any.
To withdraw your consent with DocuSign Ink
To inform us that you no longer want to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your DocuSign session, and on the subsequent
page, select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an e-mail to documents@peakpowerus.com and in the body of such request you
must state your e-mail, full name, US Postal Address, and telephone number. We do not
need any other information from you to withdraw consent.. The consequences of your
withdrawing consent for online documents will be that transactions may take a longer time
to process..
Required hardware and software
Operating Systems: Windows® 2000, Windows® XP, Windows
Vista®; Mac OS® X
Browsers: Final release versions of Internet Explorer® 6.0
or above (Windows only); Mozilla Firefox 2.0
or above (Windows and Mac); Safari™ 3.0 or
above (Mac only)
PDF Reader: Acrobat® or similar software may be required
to view and print PDF files
Screen Resolution: 800 x 600 minimum
Enabled Security Settings: Allow per session cookies
** These minimum requirements are subject to change. If these requirements change, you will be
asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and
browsers are not supported.
Acknowledging your access and consent to receive materials electronically
2321 W St Anne Pl -
201824535/23/2024
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please verify that you were
able to read this electronic disclosure and that you also were able to print on paper or
electronically save this page for your future reference and access or that you were able to e-mail
this disclosure and consent to an address where you will be able to print on paper or save it for
your future reference and access. Further, if you consent to receiving notices and disclosures
exclusively in electronic format on the terms and conditions described above, please let us know
by clicking the ‘I agree’ button below.
By checking the ‘I agree’ box, I confirm that:
• I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF
ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and
• I can print on paper the disclosure or save or send the disclosure to a place where I can
print it, for future reference and access; and
• Until or unless I notify DocuSign Ink as described above, I consent to receive from
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to me by DocuSign Ink during the course of my relationship with you.
2321 W St Anne Pl -
201824535/23/2024
Sht # 0.1 of 3
Note to Plan Checker:
This calculations package shows the structural calculations of the existing 2x4
stud to support the proposed residential battery/ies (Encharge 5P) that are
fixed with 5/16" lag screws, as shown on sheet PV3.1 of the System Design
Drawings.
2019-1529 Solar Journey David Lewis - Battery Backup Date: June 4, 2019
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2022-4146 Belmont Energy Collin Vath - Battery Backup Date: October 11, 2022 2022-5205 Magic Solar Miguel Rivera - Battery Backup Date: December 15, 20222022-5296 Future Energy Today Tyler Masters - Battery Backup Date: December 21, 20222023-198 Magic Solar Nikolai Green - Battery Backup Date: January 15, 20232023-565 AV Solar Alma Ventura - Battery Backup Date: February 6, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-1967 Magic Solar Scott Berger Residence Date: June 15, 2023
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
20232613 Solar Deployed Lorne Leech Residence20231967 Magic Solar Scott Berger Residence Date: July 4, 202320233935 Berger Solar Nathan Heit Battery Date: July 4, 202320233834 Solar Renewable Energy Amador Medina Battery Date: July 12, 202320234478 Solar Deployed David Herrera Battery Date: August 10, 2023LWM SSE 20235382 Solar Deployed Maria Viridiana Battery Date: November 4, 202320240203 Solar Depoyed Donald Trapp Battery Date: January 22, 202420240331 ESP Blanca Ambriz Battery Date: February 6, 202420240386 ESP Gustavo Silva Residence Date: February 09, 202420240394 Solar Deployed Arlene Twine Residence Date: February 09, 202420240396 Smart House Peggy Garcia Date: February 9, 202420240466 Solar Deployed Anthony Britt Date: February 20, 202420240527 Solar Deployed Bridget Zuniga Date: February 26, 202420240428 Papke Designs Carlos Gonzalez Date: February 26, 202420240528 Solar Deployed Ricky Desingano Date: February 26, 202420240530 Solar Deployed Isenia Isabel Vasquez Date: February 26, 202420240562 Solar Deployed Sourivanh Hanemountry Date: February 28, 202420240554 ESP Robert Frantz Residence Date: February 28, 202420240556 ESP Dominic Accardi Residence Date: February 28, 202420240595 ESP David Villanueva Battery Date: March 4, 202420240665 ESP Raymond Chavez Battery Date: March 09, 202420240694 Effect Energy Allen Ramos Battery Date: March 13, 202420240695 Effect Energy Scott Howard Battery Date: March 13, 202420240699 Solar Deployed Gurmit Gill Battery Date: March 13, 2024 20240713 Solar Deployed Brenda Garcia Battery Date: March 14, 202420240763 Solar Deployed Ayub Shokrollahi Battery Date: March 19, 202420240764 Solar Deployed Nina Greer Battery Date: March 19, 202420240762 Solar Deployed Gary Cokers Battery Date: March 19, 202420240772 Effect Energy Lexandra Alejo Battery Date: March 20, 2024
2321 W St Anne Pl -
201824535/23/2024
Structural Calculations for a Residential
Battery with Optional Export System for:
Applicable Codes:
2022 California Building Code, 2022 California Electric Code,
2022 California Mechanical Code, American Society of Civil Engineers
Standard ASCE 716 Minimum Design Loads for Buildings and Other
Structures, American Wood Council 2018 National Design Specification
for Wood Constructione, and all other codes which are adopted by
reference or enacted by law.
