HomeMy WebLinkAbout2005 W Picasso - PlanSCOPE OF WORK | ADD-ON TO
EXISTING SOLAR SYSTEM
DESIGN CRITERIA
SINGLE FAMILY RESIDENCE
OCCUPANCY: R-3
CONSTRUCTION TYPE: VB
WIND SPEED: 130 MPH
EXPOSURE CATEGORY: C
MINIMUM STANDOFF HEIGHT: 6"
NON-SPRINKLERED
SNOW LOAD: N/A
VICINITY MAP | NOT TO SCALE
SHEET INDEX
PV-1
PV-2
PV-3
PV-4
PV-5
TITLE SHEET/SITE PLAN
EQUIPMENT LAYOUT
MOUNTING DETAIL
SINGLE LINE DIAGRAM
PLACARD / SIGNAGE
SPEC SHEETS / CALCS
(E) MAIN RESIDENCE
(E) MAIN SERVICE
PANEL W/ METER
PROPERTY LINES
SCALE: 3/32" = 1'-0"
GENERAL NOTES:
1. ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK
SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES:
2022 CA BUILDING CODE (CBC)
2022 CA RESIDENTIAL CODE (CRC)
2022 CA FIRE CODE (CFC)
2020 NATIONAL ELECTRIC CODE (NEC)
2022 CA CODE OF REGULATIONS (CCR) TITLE 24
UNDERWRITERS LABORATORIES (UL) STANDARDS
2. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST
OUTLETS, VENTILATION INTAKE AIR OPENINGS SHALL NOT
BE COVERED BY THE PHOTOVOLTAIC SYSTEM,
3. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A
RECOGNIZED ELECTRICAL TESTING LABORATORY AND
INSTALLED PER THE LISTING REQUIREMENTS AND THE
MANUFACTURER'S INSTRUCTIONS. [NEC 690.4(D)]
4. ALL OUTDOOR EQUIPMENT SHALL BE RAINTIGHT AND
MINIMUM NEMA 3R RATED.
5. ALL EXTERIOR CONDUIT WILL BE PAINTED TO MATCH
DWELLING.
6. SERVICING UTILITY WILL BE CONTACTED PRIOR TO
ENERGIZING THE PHOTOVOLTAIC SYSTEM.
PROPOSED EQUIPMENT: 1.2KW DC / 1.13KW AC
(3) QCELL QPEAK-DUO-BLK-G10+ 410W MODULES
(3) POWER OPTIMZERS
(1) LG CHEM RESU16H 16KWH BATTERY
EXISTING EQUIPMENT: 6KW DC / 5.52KW AC
(15) QCELL QPEAK-DUO-BLK-G10+ 400W MODULES
(15) POWER OPTIMZERS
(1) SOLAREDGE SE7600H-US INVERTER
(1) LG CHEM RESU16H 16KWH BATTERY
(E) 200A MAIN SERVICE PANEL
TWO STORY RESIDENCE
ROOF TYPE: COMP SHINGLE (1 LAYER)(E) POOL
PICASSO
(E) PERGOLA
Bldg#: 101118992
Elec#: 20182595
Approvals: MSmith
The scope of the plans is for the installation of the
solar photovoltaic system only and the approval is
subject to compliance with all applicable city and state
codes and regulations regarding construction. The
approval of the plans does not constitute any
certification of the accuracy, completeness, or building
permit status of the existing buildings and structures
as shown.
2005 W Picasso -
201825954/25/2024
NUT FLANGE
5/16-18 SST
WASHER,
BONDED
L-1X5, BLACK
WASHER,
BONDED
TILE REPLACEMENT
FLASHING, FLAT
SCREW, LAG, HEX,
5/16" DIAMETER
MIN 2.5" EMBEDMENT
ASSY,
PEDESTAL 1
ATTACHMENT DETAIL
NOT TO SCALE
SOLAR
MODULES
PV ROOF ATTACHMENT
TYP @ EACH (SEE
DETAIL TO LEFT)
2X4 FRAMING @
24" O.C. TYP
IRONRIDGE
RACKING SYSTEM
6'
MAX
3'
MIN
2'
O.C.
