Loading...
HomeMy WebLinkAbout2005 W Picasso - PlanSCOPE OF WORK | ADD-ON TO EXISTING SOLAR SYSTEM DESIGN CRITERIA SINGLE FAMILY RESIDENCE OCCUPANCY: R-3 CONSTRUCTION TYPE: VB WIND SPEED: 130 MPH EXPOSURE CATEGORY: C MINIMUM STANDOFF HEIGHT: 6" NON-SPRINKLERED SNOW LOAD: N/A VICINITY MAP | NOT TO SCALE SHEET INDEX PV-1 PV-2 PV-3 PV-4 PV-5 TITLE SHEET/SITE PLAN EQUIPMENT LAYOUT MOUNTING DETAIL SINGLE LINE DIAGRAM PLACARD / SIGNAGE SPEC SHEETS / CALCS (E) MAIN RESIDENCE (E) MAIN SERVICE PANEL W/ METER PROPERTY LINES SCALE: 3/32" = 1'-0" GENERAL NOTES: 1. ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES: 2022 CA BUILDING CODE (CBC) 2022 CA RESIDENTIAL CODE (CRC) 2022 CA FIRE CODE (CFC) 2020 NATIONAL ELECTRIC CODE (NEC) 2022 CA CODE OF REGULATIONS (CCR) TITLE 24 UNDERWRITERS LABORATORIES (UL) STANDARDS 2. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, VENTILATION INTAKE AIR OPENINGS SHALL NOT BE COVERED BY THE PHOTOVOLTAIC SYSTEM, 3. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY AND INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. [NEC 690.4(D)] 4. ALL OUTDOOR EQUIPMENT SHALL BE RAINTIGHT AND MINIMUM NEMA 3R RATED. 5. ALL EXTERIOR CONDUIT WILL BE PAINTED TO MATCH DWELLING. 6. SERVICING UTILITY WILL BE CONTACTED PRIOR TO ENERGIZING THE PHOTOVOLTAIC SYSTEM. PROPOSED EQUIPMENT: 1.2KW DC / 1.13KW AC (3) QCELL QPEAK-DUO-BLK-G10+ 410W MODULES (3) POWER OPTIMZERS (1) LG CHEM RESU16H 16KWH BATTERY EXISTING EQUIPMENT: 6KW DC / 5.52KW AC (15) QCELL QPEAK-DUO-BLK-G10+ 400W MODULES (15) POWER OPTIMZERS (1) SOLAREDGE SE7600H-US INVERTER (1) LG CHEM RESU16H 16KWH BATTERY (E) 200A MAIN SERVICE PANEL TWO STORY RESIDENCE ROOF TYPE: COMP SHINGLE (1 LAYER)(E) POOL PICASSO (E) PERGOLA Bldg#: 101118992 Elec#: 20182595 Approvals: MSmith The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 2005 W Picasso - 201825954/25/2024 NUT FLANGE 5/16-18 SST WASHER, BONDED L-1X5, BLACK WASHER, BONDED TILE REPLACEMENT FLASHING, FLAT SCREW, LAG, HEX, 5/16" DIAMETER MIN 2.5" EMBEDMENT ASSY, PEDESTAL 1 ATTACHMENT DETAIL NOT TO SCALE SOLAR MODULES PV ROOF ATTACHMENT TYP @ EACH (SEE DETAIL TO LEFT) 2X4 FRAMING @ 24" O.C. TYP IRONRIDGE RACKING SYSTEM 6' MAX 3' MIN 2' O.C. PARTIAL ROOF FRAMING PLAN NOT TO SCALE IRONRIDGE RAIL IRONRIDGE KO TILE A IRONRIDGE TILE REPLACEMENT FLASHING (FLAT TILE) A CROSS SECTION DETAIL NOT TO SCALE 6" MAX SOLAR MODULE ROOF FRAMING MODULE INFO MODULE WEIGHT (LBS) MODULE AREA (FT²) # OF MODULES TOTAL MODULE WEIGHT (LBS) # OF STANDOFFS ARRAY AREA (FT²) STANDOFF LOAD (PSF) 48.5 21.12 18 873 24 380.2 2.30 TILT AZIMUTH20°180° 2005 W Picasso - 201825954/25/2024 MTO UTILITY UTILITY BI-DIRECTIONAL METER PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN G 60A 2Pole MAIN OCPD EXISTING GROUND; MAY REQUIRE NEW GROUNDING ELECTRODES: SEE NOTE BELOW PV BACKFED BREAKER: SHALL BE POSITIONED AT THE OPPOSITE