HomeMy WebLinkAbout2201 S Halladay St - PlanEX. 1,661 SQ.FT. SFD
(NO SPRINKLERS)
EX
.
D
R
I
V
E
W
A
Y
AP
P
R
O
A
C
H
N
NEW 132 S.F. ADD
EX. LANDSCAPE
EX. WALKWAY
EX. DRIVEWAY
EX. CONCRETE
PROPERTY LINE 50'
S HALLADAY ST.
7' - 0"31' - 6" 6' - 0" 5' - 6"
25
'
-
7
"
35' - 0"
13
'
-
6
"
PROPERTY LINE 50'
PR
O
P
E
R
T
Y
L
I
N
E
1
3
6
'
-10
"
PR
O
P
E
R
T
Y
L
I
N
E
1
3
6
'
-10
"
EX. LANDSCAPE
EX. LANDSCAPE
632 S.F. REMODEL
KITCHEN AND
BEDROOM
2% MIN
SLOPE
2% MIN
SLOPE
5% MIN
SLOPE
GAS METER
ELEC. PANEL
Sidewalk
WATER METER
Si
d
e
w
a
l
k
EX. 400 S.F.
GARAGE
30
'
-
0
"
39
'
-
0
"
13
'
-
6
"
30
'
-
4
"
24
'
-
0
"
ST
R
E
E
T
C
.
L
.
30
'
T
O
2% MIN
SLOPE
2% MIN
SLOPE
5% MIN
SLOPE
5% MIN
SLOPE
5%
M
I
N
SL
O
P
E
5%
M
I
N
SL
O
P
E
13
'
-
6
"
16' - 8"
4:12
4:
1
2
4:12
4:
1
2
4:12
4:
1
2
4:
1
2
4:
1
2
20' - 0"18' - 0"12' - 0"
7' - 6"
TO EAVE
6' - 6"
14
'
-
4
"
2%
M
I
N
SL
O
P
E
2%
M
I
N
SL
O
P
E
2%
M
I
N
SL
O
P
E
2%
M
I
N
SL
O
P
E
2%
M
I
N
SL
O
P
E
2%
M
I
N
SL
O
P
E
2% MIN
SLOPE
EX. 300 SQ.FT.
COVERED PATIO
GENERAL NOTES
1. CONTRACTOR SHALL STUDY THE DRAWINGS, SPECIFICATIONS AND FIELD CONDITIONS
BEFORE COMMENCING WITH THE WORK INVOLVED. ANY DISCREPANCIES FOUND SHALL
BE REPORTED TO THE OWNER IN WRITING FOR CORRECTIONS OR CLARIFICATION.
2. PROVIDE SHORING AT ALL TIMES WHEN ALTERING VERTICAL MEMBERS. CONTRACTOR
SHALL VERIFY ACTUAL CONDITIONS AND REPORT IN WRITING TO THE ARCHITECT FOR
RESOLUTION PRIOR TO PROCEEDING WITH THE WORK.
3. THE AREA OF GLASS IN WINDOWS LIMITED TO 20% OF THE FLOOR ADDITION PLUS THE
AREA OF ANY GLASS THAT WAS ELIMINATED IN THE ORIGINAL RESIDENCE WALL AREA
WHERE THE NEW ADDITION IS ATTACHED. ALL NEW WINDOWS SHALL BE DUAL-GLAZED.
4. ALL WINDOWS ARE TO BE WEATHER STRIPPED.
5. SMOKE DETECTORS SHALL BE INSTALLED IN AREAS GIVING ACCESS TO SLEEPING
ROOMS ON OR NEAR THE CEILING, IN EACH SLEEPING ROOM (CBC 310.9.1-4).
6. ATTIC VENTILATION, EQUAL TO 1/150 OF SPACE VENTILATED, SHALL BE PROVIDED OR AS
REQUIRED FOR FORCED AIR UNIT.
7. UTILITY LINES AND ACCESSORIES FOUND AT THE SITE THAT INTERFERE WITH THE NEW
CONSTRUCTION SHALL BE RELOCATED AS NECESSARY. THE CONTRACTOR SHALL
OBTAIN ANY BUILDING PERMIT REQUIRED.
8. ALL WOOD IN CONTACT WITH CONCRETE AND FOUNDATION SILLS SHALL BE PRESSURE
TREATED.
9. PROVIDE CORROSION RESISTED WEEP SCREED AT FOUNDATION PLATE LINE WHICH
WILL ALLOW TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING. 4"
MINIMUM HEIGHT ABOVE GRADE.
10. WALLS CONTAINING 3" OR 4" DIAMETER DRAIN/WASTE/VENT PIPING SHALL BE SIZED TO
ALLOW CUTTING/NOTCHING/BORING (2 X 6 MIN.).
11. CAULK/SEAL ALL PENETRATIONS TO TOP AND BOTTOM PLATES.
12. CAULK/SEAL ALL EXTERIOR BOTTOM PLATES.
13. INSULATION : WALLS R-15 / CEILING R-30 / FLOOR R-19
14. ALL EXTERIOR FINISH MATERIAL TO MATCH EXISTING IN TYPE AND COLOR.
15. ALL NEW ELECTRICAL WIRING SHALL BE COPPER.
16. PROVIDE SEPARATE INSPECTION FOR EACH PHASE OF EXTERIOR PLASTER AS
FOLLOWS : SCRATCH COAT, BROWN COAT , COLOR COAT [ STAPLES ARE NOT
PERMITTED FOR ATTACHING WIRE ].
17. BUILDING PAPER TO BE USED # 60 FOR STUCCO THAT DOES NOT HAVE PLYWOOD
BACKING.
18. DUCTS SHALL BE SIZED PER CHAPTER 6 OF THE MECHANICAL CODE.
19. DISTANCE FROM FACE OF THE FOUNDATION TO PROPERTY LINE TO BE ZONING SETBACK
PLUS WALL FINISH THICKNESS (MINIMUM).
20. THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED. NO
SOLID WASTE MATERIALS, OR WASTEWATER GENERATED ON CONSTRUCTION SITES OR
BY CONSTRUCTION ACTIVITIES SHALL BE PLACED, CONVEYED OR DISCHARGED INTO THE
STREET, GUTTER OR STORM DRAIN SYSTEM.
21. THE INSULATION INSTALLER AND THE CONTRACTOR SHALL POST A SIGNED CERTIFICATE
OF COMPLIANCE IN A CONSPICUOUS LOCATION IN THE BUILDING. THIS CERTIFICATE
SHALL STATE THAT THE INSTALLATIONS AND MATERIALS CONFORM TO THE
APPROPRIATE SECTIONS OF THE CALIFORNIA ADMINISTRATIVE CODE, TITLES 20 AND 24
AND SHALL SPECIFY THE MANUFACTORE'S NAME AND MATERIAL IDENTIFICATION, THE
INSTALLED R-VALUE, AND WHEN LOOSE FILL IS INSTALLED, SHALL STATE THE MINIMUM
INSTALLED WEIGHT PER SQUARE FOOT CONSISTENT WITH THE MANUFACTURE'S
LABELED DENSITY FOR THE DESIRED R-VALUE.
22. ALL INTERIOR DOORS TO BE HOLLOW CORE 1 3/8" THICK U.N.O., (SEE PLAN FOR SIZE). AT
DOUBLE INTERIOR DOOR CONDITIONS PROVIDE DEADBOLT AT TOP OF INACTIVE DOOR.
23. ALL EXTERIOR FRENCH DOORS TO BE SOLID CORE 1 3/4" THICK. (SEE PLAN FOR SIZE). AT
DOUBLE FRENCH DOORS PROVIDE DEADBOLT AT TOP AND BOTTOM OF INACTIVE DOOR
W/ TEMP. GL.
24. CONTRACTOR SHALL VERIFY WITH WINDOW MANUFACTURER THAT ALL ESCAPE OR
RESCUE WINDOWS HAVE A MINIMUM NET CLEAR OPENING OF 5.7 SQUARE FEET, GRADE
FLOOR OPENINGS SHALL HAVE A MINIMUM NET CLEAR OPENING OF 5 FT. THE MIN. NET
CLEAR OPENING HEIGHT SHALL BE 24". THE MINIMUM NET CLEAR OPENING WIDTH SHALL
BE 20" AND THE BOTTOM OF THE CLEAR OPENING NO GREATER THAN 44" ABOVE THE
FLOOR (C.R.C. R310.1). WINDOWS NOT MEETING THESE REQUIREMENTS SHALL BE
BROUGHT TO THE IMMEDIATE ATTENTION OF THE DESIGNER.
25. DUCTS PENETRATING WALL OR CEILING PENETRATIONS BETWEEN GARAGE AND
DWELLING UNIT SHALL BE CONSTRUCTED OF 26 GAGE MIN. SHEET METAL AND SHALL
HAVE NO OPENING INTO GARAGE - PER SEC R302.5.2
26. THE CONSTRUCTION SHALL NOT RESTRICT A FIVE FOOT CLEAR AND AN OBSTRUCTED
ACCESS TO ANY WATER OR POWER DISTRIBUTION FACILITIES (POWER POLES.PULL
BOXES,TRANSFORMERS, VAULTS,PUMPS,VALVES,METERS,APPURTENANCE ETC,) OR THE
LOCATION OF THE HOOK UPS.
27. THE CONSTRUCTION SHALL NOT BE WITHIN TEN FEET OF ANY POWER LINES WHEATHER
OR NOT THE LINES ARE LOCATED ON THE PROPERTY.FAILURE TO COMPLY MAY CAUSE
CONSTRUCTION DELAYS AND/ OR ADDITIONAL EXPENSES
28. AN APPROVED SEISMIC GAS SHUT OFF VALVE WILL BE INSTALLED ON THE FUEL GAS LINE
ON THE DOWN STREAM SIDE OF THE UTILITY METER AND BE RIGIDLY CONNECTED TO
THE EXTERIOR OF THE BUILDING OR STRUCTURE CONTAINING THE FUEL GAS
PIPING.(PER ORDINANCE170.156) (INCLUDES COMMERCIAL ADDITIONS AND IT WORK
OVER $10,000) SEPARATE PLUMBING PERMIT IS REQUIRED.
29. PROVIDE ULTRA LOW FLUSH WATER CLOSETS FOR ALL NEW CONSTRUCTION.EXISTING
SHOWER HEADS AND TOILETS MUST BE ADAPTED FOR LOW WATER CONSUMPTION.
30. WATER HEATER MUST BE STRAPPED TO WALL (SEC.5013 LAPC)
31. SMOKE DETECTORS SHALL BE PROVIDED FOR ALL DWELLING UNITS INTENDEDFOR
HUMAN OCCUPANCY, UPON THE OWNER'S APPLICATION FOR A PERMIT FOR
ALTERATIONS,REPAIRS,OR ADDITIONS EXCEEDING ONE THOUSAND DOLLARS ($1,000)
(R314.6.2)
32. WHERE A PERMIT IS REQUIRED FOR ALTERATIONS,REPAIRS OR ADDITIONS EXCEEDING
ONE THOUSAND DOLLARS ($1,000) EXISTING DWELLING OR SLEEPING UNITS THAT HAVE
ATTACHED GARAGES OR FUEL BURNING APPLIANCES SHALL BE PROVIDED WITH A
CARBON MONOXIDE ALARM IN ACCORDANCE WITH SECTION R3151.CARBON MONOXIDE
ALARMS SHALL ONLY BE REQUIRED IN THE SPECIFIC DWELLING UNIT OR SLEEPING
UNITS FOR WHICH THE PERMIT WAS OBTAINED (R315 .2).
33. EVERY SPACE INTENDED FOR HUMAN OCCUPANCY SHALL BE PROVIDED WITH NATURAL
LIGHT BY MEANS OF EXTERIOR GLAZED OPENING IN ACCORDANCE WITH SECTION R303.1
OR SHALL BE PROVIDED WITH ARTIFICIAL LIGHT THAT IS ADEQUATE TO PROVIDE AN
AVERAGE ILLUMUNATION OF 6 FOOT -CANDLES OVER THE AREA OF THE ROOM, AT A
HEIGHT OF 30 INCHES ABOVE THE FLOOR LEVEL (R303.1)
GENERAL REQUIREMENTS
1. ALL CONSTRUCTION SHALL COMPLY WITH THE 2022 EDITION OF THE CBC,CRC,CMC,CPC,
AND CEC AS ADOPTED AND AMENDED BY THE STATE OF CALIFORNIA IN TITLE 24 CCR
AND HIS JURISDICTION.
2. SEPARATE PERMITS MAY BE REQUIRED FOR MECHANICAL,ELECTRICAL, LUMBING,
SHORING, GRADING, AND DEMOLITION.
3. ALL PROPERTY LINES,EASEMENTS,AND EXISTING BUILDINGS HAVE BEEN INDICATED ON
THIS SITE PLAN.
4. A SECURITY FENCE SHALL BE PROVIDED AROUND THE CONSTRUCTION AREA THAT
SHALL BE INTALLED PRIOR TO EXCAVATION AND OR F FOUNDATION TRENCHING.(BMC
9-1-13302.3).
5. WATER SHALL BE PROVIDED ON THE SITE AND USES TO CONTROL DUST.
6. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED ON SITE. (BMC 9-1-1-3305)
7. THE FINISH GRADE SHALL SLOPE A MIN. OF 5%,OR 6",TO A POINT 10 FEETFROM BUILDING
FOUNDATION,OR TO AN APPROVED ALTERNATE METHOD OF DIVERTING WATER AWAY
FROM THE FOUNDATION. SWALES SHALL SLOPE A MINIMUM OF 2%. (CRC R401.3)
8. THE TOP OF THE EXTERIOR FOUNDATION SHALL EXTEND ABOVE THE ELEVATION OF THE
STREET GUTTER A MINIMUM 12" OR PLUS 2 % (CRC R403.1.7.3)
9. BUILDING SECURITY REGULATIONS: FOR NEW BUILDINGS AND ADDITIONS, ALTERATIONS,
AND REPAIRS WITHIN ANY TWELVE-MONTH PERIOD EXCEED FIFTY (50%) PERCENT OF
THE VALUE OF ANY EXISTING BUILDING OR STRUCTURE, EACH BUILDING OR STRUCTURE
SHALL BE MADE TO CONFORM TO THE REQUIREMENTS FOR NEW BUILDINGS OR
STRUCTURES AND COMPLY WITH THE BUILDING SECURITY REGULATIONS. SANTA ANA
MUNICIPAL CODE CHAPTER 8, DIVISION 3.
FIRE PROTECTION
1. AN APPROVED SMOKE ALARMS SHALL BE INSTALLED IN EACH SLEEPING ROOM AND
HALLWAY OR AREA GIVING ACCESS TO A SLEEOING ROOM, AND EACH STORY AND
BASEMENT FOR DWELLING WITH MORE THAN ONE STORY,SMOKE ALARMS SHALL BE
INTERCONNECTED SO THAT ACTUATION OF A ONE ALARM WILL ACTIVATE ALL THE
ALARMS WITHIN THE INDIVIDUAL DWELLING UNIT.IN NEW CONSTRUCTION SMOKE
ALARMS SHALL RECIEVE THEIR PRIMARY POWER SOURCE FROM THE BUILDING WIRING
AND SHALL BE EQUIPPED WITH BATTERY BACK UP AND LOW BATTERY SIGNAL (R314).
2. AN APPROVED CARBON MONOXIDE ALARM SHALL BE INSTALLED IN DWELLING UNITS AND
IN SLEEPING UNITS.WITHIN WHICH FEL-BURNING APPLIANCES ARE INSTALLED AND IN
DWELLING UNITS THAT HAVE ATTACHED GARAGES,CARBON MONOXIDE ALARM SHALL BE
PROVIDED OUTSIDE OF EACH SEPARATE DWELLING UNITS SLEEPING AREA IN THE
IMMEDIATE VICINITY OF THE BEDROOMS AND ON EVERY LEVEL OF A DWELLING UNIT
INCLUDING BASEMENT (R315)
SCOPE OF WORK
• EX. OFFICE TO BE REMOVED
• EX. BATHROOM TO BE REMODEL AND RE LOCATED
(ROOM #3)
• EX. CLOSET TO BE REMODEL AND RE LOCATED
• (ROOM #3)
• EX. PANTRY TO BE REMODEL (KITCHEN AREA)
• EX. KITCHEN TO BE REMODEL
• NEW LAUNDRY (EX. HALLWAY)
• NEW CLOSET (EX. HALLWAY)
• NEW GAMEROOM
• NEW HALLWAY
• NEW CLOSET (N. HALLWAY)
• NEW 132 SQ.FT. ADD
ALL WORK SHALL COMPLY WITH THE FOLLOWING CODES
• 2022 CALIFORNIA RESIDENTIAL CODE
• 2022 CALIFORNIA ELECTRICAL CODE
INTERNATIONAL CODE COUNCIL
• 2022 CALIFORNIA BUILDING CODE (C.B.C.)
• 2022 CALIFORNIA BUILDING ENERGY STANDARDS
• 2022 CALIFORNIA RESIDENTIAL CODE (C.R.C.)
• 2023 LA FIRE CODE (LAFC)
• 2022 CALIFORNIA MECHANICAL CODE
• 2022 CALIFORNIA PLUMBING CODE
• CITY MUNICIPAL CODE
RESIDENTIAL GENERAL REQUIREMENTS CHECK LIST
1. THE FOLLOWING IS INTENDED AS AN ATTACHMENT FOR CONSTRUCTION AND GRADING PLANS AND REPRESENT THE
MINIMUM STANDARDS OF HOUSEKEEPING WHICH MUST BE IMPLEMENTED ON ALL CONSTRUCTION SITESREGARDLESS
OF SIZE.
2. ERODED SEDIMENTS AND OTHE POLLUTANTSMUST BE RETAINED ON SITE AND MAY NOT BE TRANSPORTED FROM THE
SITE VIA SHEET FLOW, SWALES, AREA DRAINS, NATURAL DRAINAGE OR WIND.
3. STOCKPILES OF EARTH AND OTHER CONSTRUCTION RELATED MATERIALS MUST BE RETAINED ON SITE AND MAY NOT
BE TRANSPORTED FROM THE SITE VIA SHEET FLOW, SWALES, AREA DRAINS, NATURAL DRAINAGE OR WIND.
4. FUELS, OILS, SOLVENTS AND OTHER TOXIC MATERIALS MUST BE STORED IN ACCORDANCE WITH THEIR LISTING AND ARE
NOT TO CONTAMINATE THE SOIL AND SURFACE WATERS. ALL APPROVED STORAGE CONTAINERS ARE TO PROTECTED
FROM THE WEATHER. SPILLS MUST BE CLAENED UP IMMEDIATELY AND DISPOSED OF IN A PROPER MANNER. SPILLS MAY
NOT BE WASHED INTO THE DRAINAGE SYSTEM.
5. EXCESS OR WASTE CONCRETE MAY NOT BE WASHED INTO HE PUBLIC WAY OR ANY OTHER DRAINAGE SYSTEM.
PROVISIONS SHALL BE MADE TO RETAIAN CONCRETE WASTES ON SITE UNTIL THEY CAN BE DIPOSED OF AS SOLID
WASTE
6. TRASH AND CONSTRUCTION RELATED SOLID WASTES MUST BE DEPOSITED INTO A COVERED RECEPTACLE TO PREVENT
CONTAMINATION OF RAINWATER AND DISPERSAL BY WIND.
7. SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE BY VEHICLE TRAFFIC. THE CONSTRUCTION
ENTRANCE ROADWAYS MUST BE STABILIZED SO AS TO INHIBIT SEDIMENTS FROM BEING DEPOSITED INTO THE PUBLIC
WAY. ACCIDENTAL DEPOSITIONS MUST BE SWEPT UP IMMEDIATELY AND MAY NOT BE WASHED DOWN BY RAIN OR
OTHER MEANS.
8. ANY SLOPES WITH DISTURBED SOILSOR DENUDED OF VEGITATION MUST BE STABILIZED SO AS TO INHIBIT EROSIOP
EROSION BY WIND AND WATER.
9. AS PER AMC SEC. 18.38.015 ADU LESS THAN 800 SF DO NOT GET INCLUDED IN THE LOT COVERAGE CALCULATIO. THE
LOT COVERAGE SHALL BE LIMITED TO MAIN HOME AND ADDITION.
Property Information
Assessor's ID No:016-105-18
Address:2201 HALLADAY ST
STA ANA, CA 92707
Property Type:Single Family Residential
Lot Area:6,842 sq.ft.
Property Boundary Description
N-TRACT: 668 BLOCK: R LOT: 1
Building Description
Square Footage: 1,661
Year Build / Effective Year Built: 1901 / 1901
Bedrooms / Bathrooms 3 / 1
Units 1
PROPERTY INFORMATION
VICINITY MAP
Lot Area 6,842 sq.ft.
Existing SFD 1,661 sq.ft.
New ADD 132 sq.ft
Ex. Garage 400 sq.ft.
Total SFD +ADD
1,793 sq.ft.
Ratio 26.21 %
SQUARE FOOTAGE
1/8" = 1'-0"
Site Plan1
INDEX
PLAN DESCRIPTION
00-G-01 SITE PLAN & PROJECT INFO
01-A-01 EXISTING FLOOR PLAN & EXISTING ROOF
PLAN
01-A-02 PROPOSED FLOOR PLAN, PROPOSED ROOF
PLAN - ADD
01-A-03 UTILITY PLAN - ADD
01-A-04 ELEVATIONS & SECTIONS - ADD
01-A-05 SPECS
02-S1.0 STRUCTURAL NOTES
02-S1.1 TYPICAL DETAILS
02-S1.2 TYPICAL DETAILS
02-S1.3 TYPICAL DETAILS
02-S2.0 FOUNDATION PLAN
02-S2.2 ROOF FRAMING PLAN
02-S3.0 FOUNDATION DETAILS
02-S5.0 ROOF FRAMING DETAILS
02-WS
WH1
TYPICAL DETAILS
02-WS
WH2
TYPICAL DETAILS
03-G-01 GREEN CODE
03-G-02 GREEN CODE
03-G-03 TITLE 24 REPORT-ADD
03-G-04 TITLE 24 REPORT-ADD
05-E-01 GENERAL NOTES
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
00-G-01
SITE PLAN & PROJECT INFO
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Lucas
-
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
No. Description Date
Occupancy Group: R-3
Contruction Type: V-B
Number of stories: One
Fire Sprinkler: None exists
Bldg# 101119327
APPROVALS:
PLNG - MKilroy
BLDG - CSG Consultants
2201 S Halladay St
9/24/2024
N
Ex. Door to be
removed
13
'
-
1
"
9'
-
0
"
1'
-
1
0
"
12
'
-
7
"
1'
-
1
1
"
11
'
-
2
"
52
'
-
6
"
13' - 3"4' - 0"
18' - 6"
12' - 3"
7'
-
2
"
11
'
-
3
"
12
'
-
6
"
14
'
-
0
"
46
'
-
7
"
16' - 0"14' - 3"
31' - 6"
Ex. Room #3
Ex. Master Bathroom
Ex. CL Ex. CL
Ex. Hallway
Ex. Kitchen
Ex. Living Room
Ex. Room #2
Ex. Room #1
Ex. Closet
Ex. Living Room
Ex. Office
Ex. CL
Ex. Pantry
Ex. CL
Ex. Bathroom
Ex. Door to be
removed
Ex. Door to be
removed
Ex. Door to
be removed
Ex. Door to be
removed
EX
.
5
'
x
5
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
5
'
S
L
I
D
I
N
G
W
I
N
D
.
EX. 5'x5' SLIDING WIND.EX. 4'x5' SINGLE HUNG WIND.
EX. 3'x4' SINGLE HUNG WIND.
EX
.
4
'
x
3
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
6
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX. 2'x5' SINGLE HUNG WIND.
EX. 2'x5' SINGLE HUNG WIND.
EX. WALL TO REMAIN
EX. WALL TO BE DEMO
WALL SCHEDULE
EX. ROOF FRAMING AND
FINISHES TO REMAIN
EX. FLAT ROOF FRAMING TO
REMOVE
2%
S
l
o
p
e
4:12
4:12
4:
1
2
4:12
4:
1
2
4:
1
2
4:
1
2
4:12
4:
1
2
2%
S
l
o
p
e
54
'
-
6
"
37' - 6"
1' - 0"
1'
-
0
"
21' - 0"
1' - 0"
1'
-
0
"
14
'
-
0
"
15
'
-
0
"
12
'
-
0
"
11' - 3"5' - 3"
6'
-
1
1
"
6'
-
7
"
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
01-A-01
EXISTING FLOOR PLAN &
EXISTING ROOF PLAN
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Autor
Verificador
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
1/4" = 1'-0"
Existing Floor Plan 11
1/4" = 1'-0"
Wall Schedule - Existing
1/4" = 1'-0"
Existing Roof Plan 12
No. Description Date
2201 S Halladay St
9/24/2024
A B
A 3'-0" W X 6'-8" H 1 3/8" EXT. SOLID CORE DOOR WOOD WOOD
B 2'-8" W X 6'-8" H 1 3/8"INT. HOLLOW CORE DOOR WOOD WOOD
MARK OPENING SIZE TICK DOOR TYPE SCREEN FRAME
DOOR SCHEDULE
F.F.
QTY.
1
1
C 2'-6" W X 6'-8" H 1 3/8"DOUBLE FOLDING DOOR WOOD WOOD1
2' - 8"
C
6'
-
8
"
3' - 0"2' - 6"4' - 0"5' - 0"2' - 6"4' - 0"7' - 11"
D E F G H
D
E
F
G
H
2
1
1
1
1
4'-0" W X 6'-8" H 1 3/8" DOUBLE FOUR-WING FOLDING DOOR WOOD WOOD
5'-0" W X 6'-8" H 1 3/8" DOUBLE FOUR-WING FOLDING DOOR WOOD WOOD
2'-6" W X 6'-8" H 1 3/8"INT. HOLLOW CORE DOOR WOOD WOOD
8'-0" W X 6'-8" H 1 3/8" DOUBLE FOUR-WING SLIDING DOOR GLASS WOOD
8'-0" W X 6'-8" H 1 3/8" DOUBLE POCKET DOOR GLASS WOOD
U-FACTOR SHGC
0.29 0.22
0.05
6'
-
8
"
2
4'-0"W x 2'-0"H SLIDING WINDOW VINY. YES
MARK SIZE TYPE FRAME
WINDOW SCHEDULE
NOTES:
1.BEDROOM EGRESS WINDOWS HAVE A MINIMUM CLEAR OPENING AREA OF 5.7 sf.
ABOVE THE GRADE FLOOR AND 5 SQ.FT. ON THE GRADE FLOOR, A MIN. NET HEIGHT OF 24"
AND MIN. NET WIDTH OF 20", AND SILL HEIGHT NOT MORE THAN 44" MAX. ABOVE FINISH
FLOOR.
2.THE NFRC TEMPORARY LABEL DISPLAYED ON WINDOWS AND SKYLIGHTS (INCL.
TUBULAR) MUST REMAIN ON THE UNIT UNTIL FINAL INSPECTION HAS BEEN COMPLETED.
3.SHOWER AND TUB ENCLOSURES SHALL BE TEMPERED (CBC 2406.4) WINDOWS AT
SHOWERS AND TUBS SHALL BE TEMPERED.
F.F.
4'-0"W x 3'-0"H SLIDING WINDOW VINY.YES
SCREEN
1
2
QTY.