Sht # 1 of 3
2020-1158 Solar Journey Craig Larsen - Battery Backup Date: June 4, 2020
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2020-1527 Solar Journey Johnathan Valdivia - Battery Backup Date: June 14, 20202020-1697 Sasha Intl Jill Black Zalben - Battery Backup Date: August 3, 20202020-2940 Axis Solar Shook - Battery Backup Date: October 30, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 5, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 10, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 14, 20202021-005 A1 Sun Inc Bissell & Hall - Battery Backup Date: January 05, 20212021-1084 A1 Sun Inc Christoph Dankert - Battery Backup Date: April 01, 20212021-1420 Altadena Solar Gregg & Deborah Vane - Battery Date: May 11, 20212021-2209 Axis Solar Dave Sabey - Battery Date: June 15, 20212021-2256 Solar Journey Ciro Mejia - Battery Date: June 17, 20212021-2339 Infinity Solar Jason Stokes - Battery Date: June 22, 20212021-1010 Skytech Solar Claudia Schweikert - Battery Backup Date: July 12, 20212022-1140 Future Energy Mary Black - Battery Backup Date: March 15, 20222022-1135 Ameco Solar Sherry Dibble - Battery Backup Date: March 15, 20222022-1417 Skytech Solar Richard Elder - Battery Backup Date: March 28, 20222022-2462 Nexa Solar Eric Kahn - Battery Backup Date: June 10, 2022 2022-2739 Sungreen Systems Johnny Lay - Battery Backup Date: July 1, 2022 2022-2829 Plug It In Solar Maria Cousineau - Battery Backup Date: July 11, 2022 2022-3074 Next Solar Leah Bernthal - Battery Backup Date: July 28, 2022 2022-3192 Next Solar Gaylord Naraja - Battery Backup Date: August 6, 2022 2022-3628 Power Town Solar Skylar Brown - Battery Backup Date: September 07, 20222022-3687 Plug It In Solar Corey Udkoff - Battery Backup Date: September 12, 20222022-3873 Magic Solar Harpeet Ghattaura - Battery Backup Date: September 26, 20222023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 2023
Scott Berger Residence
5 Ponte Bianco,
Lake Elsinore, CA 92532
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
Lexandra Alejo Residence
2321 W St Anne Pl.,
Santa Ana, CA 92704
20235069 Devil Dog Energy Ralph Gillespie Battery Date: October 07, 202320240772 Effect Energy Lexandra Alejo Battery Date: March 20, 2024
2321 W St Anne Pl -
201824535/23/2024
Loading Diagram
Sht # 2 of 3
Determine Applied Loads
F y = Weight of Equipment = 174 lbs
2019-1529 Solar Journey David Lewis - Battery Backup Date: June 4, 2019
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2020-1158 Solar Journey Craig Larsen - Battery Backup Date: June 4, 20202020-1527 Solar Journey Johnathan Valdivia - Battery Backup Date: June 14, 20202020-1697 Sasha Intl Jill Black Zalben - Battery Backup Date: August 3, 20202020-2940 Axis Solar Shook - Battery Backup Date: October 30, 2020
Check attachment of Support to (E) 2x4 Stud for Seismic Load
F x =F p
F p =0.4 ap SDS Wp
Rp / Ip [1 + 2(z/h)]x
ap
SDS
=1.0
=(2/3) SMS ; SMS = Fa Ssx ; Fa =1.0 ; Ss =1.25
SMS = 1.25
SDS =(2/3) 1.25 =0.83
Wp =174 lbs
Rp =2.5 [Table 13.61 ASCE 716]
[Table 13.61 ASCE 716]
; Ip =1.0 ; z / h =1.0
Total Fy
Total Fx
R1x
R2x
3.75"
16.75"
2020-2940 Axis Solar Shook - Battery Backup Date: December 5, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 10, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 14, 20202021-005 A1 Sun Inc Bissell & Hall - Battery Backup Date: January 05, 20212021-1084 A1 Sun Inc Christoph Dankert - Battery Backup Date: April 01, 20212021-1420 Altadena Solar Gregg & Deborah Vane - Battery Date: May 11, 20212021-2209 Axis Solar Dave Sabey - Battery Date: June 15, 20212021-2256 Solar Journey Ciro Mejia - Battery Date: June 17, 20212021-2339 Infinity Solar Jason Stokes - Battery Date: June 22, 20212021-1010 Skytech Solar Claudia Schweikert - Battery Backup Date: July 12, 20212022-1140 Future Energy Mary Black - Battery Backup Date: March 15, 20222022-1135 Ameco Solar Sherry Dibble - Battery Backup Date: March 15, 20222022-1417 Skytech Solar Richard Elder - Battery Backup Date: March 28, 2022
16.75"
2022-2462 Nexa Solar Eric Kahn - Battery Backup Date: June 10, 2022 2022-2739 Sungreen Systems Johnny Lay - Battery Backup Date: July 1, 2022 2022-2829 Plug It In Solar Maria Cousineau - Battery Backup Date: July 11, 2022 2022-3074 Next Solar Leah Bernthal - Battery Backup Date: July 28, 2022 2022-3192 Next Solar Gaylord Naraja - Battery Backup Date: August 6, 2022 2022-3628 Power Town Solar Skylar Brown - Battery Backup Date: September 07, 20222022-3687 Plug It In Solar Corey Udkoff - Battery Backup Date: September 12, 20222022-3873 Magic Solar Harpeet Ghattaura - Battery Backup Date: September 26, 20222022-4146 Belmont Energy Collin Vath - Battery Backup Date: October 11, 2022 2022-5205 Magic Solar Miguel Rivera - Battery Backup Date: December 15, 20222022-5296 Future Energy Today Tyler Masters - Battery Backup Date: December 21, 20222023-198 Magic Solar Nikolai Green - Battery Backup Date: January 15, 20232023-565 AV Solar Alma Ventura - Battery Backup Date: February 6, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 202320231967 Magic Solar Scott Berger Residence Date: March 28, 2023
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
2023-1967 Magic Solar Scott Berger Residence Date: June 15, 202320232613 Solar Deployed Lorne Leech Residence20231967 Magic Solar Scott Berger Residence Date: July 4, 202320233935 Berger Solar Nathan Heit Battery Date: July 4, 202320233834 Solar Renewable Energy Amador Medina Battery Date: July 12, 202320234478 Solar Deployed David Herrera Battery Date: August 10, 202320235069 Devil Dog Energy Ralph Gillespie Battery Date: October 07, 2023LWM SSE 20235382 Solar Deployed Maria Viridiana Battery Date: November 4, 202320240203 Solar Depoyed Donald Trapp Battery Date: January 22, 202420240331 ESP Blanca Ambriz Battery Date: February 6, 202420240386 ESP Gustavo Silva Residence Date: February 09, 202420240394 Solar Deployed Arlene Twine Residence Date: February 09, 202420240396 Smart House Peggy Garcia Date: February 9, 202420240466 Solar Deployed Anthony Britt Date: February 20, 202420240527 Solar Deployed Bridget Zuniga Date: February 26, 202420240428 Papke Designs Carlos Gonzalez Date: February 26, 202420240528 Solar Deployed Ricky Desingano Date: February 26, 202420240530 Solar Deployed Isenia Isabel Vasquez Date: February 26, 202420240562 Solar Deployed Sourivanh Hanemountry Date: February 28, 202420240554 ESP Robert Frantz Residence Date: February 28, 202420240556 ESP Dominic Accardi Residence Date: February 28, 202420240595 ESP David Villanueva Battery Date: March 4, 202420240665 ESP Raymond Chavez Battery Date: March 09, 202420240694 Effect Energy Allen Ramos Battery Date: March 13, 202420240695 Effect Energy Scott Howard Battery Date: March 13, 202420240699 Solar Deployed Gurmit Gill Battery Date: March 13, 2024 20240713 Solar Deployed Brenda Garcia Battery Date: March 14, 202420240763 Solar Deployed Ayub Shokrollahi Battery Date: March 19, 202420240764 Solar Deployed Nina Greer Battery Date: March 19, 202420240762 Solar Deployed Gary Cokers Battery Date: March 19, 202420240772 Effect Energy Lexandra Alejo Battery Date: March 20, 2024
2321 W St Anne Pl -
201824535/23/2024
Sht # 3 of 3
2019-1529 Solar Journey David Lewis - Battery Backup Date: June 4, 2019
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2020-1158 Solar Journey Craig Larsen - Battery Backup Date: June 4, 20202020-1527 Solar Journey Johnathan Valdivia - Battery Backup Date: June 14, 20202020-1697 Sasha Intl Jill Black Zalben - Battery Backup Date: August 3, 20202020-2940 Axis Solar Shook - Battery Backup Date: October 30, 2020
Load per bolt per strut
P = Rx / 2
P = 54.6 lbs / 2 = 27.3 lbs
Determine Applied Loads (cont...)
