Loading...
HomeMy WebLinkAboutFLOOD ZONE - 718 S Flintridge Dr Unit# 2 - PlanBldg #101119235-36 APPROVALS: PLNG - P. Raj BLDG - J.Lo POLICE - B. Martin PUBLIC WORKS - B. Sarlak FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 SCOPE OF WORK PL 6 0 . 0 0 ' WA T E R PL 100.00' NO R T H CL Fl i n t r i d g e D r . EXISTING DRIVEWAY EXISTING 6'H CMU BLOCK WALL PL 100.00' PL 6 0 . 0 0 ' Existing 2-Car garage 390 Sf. EXISTING 5'H IRON FENCE EL E C T R I C 718 S. Flintridge Dr. EXISTING HOUSE 1,285 SF. ADU PORCH 104 SF. PROPOSED ADU 800 SF. EXISTING 6'H CMU BLOCK WALL EX I S T I N G 6 ' H C M U BL O C K W A L L EXISTING 5'H IRON FENCE ELECTRICAL EXISTING LANDSCAPE EXCESS CONCRETE TO BE REPLACED WITH LANDSCAPE LATER SCIENTIFIC NAME Common Name LEGEND QUANTITY Size TYPE Location LANDSCAPE PLANTS LEGEND Rhaphiolepis indica India Hawthorn Evergreen Along driveway Total 6 minimum 5-gallon shrub every 2 feet with 2" mulch at bottom Barbara Karst Bougainvillea or Fruit Trees per owner Evergreen Vine Along perimeter Quantity as shown 5-gallon size every 20 feet Total 10 minimum 1-gallon shrub every 3 feet with 2" mulch at bottom Rosaceae Rose (species per owner's choise) Perennial As shown on plan Grass n/a Grass As shown n/a Area as shown Prunus Red flowering Peach Quantity as shown 24" box Evergreen Canopy As shown Pop-up Sprinkler (per owner) n/a As shown n/a As shown Mulch n/a Mulch As shown 2" Area as shown n/a As shown n/a As shown V Vines n/a · · · A.0 SHEET# JOB# DRAWN BY DATE SCALE REVISIONS 03/26/2024 be r e p r o d u c e d w i t h o u t t h e w r i t t e n c o n s e n t o f T M C E n g i n e e r s , I n c . Th i s D o c u m e n t i s t h e p r o p e r t y o f T M C E n g i n e e r s , I n c . a n d s h a l l n o t CO P Y R I G H T CPR O P O S E D D E T A C H E D A C C E S S O R Y DW E L L I N G U N I T ( A D U ) Ex i s t i n g A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , S a n t a A n a , C A . 9 2 7 0 4 AD U A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , U n i t # 2 , S a n t a A n a , C A . 92 7 0 4 De s i g n e d B y : HI E U L U U Em a i l : h i e u l u u . c r a @ g m a i l . c o m P h o n e : ( 7 1 4 ) 2 2 7 - 8 7 9 1 TMC2318 C I V I L TIE N CHU H.L. PR O J E C T D A T A , N O T E S , PR O P O S E D S I T E P L A N , A N D AD U R O O F P L A N Project Summary PLAN LEGEND Scale: 1/8" = 1'-0" PROPOSED SITE PLAN and LANDSCAPE PLAN1 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Existing 2-Car garage Existing Bedroom #1 Existing Bedroom #2 Existing Bedroom #3 Existing Bath #1 Existing Bath #2 Existing Kitchen Existing Living Room EL E C T R I C 1 1 1 2 3 3 1 1 2 3 3 3 4 4 8 6 7 Existing Patio To Be Demolished 750 Sf. PL 6 0 . 0 0 ' WA T E R PL 100.00' NO R T H CL Fl i n t r i d g e D r . EXISTING DRIVEWAY EXISTING 6'H CMU BLOCK WALL PL 100.00' PL 6 0 . 0 0 ' Existing 2-Car garage Existing Bedroom #1 Existing Bedroom #2 Existing Bedroom #3 Existing Bath #1 Existing Bath #2 Existing Kitchen Existing Living Room EXISTING 5'H IRON FENCE EL E C T R I C Existing Patio To Be Demolished 750 Sf. EXISTING 5'H IRON FENCE Existing Shed To Be Demolished 50 Sf. EXISTING 6'H CMU BLOCK WALL EXCESS CONCRETE TO BE REPLACED WITH LANDSCAPE LATER D O O R S C H E D U L E SIZE#GLAZ'G.THK REMARKSTYPEU-VAL.SHGC 1 3/4" 1 3/8"NONE __ NONE __2 2'-6" X 6'-8"INTERIOR SWINGING1 3/8"1 EXISTING 1 3/8"3 FRENCH DOOR 0.29 0.22 ENTRY DOOR 3'-0" X 6'-8"EXISTING EXISTING2'-6" X 6'-8"NONE MATERIAL W I N D O W S C H E D U L E SYM OPERATION GLAZ'G.U-VALUE MFR.SHGC VINYL FRAMELOW E DUAL GLAZING 0.29 0.223'-0" x 1'-0"1 2 7'-0" x 3'-0" SIZE (wxh) PER OWNER'S CHOICE SLIDING SLIDING 7 3'-6" x 3'-6" 8 REMARKS 1'-6" x 2'-6"SINGLE HUNG EXISTING EXISTING EXISTING EXISTING 3 SLIDING 4 SLIDING 5 SLIDING 4'-0" x 4'-0" 5'-6" x 3'-0" 4'-0" x 4'-0" SLIDING6'-0" x 3'-0"6 SLIDING EXISTING EXISTING EXISTING EXISTING A.0.1 SHEET# JOB# DRAWN BY DATE SCALE REVISIONS 03/26/2024 be r e p r o d u c e d w i t h o u t t h e w r i t t e n c o n s e n t o f T M C E n g i n e e r s , I n c . Th i s D o c u m e n t i s t h e p r o p e r t y o f T M C E n g i n e e r s , I n c . a n d s h a l l n o t CO P Y R I G H T CPR O P O S E D D E T A C H E D A C C E S S O R Y DW E L L I N G U N I T ( A D U ) Ex i s t i n g A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , S a n t a A n a , C A . 9 2 7 0 4 AD U A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , U n i t # 2 , S a n t a A n a , C A . 92 7 0 4 De s i g n e d B y : HI E U L U U Em a i l : h i e u l u u . c r a @ g m a i l . c o m P h o n e : ( 7 1 4 ) 2 2 7 - 8 7 9 1 TMC2318 C I V I L TI E N CHU H.L. LEGEND EX I S T I N G M A I N H O U S E : S I T E PL A N , F L O O R P L A N , R O O F PL A N A N D E L E V A T I O N S Scale: 3/16" = 1'-0" EXISTING MAIN HOUSE FLOOR PLAN2 Roof Plan Notes Scale: 1/8" = 1'-0" EXISTING SITE PLAN1 PLAN LEGEND Scale: 3/16" = 1'-0" EXISTING HOUSE : NORTH ELEVATION5 Scale: 3/16" = 1'-0" EXISTING HOUSE : WEST ELEVATION4 Scale: 3/16" = 1'-0" EXISTING HOUSE : EAST ELEVATION3 Scale: 3/16" = 1'-0" EXISTING HOUSE : SOUTH ELEVATION6 Scale: 1/8" = 1'-0" EXISTING MAIN HOUSE ROOF PLAN7 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 A.3 SHEET# JOB# DRAWN BY DATE SCALE REVISIONS 03/26/2024 be r e p r o d u c e d w i t h o u t t h e w r i t t e n c o n s e n t o f T M C E n g i n e e r s , I n c . Th i s D o c u m e n t i s t h e p r o p e r t y o f T M C E n g i n e e r s , I n c . a n d s h a l l n o t CO P Y R I G H T CPR O P O S E D D E T A C H E D A C C E S S O R Y DW E L L I N G U N I T ( A D U ) Ex i s t i n g A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , S a n t a A n a , C A . 9 2 7 0 4 AD U A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , U n i t # 2 , S a n t a A n a , C A . 