HomeMy WebLinkAbout1834 W Third St & #2,3 - Plan
O R A N G E C O U N T Y F I R E A U T H O R I T Y
Plan Submittal Criteria Form
Required for Single Family or Duplex Residences
(Use Commercial form for lots with 3+ dwelling units or new residential tracts)
Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification.
Project Information
New Single Family Residence/Duplex Addition/Remodel ADU Other
Address:
Unit #: City or Unincorporated County Area: ZIP:
Scope of Work:
Existing
Area:
Area to
be Added:
Total Resulting
Area:
Stories: Area Added in Past 2 Years
(excluding this project):
Yes No Questionnaire OCFA Plan Type if “Yes”
1. New – Is this a new single family residence or duplex? *(PR160) Residential Site
with Water Availability
(PR400-402) Fire Sprinkler
2. ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has
fire sprinklers or a house that will have fire sprinklers added as part of this project?
(PR400-402) Fire Sprinkler
3. Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire
sprinkler retrofit based on a threshold set by local ordinance?
(PR400-402) Fire Sprinkler
4. Distance – Is the most remote portion of the addition, ADU or other detached structure greater than
140-feet from the fire access roadway?
*(PR160) Residential Site
5. Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non-
sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all
enclosed spaces, such as garages, stairs, and detached structures separated by less than 10-feet?
*(PR160) Residential Site
with Water Availability
6. Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or
removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed
contractor to determine if a fire sprinkler modification is needed.
(PR400-402) Fire Sprinkler
7. Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a
garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold
set by local ordinance?
*(PR160) Residential Site
(PR400-402) Fire Sprinkler
8. Gate – Is a gate being installed across a driveway or road that is designated as a fire department
access roadway, or a driveway or road that serves more than a single home/duplex?
(PR180) Gate
9. Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal
Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas
seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only
applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000
sf, and ADU’s).
*(PR160) Residential Site
*(PR172-174) Methane
Test/Mitigation Plans
10. Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to
slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation,
or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as
defined by the State, or (D) near an area that could be affected by a wildfire in the open space.
*(PR125) Fuel Modification
(PR182) Accessory
Structure
*OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals.
Applicant Certification
I certify, under penalty of perjury, under the laws of the State of California, that the information above is true:
Print Name:_______________________________________ Signature:___________________________________________ Date:______________
Phone Number:_____________________________________________ Email:_____________________________________________________________
Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a
written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required.
______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes”
and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral
Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination.
For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100
SFR
1834 W Third St &
#2,33/21/2025
NEW HOUSE + DETACHED ADU +JADU
T0.0
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
Bldg #'s 101120600-03
APPROVALS -
PLNG - C. Santana
BLDG - CSG
POLICE - B. Martin
PUBLIC WORKS - B. Sarlak
1834 W Third St &
#2,33/21/2025
EXISTING SITE PLAN SHOWING (E) AREA
SCALE 1/8" =1'-0"
W THIRD ST.
N
D
A
I
S
Y
A
V
E
.
PL
=
1
1
9
'
PL
=
1
1
9
'
PL=55'
PL=55'
ONE STORY HOUSE
TO BE REMOVED
(E) PORCH
TO BE REMOVED
(E) DRIVEWAY AND CONCRETE TERRACE
TO BE REMOVED
(E) HOUSE
A0.0
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
PROPOSED SITE PLAN SHOWING NEW 1ST PLAN
SCALE 1/8" =1'-0"
NEW MAIN HOUSE 2ND FLOOR PLAN
SCALE 1/8" =1'-0"
LANDSCAPE CONCEPT PLAN
SCALE 1/8" =1'-0"
MAIN HOUSE STATISTIC:JADU STATISTIC:ADU STATISTIC:
A0.1
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
PROPOSED NORTH ELEVATION FENCE
SCALE 1/4" =1'-0"
PROPOSED SOUTH ELEVATION FENCE
SCALE 1/4" =1'-0"
PROPOSED WEST ELEVATION FENCE
SCALE 1/4" =1'-0"
PROPOSED EAST ELEVATION FENCE
SCALE 1/4" =1'-0"
LEGEND:
A0.2
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
ADDRESS PLAN
SCALE 1/8" =1'-0"
(N) PRIMARY DWELLING
PL
=
1
1
9
'
PL
=
1
1
9
'
PL=55'
PL=55'
N
D
A
I
S
Y
A
V
E
.
W THIRD STREET
SANTA ANA CA 92703
1834 W THIRD STREET
(N) JADU
SANTA ANA CA 92703
1834 W THIRD STREET, UNIT 2
(N) ADU
SANTA ANA CA 92703
1834 W THIRD STREET, UNIT 3
A0.3
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
JADU 484 SF
MAIN HOUSE FIRST FLOOR 1,013 SF.
NEW MAIN HOUSE & JADU 1ST FLOOR PLAN
SCALE 1/4" =1'-0"
SECOND FLOOR 1000 SF.
NEW MAIN HOUSE 2ND FLOOR PLAN
SCALE 1/4" =1'-0"
LEGEND:
DESCRIPTIONW x H
1
ID MATERIAL
DOOR SCHEDULE
REMARKS
QTY.
UL FACTOR SHGC
DESCRIPTIONW x H
1
ID MATERIAL
2
WINDOW SCHEDULE
REMARKS
QTY.
UL FACTOR SHGC
0.21
2
3
3
4
(2ND)(1ST)
0.29 0.21
PROPOSED DOOR & WINDOW SCHEDULE
0.21
4
0.21
5
0.21
0.29
0.29
0.29
0.29
5
6
6 0.210.29
1
2
3
4
5
13
13
6
7
7
8
9
10
8
11
6
6
6
6
6
9
0.29 0.21
10
3
1
2
3
3
5
6
11
1
A2.1
3
A2.2
A2.12
A2.2 4
MAIN HOUSE
JADU
(2ND)(1ST)
MAIN HOUSE
JADU
2 6
6
33
3
4
7 0.210.29
7
8
8 0.210.29
9
1
A3.1
1
A3.1
2
A3.1
2
A3.1
0.29 0.21
12
10 0.210.29
10
11 0.210.29
0.210.29
9
11
11
0.210.29
12 0.29 0.21
12
4
”
”
“
13
GA FILE NO.
WP 3243 GENERIC 1 HOUR FIRE 50 TO 54 STC SOUND
NOTE:
A1.1
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
1
A2.3
3
A2.3
A2.32A2.3 4
NEW ADU FLOOR PLAN
SCALE 3/16" =1'-0"
DESCRIPTIONW x H
1
ID MATERIAL
DOOR SCHEDULE
REMARKS QTY.UL FACTOR SHGC
DESCRIPTIONW x H
1
ID MATERIAL
2
WINDOW SCHEDULE
REMARKS QTY.UL FACTOR SHGC
0.21
2
3
3
4
(N)(E)
(N)(E)
0.29 0.21
PROPOSED DOOR & WINDOW SCHEDULE
0.21
4
0.21
0.21
0.29
0.29
0.29
0.29
1
26
2
6
3
4
5
5
1
112
3
44
LEGEND:
2
A1.2
1
A1.2
GROUND LEVEL
-0'-8"
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
TOP OF STRUCTURE
+13'-6"
PROPOSED SECTION
SCALE 1/4" =1'-0"
GROUND LEVEL
-0'-8"
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
PROPOSED SECTION
SCALE 1/4" =1'-0"
TOP OF STRUCTURE
+13'-6"
EXTERIOR & WEEP SCREED DETAIL
SCALE 1/2" =1'-0"
6
NOTE:
PROPOSED ROOF PLAN
SCALE 1/8" =1'-0"
A1.2
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
GROUND LEVEL
-0'-8"
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
PROPOSED NORTH ELEVATION
SCALE 1/4" =1'-0"
GROUND LEVEL
-0'-6"
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
PROPOSED EAST ELEVATION
SCALE 1/4" =1'-0"
2ND FLOOR LEVEL
+10'-2"
TOP PLATE LEVEL
+19'-2"
TOP OF ROOF
+25'-6"
TOP OF LOWER ROOF
+24'-8"
2ND FLOOR LEVEL
+10'-2"
TOP PLATE LEVEL
+19'-2"
TOP OF ROOF
+25'-6"
TOP OF LOWER ROOF
+24'-8"
PROPOSED ROOF PLAN
SCALE 1/8" =1'-0"
ONE HOUR RATED ROOF EAVES DETAIL
N.T.S.
ONE HOUR RATED ROOF EAVES DETAIL
N.T.S.
VAULTED CEILING ROOF DETAIL
N.T.S.A2.1
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
GRAB BAR SECTION DETAIL
N.T.S.
GROUND LEVEL
-0'-8"
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
PROPOSED SOUTH ELEVATION
SCALE 1/4" =1'-0"
GROUND LEVEL
-0'-8"
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
2ND FLOOR LEVEL
+10'-2"
TOP PLATE LEVEL
+19'-2"
TOP OF ROOF
+25'-6"
PROPOSED WEST ELEVATION
SCALE 1/4" =1'-0"
2ND FLOOR LEVEL
+10'-2"
TOP PLATE LEVEL
+19'-2"
TOP OF LOWER ROOF
+24'-8"
TOP OF ROOF
+25'-6"
TOP OF LOWER ROOF
+24'-8"
A2.2
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
GROUND LEVEL
-0'-8"
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
TOP OF STRUCTURE
+13'-6"
PROPOSED NORTH ELEVATION
SCALE 1/4" =1'-0"
GROUND LEVEL
-0'-8"
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
TOP OF STRUCTURE
+13'-6"
PROPOSED SOUTH ELEVATION
SCALE 1/4" =1'-0"
GROUND LEVEL
-0'-8"
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
TOP OF STRUCTURE
+13'-6"
PROPOSED WEST ELEVATION
SCALE 1/4" =1'-0"
GROUND LEVEL
-0'-8"
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
TOP OF STRUCTURE
+13'-6"
PROPOSED EAST ELEVATION
SCALE 1/4" =1'-0"
A2.3
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
VAULTED CEILING ROOF DETAIL
N.T.S.
INTERIOR GUARDRAIL DETAIL
SCALE 1/2" =1'-0"
EXTERIOR GUARDRAIL DETAIL
SCALE 1/2" =1'-0"
2ND FLOOR LEVEL
+10'-2"
TOP PLATE
+9'-0"
GROUND LEVEL
-0'-8"
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
2ND FLOOR LEVEL
+10'-2"
TOP PLATE LEVEL
+19'-2"
GROUND LEVEL
-0'-8"
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
2ND FLOOR LEVEL
+10'-2"
TOP PLATE LEVEL
+19'-2"
JADU
PROPOSED SECTION
SCALE 1/4" =1'-0"
PROPOSED SECTION
SCALE 1/4" =1'-0"
TOP OF ROOF
+25'-6"
TOP OF LOWER ROOF
+24'-8"
TOP OF ROOF
+25'-6"
TOP OF LOWER ROOF
+24'-8"
EXTERIOR & WEEP SCREED DETAIL
SCALE 1/2" =1'-0"
A3.1
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
ENLARGED STAIRCASE 1ST FLOOR PLAN
SCALE 1/2" =1'-0"
ENLARGED STAIRCASE 2ND FLOOR PLAN
SCALE 1/2" =1'-0"
A
A3.2
A
A3.2
FINISH SLAB
±0.0
TOP PLATE
+9'-0"
2ND FLOOR LEVEL
+10'-2"
GROUND LEVEL
-0'-8"
STAIR SECTION A
SCALE 1/2" =1'-0"
GUARDRAIL DETAIL
SCALE 1/2" =1'-0"
¾
’
¾
”
HANDRAIL DETAIL
SCALE 1/2" =1'-0"
A3.2
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
JADU 484 SF
MAIN HOUSE FIRST FLOOR 1,013 SF.
NEW MAIN HOUSE & JADU 1ST FLOOR UTILITY LAYOUT PLAN
SCALE 1/4" =1'-0"
NEW MAIN HOUSE 2ND FLOOR UTILITY LAYOUT PLAN
SCALE 1/4" =1'-0"
LEGEND:
SECOND FLOOR 1000 SF.
NEW ADU UTILITY LAYOUT PLAN
SCALE 3/16" =1'-0"
”
”
”
NOTES:
A4.1
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
·
·
·
·
’’’
””
“”
“”
“”
“”
”
”
”
–
–
–
–
“”
“”
“”
“
”
“
”
A4.2
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
X
SDX
DETAIL NUMBER DETAIL SHEET NUMBER
CALIFORNIA FRAMING
BEAM NUMBER, REFER TO CALCULATIONS.
LEGEND:
INDICATES ROOF RAFTER, SEE JOISTS TABLE
X
6X6 INDICATES BEAM SIZE (DFL HEADER/DROP) U.N.O.
BEARING WALLS, SEE PLAN.
INDICATES DECK JOIST, SEE JOISTS TABLE
INDICATES FLOOR JOIST, SEE JOISTS TABLE
1. REFER TO STRUCTURAL GENERAL NOTES AND DETAIL SHEETS S.0 FOR
MORE INFORMATION.
3. HANGERS FOR FLUSH FRAMED MEMBERS SHALL BE SIMPSON STRONG-TIE
AS FOLLOWS U.N.O.:
2. ALL VERTICAL PIPES THROUGH PLATES AND/OR SOLID RIM BEAMS MUST
BE DRILLED CLEAN CUT W/ 1/16" TOLERANCE. DO NOT NOTCH OR CUT
PLATES.
6. BEARING STUD HEIGHTS:
- 2x4's @ 16" o.c. maximum 10'-0" height
- 2x6's @ 16" o.c. maximum 16'-0" height
FRAMING NOTES:
7. DOUBLE TOP PLATE AT ALL SHEAR WALL LINES SHALL BE SPLICED PER
DETAIL 16/SD2.
STRAPS SCHEDULE:JOISTS TABLE:
CONSTRUCTION KEY NOTES:X
ALIGN STUD(S) / POST(S) WITH UPPER FLOOR STUD(S) / POST(S)
AND PROVIDE SOLID BLOCKING BETWEEN FLOOR1
PROVIDE SOLID BLOCKING UNDER GIRDER / BEAM.
LINE OF 2X BLOCKING W/ EDGE NAIL. & CONTINUOUS CS16 STRAP OVER
U.N.O. SEE PLAN FOR NUMBER OF BAYS.
2
3
SHEAR PANEL LENGTH AND NUMBER.
SEE SW SCHED. FOR PANEL TYPE, MIN. 2x4 @ EA. END.
xx
x'-x"
REF
XX
XX
INDICATES SHEARWALL STRAP, SEE
REFERENCE DETAIL 1/SD3
POST SIZE, SEE POST SCHEDULE.
XX
XPOST SCHEDULE:
POST SIZESYM.
24
224
324
26
226
2X4 STUD
(2)-2X4 BUNDLED STUD
(3)-2X4 BUNDLED STUD
2X6 STUD
(2)-2X6 BUNDLED STUD
326
44
46
66
(3)-2X6 BUNDLED STUD
4X4 POST
4X6 POST
6X6 POST
POST SIZESYM.MARK JOIST SPECIFICATIONS
R1 ROOF RAFTER 2 x 6 DFL#2 @ 16" O.C.
R1A
R2 ROOF RAFTER 2 x 10 DFL#2 @ 16" O.C.
C1 CEILING JOIST 2 x 6 DFL#2 @ 16" O.C.
F1
F2
ROOF RAFTER 2 x 6 DFL#2 @ 16" O.C. W/ PURLIN
FLOOR JOIST 11 7/8" TJI 210 @ 19.2" O.C.
FLOOR JOIST 11 7/8" TJI 210 @ 16" O.C.
MARK STRAP STRAP
LENGTH
NAILS/ SPACING REFERENCE
DETAIL
8d BOX/SINKER @ 4-1/8"
8d BOX/SINKER @ 4-1/8"
16d SINKER @ 4-1/2"
CS16
(2)CS16
CMSTC16
5
6
7
3' - 6"
3' - 6"
3' - 6"
19/SD2
CS16
(2)CS16
8
9
3' - 6"
3' - 6"
8d BOX/SINKER @ 2-1/16" O.C.
8d BOX/SINKER @ 2-1/16" O.C.
20/SD2
CS16
(2)CS16
CMSTC16
10
11
12
3' - 6"
3' - 6"
3' - 6"
8d BOX/SINKER @ 4-1/8" O.C.
8d BOX/SINKER @ 4-1/8" O.C.
16d SINKER @ 4-1/2"
6/SD3
16d SINKER @ 4-1/2"
CS16
(2)CS16
CMSTC16
13
14
15
3' - 6"
3' - 6"
3' - 6"
8d BOX/SINKER @ 4-1/8" O.C.
8d BOX/SINKER @ 4-1/8" O.C.16/SD3
16d SINKER @ 4-1/2"
CS16
(2)CS16
CMSTC16
16
17
18
3' - 6"
3' - 6"
3' - 6"
8d BOX/SINKER @ 4-1/8" O.C.
8d BOX/SINKER @ 4-1/8" O.C.17/SD3
4. THE FOLLOWING TRIMMER SCHEDULE SHOULD BE USED FOR HEADERS IN
BEARING WALLS, U.N.O. ON THE PLAN. REQUIRED TRIMMER MUST BE
APPLIED @ EACH END OF HEADER.
CLEAR SPAN, L
L ≤ 6'-0"6'-0" < L ≤ 10'-0" L ≥ 10'-0"
2 x 4 2-2 x 4 2-2X4 U.N.O. PER PLAN
LUS
FACE MOUNT TOP FLANGED
HANGER TYPEMEMBER
2X JOIST
4X, 6X, LSL or PSL
TJI I-JOIST
JB
HU W/ MAX.BA
IUS ITS
- 2x4's @ 16" o.c. maximum 14'-0" height
- 2x6's @ 16" o.c. maximum 20'-0" height
5. BUILDING CODE 2308.9.1 BALLOON FRAMED WALLS (NON-BEARING) STUD
HEIGHTS:
INDICATES CEILING JOIST, SEE JOISTS TABLE
F3 DECK JOIST 2 x 12 DFL#2 @ 16" O.C.
48 4X8 POST2
4 x 6
6
x
6
6 x 8 DROP
6
x
6
4
x
6
4
x
6
4
x
6
4 x 64 x 6
4
x
6
4
x
6
4
x
6
4
x
6
4
x
6
DR
O
P
6 x 6
6 x 6
4 x 6
4 x 6
6666
4 x 6
44
2 x
8
H
I
P
LSL RIM
HHUS
HU
S
HU
44
4446
W/
E
N
66
66
5 1/4" x 9 1/4" PSL FL
5
3
1
/
2
"
x
9
1
/
4
"
P
S
L
6
3 1/2" x 11 7/8" LSL
7
3 1/2" x 16" PSL BOTT. FL W/ EN
9
7" x 14" PSL DROP W/ EN
11
7" x 11 7/8" PSL FL W/ EN
13
3 1/2" x 11 7/8" LSL FL
14
3
1
/
2
"
x
1
1
7
/
8
"
L
S
L
F
L
16
3
1
/
2
"
x
1
1
7
/
8
"
L
S
L
F
L
17
3
1
/
2
"
x
1
1
7
/
8
"
L
S
L
F
L
18
4 x 10
19
4 x 12
20
3
1
/
2
"
x
1
1
7
/
8
"
L
S
L
F
L
W
/
E
N
8
3
1
/
2
"
x
1
1
7
/
8
"
L
S
L
F
L
W
/
E
N
12
3
1
/
2
"
x
1
1
7
/
8
"
L
S
L
F
L
15
CA
N
T
.
3
1
/
2
"
x
1
1
7
/
8
"
L
S
L
F
L
10
CA
N
T
.
3
1
/
2
"
x
1
1
7
/
8
"
L
S
L
F
L
10
A
FL
3 4 5
C
D
E
44 44 44 44
44
4444
4444
44
44 44
44
44
44
44
44
44
44
44
44
44
44
4 x 8 CLG
21
CA
N
T
.
3
1
/
2
"
x
1
1
7
/
8
"
L
S
L
F
L
10
B
CA
N
T
.
3
1
/
2
"
x
1
1
7
/
8
"
L
S
L
F
L
18
SD3
R1A
R1A C1
C1 C1
C1
R1 R1
R1 R1
R1
C1
C1R1
R1
R1
C1
C1
R1
R1 C1
F111
7
/
8
"
T
J
I
2
1
0
@
1
9
.
2
"
O
.
C
.
,
T
Y
P
.
F1 F1
F2 F1
F1F1
11
7
/
8
"
T
J
I
2
1
0
@
1
6
"
O
.
C
.
F3 F3
HU
224
9
SD4
10
SD3
3A
SD3
10A
SD4
10A
SD4
48
46
48449
SD4
3B
SD3
3B
SD3
3B
SD3
3B
SD3
9
SD3W/ EC
C
Q
13
SD4
W/
ECCQ
5
46
9
SD3
W/
CC
Q
3A
SD3 W/ EN
9
SD3
W/
EC
C
Q
46
10
SD3
224
9
SD4
10
SD3
9
SD3
W/
C
C
Q
9
SD3
W/
C
C
Q
224
9
SD4
W/
E
N
44224224224
TR TR TR TR
7
SD3
W/
LC
E
4
7
SD3
W/
LC
E
4
7
SD3 W/ LCE
4
7
SD3 W/ LCE
4
4
SD2
1
SD2
9
SD2
1
SD2
4
SD2
1
SD2
8
SD3
16
15
SD3
11
SD3
12
SD3
5
SD3
6
DB
L
.
J
O
I
S
T
S
W/
E
N
DB
L
.
J
O
I
S
T
S
14
15
SD3
1
SD2
4
SD2
8
SD2
5 5
1
SD2
1
SD2
3
SD2
5 5
W/ EN
15
SD3
8
SD3
4
SD3
11
SD3
16
SD4
5
SD3
2-2X BLK'G W/EN
11
L=12'-0"
2X BLK'G
10
W/ EN
8
SD2
1
SD2
5
2X R.R.
8
W/ EN
14
SD3
5
SD3
F3
44
10
SD2 TYP.
10
SD2
TYP.
K.P.
6
x
8
2 x 8 R.B.
SEE 8/SD4
6'-0"
B
9'-6"
B
3'-6"
C
9'-0"
C
3'-0"
D
3'-0"
D
2'-6"
D
2'-6"
D
6'
-
0
"
B
6'
-
0
"
B
11
'
-
3
"
B
6'
-
0
"
B
5'
-
6
"
B
2
x
1
6
@
1
2
"
O
.
C
.
ST
R
I
N
G
E
R
PER DETAIL 14/SD2
2X PURLIN
PER DETAIL 14/SD2
2X PURLIN
14
SD3
14
SD4
2 x 8
R.B.
1
15
SD3
17
SD4
HH
U
S
HH
U
S
15
SD4
1
1
14
SD3
4x8 BOTT. FL
9A46
C1R1
17
SD4
17
SD4
4 x 6
4
x
6
4 x 6
4 x 6
4
x
6
4
x
6
4
x
8
224
224
224
22446
6 x 8 CLG W/ EN
1
6 x 8 CLG W/ EN
2A
46
46K.P.
466 x 12 RIDGE
4
4 x 8
5 1/4" x 11 7/8" PSL CLG
4A
6
x
1
0
C
L
G
2
HU
4 x 6
3A
5
1
/
4
"
x
9
1
/
4
"
P
S
L
C
L
G
4B
4
x
6
3
1 2
A
B
10'-6"
BS2 S2
5'-3"
B S2S2
5'-3"
B S2S2
14
'
-
3
"
A
S1
S1
7'
-
3
"
B
S2
S2
4'
-
0
"
B
S2
S2
224
12
SD4
9
SD4
9
SD4
10
SD3
9
SD3
W/
EP
C
10
SD3
TR
TR
224TR
11
SD4
K.P.
HHUS
9
SD4
224
13
SD2
9
SD4
W/
EC
C
Q
2 x 12 RIDGE BOARD
5
SD2
7
SD2
6
SD2
1
SD2
2X
R
.
R
.
W
/
E
N
8
2X
R
.
R
.
W
/
E
N
LS
T
A
3
0
2
x
8
R
.
B
.
4
SD2
1
SD2
ROOF DIAPH. BLOCK
" O.C. B.N.
W/ 8d COMMON NAIL
" O.C. E.N.
" O.C. F.N.
6
6
122
SD2
1
SD2
6
4
SD2
8
SD2
2
SD2
9
SD2
8
SD2
5
4
SD2
1
SD4 TYP.
7
SD4
7
SD4
14
SD2
PER DETAIL 14/SD2
2X PURLIN
PER DETAIL 14/SD2
2X PURLIN
PE
R
D
E
T
A
I
L
1
4
/
S
D
2
2X
P
U
R
L
I
N
PE
R
D
E
T
A
I
L
1
4
/
S
D
2
2X
P
U
R
L
I
N
14
SD2
7
SD4
R2
R2
R2
R2 C1
C1
C1
R1A
C1
R1A
10
SD2
TYP.
RESTRICTIVE NOTICE
DATE REVISIONS
SHEET DESCRIPTION
PROJECT OWNER
PROJECT ADDRESS
STAMP
NO:
REVISIONS
DATE SIGNED: 1/14/25
THESE DESIGNS, DRAWINGS, AND
SPECIFICATIONS ARE THE EXCLUSIVE
PROPERTY OF DONG ENGINEERING.
THESE DRAWINGS CANNOT BE COPIED,
TRANSFERRED, OR REPRODUCED NOR
CAN ANY OTHER STRUCTURES BE BUILT
FROM THEM WITHOUT WRITTEN CONSENT.
SHEET
DE#:
TEL- 714-617-5979
GARDEN GROVE, CA 92841
7661 GARDEN GROVE BLVD.,
DONG ENGINEERING, INC.
INFO@DONGENGINEERING.COM
240051
NE
W
M
A
I
N
H
O
U
S
E
&
A
D
U
M.
H
.
:
1
8
3
4
W
.
3
R
D
S
T
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
JA
D
U
.
:
1
8
3
4
W
.
3
R
D
S
T
.
U
N
I
T
2
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
AD
U
.
:
1
8
3
4
W
.
3
R
D
S
T
.
U
N
I
T
3
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
10/01/2024 PLAN CHECK01
11/19/2024 2nd PLAN CHECK02
01/02/2025 3rd PLAN CHECK03
01/14/2025 4th PLAN CHECK04
S2
MAIN HOUSE & JADU
FLOOR FRAMING PLAN
ROOF FRAMING PLAN
SCALE:
MAIN HOUSE & JADU - ROOF FRAMING PLAN
1/4" = 1'-0"SCALE:
MAIN HOUSE & JADU - FLOOR FRAMING PLAN
1/4" = 1'-0"
4
4
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
A5.1
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
DE
S
I
G
N
E
R
CONTACTOR
CO
N
T
A
C
T
O
R
CO
N
T
A
C
T
O
R
OW
N
E
R
/
C
O
N
T
A
C
T
O
R
OW
N
E
R
/
C
O
N
T
A
C
T
O
R
N/A
N/A
N/A
N/A
N/A
N/A
CO
N
T
R
A
C
T
O
R
CO
N
T
R
A
C
T
O
R
DE
S
I
G
N
E
R
CO
N
T
R
A
C
T
O
R
CO
N
T
R
A
C
T
O
R
CO
N
T
R
A
C
T
O
R
CO
N
T
R
A
C
T
O
R
DE
S
I
G
N
E
R
DE
S
I
G
N
E
R
N/A
1834 W Third St &
#2,33/21/2025
A5.2
Pr
o
j
e
c
t
N
a
m
e
Date
Drawing Title
Project Number
DesignedDrawn
DRAWING NUMBER
Checked
NO. DATE REVISION
ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED
CONTRACTOR IS TO NOTIFY INFINITE-ARCH FOR CLARIFICATION OF
OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS
WRITING AND APPROPRIATE COMPENSATION TO INFINITEARCH
COMPLETION OF THIS PROJECT BY OTHERS, EXCEPT BY AGREEMENT IN
ANY OTHER PROJECT OR FOR ADDITIONS TO THIS PROJECT OR FOR
SPECIFICATIONS SHALL NOT BE USED BY THE OWNER OR OTHERS, ON
CONSTRUCTION AT THE SITE REFERENCED HEREON. THE PLANS AND
OCCUPANCY. THE PLANS AND SPECIFICATIONS ARE FOR THE
COPIES FOR REFERENCE IN CONNECTION WITH THE OWNER'S USE OR
IS EXECUTED OR NOT. THE OWNER SHALL BE PERMITTED TO RETAIN
INFINITE ARCH WHETHER THE PROJECT FOR WHICH THEY WERE CREATED
INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN, THE PROPERTY OF
OWNERSHIP OF DOCUMENTS, PLANS AND SPECIFICATIONS, AS
CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS.
RULES, REGULATIONS AND ORDINANCES OF THE STATE OF
THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE
HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO
I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS
ENGINEER
DESIGNER
DAVID H. LE
Email: brightark@gmail.com
TEL: (714) 868 2499
Email: brightark@gmail.com
TEL: (714) 868 2499
GARDEN GROVE, CA 92843
10321 WOODBURY RD.
DIMENSIONS.
INFINITE ARCH
NE
W
H
O
U
S
E
+
D
E
T
A
C
H
E
D
A
D
U
+
J
A
D
U
OW
N
E
R
:
A
N
D
Y
M
A
I
18
3
4
W
T
H
I
R
D
S
T
R
E
E
T
-
J
A
D
U
U
N
I
T
#
2
-
A
D
U
U
N
I
T
#
3
SA
N
T
A
A
N
A
C
A
9
2
7
0
3
1 10/10/24 REVISION 1
2 12/02/24 REVISION 2
3 02/05/25 REVISION 3
4 02/18/25 REVISION 4
N/A
CO
N
T
R
A
C
T
O
R
CO
N
T
R
A
C
T
O
R
CO
N
T
R
A
C
T
O
R
CO
N
T
R
A
C
T
O
R
CO
N
T
R
A
C
T
O
R
CO
N
T
R
A
C
T
O
R
IN
S
P
E
C
T
O
R
CO
N
T
R
A
C
T
O
R
IN
S
P
E
C
T
O
R
N/A
N/A
CONTRACTOR
EN
G
I
N
E
E
R
CO
N
T
R
A
C
T
O
R
CO
N
T
R
A
C
T
O
R
CO
N
T
R
A
C
T
O
R
IN
S
P
E
C
T
O
R
CO
N
T
R
A
C
T
O
R
IN
S
P
E
C
T
O
R
CO
N
T
R
A
C
T
O
R
CO
N
T
R
A
C
T
O
R
IN
S
P
E
C
T
O
R
IN
S
P
E
C
T
O
R
CO
N
T
R
A
C
T
O
R
OW
N
E
R
1834 W Third St &
#2,33/21/2025
RESTRICTIVE NOTICE
DATE REVISIONS
SHEET DESCRIPTION
PROJECT OWNER
PROJECT ADDRESS
STAMP
NO:
REVISIONS
DATE SIGNED: 1/2/25
THESE DESIGNS, DRAWINGS, AND
SPECIFICATIONS ARE THE EXCLUSIVE
PROPERTY OF DONG ENGINEERING.
THESE DRAWINGS CANNOT BE COPIED,
TRANSFERRED, OR REPRODUCED NOR
CAN ANY OTHER STRUCTURES BE BUILT
FROM THEM WITHOUT WRITTEN CONSENT.
SHEET
DE#:
TEL- 714-617-5979
GARDEN GROVE, CA 92841
7661 GARDEN GROVE BLVD.,
DONG ENGINEERING, INC.
INFO@DONGENGINEERING.COM
240051
NE
W
M
A
I
N
H
O
U
S
E
&
A
D
U
M.
H
.
:
1
8
3
4
W
.
3
R
D
S
T
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
JA
D
U
.
:
1
8
3
4
W
.
3
R
D
S
T
.
U
N
I
T
2
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
AD
U
.
:
1
8
3
4
W
.
3
R
D
S
T
.
U
N
I
T
3
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
10/01/2024 PLAN CHECK01
11/19/2024 2nd PLAN CHECK02
01/02/2025 3rd PLAN CHECK03
1834 W Third St &
#2,33/21/2025
RESTRICTIVE NOTICE
DATE REVISIONS
SHEET DESCRIPTION
PROJECT OWNER
PROJECT ADDRESS
STAMP
NO:
REVISIONS
DATE SIGNED: 1/2/25
THESE DESIGNS, DRAWINGS, AND
SPECIFICATIONS ARE THE EXCLUSIVE
PROPERTY OF DONG ENGINEERING.
THESE DRAWINGS CANNOT BE COPIED,
TRANSFERRED, OR REPRODUCED NOR
CAN ANY OTHER STRUCTURES BE BUILT
FROM THEM WITHOUT WRITTEN CONSENT.
SHEET
DE#:
TEL- 714-617-5979
GARDEN GROVE, CA 92841
7661 GARDEN GROVE BLVD.,
DONG ENGINEERING, INC.
INFO@DONGENGINEERING.COM
240051
NE
W
M
A
I
N
H
O
U
S
E
&
A
D
U
M.
H
.
:
1
8
3
4
W
.
3
R
D
S
T
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
JA
D
U
.
:
1
8
3
4
W
.
3
R
D
S
T
.
U
N
I
T
2
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
AD
U
.
:
1
8
3
4
W
.
3
R
D
S
T
.
U
N
I
T
3
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
10/01/2024 PLAN CHECK01
11/19/2024 2nd PLAN CHECK02
01/02/2025 3rd PLAN CHECK03
1834 W Third St &
#2,33/21/2025
RESTRICTIVE NOTICE
DATE REVISIONS
SHEET DESCRIPTION
PROJECT OWNER
PROJECT ADDRESS
STAMP
NO:
REVISIONS
DATE SIGNED: 1/2/25
THESE DESIGNS, DRAWINGS, AND
SPECIFICATIONS ARE THE EXCLUSIVE
PROPERTY OF DONG ENGINEERING.
THESE DRAWINGS CANNOT BE COPIED,
TRANSFERRED, OR REPRODUCED NOR
CAN ANY OTHER STRUCTURES BE BUILT
FROM THEM WITHOUT WRITTEN CONSENT.
SHEET
DE#:
TEL- 714-617-5979
GARDEN GROVE, CA 92841
7661 GARDEN GROVE BLVD.,
DONG ENGINEERING, INC.
INFO@DONGENGINEERING.COM
240051
NE
W
M
A
I
N
H
O
U
S
E
&
A
D
U
M.
H
.
:
1
8
3
4
W
.
3
R
D
S
T
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
JA
D
U
.
:
1
8
3
4
W
.
3
R
D
S
T
.
U
N
I
T
2
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
AD
U
.
:
1
8
3
4
W
.
3
R
D
S
T
.
U
N
I
T
3
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
10/01/2024 PLAN CHECK01
11/19/2024 2nd PLAN CHECK02
01/02/2025 3rd PLAN CHECK03
1834 W Third St &
#2,33/21/2025
RESTRICTIVE NOTICE
DATE REVISIONS
SHEET DESCRIPTION
PROJECT OWNER
PROJECT ADDRESS
STAMP
NO:
REVISIONS
DATE SIGNED: 1/2/25
THESE DESIGNS, DRAWINGS, AND
SPECIFICATIONS ARE THE EXCLUSIVE
PROPERTY OF DONG ENGINEERING.
THESE DRAWINGS CANNOT BE COPIED,
TRANSFERRED, OR REPRODUCED NOR
CAN ANY OTHER STRUCTURES BE BUILT
FROM THEM WITHOUT WRITTEN CONSENT.
SHEET
DE#:
TEL- 714-617-5979
GARDEN GROVE, CA 92841
7661 GARDEN GROVE BLVD.,
DONG ENGINEERING, INC.
INFO@DONGENGINEERING.COM
240051
NE
W
M
A
I
N
H
O
U
S
E
&
A
D
U
M.
H
.
:
1
8
3
4
W
.
3
R
D
S
T
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
JA
D
U
.
:
1
8
3
4
W
.
3
R
D
S
T
.
U
N
I
T
2
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
AD
U
.
:
1
8
3
4
W
.
3
R
D
S
T
.
U
N
I
T
3
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
10/01/2024 PLAN CHECK01
11/19/2024 2nd PLAN CHECK02
01/02/2025 3rd PLAN CHECK03
1834 W Third St &
#2,33/21/2025
RESTRICTIVE NOTICE
DATE REVISIONS
SHEET DESCRIPTION
PROJECT OWNER
PROJECT ADDRESS
STAMP
NO:
REVISIONS
DATE SIGNED: 1/2/25
THESE DESIGNS, DRAWINGS, AND
SPECIFICATIONS ARE THE EXCLUSIVE
PROPERTY OF DONG ENGINEERING.
THESE DRAWINGS CANNOT BE COPIED,
TRANSFERRED, OR REPRODUCED NOR
CAN ANY OTHER STRUCTURES BE BUILT
FROM THEM WITHOUT WRITTEN CONSENT.
SHEET
DE#:
TEL- 714-617-5979
GARDEN GROVE, CA 92841
7661 GARDEN GROVE BLVD.,
DONG ENGINEERING, INC.
INFO@DONGENGINEERING.COM
240051
NE
W
M
A
I
N
H
O
U
S
E
&
A
D
U
M.
H
.
:
1
8
3
4
W
.
3
R
D
S
T
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
JA
D
U
.
:
1
8
3
4
W
.
3
R
D
S
T
.
U
N
I
T
2
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
AD
U
.
:
1
8
3
4
W
.
3
R
D
S
T
.
U
N
I
T
3
,
S
A
N
T
A
A
N
A
C
A
9
2
7
0
3
10/01/2024 PLAN CHECK01
11/19/2024 2nd PLAN CHECK02
01/02/2025 3rd PLAN CHECK03
1834 W Third St &
#2,33/21/2025
Dong Engineering, Inc.
7661 GARDEN GROVE BLVD. , GARDEN GROVE, CA 92841
Office: (714) 617-5979
Email: info@dongengineering.com
DATE:7/17/2024
CLIENT:
JOB NO.:240051
Project:
NEW MAIN HOUSE & ADU
STRUCTURAL CALCULATIONS FOR THE BUILDING AT:
1834 W.3RD ST,
SANTA ANA, CA 92703
Page 1 of 57
1834 W Third St &
#2,33/21/2025
Job#:240051
Date:
ROOF:SHINGLE ROOF (VAULTED):SHINGLE
Slope 6:12 Slope 6:12
Live Load 20 psf Live Load 20 psf
Roof'g Material 3.0 psf Roof'g Material 3.0 psf
Sheathing 2.0 psf Sheathing 2.0 psf
Trusses / Rafters 2.0 psf Trusses / Rafters 2.0 psf
Ceiling Joists 2.0 psf
Drywall 2.0 psf Drywall 2.0 psf
Sprinkler 0.5 psf Sprinkler 0.5 psf
Solar 3.0 psf Solar 3.0 psf
Miscellaneous 0.5 psf Miscellaneous 0.5 psf
Total D.L.15 psf Total D.L.13.0 psf
Total Load 35 psf Total Load 33 psf
FLOOR:Without Lt. Wt. CONC.DECK:
Live Load 40 psf Live Load 60 psf
Floor Material 3.0 psf Floor Material 3.0 psf
Sheathing 3.0 psf Sheathing 3.0 psf
Floor Joist 3.0 psf Floor Joist 3.0 psf
Sprinkler 0.5 psf Sprinkler 0.5 psf
Miscellaneous 0.5 psf Miscellaneous 0.5 psf
Drywall 3.0 psf Drywall 3.0 psf
Total D.L.13 psf Total D.L.13 psf
Total Load 53 psf Total Load 73 psf
LOADING CONDITIONS
7/10/2024
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Page 2 of 57
1834 W Third St &
#2,33/21/2025
EXTERIOR WALL:INTERIOR WALL:
EXTERIOR:9 DRYWALL:3
DRYWALL:3.0 DRYWALL:3.0
STUDS:2.0 STUDS:2.0
MISC.:1.0 MISC.:2.0
DL=15.0 PSF DL=10.0 PSF
REVISIONS:
1 Sheets:Date:
Init:Remark:
2 Sheets:Date:
Init:Remark:
3 Sheets:Date:
Init:Remark:
4 Sheets:Date:
Init:Remark:
5 Sheets:Date:
Init:Remark:
6 Sheets:Date:
Init:Remark:
Page 3 of 57
1834 W Third St &
#2,33/21/2025
1Y
1X
1 2
A
B
MAIN HOUSE - JADU ROOF SHEARWALL LAYOUT
Page 4 of 57
1834 W Third St &
#2,33/21/2025
1Y
1X
3 4 5
C
D
E
MAIN HOUSE - JADU FLOOR SHEARWALL LAYOUT
Page 5 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1X
Number of Story: 2 Section width: 39(ft)Section length: 33(ft)
Base height: 0.5(ft)Slope roof height: 25.5(ft)Gable mean roof height: 22.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 39(ft), L = 33(ft), H = 23(ft)-->L/B = 0.85, H/L = 0.7
Wall coefficient: Cpw = 0.8, Cpl = -0.5
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Rx = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Rx = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 90.72 + 118.31 = 209.03 PLF
Redistrib: 720*19 + 939*9 = 22131 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 184.59 x 39 / (2 x 33) = 109.08 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 184.59 x 39^2 / (8 x 33) = 1063.49 LBS
Splice w/ min. (6) 16d sinker nails each side of splice at 8" o.c. (standard construction)
FIRST FLOOR DIAPHRAGM
Max shear = 124.96 x 39 / (2 x 33) = 73.84 PLF
Use: 23/32" apa rated unblock w/10d common nails at 6", 6", 12" o.c.
Chord force = 124.96 x 39^2 / (8 x 33) = 719.94 LBS
Splice w/ min. (4) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (23, 0.93, 24.46, 27.07); (19.5, 0.9, 23.62, 26.5); (15, 0.85, 22.35, 25.64)
ROOF
Roof = 15*33 = 495 PLF
Wall = 15*2*4.5 + 10*2*4.5 = 225 PLF
Shear = 0.126(495+225) = 0.126*720 = 90.72 PLF
FIRST FLOOR
Roof + Floor = 15*7 + 13*33 = 534 PLF
Wall = 15*2*4.5 + 15*2*4.5 + 10*2*4.5 + 10*1*4.5 = 405 PLF
Shear = 0.126(534+405) = 0.126*939 = 118.31 PLF
Plate height: ROOF = 19(ft); FIRST FLOOR = 9(ft)
SHEAR ROOF = 209.03*720*19/22131 = 129.21 PLF
SHEAR FIRST FLOOR = 209.03*939*9/22131 = 79.82 PLF
SHEAR ROOF = 0.6*W = 128.3(plf)
SHEAR FIRST FLOOR = 0.6*W = 153.84(plf)
ROOF
FIRST FLOOR
129.21 PLF
153.84 PLF
SEISMIC GOVERN
WIND GOVERN
Page 6 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1Y
Number of Story: 2 Section width: 33(ft)Section length: 39(ft)
Base height: 0.5(ft)Slope roof height: 25.5(ft)Gable mean roof height: 22.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 33(ft), L = 39(ft), H = 23(ft)-->L/B = 1.18, H/L = 0.59
Wall coefficient: Cpw = 0.8, Cpl = -0.46, Roof coefficient: Cpw = (0.17;-0.3), Cpl = -0.6
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 102.06 + 138.98 = 241.04 PLF
Redistrib: 810*19 + 1103*9 = 25317 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 209.33 x 33 / (2 x 39) = 88.56 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 209.33 x 33^2 / (8 x 39) = 730.64 LBS
Splice w/ min. (4) 16d sinker nails each side of splice at 8" o.c. (standard construction)
FIRST FLOOR DIAPHRAGM
Max shear = 142.27 x 33 / (2 x 39) = 60.19 PLF
Use: 23/32" apa rated unblock w/10d common nails at 6", 6", 12" o.c.
Chord force = 142.27 x 33^2 / (8 x 39) = 496.58 LBS
Splice w/ min. (3) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (26, 0.95, 25.09, 26.75); (19.5, 0.9, 23.62, 25.74); (15, 0.85, 22.35, 24.88)
ROOF
Roof = 15*36 = 540 PLF
Wall = 15*2*4.5 + 10*3*4.5 = 270 PLF
Shear = 0.126(540+270) = 0.126*810 = 102.06 PLF
FIRST FLOOR
Roof + Floor = 15*11.5 + 13*33.5 = 608 PLF
Wall = 15*2*4.5 + 15*2*4.5 + 10*3*4.5 + 10*2*4.5 = 495 PLF
Shear = 0.126(608+495) = 0.126*1103 = 138.98 PLF
Plate height: ROOF = 19(ft); FIRST FLOOR = 9(ft)
SHEAR ROOF = 241.04*810*19/25317 = 146.53 PLF
SHEAR FIRST FLOOR = 241.04*1103*9/25317 = 94.51 PLF
SHEAR ROOF = 0.6*W = 133.71(plf)
SHEAR FIRST FLOOR = 0.6*W = 149.28(plf)
ROOF
FIRST FLOOR
146.53 PLF
149.28 PLF
SEISMIC GOVERN
WIND GOVERN
Page 7 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
5
"
|
4
*
d
*
1
.
4
=
0
.
2
6
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
3.
5
0
7.
2
5
4.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
9
1.
9
Co
m
.
(
k
i
p
s
)
2.
7
2.
4
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
9
1.
9
Co
m
.
(
k
i
p
s
)
2.
7
2.
4
8.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
0
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
P2
LI
N
E
1
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
2
0
7
l
b
s
|
S
e
i
s
m
i
c
:
2
4
1
8
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
2
9
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
1
8
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
0
4
p
l
f
(
W
i
n
d
)
/
2
2
4
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
2
.
3
/
2
.
3
)
+
P
2
(
1
.
1
/
1
.
3
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
3
.
2
/
3
.
2
)
+
P
2
(
1
.
6
/
1
.
8
)
=
4
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
11
2
2
-24
8
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 8 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
3
"
|
4
*
d
*
1
.
4
=
0
.
1
9
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
1.
2
5
14
.
2
5
5.
7
5
10
.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(1
)
C
S
1
6
Po
s
t
S
i
z
e
2x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
1
Co
m
.
(
k
i
p
s
)
2.
7
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(1
)
C
S
1
6
Po
s
t
S
i
z
e
2x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
1
Co
m
.
(
k
i
p
s
)
2.
7
5.
2
5
2.
2
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
2
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
2
0
7
l
b
s
|
S
e
i
s
m
i
c
:
2
4
1
8
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
3
9
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
4
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
8
9
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
5
5
p
l
f
(
W
i
n
d
)
/
1
7
0
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
1
/
3
.
1
)
=
3
.
1
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
4
.
4
/
4
.
4
)
=
4
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
11
1
-20
8
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 9 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
3
"
|
4
*
d
*
1
.
4
=
1
.
2
8
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
14
.
0
0
6.
0
0
4.
5
0
5.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
9
Co
m
.
(
k
i
p
s
)
3.
3
3.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
9
Co
m
.
(
k
i
p
s
)
3.
3
3.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
8.
0
0
P2
5.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
C:
S
i
m
p
s
o
n
M
S
T
4
8
(
3
7
6
0
L
B
)
-
A
l
t
t
w
o
r
o
w
(
9
)
#
1
6
E
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
5
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
3
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
6
6
3
l
b
s
|
S
e
i
s
m
i
c
:
3
3
3
9
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
5
0
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
9
8
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
1
9
p
l
f
(
W
i
n
d
)
/
2
9
0
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
1
.
8
/
1
.
8
)
=
3
.
7
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
2
.
5
/
2
.
5
)
=
5
.
2
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
25
1
6
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 10 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
3
7
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
11
.
2
5
11
.
2
5
25
.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
2
Co
m
.
(
k
i
p
s
)
2.
4
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
2
Co
m
.
(
k
i
p
s
)
2.
4
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
4
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
9
8
6
l
b
s
|
S
e
i
s
m
i
c
:
1
8
9
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
4
8
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
6
2
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
6
5
p
l
f
(
W
i
n
d
)
/
1
6
8
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
6
/
3
.
6
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
5
/
5
)
=
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
69
6
-15
9
4
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 11 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
"
|
4
*
d
*
1
.
4
=
1
.
1
5
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
11
.
2
5
6.
0
0
9.
0
0
6.
0
0
3.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
8
Co
m
.
(
k
i
p
s
)
3.
2
3.
2
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
8
Co
m
.
(
k
i
p
s
)
3.
2
3.
2
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
2.
7
5
6.
2
5
5.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P2
P1
LI
N
E
5
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
7
3
8
l
b
s
|
S
e
i
s
m
i
c
:
3
3
8
7
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
4
9
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
2
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
0
0
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
1
2
p
l
f
(
W
i
n
d
)
/
2
8
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
1
.
9
/
1
.
9
)
=
3
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
2
.
7
/
2
.
7
)
=
5
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
14
0
9
-10
6
4
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 12 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
4
1
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
2.
5
0
6.
2
5
5.
2
5
5.
2
5
5.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
9
2.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
5
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
9
2.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
5
P2
2.
7
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
A
(
D
i
r
e
c
t
i
o
n
:
X
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
5
0
2
l
b
s
|
S
e
i
s
m
i
c
:
3
2
7
5
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
3
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
0
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
0
7
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
3
8
p
l
f
(
W
i
n
d
)
/
3
1
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
7
/
1
.
7
)
+
P
2
(
1
.
7
/
1
.
7
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
3
/
2
.
3
)
+
P
2
(
2
.
3
/
2
.
3
)
=
4
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
19
0
7
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 13 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
3
8
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
10
.
5
0
10
.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
6
Co
m
.
(
k
i
p
s
)
3.
8
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
6
Co
m
.
(
k
i
p
s
)
3.
8
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
2.
5
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
B
(
D
i
r
e
c
t
i
o
n
:
X
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
5
0
2
l
b
s
|
S
e
i
s
m
i
c
:
3
2
7
5
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
2
3
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
0
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
5
3
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
3
8
p
l
f
(
W
i
n
d
)
/
3
1
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
4
/
3
.
4
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
4
.
7
/
4
.
7
)
=
4
.
7
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
19
9
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 14 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
3
5
"
|
4
*
d
*
1
.
4
=
1
.
9
4
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
3.
0
0
5.
7
5
3.
0
0
8.
2
5
2.
5
0
16
.
5
0
2.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
HD
U
5
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
0
3.
0
2.
7
2.
7
Co
m
.
(
k
i
p
s
)
3.
4
3.
4
2.
9
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
HD
U
5
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
0
3.
0
2.
7
2.
7
Co
m
.
(
k
i
p
s
)
3.
4
3.
4
2.
9
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
P3
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
P4
LI
N
E
C
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
0
7
9
l
b
s
|
S
e
i
s
m
i
c
:
3
0
2
9
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
D
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
1
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
9
0
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
4
5
4
p
l
f
(
W
i
n
d
)
/
4
4
7
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
1
/
1
.
6
)
+
P
2
(
1
.
1
/
1
.
6
)
+
P
3
(
0
.
7
/
1
.
3
)
+
P
4
(
0
.
7
/
1
.
3
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
5
/
2
.
2
)
+
P
2
(
1
.
5
/
2
.
2
)
+
P
3
(
1
/
1
.
9
)
+
P
4
(
1
/
1
.
9
)
=
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
78
0
-12
2
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 15 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
8
"
|
4
*
d
*
1
.
4
=
1
.
6
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
18
.
7
5
3.
5
0
2.
7
5
9.
0
0
4.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
4
HD
U
4
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
6
Co
m
.
(
k
i
p
s
)
2.
8
3.
6
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
4
HD
U
4
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
6
Co
m
.
(
k
i
p
s
)
2.
8
3.
6
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
C:
S
i
m
p
s
o
n
M
S
T
4
8
(
3
7
6
0
L
B
)
-
A
l
t
t
w
o
r
o
w
(
9
)
#
1
6
E
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P2
P1
LI
N
E
D
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
4
7
7
1
l
b
s
|
S
e
i
s
m
i
c
:
3
8
5
2
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
C
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
2
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
4
0
7
p
l
f
(
W
i
n
d
)
/
3
2
9
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
1
/
1
.
4
)
+
P
2
(
3
.
7
/
3
.
7
)
=
4
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
6
/
2
)
+
P
2
(
5
.
2
/
5
.
2
)
=
6
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
31
5
1
-79
8
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 16 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
3
"
|
4
*
d
*
1
.
4
=
1
.
2
7
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
3.
2
5
2.
7
5
6.
0
0
4.
0
0
9.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
5
Co
m
.
(
k
i
p
s
)
3.
5
3.
7
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
4.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
7
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
2.
2
5
2.
2
5
3.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
5.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
E
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
4
6
9
5
l
b
s
|
S
e
i
s
m
i
c
:
4
7
5
4
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
5
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
4
9
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
0
3
p
l
f
(
W
i
n
d
)
/
3
0
7
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
3
/
3
)
=
4
.
9
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
4
.
2
/
4
.
2
)
=
6
.