1
1
4' - 0"
2'
-
0
"
1
4' - 0"
3'
-
0
"
U-FACTOR SHGC
0.29 0.22
0.29 0.22
N
30" MIN
ø 2' - 8"
N.Landing
4' x 3'
Landing 7 3/4"
max. below
threshold
Tempered
Glass
N. Gameroom
N. Bathroom
N. CL N. CL
N. CL
N. Laundry
N. Hallway
Ex. Room #3
Ex. Master Bathroom
Ex. Kitchen
Ex. Hallway
Ex. Room #2 Ex. Living Room
Ex. CL Ex. CL
Pa
n
t
r
y
Pa
n
t
r
y
G
A
F
D D
E
C
H
1
2
F
B
15
"
mi
n
15
"
mi
n
19
'
-
0
"
4' - 0"3' - 8"5' - 3"5' - 1"
13
'
-
6
"
11
'
-
8
"
25
'
-
2
"
6' - 3"4' - 0"10' - 8"
21' - 4"
8'
-
5
"
5'
-
1
"
5'
-
7
"
2'
-
1
0
"
3'
-
3
"
3' - 11"3' - 3"17' - 3"
2' - 7"
4
01-A-04
3
01-A-04
01-A-04
1
01-A-042
Ex. Room #1
Ex. Closet
Ex. Living Room
EX
.
5
'
x
5
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
5
'
S
L
I
D
I
N
G
W
I
N
D
.
EX. 5'x5' SLIDING WIND.EX. 4'x5' SINGLE HUNG WIND.
EX. 3'x4' SINGLE HUNG WIND.
EX
.
4
'
x
3
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
6
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX. 2'x5' SINGLE HUNG WIND.
EX. 2'x5' SINGLE HUNG WIND.
EX
.
5
'
x
5
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
5
'
S
L
I
D
I
N
G
W
I
N
D
.
EX. 5'x5' SLIDING WIND.EX. 4'x5' SINGLE HUNG WIND.
EX. 3'x4' SINGLE HUNG WIND.
EX
.
4
'
x
3
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
6
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX. 2'x5' SINGLE HUNG WIND.
EX. 2'x5' SINGLE HUNG WIND.
13
'
-
1
"
9'
-
0
"
1'
-
1
0
"
12
'
-
7
"
1'
-
1
1
"
10
'
-
2
"
51
'
-
6
"
5' - 0"11' - 0"14' - 3"
31' - 6"
12
'
-
6
"
14
'
-
0
"
13' - 3"
13' - 8"
N.Landing
6' x 3'
3' - 7"
3' - 6"
EX. SLIDING DOOR
3'
-
0
"
3' - 6"
2'
-
1
0
"
6' - 0"
3' - 0"
6' - 0"4' - 0"
3'
-
0
"
3'
-
0
"
Landing 7 3/4"
max. below
threshold
PROVIDE 1 SQ. IN. OF VENTILATION PER 150 SQ. IN. OF ATTIC SPACE.
PROVIDE THAT 50% OF THE REQ. VENTILATION AREA IS PROVIDED BY
VENTILATORS IN THE UPPER PORTION OF THE ATTIC, (HIGH VENTING) AT 3'-0"
ABOVE EAVE VENT WITH THE BALANCE BEING PROVIDED BY EAVE VENTS,
(LOW VENTING) PER I.R.C. R806, (U.B.C. 1505.3).
ATTIC VENT CALCULATION ZONE 1
VENTILATION REQUIRED:
SQ. FT. / 150 =SQ. FT.1150ATTIC AREA
X 144 =SQ. IN.144
VENTILATION PROVIDED:
72 SQ. IN. EA. =1442
SQ. IN.-
SQ. IN.O HAGIN
147 SQ. IN. EA. =-GABLE LOUVER VENT
TOTAL VENTILATION PROVIDED:SQ. IN.144
EX. WALL TO REMAIN
EX. WALL TO BE DEMO
WALL SCHEDULE
NEW WALL
1-HR RATED/ SOUND
RATED (STC-50)
NEW FLAT ROOF
EX. ROOF FRAMING AND
FINISHES TO REMAIN
12
'
-
0
"
13
'
-
6
"
16' - 6"21' - 0"
4:12
4:12
4:
1
2
4:
1
2
4:12
4:
1
2
4:12
4:12
4:
1
2
4:
1
2
54
'
-
6
"
37' - 6"
14
'
-
0
"
15
'
-
0
"
2%
EAVE
1' - 0"
EA
V
E
1'
-
0
"
Dryer duct termination location
1
01-A-03
1
01-A-03
2
01-A-03
ARCHITECTURAL NOTES
1.PROVIDE 72" HIGH NON ABSORBENT WALL ADJACENT TO SHOWER AND APPROVED
SHATTER RESISTANT MATERIALS FOR SHOWER ENCLOSURE. MATERIALS OTHER THAN
STRUCTURAL ELEMENTS TO BE MOISTURE RESISTANT.
2.SIZE OF SHOWER STALL TO COMPLY WITH CPC 412.7, 1024 SQ. IN. MINIMUM INTERIOR
AND ENCOMPASSING 30" CIRCLE. DOOR SHALL SWING TO THE OUTSIDE.
3.LOW FLOW TOILETS (1.28 GALLON/FLUSH) -SHOWERHEADS (2.0 GPM @ 80 PSI)
-FAUCETS (2.0 GPM @ 60 PSI)
4.PROVIDE INDIVIDUAL CONTROL VALVES OF THE PRESSURE BALANCE OR THE
THERMOSTATIC MIXING VALVE TYPE FOR SHOWERS AND TUB SHOWERS.
5.PROVIDE WEEP SCREED FOR STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM OF
4" ABOVE THE EARTH OR 2" ABOVE PAVED AREAS.
6.DUCTS SHALL BE SIZED PER CHAPTER 6 OF THE MECHANICAL CODE.
7.CLOTHES DRYER MOISTURE EXHAUST DUCT IS LIMITED TO 14 FEET WITH 2 ELBOWS
FROM THE CLOTHES DRYER TO POINT OF TERMINATION REDUCE THIS LENGTH BY 2 FEET
FOR EVERY ELBOW IN EXCESS OF 2.
8.UNIT SKYLIGHTS SHALL BE LABELED BY L.A CITY APPROVED LABELING AGENCY.SUCH
LABEL SHALL STATE THE APPROVED LABELING AGENCY NAME, PRODUCT DESIGNATION AND
PERFORMANCE GRADE RATING.
10. PROVIDE ULTRA LOW FLUSH WATER CLOSETS FOR ALL NEW CONSTRUCTION. EXISTING
SHOWER HEADS AND TOILETS MUST BE UPDATED FOR LOW WATER CONSUMPTION.
11. THE CONSTRUCTION SHALL NOT RESTRICT A FIVE FOOT CLEAR AND UNOBSTRUCTED
ACCESS TO ANY WATER OR POWER DISTRIBUTION FACILITIES (POWER POLES, PULL BOXES,
TRANSFORMERS, VAULTS, PUMPS, VALVES, METERS, APPURTENANCES, ETC.) OR TO THE
LOCATION OF THE HOOK UP. THE CONSTRUCTION SHALL NOT BE WITHIN TEN FEET OF ANY
POWER LINES WHETHER OR NOT THE LINES ARE LOCATED ON THE PROPERTY. FAILURE TO
COMPLY MAY CAUSE CONSTRUCTION DELAYS AND OR ADDITIONAL EXPENSES.
12. AN APPROVED SEISMIC GAS SHUTOFF VALVE WILL BE INSTALLED ON THE FUEL GAS LINE
ON THE DOWN STREAM SIDE OF THE UTILITY METER AND BE RIGIDLY CONNECTED TO THE
EXTERIOR OF THE BUILDING OR STRUCTURE CONTAINING THE FUEL GAS PIPING.
13. NEW OR REPLACEMENT WATER HEATERS SHALL BE STRAPPED TO THE WALL IN TWO
PLACES. ONE IN THE UPPER 1/3 OF THE TANK AND ONE IN THE LOWER 1/3 OF THE TANK. THE
LOWER POINT SHALL BE A MINIMUM OF 4" ABOVE THE CONTROLS.(P.C.510.5) LOW IN EXCESS
OF 2.
14.PLUMBING FIXTURES ARE REQUIRED TO BE CONNECTED TO A SANITARY SEWER OR
TO AN APPROVED SEWAGE DISPOSAL SYSTEM (R306.3).
15. KITCHEN SINK LAVATORIES, BATHTUBS, SHOWERS, BIDETS, LAUNDRY TUBS AND
WASHING MACHINE OUTLETS SHALL BE PROVIDED WITH HOT AND COLD WATER AND
CONNECTED TO AN APPROVED WATER SUPPLY (R306.4).
16. BATHTUB AND SHOWER FLOORS, WALL ABOVE BATHTUBS WITH A SHOWERHEAD, AND
SHOWER COMPARTMENTS SHALL BE FINISHED WITH A NONABSORBENT SURFACE. SUCH
WALL SURFACES SHALL EXTEND TO A HEIGHT OF NOT LESS THAN 6' ABOVE THE FLOOR
(R307.2).
17. EVERY SPACE INTENDED FOR HUMAN OCCUPANCY SHALL BE PROVIDED WITH
NATURAL LIGHT BY MEANS OF EXTERIOR GLAZED OPENINGS IN ACCORDANCE WITH SECTION
R303.1 OR SHALL BR PROVIDED WITH ARTIFICIAL LIGHT THAT IS ADEQUATE TO PROVIDE AN
AVERAGE ILLUMINATION OF 6' CANDLES OVER THE AREA OF THE ROOM AT A HEIGHT OF 30"
ABOVE THE FLOOR LEVEL. (R303.1)
18. A COPY OF THE EVALUATION REPORT AND/ OR CONDITIONS OF LISTING SHALL BE
MADE AVAILABLE AT THE JOB SITE.
19. HEATER SHALL BE CAPABLE OF MAINTAINING A MINIMUM ROOM TEMP' OF 68°F AT A
POINT 3' ABOVE THE FLOOR AND 2' FROM EXTERIOR WALLS IN ALL HABITABLE ROOMS AT THE
DESIGN TEMPERATURE.
20.PROTECTION OF WOOD AND WOOD BASED PRODUCTS FROM DECAY SHALL BE
PROVIDED IN THE LOCATIONS SPECIFIED PER SECTION R317.1 BY THE USE OF NATURALLY
DURABLE WOOD OR WOOD THAT IS PRESERVATIVE TREATED IN ACCORDANCE WITH AWPA
U1 FOR THE SPECIES, PRODUCT, PRESERVATIVE AND END USE.PRESERVATIVES SHALL BE
LISTED IN SECTION 4 OF AWPA U1.
21. PROVIDE ANTI-GRAFFITI FINISH WITHIN THE FIRST 9 FEET,MEASURED FROM GRADE,AT
EXTERIOR WALLS AND DOORS .EXCEPTION:MAINTENANCE OF BUILDING AFFIDAVIT IS
RECORDED BY THE OWNER TO COVENANT AND AGREE WITH THE CITY OF LOS ANGELES TO
REMOVE ANY GRAFFITI WITHIN 7 DAYS OF THE GRAFFITI BEING APPLIED.(6306)
UTILITY NOTES
1 ALL BRANCH CIRCUTS SUPPLYING RECEPTACLES SHALL BE PROTECTED BY A
LISTED ARC-FAULT CIRCUIT INTERRUPTER (AFCI)
2.ALL 120-VOLT, SINGLE PAHSE 15 AND 20 AMP BRANCH CIRCUIT SUPPLYING
OUTLETS INSTALLED IN DWELLING UNIT FAMILY ROOMS, DINING ROOMS, LIVING ROOMS,
PARLORS, DENS, BEDROOMS, SUNROOMS, RECREATION ROOMS, CLOSETS, HALLWAYS,
LAUNDRY ROOMS OR SIMILAR ROOMS OR AREAS SHALL BE AFCI PROTECTED BY ANY OF
THE MEANS DESCRIBED IN 210.12 (A)(1). AT KITCHEN COUNTER SPACE, RECEPTACLES
SHALL BE INDICATED AS COMBINATION AFCDI/GFCI.
3.TAMPER RESISTANT RECEPTACLES IN ALL AREAS SPECIFIED IN SECTION 210.52
ALL 125-VOLT, 15 AND 20 AMP RECEPTACLES SHALL BE LISTED TAMPER RESISTANT
RECEPTACLES
4.NEW BOXES USED AT LUMINAIRES OR LAMPHOLDER OUTLETS IN A CEILING SHALL
BE REQUIRED TO SUPPORT A LUMINAIRIE WEIGHING A MINIMUM OF 50 LB. BOXES USED AT
LUMINARIE OUTLETS IN WALL SHALL BE DESIGNED FOR THE PURPOSE AND SHALL BE
MARKED ON THE INTERIOR INDICATING THE MAXIMUM WEIGHT OF LUMINAIRE PERMITTED,
IF OTHER THAN 50 LBS. OUTLET BOXES OR SYSTEMS USED AS THE SOLE SUPPORT OF
CEILING FANS SHALL BE LISTED AND MARKED BY THE MANUFACTURE AS SUITABLE FOR
THIS PURPOSE. (314.27 CEC)
5.ALL LEAD LUMINAIRES ARE REQUIRED TO BE CONTROLLED BY NATIONAL
ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA) SSL-7A-COMPLIANT DIMMER UNLESS
THEY ARE CONTROLLED BY A VACANCY SENSOR OR AN OCCUPANCY SENSOR. THE
COMBINED USE OF NEMA SSL-7A-COMPLIANT DIMMER WITH LED LUMINAIRES CAN
ENSURE FLICKER FREE OPERATION WHEN THE LUMINAIRE IS DIMMED. (2019 RESIDENTIAL
COMPLIANCE MANUAL 6.3.1(G)
6.IN BATHROOMS, AT LEAST ONE LUMINAIRE IN EACH OF THIS SPACES MUST BE
CONTROLLED BY AN OCCUPANT SENSOR OR A VACANCY SENSOR PROVIDING
AUTOMATIC-OFF FUNCTIONALITY. IF A OCCUPANT SENSOR IS INSTALLED, IT MUST BE
INITIALLY CONFIGURED TO MANUAL-ON OPERATION USING THE MANUAL CONTROL
REQUIRED UNDER SECTION 150.0(k)2C.
ADDITIONAL NOTES
1.PROVIDE A MINIMUM OF (2) 20 AMP SMALL APPLIANCE CIRCUITS FOR THE KITCHEN
COUNTER TOPS. SUCH CIRCUIT SHALL HAVE NO OTHER OUTLETS. LOADS SHALL BE
BALANCED. CEC 210-52(B) (2)
2.PROVIDE A MINIMUM OF (1) 20 AMP LAUNDRY BRANCH CIRCUIT. SUCH CIRCUIT
SHALL HAVE NO OTCOHER OUTLETS. CEC 210-23(A).
3.A MINIMUM OF (1) 20-AMP CIRCUIT FOR BATHROOM(S) OUTLET. SUCH CIRCUIT
SHALL HAVE NO OTHER OUTLETS. THIS CIRCUIT MAY SERVE MORE THAN ONE BATHROOM
CEC 210-23
4.IN BATHROOMS, GARAGES, LAUNDRY ROOMS, AND UTILITY ROOMS, AT LEAST ONE
LUMINAIRE IN EACH OF THESE SPACES MUST BE CONTROLLED BY A VACANCY SENSOR.
5.OUTDOOR LIGHTING PERMANENTLY MOUNTED TO A RESIDENTIAL BUILDING, OR
TO OTHER BUILDING ON THE SAME LOT, MUST MEET THE REQUIREMENT IN ITEM
150.0(K)3AI (ON AND OFF SWITCH) AND THE REQUIREMENTS IN EITHER ITEM 150.0(K)3AII
(PHOTOCELL AND MOTION SENSOR) OR ITEM 150.0(K)3AIII (PHOTO CONTROL AND
AUTOMATIC TIME SWITCH CONTROL, ASTRONOMICAL TIME CLOCK, OR EMCS
6.ALL LIMINAIRES SHALL BE HIGH EFFICACY -PER SECTION 150.0(K)1A.
7.CIRCUIT SHALL HAVE NO OTHER OUTLETS. CEC 210-23(A).
ADDITIONAL NOTES:
1. HABITABLE SPACES SHALL HAVE CEILING HEIGHT OF NO LESS THAN 7'-6". KITCHENS,
LAUNDRY ROOM, CORRIDORS AND BATHROOMS SHALL HAVE CEILING HEIGHT NOT
LESS THAN 7'.
2. PROVIDE 1 ESCAPE WINDOW IN EACH BEDROOM MEETING ALL OF THE FOLLOWING: AN
OPENABLE AREA NOT LESS THAN 5.7 SQ.FT. MIN. CLEAR 24" HEIGHT AND 20" WIDTH
AND SILL NOT OVER 44" ABOVE FLOOR
3. SHOWER WALLS MUST BE FINISHED TO A HEIGHT OF 72" ABOVE DRAIN W/ MOISTURE
RESISTIVE TILE OR APPROVED EQUAL
4. MAX. FLOW RATE STANDARDS SET BY THE CALIFORNIA ENERGY COMMISION: WATER
CLOSETS 1.28 GPF, SHOWERHEADS 2.0 GPM, LAUNDRY FAUCETS 1.5 GPM, SINK
FAUCETS 1.5 GPM, AND KITCHEN FAUCETS 1.8 GPM
5. EXTERIOR WALLS WITHIN 3 FEET OF PROPERTY LINE (SPRINKLERS) OR 5 FEET OF
PROPERTY LINE (WITHOUT SPRINKLERS) REQUIRE 1-HOUR FIRE RATING FOR
EXPOSURE TO BOTH SIDES
6. PROJECTIONS: -PROHIBITED WITHIN 2 FEET OF PROPERTY LINE -1-HOUR FIRE
RATING ON THE UNDERSIDE WITHIN 3FT OF PROPERTY LINE (SPRINKLERS) -1-HOUR
FIRE RATING ON THE UNDERSIDE WITHIN 5FT OF PROPERTY LINE (WITHOUT
SPRINKLERS)
7. OPENINGS: -PROHIBITED WITHIN 3FT OF PROPERTY LINE -MAXIMUM 25% OF WALL
AREA WITHIN 5 FEET OF PROPERTY LINE (WITHOUT SPRINKLERS)
8. PENETRATIONS: -1-HOUR FIRE-RATED PENETRATIONS OF WALLS WITHIN 3FT OF
PROPERTY LINE (SPRINKLERS) -1-HOUR FIRE-RATED PENETRATIONS OF WALLS
WITHIN 5FT OF PROPERTY LINE (WITHOUT SPRINKLERS)
1/4" = 1'-0"
Proposed Floor Plan 11
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
01-A-02
PROPOSED FLOOR PLAN,
PROPOSED ROOF PLAN -
ADD
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Lucas
-
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
1/4" = 1'-0"
Proposed Roof Plan 12
No. Description Date
2201 S Halladay St
9/24/2024
SWITCH ON DIMMER
SWITCH ON VACANCY SENSOR
RECESSED LED LIGHT
WET LOCATION APPROVED
RECESSED LED
WALL MOUNTED LED LIGHT FIXTURE
INT/EXT
DUPLEX OUTLET (AFCI)
GFIC DUPLEX OUTLET (GFCI & AFCI
DUPLEX @ KIT & LAU)
EXTERIOR WATER PROOF GFIC
DUPLEX OUTLET
MINI SPLIT
NEW ELECTRICAL TANKLESS
WATER HEATER (16,000 BTU)
EXHAUST INTAKE FAN. 50 CFM MIN.
WITH HUMIDSTAT CONTROLS AT
RESTROOMS, LAU AND UTILITY. 100
CFM MIN AT KITCHEN
UTILITY LEGEND
W
LED
LED
ELECTRICAL SUBPANEL 100 A.
SMOKE DETECTOR
CM CARBON MONOXIDE ALARM
SD
SDCM
W.
LED
LED
SD
LED
LED
LED
LED
LED
LED
LED
SD
CM
SD
SD
SD
SD
CM
SD
CM
Dryer duct (See detail)
W
D
D
D
D
D
D
D
LED
LED
LED
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
01-A-03
UTILITY PLAN - ADD
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Autor
Verificador
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
1/4" = 1'-0"
Utility Plan 1 (For reference only)1
No. Description Date
1 Revisión 1 Fecha 1
TYPICAL DETAIL / DRYER DUCT
NOTES:
-IN BATHROOMS, GARAGES, LAUNDRY ROOMS, UTILITY ROOMS AND WALK-IN
CLOSETS AT LEAST ONE LUMINAIRE IN EACH OF THESE SPACES SHALL BE
CONTROLLED BY AN OCCUPANT OR VACANCY SENSOR PROVIDING
AUTOMATIC-OFF FUNCTIONALITY. CENC SECTION150.0(K).2.E.I
INDOOR LIGHTING CONTROLS NOTES:
1) ADDS AUTO-OFF CONTROLS FOR LIGHTING IN DRAWERS AND CABINETS.
2) UNDERSHELF, DISPLAY CABINETS, SWITCHED OUTLETS CONTROLLED
SEPARATE FROM CEILING LIGHTING.
3) LIGHTING IN HABITABLE SPACES SHALL HAVE ACCESSIBLE WALL-MOUNTED
DIMMING CONTROLS.
UNVENTED - FLAT ROOF SECTION DETAIL 2
MIN. R -VALUE: R-5 PER CRC TABLE R806.5
2201 S Halladay St
9/24/2024
G A
1
A-9
A-1
A-3
A-2
A-5A-6
A-15
1'
-
0
"
7'
-
9
"
0'
-
1
0
"
9'
-
7
"
6' - 0"4' - 0"0'
-
6
"
0'
-
6
"
0'
-
7
"
(N) THERMOPLASTIC MEMBRENE ROOFING
ICC-ES ESR-2831 (SEE 01-A-05 SPECS)
2
A-9
A-15
A-3
A-1
A-2
A-6
0'
-
1
0
"
7'
-
9
"
1'
-
0
"
9'
-
7
"
0'
-
7
"
0'
-
6
"
(N) THERMOPLASTIC MEMBRENE ROOFING
ICC-ES ESR-2831 (SEE 01-A-05 SPECS)
7'
-
9
"
0'
-
1
0
"
N. Gameroom N. Hallway N. Bathroom Ex. Room #3
14
14
15
4
10 4
1
2
3
5
6 811
16
EXISTINGADD
1'
-
0
"
9'
-
7
"
(N) THERMOPLASTIC MEMBRENE ROOFING
ICC-ES ESR-2831 (SEE 01-A-05 SPECS)
7'
-
9
"
0'
-
1
0
"
Ex. Kitchen N. GameroomEx. Living Room
1
4
10
15
14
14
5
68
9
11
13
ADDEXISTING
Elevation Keynotes
MARK Texto de nota clave
A-1 (N) ICC-ES ESR-2831 SEE
REPORT
A-2 FASCIA
A-3 NEW SIDING JAMES HARDIE
PRIMED-HZ 10-8.25-in x 144-in
A-5 CONCRETE SLAB
A-6 26 GA.
CORROSION-RESISTANT
WEEP SCREED
A-9 EXTERIOR WALL LAMP
A-15 WEATHER PROOF
RECEPTACLE
Section Keynotes
MARK DESCRIPTION
1 (N) ICC-ES ESR-2831 SEE REPORT
2 2"x" SILL PLATE W/ 5/8" DIA ANCHOR BOLTS
3 2"X" STUD WALL @16" O.C. TYPE DOUBLAS
FIR GRADE #2 STUD MIN.
4 DOUBLE 2x TOP PLATE AT EXTERIOR &
BEARING WALLS TYPE DOUGLAS FIR GRADE
#2
5 R-15 FIBERBATT INSULATION SEE ENERGY
CALCS
6 R-22 FIBERBATT INSULATION SEE ENERGY
CALCS
7 2"x " R.R. @ 16" O.C. TYPE DOUGLAS FIR
GRADE #2
8 2"x " C.J. @ 16" O.C. TYPE DOUGLAS FIR
GRADE #2
9 4" CONC. SLAB
10 4"x " HEADER TYPE DOUGLAS FIR GRADE #1
11 2"X SOLID BLOCK W/ FRAMING ANCHOR EA.
BLOCK TYPE DOUGLAS FIR GRADE #2
13 26 GA. CORROSION- RESISTANT WEEP
SCREED
14 1/2" GYP BOARD
15 12" FOOTING
16 INTERIOR PATITION WALL
Isometric View5
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
01-A-04
ELEVATIONS & SECTIONS -
ADD
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Lucas
-
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
1/4" = 1'-0"
East Elevation ADD1 1/4" = 1'-0"
South Elevation ADD2
1/4" = 1'-0"
Section A-ADD3
1/4" = 1'-0"
Section B-ADD4
No. Description Date
1 Revisión 1 Fecha 1
(N ) I C C -E S E S R -2 8 3 1
2"
MIN
4"
MIN
8"
MIN
SECTION DETAIL OF EXTERIOR W ALL
FIRE C. CLASS A/B
CLASS A/B
2201 S Halladay St
9/24/2024
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
01-A-05
SPECS
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Autor
Verificador
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
No. Description Date
2201 S Halladay St
9/24/2024
structural calculations
for
2201 HALLADAY STREET
addition and remodel
2201 HALLADAY STREET
SANTA ANA, CA 92707.
07-Aug-24
CE JOB NO. : 24-459
S T R U C T U R A L
1 1 4 7 e m a r k e t s T , L O N G B E A C H , C A L I F O R N I A 9 0 8 0 5
T : 5 6 2 . 9 6 1 . 5 6 0 0 W W W . C A S T I L L O E N G I N E E R I N G . C O M
1
2201 S Halladay St
9/24/2024
ARCHITECT CASTILLO ENGINEERING, INC.JOB
1205 Pine Avenue, Suite 201
Long Beach, CA 90813
ENGR. MC JOB NO. SHEET NO.
DESIGN CRITERIA
1 Soil supporting footings is natural grade or engineered fill.
2 Soil allowable bearing pressure used in design_______________________________
3 Footing shall extend_____ minimum into undisturbed soil or_____ below finish grade
whichever is lower.