92 7 0 4 De s i g n e d B y : HI E U L U U Em a i l : h i e u l u u . c r a @ g m a i l . c o m P h o n e : ( 7 1 4 ) 2 2 7 - 8 7 9 1 TMC2318 C I V I L TIE N CHU H.L. FE M A : E L E V A T I O N C E R T I F I C A T E S FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 SHEET# JOB# DRAWN BY DATE SCALE REVISIONS 03/26/2024 be r e p r o d u c e d w i t h o u t t h e w r i t t e n c o n s e n t o f T M C E n g i n e e r s , I n c . Th i s D o c u m e n t i s t h e p r o p e r t y o f T M C E n g i n e e r s , I n c . a n d s h a l l n o t CO P Y R I G H T CPR O P O S E D D E T A C H E D A C C E S S O R Y DW E L L I N G U N I T ( A D U ) Ex i s t i n g A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , S a n t a A n a , C A . 9 2 7 0 4 AD U A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , U n i t # 2 , S a n t a A n a , C A . 92 7 0 4 De s i g n e d B y : HI E U L U U Em a i l : h i e u l u u . c r a @ g m a i l . c o m P h o n e : ( 7 1 4 ) 2 2 7 - 8 7 9 1 TMC2318 C I V I L TIE N CHU H.L. GB.1 Gr e e n B u i l d i n g Re s i d e n t i a l Ma n d a t o r y C h e c k l i s t x builder x builder x builder x x x x x x x builder x builder x x builder x x builder x builder x builder x builder x builder x builder x builder FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 SHEET# JOB# DRAWN BY DATE SCALE REVISIONS 03/26/2024 be r e p r o d u c e d w i t h o u t t h e w r i t t e n c o n s e n t o f T M C E n g i n e e r s , I n c . Th i s D o c u m e n t i s t h e p r o p e r t y o f T M C E n g i n e e r s , I n c . a n d s h a l l n o t CO P Y R I G H T CPR O P O S E D D E T A C H E D A C C E S S O R Y DW E L L I N G U N I T ( A D U ) Ex i s t i n g A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , S a n t a A n a , C A . 9 2 7 0 4 AD U A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , U n i t # 2 , S a n t a A n a , C A . 92 7 0 4 De s i g n e d B y : HI E U L U U Em a i l : h i e u l u u . c r a @ g m a i l . c o m P h o n e : ( 7 1 4 ) 2 2 7 - 8 7 9 1 TMC2318 C I V I L TIE N CHU H.L. GB.2 Gr e e n B u i l d i n g Re s i d e n t i a l Ma n d a t o r y C h e c k l i s t x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 1 Date: March 8, 2024 To Owner: Mr. DINH MAI Address: 718 S Flindridge Dr, Santa Ana, CA 92704. Subject: Report of Geotechnical Engineering Investigation, Proposed Residential Development at 718 S Flindridge Dr, Santa Ana, CA. 92704. Project Number: GEO2339424TMC Gentlemen: In accordance with your request, I am pleased to submit this geotechnical engineering report for the proposed development at subject site. The purpose of this report was to evaluate the subsurface conditions and provide recommendations for foundation designs and other relevant parameters for the proposed construction. Based on the findings of our field exploration, laboratory testing and engineering analysis, the proposed construction of the subject site for the intended use is feasible from the geotechnical engineering viewpoint, provided that specific recommendations set forth herein are followed. This opportunity to be of service is sincerely appreciated. If you have any questions pertaining to this report, please call the undersigned. Respectfully submitted, Tien Chu Dist: (2) Addressee FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 2 REPORT OF GEOTECHNICAL ENGINEERING INVESTIGATION Proposed Residential Development at 718 S Flindridge Dr, Santa Ana, CA. 92704 Project Number: GEO2339424TMC Prepared by TMC ENGINEERS INC. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 3 1.0 INTRODUCTION 1.1 Purpose This report presents a summary of our preliminary geotechnical engineering investigation for the proposed development at the subject site. The purposes of this investigation were to evaluate the subsurface conditions at the area of proposed construction and to provide recommendations pertinent to grading, foundation design and other relevant parameters. 1.2 Scope of Services Our scope of services included: • Review of available soil and geologic data of the area. • Logging and sampling of hand auger boring to a maximum depth of 5 feet below the existing ground surface. Boring logs are presented in Appendix “A” (Field Investigation). • Laboratory testing of representative samples collected from the proposed construction area to establish engineering characteristics of the on-site soils. The laboratory test results are presented in Appendix B (Laboratory Testing) and on the boring logs (Appendix A). • Engineering analyses of the geotechnical data obtained from our background studies, field investigation, and laboratory testing. • Preparation of this report presenting our findings, conclusions, and recommendations for the proposed development. 1.3 Proposed Construction It is anticipated that the proposed construction is a new ADU residential with a one-story house in the rear of lot site. The structure of the proposed residential building is anticipated to be one story in height. Column loads are be light. Final grade is anticipated to be near the existing grade. 1.4 Site Conditions The subject site is located at East side of Flindridge Dr.., South of McFadden St.., West of Harbor Blvd, East of Euclid street, North of Edinger Ave. within a fully development area. An existing one story house with typical concrete driveway, sidewalks, rear yard. The subject site is relatively flat and is currently occupied by a residential house and a garage. No major surface erosions were observed at the time of our field investigation. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 4 2.0 SUBSURFACE EXPLORATION AND LABORATORY TESTING 2.1 Subsurface Exploration Our subsurface exploration consisted of drilling hand auger boring to a maximum depth of 5 feet below the existing ground surface. Relatively undisturbed, bulk samples were collected during drilling for laboratory testing. The approximate locations of the boring are shown on the attached Site Plan. Boring logs are presented in Appendix A. 2.2 Laboratory Testing Representative samples were tested for the following parameters: Atterberg Limits, expansion index. The results of our laboratory testing along with a summary of the testing procedures are presented in Appendix B. 3.0 SUMMARY OF GEOTECHNICAL CONDITIONS 3.1 Soil Conditions Based on field observation and testing of sampler of the near ground surface soil. The ground surface soils consist of silty very fine sand. In general, these soils exist slightly moist to moist condition. 