9
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
22
0
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 17 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (X-X Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
A 2 1X 39 128 129 9 10.5 312 B
B 2 1X 39 128 129 9 10.5 312 B
C 1 1X 20.5 154 80 1502 1965 9 6.78 454 D
D 1 1X 49 154 80 1001 1310 9 11.72 407 C
E 1 1X 28.5 154 80 2502 3275 9 15.5 307 B
SUMMARY SHEAR WALL
V2 = Seismic*Span/2 + Added Vseismic
Line shear V = Maximum(V1;V2)
V1 = Wind*Span/2 + Added Vwind
v(plf) = V/L
Page 18 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (Y-Y Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
1 2 1Y 33 134 147 9 10.81 224 B
2 2 1Y 33 134 147 9 14.25 170 A
3 1 1Y 19.5 149 95 2207 2418 9 11.5 319 B
4 1 1Y 40 149 95 9 11.25 265 B
5 1 1Y 20.5 149 95 2207 2418 9 12 312 B
v(plf) = V/L
Line shear V = Maximum(V1;V2)
SUMMARY SHEAR WALL
V1 = Wind*Span/2 + Added Vwind
V2 = Seismic*Span/2 + Added Vseismic
Page 19 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic
(#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb)
1 :Wind = 2207(lb), Seismic = 2418(lb)
1 1Y 2 133.7 146.5 33 2206 2418 l---------------33.0(ft)---------------l
2 :Wind = 2207(lb), Seismic = 2418(lb)
2 1Y 2 133.7 146.5 33 2206 2418 l---------------33.0(ft)---------------l
3 :Wind = 3663(lb), Seismic = 3339(lb), Line above : 1 - 100%, Wind = 2207(lb), Seismic = 2418(lb)
3 1Y 1 149.3 94.5 19.5 1455 921 l---------------19.5(ft)---------------l
4 :Wind = 2986(lb), Seismic = 1890(lb)
4 1Y 1 149.3 94.5 40 2986 1890 l---------------40.0(ft)---------------l
5 :Wind = 3738(lb), Seismic = 3387(lb), Line above : 2 - 100%, Wind = 2207(lb), Seismic = 2418(lb)
5 1Y 1 149.3 94.5 20.5 1530 969 l---------------20.5(ft)---------------l
A :Wind = 2502(lb), Seismic = 3275(lb)
A 1X 2 128.3 129.2 39 2502 2520 l---------------39.0(ft)---------------l
B :Wind = 2502(lb), Seismic = 3275(lb)
B 1X 2 128.3 129.2 39 2502 2520 l---------------39.0(ft)---------------l
C :Wind = 3079(lb), Seismic = 3029(lb), Line above : A - 60%, Wind = 1502(lb), Seismic = 1965(lb)
C 1X 1 153.8 79.8 20.5 1577 818 l---------------20.5(ft)---------------l
D :Wind = 4771(lb), Seismic = 3852(lb), Line above : A - 40%, Wind = 1001(lb), Seismic = 1310(lb)
D 1X 1 153.8 79.8 49 3769 1956 l---------------49.0(ft)---------------l
E :Wind = 4695(lb), Seismic = 4754(lb), Line above : B - 100%, Wind = 2502(lb), Seismic = 3275(lb)
E 1X 1 153.8 79.8 28.5 2192 1137 l---------------28.5(ft)---------------l
#N/A #N/A
#N/A #N/A
#N/A #N/A
Description
V_(lb)=v_(plf)*Span*Span/2/(Span+Offset)
LATERAL
p Factor: X Direction: p=1.3; Y Direction: p=1
20 of 52Page 20 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT2, SANTA ANA, CA 92703
BEAM : 1 - CLG AT BED 3
Loads(Downward+)
Beam Weight 10.1 plf from 0 ft to 14.75 ft
Roof Rafter: (11+20)(4.2) = (DL=46.8PLF; LLr=85PLF) form 0 to 14.75
Ceiling Joist DL: (4)(6.8) = (DL=27PLF) form 0 to 14.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1239/1239 0
2 1239/1239 0
USE 6 x 8
Critcal Shear = 1239 LB @0' 1.5xV/(F'v x A)= 0.21
F'v = 212, A = 41.25
Critcal Moment = 4569 LB-FT @7.37' M/(F'b x S)= 0.63
F'b = 1688, S = 51.56
Critical Deflection for TL = -0.578 INCH @ 7.37 L/240 = 0.738"
Critical Deflection for LL = -0.29 INCH @ 7.37 L/360 = 0.492"
1 2
Moment
Shear
Deflection
14.75'
BEAM : 2 - CLG AT M.BED 4
Loads(Downward+)
Beam Weight 12.7 plf from 0 ft to 10.75 ft
Roof Primary: (15+20)(11.8) = (DL=176.2PLF; LLr=235PLF) form 0 to 10.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2279/2279 0
2 2279/2279 0
USE 6 x 10
Critcal Shear = 2278 LB @0' 1.5xV/(F'v x A)= 0.3
F'v = 212, A = 52.25
Critcal Moment = 6120 LB-FT @5.25' M/(F'b x S)= 0.52
F'b = 1688, S = 82.73
Critical Deflection for TL = -0.202 INCH @ 5.25 L/240 = 0.538"
Critical Deflection for LL = -0.112 INCH @ 5.25 L/360 = 0.358"
1 2
Moment
Shear
Deflection
10.75'
Page 21 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT2, SANTA ANA, CA 92703
BEAM : 2A - CLG AT M.BATH
Loads(Downward+)
Beam Weight 10.1 plf from 0 ft to 13 ft
Roof Rafter: (11+20)(4.2) = (DL=46.8PLF; LLr=85PLF) form 0 to 13
Ceiling Joist DL: (4)(6.5) = (DL=26PLF) form 0 to 13
Point load @ 1.5 : Load from beam 2 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 3036/3036 0
2 1325/1324 0
USE 6 x 8
Critcal Shear = 3036 LB @0' 1.5xV/(F'v x A)= 0.52
F'v = 212, A = 41.25
Critcal Moment = 5339 LB-FT @5' M/(F'b x S)= 0.73
F'b = 1688, S = 51.56
Critical Deflection for TL = -0.538 INCH @ 6.25 L/240 = 0.65"
Critical Deflection for LL = -0.276 INCH @ 6.25 L/360 = 0.433"
1 2
P1
Moment
Shear
Deflection
13'
BEAM : 3 - HDR AT M.BATH
Loads(Downward+)
Beam Weight 4.7 plf from 0 ft to 2.25 ft
Roof Rafter: (11+20)(3.8) = (DL=41.2PLF; LLr=75PLF) form 1.25 to 2.25
Ceiling Joist DL: (4)(5.5) = (DL=22PLF) form 1.25 to 2.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 2.25
Point load @ 1.25 : Load from beam 2A at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 672/672 0
2 899/899 0
USE 4 x 6
Critcal Shear = -898 LB @2.25' 1.5xV/(F'v x A)= 0.31
F'v = 225, A = 19.25
Critcal Moment = 812 LB-FT @1.25' M/(F'b x S)= 0.37
F'b = 1462, S = 17.65
Critical Deflection for TL = -0.007 INCH @ 1 L/240 = 0.112"
Critical Deflection for LL = -0.004 INCH @ 1 L/360 = 0.075"
1 2
P1
Moment
Shear
Deflection
2.25'
(DL=1016#, LLr=1263#)
(DL=656#, LLr=669#)
Page 22 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 3A - HDR AT M.BED 4
Loads(Downward+)
Beam Weight 4.7 plf from 0 ft to 2.25 ft
Exterior Wall: (15)(4) = (DL=60PLF) form 0 to 2.25
Point load @ 1 : Load from beam 2 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1339/1339 0
2 1085/1086 0
USE 4 x 6
Critcal Shear = 1338 LB @0' 1.5xV/(F'v x A)= 0.46
F'v = 225, A = 19.25
Critcal Moment = 1306 LB-FT @1' M/(F'b x S)= 0.6
F'b = 1462, S = 17.65
Critical Deflection for TL = -0.012 INCH @ 1 L/240 = 0.112"
Critical Deflection for LL = -0.007 INCH @ 1 L/360 = 0.075"
1 2
P1
Moment
Shear
Deflection
2.25'
BEAM : 4 - RIDGE AT FAMILY ROOM
Loads(Downward+)
Beam Weight 15.4 plf from 0 ft to 14 ft
Rafter Vaulted: (13+20)(13.2) = (DL=172.2PLF; LLr=265PLF) form 0 to 14
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 3116/3116 0
2 3116/3116 0
USE 6 x 12
Critcal Shear = 3115 LB @0' 1.5xV/(F'v x A)= 0.34
F'v = 212, A = 63.25
Critcal Moment = 10905 LB-FT @7' M/(F'b x S)= 0.64
F'b = 1688, S = 121.23
Critical Deflection for TL = -0.345 INCH @ 7 L/240 = 0.7"
Critical Deflection for LL = -0.2 INCH @ 7 L/360 = 0.467"
1 2
Moment
Shear
Deflection
14'
(DL=1016#, LLr=1263#)
Page 23 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 4A - CLG AT HALLWAY
Loads(Downward+)
Beam Weight 19.5 plf from 0 ft to 18.25 ft
Roof Primary: (15+20)(13.2) = (DL=198.8PLF; LLr=265PLF) form 0 to 18.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 4233/4232 0
2 4233/4232 0
USE 5 1/4" x 11 7/8" PSL
Critcal Shear = 4232 LB @0' 1.5xV/(F'v x A)= 0.28
F'v = 362, A = 62.34
Critcal Moment = 19308 LB-FT @9.12' M/(F'b x S)= 0.52
F'b = 3625, S = 123.39
Critical Deflection for TL = -0.79 INCH @ 9.13 L/240 = 0.912"
Critical Deflection for LL = -0.418 INCH @ 9.13 L/360 = 0.608"
1 2
Moment
Shear
Deflection
18.25'
BEAM : 4B - CLG AT STAIR
Loads(Downward+)
Beam Weight 15.2 plf from 0 ft to 14.25 ft
Interior Wall: (10)(0~5) = (DL=0~50PLF) form 0 to 14.25
Point load @ 13 : Load from beam 4 at Support 2(P1)
Point load @ 13 : Load from beam 4A at Support 1(P2)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 873/873 0
2 7062/7061 0
USE 5 1/4" x 9 1/4" PSL
Critcal Shear = -7061 LB @14.25' 1.5xV/(F'v x A)= 0.6
F'v = 362, A = 48.56
Critcal Moment = 8777 LB-FT @13' M/(F'b x S)= 0.39
F'b = 3625, S = 74.87
Critical Deflection for TL = -0.339 INCH @ 7.92 L/240 = 0.712"
Critical Deflection for LL = -0.158 INCH @ 7.92 L/360 = 0.475"
1 2
P1P2
Moment
Shear
Deflection
14.25'
(DL=1314#, LLr=1802#)
(DL=1992#, LLr=2241#)
Page 24 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 5 - FL AT GARAGE
Loads(Downward+)
Beam Weight 15.2 plf from 0 ft to 15.5 ft
Deck Primary: (13+60)(3.2) = (DL=42.2PLF; LLr=195PLF) form 0 to 5.25
Deck Primary: (13+60)(2.5) = (DL=32.5PLF; LLr=150PLF) form 5.25 to 15.5
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 15.5
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 0 to 15.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2857/2468 0
2 2667/2278 0
USE 5 1/4" x 9 1/4" PSL
Critcal Shear = 2468 LB @0' 1.5xV/(F'v x A)= 0.26
F'v = 290, A = 48.56
Critcal Moment = 9019 LB-FT @7.46' M/(F'b x S)= 0.5
F'b = 2900, S = 74.87
Critical Deflection for TL = -0.566 INCH @ 7.75 L/240 = 0.775"
Critical Deflection for LL = -0.303 INCH @ 7.75 L/360 = 0.517"
1 2
Moment
Shear
Deflection
15.5'
BEAM : 6 - FL AT GARAGE
Loads(Downward+)
Beam Weight 10.2 plf from 0 ft to 11.5 ft
Roof Primary: (15+20)(2.2) = (DL=33.8PLF; LLr=45PLF) form 0 to 11.5
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 5 to 11.5
Point load @ 5 : Load from beam 5 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2115/1826 0
2 1915/1678 0
USE 3 1/2" x 9 1/4" PSL
Critcal Shear = 1637 LB @0' 1.5xV/(F'v x A)= 0.26
F'v = 290, A = 32.38
Critcal Moment = 7637 LB-FT @5' M/(F'b x S)= 0.63
F'b = 2900, S = 49.91
Critical Deflection for TL = -0.357 INCH @ 5.5 L/240 = 0.575"
Critical Deflection for LL = -0.168 INCH @ 5.5 L/360 = 0.383"
1 2
P1
Moment
Shear
Deflection
11.5'
(DL=1076#, LLr=388#, LL=1203#)
Page 25 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 7 - HDR AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 16.25 ft
Roof Primary: (15+20)(4.5) = (DL=67.5PLF; LLr=90PLF) form 0 to 13.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 16.25
Point load @ 13.25 : Load from beam 6 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1968/1841 0
2 2915/2558 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = -2558 LB @16.25' 1.5xV/(F'v x A)= 0.24
F'v = 388, A = 41.56
Critcal Moment = 8527 LB-FT @9.81' M/(F'b x S)= 0.43
F'b = 2906, S = 82.26
Critical Deflection for TL = -0.539 INCH @ 8.43 L/240 = 0.812"
Critical Deflection for LL = -0.222 INCH @ 8.43 L/360 = 0.542"
1 2
P1
Moment
Shear
Deflection
16.25'
BEAM : 8 - FL AT DINING
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 11.25 ft
Exterior Wall: (15)(9~13) = (DL=135~195PLF) form 0 to 11.25
Roof Primary: (15+20)(1.3) = (DL=20PLF; LLr=26.7PLF) form 0 to 11.25
Point load from Panel P1(Left) of Line 1 at @ 7.5(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1201/2981 0 2981
2 1314/4895 -265 4895
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -4895 LB @11.25' 1.5xV/(F'v x A)= 0.35
F'v = 496, A = 41.56
Critcal Moment = 16595 LB-FT @7.5' M/(F'b x S)= 0.65
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.214 INCH @ 6 L/240 = 0.562"
Critical Deflection for LL = -0.121 INCH @ 6 L/360 = 0.375"
1 2
P1*
Moment
Shear
Deflection
11.25'
(DL=957#, LLr=478#, LL=680#)
Page 26 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 9 - FL AT LIVING
Loads(Downward+)
Beam Weight 17.5 plf from 0 ft to 19 ft
Roof Primary: (15+20)(11.2) = (DL=168.8PLF; LLr=225PLF) form 0 to 4.75
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 4.75 to 10.25
Roof Primary: (15+20)(3.8) = (DL=56.2PLF; LLr=75PLF) form 10.25 to 19
Exterior Wall: (15)(9) = (DL=135PLF) form 4.75 to 19
Rafter Vaulted: (13+20)(8.8) = (DL=113.8PLF; LLr=175PLF) form 4.75 to 19
Point load @ 4.75 : Load from beam 8 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 5701/5701 0 5701
2 5597/5596 0 5596
USE 3 1/2" x 16" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5700 LB @0' 1.5xV/(F'v x A)= 0.42
F'v = 362, A = 56
Critcal Moment = 28279 LB-FT @8.86' M/(F'b x S)= 0.62
F'b = 3625, S = 149.33
Critical Deflection for TL = -0.77 INCH @ 9.29 L/240 = 0.95"
Critical Deflection for LL = -0.307 INCH @ 9.29 L/360 = 0.633"
1 2
P1
Moment
Shear
Deflection
19'
BEAM : 10 - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 13.5
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 13.5
Roof Primary: (15+20)(9.8) = (DL=146.2PLF; LLr=195PLF) form 0 to 1.5
Point load from Panel P2(Left) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1926/10274 -1982 10274
2 1043/2027 0 2027
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -8181 LB @1.5' 1.5xV/(F'v x A)= 0.59
F'v = 496, A = 41.56
Critcal Moment = -11877 LB-FT @1.5' M/(F'b x S)= 0.46
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.195 INCH @ 7.25 L/240 = 0.6"
Critical Deflection for LL = -0.103 INCH @ 7.25 L/360 = 0.4"
1 2
P1*
Moment
Shear
Deflection
1.5'12'
(DL=1051#, LLr=150#,
W=-652#, E=-714#)
Page 27 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UINT 2, SANTA ANA, CA 92703
BEAM : 10A - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 1.5
Roof Primary: (15+20)(9.8) = (DL=146.2PLF; LLr=195PLF) form 0 to 1.5
Point load from Panel P1(Left) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 793/9474 -3096 9474
2 -61/1258 -547 1258
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -8156 LB @1.5' 1.5xV/(F'v x A)= 0.59
F'v = 496, A = 41.56
Critcal Moment = -11858 LB-FT @1.5' M/(F'b x S)= 0.46
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.062 INCH @ 5.5 L/240 = 0.45"
Critical Deflection for LL = -0.06 INCH @ 5.5 L/360 = 0.3"
1 2
P1*
Moment
Shear
Deflection
1.5'9'
BEAM : 10B - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Floor Primary: (13+40)(1.3) = (DL=17.4PLF; LL=53.4PLF) form 0 to 10.5
Point load from Panel P1(Right) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 506/9126 -3393 9126
2 362/1415 -382 1415
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -7702 LB @1.5' 1.5xV/(F'v x A)= 0.56
F'v = 496, A = 41.56
Critcal Moment = -11504 LB-FT @1.5' M/(F'b x S)= 0.45
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.067 INCH @ 5.75 L/240 = 0.45"
Critical Deflection for LL = -0.062 INCH @ 5.75 L/360 = 0.3"
1 2
P1*
Moment
Shear
Deflection
1.5'9'
Page 28 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 11 - DROP AT GARAGE
Loads(Downward+)
Beam Weight 30.7 plf from 0 ft to 20.25 ft
Floor Primary: (13+40)(4.5) = (DL=58.5PLF; LL=180PLF) form 0 to 3
Floor Primary: (13+40)(6) = (DL=78PLF; LL=240PLF) form 3 to 18.25
Deck Primary: (13+60)(2.5) = (DL=32.5PLF; LLr=150PLF) form 3 to 15.25
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 18.25
Roof Primary: (15+20)(6.8) = (DL=101.2PLF; LLr=135PLF) form 0 to 3
Deck Primary: (13+60)(3.2) = (DL=42.2PLF; LLr=195PLF) form 0 to 3
Point load @ 3 : Load from beam 1 at Support 1(P1)
Point load @ 3 : Load from beam 10A at Support 1(P2)
Point load @ 15.25 : Load from beam 6 at Support 2(P3)
Point load @ 18.25 : Load from beam 10 at Support 1(P4)
Point load @ 18.25 : Load from beam 1 at Support 2(P5)
Point load @ 13.25 : Load from beam 10B at Support 1(P6)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 8769/7689 -171 7689
2 9065/8087 -820 8087
USE 7" x 14" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 13104 LB @18.25' 1.5xV/(F'v x A)= 0.43
F'v = 464, A = 98
Critcal Moment = 37746 LB-FT @10.68' M/(F'b x S)= 0.68
F'b = 2900, S = 228.67
Critical Deflection for TL = -0.885 INCH @ 10.12 L/240 = 1.012"
Critical Deflection for LL = -0.389 INCH @ 10.12 L/360 = 0.675"
1 2
P1P2 P3 P4P5P6
Moment
Shear
Deflection
20.25'
BEAM : 12 - FL AT KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 12.5 ft
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 12.5
Exterior Wall: (15)(14~11) = (DL=210~165PLF) form 0 to 12.5
Point load @ 2.25 : Load from beam 4 at Support 1(P1)
Point load from Panel P1(Right) of Line 1 at @ 3.75(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 4439/5490 0 5490
2 2316/3239 0 3239
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 4438 LB @0' 1.5xV/(F'v x A)= 0.41
F'v = 388, A = 41.56
Critcal Moment = 18544 LB-FT @3.75' M/(F'b x S)= 0.72
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.367 INCH @ 6 L/240 = 0.625"
Critical Deflection for LL = -0.129 INCH @ 6 L/360 = 0.417"
1 2
P1 P2*
Moment
Shear
Deflection
12.5'
(DL=618#, LLr=621#)
(DL=476#, LLr=317#, W=-2730#, E=-3572#)
(DL=965#, LLr=427#, LL=523#)
(DL=1463#, LLr=463#, W=-2633#, E=-3445#)
(DL=618#, LLr=621#)
(DL=179#, LL=327#,
W=-2730#, E=-3572#)
(DL=1314#, LLr=1802#)
Page 29 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 13 - FL AT DINING
Loads(Downward+)
Beam Weight 26 plf from 0 ft to 19 ft
Floor Primary: (13+40)(6.2) = (DL=81.2PLF; LL=250PLF) form 4.75 to 19
Roof Rafter: (11+20)(3.8) = (DL=41.2PLF; LLr=75PLF) form 0 to 4.75
Ceiling Joist DL: (4)(5.5) = (DL=22PLF) form 0 to 4.75
Interior Wall: (10)(3.5) = (DL=35PLF) form 4.75 to 15.25
Point load @ 4.75 : Load from beam 8 at Support 2(P1)
Point load @ 4.75 : Load from beam 12 at Support 1(P2)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 6874/6142 0 6142
2 4729/4224 0 4224
USE 7" x 11 7/8" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5192 LB @0' 1.5xV/(F'v x A)= 0.32
F'v = 290, A = 83.12
Critcal Moment = 24983 LB-FT @7.6' M/(F'b x S)= 0.63
F'b = 2900, S = 164.52
Critical Deflection for TL = -0.889 INCH @ 8.89 L/240 = 0.95"
Critical Deflection for LL = -0.358 INCH @ 8.89 L/360 = 0.633"
1 2
P1P2
Moment
Shear
Deflection
19'
BEAM : 14 - FL AT JADU KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 9.75 ft
Floor Primary: (13+40)(1.2) = (DL=16.2PLF; LL=50PLF) form 0 to 9.75
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 0 to 9.75
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 9.75
Rafter Vaulted: (13+20)(8.8) = (DL=113.8PLF; LLr=175PLF) form 0 to 9.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 4401/3726 0
2 4401/3726 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = 3549 LB @0' 1.5xV/(F'v x A)= 0.41
F'v = 310, A = 41.56
Critcal Moment = 8645 LB-FT @4.75' M/(F'b x S)= 0.54
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.205 INCH @ 4.75 L/240 = 0.488"
Critical Deflection for LL = -0.112 INCH @ 4.75 L/360 = 0.325"
1 2
Moment
Shear
Deflection
9.75'
(DL=1164#, LLr=150#, W=-1304#, E=-1429#)
(DL=2605#, LLr=1834#, W=-1369#, E=-1500#)
Page 30 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 15 - FL AT JADU LIVING
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 13.5
Exterior Wall: (15)(11~9) = (DL=165~135PLF) form 0 to 2.75
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 2.75 to 13.5
Point load @ 2.75 : Load from beam 14 at Support 1(P1)
Point load from Panel P2(Left) of Line 1 at @ 2.75(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 4774/6630 0 6630
2 1948/2226 0 2226
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 6629 LB @0' 1.5xV/(F'v x A)= 0.48
F'v = 496, A = 41.56
Critcal Moment = 17346 LB-FT @2.75' M/(F'b x S)= 0.68
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.508 INCH @ 6.23 L/240 = 0.675"
Critical Deflection for LL = -0.278 INCH @ 6.23 L/360 = 0.45"
1 2
P1P2*
Moment
Shear
Deflection
13.5'
BEAM : 16 - FL AT JADU KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 2.75 to 13.5
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 2.75 to 13.5
Point load @ 2.75 : Load from beam 14 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 5025/4364 0
2 3153/2829 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = 3854 LB @0' 1.5xV/(F'v x A)= 0.45
F'v = 310, A = 41.56
Critcal Moment = 10711 LB-FT @4' M/(F'b x S)= 0.67
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.546 INCH @ 6.49 L/240 = 0.675"
Critical Deflection for LL = -0.219 INCH @ 6.49 L/360 = 0.45"
1 2
P1
Moment
Shear
Deflection
13.5'
(DL=1044#, LLr=539#, LL=1016#)
(DL=1554#, LLr=817#, LL=1541#)
Page 31 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 17 - FL AT BED 1
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 14 ft
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 14
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 14
Floor Primary: (13+40)(0.8) = (DL=10.4PLF; LL=32PLF) form 0 to 14
Point load @ 12.75 : Load from beam 3 at Support 1(P1)
Point load @ 1 : Load from beam 4A at Support 1(P3)
Point load from Panel P1(Right) of Line 2 at @ 2(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 5672/5447 0 5447
2 1949/1933 0 1933
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5447 LB @0' 1.5xV/(F'v x A)= 0.5
F'v = 388, A = 41.56
Critcal Moment = 6080 LB-FT @6.25' M/(F'b x S)= 0.38
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.354 INCH @ 6.74 L/240 = 0.7"
Critical Deflection for LL = -0.098 INCH @ 6.74 L/360 = 0.467"
1 2
P1P3P2*
Moment
Shear
Deflection
14'
BEAM : 18 - FL AT JADU BED
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 10.5
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 10.5
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 0.75 to 10.5
Point load @ 0.75 : Load from beam 3 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2701/2701 0
2 2071/2070 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = 2700 LB @0' 1.5xV/(F'v x A)= 0.25
F'v = 388, A = 41.56
Critcal Moment = 5591 LB-FT @5' M/(F'b x S)= 0.28
F'b = 2906, S = 82.26
Critical Deflection for TL = -0.149 INCH @ 5.25 L/240 = 0.525"
Critical Deflection for LL = -0.054 INCH @ 5.25 L/360 = 0.35"
1 2
P1
Moment
Shear
Deflection
10.5'
(DL=345#, LLr=327#)
(DL=1992#, LLr=2241#)
(DL=453#, LLr=446#)
Page 32 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 19 - HDR AT JADU LIVING
Loads(Downward+)
Beam Weight 7.9 plf from 0 ft to 5.25 ft
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 1.75 to 5.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 5.25
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 1.75 to 5.25
Point load @ 1.75 : Load from beam 15 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1928/1684 0 1684
2 1808/1638 0 1638
USE 4 x 10
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -1637 LB @5.25' 1.5xV/(F'v x A)= 0.42
F'v = 180, A = 32.38
Critcal Moment = 2725 LB-FT @2' M/(F'b x S)= 0.6
F'b = 1080, S = 49.91
Critical Deflection for TL = -0.036 INCH @ 2.5 L/240 = 0.262"
Critical Deflection for LL = -0.017 INCH @ 2.5 L/360 = 0.175"
1 2
P1
Moment
Shear
Deflection
5.25'
BEAM : 20 - HDR AT JADU DINING
Loads(Downward+)
Beam Weight 9.6 plf from 0 ft to 5.25 ft
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 0 to 3.75
Floor Primary: (13+40)(6.8) = (DL=87.8PLF; LL=270PLF) form 3.75 to 5.25
Exterior Wall: (15)(5.5) = (DL=82.5PLF) form 0 to 3.75
Exterior Wall: (15)(11) = (DL=165PLF) form 3.75 to 5.25
Point load @ 3.75 : Load from beam 16 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2204/1943 0
2 3598/3169 0
USE 4 x 12
Critcal Shear = -2941 LB @5.25' 1.5xV/(F'v x A)= 0.62
F'v = 180, A = 39.38
Critcal Moment = 3814 LB-FT @3.75' M/(F'b x S)= 0.56
F'b = 1100, S = 73.83
Critical Deflection for TL = -0.024 INCH @ 2.75 L/240 = 0.262"
Critical Deflection for LL = -0.011 INCH @ 2.75 L/360 = 0.175"
1 2
P1
Moment
Shear
Deflection
5.25'
(DL=932#, LLr=447#, LL=207#,
W=-374#, E=-409#)
(DL=1828#, LLr=910#, LL=314#)
Page 33 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 21 - CLG AT ENTRANCE
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 8.25 ft
Roof Rafter: (11+20)(2) = (DL=22PLF; LLr=40PLF) form 0 to 8.25
Ceiling Joist DL: (4)(1.3) = (DL=5.3PLF) form 0 to 8.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 303/303 0
2 303/303 0
USE 4 x 8
Critcal Shear = 303 LB @0' 1.5xV/(F'v x A)= 0.08
F'v = 225, A = 25.38
Critcal Moment = 625 LB-FT @4' M/(F'b x S)= 0.16
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.043 INCH @ 4 L/240 = 0.412"
Critical Deflection for LL = -0.023 INCH @ 4 L/360 = 0.275"
1 2
Moment
Shear
Deflection
8.25'
BEAM : C1 - C.J. 2X6#2 @ 16" O.C. TYP. (MAX L=15'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 140/140 0
2 140/140 0
USE 2 x 6
Critcal Shear = 140 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 8.25
Critcal Moment = 525 LB-FT @7.5' M/(F'b x S)= 0.49
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.64 INCH @ 7.5 L/240 = 0.75"
Critical Deflection for LL = -0.457 INCH @ 7.5 L/360 = 0.5"
1 2
Moment
Shear
Deflection
15'
Page 34 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : F3 - D.J. 2X10#2 @ 16" O.C. TYP. (MAX L=12'-
0")
Loads(Downward+)
Deck Primary: (13+60)(1.3) = (DL=17.4PLF; LLr=80.1PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 585/585 0
2 585/585 0
USE 2 x 10
Critcal Shear = 584 LB @0' 1.5xV/(F'v x A)= 0.35
F'v = 180, A = 13.88
Critcal Moment = 1754 LB-FT @6' M/(F'b x S)= 0.86
F'b = 1138, S = 21.39
Critical Deflection for TL = -0.287 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.236 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
BEAM : R1 - R.R. 2X6#2 @ 16" O.C. TYP. (MAX L=12'-0")
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 248/248 0
2 248/248 0
USE 2 x 6
Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2
F'v = 225, A = 8.25
Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
Page 35 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : R1A - R.R. 2X6#2 @ 16" O.C. W/ PURLIN
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 13.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 25/25 0
2 381/382 0
3 152/152 0
USE 2 x 6
Critcal Shear = 220 LB @4.5' 1.5xV/(F'v x A)= 0.18
F'v = 225, A = 8.25
Critcal Moment = -306 LB-FT @4.5' M/(F'b x S)= 0.29
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.101 INCH @ 9.5 L/240 = 0.45"
Critical Deflection for LL = -0.065 INCH @ 9.5 L/360 = 0.3"
1 2 3
Moment
Shear
Deflection
4.5'9'
BEAM : R2 - R.R. 2X10#2 @ 16" O.C.
Loads(Downward+)
Rafter Vaulted: (13+20)(1.3) = (DL=17.4PLF; LLr=26.7PLF) form 0 to 13.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 297/297 0
2 297/297 0
USE 2 x 10
Critcal Shear = 297 LB @0' 1.5xV/(F'v x A)= 0.14
F'v = 225, A = 13.88
Critcal Moment = 1003 LB-FT @6.75' M/(F'b x S)= 0.39
F'b = 1423, S = 21.39
Critical Deflection for TL = -0.208 INCH @ 6.75 L/240 = 0.675"
Critical Deflection for LL = -0.126 INCH @ 6.75 L/360 = 0.45"
1 2
Moment
Shear
Deflection
13.5'
Page 36 of 57
1834 W Third St &
#2,33/21/2025
P=200#
ZM
Plate use: 4 1/2" x 4 1/2" x 3/8" Stl. Plate. W/ (4)-3/8" x 6" Long Lag Screws.
Lag Screws Effective Thread Length for
3/8" Dia - 6" Long lag screw:
T-E = 3-9/32"(Table L2 - NDS 2018)
Moment at guard rail base:
M = PxH
= 200 x 42 = 8400 lbs-in
Withdrawal Load at each Lag screw:
Z = (M/D)/N = (8400/2.25)/4 = 933.3#
Lag Screws Withdrawal Value :
W = 1800xG^(3
2)xD^(3
4)x(T-E)(12.2-1 - NDS 2018)
= 1800x0.5^(3
2)x3/8^(3
4)x(3 9
32") = 1000.7#
=> Z < W : OK.
GUARDRAIL CALCULATION
Page 37 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.23.05.01 DONG ENGINEERING INC (c) ENERCALC INC 1983-2023
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
CODE REFERENCES
Calculations per ACI 318-19, IBC 2021, ASCE 7-16
Load Combinations Used : ASCE 7-16
Material Properties
4.0
7.50
145.0
Elastic Modulus 3,122.0 ksi
Soil Subgrade Modulus =250.0 psi / (inch deflection)
11.0Lt Wt FactorO =
=60.0
29,000.0
40.0
29,000.0
3
Beam is supported on an elastic foundation,
2
=0.90
0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c *474.342
pcf
E - Main Rebar ksi
psi
=
Fy - Stirrups ksi
==
=
E - Stirrups ksi
E 0.850
==
=
Shear :
Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
\
#
I
Load Combination :ASCE 7-16
.Cross Section & Reinforcing Details
Rectangular Section, Width = 15.0 in, Height = 24.0 in
Span #1 Reinforcing....
2-#4 at 3.0 in from Top, from 0.0 to 10.0 ft in this span 2-#4 at 3.0 in from Bottom, from 0.0 to 10.0 ft in this span
.Service loads entered. Load Factors will be applied for calculations.Applied Loads
Load for Span Number 1
Moment : W = 6.20 k-ft, Location = 5.0 ft from left end of this span
.Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio =0.073 : 1
Load Combination W Only
Span # where maximum occurs Span # 1
Maximum Soil Pressure =0.294 ksf at 10.00 ft LdComb: W Only
Allowable Soil Pressure =OK2.90 ksf
Location of maximum on span 4.941 ft
Mn * Phi : Allowable 41.506 k-ft
Typical SectionSection used for this span
Mu : Applied -3.045 k-ft
Maximum Deflection
Max Downward L+Lr+S Deflection 0.000 in
Max Upward L+Lr+S Deflection 0.000 in
Max Downward Total Deflection 0.008 in
Max Upward Total Deflection -0.008 in
.
Bar Layout DescriptionCross Section
Moment of Inertia ( in^4 )
Btm Tension Top Tension I gross Icr - Top TensionIcr - Btm Tension
Phi*Mn ( k-ft )
Cross Section Strength & Inertia
Section 1 2- #4 @ d=3",2- #4 @ d=21",41.51 41.51 17,280.00 1,338.84 1,338.84
.Shear Stirrup Requirements
Entire Beam Span Length : Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in
.Maximum Forces & Stresses for Load Combinations
Page 38 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.23.05.01 DONG ENGINEERING INC (c) ENERCALC INC 1983-2023
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination
Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum Bending Envelope
Span # 1 1 5.059 3.04 41.51 0.07
Span # 1 1 5.059
+0.50W
Span # 1 1 5.059 1.52 41.51 0.04
W Only
Span # 1 1 5.059 3.04 41.51 0.07
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections - Unfactored Loads
Span 1Span 1 1 0.0082 10.000 -0.0082 0.000
Location in SpanMax. Downward Defl Location in SpanLoad Combination Span Max. Upward Defl
Maximum Deflections for Load Combinations - Unfactored Loads
1 0.0000 0.000 0.0000 0.000
+0.60W 1 0.0049 10.000 -0.0049 0.000
+0.450W 1 0.0037 10.000 -0.0037 0.000
W Only 1 0.0082 10.000 -0.0082 0.000
.
.Detailed Shear Information
Load Combination
Vu (k)Span Distance 'd'Comment Phi*Vs
Req'd
d*Vu/MuMu
(ft)(k)(in)Actual Suggest(k-ft)Number (k)
Spacing (in)
Design
Phi*Vc
W Only 1 0.00 21.00 -0.02 0.02 0.00 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.12 21.00 -0.06 0.06 0.00 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.24 21.00 -0.11 0.11 0.01 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00Page 39 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.23.05.01 DONG ENGINEERING INC (c) ENERCALC INC 1983-2023
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
Detailed Shear Information
Load Combination
Vu (k)Span Distance 'd'Comment Phi*Vs
Req'd
d*Vu/MuMu
(ft)(k)(in)Actual Suggest(k-ft)Number (k)
Spacing (in)
Design
Phi*Vc
W Only 1 0.35 21.00 -0.15 0.15 0.02 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.47 21.00 -0.18 0.18 0.04 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.59 21.00 -0.22 0.22 0.06 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.71 21.00 -0.26 0.26 0.09 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.82 21.00 -0.30 0.30 0.12 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.94 21.00 -0.33 0.33 0.15 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.06 21.00 -0.37 0.37 0.19 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.18 21.00 -0.40 0.40 0.24 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.29 21.00 -0.43 0.43 0.28 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.41 21.00 -0.46 0.46 0.33 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.53 21.00 -0.49 0.49 0.39 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.65 21.00 -0.52 0.52 0.45 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.76 21.00 -0.55 0.55 0.51 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.88 21.00 -0.58 0.58 0.57 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.00 21.00 -0.61 0.61 0.64 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.12 21.00 -0.63 0.63 0.71 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.24 21.00 -0.66 0.66 0.79 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.35 21.00 -0.68 0.68 0.86 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.47 21.00 -0.70 0.70 0.94 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.59 21.00 -0.72 0.72 1.03 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.71 21.00 -0.74 0.74 1.11 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.82 21.00 -0.76 0.76 1.20 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.94 21.00 -0.78 0.78 1.29 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.06 21.00 -0.80 0.80 1.38 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.18 21.00 -0.81 0.81 1.47 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.29 21.00 -0.83 0.83 1.57 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.41 21.00 -0.84 0.84 1.67 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.53 21.00 -0.86 0.86 1.77 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.65 21.00 -0.87 0.87 1.87 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.76 21.00 -0.88 0.88 1.97 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.88 21.00 -0.89 0.89 2.07 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.00 21.00 -0.90 0.90 2.18 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.12 21.00 -0.91 0.91 2.28 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.24 21.00 -0.92 0.92 2.39 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.35 21.00 -0.92 0.92 2.50 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.47 21.00 -0.93 0.93 2.61 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.59 21.00 -0.93 0.93 2.72 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.71 21.00 -0.93 0.93 2.83 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.82 21.00 -0.93 0.93 2.94 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.94 21.00 -0.94 0.94 3.04 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.06 21.00 -0.93 0.93 3.04 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.18 21.00 -0.93 0.93 2.94 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.29 21.00 -0.93 0.93 2.83 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.41 21.00 -0.93 0.93 2.72 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.53 21.00 -0.92 0.92 2.61 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.65 21.00 -0.92 0.92 2.50 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.76 21.00 -0.91 0.91 2.39 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.88 21.00 -0.90 0.90 2.28 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 6.00 21.00 -0.89 0.89 2.18 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 6.12 21.00 -0.88 0.88 2.07 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 6.24 21.00 -0.87 0.87 1.97 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 6.35 21.00 -0.86 0.86 1.87 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 6.47 21.00 -0.84 0.84 1.77 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 6.59 21.00 -0.83 0.83 1.67 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 6.71 21.00 -0.81 0.81 1.57 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 6.82 21.00 -0.80 0.80 1.47 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 6.94 21.00 -0.78 0.78 1.38 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 7.06 21.00 -0.76 0.76 1.29 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 7.18 21.00 -0.74 0.74 1.20 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 7.29 21.00 -0.72 0.72 1.11 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 7.41 21.00 -0.70 0.70 1.03 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 7.53 21.00 -0.68 0.68 0.94 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 7.65 21.00 -0.66 0.66 0.86 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 7.76 21.00 -0.63 0.63 0.79 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 7.88 21.00 -0.61 0.61 0.71 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 8.00 21.00 -0.58 0.58 0.64 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 8.12 21.00 -0.55 0.55 0.57 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 8.24 21.00 -0.52 0.52 0.51 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
Page 40 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.23.05.01 DONG ENGINEERING INC (c) ENERCALC INC 1983-2023
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
Detailed Shear Information
Load Combination
Vu (k)Span Distance 'd'Comment Phi*Vs
Req'd
d*Vu/MuMu
(ft)(k)(in)Actual Suggest(k-ft)Number (k)
Spacing (in)
Design
Phi*Vc
W Only 1 8.35 21.00 -0.49 0.49 0.45 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 8.47 21.00 -0.46 0.46 0.39 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 8.59 21.00 -0.43 0.43 0.33 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 8.71 21.00 -0.40 0.40 0.28 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 8.82 21.00 -0.37 0.37 0.24 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 8.94 21.00 -0.33 0.33 0.19 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 9.06 21.00 -0.30 0.30 0.15 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 9.18 21.00 -0.26 0.26 0.12 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 9.29 21.00 -0.22 0.22 0.09 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 9.41 21.00 -0.18 0.18 0.06 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 9.53 21.00 -0.15 0.15 0.04 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 9.65 21.00 -0.11 0.11 0.02 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 9.76 21.00 -0.06 0.06 0.01 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 9.88 21.00 -0.02 0.02 0.00 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
Page 41 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
(allowable)
P(allowable) = 14,500 #
FOUNDATION - 2-STORY
45𝑜
Page 42 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
2' - 0"Square x 24" Deep Concrete Pad With
3-#4 Each way
BEAM NO. BM#9+11 Support 1 P =13,856 #
Use 2' - 6"Square x 24" Deep Concrete Pad With
3-#5 Each way
PAD SCHEDULE
Page 43 of 57
1834 W Third St &
#2,33/21/2025
1Y
1X
1
2
A B
AD
U
R
O
O
F
S
H
E
A
R
W
A
L
L
L
A
Y
O
U
T
Page 44 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
SECTION: 1X
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
ROOF 113.4 PLF SEISMIC GOVERN
Page 45 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
SECTION: 1Y
Number of Story: 1 Section width: 45(ft)Section length: 19(ft)
Base height: 0.5(ft)Slope roof height: 13.5(ft)Gable mean roof height: 11.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 45(ft), L = 19(ft), H = 12(ft)-->L/B = 0.42, H/L = 0.63
Wall coefficient: Cpw = 0.8, Cpl = -0.5, Roof coefficient: Cpw = (0.16;-0.32), Cpl = -0.6
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 64.26 = 64.26 PLF
Redistrib: 510*9 = 4590 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 91.8 x 45 / (2 x 19) = 108.71 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 91.8 x 45^2 / (8 x 19) = 1222.99 LBS
Splice w/ min. (7) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (15, 0.85, 22.35, 24.7)
ROOF
Roof = 15*19 = 285 PLF
Wall = 15*2*4.5 + 10*2*4.5 = 225 PLF
Shear = 0.126(285+225) = 0.126*510 = 64.26 PLF
Plate height: ROOF = 9(ft)
SHEAR ROOF = 64.26*510*9/4590 = 64.26 PLF
SHEAR ROOF = 0.6*W = 105.49(plf)
ROOF 105.49 PLF WIND GOVERN
Page 46 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
9
"
|
4
*
d
*
1
.
4
=
1
.
6
4
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
5.
2
5
3.
7
5
3.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
1
Co
m
.
(
k
i
p
s
)
2.
9
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
1
Co
m
.
(
k
i
p
s
)
2.
9
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
6.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
1
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
3
7
4
l
b
s
|
S
e
i
s
m
i
c
:
1
8
8
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
1
9
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
7
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
2
3
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
8
0
p
l
f
(
W
i
n
d
)
/
3
0
1
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
/
1
.
2
)
+
P
2
(
1
/
1
.
2
)
=
2
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
4
/
1
.
7
)
+
P
2
(
1
.
4
/
1
.
7
)
=
2
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
72
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 47 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
3
"
|
4
*
d
*
1
.
4
=
0
.
7
2
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
8.
5
0
8.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
5
Co
m
.
(
k
i
p
s
)
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
5
Co
m
.
(
k
i
p
s
)
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
2.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
2
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
3
7
4
l
b
s
|
S
e
i
s
m
i
c
:
1
8
8
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
1
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
2
7
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
9
7
p
l
f
(
W
i
n
d
)
/
2
3
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
2
.
6
/
2
.
6
)
=
2
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
3
.
6
/
3
.
6
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
13
6
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 48 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
"
|
4
*
d
*
1
.
4
=
0
.
5
3
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
9.
7
5
8.
0
0
5.
2
5
7.
2
5
4.
0
0
4.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
2.
2
5
2.
2
5
2.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
A
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
8
2
0
l
b
s
|
S
e
i
s
m
i
c
:
1
4
0
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
5
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
0
3
p
l
f
(
W
i
n
d
)
/
1
7
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
33
2
-93
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 49 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
"
|
4
*
d
*
1
.
4
=
0
.
5
3
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
5.
5
0
8.
0
0
6.
2
5
6.
2
5
3.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
6.
2
5
6.
5
0
3.
2
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
B
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
8
2
0
l
b
s
|
S
e
i
s
m
i
c
:
1
4
0
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
5
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
0
3
p
l
f
(
W
i
n
d
)
/
1
7
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
18
7
-10
8
0
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 50 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Shear Wall (X-X Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
A 1 1X 19 86 113 9 8 175 A
B 1 1X 19 86 113 9 8 175 A
SUMMARY SHEAR WALL
V2 = Seismic*Span/2 + Added Vseismic
Line shear V = Maximum(V1;V2)
V1 = Wind*Span/2 + Added Vwind
v(plf) = V/L
Page 51 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Shear Wall (Y-Y Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
1 1 1Y 45 105 64 9 6.25 380 B
2 1 1Y 45 105 64 9 8 297 B
v(plf) = V/L
Line shear V = Maximum(V1;V2)
SUMMARY SHEAR WALL
V1 = Wind*Span/2 + Added Vwind
V2 = Seismic*Span/2 + Added Vseismic
Page 52 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic
(#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb)
1 :Wind = 2374(lb), Seismic = 1880(lb)
1 1Y 1 105.5 64.3 45 2374 1446 l---------------45.0(ft)---------------l
2 :Wind = 2374(lb), Seismic = 1880(lb)
2 1Y 1 105.5 64.3 45 2374 1446 l---------------45.0(ft)---------------l
A :Wind = 820(lb), Seismic = 1400(lb)
A 1X 1 86.3 113.4 19 820 1077 l---------------19.0(ft)---------------l
B :Wind = 820(lb), Seismic = 1400(lb)
B 1X 1 86.3 113.4 19 820 1077 l---------------19.0(ft)---------------l
#N/A #N/A
#N/A #N/A
#N/A #N/A
Description
V_(lb)=v_(plf)*Span*Span/2/(Span+Offset)
LATERAL
p Factor: X Direction: p=1.3; Y Direction: p=1.3
Page 53 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : 1 - DROP AT ENTRANCE
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 9.75 ft
Roof Primary: (15+20)(4.8) = (DL=71.2PLF; LLr=95PLF) form 0 to 9.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 841/841 0
2 841/841 0
USE 4 x 8
Critcal Shear = 840 LB @0' 1.5xV/(F'v x A)= 0.22
F'v = 225, A = 25.38
Critcal Moment = 2047 LB-FT @4.75' M/(F'b x S)= 0.55
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.197 INCH @ 5 L/240 = 0.488"
Critical Deflection for LL = -0.109 INCH @ 5 L/360 = 0.325"
1 2
Moment
Shear
Deflection
9.75'
BEAM : 2 - HDR AT BED
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 6 ft
Roof Primary: (15+20)(11.5) = (DL=172.5PLF; LLr=230PLF) form 0 to 6
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 6
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1316/1316 0
2 1316/1316 0
USE 4 x 8
Critcal Shear = 1316 LB @0' 1.5xV/(F'v x A)= 0.34
F'v = 225, A = 25.38
Critcal Moment = 1974 LB-FT @3' M/(F'b x S)= 0.53
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.072 INCH @ 3 L/240 = 0.3"
Critical Deflection for LL = -0.038 INCH @ 3 L/360 = 0.2"
1 2
Moment
Shear
Deflection
6'
Page 54 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : C1 - C.J. 2X6#2 @ 16" O.C. TYP. (MAX L=15'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 140/140 0
2 140/140 0
USE 2 x 6
Critcal Shear = 140 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 8.25
Critcal Moment = 525 LB-FT @7.5' M/(F'b x S)= 0.49
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.64 INCH @ 7.5 L/240 = 0.75"
Critical Deflection for LL = -0.457 INCH @ 7.5 L/360 = 0.5"
1 2
Moment
Shear
Deflection
15'
BEAM : C2 - C.J. 2X8#2 @ 16" O.C. TYP. (MAX L=20'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 20
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 187/187 0
2 187/187 0
USE 2 x 8
Critcal Shear = 186 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 10.88
Critcal Moment = 934 LB-FT @10' M/(F'b x S)= 0.55
F'b = 1552, S = 13.14
Critical Deflection for TL = -0.883 INCH @ 10 L/240 = 1"
Critical Deflection for LL = -0.631 INCH @ 10 L/360 = 0.667"
1 2
Moment
Shear
Deflection
20'
Page 55 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : R1 - R.R. 2X6#2 @ 16" O.C. TYP. (MAX L=12'-0")
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 248/248 0
2 248/248 0
USE 2 x 6
Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2
F'v = 225, A = 8.25
Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
Page 56 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
2900 psf
Trib Trib Wall Height
DL(psf)LL(psf)roof(ft)DL(psf)LL(psf)floor(ft)DL(psf)wall(ft)
15 20 11.5 15 9
Roof:(DL+LL)(Trib) =402.5 plf
Floor:(DL+LL)(Trib) =0 plf
Wall:DL (Height)=135 plf
537.5 plf
537.5 /(12"/12)=537.5 psf< 2900 psf
P(allowable)
P(allowable) = 8,700 #
18 in
FOUNDATION - 1-STORY
Allowable soil bearing value:
Roof Floor
use 12" wide cont. ftg w/ 2-#4 top & bott.
45𝑜
Page 57 of 57
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 1 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
GENERAL INFORMATION
01 Project Name 240051
02 Run Title Title 24 Analysis
03 Project Location 1834 W.3RD ST,
04 City SANTA ANA 05 Standards Version 2022
06 Zip code 92703 07 Software Version EnergyPro 9.2
08 Climate Zone 8 09 Front Orientation (deg/ Cardinal)0
10 Building Type Single family 11 Number of Dwelling Units 1
12 Project Scope Newly Constructed 13 Number of Bedrooms 5
14 Addition Cond. Floor Area (ft2)0 15 Number of Stories 2
16 Existing Cond. Floor Area (ft2)n/a 17 Fenestration Average U-factor 0.3
18 Total Cond. Floor Area (ft2)2497 19 Glazing Percentage (%)16.66%
20 ADU Bedroom Count n/a 21 ADU Conditioned Floor Area n/a
22 Fuel Type All electric 23 No Dwelling Unit:No
COMPLIANCE RESULTS
01 Building Complies with Computer Performance
02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03 This building incorporates one or more Special Features shown below
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 2 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
ENERGY DESIGN RATINGS
Energy Design Ratings Compliance Margins
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Standard Design 32.3 37.8 24.2
Proposed Design 29.3 37.8 24.1 3 0 0.1
RESULT3: PASS
1Efficiency EDR includes improvements like a better building envelope and more efficient equipment
2Total EDR includes efficiency and demand response measures such as photovoltaic (PV) system and batteries
3Building complies when source energy, efficiency and total compliance margins are greater than or equal to zero and unmet load hour limits are not exceeded
•Standard Design PV Capacity: 3.56 kWdc
•PV System resized to 3.56 kWdc (a factor of 3.563) to achieve 'Standard Design PV' PV scaling
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 3 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
ENERGY USE SUMMARY
Energy Use Standard Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Standard Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Proposed Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Proposed Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Compliance
Margin (EDR1)
Compliance
Margin (EDR2)
Space Heating 1.12 5.05 0.59 4.22 0.53 0.83
Space Cooling 0.67 18.98 0.7 21.45 -0.03 -2.47
IAQ Ventilation 0.36 3.82 0.36 3.82 0 0
Water Heating 1.28 13 1.11 11.29 0.17 1.71
Self
Utilization/Flexibility
Credit
0 0
Efficiency Compliance
Total 3.43 40.85 2.76 40.78 0.67 0.07
Photovoltaics -1.56 -46.86 -1.56 -46.87
Battery 0 0
Flexibility
Indoor Lighting 0.72 6.73 0.72 6.73
Appl. & Cooking 1.61 13.89 1.59 13.74
Plug Loads 2.94 29.93 2.94 29.93
Outdoor Lighting 0.18 1.61 0.18 1.61
TOTAL COMPLIANCE 7.32 46.15 6.63 45.92
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 4 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
ENERGY USE INTENSITY
Standard Design (kBtu/ft2 - yr )Proposed Design (kBtu/ft2 - yr )Compliance Margin (kBtu/ft2 - yr )Margin Percentage
Gross EUI1 11.37 10.46 0.91 8
Net EUI2 3.42 2.51 0.91 26.61
Notes
1. Gross EUI is Energy Use Total (not including PV) / Total Building Area.
2. Net EUI is Energy Use Total (including PV) / Total Building Area.
REQUIRED PV SYSTEMS
01 02 03 04 05 06 07 08 09 10 11 12
DC System Size
(kWdc)Exception Module Type Array Type Power Electronics CFI Azimuth
(deg)
Tilt
Input
Array Angle
(deg)
Tilt: (x in
12)
Inverter Eff.
(%)
Annual
Solar Access
(%)
3.56 NA Standard (14-17%)Fixed none true 150-270 n/a n/a <=7:12 96 98
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
•Insulation below roof deck
•Variable capacity heat pump compliance option (verification details from VCHP Staff report, Appendix B, and RA3)
•Northwest Energy Efficiency Alliance (NEEA) rated heat pump water heater; specific brand/model, or equivalent, must be installed
HERS FEATURE SUMMARY
The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional
detail is provided in the building tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry
•Quality insulation installation (QII)
•Indoor air quality ventilation
•Verified Refrigerant Charge
•Airflow in habitable rooms (SC3.1.4.1.7)
•Verified heat pump rated heating capacity
•Wall-mounted thermostat in zones greater than 150 ft2 (SC3.4.5)
•Ductless indoor units located entirely in conditioned space (SC3.1.4.1.8)
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 5 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
BUILDING - FEATURES INFORMATION
01 02 03 04 05 06 07
Project Name Conditioned Floor Area (ft2)Number of Dwelling
Units Number of Bedrooms Number of Zones Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
240051 2497 1 5 3 0 2
ZONE INFORMATION
01 02 03 04 05 06 07
Zone Name Zone Type HVAC System Name Zone Floor Area (ft2)Avg. Ceiling Height Water Heating System 1 Status
1st Floor Conditioned HVAC1 1013 9 DHW Sys 1 New
2nd Floor Conditioned HVAC1 1000 9 DHW Sys 1 New
JADU Conditioned JADU HVAC2 484 9 DHW Sys 3 New
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Front wall 1st Floor R-15 Wall.0 Front 172 56 90
Left wall 1st Floor R-15 Wall.90 Left 132 30 90
Right wall 1st Floor R-15 Wall.270 Right 319.5 59 90
Front wall 2 2nd Floor R-15 Wall.0 Front 297 56 90
Left wall 2 2nd Floor R-15 Wall.90 Left 351 35 90
Rear wall 2nd Floor R-15 Wall.180 Back 297 45 90
Right wall 2 2nd Floor R-15 Wall.270 Right 351 81 90
Left wall 3 JADU R-15 Wall.90 Left 97 25 90
Rear wall 2 JADU R-15 Wall.180 Back 360 63 90
Right wall 3 JADU R-15 Wall.270 Right 121.5 41 90
Roof 1st Floor R-30 + R-13 Roof Attic n/a n/a 466 n/a n/a
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 6 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Roof 2 2nd Floor R-30 + R-13 Roof Attic n/a n/a 1000 n/a n/a
Roof 3 JADU R-30 + R-13 Roof Attic n/a n/a 204 n/a n/a
Roof 4 __Garage__R-0 Roof Attic n/a n/a 27 n/a n/a
Floor under 2nd 2nd Floor R-19 Floor No Crawlspace n/a n/a 547 n/a n/a
Floor over garage 2nd Floor R-19 Floor No Crawlspace n/a n/a 173 n/a n/a
Floor over jadu 2nd Floor R-19 Floor No Crawlspace n/a n/a 280 n/a n/a
Front wall 3 __Garage__R-0 Wall 0 Front 188 112 90
Left wall 4 __Garage__R-0 Wall 90 Left 180 17.5 90
Right wall 4 __Garage__R-0 Wall 270 Right 35 0 90
OPAQUE SURFACES - CATHEDRAL CEILINGS
01 02 03 04 05 06 07 08 09 10 11
Name Zone Construction Azimuth Orientation Area (ft2)
Skylight Area
(ft2)
Roof Rise (x in
12)
Roof
Reflectance Roof Emittance Cool Roof
Roof deck __Garage__R-0 Roof No
Attic 0 Front 217 0 0 0.1 0.85 No
ATTIC
01 02 03 04 05 06 07 08
Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof
Attic __Garage__Attic Garage Roof Cons Ventilated 4 0.1 0.85 No No
Attic 1st Floor Attic Roof1st Floor Ventilated 4 0.1 0.85 No No
Attic 2nd Floor Attic Roof2nd Floor Ventilated 4 0.1 0.85 No No
Attic JADU Attic RoofJADU Ventilated 4 0.1 0.85 No No
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 7 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W3 Window Front wall Front 0 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W9 Window Front wall Front 0 1 10 0.3 NFRC 0.23 NFRC Bug Screen
W1 Window Left wall Left 90 1 30 0.3 NFRC 0.23 NFRC Bug Screen
W2 Window Right wall Right 270 1 17 0.3 NFRC 0.23 NFRC Bug Screen
D3 Window Right wall Right 270 1 42 0.3 NFRC 0.23 NFRC Bug Screen
W11 Window Front wall 2 Front 0 1 12 0.3 NFRC 0.23 NFRC Bug Screen
W3 2 Window Front wall 2 Front 0 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W3 3 Window Left wall 2 Left 90 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W5 Window Left wall 2 Left 90 1 10 0.3 NFRC 0.23 NFRC Bug Screen
W4 Window Rear wall Back 180 1 10 0.3 NFRC 0.23 NFRC Bug Screen
D12 Window Rear wall Back 180 1 35 0.3 NFRC 0.23 NFRC Bug Screen
D12 2 Window Right wall 2 Right 270 1 35 0.3 NFRC 0.23 NFRC Bug Screen
W6 Window Right wall 2 Right 270 1 14 0.3 NFRC 0.23 NFRC Bug Screen
W10 Window Right wall 2 Right 270 1 32 0.3 NFRC 0.23 NFRC Bug Screen
W3 4 Window Left wall 3 Left 90 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W4 2 Window Rear wall 2 Back 180 1 10 0.3 NFRC 0.23 NFRC Bug Screen
W7 Window Rear wall 2 Back 180 1 3 0.3 NFRC 0.23 NFRC Bug Screen
W3 5 Window Rear wall 2 Back 180 1 25 0.3 NFRC 0.23 NFRC Bug Screen
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 8 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W3 6 Window Rear wall 2 Back 180 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W8 Window Right wall 3 Right 270 1 6 0.3 NFRC 0.23 NFRC Bug Screen
OPAQUE DOORS
01 02 03 04
Name Side of Building Area (ft2)U-factor
D2 Front wall 21 0.5
D9 Front wall 2 19 0.5
D2 2 Right wall 3 21 0.5
D 2070 Right wall 3 14 0.5
D1 Front wall 3 112 0.7
D4 Left wall 4 17.5 0.5
SLAB FLOORS
01 02 03 04 05 06 07 08
Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value
and Depth
Edge Insul. R-value
and Depth Carpeted Fraction Heated
Slab-on-Grade 1st Floor 1013 156 none 0 80%No
Slab-on-Grade 2 JADU 484 107 none 0 80%No
Slab-on-Grade 3 __Garage__417 86 none 0 0%No
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 9 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
R-0 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-0 None / None 0.361
Inside Finish: Gypsum Board
Cavity / Frame: no insul. / 2x4
Exterior Finish: 3 Coat Stucco
R-15 Wall.Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-15 None / None 0.095
Inside Finish: Gypsum Board
Cavity / Frame: R-15 / 2x4
Exterior Finish: 3 Coat Stucco
R-0 Roof No Attic Cathedral Ceilings Wood Framed
Ceiling 2x4 @ 16 in. O. C.R-0 None / None 0.484
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: no insul. / 2x4
Inside Finish: Gypsum Board
Attic Garage Roof Cons Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-0 None / 0 0.644
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: no insul. / 2x4
Attic Roof1st Floor Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
Attic Roof2nd Floor Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 10 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
Attic RoofJADU Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
R-0 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-0 None / None 0.481 Cavity / Frame: no insul. / 2x4
Inside Finish: Gypsum Board
R-30 + R-13 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 16 in. O. C.R-30 None / None 0.032
Over Ceiling Joists: R-20.9 insul.
Cavity / Frame: R-9.1 / 2x4
Inside Finish: Gypsum Board
R-19 Floor No
Crawlspace Interior Floors Wood Framed Floor 2x10 @ 16 in. O. C.R-19 None / None 0.045
Floor Surface: Carpeted
Floor Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-19 / 2x10
Ceiling Below Finish: Gypsum Board
BUILDING ENVELOPE - HERS VERIFICATION
01 02 03 04 05
Quality Insulation Installation (QII)High R-value Spray Foam Insulation Building Envelope Air Leakage CFM50 CFM50
Required Not Required N/A n/a n/a
WATER HEATING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Distribution Type Water Heater Name Number of Units Solar Heating
System
Compact
Distribution HERS Verification Water Heater
Name (#)
DHW Sys 1 Domestic Hot
Water (DHW)Standard DHW Heater 1 1 n/a None n/a DHW Heater 1 (1)
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 11 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
WATER HEATING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Distribution Type Water Heater Name Number of Units Solar Heating
System
Compact
Distribution HERS Verification Water Heater
Name (#)
DHW Sys 3 Domestic Hot
Water (DHW)Standard DHW Heater 3 1 n/a None n/a DHW Heater 3 (1)
WATER HEATERS - NEEA HEAT PUMP
01 02 03 04 05 06 07 08
Name # of Units Tank Vol. (gal)NEEA Heat Pump
Brand
NEEA Heat Pump
Model Tank Location Duct Inlet Air Source Duct Outlet Air Source
DHW Heater 1 1 40 Rheem Rheem HPLD40-1RH TankZone __Garage____Garage__
DHW Heater 3 1 40 Rheem Rheem HPLD40-1RH TankZone __Garage____Garage__
WATER HEATING - HERS VERIFICATION
01 02 03 04 05 06 07
Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution
Type Recirculation Control Shower Drain Water Heat
Recovery
DHW Sys 1 - 1/1 Not Required Not Required Not Required None Not Required Not Required
DHW Sys 3 - 1/1 Not Required Not Required Not Required None Not Required Not Required
SPACE CONDITIONING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Heating Unit Name Heating Equipment
Count Cooling Unit Name Cooling Equipment
Count Fan Name Distribution Name Required
Thermostat Type
HVAC1 Heat pump
heating cooling
Heat Pump System
1 1 Heat Pump System
1 1 n/a n/a Setback
JADU HVAC2 Heat pump
heating cooling
Heat Pump System
2 1 Heat Pump System
2 1 n/a n/a Setback
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 12 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
HVAC - HEAT PUMPS
01 02 03 04 05 06 07 08 09 10 11 12 13
Name System Type Number of
Units
Heating Cooling
Zonally
Controlled
Compressor
Type HERS VerificationHeating
Efficiency
Type
HSPF/HS
PF2/COP Cap 47 Cap 17
Cooling
Efficiency
Type
SEER/SE
ER2
EER/EER
2/CEER
Heat Pump
System 1 VCHP-ductless 1 HSPF 8 17000 13500 EERSEER 14 12 Not Zonal Single
Speed
Heat Pump System
1-hers-htpump
Heat Pump
System 2 VCHP-ductless 1 HSPF 8 17000 13500 EERSEER 14 12 Not Zonal Single
Speed
Heat Pump System
2-hers-htpump
HVAC HEAT PUMPS - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Verified Airflow Airflow Target Verified EER/EER2 Verified
SEER/SEER2
Verified Refrigerant
Charge
Verified
HSPF/HSPF2
Verified Heating
Cap 47
Verified Heating
Cap 17
Heat Pump System
1-hers-htpump Not Required 0 Not Required Not Required Yes No Yes Yes
Heat Pump System
2-hers-htpump Not Required 0 Not Required Not Required Yes No Yes Yes
VARIABLE CAPACITY HEAT PUMP COMPLIANCE OPTION - HERS VERIFICATION
01 02 03 04 05 06 07 08 09 10
Name
Certified
Low-Static
VCHP System
Airflow to
Habitable
Rooms
Ductless Units
in Conditioned
Space
Wall Mount
Thermostat
Air Filter Sizing
& Pressure
Drop Rating
Low Leakage
Ducts in
Conditioned
Space
Minimum
Airflow per
RA3.3 and
SC3.3.3.4.1
Certified
non-continuous
Fan
Indoor Fan not
Running
Continuously
Heat Pump System 1 Not required Required Required Required Not required Not required Not required Not required Not required
Heat Pump System 2 Not required Required Required Required Not required Not required Not required Not required Not required
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 13 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
INDOOR AIR QUALITY (IAQ) FANS
01 02 03 04 05 06 07 08 09
Dwelling Unit Airflow (CFM)Fan Efficacy
(W/CFM)IAQ Fan Type
Includes
Heat/Energy
Recovery?