4 All concrete shall develop a minimum compressive strength of 2500 psi in 28 days.
5 Reinforcing steel shall conform to ASTM 615, Grade 60.
6 Structural steel shall conform to the following:
Wide flange shapes ASTM A992
TS shapes ASTM A500, Grade B
Pipe shapes ASTM A53 , Grade B
Other rolled shapes, Bars and plates ASTM A36
7 Structural steel shall be fabricated in a shop of an approved fabricator.
8 All welding shall be done by Certified Welders.
9 Concrete Block shall conform to ASTM C90, Grade N-1.
10 Grout shall develop 2000 psi in 28 days.
11 Mortar shall be Type S and develop 1800 psi in 28 days.
12 All lumber shall be grade marked Douglas Fir. (Grading rule No. 17)
Light Framing Construction
Joist & Planks No. 2
Beams & Stringers No. 1
Posts & Timbers No. 1
13 Glue Laminated Timbers shall be combination No. 24F-V8.
14 Plywood shall conform to PS 1-95, Structural 1.
15 All material and workmanship shall conform to the requirements of
2019 California Building Code.
2
2201 S Halladay St
9/24/2024
3
2201 S Halladay St
9/24/2024
PROJECT:CASTILLO ENGINEERING
324 E South St, Long Beach, CA 90805
37683.00
Wood :Douglas-Fir/Larch Cr = 1.15 (repetitive member factor)Fv =180 psi (for Light Framing and Joists & Planks)
E = 1,500,000 psi (Const Light Framing)Fv =170 psi (for Beams & Stringers and Posts & Timbers)
E = 1,600,000 psi (#2 Joists & Planks, #1 Beams & Stringers, #1 Posts & Timbers)
FLOO ROOF
MEMBER:SIZE:(35 PCF)PROPERTIES:BENDING STRESS:1.00 (k-ft & k)Cd =1.00 (k-ft & k)Cd =1.25
Nominal Grade Type B (in)D (in)PLF (in^2)S(in^3)I(in^4)Fb(psi)CF Fb x CF max Mmax Mmax(rep)max Mmax Mmax(rep)
2x4 Const. LF 1.5 3.50 1.3 5.3 3.1 5.4 1000 1.00 1000 0.63 0.26 0.29 0.79 0.32 0.37
2x6 #2 JP 1.5 5.50 2.0 8.3 7.6 20.8 900 1.30 1170 0.99 0.74 0.85 1.24 0.92 1.06
2x8 #2 JP 1.5 7.25 2.6 10.9 13.1 47.6 900 1.20 1080 1.31 1.18 1.36 1.63 1.48 1.70
2x10 #2 JP 1.5 9.25 3.4 13.9 21.4 98.9 900 1.10 990 1.67 1.76 2.03 2.08 2.21 2.54
2x12 #2 JP 1.5 11.25 4.1 16.9 31.6 178.0 900 1.00 900 2.03 2.37 2.73 2.53 2.97 3.41
2x14 #2 JP 1.5 13.25 4.8 19.9 43.9 290.8 900 0.90 810 2.39 2.96 3.41 2.98 3.70 4.26
4x4 Const LF 3.5 3.50 3.0 12.3 7.1 12.5 1000 1.00 1000 1.47 0.60 0.68 1.84 0.74 0.86
4x6 #2 JP 3.5 5.50 4.7 19.3 17.6 48.5 900 1.30 1170 2.31 1.72 1.98 2.89 2.15 2.47
4x8 #2 JP 3.5 7.25 6.2 25.4 30.7 111.1 900 1.30 1170 3.05 2.99 3.44 3.81 3.74 4.30
4x10 #2 JP 3.5 9.25 7.9 32.4 49.9 230.8 900 1.20 1080 3.89 4.49 5.17 4.86 5.62 6.46
4x12 #2 JP 3.5 11.25 9.6 39.4 73.8 415.3 900 1.10 990 4.73 6.09 7.00 5.91 7.61 8.76
4x14 #2 JP 3.5 13.25 11.3 46.4 102.4 678.5 900 1.00 900 5.57 7.68 8.83 6.96 9.60 11.0
6x4 #2 JP 5.5 3.50 4.7 19.3 11.2 19.7 900 1.00 900 2.31 0.84 2.89 1.05
6x6 #1 PT 5.5 5.50 7.4 30.3 27.7 76.3 1200 1.00 1200 3.43 2.77 4.29 3.47
6x8 #1 PT 5.5 7.50 10.0 41.3 51.6 193.4 1200 1.00 1200 4.68 5.16 5.84 6.45
6x10 #1 BS 5.5 9.50 12.7 52.3 82.7 393.0 1350 1.00 1350 5.92 9.31 7.40 11.6
6x12 #1 BS 5.5 11.50 15.4 63.3 121.2 697.1 1350 1.00 1350 7.17 13.6 8.96 17.0
6x14 #1 BS 5.5 13.50 18.0 74.3 167.1 1127.7 1350 0.99 1332 8.42 18.6 10.5 23.2
4
2201 S Halladay St
9/24/2024
5
2201 S Halladay St
9/24/2024
6
2201 S Halladay St
9/24/2024
7
2201 S Halladay St
9/24/2024
8
2201 S Halladay St
9/24/2024
CASTILLO ENGINEERING, INC
324 E South St,
Long Beach, CA 90805
ROOF LOADS
composite shingles 2.5 psf
re-roof 2.0 psf
1/2" plywwod 1.5 psf
rafters 4.0 psf
insulation 0.5 psf
Ceiling 3.0 psf
beams/headers 1.0 psf
MP&E/ misc.0.5 psf
D=15.0 psf
Lr=20.0 psf REDUCIBLE
FLOOR LOADS
flooring 1.0 psf
3/4" plywood 2.3 psf
joist 3.0 psf
ceiling 4.0 psf
beams/headers 2.0 psf
MP&E/ misc.2.7 psf
D=15.0 psf
L=40.0 psf
EXTERIOR WALL LOADS
7/8" stucco 10.0 psf
1/2" plywood 1.5 psf
2x6 studs at 16"oc 1.5 psf
insulation 0.5 psf
1/2" gyp board 2.3 psf
MP&E/ misc.0.2 psf
D=16.0 psf
INTERIOR WALL LOADS
1/2" gyp board 2.3 psf
1/2" plywood 1.5 psf
2x6 studs at 16"oc 1.5 psf
insulation 0.5 psf
1/2" gyp board 2.3 psf
MP&E/ misc.1.9 psf
D=10.0 psf
9
2201 S Halladay St
9/24/2024
10
2201 S Halladay St
9/24/2024
ROOF KEYPLAN
H1 H2 H3
RJ1
H4
B1
H5
11
2201 S Halladay St
9/24/2024
CASTILLO ENGINEERING, INC.Project 2201 HALLADAY STREET
1147 E Market Street
Long Beach, CA 90805
Engr.Date:Job No.24-459 Sheet
Tag
Beam 5
L =13.08 ft
Member=2x8 A =10.88 in^2
S =13.1 in^3
No. of members=1 I =47.6 in^4
CD=1.25 E =1,600,000 psi
CF=1.20 Va =1.305 kips
CV=1.00 Ma =0.986 k-ft
Cr=1.15
Total Load L/n=180
Live Load L/n=240
L=13.08 ft
0.30 0.30
Uniform load (W1)
D L Trib
w1,1 (15 +20)x 1.33 =19.95 +26.6
w1,2 (16 +0)x 0 =0 +0
w1,3 (15 +40)x 0 =0 +0
w1,4 (16 +60)x 0 =0 +0
w1,5 (5 +20)x 0 =0 +0
W1 =19.95 +26.6 =0.047 klf
Triangular load (W2)
D L Trib `
w2,1 (0 +0)x 0 =0 +0
w2,2 (0 +0)x 0 =0 +0
w2,3 (0 +0)x 0 =0 +0
w2,4 (0 +0)x 0 =0 +0
w2,5 (0 +0)x 0 =0 +0
W2 =0 +0 =0.000 klf
Point Load (P1)
D L Trib.1 Trib.2 TAG:
p1,1 (+)x 0.00 x 0.00 =0 +0 0
p1,2 (+)x 0 x 0 =0 +0 0
p1,3 (+)x 0 x 0 =0 +0 0
p1,4 (+)x 0 x 0 =0 +0
p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft)
P1 =0 +0 =0.00 kips 0 13.08
Point Load (P2)
D L Trib.1 Trib.2 TAG:
p2,1 (+)x 0 x 0 =0 +0 0
p2,2 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0
p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft)
P2 =0 +0 =0.00 kips 0 13.08
Shear
R1=0.304 kips
R2=-0.304 kips Stress Ratio
Vmax=0.30 kips Vallow.=1.63 x 1 =1.6313 kips OK .19
Flexure
M=0.996 k-ft Mallow.=1.70 x 1 =1.7001 k-ft OK .59
Deflection
D =D w1 +Dw2 +D p1 +Dp2
D (D+L)=0.402 +0.000 +0.000 +0.000 =0.40 =L <L OK deflection:.46
390 180
0.402 +0
D (L Only)=0.23 +0 +0 +0 =0.23 =L L OK deflection:.35
683 240
USE:1-2X8
shear:
6/26/24 12:00 AM
RJ1
WALL
FLOOR
ROOF
flexure:
DECK
12
2201 S Halladay St
9/24/2024
Wood Beam
LIC# : KW-06017148, Build:20.23.10.31 CASTILLO ENGINEERING INC.(c) ENERCALC INC 1983-2023
DESCRIPTION:B1
Project File: 24-459.ec6
Project Title:Engineer:
CODE REFERENCES
Calculations per NDS 2024, IBC 2024, ASCE 7-22
Load Combination Set : ASCE 7-22
Material Properties
Beam Bracing :Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Douglas Fir-Larch
No.1
900.0
900.0
925
625
1600
580
170
675 31.21
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination : ASCE 7-22
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Load for Span Number 1
Uniform Load : D = 0.0150, Lr = 0.020 ksf, Extent = 0.0 -->> 4.160 ft, Tributary Width = 10.0 ft, (ROOF)
Uniform Load : D = 0.0150, Lr = 0.020 ksf, Extent = 4.160 -->> 13.50 ft, Tributary Width = 10.0->1.0 ft, (ROOF)
Point Load : D = 0.4370, Lr = 0.5830 k @ 4.160 ft, ((E)BM)
Point Load : D = 0.1070, Lr = 0.1420 k @ 11.750 ft, ((E)HIP BM)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.755: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 1
Location of maximum on span 5.026 ft
57.71 psi=
=
1,125.00 psi
6x12Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+Lr
=
=
=
212.50 psi==
Section used for this span 6x12
Maximum Shear Stress Ratio 0.272 : 1
0.000 ft=
=
849.06 psi
Maximum Deflection
0 <240
663Ratio =0 <180
Max Downward Transient Deflection 0.139 in 1161Ratio =>=240
Max Upward Transient Deflection 0 in Ratio =
Max Downward Total Deflection 0.244 in Ratio =>=180
Max Upward Total Deflection 0 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : Lr Only
n/a
Span: 1 : +D+Lr
n/a
.Maximum Forces & Stresses for Load Combinations
Span #C iCLx CCCMCF rt
Shear ValuesMax Stress Ratios
M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0
1 0.449 0.162 0.90 1.000 1.001.00 1.00 3.68 363.9 810.0 1.04 153.024.7
1 0.005 0.162 0.90 1.000 1.001.00 1.00 0.04 3.7 810.0 0.73 153.024.7
0.00.0
1 0.755 0.272 1.25 1.000 1.001.00 1.00 8.58 849.1 1,125.0 2.43 212.557.7
1 0.008 0.272 1.25 1.000 1.001.00 1.00 0.09 8.6 1,125.0 1.71 212.557.7
0.00.0
13
2201 S Halladay St
9/24/2024
Wood Beam
LIC# : KW-06017148, Build:20.23.10.31 CASTILLO ENGINEERING INC.(c) ENERCALC INC 1983-2023
DESCRIPTION:B1
Project File: 24-459.ec6
Project Title:Engineer:
Maximum Forces & Stresses for Load Combinations
Span #C iCLx CCCMCF rt
Shear ValuesMax Stress Ratios
M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 13.451 ft 1 0.647 0.233 1.25 1.000 1.001.00 1.00 7.35 727.8 1,125.0 2.09 212.549.5
1 0.007 0.233 1.25 1.000 1.001.00 1.00 0.07 7.4 1,125.0 1.47 212.549.5
0.00.0
1 0.152 0.055 1.60 1.000 1.001.00 1.00 2.21 218.3 1,440.0 0.63 272.014.8
1 0.002 0.055 1.60 1.000 1.001.00 1.00 0.02 2.2 1,440.0 0.44 272.014.8
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+D+Lr 1 0.2441 6.504 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 2.761 1.762
Max Upward from Load Combinations 2.761 1.762
Max Upward from Load Cases 1.578 1.006
D Only 1.183 0.755
+D+Lr 2.761 1.762
+D+0.750Lr 2.367 1.510
+0.60D 0.710 0.453
Lr Only 1.578 1.006
14
2201 S Halladay St
9/24/2024
ARCHITECT CASTILLO ENGINEERING JOB
1147 E Market Street
Long Beach, CA 90805
ENGR. MC DATE 24-459
NOTCH ON COMPRESSION FACE AT END
1.833
5.798
0.917
4.881
V 1762 lbs member type=
b=5.5 in viga Fv=psi
11.5 Cd=
F'v=
e=5.00 in 'e' > 'dn', therefore use Eq.(3.4-2)slope=4 :12
2018 NDS Equation 3.4-5
=3 x =psi < psi, therefore NA
2 x 5.5 x 11.50 --4.88 x 5
Use Eq. (3.4-2)
fv= 1.5V =psi < psi, therefore Satisfactory (.46)
b dn
98 213
26/06/2024
170
1.25
213
1762
w
3V
d-(d-dn)/(dn)*e
5.50
4.88dn Rec'd=
B1
102
4.88
213
draftrer=
11.50
6x
C:\Users\gilbe\OneDrive\Escritorio\CBA\CALCULATIONS\01 ROOF OR FLOOR\w-notched beam
15
2201 S Halladay St
9/24/2024
Wood Beam
LIC# : KW-06017148, Build:20.23.10.31 CASTILLO ENGINEERING INC.(c) ENERCALC INC 1983-2023
DESCRIPTION:H1
Project File: 24-459.ec6
Project Title:Engineer:
CODE REFERENCES
Calculations per Nds 2024, IBC 2024, ASCE 7-22
Load Combination Set : ASCE 7-22
Material Properties
Beam Bracing :Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Douglas Fir-Larch
No.1
900.0
900.0
925
625
1600
580
170
675 31.21
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination : ASCE 7-22
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Load for Span Number 1
Uniform Load : D = 0.0150, Lr = 0.020 ksf, Extent = 0.0 -->> 3.250 ft, Tributary Width = 2.830->1.160 ft, (ROOF)
Uniform Load : D = 0.0150, Lr = 0.020 ksf, Extent = 3.250 -->> 4.0 ft, Tributary Width = 8.0 ft, (ROOF)
Point Load : D = 0.7550, Lr = 1.006 k @ 3.250 ft, (B1)
Point Load : D = 0.1070, Lr = 0.1420 k @ 1.750 ft, (HIP BM)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.594: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 1
Location of maximum on span 3.241 ft
131.12 psi=
=
1,462.50 psi
4x6Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+Lr
=
=
=
212.50 psi==
Section used for this span 4x6
Maximum Shear Stress Ratio 0.617 : 1
3.547 ft=
=
868.30 psi
Maximum Deflection
0 <240
1143Ratio =0 <180
Max Downward Transient Deflection 0.024 in 2003Ratio =>=240
Max Upward Transient Deflection 0 in Ratio =
Max Downward Total Deflection 0.042 in Ratio =>=180
Max Upward Total Deflection 0 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : Lr Only
n/a
Span: 1 : +D+Lr
n/a
.Maximum Forces & Stresses for Load Combinations
Span #C iCLx CCCMCF rt
Shear ValuesMax Stress Ratios
M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0
1 0.354 0.367 0.90 1.300 1.001.00 1.00 0.55 372.3 1,053.0 0.72 153.056.2
0.00.0
1 0.594 0.617 1.25 1.300 1.001.00 1.00 1.28 868.3 1,462.5 1.68 212.5131.1
0.00.0
1 0.509 0.529 1.25 1.300 1.001.00 1.00 1.09 744.3 1,462.5 1.44 212.5112.4
0.00.0
16
2201 S Halladay St
9/24/2024
Wood Beam
LIC# : KW-06017148, Build:20.23.10.31 CASTILLO ENGINEERING INC.(c) ENERCALC INC 1983-2023
DESCRIPTION:H1
Project File: 24-459.ec6
Project Title:Engineer:
Maximum Forces & Stresses for Load Combinations
Span #C iCLx CCCMCF rt
Shear ValuesMax Stress Ratios
M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 4.0 ft 1 0.119 0.124 1.60 1.300 1.001.00 1.00 0.33 223.4 1,872.0 0.43 272.033.7
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+D+Lr 1 0.0420 2.175 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.638 1.809
Max Upward from Load Combinations 0.638 1.809
Max Upward from Load Cases 0.364 1.034
D Only 0.273 0.776
+D+Lr 0.638 1.809
+D+0.750Lr 0.547 1.551
+0.60D 0.164 0.465
Lr Only 0.364 1.034
17
2201 S Halladay St
9/24/2024
CASTILLO ENGINEERING, INC.Project 2201 HALLADAY STREET
1147 E Market Street
Long Beach, CA 90805
Engr.Date:Job No.24-459 Sheet
Tag
Beam 5
L =3.16 ft
Member=4x6 A =19.25 in^2
S =17.6 in^3
No. of members=1 I =48.5 in^4
CD=1.25 E =1,600,000 psi
CF=1.30 Va =2.310 kips
CV=1.00 Ma =1.323 k-ft
Cr=1.00
Total Load L/n=180
Live Load L/n=240
L=3.16 ft
0.48 0.48
Uniform load (W1)
D L Trib
w1,1 (15 +20)x 8.08 =121.2 +161.6
w1,2 (16 +0)x 1.5 =24 +0
w1,3 (15 +40)x 0 =0 +0
w1,4 (16 +60)x 0 =0 +0
w1,5 (5 +20)x 0 =0 +0
W1 =145.2 +161.6 =0.307 klf
Triangular load (W2)
D L Trib `
w2,1 (0 +0)x 0 =0 +0
w2,2 (0 +0)x 0 =0 +0
w2,3 (0 +0)x 0 =0 +0
w2,4 (0 +0)x 0 =0 +0
w2,5 (0 +0)x 0 =0 +0
W2 =0 +0 =0.000 klf
Point Load (P1)
D L Trib.1 Trib.2 TAG:
p1,1 (+)x 0.00 x 0.00 =0 +0 0
p1,2 (+)x 0 x 0 =0 +0 0
p1,3 (+)x 0 x 0 =0 +0 0
p1,4 (+)x 0 x 0 =0 +0
p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft)
P1 =0 +0 =0.00 kips 0 3.16
Point Load (P2)
D L Trib.1 Trib.2 TAG:
p2,1 (+)x 0 x 0 =0 +0 0
p2,2 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0
p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft)
P2 =0 +0 =0.00 kips 0 3.16
Shear
R1=0.485 kips
R2=-0.485 kips Stress Ratio
Vmax=0.48 kips Vallow.=2.89 x 1 =2.8875 kips OK .17
Flexure
M=0.383 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .18
Deflection
D =D w1 +Dw2 +D p1 +Dp2
D (D+L)=0.009 +0.000 +0.000 +0.000 =0.01 =L <L OK deflection:.04
4277 180
0.009 +0
D (L Only)=0.005 +0 +0 +0 =0 =L L OK deflection:.03
8121 240
USE:1-4X6
shear:
6/26/24 12:00 AM
H2
WALL
FLOOR
ROOF
flexure:
DECK
18
2201 S Halladay St
9/24/2024
CASTILLO ENGINEERING, INC.Project 2201 HALLADAY STREET
1147 E Market Street
Long Beach, CA 90805
Engr.Date:Job No.24-459 Sheet
Tag
Beam 5
L =8.00 ft
Member=4x10 A =32.38 in^2
S =49.9 in^3
No. of members=1 I =230.8 in^4
CD=1.25 E =1,600,000 psi
CF=1.20 Va =3.885 kips
CV=1.00 Ma =3.743 k-ft
Cr=1.00
Total Load L/n=180
Live Load L/n=240
L=8 ft
1.52 1.52
Uniform load (W1)
D L Trib
w1,1 (15 +20)x 8.08 =121.2 +161.6
w1,2 (16 +0)x 2 =32 +0
w1,3 (10 +0)x 6.58 =65.8 +0
w1,4 (16 +60)x 0 =0 +0
w1,5 (5 +20)x 0 =0 +0
W1 =219 +161.6 =0.381 klf
Triangular load (W2)
D L Trib `
w2,1 (0 +0)x 0 =0 +0
w2,2 (0 +0)x 0 =0 +0
w2,3 (0 +0)x 0 =0 +0
w2,4 (0 +0)x 0 =0 +0
w2,5 (0 +0)x 0 =0 +0
W2 =0 +0 =0.000 klf
Point Load (P1)
D L Trib.1 Trib.2 TAG:
p1,1 (+)x 0.00 x 0.00 =0 +0 0
p1,2 (+)x 0 x 0 =0 +0 0
p1,3 (+)x 0 x 0 =0 +0 0
p1,4 (+)x 0 x 0 =0 +0
p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft)
P1 =0 +0 =0.00 kips 0 8
Point Load (P2)
D L Trib.1 Trib.2 TAG:
p2,1 (+)x 0 x 0 =0 +0 0
p2,2 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0
p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft)
P2 =0 +0 =0.00 kips 0 8
Shear
R1=1.522 kips
R2=-1.522 kips Stress Ratio
Vmax=1.52 kips Vallow.=4.86 x 1 =4.8563 kips OK .31
Flexure
M=3.045 k-ft Mallow.=5.62 x 1 =5.615 k-ft OK .54
Deflection
D =D w1 +Dw2 +D p1 +Dp2
D (D+L)=0.095 +0.000 +0.000 +0.000 =0.09 =L <L OK deflection:.18
1011 180
0.095 +0
D (L Only)=0.04 +0 +0 +0 =0.04 =L L OK deflection:.10
2381 240
USE:1-4X10
shear:
6/26/24 12:00 AM
H3
WALL
DOOR
ROOF
flexure:
DECK
19
2201 S Halladay St
9/24/2024
CASTILLO ENGINEERING, INC.Project 2201 HALLADAY STREET
1147 E Market Street
Long Beach, CA 90805
Engr.Date:Job No.24-459 Sheet
Tag
Beam 5
L =3.00 ft
Member=4x6 A =19.25 in^2
S =17.6 in^3
No. of members=1 I =48.5 in^4
CD=1.25 E =1,600,000 psi
CF=1.30 Va =2.310 kips
CV=1.00 Ma =1.323 k-ft
Cr=1.00
Total Load L/n=180
Live Load L/n=240
L=3 ft
0.94 0.94
Uniform load (W1)
D L Trib
w1,1 (15 +20)x 17 =255 +340
w1,2 (16 +0)x 2 =32 +0
w1,3 (10 +0)x 0 =0 +0
w1,4 (16 +60)x 0 =0 +0
w1,5 (5 +20)x 0 =0 +0
W1 =287 +340 =0.627 klf
Triangular load (W2)
D L Trib `
w2,1 (0 +0)x 0 =0 +0
w2,2 (0 +0)x 0 =0 +0
w2,3 (0 +0)x 0 =0 +0
w2,4 (0 +0)x 0 =0 +0
w2,5 (0 +0)x 0 =0 +0
W2 =0 +0 =0.000 klf
Point Load (P1)
D L Trib.1 Trib.2 TAG:
p1,1 (+)x 0.00 x 0.00 =0 +0 0
p1,2 (+)x 0 x 0 =0 +0 0
p1,3 (+)x 0 x 0 =0 +0 0
p1,4 (+)x 0 x 0 =0 +0
p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft)
P1 =0 +0 =0.00 kips 0 3
Point Load (P2)
D L Trib.1 Trib.2 TAG:
p2,1 (+)x 0 x 0 =0 +0 0
p2,2 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0
p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft)
P2 =0 +0 =0.00 kips 0 3
Shear
R1=0.941 kips
R2=-0.941 kips Stress Ratio
Vmax=0.94 kips Vallow.=2.89 x 1 =2.8875 kips OK .33
Flexure
M=0.705 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .33
Deflection
D =D w1 +Dw2 +D p1 +Dp2
D (D+L)=0.015 +0.000 +0.000 +0.000 =0.01 =L <L OK deflection:.07
2446 180
0.015 +0
D (L Only)=0.008 +0 +0 +0 =0.01 =L L OK deflection:.05
4511 240
USE:1-4X6
shear:
6/26/24 12:00 AM
H4
WALL
DOOR
ROOF
flexure:
DECK
20
2201 S Halladay St
9/24/2024
CASTILLO ENGINEERING, INC.Project 2201 HALLADAY STREET
1147 E Market Street
Long Beach, CA 90805
Engr.Date:Job No.24-459 Sheet
Tag
Beam 5
L =4.00 ft
Member=4x6 A =19.25 in^2
S =17.6 in^3
No. of members=1 I =48.5 in^4
CD=1.25 E =1,600,000 psi
CF=1.30 Va =2.310 kips
CV=1.00 Ma =1.323 k-ft
Cr=1.00
Total Load L/n=180
Live Load L/n=240
L=4 ft
0.41 0.41
Uniform load (W1)
D L Trib
w1,1 (15 +20)x 5 =75 +100
w1,2 (16 +0)x 2 =32 +0
w1,3 (10 +0)x 0 =0 +0
w1,4 (16 +60)x 0 =0 +0
w1,5 (5 +20)x 0 =0 +0
W1 =107 +100 =0.207 klf
Triangular load (W2)
D L Trib `
w2,1 (0 +0)x 0 =0 +0
w2,2 (0 +0)x 0 =0 +0
w2,3 (0 +0)x 0 =0 +0
w2,4 (0 +0)x 0 =0 +0
w2,5 (0 +0)x 0 =0 +0
W2 =0 +0 =0.000 klf
Point Load (P1)
D L Trib.1 Trib.2 TAG:
p1,1 (+)x 0.00 x 0.00 =0 +0 0
p1,2 (+)x 0 x 0 =0 +0 0
p1,3 (+)x 0 x 0 =0 +0 0
p1,4 (+)x 0 x 0 =0 +0
p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft)
P1 =0 +0 =0.00 kips 0 4
Point Load (P2)
D L Trib.1 Trib.2 TAG:
p2,1 (+)x 0 x 0 =0 +0 0
p2,2 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0
p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft)
P2 =0 +0 =0.00 kips 0 4
Shear
R1=0.414 kips
R2=-0.414 kips Stress Ratio
Vmax=0.41 kips Vallow.=2.89 x 1 =2.8875 kips OK .14
Flexure
M=0.414 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .19
Deflection
D =D w1 +Dw2 +D p1 +Dp2
D (D+L)=0.015 +0.000 +0.000 +0.000 =0.02 =L <L OK deflection:.06
3126 180
0.015 +0
D (L Only)=0.007 +0 +0 +0 =0.01 =L L OK deflection:.04
6470 240
USE:1-4X6
shear:
6/26/24 12:00 AM
WALL
DOOR
ROOF
flexure:
DECK
21
2201 S Halladay St
9/24/2024
FOUNDATION KEYPLAN
CF1
CF2
(E)CF1
3.14 K
F1
2.76 K
22
2201 S Halladay St
9/24/2024
ARCHITECT CASTILLO ENGINEERING JOB 2201 HALLADAY
1147 E Market, Long Beach, CA 90805
ENGR. MC DATE JOB NO. 24-459 SHEET NO.
CONTINUOUS FOOTINGS
CF-1
LOADING:TRIB.
( + ) x ft = +
( + ) x ft = +
( + ) x ft = +
DECK ( + ) x ft = +
w = + =plf
B=plf = ft
psf USE:
CF-2
LOADING:TRIB.
( + ) x ft = +
( + ) x ft = +
( + ) x ft = +
w = + =plf
B=plf = ft
psf USE:
0
410.8
16
249.2
4015 0
15 60 0
WALL:8
26/06/2024
20
D L
ROOF:
FLOOR:
15 8.08
1500
410.8
128
161.6
0
0
121.2
0
161.6
0
0
0.27
D L
115 20
15
0
128
15
WALL: 16 0 8
FLOOR:60 0
ROOF:
163 0.11
1500
1'-0" WIDE FTG.
20
20
0
0
143
1'-0" WIDE FTG.
163
F-CONTINUOUS FOOTINGS-1500
23
2201 S Halladay St
9/24/2024
ARCHITECT Castillo Engineering, Inc.PROJECT 2201 HALLADAY STREET
1205 Pine Avenue, Suite 201
Long Beach, CA 90813
ENGR. MC DATE JOB NO. 24-459 SHEET NO.