3.2 Groundwater Ground water was not encountered at a depth of about 5 feet below the existing ground surface during our subsurface investigation. Based on our review of the “Historically Highest Ground Water Contours and Borehole Log Data Locations, Anaheim and Newport Beach Quadrangle” per page # 22, it is estimated that the highest ground water level is approximate 5 feet below the existing grade. It should be noted that the CDMG ground water map is obtained by evaluating technical publications, geotechnical borehole data, water-well logs dating back to the “turn-of-the-century”. This report also indicated that ground water levels in the areas from 1960-1997 data are generally 5 to 50 feet deeper than the earlier measured data. No specific date was provided pertaining to the high ground water level. Deep footings and excavations are not proposed for this site, therefore the effect due to ground FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 5 water are not anticipated for the proposed structural. SEISMIC DESIGN CONSIDERATIONS Although no know active faults traverse through the subject site, like most of Southern California, the subject site lies within a seismically active area. Earthquake resistance structural design is recommended. Designing structural to be earthquake-proof is generally considered to be impractical, especially for private projects, due to cost limitations, significant damage to structures may be unavoidable during large earthquakes. The structural design of the proposed structures should be based on the 2022 California Building Code. The following minimum seismic parameter should be used: Latitude = 33.73748, Longitude = - 117.935918 Site Class: D-default Ss= 1.332 S1= 0.476 SMS= 1.332 SDS=0.888 Seismic Design Category: D This minimum code values are intended to protect life and may not provide an acceptable level of protection against significant cosmetic damage and serious economic loss. A significantly higher than code lateral design parameter would be necessary to further reduce potential economic loss during a major seismic event. Structural engineers, however, often regard higher than code values as impractical for use in structural design. The structural engineer and project owner must decide what level of risk is acceptable and to assign appropriate seismic values for use in structural design. The risk of damage to the structural due to a large earthquake cannot be totally eliminated and obtain appropriate insurance as a mitigation measure is strongly recommended. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 6 5.0 SEISMIC HAZARDS 5.1 Liquefaction Potential Liquefaction is the transformation of a granular material from a solid to a liquid state as a result of as flow land sliding, lateral spread, loss of bearing capacity, or settlement. Based on the Seismic Hazard Zones Map, Newport Beach Quadrangle, the site is located within a potential liquefaction zone. Therefore, liquefaction may occur at the site, and the property owner(s) should be aware of the risks associated with being in a potential liquefaction zone. We recommend the proposed new structures should have a strengthened footing system as recommended in this report, and the proposed new structures will be designed based on up-to-date building codes to reduce the potential adverse effects due to potential liquefaction increasing pore-water pressure. The material will then lose strength and can flow if unrestrained, thus leading to ground failure. Liquefaction can be triggered in saturated cohesionless material by short-term cyclic loading, such as shaking due to an earthquake. Ground failure that results from liquefaction can be manifested to the proposed new structures. It should be recognized that structural mitigation may not reduce the potential of the soils to liquefy during an earthquake; and there will remain some risks that the structure could still suffer damage if liquefaction occurs during a very strong earthquake. Differential settlement due to liquefaction may occur, to reduce the potential adverse effect to the proposed new structural due to potential liquefaction induced differential settlement and/or reduction in soil bearing capacity, and it is our opinion that our recommendations shall satisfy the liquefaction requirements. 5.2 Lurching Soil lurching refers to the rolling motion on the surface due to the passage of seismic surface waves. Effects of this nature are not considered significant on the subject site where the thickness of alluvium does not vary appreciably under structures. 5.3 Surface Rupture FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 7 Surface rupture is a break in the ground surface during or as a consequence of seismic activity. The potential for surface rupture on the subject site is considered negligible due to the absence of known active faults at the site. 5.4 Ground Shaking Throughout southern California, ground shaking, as a result of earthquakes, is a constant potential hazard. The relative potential for damage from this hazard is a function of the type and magnitude of earthquake events and the distance of the subject site from the event. Accordingly, proposed structures should be designed and constructed in accordance with applicable portions of the building code. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 8 6.0 CONCLUSIONS Based on the results of our subsurface investigation, it is our opinion that the proposed residential development is feasible from a geotechnical standpoint, provided the recommendations contained herein are incorporated in the design and construction. The following is a summary of the geotechnical design and construction factors that may affect development of the site. 6.1 Seismicity Based on our studies on seismicity, there are no known active faults crossing the property. However, the site is located in a seismically active region and is subject to seismically induced ground shaking from nearby and distant faults, which is a characteristic of all Southern California areas. 