Fpmax =1.6 SDS Ip Wp =231 lbs
Fpmin =0.3 SDS Ip Wp =43 lbs
Fpmin <Fp <Fpmax OK
F p =0.4 (1.0) (0.83) (174 lbs)
(2.5 / 1)
[1 + 2(1)]x
F p =70 lbs
R1x (33.5") F y (3.75") Fp (16.75") = 0
Check Moment at R2:
R1x = (Fp x 16.75" + Fy x 3.75") / 33.5"
R1x = (1,172.5 lbf-in + 656 lbf-in) / 33.5 in
R1x = 54.6 lbs
Determine allowable load per 5/16" lag screw w/ 3" min. embedment into 2x4 stud per
2018 NDS.
W ' = W x Cd x Ct Table 10.3.1 2018 NDS
where:
W = 266 lbs / in. of embedment per Table 12.2a
Cd = 1.6 per Table 2.3.2 of 2018 NDS
Ct = 1.0 per Table 10.3.4 of 2018 NDS
W ' = 266 lbs/ in. x 3 in. x 1.6 x 1.0 = 1,277 lbs > 27.3 lbs OK
Check for withdrawal of each bolt:
2020-2940 Axis Solar Shook - Battery Backup Date: December 5, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 10, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 14, 20202021-005 A1 Sun Inc Bissell & Hall - Battery Backup Date: January 05, 20212021-1084 A1 Sun Inc Christoph Dankert - Battery Backup Date: April 01, 20212021-1420 Altadena Solar Gregg & Deborah Vane - Battery Date: May 11, 20212021-2209 Axis Solar Dave Sabey - Battery Date: June 15, 20212021-2256 Solar Journey Ciro Mejia - Battery Date: June 17, 20212021-2339 Infinity Solar Jason Stokes - Battery Date: June 22, 20212021-1010 Skytech Solar Claudia Schweikert - Battery Backup Date: July 12, 20212022-1140 Future Energy Mary Black - Battery Backup Date: March 15, 20222022-1135 Ameco Solar Sherry Dibble - Battery Backup Date: March 15, 20222022-1417 Skytech Solar Richard Elder - Battery Backup Date: March 28, 20222022-2462 Nexa Solar Eric Kahn - Battery Backup Date: June 10, 2022 2022-2739 Sungreen Systems Johnny Lay - Battery Backup Date: July 1, 2022 2022-2829 Plug It In Solar Maria Cousineau - Battery Backup Date: July 11, 2022 2022-3074 Next Solar Leah Bernthal - Battery Backup Date: July 28, 2022 2022-3192 Next Solar Gaylord Naraja - Battery Backup Date: August 6, 2022 2022-3628 Power Town Solar Skylar Brown - Battery Backup Date: September 07, 20222022-3687 Plug It In Solar Corey Udkoff - Battery Backup Date: September 12, 20222022-3873 Magic Solar Harpeet Ghattaura - Battery Backup Date: September 26, 20222022-4146 Belmont Energy Collin Vath - Battery Backup Date: October 11, 2022 2022-5205 Magic Solar Miguel Rivera - Battery Backup Date: December 15, 20222022-5296 Future Energy Today Tyler Masters - Battery Backup Date: December 21, 20222023-198 Magic Solar Nikolai Green - Battery Backup Date: January 15, 20232023-565 AV Solar Alma Ventura - Battery Backup Date: February 6, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 202320231967 Magic Solar Scott Berger Residence Date: March 28, 2023
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
2023-1967 Magic Solar Scott Berger Residence Date: June 15, 202320232613 Solar Deployed Lorne Leech Residence20231967 Magic Solar Scott Berger Residence Date: July 4, 202320233935 Berger Solar Nathan Heit Battery Date: July 4, 202320233834 Solar Renewable Energy Amador Medina Battery Date: July 12, 202320234478 Solar Deployed David Herrera Battery Date: August 10, 202320235069 Devil Dog Energy Ralph Gillespie Battery Date: October 07, 2023LWM SSE 20235382 Solar Deployed Maria Viridiana Battery Date: November 4, 202320240203 Solar Depoyed Donald Trapp Battery Date: January 22, 202420240331 ESP Blanca Ambriz Battery Date: February 6, 202420240386 ESP Gustavo Silva Residence Date: February 09, 202420240394 Solar Deployed Arlene Twine Residence Date: February 09, 202420240396 Smart House Peggy Garcia Date: February 9, 202420240466 Solar Deployed Anthony Britt Date: February 20, 202420240527 Solar Deployed Bridget Zuniga Date: February 26, 202420240428 Papke Designs Carlos Gonzalez Date: February 26, 202420240528 Solar Deployed Ricky Desingano Date: February 26, 202420240530 Solar Deployed Isenia Isabel Vasquez Date: February 26, 202420240562 Solar Deployed Sourivanh Hanemountry Date: February 28, 202420240554 ESP Robert Frantz Residence Date: February 28, 202420240556 ESP Dominic Accardi Residence Date: February 28, 202420240595 ESP David Villanueva Battery Date: March 4, 202420240665 ESP Raymond Chavez Battery Date: March 09, 202420240694 Effect Energy Allen Ramos Battery Date: March 13, 202420240695 Effect Energy Scott Howard Battery Date: March 13, 202420240699 Solar Deployed Gurmit Gill Battery Date: March 13, 2024 20240713 Solar Deployed Brenda Garcia Battery Date: March 14, 202420240763 Solar Deployed Ayub Shokrollahi Battery Date: March 19, 202420240764 Solar Deployed Nina Greer Battery Date: March 19, 202420240762 Solar Deployed Gary Cokers Battery Date: March 19, 202420240772 Effect Energy Lexandra Alejo Battery Date: March 20, 2024
2321 W St Anne Pl -
201824535/23/2024
Structural Calculations for a Roof Mounted Solar Photovoltaic System for:
Alexandra Alejo Residence
2321 W St Anne Pl.,
Santa Ana, CA 92704
Applicable Codes:
2022 California Building Code, 2022 California Electric Code,
2022 California Mechanical Code, American Society of Civil Engineers
Standard ASCE 7-16 Minimum Design Loads for Buildings and Other
Structures, American Wood Council 2018 National Design Specification
for Wood Construction, Local Municipal Code, and all other codes which
are adopted by reference or enacted by law.
Assumed Design Parameters:
The existing structure has been built under a building permit and is in its
original condition. The existing roof structure is capable of its code
required live load and the ability of the roof structure to support live loads
has not been substantially reduced by the age of the structure, termites or
mold, or unauthorized modifications to the existing structure. Solar Energy
Contractor shall make an inspection of the existing roof framing system
prior to installation of the roof mounted solar energy system to verify that
the existing roof is capable of supporting minimum roof live loads.
Assumed Design Parameters:
All 2x members are grade Douglas Fir #2 or better
All 4X members are grade Douglas Fir #1 or better
All Roof Connectors are Simpson Strong-Tie or Equal
All Concrete Foundations are f'c = 2500 psi or stronger
Original Structure was built to the Type-V Wood Framed Standards
of the Applicable Building Code at the time of Construction.
Sht # 1 of 72020-3796 Solar DeployeNicolas Glackin Residen ce Date: December 29, 2020
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
21Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
23
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
2321 W St Anne Pl -
201824535/23/2024
Sht # 2 of 7
Note to Building Official:
Based upon a review of the proposed plans and information, the
existing roof framing system is capable of safely supporting the additional
loads caused by the new solar photovoltaic energy system. The contractor
shall field verify that the existing roof structure is in its original permited
condition and verify that it can support the normal code required roof live
loads. Attached in this package are several calculations showing that the roof
members can support the additional weight of the solar array.