IAQ Recovery
Effectiveness -
SRE/ASRE
Includes Fault
Indicator Display?HERS Verification Status
SFam IAQVentRpt 117 0.35 Exhaust No n/a / n/a No Yes
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 14 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:Documentation Author Signature:
Company:Signature Date:
Address:CEA/ HERS Certification Identification (If applicable):
City/State/Zip:Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets,
calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name:Responsible Designer Signature:
Company:Date Signed:
Address:License:
City/State/Zip:Phone:
1834 W Third St &
#2,33/21/2025
SANTA ANA CITY COUNCIL
Mayor
vamezcua@santa-ana.org
Mayor Pro Tem, Ward 1
tphan@santa-ana.org
Ward 2
bvazquez@santa-ana.org
Ward 3
jessielopez@santa-ana.org
Ward 4
pbacerra@santa-ana.org
Ward 5
jryanhernandez@santa-ana.org
Ward 6
dpenaloza@santa-ana.org
MAYOR
Valerie Amezcua
MAYOR PRO TEM
Thai Viet Phan
COUNCILMEMBERS
Phil Bacerra
Johnathan Ryan Hernandez
Jessie Lopez
David Penaloza
Benjamin Vazquez
CITY OF SANTA ANA
PLANNING AND BUILDING AGENCY
20 Civic Center Plaza ● P.O. Box 1988
Santa Ana, California 92702
www.santa-ana.org
CITY MANAGER
Alvaro Nuñez
CITY ATTORNEY
Sonia R. Carvalho
CITY CLERK
Jennifer L. Hall
August 9, 2024
Also sent via email to: andytm310@gmail.com
Andy Mai
1834 West Third Street
Santa Ana, CA 92703
Subject: Address Assignment for a Single-Family Dwelling, Junior Accessory Dwelling Unit,
and Accessory Dwelling Unit located at 1834 West Third Street (APN: 007-163-
18) in Santa Ana, CA
Dear Andy,
The City of Santa Ana Planning and Building Agency (PBA) is the responsible agency for legal
addressing within the City of Santa Ana’s jurisdiction. This letter confirms the address assignment
for a new single-family dwelling, JADU and ADU located at 1834 West Third Street (APN: 007-
163-18. Notice is hereby given that the following assigned addresses shall be posted onsite per
the approved address plan, attached hereto as Exhibit A.
Addresses to be Activated/Posted
1834
2. 1834 W est Third Street, Unit 2 (Address for New JADU)
1834
To subdivide commercial and/or residential units into multiple units, a building permit (and all other
associated permits), plans, and inspection approvals by the PBA are required. Addresses will be
verified during inspections by the Building Safety Division.
Please update your records accordingly. Should you have any questions, feel free to contact me
by phone at (714) 664-2753 or by email at PRaj@santa-ana.org.
Sincerely,
Punkaj Raj
Planning Technician
1834 W Third St &
#2,33/21/2025
Address Letter for 1834 West Third Street
Page 2 of 2
Exhibit A – Address Plan
c:
Vencent Quaglia, United States Post Office
Chris Tuiolosega, United States Post Office
Cipriano Corona, Marketing Manager, United States Post Office
Alex Alvarez, Postmaster Santa Ana, United States Post Office
Federal Express, Administration
Cathy Joseph, Garden Grove Unified School District
Christine Hy, Garden Grove Unified School District
Cathy Slader, Orange Unified School District
Orin Williams, Santa Ana Unified School District
Yvette Miranda, Santa Ana Unified School District
Cristina Bernal, Tustin Unified School District
Mishele Richards, Orange County Fire Authority, GEO Files Coordinator
Orange County Fire Authority
Neal Kelly, Registrar of Voters
Members, Board of Supervisors
Southern California Gas Company
Southern California Edison Company
Claude Parrish, County Assessor's Office
SAG, AT&T
UPS, Administration
City Manager’s Office
Beverly Martin, Police Community Services Specialist
Boris Duran, Police Systems Manager
Jennifer Mendoza, Police Communications Manager
Chris Hubbard, Police Systems Support Analyst
Alejandra Gutierrez, Treasury & Customer Services Manager
Hector Jimenez, Revenue Supervisor
Alfonso Chavez, Utilities Customer Services Supervisor
Judson Brown, Housing & Neighborhood Development Manager
Rudy Rosas, Principal Civil Engineer
Zdenek (Zed) Kekula, Principal Civil Engineer
Jason Kwak, Building Safety Manager
Evelyn LaRocca, Permit Supervisor
Kathy Hernandez, Permit Technician
Julie Amsden, Permit Technician
Ali Pezeshkpour, Planning Manager
Jerry Guevara, Senior Planner
Alvaro Nunez, PBA Assistant Director and Code Enforcement Manager
1834 W Third St &
#2,33/21/2025
(N) SINGLE FAMILY DWELLING
1834 W. THIRD STREET
W. THIRD STREET
N.
D
A
I
S
Y
A
V
E
N
U
E
EXHBIT A: ADDRESS LETTER
(N) JUNIOR ADU1834 W. THIRDSTREET, UNIT 2
(N) ADU
1834 W. THIRD
STREET, UNIT 3
1834 W Third St &
#2,33/21/2025
Geotechnical
Investigation
Investigation and Report
New Single Family Residence (NSFR)
New Accessory Dwelling Unit (ADU)
Jr Accessory Dwelling Unit (JrADU)
Located at:
1834 W. 3rd St.
Santa Ana CA 92703
Project No.:
24-239
Revised
October 3, 2024
July 11, 2024
Priorit En . yg1neenng Group
Priority Engineering Group
335 E. Blueridge Ave.
Orange CA 92865
949-391-8200
priorityengineeringgroup09@gmail.com
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W. 3 rd St.
Santa Ana CA 92703
LABORATORY TESTING PROGRAMS
Samples of the in-situ soils recovered from the borings were used for our visual classification of the
material and further laboratory testing to obtain data for foundation design and site preparation
recommendations.
The laboratory testing consisted of performing classification, strength (shear), determining in-situ dry
density and moisture content; and determining the moisture-density relationship of major soils.
Descriptions of test procedures are included in the Appendix of this report.
The results of the testing are the basis for the conclusions and recommendations in the report.
SUMMARY OF SOIL AND DESIGN PROPERTIES
The following subsections and sections will present our detailed conclusions and recommendations for
the development of the site.
Basic Soil Properties
Maximum Density
The Maximum Density for the grayish brown silty sand per (ASTM D1557)
Boring #1
Boring #2
116.2 pcf@
119.1 pcf@
13.0% MC
10.8%MC
For compaction control during excavation and recompaction of the on-site soils use:
Direct Shear
Boring #1
Boring #2
114.2 pcf@ Optimum moisture
108.45 pcf@Optimum moisture
The Shear values for the grayish brown silty sand per (ASTM D3080)
Bearing Value
Boring #1
Boring #2
For design purposes
Peak
260
250
2900 psf
Ultimate Angle
160 28°
140 27°
2
1834 W Third St &
#2,33/21/2025
1834 W. 3 rd St.
Santa Ana CA 92703
Soil Pressure Factors
Seismic Factors
1.2
SMs: 1.562
SM1: N/A
Sos: 1.041
Soi: N/A
Earth Pressure Factors
4>28
Maximum Dry Density =116.2 y= 104.58 pcf
Active Earth Pressure
Ka=0.3610334834
Pa=37.7568816939
Passive Earth Pressure
At Rest
Tc
Ss:
S1:
Cv:
Fv
Kp= 2.7698261953
Pp=289.6684235044
Kat=0.5305284373
Pat=55.4826639728
8
1.301
0.464
1.36
N/A
A full list of Seismic factors is in the Attachment 'G'
Soluble Sulfates
The results of the limited in-house laboratory tests indicate that the on-site soils tested contain a
water-soluble sulfate content of .16 by weight. Based on Table 19 .3 .1.1 of ACI 318-14, the Exposure
Class Sl is appropriate for onsite soils. Water cement ratio (0.50) shall be adjusted to produce a low
slump ( <3inches>) mix. Concrete specifications may be changed by the Structural Engineer.
Type V cement is not required but is recommended for use. Strength should be 4000 psi.
Expansive Soil
The soil found on this site consists of silty sand. The soil found on the site is expansive. A modified
test in the laboratory and the condition of the concrete paving and foundations on site show very low
signs of expansive reaction in the soil. Expansion Index: Very low 22
3
Fa
PGA:0.553
PGAM:0.663
FPGA:1.2
Ie 1
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W. 3 rd St.
Santa Ana CA 92703
Settlement
When constructed in accordance with the specifications in this report, total settlement is estimated to
be 0.25 inch and differential settlement over a 20 foot span less than 0.25 inch.
Drainage
According to CBC 2022, Chapter 18, 1804.4, Site Grading, the ground immediately adjacent to the
foundation shall be sloped away from the building at a slope of not less than one unit vertical in 20
units horizontal (5 percent slope) for a minimum distance of 10 feet measured perpendicular to the
face of the wall. If physical obstructions of lot lines prohibit 10 ft of horizontal distance, a 5 percent
slope shall be provided at an approved alternative method of diverting water away from the
foundation. Swales used for this purpose shall be sloped a minimum of 2 percent within 10 feet of the
building foundation. Impervious surfaces within 10 feet of the building foundation shall be sloped a
minimum of 2 percent away from the building.
Concrete Slab Construction
Footing Design
Exterior and interior footings for a single story structure should be founded 16 inches below the lowest
adjacent grade with a minimum width of 12 inches.
Two story structures shall have footings 24 inches below the lowest adjacent grade with a minimum
width of 15 inches. Reinforcement should consist of four #4 reinforcing bars placed two at the top and
two at the bottom of the footing. These reinforcing bars shall be positioned with minimum cover of 3
inches at the center of all continuous footings, properly lapped and tied.
Foundation
Over excavate all building areas three feet and three feet beyond foundation dimension, or to compe
tent insitu soils as determined by field test during excavation, whichever is deeper. Scarify exposed
subgrade 8 inches and moisturize to optimum moisture content. Compact to minimum 90% density
and replace soil in 8 inch lifts, moisturize and compact to minimum 90% of maximum density.
Paved Areas-General
Paved areas consist of concrete patios, sidewalks and driveways. There are different requirements for
the preparation of each of these areas.
Concrete patios are generally adjacent to the building itself. Proper preparation of the area for con
crete patios is extremely important. Improper compaction or preparation will permit cracks and settle
ment of the paving that are not acceptable. It is required that all areas for concrete patios be excavated
12 inches and recompacted to the proper density as described above.
5
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
PROJECT: Priority Engineering SAMPLE ID: PROJECT NO.: AL2022 DATE: TESTED BY: Eric Y. CHECKED BY: SAMPLE DISCRIPTION: Grayish Brown Silty Sand LOCATION:. 1834 W 3rd St Santa Ana Ca 92703
Method.: Mechanical B Manual□
A)WATEiR ADDED 0 2 -2 -4
18)MOLD TARE WEIGHT 1935.0 1935.0 1935.0 1935.0 C)WEIGHT OF WET SOil ANO MOLD 3942.0 3916.8 3902.3 3843.0 D)WET SOIL WEIGHT (C -8)2007.0 1981.8 1967,3 1908.0 E)WET DENSITY (D / V)132.6 130.9 129.9 126.0 'F) DRY DENSITY (E /f(L/100) + 1])118.9 115.3 118. 7 117.3
G)TARE WEIGHT 228.2 226.8. 235.0 239.0 H)WEIGHT OF WET SOIL AND TARE 1276.0 1257.2 1329.3 1404.6 I)WEIGHT OF DRY SOIL AND TARE 1168.1 1134.5 1234.4 1323.7 J)WEIGHT OF WATER (H -I)107.9 122.7 94.9 80.9 K)DRY WEIGHT OF SOIL (I -G)939.9 907.7 999.4 1084.7 L)MOISTURE CONTENT (J / K )* 100)11.5 13.5 9.5 7.5
135
130
.. , ' ! ' -·l \ t I I I � t ' I ' ! I I \ I : i ' -I-1 I· -t--1
f -1-!
125 I .I.,-+--I-� -t·, t + -, t i ' ' ' I . .J..
� 120
115 C
110
-+ t I •1-
"f"1 1 I 1--i-J ! I ' ' I -· ·I · ! ,_..,..., -1'-r+ I t • I +--,--,--1 I t ' -t ' I � "' I . t '
I I
105 r -;-t I I ! -t ' I l 100
,1 +-1 � +-! I-\: I I -1-t--
\\ I
'":+-I-Itt-�\ '. l
I' ,, ' \ -ZERO ,AIR VOIOS +-C\� �, • ' �· � ' ' -.. a. ' I t +
i �r� I . i I
\1 I .. I .\ t
�� f\! -f\t'-: I\ '�t-+---
I ..I.'
l t � ++ i .,
I I I � I -
.
I ;
I i +-! • 1 T •r' I ... ...
......._ __ ._.J.. j I f
--------Gs=2. 6
--�Gs=2.7
--Gs=2.8
-Poly
(Series1
r 1 I I -, l I I ' f t ' I r -r-rl '-+-+-I '
·---It---
1--,_ t-
I
r ---
l 0 5 10 15 20 25 30
WATER CONTENT (%)
1834 W 3rd St Santa Ana Ca 92703
Maximum Density '02'
S06082 July 31 2024 Edward T.
Hammer: 1 Olb.0 5.5 lb.D
% orams ·~-· grams grams ocf .. pct
grams orams grams orams grams percent
4 inch: V= 16.14 pcf/gm 6 inch: V= 33.98 pcf/gm
B I. METHOD USED I_ (A,B or C)
4 inch MOLD USED
15.14 MOLD VOLUME CORRECTION (V
-3/8"StEVE NUMBER
11.0% PERCENT RETAINED
WITH ROCK CORRECTION
M I UM . DENSITY [PCFJ
OPTIMUM
MOISTURE [%)
WITHOUT ROCK CORRECTION
119.1 MAXIMUM.
DENSITY [PCF]
10.8 Ot-11MUM
MOISTURE [%]
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:18:37-07:00 (Page 1 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:19:06
GENERAL INFORMATION
01 Project Name 240051
02 Run Title Title 24 Analysis
03 Project Location 1834 W.3RD ST, Unit#2
04 City SANTA ANA 05 Standards Version 2022
06 Zip code 92703 07 Software Version EnergyPro 9.2
08 Climate Zone 8 09 Front Orientation (deg/ Cardinal)270
10 Building Type Single family 11 Number of Dwelling Units 1
12 Project Scope Newly Constructed 13 Number of Bedrooms 2
14 Addition Cond. Floor Area (ft2)0 15 Number of Stories 1
16 Existing Cond. Floor Area (ft2)n/a 17 Fenestration Average U-factor 0.29
18 Total Cond. Floor Area (ft2)794 19 Glazing Percentage (%)15.37%
20 ADU Bedroom Count n/a 21 ADU Conditioned Floor Area n/a
22 Fuel Type All electric 23 No Dwelling Unit:No
COMPLIANCE RESULTS
01 Building Complies with Computer Performance
02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03 This building incorporates one or more Special Features shown below
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:18:37-07:00 (Page 2 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:19:06
ENERGY DESIGN RATINGS
Energy Design Ratings Compliance Margins
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Standard Design 31.6 37 24.6
Proposed Design 30.9 36.9 24.6 0.7 0.1 0
RESULT3: PASS
1Efficiency EDR includes improvements like a better building envelope and more efficient equipment
2Total EDR includes efficiency and demand response measures such as photovoltaic (PV) system and batteries
3Building complies when source energy, efficiency and total compliance margins are greater than or equal to zero and unmet load hour limits are not exceeded
•Standard Design PV Capacity: 1.96 kWdc
•PV System resized to 1.96 kWdc (a factor of 1.959) to achieve 'Standard Design PV' PV scaling
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:18:37-07:00 (Page 3 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:19:06
ENERGY USE SUMMARY
Energy Use Standard Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Standard Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Proposed Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Proposed Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Compliance
Margin (EDR1)
Compliance
Margin (EDR2)
Space Heating 0.22 1.06 0.98 7.13 -0.76 -6.07
Space Cooling 1.17 28.1 0.9 29.5 0.27 -1.4
IAQ Ventilation 0.45 4.72 0.45 4.72 0 0
Water Heating 2.26 23.72 1.55 16.14 0.71 7.58
Self
Utilization/Flexibility
Credit
0 0
Efficiency Compliance
Total 4.1 57.6 3.88 57.49 0.22 0.11
Photovoltaics -2.7 -81.39 -2.7 -80.68
Battery 0 0
Flexibility
Indoor Lighting 0.94 8.81 0.94 8.81
Appl. & Cooking 3.31 26.47 3.28 26.14
Plug Loads 5.72 58.26 5.72 58.26
Outdoor Lighting 0.21 1.81 0.21 1.81
TOTAL COMPLIANCE 11.58 71.56 11.33 71.83
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:18:37-07:00 (Page 4 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:19:06
ENERGY USE INTENSITY
Standard Design (kBtu/ft2 - yr )Proposed Design (kBtu/ft2 - yr )Compliance Margin (kBtu/ft2 - yr )Margin Percentage
Gross EUI1 18.69 17.64 1.05 5.62
Net EUI2 4.93 3.88 1.05 21.3
Notes
1. Gross EUI is Energy Use Total (not including PV) / Total Building Area.
2. Net EUI is Energy Use Total (including PV) / Total Building Area.
REQUIRED PV SYSTEMS
01 02 03 04 05 06 07 08 09 10 11 12
DC System Size
(kWdc)Exception Module Type Array Type Power Electronics CFI Azimuth
(deg)
Tilt
Input
Array Angle
(deg)
Tilt: (x in
12)
Inverter Eff.
(%)
Annual
Solar Access
(%)
1.96 NA Standard (14-17%)Fixed none true 150-270 n/a n/a <=7:12 96 98
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
•Cool roof
•Insulation below roof deck
•Northwest Energy Efficiency Alliance (NEEA) rated heat pump water heater; specific brand/model, or equivalent, must be installed
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:18:37-07:00 (Page 5 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:19:06
HERS FEATURE SUMMARY
The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional
detail is provided in the building tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry
•Quality insulation installation (QII)
•Indoor air quality ventilation
•Minimum Airflow
•Fan Efficacy Watts/CFM
•Verified HSPF
•Verified heat pump rated heating capacity
•Duct leakage testing
•Compact distribution system expanded credit
•Drain water heat recovery system
BUILDING - FEATURES INFORMATION
01 02 03 04 05 06 07
Project Name Conditioned Floor Area (ft2)Number of Dwelling
Units Number of Bedrooms Number of Zones Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
240051 794 1 2 1 0 1
ZONE INFORMATION
01 02 03 04 05 06 07
Zone Name Zone Type HVAC System Name Zone Floor Area (ft2)Avg. Ceiling Height Water Heating System 1 Status
Living Conditioned HVAC1 794 9 DHW Sys 1 New
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Front wall Living R-15 Wall 270 Front 170 51 90
Left wall Living R-15 Wall 0 Left 405 26 90
Rear wall Living R-15 Wall 90 Back 170 10 90
Right wall Living R-15 Wall 180 Right 405 70 90
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:18:37-07:00 (Page 6 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:19:06
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Roof Attic Living R-38 + R-13 Roof Attic n/a n/a 794 n/a n/a
ATTIC
01 02 03 04 05 06 07 08
Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof
Attic Living Attic RoofLiving Ventilated 6 0.21 0.92 No Yes
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W1 Window Front wall Front 270 1 30 0.29 NFRC 0.21 NFRC Bug Screen
W4 Window Left wall Left 0 1 6 0.29 NFRC 0.21 NFRC Bug Screen
W4 2 Window Left wall Left 0 1 6 0.29 NFRC 0.21 NFRC Bug Screen
W3 Window Rear wall Back 90 1 10 0.29 NFRC 0.21 NFRC Bug Screen
W1 2 Window Right wall Right 180 1 30 0.29 NFRC 0.21 NFRC Bug Screen
W1 3 Window Right wall Right 180 1 30 0.29 NFRC 0.21 NFRC Bug Screen
W2 Window Right wall Right 180 1 10 0.29 NFRC 0.21 NFRC Bug Screen
OPAQUE DOORS
01 02 03 04
Name Side of Building Area (ft2)U-factor
D1 Front wall 21 0.5
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:18:37-07:00 (Page 7 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:19:06
OPAQUE DOORS
01 02 03 04
Name Side of Building Area (ft2)U-factor
D5 Left wall 14 0.5
SLAB FLOORS
01 02 03 04 05 06 07 08
Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value
and Depth
Edge Insul. R-value
and Depth Carpeted Fraction Heated
Slab-on-Grade Living 794 128 none 0 80%No
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
R-15 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-15 None / None 0.095
Inside Finish: Gypsum Board
Cavity / Frame: R-15 / 2x4
Exterior Finish: 3 Coat Stucco
Attic RoofLiving Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
R-38 + R-13 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 16 in. O. C.R-38 None / None 0.025
Over Ceiling Joists: R-28.9 insul.
Cavity / Frame: R-9.1 / 2x4
Inside Finish: Gypsum Board
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:18:37-07:00 (Page 8 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:19:06
BUILDING ENVELOPE - HERS VERIFICATION
01 02 03 04 05
Quality Insulation Installation (QII)High R-value Spray Foam Insulation Building Envelope Air Leakage CFM50 CFM50
Required Not Required N/A n/a n/a
WATER HEATING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Distribution Type Water Heater Name Number of Units Solar Heating
System
Compact
Distribution HERS Verification Water Heater
Name (#)
DHW Sys 1 Domestic Hot
Water (DHW)Standard DHW Heater 1 1 n/a Expanded DHW Sys
1-hers-dhw DHW Heater 1 (1)
WATER HEATERS - NEEA HEAT PUMP
01 02 03 04 05 06 07 08
Name # of Units Tank Vol. (gal)NEEA Heat Pump
Brand
NEEA Heat Pump
Model Tank Location Duct Inlet Air Source Duct Outlet Air Source
DHW Heater 1 1 40 Rheem Rheem HPLD40-1RH Outside Living Living
WATER HEATING - COMPACT DISTRIBUTION
01 02 03 04 05 06 07
Dwelling Unit type Water Heating System
Name
Master Bath distance of
furthest fixture to Water
Heater (ft)
Kitchen distance of
furthest fixture to Water
Heater (ft)
Furthest Third furthest
fixture to Water Heater
(ft)
Compactness Factor HERS Verification
Dwelling DHW Sys 1 n/a n/a n/a 0.6 Expanded Credit
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:18:37-07:00 (Page 9 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:19:06
WATER HEATING - DRAIN WATER HEAT RECOVERY
01 02 03 04 05 06
Dwelling Unit type DHW System and DWHR
Names Installation Configuration Shower Drains Shower Drain Water Heat
Recovery Efficiency (%)HERS Verification
Dwelling DHW Sys 1 - 1 - DWHR-1 Equal Flow 2 43 Required
WATER HEATING - HERS VERIFICATION
01 02 03 04 05 06 07
Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution
Type Recirculation Control Shower Drain Water Heat
Recovery
DHW Sys 1 - 1/1 Not Required Not Required Required Expanded Not Required Required
SPACE CONDITIONING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Heating Unit Name Heating Equipment
Count Cooling Unit Name Cooling Equipment
Count Fan Name Distribution Name Required
Thermostat Type
HVAC1 Heat pump
heating cooling
Heat Pump System
1 1 Heat Pump System
1 1 HVAC Fan 1 Air Distribution
System 1 Setback
HVAC - HEAT PUMPS
01 02 03 04 05 06 07 08 09 10 11 12 13
Name System Type Number of
Units
Heating Cooling
Zonally
Controlled
Compressor
Type HERS VerificationHeating
Efficiency
Type
HSPF/HS
PF2/COP Cap 47 Cap 17
Cooling
Efficiency
Type
SEER/SE
ER2
EER/EER
2/CEER
Heat Pump
System 1 Central split HP 1 HSPF 9 22000 19500 EERSEER 14 12 Not Zonal Single
Speed
Heat Pump System
1-hers-htpump
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:18:37-07:00 (Page 10 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:19:06
HVAC HEAT PUMPS - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Verified Airflow Airflow Target Verified EER/EER2 Verified
SEER/SEER2
Verified Refrigerant
Charge
Verified
HSPF/HSPF2
Verified Heating
Cap 47
Verified Heating
Cap 17
Heat Pump System
1-hers-htpump Required 350 Not Required Not Required No Yes Yes Yes
HVAC - DISTRIBUTION SYSTEMS
01 02 03 04 05 06 07 08 09 10 11 12
Name Type Design Type
Duct Ins. R-value Duct Location Surface Area
Bypass Duct Duct Leakage HERS Verification
Supply Return Supply Return Supply Return
Air Distribution
System 1
Unconditioned
attic Non-Verified R-6 R-6 Attic Attic n/a n/a No Bypass Duct Sealed and Tested Air Distribution
System 1-hers-dist
HVAC DISTRIBUTION - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Duct Leakage
Verification
Duct Leakage
Target (%)
Verified Duct
Location
Verified Duct
Design Buried Ducts Deeply Buried
Ducts
Low-leakage Air
Handler
Low Leakage
Ducts Entirely in
Conditioned
Space
Air Distribution
System 1-hers-dist Yes 5.0 Not Required Not Required Not Required Credit not taken Not Required No
HVAC - FAN SYSTEMS
01 02 03 04
Name Type Fan Power (Watts/CFM)Name
HVAC Fan 1 HVAC Fan 0.3 HVAC Fan 1-hers-fan
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:18:37-07:00 (Page 11 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:19:06
HVAC FAN SYSTEMS - HERS VERIFICATION
01 02 03
Name Verified Fan Watt Draw Required Fan Efficacy (Watts/CFM)
HVAC Fan 1-hers-fan Required 0.3
INDOOR AIR QUALITY (IAQ) FANS
01 02 03 04 05 06 07 08 09
Dwelling Unit Airflow (CFM)Fan Efficacy
(W/CFM)IAQ Fan Type
Includes
Heat/Energy
Recovery?
IAQ Recovery
Effectiveness -
SRE/ASRE
Includes Fault
Indicator Display?HERS Verification Status
SFam IAQVentRpt 46 0.35 Exhaust No n/a / n/a No Yes
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:18:37-07:00 (Page 12 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:19:06
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:Documentation Author Signature:
Company:Signature Date:
Address:CEA/ HERS Certification Identification (If applicable):
City/State/Zip:Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets,
calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name:Responsible Designer Signature:
Company:Date Signed:
Address:License:
City/State/Zip:Phone:
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 1 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
GENERAL INFORMATION
01 Project Name 240051
02 Run Title Title 24 Analysis
03 Project Location 1834 W.3RD ST, Unit#3
04 City SANTA ANA 05 Standards Version 2022
06 Zip code 92703 07 Software Version EnergyPro 9.2
08 Climate Zone 8 09 Front Orientation (deg/ Cardinal)270
10 Building Type Single family 11 Number of Dwelling Units 1
12 Project Scope Newly Constructed 13 Number of Bedrooms 2
14 Addition Cond. Floor Area (ft2)0 15 Number of Stories 1
16 Existing Cond. Floor Area (ft2)n/a 17 Fenestration Average U-factor 0.29
18 Total Cond. Floor Area (ft2)794 19 Glazing Percentage (%)15.37%
20 ADU Bedroom Count n/a 21 ADU Conditioned Floor Area n/a
22 Fuel Type Natural gas 23 No Dwelling Unit:No
COMPLIANCE RESULTS
01 Building Complies with Computer Performance
02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03 This building incorporates one or more Special Features shown below
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 2 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
ENERGY DESIGN RATINGS
Energy Design Ratings Compliance Margins
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Standard Design 36.8 37.2 27.4
Proposed Design 35.7 32.1 24.9 1.1 5.1 2.5
RESULT3: PASS
1Efficiency EDR includes improvements like a better building envelope and more efficient equipment
2Total EDR includes efficiency and demand response measures such as photovoltaic (PV) system and batteries
3Building complies when source energy, efficiency and total compliance margins are greater than or equal to zero and unmet load hour limits are not exceeded
•Standard Design PV Capacity: 2.06 kWdc
•PV System resized to 2.06 kWdc (a factor of 2.056) to achieve 'Standard Design PV' PV scaling
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 3 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
ENERGY USE SUMMARY
Energy Use Standard Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Standard Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Proposed Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Proposed Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Compliance
Margin (EDR1)
Compliance
Margin (EDR2)
Space Heating 0.15 0.79 1.09 7.91 -0.94 -7.12
Space Cooling 1.24 29.23 0.59 21.56 0.65 7.67
IAQ Ventilation 0.45 4.72 0.45 4.72 0 0
Water Heating 2.25 23.67 1.55 16.12 0.7 7.55
Self
Utilization/Flexibility
Credit
0 0
Efficiency Compliance
Total 4.09 58.41 3.68 50.31 0.41 8.1
Photovoltaics -2.84 -85.52 -2.84 -84.61
Battery 0 0
Flexibility
Indoor Lighting 0.94 8.81 0.94 8.81
Appl. & Cooking 6.55 42.4 6.52 42.06
Plug Loads 5.72 58.26 5.72 58.26
Outdoor Lighting 0.21 1.81 0.21 1.81
TOTAL COMPLIANCE 14.67 84.17 14.23 76.64
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 4 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
ENERGY USE INTENSITY
Standard Design (kBtu/ft2 - yr )Proposed Design (kBtu/ft2 - yr )Compliance Margin (kBtu/ft2 - yr )Margin Percentage
Gross EUI1 22.7 21.25 1.45 6.39
Net EUI2 8.26 6.81 1.45 17.55
Notes
1. Gross EUI is Energy Use Total (not including PV) / Total Building Area.
2. Net EUI is Energy Use Total (including PV) / Total Building Area.
REQUIRED PV SYSTEMS
01 02 03 04 05 06 07 08 09 10 11 12
DC System Size
(kWdc)Exception Module Type Array Type Power Electronics CFI Azimuth
(deg)
Tilt
Input
Array Angle
(deg)
Tilt: (x in
12)
Inverter Eff.
(%)
Annual
Solar Access
(%)
2.06 NA Standard (14-17%)Fixed none true 150-270 n/a n/a <=7:12 96 98
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
•Cool roof
•Insulation below roof deck
•Northwest Energy Efficiency Alliance (NEEA) rated heat pump water heater; specific brand/model, or equivalent, must be installed
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 5 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
HERS FEATURE SUMMARY
The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional
detail is provided in the building tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry
•Quality insulation installation (QII)
•Indoor air quality ventilation
•Kitchen range hood
•Minimum Airflow
•Verified EER/EER2
•Verified SEER/SEER2
•Fan Efficacy Watts/CFM
•Verified heat pump rated heating capacity
•Duct leakage testing
•Compact distribution system expanded credit
•Drain water heat recovery system
BUILDING - FEATURES INFORMATION
01 02 03 04 05 06 07
Project Name Conditioned Floor Area (ft2)Number of Dwelling
Units Number of Bedrooms Number of Zones Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
240051 794 1 2 1 0 1
ZONE INFORMATION
01 02 03 04 05 06 07
Zone Name Zone Type HVAC System Name Zone Floor Area (ft2)Avg. Ceiling Height Water Heating System 1 Status
Living Conditioned HVAC1 794 9 DHW Sys 1 New
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Front wall Living R-15 Wall 270 Front 170 51 90
Left wall Living R-15 Wall 0 Left 405 26 90
Rear wall Living R-15 Wall 90 Back 170 10 90
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 6 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Right wall Living R-15 Wall 180 Right 405 70 90
Roof Attic Living R-38 + R-13 Roof Attic n/a n/a 794 n/a n/a
ATTIC
01 02 03 04 05 06 07 08
Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof
Attic Living Attic RoofLiving Ventilated 6 0.21 0.92 No Yes
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W1 Window Front wall Front 270 1 30 0.29 NFRC 0.21 NFRC Bug Screen
W4 Window Left wall Left 0 1 6 0.29 NFRC 0.21 NFRC Bug Screen
W4 2 Window Left wall Left 0 1 6 0.29 NFRC 0.21 NFRC Bug Screen
W3 Window Rear wall Back 90 1 10 0.29 NFRC 0.21 NFRC Bug Screen
W1 2 Window Right wall Right 180 1 30 0.29 NFRC 0.21 NFRC Bug Screen
W1 3 Window Right wall Right 180 1 30 0.29 NFRC 0.21 NFRC Bug Screen
W2 Window Right wall Right 180 1 10 0.29 NFRC 0.21 NFRC Bug Screen
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 7 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
OPAQUE DOORS
01 02 03 04
Name Side of Building Area (ft2)U-factor
D1 Front wall 21 0.5
D5 Left wall 14 0.5
SLAB FLOORS
01 02 03 04 05 06 07 08
Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value
and Depth
Edge Insul. R-value
and Depth Carpeted Fraction Heated
Slab-on-Grade Living 794 128 none 0 80%No
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
R-15 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-15 None / None 0.095
Inside Finish: Gypsum Board
Cavity / Frame: R-15 / 2x4
Exterior Finish: 3 Coat Stucco
Attic RoofLiving Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
R-38 + R-13 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 16 in. O. C.R-38 None / None 0.025
Over Ceiling Joists: R-28.9 insul.
Cavity / Frame: R-9.1 / 2x4
Inside Finish: Gypsum Board
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 8 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
BUILDING ENVELOPE - HERS VERIFICATION
01 02 03 04 05
Quality Insulation Installation (QII)High R-value Spray Foam Insulation Building Envelope Air Leakage CFM50 CFM50
Required Not Required N/A n/a n/a
WATER HEATING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Distribution Type Water Heater Name Number of Units Solar Heating
System
Compact
Distribution HERS Verification Water Heater
Name (#)
DHW Sys 1 Domestic Hot
Water (DHW)Standard DHW Heater 1 1 n/a Expanded DHW Sys
1-hers-dhw DHW Heater 1 (1)
WATER HEATERS - NEEA HEAT PUMP
01 02 03 04 05 06 07 08
Name # of Units Tank Vol. (gal)NEEA Heat Pump
Brand
NEEA Heat Pump
Model Tank Location Duct Inlet Air Source Duct Outlet Air Source
DHW Heater 1 1 40 Rheem Rheem HPLD40-1RH Outside Living Living
WATER HEATING - COMPACT DISTRIBUTION
01 02 03 04 05 06 07
Dwelling Unit type Water Heating System
Name
Master Bath distance of
furthest fixture to Water
Heater (ft)
Kitchen distance of
furthest fixture to Water
Heater (ft)
Furthest Third furthest
fixture to Water Heater
(ft)
Compactness Factor HERS Verification
Dwelling DHW Sys 1 n/a n/a n/a 0.6 Expanded Credit
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 9 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
WATER HEATING - DRAIN WATER HEAT RECOVERY
01 02 03 04 05 06
Dwelling Unit type DHW System and DWHR
Names Installation Configuration Shower Drains Shower Drain Water Heat
Recovery Efficiency (%)HERS Verification
Dwelling DHW Sys 1 - 1 - DWHR-1 Equal Flow 2 43 Required
WATER HEATING - HERS VERIFICATION
01 02 03 04 05 06 07
Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution
Type Recirculation Control Shower Drain Water Heat
Recovery
DHW Sys 1 - 1/1 Not Required Not Required Required Expanded Not Required Required
SPACE CONDITIONING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Heating Unit Name Heating Equipment
Count Cooling Unit Name Cooling Equipment
Count Fan Name Distribution Name Required
Thermostat Type
HVAC1 Heat pump
heating cooling
Heat Pump System
1 1 Heat Pump System
1 1 HVAC Fan 1 Air Distribution
System 1 Setback
HVAC - HEAT PUMPS
01 02 03 04 05 06 07 08 09 10 11 12 13
Name System Type Number of
Units
Heating Cooling
Zonally
Controlled
Compressor
Type HERS VerificationHeating
Efficiency
Type
HSPF/HS
PF2/COP Cap 47 Cap 17
Cooling
Efficiency
Type
SEER/SE
ER2
EER/EER
2/CEER
Heat Pump
System 1 Central split HP 1 HSPF 7.7 24400 22500 EERSEER 24 14 Not Zonal Single
Speed
Heat Pump System
1-hers-htpump
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 10 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
HVAC HEAT PUMPS - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Verified Airflow Airflow Target Verified EER/EER2 Verified
SEER/SEER2
Verified Refrigerant
Charge
Verified
HSPF/HSPF2
Verified Heating
Cap 47
Verified Heating
Cap 17
Heat Pump System
1-hers-htpump Required 350 Required Required No No Yes Yes
HVAC - DISTRIBUTION SYSTEMS
01 02 03 04 05 06 07 08 09 10 11 12
Name Type Design Type
Duct Ins. R-value Duct Location Surface Area
Bypass Duct Duct Leakage HERS Verification
Supply Return Supply Return Supply Return
Air Distribution
System 1
Unconditioned
attic Non-Verified R-6 R-6 Attic Attic n/a n/a No Bypass Duct Sealed and Tested Air Distribution
System 1-hers-dist
HVAC DISTRIBUTION - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Duct Leakage
Verification
Duct Leakage
Target (%)
Verified Duct
Location
Verified Duct
Design Buried Ducts Deeply Buried
Ducts
Low-leakage Air
Handler
Low Leakage
Ducts Entirely in
Conditioned
Space
Air Distribution
System 1-hers-dist Yes 5.0 Not Required Not Required Not Required Credit not taken Not Required No
HVAC - FAN SYSTEMS
01 02 03 04
Name Type Fan Power (Watts/CFM)Name
HVAC Fan 1 HVAC Fan 0.3 HVAC Fan 1-hers-fan
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 11 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
HVAC FAN SYSTEMS - HERS VERIFICATION
01 02 03
Name Verified Fan Watt Draw Required Fan Efficacy (Watts/CFM)
HVAC Fan 1-hers-fan Required 0.3
INDOOR AIR QUALITY (IAQ) FANS
01 02 03 04 05 06 07 08 09
Dwelling Unit Airflow (CFM)Fan Efficacy
(W/CFM)IAQ Fan Type
Includes
Heat/Energy
Recovery?
IAQ Recovery
Effectiveness -
SRE/ASRE
Includes Fault
Indicator Display?HERS Verification Status
SFam IAQVentRpt 46 0.35 Exhaust No n/a / n/a No Yes
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 12 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:Documentation Author Signature:
Company:Signature Date:
Address:CEA/ HERS Certification Identification (If applicable):
City/State/Zip:Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets,
calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name:Responsible Designer Signature:
Company:Date Signed:
Address:License:
City/State/Zip:Phone:
Truong Dong
Dong Engineering 01/02/2025
10692 silver cir
garden grove, CA 92843 (714) 204-2874
Truong Dong
Dong Engineering 01/02/2025
10692 silver cir N/A
garden grove, CA 92843 (714) 204-2874
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 1 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
GENERAL INFORMATION
01 Project Name 240051
02 Run Title Title 24 Analysis
03 Project Location 1834 W.3RD ST, Unit#3
04 City SANTA ANA 05 Standards Version 2022
06 Zip code 92703 07 Software Version EnergyPro 9.2
08 Climate Zone 8 09 Front Orientation (deg/ Cardinal)270
10 Building Type Single family 11 Number of Dwelling Units 1
12 Project Scope Newly Constructed 13 Number of Bedrooms 2
14 Addition Cond. Floor Area (ft2)0 15 Number of Stories 1
16 Existing Cond. Floor Area (ft2)n/a 17 Fenestration Average U-factor 0.29
18 Total Cond. Floor Area (ft2)794 19 Glazing Percentage (%)15.37%
20 ADU Bedroom Count n/a 21 ADU Conditioned Floor Area n/a
22 Fuel Type Natural gas 23 No Dwelling Unit:No
COMPLIANCE RESULTS
01 Building Complies with Computer Performance
02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03 This building incorporates one or more Special Features shown below
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 2 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
ENERGY DESIGN RATINGS
Energy Design Ratings Compliance Margins
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Standard Design 36.8 37.2 27.4
Proposed Design 35.7 32.1 24.9 1.1 5.1 2.5
RESULT3: PASS
1Efficiency EDR includes improvements like a better building envelope and more efficient equipment
2Total EDR includes efficiency and demand response measures such as photovoltaic (PV) system and batteries
3Building complies when source energy, efficiency and total compliance margins are greater than or equal to zero and unmet load hour limits are not exceeded
•Standard Design PV Capacity: 2.06 kWdc
•PV System resized to 2.06 kWdc (a factor of 2.056) to achieve 'Standard Design PV' PV scaling
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 3 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
ENERGY USE SUMMARY
Energy Use Standard Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Standard Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Proposed Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Proposed Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Compliance
Margin (EDR1)
Compliance
Margin (EDR2)
Space Heating 0.15 0.79 1.09 7.91 -0.94 -7.12
Space Cooling 1.24 29.23 0.59 21.56 0.65 7.67
IAQ Ventilation 0.45 4.72 0.45 4.72 0 0
Water Heating 2.25 23.67 1.55 16.12 0.7 7.55
Self
Utilization/Flexibility
Credit
0 0
Efficiency Compliance
Total 4.09 58.41 3.68 50.31 0.41 8.1
Photovoltaics -2.84 -85.52 -2.84 -84.61
Battery 0 0
Flexibility
Indoor Lighting 0.94 8.81 0.94 8.81
Appl. & Cooking 6.55 42.4 6.52 42.06
Plug Loads 5.72 58.26 5.72 58.26
Outdoor Lighting 0.21 1.81 0.21 1.81
TOTAL COMPLIANCE 14.67 84.17 14.23 76.64
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 4 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
ENERGY USE INTENSITY
Standard Design (kBtu/ft2 - yr )Proposed Design (kBtu/ft2 - yr )Compliance Margin (kBtu/ft2 - yr )Margin Percentage
Gross EUI1 22.7 21.25 1.45 6.39
Net EUI2 8.26 6.81 1.45 17.55
Notes
1. Gross EUI is Energy Use Total (not including PV) / Total Building Area.
2. Net EUI is Energy Use Total (including PV) / Total Building Area.
REQUIRED PV SYSTEMS
01 02 03 04 05 06 07 08 09 10 11 12
DC System Size
(kWdc)Exception Module Type Array Type Power Electronics CFI Azimuth
(deg)
Tilt
Input
Array Angle
(deg)
Tilt: (x in
12)
Inverter Eff.
(%)
Annual
Solar Access
(%)
2.06 NA Standard (14-17%)Fixed none true 150-270 n/a n/a <=7:12 96 98
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
•Cool roof
•Insulation below roof deck
•Northwest Energy Efficiency Alliance (NEEA) rated heat pump water heater; specific brand/model, or equivalent, must be installed
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 5 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
HERS FEATURE SUMMARY
The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional
detail is provided in the building tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry
•Quality insulation installation (QII)
•Indoor air quality ventilation
•Kitchen range hood
•Minimum Airflow
•Verified EER/EER2
•Verified SEER/SEER2
•Fan Efficacy Watts/CFM
•Verified heat pump rated heating capacity
•Duct leakage testing
•Compact distribution system expanded credit
•Drain water heat recovery system
BUILDING - FEATURES INFORMATION
01 02 03 04 05 06 07
Project Name Conditioned Floor Area (ft2)Number of Dwelling
Units Number of Bedrooms Number of Zones Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
240051 794 1 2 1 0 1
ZONE INFORMATION
01 02 03 04 05 06 07
Zone Name Zone Type HVAC System Name Zone Floor Area (ft2)Avg. Ceiling Height Water Heating System 1 Status
Living Conditioned HVAC1 794 9 DHW Sys 1 New
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Front wall Living R-15 Wall 270 Front 170 51 90
Left wall Living R-15 Wall 0 Left 405 26 90
Rear wall Living R-15 Wall 90 Back 170 10 90
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 6 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Right wall Living R-15 Wall 180 Right 405 70 90
Roof Attic Living R-38 + R-13 Roof Attic n/a n/a 794 n/a n/a
ATTIC
01 02 03 04 05 06 07 08
Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof
Attic Living Attic RoofLiving Ventilated 6 0.21 0.92 No Yes
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W1 Window Front wall Front 270 1 30 0.29 NFRC 0.21 NFRC Bug Screen
W4 Window Left wall Left 0 1 6 0.29 NFRC 0.21 NFRC Bug Screen
W4 2 Window Left wall Left 0 1 6 0.29 NFRC 0.21 NFRC Bug Screen
W3 Window Rear wall Back 90 1 10 0.29 NFRC 0.21 NFRC Bug Screen
W1 2 Window Right wall Right 180 1 30 0.29 NFRC 0.21 NFRC Bug Screen
W1 3 Window Right wall Right 180 1 30 0.29 NFRC 0.21 NFRC Bug Screen
W2 Window Right wall Right 180 1 10 0.29 NFRC 0.21 NFRC Bug Screen
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 7 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
OPAQUE DOORS
01 02 03 04
Name Side of Building Area (ft2)U-factor
D1 Front wall 21 0.5
D5 Left wall 14 0.5
SLAB FLOORS
01 02 03 04 05 06 07 08
Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value
and Depth
Edge Insul. R-value
and Depth Carpeted Fraction Heated
Slab-on-Grade Living 794 128 none 0 80%No
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
R-15 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-15 None / None 0.095
Inside Finish: Gypsum Board
Cavity / Frame: R-15 / 2x4
Exterior Finish: 3 Coat Stucco
Attic RoofLiving Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
R-38 + R-13 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 16 in. O. C.R-38 None / None 0.025
Over Ceiling Joists: R-28.9 insul.
Cavity / Frame: R-9.1 / 2x4
Inside Finish: Gypsum Board
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 8 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
BUILDING ENVELOPE - HERS VERIFICATION
01 02 03 04 05
Quality Insulation Installation (QII)High R-value Spray Foam Insulation Building Envelope Air Leakage CFM50 CFM50
Required Not Required N/A n/a n/a
WATER HEATING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Distribution Type Water Heater Name Number of Units Solar Heating
System
Compact
Distribution HERS Verification Water Heater
Name (#)
DHW Sys 1 Domestic Hot
Water (DHW)Standard DHW Heater 1 1 n/a Expanded DHW Sys
1-hers-dhw DHW Heater 1 (1)
WATER HEATERS - NEEA HEAT PUMP
01 02 03 04 05 06 07 08
Name # of Units Tank Vol. (gal)NEEA Heat Pump
Brand
NEEA Heat Pump
Model Tank Location Duct Inlet Air Source Duct Outlet Air Source
DHW Heater 1 1 40 Rheem Rheem HPLD40-1RH Outside Living Living
WATER HEATING - COMPACT DISTRIBUTION
01 02 03 04 05 06 07
Dwelling Unit type Water Heating System
Name
Master Bath distance of
furthest fixture to Water
Heater (ft)
Kitchen distance of
furthest fixture to Water
Heater (ft)
Furthest Third furthest
fixture to Water Heater
(ft)
Compactness Factor HERS Verification
Dwelling DHW Sys 1 n/a n/a n/a 0.6 Expanded Credit
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 9 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
WATER HEATING - DRAIN WATER HEAT RECOVERY
01 02 03 04 05 06
Dwelling Unit type DHW System and DWHR
Names Installation Configuration Shower Drains Shower Drain Water Heat
Recovery Efficiency (%)HERS Verification
Dwelling DHW Sys 1 - 1 - DWHR-1 Equal Flow 2 43 Required
WATER HEATING - HERS VERIFICATION
01 02 03 04 05 06 07
Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution
Type Recirculation Control Shower Drain Water Heat
Recovery
DHW Sys 1 - 1/1 Not Required Not Required Required Expanded Not Required Required
SPACE CONDITIONING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Heating Unit Name Heating Equipment
Count Cooling Unit Name Cooling Equipment
Count Fan Name Distribution Name Required
Thermostat Type
HVAC1 Heat pump
heating cooling
Heat Pump System
1 1 Heat Pump System
1 1 HVAC Fan 1 Air Distribution
System 1 Setback
HVAC - HEAT PUMPS
01 02 03 04 05 06 07 08 09 10 11 12 13
Name System Type Number of
Units
Heating Cooling
Zonally
Controlled
Compressor
Type HERS VerificationHeating
Efficiency
Type
HSPF/HS
PF2/COP Cap 47 Cap 17
Cooling
Efficiency
Type
SEER/SE
ER2
EER/EER
2/CEER
Heat Pump
System 1 Central split HP 1 HSPF 7.7 24400 22500 EERSEER 24 14 Not Zonal Single
Speed
Heat Pump System
1-hers-htpump
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 10 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
HVAC HEAT PUMPS - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Verified Airflow Airflow Target Verified EER/EER2 Verified
SEER/SEER2
Verified Refrigerant
Charge
Verified
HSPF/HSPF2
Verified Heating
Cap 47
Verified Heating
Cap 17
Heat Pump System
1-hers-htpump Required 350 Required Required No No Yes Yes
HVAC - DISTRIBUTION SYSTEMS
01 02 03 04 05 06 07 08 09 10 11 12
Name Type Design Type
Duct Ins. R-value Duct Location Surface Area
Bypass Duct Duct Leakage HERS Verification
Supply Return Supply Return Supply Return
Air Distribution
System 1
Unconditioned
attic Non-Verified R-6 R-6 Attic Attic n/a n/a No Bypass Duct Sealed and Tested Air Distribution
System 1-hers-dist
HVAC DISTRIBUTION - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Duct Leakage
Verification
Duct Leakage
Target (%)
Verified Duct
Location
Verified Duct
Design Buried Ducts Deeply Buried
Ducts
Low-leakage Air
Handler
Low Leakage
Ducts Entirely in
Conditioned
Space
Air Distribution
System 1-hers-dist Yes 5.0 Not Required Not Required Not Required Credit not taken Not Required No
HVAC - FAN SYSTEMS
01 02 03 04
Name Type Fan Power (Watts/CFM)Name
HVAC Fan 1 HVAC Fan 0.3 HVAC Fan 1-hers-fan
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 11 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
HVAC FAN SYSTEMS - HERS VERIFICATION
01 02 03
Name Verified Fan Watt Draw Required Fan Efficacy (Watts/CFM)
HVAC Fan 1-hers-fan Required 0.3
INDOOR AIR QUALITY (IAQ) FANS
01 02 03 04 05 06 07 08 09
Dwelling Unit Airflow (CFM)Fan Efficacy
(W/CFM)IAQ Fan Type
Includes
Heat/Energy
Recovery?
IAQ Recovery
Effectiveness -
SRE/ASRE
Includes Fault
Indicator Display?HERS Verification Status
SFam IAQVentRpt 46 0.35 Exhaust No n/a / n/a No Yes
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:39:46-08:00 (Page 12 of 12)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:40:26
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:Documentation Author Signature:
Company:Signature Date:
Address:CEA/ HERS Certification Identification (If applicable):
City/State/Zip:Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets,
calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name:Responsible Designer Signature:
Company:Date Signed:
Address:License:
City/State/Zip:Phone:
Truong Dong
Dong Engineering 01/02/2025
10692 silver cir
garden grove, CA 92843 (714) 204-2874
Truong Dong
Dong Engineering 01/02/2025
10692 silver cir N/A
garden grove, CA 92843 (714) 204-2874
425-P010001119A-000-000-0000000-0000 01/02/2025 17:05 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 1 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
GENERAL INFORMATION
01 Project Name 240051
02 Run Title Title 24 Analysis
03 Project Location 1834 W.3RD ST,
04 City SANTA ANA 05 Standards Version 2022
06 Zip code 92703 07 Software Version EnergyPro 9.2
08 Climate Zone 8 09 Front Orientation (deg/ Cardinal)0
10 Building Type Single family 11 Number of Dwelling Units 1
12 Project Scope Newly Constructed 13 Number of Bedrooms 5
14 Addition Cond. Floor Area (ft2)0 15 Number of Stories 2
16 Existing Cond. Floor Area (ft2)n/a 17 Fenestration Average U-factor 0.3
18 Total Cond. Floor Area (ft2)2497 19 Glazing Percentage (%)16.66%
20 ADU Bedroom Count n/a 21 ADU Conditioned Floor Area n/a
22 Fuel Type All electric 23 No Dwelling Unit:No
COMPLIANCE RESULTS
01 Building Complies with Computer Performance
02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03 This building incorporates one or more Special Features shown below
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 2 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
ENERGY DESIGN RATINGS
Energy Design Ratings Compliance Margins
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Standard Design 32.3 37.8 24.2
Proposed Design 29.3 37.8 24.1 3 0 0.1
RESULT3: PASS
1Efficiency EDR includes improvements like a better building envelope and more efficient equipment
2Total EDR includes efficiency and demand response measures such as photovoltaic (PV) system and batteries
3Building complies when source energy, efficiency and total compliance margins are greater than or equal to zero and unmet load hour limits are not exceeded
•Standard Design PV Capacity: 3.56 kWdc
•PV System resized to 3.56 kWdc (a factor of 3.563) to achieve 'Standard Design PV' PV scaling
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 3 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
ENERGY USE SUMMARY
Energy Use Standard Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Standard Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Proposed Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Proposed Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Compliance
Margin (EDR1)
Compliance
Margin (EDR2)
Space Heating 1.12 5.05 0.59 4.22 0.53 0.83
Space Cooling 0.67 18.98 0.7 21.45 -0.03 -2.47
IAQ Ventilation 0.36 3.82 0.36 3.82 0 0
Water Heating 1.28 13 1.11 11.29 0.17 1.71
Self
Utilization/Flexibility
Credit
0 0
Efficiency Compliance
Total 3.43 40.85 2.76 40.78 0.67 0.07
Photovoltaics -1.56 -46.86 -1.56 -46.87
Battery 0 0
Flexibility
Indoor Lighting 0.72 6.73 0.72 6.73
Appl. & Cooking 1.61 13.89 1.59 13.74
Plug Loads 2.94 29.93 2.94 29.93
Outdoor Lighting 0.18 1.61 0.18 1.61
TOTAL COMPLIANCE 7.32 46.15 6.63 45.92
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 4 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
ENERGY USE INTENSITY
Standard Design (kBtu/ft2 - yr )Proposed Design (kBtu/ft2 - yr )Compliance Margin (kBtu/ft2 - yr )Margin Percentage
Gross EUI1 11.37 10.46 0.91 8
Net EUI2 3.42 2.51 0.91 26.61
Notes
1. Gross EUI is Energy Use Total (not including PV) / Total Building Area.
2. Net EUI is Energy Use Total (including PV) / Total Building Area.
REQUIRED PV SYSTEMS
01 02 03 04 05 06 07 08 09 10 11 12
DC System Size
(kWdc)Exception Module Type Array Type Power Electronics CFI Azimuth
(deg)
Tilt
Input
Array Angle
(deg)
Tilt: (x in
12)
Inverter Eff.