6.2 Liquefaction Differential settlement due to liquefaction is roughly estimated to be about ¼ inch for a horizontal distance of 40 feet. Please note that this is only a rough estimate. 6.3 Groundwater Ground water was not encountered at a depth of about 5 feet below the existing ground surface during our subsurface investigation. In our opinion, groundwater will not be a problem during the near surface construction. 6.4 Expansion Potential Based on our field observation and testing of sample of the near ground surface on-site earth materials, the foundation subgrade soils at the site generally consisted of sandy soil with some sill and have a very low expansion potential. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 9 7.0 RECOMMENDATIONS The following recommendations should be incorporated into the design or construction phases. 7.1 Grading 7.1.1 Site Preparation Prior to initiating grading operations, any existing vegetation, trash, debris, over-sized materials (greater than 12 inches), and other deleterious materials within fill areas should be removed from the site. 7.1.2 Surficial Soil Removals For the proposed new house, after removal of existing concrete slabs where occur and/or vegetation including roots. It is recommended that the top 2 feet thick near surface earth materials should be over-excavated and re-compacted. Removal should be extended at least 2 feet beyond building lines. No deeper removal is anticipated, however, if deeper loose soils are encountered, deeper removal and re-compaction will be required. This will be determined at the field by the project geotechnical/civil engineer, based on the actual conditions exposed at the time of site grading. The removed clean on-site earth materials without any debris, vegetation and roots can be re- used as fill or back fill material. Fill, back fill material or additional imported soils should be free of organic matter and oversize material, 6 inches or greater in diameter, placed in near-horizontal loose lift not to exceed 4 inches in thickness and moisture conditioned to slightly over optimum moisture content prior to compaction. Imported soil, if any, should have a very low expansion potential and should be geotechnical observed/tested and accepted by the geotechnical/civil engineer prior to using at the site. In general, grading at the site should be performed in accordance with the requirements of the city and under the geotechnical observation and testing of the project geotechnical / civil engineer. The compaction criteria for fill and backfill material is a minimum of 90% of the maximum density determined in accordance with ASTM Test Method D1557. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 10 7.1.3 Structural Backfill The onsite soils may be used as compacted fill provided they are free of organic materials and debris. Fills should be placed in relatively thin lifts; brought to near optimum moisture content, then compacted to obtain at least 90 percent relative compaction based on laboratory standard ASTM D-1557-07. 7.1.4 Site Drainage Foundation and slab performance depend greatly on how well runoff waters drain from the site. This is true both during construction and over the entire life of the structure. The ground surface around structures should be graded so that water flows rapidly away from structure. Roof gutters and downspouts should be properly provided and maintained. In the future, sources of uncontrolled water, such as leaky sewer, water (domestic, irrigation) or drain pipes should be repaired if identified. The requirements of the governmental agency and the current CBC should be followed, as needed. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 11 7.2 Shallow Foundation Design 7.2.1 Allowable foundation and Lateral Pressure: Based on our field investigation and laboratory testing results. In accordance with Section 1806.2 of the 2022 California Building Code. It is recommended that the following parameters should be considered in the foundation design and construction: For conservative, the lowest values in table 1806.2, 2022 CBC Code, allowable bearing value of 1500 pounds per square foot. 7.2.2 Settlement Distress to the existing house due to settlement of the underlying soil was not observed. Settlement of soils underlying is not a concerned for the proposed development. Under construction, differential settlement between adjacent columns is not anticipated to exceed 1/4 inch for the adjacent column spaced at a distance of about 40 feet. 7.2.3 Lateral Pressures Passive earth pressure may be computed as an equivalent fluid pressure of 150 pounds per cubic foot, with a maximum earth pressure of 1500 pounds per square foot. An allowable coefficient of friction between soil and concrete of 0.3 may be used with the dead load forces. When combining passive pressure and frictional resistance, the passive pressure component should be reduced by one-third. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 12 7.2.4 Foundation Construction It is anticipated that the entire structure will be underlain by onsite soils of very low expansion potential. All new footings should be founded at a minimum depth of 24 inches below the lowest adjacent ground surface. All continuous footings should have at least two No. 4 reinforcing bars placed both at the top and two No. 4 reinforcing bars placed at the bottom of the footings. + New building footings: New continuous footings 12 inches wide at one-story, 15 inches wide at two-story. 24 inches deep at interior and exterior footings. Shallow pad footings at least 24 square inch and 24 inches deep. All continuous new footings should have at least two No. 4 reinforcing bars placed at the top and two No. 4 reinforcing bars placed at the bottom of the footings. 