PARTIAL ROOF FRAMING PLAN
NOT TO SCALE
IRONRIDGE RAIL
IRONRIDGE KO TILE
A
IRONRIDGE TILE REPLACEMENT
FLASHING (FLAT TILE)
A
CROSS SECTION DETAIL
NOT TO SCALE
6" MAX
SOLAR MODULE
ROOF FRAMING
MODULE INFO
MODULE WEIGHT (LBS)
MODULE AREA (FT²)
# OF MODULES
TOTAL MODULE WEIGHT (LBS)
# OF STANDOFFS
ARRAY AREA (FT²)
STANDOFF LOAD (PSF)
48.5
21.12
18
873
24
380.2
2.30
TILT AZIMUTH20°180°
2005 W Picasso -
201825954/25/2024
MTO
UTILITY
UTILITY
BI-DIRECTIONAL
METER
PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
G
60A
2Pole
MAIN
OCPD
EXISTING GROUND;
MAY REQUIRE NEW GROUNDING
ELECTRODES: SEE NOTE BELOW
PV BACKFED BREAKER:
SHALL BE POSITIONED AT THE
OPPOSITE END OF MAIN BREAKER
MAIN SERVICE PANEL (E)
1PH 3W 240VAC
225A Bus Rating (E)
200A Main OCPD (Non-Center Fed)
200A
(3) #6 AWG THWN-2
(1) #8 AWG THWN-2 GROUND
1" EMT CONDUIT @ 6FT
SOLAREDGE: SE7600H-US INVERTER
1PH 240VAC NEMA 3R
W/ INTEGRATED
DC DISCONNECT AND
RAPID SHUTDOWN
PER NEC 2017 690.12
(4) #10 AWG THWN-2
(1) #8 AWG THWN-2 GROUND
3/4" EMT CONDUIT @ 60FT
JUNCTION
BOX @
ARRAY
MOUNTED
ON RAIL
NEMA 3R
SYSTEM CONFIGURATION
Number of Modules
Modules per String
EXISTING Module Type
Number of Inverters
Inverter Model
PV OCPD Size @ 125% PV AC Current
Main Breaker Ampere Rating
Service Bus Ampere Rating
AC Watts CEC Rated
DC Watts STC
Operating AC Voltage
18
2 STRINGS OF (9) MODULES
(15) Q-CELLS QPEAK-DUO BLK-G10+ 400W
1
SOLAREDGE SE7600H-US
40A
200A
225A
5.52 kW
6 kW
240VAC
(E)- EXISTING
(P)- PROPOSED # OF MODULES - 18
# OF INVERTERS - 1
# OF BATTERIES - 2
MODULES INTERCONNECTED PER NEC SECTIONS 690.48, 690.43 & 250.136A
USING #10 AWG PV WIRE AND GROUNDED BY #6 BARE CU. PER NEC
SECTIONS 690.45 & 250.122. (TYPICAL FOR ALL ARRAYS) EXPOSED WIRE
SHALL BE OF USE-2 INSULATION AND ALL EXPOSED GROUND WIRE SHALL
BE BARE CU. MODULES GROUND BY ILSCO GBL-4DBT LUGS PER UL 2703
Solar Module Ratings:Optimizer Ratings:
Q-CELLS Q.PEAK DUO-BLK-G10+ 400W SOLAREDGE P400 POWER OPTIMZER
Pmax
Vmpp
Impp
Voc
Isc
400W
37.13V
10.77A
45.3V
11.14A
Max Input Voltage: 80V
Max Input Current: 12.63A
Max Output Voltage: 60V
Max Output Current: 15A
Min/Max String Length: 8-25
Inverter Ratings:
SOLAREDGE SE7600H-US INVERTER
Grid Voltage: 240V Phase: Single
Max Amps Out: 32A
Efficiency: 99.2%
Integrated DC Disconnect
Rapid Shutdown: Yes
ELECTRICAL NOTES:
1.ALL CONDUCTORS SHALL BE COPPER. ALL COMPONENTS ARE UL LISTED AND CEC CERTIFIED, WHERE WARRANTED.
2.MODULES AND RACKING GROUNDING METHOD - ALL MODULES WILL BE GROUNDED IN ACCORDANCE WITH CODE AND MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
3.IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE VERIFIABLE GROUNDING ELECTRODE, A GROUNDING ELECTRODE ROD SHALL BE
INSTALLED, WHERE #8 THWN-2 SERVES AS BOTH EQUIPMENT GROUND AND GROUNDING ELECTRODE CONDUCTOR. SUPPLEMENTAL GROUNDING
ELECTRODE REQUIRED WHERE EXISTING GROUNDING ELECTRODE HAS RESISTANCE OF MORE THAN 25 OHMS, OR IF RESISTANCE TESTING
RESULTS ARE NOT PROVIDED (CEC 690.47(A)). IF REQUIRED MULTIPLE GROUNDING ELECTRODE RODS MUST BE INSTALLED AT LEAST 6' APART.
(CEC 250.53 (A)(3)).
4.THE GEC/EGC SHALL BE CONTINUOUS, OR WHEN SPLICED, THE SPLICE SHALL BE MADE BY IRREVERSIBLE CRIMP OR EXOTHERMIC WELD.