Furthermore, an analysis of the solar array's support for wind forces and a
seismic analysis of the existing structure are also included.
W DL + LL
R1 R2
7.8'
Total load on rafter = 60 plf x 7.8 ft. = 468 lbs
w = 30 psf x 2 ft. = 60 plf
Check Existing 2x4 Roof Rafters @ 24" O.C.: *
*Note: Contractor to Field Verify Framing
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 201901920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 2020193009 Axis Solar Design Appleba Date: September 11, 2192020053 Axis Solar Ryerson Residence Date: November 9, 20192020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20200020201806 ilum Solar Jus
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
21
20202565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 202020202564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 202020202576 Sunrise Solar Derrick Darland Residence Date: October 12, 202020202591 ESD 20590 Supulveda Residence Date: October 13, 202020202603 New Power John Yager Residence Date: October 14, 202020202603 New Power William Fuller Residence Date: October 14, 202020202601 TG Roofing Michael Seffintger Residence Date: October 14, 202020202652 Axis Solar Marcus Residence Date: October 15, 202020202652 Axis Solar Freimanis Residence Date: October 15, 202020202674 Complete Solar Dorado Residence Date: October 16, 202020202699 Solar Deployed Daniel Rivera Residence Date: October 17, 202020202694 ESD 20648 Barrera Residence Date: October 17, 202020202836 Penguin Solar Kalup Residence Date: October 26, 202020202832 Grid Alt IE Ana Hernandez Residence Date: October 26, 202020202841 Sunrise Solar Lathan Williams Residence Date: October 26, 202020202862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 202020202861 New Power Susan Bakken Residence Date: October 27, 202020202859 Grid Alt IE Terry McDonnell Residence Date: October 27, 202020202856 Solar Deployed Azsa Villalobos Residence Date: October 27, 202020202854 Solar Deployed Deilar Aguilera Residence Date: October 27, 202020202853 TG Roofing Brown Robert Residence Date: October 27, 202020202875 Trinity Power John Mendel Residence Date: October 28, 202020202874 Solar Deployed Jesse Haynes Residence Date: October 28, 202020202873 Solar Deployed Elward Beyerle Residence Date: October 28, 202020202887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 202020202907 Solar Deployed Rudy Valdez Residence Date: October 29, 202020202905 Sasha Intl Susan Driggs Residence Date: October 29, 202020202904 HPM Solar Leona Sankhla Residence Date: October 29, 202020202904 HPM Solar Leona Fisher Residence Date: October 29, 202020202918 Precis Solar Humberto Lemus Residence Date: October 29, 202020202936 ESD 20614 2892 Falcon Services Date: October 29, 202020202936 ESD 20614 2892 Falcon Walker Date: October 29, 202020202936 ESD 20614 2892 Falcon Walker Date: October 30, 202020202938 ESD 20610 Sisto RNR Date: October 30, 202020202940 Axis Solar Shook Date: October 30, 202020202963 Axis Solar Luke Ding Residence Date: October 31, 202020202959 Penguin Solar Stevens Residence Date: October 31, 202020202954 Solar Deployed Edith Vigil Residence Date: October 31, 202020202939 Mohr Power Pappillion Residence Date: October 31, 202020202983 Infinity Solar Gernazio Residence Date: November 3, 202020202982 Infinity Solar Luna Residence Date: November 3, 202020203021 TG Roofing Jeff Costa Residence Date: November 4, 202020203033 Penguin Solar Christina Cvek Residence Date: November 5, 202020203062 UniverCity Solar Mantri Residence Date: November 6, 202020203059 Solar Deployed Joshua Bethmann Residence Date: November 6, 202020203058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 202020203057 Future Energy Rebecca Jamison Residence Date: November 6, 202020203056 Penguin Solar David Esqueda Residence Date: November 6, 202020203055 Solar Journey Darren Misaresh Residence Date: November 6, 202020203052 ESD 20747 Perez Residence Date: November 6, 202020203065 HPM Solar Torres Residence Date: November 6, 202020203085 20729 Green Residence Date: November 8, 202020203083 HPM Solar Lisa Morales Residence Date: November 8, 202020203076 V's Solar Alberto Valadez Residence Date: November 8, 202020203249 Penguin Solar Scantlin Mark Residence Date: November 13, 202020203249 Penguin Solar Christina Cvek Residence Date: November 13, 202020203248 Penguin Solar Al Timpson Residence Date: November 13, 202020203255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 202020203235 Infinity Solar Dizon Residence Date: November 16, 202020203360 Axis Solar Hogan Residence Date: November 23, 202020203457 Solar Deployed Quyen Tran Residence Date: November 30, 202020203570 ESD 20917 Hatter Residence Date: December 6, 202020203567 Infinity Solar Wittenberg Residence Date: December 6, 202020203566 TG Roofing Morff Craig Residence Date: December 6, 202020203566 TG Roofing Craig Morff Residence Date: December 6, 202020203686 Bratton Solar Love Residence Date: December 14, 202020203682 New Power Shawn Johnson Date: December 14, 202020203681 Solar Deployed Javier Barragan Residence Date: December 14, 202020203695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 202020203707 Penguin Solar James Logan Residence Date: December 15, 202020203704 New Power Marite Cappelletti Residence Date: December 15, 202020203735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 202020203734 New Power Judith Park Residence Date: December 16, 202020203729 ilum Solar Jack Weddle Residence Date: December 16, 202020203738 Sasha Intl Amita Seth Residence Date: December 16, 202020203759 Mohr Power Smith Residence Date: December 17, 20202021056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021147 Better Earth Paul Garcia Residence Date: January 14, 20212021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 2021
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
23
2023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 20232023-448 HPM Solar Orellana Roberta Residence Date: January 31, 20232023-528 Magic Solar Jocelyn Gomez Residence Date: February 03, 20232023-538 Next Solar Amit Patil Residence Date: February 03, 20232023-587 LA Solar Jorge Carollo Residence Date: February 03, 20232023-784 LA Solar Jose Ernesto Fierros Rojo Residence Date: February 15, 20232023-812 LA Solar Gerald Chua Residence Date: February 16, 2023
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
2023-847 LA Anna Galstyan Residence Date: February 18, 2023
w = 30 psf x 2 ft. = 60 plf
2023-847 LA Anna Galstyan Residence Date: February 18, 20232023-1643 Revolt Electric Job Stevenson Residence Date: March 17, 20232024-0437 Energy Planner Christine Sullivan Residence Date: February 15, 2024
( Assume max rafter span = 7.8 ft. )
2024-0772 Effect Energy Lexandra Alejo Residence Date: March 20, 2024
2321 W St Anne Pl -
201824535/23/2024
Check Existing 2x4 Roof Rafters @ 24" O.C.:
Sht # 3 of 7
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020053 Axis Solar Ryerson Residence Date: November 9, 20192020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 2020
Check attachment of Support to Existing Structure for Wind Uplift
CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7-16 WIND LOADS ON BUILDING
APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK
ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2.
NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7-16 EFFECTIVE WIND AREA:
"FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS
EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING
CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT
BE LESS THAN ONE-THIRD ITS LENGTH."
EFFECTIVE AREA = 15 SQ FT
2020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201119 ilum Solar
Aaron Gonzalez
Residence
Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202
0020201438 ilum Solar Thomas
Aucoin Residence
Date: July 2, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202
20201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 202020201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 202020201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 202020202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 202020202269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 202020202392 UniverCity Solar Debra Enriquez Residence Date: September 29, 202020202390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 202020202437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 202020202436 Grid Alt IE Otoniel Villegas Residence Date: October 1, 202020202434 Mohr Power Thurin Residence Date: October 1, 202020202450 ESD 20579 Sanchez Residence Date: October 2, 202020202466 Solar Deployed Jose Bautista Residence Date: October 3, 202020202472 Solar Deployed Sava Knezevich Residence Date: October 5, 202020202493 Sunrise Solar Luis Avila Residence Date: October 6, 202020202491 Effect Energy Ana Lopez Residence Date: October 6, 202020202495 Penguin Solar German Rios Residence Date: October 6, 202020202498 Penguin Solar Lisa Bishop Residence Date: October 6, 202020202510 Sasha Intl Mayra Davila Residence Date: October 6, 202020202510 Sasha Intl Mayra Davila Residence Date: October 7, 202020202507 ESD 20593 So Residence Date: October 7, 202020202515 Penguin Solar Black Annette Residence Date: October 7, 202020202531 Solar Journey Charlie Zheng Residence Date: October 8, 202020202525 New Power William Fuller Residence Date: October 8, 202020202545 Grid Alt IE Francisco Guerrero Residence Date: October 9, 202020202565 Grid Alt IE Luis Aguiniga Residence Date: October 11, 202020202564 Grid Alt IE Claudia Rodriguez Residence Date: October 11, 202020202576 Sunrise Solar Derrick Darland Residence Date: October 12, 202020202591 ESD 20590 Supulveda Residence Date: October 13, 202020202603 New Power John Yager Residence Date: October 14, 202020202603 New Power William Fuller Residence Date: October 14, 202020202601 TG Roofing Michael Seffintger Residence Date: October 14, 202020202652 Axis Solar Marcus Residence Date: October 15, 202020202652 Axis Solar Freimanis Residence Date: October 15, 202020202674 Complete Solar Dorado Residence Date: October 16, 202020202699 Solar Deployed Daniel Rivera Residence Date: October 17, 202020202694 ESD 20648 Barrera Residence Date: October 17, 202020202836 Penguin Solar Kalup Residence Date: October 26, 202020202832 Grid Alt IE Ana Hernandez Residence Date: October 26, 202020202841 Sunrise Solar Lathan Williams Residence Date: October 26, 202020202862 Sunrise Solar Eduardo Vilchis Residence Date: October 27, 202020202861 New Power Susan Bakken Residence Date: October 27, 202020202859 Grid Alt IE Terry McDonnell Residence Date: October 27, 202020202856 Solar Deployed Azsa Villalobos Residence Date: October 27, 202020202854 Solar Deployed Deilar Aguilera Residence Date: October 27, 202020202853 TG Roofing Brown Robert Residence Date: October 27, 202020202875 Trinity Power John Mendel Residence Date: October 28, 202020202874 Solar Deployed Jesse Haynes Residence Date: October 28, 202020202873 Solar Deployed Elward Beyerle Residence Date: October 28, 202020202887 Solar Deployed Dipika Kadakia 2 Residence Date: October 28, 202020202907 Solar Deployed Rudy Valdez Residence Date: October 29, 202020202905 Sasha Intl Susan Driggs Residence Date: October 29, 202020202904 HPM Solar Leona Sankhla Residence Date: October 29, 202020202904 HPM Solar Leona Fisher Residence Date: October 29, 202020202918 Precis Solar Humberto Lemus Residence Date: October 29, 202020202915 Complete Solar Ojeda Residence Date: October 29, 202020202936 ESD 20614 2892 Walker Residence Date: October 29, 202020202936 ESD 20614 2892 Falcon Services Date: October 29, 202020202936 ESD 20614 2892 Falcon Walker Date: October 29, 202020202936 ESD 20614 2892 Falcon Walker Date: October 30, 202020202938 ESD 20610 Sisto RNR Date: October 30, 202020202940 Axis Solar Shook Date: October 30, 202020202963 Axis Solar Luke Ding Residence Date: October 31, 202020202959 Penguin Solar Stevens Residence Date: October 31, 202020202954 Solar Deployed Edith Vigil Residence Date: October 31, 202020202939 Mohr Power Pappillion Residence Date: October 31, 202020202983 Infinity Solar Gernazio Residence Date: November 3, 202020202982 Infinity Solar Luna Residence Date: November 3, 202020203021 TG Roofing Jeff Costa Residence Date: November 4, 202020203033 Penguin Solar Christina Cvek Residence Date: November 5, 202020203062 UniverCity Solar Mantri Residence Date: November 6, 202020203059 Solar Deployed Joshua Bethmann Residence Date: November 6, 202020203058 Guasti Const Anthony Guastadisegni Residence Date: November 6, 202020203057 Future Energy Rebecca Jamison Residence Date: November 6, 202020203056 Penguin Solar David Esqueda Residence Date: November 6, 202020203055 Solar Journey Darren Misaresh Residence Date: November 6, 202020203052 ESD 20747 Perez Residence Date: November 6, 202020203065 HPM Solar Torres Residence Date: November 6, 202020203085 20729 Green Residence Date: November 8, 202020203083 HPM Solar Lisa Morales Residence Date: November 8, 202020203076 V's Solar Alberto Valadez Residence Date: November 8, 202020203249 Penguin Solar Scantlin Mark Residence Date: November 13, 202020203249 Penguin Solar Christina Cvek Residence Date: November 13, 202020203248 Penguin Solar Al Timpson Residence Date: November 13, 202020203255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 202020203235 Infinity Solar Dizon Residence Date: November 16, 202020203360 Axis Solar Hogan Residence Date: November 23, 202020203457 Solar Deployed Quyen Tran Residence Date: November 30, 202020203570 ESD 20917 Hatter Residence Date: December 6, 202020203567 Infinity Solar Wittenberg Residence Date: December 6, 202020203566 TG Roofing Morff Craig Residence Date: December 6, 202020203566 TG Roofing Craig Morff Residence Date: December 6, 202020203686 Bratton Solar Love Residence Date: December 14, 202020203682 New Power Shawn Johnson Date: December 14, 202020203681 Solar Deployed Javier Barragan Residence Date: December 14, 202020203695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 202020203695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 202020203695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 202020203707 Penguin Solar James Logan Residence Date: December 15, 202020203704 New Power Marite Cappelletti Residence Date: December 15, 202020203735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 202020203734 New Power Judith Park Residence Date: December 16, 202020203729 ilum Solar Jack Weddle Residence Date: December 16, 202020203738 Sasha Intl Amita Seth Residence Date: December 16, 2020