7.2.5 Concrete Slab Concrete slabs should be a minimum of 4 inches thick and reinforced with a minimum of No. 4 bars spacing at 18 inch both ways and its equivalent. All slab reinforcement should be supported to ensure proper positioning during placement of concrete. Concrete slabs in moisture sensitive areas should be underlain with a vapor barrier consist of a minimum of 10-mil vaper retarder with all laps sealed. A minimum of 2 inch of sand should be placed over the membrane to aid in uniform curing of concrete and 2 inch of sand under vapor barrier. Alternate per Cal Green code, a 4-inch-thick base of ½ inch or larger clean aggregate shall be provided with a 10-mil vaper retarder with all laps sealed in direct contact with concrete. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 13 7.3 Temporary Trench Excavation and Backfill All trench excavations should conform to CAL-OSHA and local safety codes. All utilities trench backfill should be brought to near optimum moisture content and then compacted to obtain a minimum relative compaction of 90 percent of ASTM D-1557-07. 7.4 Nonstructural concrete Flatwork: Sidewalk and Private Driveway 4 inches (sidewalk) and 5 inch (driveway) minimum thickness reinforce concrete with # 3 at 24” on center. Crack control with saw cut or deep tool joint to a minimum of 1/3 the concrete thickness, maximum joint spacing is 5 feet (sidewalk) and 10 feet or quarter cut (driveway) whichever closer. 8.0 CORROSION POTENTIAL Sulfate attack was not observed for the existing buildings in this subjected area. Type V cement with concrete strength 3000 psi is recommended to use, Water-Cement ratio=0.5. Other requirement from government agencies, if any, can be followed. It is recommended that the subsurface soils can be corrosive to buried metal pipe. It is recommended that any underground steel utilities be blasted and given protective coating. Should additional protective measures be warranted, a corrosion specialist should be consulted. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 14 9.0 INSPECTION As a necessary requisite to the use of this report, the following inspection is recommended: Temporary excavations. Removal of surficial soils. Backfill placement and compaction. • Foundation excavations. The geotechnical engineer should be notified at least 1 day in advance of the start of construction. A joint meeting between the client, the contractor, and the geotechnical engineer is recommended prior to the start of construction to discuss specific procedures and scheduling. 10.0 INVESTIGATION LIMITATIONS + The materials encountered on the subject site and utilized in our laboratory testing program are believed to be representative of the area. However, soil may vary in characters between the exploratory borings. Since our investigation is based on the site materials observed, selected laboratory testing, and engineering analyses, the conclusions and recommendations are professional opinion. These opinions have been derived in accordance with current standard of practice. + Based on our site investigation and recommendation, we believed that the proposed improvements will not adversely impact adjoining site. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 15 11.0 REFERENCES Ishihara, K. and Yoshimine, M., (1992), “Evaluation of Settlements in Sand Deposits Following Liquefaction During Earthquakes”, Japanese Society of Soil Mechanics and Foundation Engineering, Vol. 32, No. 1, pp. 173-188 Guidelines for Evaluating and Mitigating Seismic Hazards in California, 2008 Special Publication 117A, revised and re-adopted September 11, 2008. T.Y. Loud, I.M. Idriss, and et. al. (2001), “Liquefaction Resistance of Soils: Summary Report from the 1996 NCEER and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils”, Journal of the Geotechnical Engineering Division, American Society of Civil Engineers, Vol. 127, No. GT10, pp. 817-833. California Geological Survey “Probabilistic Seismic Hazard Mapping Ground Motion Page.” California Division of Mines and Geology, 1998, Seismic Hazard Zone Report for the Newport Beach Seismic Hazard Zone. EERC, “Recent Advances in Soil Liquefaction Engineering: A Unified and Consistent Framework”, EERC Report No. 2003-06, 26th Annual ASCE Geotehcnial Spring Seminar, Long Beach, April 30, 2003 Southern California Earthquake Center (SCEC), “Recommended Procedures for Implementation of DMG Special Publication 117, Guidelines for Analyzing and Mitigating Liquefaction Hazards in California”, March, 1999. www. conservation.ca.gov/cgs/rghm/psha/fault_parameters/pdf/Documents/B_flt.pdf Report of Geotechnical Engineering Investigation, Proposed Residential Development 930 S Birch St, Santa Ana, CA 92701; Project Number: 0119DD Report of Geotechnical Engineering Investigation, Proposed Residential Development, 601 S SUSAN ST. SANTA ANA, CA 92704. Project Number: 0116NT Report of Geotechnical Engineering Investigation, Proposed Residential Development 930 S Birch St, Santa Ana, CA 92701; Project Number: 0119DD Report of Geotechnical Engineering Investigation, Proposed Residential Development 2302 W Stanford St, Santa Ana, CA 92704; Project Number: 0120KHOA Report of Geotechnical Engineering Investigation, Proposed Residential Development 3614 W Camile St, Santa Ana, CA 92704; Project Number: 9017TMC Report of Geotechnical Engineering Investigation, Proposed Residential Development 2221 1 2 CYPRESS AVE, SANTA ANA , CA 92707; Project Number: 14120DT Report of Geotechnical Engineering Investigation, Proposed Residential Development 2108 Alona St, FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 16 Santa Ana, CA 92706; Project Number: GEO14720DT Report of Geotechnical Engineering Investigation, Proposed Residential Development 1121 S Golden W Ave, Santa Ana, CA 92704; Project Number: GEO0221KHOA Report of Geotechnical Engineering Investigation, Proposed Residential Development, 634 UNIT 2 S. BAMDAL ST., SANTA ANA, CA 92703; Project Number: GEO16121DT SOIL Report of Geotechnical Engineering Investigation, Proposed Residential Development, 2302 W La Verne Ave, Santa Ana, CA 92704; Project Number: GEO15521DT Report of Geotechnical Engineering Investigation, Proposed Residential Development, 601 AND 601 1/2 S. SUSANE ST, SANTA ANA - CA 92704; Project Number: GEO16521DT Report of Geotechnical Engineering Investigation, Proposed Residential