5.EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUPMENT, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN
ACCORDANCE WITH 250.13 OR 250.136 (a) REGARDLESS OF VOLTAGE.
6.MARKING WILL BE PROVIDED IN A CCORDANCE WITH CAL FIRE SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINES.
7.UTILITY WILL BE NOTIFIED PRIOR TO USE AND ACTIVATION OF AN SOLAR INSTALLATION. SYSTEM WILL BE COMMISSIONED BY OWNER PER UTILITY
INTERCONNECTION AGREEMENT.
8.AC AND DC CONDUCTOR SIZING AND TERMINATIONS AT J-BOXES WERE CALCULATED IN A CCORDANCE WITH 2022 CEC. ALL WIRES TO BE
PROVIDED WITH STRAIN RELIEF AT ALL ENTRY TO JUNCTION BOXES AS REQUIRED BY THE BOX LISTING.
9.DC SOURCE AND OUTPUT CIRCUITS SHALL BE CONTAINED IN A METAL RACEWAY/ENCLOSURE WITHIN A BUILDING/ATTIC/WALLS AND SHALL BE
IDENTIFIED EVERY 10' PER NEC 690.3(E).
SOLAREDGE P400
POWER OPTIMZER:
(1) PER SOLAR
MODULE (TYP)
SOLAR MODULE:
Q-CELLS
Q.PEAKDUOBLKG10+
(TYP)
AMPACITY
CALCULATIONS
Array to J-Box
J-Box to Inverter
Inverter to Service Panel
WIRE AMPACITY TABLE
310.15(B)(16) / PV-1KV-90°C
10AWG / 10AWG / 8AWG
THERMAL DERATE FACTOR
310.15(B)(2)(a) / (ON ROOF)(C°)
51 / 51 / 29
NUMBER OF CONDUCTORS
310.15(B)(3)(a)
4-6 / 4-6 / 0-3
40AMP
40AMP
50AMP
0.75
0.75
1
0.8
0.8
1
X
X
X
X
X
X
MAXIMUM
ALLOWABLE
AMPACITY
PV
DESIGN
AMPACITY
=
=
=
24
24
50
15
15
40
9
(3) #8 AWG THWN-2
(1) #8 AWG THWN-2 GROUND
3/4" EMT CONDUIT @ 6FT
LG CHEM
RESU16
16KWH
BATTERY
SOLAREDGE BACKUP
INTERFACE BI-NUSGN-01
1PH 3W 240VAC
MLO NEMA 3R
40A
2Pole
SUBPANEL (E)
1PH 3W 240VAC
125A BUS
MLO NEMA 3R
Battery Ratings:
LG CHEM RESU16 (16KWH BATTERY)
Grid Voltage: 240V Phase: Single
Rated Output Current: 30A
Rated Continuous Output: 7 kVA
Usable Capacity: 16 kWh
(3) #10 AWG THWN-2
(1) #8 AWG THWN-2 GROUND
3/4" EMT CONDUIT @ 6FT
(3) #6 AWG THWN-2 (CU)
(1) #8 AWG THWN-2 CU G.E.C.
1" EMT CONDUIT @ 6FT
AC DISCONNECT
KNIFE SWITCH
NON-FUSED
60A 240VAC
NEMA 3R 60A
2Pole
LG CHEM
RESU16
16KWH
BATTERY
PROPOSED Module Type (3) Q-CELLS QPEAK-DUO BLK-G10+ 410W
Solar Module Ratings:
Q-CELLS Q.PEAK DUO-BLK-G10+ 410W
Pmax
Vmpp
Impp
Voc
Isc
410W
38.63V
10.61A
45.62V
11.13A
ALL EQUIPMENT IN RED IS EXISTING
9
(6) EXISTING
(3) NEW
2005 W Picasso -
201825954/25/2024
ROOF INFO
ARRAY PERCENTAGE 11.88%
ARRAY AREA (FT²)380.16
ROOF AREA (FT²)3198
TILT AZIMUTH20°180°
SCALE: 1/8" = 1'-0"
EXISTING
UTILITY DISCONNECT
18" FIRE
SETBACK
3' FIRE
SETBACK
EXISTING
INVERTER
(E) MAIN SERVICE
PANEL W/ METER
EXISTING
BACK UP INTERFACE
EXISTING
PHOTOVOLTAIC
ARRAY
(15 MODULES)
EXISTING BATTERY
PROPOSED
PHOTOVOLTAIC
ARRAY
(3 NEW MODULES)
PROPOSED BATTERY
EXISTING SUBPANEL
2005 W Picasso -
201825954/25/2024
WARNING
INVERTER OUTPUT CONNECTION
DO NOT RELOCATE THIS
OVERCURRENT DEVICE
WARNING
ELECTRICAL SHOCK HAZARD
THE DC CONDUCTORS OF
THIS PHOTOVOLTAIC
SYSTEM ARE UNGROUNDED
AND MAY BE ENERGIZED
TURN RAPID SHUTDOWN
SWITCH
TO THE "OFF" POSITION
TO SHUT DOWN PV SYSTEM
AND REDUCE SHOCK HAZARD
IN ARRAY
Disconnect for
Utility Operations
Main Service
Panel
Inverter w/ Integrated
DC Disconnect
CAUTION
MULTIPLE SOURCES OF POWER
INSTALLED BY:
SUNBROOK SOLAR POWER
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
DISCONNECT
DC
WARNING
ELECTRIC SHOCK HAZARD
TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE
ENERGIZED IN THE OPEN POSITION
IF GROUND FAULT IS INDICATED, NORMALLY GROUNDED
CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED
RATED MAXIMUM POWER-POINT CURRENT: 15A
RATED MAXIMUM POWER-POINT VOLTAGE: 400V
MAXIMUM SYSTEM VOLTAGE: 500V
MAXIMUM CIRCUIT CURRENT: 30A
WARNING
THREE POWER SOURCES
SOURCES UTILITY GRID,
BATTERY AND PV SOLAR
ELECTRIC SYSTEM
!!