END OF MAIN BREAKER MAIN SERVICE PANEL (E) 1PH 3W 240VAC 225A Bus Rating (E) 200A Main OCPD (Non-Center Fed) 200A (3) #6 AWG THWN-2 (1) #8 AWG THWN-2 GROUND 1" EMT CONDUIT @ 6FT SOLAREDGE: SE7600H-US INVERTER 1PH 240VAC NEMA 3R W/ INTEGRATED DC DISCONNECT AND RAPID SHUTDOWN PER NEC 2017 690.12 (4) #10 AWG THWN-2 (1) #8 AWG THWN-2 GROUND 3/4" EMT CONDUIT @ 60FT JUNCTION BOX @ ARRAY MOUNTED ON RAIL NEMA 3R SYSTEM CONFIGURATION Number of Modules Modules per String EXISTING Module Type Number of Inverters Inverter Model PV OCPD Size @ 125% PV AC Current Main Breaker Ampere Rating Service Bus Ampere Rating AC Watts CEC Rated DC Watts STC Operating AC Voltage 18 2 STRINGS OF (9) MODULES (15) Q-CELLS QPEAK-DUO BLK-G10+ 400W 1 SOLAREDGE SE7600H-US 40A 200A 225A 5.52 kW 6 kW 240VAC (E)- EXISTING (P)- PROPOSED # OF MODULES - 18 # OF INVERTERS - 1 # OF BATTERIES - 2 MODULES INTERCONNECTED PER NEC SECTIONS 690.48, 690.43 & 250.136A USING #10 AWG PV WIRE AND GROUNDED BY #6 BARE CU. PER NEC SECTIONS 690.45 & 250.122. (TYPICAL FOR ALL ARRAYS) EXPOSED WIRE SHALL BE OF USE-2 INSULATION AND ALL EXPOSED GROUND WIRE SHALL BE BARE CU. MODULES GROUND BY ILSCO GBL-4DBT LUGS PER UL 2703 Solar Module Ratings:Optimizer Ratings: Q-CELLS Q.PEAK DUO-BLK-G10+ 400W SOLAREDGE P400 POWER OPTIMZER Pmax Vmpp Impp Voc Isc 400W 37.13V 10.77A 45.3V 11.14A Max Input Voltage: 80V Max Input Current: 12.63A Max Output Voltage: 60V Max Output Current: 15A Min/Max String Length: 8-25 Inverter Ratings: SOLAREDGE SE7600H-US INVERTER Grid Voltage: 240V Phase: Single Max Amps Out: 32A Efficiency: 99.2% Integrated DC Disconnect Rapid Shutdown: Yes ELECTRICAL NOTES: 1.ALL CONDUCTORS SHALL BE COPPER. ALL COMPONENTS ARE UL LISTED AND CEC CERTIFIED, WHERE WARRANTED. 2.MODULES AND RACKING GROUNDING METHOD - ALL MODULES WILL BE GROUNDED IN ACCORDANCE WITH CODE AND MANUFACTURER'S INSTALLATION INSTRUCTIONS. 3.IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE VERIFIABLE GROUNDING ELECTRODE, A GROUNDING ELECTRODE ROD SHALL BE INSTALLED, WHERE #8 THWN-2 SERVES AS BOTH EQUIPMENT GROUND AND GROUNDING ELECTRODE CONDUCTOR. SUPPLEMENTAL GROUNDING ELECTRODE REQUIRED WHERE EXISTING GROUNDING ELECTRODE HAS RESISTANCE OF MORE THAN 25 OHMS, OR IF RESISTANCE TESTING RESULTS ARE NOT PROVIDED (CEC 690.47(A)). IF REQUIRED MULTIPLE GROUNDING ELECTRODE RODS MUST BE INSTALLED AT LEAST 6' APART. (CEC 250.53 (A)(3)). 4.THE GEC/EGC SHALL BE CONTINUOUS, OR WHEN SPLICED, THE SPLICE SHALL BE MADE BY IRREVERSIBLE CRIMP OR EXOTHERMIC WELD. 5.EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUPMENT, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH 250.13 OR 250.136 (a) REGARDLESS OF VOLTAGE. 6.MARKING WILL BE PROVIDED IN A CCORDANCE WITH CAL FIRE SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINES. 7.UTILITY WILL BE NOTIFIED PRIOR TO USE AND ACTIVATION OF AN SOLAR INSTALLATION. SYSTEM WILL BE COMMISSIONED BY OWNER PER UTILITY INTERCONNECTION AGREEMENT. 