Development 1510 & 1510 1/2 N. BEWLEY ST., SANTA ANA, CA 92703,; Project Number: GEO 16221DT Report of Geotechnical Engineering Investigation, Proposed Residential Development, 4325 W Oakfield Ave, Santa Ana, CA 92703 SOIL REPORT; Project Number: GEO12-0522ESS Report of Geotechnical Engineering Investigation, Proposed Residential Development 2018 W.11th, Santa Ana, CA. 92703; Project Number: GEO13-31222TMC Report of Geotechnical Engineering Investigation, Proposed Residential Development: 1413 N Hastings St., Santa Ana, CA 92703,; Project Number: GEO14-14022QD Report of Geotechnical Engineering Investigation, Proposed Residential Development: 5113 W Roberts Dr, Santa Ana, CA 92704; Project Number: GEO15-14523QD Report of Geotechnical Engineering Investigation, Proposed Residential Development: 1702 S Rene Dr, Santa Ana, CA 92704; Project Number: GEO16-18123DT Report of Geotechnical Engineering Investigation, Proposed Residential Development: 1021 W Cubbon St. Santa Ana, CA 92703; Project Number: GEO17-0123HP Report of Geotechnical Engineering Investigation, Proposed Residential Development 5017 W 6th St, Santa Ana, CA 92703,; Project Number: GEO18 Report of Geotechnical Engineering Investigation, Proposed Residential Development 1204 W 2nd St, Santa Ana, CA 92703; Project Number: GEO19 Report of Geotechnical Engineering Investigation, Proposed Residential Development, 1402 S Lowell St, Santa Ana, CA 92707; Project Number: GEO20 Report of Geotechnical Engineering Investigation, Proposed Residential Development 522 S Raitt St, Santa Ana, CA 92703,; Project Number: GEO21 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 17 APPENDIX A FIELD INVESTIGATION Subsurface conditions were explored by drilling hand auger boring to a maximum depth of 5 feet at approximate locations shown on the enclosed Site Plan. Upon completion of excavating, the boreholes were backfilled with onsite soils that were removed from the excavations. The drilling of the test boring was supervised by a geotechnical engineer, who continuously logged the borings and visually classified the soils in accordance with the Unified Soil Classification System. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 18 GEOTECHNICAL LOG OF TEST HOLES Test hole Number: BH-1 Hole Diameter: 4 inches Equipment: Hand-Auger DEPTH DESCRIPTION 0ft –2 ft Poorly grade sand with sill (SP-SM), dry, fine to medium sand, medium dense, light brown 2 ft - 5ft Poorly grade sand with sill (SP-SM), dry to moist, fine sand, dense, light brown Total depth: 5 ft No Caving No free standing water Hole back fill with on-site soil FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 19 APPENDIX B LABORATORY TESTING Expansion Index Expansion Index test was conducted on the existing onsite near surface materials sampled during field investigation. The test is performed in accordance with ASTM D-4829. The testing results are presented below: Sample Location Dry Density pcf Moisture content % Expansion Index Classification BH-1 2.0’ 128 11.8 Zero Ver Low Corrosion Potential Chemical laboratory test were conducted on the existing onsite near surface materials. The rests are performed in accordance with California Test Method 417, 422, 532 and 643. The resting results are shown in table below: Sample Location PH Sulfate Content % b Wei ht Min. Resistivity ohm-cm Chloride Content ppm BH-1 0’ to 5’ 8 0.0656 1,976 133 Note: N/R= Not Requested FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 20 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 21 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 22 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 23 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 STRUCTURAL CALCULATION FOR ADDRESS AT: Date: 2/11/24 Codes: 2022 CBC and as amended by City Ordinance Seismic Analysis: Equivalent Lateral Force Procedure, ASCE 7-16; Wind Analysis: Method 2: Analytical Procedure PROJECT: DINH MAI & THOA TRUONG's RESIDENCE 718 S FLINDTRIDGE DR., SANTA ANA, CA. 92704 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: 714 -829-5053; Email: Tienchu.e mail.com. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 PRIMARY ROOF LOADING EXTERIOR WALL LOADING ROOF FRAMING 3.55 FRAMING 0.96 1/2" PLYWOOD 1.50 DRYWALL ONE SIDE 2.60 ROOF MATERIAL 3.25 STUCCO ONE SIDE 10.00 DRYWALL 2.60 Misc. 1.44 Misc. (as solar panels) 3.10 Total load (psf) 15.00 Total Roof Dead Load (psf) 14.00 Total Roof Live Load (psf) 20.00 INTERIOR WALL LOADING Total load (psf) 34.00 FRAMING 0.96 DRYWALL BOTH SIDE 5.20 ROOF RAFTER LOADING Misc. 0.84 ROOF RAFTER 2.05 Total load (psf) 7.00 PLYWOOD 1.50 ROOF MATERIAL 3.25 PRIMARY FLOOR LOADING Misc. (as solar panels) 3.20 FLOOR FRAMING 3.14 Total Roof Dead Load (psf) 10.00 PLYWOOD (3/4") 2.25 Total Roof Live Load (psf) 20.00 DRYWALL 2.60 Total load (psf) 30.00 CARPET 1.00 Misc. 3.01 CEILING LOADING Total Floor Dead Load (psf) 12.00 CEILING JOIST 2.05 Total Floor Live Load (psf) 40.00 DRYWALL 2.60 Total load (psf) 52.00 Misc. 1.35 Total Roof Dead Load (psf) 6.00 DECK LOADING Total Roof Live Load (psf) 10.00 FLOOR FRAMING 3.14 Total load (psf) 16.00 PLYWOOD (3/4") 2.25 DRYWALL 2.60 GUARD / HAND RAIL CALCULATION Misc. 0.01 M=200*(42")=8400 lb-in Total Floor Dead Load (psf) 8.00 P=8400/3.25=2285#Total Floor Live Load (psf) 60.00 3/8" DIA. BOLTS CAPACITY Total load (psf) 68.00 IN WITHDRAWL IS 305 #/IN. PENETRATION. L=2585/2 BOLTS /305 = 4.2" USE 4 3/4" SQ. X 1/4" THICK PLATE W/(4) 3/8x10" MIN. LAG BOLT TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: 714 -829-5053; Email: Tienchu.e mail.com. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Project #: 1 MEMBER SPAN: P1 = lbs from @ X1=DL= P2 = lbs from @ X2=DL= P3 = lbs from @ X3=DL= FROM (ft) - TO (ft)PSF PLF DEAD LOAD plf CHOOSE BM TYPE= 3 0.00 - 9.25 ROOF T.L.=(34 ) x (1.33 ) = 45.22 14 PSF=>18.62 0.00 - 9.25 WALL T.L.=(15 ) x (0 ) = 0 15 PSF=>0 0.00 - 9.25 FLR. T.L.=(52 ) x (0 ) = 0 12 PSF=>0 0.00 - 9.25 Deck. T.L.