Given:
h1 =18 in.d1 =3.5 in.D L TRIB D L
w1 15 20 17 =255 +340
h2 =18 in.w =12 in.16 0 8 =128 +0
15 40 3 45 +120
15 60 0 =0 +0
H =36 in.b =6 in.428 +460 =888 plf
Area = 906 in.2 L = 75.5 in.
6.292 ft.2 = 6.29 ft.
Stemwall wt. = 150 x 6 x 18 /144 = 113 plf
=1001
qa =1500 psf
Pa =1500 x 6.29 =9.44 kips Pload =1001 x 6.29 =6.29 kips
Pnet kips
(E) CF1 RAISED FLOOR CAPACITY
Pnet =
26/06/2024
3.14 kips
wuniform
24
2201 S Halladay St
9/24/2024
ARCHITECT CASTILLO ENGINEERING, INC.JOB 2201 HALLADAY STREET
1147 E Market Street
Long Beach, CA 90805
ENGR. MC DATE JOB NO. 24-459 SHEET NO.
SPREAD FOOTINGS
P1 =K
P2 =K
P3 =K
P4 =K
P TOTAL =K
P ALLOW.=K USE:TYPE 2.0 FOOTING
26/06/2024
0
2.76
5.4
F1
2.76
0
0
F-SPREAD FOOTINGS1500
25
2201 S Halladay St
9/24/2024
PROJECT : PAGE :
CLIENT : DESIGN BY :
JOB NO. : DATE : 06/26/24 REVIEW BY :
INPUT DATA
Exposure category (B, C or D)B
Importance factor I =1.00 Category II
Basic wind speed V =110 mph
Topographic factor Kzt =1 Flat
Building height to eave he =8 ft
Building height to ridge hr =13 ft
Effective area of components A =21.33333 ft2
DESIGN SUMMARY
ANALYSIS
Velocity pressure
qh = 0.00256 Kh Kzt Kd V2 I =18.43 psf
where:qh = velocity pressure at mean roof height, h.
Kh = velocity pressure exposure coefficient evaluated at height, h,= 0.70
Kd = wind directionality factor
h = mean roof height ft
p = qh [(G Cpf )-(G Cpi )]
where:p = pressure in appropriate zone
G Cp f = product of gust effect factor and external pressure coefficient
G Cp i = product of gust effect factor and internal pressure coefficient
=0.18 or -0.18
a = width of edge strips, MAX[ MIN(0.1B, 0.4h), 0.04B,3] =3.55 ft
Net Pressures (psf), Basic Load Cases Net Pressures (psf), Torsional Load Cases
15.73 0.00 15.73
(+GCp i )(-GCp i )(+GCp i )(-GCp i )(+GCp i )(-GCp i )
1 0.49 5.77 12.40 0.40 4.05 10.69 1T 0.49 1.44 3.10
2 -0.69 -16.03 -9.40 -0.69 -16.03 -9.40 2T -0.69 -4.01 -2.35
3 -0.45 -11.59 -4.95 -0.37 -10.14 -3.50 3T -0.45 -2.90 -1.24
4 -0.39 -10.51 -3.87 -0.29 -8.66 -2.03 4T -0.39 -2.63 -0.97
1E 0.75 10.43 17.07 0.61 7.93 14.56 0.00
2E -1.07 -23.04 -16.40 -1.07 -23.04 -16.40
3E -0.64 -15.20 -8.56 -0.53 -13.09 -6.45 p i p i
ENGINEERING
Surface
Roof angle q =
Net Pressure with
Surface
Roof angle q =
G Cp f
Net Pressure with
Surface
Roof angle q =
G Cp f
24-459
2201 HALADAY STREET
Wind Analysis for Low-rise Building, Based on ASCE 7-16 / IBC 2024 / CBC 2022
Roof angle q =
G Cp f
Net Pressure with
CASTILLO
Net Pressure withG Cp f
26
2201 S Halladay St
9/24/2024
Basic Load Cases in Transverse Direction Basic Load Cases in Longitudinal Direction
Area Area
(ft2)(+GCp i )(-GCp i )(ft2)(+GCp i )(-GCp i )
1 363 2.10 4.51 1 309 1.25 3.30
2 837 -13.42 -7.87 2 775 -12.42 -7.28
3 837 -9.70 -4.15 3 775 -7.85 -2.71
4 363 -3.82 -1.41 4 309 -2.68 -0.63
1E 57 0.59 0.97 1E 64 0.51 0.93
2E 131 -3.02 -2.15 2E 194 -4.46 -3.18
3E 131 -1.99 -1.12 3E 194 -2.53 -1.25
4E 57 -0.80 -0.42 4E 64 -0.72 -0.29
Horiz.6.01 6.01 Horiz.5.15 5.15
Vert.-27.08 -14.71 Vert.-26.24 -13.88
10 psf min.Horiz.6.83 6.83 10 psf min.Horiz.3.73 3.73
Sec. 6.1.4.1 Vert.-18.64 -18.64 Sec. 6.1.4.1 Vert.-18.64 -18.64
Torsional Load Cases in Transverse Direction Torsional Load Cases in Longitudinal Direction
Area Area
(ft2)(+GCp i )(-GCp i )(+GCp i )(-GCp i )(ft2)(+GCp i )(-GCp i )(+GCp i )(-GCp i )
1 153 0.88 1.90 10 22 1 122 0.50 1.31 3 7
2 353 -5.66 -3.32 -17 -10 2 581 -9.31 -5.46 33 19
3 353 -4.09 -1.75 13 5 3 581 -5.89 -2.03 -21 -7
4 153 -1.61 -0.59 18 7 4 122 -1.06 -0.25 5 1
1E 57 0.59 0.97 13 22 1E 64 0.51 0.93 7 13
2E 131 -3.02 -2.15 -19 -13 2E 194 -4.46 -3.18 16 11
3E 131 -1.99 -1.12 12 7 3E 194 -2.53 -1.25 -9 -4
4E 57 -0.80 -0.42 18 10 4E 64 -0.72 -0.29 10 4
1T 210 0.30 0.65 -4 -9 1T 186 0.19 0.50 -2 -4
2T 484 -1.94 -1.14 7 4 2T 775 -3.10 -1.82 -22 -13
3T 484 -1.40 -0.60 -5 -2 3T 775 -1.96 -0.68 14 5
4T 210 -0.55 -0.20 -7 -3 4T 186 -0.40 -0.09 -3 -1
39 39 31.2 31.2
Design pressures for components and cladding
p = qh[ (G Cp) - (G Cpi)]
where:p = pressure on component
pmin = 10 psf (Sec. 6.1.4.2, pg 21)
p
Effective
2 GCP - GCP GCP - GCP GCP - GCP GCP - GCP GCP - GCP
Comp.21.33333 0.43 -0.87 0.43 -1.54 0.43 -2.40 0.94 -1.04 0.94 -1.28
Positive Negative Positive Negative Positive Negative Positive Negative Positive Negative
11.32 -19.30 11.32 -31.62 11.32 -47.60 20.68 -22.52 20.68 -26.98
S
Surface Pressure (k) withPressure (k) with
S
Surface
Torsion (ft-k)Surface
Zone 5
Zone 3 Zone 4 Zone 5
Pressure (k) with Torsion (ft-k)
Total Horiz. Torsional Load, MT
Zone 1
( psf )
Zone 3 Zone 4Zone 2
Surface Pressure (k) with
Pressure
Zone 1 Zone 2
Total Horiz. Torsional Load, MT
Comp. & Cladding
27
2201 S Halladay St
9/24/2024
ASCE Hazards Report
Address:
2201 Halladay St
Santa Ana, California
92707
Standard:ASCE/SEI 7-16 Latitude: 33.717669
Risk Category:II Longitude:-117.859522
Soil Class:Default Elevation:61.81198352982068 ft
(NAVD 88)
Wind
Results:
Wind Speed 95 Vmph
10-year MRI 66 Vmph
25-year MRI 72 Vmph
50-year MRI 76 Vmph
100-year MRI 81 Vmph
300-year MRI 89 Vmph
700-year MRI 95 Vmph
1,700-year MRI 102 Vmph
3,000-year MRI 106 Vmph
10,000-year MRI 115 Vmph
100,000-year MRI
1,000,000-year MRI
Data Source:
Date Accessed:
133 Vmph
151 Vmph
ASCE/SEI 7-16, Fig. 26.5-1B and Figs. CC.2-1–CC.2-4, and Section 26.5.2
Aug 07 2024
Page 1 of 5https://ascehazardtool.org/
28
2201 S Halladay St
9/24/2024
Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear
interpolation between contours. Wind speeds are interpolated in accordance with the 7-16 Standard. Wind
speeds correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability
= 0.00143, MRI = 700 years). Values for 10-year MRI, 25-year MRI, 50-year MRI and 100-year MRI are Service
Level wind speeds, all other wind speeds are Ultimate wind speeds.
Site is not in a hurricane-prone region as defined in ASCE/SEI 7-16 Section 26.2.
Page 2 of 5https://ascehazardtool.org/
29
2201 S Halladay St
9/24/2024
PGA M : 0.65
SMS : 1.73
SM1 : 1.17
SDS : 1.15
SD1 : 0.78
T L : 8
SS : 1.46
S1 : 0.49
VS30 : 260
Seismic Design Category: D
Multi-Period Design Spectrum
S (g) vs T(s)a
Multi-Period MCE SpectrumR
S (g) vs T(s)a
Two-Period Design Spectrum
S (g) vs T(s)a
Two-Period MCE SpectrumR
S (g) vs T(s)a
Design Vertical Response Spectrum
Vertical ground motion data has not yet been made
available by USGS.
MCE Vertical Response SpectrumR
Vertical ground motion data has not yet been made
available by USGS.
Seismic
DefaultSite Soil Class:
Results:
Page 3 of 5https://ascehazardtool.org/
30
2201 S Halladay St
9/24/2024
Data Accessed: Aug 07 2024
Date Source:
USGS Seismic Design Maps based on ASCE/SEI 7-16 and ASCE/SEI 7-16 Table 1.5-2. Additional data for
site-specific ground motion procedures in accordance with ASCE/SEI 7-16 Ch. 21 are available from USGS.
Page 4 of 5https://ascehazardtool.org/
31
2201 S Halladay St
9/24/2024
Snow
Results:
Ground Snow Load, p : g
20-year MRI Value:
Winter Wind Parameter:
Mapped Elevation:
Data Source:
Date Accessed:
Ground Snow Loads for IRC only, p :g(asd)
3 lb/ft
2
1 lb/ft^2
0.25
61.6 ft
ASCE/SEI 7-16, Figures 7.6-1 and 7.6-2 A-D
Wed Jun 26 2024
Values provided are ground snow loads. In areas
designated "case study required," extreme local
variations in ground snow loads preclude mapping at this
scale. Site-specific case studies are required to establish
ground snow loads at elevations not covered.
Snow load values are mapped to a 0.5 mile resolution.
This resolution can create a mismatch between the
mapped elevation and the site-specific elevation in
topographically complex areas. Engineers should consult
the local authority having jurisdiction in locations where
the reported ‘elevation’ and ‘mapped elevation’ differ
significantly from each other.
2.1 lb/ft
2
The ASCE Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any
kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or
has been extrapolated from maps incorporated in the ASCE standard. While ASCE has made every effort to use data obtained from reliable
sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or
quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation,
relationship, or sponsorship of such third-party content by or from ASCE.
ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent
professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such
professionals in interpreting and applying the contents of this Tool or the ASCE standard.
In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors,
employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential
damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by
law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data
provided by the ASCE Hazard Tool.
Page 5 of 5https://ascehazardtool.org/
32
2201 S Halladay St
9/24/2024
SEISMIC BASE SHEAR (ASCE7-16)
Latitude:33.717669
Longitude:-117.85952
SITE CLASS:D (Table 20.3-1)ρ=1.3
R=6.5 (Table 12.2-1)Ie=1
(Section 21.4)
1.730 0
1.170 0
(11.4-3)
1.153
(11.4-4)
0.78 0.13526
0.6763
See on Figs. 22-14 through 22-17
0.02
8.000
0.75
0.095
W= Effective seismeic weight
(GOVERNS)
For S1 is equal to greater than 0.6g
0.090 W
1.261 W
0.177
0.231 W Strength Level
0.161 W Allowable Stress Design
𝑆
=
𝑆
=
𝑆
=
𝑆=3 𝑆
=
𝑇= 𝐶ℎ
=ℎ
=𝑥
=𝑇
=
𝑉=
=.
=
=
=
=
=
==
=.=
=
=
=
33
2201 S Halladay St
9/24/2024
SEISMIC ANALYSIS
WEIGHT
Level 1 W roof =20 psf x 2074 ft^2 =
=
WR =52.82 kips
BASE SHEAR
8.53 kips
F1=
DISTRIBUTION OF BASE SHEAR
W TOTAL
52.82 kips
4.113 psf
𝑽𝑩𝑨𝑺𝑬= 𝑽 ∗ 𝑾𝑻𝑶𝑻𝑨𝑳
= 𝑉 ∗ 𝑊=
𝑭𝒙= 𝑽𝑩𝑨𝑺𝑬∗𝑾𝑿∗ 𝒉𝑻𝑶𝑻𝑨𝑳
𝑾𝟏∗ 𝒉𝟏+𝑾𝟐∗𝒉𝟏+ 𝒉𝟐+ ⋯𝑾𝒏∗ 𝒉𝑻𝑶𝑻𝑨𝑳
𝑩𝑨𝑺𝑬=∗𝑻𝑶𝑻𝑨𝑳
𝑨
34
2201 S Halladay St
9/24/2024
ARCHITECT JOB 2201 HALLADAY STREET
CASTILLO ENGINEERING, INC.
1147 E Market St
ENGR. MC DATE:LONG BEACH CA. 90805 JOB NO. 24-447 SHEET NO.
SEISMIC FORCES
First Floor Shearwall Forces
L1 Level 1 F1=4.113 psf
SW U-FORCE T.A.FORCE L1 L2 L3 L4
X1 4.11 179.47 0.74 KIPS STRONGWALL
X2 4.11 994.01 4.09 KIPS 11.33 ft
Y1 4.11 865.21 3.56 KIPS 13.50 ft 4.50 ft
June 27, 2024
LENGHT WALLS
35
2201 S Halladay St
9/24/2024
SHEARWALL KEYPLAN
AREA:2073.67 SQ. FT.
PERIMETER:177.33 FT.
X:35.50 FT.
Y:52.50 FT.
X1.1
X2.1
Y1.1
Y1.2
3.56 K
0.74 K
4.10 K
36
2201 S Halladay St
9/24/2024
X1.1
X2.1
X DIRECTION KEYPLAN
AREA:179.47 SQ. FT.
AREA:994.01 SQ. FT.
37
2201 S Halladay St
9/24/2024
38
2201 S Halladay St
9/24/2024
39
2201 S Halladay St
9/24/2024
40
2201 S Halladay St
9/24/2024
41
2201 S Halladay St
9/24/2024
ARCHITECT JOB 2201 HALLADAY STREET
CASTILLO ENGINEERING, INC.
1147 E Market St
ENGR. MC DATE:Long Beach, CA 90805 24-447 SHEET NO.
TAG:X2.1 ( 11.33 ft),
FORCE:
SEISMIC GOVERNS
=kips Load Comb. :(0.6-.14SDS) D + E
SDS :1.15
SHEAR STRESS
X2.1 :L1=ft v=lbs =plf
ft
Ltotal=ft
OVERTURNING
height= 8.00 ft
MOT=x x 8 =
ROOF:psf x ft =plf h/w= 0.71 OK
WALL:psf x ft =plf
w =plf Vallow= 510 PLF
MR=x 11.33 ^2/2 =k-ft USE:
TYPE 4 SHEARWALL
- 0.44 x =kips
kips OK USE:4x 4 POST w/H.D.
295
HDU2
361
11.33
June 27, 2024
11.1615
TributaryUnit load
4.09
SHEARWALL CALCULATIONS
4088
11.33
X2.1
T=
Tallow=
32.7
2.31
WALL:
0.295
16
4.09
2.15
11.33
11.33
18.96
18.96
8.00
32.7
167
128
11.33
11.33
42
2201 S Halladay St
9/24/2024
Y1.1
Y1.2
Y DIRECTION KEYPLAN
AREA:865.21 SQ. FT.
43
2201 S Halladay St
9/24/2024
ARCHITECT JOB 2201 HALLADAY STREET
CASTILLO ENGINEERING, INC.
1147 E Market St
ENGR. MC DATE:Long Beach, CA 90805 24-447 SHEET NO.
TAG:Y1.1 ( 13.50 ft),Y1.2 ( 4.50
FORCE:
SEISMIC GOVERNS
=kips Load Comb. :(0.6-.14SDS) D + E
SDS :1.15
SHEAR STRESS
Y1.1 :L1=ft v=lbs =plf
Y1.2 :L2=ft ft
Ltotal=ft
OVERTURNING
height= 8.00 ft
MOT=x x 8 =
ROOF:psf x ft =plf h/w= 0.59 OK
WALL:psf x ft =plf
w =plf Vallow= 340 PLF
MR=x 13.50 ^2/2 =k-ft USE:
TYPE 6 SHEARWALL
- 0.44 x =kips
kips OK USE:4x 4 POST w/H.D.
height= 8.00 ft
MOT=x x 8 =
ROOF:psf x ft =plf h/w= 1.78 OK
WALL:psf x ft =plf
w =plf Vallow= 340 PLF
MR=x 4.50 ^2/2 =k-ft USE:
TYPE 6 SHEARWALL
- 0.44 x =kips
kips OK USE:4x 4 POST w/H.D.
T=
Tallow=2.31
WALL:Y1.2
3.56
128
11.25
Unit load Tributary
7.12
4.50
169
16
15
8.00
4.50
3.00
15
128
18.00
13.50
1.16
13.50
13.50
4.50
13.03
13.03
8.00
21.4
18.00
Y1.1
T=
Tallow=
21.4
2.31
WALL:
0.143
16
3.56
0.297
1.297.12
June 26, 2024
1.0015
TributaryUnit load
3.00
3.56
SHEARWALL CALCULATIONS
3559 198
18.00
HDU2
HDU2
297
18.00
143
44
2201 S Halladay St
9/24/2024
45
2201 S Halladay St
9/24/2024
ARCHITECT JOB
1205 Pine Avenue, Suite 201
Long Beach, CA 90813
ENGR. MC DATE:JOB NO. SHEET NO.
CASTILLO ENGINEERING, INC.
REMARKS
4x4
4x4
4X4
4X6
4X67.15
10.83
ALLOWABLE
75%
2.31
3.42
4.23
6X6HDU14
3.075
4.565
5.645
6.970
9.535
14.445
5.23
HDU5
HDU8
HDU11
HOLDOWNS
HDU2
HDU4
HD ALLOWABLE
UPLIFT
46
2201 S Halladay St
9/24/2024
1
A5
3
13' - 10"
11' - 3"
9' - 0"
1
1
1
N. 12"X24" FTNG
N.
1
2
"
X
2
4
"
F
T
N
G
EX
.
1
2
"
X
2
4
"
F
T
N
G
N. 12"X24" FTNG
N.
1
2
"
X
2
4
"
F
T
N
G
HD
U
2
(
T
Y
P
)
2(
2
X
4
)
P
O
S
T
HDU 2 (TYP)
2(2X4) POST
HD
U
2
(
T
Y
P
)
2(
2
X
4
)
P
O
S
T
PROVIDE REDGARD WATER
PROOFING OVER
EXISTING CONC. SLAB
ICC#ESR-1413
NEW CONC. SLAB
EX. RAISED FOUNDATION
EX. RAISED FOUNDATION
EX
.
R
A
I
S
E
D
F
O
U
N
D
A
T
I
O
N
EX
.
R
A
I
S
E
D
F
O
U
N
D
A
T
I
O
N
A5
4
A5
5
A5
13' - 10"
11' - 3"
9' - 0"
1
1
1
4x10 HDR4x6 HDR4x6 HDR
4x
6
H
D
R
4x
6
H
D
R
4x
6
H
D
R
4x6 HDR
4x
1
0
H
D
R
N
2
x
1
0
C
.
J
.
@
1
6
"
O
.
C
.
EX
.
2
x
C
.
J
.
@
1
6
"
O
.
C
.
A5
8
A5
9
11
A5
EPOXY BASE PROCEDURE
1. DRILL HOLE 1/8 Ø LARGER THAN ANCHOR
2. CLEAN HOLE WITH BRUSH AND
COMPRESSED AIR
3. PLACE ROD AT BOTTOM OF HOLE OF SILL
Simpson Set XP Epoxy-Tie (ICC-ESR #2508)
4. GROUNT WITH FLOWABLE EPOXY FLUSH
TO TOP
5. DEPUTY INSPECTION REQUIRED FOR
PROPER HOLDOWN INSTALLATION AND
INTEGRITY OF (E) CONCRETE
6. ALLOW 24 HR. CURE BEFORE
TIGHTENING NUT
MINIMUM EMBEDMENTBOLT
DIAMETER
D
VERT.
ANCHOR BOLTS
HORIZ.
ANCHOR BOLTS
7"5"
7"5"
7"5"
8"6"
9"7"
10"8"
1/2"
5/8"
3/4"
7/8"
1"
1 1/8"
TYP. ANCHOR BOLTS
7 TYP. ANCHOR BOLTS
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
02-S-01
FOUNDATION AND
FRAMING PLAN - ADD
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Luis L.
Verificador
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
1/4" = 1'-0"
Foundation Plan1 1/4" = 1'-0"
Framing Plan2
No. Description Date
2201 S Halladay St
9/24/2024
STRUCTURAL NOTES
02-S1.0
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
STRUCTURAL
NOTES
2201 S Halladay St
9/24/2024
TYPICAL DETAIL1TYPICAL DETAIL2TYPICAL DETAIL4
TYPICAL DETAIL5TYPICAL DETAIL6TYPICAL DETAIL7TYPICAL DETAIL8
TYPICAL DETAIL12 TYPICAL DETAIL11 TYPICAL DETAIL10 TYPICAL DETAIL9
TYPICAL DETAIL3
02-S1.1
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
TYPICAL
DETAILS
2201 S Halladay St
9/24/2024
TYPICAL DETAIL2TYPICAL DETAIL4
TYPICAL DETAIL5TYPICAL DETAIL6TYPICAL DETAIL8
TYPICAL DETAIL12 TYPICAL DETAIL9TYPICAL DETAIL10 02-S1.2
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
TYPICAL
DETAILS
2201 S Halladay St
9/24/2024
TYPICAL DETAIL1TYPICAL DETAIL2TYPICAL DETAIL4
TYPICAL DETAIL12 TYPICAL DETAIL11
TYPICAL DETAIL3
TYPICAL DETAIL9TYPICAL DETAIL10 02-S1.3
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
TYPICAL
DETAILS
2201 S Halladay St
9/24/2024
N1FOUNDATION PLAN
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
LAZARO
--
26 JUNE 24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
Expires 12-31-24
NO. 4808
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
02-S2.0
FOUNDATION
PLAN
2201 S Halladay St
9/24/2024
N1ROOF FRAMING PLAN
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
LAZARO
--
26 JUNE 24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
Expires 12-31-24
NO. 4808
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
02-S2.2
ROOF
FRAMING
PLAN
2201 S Halladay St
9/24/2024
DETAIL1DETAIL2DETAIL4
DETAIL5DETAIL6DETAIL7DETAIL8
DETAIL12 DETAIL11 DETAIL10 DETAIL9
DETAIL3
02-S3.0
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
FOUNDATION
DETAILS
2201 S Halladay St
9/24/2024
DETAIL1DETAIL2DETAIL4
DETAIL5DETAIL6DETAIL7DETAIL8
DETAIL12 DETAIL11 DETAIL10 DETAIL9
DETAIL3
02-S5.0
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
ROOF
FRAMING
DETAILS
2201 S Halladay St
9/24/2024
®
®®
®
36
XX
1
24
HX
1
®
02-WSWH1
TYPICAL
DETAILS
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
TO THE C.B.C.
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
2201 S Halladay St
9/24/2024
®
®
®
®
®
®
®
®
®
®
®
·
·
·
·
®
®
®
®
®
®
®®
®
®
·
·
·
·
·
●
●
●
®
TYPICAL
DETAILS
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THECHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
02-WSWH2
2201 S Halladay St
9/24/2024
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
03-G-01
GREEN CODE
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Autor
Verificador
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
No. Description Date
2201 S Halladay St
9/24/2024
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
03-G-02
GREEN CODE
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Autor
Verificador
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
No. Description Date
2201 S Halladay St
9/24/2024
DU
C
T
I
N
S
P
E
C
T
I
O
N
S
E
R
V
I
C
E
SO
-
C
A
L
H
E
R
S
R
A
T
I
N
G
SE
R
V
I
N
G
A
L
L
O
F
S
O
U
T
H
E
R
N
C
A
L
I
F
O
R
N
I
A
drawing no:
date:
checked by:
drawn by:
content:
-
HC
ENV-1
07-18-24
pr
o
j
e
c
t
n
a
m
e
:
RE
S
I
D
E
N
C
E
ad
d
r
e
s
s
22
0
1
H
A
L
L
A
D
A
Y
S
T
R
E
E
T
SA
N
T
A
A
N
A
,
C
A
HE
R
S
R
A
T
I
N
G
A
N
D
81
8
-
6
6
9
-
1
8
1
1
PROJECT #
R-002306
2201 S Halladay St
9/24/2024
DU
C
T
I
N
S
P
E
C
T
I
O
N
S
E
R
V
I
C
E
SO
-
C
A
L
H
E
R
S
R
A
T
I
N
G
SE
R
V
I
N
G
A
L
L
O
F
S
O
U
T
H
E
R
N
C
A
L
I
F
O
R
N
I
A
drawing no:
date:
checked by:
drawn by:
content:
-
HC
ENV-2
PROJECT #
pr
o
j
e
c
t
n
a
m
e
:
RE
S
I
D
E
N
C
E
ad
d
r
e
s
s
HE
R
S
R
A
T
I
N
G
A
N
D
81
8
-
6
6
9
-
1
8
1
1
07-18-24
22
0
1
H
A
L
L
A
D
A
Y
S
T
R
E
E
T
SA
N
T
A
A
N
A
,
C
A
R-002306
2201 S Halladay St
9/24/2024
2201 S Halladay St
9/24/2024
2201 S Halladay St
9/24/2024
EX. 1,661 SQ.FT. SFD
(NO SPRINKLERS)
EX
.
D
R
I
V
E
W
A
Y
AP
P
R
O
A
C
H
N
NEW 132 S.F. ADD
EX. LANDSCAPE
EX. WALKWAY
EX. DRIVEWAY
EX. CONCRETE
PROPERTY LINE 50'
S HALLADAY ST.
7' - 0"31' - 6" 6' - 0" 5' - 6"
25
'
-
7
"
35' - 0"
13
'
-
6
"
PROPERTY LINE 50'
PR
O
P
E
R
T
Y
L
I
N
E
1
3
6
'
-10
"
PR
O
P
E
R
T
Y
L
I
N
E
1
3
6
'
-10
"
EX. LANDSCAPE
EX. LANDSCAPE
632 S.F. REMODEL
KITCHEN AND
BEDROOM
2% MIN
SLOPE
2% MIN
SLOPE
5% MIN
SLOPE
GAS METER
ELEC. PANEL
Sidewalk
WATER METER
Si
d
e
w
a
l
k
EX. 400 S.F.
GARAGE
30
'
-
0
"
39
'
-
0
"
13
'
-
6
"
30
'
-
4
"
24
'
-
0
"
ST
R
E
E
T
C
.