(%)
Annual
Solar Access
(%)
3.56 NA Standard (14-17%)Fixed none true 150-270 n/a n/a <=7:12 96 98
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
•Insulation below roof deck
•Variable capacity heat pump compliance option (verification details from VCHP Staff report, Appendix B, and RA3)
•Northwest Energy Efficiency Alliance (NEEA) rated heat pump water heater; specific brand/model, or equivalent, must be installed
HERS FEATURE SUMMARY
The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional
detail is provided in the building tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry
•Quality insulation installation (QII)
•Indoor air quality ventilation
•Verified Refrigerant Charge
•Airflow in habitable rooms (SC3.1.4.1.7)
•Verified heat pump rated heating capacity
•Wall-mounted thermostat in zones greater than 150 ft2 (SC3.4.5)
•Ductless indoor units located entirely in conditioned space (SC3.1.4.1.8)
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 5 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
BUILDING - FEATURES INFORMATION
01 02 03 04 05 06 07
Project Name Conditioned Floor Area (ft2)Number of Dwelling
Units Number of Bedrooms Number of Zones Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
240051 2497 1 5 3 0 2
ZONE INFORMATION
01 02 03 04 05 06 07
Zone Name Zone Type HVAC System Name Zone Floor Area (ft2)Avg. Ceiling Height Water Heating System 1 Status
1st Floor Conditioned HVAC1 1013 9 DHW Sys 1 New
2nd Floor Conditioned HVAC1 1000 9 DHW Sys 1 New
JADU Conditioned JADU HVAC2 484 9 DHW Sys 3 New
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Front wall 1st Floor R-15 Wall.0 Front 172 56 90
Left wall 1st Floor R-15 Wall.90 Left 132 30 90
Right wall 1st Floor R-15 Wall.270 Right 319.5 59 90
Front wall 2 2nd Floor R-15 Wall.0 Front 297 56 90
Left wall 2 2nd Floor R-15 Wall.90 Left 351 35 90
Rear wall 2nd Floor R-15 Wall.180 Back 297 45 90
Right wall 2 2nd Floor R-15 Wall.270 Right 351 81 90
Left wall 3 JADU R-15 Wall.90 Left 97 25 90
Rear wall 2 JADU R-15 Wall.180 Back 360 63 90
Right wall 3 JADU R-15 Wall.270 Right 121.5 41 90
Roof 1st Floor R-30 + R-13 Roof Attic n/a n/a 466 n/a n/a
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 6 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Roof 2 2nd Floor R-30 + R-13 Roof Attic n/a n/a 1000 n/a n/a
Roof 3 JADU R-30 + R-13 Roof Attic n/a n/a 204 n/a n/a
Roof 4 __Garage__R-0 Roof Attic n/a n/a 27 n/a n/a
Floor under 2nd 2nd Floor R-19 Floor No Crawlspace n/a n/a 547 n/a n/a
Floor over garage 2nd Floor R-19 Floor No Crawlspace n/a n/a 173 n/a n/a
Floor over jadu 2nd Floor R-19 Floor No Crawlspace n/a n/a 280 n/a n/a
Front wall 3 __Garage__R-0 Wall 0 Front 188 112 90
Left wall 4 __Garage__R-0 Wall 90 Left 180 17.5 90
Right wall 4 __Garage__R-0 Wall 270 Right 35 0 90
OPAQUE SURFACES - CATHEDRAL CEILINGS
01 02 03 04 05 06 07 08 09 10 11
Name Zone Construction Azimuth Orientation Area (ft2)
Skylight Area
(ft2)
Roof Rise (x in
12)
Roof
Reflectance Roof Emittance Cool Roof
Roof deck __Garage__R-0 Roof No
Attic 0 Front 217 0 0 0.1 0.85 No
ATTIC
01 02 03 04 05 06 07 08
Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof
Attic __Garage__Attic Garage Roof Cons Ventilated 4 0.1 0.85 No No
Attic 1st Floor Attic Roof1st Floor Ventilated 4 0.1 0.85 No No
Attic 2nd Floor Attic Roof2nd Floor Ventilated 4 0.1 0.85 No No
Attic JADU Attic RoofJADU Ventilated 4 0.1 0.85 No No
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 7 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W3 Window Front wall Front 0 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W9 Window Front wall Front 0 1 10 0.3 NFRC 0.23 NFRC Bug Screen
W1 Window Left wall Left 90 1 30 0.3 NFRC 0.23 NFRC Bug Screen
W2 Window Right wall Right 270 1 17 0.3 NFRC 0.23 NFRC Bug Screen
D3 Window Right wall Right 270 1 42 0.3 NFRC 0.23 NFRC Bug Screen
W11 Window Front wall 2 Front 0 1 12 0.3 NFRC 0.23 NFRC Bug Screen
W3 2 Window Front wall 2 Front 0 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W3 3 Window Left wall 2 Left 90 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W5 Window Left wall 2 Left 90 1 10 0.3 NFRC 0.23 NFRC Bug Screen
W4 Window Rear wall Back 180 1 10 0.3 NFRC 0.23 NFRC Bug Screen
D12 Window Rear wall Back 180 1 35 0.3 NFRC 0.23 NFRC Bug Screen
D12 2 Window Right wall 2 Right 270 1 35 0.3 NFRC 0.23 NFRC Bug Screen
W6 Window Right wall 2 Right 270 1 14 0.3 NFRC 0.23 NFRC Bug Screen
W10 Window Right wall 2 Right 270 1 32 0.3 NFRC 0.23 NFRC Bug Screen
W3 4 Window Left wall 3 Left 90 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W4 2 Window Rear wall 2 Back 180 1 10 0.3 NFRC 0.23 NFRC Bug Screen
W7 Window Rear wall 2 Back 180 1 3 0.3 NFRC 0.23 NFRC Bug Screen
W3 5 Window Rear wall 2 Back 180 1 25 0.3 NFRC 0.23 NFRC Bug Screen
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 8 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W3 6 Window Rear wall 2 Back 180 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W8 Window Right wall 3 Right 270 1 6 0.3 NFRC 0.23 NFRC Bug Screen
OPAQUE DOORS
01 02 03 04
Name Side of Building Area (ft2)U-factor
D2 Front wall 21 0.5
D9 Front wall 2 19 0.5
D2 2 Right wall 3 21 0.5
D 2070 Right wall 3 14 0.5
D1 Front wall 3 112 0.7
D4 Left wall 4 17.5 0.5
SLAB FLOORS
01 02 03 04 05 06 07 08
Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value
and Depth
Edge Insul. R-value
and Depth Carpeted Fraction Heated
Slab-on-Grade 1st Floor 1013 156 none 0 80%No
Slab-on-Grade 2 JADU 484 107 none 0 80%No
Slab-on-Grade 3 __Garage__417 86 none 0 0%No
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 9 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
R-0 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-0 None / None 0.361
Inside Finish: Gypsum Board
Cavity / Frame: no insul. / 2x4
Exterior Finish: 3 Coat Stucco
R-15 Wall.Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-15 None / None 0.095
Inside Finish: Gypsum Board
Cavity / Frame: R-15 / 2x4
Exterior Finish: 3 Coat Stucco
R-0 Roof No Attic Cathedral Ceilings Wood Framed
Ceiling 2x4 @ 16 in. O. C.R-0 None / None 0.484
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: no insul. / 2x4
Inside Finish: Gypsum Board
Attic Garage Roof Cons Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-0 None / 0 0.644
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: no insul. / 2x4
Attic Roof1st Floor Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
Attic Roof2nd Floor Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 10 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
Attic RoofJADU Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
R-0 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-0 None / None 0.481 Cavity / Frame: no insul. / 2x4
Inside Finish: Gypsum Board
R-30 + R-13 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 16 in. O. C.R-30 None / None 0.032
Over Ceiling Joists: R-20.9 insul.
Cavity / Frame: R-9.1 / 2x4
Inside Finish: Gypsum Board
R-19 Floor No
Crawlspace Interior Floors Wood Framed Floor 2x10 @ 16 in. O. C.R-19 None / None 0.045
Floor Surface: Carpeted
Floor Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-19 / 2x10
Ceiling Below Finish: Gypsum Board
BUILDING ENVELOPE - HERS VERIFICATION
01 02 03 04 05
Quality Insulation Installation (QII)High R-value Spray Foam Insulation Building Envelope Air Leakage CFM50 CFM50
Required Not Required N/A n/a n/a
WATER HEATING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Distribution Type Water Heater Name Number of Units Solar Heating
System
Compact
Distribution HERS Verification Water Heater
Name (#)
DHW Sys 1 Domestic Hot
Water (DHW)Standard DHW Heater 1 1 n/a None n/a DHW Heater 1 (1)
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 11 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
WATER HEATING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Distribution Type Water Heater Name Number of Units Solar Heating
System
Compact
Distribution HERS Verification Water Heater
Name (#)
DHW Sys 3 Domestic Hot
Water (DHW)Standard DHW Heater 3 1 n/a None n/a DHW Heater 3 (1)
WATER HEATERS - NEEA HEAT PUMP
01 02 03 04 05 06 07 08
Name # of Units Tank Vol. (gal)NEEA Heat Pump
Brand
NEEA Heat Pump
Model Tank Location Duct Inlet Air Source Duct Outlet Air Source
DHW Heater 1 1 40 Rheem Rheem HPLD40-1RH TankZone __Garage____Garage__
DHW Heater 3 1 40 Rheem Rheem HPLD40-1RH TankZone __Garage____Garage__
WATER HEATING - HERS VERIFICATION
01 02 03 04 05 06 07
Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution
Type Recirculation Control Shower Drain Water Heat
Recovery
DHW Sys 1 - 1/1 Not Required Not Required Not Required None Not Required Not Required
DHW Sys 3 - 1/1 Not Required Not Required Not Required None Not Required Not Required
SPACE CONDITIONING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Heating Unit Name Heating Equipment
Count Cooling Unit Name Cooling Equipment
Count Fan Name Distribution Name Required
Thermostat Type
HVAC1 Heat pump
heating cooling
Heat Pump System
1 1 Heat Pump System
1 1 n/a n/a Setback
JADU HVAC2 Heat pump
heating cooling
Heat Pump System
2 1 Heat Pump System
2 1 n/a n/a Setback
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 12 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
HVAC - HEAT PUMPS
01 02 03 04 05 06 07 08 09 10 11 12 13
Name System Type Number of
Units
Heating Cooling
Zonally
Controlled
Compressor
Type HERS VerificationHeating
Efficiency
Type
HSPF/HS
PF2/COP Cap 47 Cap 17
Cooling
Efficiency
Type
SEER/SE
ER2
EER/EER
2/CEER
Heat Pump
System 1 VCHP-ductless 1 HSPF 8 17000 13500 EERSEER 14 12 Not Zonal Single
Speed
Heat Pump System
1-hers-htpump
Heat Pump
System 2 VCHP-ductless 1 HSPF 8 17000 13500 EERSEER 14 12 Not Zonal Single
Speed
Heat Pump System
2-hers-htpump
HVAC HEAT PUMPS - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Verified Airflow Airflow Target Verified EER/EER2 Verified
SEER/SEER2
Verified Refrigerant
Charge
Verified
HSPF/HSPF2
Verified Heating
Cap 47
Verified Heating
Cap 17
Heat Pump System
1-hers-htpump Not Required 0 Not Required Not Required Yes No Yes Yes
Heat Pump System
2-hers-htpump Not Required 0 Not Required Not Required Yes No Yes Yes
VARIABLE CAPACITY HEAT PUMP COMPLIANCE OPTION - HERS VERIFICATION
01 02 03 04 05 06 07 08 09 10
Name
Certified
Low-Static
VCHP System
Airflow to
Habitable
Rooms
Ductless Units
in Conditioned
Space
Wall Mount
Thermostat
Air Filter Sizing
& Pressure
Drop Rating
Low Leakage
Ducts in
Conditioned
Space
Minimum
Airflow per
RA3.3 and
SC3.3.3.4.1
Certified
non-continuous
Fan
Indoor Fan not
Running
Continuously
Heat Pump System 1 Not required Required Required Required Not required Not required Not required Not required Not required
Heat Pump System 2 Not required Required Required Required Not required Not required Not required Not required Not required
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 13 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
INDOOR AIR QUALITY (IAQ) FANS
01 02 03 04 05 06 07 08 09
Dwelling Unit Airflow (CFM)Fan Efficacy
(W/CFM)IAQ Fan Type
Includes
Heat/Energy
Recovery?
IAQ Recovery
Effectiveness -
SRE/ASRE
Includes Fault
Indicator Display?HERS Verification Status
SFam IAQVentRpt 117 0.35 Exhaust No n/a / n/a No Yes
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2024-07-02T02:25:06-07:00 (Page 14 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-07-02 02:26:25
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:Documentation Author Signature:
Company:Signature Date:
Address:CEA/ HERS Certification Identification (If applicable):
City/State/Zip:Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets,
calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name:Responsible Designer Signature:
Company:Date Signed:
Address:License:
City/State/Zip:Phone:
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 1 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
GENERAL INFORMATION
01 Project Name 240051
02 Run Title Title 24 Analysis
03 Project Location 1834 W.3RD ST,
04 City SANTA ANA 05 Standards Version 2022
06 Zip code 92703 07 Software Version EnergyPro 9.2
08 Climate Zone 8 09 Front Orientation (deg/ Cardinal)0
10 Building Type Single family 11 Number of Dwelling Units 1
12 Project Scope Newly Constructed 13 Number of Bedrooms 5
14 Addition Cond. Floor Area (ft2)0 15 Number of Stories 2
16 Existing Cond. Floor Area (ft2)n/a 17 Fenestration Average U-factor 0.3
18 Total Cond. Floor Area (ft2)2497 19 Glazing Percentage (%)16.66%
20 ADU Bedroom Count n/a 21 ADU Conditioned Floor Area n/a
22 Fuel Type Natural gas 23 No Dwelling Unit:No
COMPLIANCE RESULTS
01 Building Complies with Computer Performance
02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03 This building incorporates one or more Special Features shown below
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 2 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
ENERGY DESIGN RATINGS
Energy Design Ratings Compliance Margins
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Standard Design 35.3 37.9 26
Proposed Design 32.7 37.9 25.9 2.6 0 0.1
RESULT3: PASS
1Efficiency EDR includes improvements like a better building envelope and more efficient equipment
2Total EDR includes efficiency and demand response measures such as photovoltaic (PV) system and batteries
3Building complies when source energy, efficiency and total compliance margins are greater than or equal to zero and unmet load hour limits are not exceeded
•Standard Design PV Capacity: 3.69 kWdc
•PV System resized to 3.69 kWdc (a factor of 3.685) to achieve 'Standard Design PV' PV scaling
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 3 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
ENERGY USE SUMMARY
Energy Use Standard Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Standard Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Proposed Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Proposed Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Compliance
Margin (EDR1)
Compliance
Margin (EDR2)
Space Heating 1.07 4.84 0.58 4.08 0.49 0.76
Space Cooling 0.69 19.46 0.72 21.89 -0.03 -2.43
IAQ Ventilation 0.36 3.82 0.36 3.82 0 0
Water Heating 1.28 13 1.11 11.29 0.17 1.71
Self
Utilization/Flexibility
Credit
0 0
Efficiency Compliance
Total 3.4 41.12 2.77 41.08 0.63 0.04
Photovoltaics -1.62 -48.52 -1.62 -48.53
Battery 0 0
Flexibility
Indoor Lighting 0.72 6.73 0.72 6.73
Appl. & Cooking 2.96 20.68 2.95 20.52
Plug Loads 2.94 29.93 2.94 29.93
Outdoor Lighting 0.18 1.61 0.18 1.61
TOTAL COMPLIANCE 8.58 51.55 7.94 51.34
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 4 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
ENERGY USE INTENSITY
Standard Design (kBtu/ft2 - yr )Proposed Design (kBtu/ft2 - yr )Compliance Margin (kBtu/ft2 - yr )Margin Percentage
Gross EUI1 13.02 12.14 0.88 6.76
Net EUI2 4.79 3.92 0.87 18.16
Notes
1. Gross EUI is Energy Use Total (not including PV) / Total Building Area.
2. Net EUI is Energy Use Total (including PV) / Total Building Area.
REQUIRED PV SYSTEMS
01 02 03 04 05 06 07 08 09 10 11 12
DC System Size
(kWdc)Exception Module Type Array Type Power Electronics CFI Azimuth
(deg)
Tilt
Input
Array Angle
(deg)
Tilt: (x in
12)
Inverter Eff.
(%)
Annual
Solar Access
(%)
3.69 NA Standard (14-17%)Fixed none true 150-270 n/a n/a <=7:12 96 98
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
•Insulation below roof deck
•Variable capacity heat pump compliance option (verification details from VCHP Staff report, Appendix B, and RA3)
•Northwest Energy Efficiency Alliance (NEEA) rated heat pump water heater; specific brand/model, or equivalent, must be installed
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 5 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
HERS FEATURE SUMMARY
The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional
detail is provided in the building tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry
•Quality insulation installation (QII)
•Indoor air quality ventilation
•Kitchen range hood
•Verified Refrigerant Charge
•Airflow in habitable rooms (SC3.1.4.1.7)
•Verified heat pump rated heating capacity
•Wall-mounted thermostat in zones greater than 150 ft2 (SC3.4.5)
•Ductless indoor units located entirely in conditioned space (SC3.1.4.1.8)
BUILDING - FEATURES INFORMATION
01 02 03 04 05 06 07
Project Name Conditioned Floor Area (ft2)Number of Dwelling
Units Number of Bedrooms Number of Zones Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
240051 2497 1 5 3 0 2
ZONE INFORMATION
01 02 03 04 05 06 07
Zone Name Zone Type HVAC System Name Zone Floor Area (ft2)Avg. Ceiling Height Water Heating System 1 Status
1st Floor Conditioned HVAC1 1013 9 DHW Sys 1 New
2nd Floor Conditioned HVAC1 1000 9 DHW Sys 1 New
JADU Conditioned JADU HVAC2 484 9 DHW Sys 3 New
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Front wall 1st Floor R-15 Wall.0 Front 172 56 90
Left wall 1st Floor R-15 Wall.90 Left 132 30 90
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 6 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Right wall 1st Floor R-15 Wall.270 Right 319.5 59 90
Front wall 2 2nd Floor R-15 Wall.0 Front 297 56 90
Left wall 2 2nd Floor R-15 Wall.90 Left 351 35 90
Rear wall 2nd Floor R-15 Wall.180 Back 297 45 90
Right wall 2 2nd Floor R-15 Wall.270 Right 351 81 90
Left wall 3 JADU R-15 Wall.90 Left 97 25 90
Rear wall 2 JADU R-15 Wall.180 Back 360 63 90
Right wall 3 JADU R-15 Wall.270 Right 121.5 41 90
Roof 1st Floor R-30 + R-13 Roof Attic n/a n/a 466 n/a n/a
Roof 2 2nd Floor R-30 + R-13 Roof Attic n/a n/a 1000 n/a n/a
Roof 3 JADU R-30 + R-13 Roof Attic n/a n/a 204 n/a n/a
Roof 4 __Garage__R-0 Roof Attic n/a n/a 27 n/a n/a
Floor under 2nd 2nd Floor R-19 Floor No Crawlspace n/a n/a 547 n/a n/a
Floor over garage 2nd Floor R-19 Floor No Crawlspace n/a n/a 173 n/a n/a
Floor over jadu 2nd Floor R-19 Floor No Crawlspace n/a n/a 280 n/a n/a
Front wall 3 __Garage__R-0 Wall 0 Front 188 112 90
Left wall 4 __Garage__R-0 Wall 90 Left 180 17.5 90
Right wall 4 __Garage__R-0 Wall 270 Right 35 0 90
OPAQUE SURFACES - CATHEDRAL CEILINGS
01 02 03 04 05 06 07 08 09 10 11
Name Zone Construction Azimuth Orientation Area (ft2)
Skylight Area
(ft2)
Roof Rise (x in
12)
Roof
Reflectance Roof Emittance Cool Roof
Roof deck __Garage__R-0 Roof No
Attic 0 Front 217 0 0 0.1 0.85 No
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 7 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
ATTIC
01 02 03 04 05 06 07 08
Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof
Attic __Garage__Attic Garage Roof Cons Ventilated 4 0.1 0.85 No No
Attic 1st Floor Attic Roof1st Floor Ventilated 4 0.1 0.85 No No
Attic 2nd Floor Attic Roof2nd Floor Ventilated 4 0.1 0.85 No No
Attic JADU Attic RoofJADU Ventilated 4 0.1 0.85 No No
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W3 Window Front wall Front 0 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W9 Window Front wall Front 0 1 10 0.3 NFRC 0.23 NFRC Bug Screen
W1 Window Left wall Left 90 1 30 0.3 NFRC 0.23 NFRC Bug Screen
W2 Window Right wall Right 270 1 17 0.3 NFRC 0.23 NFRC Bug Screen
D3 Window Right wall Right 270 1 42 0.3 NFRC 0.23 NFRC Bug Screen
W11 Window Front wall 2 Front 0 1 12 0.3 NFRC 0.23 NFRC Bug Screen
W3 2 Window Front wall 2 Front 0 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W3 3 Window Left wall 2 Left 90 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W5 Window Left wall 2 Left 90 1 10 0.3 NFRC 0.23 NFRC Bug Screen
W4 Window Rear wall Back 180 1 10 0.3 NFRC 0.23 NFRC Bug Screen
D12 Window Rear wall Back 180 1 35 0.3 NFRC 0.23 NFRC Bug Screen
D12 2 Window Right wall 2 Right 270 1 35 0.3 NFRC 0.23 NFRC Bug Screen
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 8 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W6 Window Right wall 2 Right 270 1 14 0.3 NFRC 0.23 NFRC Bug Screen
W10 Window Right wall 2 Right 270 1 32 0.3 NFRC 0.23 NFRC Bug Screen
W3 4 Window Left wall 3 Left 90 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W4 2 Window Rear wall 2 Back 180 1 10 0.3 NFRC 0.23 NFRC Bug Screen
W7 Window Rear wall 2 Back 180 1 3 0.3 NFRC 0.23 NFRC Bug Screen
W3 5 Window Rear wall 2 Back 180 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W3 6 Window Rear wall 2 Back 180 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W8 Window Right wall 3 Right 270 1 6 0.3 NFRC 0.23 NFRC Bug Screen
OPAQUE DOORS
01 02 03 04
Name Side of Building Area (ft2)U-factor
D2 Front wall 21 0.5
D9 Front wall 2 19 0.5
D2 2 Right wall 3 21 0.5
D 2070 Right wall 3 14 0.5
D1 Front wall 3 112 0.7
D4 Left wall 4 17.5 0.5
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 9 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
SLAB FLOORS
01 02 03 04 05 06 07 08
Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value
and Depth
Edge Insul. R-value
and Depth Carpeted Fraction Heated
Slab-on-Grade 1st Floor 1013 156 none 0 80%No
Slab-on-Grade 2 JADU 484 107 none 0 80%No
Slab-on-Grade 3 __Garage__417 86 none 0 0%No
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
R-0 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-0 None / None 0.361
Inside Finish: Gypsum Board
Cavity / Frame: no insul. / 2x4
Exterior Finish: 3 Coat Stucco
R-15 Wall.Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-15 None / None 0.095
Inside Finish: Gypsum Board
Cavity / Frame: R-15 / 2x4
Exterior Finish: 3 Coat Stucco
R-0 Roof No Attic Cathedral Ceilings Wood Framed
Ceiling 2x4 @ 16 in. O. C.R-0 None / None 0.484
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: no insul. / 2x4
Inside Finish: Gypsum Board
Attic Garage Roof Cons Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-0 None / 0 0.644
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: no insul. / 2x4
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 10 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
Attic Roof1st Floor Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
Attic Roof2nd Floor Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
Attic RoofJADU Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
R-0 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-0 None / None 0.481 Cavity / Frame: no insul. / 2x4
Inside Finish: Gypsum Board
R-30 + R-13 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 16 in. O. C.R-30 None / None 0.032
Over Ceiling Joists: R-20.9 insul.
Cavity / Frame: R-9.1 / 2x4
Inside Finish: Gypsum Board
R-19 Floor No
Crawlspace Interior Floors Wood Framed Floor 2x10 @ 16 in. O. C.R-19 None / None 0.045
Floor Surface: Carpeted
Floor Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-19 / 2x10
Ceiling Below Finish: Gypsum Board
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 11 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
BUILDING ENVELOPE - HERS VERIFICATION
01 02 03 04 05
Quality Insulation Installation (QII)High R-value Spray Foam Insulation Building Envelope Air Leakage CFM50 CFM50
Required Not Required N/A n/a n/a
WATER HEATING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Distribution Type Water Heater Name Number of Units Solar Heating
System
Compact
Distribution HERS Verification Water Heater
Name (#)
DHW Sys 1 Domestic Hot
Water (DHW)Standard DHW Heater 1 1 n/a None n/a DHW Heater 1 (1)
DHW Sys 3 Domestic Hot
Water (DHW)Standard DHW Heater 3 1 n/a None n/a DHW Heater 3 (1)
WATER HEATERS - NEEA HEAT PUMP
01 02 03 04 05 06 07 08
Name # of Units Tank Vol. (gal)NEEA Heat Pump
Brand
NEEA Heat Pump
Model Tank Location Duct Inlet Air Source Duct Outlet Air Source
DHW Heater 1 1 40 Rheem Rheem HPLD40-1RH TankZone __Garage____Garage__
DHW Heater 3 1 40 Rheem Rheem HPLD40-1RH TankZone __Garage____Garage__
WATER HEATING - HERS VERIFICATION
01 02 03 04 05 06 07
Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution
Type Recirculation Control Shower Drain Water Heat
Recovery
DHW Sys 1 - 1/1 Not Required Not Required Not Required None Not Required Not Required
DHW Sys 3 - 1/1 Not Required Not Required Not Required None Not Required Not Required
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 12 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
SPACE CONDITIONING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Heating Unit Name Heating Equipment
Count Cooling Unit Name Cooling Equipment
Count Fan Name Distribution Name Required
Thermostat Type
HVAC1 Heat pump
heating cooling
Heat Pump System
1 1 Heat Pump System
1 1 n/a n/a Setback
JADU HVAC2 Heat pump
heating cooling
Heat Pump System
2 1 Heat Pump System
2 1 n/a n/a Setback
HVAC - HEAT PUMPS
01 02 03 04 05 06 07 08 09 10 11 12 13
Name System Type Number of
Units
Heating Cooling
Zonally
Controlled
Compressor
Type HERS VerificationHeating
Efficiency
Type
HSPF/HS
PF2/COP Cap 47 Cap 17
Cooling
Efficiency
Type
SEER/SE
ER2
EER/EER
2/CEER
Heat Pump
System 1 VCHP-ductless 1 HSPF 8 17000 13500 EERSEER 14 12 Not Zonal Single
Speed
Heat Pump System
1-hers-htpump
Heat Pump
System 2 VCHP-ductless 1 HSPF 8 17000 13500 EERSEER 14 12 Not Zonal Single
Speed
Heat Pump System
2-hers-htpump
HVAC HEAT PUMPS - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Verified Airflow Airflow Target Verified EER/EER2 Verified
SEER/SEER2
Verified Refrigerant
Charge
Verified
HSPF/HSPF2
Verified Heating
Cap 47
Verified Heating
Cap 17
Heat Pump System
1-hers-htpump Not Required 0 Not Required Not Required Yes No Yes Yes
Heat Pump System
2-hers-htpump Not Required 0 Not Required Not Required Yes No Yes Yes
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 13 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
VARIABLE CAPACITY HEAT PUMP COMPLIANCE OPTION - HERS VERIFICATION
01 02 03 04 05 06 07 08 09 10
Name
Certified
Low-Static
VCHP System
Airflow to
Habitable
Rooms
Ductless Units
in Conditioned
Space
Wall Mount
Thermostat
Air Filter Sizing
& Pressure
Drop Rating
Low Leakage
Ducts in
Conditioned
Space
Minimum
Airflow per
RA3.3 and
SC3.3.3.4.1
Certified
non-continuous
Fan
Indoor Fan not
Running
Continuously
Heat Pump System 1 Not required Required Required Required Not required Not required Not required Not required Not required
Heat Pump System 2 Not required Required Required Required Not required Not required Not required Not required Not required
INDOOR AIR QUALITY (IAQ) FANS
01 02 03 04 05 06 07 08 09
Dwelling Unit Airflow (CFM)Fan Efficacy
(W/CFM)IAQ Fan Type
Includes
Heat/Energy
Recovery?
IAQ Recovery
Effectiveness -
SRE/ASRE
Includes Fault
Indicator Display?HERS Verification Status
SFam IAQVentRpt 117 0.35 Exhaust No n/a / n/a No Yes
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 14 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:Documentation Author Signature:
Company:Signature Date:
Address:CEA/ HERS Certification Identification (If applicable):
City/State/Zip:Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets,
calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name:Responsible Designer Signature:
Company:Date Signed:
Address:License:
City/State/Zip:Phone:
Truong Dong
Dong Engineering 01/02/2025
10692 silver cir
garden grove, CA 92843 (714) 204-2874
Truong Dong
Dong Engineering 01/02/2025
10692 silver cir N/A
garden grove, CA 92843 (714) 204-2874
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 1 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
GENERAL INFORMATION
01 Project Name 240051
02 Run Title Title 24 Analysis
03 Project Location 1834 W.3RD ST,
04 City SANTA ANA 05 Standards Version 2022
06 Zip code 92703 07 Software Version EnergyPro 9.2
08 Climate Zone 8 09 Front Orientation (deg/ Cardinal)0
10 Building Type Single family 11 Number of Dwelling Units 1
12 Project Scope Newly Constructed 13 Number of Bedrooms 5
14 Addition Cond. Floor Area (ft2)0 15 Number of Stories 2
16 Existing Cond. Floor Area (ft2)n/a 17 Fenestration Average U-factor 0.3
18 Total Cond. Floor Area (ft2)2497 19 Glazing Percentage (%)16.66%
20 ADU Bedroom Count n/a 21 ADU Conditioned Floor Area n/a
22 Fuel Type Natural gas 23 No Dwelling Unit:No
COMPLIANCE RESULTS
01 Building Complies with Computer Performance
02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03 This building incorporates one or more Special Features shown below
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 2 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
ENERGY DESIGN RATINGS
Energy Design Ratings Compliance Margins
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Standard Design 35.3 37.9 26
Proposed Design 32.7 37.9 25.9 2.6 0 0.1
RESULT3: PASS
1Efficiency EDR includes improvements like a better building envelope and more efficient equipment
2Total EDR includes efficiency and demand response measures such as photovoltaic (PV) system and batteries
3Building complies when source energy, efficiency and total compliance margins are greater than or equal to zero and unmet load hour limits are not exceeded
•Standard Design PV Capacity: 3.69 kWdc
•PV System resized to 3.69 kWdc (a factor of 3.685) to achieve 'Standard Design PV' PV scaling
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 3 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
ENERGY USE SUMMARY
Energy Use Standard Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Standard Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Proposed Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Proposed Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Compliance
Margin (EDR1)
Compliance
Margin (EDR2)
Space Heating 1.07 4.84 0.58 4.08 0.49 0.76
Space Cooling 0.69 19.46 0.72 21.89 -0.03 -2.43
IAQ Ventilation 0.36 3.82 0.36 3.82 0 0
Water Heating 1.28 13 1.11 11.29 0.17 1.71
Self
Utilization/Flexibility
Credit
0 0
Efficiency Compliance
Total 3.4 41.12 2.77 41.08 0.63 0.04
Photovoltaics -1.62 -48.52 -1.62 -48.53
Battery 0 0
Flexibility
Indoor Lighting 0.72 6.73 0.72 6.73
Appl. & Cooking 2.96 20.68 2.95 20.52
Plug Loads 2.94 29.93 2.94 29.93
Outdoor Lighting 0.18 1.61 0.18 1.61
TOTAL COMPLIANCE 8.58 51.55 7.94 51.34
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 4 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
ENERGY USE INTENSITY
Standard Design (kBtu/ft2 - yr )Proposed Design (kBtu/ft2 - yr )Compliance Margin (kBtu/ft2 - yr )Margin Percentage
Gross EUI1 13.02 12.14 0.88 6.76
Net EUI2 4.79 3.92 0.87 18.16
Notes
1. Gross EUI is Energy Use Total (not including PV) / Total Building Area.
2. Net EUI is Energy Use Total (including PV) / Total Building Area.
REQUIRED PV SYSTEMS
01 02 03 04 05 06 07 08 09 10 11 12
DC System Size
(kWdc)Exception Module Type Array Type Power Electronics CFI Azimuth
(deg)
Tilt
Input
Array Angle
(deg)
Tilt: (x in
12)
Inverter Eff.
(%)
Annual
Solar Access
(%)
3.69 NA Standard (14-17%)Fixed none true 150-270 n/a n/a <=7:12 96 98
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
•Insulation below roof deck
•Variable capacity heat pump compliance option (verification details from VCHP Staff report, Appendix B, and RA3)
•Northwest Energy Efficiency Alliance (NEEA) rated heat pump water heater; specific brand/model, or equivalent, must be installed
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 5 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
HERS FEATURE SUMMARY
The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional
detail is provided in the building tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry
•Quality insulation installation (QII)
•Indoor air quality ventilation
•Kitchen range hood
•Verified Refrigerant Charge
•Airflow in habitable rooms (SC3.1.4.1.7)
•Verified heat pump rated heating capacity
•Wall-mounted thermostat in zones greater than 150 ft2 (SC3.4.5)
•Ductless indoor units located entirely in conditioned space (SC3.1.4.1.8)
BUILDING - FEATURES INFORMATION
01 02 03 04 05 06 07
Project Name Conditioned Floor Area (ft2)Number of Dwelling
Units Number of Bedrooms Number of Zones Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
240051 2497 1 5 3 0 2
ZONE INFORMATION
01 02 03 04 05 06 07
Zone Name Zone Type HVAC System Name Zone Floor Area (ft2)Avg. Ceiling Height Water Heating System 1 Status
1st Floor Conditioned HVAC1 1013 9 DHW Sys 1 New
2nd Floor Conditioned HVAC1 1000 9 DHW Sys 1 New
JADU Conditioned JADU HVAC2 484 9 DHW Sys 3 New
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Front wall 1st Floor R-15 Wall.0 Front 172 56 90
Left wall 1st Floor R-15 Wall.90 Left 132 30 90
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 6 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Right wall 1st Floor R-15 Wall.270 Right 319.5 59 90
Front wall 2 2nd Floor R-15 Wall.0 Front 297 56 90
Left wall 2 2nd Floor R-15 Wall.90 Left 351 35 90
Rear wall 2nd Floor R-15 Wall.180 Back 297 45 90
Right wall 2 2nd Floor R-15 Wall.270 Right 351 81 90
Left wall 3 JADU R-15 Wall.90 Left 97 25 90
Rear wall 2 JADU R-15 Wall.180 Back 360 63 90
Right wall 3 JADU R-15 Wall.270 Right 121.5 41 90
Roof 1st Floor R-30 + R-13 Roof Attic n/a n/a 466 n/a n/a
Roof 2 2nd Floor R-30 + R-13 Roof Attic n/a n/a 1000 n/a n/a
Roof 3 JADU R-30 + R-13 Roof Attic n/a n/a 204 n/a n/a
Roof 4 __Garage__R-0 Roof Attic n/a n/a 27 n/a n/a
Floor under 2nd 2nd Floor R-19 Floor No Crawlspace n/a n/a 547 n/a n/a
Floor over garage 2nd Floor R-19 Floor No Crawlspace n/a n/a 173 n/a n/a
Floor over jadu 2nd Floor R-19 Floor No Crawlspace n/a n/a 280 n/a n/a
Front wall 3 __Garage__R-0 Wall 0 Front 188 112 90
Left wall 4 __Garage__R-0 Wall 90 Left 180 17.5 90
Right wall 4 __Garage__R-0 Wall 270 Right 35 0 90
OPAQUE SURFACES - CATHEDRAL CEILINGS
01 02 03 04 05 06 07 08 09 10 11
Name Zone Construction Azimuth Orientation Area (ft2)
Skylight Area
(ft2)
Roof Rise (x in
12)
Roof
Reflectance Roof Emittance Cool Roof
Roof deck __Garage__R-0 Roof No
Attic 0 Front 217 0 0 0.1 0.85 No
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 7 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
ATTIC
01 02 03 04 05 06 07 08
Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof
Attic __Garage__Attic Garage Roof Cons Ventilated 4 0.1 0.85 No No
Attic 1st Floor Attic Roof1st Floor Ventilated 4 0.1 0.85 No No
Attic 2nd Floor Attic Roof2nd Floor Ventilated 4 0.1 0.85 No No
Attic JADU Attic RoofJADU Ventilated 4 0.1 0.85 No No
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W3 Window Front wall Front 0 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W9 Window Front wall Front 0 1 10 0.3 NFRC 0.23 NFRC Bug Screen
W1 Window Left wall Left 90 1 30 0.3 NFRC 0.23 NFRC Bug Screen
W2 Window Right wall Right 270 1 17 0.3 NFRC 0.23 NFRC Bug Screen
D3 Window Right wall Right 270 1 42 0.3 NFRC 0.23 NFRC Bug Screen
W11 Window Front wall 2 Front 0 1 12 0.3 NFRC 0.23 NFRC Bug Screen
W3 2 Window Front wall 2 Front 0 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W3 3 Window Left wall 2 Left 90 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W5 Window Left wall 2 Left 90 1 10 0.3 NFRC 0.23 NFRC Bug Screen
W4 Window Rear wall Back 180 1 10 0.3 NFRC 0.23 NFRC Bug Screen
D12 Window Rear wall Back 180 1 35 0.3 NFRC 0.23 NFRC Bug Screen
D12 2 Window Right wall 2 Right 270 1 35 0.3 NFRC 0.23 NFRC Bug Screen
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 8 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W6 Window Right wall 2 Right 270 1 14 0.3 NFRC 0.23 NFRC Bug Screen
W10 Window Right wall 2 Right 270 1 32 0.3 NFRC 0.23 NFRC Bug Screen
W3 4 Window Left wall 3 Left 90 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W4 2 Window Rear wall 2 Back 180 1 10 0.3 NFRC 0.23 NFRC Bug Screen
W7 Window Rear wall 2 Back 180 1 3 0.3 NFRC 0.23 NFRC Bug Screen
W3 5 Window Rear wall 2 Back 180 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W3 6 Window Rear wall 2 Back 180 1 25 0.3 NFRC 0.23 NFRC Bug Screen
W8 Window Right wall 3 Right 270 1 6 0.3 NFRC 0.23 NFRC Bug Screen
OPAQUE DOORS
01 02 03 04
Name Side of Building Area (ft2)U-factor
D2 Front wall 21 0.5
D9 Front wall 2 19 0.5
D2 2 Right wall 3 21 0.5
D 2070 Right wall 3 14 0.5
D1 Front wall 3 112 0.7
D4 Left wall 4 17.5 0.5
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 9 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
SLAB FLOORS
01 02 03 04 05 06 07 08
Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value
and Depth
Edge Insul. R-value
and Depth Carpeted Fraction Heated
Slab-on-Grade 1st Floor 1013 156 none 0 80%No
Slab-on-Grade 2 JADU 484 107 none 0 80%No
Slab-on-Grade 3 __Garage__417 86 none 0 0%No
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
R-0 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-0 None / None 0.361
Inside Finish: Gypsum Board
Cavity / Frame: no insul. / 2x4
Exterior Finish: 3 Coat Stucco
R-15 Wall.Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-15 None / None 0.095
Inside Finish: Gypsum Board
Cavity / Frame: R-15 / 2x4
Exterior Finish: 3 Coat Stucco
R-0 Roof No Attic Cathedral Ceilings Wood Framed
Ceiling 2x4 @ 16 in. O. C.R-0 None / None 0.484
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: no insul. / 2x4
Inside Finish: Gypsum Board
Attic Garage Roof Cons Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-0 None / 0 0.644
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: no insul. / 2x4
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 10 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
Attic Roof1st Floor Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
Attic Roof2nd Floor Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
Attic RoofJADU Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
R-0 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-0 None / None 0.481 Cavity / Frame: no insul. / 2x4
Inside Finish: Gypsum Board
R-30 + R-13 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 16 in. O. C.R-30 None / None 0.032
Over Ceiling Joists: R-20.9 insul.
Cavity / Frame: R-9.1 / 2x4
Inside Finish: Gypsum Board
R-19 Floor No
Crawlspace Interior Floors Wood Framed Floor 2x10 @ 16 in. O. C.R-19 None / None 0.045
Floor Surface: Carpeted
Floor Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-19 / 2x10
Ceiling Below Finish: Gypsum Board
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 11 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
BUILDING ENVELOPE - HERS VERIFICATION
01 02 03 04 05
Quality Insulation Installation (QII)High R-value Spray Foam Insulation Building Envelope Air Leakage CFM50 CFM50
Required Not Required N/A n/a n/a
WATER HEATING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Distribution Type Water Heater Name Number of Units Solar Heating
System
Compact
Distribution HERS Verification Water Heater
Name (#)
DHW Sys 1 Domestic Hot
Water (DHW)Standard DHW Heater 1 1 n/a None n/a DHW Heater 1 (1)
DHW Sys 3 Domestic Hot
Water (DHW)Standard DHW Heater 3 1 n/a None n/a DHW Heater 3 (1)
WATER HEATERS - NEEA HEAT PUMP
01 02 03 04 05 06 07 08
Name # of Units Tank Vol. (gal)NEEA Heat Pump
Brand
NEEA Heat Pump
Model Tank Location Duct Inlet Air Source Duct Outlet Air Source
DHW Heater 1 1 40 Rheem Rheem HPLD40-1RH TankZone __Garage____Garage__
DHW Heater 3 1 40 Rheem Rheem HPLD40-1RH TankZone __Garage____Garage__
WATER HEATING - HERS VERIFICATION
01 02 03 04 05 06 07
Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution
Type Recirculation Control Shower Drain Water Heat
Recovery
DHW Sys 1 - 1/1 Not Required Not Required Not Required None Not Required Not Required
DHW Sys 3 - 1/1 Not Required Not Required Not Required None Not Required Not Required
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 12 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
SPACE CONDITIONING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Heating Unit Name Heating Equipment
Count Cooling Unit Name Cooling Equipment
Count Fan Name Distribution Name Required
Thermostat Type
HVAC1 Heat pump
heating cooling
Heat Pump System
1 1 Heat Pump System
1 1 n/a n/a Setback
JADU HVAC2 Heat pump
heating cooling
Heat Pump System
2 1 Heat Pump System
2 1 n/a n/a Setback
HVAC - HEAT PUMPS
01 02 03 04 05 06 07 08 09 10 11 12 13
Name System Type Number of
Units
Heating Cooling
Zonally
Controlled
Compressor
Type HERS VerificationHeating
Efficiency
Type
HSPF/HS
PF2/COP Cap 47 Cap 17
Cooling
Efficiency
Type
SEER/SE
ER2
EER/EER
2/CEER
Heat Pump
System 1 VCHP-ductless 1 HSPF 8 17000 13500 EERSEER 14 12 Not Zonal Single
Speed
Heat Pump System
1-hers-htpump
Heat Pump
System 2 VCHP-ductless 1 HSPF 8 17000 13500 EERSEER 14 12 Not Zonal Single
Speed
Heat Pump System
2-hers-htpump
HVAC HEAT PUMPS - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Verified Airflow Airflow Target Verified EER/EER2 Verified
SEER/SEER2
Verified Refrigerant
Charge
Verified
HSPF/HSPF2
Verified Heating
Cap 47
Verified Heating
Cap 17
Heat Pump System
1-hers-htpump Not Required 0 Not Required Not Required Yes No Yes Yes
Heat Pump System
2-hers-htpump Not Required 0 Not Required Not Required Yes No Yes Yes
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 13 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
VARIABLE CAPACITY HEAT PUMP COMPLIANCE OPTION - HERS VERIFICATION
01 02 03 04 05 06 07 08 09 10
Name
Certified
Low-Static
VCHP System
Airflow to
Habitable
Rooms
Ductless Units
in Conditioned
Space
Wall Mount
Thermostat
Air Filter Sizing
& Pressure
Drop Rating
Low Leakage
Ducts in
Conditioned
Space
Minimum
Airflow per
RA3.3 and
SC3.3.3.4.1
Certified
non-continuous
Fan
Indoor Fan not
Running
Continuously
Heat Pump System 1 Not required Required Required Required Not required Not required Not required Not required Not required
Heat Pump System 2 Not required Required Required Required Not required Not required Not required Not required Not required
INDOOR AIR QUALITY (IAQ) FANS
01 02 03 04 05 06 07 08 09
Dwelling Unit Airflow (CFM)Fan Efficacy
(W/CFM)IAQ Fan Type
Includes
Heat/Energy
Recovery?
IAQ Recovery
Effectiveness -
SRE/ASRE
Includes Fault
Indicator Display?HERS Verification Status
SFam IAQVentRpt 117 0.35 Exhaust No n/a / n/a No Yes
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
1834 W Third St &
#2,33/21/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240051 Calculation Date/Time:2025-01-02T16:35:05-08:00 (Page 14 of 14)
Calculation Description:Title 24 Analysis Input File Name:2 STORY MAIN HOUSE + ATTACHED JADU GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2025-01-02 16:36:41
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:Documentation Author Signature:
Company:Signature Date:
Address:CEA/ HERS Certification Identification (If applicable):
City/State/Zip:Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets,
calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name:Responsible Designer Signature:
Company:Date Signed:
Address:License:
City/State/Zip:Phone:
Truong Dong
Dong Engineering 01/02/2025
10692 silver cir
garden grove, CA 92843 (714) 204-2874
Truong Dong
Dong Engineering 01/02/2025
10692 silver cir N/A
garden grove, CA 92843 (714) 204-2874
425-P010001118A-000-000-0000000-0000 01/02/2025 17:04 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
1834 W Third St &
#2,33/21/2025
Dong Engineering, Inc.
7661 GARDEN GROVE BLVD. , GARDEN GROVE, CA 92841
Office: (714) 617-5979
Email: info@dongengineering.com
DATE:7/17/2024
CLIENT:
JOB NO.:240051
Project:
NEW MAIN HOUSE & ADU
STRUCTURAL CALCULATIONS FOR THE BUILDING AT:
1834 W.3RD ST,
SANTA ANA, CA 92703
1 of 52
1834 W Third St &
#2,33/21/2025
Job#:240051
Date:
ROOF:SHINGLE ROOF (VAULTED):SHINGLE
Slope 6:12 Slope 6:12
Live Load 20 psf Live Load 20 psf
Roof'g Material 3.0 psf Roof'g Material 3.0 psf
Sheathing 2.0 psf Sheathing 2.0 psf
Trusses / Rafters 2.0 psf Trusses / Rafters 2.0 psf
Ceiling Joists 2.0 psf
Drywall 2.0 psf Drywall 2.0 psf
Sprinkler 0.5 psf Sprinkler 0.5 psf
Solar 3.0 psf Solar 3.0 psf
Miscellaneous 0.5 psf Miscellaneous 0.5 psf
Total D.L.15 psf Total D.L.13.0 psf
Total Load 35 psf Total Load 33 psf
FLOOR:Without Lt. Wt. CONC.DECK:
Live Load 40 psf Live Load 60 psf
Floor Material 3.0 psf Floor Material 3.0 psf
Sheathing 3.0 psf Sheathing 3.0 psf
Floor Joist 3.0 psf Floor Joist 3.0 psf
Sprinkler 0.5 psf Sprinkler 0.5 psf
Miscellaneous 0.5 psf Miscellaneous 0.5 psf
Drywall 3.0 psf Drywall 3.0 psf
Total D.L.13 psf Total D.L.13 psf
Total Load 53 psf Total Load 73 psf
LOADING CONDITIONS
7/10/2024
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
2 of 52
1834 W Third St &
#2,33/21/2025
EXTERIOR WALL:INTERIOR WALL:
EXTERIOR:9 DRYWALL:3
DRYWALL:3.0 DRYWALL:3.0
STUDS:2.0 STUDS:2.0
MISC.:1.0 MISC.:2.0
DL=15.0 PSF DL=10.0 PSF
REVISIONS:
1 Sheets:Date:
Init:Remark:
2 Sheets:Date:
Init:Remark:
3 Sheets:Date:
Init:Remark:
4 Sheets:Date:
Init:Remark:
5 Sheets:Date:
Init:Remark:
6 Sheets:Date:
Init:Remark:
3 of 52
1834 W Third St &
#2,33/21/2025
1Y
1X
1 2
A
B
MAIN HOUSE - JADU ROOF SHEARWALL LAYOUT
4 of 52
1834 W Third St &
#2,33/21/2025
1Y
1X
3 4 5
C
D
E
MAIN HOUSE - JADU FLOOR SHEARWALL LAYOUT
5 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1X
Number of Story: 2 Section width: 39(ft)Section length: 33(ft)
Base height: 0.5(ft)Slope roof height: 25.5(ft)Gable mean roof height: 22.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 39(ft), L = 33(ft), H = 23(ft)-->L/B = 0.85, H/L = 0.7
Wall coefficient: Cpw = 0.8, Cpl = -0.5
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Rx = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Rx = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 90.72 + 118.31 = 209.03 PLF
Redistrib: 720*19 + 939*9 = 22131 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 184.59 x 39 / (2 x 33) = 109.08 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 184.59 x 39^2 / (8 x 33) = 1063.49 LBS
Splice w/ min. (6) 16d sinker nails each side of splice at 8" o.c. (standard construction)
FIRST FLOOR DIAPHRAGM
Max shear = 124.96 x 39 / (2 x 33) = 73.84 PLF
Use: 23/32" apa rated unblock w/10d common nails at 6", 6", 12" o.c.
Chord force = 124.96 x 39^2 / (8 x 33) = 719.94 LBS
Splice w/ min. (4) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (23, 0.93, 24.46, 27.07); (19.5, 0.9, 23.62, 26.5); (15, 0.85, 22.35, 25.64)
ROOF
Roof = 15*33 = 495 PLF
Wall = 15*2*4.5 + 10*2*4.5 = 225 PLF
Shear = 0.126(495+225) = 0.126*720 = 90.72 PLF
FIRST FLOOR
Roof + Floor = 15*7 + 13*33 = 534 PLF
Wall = 15*2*4.5 + 15*2*4.5 + 10*2*4.5 + 10*1*4.5 = 405 PLF
Shear = 0.126(534+405) = 0.126*939 = 118.31 PLF
Plate height: ROOF = 19(ft); FIRST FLOOR = 9(ft)
SHEAR ROOF = 209.03*720*19/22131 = 129.21 PLF
SHEAR FIRST FLOOR = 209.03*939*9/22131 = 79.82 PLF
SHEAR ROOF = 0.6*W = 128.3(plf)
SHEAR FIRST FLOOR = 0.6*W = 153.84(plf)
ROOF
FIRST FLOOR
129.21 PLF
153.84 PLF
SEISMIC GOVERN
WIND GOVERN
6 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1Y
Number of Story: 2 Section width: 33(ft)Section length: 39(ft)
Base height: 0.5(ft)Slope roof height: 25.5(ft)Gable mean roof height: 22.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 33(ft), L = 39(ft), H = 23(ft)-->L/B = 1.18, H/L = 0.59
Wall coefficient: Cpw = 0.8, Cpl = -0.46, Roof coefficient: Cpw = (0.17;-0.3), Cpl = -0.6
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 102.06 + 138.98 = 241.04 PLF
Redistrib: 810*19 + 1103*9 = 25317 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 209.33 x 33 / (2 x 39) = 88.56 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 209.33 x 33^2 / (8 x 39) = 730.64 LBS
Splice w/ min. (4) 16d sinker nails each side of splice at 8" o.c. (standard construction)
FIRST FLOOR DIAPHRAGM
Max shear = 142.27 x 33 / (2 x 39) = 60.19 PLF
Use: 23/32" apa rated unblock w/10d common nails at 6", 6", 12" o.c.
Chord force = 142.27 x 33^2 / (8 x 39) = 496.58 LBS
Splice w/ min. (3) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (26, 0.95, 25.09, 26.75); (19.5, 0.9, 23.62, 25.74); (15, 0.85, 22.35, 24.88)
ROOF
Roof = 15*36 = 540 PLF
Wall = 15*2*4.5 + 10*3*4.5 = 270 PLF
Shear = 0.126(540+270) = 0.126*810 = 102.06 PLF
FIRST FLOOR
Roof + Floor = 15*11.5 + 13*33.5 = 608 PLF
Wall = 15*2*4.5 + 15*2*4.5 + 10*3*4.5 + 10*2*4.5 = 495 PLF
Shear = 0.126(608+495) = 0.126*1103 = 138.98 PLF
Plate height: ROOF = 19(ft); FIRST FLOOR = 9(ft)
SHEAR ROOF = 241.04*810*19/25317 = 146.53 PLF
SHEAR FIRST FLOOR = 241.04*1103*9/25317 = 94.51 PLF
SHEAR ROOF = 0.6*W = 133.71(plf)
SHEAR FIRST FLOOR = 0.6*W = 149.28(plf)
ROOF
FIRST FLOOR
146.53 PLF
149.28 PLF
SEISMIC GOVERN
WIND GOVERN
7 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
5
"
|
4
*
d
*
1
.
4
=
0
.
2
6
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
3.
5
0
7.
2
5
4.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
9
1.
9
Co
m
.
(
k
i
p
s
)
2.
7
2.
4
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
9
1.
9
Co
m
.
(
k
i
p
s
)
2.
7
2.
4
8.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
0
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
P2
LI
N
E
1
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
2
0
7
l
b
s
|
S
e
i
s
m
i
c
:
2
4
1
8
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
2
9
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
1
8
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
0
4
p
l
f
(
W
i
n
d
)
/
2
2
4
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
2
.
3
/
2
.
3
)
+
P
2
(
1
.
1
/
1
.
3
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
3
.
2
/
3
.
2
)
+
P
2
(
1
.
6
/
1
.
8
)
=
4
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
11
2
2
-24
8
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
8 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
3
"
|
4
*
d
*
1
.
4
=
0
.
1
9
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
1.
2
5
14
.
2
5
5.
7
5
10
.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(1
)
C
S
1
6
Po
s
t
S
i
z
e
2x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
1
Co
m
.
(
k
i
p
s
)
2.
7
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(1
)
C
S
1
6
Po
s
t
S
i
z
e
2x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
1
Co
m
.
(
k
i
p
s
)
2.
7
5.
2
5
2.
2
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
2
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
2
0
7
l
b
s
|
S
e
i
s
m
i
c
:
2
4
1
8
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
3
9
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
4
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
8
9
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
5
5
p
l
f
(
W
i
n
d
)
/
1
7
0
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
1
/
3
.
1
)
=
3
.
1
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
4
.
4
/
4
.
4
)
=
4
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
11
1
-20
8
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
9 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
3
"
|
4
*
d
*
1
.
4
=
1
.
2
8
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
14
.
0
0
6.
0
0
4.
5
0
5.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
9
Co
m
.
(
k
i
p
s
)
3.
3
3.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
9
Co
m
.
(
k
i
p
s
)
3.
3
3.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
8.
0
0
P2
5.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
C:
S
i
m
p
s
o
n
M
S
T
4
8
(
3
7
6
0
L
B
)
-
A
l
t
t
w
o
r
o
w
(
9
)
#
1
6
E
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
5
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
3
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
6
6
3
l
b
s
|
S
e
i
s
m
i
c
:
3
3
3
9
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
5
0
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
9
8
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
1
9
p
l
f
(
W
i
n
d
)
/
2
9
0
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
1
.
8
/
1
.
8
)
=
3
.
7
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
2
.
5
/
2
.
5
)
=
5
.
2
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
25
1
6
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
10 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
3
7
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
11
.
2
5
11
.
2
5
25
.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
2
Co
m
.
(
k
i
p
s
)
2.
4
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
2
Co
m
.
(
k
i
p
s
)
2.
4
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
4
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
9
8
6
l
b
s
|
S
e
i
s
m
i
c
:
1
8
9
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
4
8
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
6
2
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
6
5
p
l
f
(
W
i
n
d
)
/
1
6
8
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
6
/
3
.
6
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
5
/
5
)
=
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
69
6
-15
9
4
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
11 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
"
|
4
*
d
*
1
.
4
=
1
.
1
5
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
11
.
2
5
6.
0
0
9.
0
0
6.
0
0
3.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
8
Co
m
.
(
k
i
p
s
)
3.
2
3.
2
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
8
Co
m
.
(
k
i
p
s
)
3.
2
3.
2
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
2.
7
5
6.
2
5
5.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P2
P1
LI
N
E
5
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
7
3
8
l
b
s
|
S
e
i
s
m
i
c
:
3
3
8
7
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
4
9
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
2
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
0
0
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
1
2
p
l
f
(
W
i
n
d
)
/
2
8
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
1
.
9
/
1
.
9
)
=
3
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
2
.
7
/
2
.
7
)
=
5
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
14
0
9
-10
6
4
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
12 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
4
1
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
2.
5
0
6.
2
5
5.
2
5
5.
2
5
5.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
9
2.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
5
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
9
2.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
5
P2
2.
7
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
A
(
D
i
r
e
c
t
i
o
n
:
X
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
5
0
2
l
b
s
|
S
e
i
s
m
i
c
:
3
2
7
5
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
3
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
0
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
0
7
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
3
8
p
l
f
(
W
i
n
d
)
/
3
1
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
7
/
1
.
7
)
+
P
2
(
1
.
7
/
1
.
7
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
3
/
2
.
3
)
+
P
2
(
2
.
3
/
2
.
3
)
=
4
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
19
0
7
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
13 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
3
8
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
10
.
5
0
10
.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
6
Co
m
.
(
k
i
p
s
)
3.
8
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
6
Co
m
.
(
k
i
p
s
)
3.
8
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
2.
5
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
B
(
D
i
r
e
c
t
i
o
n
:
X
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
5
0
2
l
b
s
|
S
e
i
s
m
i
c
:
3
2
7
5
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
2
3
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
0
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
5
3
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
3
8
p
l
f
(
W
i
n
d
)
/
3
1
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
4
/
3
.
4
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
4
.
7
/
4
.
7
)
=
4
.
7
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
19
9
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
14 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
3
5
"
|
4
*
d
*
1
.
4
=
1
.
9
4
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
3.
0
0
5.
7
5
3.
0
0
8.
2
5
2.
5
0
16
.
5
0
2.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
HD
U
5
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
0
3.
0
2.
7
2.
7
Co
m
.
(
k
i
p
s
)
3.
4
3.
4
2.
9
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
HD
U
5
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
0
3.
0
2.
7
2.
7
Co
m
.
(
k
i
p
s
)
3.
4
3.
4
2.
9
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
P3
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
P4
LI
N
E
C
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
0
7
9
l
b
s
|
S
e
i
s
m
i
c
:
3
0
2
9
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
D
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
1
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
9
0
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
4
5
4
p
l
f
(
W
i
n
d
)
/
4
4
7
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
1
/
1
.
6
)
+
P
2
(
1
.
1
/
1
.
6
)
+
P
3
(
0
.
7
/
1
.
3
)
+
P
4
(
0
.
7
/
1
.
3
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
5
/
2
.
2
)
+
P
2
(
1
.
5
/
2
.
2
)
+
P
3
(
1
/
1
.
9
)
+
P
4
(
1
/
1
.
9
)
=
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
78
0
-12
2
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
15 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
8
"
|
4
*
d
*
1
.
4
=
1
.
6
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
18
.
7
5
3.
5
0
2.
7
5
9.
0
0
4.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
4
HD
U
4
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
6
Co
m
.
(
k
i
p
s
)
2.
8
3.
6
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
4
HD
U
4
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
6
Co
m
.
(
k
i
p
s
)
2.
8
3.
6
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
C:
S
i
m
p
s
o
n
M
S
T
4
8
(
3
7
6
0
L
B
)
-
A
l
t
t
w
o
r
o
w
(
9
)
#
1
6
E
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P2
P1
LI
N
E
D
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
4
7
7
1
l
b
s
|
S
e
i
s
m
i
c
:
3
8
5
2
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
C
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
2
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
4
0
7
p
l
f
(
W
i
n
d
)
/
3
2
9
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
1
/
1
.
4
)
+
P
2
(
3
.
7
/
3
.
7
)
=
4
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
6
/
2
)
+
P
2
(
5
.
2
/
5
.
2
)
=
6
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
31
5
1
-79
8
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
16 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
3
"
|
4
*
d
*
1
.
4
=
1
.
2
7
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
3.
2
5
2.
7
5
6.
0
0
4.
0
0
9.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
5
Co
m
.
(
k
i
p
s
)
3.
5
3.
7
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
4.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
7
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
2.
2
5
2.
2
5
3.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
5.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
E
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
4
6
9
5
l
b
s
|
S
e
i
s
m
i
c
:
4
7
5
4
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
5
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
4
9
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
0
3
p
l
f
(
W
i
n
d
)
/
3
0
7
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
3
/
3
)
=
4
.
9
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
4
.
2
/
4
.
2
)
=
6
.