=(72 ) x (0 ) = 0 12 PSF=>0 0.00 - 9.25 16 ) x (0 ) = 0 6 PSF=>0 Beam Weight = 1.83 1.83 1.83 Fb = 900 psi Fv = 180 psi E = 1.6 x106 si d = 5.5 inc Mmax =ft-lb= in-K Vmax=Rmax-(Wxd)= lbs b = 1.5 inch RL= 218 lbs RR= 218 lbs (Dead) R =95 lbs (Dead) R = 95 lbs If d>12, Size Factor, S = (12/d)(n)=>S =1.00 (Live) R = 123 lbs (Live) R = 123 lbs {n=0.111 for PSL and 6xSAWN members, n=0.136 for LVL and n=0.092 for LSL} Cd= 4 Cd= 1.25 Are you using Repetitive Member? no => Rm = 1 REQUIRED PROVIDED S=Mmax / (Fb*Cd*Sf*Rm) = 5.368 in3 S=in3 O.K. A=1.5 * Vmax / (Fv*Cd) = 1.307 in2 A=in2 O.K. Allow.Def.= L/ 240 = 0.4625 in Dac =in O.K. L/ 477 USE BEAM : ( 1 )2 x 6 2 MEMBER SPAN: P1 = lbs from @ X1=DL= P2 = lbs from @ X2=DL= P3 = lbs from @ X3=DL= FROM (ft) - TO (ft)PSF PLF DEAD LOAD plf CHOOSE BM TYPE= 3 0.00 - 17.25 ROOF T.L.=(34 ) x (0 ) = 0 14 PSF=>0 0.00 - 17.25 WALL T.L.=(15 ) x (0 ) = 0 15 PSF=>0 0.00 - 17.25 FLR. T.L.=(52 ) x (0 ) = 0 12 PSF=>0 0.00 - 17.25 Deck. T.L.=(72 ) x (0 ) = 0 12 PSF=>0 0.00 - 17.25 16 ) x (1.33 ) = 21.28 6 PSF=>7.98 Beam Weight = 2.42 2.42 2.42 Fb = 900 psi Fv = 180 psi E = 1.6 x106 si d = 7.25 inc Mmax =ft-lb= in-K Vmax=Rmax-(Wxd)= lbs b = 1.5 inch RL= 204 lbs RR= 204 lbs (Dead) R =90 lbs (Dead) R = 90 lbs If d>12, Size Factor, S = (12/d)(n)=>S =1.00 (Live) R = 115 lbs (Live) R = 115 lbs {n=0.111 for PSL and 6xSAWN members, n=0.136 for LVL and n=0.092 for LSL} Cd= 4 Cd= 1.25 Are you using Repetitive Member? no => Rm = 1 REQUIRED PROVIDED S=Mmax / (Fb*Cd*Sf*Rm) = 9.4017 in3 S=in3 O.K. A=1.5 * Vmax / (Fv*Cd) = 1.2671 in2 A=in2 O.K. Allow.Def.= L/ 240 = 0.8625 in Dac =in O.K. L/ 334 USE BEAM : ( 1 )2 x 8 0.62 Douglas Fir # 2 Roof % Capacity 13.1 71.5 10.9 11.7 TRIBUTARY (ft) 881 10.58 190 17.25 ft 503 6.04 196 Roof % Capacity 7.6 71.0 8.3 15.8 0.23 Douglas Fir # 2 CEILING JOIST TRIBUTARY (ft) TMC ENGINEERS INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. DATE: 2/11/24 39424TMC ROOF RAFTER 9.25 ft FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Project #: 3 MEMBER SPAN: P1 = lbs from @ X1=DL= P2 = lbs from @ X2=DL= P3 = lbs from @ X3=DL= FROM (ft) - TO (ft)PSF PLF DEAD LOAD plf CHOOSE BM TYPE= 8 0.00 - 21.50 ROOF T.L.=(34 ) x (4 ) = 136 14 PSF=>56 0.00 - 21.50 WALL T.L.=(15 ) x (1 ) = 15 15 PSF=>15 0.00 - 21.50 FLR. T.L.=(52 ) x (0 ) = 0 12 PSF=>0 0.00 - 21.50 Deck. T.L.=(72 ) x (0 ) = 0 12 PSF=>0 0.00 - 21.50 16 ) x (0 ) = 0 6 PSF=>0 Beam Weight = 11.72 11.72 11.72 Fb = 2400 psi Fv = 265 psi E = 1.8 x106 si d = 12 inc Mmax =ft-lb= in-K Vmax=Rmax-(Wxd)= lbs b = 3.125 inch RL= 1749 lbs RR= 1749 lbs (Dead) R =889 lbs (Dead) R = 889 lbs If d>12, Size Factor, S = (12/d)(n)=>S =1.00 (Live) R = 860 lbs (Live) R = 860 lbs {n=0.111 for PSL and 6xSAWN members, n=0.136 for LVL and n=0.092 for LSL} Cd= 4 Cd= 1.25 Are you using Repetitive Member? no => Rm = 1 REQUIRED PROVIDED S=Mmax / (Fb*Cd*Sf*Rm) = 37.608 in3 S=in3 O.K. A=1.5 * Vmax / (Fv*Cd) = 7.1842 in2 A=in2 O.K. Allow.Def.= L/ 240 = 1.075 in Dac =in O.K. L/ 267 USE BEAM : ( 1 )3.125 x 12 4 MEMBER SPAN: P1 = lbs from @ X1=DL= P2 = lbs from @ X2=DL= P3 = lbs from @ X3=DL= FROM (ft) - TO (ft)PSF PLF DEAD LOAD plf CHOOSE BM TYPE= 2 0.00 - 6.25 ROOF T.L.=(34 ) x (10.5 ) = 357 14 PSF=>147 0.00 - 6.25 WALL T.L.=(15 ) x (2 ) = 30 15 PSF=>30 0.00 - 6.25 FLR. T.L.=(52 ) x (0 ) = 0 12 PSF=>0 0.00 - 6.25 Deck. T.L.=(72 ) x (0 ) = 0 12 PSF=>0 0.00 - 6.25 16 ) x (0 ) = 0 6 PSF=>0 Beam Weight = 5.64 5.64 5.64 Fb = 1000 psi Fv = 180 psi E = 1.6 x106 si d = 7.25 inc Mmax =ft-lb= in-K Vmax=Rmax-(Wxd)= lbs b = 3.5 inch RL= 1227 lbs RR= 1227 lbs (Dead) R =571 lbs (Dead) R = 571 lbs If d>12, Size Factor, S = (12/d)(n)=>S =1.00 (Live) R = 656 lbs (Live) R = 656 lbs {n=0.111 for PSL and 6xSAWN members, n=0.136 for LVL and n=0.092 for LSL} Cd= 4 Cd= 1.25 Are you using Repetitive Member? no => Rm = 1 REQUIRED PROVIDED S=Mmax / (Fb*Cd*Sf*Rm) = 18.405 in3 S=in3 O.K. A=1.5 * Vmax / (Fv*Cd) = 6.5985 in2 A=in2 O.K. Allow.Def.= L/ 240 = 0.3125 in Dac =in O.K. L/ 989 USE BEAM : ( 1 )4 x 8 0.08 Douglas Fir # 1 Roof % Capacity 30.7 60.0 25.4 26.0 TRIBUTARY (ft) 1917 23.01 990 6.25 ft 9402 112.83 1587 Roof % Capacity 75.0 50.1 37.5 19.2 0.97 Glulam GLB 24F-V4 HDR AT LIVING/ BED 2 TRIBUTARY (ft) TMC ENGINEERS INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. DATE: 2/11/24 39424TMC BM. AT PORCH 21.50 ft FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Project #: 5 MEMBER SPAN: P1 = lbs from @ X1=DL= P2 = lbs from @ X2=DL= P3 = lbs from @ X3=DL= FROM (ft) - TO (ft)PSF PLF DEAD LOAD plf CHOOSE BM TYPE= 2 0.00 - 13.75 ROOF T.L.=(34 ) x (8.75 ) = 297.5 14 PSF=>122.5 0.00 - 13.75 WALL T.L.=(15 ) x (0 ) = 0 15 PSF=>0 0.00 - 13.75 FLR. T.L.=(52 ) x (0 ) = 0 12 PSF=>0 0.00 - 13.75 Deck. T.L.=(72 ) x (0 ) = 0 12 PSF=>0 0.00 - 13.75 16 ) x (0 ) = 0 6 PSF=>0 Beam Weight = 8.75 8.75 8.75 Fb = 1000 psi Fv = 180 psi E = 1.6 x106 si d = 11.25 inc Mmax =ft-lb= in-K Vmax=Rmax-(Wxd)= lbs b = 3.5 inch RL= 2105 lbs RR= 2105 lbs (Dead) R =902 lbs (Dead) R = 902 lbs If d>12, Size Factor, S = (12/d)(n)=>S =1.00 (Live) R = 1203 lbs (Live) R = 1203 lbs {n=0.111 for PSL and 6xSAWN members, n=0.136 for LVL and n=0.092 for LSL} Cd= 4 Cd= 1.25 Are you using Repetitive Member? no => Rm = 1 REQUIRED PROVIDED S=Mmax / (Fb*Cd*Sf*Rm) = 69.48 in3 S=in3 O.K. A=1.5 * Vmax / (Fv*Cd) = 12.122 in2 A=in2 O.K. Allow.Def.= L/ 240 = 0.6875 in Dac =in O.K. L/ 445 USE BEAM : ( 1 )4 x 12 MEMBER SPAN: P1 = lbs from @ X1=DL= P2 = lbs from @ X2=DL= P3 = lbs from @ X3=DL= FROM (ft) - TO (ft)PSF PLF DEAD LOAD plf CHOOSE BM TYPE= 2 0.00 - 6.25 ROOF T.L.=(34 ) x (10.5 ) = 357 14 PSF=>147 0.00 - 6.25 WALL T.L.=(15 ) x (2 ) = 30 15 PSF=>30 0.00 - 6.25 FLR. T.L.=(52 ) x (0 ) = 0 12 PSF=>0 0.00 - 6.25 Deck. T.L.=(72 ) x (0 ) = 0 12 PSF=>0 0.00 - 6.25 16 ) x (0 ) = 0 6 PSF=>0 Beam Weight = 5.64 5.64 5.64 Fb = 1000 psi Fv = 180 psi E = 1.6 x106 si d = 7.25 inc Mmax =ft-lb= in-K Vmax=Rmax-(Wxd)= lbs b = 3.5 inch RL= 1227 lbs RR= 1227 lbs (Dead) R =571 lbs (Dead) R = 571 lbs If d>12, Size Factor, S = (12/d)(n)=>S =1.00 (Live) R = 656 lbs (Live) R = 656 lbs {n=0.111 for PSL and 6xSAWN members, n=0.136 for LVL and n=0.092 for LSL} Cd= 4 Cd= 1.25 Are you using Repetitive Member? no => Rm = 1 REQUIRED PROVIDED S=Mmax / (Fb*Cd*Sf*Rm) = 18.405 in3 S=in3 O.K. A=1.5 * Vmax / (Fv*Cd) = 6.5985 in2 A=in2 O.K. Allow.Def.