L
.
30
'
T
O
2% MIN
SLOPE
2% MIN
SLOPE
5% MIN
SLOPE
5% MIN
SLOPE
5%
M
I
N
SL
O
P
E
5%
M
I
N
SL
O
P
E
13
'
-
6
"
16' - 8"
4:12
4:
1
2
4:12
4:
1
2
4:12
4:
1
2
4:
1
2
4:
1
2
20' - 0"18' - 0"12' - 0"
7' - 6"
TO EAVE
6' - 6"
14
'
-
4
"
2%
M
I
N
SL
O
P
E
2%
M
I
N
SL
O
P
E
2%
M
I
N
SL
O
P
E
2%
M
I
N
SL
O
P
E
2%
M
I
N
SL
O
P
E
2%
M
I
N
SL
O
P
E
2% MIN
SLOPE
EX. 300 SQ.FT.
COVERED PATIO
GENERAL NOTES
1. CONTRACTOR SHALL STUDY THE DRAWINGS, SPECIFICATIONS AND FIELD CONDITIONS
BEFORE COMMENCING WITH THE WORK INVOLVED. ANY DISCREPANCIES FOUND SHALL
BE REPORTED TO THE OWNER IN WRITING FOR CORRECTIONS OR CLARIFICATION.
2. PROVIDE SHORING AT ALL TIMES WHEN ALTERING VERTICAL MEMBERS. CONTRACTOR
SHALL VERIFY ACTUAL CONDITIONS AND REPORT IN WRITING TO THE ARCHITECT FOR
RESOLUTION PRIOR TO PROCEEDING WITH THE WORK.
3. THE AREA OF GLASS IN WINDOWS LIMITED TO 20% OF THE FLOOR ADDITION PLUS THE
AREA OF ANY GLASS THAT WAS ELIMINATED IN THE ORIGINAL RESIDENCE WALL AREA
WHERE THE NEW ADDITION IS ATTACHED. ALL NEW WINDOWS SHALL BE DUAL-GLAZED.
4. ALL WINDOWS ARE TO BE WEATHER STRIPPED.
5. SMOKE DETECTORS SHALL BE INSTALLED IN AREAS GIVING ACCESS TO SLEEPING
ROOMS ON OR NEAR THE CEILING, IN EACH SLEEPING ROOM (CBC 310.9.1-4).
6. ATTIC VENTILATION, EQUAL TO 1/150 OF SPACE VENTILATED, SHALL BE PROVIDED OR AS
REQUIRED FOR FORCED AIR UNIT.
7. UTILITY LINES AND ACCESSORIES FOUND AT THE SITE THAT INTERFERE WITH THE NEW
CONSTRUCTION SHALL BE RELOCATED AS NECESSARY. THE CONTRACTOR SHALL
OBTAIN ANY BUILDING PERMIT REQUIRED.
8. ALL WOOD IN CONTACT WITH CONCRETE AND FOUNDATION SILLS SHALL BE PRESSURE
TREATED.
9. PROVIDE CORROSION RESISTED WEEP SCREED AT FOUNDATION PLATE LINE WHICH
WILL ALLOW TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING. 4"
MINIMUM HEIGHT ABOVE GRADE.
10. WALLS CONTAINING 3" OR 4" DIAMETER DRAIN/WASTE/VENT PIPING SHALL BE SIZED TO
ALLOW CUTTING/NOTCHING/BORING (2 X 6 MIN.).
11. CAULK/SEAL ALL PENETRATIONS TO TOP AND BOTTOM PLATES.
12. CAULK/SEAL ALL EXTERIOR BOTTOM PLATES.
13. INSULATION : WALLS R-15 / CEILING R-30 / FLOOR R-19
14. ALL EXTERIOR FINISH MATERIAL TO MATCH EXISTING IN TYPE AND COLOR.
15. ALL NEW ELECTRICAL WIRING SHALL BE COPPER.
16. PROVIDE SEPARATE INSPECTION FOR EACH PHASE OF EXTERIOR PLASTER AS
FOLLOWS : SCRATCH COAT, BROWN COAT , COLOR COAT [ STAPLES ARE NOT
PERMITTED FOR ATTACHING WIRE ].
17. BUILDING PAPER TO BE USED # 60 FOR STUCCO THAT DOES NOT HAVE PLYWOOD
BACKING.
18. DUCTS SHALL BE SIZED PER CHAPTER 6 OF THE MECHANICAL CODE.
19. DISTANCE FROM FACE OF THE FOUNDATION TO PROPERTY LINE TO BE ZONING SETBACK
PLUS WALL FINISH THICKNESS (MINIMUM).
20. THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED. NO
SOLID WASTE MATERIALS, OR WASTEWATER GENERATED ON CONSTRUCTION SITES OR
BY CONSTRUCTION ACTIVITIES SHALL BE PLACED, CONVEYED OR DISCHARGED INTO THE
STREET, GUTTER OR STORM DRAIN SYSTEM.
21. THE INSULATION INSTALLER AND THE CONTRACTOR SHALL POST A SIGNED CERTIFICATE
OF COMPLIANCE IN A CONSPICUOUS LOCATION IN THE BUILDING. THIS CERTIFICATE
SHALL STATE THAT THE INSTALLATIONS AND MATERIALS CONFORM TO THE
APPROPRIATE SECTIONS OF THE CALIFORNIA ADMINISTRATIVE CODE, TITLES 20 AND 24
AND SHALL SPECIFY THE MANUFACTORE'S NAME AND MATERIAL IDENTIFICATION, THE
INSTALLED R-VALUE, AND WHEN LOOSE FILL IS INSTALLED, SHALL STATE THE MINIMUM
INSTALLED WEIGHT PER SQUARE FOOT CONSISTENT WITH THE MANUFACTURE'S
LABELED DENSITY FOR THE DESIRED R-VALUE.
22. ALL INTERIOR DOORS TO BE HOLLOW CORE 1 3/8" THICK U.N.O., (SEE PLAN FOR SIZE). AT
DOUBLE INTERIOR DOOR CONDITIONS PROVIDE DEADBOLT AT TOP OF INACTIVE DOOR.
23. ALL EXTERIOR FRENCH DOORS TO BE SOLID CORE 1 3/4" THICK. (SEE PLAN FOR SIZE). AT
DOUBLE FRENCH DOORS PROVIDE DEADBOLT AT TOP AND BOTTOM OF INACTIVE DOOR
W/ TEMP. GL.
24. CONTRACTOR SHALL VERIFY WITH WINDOW MANUFACTURER THAT ALL ESCAPE OR
RESCUE WINDOWS HAVE A MINIMUM NET CLEAR OPENING OF 5.7 SQUARE FEET, GRADE
FLOOR OPENINGS SHALL HAVE A MINIMUM NET CLEAR OPENING OF 5 FT. THE MIN. NET
CLEAR OPENING HEIGHT SHALL BE 24". THE MINIMUM NET CLEAR OPENING WIDTH SHALL
BE 20" AND THE BOTTOM OF THE CLEAR OPENING NO GREATER THAN 44" ABOVE THE
FLOOR (C.R.C. R310.1). WINDOWS NOT MEETING THESE REQUIREMENTS SHALL BE
BROUGHT TO THE IMMEDIATE ATTENTION OF THE DESIGNER.
25. DUCTS PENETRATING WALL OR CEILING PENETRATIONS BETWEEN GARAGE AND
DWELLING UNIT SHALL BE CONSTRUCTED OF 26 GAGE MIN. SHEET METAL AND SHALL
HAVE NO OPENING INTO GARAGE - PER SEC R302.5.2
26. THE CONSTRUCTION SHALL NOT RESTRICT A FIVE FOOT CLEAR AND AN OBSTRUCTED
ACCESS TO ANY WATER OR POWER DISTRIBUTION FACILITIES (POWER POLES.PULL
BOXES,TRANSFORMERS, VAULTS,PUMPS,VALVES,METERS,APPURTENANCE ETC,) OR THE
LOCATION OF THE HOOK UPS.
27. THE CONSTRUCTION SHALL NOT BE WITHIN TEN FEET OF ANY POWER LINES WHEATHER
OR NOT THE LINES ARE LOCATED ON THE PROPERTY.FAILURE TO COMPLY MAY CAUSE
CONSTRUCTION DELAYS AND/ OR ADDITIONAL EXPENSES
28. AN APPROVED SEISMIC GAS SHUT OFF VALVE WILL BE INSTALLED ON THE FUEL GAS LINE
ON THE DOWN STREAM SIDE OF THE UTILITY METER AND BE RIGIDLY CONNECTED TO
THE EXTERIOR OF THE BUILDING OR STRUCTURE CONTAINING THE FUEL GAS
PIPING.(PER ORDINANCE170.156) (INCLUDES COMMERCIAL ADDITIONS AND IT WORK
OVER $10,000) SEPARATE PLUMBING PERMIT IS REQUIRED.
29. PROVIDE ULTRA LOW FLUSH WATER CLOSETS FOR ALL NEW CONSTRUCTION.EXISTING
SHOWER HEADS AND TOILETS MUST BE ADAPTED FOR LOW WATER CONSUMPTION.
30. WATER HEATER MUST BE STRAPPED TO WALL (SEC.5013 LAPC)
31. SMOKE DETECTORS SHALL BE PROVIDED FOR ALL DWELLING UNITS INTENDEDFOR
HUMAN OCCUPANCY, UPON THE OWNER'S APPLICATION FOR A PERMIT FOR
ALTERATIONS,REPAIRS,OR ADDITIONS EXCEEDING ONE THOUSAND DOLLARS ($1,000)
(R314.6.2)
32. WHERE A PERMIT IS REQUIRED FOR ALTERATIONS,REPAIRS OR ADDITIONS EXCEEDING
ONE THOUSAND DOLLARS ($1,000) EXISTING DWELLING OR SLEEPING UNITS THAT HAVE
ATTACHED GARAGES OR FUEL BURNING APPLIANCES SHALL BE PROVIDED WITH A
CARBON MONOXIDE ALARM IN ACCORDANCE WITH SECTION R3151.CARBON MONOXIDE
ALARMS SHALL ONLY BE REQUIRED IN THE SPECIFIC DWELLING UNIT OR SLEEPING
UNITS FOR WHICH THE PERMIT WAS OBTAINED (R315 .2).
33. EVERY SPACE INTENDED FOR HUMAN OCCUPANCY SHALL BE PROVIDED WITH NATURAL
LIGHT BY MEANS OF EXTERIOR GLAZED OPENING IN ACCORDANCE WITH SECTION R303.1
OR SHALL BE PROVIDED WITH ARTIFICIAL LIGHT THAT IS ADEQUATE TO PROVIDE AN
AVERAGE ILLUMUNATION OF 6 FOOT -CANDLES OVER THE AREA OF THE ROOM, AT A
HEIGHT OF 30 INCHES ABOVE THE FLOOR LEVEL (R303.1)
GENERAL REQUIREMENTS
1. ALL CONSTRUCTION SHALL COMPLY WITH THE 2022 EDITION OF THE CBC,CRC,CMC,CPC,
AND CEC AS ADOPTED AND AMENDED BY THE STATE OF CALIFORNIA IN TITLE 24 CCR
AND HIS JURISDICTION.
2. SEPARATE PERMITS MAY BE REQUIRED FOR MECHANICAL,ELECTRICAL, LUMBING,
SHORING, GRADING, AND DEMOLITION.
3. ALL PROPERTY LINES,EASEMENTS,AND EXISTING BUILDINGS HAVE BEEN INDICATED ON
THIS SITE PLAN.
4. A SECURITY FENCE SHALL BE PROVIDED AROUND THE CONSTRUCTION AREA THAT
SHALL BE INTALLED PRIOR TO EXCAVATION AND OR F FOUNDATION TRENCHING.(BMC
9-1-13302.3).
5. WATER SHALL BE PROVIDED ON THE SITE AND USES TO CONTROL DUST.
6. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED ON SITE. (BMC 9-1-1-3305)
7. THE FINISH GRADE SHALL SLOPE A MIN. OF 5%,OR 6",TO A POINT 10 FEETFROM BUILDING
FOUNDATION,OR TO AN APPROVED ALTERNATE METHOD OF DIVERTING WATER AWAY
FROM THE FOUNDATION. SWALES SHALL SLOPE A MINIMUM OF 2%. (CRC R401.3)
8. THE TOP OF THE EXTERIOR FOUNDATION SHALL EXTEND ABOVE THE ELEVATION OF THE
STREET GUTTER A MINIMUM 12" OR PLUS 2 % (CRC R403.1.7.3)
9. BUILDING SECURITY REGULATIONS: FOR NEW BUILDINGS AND ADDITIONS, ALTERATIONS,
AND REPAIRS WITHIN ANY TWELVE-MONTH PERIOD EXCEED FIFTY (50%) PERCENT OF
THE VALUE OF ANY EXISTING BUILDING OR STRUCTURE, EACH BUILDING OR STRUCTURE
SHALL BE MADE TO CONFORM TO THE REQUIREMENTS FOR NEW BUILDINGS OR
STRUCTURES AND COMPLY WITH THE BUILDING SECURITY REGULATIONS. SANTA ANA
MUNICIPAL CODE CHAPTER 8, DIVISION 3.
FIRE PROTECTION
1. AN APPROVED SMOKE ALARMS SHALL BE INSTALLED IN EACH SLEEPING ROOM AND
HALLWAY OR AREA GIVING ACCESS TO A SLEEOING ROOM, AND EACH STORY AND
BASEMENT FOR DWELLING WITH MORE THAN ONE STORY,SMOKE ALARMS SHALL BE
INTERCONNECTED SO THAT ACTUATION OF A ONE ALARM WILL ACTIVATE ALL THE
ALARMS WITHIN THE INDIVIDUAL DWELLING UNIT.IN NEW CONSTRUCTION SMOKE
ALARMS SHALL RECIEVE THEIR PRIMARY POWER SOURCE FROM THE BUILDING WIRING
AND SHALL BE EQUIPPED WITH BATTERY BACK UP AND LOW BATTERY SIGNAL (R314).
2. AN APPROVED CARBON MONOXIDE ALARM SHALL BE INSTALLED IN DWELLING UNITS AND
IN SLEEPING UNITS.WITHIN WHICH FEL-BURNING APPLIANCES ARE INSTALLED AND IN
DWELLING UNITS THAT HAVE ATTACHED GARAGES,CARBON MONOXIDE ALARM SHALL BE
PROVIDED OUTSIDE OF EACH SEPARATE DWELLING UNITS SLEEPING AREA IN THE
IMMEDIATE VICINITY OF THE BEDROOMS AND ON EVERY LEVEL OF A DWELLING UNIT
INCLUDING BASEMENT (R315)
SCOPE OF WORK
• EX. OFFICE TO BE REMOVED
• EX. BATHROOM TO BE REMODEL AND RE LOCATED
(ROOM #3)
• EX. CLOSET TO BE REMODEL AND RE LOCATED
• (ROOM #3)
• EX. PANTRY TO BE REMODEL (KITCHEN AREA)
• EX. KITCHEN TO BE REMODEL
• NEW LAUNDRY (EX. HALLWAY)
• NEW CLOSET (EX. HALLWAY)
• NEW GAMEROOM
• NEW HALLWAY
• NEW CLOSET (N. HALLWAY)
• NEW 132 SQ.FT. ADD
ALL WORK SHALL COMPLY WITH THE FOLLOWING CODES
• 2022 CALIFORNIA RESIDENTIAL CODE
• 2022 CALIFORNIA ELECTRICAL CODE
INTERNATIONAL CODE COUNCIL
• 2022 CALIFORNIA BUILDING CODE (C.B.C.)
• 2022 CALIFORNIA BUILDING ENERGY STANDARDS
• 2022 CALIFORNIA RESIDENTIAL CODE (C.R.C.)
• 2023 LA FIRE CODE (LAFC)
• 2022 CALIFORNIA MECHANICAL CODE
• 2022 CALIFORNIA PLUMBING CODE
• CITY MUNICIPAL CODE
RESIDENTIAL GENERAL REQUIREMENTS CHECK LIST
1. THE FOLLOWING IS INTENDED AS AN ATTACHMENT FOR CONSTRUCTION AND GRADING PLANS AND REPRESENT THE
MINIMUM STANDARDS OF HOUSEKEEPING WHICH MUST BE IMPLEMENTED ON ALL CONSTRUCTION SITESREGARDLESS
OF SIZE.
2. ERODED SEDIMENTS AND OTHE POLLUTANTSMUST BE RETAINED ON SITE AND MAY NOT BE TRANSPORTED FROM THE
SITE VIA SHEET FLOW, SWALES, AREA DRAINS, NATURAL DRAINAGE OR WIND.
3. STOCKPILES OF EARTH AND OTHER CONSTRUCTION RELATED MATERIALS MUST BE RETAINED ON SITE AND MAY NOT
BE TRANSPORTED FROM THE SITE VIA SHEET FLOW, SWALES, AREA DRAINS, NATURAL DRAINAGE OR WIND.
4. FUELS, OILS, SOLVENTS AND OTHER TOXIC MATERIALS MUST BE STORED IN ACCORDANCE WITH THEIR LISTING AND ARE
NOT TO CONTAMINATE THE SOIL AND SURFACE WATERS. ALL APPROVED STORAGE CONTAINERS ARE TO PROTECTED
FROM THE WEATHER. SPILLS MUST BE CLAENED UP IMMEDIATELY AND DISPOSED OF IN A PROPER MANNER. SPILLS MAY
NOT BE WASHED INTO THE DRAINAGE SYSTEM.
5. EXCESS OR WASTE CONCRETE MAY NOT BE WASHED INTO HE PUBLIC WAY OR ANY OTHER DRAINAGE SYSTEM.
PROVISIONS SHALL BE MADE TO RETAIAN CONCRETE WASTES ON SITE UNTIL THEY CAN BE DIPOSED OF AS SOLID
WASTE
6. TRASH AND CONSTRUCTION RELATED SOLID WASTES MUST BE DEPOSITED INTO A COVERED RECEPTACLE TO PREVENT
CONTAMINATION OF RAINWATER AND DISPERSAL BY WIND.
7. SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE BY VEHICLE TRAFFIC. THE CONSTRUCTION
ENTRANCE ROADWAYS MUST BE STABILIZED SO AS TO INHIBIT SEDIMENTS FROM BEING DEPOSITED INTO THE PUBLIC
WAY. ACCIDENTAL DEPOSITIONS MUST BE SWEPT UP IMMEDIATELY AND MAY NOT BE WASHED DOWN BY RAIN OR
OTHER MEANS.
8. ANY SLOPES WITH DISTURBED SOILSOR DENUDED OF VEGITATION MUST BE STABILIZED SO AS TO INHIBIT EROSIOP
EROSION BY WIND AND WATER.
9. AS PER AMC SEC. 18.38.015 ADU LESS THAN 800 SF DO NOT GET INCLUDED IN THE LOT COVERAGE CALCULATIO. THE
LOT COVERAGE SHALL BE LIMITED TO MAIN HOME AND ADDITION.
Property Information
Assessor's ID No:016-105-18
Address:2201 HALLADAY ST
STA ANA, CA 92707
Property Type:Single Family Residential
Lot Area:6,842 sq.ft.
Property Boundary Description
N-TRACT: 668 BLOCK: R LOT: 1
Building Description
Square Footage: 1,661
Year Build / Effective Year Built: 1901 / 1901
Bedrooms / Bathrooms 3 / 1
Units 1
PROPERTY INFORMATION
VICINITY MAP
Lot Area 6,842 sq.ft.
Existing SFD 1,661 sq.ft.
New ADD 132 sq.ft
Ex. Garage 400 sq.ft.
Total SFD +ADD
1,793 sq.ft.
Ratio 26.21 %
SQUARE FOOTAGE
1/8" = 1'-0"
Site Plan1
INDEX
PLAN DESCRIPTION
00-G-01 SITE PLAN & PROJECT INFO
01-A-01 EXISTING FLOOR PLAN & EXISTING ROOF
PLAN
01-A-02 PROPOSED FLOOR PLAN, PROPOSED ROOF
PLAN - ADD
01-A-03 UTILITY PLAN - ADD
01-A-04 ELEVATIONS & SECTIONS - ADD
01-A-05 SPECS
02-S1.0 STRUCTURAL NOTES
02-S1.1 TYPICAL DETAILS
02-S1.2 TYPICAL DETAILS
02-S1.3 TYPICAL DETAILS
02-S2.0 FOUNDATION PLAN
02-S2.2 ROOF FRAMING PLAN
02-S3.0 FOUNDATION DETAILS
02-S5.0 ROOF FRAMING DETAILS
02-WS
WH1
TYPICAL DETAILS
02-WS
WH2
TYPICAL DETAILS
03-G-01 GREEN CODE
03-G-02 GREEN CODE
03-G-03 TITLE 24 REPORT-ADD
03-G-04 TITLE 24 REPORT-ADD
05-E-01 GENERAL NOTES
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
00-G-01
SITE PLAN & PROJECT INFO
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Lucas
-
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
No. Description Date
Occupancy Group: R-3
Contruction Type: V-B
Number of stories: One
Fire Sprinkler: None exists
Bldg# 101119327
APPROVALS:
PLNG - MKilroy
BLDG - CSG Consultants
2201 S Halladay St
9/24/2024
N
Ex. Door to be
removed
13
'
-
1
"
9'
-
0
"
1'
-
1
0
"
12
'
-
7
"
1'
-
1
1
"
11
'
-
2
"
52
'
-
6
"
13' - 3"4' - 0"
18' - 6"
12' - 3"
7'
-
2
"
11
'
-
3
"
12
'
-
6
"
14
'
-
0
"
46
'
-
7
"
16' - 0"14' - 3"
31' - 6"
Ex. Room #3
Ex. Master Bathroom
Ex. CL Ex. CL
Ex. Hallway
Ex. Kitchen
Ex. Living Room
Ex. Room #2
Ex. Room #1
Ex. Closet
Ex. Living Room
Ex. Office
Ex. CL
Ex. Pantry
Ex. CL
Ex. Bathroom
Ex. Door to be
removed
Ex. Door to be
removed
Ex. Door to
be removed
Ex. Door to be
removed
EX
.
5
'
x
5
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
5
'
S
L
I
D
I
N
G
W
I
N
D
.
EX. 5'x5' SLIDING WIND.EX. 4'x5' SINGLE HUNG WIND.
EX. 3'x4' SINGLE HUNG WIND.
EX
.
4
'
x
3
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
6
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX. 2'x5' SINGLE HUNG WIND.
EX. 2'x5' SINGLE HUNG WIND.
EX. WALL TO REMAIN
EX. WALL TO BE DEMO
WALL SCHEDULE
EX. ROOF FRAMING AND
FINISHES TO REMAIN
EX. FLAT ROOF FRAMING TO
REMOVE
2%
S
l
o
p
e
4:12
4:12
4:
1
2
4:12
4:
1
2
4:
1
2
4:
1
2
4:12
4:
1
2
2%
S
l
o
p
e
54
'
-
6
"
37' - 6"
1' - 0"
1'
-
0
"
21' - 0"
1' - 0"
1'
-
0
"
14
'
-
0
"
15
'
-
0
"
12
'
-
0
"
11' - 3"5' - 3"
6'
-
1
1
"
6'
-
7
"
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
01-A-01
EXISTING FLOOR PLAN &
EXISTING ROOF PLAN
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Autor
Verificador
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
1/4" = 1'-0"
Existing Floor Plan 11
1/4" = 1'-0"
Wall Schedule - Existing
1/4" = 1'-0"
Existing Roof Plan 12
No. Description Date
2201 S Halladay St
9/24/2024
A B
A 3'-0" W X 6'-8" H 1 3/8" EXT. SOLID CORE DOOR WOOD WOOD
B 2'-8" W X 6'-8" H 1 3/8"INT. HOLLOW CORE DOOR WOOD WOOD
MARK OPENING SIZE TICK DOOR TYPE SCREEN FRAME
DOOR SCHEDULE
F.F.
QTY.
1
1
C 2'-6" W X 6'-8" H 1 3/8"DOUBLE FOLDING DOOR WOOD WOOD1
2' - 8"
C
6'
-
8
"
3' - 0"2' - 6"4' - 0"5' - 0"2' - 6"4' - 0"7' - 11"
D E F G H
D
E
F
G
H
2
1
1
1
1
4'-0" W X 6'-8" H 1 3/8" DOUBLE FOUR-WING FOLDING DOOR WOOD WOOD
5'-0" W X 6'-8" H 1 3/8" DOUBLE FOUR-WING FOLDING DOOR WOOD WOOD
2'-6" W X 6'-8" H 1 3/8"INT. HOLLOW CORE DOOR WOOD WOOD
8'-0" W X 6'-8" H 1 3/8" DOUBLE FOUR-WING SLIDING DOOR GLASS WOOD
8'-0" W X 6'-8" H 1 3/8" DOUBLE POCKET DOOR GLASS WOOD
U-FACTOR SHGC
0.29 0.22
0.05
6'
-
8
"
2
4'-0"W x 2'-0"H SLIDING WINDOW VINY. YES
MARK SIZE TYPE FRAME
WINDOW SCHEDULE
NOTES:
1.BEDROOM EGRESS WINDOWS HAVE A MINIMUM CLEAR OPENING AREA OF 5.7 sf.
ABOVE THE GRADE FLOOR AND 5 SQ.FT. ON THE GRADE FLOOR, A MIN. NET HEIGHT OF 24"
AND MIN. NET WIDTH OF 20", AND SILL HEIGHT NOT MORE THAN 44" MAX. ABOVE FINISH
FLOOR.
2.THE NFRC TEMPORARY LABEL DISPLAYED ON WINDOWS AND SKYLIGHTS (INCL.
TUBULAR) MUST REMAIN ON THE UNIT UNTIL FINAL INSPECTION HAS BEEN COMPLETED.
3.SHOWER AND TUB ENCLOSURES SHALL BE TEMPERED (CBC 2406.4) WINDOWS AT
SHOWERS AND TUBS SHALL BE TEMPERED.
F.F.
4'-0"W x 3'-0"H SLIDING WINDOW VINY.YES
SCREEN
1
2
QTY.
1
1
4' - 0"
2'
-
0
"
1
4' - 0"
3'
-
0
"
U-FACTOR SHGC
0.29 0.22
0.29 0.22
N
30" MIN
ø 2' - 8"
N.Landing
4' x 3'
Landing 7 3/4"
max. below
threshold
Tempered
Glass
N. Gameroom
N. Bathroom
N. CL N. CL
N. CL
N. Laundry
N. Hallway
Ex. Room #3
Ex. Master Bathroom
Ex. Kitchen
Ex. Hallway
Ex. Room #2 Ex. Living Room
Ex. CL Ex. CL
Pa
n
t
r
y
Pa
n
t
r
y
G
A
F
D D
E
C
H
1
2
F
B
15
"
mi
n
15
"
mi
n
19
'
-
0
"
4' - 0"3' - 8"5' - 3"5' - 1"
13
'
-
6
"
11
'
-
8
"
25
'
-
2
"
6' - 3"4' - 0"10' - 8"
21' - 4"
8'
-
5
"
5'
-
1
"
5'
-
7
"
2'
-
1
0
"
3'
-
3
"
3' - 11"3' - 3"17' - 3"
2' - 7"
4
01-A-04
3
01-A-04
01-A-04
1
01-A-042
Ex. Room #1
Ex. Closet
Ex. Living Room
EX
.
5
'
x
5
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
5
'
S
L
I
D
I
N
G
W
I
N
D
.