9
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
22
0
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
17 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (X-X Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
A 2 1X 39 128 129 9 10.5 312 B
B 2 1X 39 128 129 9 10.5 312 B
C 1 1X 20.5 154 80 1502 1965 9 6.78 454 D
D 1 1X 49 154 80 1001 1310 9 11.72 407 C
E 1 1X 28.5 154 80 2502 3275 9 15.5 307 B
SUMMARY SHEAR WALL
V2 = Seismic*Span/2 + Added Vseismic
Line shear V = Maximum(V1;V2)
V1 = Wind*Span/2 + Added Vwind
v(plf) = V/L
18 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (Y-Y Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
1 2 1Y 33 134 147 9 10.81 224 B
2 2 1Y 33 134 147 9 14.25 170 A
3 1 1Y 19.5 149 95 2207 2418 9 11.5 319 B
4 1 1Y 40 149 95 9 11.25 265 B
5 1 1Y 20.5 149 95 2207 2418 9 12 312 B
v(plf) = V/L
Line shear V = Maximum(V1;V2)
SUMMARY SHEAR WALL
V1 = Wind*Span/2 + Added Vwind
V2 = Seismic*Span/2 + Added Vseismic
19 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic
(#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb)
1 :Wind = 2207(lb), Seismic = 2418(lb)
1 1Y 2 133.7 146.5 33 2206 2418 l---------------33.0(ft)---------------l
2 :Wind = 2207(lb), Seismic = 2418(lb)
2 1Y 2 133.7 146.5 33 2206 2418 l---------------33.0(ft)---------------l
3 :Wind = 3663(lb), Seismic = 3339(lb), Line above : 1 - 100%, Wind = 2207(lb), Seismic = 2418(lb)
3 1Y 1 149.3 94.5 19.5 1455 921 l---------------19.5(ft)---------------l
4 :Wind = 2986(lb), Seismic = 1890(lb)
4 1Y 1 149.3 94.5 40 2986 1890 l---------------40.0(ft)---------------l
5 :Wind = 3738(lb), Seismic = 3387(lb), Line above : 2 - 100%, Wind = 2207(lb), Seismic = 2418(lb)
5 1Y 1 149.3 94.5 20.5 1530 969 l---------------20.5(ft)---------------l
A :Wind = 2502(lb), Seismic = 3275(lb)
A 1X 2 128.3 129.2 39 2502 2520 l---------------39.0(ft)---------------l
B :Wind = 2502(lb), Seismic = 3275(lb)
B 1X 2 128.3 129.2 39 2502 2520 l---------------39.0(ft)---------------l
C :Wind = 3079(lb), Seismic = 3029(lb), Line above : A - 60%, Wind = 1502(lb), Seismic = 1965(lb)
C 1X 1 153.8 79.8 20.5 1577 818 l---------------20.5(ft)---------------l
D :Wind = 4771(lb), Seismic = 3852(lb), Line above : A - 40%, Wind = 1001(lb), Seismic = 1310(lb)
D 1X 1 153.8 79.8 49 3769 1956 l---------------49.0(ft)---------------l
E :Wind = 4695(lb), Seismic = 4754(lb), Line above : B - 100%, Wind = 2502(lb), Seismic = 3275(lb)
E 1X 1 153.8 79.8 28.5 2192 1137 l---------------28.5(ft)---------------l
#N/A #N/A
#N/A #N/A
#N/A #N/A
Description
V_(lb)=v_(plf)*Span*Span/2/(Span+Offset)
LATERAL
p Factor: X Direction: p=1.3; Y Direction: p=1
20 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT2, SANTA ANA, CA 92703
BEAM : 1 - CLG AT BED 3
Loads(Downward+)
Beam Weight 10.1 plf from 0 ft to 14.75 ft
Roof Rafter: (11+20)(4.2) = (DL=46.8PLF; LLr=85PLF) form 0 to 14.75
Ceiling Joist DL: (4)(6.8) = (DL=27PLF) form 0 to 14.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1239/1239 0
2 1239/1239 0
USE 6 x 8
Critcal Shear = 1239 LB @0' 1.5xV/(F'v x A)= 0.21
F'v = 212, A = 41.25
Critcal Moment = 4569 LB-FT @7.37' M/(F'b x S)= 0.63
F'b = 1688, S = 51.56
Critical Deflection for TL = -0.578 INCH @ 7.37 L/240 = 0.738"
Critical Deflection for LL = -0.29 INCH @ 7.37 L/360 = 0.492"
1 2
Moment
Shear
Deflection
14.75'
BEAM : 2 - CLG AT M.BED 4
Loads(Downward+)
Beam Weight 12.7 plf from 0 ft to 10.75 ft
Roof Primary: (15+20)(11.8) = (DL=176.2PLF; LLr=235PLF) form 0 to 10.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2279/2279 0
2 2279/2279 0
USE 6 x 10
Critcal Shear = 2278 LB @0' 1.5xV/(F'v x A)= 0.3
F'v = 212, A = 52.25
Critcal Moment = 6120 LB-FT @5.25' M/(F'b x S)= 0.52
F'b = 1688, S = 82.73
Critical Deflection for TL = -0.202 INCH @ 5.25 L/240 = 0.538"
Critical Deflection for LL = -0.112 INCH @ 5.25 L/360 = 0.358"
1 2
Moment
Shear
Deflection
10.75'
21 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT2, SANTA ANA, CA 92703
BEAM : 2A - CLG AT M.BATH
Loads(Downward+)
Beam Weight 10.1 plf from 0 ft to 13 ft
Roof Rafter: (11+20)(4.2) = (DL=46.8PLF; LLr=85PLF) form 0 to 13
Ceiling Joist DL: (4)(6.5) = (DL=26PLF) form 0 to 13
Point load @ 1.5 : Load from beam 2 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 3036/3036 0
2 1325/1324 0
USE 6 x 8
Critcal Shear = 3036 LB @0' 1.5xV/(F'v x A)= 0.52
F'v = 212, A = 41.25
Critcal Moment = 5339 LB-FT @5' M/(F'b x S)= 0.73
F'b = 1688, S = 51.56
Critical Deflection for TL = -0.538 INCH @ 6.25 L/240 = 0.65"
Critical Deflection for LL = -0.276 INCH @ 6.25 L/360 = 0.433"
1 2
P1
Moment
Shear
Deflection
13'
BEAM : 3 - HDR AT M.BATH
Loads(Downward+)
Beam Weight 4.7 plf from 0 ft to 2.25 ft
Roof Rafter: (11+20)(3.8) = (DL=41.2PLF; LLr=75PLF) form 1.25 to 2.25
Ceiling Joist DL: (4)(5.5) = (DL=22PLF) form 1.25 to 2.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 2.25
Point load @ 1.25 : Load from beam 2A at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 672/672 0
2 899/899 0
USE 4 x 6
Critcal Shear = -898 LB @2.25' 1.5xV/(F'v x A)= 0.31
F'v = 225, A = 19.25
Critcal Moment = 812 LB-FT @1.25' M/(F'b x S)= 0.37
F'b = 1462, S = 17.65
Critical Deflection for TL = -0.007 INCH @ 1 L/240 = 0.112"
Critical Deflection for LL = -0.004 INCH @ 1 L/360 = 0.075"
1 2
P1
Moment
Shear
Deflection
2.25'
22 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 3A - HDR AT M.BED 4
Loads(Downward+)
Beam Weight 4.7 plf from 0 ft to 2.25 ft
Exterior Wall: (15)(4) = (DL=60PLF) form 0 to 2.25
Point load @ 1 : Load from beam 2 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1339/1339 0
2 1085/1086 0
USE 4 x 6
Critcal Shear = 1338 LB @0' 1.5xV/(F'v x A)= 0.46
F'v = 225, A = 19.25
Critcal Moment = 1306 LB-FT @1' M/(F'b x S)= 0.6
F'b = 1462, S = 17.65
Critical Deflection for TL = -0.012 INCH @ 1 L/240 = 0.112"
Critical Deflection for LL = -0.007 INCH @ 1 L/360 = 0.075"
1 2
P1
Moment
Shear
Deflection
2.25'
BEAM : 4 - RIDGE AT FAMILY ROOM
Loads(Downward+)
Beam Weight 15.4 plf from 0 ft to 14 ft
Rafter Vaulted: (13+20)(13.2) = (DL=172.2PLF; LLr=265PLF) form 0 to 14
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 3116/3116 0
2 3116/3116 0
USE 6 x 12
Critcal Shear = 3115 LB @0' 1.5xV/(F'v x A)= 0.34
F'v = 212, A = 63.25
Critcal Moment = 10905 LB-FT @7' M/(F'b x S)= 0.64
F'b = 1688, S = 121.23
Critical Deflection for TL = -0.345 INCH @ 7 L/240 = 0.7"
Critical Deflection for LL = -0.2 INCH @ 7 L/360 = 0.467"
1 2
Moment
Shear
Deflection
14'
23 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 4A - CLG AT HALLWAY
Loads(Downward+)
Beam Weight 19.5 plf from 0 ft to 18.25 ft
Roof Primary: (15+20)(13.2) = (DL=198.8PLF; LLr=265PLF) form 0 to 18.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 4233/4232 0
2 4233/4232 0
USE 5 1/4" x 11 7/8" PSL
Critcal Shear = 4232 LB @0' 1.5xV/(F'v x A)= 0.28
F'v = 362, A = 62.34
Critcal Moment = 19308 LB-FT @9.12' M/(F'b x S)= 0.52
F'b = 3625, S = 123.39
Critical Deflection for TL = -0.79 INCH @ 9.13 L/240 = 0.912"
Critical Deflection for LL = -0.418 INCH @ 9.13 L/360 = 0.608"
1 2
Moment
Shear
Deflection
18.25'
BEAM : 4B - CLG AT STAIR
Loads(Downward+)
Beam Weight 15.2 plf from 0 ft to 14.25 ft
Interior Wall: (10)(0~5) = (DL=0~50PLF) form 0 to 14.25
Point load @ 13 : Load from beam 4 at Support 2(P1)
Point load @ 13 : Load from beam 4A at Support 1(P2)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 873/873 0
2 7062/7061 0
USE 5 1/4" x 9 1/4" PSL
Critcal Shear = -7061 LB @14.25' 1.5xV/(F'v x A)= 0.6
F'v = 362, A = 48.56
Critcal Moment = 8777 LB-FT @13' M/(F'b x S)= 0.39
F'b = 3625, S = 74.87
Critical Deflection for TL = -0.339 INCH @ 7.92 L/240 = 0.712"
Critical Deflection for LL = -0.158 INCH @ 7.92 L/360 = 0.475"
1 2
P1P2
Moment
Shear
Deflection
14.25'
24 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 5 - FL AT GARAGE
Loads(Downward+)
Beam Weight 15.2 plf from 0 ft to 15.5 ft
Deck Primary: (13+60)(3.2) = (DL=42.2PLF; LLr=195PLF) form 0 to 5.25
Deck Primary: (13+60)(2.5) = (DL=32.5PLF; LLr=150PLF) form 5.25 to 15.5
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 15.5
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 0 to 15.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2857/2468 0
2 2667/2278 0
USE 5 1/4" x 9 1/4" PSL
Critcal Shear = 2468 LB @0' 1.5xV/(F'v x A)= 0.26
F'v = 290, A = 48.56
Critcal Moment = 9019 LB-FT @7.46' M/(F'b x S)= 0.5
F'b = 2900, S = 74.87
Critical Deflection for TL = -0.566 INCH @ 7.75 L/240 = 0.775"
Critical Deflection for LL = -0.303 INCH @ 7.75 L/360 = 0.517"
1 2
Moment
Shear
Deflection
15.5'
BEAM : 6 - FL AT GARAGE
Loads(Downward+)
Beam Weight 10.2 plf from 0 ft to 11.5 ft
Roof Primary: (15+20)(2.2) = (DL=33.8PLF; LLr=45PLF) form 0 to 11.5
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 5 to 11.5
Point load @ 5 : Load from beam 5 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2115/1826 0
2 1915/1678 0
USE 3 1/2" x 9 1/4" PSL
Critcal Shear = 1637 LB @0' 1.5xV/(F'v x A)= 0.26
F'v = 290, A = 32.38
Critcal Moment = 7637 LB-FT @5' M/(F'b x S)= 0.63
F'b = 2900, S = 49.91
Critical Deflection for TL = -0.357 INCH @ 5.5 L/240 = 0.575"
Critical Deflection for LL = -0.168 INCH @ 5.5 L/360 = 0.383"
1 2
P1
Moment
Shear
Deflection
11.5'
25 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 7 - HDR AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 16.25 ft
Roof Primary: (15+20)(4.5) = (DL=67.5PLF; LLr=90PLF) form 0 to 13.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 16.25
Point load @ 13.25 : Load from beam 6 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1968/1841 0
2 2915/2558 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = -2558 LB @16.25' 1.5xV/(F'v x A)= 0.24
F'v = 388, A = 41.56
Critcal Moment = 8527 LB-FT @9.81' M/(F'b x S)= 0.43
F'b = 2906, S = 82.26
Critical Deflection for TL = -0.539 INCH @ 8.43 L/240 = 0.812"
Critical Deflection for LL = -0.222 INCH @ 8.43 L/360 = 0.542"
1 2
P1
Moment
Shear
Deflection
16.25'
BEAM : 8 - FL AT DINING
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 11.25 ft
Exterior Wall: (15)(9~13) = (DL=135~195PLF) form 0 to 11.25
Roof Primary: (15+20)(1.3) = (DL=20PLF; LLr=26.7PLF) form 0 to 11.25
Point load from Panel P1(Left) of Line 1 at @ 7.5(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1201/2981 0 2981
2 1314/4895 -265 4895
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -4895 LB @11.25' 1.5xV/(F'v x A)= 0.35
F'v = 496, A = 41.56
Critcal Moment = 16595 LB-FT @7.5' M/(F'b x S)= 0.65
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.214 INCH @ 6 L/240 = 0.562"
Critical Deflection for LL = -0.121 INCH @ 6 L/360 = 0.375"
1 2
P1*
Moment
Shear
Deflection
11.25'
26 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 9 - FL AT LIVING
Loads(Downward+)
Beam Weight 17.5 plf from 0 ft to 19 ft
Roof Primary: (15+20)(11.2) = (DL=168.8PLF; LLr=225PLF) form 0 to 4.75
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 4.75 to 10.25
Roof Primary: (15+20)(3.8) = (DL=56.2PLF; LLr=75PLF) form 10.25 to 19
Exterior Wall: (15)(9) = (DL=135PLF) form 4.75 to 19
Rafter Vaulted: (13+20)(8.8) = (DL=113.8PLF; LLr=175PLF) form 4.75 to 19
Point load @ 4.75 : Load from beam 8 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 5701/5701 0 5701
2 5597/5596 0 5596
USE 3 1/2" x 16" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5700 LB @0' 1.5xV/(F'v x A)= 0.42
F'v = 362, A = 56
Critcal Moment = 28279 LB-FT @8.86' M/(F'b x S)= 0.62
F'b = 3625, S = 149.33
Critical Deflection for TL = -0.77 INCH @ 9.29 L/240 = 0.95"
Critical Deflection for LL = -0.307 INCH @ 9.29 L/360 = 0.633"
1 2
P1
Moment
Shear
Deflection
19'
BEAM : 10 - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 13.5
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 13.5
Roof Primary: (15+20)(9.8) = (DL=146.2PLF; LLr=195PLF) form 0 to 1.5
Point load from Panel P2(Left) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1926/10274 -1982 10274
2 1043/2027 0 2027
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -8181 LB @1.5' 1.5xV/(F'v x A)= 0.59
F'v = 496, A = 41.56
Critcal Moment = -11877 LB-FT @1.5' M/(F'b x S)= 0.46
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.195 INCH @ 7.25 L/240 = 0.6"
Critical Deflection for LL = -0.103 INCH @ 7.25 L/360 = 0.4"
1 2
P1*
Moment
Shear
Deflection
1.5'12'
27 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UINT 2, SANTA ANA, CA 92703
BEAM : 10A - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 1.5
Roof Primary: (15+20)(9.8) = (DL=146.2PLF; LLr=195PLF) form 0 to 1.5
Point load from Panel P1(Left) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 793/9474 -3096 9474
2 -61/1258 -547 1258
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -8156 LB @1.5' 1.5xV/(F'v x A)= 0.59
F'v = 496, A = 41.56
Critcal Moment = -11858 LB-FT @1.5' M/(F'b x S)= 0.46
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.062 INCH @ 5.5 L/240 = 0.45"
Critical Deflection for LL = -0.06 INCH @ 5.5 L/360 = 0.3"
1 2
P1*
Moment
Shear
Deflection
1.5'9'
BEAM : 10B - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Floor Primary: (13+40)(1.3) = (DL=17.4PLF; LL=53.4PLF) form 0 to 10.5
Point load from Panel P1(Right) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 506/9126 -3393 9126
2 362/1415 -382 1415
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -7702 LB @1.5' 1.5xV/(F'v x A)= 0.56
F'v = 496, A = 41.56
Critcal Moment = -11504 LB-FT @1.5' M/(F'b x S)= 0.45
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.067 INCH @ 5.75 L/240 = 0.45"
Critical Deflection for LL = -0.062 INCH @ 5.75 L/360 = 0.3"
1 2
P1*
Moment
Shear
Deflection
1.5'9'
28 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 11 - DROP AT GARAGE
Loads(Downward+)
Beam Weight 30.7 plf from 0 ft to 20.25 ft
Floor Primary: (13+40)(4.5) = (DL=58.5PLF; LL=180PLF) form 0 to 3
Floor Primary: (13+40)(6) = (DL=78PLF; LL=240PLF) form 3 to 18.25
Deck Primary: (13+60)(2.5) = (DL=32.5PLF; LLr=150PLF) form 3 to 15.25
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 18.25
Roof Primary: (15+20)(6.8) = (DL=101.2PLF; LLr=135PLF) form 0 to 3
Deck Primary: (13+60)(3.2) = (DL=42.2PLF; LLr=195PLF) form 0 to 3
Point load @ 3 : Load from beam 1 at Support 1(P1)
Point load @ 3 : Load from beam 10A at Support 1(P2)
Point load @ 15.25 : Load from beam 6 at Support 2(P3)
Point load @ 18.25 : Load from beam 10 at Support 1(P4)
Point load @ 18.25 : Load from beam 1 at Support 2(P5)
Point load @ 13.25 : Load from beam 10B at Support 1(P6)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 8769/7689 -171 7689
2 9065/8087 -820 8087
USE 7" x 14" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 13104 LB @18.25' 1.5xV/(F'v x A)= 0.43
F'v = 464, A = 98
Critcal Moment = 37746 LB-FT @10.68' M/(F'b x S)= 0.68
F'b = 2900, S = 228.67
Critical Deflection for TL = -0.885 INCH @ 10.12 L/240 = 1.012"
Critical Deflection for LL = -0.389 INCH @ 10.12 L/360 = 0.675"
1 2
P1P2 P3 P4P5P6
Moment
Shear
Deflection
20.25'
BEAM : 12 - FL AT KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 12.5 ft
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 12.5
Exterior Wall: (15)(14~11) = (DL=210~165PLF) form 0 to 12.5
Point load @ 2.25 : Load from beam 4 at Support 1(P1)
Point load from Panel P1(Right) of Line 1 at @ 3.75(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 4439/5490 0 5490
2 2316/3239 0 3239
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 4438 LB @0' 1.5xV/(F'v x A)= 0.41
F'v = 388, A = 41.56
Critcal Moment = 18544 LB-FT @3.75' M/(F'b x S)= 0.72
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.367 INCH @ 6 L/240 = 0.625"
Critical Deflection for LL = -0.129 INCH @ 6 L/360 = 0.417"
1 2
P1 P2*
Moment
Shear
Deflection
12.5'
29 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 13 - FL AT DINING
Loads(Downward+)
Beam Weight 26 plf from 0 ft to 19 ft
Floor Primary: (13+40)(6.2) = (DL=81.2PLF; LL=250PLF) form 4.75 to 19
Roof Rafter: (11+20)(3.8) = (DL=41.2PLF; LLr=75PLF) form 0 to 4.75
Ceiling Joist DL: (4)(5.5) = (DL=22PLF) form 0 to 4.75
Interior Wall: (10)(3.5) = (DL=35PLF) form 4.75 to 15.25
Point load @ 4.75 : Load from beam 8 at Support 2(P1)
Point load @ 4.75 : Load from beam 12 at Support 1(P2)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 6874/6142 0 6142
2 4729/4224 0 4224
USE 7" x 11 7/8" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5192 LB @0' 1.5xV/(F'v x A)= 0.32
F'v = 290, A = 83.12
Critcal Moment = 24983 LB-FT @7.6' M/(F'b x S)= 0.63
F'b = 2900, S = 164.52
Critical Deflection for TL = -0.889 INCH @ 8.89 L/240 = 0.95"
Critical Deflection for LL = -0.358 INCH @ 8.89 L/360 = 0.633"
1 2
P1P2
Moment
Shear
Deflection
19'
BEAM : 14 - FL AT JADU KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 9.75 ft
Floor Primary: (13+40)(1.2) = (DL=16.2PLF; LL=50PLF) form 0 to 9.75
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 0 to 9.75
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 9.75
Rafter Vaulted: (13+20)(8.8) = (DL=113.8PLF; LLr=175PLF) form 0 to 9.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 4401/3726 0
2 4401/3726 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = 3549 LB @0' 1.5xV/(F'v x A)= 0.41
F'v = 310, A = 41.56
Critcal Moment = 8645 LB-FT @4.75' M/(F'b x S)= 0.54
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.205 INCH @ 4.75 L/240 = 0.488"
Critical Deflection for LL = -0.112 INCH @ 4.75 L/360 = 0.325"
1 2
Moment
Shear
Deflection
9.75'
30 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 15 - FL AT JADU LIVING
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 13.5
Exterior Wall: (15)(11~9) = (DL=165~135PLF) form 0 to 2.75
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 2.75 to 13.5
Point load @ 2.75 : Load from beam 14 at Support 1(P1)
Point load from Panel P2(Left) of Line 1 at @ 2.75(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 4774/6630 0 6630
2 1948/2226 0 2226
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 6629 LB @0' 1.5xV/(F'v x A)= 0.48
F'v = 496, A = 41.56
Critcal Moment = 17346 LB-FT @2.75' M/(F'b x S)= 0.68
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.508 INCH @ 6.23 L/240 = 0.675"
Critical Deflection for LL = -0.278 INCH @ 6.23 L/360 = 0.45"
1 2
P1P2*
Moment
Shear
Deflection
13.5'
BEAM : 16 - FL AT JADU KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 2.75 to 13.5
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 2.75 to 13.5
Point load @ 2.75 : Load from beam 14 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 5025/4364 0
2 3153/2829 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = 3854 LB @0' 1.5xV/(F'v x A)= 0.45
F'v = 310, A = 41.56
Critcal Moment = 10711 LB-FT @4' M/(F'b x S)= 0.67
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.546 INCH @ 6.49 L/240 = 0.675"
Critical Deflection for LL = -0.219 INCH @ 6.49 L/360 = 0.45"
1 2
P1
Moment
Shear
Deflection
13.5'
31 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 17 - FL AT BED 1
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 14 ft
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 14
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 14
Floor Primary: (13+40)(0.8) = (DL=10.4PLF; LL=32PLF) form 0 to 14
Point load @ 12.75 : Load from beam 3 at Support 1(P1)
Point load @ 1 : Load from beam 4A at Support 1(P3)
Point load from Panel P1(Right) of Line 2 at @ 2(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 5672/5447 0 5447
2 1949/1933 0 1933
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5447 LB @0' 1.5xV/(F'v x A)= 0.5
F'v = 388, A = 41.56
Critcal Moment = 6080 LB-FT @6.25' M/(F'b x S)= 0.38
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.354 INCH @ 6.74 L/240 = 0.7"
Critical Deflection for LL = -0.098 INCH @ 6.74 L/360 = 0.467"
1 2
P1P3P2*
Moment
Shear
Deflection
14'
BEAM : 18 - FL AT JADU BED
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 10.5
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 10.5
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 0.75 to 10.5
Point load @ 0.75 : Load from beam 3 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2701/2701 0
2 2071/2070 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = 2700 LB @0' 1.5xV/(F'v x A)= 0.25
F'v = 388, A = 41.56
Critcal Moment = 5591 LB-FT @5' M/(F'b x S)= 0.28
F'b = 2906, S = 82.26
Critical Deflection for TL = -0.149 INCH @ 5.25 L/240 = 0.525"
Critical Deflection for LL = -0.054 INCH @ 5.25 L/360 = 0.35"
1 2
P1
Moment
Shear
Deflection
10.5'
32 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 19 - HDR AT JADU LIVING
Loads(Downward+)
Beam Weight 7.9 plf from 0 ft to 5.25 ft
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 1.75 to 5.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 5.25
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 1.75 to 5.25
Point load @ 1.75 : Load from beam 15 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1928/1684 0 1684
2 1808/1638 0 1638
USE 4 x 10
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -1637 LB @5.25' 1.5xV/(F'v x A)= 0.42
F'v = 180, A = 32.38
Critcal Moment = 2725 LB-FT @2' M/(F'b x S)= 0.6
F'b = 1080, S = 49.91
Critical Deflection for TL = -0.036 INCH @ 2.5 L/240 = 0.262"
Critical Deflection for LL = -0.017 INCH @ 2.5 L/360 = 0.175"
1 2
P1
Moment
Shear
Deflection
5.25'
BEAM : 20 - HDR AT JADU DINING
Loads(Downward+)
Beam Weight 9.6 plf from 0 ft to 5.25 ft
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 0 to 3.75
Floor Primary: (13+40)(6.8) = (DL=87.8PLF; LL=270PLF) form 3.75 to 5.25
Exterior Wall: (15)(5.5) = (DL=82.5PLF) form 0 to 3.75
Exterior Wall: (15)(11) = (DL=165PLF) form 3.75 to 5.25
Point load @ 3.75 : Load from beam 16 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2204/1943 0
2 3598/3169 0
USE 4 x 12
Critcal Shear = -2941 LB @5.25' 1.5xV/(F'v x A)= 0.62
F'v = 180, A = 39.38
Critcal Moment = 3814 LB-FT @3.75' M/(F'b x S)= 0.56
F'b = 1100, S = 73.83
Critical Deflection for TL = -0.024 INCH @ 2.75 L/240 = 0.262"
Critical Deflection for LL = -0.011 INCH @ 2.75 L/360 = 0.175"
1 2
P1
Moment
Shear
Deflection
5.25'
33 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 21 - CLG AT ENTRANCE
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 8.25 ft
Roof Rafter: (11+20)(2) = (DL=22PLF; LLr=40PLF) form 0 to 8.25
Ceiling Joist DL: (4)(1.3) = (DL=5.3PLF) form 0 to 8.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 303/303 0
2 303/303 0
USE 4 x 8
Critcal Shear = 303 LB @0' 1.5xV/(F'v x A)= 0.08
F'v = 225, A = 25.38
Critcal Moment = 625 LB-FT @4' M/(F'b x S)= 0.16
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.043 INCH @ 4 L/240 = 0.412"
Critical Deflection for LL = -0.023 INCH @ 4 L/360 = 0.275"
1 2
Moment
Shear
Deflection
8.25'
BEAM : C1 - C.J. 2X6#2 @ 16" O.C. TYP. (MAX L=15'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 140/140 0
2 140/140 0
USE 2 x 6
Critcal Shear = 140 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 8.25
Critcal Moment = 525 LB-FT @7.5' M/(F'b x S)= 0.49
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.64 INCH @ 7.5 L/240 = 0.75"
Critical Deflection for LL = -0.457 INCH @ 7.5 L/360 = 0.5"
1 2
Moment
Shear
Deflection
15'
34 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : F3 - D.J. 2X10#2 @ 16" O.C. TYP. (MAX L=12'-
0")
Loads(Downward+)
Deck Primary: (13+60)(1.3) = (DL=17.4PLF; LLr=80.1PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 585/585 0
2 585/585 0
USE 2 x 10
Critcal Shear = 584 LB @0' 1.5xV/(F'v x A)= 0.35
F'v = 180, A = 13.88
Critcal Moment = 1754 LB-FT @6' M/(F'b x S)= 0.86
F'b = 1138, S = 21.39
Critical Deflection for TL = -0.287 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.236 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
BEAM : R1 - R.R. 2X6#2 @ 16" O.C. TYP. (MAX L=12'-0")
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 248/248 0
2 248/248 0
USE 2 x 6
Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2
F'v = 225, A = 8.25
Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
35 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : R1A - R.R. 2X6#2 @ 16" O.C. W/ PURLIN
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 13.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 25/25 0
2 381/382 0
3 152/152 0
USE 2 x 6
Critcal Shear = 220 LB @4.5' 1.5xV/(F'v x A)= 0.18
F'v = 225, A = 8.25
Critcal Moment = -306 LB-FT @4.5' M/(F'b x S)= 0.29
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.101 INCH @ 9.5 L/240 = 0.45"
Critical Deflection for LL = -0.065 INCH @ 9.5 L/360 = 0.3"
1 2 3
Moment
Shear
Deflection
4.5'9'
BEAM : R2 - R.R. 2X10#2 @ 16" O.C.
Loads(Downward+)
Rafter Vaulted: (13+20)(1.3) = (DL=17.4PLF; LLr=26.7PLF) form 0 to 13.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 297/297 0
2 297/297 0
USE 2 x 10
Critcal Shear = 297 LB @0' 1.5xV/(F'v x A)= 0.14
F'v = 225, A = 13.88
Critcal Moment = 1003 LB-FT @6.75' M/(F'b x S)= 0.39
F'b = 1423, S = 21.39
Critical Deflection for TL = -0.208 INCH @ 6.75 L/240 = 0.675"
Critical Deflection for LL = -0.126 INCH @ 6.75 L/360 = 0.45"
1 2
Moment
Shear
Deflection
13.5'
36 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
(allowable)
P(allowable) = 14,500 #
FOUNDATION - 2-STORY
45𝑜
37 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
2' - 0"Square x 24" Deep Concrete Pad With
3-#4 Each way
BEAM NO. BM#9+11 Support 1 P =13,856 #
Use 2' - 6"Square x 24" Deep Concrete Pad With
3-#5 Each way
PAD SCHEDULE
38 of 52
1834 W Third St &
#2,33/21/2025
1Y
1X
1
2
A B
AD
U
R
O
O
F
S
H
E
A
R
W
A
L
L
L
A
Y
O
U
T
39 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
SECTION: 1X
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
ROOF 113.4 PLF SEISMIC GOVERN
40 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
SECTION: 1Y
Number of Story: 1 Section width: 45(ft)Section length: 19(ft)
Base height: 0.5(ft)Slope roof height: 13.5(ft)Gable mean roof height: 11.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 45(ft), L = 19(ft), H = 12(ft)-->L/B = 0.42, H/L = 0.63
Wall coefficient: Cpw = 0.8, Cpl = -0.5, Roof coefficient: Cpw = (0.16;-0.32), Cpl = -0.6
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 64.26 = 64.26 PLF
Redistrib: 510*9 = 4590 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 91.8 x 45 / (2 x 19) = 108.71 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 91.8 x 45^2 / (8 x 19) = 1222.99 LBS
Splice w/ min. (7) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (15, 0.85, 22.35, 24.7)
ROOF
Roof = 15*19 = 285 PLF
Wall = 15*2*4.5 + 10*2*4.5 = 225 PLF
Shear = 0.126(285+225) = 0.126*510 = 64.26 PLF
Plate height: ROOF = 9(ft)
SHEAR ROOF = 64.26*510*9/4590 = 64.26 PLF
SHEAR ROOF = 0.6*W = 105.49(plf)
ROOF 105.49 PLF WIND GOVERN
41 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
9
"
|
4
*
d
*
1
.
4
=
1
.
6
4
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
5.
2
5
3.
7
5
3.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
1
Co
m
.
(
k
i
p
s
)
2.
9
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
1
Co
m
.
(
k
i
p
s
)
2.
9
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
6.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
1
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
3
7
4
l
b
s
|
S
e
i
s
m
i
c
:
1
8
8
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
1
9
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
7
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
2
3
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
8
0
p
l
f
(
W
i
n
d
)
/
3
0
1
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
/
1
.
2
)
+
P
2
(
1
/
1
.
2
)
=
2
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
4
/
1
.
7
)
+
P
2
(
1
.
4
/
1
.
7
)
=
2
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
72
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
42 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
3
"
|
4
*
d
*
1
.
4
=
0
.
7
2
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
8.
5
0
8.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
5
Co
m
.
(
k
i
p
s
)
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
5
Co
m
.
(
k
i
p
s
)
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
2.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
2
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
3
7
4
l
b
s
|
S
e
i
s
m
i
c
:
1
8
8
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
1
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
2
7
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
9
7
p
l
f
(
W
i
n
d
)
/
2
3
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
2
.
6
/
2
.
6
)
=
2
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
3
.
6
/
3
.
6
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
13
6
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
43 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
"
|
4
*
d
*
1
.
4
=
0
.
5
3
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
9.
7
5
8.
0
0
5.
2
5
7.
2
5
4.
0
0
4.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
2.
2
5
2.
2
5
2.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
A
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
8
2
0
l
b
s
|
S
e
i
s
m
i
c
:
1
4
0
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
5
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
0
3
p
l
f
(
W
i
n
d
)
/
1
7
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
33
2
-93
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
44 of 52
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
"
|
4
*
d
*
1
.
4
=
0
.
5
3
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
5.
5
0
8.
0
0
6.
2
5
6.
2
5
3.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
6.
2
5
6.
5
0
3.
2
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
B
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
8
2
0
l
b
s
|
S
e
i
s
m
i
c
:
1
4
0
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
5
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
0
3
p
l
f
(
W
i
n
d
)
/
1
7
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
18
7
-10
8
0
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
45 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Shear Wall (X-X Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
A 1 1X 19 86 113 9 8 175 A
B 1 1X 19 86 113 9 8 175 A
SUMMARY SHEAR WALL
V2 = Seismic*Span/2 + Added Vseismic
Line shear V = Maximum(V1;V2)
V1 = Wind*Span/2 + Added Vwind
v(plf) = V/L
46 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Shear Wall (Y-Y Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
1 1 1Y 45 105 64 9 6.25 380 B
2 1 1Y 45 105 64 9 8 297 B
v(plf) = V/L
Line shear V = Maximum(V1;V2)
SUMMARY SHEAR WALL
V1 = Wind*Span/2 + Added Vwind
V2 = Seismic*Span/2 + Added Vseismic
47 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic
(#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb)
1 :Wind = 2374(lb), Seismic = 1880(lb)
1 1Y 1 105.5 64.3 45 2374 1446 l---------------45.0(ft)---------------l
2 :Wind = 2374(lb), Seismic = 1880(lb)
2 1Y 1 105.5 64.3 45 2374 1446 l---------------45.0(ft)---------------l
A :Wind = 820(lb), Seismic = 1400(lb)
A 1X 1 86.3 113.4 19 820 1077 l---------------19.0(ft)---------------l
B :Wind = 820(lb), Seismic = 1400(lb)
B 1X 1 86.3 113.4 19 820 1077 l---------------19.0(ft)---------------l
#N/A #N/A
#N/A #N/A
#N/A #N/A
Description
V_(lb)=v_(plf)*Span*Span/2/(Span+Offset)
LATERAL
p Factor: X Direction: p=1.3; Y Direction: p=1.3
48 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : 1 - DROP AT ENTRANCE
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 9.75 ft
Roof Primary: (15+20)(4.8) = (DL=71.2PLF; LLr=95PLF) form 0 to 9.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 841/841 0
2 841/841 0
USE 4 x 8
Critcal Shear = 840 LB @0' 1.5xV/(F'v x A)= 0.22
F'v = 225, A = 25.38
Critcal Moment = 2047 LB-FT @4.75' M/(F'b x S)= 0.55
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.197 INCH @ 5 L/240 = 0.488"
Critical Deflection for LL = -0.109 INCH @ 5 L/360 = 0.325"
1 2
Moment
Shear
Deflection
9.75'
BEAM : 2 - HDR AT BED
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 6 ft
Roof Primary: (15+20)(11.5) = (DL=172.5PLF; LLr=230PLF) form 0 to 6
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 6
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1316/1316 0
2 1316/1316 0
USE 4 x 8
Critcal Shear = 1316 LB @0' 1.5xV/(F'v x A)= 0.34
F'v = 225, A = 25.38
Critcal Moment = 1974 LB-FT @3' M/(F'b x S)= 0.53
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.072 INCH @ 3 L/240 = 0.3"
Critical Deflection for LL = -0.038 INCH @ 3 L/360 = 0.2"
1 2
Moment
Shear
Deflection
6'
49 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : C1 - C.J. 2X6#2 @ 16" O.C. TYP. (MAX L=15'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 140/140 0
2 140/140 0
USE 2 x 6
Critcal Shear = 140 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 8.25
Critcal Moment = 525 LB-FT @7.5' M/(F'b x S)= 0.49
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.64 INCH @ 7.5 L/240 = 0.75"
Critical Deflection for LL = -0.457 INCH @ 7.5 L/360 = 0.5"
1 2
Moment
Shear
Deflection
15'
BEAM : C2 - C.J. 2X8#2 @ 16" O.C. TYP. (MAX L=20'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 20
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 187/187 0
2 187/187 0
USE 2 x 8
Critcal Shear = 186 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 10.88
Critcal Moment = 934 LB-FT @10' M/(F'b x S)= 0.55
F'b = 1552, S = 13.14
Critical Deflection for TL = -0.883 INCH @ 10 L/240 = 1"
Critical Deflection for LL = -0.631 INCH @ 10 L/360 = 0.667"
1 2
Moment
Shear
Deflection
20'
50 of 52
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : R1 - R.R. 2X6#2 @ 16" O.C. TYP. (MAX L=12'-0")
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 248/248 0
2 248/248 0
USE 2 x 6
Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2
F'v = 225, A = 8.25
Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
51 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
2900 psf
Trib Trib Wall Height
DL(psf)LL(psf)roof(ft)DL(psf)LL(psf)floor(ft)DL(psf)wall(ft)
15 20 11.5 15 9
Roof:(DL+LL)(Trib) =402.5 plf
Floor:(DL+LL)(Trib) =0 plf
Wall:DL (Height)=135 plf
537.5 plf
537.5 /(12"/12)=537.5 psf< 2900 psf
P(allowable)
P(allowable) = 8,700 #
18 in
FOUNDATION - 1-STORY
Allowable soil bearing value:
Roof Floor
use 12" wide cont. ftg w/ 2-#4 top & bott.
45𝑜
52 of 52
1834 W Third St &
#2,33/21/2025
Dong Engineering, Inc.
7661 GARDEN GROVE BLVD. , GARDEN GROVE, CA 92841
Office: (714) 617-5979
Email: info@dongengineering.com
DATE:7/17/2024
CLIENT:
JOB NO.:240051
Project:
NEW MAIN HOUSE & ADU
STRUCTURAL CALCULATIONS FOR THE BUILDING AT:
1834 W.3RD ST,
SANTA ANA, CA 92703
Page 1 of 57
1834 W Third St &
#2,33/21/2025
Job#:240051
Date:
ROOF:SHINGLE ROOF (VAULTED):SHINGLE
Slope 6:12 Slope 6:12
Live Load 20 psf Live Load 20 psf
Roof'g Material 3.0 psf Roof'g Material 3.0 psf
Sheathing 2.0 psf Sheathing 2.0 psf
Trusses / Rafters 2.0 psf Trusses / Rafters 2.0 psf
Ceiling Joists 2.0 psf
Drywall 2.0 psf Drywall 2.0 psf
Sprinkler 0.5 psf Sprinkler 0.5 psf
Solar 3.0 psf Solar 3.0 psf
Miscellaneous 0.5 psf Miscellaneous 0.5 psf
Total D.L.15 psf Total D.L.13.0 psf
Total Load 35 psf Total Load 33 psf
FLOOR:Without Lt. Wt. CONC.DECK:
Live Load 40 psf Live Load 60 psf
Floor Material 3.0 psf Floor Material 3.0 psf
Sheathing 3.0 psf Sheathing 3.0 psf
Floor Joist 3.0 psf Floor Joist 3.0 psf
Sprinkler 0.5 psf Sprinkler 0.5 psf
Miscellaneous 0.5 psf Miscellaneous 0.5 psf
Drywall 3.0 psf Drywall 3.0 psf
Total D.L.13 psf Total D.L.13 psf
Total Load 53 psf Total Load 73 psf
LOADING CONDITIONS
7/10/2024
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Page 2 of 57
1834 W Third St &
#2,33/21/2025
EXTERIOR WALL:INTERIOR WALL:
EXTERIOR:9 DRYWALL:3
DRYWALL:3.0 DRYWALL:3.0
STUDS:2.0 STUDS:2.0
MISC.:1.0 MISC.:2.0
DL=15.0 PSF DL=10.0 PSF
REVISIONS:
1 Sheets:Date:
Init:Remark:
2 Sheets:Date:
Init:Remark:
3 Sheets:Date:
Init:Remark:
4 Sheets:Date:
Init:Remark:
5 Sheets:Date:
Init:Remark:
6 Sheets:Date:
Init:Remark:
Page 3 of 57
1834 W Third St &
#2,33/21/2025
1Y
1X
1 2
A
B
MAIN HOUSE - JADU ROOF SHEARWALL LAYOUT
Page 4 of 57
1834 W Third St &
#2,33/21/2025
1Y
1X
3 4 5
C
D
E
MAIN HOUSE - JADU FLOOR SHEARWALL LAYOUT
Page 5 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1X
Number of Story: 2 Section width: 39(ft)Section length: 33(ft)
Base height: 0.5(ft)Slope roof height: 25.5(ft)Gable mean roof height: 22.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 39(ft), L = 33(ft), H = 23(ft)-->L/B = 0.85, H/L = 0.7
Wall coefficient: Cpw = 0.8, Cpl = -0.5
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Rx = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Rx = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 90.72 + 118.31 = 209.03 PLF
Redistrib: 720*19 + 939*9 = 22131 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 184.59 x 39 / (2 x 33) = 109.08 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 184.59 x 39^2 / (8 x 33) = 1063.49 LBS
Splice w/ min. (6) 16d sinker nails each side of splice at 8" o.c. (standard construction)
FIRST FLOOR DIAPHRAGM
Max shear = 124.96 x 39 / (2 x 33) = 73.84 PLF
Use: 23/32" apa rated unblock w/10d common nails at 6", 6", 12" o.c.
Chord force = 124.96 x 39^2 / (8 x 33) = 719.94 LBS
Splice w/ min. (4) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (23, 0.93, 24.46, 27.07); (19.5, 0.9, 23.62, 26.5); (15, 0.85, 22.35, 25.64)
ROOF
Roof = 15*33 = 495 PLF
Wall = 15*2*4.5 + 10*2*4.5 = 225 PLF
Shear = 0.126(495+225) = 0.126*720 = 90.72 PLF
FIRST FLOOR
Roof + Floor = 15*7 + 13*33 = 534 PLF
Wall = 15*2*4.5 + 15*2*4.5 + 10*2*4.5 + 10*1*4.5 = 405 PLF
Shear = 0.126(534+405) = 0.126*939 = 118.31 PLF
Plate height: ROOF = 19(ft); FIRST FLOOR = 9(ft)
SHEAR ROOF = 209.03*720*19/22131 = 129.21 PLF
SHEAR FIRST FLOOR = 209.03*939*9/22131 = 79.82 PLF
SHEAR ROOF = 0.6*W = 128.3(plf)
SHEAR FIRST FLOOR = 0.6*W = 153.84(plf)
ROOF
FIRST FLOOR
129.21 PLF
153.84 PLF
SEISMIC GOVERN
WIND GOVERN
Page 6 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1Y
Number of Story: 2 Section width: 33(ft)Section length: 39(ft)
Base height: 0.5(ft)Slope roof height: 25.5(ft)Gable mean roof height: 22.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 33(ft), L = 39(ft), H = 23(ft)-->L/B = 1.18, H/L = 0.59
Wall coefficient: Cpw = 0.8, Cpl = -0.46, Roof coefficient: Cpw = (0.17;-0.3), Cpl = -0.6
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 102.06 + 138.98 = 241.04 PLF
Redistrib: 810*19 + 1103*9 = 25317 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 209.33 x 33 / (2 x 39) = 88.56 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 209.33 x 33^2 / (8 x 39) = 730.64 LBS
Splice w/ min. (4) 16d sinker nails each side of splice at 8" o.c. (standard construction)
FIRST FLOOR DIAPHRAGM
Max shear = 142.27 x 33 / (2 x 39) = 60.19 PLF
Use: 23/32" apa rated unblock w/10d common nails at 6", 6", 12" o.c.
Chord force = 142.27 x 33^2 / (8 x 39) = 496.58 LBS
Splice w/ min. (3) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (26, 0.95, 25.09, 26.75); (19.5, 0.9, 23.62, 25.74); (15, 0.85, 22.35, 24.88)
ROOF
Roof = 15*36 = 540 PLF
Wall = 15*2*4.5 + 10*3*4.5 = 270 PLF
Shear = 0.126(540+270) = 0.126*810 = 102.06 PLF
FIRST FLOOR
Roof + Floor = 15*11.5 + 13*33.5 = 608 PLF
Wall = 15*2*4.5 + 15*2*4.5 + 10*3*4.5 + 10*2*4.5 = 495 PLF
Shear = 0.126(608+495) = 0.126*1103 = 138.98 PLF
Plate height: ROOF = 19(ft); FIRST FLOOR = 9(ft)
SHEAR ROOF = 241.04*810*19/25317 = 146.53 PLF
SHEAR FIRST FLOOR = 241.04*1103*9/25317 = 94.51 PLF
SHEAR ROOF = 0.6*W = 133.71(plf)
SHEAR FIRST FLOOR = 0.6*W = 149.28(plf)
ROOF
FIRST FLOOR
146.53 PLF
149.28 PLF
SEISMIC GOVERN
WIND GOVERN
Page 7 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
5
"
|
4
*
d
*
1
.
4
=
0
.
2
6
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
3.
5
0
7.
2
5
4.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
9
1.
9
Co
m
.
(
k
i
p
s
)
2.
7
2.
4
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
9
1.
9
Co
m
.
(
k
i
p
s
)
2.
7
2.
4
8.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
0
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
P2
LI
N
E
1
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
2
0
7
l
b
s
|
S
e
i
s
m
i
c
:
2
4
1
8
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
2
9
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
1
8
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
0
4
p
l
f
(
W
i
n
d
)
/
2
2
4
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
2
.
3
/
2
.
3
)
+
P
2
(
1
.
1
/
1
.
3
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
3
.
2
/
3
.
2
)
+
P
2
(
1
.
6
/
1
.
8
)
=
4
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
11
2
2
-24
8
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 8 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
3
"
|
4
*
d
*
1
.
4
=
0
.
1
9
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
1.
2
5
14
.
2
5
5.
7
5
10
.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(1
)
C
S
1
6
Po
s
t
S
i
z
e
2x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
1
Co
m
.
(
k
i
p
s
)
2.
7
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(1
)
C
S
1
6
Po
s
t
S
i
z
e
2x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
1
Co
m
.
(
k
i
p
s
)
2.
7
5.
2
5
2.
2
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
2
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
2
0
7
l
b
s
|
S
e
i
s
m
i
c
:
2
4
1
8
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
3
9
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
4
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
8
9
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
5
5
p
l
f
(
W
i
n
d
)
/
1
7
0
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
1
/
3
.
1
)
=
3
.
1
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
4
.
4
/
4
.
4
)
=
4
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
11
1
-20
8
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 9 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
3
"
|
4
*
d
*
1
.
4
=
1
.
2
8
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
14
.
0
0
6.
0
0
4.
5
0
5.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
9
Co
m
.
(
k
i
p
s
)
3.
3
3.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
9
Co
m
.
(
k
i
p
s
)
3.
3
3.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
8.
0
0
P2
5.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
C:
S
i
m
p
s
o
n
M
S
T
4
8
(
3
7
6
0
L
B
)
-
A
l
t
t
w
o
r
o
w
(
9
)
#
1
6
E
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
5
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
3
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
6
6
3
l
b
s
|
S
e
i
s
m
i
c
:
3
3
3
9
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
5
0
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
9
8
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
1
9
p
l
f
(
W
i
n
d
)
/
2
9
0
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
1
.
8
/
1
.
8
)
=
3
.
7
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
2
.
5
/
2
.
5
)
=
5
.
2
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
25
1
6
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 10 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
3
7
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
11
.
2
5
11
.
2
5
25
.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
2
Co
m
.
(
k
i
p
s
)
2.
4
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
2
Co
m
.
(
k
i
p
s
)
2.
4
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
4
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
9
8
6
l
b
s
|
S
e
i
s
m
i
c
:
1
8
9
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
4
8
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
6
2
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
6
5
p
l
f
(
W
i
n
d
)
/
1
6
8
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
6
/
3
.
6
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
5
/
5
)
=
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
69
6
-15
9
4
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 11 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
"
|
4
*
d
*
1
.
4
=
1
.
1
5
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
11
.
2
5
6.
0
0
9.
0
0
6.
0
0
3.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
8
Co
m
.
(
k
i
p
s
)
3.
2
3.
2
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
8
Co
m
.
(
k
i
p
s
)
3.
2
3.
2
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
2.
7
5
6.
2
5
5.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P2
P1
LI
N
E
5
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
7
3
8
l
b
s
|
S
e
i
s
m
i
c
:
3
3
8
7
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
4
9
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
2
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
0
0
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
1
2
p
l
f
(
W
i
n
d
)
/
2
8
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
1
.
9
/
1
.
9
)
=
3
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
2
.
7
/
2
.
7
)
=
5
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
14
0
9
-10
6
4
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 12 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
4
1
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
2.
5
0
6.
2
5
5.
2
5
5.
2
5
5.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
9
2.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
5
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
9
2.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
5
P2
2.
7
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
A
(
D
i
r
e
c
t
i
o
n
:
X
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
5
0
2
l
b
s
|
S
e
i
s
m
i
c
:
3
2
7
5
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
3
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
0
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
0
7
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
3
8
p
l
f
(
W
i
n
d
)
/
3
1
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
7
/
1
.
7
)
+
P
2
(
1
.
7
/
1
.
7
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
3
/
2
.
3
)
+
P
2
(
2
.
3
/
2
.
3
)
=
4
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
19
0
7
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 13 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
3
8
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
10
.
5
0
10
.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
6
Co
m
.
(
k
i
p
s
)
3.
8
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
6
Co
m
.
(
k
i
p
s
)
3.
8
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
2.
5
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
B
(
D
i
r
e
c
t
i
o
n
:
X
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
5
0
2
l
b
s
|
S
e
i
s
m
i
c
:
3
2
7
5
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
2
3
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
0
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
5
3
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
3
8
p
l
f
(
W
i
n
d
)
/
3
1
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
4
/
3
.
4
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
4
.
7
/
4
.
7
)
=
4
.
7
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
19
9
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 14 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
3
5
"
|
4
*
d
*
1
.
4
=
1
.
9
4
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
3.
0
0
5.
7
5
3.
0
0
8.
2
5
2.
5
0
16
.
5
0
2.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
HD
U
5
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
0
3.
0
2.
7
2.
7
Co
m
.
(
k
i
p
s
)
3.
4
3.
4
2.
9
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
HD
U
5
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
0
3.
0
2.
7
2.
7
Co
m
.
(
k
i
p
s
)
3.
4
3.
4
2.
9
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
P3
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
P4
LI
N
E
C
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
0
7
9
l
b
s
|
S
e
i
s
m
i
c
:
3
0
2
9
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
D
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
1
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
9
0
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
4
5
4
p
l
f
(
W
i
n
d
)
/
4
4
7
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
1
/
1
.
6
)
+
P
2
(
1
.
1
/
1
.
6
)
+
P
3
(
0
.
7
/
1
.
3
)
+
P
4
(
0
.
7
/
1
.
3
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
5
/
2
.
2
)
+
P
2
(
1
.
5
/
2
.
2
)
+
P
3
(
1
/
1
.
9
)
+
P
4
(
1
/
1
.
9
)
=
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
78
0
-12
2
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 15 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
8
"
|
4
*
d
*
1
.
4
=
1
.
6
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
18
.
7
5
3.
5
0
2.
7
5
9.
0
0
4.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
4
HD
U
4
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
6
Co
m
.
(
k
i
p
s
)
2.
8
3.
6
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
4
HD
U
4
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
6
Co
m
.
(
k
i
p
s
)
2.
8
3.
6
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
C:
S
i
m
p
s
o
n
M
S
T
4
8
(
3
7
6
0
L
B
)
-
A
l
t
t
w
o
r
o
w
(
9
)
#
1
6
E
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P2
P1
LI
N
E
D
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
4
7
7
1
l
b
s
|
S
e
i
s
m
i
c
:
3
8
5
2
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
C
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
2
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
4
0
7
p
l
f
(
W
i
n
d
)
/
3
2
9
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
1
/
1
.
4
)
+
P
2
(
3
.
7
/
3
.
7
)
=
4
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
6
/
2
)
+
P
2
(
5
.
2
/
5
.
2
)
=
6
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
31
5
1
-79
8
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 16 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
3
"
|
4
*
d
*
1
.
4
=
1
.
2
7
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
3.
2
5
2.
7
5
6.
0
0
4.
0
0
9.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
5
Co
m
.
(
k
i
p
s
)
3.
5
3.
7
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
4.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
7
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
2.
2
5
2.
2
5
3.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
5.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
E
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
4
6
9
5
l
b
s
|
S
e
i
s
m
i
c
:
4
7
5
4
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
5
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
4
9
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
0
3
p
l
f
(
W
i
n
d
)
/
3
0
7
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
3
/
3
)
=
4
.
9
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
4
.
2
/
4
.
2
)
=
6
.