Total load on rafter = 60 plf x 1.5 ft + 28 plf x 6.3 ft + ( 4' x 2.75' x 3 psf x 2 )
= 332 lbs < 468 lbs OK
20203759 Mohr Power Smith Residence Date: December 17, 202020203793 Valley Solar Magdalena Corona Residence Date: December 21, 202020203792 Mohr Power Stansfield Residence Date: December 21, 2020 2021056 Solar Deployed Daphne Phung Residence Date: January 8, 20212021-085 Solar Deployed John Boseman Residence Date: January 12, 20212021147 Better Earth Paul Garcia Residence Date: January 14, 2021
R1 R2
7.8'
w LLwDL
2021-192 Better Earth Htoo Myat Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 18, 20212021-193 Better Earth Marion Smith Residence Date: January 19, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-509 Better Earth Refugio Valle Residence Date: February 13, 20212021-778 Better Earth Weeraya Uengwachira Residen Date: March 05, 20212021-778 Better Earth Weeraya Uengwachira Residence Date: March 05, 20212021-990 Better Earth Angel Mayhua Residence Date: March 26, 20212021-1173 Better Earth Julian Gomez Residence Date: April 08, 20212021-1Residence Date: June 05, 2021
1.5'
2022-051 Green Road Solar Shane Myers Residence Date: January 6, 20212022-3538 Solar Survey Pro 4566 W 118th Date: September 01, 20222023-344 Grid Alt LA Silvia Martinez Residence Date: January 25, 20232023-448 HPM Solar Orellana Roberta Residence Date: January 31, 20232023-528 Magic Solar Jocelyn Gomez Residence Date: February 03, 20232023-538 Next Solar Amit Patil Residence Date: February 03, 2023
6.3'
2023-587 LA Solar Jorge Carollo Residence Date: February 03, 20232023-784 LA Solar Jose Ernesto Fierros Rojo Residence Date: February 15, 20232023-812 LA Solar Gerald Chua Residence Date: February 16, 2023
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
2023-847 LA Anna Galstyan Residence Date: February 18, 20232023-847 LA Anna Galstyan Residence Date: February 18, 2023
w DL + LL = 30 psf x 2 ft. = 60 plf
2023-1643 Revolt Electric Job Stevenson Residence Date: March 17, 20232023-4261 Precis Solar Steven Kent Phillips Residence Date: July 25, 2023
P
2023-4321 Precis Solar Michael Plotkowski Residence Date: July 29, 20232023-4350 Precis Solar Lawrence Henderson Residence Date: August 01, 20232023-4355 Precis Solar George Christison Residence Date: August 01, 20232023-4367 Precis Solar Debra L Beltran Residence Date: August 01, 2023
P
2023-4446 Precis Solar Ahmed Hamed Residence Date: August 09, 20232023-4820 Precis Solar Tommy Harris Residence Date: September 13, 20232023-5231 Precis Solar Dennis Averyt Residence Date: October 21, 20232024-0437 Energy Planner Christine Sullivan Residence Date: February 15, 20242024-0772 Effect Energy Lexandra Alejo Residence Date: March 20, 2024
2321 W St Anne Pl -
201824535/23/2024
Sht # 4 of 7
20173570 Quick Solar Systems Kevin Costello 15049 Residence Date: September 16, 2017
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
20182670 Divine Power USA Ronald Howard Residence Date: September 7, 201820183631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 201820183702 Precis Solar Barbara Cervera Residence Date: November 30, 201820183831 ESD 18795 Pacheco Residence Date: December 12, 201820183831 ESD 18795 Pacheco Residence Date: January 23, 201920183831 ESD 18795 Pacheco Residence Date: January 23, 20192019292 Axis Solar Design Stephen Skjelvik Residence Date: February 5, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: February 22, 20192019489 Axis Solar Design Ecoforce 6 Peachtree Date: March 12, 201920192865 Axis Solar Design Jacobs 18 Tanglewood Date: August 29, 201920193009 Axis Solar Design Applebaum Date: September 11, 201920193922 Axis Solar Design Fitzpatrick Residence Date: November 7, 20192020053 Axis Solar Ryerson Residence Date: November 9, 20192020126 Axis Solar Mark Reynolds Residence Date: January 16, 20202020131 Axis Solar Law Residence Date: January 16, 20202020268 Axis Solar Yragui Ecoforce Residence Date: January 31, 20202020279 Penguin Solar Dan Wampole Residence Date: February 3, 20202020450 Penguin Solar Louis Sebulsky Residence Date: February 21, 20202020473 Penguin Solar Laura Caballero Residence Date: February 24, 20202020602 Penguin Solar Kevin Dodd Residence Date: March 5, 20202020640 Penguin Solar Thomas Vasquez Residence Date: March 11, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020678 ESD 20119 Barile Residence Date: March 16, 20202020780 ESD 20136 Gutierrez Residence Date: April 1, 20202020844 ESD 20164 Azim Residence Date: April 14, 20202020844 ESD 20164 Azim Residence Date: April 14, 202020201052 ESD 20206 Sarkissian Residence Date: May 15, 202020201088 ESD 20216 Yocum Residence Date: May 22, 202020201096 UniverCity Solar Rebecca Baxter Residence Date: May 26, 202020201102 Papke Designs Olvera Residence Date: May 27, 202020201100 HPM Solar Oscar Residence Date: May 27, 202020201110 ilum Solar Enrique Escontrias Residence Date: May 28, 202020201119 ilum Solar Aaron Gonzalez Residence Date: May 29, 202020201119 ilum Solar Aaron Gonzalez Residence Date: June 9, 202020201286 ilum Solar David Harski Residence Date: June 18, 202020201408 ilum Solar Antonio Escarzaga Residence Date: June 30, 202020201438 ilum Solar Thomas Aucoin Residence Date: July 2, 202020201437 ilum Solar Heliezer Espinoza Residence Date: July 2, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201626 ilum Solar Josh TobarHanavan Residence Date: July 25, 202020201643 Grid Alt IE Enrique Munoz Residence Date: July 28, 202020201667 UniverCity Solar Jenny Swanson Residence Date: July 30, 202020201674 Sunrise Solar Jose Munoz Residence Date: July 31, 202020201696 ACS Workman Residence Date: August 3, 202020201694 ACS Sing Residence Date: August 3, 202020201691 SunLectric Randy & Lynn Reeves Residence Date: August 3, 202020201689 New Power Joel Garcia Residence Date: August 3, 202020201704 Solar Journey Nisal Samarasena Residence Date: August 4, 202020201724 Grid Alt IE Efren Salgado Residence Date: August 5, 202020201723 Grid Alt IE Sandra West Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201722 HPM Solar Xavier Monge Residence Date: August 5, 202020201718 ilum Solar Mejia Emerson Residence Date: August 5, 2020