EX. 5'x5' SLIDING WIND.EX. 4'x5' SINGLE HUNG WIND.
EX. 3'x4' SINGLE HUNG WIND.
EX
.
4
'
x
3
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
6
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX. 2'x5' SINGLE HUNG WIND.
EX. 2'x5' SINGLE HUNG WIND.
EX
.
5
'
x
5
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
5
'
S
L
I
D
I
N
G
W
I
N
D
.
EX. 5'x5' SLIDING WIND.EX. 4'x5' SINGLE HUNG WIND.
EX. 3'x4' SINGLE HUNG WIND.
EX
.
4
'
x
3
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
5
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX
.
6
'
x
4
'
S
L
I
D
I
N
G
W
I
N
D
.
EX. 2'x5' SINGLE HUNG WIND.
EX. 2'x5' SINGLE HUNG WIND.
13
'
-
1
"
9'
-
0
"
1'
-
1
0
"
12
'
-
7
"
1'
-
1
1
"
10
'
-
2
"
51
'
-
6
"
5' - 0"11' - 0"14' - 3"
31' - 6"
12
'
-
6
"
14
'
-
0
"
13' - 3"
13' - 8"
N.Landing
6' x 3'
3' - 7"
3' - 6"
EX. SLIDING DOOR
3'
-
0
"
3' - 6"
2'
-
1
0
"
6' - 0"
3' - 0"
6' - 0"4' - 0"
3'
-
0
"
3'
-
0
"
Landing 7 3/4"
max. below
threshold
PROVIDE 1 SQ. IN. OF VENTILATION PER 150 SQ. IN. OF ATTIC SPACE.
PROVIDE THAT 50% OF THE REQ. VENTILATION AREA IS PROVIDED BY
VENTILATORS IN THE UPPER PORTION OF THE ATTIC, (HIGH VENTING) AT 3'-0"
ABOVE EAVE VENT WITH THE BALANCE BEING PROVIDED BY EAVE VENTS,
(LOW VENTING) PER I.R.C. R806, (U.B.C. 1505.3).
ATTIC VENT CALCULATION ZONE 1
VENTILATION REQUIRED:
SQ. FT. / 150 =SQ. FT.1150ATTIC AREA
X 144 =SQ. IN.144
VENTILATION PROVIDED:
72 SQ. IN. EA. =1442
SQ. IN.-
SQ. IN.O HAGIN
147 SQ. IN. EA. =-GABLE LOUVER VENT
TOTAL VENTILATION PROVIDED:SQ. IN.144
EX. WALL TO REMAIN
EX. WALL TO BE DEMO
WALL SCHEDULE
NEW WALL
1-HR RATED/ SOUND
RATED (STC-50)
NEW FLAT ROOF
EX. ROOF FRAMING AND
FINISHES TO REMAIN
12
'
-
0
"
13
'
-
6
"
16' - 6"21' - 0"
4:12
4:12
4:
1
2
4:
1
2
4:12
4:
1
2
4:12
4:12
4:
1
2
4:
1
2
54
'
-
6
"
37' - 6"
14
'
-
0
"
15
'
-
0
"
2%
EAVE
1' - 0"
EA
V
E
1'
-
0
"
Dryer duct termination location
1
01-A-03
1
01-A-03
2
01-A-03
ARCHITECTURAL NOTES
1.PROVIDE 72" HIGH NON ABSORBENT WALL ADJACENT TO SHOWER AND APPROVED
SHATTER RESISTANT MATERIALS FOR SHOWER ENCLOSURE. MATERIALS OTHER THAN
STRUCTURAL ELEMENTS TO BE MOISTURE RESISTANT.
2.SIZE OF SHOWER STALL TO COMPLY WITH CPC 412.7, 1024 SQ. IN. MINIMUM INTERIOR
AND ENCOMPASSING 30" CIRCLE. DOOR SHALL SWING TO THE OUTSIDE.
3.LOW FLOW TOILETS (1.28 GALLON/FLUSH) -SHOWERHEADS (2.0 GPM @ 80 PSI)
-FAUCETS (2.0 GPM @ 60 PSI)
4.PROVIDE INDIVIDUAL CONTROL VALVES OF THE PRESSURE BALANCE OR THE
THERMOSTATIC MIXING VALVE TYPE FOR SHOWERS AND TUB SHOWERS.
5.PROVIDE WEEP SCREED FOR STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM OF
4" ABOVE THE EARTH OR 2" ABOVE PAVED AREAS.
6.DUCTS SHALL BE SIZED PER CHAPTER 6 OF THE MECHANICAL CODE.
7.CLOTHES DRYER MOISTURE EXHAUST DUCT IS LIMITED TO 14 FEET WITH 2 ELBOWS
FROM THE CLOTHES DRYER TO POINT OF TERMINATION REDUCE THIS LENGTH BY 2 FEET
FOR EVERY ELBOW IN EXCESS OF 2.
8.UNIT SKYLIGHTS SHALL BE LABELED BY L.A CITY APPROVED LABELING AGENCY.SUCH
LABEL SHALL STATE THE APPROVED LABELING AGENCY NAME, PRODUCT DESIGNATION AND
PERFORMANCE GRADE RATING.
10. PROVIDE ULTRA LOW FLUSH WATER CLOSETS FOR ALL NEW CONSTRUCTION. EXISTING
SHOWER HEADS AND TOILETS MUST BE UPDATED FOR LOW WATER CONSUMPTION.
11. THE CONSTRUCTION SHALL NOT RESTRICT A FIVE FOOT CLEAR AND UNOBSTRUCTED
ACCESS TO ANY WATER OR POWER DISTRIBUTION FACILITIES (POWER POLES, PULL BOXES,
TRANSFORMERS, VAULTS, PUMPS, VALVES, METERS, APPURTENANCES, ETC.) OR TO THE
LOCATION OF THE HOOK UP. THE CONSTRUCTION SHALL NOT BE WITHIN TEN FEET OF ANY
POWER LINES WHETHER OR NOT THE LINES ARE LOCATED ON THE PROPERTY. FAILURE TO
COMPLY MAY CAUSE CONSTRUCTION DELAYS AND OR ADDITIONAL EXPENSES.
12. AN APPROVED SEISMIC GAS SHUTOFF VALVE WILL BE INSTALLED ON THE FUEL GAS LINE
ON THE DOWN STREAM SIDE OF THE UTILITY METER AND BE RIGIDLY CONNECTED TO THE
EXTERIOR OF THE BUILDING OR STRUCTURE CONTAINING THE FUEL GAS PIPING.
13. NEW OR REPLACEMENT WATER HEATERS SHALL BE STRAPPED TO THE WALL IN TWO
PLACES. ONE IN THE UPPER 1/3 OF THE TANK AND ONE IN THE LOWER 1/3 OF THE TANK. THE
LOWER POINT SHALL BE A MINIMUM OF 4" ABOVE THE CONTROLS.(P.C.510.5) LOW IN EXCESS
OF 2.
14.PLUMBING FIXTURES ARE REQUIRED TO BE CONNECTED TO A SANITARY SEWER OR
TO AN APPROVED SEWAGE DISPOSAL SYSTEM (R306.3).
15. KITCHEN SINK LAVATORIES, BATHTUBS, SHOWERS, BIDETS, LAUNDRY TUBS AND
WASHING MACHINE OUTLETS SHALL BE PROVIDED WITH HOT AND COLD WATER AND
CONNECTED TO AN APPROVED WATER SUPPLY (R306.4).
16. BATHTUB AND SHOWER FLOORS, WALL ABOVE BATHTUBS WITH A SHOWERHEAD, AND
SHOWER COMPARTMENTS SHALL BE FINISHED WITH A NONABSORBENT SURFACE. SUCH
WALL SURFACES SHALL EXTEND TO A HEIGHT OF NOT LESS THAN 6' ABOVE THE FLOOR
(R307.2).
17. EVERY SPACE INTENDED FOR HUMAN OCCUPANCY SHALL BE PROVIDED WITH
NATURAL LIGHT BY MEANS OF EXTERIOR GLAZED OPENINGS IN ACCORDANCE WITH SECTION
R303.1 OR SHALL BR PROVIDED WITH ARTIFICIAL LIGHT THAT IS ADEQUATE TO PROVIDE AN
AVERAGE ILLUMINATION OF 6' CANDLES OVER THE AREA OF THE ROOM AT A HEIGHT OF 30"
ABOVE THE FLOOR LEVEL. (R303.1)
18. A COPY OF THE EVALUATION REPORT AND/ OR CONDITIONS OF LISTING SHALL BE
MADE AVAILABLE AT THE JOB SITE.
19. HEATER SHALL BE CAPABLE OF MAINTAINING A MINIMUM ROOM TEMP' OF 68°F AT A
POINT 3' ABOVE THE FLOOR AND 2' FROM EXTERIOR WALLS IN ALL HABITABLE ROOMS AT THE
DESIGN TEMPERATURE.
20.PROTECTION OF WOOD AND WOOD BASED PRODUCTS FROM DECAY SHALL BE
PROVIDED IN THE LOCATIONS SPECIFIED PER SECTION R317.1 BY THE USE OF NATURALLY
DURABLE WOOD OR WOOD THAT IS PRESERVATIVE TREATED IN ACCORDANCE WITH AWPA
U1 FOR THE SPECIES, PRODUCT, PRESERVATIVE AND END USE.PRESERVATIVES SHALL BE
LISTED IN SECTION 4 OF AWPA U1.
21. PROVIDE ANTI-GRAFFITI FINISH WITHIN THE FIRST 9 FEET,MEASURED FROM GRADE,AT
EXTERIOR WALLS AND DOORS .EXCEPTION:MAINTENANCE OF BUILDING AFFIDAVIT IS
RECORDED BY THE OWNER TO COVENANT AND AGREE WITH THE CITY OF LOS ANGELES TO
REMOVE ANY GRAFFITI WITHIN 7 DAYS OF THE GRAFFITI BEING APPLIED.(6306)
UTILITY NOTES
1 ALL BRANCH CIRCUTS SUPPLYING RECEPTACLES SHALL BE PROTECTED BY A
LISTED ARC-FAULT CIRCUIT INTERRUPTER (AFCI)
2.ALL 120-VOLT, SINGLE PAHSE 15 AND 20 AMP BRANCH CIRCUIT SUPPLYING
OUTLETS INSTALLED IN DWELLING UNIT FAMILY ROOMS, DINING ROOMS, LIVING ROOMS,
PARLORS, DENS, BEDROOMS, SUNROOMS, RECREATION ROOMS, CLOSETS, HALLWAYS,
LAUNDRY ROOMS OR SIMILAR ROOMS OR AREAS SHALL BE AFCI PROTECTED BY ANY OF
THE MEANS DESCRIBED IN 210.12 (A)(1). AT KITCHEN COUNTER SPACE, RECEPTACLES
SHALL BE INDICATED AS COMBINATION AFCDI/GFCI.
3.TAMPER RESISTANT RECEPTACLES IN ALL AREAS SPECIFIED IN SECTION 210.52
ALL 125-VOLT, 15 AND 20 AMP RECEPTACLES SHALL BE LISTED TAMPER RESISTANT
RECEPTACLES
4.NEW BOXES USED AT LUMINAIRES OR LAMPHOLDER OUTLETS IN A CEILING SHALL
BE REQUIRED TO SUPPORT A LUMINAIRIE WEIGHING A MINIMUM OF 50 LB. BOXES USED AT
LUMINARIE OUTLETS IN WALL SHALL BE DESIGNED FOR THE PURPOSE AND SHALL BE
MARKED ON THE INTERIOR INDICATING THE MAXIMUM WEIGHT OF LUMINAIRE PERMITTED,
IF OTHER THAN 50 LBS. OUTLET BOXES OR SYSTEMS USED AS THE SOLE SUPPORT OF
CEILING FANS SHALL BE LISTED AND MARKED BY THE MANUFACTURE AS SUITABLE FOR
THIS PURPOSE. (314.27 CEC)
5.ALL LEAD LUMINAIRES ARE REQUIRED TO BE CONTROLLED BY NATIONAL
ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA) SSL-7A-COMPLIANT DIMMER UNLESS
THEY ARE CONTROLLED BY A VACANCY SENSOR OR AN OCCUPANCY SENSOR. THE
COMBINED USE OF NEMA SSL-7A-COMPLIANT DIMMER WITH LED LUMINAIRES CAN
ENSURE FLICKER FREE OPERATION WHEN THE LUMINAIRE IS DIMMED. (2019 RESIDENTIAL
COMPLIANCE MANUAL 6.3.1(G)
6.IN BATHROOMS, AT LEAST ONE LUMINAIRE IN EACH OF THIS SPACES MUST BE
CONTROLLED BY AN OCCUPANT SENSOR OR A VACANCY SENSOR PROVIDING
AUTOMATIC-OFF FUNCTIONALITY. IF A OCCUPANT SENSOR IS INSTALLED, IT MUST BE
INITIALLY CONFIGURED TO MANUAL-ON OPERATION USING THE MANUAL CONTROL
REQUIRED UNDER SECTION 150.0(k)2C.
ADDITIONAL NOTES
1.PROVIDE A MINIMUM OF (2) 20 AMP SMALL APPLIANCE CIRCUITS FOR THE KITCHEN
COUNTER TOPS. SUCH CIRCUIT SHALL HAVE NO OTHER OUTLETS. LOADS SHALL BE
BALANCED. CEC 210-52(B) (2)
2.PROVIDE A MINIMUM OF (1) 20 AMP LAUNDRY BRANCH CIRCUIT. SUCH CIRCUIT
SHALL HAVE NO OTCOHER OUTLETS. CEC 210-23(A).
3.A MINIMUM OF (1) 20-AMP CIRCUIT FOR BATHROOM(S) OUTLET. SUCH CIRCUIT
SHALL HAVE NO OTHER OUTLETS. THIS CIRCUIT MAY SERVE MORE THAN ONE BATHROOM
CEC 210-23
4.IN BATHROOMS, GARAGES, LAUNDRY ROOMS, AND UTILITY ROOMS, AT LEAST ONE
LUMINAIRE IN EACH OF THESE SPACES MUST BE CONTROLLED BY A VACANCY SENSOR.
5.OUTDOOR LIGHTING PERMANENTLY MOUNTED TO A RESIDENTIAL BUILDING, OR
TO OTHER BUILDING ON THE SAME LOT, MUST MEET THE REQUIREMENT IN ITEM
150.0(K)3AI (ON AND OFF SWITCH) AND THE REQUIREMENTS IN EITHER ITEM 150.0(K)3AII
(PHOTOCELL AND MOTION SENSOR) OR ITEM 150.0(K)3AIII (PHOTO CONTROL AND
AUTOMATIC TIME SWITCH CONTROL, ASTRONOMICAL TIME CLOCK, OR EMCS
6.ALL LIMINAIRES SHALL BE HIGH EFFICACY -PER SECTION 150.0(K)1A.
7.CIRCUIT SHALL HAVE NO OTHER OUTLETS. CEC 210-23(A).
ADDITIONAL NOTES:
1. HABITABLE SPACES SHALL HAVE CEILING HEIGHT OF NO LESS THAN 7'-6". KITCHENS,
LAUNDRY ROOM, CORRIDORS AND BATHROOMS SHALL HAVE CEILING HEIGHT NOT
LESS THAN 7'.
2. PROVIDE 1 ESCAPE WINDOW IN EACH BEDROOM MEETING ALL OF THE FOLLOWING: AN
OPENABLE AREA NOT LESS THAN 5.7 SQ.FT. MIN. CLEAR 24" HEIGHT AND 20" WIDTH
AND SILL NOT OVER 44" ABOVE FLOOR
3. SHOWER WALLS MUST BE FINISHED TO A HEIGHT OF 72" ABOVE DRAIN W/ MOISTURE
RESISTIVE TILE OR APPROVED EQUAL
4. MAX. FLOW RATE STANDARDS SET BY THE CALIFORNIA ENERGY COMMISION: WATER
CLOSETS 1.28 GPF, SHOWERHEADS 2.0 GPM, LAUNDRY FAUCETS 1.5 GPM, SINK
FAUCETS 1.5 GPM, AND KITCHEN FAUCETS 1.8 GPM
5. EXTERIOR WALLS WITHIN 3 FEET OF PROPERTY LINE (SPRINKLERS) OR 5 FEET OF
PROPERTY LINE (WITHOUT SPRINKLERS) REQUIRE 1-HOUR FIRE RATING FOR
EXPOSURE TO BOTH SIDES
6. PROJECTIONS: -PROHIBITED WITHIN 2 FEET OF PROPERTY LINE -1-HOUR FIRE
RATING ON THE UNDERSIDE WITHIN 3FT OF PROPERTY LINE (SPRINKLERS) -1-HOUR
FIRE RATING ON THE UNDERSIDE WITHIN 5FT OF PROPERTY LINE (WITHOUT
SPRINKLERS)
7. OPENINGS: -PROHIBITED WITHIN 3FT OF PROPERTY LINE -MAXIMUM 25% OF WALL
AREA WITHIN 5 FEET OF PROPERTY LINE (WITHOUT SPRINKLERS)
8. PENETRATIONS: -1-HOUR FIRE-RATED PENETRATIONS OF WALLS WITHIN 3FT OF
PROPERTY LINE (SPRINKLERS) -1-HOUR FIRE-RATED PENETRATIONS OF WALLS
WITHIN 5FT OF PROPERTY LINE (WITHOUT SPRINKLERS)
1/4" = 1'-0"
Proposed Floor Plan 11
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
01-A-02
PROPOSED FLOOR PLAN,
PROPOSED ROOF PLAN -
ADD
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Lucas
-
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
1/4" = 1'-0"
Proposed Roof Plan 12
No. Description Date
2201 S Halladay St
9/24/2024
SWITCH ON DIMMER
SWITCH ON VACANCY SENSOR
RECESSED LED LIGHT
WET LOCATION APPROVED
RECESSED LED
WALL MOUNTED LED LIGHT FIXTURE
INT/EXT
DUPLEX OUTLET (AFCI)
GFIC DUPLEX OUTLET (GFCI & AFCI
DUPLEX @ KIT & LAU)
EXTERIOR WATER PROOF GFIC
DUPLEX OUTLET
MINI SPLIT
NEW ELECTRICAL TANKLESS
WATER HEATER (16,000 BTU)
EXHAUST INTAKE FAN. 50 CFM MIN.
WITH HUMIDSTAT CONTROLS AT
RESTROOMS, LAU AND UTILITY. 100
CFM MIN AT KITCHEN
UTILITY LEGEND
W
LED
LED
ELECTRICAL SUBPANEL 100 A.
SMOKE DETECTOR
CM CARBON MONOXIDE ALARM
SD
SDCM
W.
LED
LED
SD
LED
LED
LED
LED
LED
LED
LED
SD
CM
SD
SD
SD
SD
CM
SD
CM
Dryer duct (See detail)
W
D
D
D
D
D
D
D
LED
LED
LED
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
01-A-03
UTILITY PLAN - ADD
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Autor
Verificador
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
1/4" = 1'-0"
Utility Plan 1 (For reference only)1
No. Description Date
1 Revisión 1 Fecha 1
TYPICAL DETAIL / DRYER DUCT
NOTES:
-IN BATHROOMS, GARAGES, LAUNDRY ROOMS, UTILITY ROOMS AND WALK-IN
CLOSETS AT LEAST ONE LUMINAIRE IN EACH OF THESE SPACES SHALL BE
CONTROLLED BY AN OCCUPANT OR VACANCY SENSOR PROVIDING
AUTOMATIC-OFF FUNCTIONALITY. CENC SECTION150.0(K).2.E.I
INDOOR LIGHTING CONTROLS NOTES:
1) ADDS AUTO-OFF CONTROLS FOR LIGHTING IN DRAWERS AND CABINETS.
2) UNDERSHELF, DISPLAY CABINETS, SWITCHED OUTLETS CONTROLLED
SEPARATE FROM CEILING LIGHTING.
3) LIGHTING IN HABITABLE SPACES SHALL HAVE ACCESSIBLE WALL-MOUNTED
DIMMING CONTROLS.
UNVENTED - FLAT ROOF SECTION DETAIL 2
MIN. R -VALUE: R-5 PER CRC TABLE R806.5
2201 S Halladay St
9/24/2024
G A
1
A-9
A-1
A-3
A-2
A-5A-6
A-15
1'
-
0
"
7'
-
9
"
0'
-
1
0
"
9'
-
7
"
6' - 0"4' - 0"0'
-
6
"
0'
-
6
"
0'
-
7
"
(N) THERMOPLASTIC MEMBRENE ROOFING
ICC-ES ESR-2831 (SEE 01-A-05 SPECS)
2
A-9
A-15
A-3
A-1
A-2
A-6
0'
-
1
0
"
7'
-
9
"
1'
-
0
"
9'
-
7
"
0'
-
7
"
0'
-
6
"
(N) THERMOPLASTIC MEMBRENE ROOFING
ICC-ES ESR-2831 (SEE 01-A-05 SPECS)
7'
-
9
"
0'
-
1
0
"
N. Gameroom N. Hallway N. Bathroom Ex. Room #3
14
14
15
4
10 4
1
2
3
5
6 811
16
EXISTINGADD
1'
-
0
"
9'
-
7
"
(N) THERMOPLASTIC MEMBRENE ROOFING
ICC-ES ESR-2831 (SEE 01-A-05 SPECS)
7'
-
9
"
0'
-
1
0
"
Ex. Kitchen N. GameroomEx. Living Room
1
4
10
15
14
14
5
68
9
11
13
ADDEXISTING
Elevation Keynotes
MARK Texto de nota clave
A-1 (N) ICC-ES ESR-2831 SEE
REPORT
A-2 FASCIA
A-3 NEW SIDING JAMES HARDIE
PRIMED-HZ 10-8.25-in x 144-in
A-5 CONCRETE SLAB
A-6 26 GA.
CORROSION-RESISTANT
WEEP SCREED
A-9 EXTERIOR WALL LAMP
A-15 WEATHER PROOF
RECEPTACLE
Section Keynotes
MARK DESCRIPTION
1 (N) ICC-ES ESR-2831 SEE REPORT
2 2"x" SILL PLATE W/ 5/8" DIA ANCHOR BOLTS
3 2"X" STUD WALL @16" O.C. TYPE DOUBLAS
FIR GRADE #2 STUD MIN.
4 DOUBLE 2x TOP PLATE AT EXTERIOR &
BEARING WALLS TYPE DOUGLAS FIR GRADE
#2
5 R-15 FIBERBATT INSULATION SEE ENERGY
CALCS
6 R-22 FIBERBATT INSULATION SEE ENERGY
CALCS
7 2"x " R.R. @ 16" O.C. TYPE DOUGLAS FIR
GRADE #2
8 2"x " C.J. @ 16" O.C. TYPE DOUGLAS FIR
GRADE #2
9 4" CONC. SLAB
10 4"x " HEADER TYPE DOUGLAS FIR GRADE #1
11 2"X SOLID BLOCK W/ FRAMING ANCHOR EA.
BLOCK TYPE DOUGLAS FIR GRADE #2
13 26 GA. CORROSION- RESISTANT WEEP
SCREED
14 1/2" GYP BOARD
15 12" FOOTING
16 INTERIOR PATITION WALL
Isometric View5
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
01-A-04
ELEVATIONS & SECTIONS -
ADD
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Lucas
-
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
1/4" = 1'-0"
East Elevation ADD1 1/4" = 1'-0"
South Elevation ADD2
1/4" = 1'-0"
Section A-ADD3
1/4" = 1'-0"
Section B-ADD4
No. Description Date
1 Revisión 1 Fecha 1
(N ) I C C -E S E S R -2 8 3 1
2"
MIN
4"
MIN
8"
MIN
SECTION DETAIL OF EXTERIOR W ALL
FIRE C. CLASS A/B
CLASS A/B
2201 S Halladay St
9/24/2024
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
01-A-05
SPECS
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Autor
Verificador
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
No. Description Date
2201 S Halladay St
9/24/2024
structural calculations
for
2201 HALLADAY STREET
addition and remodel
2201 HALLADAY STREET
SANTA ANA, CA 92707.
07-Aug-24
CE JOB NO. : 24-459
S T R U C T U R A L
1 1 4 7 e m a r k e t s T , L O N G B E A C H , C A L I F O R N I A 9 0 8 0 5
T : 5 6 2 . 9 6 1 . 5 6 0 0 W W W . C A S T I L L O E N G I N E E R I N G . C O M
1
2201 S Halladay St
9/24/2024
ARCHITECT CASTILLO ENGINEERING, INC.JOB
1205 Pine Avenue, Suite 201
Long Beach, CA 90813
ENGR. MC JOB NO. SHEET NO.
DESIGN CRITERIA
1 Soil supporting footings is natural grade or engineered fill.
2 Soil allowable bearing pressure used in design_______________________________
3 Footing shall extend_____ minimum into undisturbed soil or_____ below finish grade
whichever is lower.