9
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
22
0
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 17 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (X-X Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
A 2 1X 39 128 129 9 10.5 312 B
B 2 1X 39 128 129 9 10.5 312 B
C 1 1X 20.5 154 80 1502 1965 9 6.78 454 D
D 1 1X 49 154 80 1001 1310 9 11.72 407 C
E 1 1X 28.5 154 80 2502 3275 9 15.5 307 B
SUMMARY SHEAR WALL
V2 = Seismic*Span/2 + Added Vseismic
Line shear V = Maximum(V1;V2)
V1 = Wind*Span/2 + Added Vwind
v(plf) = V/L
Page 18 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (Y-Y Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
1 2 1Y 33 134 147 9 10.81 224 B
2 2 1Y 33 134 147 9 14.25 170 A
3 1 1Y 19.5 149 95 2207 2418 9 11.5 319 B
4 1 1Y 40 149 95 9 11.25 265 B
5 1 1Y 20.5 149 95 2207 2418 9 12 312 B
v(plf) = V/L
Line shear V = Maximum(V1;V2)
SUMMARY SHEAR WALL
V1 = Wind*Span/2 + Added Vwind
V2 = Seismic*Span/2 + Added Vseismic
Page 19 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic
(#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb)
1 :Wind = 2207(lb), Seismic = 2418(lb)
1 1Y 2 133.7 146.5 33 2206 2418 l---------------33.0(ft)---------------l
2 :Wind = 2207(lb), Seismic = 2418(lb)
2 1Y 2 133.7 146.5 33 2206 2418 l---------------33.0(ft)---------------l
3 :Wind = 3663(lb), Seismic = 3339(lb), Line above : 1 - 100%, Wind = 2207(lb), Seismic = 2418(lb)
3 1Y 1 149.3 94.5 19.5 1455 921 l---------------19.5(ft)---------------l
4 :Wind = 2986(lb), Seismic = 1890(lb)
4 1Y 1 149.3 94.5 40 2986 1890 l---------------40.0(ft)---------------l
5 :Wind = 3738(lb), Seismic = 3387(lb), Line above : 2 - 100%, Wind = 2207(lb), Seismic = 2418(lb)
5 1Y 1 149.3 94.5 20.5 1530 969 l---------------20.5(ft)---------------l
A :Wind = 2502(lb), Seismic = 3275(lb)
A 1X 2 128.3 129.2 39 2502 2520 l---------------39.0(ft)---------------l
B :Wind = 2502(lb), Seismic = 3275(lb)
B 1X 2 128.3 129.2 39 2502 2520 l---------------39.0(ft)---------------l
C :Wind = 3079(lb), Seismic = 3029(lb), Line above : A - 60%, Wind = 1502(lb), Seismic = 1965(lb)
C 1X 1 153.8 79.8 20.5 1577 818 l---------------20.5(ft)---------------l
D :Wind = 4771(lb), Seismic = 3852(lb), Line above : A - 40%, Wind = 1001(lb), Seismic = 1310(lb)
D 1X 1 153.8 79.8 49 3769 1956 l---------------49.0(ft)---------------l
E :Wind = 4695(lb), Seismic = 4754(lb), Line above : B - 100%, Wind = 2502(lb), Seismic = 3275(lb)
E 1X 1 153.8 79.8 28.5 2192 1137 l---------------28.5(ft)---------------l
#N/A #N/A
#N/A #N/A
#N/A #N/A
Description
V_(lb)=v_(plf)*Span*Span/2/(Span+Offset)
LATERAL
p Factor: X Direction: p=1.3; Y Direction: p=1
20 of 52Page 20 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT2, SANTA ANA, CA 92703
BEAM : 1 - CLG AT BED 3
Loads(Downward+)
Beam Weight 10.1 plf from 0 ft to 14.75 ft
Roof Rafter: (11+20)(4.2) = (DL=46.8PLF; LLr=85PLF) form 0 to 14.75
Ceiling Joist DL: (4)(6.8) = (DL=27PLF) form 0 to 14.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1239/1239 0
2 1239/1239 0
USE 6 x 8
Critcal Shear = 1239 LB @0' 1.5xV/(F'v x A)= 0.21
F'v = 212, A = 41.25
Critcal Moment = 4569 LB-FT @7.37' M/(F'b x S)= 0.63
F'b = 1688, S = 51.56
Critical Deflection for TL = -0.578 INCH @ 7.37 L/240 = 0.738"
Critical Deflection for LL = -0.29 INCH @ 7.37 L/360 = 0.492"
1 2
Moment
Shear
Deflection
14.75'
BEAM : 2 - CLG AT M.BED 4
Loads(Downward+)
Beam Weight 12.7 plf from 0 ft to 10.75 ft
Roof Primary: (15+20)(11.8) = (DL=176.2PLF; LLr=235PLF) form 0 to 10.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2279/2279 0
2 2279/2279 0
USE 6 x 10
Critcal Shear = 2278 LB @0' 1.5xV/(F'v x A)= 0.3
F'v = 212, A = 52.25
Critcal Moment = 6120 LB-FT @5.25' M/(F'b x S)= 0.52
F'b = 1688, S = 82.73
Critical Deflection for TL = -0.202 INCH @ 5.25 L/240 = 0.538"
Critical Deflection for LL = -0.112 INCH @ 5.25 L/360 = 0.358"
1 2
Moment
Shear
Deflection
10.75'
Page 21 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT2, SANTA ANA, CA 92703
BEAM : 2A - CLG AT M.BATH
Loads(Downward+)
Beam Weight 10.1 plf from 0 ft to 13 ft
Roof Rafter: (11+20)(4.2) = (DL=46.8PLF; LLr=85PLF) form 0 to 13
Ceiling Joist DL: (4)(6.5) = (DL=26PLF) form 0 to 13
Point load @ 1.5 : Load from beam 2 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 3036/3036 0
2 1325/1324 0
USE 6 x 8
Critcal Shear = 3036 LB @0' 1.5xV/(F'v x A)= 0.52
F'v = 212, A = 41.25
Critcal Moment = 5339 LB-FT @5' M/(F'b x S)= 0.73
F'b = 1688, S = 51.56
Critical Deflection for TL = -0.538 INCH @ 6.25 L/240 = 0.65"
Critical Deflection for LL = -0.276 INCH @ 6.25 L/360 = 0.433"
1 2
P1
Moment
Shear
Deflection
13'
BEAM : 3 - HDR AT M.BATH
Loads(Downward+)
Beam Weight 4.7 plf from 0 ft to 2.25 ft
Roof Rafter: (11+20)(3.8) = (DL=41.2PLF; LLr=75PLF) form 1.25 to 2.25
Ceiling Joist DL: (4)(5.5) = (DL=22PLF) form 1.25 to 2.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 2.25
Point load @ 1.25 : Load from beam 2A at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 672/672 0
2 899/899 0
USE 4 x 6
Critcal Shear = -898 LB @2.25' 1.5xV/(F'v x A)= 0.31
F'v = 225, A = 19.25
Critcal Moment = 812 LB-FT @1.25' M/(F'b x S)= 0.37
F'b = 1462, S = 17.65
Critical Deflection for TL = -0.007 INCH @ 1 L/240 = 0.112"
Critical Deflection for LL = -0.004 INCH @ 1 L/360 = 0.075"
1 2
P1
Moment
Shear
Deflection
2.25'
(DL=1016#, LLr=1263#)
(DL=656#, LLr=669#)
Page 22 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 3A - HDR AT M.BED 4
Loads(Downward+)
Beam Weight 4.7 plf from 0 ft to 2.25 ft
Exterior Wall: (15)(4) = (DL=60PLF) form 0 to 2.25
Point load @ 1 : Load from beam 2 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1339/1339 0
2 1085/1086 0
USE 4 x 6
Critcal Shear = 1338 LB @0' 1.5xV/(F'v x A)= 0.46
F'v = 225, A = 19.25
Critcal Moment = 1306 LB-FT @1' M/(F'b x S)= 0.6
F'b = 1462, S = 17.65
Critical Deflection for TL = -0.012 INCH @ 1 L/240 = 0.112"
Critical Deflection for LL = -0.007 INCH @ 1 L/360 = 0.075"
1 2
P1
Moment
Shear
Deflection
2.25'
BEAM : 4 - RIDGE AT FAMILY ROOM
Loads(Downward+)
Beam Weight 15.4 plf from 0 ft to 14 ft
Rafter Vaulted: (13+20)(13.2) = (DL=172.2PLF; LLr=265PLF) form 0 to 14
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 3116/3116 0
2 3116/3116 0
USE 6 x 12
Critcal Shear = 3115 LB @0' 1.5xV/(F'v x A)= 0.34
F'v = 212, A = 63.25
Critcal Moment = 10905 LB-FT @7' M/(F'b x S)= 0.64
F'b = 1688, S = 121.23
Critical Deflection for TL = -0.345 INCH @ 7 L/240 = 0.7"
Critical Deflection for LL = -0.2 INCH @ 7 L/360 = 0.467"
1 2
Moment
Shear
Deflection
14'
(DL=1016#, LLr=1263#)
Page 23 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 4A - CLG AT HALLWAY
Loads(Downward+)
Beam Weight 19.5 plf from 0 ft to 18.25 ft
Roof Primary: (15+20)(13.2) = (DL=198.8PLF; LLr=265PLF) form 0 to 18.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 4233/4232 0
2 4233/4232 0
USE 5 1/4" x 11 7/8" PSL
Critcal Shear = 4232 LB @0' 1.5xV/(F'v x A)= 0.28
F'v = 362, A = 62.34
Critcal Moment = 19308 LB-FT @9.12' M/(F'b x S)= 0.52
F'b = 3625, S = 123.39
Critical Deflection for TL = -0.79 INCH @ 9.13 L/240 = 0.912"
Critical Deflection for LL = -0.418 INCH @ 9.13 L/360 = 0.608"
1 2
Moment
Shear
Deflection
18.25'
BEAM : 4B - CLG AT STAIR
Loads(Downward+)
Beam Weight 15.2 plf from 0 ft to 14.25 ft
Interior Wall: (10)(0~5) = (DL=0~50PLF) form 0 to 14.25
Point load @ 13 : Load from beam 4 at Support 2(P1)
Point load @ 13 : Load from beam 4A at Support 1(P2)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 873/873 0
2 7062/7061 0
USE 5 1/4" x 9 1/4" PSL
Critcal Shear = -7061 LB @14.25' 1.5xV/(F'v x A)= 0.6
F'v = 362, A = 48.56
Critcal Moment = 8777 LB-FT @13' M/(F'b x S)= 0.39
F'b = 3625, S = 74.87
Critical Deflection for TL = -0.339 INCH @ 7.92 L/240 = 0.712"
Critical Deflection for LL = -0.158 INCH @ 7.92 L/360 = 0.475"
1 2
P1P2
Moment
Shear
Deflection
14.25'
(DL=1314#, LLr=1802#)
(DL=1992#, LLr=2241#)
Page 24 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 5 - FL AT GARAGE
Loads(Downward+)
Beam Weight 15.2 plf from 0 ft to 15.5 ft
Deck Primary: (13+60)(3.2) = (DL=42.2PLF; LLr=195PLF) form 0 to 5.25
Deck Primary: (13+60)(2.5) = (DL=32.5PLF; LLr=150PLF) form 5.25 to 15.5
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 15.5
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 0 to 15.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2857/2468 0
2 2667/2278 0
USE 5 1/4" x 9 1/4" PSL
Critcal Shear = 2468 LB @0' 1.5xV/(F'v x A)= 0.26
F'v = 290, A = 48.56
Critcal Moment = 9019 LB-FT @7.46' M/(F'b x S)= 0.5
F'b = 2900, S = 74.87
Critical Deflection for TL = -0.566 INCH @ 7.75 L/240 = 0.775"
Critical Deflection for LL = -0.303 INCH @ 7.75 L/360 = 0.517"
1 2
Moment
Shear
Deflection
15.5'
BEAM : 6 - FL AT GARAGE
Loads(Downward+)
Beam Weight 10.2 plf from 0 ft to 11.5 ft
Roof Primary: (15+20)(2.2) = (DL=33.8PLF; LLr=45PLF) form 0 to 11.5
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 5 to 11.5
Point load @ 5 : Load from beam 5 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2115/1826 0
2 1915/1678 0
USE 3 1/2" x 9 1/4" PSL
Critcal Shear = 1637 LB @0' 1.5xV/(F'v x A)= 0.26
F'v = 290, A = 32.38
Critcal Moment = 7637 LB-FT @5' M/(F'b x S)= 0.63
F'b = 2900, S = 49.91
Critical Deflection for TL = -0.357 INCH @ 5.5 L/240 = 0.575"
Critical Deflection for LL = -0.168 INCH @ 5.5 L/360 = 0.383"
1 2
P1
Moment
Shear
Deflection
11.5'
(DL=1076#, LLr=388#, LL=1203#)
Page 25 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 7 - HDR AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 16.25 ft
Roof Primary: (15+20)(4.5) = (DL=67.5PLF; LLr=90PLF) form 0 to 13.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 16.25
Point load @ 13.25 : Load from beam 6 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1968/1841 0
2 2915/2558 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = -2558 LB @16.25' 1.5xV/(F'v x A)= 0.24
F'v = 388, A = 41.56
Critcal Moment = 8527 LB-FT @9.81' M/(F'b x S)= 0.43
F'b = 2906, S = 82.26
Critical Deflection for TL = -0.539 INCH @ 8.43 L/240 = 0.812"
Critical Deflection for LL = -0.222 INCH @ 8.43 L/360 = 0.542"
1 2
P1
Moment
Shear
Deflection
16.25'
BEAM : 8 - FL AT DINING
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 11.25 ft
Exterior Wall: (15)(9~13) = (DL=135~195PLF) form 0 to 11.25
Roof Primary: (15+20)(1.3) = (DL=20PLF; LLr=26.7PLF) form 0 to 11.25
Point load from Panel P1(Left) of Line 1 at @ 7.5(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1201/2981 0 2981
2 1314/4895 -265 4895
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -4895 LB @11.25' 1.5xV/(F'v x A)= 0.35
F'v = 496, A = 41.56
Critcal Moment = 16595 LB-FT @7.5' M/(F'b x S)= 0.65
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.214 INCH @ 6 L/240 = 0.562"
Critical Deflection for LL = -0.121 INCH @ 6 L/360 = 0.375"
1 2
P1*
Moment
Shear
Deflection
11.25'
(DL=957#, LLr=478#, LL=680#)
Page 26 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 9 - FL AT LIVING
Loads(Downward+)
Beam Weight 17.5 plf from 0 ft to 19 ft
Roof Primary: (15+20)(11.2) = (DL=168.8PLF; LLr=225PLF) form 0 to 4.75
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 4.75 to 10.25
Roof Primary: (15+20)(3.8) = (DL=56.2PLF; LLr=75PLF) form 10.25 to 19
Exterior Wall: (15)(9) = (DL=135PLF) form 4.75 to 19
Rafter Vaulted: (13+20)(8.8) = (DL=113.8PLF; LLr=175PLF) form 4.75 to 19
Point load @ 4.75 : Load from beam 8 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 5701/5701 0 5701
2 5597/5596 0 5596
USE 3 1/2" x 16" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5700 LB @0' 1.5xV/(F'v x A)= 0.42
F'v = 362, A = 56
Critcal Moment = 28279 LB-FT @8.86' M/(F'b x S)= 0.62
F'b = 3625, S = 149.33
Critical Deflection for TL = -0.77 INCH @ 9.29 L/240 = 0.95"
Critical Deflection for LL = -0.307 INCH @ 9.29 L/360 = 0.633"
1 2
P1
Moment
Shear
Deflection
19'
BEAM : 10 - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 13.5
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 13.5
Roof Primary: (15+20)(9.8) = (DL=146.2PLF; LLr=195PLF) form 0 to 1.5
Point load from Panel P2(Left) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1926/10274 -1982 10274
2 1043/2027 0 2027
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -8181 LB @1.5' 1.5xV/(F'v x A)= 0.59
F'v = 496, A = 41.56
Critcal Moment = -11877 LB-FT @1.5' M/(F'b x S)= 0.46
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.195 INCH @ 7.25 L/240 = 0.6"
Critical Deflection for LL = -0.103 INCH @ 7.25 L/360 = 0.4"
1 2
P1*
Moment
Shear
Deflection
1.5'12'
(DL=1051#, LLr=150#,
W=-652#, E=-714#)
Page 27 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UINT 2, SANTA ANA, CA 92703
BEAM : 10A - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 1.5
Roof Primary: (15+20)(9.8) = (DL=146.2PLF; LLr=195PLF) form 0 to 1.5
Point load from Panel P1(Left) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 793/9474 -3096 9474
2 -61/1258 -547 1258
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -8156 LB @1.5' 1.5xV/(F'v x A)= 0.59
F'v = 496, A = 41.56
Critcal Moment = -11858 LB-FT @1.5' M/(F'b x S)= 0.46
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.062 INCH @ 5.5 L/240 = 0.45"
Critical Deflection for LL = -0.06 INCH @ 5.5 L/360 = 0.3"
1 2
P1*
Moment
Shear
Deflection
1.5'9'
BEAM : 10B - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Floor Primary: (13+40)(1.3) = (DL=17.4PLF; LL=53.4PLF) form 0 to 10.5
Point load from Panel P1(Right) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 506/9126 -3393 9126
2 362/1415 -382 1415
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -7702 LB @1.5' 1.5xV/(F'v x A)= 0.56
F'v = 496, A = 41.56
Critcal Moment = -11504 LB-FT @1.5' M/(F'b x S)= 0.45
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.067 INCH @ 5.75 L/240 = 0.45"
Critical Deflection for LL = -0.062 INCH @ 5.75 L/360 = 0.3"
1 2
P1*
Moment
Shear
Deflection
1.5'9'
Page 28 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 11 - DROP AT GARAGE
Loads(Downward+)
Beam Weight 30.7 plf from 0 ft to 20.25 ft
Floor Primary: (13+40)(4.5) = (DL=58.5PLF; LL=180PLF) form 0 to 3
Floor Primary: (13+40)(6) = (DL=78PLF; LL=240PLF) form 3 to 18.25
Deck Primary: (13+60)(2.5) = (DL=32.5PLF; LLr=150PLF) form 3 to 15.25
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 18.25
Roof Primary: (15+20)(6.8) = (DL=101.2PLF; LLr=135PLF) form 0 to 3
Deck Primary: (13+60)(3.2) = (DL=42.2PLF; LLr=195PLF) form 0 to 3
Point load @ 3 : Load from beam 1 at Support 1(P1)
Point load @ 3 : Load from beam 10A at Support 1(P2)
Point load @ 15.25 : Load from beam 6 at Support 2(P3)
Point load @ 18.25 : Load from beam 10 at Support 1(P4)
Point load @ 18.25 : Load from beam 1 at Support 2(P5)
Point load @ 13.25 : Load from beam 10B at Support 1(P6)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 8769/7689 -171 7689
2 9065/8087 -820 8087
USE 7" x 14" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 13104 LB @18.25' 1.5xV/(F'v x A)= 0.43
F'v = 464, A = 98
Critcal Moment = 37746 LB-FT @10.68' M/(F'b x S)= 0.68
F'b = 2900, S = 228.67
Critical Deflection for TL = -0.885 INCH @ 10.12 L/240 = 1.012"
Critical Deflection for LL = -0.389 INCH @ 10.12 L/360 = 0.675"
1 2
P1P2 P3 P4P5P6
Moment
Shear
Deflection
20.25'
BEAM : 12 - FL AT KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 12.5 ft
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 12.5
Exterior Wall: (15)(14~11) = (DL=210~165PLF) form 0 to 12.5
Point load @ 2.25 : Load from beam 4 at Support 1(P1)
Point load from Panel P1(Right) of Line 1 at @ 3.75(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 4439/5490 0 5490
2 2316/3239 0 3239
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 4438 LB @0' 1.5xV/(F'v x A)= 0.41
F'v = 388, A = 41.56
Critcal Moment = 18544 LB-FT @3.75' M/(F'b x S)= 0.72
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.367 INCH @ 6 L/240 = 0.625"
Critical Deflection for LL = -0.129 INCH @ 6 L/360 = 0.417"
1 2
P1 P2*
Moment
Shear
Deflection
12.5'
(DL=618#, LLr=621#)
(DL=476#, LLr=317#, W=-2730#, E=-3572#)
(DL=965#, LLr=427#, LL=523#)
(DL=1463#, LLr=463#, W=-2633#, E=-3445#)
(DL=618#, LLr=621#)
(DL=179#, LL=327#,
W=-2730#, E=-3572#)
(DL=1314#, LLr=1802#)
Page 29 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 13 - FL AT DINING
Loads(Downward+)
Beam Weight 26 plf from 0 ft to 19 ft
Floor Primary: (13+40)(6.2) = (DL=81.2PLF; LL=250PLF) form 4.75 to 19
Roof Rafter: (11+20)(3.8) = (DL=41.2PLF; LLr=75PLF) form 0 to 4.75
Ceiling Joist DL: (4)(5.5) = (DL=22PLF) form 0 to 4.75
Interior Wall: (10)(3.5) = (DL=35PLF) form 4.75 to 15.25
Point load @ 4.75 : Load from beam 8 at Support 2(P1)
Point load @ 4.75 : Load from beam 12 at Support 1(P2)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 6874/6142 0 6142
2 4729/4224 0 4224
USE 7" x 11 7/8" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5192 LB @0' 1.5xV/(F'v x A)= 0.32
F'v = 290, A = 83.12
Critcal Moment = 24983 LB-FT @7.6' M/(F'b x S)= 0.63
F'b = 2900, S = 164.52
Critical Deflection for TL = -0.889 INCH @ 8.89 L/240 = 0.95"
Critical Deflection for LL = -0.358 INCH @ 8.89 L/360 = 0.633"
1 2
P1P2
Moment
Shear
Deflection
19'
BEAM : 14 - FL AT JADU KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 9.75 ft
Floor Primary: (13+40)(1.2) = (DL=16.2PLF; LL=50PLF) form 0 to 9.75
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 0 to 9.75
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 9.75
Rafter Vaulted: (13+20)(8.8) = (DL=113.8PLF; LLr=175PLF) form 0 to 9.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 4401/3726 0
2 4401/3726 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = 3549 LB @0' 1.5xV/(F'v x A)= 0.41
F'v = 310, A = 41.56
Critcal Moment = 8645 LB-FT @4.75' M/(F'b x S)= 0.54
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.205 INCH @ 4.75 L/240 = 0.488"
Critical Deflection for LL = -0.112 INCH @ 4.75 L/360 = 0.325"
1 2
Moment
Shear
Deflection
9.75'
(DL=1164#, LLr=150#, W=-1304#, E=-1429#)
(DL=2605#, LLr=1834#, W=-1369#, E=-1500#)
Page 30 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 15 - FL AT JADU LIVING
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 13.5
Exterior Wall: (15)(11~9) = (DL=165~135PLF) form 0 to 2.75
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 2.75 to 13.5
Point load @ 2.75 : Load from beam 14 at Support 1(P1)
Point load from Panel P2(Left) of Line 1 at @ 2.75(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 4774/6630 0 6630
2 1948/2226 0 2226
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 6629 LB @0' 1.5xV/(F'v x A)= 0.48
F'v = 496, A = 41.56
Critcal Moment = 17346 LB-FT @2.75' M/(F'b x S)= 0.68
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.508 INCH @ 6.23 L/240 = 0.675"
Critical Deflection for LL = -0.278 INCH @ 6.23 L/360 = 0.45"
1 2
P1P2*
Moment
Shear
Deflection
13.5'
BEAM : 16 - FL AT JADU KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 2.75 to 13.5
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 2.75 to 13.5
Point load @ 2.75 : Load from beam 14 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 5025/4364 0
2 3153/2829 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = 3854 LB @0' 1.5xV/(F'v x A)= 0.45
F'v = 310, A = 41.56
Critcal Moment = 10711 LB-FT @4' M/(F'b x S)= 0.67
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.546 INCH @ 6.49 L/240 = 0.675"
Critical Deflection for LL = -0.219 INCH @ 6.49 L/360 = 0.45"
1 2
P1
Moment
Shear
Deflection
13.5'
(DL=1044#, LLr=539#, LL=1016#)
(DL=1554#, LLr=817#, LL=1541#)
Page 31 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 17 - FL AT BED 1
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 14 ft
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 14
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 14
Floor Primary: (13+40)(0.8) = (DL=10.4PLF; LL=32PLF) form 0 to 14
Point load @ 12.75 : Load from beam 3 at Support 1(P1)
Point load @ 1 : Load from beam 4A at Support 1(P3)
Point load from Panel P1(Right) of Line 2 at @ 2(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 5672/5447 0 5447
2 1949/1933 0 1933
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5447 LB @0' 1.5xV/(F'v x A)= 0.5
F'v = 388, A = 41.56
Critcal Moment = 6080 LB-FT @6.25' M/(F'b x S)= 0.38
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.354 INCH @ 6.74 L/240 = 0.7"
Critical Deflection for LL = -0.098 INCH @ 6.74 L/360 = 0.467"
1 2
P1P3P2*
Moment
Shear
Deflection
14'
BEAM : 18 - FL AT JADU BED
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 10.5
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 10.5
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 0.75 to 10.5
Point load @ 0.75 : Load from beam 3 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2701/2701 0
2 2071/2070 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = 2700 LB @0' 1.5xV/(F'v x A)= 0.25
F'v = 388, A = 41.56
Critcal Moment = 5591 LB-FT @5' M/(F'b x S)= 0.28
F'b = 2906, S = 82.26
Critical Deflection for TL = -0.149 INCH @ 5.25 L/240 = 0.525"
Critical Deflection for LL = -0.054 INCH @ 5.25 L/360 = 0.35"
1 2
P1
Moment
Shear
Deflection
10.5'
(DL=345#, LLr=327#)
(DL=1992#, LLr=2241#)
(DL=453#, LLr=446#)
Page 32 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 19 - HDR AT JADU LIVING
Loads(Downward+)
Beam Weight 7.9 plf from 0 ft to 5.25 ft
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 1.75 to 5.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 5.25
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 1.75 to 5.25
Point load @ 1.75 : Load from beam 15 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1928/1684 0 1684
2 1808/1638 0 1638
USE 4 x 10
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -1637 LB @5.25' 1.5xV/(F'v x A)= 0.42
F'v = 180, A = 32.38
Critcal Moment = 2725 LB-FT @2' M/(F'b x S)= 0.6
F'b = 1080, S = 49.91
Critical Deflection for TL = -0.036 INCH @ 2.5 L/240 = 0.262"
Critical Deflection for LL = -0.017 INCH @ 2.5 L/360 = 0.175"
1 2
P1
Moment
Shear
Deflection
5.25'
BEAM : 20 - HDR AT JADU DINING
Loads(Downward+)
Beam Weight 9.6 plf from 0 ft to 5.25 ft
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 0 to 3.75
Floor Primary: (13+40)(6.8) = (DL=87.8PLF; LL=270PLF) form 3.75 to 5.25
Exterior Wall: (15)(5.5) = (DL=82.5PLF) form 0 to 3.75
Exterior Wall: (15)(11) = (DL=165PLF) form 3.75 to 5.25
Point load @ 3.75 : Load from beam 16 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2204/1943 0
2 3598/3169 0
USE 4 x 12
Critcal Shear = -2941 LB @5.25' 1.5xV/(F'v x A)= 0.62
F'v = 180, A = 39.38
Critcal Moment = 3814 LB-FT @3.75' M/(F'b x S)= 0.56
F'b = 1100, S = 73.83
Critical Deflection for TL = -0.024 INCH @ 2.75 L/240 = 0.262"
Critical Deflection for LL = -0.011 INCH @ 2.75 L/360 = 0.175"
1 2
P1
Moment
Shear
Deflection
5.25'
(DL=932#, LLr=447#, LL=207#,
W=-374#, E=-409#)
(DL=1828#, LLr=910#, LL=314#)
Page 33 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 21 - CLG AT ENTRANCE
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 8.25 ft
Roof Rafter: (11+20)(2) = (DL=22PLF; LLr=40PLF) form 0 to 8.25
Ceiling Joist DL: (4)(1.3) = (DL=5.3PLF) form 0 to 8.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 303/303 0
2 303/303 0
USE 4 x 8
Critcal Shear = 303 LB @0' 1.5xV/(F'v x A)= 0.08
F'v = 225, A = 25.38
Critcal Moment = 625 LB-FT @4' M/(F'b x S)= 0.16
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.043 INCH @ 4 L/240 = 0.412"
Critical Deflection for LL = -0.023 INCH @ 4 L/360 = 0.275"
1 2
Moment
Shear
Deflection
8.25'
BEAM : C1 - C.J. 2X6#2 @ 16" O.C. TYP. (MAX L=15'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 140/140 0
2 140/140 0
USE 2 x 6
Critcal Shear = 140 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 8.25
Critcal Moment = 525 LB-FT @7.5' M/(F'b x S)= 0.49
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.64 INCH @ 7.5 L/240 = 0.75"
Critical Deflection for LL = -0.457 INCH @ 7.5 L/360 = 0.5"
1 2
Moment
Shear
Deflection
15'
Page 34 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 11/19/2024
Plan : 1
BEAM : F3 - D.J. 2X12#2 @ 16" O.C. TYP. (MAX L=10'-
6")
Loads(Downward+)
Deck Primary: (13+60)(1.3) = (DL=17.4PLF; LLr=80.1PLF) form 0 to 10.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 512/512 0
2 512/512 0
USE 2 x 8
Critcal Shear = 511 LB @0' 1.5xV/(F'v x A)= 0.39
F'v = 180, A = 10.88
Critcal Moment = 1343 LB-FT @5.25' M/(F'b x S)= 0.98
F'b = 1242, S = 13.14
Critical Deflection for TL = -0.35 INCH @ 5.25 L/240 = 0.525"
Critical Deflection for LL = -0.287 INCH @ 5.25 L/360 = 0.35"
1 2
Moment
Shear
Deflection
10.5'
BEAM : R1 - R.R. 2X6#2 @ 16" O.C. TYP. (MAX L=12'-0")
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 248/248 0
2 248/248 0
USE 2 x 6
Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2
F'v = 225, A = 8.25
Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
Page 35 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : R1A - R.R. 2X6#2 @ 16" O.C. W/ PURLIN
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 13.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 25/25 0
2 381/382 0
3 152/152 0
USE 2 x 6
Critcal Shear = 220 LB @4.5' 1.5xV/(F'v x A)= 0.18
F'v = 225, A = 8.25
Critcal Moment = -306 LB-FT @4.5' M/(F'b x S)= 0.29
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.101 INCH @ 9.5 L/240 = 0.45"
Critical Deflection for LL = -0.065 INCH @ 9.5 L/360 = 0.3"
1 2 3
Moment
Shear
Deflection
4.5'9'
BEAM : R2 - R.R. 2X10#2 @ 16" O.C.
Loads(Downward+)
Rafter Vaulted: (13+20)(1.3) = (DL=17.4PLF; LLr=26.7PLF) form 0 to 13.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 297/297 0
2 297/297 0
USE 2 x 10
Critcal Shear = 297 LB @0' 1.5xV/(F'v x A)= 0.14
F'v = 225, A = 13.88
Critcal Moment = 1003 LB-FT @6.75' M/(F'b x S)= 0.39
F'b = 1423, S = 21.39
Critical Deflection for TL = -0.208 INCH @ 6.75 L/240 = 0.675"
Critical Deflection for LL = -0.126 INCH @ 6.75 L/360 = 0.45"
1 2
Moment
Shear
Deflection
13.5'
Page 36 of 57
1834 W Third St &
#2,33/21/2025
P=200#
ZM
Plate use: 4 1/2" x 4 1/2" x 3/8" Stl. Plate. W/ (4)-3/8" x 6" Long Lag Screws.
Lag Screws Effective Thread Length for
3/8" Dia - 6" Long lag screw:
T-E = 3-9/32"(Table L2 - NDS 2018)
Moment at guard rail base:
M = PxH
= 200 x 42 = 8400 lbs-in
Withdrawal Load at each Lag screw:
Z = (M/D)/N = (8400/2.25)/4 = 933.3#
Lag Screws Withdrawal Value :
W = 1800xG^(3
2)xD^(3
4)x(T-E)(12.2-1 - NDS 2018)
= 1800x0.5^(3
2)x3/8^(3
4)x(3 9
32") = 1000.7#
=> Z < W : OK.
GUARDRAIL CALCULATION
Page 37 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.23.05.01 DONG ENGINEERING INC (c) ENERCALC INC 1983-2023
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
CODE REFERENCES
Calculations per ACI 318-19, IBC 2021, ASCE 7-16
Load Combinations Used : ASCE 7-16
Material Properties
4.0
7.50
145.0
Elastic Modulus 3,122.0 ksi
Soil Subgrade Modulus =250.0 psi / (inch deflection)
11.0Lt Wt FactorO =
=60.0
29,000.0
40.0
29,000.0
3
Beam is supported on an elastic foundation,
2
=0.90
0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c *474.342
pcf
E - Main Rebar ksi
psi
=
Fy - Stirrups ksi
==
=
E - Stirrups ksi
E 0.850
==
=
Shear :
Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
\
#
I
Load Combination :ASCE 7-16
.Cross Section & Reinforcing Details
Rectangular Section, Width = 15.0 in, Height = 24.0 in
Span #1 Reinforcing....
2-#4 at 3.0 in from Top, from 0.0 to 6.0 ft in this span 2-#4 at 3.0 in from Bottom, from 0.0 to 6.0 ft in this span
.Service loads entered. Load Factors will be applied for calculations.Applied Loads
Load for Span Number 1
Moment : W = 10.20, E = 10.10 k-ft, Location = 3.0 ft from left end of this span
.Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio =0.121 : 1
Load Combination W Only
Span # where maximum occurs Span # 1
Maximum Soil Pressure =1.357 ksf at 6.00 ft LdComb: W Only
Allowable Soil Pressure =OK2.90 ksf
Location of maximum on span 3.035 ft
Mn * Phi : Allowable 41.506 k-ft
Typical SectionSection used for this span
Mu : Applied 5.010 k-ft
Maximum Deflection
Max Downward L+Lr+S Deflection 0.000 in
Max Upward L+Lr+S Deflection 0.000 in
Max Downward Total Deflection 0.038 in
Max Upward Total Deflection -0.038 in
.
Bar Layout DescriptionCross Section
Moment of Inertia ( in^4 )
Btm Tension Top Tension I gross Icr - Top TensionIcr - Btm Tension
Phi*Mn ( k-ft )
Cross Section Strength & Inertia
Section 1 2- #4 @ d=3",2- #4 @ d=21",41.51 41.51 17,280.00 1,338.84 1,338.84
.Shear Stirrup Requirements
Entire Beam Span Length : Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in
.Maximum Forces & Stresses for Load Combinations
Page 38 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.23.05.01 DONG ENGINEERING INC (c) ENERCALC INC 1983-2023
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination
Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum Bending Envelope
Span # 1 1 3.035 5.01 41.51 0.12
Span # 1 1 3.035
+0.50W
Span # 1 1 3.035 2.50 41.51 0.06
W Only
Span # 1 1 3.035 5.01 41.51 0.12
E Only
Span # 1 1 3.035 4.96 41.51 0.12
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections - Unfactored Loads
Span 1Span 1 1 0.0377 6.000 -0.0377 0.000
Location in SpanMax. Downward Defl Location in SpanLoad Combination Span Max. Upward Defl
Maximum Deflections for Load Combinations - Unfactored Loads
1 0.0000 0.000 0.0000 0.000
+0.60W 1 0.0226 6.000 -0.0226 0.000
+0.450W 1 0.0170 6.000 -0.0170 0.000
E Only * 0.70 1 0.0261 6.000 -0.0261 0.000
E Only * 0.5250 1 0.0196 6.000 -0.0196 0.000
W Only 1 0.0377 6.000 -0.0377 0.000
E Only 1 0.0373 6.000 -0.0373 0.000
.
.Page 39 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.23.05.01 DONG ENGINEERING INC (c) ENERCALC INC 1983-2023
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
Detailed Shear Information
Load Combination
Vu (k)Span Distance 'd'Comment Phi*Vs
Req'd
d*Vu/MuMu
(ft)(k)(in)Actual Suggest(k-ft)Number (k)
Spacing (in)
Design
Phi*Vc
W Only 1 0.00 21.00 -0.06 0.06 0.00 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.07 21.00 -0.18 0.18 0.00 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.14 21.00 -0.29 0.29 0.02 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.21 21.00 -0.40 0.40 0.04 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.28 21.00 -0.51 0.51 0.07 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.35 21.00 -0.62 0.62 0.10 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.42 21.00 -0.72 0.72 0.15 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.49 21.00 -0.82 0.82 0.20 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.56 21.00 -0.92 0.92 0.25 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.64 21.00 -1.01 1.01 0.32 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.71 21.00 -1.10 1.10 0.39 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.78 21.00 -1.19 1.19 0.47 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.85 21.00 -1.28 1.28 0.55 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.92 21.00 -1.36 1.36 0.64 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.99 21.00 -1.44 1.44 0.74 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.06 21.00 -1.52 1.52 0.84 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.13 21.00 -1.59 1.59 0.95 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.20 21.00 -1.67 1.67 1.06 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.27 21.00 -1.74 1.74 1.18 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.34 21.00 -1.80 1.80 1.30 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.41 21.00 -1.87 1.87 1.43 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.48 21.00 -1.93 1.93 1.56 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.55 21.00 -1.98 1.98 1.70 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.62 21.00 -2.04 2.04 1.84 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.69 21.00 -2.09 2.09 1.98 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.76 21.00 -2.14 2.14 2.13 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.84 21.00 -2.19 2.19 2.28 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.91 21.00 -2.23 2.23 2.43 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.98 21.00 -2.27 2.27 2.59 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.05 21.00 -2.31 2.31 2.75 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.12 21.00 -2.35 2.35 2.91 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.19 21.00 -2.38 2.38 3.08 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.26 21.00 -2.41 2.41 3.25 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.33 21.00 -2.44 2.44 3.42 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.40 21.00 -2.46 2.46 3.59 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.47 21.00 -2.48 2.48 3.76 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.54 21.00 -2.50 2.50 3.94 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.61 21.00 -2.52 2.52 4.11 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.68 21.00 -2.53 2.53 4.29 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.75 21.00 -2.54 2.54 4.47 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.82 21.00 -2.55 2.55 4.65 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.89 21.00 -2.55 2.55 4.83 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.96 21.00 -2.55 2.55 5.01 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.04 21.00 -2.55 2.55 5.01 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.11 21.00 -2.55 2.55 4.83 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.18 21.00 -2.54 2.54 4.65 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.25 21.00 -2.53 2.53 4.47 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.32 21.00 -2.52 2.52 4.29 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.39 21.00 -2.50 2.50 4.11 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.46 21.00 -2.48 2.48 3.94 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.53 21.00 -2.46 2.46 3.76 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.60 21.00 -2.44 2.44 3.59 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.67 21.00 -2.41 2.41 3.42 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.74 21.00 -2.38 2.38 3.25 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.81 21.00 -2.35 2.35 3.08 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.88 21.00 -2.31 2.31 2.91 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.95 21.00 -2.27 2.27 2.75 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.02 21.00 -2.23 2.23 2.59 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.09 21.00 -2.19 2.19 2.43 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.16 21.00 -2.14 2.14 2.28 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.24 21.00 -2.09 2.09 2.13 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.31 21.00 -2.04 2.04 1.98 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.38 21.00 -1.98 1.98 1.84 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.45 21.00 -1.93 1.93 1.70 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.52 21.00 -1.87 1.87 1.56 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.59 21.00 -1.80 1.80 1.43 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.66 21.00 -1.74 1.74 1.30 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.73 21.00 -1.67 1.67 1.18 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
Page 40 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.23.05.01 DONG ENGINEERING INC (c) ENERCALC INC 1983-2023
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
Detailed Shear Information
Load Combination
Vu (k)Span Distance 'd'Comment Phi*Vs
Req'd
d*Vu/MuMu
(ft)(k)(in)Actual Suggest(k-ft)Number (k)
Spacing (in)
Design
Phi*Vc
W Only 1 4.80 21.00 -1.59 1.59 1.06 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.87 21.00 -1.52 1.52 0.95 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.94 21.00 -1.44 1.44 0.84 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.01 21.00 -1.36 1.36 0.74 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.08 21.00 -1.28 1.28 0.64 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.15 21.00 -1.19 1.19 0.55 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.22 21.00 -1.10 1.10 0.47 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.29 21.00 -1.01 1.01 0.39 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.36 21.00 -0.92 0.92 0.32 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.44 21.00 -0.82 0.82 0.25 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.51 21.00 -0.72 0.72 0.20 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.58 21.00 -0.62 0.62 0.15 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.65 21.00 -0.51 0.51 0.10 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.72 21.00 -0.40 0.40 0.07 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.79 21.00 -0.29 0.29 0.04 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.86 21.00 -0.18 0.18 0.02 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.93 21.00 -0.06 0.06 0.00 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
Page 41 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
(allowable)
P(allowable) = 14,500 #
FOUNDATION - 2-STORY
45𝑜
Page 42 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
2' - 0"Square x 24" Deep Concrete Pad With
3-#4 Each way
BEAM NO. BM#9+11 Support 1 P =13,856 #
Use 2' - 6"Square x 24" Deep Concrete Pad With
3-#5 Each way
PAD SCHEDULE
Page 43 of 57
1834 W Third St &
#2,33/21/2025
1Y
1X
1
2
A B
AD
U
R
O
O
F
S
H
E
A
R
W
A
L
L
L
A
Y
O
U
T
Page 44 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
SECTION: 1X
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
ROOF 113.4 PLF SEISMIC GOVERN
Page 45 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
SECTION: 1Y
Number of Story: 1 Section width: 45(ft)Section length: 19(ft)
Base height: 0.5(ft)Slope roof height: 13.5(ft)Gable mean roof height: 11.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 45(ft), L = 19(ft), H = 12(ft)-->L/B = 0.42, H/L = 0.63
Wall coefficient: Cpw = 0.8, Cpl = -0.5, Roof coefficient: Cpw = (0.16;-0.32), Cpl = -0.6
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 64.26 = 64.26 PLF
Redistrib: 510*9 = 4590 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 91.8 x 45 / (2 x 19) = 108.71 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 91.8 x 45^2 / (8 x 19) = 1222.99 LBS
Splice w/ min. (7) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (15, 0.85, 22.35, 24.7)
ROOF
Roof = 15*19 = 285 PLF
Wall = 15*2*4.5 + 10*2*4.5 = 225 PLF
Shear = 0.126(285+225) = 0.126*510 = 64.26 PLF
Plate height: ROOF = 9(ft)
SHEAR ROOF = 64.26*510*9/4590 = 64.26 PLF
SHEAR ROOF = 0.6*W = 105.49(plf)
ROOF 105.49 PLF WIND GOVERN
Page 46 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
9
"
|
4
*
d
*
1
.
4
=
1
.
6
4
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
5.
2
5
3.
7
5
3.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
1
Co
m
.
(
k
i
p
s
)
2.
9
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
1
Co
m
.
(
k
i
p
s
)
2.
9
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
6.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
1
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
3
7
4
l
b
s
|
S
e
i
s
m
i
c
:
1
8
8
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
1
9
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
7
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
2
3
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
8
0
p
l
f
(
W
i
n
d
)
/
3
0
1
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
/
1
.
2
)
+
P
2
(
1
/
1
.
2
)
=
2
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
4
/
1
.
7
)
+
P
2
(
1
.
4
/
1
.
7
)
=
2
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
72
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 47 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
3
"
|
4
*
d
*
1
.
4
=
0
.
7
2
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
8.
5
0
8.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
5
Co
m
.
(
k
i
p
s
)
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
5
Co
m
.
(
k
i
p
s
)
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
2.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
2
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
3
7
4
l
b
s
|
S
e
i
s
m
i
c
:
1
8
8
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
1
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
2
7
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
9
7
p
l
f
(
W
i
n
d
)
/
2
3
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
2
.
6
/
2
.
6
)
=
2
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
3
.
6
/
3
.
6
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
13
6
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 48 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
"
|
4
*
d
*
1
.
4
=
0
.
5
3
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
9.
7
5
8.
0
0
5.
2
5
7.
2
5
4.
0
0
4.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
2.
2
5
2.
2
5
2.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
A
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
8
2
0
l
b
s
|
S
e
i
s
m
i
c
:
1
4
0
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
5
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
0
3
p
l
f
(
W
i
n
d
)
/
1
7
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
33
2
-93
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 49 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
"
|
4
*
d
*
1
.
4
=
0
.
5
3
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
5.
5
0
8.
0
0
6.
2
5
6.
2
5
3.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
6.
2
5
6.
5
0
3.
2
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
B
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
8
2
0
l
b
s
|
S
e
i
s
m
i
c
:
1
4
0
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
5
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
0
3
p
l
f
(
W
i
n
d
)
/
1
7
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
18
7
-10
8
0
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 50 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Shear Wall (X-X Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
A 1 1X 19 86 113 9 8 175 A
B 1 1X 19 86 113 9 8 175 A
SUMMARY SHEAR WALL
V2 = Seismic*Span/2 + Added Vseismic
Line shear V = Maximum(V1;V2)
V1 = Wind*Span/2 + Added Vwind
v(plf) = V/L
Page 51 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Shear Wall (Y-Y Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
1 1 1Y 45 105 64 9 6.25 380 B
2 1 1Y 45 105 64 9 8 297 B
v(plf) = V/L
Line shear V = Maximum(V1;V2)
SUMMARY SHEAR WALL
V1 = Wind*Span/2 + Added Vwind
V2 = Seismic*Span/2 + Added Vseismic
Page 52 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic
(#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb)
1 :Wind = 2374(lb), Seismic = 1880(lb)
1 1Y 1 105.5 64.3 45 2374 1446 l---------------45.0(ft)---------------l
2 :Wind = 2374(lb), Seismic = 1880(lb)
2 1Y 1 105.5 64.3 45 2374 1446 l---------------45.0(ft)---------------l
A :Wind = 820(lb), Seismic = 1400(lb)
A 1X 1 86.3 113.4 19 820 1077 l---------------19.0(ft)---------------l
B :Wind = 820(lb), Seismic = 1400(lb)
B 1X 1 86.3 113.4 19 820 1077 l---------------19.0(ft)---------------l
#N/A #N/A
#N/A #N/A
#N/A #N/A
Description
V_(lb)=v_(plf)*Span*Span/2/(Span+Offset)
LATERAL
p Factor: X Direction: p=1.3; Y Direction: p=1.3
Page 53 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : 1 - DROP AT ENTRANCE
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 9.75 ft
Roof Primary: (15+20)(4.8) = (DL=71.2PLF; LLr=95PLF) form 0 to 9.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 841/841 0
2 841/841 0
USE 4 x 8
Critcal Shear = 840 LB @0' 1.5xV/(F'v x A)= 0.22
F'v = 225, A = 25.38
Critcal Moment = 2047 LB-FT @4.75' M/(F'b x S)= 0.55
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.197 INCH @ 5 L/240 = 0.488"
Critical Deflection for LL = -0.109 INCH @ 5 L/360 = 0.325"
1 2
Moment
Shear
Deflection
9.75'
BEAM : 2 - HDR AT BED
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 6 ft
Roof Primary: (15+20)(11.5) = (DL=172.5PLF; LLr=230PLF) form 0 to 6
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 6
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1316/1316 0
2 1316/1316 0
USE 4 x 8
Critcal Shear = 1316 LB @0' 1.5xV/(F'v x A)= 0.34
F'v = 225, A = 25.38
Critcal Moment = 1974 LB-FT @3' M/(F'b x S)= 0.53
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.072 INCH @ 3 L/240 = 0.3"
Critical Deflection for LL = -0.038 INCH @ 3 L/360 = 0.2"
1 2
Moment
Shear
Deflection
6'
Page 54 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : C1 - C.J. 2X6#2 @ 16" O.C. TYP. (MAX L=15'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 140/140 0
2 140/140 0
USE 2 x 6
Critcal Shear = 140 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 8.25
Critcal Moment = 525 LB-FT @7.5' M/(F'b x S)= 0.49
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.64 INCH @ 7.5 L/240 = 0.75"
Critical Deflection for LL = -0.457 INCH @ 7.5 L/360 = 0.5"
1 2
Moment
Shear
Deflection
15'
BEAM : C2 - C.J. 2X8#2 @ 16" O.C. TYP. (MAX L=20'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 20
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 187/187 0
2 187/187 0
USE 2 x 8
Critcal Shear = 186 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 10.88
Critcal Moment = 934 LB-FT @10' M/(F'b x S)= 0.55
F'b = 1552, S = 13.14
Critical Deflection for TL = -0.883 INCH @ 10 L/240 = 1"
Critical Deflection for LL = -0.631 INCH @ 10 L/360 = 0.667"
1 2
Moment
Shear
Deflection
20'
Page 55 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : R1 - R.R. 2X6#2 @ 16" O.C. TYP. (MAX L=12'-0")
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 248/248 0
2 248/248 0
USE 2 x 6
Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2
F'v = 225, A = 8.25
Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
Page 56 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
2900 psf
Trib Trib Wall Height
DL(psf)LL(psf)roof(ft)DL(psf)LL(psf)floor(ft)DL(psf)wall(ft)
15 20 11.5 15 9
Roof:(DL+LL)(Trib) =402.5 plf
Floor:(DL+LL)(Trib) =0 plf
Wall:DL (Height)=135 plf
537.5 plf
537.5 /(12"/12)=537.5 psf< 2900 psf
P(allowable)
P(allowable) = 8,700 #
18 in
FOUNDATION - 1-STORY
Allowable soil bearing value:
Roof Floor
use 12" wide cont. ftg w/ 2-#4 top & bott.
45𝑜
Page 57 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering, Inc.
7661 GARDEN GROVE BLVD. , GARDEN GROVE, CA 92841
Office: (714) 617-5979
Email: info@dongengineering.com
DATE:7/17/2024
CLIENT:
JOB NO.:240051
Project:
NEW MAIN HOUSE & ADU
STRUCTURAL CALCULATIONS FOR THE BUILDING AT:
1834 W.3RD ST,
SANTA ANA, CA 92703
Page 1 of 57
1834 W Third St &
#2,33/21/2025
Job#:240051
Date:
ROOF:SHINGLE ROOF (VAULTED):SHINGLE
Slope 6:12 Slope 6:12
Live Load 20 psf Live Load 20 psf
Roof'g Material 3.0 psf Roof'g Material 3.0 psf
Sheathing 2.0 psf Sheathing 2.0 psf
Trusses / Rafters 2.0 psf Trusses / Rafters 2.0 psf
Ceiling Joists 2.0 psf
Drywall 2.0 psf Drywall 2.0 psf
Sprinkler 0.5 psf Sprinkler 0.5 psf
Solar 3.0 psf Solar 3.0 psf
Miscellaneous 0.5 psf Miscellaneous 0.5 psf
Total D.L.15 psf Total D.L.13.0 psf
Total Load 35 psf Total Load 33 psf
FLOOR:Without Lt. Wt. CONC.DECK:
Live Load 40 psf Live Load 60 psf
Floor Material 3.0 psf Floor Material 3.0 psf
Sheathing 3.0 psf Sheathing 3.0 psf
Floor Joist 3.0 psf Floor Joist 3.0 psf
Sprinkler 0.5 psf Sprinkler 0.5 psf
Miscellaneous 0.5 psf Miscellaneous 0.5 psf
Drywall 3.0 psf Drywall 3.0 psf
Total D.L.13 psf Total D.L.13 psf
Total Load 53 psf Total Load 73 psf
LOADING CONDITIONS
7/10/2024
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Page 2 of 57
1834 W Third St &
#2,33/21/2025
EXTERIOR WALL:INTERIOR WALL:
EXTERIOR:9 DRYWALL:3
DRYWALL:3.0 DRYWALL:3.0
STUDS:2.0 STUDS:2.0
MISC.:1.0 MISC.:2.0
DL=15.0 PSF DL=10.0 PSF
REVISIONS:
1 Sheets:Date:
Init:Remark:
2 Sheets:Date:
Init:Remark:
3 Sheets:Date:
Init:Remark:
4 Sheets:Date:
Init:Remark:
5 Sheets:Date:
Init:Remark:
6 Sheets:Date:
Init:Remark:
Page 3 of 57
1834 W Third St &
#2,33/21/2025
1Y
1X
1 2
A
B
MAIN HOUSE - JADU ROOF SHEARWALL LAYOUT
Page 4 of 57
1834 W Third St &
#2,33/21/2025
1Y
1X
3 4 5
C
D
E
MAIN HOUSE - JADU FLOOR SHEARWALL LAYOUT
Page 5 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1X
Number of Story: 2 Section width: 39(ft)Section length: 33(ft)
Base height: 0.5(ft)Slope roof height: 25.5(ft)Gable mean roof height: 22.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 39(ft), L = 33(ft), H = 23(ft)-->L/B = 0.85, H/L = 0.7
Wall coefficient: Cpw = 0.8, Cpl = -0.5
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Rx = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Rx = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 90.72 + 118.31 = 209.03 PLF
Redistrib: 720*19 + 939*9 = 22131 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 184.59 x 39 / (2 x 33) = 109.08 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 184.59 x 39^2 / (8 x 33) = 1063.49 LBS
Splice w/ min. (6) 16d sinker nails each side of splice at 8" o.c. (standard construction)
FIRST FLOOR DIAPHRAGM
Max shear = 124.96 x 39 / (2 x 33) = 73.84 PLF
Use: 23/32" apa rated unblock w/10d common nails at 6", 6", 12" o.c.
Chord force = 124.96 x 39^2 / (8 x 33) = 719.94 LBS
Splice w/ min. (4) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (23, 0.93, 24.46, 27.07); (19.5, 0.9, 23.62, 26.5); (15, 0.85, 22.35, 25.64)
ROOF
Roof = 15*33 = 495 PLF
Wall = 15*2*4.5 + 10*2*4.5 = 225 PLF
Shear = 0.126(495+225) = 0.126*720 = 90.72 PLF
FIRST FLOOR
Roof + Floor = 15*7 + 13*33 = 534 PLF
Wall = 15*2*4.5 + 15*2*4.5 + 10*2*4.5 + 10*1*4.5 = 405 PLF
Shear = 0.126(534+405) = 0.126*939 = 118.31 PLF
Plate height: ROOF = 19(ft); FIRST FLOOR = 9(ft)
SHEAR ROOF = 209.03*720*19/22131 = 129.21 PLF
SHEAR FIRST FLOOR = 209.03*939*9/22131 = 79.82 PLF
SHEAR ROOF = 0.6*W = 128.3(plf)
SHEAR FIRST FLOOR = 0.6*W = 153.84(plf)
ROOF
FIRST FLOOR
129.21 PLF
153.84 PLF
SEISMIC GOVERN
WIND GOVERN
Page 6 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1Y
Number of Story: 2 Section width: 33(ft)Section length: 39(ft)
Base height: 0.5(ft)Slope roof height: 25.5(ft)Gable mean roof height: 22.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 33(ft), L = 39(ft), H = 23(ft)-->L/B = 1.18, H/L = 0.59
Wall coefficient: Cpw = 0.8, Cpl = -0.46, Roof coefficient: Cpw = (0.17;-0.3), Cpl = -0.6
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 102.06 + 138.98 = 241.04 PLF
Redistrib: 810*19 + 1103*9 = 25317 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 209.33 x 33 / (2 x 39) = 88.56 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 209.33 x 33^2 / (8 x 39) = 730.64 LBS
Splice w/ min. (4) 16d sinker nails each side of splice at 8" o.c. (standard construction)
FIRST FLOOR DIAPHRAGM
Max shear = 142.27 x 33 / (2 x 39) = 60.19 PLF
Use: 23/32" apa rated unblock w/10d common nails at 6", 6", 12" o.c.
Chord force = 142.27 x 33^2 / (8 x 39) = 496.58 LBS
Splice w/ min. (3) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (26, 0.95, 25.09, 26.75); (19.5, 0.9, 23.62, 25.74); (15, 0.85, 22.35, 24.88)
ROOF
Roof = 15*36 = 540 PLF
Wall = 15*2*4.5 + 10*3*4.5 = 270 PLF
Shear = 0.126(540+270) = 0.126*810 = 102.06 PLF
FIRST FLOOR
Roof + Floor = 15*11.5 + 13*33.5 = 608 PLF
Wall = 15*2*4.5 + 15*2*4.5 + 10*3*4.5 + 10*2*4.5 = 495 PLF
Shear = 0.126(608+495) = 0.126*1103 = 138.98 PLF
Plate height: ROOF = 19(ft); FIRST FLOOR = 9(ft)
SHEAR ROOF = 241.04*810*19/25317 = 146.53 PLF
SHEAR FIRST FLOOR = 241.04*1103*9/25317 = 94.51 PLF
SHEAR ROOF = 0.6*W = 133.71(plf)
SHEAR FIRST FLOOR = 0.6*W = 149.28(plf)
ROOF
FIRST FLOOR
146.53 PLF
149.28 PLF
SEISMIC GOVERN
WIND GOVERN
Page 7 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
5
"
|
4
*
d
*
1
.
4
=
0
.
2
6
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
3.
5
0
7.
2
5
4.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
9
1.
9
Co
m
.
(
k
i
p
s
)
2.
7
2.
4
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
9
1.
9
Co
m
.
(
k
i
p
s
)
2.
7
2.
4
8.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
0
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
P2
LI
N
E
1
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
2
0
7
l
b
s
|
S
e
i
s
m
i
c
:
2
4
1
8
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
2
9
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
1
8
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
0
4
p
l
f
(
W
i
n
d
)
/
2
2
4
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
2
.
3
/
2
.
3
)
+
P
2
(
1
.
1
/
1
.
3
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
3
.
2
/
3
.
2
)
+
P
2
(
1
.
6
/
1
.
8
)
=
4
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
11
2
2
-24
8
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 8 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
3
"
|
4
*
d
*
1
.
4
=
0
.
1
9
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
1.
2
5
14
.
2
5
5.
7
5
10
.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(1
)
C
S
1
6
Po
s
t
S
i
z
e
2x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
1
Co
m
.
(
k
i
p
s
)
2.
7
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(1
)
C
S
1
6
Po
s
t
S
i
z
e
2x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
1
Co
m
.
(
k
i
p
s
)
2.
7
5.
2
5
2.
2
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
2
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
2
0
7
l
b
s
|
S
e
i
s
m
i
c
:
2
4
1
8
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
3
9
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
4
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
8
9
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
5
5
p
l
f
(
W
i
n
d
)
/
1
7
0
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
1
/
3
.
1
)
=
3
.
1
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
4
.
4
/
4
.
4
)
=
4
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
11
1
-20
8
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 9 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
3
"
|
4
*
d
*
1
.
4
=
1
.
2
8
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
14
.
0
0
6.
0
0
4.
5
0
5.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
9
Co
m
.
(
k
i
p
s
)
3.
3
3.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
9
Co
m
.
(
k
i
p
s
)
3.
3
3.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
8.
0
0
P2
5.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
C:
S
i
m
p
s
o
n
M
S
T
4
8
(
3
7
6
0
L
B
)
-
A
l
t
t
w
o
r
o
w
(
9
)
#
1
6
E
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
5
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
3
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
6
6
3
l
b
s
|
S
e
i
s
m
i
c
:
3
3
3
9
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
5
0
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
9
8
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
1
9
p
l
f
(
W
i
n
d
)
/
2
9
0
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
1
.
8
/
1
.
8
)
=
3
.
7
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
2
.
5
/
2
.
5
)
=
5
.
2
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
25
1
6
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 10 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
3
7
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
11
.
2
5
11
.
2
5
25
.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
2
Co
m
.
(
k
i
p
s
)
2.
4
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
2
Co
m
.
(
k
i
p
s
)
2.
4
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
4
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
9
8
6
l
b
s
|
S
e
i
s
m
i
c
:
1
8
9
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
4
8
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
6
2
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
6
5
p
l
f
(
W
i
n
d
)
/
1
6
8
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
6
/
3
.
6
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
5
/
5
)
=
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
69
6
-15
9
4
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 11 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
"
|
4
*
d
*
1
.
4
=
1
.
1
5
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
11
.
2
5
6.
0
0
9.
0
0
6.
0
0
3.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
8
Co
m
.
(
k
i
p
s
)
3.
2
3.
2
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
8
Co
m
.
(
k
i
p
s
)
3.
2
3.
2
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
2.
7
5
6.
2
5
5.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P2
P1
LI
N
E
5
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
7
3
8
l
b
s
|
S
e
i
s
m
i
c
:
3
3
8
7
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
4
9
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
2
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
0
0
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
1
2
p
l
f
(
W
i
n
d
)
/
2
8
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
1
.
9
/
1
.
9
)
=
3
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
2
.
7
/
2
.
7
)
=
5
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
14
0
9
-10
6
4
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 12 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
4
1
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
2.
5
0
6.
2
5
5.
2
5
5.
2
5
5.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
9
2.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
5
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
9
2.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
5
P2
2.
7
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
A
(
D
i
r
e
c
t
i
o
n
:
X
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
5
0
2
l
b
s
|
S
e
i
s
m
i
c
:
3
2
7
5
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
3
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
0
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
0
7
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
3
8
p
l
f
(
W
i
n
d
)
/
3
1
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
7
/
1
.
7
)
+
P
2
(
1
.
7
/
1
.
7
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
3
/
2
.
3
)
+
P
2
(
2
.
3
/
2
.
3
)
=
4
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
19
0
7
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 13 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
3
8
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
10
.
5
0
10
.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
6
Co
m
.
(
k
i
p
s
)
3.
8
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
6
Co
m
.
(
k
i
p
s
)
3.
8
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
2.
5
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
B
(
D
i
r
e
c
t
i
o
n
:
X
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
5
0
2
l
b
s
|
S
e
i
s
m
i
c
:
3
2
7
5
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
2
3
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
0
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
5
3
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
3
8
p
l
f
(
W
i
n
d
)
/
3
1
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
4
/
3
.
4
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
4
.
7
/
4
.
7
)
=
4
.
7
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
19
9
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 14 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
3
5
"
|
4
*
d
*
1
.
4
=
1
.
9
4
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
3.
0
0
5.
7
5
3.
0
0
8.
2
5
2.
5
0
16
.
5
0
2.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
HD
U
5
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
0
3.
0
2.
7
2.
7
Co
m
.
(
k
i
p
s
)
3.
4
3.
4
2.
9
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
HD
U
5
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
0
3.
0
2.
7
2.
7
Co
m
.
(
k
i
p
s
)
3.
4
3.
4
2.
9
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
P3
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
P4
LI
N
E
C
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
0
7
9
l
b
s
|
S
e
i
s
m
i
c
:
3
0
2
9
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
D
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
1
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
9
0
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
4
5
4
p
l
f
(
W
i
n
d
)
/
4
4
7
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
1
/
1
.
6
)
+
P
2
(
1
.
1
/
1
.
6
)
+
P
3
(
0
.
7
/
1
.
3
)
+
P
4
(
0
.
7
/
1
.
3
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
5
/
2
.
2
)
+
P
2
(
1
.
5
/
2
.
2
)
+
P
3
(
1
/
1
.
9
)
+
P
4
(
1
/
1
.
9
)
=
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
78
0
-12
2
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 15 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
8
"
|
4
*
d
*
1
.
4
=
1
.
6
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
18
.
7
5
3.
5
0
2.
7
5
9.
0
0
4.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
4
HD
U
4
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
6
Co
m
.
(
k
i
p
s
)
2.
8
3.
6
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
4
HD
U
4
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
6
Co
m
.
(
k
i
p
s
)
2.
8
3.
6
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
C:
S
i
m
p
s
o
n
M
S
T
4
8
(
3
7
6
0
L
B
)
-
A
l
t
t
w
o
r
o
w
(
9
)
#
1
6
E
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P2
P1
LI
N
E
D
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
4
7
7
1
l
b
s
|
S
e
i
s
m
i
c
:
3
8
5
2
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
C
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
2
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
4
0
7
p
l
f
(
W
i
n
d
)
/
3
2
9
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
1
/
1
.