qh =
Note:
qh =
qh =
ðγE
ðγa
Check attachment of Support to Existing Structure for Wind Uplift Cont'd
Tributary Area to Each Solar Mount = 4 ft. x 2.75 ft. = 11 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 110 mph Exposure C):
Eq'n 29.4-7 ASCE 7-16
Kz = velocity pressure coefficient
p =qh ðGC p ÞðγE Þðγa Þð
0.00256 Kz Kzt Kd Ke V2
Section 29.10.1 ASCE 7-16
Kz = 0.9 (Exposure C, Height = 20 ft or less)
Kzt =Topographical Factor = 1.0
Kd =Wind Directionality Factor = 0.85
Ke =Ground Elevation Factor = 1.0
V = 110 mph ; VASD = 85 mph Table 1609.3.1 2022 CBC
0.00256 (0.9) (1.0) (0.85) (1.0) (85)2
p =qh ðGC p ÞðγE Þðγa Þð
14.15 psf
p =14.15 psf (2.0) (1.5) (0.7) = 29.7 psf
Eq'n 26.10-1 ASCE 7-16
GCp = 2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
GCp =Exposure Factor = 1.5
GCp =Solar Array Pressure Equalization Factor = 0.7 Fig. 29.4-8 ASCE 7-16
Nominal (Unfactored) Uplift at each support = 29.7 psf x 11 sq. ft. = 327 lbs
Note: Section 2.4.1 of ASCE 7-16 , Basic Load Combinations for Allowable Stress
Design. Note: Applicable Load Combination #5 : D + 0.6W
Dead Load = 03 psf
Wind Load = 29.7 psf
Snow Load = 20.0 psf
20201806 ilum Solar Justice Lloyd Residence Date: August 13, 202020201804 ilum Solar Joshua Gould Residence Date: August 13, 202020201803 ilum Solar Lloyd Harmon Residence Date: August 13, 202020201958 ilum Solar Deane Martinez Residence Date: August 27, 202020202114 ilum Solar Mike Rich Residence Date: September 10, 202020202159 ilum Solar Norman Allen Residence Date: September 13, 202020202158 ilum Solar Paul Kiehn Residence Date: September 13, 202020202666 ilum Solar Yvonne Quinones Residence Date: October 16, 202020202762 ilum Solar Andre James Residence Date: October 21, 202020203084 ilum Solar Christine Quilon Residence Date: October 21, 202020203189 ilum Solar Michael Ireland Residence Date: November 12, 202020203252 ilum Solar Viorato Residence Date: November 13, 202020203243 ilum Solar Jeremiah Green Residence Date: November 13, 20202021072 Ilum Solar Cory Hoffa Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 12, 20212021-284 Ilum Solar Henry Verduzco Residence Date: January 25, 20212021-285 Ilum Solar Andrew Hollihan Residence Date: January 25, 20212021-428 Solar Journey Eddie Joseph Residence Date: February 6, 20212021-679 Precis Solar Tyrone Hudson Residence Date: February 26, 20212021-680 Precis Solar David Garibaldi Residence Date: February 26, 20212021-1059 Precis Solar Susan Anderson Residence Date: March 31, 2021
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
2021-1063 Precis Solar John Evancoe Residence Date: March 31, 20212021-1065 Precis Solar Wallace Ward Residence Date: March 31, 20212021-1155 Better Earth Maria Jimenez Residence Date: April 8, 20212021-1202 Better Earth John Boozer Residence Date: April 12, 20212021-1388 Better Earth Omar Camacho Residence Date: April 27, 20212022-004 Better Earth Rick Kelleher Residence Date: January 4, 20222022-003 Better Earth Henry Arevalo Residence Date: January 4, 20222022-006 Better Earth Jesus Hernandez Residence Date: January 4, 20222022-683 Better Earth Mayra Padilla Residence Date: February 19, 20222023-537 Effect Energy Jeff Blaxland Residence Date: February 03, 20222023-587 LA Solar Jorge Carollo Residence Date: February 03, 20232023-784 LA Solar Jose Ernesto Fierros Rojo Residence Date: February 15, 20232023-812 LA Solar Gerald Chua Residence Date: February 16, 2023
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
2023-847 LA Anna Galstyan Residence Date: February 18, 20232023-847 LA Anna Galstyan Residence Date: February 18, 20232023-1643 Revolt Electric Job Stevenson Residence Date: March 17, 20232023-4261 Precis Solar Steven Kent Phillips Residence Date: July 25, 20232023-4321 Precis Solar Michael Plotkowski Residence Date: July 29, 20232023-4350 Precis Solar Lawrence Henderson Residence Date: August 01, 20232023-4355 Precis Solar George Christison Residence Date: August 01, 20232023-4367 Precis Solar Debra L Beltran Residence Date: August 01, 20232023-4446 Precis Solar Ahmed Hamed Residence Date: August 09, 20232023-4820 Precis Solar Tommy Harris Residence Date: September 13, 20232023-5231 Precis Solar Dennis Averyt Residence Date: October 21, 20232024-0437 Energy Planner Christine Sullivan Residence Date: February 15, 20242024-0772 Effect Energy Lexandra Alejo Residence Date: March 20, 2024
2321 W St Anne Pl -
201824535/23/2024
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
Check attachment of Support to Existing Structure for Wind Uplift Cont'd
where:
Y = Distance between 2 lag screws
X = 1.2"
Y' = Moment arm to 1st lag screw
X = 5.6"
Design (Factored) Load at each support:
3 psf + (0.6 x 29.7 psf) = 20.8 psf
Moment due to Load = (20.8 psf x 11 sq. ft.) x 5.6 inches
Determine allowable load per 5/16" lag screw w/ 3.25" embedment into wood below
according to the 2018 NDS.
W ' = W x Cd x Ct Table 10.3.1 2018 NDS
where:
W = 266 lbs / in. of embedment per Table 12.2a
Cd = 1.6 per Table 2.3.2 of 2018 NDS
Ct = 1.0 per Table 10.3.4 of 2018 NDS
W ' = 266 lbs/ in. x 3.25 in. x 1.6 x 1.0 = 1,383 lbs > 1,280 lbs OK
OK. Use Tile Hooks with (2) 5/16" x 3.5" Lag Screws
with 3.25" min. embedment into wood, at 48" O.C.
max, as per Plans to Manufacturer's instructions.
Moment due to Load = 1,281 in-lb
Load to lag screw = 1,281 in-lb / 1.2 in
Load to lag screw = 1,280 lbs
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
-23
YY'
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
2321 W St Anne Pl -
201824535/23/2024
Check Seismic load due to added dead load of photovoltaic system.
Determine Seismic Weight of Existing Building:
Effective Existing Seismic Weight
Area of (E) Building =Approximately 1,300 Sq. ft.