4 All concrete shall develop a minimum compressive strength of 2500 psi in 28 days.
5 Reinforcing steel shall conform to ASTM 615, Grade 60.
6 Structural steel shall conform to the following:
Wide flange shapes ASTM A992
TS shapes ASTM A500, Grade B
Pipe shapes ASTM A53 , Grade B
Other rolled shapes, Bars and plates ASTM A36
7 Structural steel shall be fabricated in a shop of an approved fabricator.
8 All welding shall be done by Certified Welders.
9 Concrete Block shall conform to ASTM C90, Grade N-1.
10 Grout shall develop 2000 psi in 28 days.
11 Mortar shall be Type S and develop 1800 psi in 28 days.
12 All lumber shall be grade marked Douglas Fir. (Grading rule No. 17)
Light Framing Construction
Joist & Planks No. 2
Beams & Stringers No. 1
Posts & Timbers No. 1
13 Glue Laminated Timbers shall be combination No. 24F-V8.
14 Plywood shall conform to PS 1-95, Structural 1.
15 All material and workmanship shall conform to the requirements of
2019 California Building Code.
2
2201 S Halladay St
9/24/2024
3
2201 S Halladay St
9/24/2024
PROJECT:CASTILLO ENGINEERING
324 E South St, Long Beach, CA 90805
37683.00
Wood :Douglas-Fir/Larch Cr = 1.15 (repetitive member factor)Fv =180 psi (for Light Framing and Joists & Planks)
E = 1,500,000 psi (Const Light Framing)Fv =170 psi (for Beams & Stringers and Posts & Timbers)
E = 1,600,000 psi (#2 Joists & Planks, #1 Beams & Stringers, #1 Posts & Timbers)
FLOO ROOF
MEMBER:SIZE:(35 PCF)PROPERTIES:BENDING STRESS:1.00 (k-ft & k)Cd =1.00 (k-ft & k)Cd =1.25
Nominal Grade Type B (in)D (in)PLF (in^2)S(in^3)I(in^4)Fb(psi)CF Fb x CF max Mmax Mmax(rep)max Mmax Mmax(rep)
2x4 Const. LF 1.5 3.50 1.3 5.3 3.1 5.4 1000 1.00 1000 0.63 0.26 0.29 0.79 0.32 0.37
2x6 #2 JP 1.5 5.50 2.0 8.3 7.6 20.8 900 1.30 1170 0.99 0.74 0.85 1.24 0.92 1.06
2x8 #2 JP 1.5 7.25 2.6 10.9 13.1 47.6 900 1.20 1080 1.31 1.18 1.36 1.63 1.48 1.70
2x10 #2 JP 1.5 9.25 3.4 13.9 21.4 98.9 900 1.10 990 1.67 1.76 2.03 2.08 2.21 2.54
2x12 #2 JP 1.5 11.25 4.1 16.9 31.6 178.0 900 1.00 900 2.03 2.37 2.73 2.53 2.97 3.41
2x14 #2 JP 1.5 13.25 4.8 19.9 43.9 290.8 900 0.90 810 2.39 2.96 3.41 2.98 3.70 4.26
4x4 Const LF 3.5 3.50 3.0 12.3 7.1 12.5 1000 1.00 1000 1.47 0.60 0.68 1.84 0.74 0.86
4x6 #2 JP 3.5 5.50 4.7 19.3 17.6 48.5 900 1.30 1170 2.31 1.72 1.98 2.89 2.15 2.47
4x8 #2 JP 3.5 7.25 6.2 25.4 30.7 111.1 900 1.30 1170 3.05 2.99 3.44 3.81 3.74 4.30
4x10 #2 JP 3.5 9.25 7.9 32.4 49.9 230.8 900 1.20 1080 3.89 4.49 5.17 4.86 5.62 6.46
4x12 #2 JP 3.5 11.25 9.6 39.4 73.8 415.3 900 1.10 990 4.73 6.09 7.00 5.91 7.61 8.76
4x14 #2 JP 3.5 13.25 11.3 46.4 102.4 678.5 900 1.00 900 5.57 7.68 8.83 6.96 9.60 11.0
6x4 #2 JP 5.5 3.50 4.7 19.3 11.2 19.7 900 1.00 900 2.31 0.84 2.89 1.05
6x6 #1 PT 5.5 5.50 7.4 30.3 27.7 76.3 1200 1.00 1200 3.43 2.77 4.29 3.47
6x8 #1 PT 5.5 7.50 10.0 41.3 51.6 193.4 1200 1.00 1200 4.68 5.16 5.84 6.45
6x10 #1 BS 5.5 9.50 12.7 52.3 82.7 393.0 1350 1.00 1350 5.92 9.31 7.40 11.6
6x12 #1 BS 5.5 11.50 15.4 63.3 121.2 697.1 1350 1.00 1350 7.17 13.6 8.96 17.0
6x14 #1 BS 5.5 13.50 18.0 74.3 167.1 1127.7 1350 0.99 1332 8.42 18.6 10.5 23.2
4
2201 S Halladay St
9/24/2024
5
2201 S Halladay St
9/24/2024
6
2201 S Halladay St
9/24/2024
7
2201 S Halladay St
9/24/2024
8
2201 S Halladay St
9/24/2024
CASTILLO ENGINEERING, INC
324 E South St,
Long Beach, CA 90805
ROOF LOADS
composite shingles 2.5 psf
re-roof 2.0 psf
1/2" plywwod 1.5 psf
rafters 4.0 psf
insulation 0.5 psf
Ceiling 3.0 psf
beams/headers 1.0 psf
MP&E/ misc.0.5 psf
D=15.0 psf
Lr=20.0 psf REDUCIBLE
FLOOR LOADS
flooring 1.0 psf
3/4" plywood 2.3 psf
joist 3.0 psf
ceiling 4.0 psf
beams/headers 2.0 psf
MP&E/ misc.2.7 psf
D=15.0 psf
L=40.0 psf
EXTERIOR WALL LOADS
7/8" stucco 10.0 psf
1/2" plywood 1.5 psf
2x6 studs at 16"oc 1.5 psf
insulation 0.5 psf
1/2" gyp board 2.3 psf
MP&E/ misc.0.2 psf
D=16.0 psf
INTERIOR WALL LOADS
1/2" gyp board 2.3 psf
1/2" plywood 1.5 psf
2x6 studs at 16"oc 1.5 psf
insulation 0.5 psf
1/2" gyp board 2.3 psf
MP&E/ misc.1.9 psf
D=10.0 psf
9
2201 S Halladay St
9/24/2024
10
2201 S Halladay St
9/24/2024
ROOF KEYPLAN
H1 H2 H3
RJ1
H4
B1
H5
11
2201 S Halladay St
9/24/2024
CASTILLO ENGINEERING, INC.Project 2201 HALLADAY STREET
1147 E Market Street
Long Beach, CA 90805
Engr.Date:Job No.24-459 Sheet
Tag
Beam 5
L =13.08 ft
Member=2x8 A =10.88 in^2
S =13.1 in^3
No. of members=1 I =47.6 in^4
CD=1.25 E =1,600,000 psi
CF=1.20 Va =1.305 kips
CV=1.00 Ma =0.986 k-ft
Cr=1.15
Total Load L/n=180
Live Load L/n=240
L=13.08 ft
0.30 0.30
Uniform load (W1)
D L Trib
w1,1 (15 +20)x 1.33 =19.95 +26.6
w1,2 (16 +0)x 0 =0 +0
w1,3 (15 +40)x 0 =0 +0
w1,4 (16 +60)x 0 =0 +0
w1,5 (5 +20)x 0 =0 +0
W1 =19.95 +26.6 =0.047 klf
Triangular load (W2)
D L Trib `
w2,1 (0 +0)x 0 =0 +0
w2,2 (0 +0)x 0 =0 +0
w2,3 (0 +0)x 0 =0 +0
w2,4 (0 +0)x 0 =0 +0
w2,5 (0 +0)x 0 =0 +0
W2 =0 +0 =0.000 klf
Point Load (P1)
D L Trib.1 Trib.2 TAG:
p1,1 (+)x 0.00 x 0.00 =0 +0 0
p1,2 (+)x 0 x 0 =0 +0 0
p1,3 (+)x 0 x 0 =0 +0 0
p1,4 (+)x 0 x 0 =0 +0
p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft)
P1 =0 +0 =0.00 kips 0 13.08
Point Load (P2)
D L Trib.1 Trib.2 TAG:
p2,1 (+)x 0 x 0 =0 +0 0
p2,2 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0
p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft)
P2 =0 +0 =0.00 kips 0 13.08
Shear
R1=0.304 kips
R2=-0.304 kips Stress Ratio
Vmax=0.30 kips Vallow.=1.63 x 1 =1.6313 kips OK .19
Flexure
M=0.996 k-ft Mallow.=1.70 x 1 =1.7001 k-ft OK .59
Deflection
D =D w1 +Dw2 +D p1 +Dp2
D (D+L)=0.402 +0.000 +0.000 +0.000 =0.40 =L <L OK deflection:.46
390 180
0.402 +0
D (L Only)=0.23 +0 +0 +0 =0.23 =L L OK deflection:.35
683 240
USE:1-2X8
shear:
6/26/24 12:00 AM
RJ1
WALL
FLOOR
ROOF
flexure:
DECK
12
2201 S Halladay St
9/24/2024
Wood Beam
LIC# : KW-06017148, Build:20.23.10.31 CASTILLO ENGINEERING INC.(c) ENERCALC INC 1983-2023
DESCRIPTION:B1
Project File: 24-459.ec6
Project Title:Engineer:
CODE REFERENCES
Calculations per NDS 2024, IBC 2024, ASCE 7-22
Load Combination Set : ASCE 7-22
Material Properties
Beam Bracing :Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Douglas Fir-Larch
No.1
900.0
900.0
925
625
1600
580
170
675 31.21
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination : ASCE 7-22
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Load for Span Number 1
Uniform Load : D = 0.0150, Lr = 0.020 ksf, Extent = 0.0 -->> 4.160 ft, Tributary Width = 10.0 ft, (ROOF)
Uniform Load : D = 0.0150, Lr = 0.020 ksf, Extent = 4.160 -->> 13.50 ft, Tributary Width = 10.0->1.0 ft, (ROOF)
Point Load : D = 0.4370, Lr = 0.5830 k @ 4.160 ft, ((E)BM)
Point Load : D = 0.1070, Lr = 0.1420 k @ 11.750 ft, ((E)HIP BM)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.755: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 1
Location of maximum on span 5.026 ft
57.71 psi=
=
1,125.00 psi
6x12Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+Lr
=
=
=
212.50 psi==
Section used for this span 6x12
Maximum Shear Stress Ratio 0.272 : 1
0.000 ft=
=
849.06 psi
Maximum Deflection
0 <240
663Ratio =0 <180
Max Downward Transient Deflection 0.139 in 1161Ratio =>=240
Max Upward Transient Deflection 0 in Ratio =
Max Downward Total Deflection 0.244 in Ratio =>=180
Max Upward Total Deflection 0 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : Lr Only
n/a
Span: 1 : +D+Lr
n/a
.Maximum Forces & Stresses for Load Combinations
Span #C iCLx CCCMCF rt
Shear ValuesMax Stress Ratios
M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0
1 0.449 0.162 0.90 1.000 1.001.00 1.00 3.68 363.9 810.0 1.04 153.024.7
1 0.005 0.162 0.90 1.000 1.001.00 1.00 0.04 3.7 810.0 0.73 153.024.7
0.00.0
1 0.755 0.272 1.25 1.000 1.001.00 1.00 8.58 849.1 1,125.0 2.43 212.557.7
1 0.008 0.272 1.25 1.000 1.001.00 1.00 0.09 8.6 1,125.0 1.71 212.557.7
0.00.0
13
2201 S Halladay St
9/24/2024
Wood Beam
LIC# : KW-06017148, Build:20.23.10.31 CASTILLO ENGINEERING INC.(c) ENERCALC INC 1983-2023
DESCRIPTION:B1
Project File: 24-459.ec6
Project Title:Engineer:
Maximum Forces & Stresses for Load Combinations
Span #C iCLx CCCMCF rt
Shear ValuesMax Stress Ratios
M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 13.451 ft 1 0.647 0.233 1.25 1.000 1.001.00 1.00 7.35 727.8 1,125.0 2.09 212.549.5
1 0.007 0.233 1.25 1.000 1.001.00 1.00 0.07 7.4 1,125.0 1.47 212.549.5
0.00.0
1 0.152 0.055 1.60 1.000 1.001.00 1.00 2.21 218.3 1,440.0 0.63 272.014.8
1 0.002 0.055 1.60 1.000 1.001.00 1.00 0.02 2.2 1,440.0 0.44 272.014.8
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+D+Lr 1 0.2441 6.504 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 2.761 1.762
Max Upward from Load Combinations 2.761 1.762
Max Upward from Load Cases 1.578 1.006
D Only 1.183 0.755
+D+Lr 2.761 1.762
+D+0.750Lr 2.367 1.510
+0.60D 0.710 0.453
Lr Only 1.578 1.006
14
2201 S Halladay St
9/24/2024
ARCHITECT CASTILLO ENGINEERING JOB
1147 E Market Street
Long Beach, CA 90805
ENGR. MC DATE 24-459
NOTCH ON COMPRESSION FACE AT END
1.833
5.798
0.917
4.881
V 1762 lbs member type=
b=5.5 in viga Fv=psi
11.5 Cd=
F'v=
e=5.00 in 'e' > 'dn', therefore use Eq.(3.4-2)slope=4 :12
2018 NDS Equation 3.4-5
=3 x =psi < psi, therefore NA
2 x 5.5 x 11.50 --4.88 x 5
Use Eq. (3.4-2)
fv= 1.5V =psi < psi, therefore Satisfactory (.46)
b dn
98 213
26/06/2024
170
1.25
213
1762
w
3V
d-(d-dn)/(dn)*e
5.50
4.88dn Rec'd=
B1
102
4.88
213
draftrer=
11.50
6x
C:\Users\gilbe\OneDrive\Escritorio\CBA\CALCULATIONS\01 ROOF OR FLOOR\w-notched beam
15
2201 S Halladay St
9/24/2024
Wood Beam
LIC# : KW-06017148, Build:20.23.10.31 CASTILLO ENGINEERING INC.(c) ENERCALC INC 1983-2023
DESCRIPTION:H1
Project File: 24-459.ec6
Project Title:Engineer:
CODE REFERENCES
Calculations per Nds 2024, IBC 2024, ASCE 7-22
Load Combination Set : ASCE 7-22
Material Properties
Beam Bracing :Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Douglas Fir-Larch
No.1
900.0
900.0
925
625
1600
580
170
675 31.21
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination : ASCE 7-22
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Load for Span Number 1
Uniform Load : D = 0.0150, Lr = 0.020 ksf, Extent = 0.0 -->> 3.250 ft, Tributary Width = 2.830->1.160 ft, (ROOF)
Uniform Load : D = 0.0150, Lr = 0.020 ksf, Extent = 3.250 -->> 4.0 ft, Tributary Width = 8.0 ft, (ROOF)
Point Load : D = 0.7550, Lr = 1.006 k @ 3.250 ft, (B1)
Point Load : D = 0.1070, Lr = 0.1420 k @ 1.750 ft, (HIP BM)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.594: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 1
Location of maximum on span 3.241 ft
131.12 psi=
=
1,462.50 psi
4x6Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+Lr
=
=
=
212.50 psi==
Section used for this span 4x6
Maximum Shear Stress Ratio 0.617 : 1
3.547 ft=
=
868.30 psi
Maximum Deflection
0 <240
1143Ratio =0 <180
Max Downward Transient Deflection 0.024 in 2003Ratio =>=240
Max Upward Transient Deflection 0 in Ratio =
Max Downward Total Deflection 0.042 in Ratio =>=180
Max Upward Total Deflection 0 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : Lr Only
n/a
Span: 1 : +D+Lr
n/a
.Maximum Forces & Stresses for Load Combinations
Span #C iCLx CCCMCF rt
Shear ValuesMax Stress Ratios
M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0
1 0.354 0.367 0.90 1.300 1.001.00 1.00 0.55 372.3 1,053.0 0.72 153.056.2
0.00.0
1 0.594 0.617 1.25 1.300 1.001.00 1.00 1.28 868.3 1,462.5 1.68 212.5131.1
0.00.0
1 0.509 0.529 1.25 1.300 1.001.00 1.00 1.09 744.3 1,462.5 1.44 212.5112.4
0.00.0
16
2201 S Halladay St
9/24/2024
Wood Beam
LIC# : KW-06017148, Build:20.23.10.31 CASTILLO ENGINEERING INC.(c) ENERCALC INC 1983-2023
DESCRIPTION:H1
Project File: 24-459.ec6
Project Title:Engineer:
Maximum Forces & Stresses for Load Combinations
Span #C iCLx CCCMCF rt
Shear ValuesMax Stress Ratios
M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 4.0 ft 1 0.119 0.124 1.60 1.300 1.001.00 1.00 0.33 223.4 1,872.0 0.43 272.033.7
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+D+Lr 1 0.0420 2.175 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.638 1.809
Max Upward from Load Combinations 0.638 1.809
Max Upward from Load Cases 0.364 1.034
D Only 0.273 0.776
+D+Lr 0.638 1.809
+D+0.750Lr 0.547 1.551
+0.60D 0.164 0.465
Lr Only 0.364 1.034
17
2201 S Halladay St
9/24/2024
CASTILLO ENGINEERING, INC.Project 2201 HALLADAY STREET
1147 E Market Street
Long Beach, CA 90805
Engr.Date:Job No.24-459 Sheet
Tag
Beam 5
L =3.16 ft
Member=4x6 A =19.25 in^2
S =17.6 in^3
No. of members=1 I =48.5 in^4
CD=1.25 E =1,600,000 psi
CF=1.30 Va =2.310 kips
CV=1.00 Ma =1.323 k-ft
Cr=1.00
Total Load L/n=180
Live Load L/n=240
L=3.16 ft
0.48 0.48
Uniform load (W1)
D L Trib
w1,1 (15 +20)x 8.08 =121.2 +161.6
w1,2 (16 +0)x 1.5 =24 +0
w1,3 (15 +40)x 0 =0 +0
w1,4 (16 +60)x 0 =0 +0
w1,5 (5 +20)x 0 =0 +0
W1 =145.2 +161.6 =0.307 klf
Triangular load (W2)
D L Trib `
w2,1 (0 +0)x 0 =0 +0
w2,2 (0 +0)x 0 =0 +0
w2,3 (0 +0)x 0 =0 +0
w2,4 (0 +0)x 0 =0 +0
w2,5 (0 +0)x 0 =0 +0
W2 =0 +0 =0.000 klf
Point Load (P1)
D L Trib.1 Trib.2 TAG:
p1,1 (+)x 0.00 x 0.00 =0 +0 0
p1,2 (+)x 0 x 0 =0 +0 0
p1,3 (+)x 0 x 0 =0 +0 0
p1,4 (+)x 0 x 0 =0 +0
p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft)
P1 =0 +0 =0.00 kips 0 3.16
Point Load (P2)
D L Trib.1 Trib.2 TAG:
p2,1 (+)x 0 x 0 =0 +0 0
p2,2 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0
p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft)
P2 =0 +0 =0.00 kips 0 3.16
Shear
R1=0.485 kips
R2=-0.485 kips Stress Ratio
Vmax=0.48 kips Vallow.=2.89 x 1 =2.8875 kips OK .17
Flexure
M=0.383 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .18
Deflection
D =D w1 +Dw2 +D p1 +Dp2
D (D+L)=0.009 +0.000 +0.000 +0.000 =0.01 =L <L OK deflection:.04
4277 180
0.009 +0
D (L Only)=0.005 +0 +0 +0 =0 =L L OK deflection:.03
8121 240
USE:1-4X6
shear:
6/26/24 12:00 AM
H2
WALL
FLOOR
ROOF
flexure:
DECK
18
2201 S Halladay St
9/24/2024
CASTILLO ENGINEERING, INC.Project 2201 HALLADAY STREET
1147 E Market Street
Long Beach, CA 90805
Engr.Date:Job No.24-459 Sheet
Tag
Beam 5
L =8.00 ft
Member=4x10 A =32.38 in^2
S =49.9 in^3
No. of members=1 I =230.8 in^4
CD=1.25 E =1,600,000 psi
CF=1.20 Va =3.885 kips
CV=1.00 Ma =3.743 k-ft
Cr=1.00
Total Load L/n=180
Live Load L/n=240
L=8 ft
1.52 1.52
Uniform load (W1)
D L Trib
w1,1 (15 +20)x 8.08 =121.2 +161.6
w1,2 (16 +0)x 2 =32 +0
w1,3 (10 +0)x 6.58 =65.8 +0
w1,4 (16 +60)x 0 =0 +0
w1,5 (5 +20)x 0 =0 +0
W1 =219 +161.6 =0.381 klf
Triangular load (W2)
D L Trib `
w2,1 (0 +0)x 0 =0 +0
w2,2 (0 +0)x 0 =0 +0
w2,3 (0 +0)x 0 =0 +0
w2,4 (0 +0)x 0 =0 +0
w2,5 (0 +0)x 0 =0 +0
W2 =0 +0 =0.000 klf
Point Load (P1)
D L Trib.1 Trib.2 TAG:
p1,1 (+)x 0.00 x 0.00 =0 +0 0
p1,2 (+)x 0 x 0 =0 +0 0
p1,3 (+)x 0 x 0 =0 +0 0
p1,4 (+)x 0 x 0 =0 +0
p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft)
P1 =0 +0 =0.00 kips 0 8
Point Load (P2)
D L Trib.1 Trib.2 TAG:
p2,1 (+)x 0 x 0 =0 +0 0
p2,2 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0
p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft)
P2 =0 +0 =0.00 kips 0 8
Shear
R1=1.522 kips
R2=-1.522 kips Stress Ratio
Vmax=1.52 kips Vallow.=4.86 x 1 =4.8563 kips OK .31
Flexure
M=3.045 k-ft Mallow.=5.62 x 1 =5.615 k-ft OK .54
Deflection
D =D w1 +Dw2 +D p1 +Dp2
D (D+L)=0.095 +0.000 +0.000 +0.000 =0.09 =L <L OK deflection:.18
1011 180
0.095 +0
D (L Only)=0.04 +0 +0 +0 =0.04 =L L OK deflection:.10
2381 240
USE:1-4X10
shear:
6/26/24 12:00 AM
H3
WALL
DOOR
ROOF
flexure:
DECK
19
2201 S Halladay St
9/24/2024
CASTILLO ENGINEERING, INC.Project 2201 HALLADAY STREET
1147 E Market Street
Long Beach, CA 90805
Engr.Date:Job No.24-459 Sheet
Tag
Beam 5
L =3.00 ft
Member=4x6 A =19.25 in^2
S =17.6 in^3
No. of members=1 I =48.5 in^4
CD=1.25 E =1,600,000 psi
CF=1.30 Va =2.310 kips
CV=1.00 Ma =1.323 k-ft
Cr=1.00
Total Load L/n=180
Live Load L/n=240
L=3 ft
0.94 0.94
Uniform load (W1)
D L Trib
w1,1 (15 +20)x 17 =255 +340
w1,2 (16 +0)x 2 =32 +0
w1,3 (10 +0)x 0 =0 +0
w1,4 (16 +60)x 0 =0 +0
w1,5 (5 +20)x 0 =0 +0
W1 =287 +340 =0.627 klf
Triangular load (W2)
D L Trib `
w2,1 (0 +0)x 0 =0 +0
w2,2 (0 +0)x 0 =0 +0
w2,3 (0 +0)x 0 =0 +0
w2,4 (0 +0)x 0 =0 +0
w2,5 (0 +0)x 0 =0 +0
W2 =0 +0 =0.000 klf
Point Load (P1)
D L Trib.1 Trib.2 TAG:
p1,1 (+)x 0.00 x 0.00 =0 +0 0
p1,2 (+)x 0 x 0 =0 +0 0
p1,3 (+)x 0 x 0 =0 +0 0
p1,4 (+)x 0 x 0 =0 +0
p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft)
P1 =0 +0 =0.00 kips 0 3
Point Load (P2)
D L Trib.1 Trib.2 TAG:
p2,1 (+)x 0 x 0 =0 +0 0
p2,2 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0
p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft)
P2 =0 +0 =0.00 kips 0 3
Shear
R1=0.941 kips
R2=-0.941 kips Stress Ratio
Vmax=0.94 kips Vallow.=2.89 x 1 =2.8875 kips OK .33
Flexure
M=0.705 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .33
Deflection
D =D w1 +Dw2 +D p1 +Dp2
D (D+L)=0.015 +0.000 +0.000 +0.000 =0.01 =L <L OK deflection:.07
2446 180
0.015 +0
D (L Only)=0.008 +0 +0 +0 =0.01 =L L OK deflection:.05
4511 240
USE:1-4X6
shear:
6/26/24 12:00 AM
H4
WALL
DOOR
ROOF
flexure:
DECK
20
2201 S Halladay St
9/24/2024
CASTILLO ENGINEERING, INC.Project 2201 HALLADAY STREET
1147 E Market Street
Long Beach, CA 90805
Engr.Date:Job No.24-459 Sheet
Tag
Beam 5
L =4.00 ft
Member=4x6 A =19.25 in^2
S =17.6 in^3
No. of members=1 I =48.5 in^4
CD=1.25 E =1,600,000 psi
CF=1.30 Va =2.310 kips
CV=1.00 Ma =1.323 k-ft
Cr=1.00
Total Load L/n=180
Live Load L/n=240
L=4 ft
0.41 0.41
Uniform load (W1)
D L Trib
w1,1 (15 +20)x 5 =75 +100
w1,2 (16 +0)x 2 =32 +0
w1,3 (10 +0)x 0 =0 +0
w1,4 (16 +60)x 0 =0 +0
w1,5 (5 +20)x 0 =0 +0
W1 =107 +100 =0.207 klf
Triangular load (W2)
D L Trib `
w2,1 (0 +0)x 0 =0 +0
w2,2 (0 +0)x 0 =0 +0
w2,3 (0 +0)x 0 =0 +0
w2,4 (0 +0)x 0 =0 +0
w2,5 (0 +0)x 0 =0 +0
W2 =0 +0 =0.000 klf
Point Load (P1)
D L Trib.1 Trib.2 TAG:
p1,1 (+)x 0.00 x 0.00 =0 +0 0
p1,2 (+)x 0 x 0 =0 +0 0
p1,3 (+)x 0 x 0 =0 +0 0
p1,4 (+)x 0 x 0 =0 +0
p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft)
P1 =0 +0 =0.00 kips 0 4
Point Load (P2)
D L Trib.1 Trib.2 TAG:
p2,1 (+)x 0 x 0 =0 +0 0
p2,2 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0 0
p2,4 (+)x 0 x 0 =0 +0
p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft)
P2 =0 +0 =0.00 kips 0 4
Shear
R1=0.414 kips
R2=-0.414 kips Stress Ratio
Vmax=0.41 kips Vallow.=2.89 x 1 =2.8875 kips OK .14
Flexure
M=0.414 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .19
Deflection
D =D w1 +Dw2 +D p1 +Dp2
D (D+L)=0.015 +0.000 +0.000 +0.000 =0.02 =L <L OK deflection:.06
3126 180
0.015 +0
D (L Only)=0.007 +0 +0 +0 =0.01 =L L OK deflection:.04
6470 240
USE:1-4X6
shear:
6/26/24 12:00 AM
WALL
DOOR
ROOF
flexure:
DECK
21
2201 S Halladay St
9/24/2024
FOUNDATION KEYPLAN
CF1
CF2
(E)CF1
3.14 K
F1
2.76 K
22
2201 S Halladay St
9/24/2024
ARCHITECT CASTILLO ENGINEERING JOB 2201 HALLADAY
1147 E Market, Long Beach, CA 90805
ENGR. MC DATE JOB NO. 24-459 SHEET NO.
CONTINUOUS FOOTINGS
CF-1
LOADING:TRIB.
( + ) x ft = +
( + ) x ft = +
( + ) x ft = +
DECK ( + ) x ft = +
w = + =plf
B=plf = ft
psf USE:
CF-2
LOADING:TRIB.
( + ) x ft = +
( + ) x ft = +
( + ) x ft = +
w = + =plf
B=plf = ft
psf USE:
0
410.8
16
249.2
4015 0
15 60 0
WALL:8
26/06/2024
20
D L
ROOF:
FLOOR:
15 8.08
1500
410.8
128
161.6
0
0
121.2
0
161.6
0
0
0.27
D L
115 20
15
0
128
15
WALL: 16 0 8
FLOOR:60 0
ROOF:
163 0.11
1500
1'-0" WIDE FTG.
20
20
0
0
143
1'-0" WIDE FTG.
163
F-CONTINUOUS FOOTINGS-1500
23
2201 S Halladay St
9/24/2024
ARCHITECT Castillo Engineering, Inc.PROJECT 2201 HALLADAY STREET
1205 Pine Avenue, Suite 201
Long Beach, CA 90813
ENGR. MC DATE JOB NO. 24-459 SHEET NO.
Given:
h1 =18 in.d1 =3.5 in.D L TRIB D L
w1 15 20 17 =255 +340
h2 =18 in.w =12 in.16 0 8 =128 +0
15 40 3 45 +120
15 60 0 =0 +0
H =36 in.b =6 in.428 +460 =888 plf
Area = 906 in.2 L = 75.5 in.
6.292 ft.2 = 6.29 ft.
Stemwall wt. = 150 x 6 x 18 /144 = 113 plf
=1001
qa =1500 psf
Pa =1500 x 6.29 =9.44 kips Pload =1001 x 6.29 =6.29 kips
Pnet kips
(E) CF1 RAISED FLOOR CAPACITY
Pnet =
26/06/2024
3.14 kips
wuniform
24
2201 S Halladay St
9/24/2024
ARCHITECT CASTILLO ENGINEERING, INC.JOB 2201 HALLADAY STREET
1147 E Market Street
Long Beach, CA 90805
ENGR. MC DATE JOB NO. 24-459 SHEET NO.