4
)
+
P
2
(
3
.
7
/
3
.
7
)
=
4
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
6
/
2
)
+
P
2
(
5
.
2
/
5
.
2
)
=
6
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
31
5
1
-79
8
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 16 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
3
"
|
4
*
d
*
1
.
4
=
1
.
2
7
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
3.
2
5
2.
7
5
6.
0
0
4.
0
0
9.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
5
Co
m
.
(
k
i
p
s
)
3.
5
3.
7
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
4.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
7
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
2.
2
5
2.
2
5
3.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
5.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
E
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
4
6
9
5
l
b
s
|
S
e
i
s
m
i
c
:
4
7
5
4
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
5
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
4
9
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
0
3
p
l
f
(
W
i
n
d
)
/
3
0
7
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
3
/
3
)
=
4
.
9
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
4
.
2
/
4
.
2
)
=
6
.
9
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
22
0
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 17 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (X-X Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
A 2 1X 39 128 129 9 10.5 312 B
B 2 1X 39 128 129 9 10.5 312 B
C 1 1X 20.5 154 80 1502 1965 9 6.78 454 D
D 1 1X 49 154 80 1001 1310 9 11.72 407 C
E 1 1X 28.5 154 80 2502 3275 9 15.5 307 B
SUMMARY SHEAR WALL
V2 = Seismic*Span/2 + Added Vseismic
Line shear V = Maximum(V1;V2)
V1 = Wind*Span/2 + Added Vwind
v(plf) = V/L
Page 18 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (Y-Y Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
1 2 1Y 33 134 147 9 10.81 224 B
2 2 1Y 33 134 147 9 14.25 170 A
3 1 1Y 19.5 149 95 2207 2418 9 11.5 319 B
4 1 1Y 40 149 95 9 11.25 265 B
5 1 1Y 20.5 149 95 2207 2418 9 12 312 B
v(plf) = V/L
Line shear V = Maximum(V1;V2)
SUMMARY SHEAR WALL
V1 = Wind*Span/2 + Added Vwind
V2 = Seismic*Span/2 + Added Vseismic
Page 19 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic
(#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb)
1 :Wind = 2207(lb), Seismic = 2418(lb)
1 1Y 2 133.7 146.5 33 2206 2418 l---------------33.0(ft)---------------l
2 :Wind = 2207(lb), Seismic = 2418(lb)
2 1Y 2 133.7 146.5 33 2206 2418 l---------------33.0(ft)---------------l
3 :Wind = 3663(lb), Seismic = 3339(lb), Line above : 1 - 100%, Wind = 2207(lb), Seismic = 2418(lb)
3 1Y 1 149.3 94.5 19.5 1455 921 l---------------19.5(ft)---------------l
4 :Wind = 2986(lb), Seismic = 1890(lb)
4 1Y 1 149.3 94.5 40 2986 1890 l---------------40.0(ft)---------------l
5 :Wind = 3738(lb), Seismic = 3387(lb), Line above : 2 - 100%, Wind = 2207(lb), Seismic = 2418(lb)
5 1Y 1 149.3 94.5 20.5 1530 969 l---------------20.5(ft)---------------l
A :Wind = 2502(lb), Seismic = 3275(lb)
A 1X 2 128.3 129.2 39 2502 2520 l---------------39.0(ft)---------------l
B :Wind = 2502(lb), Seismic = 3275(lb)
B 1X 2 128.3 129.2 39 2502 2520 l---------------39.0(ft)---------------l
C :Wind = 3079(lb), Seismic = 3029(lb), Line above : A - 60%, Wind = 1502(lb), Seismic = 1965(lb)
C 1X 1 153.8 79.8 20.5 1577 818 l---------------20.5(ft)---------------l
D :Wind = 4771(lb), Seismic = 3852(lb), Line above : A - 40%, Wind = 1001(lb), Seismic = 1310(lb)
D 1X 1 153.8 79.8 49 3769 1956 l---------------49.0(ft)---------------l
E :Wind = 4695(lb), Seismic = 4754(lb), Line above : B - 100%, Wind = 2502(lb), Seismic = 3275(lb)
E 1X 1 153.8 79.8 28.5 2192 1137 l---------------28.5(ft)---------------l
#N/A #N/A
#N/A #N/A
#N/A #N/A
Description
V_(lb)=v_(plf)*Span*Span/2/(Span+Offset)
LATERAL
p Factor: X Direction: p=1.3; Y Direction: p=1
20 of 52Page 20 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT2, SANTA ANA, CA 92703
BEAM : 1 - CLG AT BED 3
Loads(Downward+)
Beam Weight 10.1 plf from 0 ft to 14.75 ft
Roof Rafter: (11+20)(4.2) = (DL=46.8PLF; LLr=85PLF) form 0 to 14.75
Ceiling Joist DL: (4)(6.8) = (DL=27PLF) form 0 to 14.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1239/1239 0
2 1239/1239 0
USE 6 x 8
Critcal Shear = 1239 LB @0' 1.5xV/(F'v x A)= 0.21
F'v = 212, A = 41.25
Critcal Moment = 4569 LB-FT @7.37' M/(F'b x S)= 0.63
F'b = 1688, S = 51.56
Critical Deflection for TL = -0.578 INCH @ 7.37 L/240 = 0.738"
Critical Deflection for LL = -0.29 INCH @ 7.37 L/360 = 0.492"
1 2
Moment
Shear
Deflection
14.75'
BEAM : 2 - CLG AT M.BED 4
Loads(Downward+)
Beam Weight 12.7 plf from 0 ft to 10.75 ft
Roof Primary: (15+20)(11.8) = (DL=176.2PLF; LLr=235PLF) form 0 to 10.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2279/2279 0
2 2279/2279 0
USE 6 x 10
Critcal Shear = 2278 LB @0' 1.5xV/(F'v x A)= 0.3
F'v = 212, A = 52.25
Critcal Moment = 6120 LB-FT @5.25' M/(F'b x S)= 0.52
F'b = 1688, S = 82.73
Critical Deflection for TL = -0.202 INCH @ 5.25 L/240 = 0.538"
Critical Deflection for LL = -0.112 INCH @ 5.25 L/360 = 0.358"
1 2
Moment
Shear
Deflection
10.75'
Page 21 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT2, SANTA ANA, CA 92703
BEAM : 2A - CLG AT M.BATH
Loads(Downward+)
Beam Weight 10.1 plf from 0 ft to 13 ft
Roof Rafter: (11+20)(4.2) = (DL=46.8PLF; LLr=85PLF) form 0 to 13
Ceiling Joist DL: (4)(6.5) = (DL=26PLF) form 0 to 13
Point load @ 1.5 : Load from beam 2 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 3036/3036 0
2 1325/1324 0
USE 6 x 8
Critcal Shear = 3036 LB @0' 1.5xV/(F'v x A)= 0.52
F'v = 212, A = 41.25
Critcal Moment = 5339 LB-FT @5' M/(F'b x S)= 0.73
F'b = 1688, S = 51.56
Critical Deflection for TL = -0.538 INCH @ 6.25 L/240 = 0.65"
Critical Deflection for LL = -0.276 INCH @ 6.25 L/360 = 0.433"
1 2
P1
Moment
Shear
Deflection
13'
BEAM : 3 - HDR AT M.BATH
Loads(Downward+)
Beam Weight 4.7 plf from 0 ft to 2.25 ft
Roof Rafter: (11+20)(3.8) = (DL=41.2PLF; LLr=75PLF) form 1.25 to 2.25
Ceiling Joist DL: (4)(5.5) = (DL=22PLF) form 1.25 to 2.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 2.25
Point load @ 1.25 : Load from beam 2A at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 672/672 0
2 899/899 0
USE 4 x 6
Critcal Shear = -898 LB @2.25' 1.5xV/(F'v x A)= 0.31
F'v = 225, A = 19.25
Critcal Moment = 812 LB-FT @1.25' M/(F'b x S)= 0.37
F'b = 1462, S = 17.65
Critical Deflection for TL = -0.007 INCH @ 1 L/240 = 0.112"
Critical Deflection for LL = -0.004 INCH @ 1 L/360 = 0.075"
1 2
P1
Moment
Shear
Deflection
2.25'
(DL=1016#, LLr=1263#)
(DL=656#, LLr=669#)
Page 22 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 3A - HDR AT M.BED 4
Loads(Downward+)
Beam Weight 4.7 plf from 0 ft to 2.25 ft
Exterior Wall: (15)(4) = (DL=60PLF) form 0 to 2.25
Point load @ 1 : Load from beam 2 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1339/1339 0
2 1085/1086 0
USE 4 x 6
Critcal Shear = 1338 LB @0' 1.5xV/(F'v x A)= 0.46
F'v = 225, A = 19.25
Critcal Moment = 1306 LB-FT @1' M/(F'b x S)= 0.6
F'b = 1462, S = 17.65
Critical Deflection for TL = -0.012 INCH @ 1 L/240 = 0.112"
Critical Deflection for LL = -0.007 INCH @ 1 L/360 = 0.075"
1 2
P1
Moment
Shear
Deflection
2.25'
BEAM : 4 - RIDGE AT FAMILY ROOM
Loads(Downward+)
Beam Weight 15.4 plf from 0 ft to 14 ft
Rafter Vaulted: (13+20)(13.2) = (DL=172.2PLF; LLr=265PLF) form 0 to 14
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 3116/3116 0
2 3116/3116 0
USE 6 x 12
Critcal Shear = 3115 LB @0' 1.5xV/(F'v x A)= 0.34
F'v = 212, A = 63.25
Critcal Moment = 10905 LB-FT @7' M/(F'b x S)= 0.64
F'b = 1688, S = 121.23
Critical Deflection for TL = -0.345 INCH @ 7 L/240 = 0.7"
Critical Deflection for LL = -0.2 INCH @ 7 L/360 = 0.467"
1 2
Moment
Shear
Deflection
14'
(DL=1016#, LLr=1263#)
Page 23 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 4A - CLG AT HALLWAY
Loads(Downward+)
Beam Weight 19.5 plf from 0 ft to 18.25 ft
Roof Primary: (15+20)(13.2) = (DL=198.8PLF; LLr=265PLF) form 0 to 18.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 4233/4232 0
2 4233/4232 0
USE 5 1/4" x 11 7/8" PSL
Critcal Shear = 4232 LB @0' 1.5xV/(F'v x A)= 0.28
F'v = 362, A = 62.34
Critcal Moment = 19308 LB-FT @9.12' M/(F'b x S)= 0.52
F'b = 3625, S = 123.39
Critical Deflection for TL = -0.79 INCH @ 9.13 L/240 = 0.912"
Critical Deflection for LL = -0.418 INCH @ 9.13 L/360 = 0.608"
1 2
Moment
Shear
Deflection
18.25'
BEAM : 4B - CLG AT STAIR
Loads(Downward+)
Beam Weight 15.2 plf from 0 ft to 14.25 ft
Interior Wall: (10)(0~5) = (DL=0~50PLF) form 0 to 14.25
Point load @ 13 : Load from beam 4 at Support 2(P1)
Point load @ 13 : Load from beam 4A at Support 1(P2)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 873/873 0
2 7062/7061 0
USE 5 1/4" x 9 1/4" PSL
Critcal Shear = -7061 LB @14.25' 1.5xV/(F'v x A)= 0.6
F'v = 362, A = 48.56
Critcal Moment = 8777 LB-FT @13' M/(F'b x S)= 0.39
F'b = 3625, S = 74.87
Critical Deflection for TL = -0.339 INCH @ 7.92 L/240 = 0.712"
Critical Deflection for LL = -0.158 INCH @ 7.92 L/360 = 0.475"
1 2
P1P2
Moment
Shear
Deflection
14.25'
(DL=1314#, LLr=1802#)
(DL=1992#, LLr=2241#)
Page 24 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 5 - FL AT GARAGE
Loads(Downward+)
Beam Weight 15.2 plf from 0 ft to 15.5 ft
Deck Primary: (13+60)(3.2) = (DL=42.2PLF; LLr=195PLF) form 0 to 5.25
Deck Primary: (13+60)(2.5) = (DL=32.5PLF; LLr=150PLF) form 5.25 to 15.5
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 15.5
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 0 to 15.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2857/2468 0
2 2667/2278 0
USE 5 1/4" x 9 1/4" PSL
Critcal Shear = 2468 LB @0' 1.5xV/(F'v x A)= 0.26
F'v = 290, A = 48.56
Critcal Moment = 9019 LB-FT @7.46' M/(F'b x S)= 0.5
F'b = 2900, S = 74.87
Critical Deflection for TL = -0.566 INCH @ 7.75 L/240 = 0.775"
Critical Deflection for LL = -0.303 INCH @ 7.75 L/360 = 0.517"
1 2
Moment
Shear
Deflection
15.5'
BEAM : 6 - FL AT GARAGE
Loads(Downward+)
Beam Weight 10.2 plf from 0 ft to 11.5 ft
Roof Primary: (15+20)(2.2) = (DL=33.8PLF; LLr=45PLF) form 0 to 11.5
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 5 to 11.5
Point load @ 5 : Load from beam 5 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2115/1826 0
2 1915/1678 0
USE 3 1/2" x 9 1/4" PSL
Critcal Shear = 1637 LB @0' 1.5xV/(F'v x A)= 0.26
F'v = 290, A = 32.38
Critcal Moment = 7637 LB-FT @5' M/(F'b x S)= 0.63
F'b = 2900, S = 49.91
Critical Deflection for TL = -0.357 INCH @ 5.5 L/240 = 0.575"
Critical Deflection for LL = -0.168 INCH @ 5.5 L/360 = 0.383"
1 2
P1
Moment
Shear
Deflection
11.5'
(DL=1076#, LLr=388#, LL=1203#)
Page 25 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 7 - HDR AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 16.25 ft
Roof Primary: (15+20)(4.5) = (DL=67.5PLF; LLr=90PLF) form 0 to 13.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 16.25
Point load @ 13.25 : Load from beam 6 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1968/1841 0
2 2915/2558 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = -2558 LB @16.25' 1.5xV/(F'v x A)= 0.24
F'v = 388, A = 41.56
Critcal Moment = 8527 LB-FT @9.81' M/(F'b x S)= 0.43
F'b = 2906, S = 82.26
Critical Deflection for TL = -0.539 INCH @ 8.43 L/240 = 0.812"
Critical Deflection for LL = -0.222 INCH @ 8.43 L/360 = 0.542"
1 2
P1
Moment
Shear
Deflection
16.25'
BEAM : 8 - FL AT DINING
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 11.25 ft
Exterior Wall: (15)(9~13) = (DL=135~195PLF) form 0 to 11.25
Roof Primary: (15+20)(1.3) = (DL=20PLF; LLr=26.7PLF) form 0 to 11.25
Point load from Panel P1(Left) of Line 1 at @ 7.5(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1201/2981 0 2981
2 1314/4895 -265 4895
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -4895 LB @11.25' 1.5xV/(F'v x A)= 0.35
F'v = 496, A = 41.56
Critcal Moment = 16595 LB-FT @7.5' M/(F'b x S)= 0.65
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.214 INCH @ 6 L/240 = 0.562"
Critical Deflection for LL = -0.121 INCH @ 6 L/360 = 0.375"
1 2
P1*
Moment
Shear
Deflection
11.25'
(DL=957#, LLr=478#, LL=680#)
Page 26 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 9 - FL AT LIVING
Loads(Downward+)
Beam Weight 17.5 plf from 0 ft to 15.5 ft
Roof Primary: (15+20)(11.2) = (DL=168.8PLF; LLr=225PLF) form 0 to 4.75
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 4.75 to 10.25
Roof Primary: (15+20)(3.8) = (DL=56.2PLF; LLr=75PLF) form 10.25 to 15.5
Exterior Wall: (15)(9) = (DL=135PLF) form 4.75 to 15.5
Rafter Vaulted: (13+20)(8.8) = (DL=113.8PLF; LLr=175PLF) form 4.75 to 15.5
Point load @ 4.75 : Load from beam 8 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 4727/4727 0 4727
2 4780/4781 0 4781
USE 3 1/2" x 16" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -4780 LB @15.5' 1.5xV/(F'v x A)= 0.35
F'v = 362, A = 56
Critcal Moment = 20031 LB-FT @7.23' M/(F'b x S)= 0.44
F'b = 3625, S = 149.33
Critical Deflection for TL = -0.361 INCH @ 7.58 L/240 = 0.775"
Critical Deflection for LL = -0.145 INCH @ 7.58 L/360 = 0.517"
1 2
P1
Moment
Shear
Deflection
15.5'
BEAM : 9A - AT STAIR
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 4 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 4
Roof Primary: (15+20)(4) = (DL=60PLF; LLr=80PLF) form 0 to 4
Rafter Vaulted: (13+20)(6.5) = (DL=84.5PLF; LLr=130PLF) form 0 to 4
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 991/991 0
2 991/991 0
USE 4 x 8
Critcal Shear = 991 LB @0' 1.5xV/(F'v x A)= 0.26
F'v = 225, A = 25.38
Critcal Moment = 991 LB-FT @2' M/(F'b x S)= 0.26
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.016 INCH @ 2 L/240 = 0.2"
Critical Deflection for LL = -0.007 INCH @ 2 L/360 = 0.133"
1 2
Moment
Shear
Deflection
4'
Page 27 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 10 - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 13.5
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 13.5
Roof Primary: (15+20)(9.8) = (DL=146.2PLF; LLr=195PLF) form 0 to 1.5
Point load from Panel P2(Left) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1926/10274 -1982 10274
2 1043/2027 0 2027
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -8181 LB @1.5' 1.5xV/(F'v x A)= 0.59
F'v = 496, A = 41.56
Critcal Moment = -11877 LB-FT @1.5' M/(F'b x S)= 0.46
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.195 INCH @ 7.25 L/240 = 0.6"
Critical Deflection for LL = -0.103 INCH @ 7.25 L/360 = 0.4"
1 2
P1*
Moment
Shear
Deflection
1.5'12'
BEAM : 10A - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 1.5
Roof Primary: (15+20)(9.8) = (DL=146.2PLF; LLr=195PLF) form 0 to 1.5
Point load from Panel P1(Left) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 793/9474 -3096 9474
2 -61/1258 -547 1258
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -8156 LB @1.5' 1.5xV/(F'v x A)= 0.59
F'v = 496, A = 41.56
Critcal Moment = -11858 LB-FT @1.5' M/(F'b x S)= 0.46
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.062 INCH @ 5.5 L/240 = 0.45"
Critical Deflection for LL = -0.06 INCH @ 5.5 L/360 = 0.3"
1 2
P1*
Moment
Shear
Deflection
1.5'9'
Page 28 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 10B - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Floor Primary: (13+40)(1.3) = (DL=17.4PLF; LL=53.4PLF) form 0 to 10.5
Point load from Panel P1(Right) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 506/9126 -3393 9126
2 362/1415 -382 1415
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -7702 LB @1.5' 1.5xV/(F'v x A)= 0.56
F'v = 496, A = 41.56
Critcal Moment = -11504 LB-FT @1.5' M/(F'b x S)= 0.45
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.067 INCH @ 5.75 L/240 = 0.45"
Critical Deflection for LL = -0.062 INCH @ 5.75 L/360 = 0.3"
1 2
P1*
Moment
Shear
Deflection
1.5'9'
BEAM : 11 - DROP AT GARAGE
Loads(Downward+)
Beam Weight 30.7 plf from 0 ft to 20.25 ft
Floor Primary: (13+40)(4.5) = (DL=58.5PLF; LL=180PLF) form 0 to 3
Floor Primary: (13+40)(6) = (DL=78PLF; LL=240PLF) form 3 to 18.25
Deck Primary: (13+60)(2.5) = (DL=32.5PLF; LLr=150PLF) form 3 to 15.25
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 18.25
Roof Primary: (15+20)(6.8) = (DL=101.2PLF; LLr=135PLF) form 0 to 3
Deck Primary: (13+60)(3.2) = (DL=42.2PLF; LLr=195PLF) form 0 to 3
Point load @ 3 : Load from beam 1 at Support 1(P1)
Point load @ 3 : Load from beam 10A at Support 1(P2)
Point load @ 15.25 : Load from beam 6 at Support 2(P3)
Point load @ 18.25 : Load from beam 10 at Support 1(P4)
Point load @ 18.25 : Load from beam 1 at Support 2(P5)
Point load @ 13.25 : Load from beam 10B at Support 1(P6)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 8769/7689 -171 7689
2 9065/8087 -820 8087
USE 7" x 14" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 13104 LB @18.25' 1.5xV/(F'v x A)= 0.43
F'v = 464, A = 98
Critcal Moment = 37746 LB-FT @10.68' M/(F'b x S)= 0.68
F'b = 2900, S = 228.67
Critical Deflection for TL = -0.885 INCH @ 10.12 L/240 = 1.012"
1 2
P1P2 P3 P4P5P6
Moment
Shear
Deflection
20.25'
Page 29 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 12 - FL AT KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 12.5 ft
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 12.5
Exterior Wall: (15)(14~11) = (DL=210~165PLF) form 0 to 12.5
Point load @ 2.25 : Load from beam 4 at Support 1(P1)
Point load from Panel P1(Right) of Line 1 at @ 3.75(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 4439/5490 0 5490
2 2316/3239 0 3239
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 4438 LB @0' 1.5xV/(F'v x A)= 0.41
F'v = 388, A = 41.56
Critcal Moment = 18544 LB-FT @3.75' M/(F'b x S)= 0.72
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.367 INCH @ 6 L/240 = 0.625"
Critical Deflection for LL = -0.129 INCH @ 6 L/360 = 0.417"
1 2
P1 P2*
Moment
Shear
Deflection
12.5'
BEAM : 13 - FL AT DINING
Loads(Downward+)
Beam Weight 26 plf from 0 ft to 19 ft
Floor Primary: (13+40)(6.2) = (DL=81.2PLF; LL=250PLF) form 4.75 to 19
Roof Rafter: (11+20)(3.8) = (DL=41.2PLF; LLr=75PLF) form 0 to 4.75
Ceiling Joist DL: (4)(5.5) = (DL=22PLF) form 0 to 4.75
Interior Wall: (10)(3.5) = (DL=35PLF) form 4.75 to 15.25
Point load @ 4.75 : Load from beam 8 at Support 2(P1)
Point load @ 4.75 : Load from beam 12 at Support 1(P2)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 6874/6142 0 6142
2 4729/4224 0 4224
USE 7" x 11 7/8" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5192 LB @0' 1.5xV/(F'v x A)= 0.32
F'v = 290, A = 83.12
Critcal Moment = 24983 LB-FT @7.6' M/(F'b x S)= 0.63
F'b = 2900, S = 164.52
Critical Deflection for TL = -0.889 INCH @ 8.89 L/240 = 0.95"
Critical Deflection for LL = -0.358 INCH @ 8.89 L/360 = 0.633"
1 2
P1P2
Moment
Shear
Deflection
19'
Page 30 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 14 - FL AT JADU KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 9.75 ft
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 2 to 9.75
Exterior Wall: (15)(9) = (DL=135PLF) form 2 to 9.75
Rafter Vaulted: (13+20)(8.8) = (DL=113.8PLF; LLr=175PLF) form 2 to 9.75
Floor Primary: (13+40)(1.2) = (DL=16.2PLF; LL=50PLF) form 11.75 to 9.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2599/2211 0
2 3912/3322 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = -3094 LB @9.75' 1.5xV/(F'v x A)= 0.36
F'v = 310, A = 41.56
Critcal Moment = 7229 LB-FT @5' M/(F'b x S)= 0.45
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.171 INCH @ 5 L/240 = 0.488"
Critical Deflection for LL = -0.091 INCH @ 5 L/360 = 0.325"
1 2
Moment
Shear
Deflection
9.75'
BEAM : 15 - FL AT JADU LIVING
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 13.5
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 2.75 to 13.5
Exterior Wall: (15)(11) = (DL=165PLF) form 0 to 2.75
Point load @ 2.75 : Load from beam 14 at Support 1(P1)
Point load from Panel P2(Left) of Line 1 at @ 2.75(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 3373/6049 0 6049
2 1586/2080 0 2080
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 6048 LB @0' 1.5xV/(F'v x A)= 0.44
F'v = 496, A = 41.56
Critcal Moment = 15711 LB-FT @2.75' M/(F'b x S)= 0.61
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.402 INCH @ 6.23 L/240 = 0.675"
Critical Deflection for LL = -0.217 INCH @ 6.23 L/360 = 0.45"
1 2
P1P2*
Moment
Shear
Deflection
13.5'
Page 31 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 16 - FL AT JADU KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 2.75 to 13.5
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 2.75 to 13.5
Point load @ 2.75 : Load from beam 14 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 4635/4042 0
2 3052/2747 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = 3491 LB @0' 1.5xV/(F'v x A)= 0.4
F'v = 310, A = 41.56
Critcal Moment = 9841 LB-FT @4.25' M/(F'b x S)= 0.61
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.517 INCH @ 6.49 L/240 = 0.675"
Critical Deflection for LL = -0.201 INCH @ 6.49 L/360 = 0.45"
1 2
P1
Moment
Shear
Deflection
13.5'
BEAM : 17 - FL AT BED 1
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 14 ft
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 14
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 14
Floor Primary: (13+40)(0.8) = (DL=10.4PLF; LL=32PLF) form 0 to 14
Point load @ 12.75 : Load from beam 3 at Support 1(P1)
Point load @ 1 : Load from beam 4A at Support 1(P3)
Point load from Panel P1(Right) of Line 2 at @ 2(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 5672/5447 0 5447
2 1949/1933 0 1933
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5447 LB @0' 1.5xV/(F'v x A)= 0.5
F'v = 388, A = 41.56
Critcal Moment = 6080 LB-FT @6.25' M/(F'b x S)= 0.38
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.354 INCH @ 6.74 L/240 = 0.7"
Critical Deflection for LL = -0.098 INCH @ 6.74 L/360 = 0.467"
1 2
P1P3P2*
Moment
Shear
Deflection
14'
Page 32 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 20 - HDR AT JADU DINING
Loads(Downward+)
Beam Weight 9.6 plf from 0 ft to 5.25 ft
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 0 to 3.75
Floor Primary: (13+40)(6.8) = (DL=87.8PLF; LL=270PLF) form 3.75 to 5.25
Exterior Wall: (15)(5.5) = (DL=82.5PLF) form 0 to 3.75
Exterior Wall: (15)(11) = (DL=165PLF) form 3.75 to 5.25
Point load @ 3.75 : Load from beam 16 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2176/1916 0
2 3525/3110 0
USE 4 x 12
Critcal Shear = -2875 LB @5.25' 1.5xV/(F'v x A)= 0.61
F'v = 180, A = 39.38
Critcal Moment = 3714 LB-FT @3.75' M/(F'b x S)= 0.55
F'b = 1100, S = 73.83
Critical Deflection for TL = -0.023 INCH @ 2.75 L/240 = 0.262"
Critical Deflection for LL = -0.01 INCH @ 2.75 L/360 = 0.175"
1 2
P1
Moment
Shear
Deflection
5.25'
BEAM : 21 - CLG AT ENTRANCE
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 8.25 ft
Roof Rafter: (11+20)(2) = (DL=22PLF; LLr=40PLF) form 0 to 8.25
Ceiling Joist DL: (4)(1.3) = (DL=5.3PLF) form 0 to 8.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 303/303 0
2 303/303 0
USE 4 x 8
Critcal Shear = 303 LB @0' 1.5xV/(F'v x A)= 0.08
F'v = 225, A = 25.38
Critcal Moment = 625 LB-FT @4' M/(F'b x S)= 0.16
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.043 INCH @ 4 L/240 = 0.412"
Critical Deflection for LL = -0.023 INCH @ 4 L/360 = 0.275"
1 2
Moment
Shear
Deflection
8.25'
Page 33 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : C1 - C.J. 2X6#2 @ 16" O.C. TYP. (MAX L=15'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 140/140 0
2 140/140 0
USE 2 x 6
Critcal Shear = 140 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 8.25
Critcal Moment = 525 LB-FT @7.5' M/(F'b x S)= 0.49
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.64 INCH @ 7.5 L/240 = 0.75"
Critical Deflection for LL = -0.457 INCH @ 7.5 L/360 = 0.5"
1 2
Moment
Shear
Deflection
15'
BEAM : F3 - D.J. 2X12#2 @ 16" O.C. TYP. (MAX L=10'-
6")
Loads(Downward+)
Deck Primary: (13+60)(1.3) = (DL=17.4PLF; LLr=80.1PLF) form 0 to 10.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 512/512 0
2 512/512 0
USE 2 x 8
Critcal Shear = 511 LB @0' 1.5xV/(F'v x A)= 0.39
F'v = 180, A = 10.88
Critcal Moment = 1343 LB-FT @5.25' M/(F'b x S)= 0.98
F'b = 1242, S = 13.14
Critical Deflection for TL = -0.35 INCH @ 5.25 L/240 = 0.525"
Critical Deflection for LL = -0.287 INCH @ 5.25 L/360 = 0.35"
1 2
Moment
Shear
Deflection
10.5'
Page 34 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : R1 - R.R. 2X6#2 @ 16" O.C. TYP. (MAX L=12'-0")
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 248/248 0
2 248/248 0
USE 2 x 6
Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2
F'v = 225, A = 8.25
Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
BEAM : R1A - R.R. 2X6#2 @ 16" O.C. W/ PURLIN
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 13.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 25/25 0
2 381/382 0
3 152/152 0
USE 2 x 6
Critcal Shear = 220 LB @4.5' 1.5xV/(F'v x A)= 0.18
F'v = 225, A = 8.25
Critcal Moment = -306 LB-FT @4.5' M/(F'b x S)= 0.29
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.101 INCH @ 9.5 L/240 = 0.45"
Critical Deflection for LL = -0.065 INCH @ 9.5 L/360 = 0.3"
1 2 3
Moment
Shear
Deflection
4.5'9'
Page 35 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : R2 - R.R. 2X10#2 @ 16" O.C.
Loads(Downward+)
Rafter Vaulted: (13+20)(1.3) = (DL=17.4PLF; LLr=26.7PLF) form 0 to 13.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 297/297 0
2 297/297 0
USE 2 x 10
Critcal Shear = 297 LB @0' 1.5xV/(F'v x A)= 0.14
F'v = 225, A = 13.88
Critcal Moment = 1003 LB-FT @6.75' M/(F'b x S)= 0.39
F'b = 1423, S = 21.39
Critical Deflection for TL = -0.208 INCH @ 6.75 L/240 = 0.675"
Critical Deflection for LL = -0.126 INCH @ 6.75 L/360 = 0.45"
1 2
Moment
Shear
Deflection
13.5'
Page 36 of 57
1834 W Third St &
#2,33/21/2025
P=200#
ZM
Plate use: 4 1/2" x 4 1/2" x 3/8" Stl. Plate. W/ (4)-3/8" x 6" Long Lag Screws.
Lag Screws Effective Thread Length for
3/8" Dia - 6" Long lag screw:
T-E = 3-9/32"(Table L2 - NDS 2018)
Moment at guard rail base:
M = PxH
= 200 x 42 = 8400 lbs-in
Withdrawal Load at each Lag screw:
Z = (M/D)/N = (8400/2.25)/4 = 933.3#
Lag Screws Withdrawal Value :
W = 1800xG^(3
2)xD^(3
4)x(T-E)(12.2-1 - NDS 2018)
= 1800x0.5^(3
2)x3/8^(3
4)x(3 9
32") = 1000.7#
=> Z < W : OK.
GUARDRAIL CALCULATION
Page 37 of 57
1834 W Third St &
#2,33/21/2025
F = 200 #
CHECK TENSION:
M = 200 x 51 = 10,200 LB-INCH
1.5T + 7.5T = 10,200 LB-INCH
=> T = 1134 LB.
CHECK SHEAR:
V=F/2=200 / 2 =100 LB
USE 3/8"x6" LAG SCREW
WITHDRAWAL CAPCITY: 305 x 1.6 x 3 =1.464 LB > 1134 LB
SHEAR CAPACITY: 11,700 X 0.36 x 0.375 x 3.28 = 5180 LBF >
100 LBF
M
GUARDRAIL CALCULATION
42
"
F
1.
5
"
6"
1.
5
"
51
"
F
1.
5
"
6"
1.
5
"
1.5"5"1.5"
Page 38 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.24.12.17 DONG ENGINEERING INC (c) ENERCALC, LLC 1982-2025
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per ACI 318-19, IBC 2021
Load Combinations Used : ASCE 7-16
Material Properties
4.0
7.50
145.0
Elastic Modulus 3,122.0 ksi
Soil Subgrade Modulus =250.0 psi / (inch deflection)
11.0Lt Wt FactorO =
=60.0
29,000.0
40.0
29,000.0
3
Beam is supported on an elastic foundation,
2
=0.90
0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c *474.342
pcf
E - Main Rebar ksi
psi
=
Fy - Stirrups ksi
==
=
E - Stirrups ksi
E
==
=
Shear :
Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
\
#
I
Load Combination :ASCE 7-16
.Cross Section & Reinforcing Details
Rectangular Section, Width = 15.0 in, Height = 24.0 in
Span #1 Reinforcing....
2-#4 at 3.0 in from Top, from 0.0 to 6.0 ft in this span 2-#4 at 3.0 in from Bottom, from 0.0 to 6.0 ft in this span
.Service loads entered. Load Factors will be applied for calculations.Applied Loads
Load for Span Number 1
Moment : W = 10.20, E = 10.10 k-ft, Location = 1.250 ft from left end of this span
.Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio =0.217 : 1
Load Combination W Only
Span # where maximum occurs Span # 1
Maximum Soil Pressure =1.347 ksf at 6.00 ft LdComb: W Only
Allowable Soil Pressure =OK2.90 ksf
Location of maximum on span 1.271 ft
Mn * Phi : Allowable 41.506 k-ft
Typical SectionSection used for this span
Mu : Applied 9.011 k-ft
Maximum Deflection
Max Downward L+Lr+S Deflection 0.000 in
Max Upward L+Lr+S Deflection 0.000 in
Max Downward Total Deflection 0.037 in
Max Upward Total Deflection -0.038 in
.Shear Stirrup Requirements
Entire Beam Span Length : Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in
.Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination
Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum Bending Envelope
Span # 1 1 1.271 9.01 41.51 0.22
Span # 1 1 1.271
+0.50W
Span # 1 1 1.271 4.51 41.51 0.11
Page 39 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.24.12.17 DONG ENGINEERING INC (c) ENERCALC, LLC 1982-2025
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination
Mu : Max Stress RatioSegment Length Phi*Mnxin Span
W Only
Span # 1 1 1.271 9.01 41.51 0.22
E Only
Span # 1 1 1.271 8.92 41.51 0.21
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections - Unfactored Loads
Span 1Span 1 1 0.0374 6.000 -0.0382 0.000
.Detailed Shear Information
Load Combination
Vu (k)Span Distance 'd'Comment Phi*Vs
Req'd
d*Vu/MuMu
(ft)(k)(in)Actual Suggest(k-ft)Number (k)
Spacing (in)
Design
Phi*Vc
W Only 1 0.00 21.00 -0.06 0.06 0.00 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.07 21.00 -0.18 0.18 0.00 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.14 21.00 -0.29 0.29 0.02 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.21 21.00 -0.41 0.41 0.04 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.28 21.00 -0.52 0.52 0.07 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.35 21.00 -0.62 0.62 0.10 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.42 21.00 -0.73 0.73 0.15 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.49 21.00 -0.83 0.83 0.20 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.56 21.00 -0.93 0.93 0.26 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.64 21.00 -1.02 1.02 0.32 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.71 21.00 -1.11 1.11 0.39 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.78 21.00 -1.20 1.20 0.47 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.85 21.00 -1.29 1.29 0.56 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.92 21.00 -1.37 1.37 0.65 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.99 21.00 -1.45 1.45 0.75 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.06 21.00 -1.53 1.53 0.85 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.13 21.00 -1.61 1.61 0.96 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.20 21.00 -1.68 1.68 1.07 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.27 21.00 -1.75 1.75 9.01 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.34 21.00 -1.81 1.81 8.89 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.41 21.00 -1.88 1.88 8.76 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.48 21.00 -1.94 1.94 8.63 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.55 21.00 -2.00 2.00 8.49 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.62 21.00 -2.05 2.05 8.35 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.69 21.00 -2.10 2.10 8.20 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.76 21.00 -2.15 2.15 8.06 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.84 21.00 -2.20 2.20 7.90 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.91 21.00 -2.24 2.24 7.75 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.98 21.00 -2.28 2.28 7.59 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.05 21.00 -2.32 2.32 7.43 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.12 21.00 -2.35 2.35 7.27 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.19 21.00 -2.39 2.39 7.10 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.26 21.00 -2.41 2.41 6.93 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.33 21.00 -2.44 2.44 6.76 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.40 21.00 -2.46 2.46 6.59 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.47 21.00 -2.48 2.48 6.41 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.54 21.00 -2.50 2.50 6.24 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.61 21.00 -2.52 2.52 6.06 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.68 21.00 -2.53 2.53 5.89 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.75 21.00 -2.54 2.54 5.71 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.82 21.00 -2.54 2.54 5.53 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.89 21.00 -2.55 2.55 5.35 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.96 21.00 -2.55 2.55 5.17 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.04 21.00 -2.55 2.55 4.99 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.11 21.00 -2.54 2.54 4.81 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.18 21.00 -2.53 2.53 4.63 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.25 21.00 -2.52 2.52 4.45 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.32 21.00 -2.51 2.51 4.27 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.39 21.00 -2.49 2.49 4.10 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.46 21.00 -2.47 2.47 3.92 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.53 21.00 -2.45 2.45 3.74 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.60 21.00 -2.43 2.43 3.57 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.67 21.00 -2.40 2.40 3.40 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.74 21.00 -2.37 2.37 3.23 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.81 21.00 -2.34 2.34 3.06 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.88 21.00 -2.30 2.30 2.90 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.95 21.00 -2.26 2.26 2.74 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
Page 40 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.24.12.17 DONG ENGINEERING INC (c) ENERCALC, LLC 1982-2025
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Detailed Shear Information
Load Combination
Vu (k)Span Distance 'd'Comment Phi*Vs
Req'd
d*Vu/MuMu
(ft)(k)(in)Actual Suggest(k-ft)Number (k)
Spacing (in)
Design
Phi*Vc
W Only 1 4.02 21.00 -2.22 2.22 2.58 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.09 21.00 -2.18 2.18 2.42 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.16 21.00 -2.13 2.13 2.27 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.24 21.00 -2.08 2.08 2.11 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.31 21.00 -2.03 2.03 1.97 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.38 21.00 -1.97 1.97 1.82 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.45 21.00 -1.92 1.92 1.68 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.52 21.00 -1.86 1.86 1.55 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.59 21.00 -1.79 1.79 1.42 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.66 21.00 -1.73 1.73 1.29 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.73 21.00 -1.66 1.66 1.17 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.80 21.00 -1.59 1.59 1.05 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.87 21.00 -1.51 1.51 0.94 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.94 21.00 -1.43 1.43 0.83 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.01 21.00 -1.35 1.35 0.73 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.08 21.00 -1.27 1.27 0.64 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.15 21.00 -1.18 1.18 0.55 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.22 21.00 -1.10 1.10 0.46 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.29 21.00 -1.00 1.00 0.39 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.36 21.00 -0.91 0.91 0.32 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.44 21.00 -0.81 0.81 0.25 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.51 21.00 -0.71 0.71 0.19 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.58 21.00 -0.61 0.61 0.14 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.65 21.00 -0.51 0.51 0.10 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.72 21.00 -0.40 0.40 0.07 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.79 21.00 -0.29 0.29 0.04 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.86 21.00 -0.18 0.18 0.02 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.93 21.00 -0.06 0.06 0.00 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
Page 41 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
(allowable)
P(allowable) = 14,500 #
FOUNDATION - 2-STORY
45𝑜
Page 42 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job#: 240051
Date: 1/7/2025
PLAN: 1
CODE: CBC 2022
BEAM NO. BM#4B Support 2 P =7,062 #
Use 2' - 6"Square x 24" Deep Concrete Pad With
3-#5 Each way
BEAM NO. BM#11+BM#9A Support 2 P =10,056 #
Use 3' - 0"Square x 24" Deep Concrete Pad With
4-#4 Each way
BEAM NO. BM#9+BM#9A Support 1 P =6,171 #
Use 2' - 6"Square x 24" Deep Concrete Pad With
3-#5 Each way
PAD SCHEDULE
Page 43 of 57
1834 W Third St &
#2,33/21/2025
1Y
1X
1
2
A B
AD
U
R
O
O
F
S
H
E
A
R
W
A
L
L
L
A
Y
O
U
T
Page 44 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
SECTION: 1X
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
ROOF 113.4 PLF SEISMIC GOVERN
Page 45 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
SECTION: 1Y
Number of Story: 1 Section width: 45(ft)Section length: 19(ft)
Base height: 0.5(ft)Slope roof height: 13.5(ft)Gable mean roof height: 11.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 45(ft), L = 19(ft), H = 12(ft)-->L/B = 0.42, H/L = 0.63
Wall coefficient: Cpw = 0.8, Cpl = -0.5, Roof coefficient: Cpw = (0.16;-0.32), Cpl = -0.6
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 64.26 = 64.26 PLF
Redistrib: 510*9 = 4590 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 91.8 x 45 / (2 x 19) = 108.71 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 91.8 x 45^2 / (8 x 19) = 1222.99 LBS
Splice w/ min. (7) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (15, 0.85, 22.35, 24.7)
ROOF
Roof = 15*19 = 285 PLF
Wall = 15*2*4.5 + 10*2*4.5 = 225 PLF
Shear = 0.126(285+225) = 0.126*510 = 64.26 PLF
Plate height: ROOF = 9(ft)
SHEAR ROOF = 64.26*510*9/4590 = 64.26 PLF
SHEAR ROOF = 0.6*W = 105.49(plf)
ROOF 105.49 PLF WIND GOVERN
Page 46 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
9
"
|
4
*
d
*
1
.
4
=
1
.
6
4
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
5.
2
5
3.
7
5
3.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
1
Co
m
.
(
k
i
p
s
)
2.
9
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
1
Co
m
.
(
k
i
p
s
)
2.
9
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
6.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
1
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
3
7
4
l
b
s
|
S
e
i
s
m
i
c
:
1
8
8
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
1
9
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
7
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
2
3
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
8
0
p
l
f
(
W
i
n
d
)
/
3
0
1
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
/
1
.
2
)
+
P
2
(
1
/
1
.
2
)
=
2
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
4
/
1
.
7
)
+
P
2
(
1
.
4
/
1
.
7
)
=
2
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
72
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 47 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
3
"
|
4
*
d
*
1
.
4
=
0
.
7
2
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
8.
5
0
8.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
5
Co
m
.
(
k
i
p
s
)
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
5
Co
m
.
(
k
i
p
s
)
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
2.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
2
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
3
7
4
l
b
s
|
S
e
i
s
m
i
c
:
1
8
8
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
1
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
2
7
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
9
7
p
l
f
(
W
i
n
d
)
/
2
3
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
2
.
6
/
2
.
6
)
=
2
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
3
.
6
/
3
.
6
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
13
6
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 48 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
"
|
4
*
d
*
1
.
4
=
0
.
5
3
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
9.
7
5
8.
0
0
5.
2
5
7.
2
5
4.
0
0
4.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
2.
2
5
2.
2
5
2.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
A
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
8
2
0
l
b
s
|
S
e
i
s
m
i
c
:
1
4
0
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
5
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
0
3
p
l
f
(
W
i
n
d
)
/
1
7
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
33
2
-93
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 49 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
"
|
4
*
d
*
1
.
4
=
0
.
5
3
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
5.
5
0
8.
0
0
6.
2
5
6.
2
5
3.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
6.
2
5
6.
5
0
3.
2
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
B
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
8
2
0
l
b
s
|
S
e
i
s
m
i
c
:
1
4
0
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
5
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
0
3
p
l
f
(
W
i
n
d
)
/
1
7
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
18
7
-10
8
0
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 50 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Shear Wall (X-X Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
A 1 1X 19 86 113 9 8 175 A
B 1 1X 19 86 113 9 8 175 A
SUMMARY SHEAR WALL
V2 = Seismic*Span/2 + Added Vseismic
Line shear V = Maximum(V1;V2)
V1 = Wind*Span/2 + Added Vwind
v(plf) = V/L
Page 51 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Shear Wall (Y-Y Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
1 1 1Y 45 105 64 9 6.25 380 B
2 1 1Y 45 105 64 9 8 297 B
v(plf) = V/L
Line shear V = Maximum(V1;V2)
SUMMARY SHEAR WALL
V1 = Wind*Span/2 + Added Vwind
V2 = Seismic*Span/2 + Added Vseismic
Page 52 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic
(#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb)
1 :Wind = 2374(lb), Seismic = 1880(lb)
1 1Y 1 105.5 64.3 45 2374 1446 l---------------45.0(ft)---------------l
2 :Wind = 2374(lb), Seismic = 1880(lb)
2 1Y 1 105.5 64.3 45 2374 1446 l---------------45.0(ft)---------------l
A :Wind = 820(lb), Seismic = 1400(lb)
A 1X 1 86.3 113.4 19 820 1077 l---------------19.0(ft)---------------l
B :Wind = 820(lb), Seismic = 1400(lb)
B 1X 1 86.3 113.4 19 820 1077 l---------------19.0(ft)---------------l
#N/A #N/A
#N/A #N/A
#N/A #N/A
Description
V_(lb)=v_(plf)*Span*Span/2/(Span+Offset)
LATERAL
p Factor: X Direction: p=1.3; Y Direction: p=1.3
Page 53 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : 1 - DROP AT ENTRANCE
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 9.75 ft
Roof Primary: (15+20)(4.8) = (DL=71.2PLF; LLr=95PLF) form 0 to 9.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 841/841 0
2 841/841 0
USE 4 x 8
Critcal Shear = 840 LB @0' 1.5xV/(F'v x A)= 0.22
F'v = 225, A = 25.38
Critcal Moment = 2047 LB-FT @4.75' M/(F'b x S)= 0.55
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.197 INCH @ 5 L/240 = 0.488"
Critical Deflection for LL = -0.109 INCH @ 5 L/360 = 0.325"
1 2
Moment
Shear
Deflection
9.75'
BEAM : 2 - HDR AT BED
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 6 ft
Roof Primary: (15+20)(11.5) = (DL=172.5PLF; LLr=230PLF) form 0 to 6
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 6
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1316/1316 0
2 1316/1316 0
USE 4 x 8
Critcal Shear = 1316 LB @0' 1.5xV/(F'v x A)= 0.34
F'v = 225, A = 25.38
Critcal Moment = 1974 LB-FT @3' M/(F'b x S)= 0.53
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.072 INCH @ 3 L/240 = 0.3"
Critical Deflection for LL = -0.038 INCH @ 3 L/360 = 0.2"
1 2
Moment
Shear
Deflection
6'
Page 54 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : C1 - C.J. 2X6#2 @ 16" O.C. TYP. (MAX L=15'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 140/140 0
2 140/140 0
USE 2 x 6
Critcal Shear = 140 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 8.25
Critcal Moment = 525 LB-FT @7.5' M/(F'b x S)= 0.49
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.64 INCH @ 7.5 L/240 = 0.75"
Critical Deflection for LL = -0.457 INCH @ 7.5 L/360 = 0.5"
1 2
Moment
Shear
Deflection
15'
BEAM : C2 - C.J. 2X8#2 @ 16" O.C. TYP. (MAX L=20'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 20
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 187/187 0
2 187/187 0
USE 2 x 8
Critcal Shear = 186 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 10.88
Critcal Moment = 934 LB-FT @10' M/(F'b x S)= 0.55
F'b = 1552, S = 13.14
Critical Deflection for TL = -0.883 INCH @ 10 L/240 = 1"
Critical Deflection for LL = -0.631 INCH @ 10 L/360 = 0.667"
1 2
Moment
Shear
Deflection
20'
Page 55 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : R1 - R.R. 2X6#2 @ 16" O.C. TYP. (MAX L=12'-0")
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 248/248 0
2 248/248 0
USE 2 x 6
Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2
F'v = 225, A = 8.25
Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
Page 56 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
2900 psf
Trib Trib Wall Height
DL(psf)LL(psf)roof(ft)DL(psf)LL(psf)floor(ft)DL(psf)wall(ft)
15 20 11.5 15 9
Roof:(DL+LL)(Trib) =402.5 plf
Floor:(DL+LL)(Trib) =0 plf
Wall:DL (Height)=135 plf
537.5 plf
537.5 /(12"/12)=537.5 psf< 2900 psf
P(allowable)
P(allowable) = 8,700 #
18 in
FOUNDATION - 1-STORY
Allowable soil bearing value:
Roof Floor
use 12" wide cont. ftg w/ 2-#4 top & bott.
45𝑜
Page 57 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering, Inc.
7661 GARDEN GROVE BLVD. , GARDEN GROVE, CA 92841
Office: (714) 617-5979
Email: info@dongengineering.com
DATE:7/17/2024
CLIENT:
JOB NO.:240051
Project:
NEW MAIN HOUSE & ADU
STRUCTURAL CALCULATIONS FOR THE BUILDING AT:
1834 W.3RD ST,
SANTA ANA, CA 92703
Page 1 of 57
1834 W Third St &
#2,33/21/2025
Job#:240051
Date:
ROOF:SHINGLE ROOF (VAULTED):SHINGLE
Slope 6:12 Slope 6:12
Live Load 20 psf Live Load 20 psf
Roof'g Material 3.0 psf Roof'g Material 3.0 psf
Sheathing 2.0 psf Sheathing 2.0 psf
Trusses / Rafters 2.0 psf Trusses / Rafters 2.0 psf
Ceiling Joists 2.0 psf
Drywall 2.0 psf Drywall 2.0 psf
Sprinkler 0.5 psf Sprinkler 0.5 psf
Solar 3.0 psf Solar 3.0 psf
Miscellaneous 0.5 psf Miscellaneous 0.5 psf
Total D.L.15 psf Total D.L.13.0 psf
Total Load 35 psf Total Load 33 psf
FLOOR:Without Lt. Wt. CONC.DECK:
Live Load 40 psf Live Load 60 psf
Floor Material 3.0 psf Floor Material 3.0 psf
Sheathing 3.0 psf Sheathing 3.0 psf
Floor Joist 3.0 psf Floor Joist 3.0 psf
Sprinkler 0.5 psf Sprinkler 0.5 psf
Miscellaneous 0.5 psf Miscellaneous 0.5 psf
Drywall 3.0 psf Drywall 3.0 psf
Total D.L.13 psf Total D.L.13 psf
Total Load 53 psf Total Load 73 psf
LOADING CONDITIONS
7/10/2024
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Page 2 of 57
1834 W Third St &
#2,33/21/2025
EXTERIOR WALL:INTERIOR WALL:
EXTERIOR:9 DRYWALL:3
DRYWALL:3.0 DRYWALL:3.0
STUDS:2.0 STUDS:2.0
MISC.:1.0 MISC.:2.0
DL=15.0 PSF DL=10.0 PSF
REVISIONS:
1 Sheets:Date:
Init:Remark:
2 Sheets:Date:
Init:Remark:
3 Sheets:Date:
Init:Remark:
4 Sheets:Date:
Init:Remark:
5 Sheets:Date:
Init:Remark:
6 Sheets:Date:
Init:Remark:
Page 3 of 57
1834 W Third St &
#2,33/21/2025
1Y
1X
1 2
A
B
MAIN HOUSE - JADU ROOF SHEARWALL LAYOUT
Page 4 of 57
1834 W Third St &
#2,33/21/2025
1Y
1X
3 4 5
C
D
E
MAIN HOUSE - JADU FLOOR SHEARWALL LAYOUT
Page 5 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1X
Number of Story: 2 Section width: 39(ft)Section length: 33(ft)
Base height: 0.5(ft)Slope roof height: 25.5(ft)Gable mean roof height: 22.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 39(ft), L = 33(ft), H = 23(ft)-->L/B = 0.85, H/L = 0.7
Wall coefficient: Cpw = 0.8, Cpl = -0.5
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Rx = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Rx = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 90.72 + 118.31 = 209.03 PLF
Redistrib: 720*19 + 939*9 = 22131 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 184.59 x 39 / (2 x 33) = 109.08 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 184.59 x 39^2 / (8 x 33) = 1063.49 LBS
Splice w/ min. (6) 16d sinker nails each side of splice at 8" o.c. (standard construction)
FIRST FLOOR DIAPHRAGM
Max shear = 124.96 x 39 / (2 x 33) = 73.84 PLF
Use: 23/32" apa rated unblock w/10d common nails at 6", 6", 12" o.c.
Chord force = 124.96 x 39^2 / (8 x 33) = 719.94 LBS
Splice w/ min. (4) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (23, 0.93, 24.46, 27.07); (19.5, 0.9, 23.62, 26.5); (15, 0.85, 22.35, 25.64)
ROOF
Roof = 15*33 = 495 PLF
Wall = 15*2*4.5 + 10*2*4.5 = 225 PLF
Shear = 0.126(495+225) = 0.126*720 = 90.72 PLF
FIRST FLOOR
Roof + Floor = 15*7 + 13*33 = 534 PLF
Wall = 15*2*4.5 + 15*2*4.5 + 10*2*4.5 + 10*1*4.5 = 405 PLF
Shear = 0.126(534+405) = 0.126*939 = 118.31 PLF
Plate height: ROOF = 19(ft); FIRST FLOOR = 9(ft)
SHEAR ROOF = 209.03*720*19/22131 = 129.21 PLF
SHEAR FIRST FLOOR = 209.03*939*9/22131 = 79.82 PLF
SHEAR ROOF = 0.6*W = 128.3(plf)
SHEAR FIRST FLOOR = 0.6*W = 153.84(plf)
ROOF
FIRST FLOOR
129.21 PLF
153.84 PLF
SEISMIC GOVERN
WIND GOVERN
Page 6 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1Y
Number of Story: 2 Section width: 33(ft)Section length: 39(ft)
Base height: 0.5(ft)Slope roof height: 25.5(ft)Gable mean roof height: 22.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 33(ft), L = 39(ft), H = 23(ft)-->L/B = 1.18, H/L = 0.59
Wall coefficient: Cpw = 0.8, Cpl = -0.46, Roof coefficient: Cpw = (0.17;-0.3), Cpl = -0.6
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 102.06 + 138.98 = 241.04 PLF
Redistrib: 810*19 + 1103*9 = 25317 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 209.33 x 33 / (2 x 39) = 88.56 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 209.33 x 33^2 / (8 x 39) = 730.64 LBS
Splice w/ min. (4) 16d sinker nails each side of splice at 8" o.c. (standard construction)
FIRST FLOOR DIAPHRAGM
Max shear = 142.27 x 33 / (2 x 39) = 60.19 PLF
Use: 23/32" apa rated unblock w/10d common nails at 6", 6", 12" o.c.
Chord force = 142.27 x 33^2 / (8 x 39) = 496.58 LBS
Splice w/ min. (3) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (26, 0.95, 25.09, 26.75); (19.5, 0.9, 23.62, 25.74); (15, 0.85, 22.35, 24.88)
ROOF
Roof = 15*36 = 540 PLF
Wall = 15*2*4.5 + 10*3*4.5 = 270 PLF
Shear = 0.126(540+270) = 0.126*810 = 102.06 PLF
FIRST FLOOR
Roof + Floor = 15*11.5 + 13*33.5 = 608 PLF
Wall = 15*2*4.5 + 15*2*4.5 + 10*3*4.5 + 10*2*4.5 = 495 PLF
Shear = 0.126(608+495) = 0.126*1103 = 138.98 PLF
Plate height: ROOF = 19(ft); FIRST FLOOR = 9(ft)
SHEAR ROOF = 241.04*810*19/25317 = 146.53 PLF
SHEAR FIRST FLOOR = 241.04*1103*9/25317 = 94.51 PLF
SHEAR ROOF = 0.6*W = 133.71(plf)
SHEAR FIRST FLOOR = 0.6*W = 149.28(plf)
ROOF
FIRST FLOOR
146.53 PLF
149.28 PLF
SEISMIC GOVERN
WIND GOVERN
Page 7 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
5
"
|
4
*
d
*
1
.
4
=
0
.
2
6
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
3.
5
0
7.
2
5
4.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
9
1.
9
Co
m
.
(
k
i
p
s
)
2.
7
2.
4
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
9
1.
9
Co
m
.
(
k
i
p
s
)
2.
7
2.
4
8.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
0
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
P2
LI
N
E
1
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
2
0
7
l
b
s
|
S
e
i
s
m
i
c
:
2
4
1
8
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
2
9
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
1
8
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
0
4
p
l
f
(
W
i
n
d
)
/
2
2
4
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
2
.
3
/
2
.
3
)
+
P
2
(
1
.
1
/
1
.
3
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
3
.
2
/
3
.
2
)
+
P
2
(
1
.
6
/
1
.
8
)
=
4
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
11
2
2
-24
8
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 8 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
3
"
|
4
*
d
*
1
.
4
=
0
.
1
9
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
1.
2
5
14
.
2
5
5.
7
5
10
.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(1
)
C
S
1
6
Po
s
t
S
i
z
e
2x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
1
Co
m
.
(
k
i
p
s
)
2.
7
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(1
)
C
S
1
6
Po
s
t
S
i
z
e
2x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
1
Co
m
.
(
k
i
p
s
)
2.
7
5.
2
5
2.
2
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
2
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
2
0
7
l
b
s
|
S
e
i
s
m
i
c
:
2
4
1
8
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
3
9
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
4
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
8
9
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
5
5
p
l
f
(
W
i
n
d
)
/
1
7
0
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
1
/
3
.
1
)
=
3
.
1
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
4
.
4
/
4
.
4
)
=
4
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
11
1
-20
8
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 9 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
3
"
|
4
*
d
*
1
.
4
=
1
.
2
8
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
14
.
0
0
6.
0
0
4.
5
0
5.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
9
Co
m
.
(
k
i
p
s
)
3.
3
3.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
9
Co
m
.
(
k
i
p
s
)
3.
3
3.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
8.
0
0
P2
5.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
C:
S
i
m
p
s
o
n
M
S
T
4
8
(
3
7
6
0
L
B
)
-
A
l
t
t
w
o
r
o
w
(
9
)
#
1
6
E
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
5
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
3
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
6
6
3
l
b
s
|
S
e
i
s
m
i
c
:
3
3
3
9
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
5
0
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
9
8
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
1
9
p
l
f
(
W
i
n
d
)
/
2
9
0
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
1
.
8
/
1
.
8
)
=
3
.
7
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
2
.
5
/
2
.
5
)
=
5
.