8.AC AND DC CONDUCTOR SIZING AND TERMINATIONS AT J-BOXES WERE CALCULATED IN A CCORDANCE WITH 2022 CEC. ALL WIRES TO BE PROVIDED WITH STRAIN RELIEF AT ALL ENTRY TO JUNCTION BOXES AS REQUIRED BY THE BOX LISTING. 9.DC SOURCE AND OUTPUT CIRCUITS SHALL BE CONTAINED IN A METAL RACEWAY/ENCLOSURE WITHIN A BUILDING/ATTIC/WALLS AND SHALL BE IDENTIFIED EVERY 10' PER NEC 690.3(E). SOLAREDGE P400 POWER OPTIMZER: (1) PER SOLAR MODULE (TYP) SOLAR MODULE: Q-CELLS Q.PEAKDUOBLKG10+ (TYP) AMPACITY CALCULATIONS Array to J-Box J-Box to Inverter Inverter to Service Panel WIRE AMPACITY TABLE 310.15(B)(16) / PV-1KV-90°C 10AWG / 10AWG / 8AWG THERMAL DERATE FACTOR 310.15(B)(2)(a) / (ON ROOF)(C°) 51 / 51 / 29 NUMBER OF CONDUCTORS 310.15(B)(3)(a) 4-6 / 4-6 / 0-3 40AMP 40AMP 50AMP 0.75 0.75 1 0.8 0.8 1 X X X X X X MAXIMUM ALLOWABLE AMPACITY PV DESIGN AMPACITY = = = 24 24 50 15 15 40 9 (3) #8 AWG THWN-2 (1) #8 AWG THWN-2 GROUND 3/4" EMT CONDUIT @ 6FT LG CHEM RESU16 16KWH BATTERY SOLAREDGE BACKUP INTERFACE BI-NUSGN-01 1PH 3W 240VAC MLO NEMA 3R 40A 2Pole SUBPANEL (E) 1PH 3W 240VAC 125A BUS MLO NEMA 3R Battery Ratings: LG CHEM RESU16 (16KWH BATTERY) Grid Voltage: 240V Phase: Single Rated Output Current: 30A Rated Continuous Output: 7 kVA Usable Capacity: 16 kWh (3) #10 AWG THWN-2 (1) #8 AWG THWN-2 GROUND 3/4" EMT CONDUIT @ 6FT (3) #6 AWG THWN-2 (CU) (1) #8 AWG THWN-2 CU G.E.C. 1" EMT CONDUIT @ 6FT AC DISCONNECT KNIFE SWITCH NON-FUSED 60A 240VAC NEMA 3R 60A 2Pole LG CHEM RESU16 16KWH BATTERY PROPOSED Module Type (3) Q-CELLS QPEAK-DUO BLK-G10+ 410W Solar Module Ratings: Q-CELLS Q.PEAK DUO-BLK-G10+ 410W Pmax Vmpp Impp Voc Isc 410W 38.63V 10.61A 45.62V 11.13A ALL EQUIPMENT IN RED IS EXISTING 9 (6) EXISTING (3) NEW 2005 W Picasso - 201825954/25/2024 ROOF INFO ARRAY PERCENTAGE 11.88% ARRAY AREA (FT²)380.16 ROOF AREA (FT²)3198 TILT AZIMUTH20°180° SCALE: 1/8" = 1'-0" EXISTING UTILITY DISCONNECT 18" FIRE SETBACK 3' FIRE SETBACK EXISTING INVERTER (E) MAIN SERVICE PANEL W/ METER EXISTING BACK UP INTERFACE EXISTING PHOTOVOLTAIC ARRAY (15 MODULES) EXISTING BATTERY PROPOSED PHOTOVOLTAIC ARRAY (3 NEW MODULES) PROPOSED BATTERY EXISTING SUBPANEL 2005 W Picasso - 201825954/25/2024 WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE WARNING ELECTRICAL SHOCK HAZARD THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY Disconnect for Utility Operations Main Service Panel Inverter w/ Integrated DC Disconnect CAUTION MULTIPLE SOURCES OF POWER INSTALLED BY: SUNBROOK SOLAR POWER SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN DISCONNECT DC WARNING ELECTRIC SHOCK HAZARD TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION IF GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED RATED MAXIMUM POWER-POINT CURRENT: 15A RATED MAXIMUM POWER-POINT VOLTAGE: 400V MAXIMUM