SPREAD FOOTINGS
P1 =K
P2 =K
P3 =K
P4 =K
P TOTAL =K
P ALLOW.=K USE:TYPE 2.0 FOOTING
26/06/2024
0
2.76
5.4
F1
2.76
0
0
F-SPREAD FOOTINGS1500
25
2201 S Halladay St
9/24/2024
PROJECT : PAGE :
CLIENT : DESIGN BY :
JOB NO. : DATE : 06/26/24 REVIEW BY :
INPUT DATA
Exposure category (B, C or D)B
Importance factor I =1.00 Category II
Basic wind speed V =110 mph
Topographic factor Kzt =1 Flat
Building height to eave he =8 ft
Building height to ridge hr =13 ft
Effective area of components A =21.33333 ft2
DESIGN SUMMARY
ANALYSIS
Velocity pressure
qh = 0.00256 Kh Kzt Kd V2 I =18.43 psf
where:qh = velocity pressure at mean roof height, h.
Kh = velocity pressure exposure coefficient evaluated at height, h,= 0.70
Kd = wind directionality factor
h = mean roof height ft
p = qh [(G Cpf )-(G Cpi )]
where:p = pressure in appropriate zone
G Cp f = product of gust effect factor and external pressure coefficient
G Cp i = product of gust effect factor and internal pressure coefficient
=0.18 or -0.18
a = width of edge strips, MAX[ MIN(0.1B, 0.4h), 0.04B,3] =3.55 ft
Net Pressures (psf), Basic Load Cases Net Pressures (psf), Torsional Load Cases
15.73 0.00 15.73
(+GCp i )(-GCp i )(+GCp i )(-GCp i )(+GCp i )(-GCp i )
1 0.49 5.77 12.40 0.40 4.05 10.69 1T 0.49 1.44 3.10
2 -0.69 -16.03 -9.40 -0.69 -16.03 -9.40 2T -0.69 -4.01 -2.35
3 -0.45 -11.59 -4.95 -0.37 -10.14 -3.50 3T -0.45 -2.90 -1.24
4 -0.39 -10.51 -3.87 -0.29 -8.66 -2.03 4T -0.39 -2.63 -0.97
1E 0.75 10.43 17.07 0.61 7.93 14.56 0.00
2E -1.07 -23.04 -16.40 -1.07 -23.04 -16.40
3E -0.64 -15.20 -8.56 -0.53 -13.09 -6.45 p i p i
ENGINEERING
Surface
Roof angle q =
Net Pressure with
Surface
Roof angle q =
G Cp f
Net Pressure with
Surface
Roof angle q =
G Cp f
24-459
2201 HALADAY STREET
Wind Analysis for Low-rise Building, Based on ASCE 7-16 / IBC 2024 / CBC 2022
Roof angle q =
G Cp f
Net Pressure with
CASTILLO
Net Pressure withG Cp f
26
2201 S Halladay St
9/24/2024
Basic Load Cases in Transverse Direction Basic Load Cases in Longitudinal Direction
Area Area
(ft2)(+GCp i )(-GCp i )(ft2)(+GCp i )(-GCp i )
1 363 2.10 4.51 1 309 1.25 3.30
2 837 -13.42 -7.87 2 775 -12.42 -7.28
3 837 -9.70 -4.15 3 775 -7.85 -2.71
4 363 -3.82 -1.41 4 309 -2.68 -0.63
1E 57 0.59 0.97 1E 64 0.51 0.93
2E 131 -3.02 -2.15 2E 194 -4.46 -3.18
3E 131 -1.99 -1.12 3E 194 -2.53 -1.25
4E 57 -0.80 -0.42 4E 64 -0.72 -0.29
Horiz.6.01 6.01 Horiz.5.15 5.15
Vert.-27.08 -14.71 Vert.-26.24 -13.88
10 psf min.Horiz.6.83 6.83 10 psf min.Horiz.3.73 3.73
Sec. 6.1.4.1 Vert.-18.64 -18.64 Sec. 6.1.4.1 Vert.-18.64 -18.64
Torsional Load Cases in Transverse Direction Torsional Load Cases in Longitudinal Direction
Area Area
(ft2)(+GCp i )(-GCp i )(+GCp i )(-GCp i )(ft2)(+GCp i )(-GCp i )(+GCp i )(-GCp i )
1 153 0.88 1.90 10 22 1 122 0.50 1.31 3 7
2 353 -5.66 -3.32 -17 -10 2 581 -9.31 -5.46 33 19
3 353 -4.09 -1.75 13 5 3 581 -5.89 -2.03 -21 -7
4 153 -1.61 -0.59 18 7 4 122 -1.06 -0.25 5 1
1E 57 0.59 0.97 13 22 1E 64 0.51 0.93 7 13
2E 131 -3.02 -2.15 -19 -13 2E 194 -4.46 -3.18 16 11
3E 131 -1.99 -1.12 12 7 3E 194 -2.53 -1.25 -9 -4
4E 57 -0.80 -0.42 18 10 4E 64 -0.72 -0.29 10 4
1T 210 0.30 0.65 -4 -9 1T 186 0.19 0.50 -2 -4
2T 484 -1.94 -1.14 7 4 2T 775 -3.10 -1.82 -22 -13
3T 484 -1.40 -0.60 -5 -2 3T 775 -1.96 -0.68 14 5
4T 210 -0.55 -0.20 -7 -3 4T 186 -0.40 -0.09 -3 -1
39 39 31.2 31.2
Design pressures for components and cladding
p = qh[ (G Cp) - (G Cpi)]
where:p = pressure on component
pmin = 10 psf (Sec. 6.1.4.2, pg 21)
p
Effective
2 GCP - GCP GCP - GCP GCP - GCP GCP - GCP GCP - GCP
Comp.21.33333 0.43 -0.87 0.43 -1.54 0.43 -2.40 0.94 -1.04 0.94 -1.28
Positive Negative Positive Negative Positive Negative Positive Negative Positive Negative
11.32 -19.30 11.32 -31.62 11.32 -47.60 20.68 -22.52 20.68 -26.98
S
Surface Pressure (k) withPressure (k) with
S
Surface
Torsion (ft-k)Surface
Zone 5
Zone 3 Zone 4 Zone 5
Pressure (k) with Torsion (ft-k)
Total Horiz. Torsional Load, MT
Zone 1
( psf )
Zone 3 Zone 4Zone 2
Surface Pressure (k) with
Pressure
Zone 1 Zone 2
Total Horiz. Torsional Load, MT
Comp. & Cladding
27
2201 S Halladay St
9/24/2024
ASCE Hazards Report
Address:
2201 Halladay St
Santa Ana, California
92707
Standard:ASCE/SEI 7-16 Latitude: 33.717669
Risk Category:II Longitude:-117.859522
Soil Class:Default Elevation:61.81198352982068 ft
(NAVD 88)
Wind
Results:
Wind Speed 95 Vmph
10-year MRI 66 Vmph
25-year MRI 72 Vmph
50-year MRI 76 Vmph
100-year MRI 81 Vmph
300-year MRI 89 Vmph
700-year MRI 95 Vmph
1,700-year MRI 102 Vmph
3,000-year MRI 106 Vmph
10,000-year MRI 115 Vmph
100,000-year MRI
1,000,000-year MRI
Data Source:
Date Accessed:
133 Vmph
151 Vmph
ASCE/SEI 7-16, Fig. 26.5-1B and Figs. CC.2-1–CC.2-4, and Section 26.5.2
Aug 07 2024
Page 1 of 5https://ascehazardtool.org/
28
2201 S Halladay St
9/24/2024
Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear
interpolation between contours. Wind speeds are interpolated in accordance with the 7-16 Standard. Wind
speeds correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability
= 0.00143, MRI = 700 years). Values for 10-year MRI, 25-year MRI, 50-year MRI and 100-year MRI are Service
Level wind speeds, all other wind speeds are Ultimate wind speeds.
Site is not in a hurricane-prone region as defined in ASCE/SEI 7-16 Section 26.2.
Page 2 of 5https://ascehazardtool.org/
29
2201 S Halladay St
9/24/2024
PGA M : 0.65
SMS : 1.73
SM1 : 1.17
SDS : 1.15
SD1 : 0.78
T L : 8
SS : 1.46
S1 : 0.49
VS30 : 260
Seismic Design Category: D
Multi-Period Design Spectrum
S (g) vs T(s)a
Multi-Period MCE SpectrumR
S (g) vs T(s)a
Two-Period Design Spectrum
S (g) vs T(s)a
Two-Period MCE SpectrumR
S (g) vs T(s)a
Design Vertical Response Spectrum
Vertical ground motion data has not yet been made
available by USGS.
MCE Vertical Response SpectrumR
Vertical ground motion data has not yet been made
available by USGS.
Seismic
DefaultSite Soil Class:
Results:
Page 3 of 5https://ascehazardtool.org/
30
2201 S Halladay St
9/24/2024
Data Accessed: Aug 07 2024
Date Source:
USGS Seismic Design Maps based on ASCE/SEI 7-16 and ASCE/SEI 7-16 Table 1.5-2. Additional data for
site-specific ground motion procedures in accordance with ASCE/SEI 7-16 Ch. 21 are available from USGS.
Page 4 of 5https://ascehazardtool.org/
31
2201 S Halladay St
9/24/2024
Snow
Results:
Ground Snow Load, p : g
20-year MRI Value:
Winter Wind Parameter:
Mapped Elevation:
Data Source:
Date Accessed:
Ground Snow Loads for IRC only, p :g(asd)
3 lb/ft
2
1 lb/ft^2
0.25
61.6 ft
ASCE/SEI 7-16, Figures 7.6-1 and 7.6-2 A-D
Wed Jun 26 2024
Values provided are ground snow loads. In areas
designated "case study required," extreme local
variations in ground snow loads preclude mapping at this
scale. Site-specific case studies are required to establish
ground snow loads at elevations not covered.
Snow load values are mapped to a 0.5 mile resolution.
This resolution can create a mismatch between the
mapped elevation and the site-specific elevation in
topographically complex areas. Engineers should consult
the local authority having jurisdiction in locations where
the reported ‘elevation’ and ‘mapped elevation’ differ
significantly from each other.
2.1 lb/ft
2
The ASCE Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any
kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or
has been extrapolated from maps incorporated in the ASCE standard. While ASCE has made every effort to use data obtained from reliable
sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or
quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation,
relationship, or sponsorship of such third-party content by or from ASCE.
ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent
professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such
professionals in interpreting and applying the contents of this Tool or the ASCE standard.
In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors,
employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential
damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by
law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data
provided by the ASCE Hazard Tool.
Page 5 of 5https://ascehazardtool.org/
32
2201 S Halladay St
9/24/2024
SEISMIC BASE SHEAR (ASCE7-16)
Latitude:33.717669
Longitude:-117.85952
SITE CLASS:D (Table 20.3-1)ρ=1.3
R=6.5 (Table 12.2-1)Ie=1
(Section 21.4)
1.730 0
1.170 0
(11.4-3)
1.153
(11.4-4)
0.78 0.13526
0.6763
See on Figs. 22-14 through 22-17
0.02
8.000
0.75
0.095
W= Effective seismeic weight
(GOVERNS)
For S1 is equal to greater than 0.6g
0.090 W
1.261 W
0.177
0.231 W Strength Level
0.161 W Allowable Stress Design
𝑆
=
𝑆
=
𝑆
=
𝑆=3 𝑆
=
𝑇= 𝐶ℎ
=ℎ
=𝑥
=𝑇
=
𝑉=
=.
=
=
=
=
=
==
=.=
=
=
=
33
2201 S Halladay St
9/24/2024
SEISMIC ANALYSIS
WEIGHT
Level 1 W roof =20 psf x 2074 ft^2 =
=
WR =52.82 kips
BASE SHEAR
8.53 kips
F1=
DISTRIBUTION OF BASE SHEAR
W TOTAL
52.82 kips
4.113 psf
𝑽𝑩𝑨𝑺𝑬= 𝑽 ∗ 𝑾𝑻𝑶𝑻𝑨𝑳
= 𝑉 ∗ 𝑊=
𝑭𝒙= 𝑽𝑩𝑨𝑺𝑬∗𝑾𝑿∗ 𝒉𝑻𝑶𝑻𝑨𝑳
𝑾𝟏∗ 𝒉𝟏+𝑾𝟐∗𝒉𝟏+ 𝒉𝟐+ ⋯𝑾𝒏∗ 𝒉𝑻𝑶𝑻𝑨𝑳
𝑩𝑨𝑺𝑬=∗𝑻𝑶𝑻𝑨𝑳
𝑨
34
2201 S Halladay St
9/24/2024
ARCHITECT JOB 2201 HALLADAY STREET
CASTILLO ENGINEERING, INC.
1147 E Market St
ENGR. MC DATE:LONG BEACH CA. 90805 JOB NO. 24-447 SHEET NO.
SEISMIC FORCES
First Floor Shearwall Forces
L1 Level 1 F1=4.113 psf
SW U-FORCE T.A.FORCE L1 L2 L3 L4
X1 4.11 179.47 0.74 KIPS STRONGWALL
X2 4.11 994.01 4.09 KIPS 11.33 ft
Y1 4.11 865.21 3.56 KIPS 13.50 ft 4.50 ft
June 27, 2024
LENGHT WALLS
35
2201 S Halladay St
9/24/2024
SHEARWALL KEYPLAN
AREA:2073.67 SQ. FT.
PERIMETER:177.33 FT.
X:35.50 FT.
Y:52.50 FT.
X1.1
X2.1
Y1.1
Y1.2
3.56 K
0.74 K
4.10 K
36
2201 S Halladay St
9/24/2024
X1.1
X2.1
X DIRECTION KEYPLAN
AREA:179.47 SQ. FT.
AREA:994.01 SQ. FT.
37
2201 S Halladay St
9/24/2024
38
2201 S Halladay St
9/24/2024
39
2201 S Halladay St
9/24/2024
40
2201 S Halladay St
9/24/2024
41
2201 S Halladay St
9/24/2024
ARCHITECT JOB 2201 HALLADAY STREET
CASTILLO ENGINEERING, INC.
1147 E Market St
ENGR. MC DATE:Long Beach, CA 90805 24-447 SHEET NO.
TAG:X2.1 ( 11.33 ft),
FORCE:
SEISMIC GOVERNS
=kips Load Comb. :(0.6-.14SDS) D + E
SDS :1.15
SHEAR STRESS
X2.1 :L1=ft v=lbs =plf
ft
Ltotal=ft
OVERTURNING
height= 8.00 ft
MOT=x x 8 =
ROOF:psf x ft =plf h/w= 0.71 OK
WALL:psf x ft =plf
w =plf Vallow= 510 PLF
MR=x 11.33 ^2/2 =k-ft USE:
TYPE 4 SHEARWALL
- 0.44 x =kips
kips OK USE:4x 4 POST w/H.D.
295
HDU2
361
11.33
June 27, 2024
11.1615
TributaryUnit load
4.09
SHEARWALL CALCULATIONS
4088
11.33
X2.1
T=
Tallow=
32.7
2.31
WALL:
0.295
16
4.09
2.15
11.33
11.33
18.96
18.96
8.00
32.7
167
128
11.33
11.33
42
2201 S Halladay St
9/24/2024
Y1.1
Y1.2
Y DIRECTION KEYPLAN
AREA:865.21 SQ. FT.
43
2201 S Halladay St
9/24/2024
ARCHITECT JOB 2201 HALLADAY STREET
CASTILLO ENGINEERING, INC.
1147 E Market St
ENGR. MC DATE:Long Beach, CA 90805 24-447 SHEET NO.
TAG:Y1.1 ( 13.50 ft),Y1.2 ( 4.50
FORCE:
SEISMIC GOVERNS
=kips Load Comb. :(0.6-.14SDS) D + E
SDS :1.15
SHEAR STRESS
Y1.1 :L1=ft v=lbs =plf
Y1.2 :L2=ft ft
Ltotal=ft
OVERTURNING
height= 8.00 ft
MOT=x x 8 =
ROOF:psf x ft =plf h/w= 0.59 OK
WALL:psf x ft =plf
w =plf Vallow= 340 PLF
MR=x 13.50 ^2/2 =k-ft USE:
TYPE 6 SHEARWALL
- 0.44 x =kips
kips OK USE:4x 4 POST w/H.D.
height= 8.00 ft
MOT=x x 8 =
ROOF:psf x ft =plf h/w= 1.78 OK
WALL:psf x ft =plf
w =plf Vallow= 340 PLF
MR=x 4.50 ^2/2 =k-ft USE:
TYPE 6 SHEARWALL
- 0.44 x =kips
kips OK USE:4x 4 POST w/H.D.
T=
Tallow=2.31
WALL:Y1.2
3.56
128
11.25
Unit load Tributary
7.12
4.50
169
16
15
8.00
4.50
3.00
15
128
18.00
13.50
1.16
13.50
13.50
4.50
13.03
13.03
8.00
21.4
18.00
Y1.1
T=
Tallow=
21.4
2.31
WALL:
0.143
16
3.56
0.297
1.297.12
June 26, 2024
1.0015
TributaryUnit load
3.00
3.56
SHEARWALL CALCULATIONS
3559 198
18.00
HDU2
HDU2
297
18.00
143
44
2201 S Halladay St
9/24/2024
45
2201 S Halladay St
9/24/2024
ARCHITECT JOB
1205 Pine Avenue, Suite 201
Long Beach, CA 90813
ENGR. MC DATE:JOB NO. SHEET NO.
CASTILLO ENGINEERING, INC.
REMARKS
4x4
4x4
4X4
4X6
4X67.15
10.83
ALLOWABLE
75%
2.31
3.42
4.23
6X6HDU14
3.075
4.565
5.645
6.970
9.535
14.445
5.23
HDU5
HDU8
HDU11
HOLDOWNS
HDU2
HDU4
HD ALLOWABLE
UPLIFT
46
2201 S Halladay St
9/24/2024
1
A5
3
13' - 10"
11' - 3"
9' - 0"
1
1
1
N. 12"X24" FTNG
N.
1
2
"
X
2
4
"
F
T
N
G
EX
.
1
2
"
X
2
4
"
F
T
N
G
N. 12"X24" FTNG
N.
1
2
"
X
2
4
"
F
T
N
G
HD
U
2
(
T
Y
P
)
2(
2
X
4
)
P
O
S
T
HDU 2 (TYP)
2(2X4) POST
HD
U
2
(
T
Y
P
)
2(
2
X
4
)
P
O
S
T
PROVIDE REDGARD WATER
PROOFING OVER
EXISTING CONC. SLAB
ICC#ESR-1413
NEW CONC. SLAB
EX. RAISED FOUNDATION
EX. RAISED FOUNDATION
EX
.
R
A
I
S
E
D
F
O
U
N
D
A
T
I
O
N
EX
.
R
A
I
S
E
D
F
O
U
N
D
A
T
I
O
N
A5
4
A5
5
A5
13' - 10"
11' - 3"
9' - 0"
1
1
1
4x10 HDR4x6 HDR4x6 HDR
4x
6
H
D
R
4x
6
H
D
R
4x
6
H
D
R
4x6 HDR
4x
1
0
H
D
R
N
2
x
1
0
C
.
J
.
@
1
6
"
O
.
C
.
EX
.
2
x
C
.
J
.
@
1
6
"
O
.
C
.
A5
8
A5
9
11
A5
EPOXY BASE PROCEDURE
1. DRILL HOLE 1/8 Ø LARGER THAN ANCHOR
2. CLEAN HOLE WITH BRUSH AND
COMPRESSED AIR
3. PLACE ROD AT BOTTOM OF HOLE OF SILL
Simpson Set XP Epoxy-Tie (ICC-ESR #2508)
4. GROUNT WITH FLOWABLE EPOXY FLUSH
TO TOP
5. DEPUTY INSPECTION REQUIRED FOR
PROPER HOLDOWN INSTALLATION AND
INTEGRITY OF (E) CONCRETE
6. ALLOW 24 HR. CURE BEFORE
TIGHTENING NUT
MINIMUM EMBEDMENTBOLT
DIAMETER
D
VERT.
ANCHOR BOLTS
HORIZ.
ANCHOR BOLTS
7"5"
7"5"
7"5"
8"6"
9"7"
10"8"
1/2"
5/8"
3/4"
7/8"
1"
1 1/8"
TYP. ANCHOR BOLTS
7 TYP. ANCHOR BOLTS
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
02-S-01
FOUNDATION AND
FRAMING PLAN - ADD
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Luis L.
Verificador
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
1/4" = 1'-0"
Foundation Plan1 1/4" = 1'-0"
Framing Plan2
No. Description Date
2201 S Halladay St
9/24/2024
STRUCTURAL NOTES
02-S1.0
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
STRUCTURAL
NOTES
2201 S Halladay St
9/24/2024
TYPICAL DETAIL1TYPICAL DETAIL2TYPICAL DETAIL4
TYPICAL DETAIL5TYPICAL DETAIL6TYPICAL DETAIL7TYPICAL DETAIL8
TYPICAL DETAIL12 TYPICAL DETAIL11 TYPICAL DETAIL10 TYPICAL DETAIL9
TYPICAL DETAIL3
02-S1.1
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
TYPICAL
DETAILS
2201 S Halladay St
9/24/2024
TYPICAL DETAIL2TYPICAL DETAIL4
TYPICAL DETAIL5TYPICAL DETAIL6TYPICAL DETAIL8
TYPICAL DETAIL12 TYPICAL DETAIL9TYPICAL DETAIL10 02-S1.2
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
TYPICAL
DETAILS
2201 S Halladay St
9/24/2024
TYPICAL DETAIL1TYPICAL DETAIL2TYPICAL DETAIL4
TYPICAL DETAIL12 TYPICAL DETAIL11
TYPICAL DETAIL3
TYPICAL DETAIL9TYPICAL DETAIL10 02-S1.3
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
TYPICAL
DETAILS
2201 S Halladay St
9/24/2024
N1FOUNDATION PLAN
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
LAZARO
--
26 JUNE 24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
Expires 12-31-24
NO. 4808
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
02-S2.0
FOUNDATION
PLAN
2201 S Halladay St
9/24/2024
N1ROOF FRAMING PLAN
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
LAZARO
--
26 JUNE 24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
Expires 12-31-24
NO. 4808
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
02-S2.2
ROOF
FRAMING
PLAN
2201 S Halladay St
9/24/2024
DETAIL1DETAIL2DETAIL4
DETAIL5DETAIL6DETAIL7DETAIL8
DETAIL12 DETAIL11 DETAIL10 DETAIL9
DETAIL3
02-S3.0
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
FOUNDATION
DETAILS
2201 S Halladay St
9/24/2024
DETAIL1DETAIL2DETAIL4
DETAIL5DETAIL6DETAIL7DETAIL8
DETAIL12 DETAIL11 DETAIL10 DETAIL9
DETAIL3
02-S5.0
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
ROOF
FRAMING
DETAILS
2201 S Halladay St
9/24/2024
®
®®
®
36
XX
1
24
HX
1
®
02-WSWH1
TYPICAL
DETAILS
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THE
CHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
TO THE C.B.C.
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
2201 S Halladay St
9/24/2024
®
®
®
®
®
®
®
®
®
®
®
·
·
·
·
®
®
®
®
®
®
®®
®
®
·
·
·
·
·
●
●
●
®
TYPICAL
DETAILS
SHEET NUMBER
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
SHEETSOF
REVISIONS
CONSTRUCTION SHALL CONFORMTO THE ENGINEER. ALLWORK. REPORT DISCREPANCIESBEFORE PROCEEDING WITH THECHECK AND VERIFY ALL DIMENSIONS
DRAWN :
CHECKED :
DATE :
JOB NO.
TO THE C.B.C.
MARK DATE
PROJECT:
24-459
ANAHI
ANAHI
07-AUG-24
. .
.
.
.
.
.
.
.
.
.
.
TITLE
AD
D
I
T
I
O
N
A
N
D
R
E
M
O
D
E
L
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
3
1
2
3
1147 E MARKET ST. LONG BEACH, CA 90805
T:562-961-5600
ENGINEER:
Margarito Castillo, S.E.
CASTILLO ENGINEERING
22
0
1
H
A
L
L
A
D
A
Y
S
T
.
,
SA
N
T
A
A
N
A
,
C
A
.
9
2
7
0
7
WWW.CASTILLOENGINEERING.COM
02-WSWH2
2201 S Halladay St
9/24/2024
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
03-G-01
GREEN CODE
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Autor
Verificador
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
No. Description Date
2201 S Halladay St
9/24/2024
Project number
Date
Drawn by
Checked by
E-mail:skyaaconstruction@gmail.com
THIS DESIGN AND DRAWINGS, ARE
COPYRIGHT PROTECTED AND ARE
THE EXCLUSIVE PROPERTY OF AA SKY
CONSTRUCTION INC., THEY SHALL BE
NO USED, MODIFIED DUPLICATED IN
WHOLE OR IN ANY MANNER, NOR
ASSIGNED TO A THIRD PARTY WITHOUT
THE WRITTEN AUTHORIZATION
OF AA SKY CONSTRUCTION INC.
APPROVAL STAMP
OWNER
CONTACT PERSON
DESIGNER
AA SKY CONSTRUCTION INC.
2074 SILVERADO ST.
SAN MARCOS CA 92078
LIC#1061749
OFFICE 858 888 3752
CELL 760 845 7697
RAFAEL G LUJANO
E-MAIL: SKYAACONSTRUCTION@GMAIL.COM
CONSULTANTS
03-G-02
GREEN CODE
0001
2201 HALLADAY ST.
STA. ANA, CA 92707
01-24-2024
Autor
Verificador
NEW 132 SQ.FT. ADD
TO BE GAMEROOM
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
RAFAEL LUJANO
2201 HALLADAY ST. STA. ANA, CA 92707
skyaaconstruction@gmail.com
+17608457697
No. Description Date
2201 S Halladay St
9/24/2024
DU
C
T
I
N
S
P
E
C
T
I
O
N
S
E
R
V
I
C
E
SO
-
C
A
L
H
E
R
S
R
A
T
I
N
G
SE
R
V
I
N
G
A
L
L
O
F
S
O
U
T
H
E
R
N
C
A
L
I
F
O
R
N
I
A
drawing no:
date:
checked by:
drawn by:
content:
-
HC
ENV-1
07-18-24
pr
o
j
e
c
t
n
a
m
e
:
RE
S
I
D
E
N
C
E
ad
d
r
e
s
s
22
0
1
H
A
L
L
A
D
A
Y
S
T
R
E
E
T
SA
N
T
A
A
N
A
,
C
A
HE
R
S
R
A
T
I
N
G
A
N
D
81
8
-
6
6
9
-
1
8
1
1
PROJECT #
R-002306
2201 S Halladay St
9/24/2024
DU
C
T
I
N
S
P
E
C
T
I
O
N
S
E
R
V
I
C
E
SO
-
C
A
L
H
E
R
S
R
A
T
I
N
G
SE
R
V
I
N
G
A
L
L
O
F
S
O
U
T
H
E
R
N
C
A
L
I
F
O
R
N
I
A
drawing no:
date:
checked by:
drawn by:
content:
-
HC
ENV-2
PROJECT #
pr
o
j
e
c
t
n
a
m
e
:
RE
S
I
D
E
N
C
E
ad
d
r
e
s
s
HE
R
S
R
A
T
I
N
G
A
N
D
81
8
-
6
6
9
-
1
8
1
1
07-18-24
22
0
1
H
A
L
L
A
D
A
Y
S
T
R
E
E
T
SA
N
T
A
A
N
A
,
C
A
R-002306
2201 S Halladay St
9/24/2024
2201 S Halladay St
9/24/2024
2201 S Halladay St
9/24/2024