Approximate
Effective
Seismic Weight
=1,300 sq. ft. x 30 psf ave. = 39,000 LBS
DETERMINE BASE SHEAR
V = Cs W
Cs =SDS
R
Ie
R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1
R = 6.5 WOOD SHEAR WALLS
Ie = 1.0 IMPORTANCE FACTOR
SDS =2/3 x SMS
SMS =FA x SS
SMS =1.2 x 1.5 = 1.8
SDS =2/3 x 1.8 = 1.2
Cs =1.2
6.5
1
=0.185
Residence Date: September 16, 2017
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2018-2670 Divine Power USA Ronald Howard Residence Date: September 7, 20182018-3631 Solar Survey Pro Itzel Lopez Residence Date: November 21, 20182018-3702 Precis Solar Barbara Cervera Residence Date: November 30, 20182018-3831 ESD 18-795 Pacheco Residence Date: December 12, 2018
EQ'N 12.8-1 ASCE 7-16
EQ'N 12.8-2 ASCE 7-16
EQ'N 11.4-3 ASCE 7-16
EQ'N 11.4-1 ASCE 7-16
EQ'N 12.8-2 ASCE 7-16
2020-2114 ilum Solar Mike Rich Residence Date: September 10, 20202020-2159 ilum Solar Norman Allen Residence Date: September 13, 2020
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
21
2020-2269 UniverCity Solar Jeffrey Smilen Residence Date: September 20, 20202020-2392 UniverCity Solar Debra Enriquez Residence Date: September 29, 20202020-2390 UniverCity Solar Ricky Hofmann Residence Date: September 29, 20202020-2437 Grid Alt IE Jocelyn Hernandez Residence Date: October 1, 20202020-3249 Penguin Solar Scantlin Mark Residence Date: November 13, 20202020-3249 Penguin Solar Christina Cvek Residence Date: November 13, 20202020-3248 Penguin Solar Al Timpson Residence Date: November 13, 20202020-3255 Sunrise Solar Gerardo Cardenas Residence Date: November 16, 20202020-3235 Infinity Solar Dizon Residence Date: November 16, 20202020-3360 Axis Solar Hogan Residence Date: November 23, 20202020-3457 Solar Deployed Quyen Tran Residence Date: November 30, 20202020-3570 ESD 20-917 Hatter Residence Date: December 6, 20202020-3682 New Power Shawn Johnson Date: December 14, 20202020-3681 Solar Deployed Javier Barragan Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique Henry Foster Residence Date: December 14, 20202020-3695 Revamp Energy Antonique & Henry Foster Residence Date: December 14, 20202020-3707 Penguin Solar James Logan Residence Date: December 15, 20202020-3704 New Power Marite Cappelletti Residence Date: December 15, 20202020-3735 Grid Alt IE Gabriela Ameijenda Residence Date: December 16, 20202020-3734 New Power Judith Park Residence Date: December 16, 20202020-3729 ilum Solar Jack Weddle Residence Date: December 16, 20202020-3738 Sasha Intl Amita Seth Residence Date: December 16, 20202020-3759 Mohr Power Smith Residence Date: December 17, 20202020-3793 Valley Solar Magdalena Corona Residence Date: December 21, 20202020-3792 Mohr Power Stansfield Residence Date: December 21, 2020 2020-3795 ilum Solar Hae Lee Residence Date: December 27, 2020 2020-3796 Regal Solar Nicolas Glackin Residence Date: December 29, 2020 2020-3796 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2020-3842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
23
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
2023-4820 Precis Solar Tommy Harris Residence Date: September 13, 20232023-5231 Precis Solar Dennis Averyt Residence Date: October 21, 2023
2321 W St Anne Pl -
201824535/23/2024
V = 0.185 x 39,000 LBS = 7,215 LBS
DETERMINE NEW BASE SHEAR
EXISTING BASE SHEAR
Determine Seismic Weight of Building with Solar Array:
EXISTING
SEISMIC
WEIGHT
=39,000 LBS
NEW SOLAR
ARRAY =3 PSF x 20 PANELS x 3.3' x 5.5' = 1,089 LBS
NEW
SEISMIC
WEIGHT
=39,000 LBS + 1,089 LBS = 40,089 LBS
THEREFORE NEW BASE SHEAR:
V = 0.185 x 40,089 = 7,416 LBS
% CHANGE =7,416 LBS - 7,215LBS
7,215 LBS x 100 =2.8 % < 10% OK
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
EQ'N 12.8-1 ASCE 7-16
EQ'N 12.8-1 ASCE 7-16
OK. PER ASCE 7-16 SECTION 11.B.3 ALTERATIONS
20203842 Solar Deployed Nicolas Glackin Residence Date: December 29, 2020 2021056 Solar Deployed Daphne Phung Residence Date: January 8, 2021
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
OK. PER ASCE 7-16 SECTION 11B.4 ALTERATIONS
EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT
FROM ANALYSIS SINCE NEW SEISMIC FORCE IS
LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE
"Alterations may be made to any structure without requiring the existing structure to
comply with this standard, provided that the alterations comply with the requirements for a
new structure. Alterations that increase the seismic force in any existing structural element
by more than 10% or decrease the design strength of any existing structural element to
resist seismic forces by more than 10% shall not be permitted unless the entire seismic
force-resisting system is determined to comply with this standard for a new structure."
2321 W St Anne Pl -
201824535/23/2024
360 E. 1st Street #947 Tustin, CA 92780
Phone (714) 258-3900 C10-973253
Attention: Santa Ana Building & Safety
On March 11, 2024, I, Alexandra, entered a binding contract with & Peak Power Solutions. This
contract is to install a new solar system at 2321 W St Anne Place Santa Ana, CA 92704.
I give permission to Peak Power Solutions, Inc. to pull a building permit on my behalf.
Should you have any questions, please contact me at (714) 795-4106
Thank you,
__________________________ Date__________________
Alexandra Alejo
DocuSign Envelope ID: B8C0B3C9-267D-432E-B86D-08D3576F0F88
3/25/2024
2321 W St Anne Pl -
201824535/23/2024
INVERTER
DATA SHEET6
03/21/2024DATE:
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
2321 W St Anne Pl -
201824535/23/2024
MODULE
DATA SHEET7
03/21/2024DATE:
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
2321 W St Anne Pl -
201824535/23/2024
8 ECB
DATA SHEET
03/21/2024DATE:
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
2321 W St Anne Pl -
201824535/23/2024
RACKING
DATA SHEET
03/21/2024DATE:
9
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
-219
2321 W St Anne Pl -
201824535/23/2024
10 ATTACHMENT
DATA SHEET
03/21/2024DATE:
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
-219
2321 W St Anne Pl -
201824535/23/2024
11
03/21/2024DATE:
RSD DATA
SHEET
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
2321 W St Anne Pl -
201824535/23/2024
12
03/21/2024DATE:
BATTERY
DATA SHEET
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
2321 W St Anne Pl -
201824535/23/2024
13
03/21/2024DATE:
BATTERY
MOUNTING
DETAIL
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
2321 W St Anne Pl -
201824535/23/2024
EQUIPOMENT
ELEVATION
03/21/2024DATE:
NOTE :ESS UNIT WILL NOT BE INSTALLED WITHIN 5' IN ANY DIRECTION OF
ANY WINDOWS, DOORS AND HVAC INLETS
NOTE :ESS UNIT WILL BE INSTALLED NO LESS THAN 3' FROM OTHER ESS
UNITS
14
Project Name:
Alexandra Alejo
Property address:2321 W St Anne Pl,
Santa Ana, CA 92704
3'
ECB
AC DISCONNECT 2 OF 2
Encharge
Battery
Encharge
Battery
Main
Service
Panel
MSP DISCONNECT 1 OF 2
OUTSIDE
POWER SOURCE DISCONNECT SCHEDULE
DISCONNECT NUMBER DISCONNECT TYPE
1 OF 2 UTILITY
2 OF 2 PV AND ESS SYSTEM
PEAK POWER SOLUTIONS
360 E 1ST STREET #947,
TUSTIN, CA 92780
Phone: 714-258-3900
License # 973253 C10
2321 W St Anne Pl -
201824535/23/2024