SYSTEM VOLTAGE: 500V MAXIMUM CIRCUIT CURRENT: 30A WARNING THREE POWER SOURCES SOURCES UTILITY GRID, BATTERY AND PV SOLAR ELECTRIC SYSTEM !! BATTERY SYSTEM MAIN DISCONNECT Subpanel PV Array on Roof Batteries Rapid Shutdown Switch 2005 W Picasso - 201825954/25/2024 (760) 468-8333 james@sunbrooksolarpower.com SunbrookSolarPower.com 747 S. Mission Rd #1215 Fallbrook CA 92088 7/7/2023 Homeowner Authorization Letter Kevin Anderson 2005 Picasso Santa Ana, CA 92704 To whom it may concern at the City of Santa Ana; I, Kevin Anderson, am authorizing Sunbrook Solar Power to install solar on my property located at 2005 Picasso. Accepted by__Kevin Anderson__ Signature_________________ Date_______ DocuSign Envelope ID: 680FB339-1D80-4591-B424-103DB76B00C4 7/7/2023 2005 W Picasso - 201825954/25/2024 Certificate Of Completion Envelope Id: 680FB3391D804591B424103DB76B00C4 Status: Completed Subject: Complete with DocuSign: ANDERSON, KEVIN - AUTHORIZATION LETTER.pdf Source Envelope: Document Pages: 1 Signatures: 1 Envelope Originator: Certificate Pages: 1 Initials: 0 James McKnight AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 747 S Mission Rd. #1215 Fallbrook, CA 92088 james@sunbrooksolarpower.com IP Address: 76.166.135.9 Record Tracking Status: Original 7/7/2023 1:48:00 PM Holder: James McKnight james@sunbrooksolarpower.com Location: DocuSign Signer Events Signature Timestamp Kevin Anderson rexflash@yahoo.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 107.208.198.146 Sent: 7/7/2023 1:49:09 PM Viewed: 7/7/2023 1:52:30 PM Signed: 7/7/2023 1:53:00 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 7/7/2023 1:49:09 PM Certified Delivered Security Checked 7/7/2023 1:52:30 PM Signing Complete Security Checked 7/7/2023 1:53:00 PM Completed Security Checked 7/7/2023 1:53:00 PM Payment Events Status Timestamps 2005 W Picasso - 201825954/25/2024 2005 W Picasso - 201825954/25/2024 2005 W Picasso - 201825954/25/2024 2005 W Picasso - 201825954/25/2024 2005 W Picasso - 201825954/25/2024 2005 W Picasso - 201825954/25/2024 2005 W Picasso - 201825954/25/2024 2005 W Picasso - 201825954/25/2024 200A MAIN SERVICE PANEL 2005 W Picasso - 201825954/25/2024 2005 W Picasso - 201825954/25/2024 2005 W Picasso - 201825954/25/2024 2005 W Picasso - 201825954/25/2024 2005 W Picasso - 201825954/25/2024 (760) 207-2094 derek@sunbrooksolarpower.com SunbrookSolarPower.com 747 S. Mission Rd #1215 Fallbrook CA 92088 1/3/2024 Letter of Authorization To whom it may concern, I, Derek McKnight, give full authorization to James McKnight to act on my behalf, in regard to all permitting needs, included but not limited to; submitting and receiving documents pertaining to any permitting needs established by any and all AHJ's, signing documents and making payments. Sincerely, Derek McKnight Owner – Sunbrook Solar Power 2005 W Picasso - 201825954/25/2024