BATTERY SYSTEM
MAIN DISCONNECT
Subpanel
PV Array
on Roof
Batteries
Rapid
Shutdown Switch
2005 W Picasso -
201825954/25/2024
(760) 468-8333 james@sunbrooksolarpower.com SunbrookSolarPower.com
747 S. Mission Rd #1215 Fallbrook CA 92088
7/7/2023
Homeowner Authorization Letter
Kevin Anderson
2005 Picasso
Santa Ana, CA 92704
To whom it may concern at the City of Santa Ana;
I, Kevin Anderson, am authorizing Sunbrook Solar Power to install solar on my
property located at 2005 Picasso.
Accepted by__Kevin Anderson__ Signature_________________ Date_______
DocuSign Envelope ID: 680FB339-1D80-4591-B424-103DB76B00C4
7/7/2023
2005 W Picasso -
201825954/25/2024
Certificate Of Completion
Envelope Id: 680FB3391D804591B424103DB76B00C4 Status: Completed
Subject: Complete with DocuSign: ANDERSON, KEVIN - AUTHORIZATION LETTER.pdf
Source Envelope:
Document Pages: 1 Signatures: 1 Envelope Originator:
Certificate Pages: 1 Initials: 0 James McKnight
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
747 S Mission Rd.
#1215
Fallbrook, CA 92088
james@sunbrooksolarpower.com
IP Address: 76.166.135.9
Record Tracking
Status: Original
7/7/2023 1:48:00 PM
Holder: James McKnight
james@sunbrooksolarpower.com
Location: DocuSign
Signer Events Signature Timestamp
Kevin Anderson
rexflash@yahoo.com
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 107.208.198.146
Sent: 7/7/2023 1:49:09 PM
Viewed: 7/7/2023 1:52:30 PM
Signed: 7/7/2023 1:53:00 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 7/7/2023 1:49:09 PM
Certified Delivered Security Checked 7/7/2023 1:52:30 PM
Signing Complete Security Checked 7/7/2023 1:53:00 PM
Completed Security Checked 7/7/2023 1:53:00 PM
Payment Events Status Timestamps
2005 W Picasso -
201825954/25/2024
2005 W Picasso -
201825954/25/2024
2005 W Picasso -
201825954/25/2024
2005 W Picasso -
201825954/25/2024
2005 W Picasso -
201825954/25/2024
2005 W Picasso -
201825954/25/2024
2005 W Picasso -
201825954/25/2024
2005 W Picasso -
201825954/25/2024
200A MAIN SERVICE PANEL 2005 W Picasso -
201825954/25/2024
2005 W Picasso -
201825954/25/2024
2005 W Picasso -
201825954/25/2024
2005 W Picasso -
201825954/25/2024
2005 W Picasso -
201825954/25/2024
(760) 207-2094 derek@sunbrooksolarpower.com SunbrookSolarPower.com
747 S. Mission Rd #1215 Fallbrook CA 92088
1/3/2024
Letter of Authorization
To whom it may concern,
I, Derek McKnight, give full authorization to James McKnight to act on my behalf, in regard to all
permitting needs, included but not limited to; submitting and receiving documents pertaining to any
permitting needs established by any and all AHJ's, signing documents and making payments.
Sincerely,
Derek McKnight
Owner – Sunbrook Solar Power