2
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
25
1
6
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 10 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
3
7
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
11
.
2
5
11
.
2
5
25
.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
2
Co
m
.
(
k
i
p
s
)
2.
4
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
2
Co
m
.
(
k
i
p
s
)
2.
4
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
4
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
9
8
6
l
b
s
|
S
e
i
s
m
i
c
:
1
8
9
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
4
8
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
.
2
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
6
2
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
6
5
p
l
f
(
W
i
n
d
)
/
1
6
8
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
6
/
3
.
6
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
5
/
5
)
=
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
69
6
-15
9
4
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 11 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
"
|
4
*
d
*
1
.
4
=
1
.
1
5
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
11
.
2
5
6.
0
0
9.
0
0
6.
0
0
3.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
8
Co
m
.
(
k
i
p
s
)
3.
2
3.
2
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
8
Co
m
.
(
k
i
p
s
)
3.
2
3.
2
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
2.
7
5
6.
2
5
5.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P2
P1
LI
N
E
5
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
7
3
8
l
b
s
|
S
e
i
s
m
i
c
:
3
3
8
7
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
)
To
t
a
l
L
e
n
g
t
h
=
4
9
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
2
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
0
0
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
1
2
p
l
f
(
W
i
n
d
)
/
2
8
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
1
.
9
/
1
.
9
)
=
3
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
2
.
7
/
2
.
7
)
=
5
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
14
0
9
-10
6
4
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 12 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
4
1
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
2.
5
0
6.
2
5
5.
2
5
5.
2
5
5.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
9
2.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
5
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
9
2.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
5
P2
2.
7
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
6.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
A
(
D
i
r
e
c
t
i
o
n
:
X
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
5
0
2
l
b
s
|
S
e
i
s
m
i
c
:
3
2
7
5
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
3
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
0
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
0
7
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
3
8
p
l
f
(
W
i
n
d
)
/
3
1
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
7
/
1
.
7
)
+
P
2
(
1
.
7
/
1
.
7
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
3
/
2
.
3
)
+
P
2
(
2
.
3
/
2
.
3
)
=
4
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
19
0
7
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 13 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
7
"
|
4
*
d
*
1
.
4
=
0
.
3
8
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
10
.
5
0
10
.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
6
Co
m
.
(
k
i
p
s
)
3.
8
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
(2
)
C
S
1
6
Po
s
t
S
i
z
e
2-
2
x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
6
Co
m
.
(
k
i
p
s
)
3.
8
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
2.
5
0
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
B
(
D
i
r
e
c
t
i
o
n
:
X
)
@
S
E
C
O
N
D
F
L
O
O
R
|
W
i
n
d
:
2
5
0
2
l
b
s
|
S
e
i
s
m
i
c
:
3
2
7
5
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
2
3
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
0
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
5
3
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
3
8
p
l
f
(
W
i
n
d
)
/
3
1
2
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
3
.
4
/
3
.
4
)
=
3
.
4
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
4
.
7
/
4
.
7
)
=
4
.
7
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
19
9
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 14 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
3
5
"
|
4
*
d
*
1
.
4
=
1
.
9
4
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
3.
0
0
5.
7
5
3.
0
0
8.
2
5
2.
5
0
16
.
5
0
2.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
HD
U
5
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
0
3.
0
2.
7
2.
7
Co
m
.
(
k
i
p
s
)
3.
4
3.
4
2.
9
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
HD
U
5
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
0
3.
0
2.
7
2.
7
Co
m
.
(
k
i
p
s
)
3.
4
3.
4
2.
9
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
P3
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
P4
LI
N
E
C
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
3
0
7
9
l
b
s
|
S
e
i
s
m
i
c
:
3
0
2
9
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
D
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
1
.
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
1
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
9
0
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
4
5
4
p
l
f
(
W
i
n
d
)
/
4
4
7
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
1
/
1
.
6
)
+
P
2
(
1
.
1
/
1
.
6
)
+
P
3
(
0
.
7
/
1
.
3
)
+
P
4
(
0
.
7
/
1
.
3
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
5
/
2
.
2
)
+
P
2
(
1
.
5
/
2
.
2
)
+
P
3
(
1
/
1
.
9
)
+
P
4
(
1
/
1
.
9
)
=
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
78
0
-12
2
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 15 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
8
"
|
4
*
d
*
1
.
4
=
1
.
6
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
Dr
a
g
L
o
a
d
I
n
c
r
e
a
s
e
d
2
5
%
P
e
r
A
S
C
E
7
-
1
6
S
e
c
t
i
o
n
1
2
.
3
.
4
18
.
7
5
3.
5
0
2.
7
5
9.
0
0
4.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
4
HD
U
4
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
6
Co
m
.
(
k
i
p
s
)
2.
8
3.
6
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
4
HD
U
4
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
6
Co
m
.
(
k
i
p
s
)
2.
8
3.
6
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
C:
S
i
m
p
s
o
n
M
S
T
4
8
(
3
7
6
0
L
B
)
-
A
l
t
t
w
o
r
o
w
(
9
)
#
1
6
E
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P2
P1
LI
N
E
D
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
4
7
7
1
l
b
s
|
S
e
i
s
m
i
c
:
3
8
5
2
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
C
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
2
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
4
0
7
p
l
f
(
W
i
n
d
)
/
3
2
9
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
1
/
1
.
4
)
+
P
2
(
3
.
7
/
3
.
7
)
=
4
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
6
/
2
)
+
P
2
(
5
.
2
/
5
.
2
)
=
6
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
31
5
1
-79
8
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 16 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
M
A
I
N
H
O
U
S
E
&
J
A
D
U
18
3
4
W
.
3
R
D
S
T
,
U
N
I
T
2
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
3
"
|
4
*
d
*
1
.
4
=
1
.
2
7
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
3.
2
5
2.
7
5
6.
0
0
4.
0
0
9.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
2.
5
Co
m
.
(
k
i
p
s
)
3.
5
3.
7
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
5
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
8
4.
9
Co
m
.
(
k
i
p
s
)
3.
5
3.
7
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
2.
2
5
2.
2
5
3.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
|
B
:
S
i
m
p
s
o
n
S
T
6
2
2
4
(
2
5
0
6
L
B
)
-
A
l
t
t
w
o
r
o
w
(
6
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
5.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
E
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
4
6
9
5
l
b
s
|
S
e
i
s
m
i
c
:
4
7
5
4
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
3
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
1
5
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
4
9
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
0
3
p
l
f
(
W
i
n
d
)
/
3
0
7
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
9
/
1
.
9
)
+
P
2
(
3
/
3
)
=
4
.
9
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
7
/
2
.
7
)
+
P
2
(
4
.
2
/
4
.
2
)
=
6
.
9
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
22
0
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 17 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (X-X Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
A 2 1X 39 128 129 9 10.5 312 B
B 2 1X 39 128 129 9 10.5 312 B
C 1 1X 20.5 154 80 1502 1965 9 6.78 454 D
D 1 1X 49 154 80 1001 1310 9 11.72 407 C
E 1 1X 28.5 154 80 2502 3275 9 15.5 307 B
SUMMARY SHEAR WALL
V2 = Seismic*Span/2 + Added Vseismic
Line shear V = Maximum(V1;V2)
V1 = Wind*Span/2 + Added Vwind
v(plf) = V/L
Page 18 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (Y-Y Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
1 2 1Y 33 134 147 9 10.81 224 B
2 2 1Y 33 134 147 9 14.25 170 A
3 1 1Y 19.5 149 95 2207 2418 9 11.5 319 B
4 1 1Y 40 149 95 9 11.25 265 B
5 1 1Y 20.5 149 95 2207 2418 9 12 312 B
v(plf) = V/L
Line shear V = Maximum(V1;V2)
SUMMARY SHEAR WALL
V1 = Wind*Span/2 + Added Vwind
V2 = Seismic*Span/2 + Added Vseismic
Page 19 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 1
CODE: CBC 2022
Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic
(#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb)
1 :Wind = 2207(lb), Seismic = 2418(lb)
1 1Y 2 133.7 146.5 33 2206 2418 l---------------33.0(ft)---------------l
2 :Wind = 2207(lb), Seismic = 2418(lb)
2 1Y 2 133.7 146.5 33 2206 2418 l---------------33.0(ft)---------------l
3 :Wind = 3663(lb), Seismic = 3339(lb), Line above : 1 - 100%, Wind = 2207(lb), Seismic = 2418(lb)
3 1Y 1 149.3 94.5 19.5 1455 921 l---------------19.5(ft)---------------l
4 :Wind = 2986(lb), Seismic = 1890(lb)
4 1Y 1 149.3 94.5 40 2986 1890 l---------------40.0(ft)---------------l
5 :Wind = 3738(lb), Seismic = 3387(lb), Line above : 2 - 100%, Wind = 2207(lb), Seismic = 2418(lb)
5 1Y 1 149.3 94.5 20.5 1530 969 l---------------20.5(ft)---------------l
A :Wind = 2502(lb), Seismic = 3275(lb)
A 1X 2 128.3 129.2 39 2502 2520 l---------------39.0(ft)---------------l
B :Wind = 2502(lb), Seismic = 3275(lb)
B 1X 2 128.3 129.2 39 2502 2520 l---------------39.0(ft)---------------l
C :Wind = 3079(lb), Seismic = 3029(lb), Line above : A - 60%, Wind = 1502(lb), Seismic = 1965(lb)
C 1X 1 153.8 79.8 20.5 1577 818 l---------------20.5(ft)---------------l
D :Wind = 4771(lb), Seismic = 3852(lb), Line above : A - 40%, Wind = 1001(lb), Seismic = 1310(lb)
D 1X 1 153.8 79.8 49 3769 1956 l---------------49.0(ft)---------------l
E :Wind = 4695(lb), Seismic = 4754(lb), Line above : B - 100%, Wind = 2502(lb), Seismic = 3275(lb)
E 1X 1 153.8 79.8 28.5 2192 1137 l---------------28.5(ft)---------------l
#N/A #N/A
#N/A #N/A
#N/A #N/A
Description
V_(lb)=v_(plf)*Span*Span/2/(Span+Offset)
LATERAL
p Factor: X Direction: p=1.3; Y Direction: p=1
20 of 52Page 20 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT2, SANTA ANA, CA 92703
BEAM : 1 - CLG AT BED 3
Loads(Downward+)
Beam Weight 10.1 plf from 0 ft to 14.75 ft
Roof Rafter: (11+20)(4.2) = (DL=46.8PLF; LLr=85PLF) form 0 to 14.75
Ceiling Joist DL: (4)(6.8) = (DL=27PLF) form 0 to 14.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1239/1239 0
2 1239/1239 0
USE 6 x 8
Critcal Shear = 1239 LB @0' 1.5xV/(F'v x A)= 0.21
F'v = 212, A = 41.25
Critcal Moment = 4569 LB-FT @7.37' M/(F'b x S)= 0.63
F'b = 1688, S = 51.56
Critical Deflection for TL = -0.578 INCH @ 7.37 L/240 = 0.738"
Critical Deflection for LL = -0.29 INCH @ 7.37 L/360 = 0.492"
1 2
Moment
Shear
Deflection
14.75'
BEAM : 2 - CLG AT M.BED 4
Loads(Downward+)
Beam Weight 12.7 plf from 0 ft to 10.75 ft
Roof Primary: (15+20)(11.8) = (DL=176.2PLF; LLr=235PLF) form 0 to 10.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2279/2279 0
2 2279/2279 0
USE 6 x 10
Critcal Shear = 2278 LB @0' 1.5xV/(F'v x A)= 0.3
F'v = 212, A = 52.25
Critcal Moment = 6120 LB-FT @5.25' M/(F'b x S)= 0.52
F'b = 1688, S = 82.73
Critical Deflection for TL = -0.202 INCH @ 5.25 L/240 = 0.538"
Critical Deflection for LL = -0.112 INCH @ 5.25 L/360 = 0.358"
1 2
Moment
Shear
Deflection
10.75'
Page 21 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT2, SANTA ANA, CA 92703
BEAM : 2A - CLG AT M.BATH
Loads(Downward+)
Beam Weight 10.1 plf from 0 ft to 13 ft
Roof Rafter: (11+20)(4.2) = (DL=46.8PLF; LLr=85PLF) form 0 to 13
Ceiling Joist DL: (4)(6.5) = (DL=26PLF) form 0 to 13
Point load @ 1.5 : Load from beam 2 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 3036/3036 0
2 1325/1324 0
USE 6 x 8
Critcal Shear = 3036 LB @0' 1.5xV/(F'v x A)= 0.52
F'v = 212, A = 41.25
Critcal Moment = 5339 LB-FT @5' M/(F'b x S)= 0.73
F'b = 1688, S = 51.56
Critical Deflection for TL = -0.538 INCH @ 6.25 L/240 = 0.65"
Critical Deflection for LL = -0.276 INCH @ 6.25 L/360 = 0.433"
1 2
P1
Moment
Shear
Deflection
13'
BEAM : 3 - HDR AT M.BATH
Loads(Downward+)
Beam Weight 4.7 plf from 0 ft to 2.25 ft
Roof Rafter: (11+20)(3.8) = (DL=41.2PLF; LLr=75PLF) form 1.25 to 2.25
Ceiling Joist DL: (4)(5.5) = (DL=22PLF) form 1.25 to 2.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 2.25
Point load @ 1.25 : Load from beam 2A at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 672/672 0
2 899/899 0
USE 4 x 6
Critcal Shear = -898 LB @2.25' 1.5xV/(F'v x A)= 0.31
F'v = 225, A = 19.25
Critcal Moment = 812 LB-FT @1.25' M/(F'b x S)= 0.37
F'b = 1462, S = 17.65
Critical Deflection for TL = -0.007 INCH @ 1 L/240 = 0.112"
Critical Deflection for LL = -0.004 INCH @ 1 L/360 = 0.075"
1 2
P1
Moment
Shear
Deflection
2.25'
(DL=1016#, LLr=1263#)
(DL=656#, LLr=669#)
Page 22 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 3A - HDR AT M.BED 4
Loads(Downward+)
Beam Weight 4.7 plf from 0 ft to 2.25 ft
Exterior Wall: (15)(4) = (DL=60PLF) form 0 to 2.25
Point load @ 1 : Load from beam 2 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1339/1339 0
2 1085/1086 0
USE 4 x 6
Critcal Shear = 1338 LB @0' 1.5xV/(F'v x A)= 0.46
F'v = 225, A = 19.25
Critcal Moment = 1306 LB-FT @1' M/(F'b x S)= 0.6
F'b = 1462, S = 17.65
Critical Deflection for TL = -0.012 INCH @ 1 L/240 = 0.112"
Critical Deflection for LL = -0.007 INCH @ 1 L/360 = 0.075"
1 2
P1
Moment
Shear
Deflection
2.25'
BEAM : 4 - RIDGE AT FAMILY ROOM
Loads(Downward+)
Beam Weight 15.4 plf from 0 ft to 14 ft
Rafter Vaulted: (13+20)(13.2) = (DL=172.2PLF; LLr=265PLF) form 0 to 14
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 3116/3116 0
2 3116/3116 0
USE 6 x 12
Critcal Shear = 3115 LB @0' 1.5xV/(F'v x A)= 0.34
F'v = 212, A = 63.25
Critcal Moment = 10905 LB-FT @7' M/(F'b x S)= 0.64
F'b = 1688, S = 121.23
Critical Deflection for TL = -0.345 INCH @ 7 L/240 = 0.7"
Critical Deflection for LL = -0.2 INCH @ 7 L/360 = 0.467"
1 2
Moment
Shear
Deflection
14'
(DL=1016#, LLr=1263#)
Page 23 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 4A - CLG AT HALLWAY
Loads(Downward+)
Beam Weight 19.5 plf from 0 ft to 18.25 ft
Roof Primary: (15+20)(13.2) = (DL=198.8PLF; LLr=265PLF) form 0 to 18.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 4233/4232 0
2 4233/4232 0
USE 5 1/4" x 11 7/8" PSL
Critcal Shear = 4232 LB @0' 1.5xV/(F'v x A)= 0.28
F'v = 362, A = 62.34
Critcal Moment = 19308 LB-FT @9.12' M/(F'b x S)= 0.52
F'b = 3625, S = 123.39
Critical Deflection for TL = -0.79 INCH @ 9.13 L/240 = 0.912"
Critical Deflection for LL = -0.418 INCH @ 9.13 L/360 = 0.608"
1 2
Moment
Shear
Deflection
18.25'
BEAM : 4B - CLG AT STAIR
Loads(Downward+)
Beam Weight 15.2 plf from 0 ft to 14.25 ft
Interior Wall: (10)(0~5) = (DL=0~50PLF) form 0 to 14.25
Point load @ 13 : Load from beam 4 at Support 2(P1)
Point load @ 13 : Load from beam 4A at Support 1(P2)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 873/873 0
2 7062/7061 0
USE 5 1/4" x 9 1/4" PSL
Critcal Shear = -7061 LB @14.25' 1.5xV/(F'v x A)= 0.6
F'v = 362, A = 48.56
Critcal Moment = 8777 LB-FT @13' M/(F'b x S)= 0.39
F'b = 3625, S = 74.87
Critical Deflection for TL = -0.339 INCH @ 7.92 L/240 = 0.712"
Critical Deflection for LL = -0.158 INCH @ 7.92 L/360 = 0.475"
1 2
P1P2
Moment
Shear
Deflection
14.25'
(DL=1314#, LLr=1802#)
(DL=1992#, LLr=2241#)
Page 24 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 5 - FL AT GARAGE
Loads(Downward+)
Beam Weight 15.2 plf from 0 ft to 15.5 ft
Deck Primary: (13+60)(3.2) = (DL=42.2PLF; LLr=195PLF) form 0 to 5.25
Deck Primary: (13+60)(2.5) = (DL=32.5PLF; LLr=150PLF) form 5.25 to 15.5
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 15.5
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 0 to 15.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2857/2468 0
2 2667/2278 0
USE 5 1/4" x 9 1/4" PSL
Critcal Shear = 2468 LB @0' 1.5xV/(F'v x A)= 0.26
F'v = 290, A = 48.56
Critcal Moment = 9019 LB-FT @7.46' M/(F'b x S)= 0.5
F'b = 2900, S = 74.87
Critical Deflection for TL = -0.566 INCH @ 7.75 L/240 = 0.775"
Critical Deflection for LL = -0.303 INCH @ 7.75 L/360 = 0.517"
1 2
Moment
Shear
Deflection
15.5'
BEAM : 6 - FL AT GARAGE
Loads(Downward+)
Beam Weight 10.2 plf from 0 ft to 11.5 ft
Roof Primary: (15+20)(2.2) = (DL=33.8PLF; LLr=45PLF) form 0 to 11.5
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 5 to 11.5
Point load @ 5 : Load from beam 5 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2115/1826 0
2 1915/1678 0
USE 3 1/2" x 9 1/4" PSL
Critcal Shear = 1637 LB @0' 1.5xV/(F'v x A)= 0.26
F'v = 290, A = 32.38
Critcal Moment = 7637 LB-FT @5' M/(F'b x S)= 0.63
F'b = 2900, S = 49.91
Critical Deflection for TL = -0.357 INCH @ 5.5 L/240 = 0.575"
Critical Deflection for LL = -0.168 INCH @ 5.5 L/360 = 0.383"
1 2
P1
Moment
Shear
Deflection
11.5'
(DL=1076#, LLr=388#, LL=1203#)
Page 25 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 1
Dong Engineering Inc.
NEW MAIN HOUSE & JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
BEAM : 7 - HDR AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 16.25 ft
Roof Primary: (15+20)(4.5) = (DL=67.5PLF; LLr=90PLF) form 0 to 13.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 16.25
Point load @ 13.25 : Load from beam 6 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1968/1841 0
2 2915/2558 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = -2558 LB @16.25' 1.5xV/(F'v x A)= 0.24
F'v = 388, A = 41.56
Critcal Moment = 8527 LB-FT @9.81' M/(F'b x S)= 0.43
F'b = 2906, S = 82.26
Critical Deflection for TL = -0.539 INCH @ 8.43 L/240 = 0.812"
Critical Deflection for LL = -0.222 INCH @ 8.43 L/360 = 0.542"
1 2
P1
Moment
Shear
Deflection
16.25'
BEAM : 8 - FL AT DINING
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 11.25 ft
Exterior Wall: (15)(9~13) = (DL=135~195PLF) form 0 to 11.25
Roof Primary: (15+20)(1.3) = (DL=20PLF; LLr=26.7PLF) form 0 to 11.25
Point load from Panel P1(Left) of Line 1 at @ 7.5(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1201/2981 0 2981
2 1314/4895 -265 4895
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -4895 LB @11.25' 1.5xV/(F'v x A)= 0.35
F'v = 496, A = 41.56
Critcal Moment = 16595 LB-FT @7.5' M/(F'b x S)= 0.65
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.214 INCH @ 6 L/240 = 0.562"
Critical Deflection for LL = -0.121 INCH @ 6 L/360 = 0.375"
1 2
P1*
Moment
Shear
Deflection
11.25'
(DL=957#, LLr=478#, LL=680#)
Page 26 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 9 - FL AT LIVING
Loads(Downward+)
Beam Weight 17.5 plf from 0 ft to 15.5 ft
Roof Primary: (15+20)(11.2) = (DL=168.8PLF; LLr=225PLF) form 0 to 4.75
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 4.75 to 10.25
Roof Primary: (15+20)(3.8) = (DL=56.2PLF; LLr=75PLF) form 10.25 to 15.5
Exterior Wall: (15)(9) = (DL=135PLF) form 4.75 to 15.5
Rafter Vaulted: (13+20)(8.8) = (DL=113.8PLF; LLr=175PLF) form 4.75 to 15.5
Point load @ 4.75 : Load from beam 8 at Support 1(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 4727/4727 0 4727
2 4780/4781 0 4781
USE 3 1/2" x 16" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -4780 LB @15.5' 1.5xV/(F'v x A)= 0.35
F'v = 362, A = 56
Critcal Moment = 20031 LB-FT @7.23' M/(F'b x S)= 0.44
F'b = 3625, S = 149.33
Critical Deflection for TL = -0.361 INCH @ 7.58 L/240 = 0.775"
Critical Deflection for LL = -0.145 INCH @ 7.58 L/360 = 0.517"
1 2
P1
Moment
Shear
Deflection
15.5'
BEAM : 9A - AT STAIR
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 4 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 4
Roof Primary: (15+20)(4) = (DL=60PLF; LLr=80PLF) form 0 to 4
Rafter Vaulted: (13+20)(6.5) = (DL=84.5PLF; LLr=130PLF) form 0 to 4
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 991/991 0
2 991/991 0
USE 4 x 8
Critcal Shear = 991 LB @0' 1.5xV/(F'v x A)= 0.26
F'v = 225, A = 25.38
Critcal Moment = 991 LB-FT @2' M/(F'b x S)= 0.26
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.016 INCH @ 2 L/240 = 0.2"
Critical Deflection for LL = -0.007 INCH @ 2 L/360 = 0.133"
1 2
Moment
Shear
Deflection
4'
Page 27 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 10 - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 13.5
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 13.5
Roof Primary: (15+20)(9.8) = (DL=146.2PLF; LLr=195PLF) form 0 to 1.5
Point load from Panel P2(Left) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 1926/10274 -1982 10274
2 1043/2027 0 2027
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -8181 LB @1.5' 1.5xV/(F'v x A)= 0.59
F'v = 496, A = 41.56
Critcal Moment = -11877 LB-FT @1.5' M/(F'b x S)= 0.46
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.195 INCH @ 7.25 L/240 = 0.6"
Critical Deflection for LL = -0.103 INCH @ 7.25 L/360 = 0.4"
1 2
P1*
Moment
Shear
Deflection
1.5'12'
BEAM : 10A - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 1.5
Roof Primary: (15+20)(9.8) = (DL=146.2PLF; LLr=195PLF) form 0 to 1.5
Point load from Panel P1(Left) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 793/9474 -3096 9474
2 -61/1258 -547 1258
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -8156 LB @1.5' 1.5xV/(F'v x A)= 0.59
F'v = 496, A = 41.56
Critcal Moment = -11858 LB-FT @1.5' M/(F'b x S)= 0.46
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.062 INCH @ 5.5 L/240 = 0.45"
Critical Deflection for LL = -0.06 INCH @ 5.5 L/360 = 0.3"
1 2
P1*
Moment
Shear
Deflection
1.5'9'
Page 28 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 10B - CANT. FL AT GARAGE
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 10.5 ft
Floor Primary: (13+40)(1.3) = (DL=17.4PLF; LL=53.4PLF) form 0 to 10.5
Point load from Panel P1(Right) of Line A at @ 0(P1*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 506/9126 -3393 9126
2 362/1415 -382 1415
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = -7702 LB @1.5' 1.5xV/(F'v x A)= 0.56
F'v = 496, A = 41.56
Critcal Moment = -11504 LB-FT @1.5' M/(F'b x S)= 0.45
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.067 INCH @ 5.75 L/240 = 0.45"
Critical Deflection for LL = -0.062 INCH @ 5.75 L/360 = 0.3"
1 2
P1*
Moment
Shear
Deflection
1.5'9'
BEAM : 11 - DROP AT GARAGE
Loads(Downward+)
Beam Weight 30.7 plf from 0 ft to 20.25 ft
Floor Primary: (13+40)(4.5) = (DL=58.5PLF; LL=180PLF) form 0 to 3
Floor Primary: (13+40)(6) = (DL=78PLF; LL=240PLF) form 3 to 18.25
Deck Primary: (13+60)(2.5) = (DL=32.5PLF; LLr=150PLF) form 3 to 15.25
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 18.25
Roof Primary: (15+20)(6.8) = (DL=101.2PLF; LLr=135PLF) form 0 to 3
Deck Primary: (13+60)(3.2) = (DL=42.2PLF; LLr=195PLF) form 0 to 3
Point load @ 3 : Load from beam 1 at Support 1(P1)
Point load @ 3 : Load from beam 10A at Support 1(P2)
Point load @ 15.25 : Load from beam 6 at Support 2(P3)
Point load @ 18.25 : Load from beam 10 at Support 1(P4)
Point load @ 18.25 : Load from beam 1 at Support 2(P5)
Point load @ 13.25 : Load from beam 10B at Support 1(P6)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 8769/7689 -171 7689
2 9065/8087 -820 8087
USE 7" x 14" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 13104 LB @18.25' 1.5xV/(F'v x A)= 0.43
F'v = 464, A = 98
Critcal Moment = 37746 LB-FT @10.68' M/(F'b x S)= 0.68
F'b = 2900, S = 228.67
Critical Deflection for TL = -0.885 INCH @ 10.12 L/240 = 1.012"
1 2
P1P2 P3 P4P5P6
Moment
Shear
Deflection
20.25'
Page 29 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 12 - FL AT KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 12.5 ft
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 12.5
Exterior Wall: (15)(14~11) = (DL=210~165PLF) form 0 to 12.5
Point load @ 2.25 : Load from beam 4 at Support 1(P1)
Point load from Panel P1(Right) of Line 1 at @ 3.75(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 4439/5490 0 5490
2 2316/3239 0 3239
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 4438 LB @0' 1.5xV/(F'v x A)= 0.41
F'v = 388, A = 41.56
Critcal Moment = 18544 LB-FT @3.75' M/(F'b x S)= 0.72
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.367 INCH @ 6 L/240 = 0.625"
Critical Deflection for LL = -0.129 INCH @ 6 L/360 = 0.417"
1 2
P1 P2*
Moment
Shear
Deflection
12.5'
BEAM : 13 - FL AT DINING
Loads(Downward+)
Beam Weight 26 plf from 0 ft to 19 ft
Floor Primary: (13+40)(6.2) = (DL=81.2PLF; LL=250PLF) form 4.75 to 19
Roof Rafter: (11+20)(3.8) = (DL=41.2PLF; LLr=75PLF) form 0 to 4.75
Ceiling Joist DL: (4)(5.5) = (DL=22PLF) form 0 to 4.75
Interior Wall: (10)(3.5) = (DL=35PLF) form 4.75 to 15.25
Point load @ 4.75 : Load from beam 8 at Support 2(P1)
Point load @ 4.75 : Load from beam 12 at Support 1(P2)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 6874/6142 0 6142
2 4729/4224 0 4224
USE 7" x 11 7/8" PSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5192 LB @0' 1.5xV/(F'v x A)= 0.32
F'v = 290, A = 83.12
Critcal Moment = 24983 LB-FT @7.6' M/(F'b x S)= 0.63
F'b = 2900, S = 164.52
Critical Deflection for TL = -0.889 INCH @ 8.89 L/240 = 0.95"
Critical Deflection for LL = -0.358 INCH @ 8.89 L/360 = 0.633"
1 2
P1P2
Moment
Shear
Deflection
19'
Page 30 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 14 - FL AT JADU KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 9.75 ft
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 2 to 9.75
Exterior Wall: (15)(9) = (DL=135PLF) form 2 to 9.75
Rafter Vaulted: (13+20)(8.8) = (DL=113.8PLF; LLr=175PLF) form 2 to 9.75
Floor Primary: (13+40)(1.2) = (DL=16.2PLF; LL=50PLF) form 11.75 to 9.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2599/2211 0
2 3912/3322 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = -3094 LB @9.75' 1.5xV/(F'v x A)= 0.36
F'v = 310, A = 41.56
Critcal Moment = 7229 LB-FT @5' M/(F'b x S)= 0.45
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.171 INCH @ 5 L/240 = 0.488"
Critical Deflection for LL = -0.091 INCH @ 5 L/360 = 0.325"
1 2
Moment
Shear
Deflection
9.75'
BEAM : 15 - FL AT JADU LIVING
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Roof Primary: (15+20)(2.5) = (DL=37.5PLF; LLr=50PLF) form 0 to 13.5
Exterior Wall: (15)(3.5) = (DL=52.5PLF) form 2.75 to 13.5
Exterior Wall: (15)(11) = (DL=165PLF) form 0 to 2.75
Point load @ 2.75 : Load from beam 14 at Support 1(P1)
Point load from Panel P2(Left) of Line 1 at @ 2.75(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 3373/6049 0 6049
2 1586/2080 0 2080
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 6048 LB @0' 1.5xV/(F'v x A)= 0.44
F'v = 496, A = 41.56
Critcal Moment = 15711 LB-FT @2.75' M/(F'b x S)= 0.61
F'b = 3720, S = 82.26
Critical Deflection for TL = -0.402 INCH @ 6.23 L/240 = 0.675"
Critical Deflection for LL = -0.217 INCH @ 6.23 L/360 = 0.45"
1 2
P1P2*
Moment
Shear
Deflection
13.5'
Page 31 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 16 - FL AT JADU KITCHEN
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 13.5 ft
Exterior Wall: (15)(9) = (DL=135PLF) form 2.75 to 13.5
Roof Primary: (15+20)(5.8) = (DL=86.2PLF; LLr=115PLF) form 2.75 to 13.5
Point load @ 2.75 : Load from beam 14 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 4635/4042 0
2 3052/2747 0
USE 3 1/2" x 11 7/8" LSL
Critcal Shear = 3491 LB @0' 1.5xV/(F'v x A)= 0.4
F'v = 310, A = 41.56
Critcal Moment = 9841 LB-FT @4.25' M/(F'b x S)= 0.61
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.517 INCH @ 6.49 L/240 = 0.675"
Critical Deflection for LL = -0.201 INCH @ 6.49 L/360 = 0.45"
1 2
P1
Moment
Shear
Deflection
13.5'
BEAM : 17 - FL AT BED 1
Loads(Downward+)
Beam Weight 11.9 plf from 0 ft to 14 ft
Roof Primary: (15+20)(1) = (DL=15PLF; LLr=20PLF) form 0 to 14
Exterior Wall: (15)(9) = (DL=135PLF) form 0 to 14
Floor Primary: (13+40)(0.8) = (DL=10.4PLF; LL=32PLF) form 0 to 14
Point load @ 12.75 : Load from beam 3 at Support 1(P1)
Point load @ 1 : Load from beam 4A at Support 1(P3)
Point load from Panel P1(Right) of Line 2 at @ 2(P2*)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up Overstrength
1 5672/5447 0 5447
2 1949/1933 0 1933
USE 3 1/2" x 11 7/8" LSL
Design with the seismic load effect with overstrength (Omega = 2.5)
Critcal Shear = 5447 LB @0' 1.5xV/(F'v x A)= 0.5
F'v = 388, A = 41.56
Critcal Moment = 6080 LB-FT @6.25' M/(F'b x S)= 0.38
F'b = 2325, S = 82.26
Critical Deflection for TL = -0.354 INCH @ 6.74 L/240 = 0.7"
Critical Deflection for LL = -0.098 INCH @ 6.74 L/360 = 0.467"
1 2
P1P3P2*
Moment
Shear
Deflection
14'
Page 32 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : 20 - HDR AT JADU DINING
Loads(Downward+)
Beam Weight 9.6 plf from 0 ft to 5.25 ft
Deck Primary: (13+60)(5.5) = (DL=71.5PLF; LLr=330PLF) form 0 to 3.75
Floor Primary: (13+40)(6.8) = (DL=87.8PLF; LL=270PLF) form 3.75 to 5.25
Exterior Wall: (15)(5.5) = (DL=82.5PLF) form 0 to 3.75
Exterior Wall: (15)(11) = (DL=165PLF) form 3.75 to 5.25
Point load @ 3.75 : Load from beam 16 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2176/1916 0
2 3525/3110 0
USE 4 x 12
Critcal Shear = -2875 LB @5.25' 1.5xV/(F'v x A)= 0.61
F'v = 180, A = 39.38
Critcal Moment = 3714 LB-FT @3.75' M/(F'b x S)= 0.55
F'b = 1100, S = 73.83
Critical Deflection for TL = -0.023 INCH @ 2.75 L/240 = 0.262"
Critical Deflection for LL = -0.01 INCH @ 2.75 L/360 = 0.175"
1 2
P1
Moment
Shear
Deflection
5.25'
BEAM : 21 - CLG AT ENTRANCE
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 8.25 ft
Roof Rafter: (11+20)(2) = (DL=22PLF; LLr=40PLF) form 0 to 8.25
Ceiling Joist DL: (4)(1.3) = (DL=5.3PLF) form 0 to 8.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 303/303 0
2 303/303 0
USE 4 x 8
Critcal Shear = 303 LB @0' 1.5xV/(F'v x A)= 0.08
F'v = 225, A = 25.38
Critcal Moment = 625 LB-FT @4' M/(F'b x S)= 0.16
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.043 INCH @ 4 L/240 = 0.412"
Critical Deflection for LL = -0.023 INCH @ 4 L/360 = 0.275"
1 2
Moment
Shear
Deflection
8.25'
Page 33 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : C1 - C.J. 2X6#2 @ 16" O.C. TYP. (MAX L=15'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 140/140 0
2 140/140 0
USE 2 x 6
Critcal Shear = 140 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 8.25
Critcal Moment = 525 LB-FT @7.5' M/(F'b x S)= 0.49
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.64 INCH @ 7.5 L/240 = 0.75"
Critical Deflection for LL = -0.457 INCH @ 7.5 L/360 = 0.5"
1 2
Moment
Shear
Deflection
15'
BEAM : F3 - D.J. 2X12#2 @ 16" O.C. TYP. (MAX L=10'-
6")
Loads(Downward+)
Deck Primary: (13+60)(1.3) = (DL=17.4PLF; LLr=80.1PLF) form 0 to 10.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 512/512 0
2 512/512 0
USE 2 x 8
Critcal Shear = 511 LB @0' 1.5xV/(F'v x A)= 0.39
F'v = 180, A = 10.88
Critcal Moment = 1343 LB-FT @5.25' M/(F'b x S)= 0.98
F'b = 1242, S = 13.14
Critical Deflection for TL = -0.35 INCH @ 5.25 L/240 = 0.525"
Critical Deflection for LL = -0.287 INCH @ 5.25 L/360 = 0.35"
1 2
Moment
Shear
Deflection
10.5'
Page 34 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : R1 - R.R. 2X6#2 @ 16" O.C. TYP. (MAX L=12'-0")
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 248/248 0
2 248/248 0
USE 2 x 6
Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2
F'v = 225, A = 8.25
Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
BEAM : R1A - R.R. 2X6#2 @ 16" O.C. W/ PURLIN
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 13.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 25/25 0
2 381/382 0
3 152/152 0
USE 2 x 6
Critcal Shear = 220 LB @4.5' 1.5xV/(F'v x A)= 0.18
F'v = 225, A = 8.25
Critcal Moment = -306 LB-FT @4.5' M/(F'b x S)= 0.29
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.101 INCH @ 9.5 L/240 = 0.45"
Critical Deflection for LL = -0.065 INCH @ 9.5 L/360 = 0.3"
1 2 3
Moment
Shear
Deflection
4.5'9'
Page 35 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job #: 240051
Date : 01/07/2025
Plan : 1
BEAM : R2 - R.R. 2X10#2 @ 16" O.C.
Loads(Downward+)
Rafter Vaulted: (13+20)(1.3) = (DL=17.4PLF; LLr=26.7PLF) form 0 to 13.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 297/297 0
2 297/297 0
USE 2 x 10
Critcal Shear = 297 LB @0' 1.5xV/(F'v x A)= 0.14
F'v = 225, A = 13.88
Critcal Moment = 1003 LB-FT @6.75' M/(F'b x S)= 0.39
F'b = 1423, S = 21.39
Critical Deflection for TL = -0.208 INCH @ 6.75 L/240 = 0.675"
Critical Deflection for LL = -0.126 INCH @ 6.75 L/360 = 0.45"
1 2
Moment
Shear
Deflection
13.5'
Page 36 of 57
1834 W Third St &
#2,33/21/2025
P=200#
ZM
Plate use: 4 1/2" x 4 1/2" x 3/8" Stl. Plate. W/ (4)-3/8" x 6" Long Lag Screws.
Lag Screws Effective Thread Length for
3/8" Dia - 6" Long lag screw:
T-E = 3-9/32"(Table L2 - NDS 2018)
Moment at guard rail base:
M = PxH
= 200 x 42 = 8400 lbs-in
Withdrawal Load at each Lag screw:
Z = (M/D)/N = (8400/2.25)/4 = 933.3#
Lag Screws Withdrawal Value :
W = 1800xG^(3
2)xD^(3
4)x(T-E)(12.2-1 - NDS 2018)
= 1800x0.5^(3
2)x3/8^(3
4)x(3 9
32") = 1000.7#
=> Z < W : OK.
GUARDRAIL CALCULATION
Page 37 of 57
1834 W Third St &
#2,33/21/2025
F = 200 #
CHECK TENSION:
M = 200 x 51 = 10,200 LB-INCH
1.5T + 7.5T = 10,200 LB-INCH
=> T = 1134 LB.
CHECK SHEAR:
V=F/2=200 / 2 =100 LB
USE 3/8"x6" LAG SCREW
WITHDRAWAL CAPCITY: 305 x 1.6 x 3 =1.464 LB > 1134 LB
SHEAR CAPACITY: 11,700 X 0.36 x 0.375 x 3.28 = 5180 LBF >
100 LBF
M
GUARDRAIL CALCULATION
42
"
F
1.
5
"
6"
1.
5
"
51
"
F
1.
5
"
6"
1.
5
"
1.5"5"1.5"
Page 38 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.24.12.17 DONG ENGINEERING INC (c) ENERCALC, LLC 1982-2025
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per ACI 318-19, IBC 2021
Load Combinations Used : ASCE 7-16
Material Properties
4.0
7.50
145.0
Elastic Modulus 3,122.0 ksi
Soil Subgrade Modulus =250.0 psi / (inch deflection)
11.0Lt Wt FactorO =
=60.0
29,000.0
40.0
29,000.0
3
Beam is supported on an elastic foundation,
2
=0.90
0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c *474.342
pcf
E - Main Rebar ksi
psi
=
Fy - Stirrups ksi
==
=
E - Stirrups ksi
E
==
=
Shear :
Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
\
#
I
Load Combination :ASCE 7-16
.Cross Section & Reinforcing Details
Rectangular Section, Width = 15.0 in, Height = 24.0 in
Span #1 Reinforcing....
2-#4 at 3.0 in from Top, from 0.0 to 6.0 ft in this span 2-#4 at 3.0 in from Bottom, from 0.0 to 6.0 ft in this span
.Service loads entered. Load Factors will be applied for calculations.Applied Loads
Load for Span Number 1
Moment : W = 10.20, E = 10.10 k-ft, Location = 1.250 ft from left end of this span
.Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio =0.217 : 1
Load Combination W Only
Span # where maximum occurs Span # 1
Maximum Soil Pressure =1.347 ksf at 6.00 ft LdComb: W Only
Allowable Soil Pressure =OK2.90 ksf
Location of maximum on span 1.271 ft
Mn * Phi : Allowable 41.506 k-ft
Typical SectionSection used for this span
Mu : Applied 9.011 k-ft
Maximum Deflection
Max Downward L+Lr+S Deflection 0.000 in
Max Upward L+Lr+S Deflection 0.000 in
Max Downward Total Deflection 0.037 in
Max Upward Total Deflection -0.038 in
.Shear Stirrup Requirements
Entire Beam Span Length : Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in
.Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination
Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum Bending Envelope
Span # 1 1 1.271 9.01 41.51 0.22
Span # 1 1 1.271
+0.50W
Span # 1 1 1.271 4.51 41.51 0.11
Page 39 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.24.12.17 DONG ENGINEERING INC (c) ENERCALC, LLC 1982-2025
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination
Mu : Max Stress RatioSegment Length Phi*Mnxin Span
W Only
Span # 1 1 1.271 9.01 41.51 0.22
E Only
Span # 1 1 1.271 8.92 41.51 0.21
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections - Unfactored Loads
Span 1Span 1 1 0.0374 6.000 -0.0382 0.000
.Detailed Shear Information
Load Combination
Vu (k)Span Distance 'd'Comment Phi*Vs
Req'd
d*Vu/MuMu
(ft)(k)(in)Actual Suggest(k-ft)Number (k)
Spacing (in)
Design
Phi*Vc
W Only 1 0.00 21.00 -0.06 0.06 0.00 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.07 21.00 -0.18 0.18 0.00 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.14 21.00 -0.29 0.29 0.02 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.21 21.00 -0.41 0.41 0.04 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.28 21.00 -0.52 0.52 0.07 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.35 21.00 -0.62 0.62 0.10 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.42 21.00 -0.73 0.73 0.15 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.49 21.00 -0.83 0.83 0.20 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.56 21.00 -0.93 0.93 0.26 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.64 21.00 -1.02 1.02 0.32 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.71 21.00 -1.11 1.11 0.39 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.78 21.00 -1.20 1.20 0.47 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.85 21.00 -1.29 1.29 0.56 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.92 21.00 -1.37 1.37 0.65 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 0.99 21.00 -1.45 1.45 0.75 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.06 21.00 -1.53 1.53 0.85 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.13 21.00 -1.61 1.61 0.96 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.20 21.00 -1.68 1.68 1.07 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.27 21.00 -1.75 1.75 9.01 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.34 21.00 -1.81 1.81 8.89 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.41 21.00 -1.88 1.88 8.76 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.48 21.00 -1.94 1.94 8.63 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.55 21.00 -2.00 2.00 8.49 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.62 21.00 -2.05 2.05 8.35 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.69 21.00 -2.10 2.10 8.20 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.76 21.00 -2.15 2.15 8.06 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.84 21.00 -2.20 2.20 7.90 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.91 21.00 -2.24 2.24 7.75 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 1.98 21.00 -2.28 2.28 7.59 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.05 21.00 -2.32 2.32 7.43 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.12 21.00 -2.35 2.35 7.27 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.19 21.00 -2.39 2.39 7.10 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.26 21.00 -2.41 2.41 6.93 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.33 21.00 -2.44 2.44 6.76 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.40 21.00 -2.46 2.46 6.59 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.47 21.00 -2.48 2.48 6.41 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.54 21.00 -2.50 2.50 6.24 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.61 21.00 -2.52 2.52 6.06 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.68 21.00 -2.53 2.53 5.89 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.75 21.00 -2.54 2.54 5.71 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.82 21.00 -2.54 2.54 5.53 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.89 21.00 -2.55 2.55 5.35 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 2.96 21.00 -2.55 2.55 5.17 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.04 21.00 -2.55 2.55 4.99 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.11 21.00 -2.54 2.54 4.81 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.18 21.00 -2.53 2.53 4.63 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.25 21.00 -2.52 2.52 4.45 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.32 21.00 -2.51 2.51 4.27 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.39 21.00 -2.49 2.49 4.10 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.46 21.00 -2.47 2.47 3.92 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.53 21.00 -2.45 2.45 3.74 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.60 21.00 -2.43 2.43 3.57 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.67 21.00 -2.40 2.40 3.40 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.74 21.00 -2.37 2.37 3.23 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.81 21.00 -2.34 2.34 3.06 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.88 21.00 -2.30 2.30 2.90 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 3.95 21.00 -2.26 2.26 2.74 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
Page 40 of 57
1834 W Third St &
#2,33/21/2025
Beam on Elastic Foundation
LIC# : KW-06019698, Build:20.24.12.17 DONG ENGINEERING INC (c) ENERCALC, LLC 1982-2025
DESCRIPTION:CONT. FOOTING AT SHEAR WALL LINE C
Project File: 240051.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Detailed Shear Information
Load Combination
Vu (k)Span Distance 'd'Comment Phi*Vs
Req'd
d*Vu/MuMu
(ft)(k)(in)Actual Suggest(k-ft)Number (k)
Spacing (in)
Design
Phi*Vc
W Only 1 4.02 21.00 -2.22 2.22 2.58 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.09 21.00 -2.18 2.18 2.42 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.16 21.00 -2.13 2.13 2.27 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.24 21.00 -2.08 2.08 2.11 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.31 21.00 -2.03 2.03 1.97 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.38 21.00 -1.97 1.97 1.82 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.45 21.00 -1.92 1.92 1.68 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.52 21.00 -1.86 1.86 1.55 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.59 21.00 -1.79 1.79 1.42 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.66 21.00 -1.73 1.73 1.29 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.73 21.00 -1.66 1.66 1.17 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.80 21.00 -1.59 1.59 1.05 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.87 21.00 -1.51 1.51 0.94 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 4.94 21.00 -1.43 1.43 0.83 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.01 21.00 -1.35 1.35 0.73 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.08 21.00 -1.27 1.27 0.64 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.15 21.00 -1.18 1.18 0.55 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.22 21.00 -1.10 1.10 0.46 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.29 21.00 -1.00 1.00 0.39 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.36 21.00 -0.91 0.91 0.32 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.44 21.00 -0.81 0.81 0.25 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.51 21.00 -0.71 0.71 0.19 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.58 21.00 -0.61 0.61 0.14 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.65 21.00 -0.51 0.51 0.10 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.72 21.00 -0.40 0.40 0.07 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.79 21.00 -0.29 0.29 0.04 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.86 21.00 -0.18 0.18 0.02 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
W Only 1 5.93 21.00 -0.06 0.06 0.00 1.00 29.89 Vu < PhiVc/2 Not Reqd 0.00 0.00
Page 41 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE JADU
1834 W.3RD ST, UNIT 2, SANTA ANA, CA 92703
(allowable)
P(allowable) = 14,500 #
FOUNDATION - 2-STORY
45𝑜
Page 42 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, SANTA ANA, CA 92703
Job#: 240051
Date: 1/7/2025
PLAN: 1
CODE: CBC 2022
BEAM NO. BM#4B Support 2 P =7,062 #
Use 2' - 6"Square x 24" Deep Concrete Pad With
3-#5 Each way
BEAM NO. BM#11+BM#9A Support 2 P =10,056 #
Use 3' - 0"Square x 24" Deep Concrete Pad With
4-#4 Each way
BEAM NO. BM#9+BM#9A Support 1 P =6,171 #
Use 2' - 6"Square x 24" Deep Concrete Pad With
3-#5 Each way
PAD SCHEDULE
Page 43 of 57
1834 W Third St &
#2,33/21/2025
1Y
1X
1
2
A B
AD
U
R
O
O
F
S
H
E
A
R
W
A
L
L
L
A
Y
O
U
T
Page 44 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
SECTION: 1X
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
ROOF 113.4 PLF SEISMIC GOVERN
Page 45 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
SECTION: 1Y
Number of Story: 1 Section width: 45(ft)Section length: 19(ft)
Base height: 0.5(ft)Slope roof height: 13.5(ft)Gable mean roof height: 11.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 45(ft), L = 19(ft), H = 12(ft)-->L/B = 0.42, H/L = 0.63
Wall coefficient: Cpw = 0.8, Cpl = -0.5, Roof coefficient: Cpw = (0.16;-0.32), Cpl = -0.6
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.17, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.17*1*W/6.5 = 0.126*W
Total Seismic Load = 64.26 = 64.26 PLF
Redistrib: 510*9 = 4590 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 91.8 x 45 / (2 x 19) = 108.71 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 91.8 x 45^2 / (8 x 19) = 1222.99 LBS
Splice w/ min. (7) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (15, 0.85, 22.35, 24.7)
ROOF
Roof = 15*19 = 285 PLF
Wall = 15*2*4.5 + 10*2*4.5 = 225 PLF
Shear = 0.126(285+225) = 0.126*510 = 64.26 PLF
Plate height: ROOF = 9(ft)
SHEAR ROOF = 64.26*510*9/4590 = 64.26 PLF
SHEAR ROOF = 0.6*W = 105.49(plf)
ROOF 105.49 PLF WIND GOVERN
Page 46 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
2
9
"
|
4
*
d
*
1
.
4
=
1
.
6
4
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
5.
2
5
3.
7
5
3.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
1
Co
m
.
(
k
i
p
s
)
2.
9
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
HD
U
2
Po
s
t
S
i
z
e
4x
4
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
1
3.
1
Co
m
.
(
k
i
p
s
)
2.
9
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
P2
6.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
1
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
3
7
4
l
b
s
|
S
e
i
s
m
i
c
:
1
8
8
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
1
9
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
7
.
5
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
2
3
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
8
0
p
l
f
(
W
i
n
d
)
/
3
0
1
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
/
1
.
2
)
+
P
2
(
1
/
1
.
2
)
=
2
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
1
.
4
/
1
.
7
)
+
P
2
(
1
.
4
/
1
.
7
)
=
2
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
72
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 47 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
3
"
|
4
*
d
*
1
.
4
=
0
.
7
2
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
8.
5
0
8.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
5
Co
m
.
(
k
i
p
s
)
2.
9
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
5
Co
m
.
(
k
i
p
s
)
2.
9
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
2.
2
5
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
2
(
D
i
r
e
c
t
i
o
n
:
Y
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
3
7
4
l
b
s
|
S
e
i
s
m
i
c
:
1
8
8
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
1
8
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
2
7
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
9
7
p
l
f
(
W
i
n
d
)
/
2
3
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
2
.
6
/
2
.
6
)
=
2
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
3
.
6
/
3
.
6
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
13
6
1
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 48 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
"
|
4
*
d
*
1
.
4
=
0
.
5
3
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
9.
7
5
8.
0
0
5.
2
5
7.
2
5
4.
0
0
4.
0
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
2.
2
5
2.
2
5
2.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
A
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
8
2
0
l
b
s
|
S
e
i
s
m
i
c
:
1
4
0
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
5
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
0
3
p
l
f
(
W
i
n
d
)
/
1
7
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
33
2
-93
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 49 of 57
1834 W Third St &
#2,33/21/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
NE
W
MA
I
N
H
O
U
S
E
AD
U
18
3
4
W.
3
R
D
S
T
,
UN
I
T
3
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
3
Jo
b
#
:
2
4
0
0
5
1
Da
t
e
:
7
/
1
7
/
2
0
2
4
PL
A
N
:
2
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
"
|
4
*
d
*
1
.
4
=
0
.
5
3
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
5.
5
0
8.
0
0
6.
2
5
6.
2
5
3.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
6.
2
5
6.
5
0
3.
2
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
P1
LI
N
E
B
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
8
2
0
l
b
s
|
S
e
i
s
m
i
c
:
1
4
0
0
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
5
.
2
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
3
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
0
3
p
l
f
(
W
i
n
d
)
/
1
7
5
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
18
7
-10
8
0
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 50 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Shear Wall (X-X Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
A 1 1X 19 86 113 9 8 175 A
B 1 1X 19 86 113 9 8 175 A
SUMMARY SHEAR WALL
V2 = Seismic*Span/2 + Added Vseismic
Line shear V = Maximum(V1;V2)
V1 = Wind*Span/2 + Added Vwind
v(plf) = V/L
Page 51 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Shear Wall (Y-Y Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
1 1 1Y 45 105 64 9 6.25 380 B
2 1 1Y 45 105 64 9 8 297 B
v(plf) = V/L
Line shear V = Maximum(V1;V2)
SUMMARY SHEAR WALL
V1 = Wind*Span/2 + Added Vwind
V2 = Seismic*Span/2 + Added Vseismic
Page 52 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic
(#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb)
1 :Wind = 2374(lb), Seismic = 1880(lb)
1 1Y 1 105.5 64.3 45 2374 1446 l---------------45.0(ft)---------------l
2 :Wind = 2374(lb), Seismic = 1880(lb)
2 1Y 1 105.5 64.3 45 2374 1446 l---------------45.0(ft)---------------l
A :Wind = 820(lb), Seismic = 1400(lb)
A 1X 1 86.3 113.4 19 820 1077 l---------------19.0(ft)---------------l
B :Wind = 820(lb), Seismic = 1400(lb)
B 1X 1 86.3 113.4 19 820 1077 l---------------19.0(ft)---------------l
#N/A #N/A
#N/A #N/A
#N/A #N/A
Description
V_(lb)=v_(plf)*Span*Span/2/(Span+Offset)
LATERAL
p Factor: X Direction: p=1.3; Y Direction: p=1.3
Page 53 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : 1 - DROP AT ENTRANCE
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 9.75 ft
Roof Primary: (15+20)(4.8) = (DL=71.2PLF; LLr=95PLF) form 0 to 9.75
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 841/841 0
2 841/841 0
USE 4 x 8
Critcal Shear = 840 LB @0' 1.5xV/(F'v x A)= 0.22
F'v = 225, A = 25.38
Critcal Moment = 2047 LB-FT @4.75' M/(F'b x S)= 0.55
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.197 INCH @ 5 L/240 = 0.488"
Critical Deflection for LL = -0.109 INCH @ 5 L/360 = 0.325"
1 2
Moment
Shear
Deflection
9.75'
BEAM : 2 - HDR AT BED
Loads(Downward+)
Beam Weight 6.2 plf from 0 ft to 6 ft
Roof Primary: (15+20)(11.5) = (DL=172.5PLF; LLr=230PLF) form 0 to 6
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 6
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 1316/1316 0
2 1316/1316 0
USE 4 x 8
Critcal Shear = 1316 LB @0' 1.5xV/(F'v x A)= 0.34
F'v = 225, A = 25.38
Critcal Moment = 1974 LB-FT @3' M/(F'b x S)= 0.53
F'b = 1462, S = 30.66
Critical Deflection for TL = -0.072 INCH @ 3 L/240 = 0.3"
Critical Deflection for LL = -0.038 INCH @ 3 L/360 = 0.2"
1 2
Moment
Shear
Deflection
6'
Page 54 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : C1 - C.J. 2X6#2 @ 16" O.C. TYP. (MAX L=15'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 140/140 0
2 140/140 0
USE 2 x 6
Critcal Shear = 140 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 8.25
Critcal Moment = 525 LB-FT @7.5' M/(F'b x S)= 0.49
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.64 INCH @ 7.5 L/240 = 0.75"
Critical Deflection for LL = -0.457 INCH @ 7.5 L/360 = 0.5"
1 2
Moment
Shear
Deflection
15'
BEAM : C2 - C.J. 2X8#2 @ 16" O.C. TYP. (MAX L=20'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 20
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 187/187 0
2 187/187 0
USE 2 x 8
Critcal Shear = 186 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 10.88
Critcal Moment = 934 LB-FT @10' M/(F'b x S)= 0.55
F'b = 1552, S = 13.14
Critical Deflection for TL = -0.883 INCH @ 10 L/240 = 1"
Critical Deflection for LL = -0.631 INCH @ 10 L/360 = 0.667"
1 2
Moment
Shear
Deflection
20'
Page 55 of 57
1834 W Third St &
#2,33/21/2025
Job #: 240051
Date : 07/17/2024
Plan : 2
Dong Engineering Inc.
NEW MAIN HOUSE & ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
BEAM : R1 - R.R. 2X6#2 @ 16" O.C. TYP. (MAX L=12'-0")
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 248/248 0
2 248/248 0
USE 2 x 6
Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2
F'v = 225, A = 8.25
Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
Page 56 of 57
1834 W Third St &
#2,33/21/2025
Dong Engineering Inc.
NEW MAIN HOUSE ADU
1834 W.3RD ST, UNIT 3, SANTA ANA, CA 92703
Job#: 240051
Date: 7/17/2024
PLAN: 2
CODE: CBC 2022
2900 psf
Trib Trib Wall Height
DL(psf)LL(psf)roof(ft)DL(psf)LL(psf)floor(ft)DL(psf)wall(ft)
15 20 11.5 15 9
Roof:(DL+LL)(Trib) =402.5 plf
Floor:(DL+LL)(Trib) =0 plf
Wall:DL (Height)=135 plf
537.5 plf
537.5 /(12"/12)=537.5 psf< 2900 psf
P(allowable)
P(allowable) = 8,700 #
18 in
FOUNDATION - 1-STORY
Allowable soil bearing value:
Roof Floor
use 12" wide cont. ftg w/ 2-#4 top & bott.
45𝑜
Page 57 of 57
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
1834 W Third St &
#2,33/21/2025
Page 1 of 1
EXISTING ONE & TWO FAMILY DWELLINGS
ELECTRICAL SERVICES UNDERGROUND
EXCEPTION
CEC 2022 ELC-04
All new utility connections are required to be installed below grade by Santa Ana Municipal Code 41-
626(b). There is a standing exception for one and two family dwellings. This exception
applies only when the new electrical service is designed to be fed from below grade as well as
overhead.
This diagram is a typical unit. The utility is able to feed this cabinet from the top or the bottom without
interfering with the distribution wiring. All the circuit breakers and branch circuits are contained in the
circuit breaker side of this cabinet.
Only listed combination overhead and underground feed service boxes may be used to connect to
an overhead utility drop. This exception to an underground fed service applies only to existing single
family and two family residences.
Planning & Building Agency
Permits & Plan Check Section
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
Rigid
Conduit
Service
Entrance
Conductor
Riser
Underground
Service
Lateral
METER
Rev. 1/21/2020
1834 W Third St &
#2,33/21/2025