= L/ 240 = 0.3125 in Dac =in O.K. L/ 989 USE BEAM : ( 1 )4 x 8 TRIBUTARY (ft) TMC ENGINEERS INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. DATE: 2/11/24 39424TMC CLG. BM. AT BED 1 13.75 ft 6.25 ft 7238 86.85 1818 Roof % Capacity 73.8 94.1 39.4 30.8 0.37 Douglas Fir # 1 void TRIBUTARY (ft) 1917 23.01 990 0.08 Douglas Fir # 1 Roof % Capacity 30.7 60.0 25.4 26.0 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 MATERIAL SPECIFICATIONS Minimum material specifications for design: 1. Concrete member strength is as noted 2. Hardware embedment into concrete is based on f'c=2500 psi, U.N.O. 3. Steel reinforcement is grade 60 except that No.3 and No.4 bars are grade 40 4. Nails are 8d common, 10d common and 16d framing (short), U.N.O. 5. Glue-Laminated beams are 24F-V4 for simple span and 24F-V8 for other conds. 6. Steel: I-beams are A36, pipe is 53B, and tube is A500B 7. Cold Formed steel is A653, 16 gauge and heavier is 50 ksi; 18 gauge and lighter is 33ksi SHEAR WALL SCHEDULE Mark Seis.(plf) Wind (plf)x1.4 10 260 364 11 350 490 12 490 686 13 600 840 14 870 1218 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. Per table 4.3A (Special Design Provision for Wind and Seimic ) FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 WIND LOADS- Horizontal Pressures [W(+)] Wind Load calculation ASCE 7-22 Risk Category: II 3-second gust wind speed (mph): 95 Exposure Category: C ASD load Factor: 0.6 Height and Exposure Coefficients: Height 0-15' 15'-20' 20'-25' 25'-30' Coeff. 1.21 1.29 1.35 1.4 Edge Strips and End Zones: Building Eave Height (ft): 10.5 Min. Horiz. Dim (ft): 21.5 Edge Strip (a): 10% of min. Horiz. Dim.:2.15 40% of bldg eave height:4.2 4% of min. Horiz. Dim.:0.86 Default min edge strip dim.:3 Governing Edge strip value: 3 End Zone Width (2a):6 Building Roof Pitch/ Roof angle(Transverse - Y): 4 :12 Building Roof Pitch/ Roof angle(Longitudinal - X): 4 :12 Number of story: 1 1st floor top plate: 9 Wind load Horizontal (plf) Wind roof height (ft): Transverse -Y: 14 Longitudinal - X: 13 Wind Load (plf) - Transverse -Y: Wind Load (plf) - Longitudinal - X: A B C D A B C D 1st Flr 62.34 -20.04 41.55 -11.25 62.34 -16.03 41.55 -9.00 Wind load Vertical (psf) E F G H Eoh Goh -20.81 -14.13 -14.52 -10.77 -29.16 -22.75 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 SEISMIC LOADS Seismic load calculation per ASCE7-22, Section 12.8: Equivalent Lateral Force Procedure Location : 718 S FLINDTRIDGE DR., SANTA ANA, CA. 92704 Site Coordinates 33.73748°N, 117.935918°W Site specific variables: Risk Category: II 1s spectral response acceleration parameter S1:0.476 g Seismic use group: I 0.2s spectral response acceleration parameter Ss: 1.332 g Site class: D-default Seismic roof height (hn): 10.5 (ft) Seismic design Cat.: D Long-period transition period TL = 8 (sec) Redundancy factor ρ: 1.3 The important factor I: 1 Intermediate Calculations: Fv = 1.8 SM1 =0.8568 SD1 =0.571 T = 0.117 Fa = 1.2 SMS =1.5984 SDS =1.066 Cs max1=Sd1/(T*(R/I)):(for TL>T)= 0.75 Cs min 1= 0.01 Csmax2=Sd1*TL/(T^2*(R/I)):(for TL<T)= 51.66 Csmin2=0.5*S1/(R/I):(forS1>0.6)= 0.04 Transverse Ry = 6.5 Cs= Sds/(R/I) =0.16 V=Cs*W*0.7*ρ=0.15*W Longitudinal Rx = 6.5 Cs= Sds/(R/I) =0.16 V=Cs*W*0.7*ρ=0.15*W Vertical Seimic Load Effect Ev=0.14Sds x Dead Load= 0.15*DL Wall Mass Ext Walls Int Walls Total Plate Floor Length Mass Length Mass Mass Level HT (ft) Thk (in) (ft) (Kips) (ft) (Kips) (kips) 1st Flr 9 8 139 18.77 77 6.93 25.70 Total Mass Diaphragms Wall Area Weight Mass Walls Walls Mass Total Abv Blw Mass Level (sq ft) (psf) (kips) kips kips (Kips) (kips) 1st Flr 903.00 14 12.64 0 12.8475 12.85 25.49 Mass Distribution Longditudinal Transverse Diaphgram Wx Hx WxHx Fx Fx/A Fy Fy/A Fpx/Ax Level (kips) (ft) (kip-ft) (kips) (psf) (kips) (psf) (psf) 1st Flr 25.49 10.50 267.64 3.80 4.211 3.80 4.211 6.02 Total 25.490 267.640 3.803 3.803 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 SEISMIC LOAD AT 1st FLOOR LONGITUDINAL DIRECTION : Wall Trib. Area Fabv. Ftrib. Ftotal L Q Mark Allow (sqr ft) (lb) (lb) (lb) (ft) (plf) (plf) 1 966 8 121 10 260 2 936 7.75 121 10 260 3 512 3.5 146 10 241.4 4 585 4 146 10 260 5 402 2.75 146 10 218.6 6 402 2.75 146 10 218.6 REDUCED SHEAR CAPACITY (1.25-0.125*H/B) TRANSVERSE DIRECTION : Wall Trib. Area Fabv. Ftrib. Ftotal L Q Mark Allow (sqr ft) (lb) (lb) (lb) (ft) (plf) (plf) 7 210 0 884 884 4 221 10 260 8 451.5 0 1901 1901 10.5 181 10 260 9 241.5 0 1017 1017 8 127 10 260 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. 451.5 0 1901 451.5 0 1901 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Nam 39424tmc Date: 3/8/24 WIND LOAD AT 1st FLOOR LONGITUDINAL DIRECTION : Wall Length W(+)end W(+)int. W(+)roof W(+)total L Q Mark Allow (ft) wall (lb) wall (lb)(min.10psf)(lb) (ft) (plf) (plf) 1 482 8 60 10 364 2 467 7.75 60 10 364 3 305 3.5 87 10 338 4 348 4 87 10 364 5 239 2.75 87 10 306 6 239 2.75 87 10 306 REDUCED SHEAR CAPACITY (1.25-0.125*H/B) TRANSVERSE DIRECTION : Wall Length W(+)end W(+)int. W(+)roof W(+)total L Q Mark Allow (ft) wall (lb) wall (lb)(min.+10psf)(lb) (ft) (plf) (plf) 7 12 374 249 600 1223 4 306 10 364 8 25 0 1039 1250 2289 10.5 218 10 364 9 13 374 291 650 1315 8 164 10 364 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. 9 374 125 450 11 374 208 550 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 SUMMARY LOAD AT 1st FLOOR LONGITUDINAL DIRECTION : Wall Fwind Fseis Fgovern L Mark Allow (#) Allow (#) (lb) (lb) (lb) (ft) Wind Seismic 1 482 966 966 8.0 10 2912 2080 2 467 936 936 7.8 10 2821 2015 3 305 512 512 3.5 10 1274 910 4 348 585 585 4.0 10 1456 1040 5 239 402 402 2.8 10 1001 715 6 239 402 402 2.8 10 1001 715 TRANSVERSE DIRECTION : Wall Fwind Fseis Fgovern L Mark Allow (#) Allow (#) (lb) (lb) (lb) (ft) Wind Seismic 7 1223 884 1223 4.0 10 1456 1040 8 2289 1901 2289 10.5 10 3822 2730 9 1315 1017 1315 8.0 10 2912 2080 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 WALL#1 L= 8.00 ft H= 9.00 ft Shear load Vseis.& Vwind= 966# & 482# P OTM = (966)x(9);482)x(9)=8694 ; 4337 ft-lb W = 39 plf Wt wall= 15psf x 8' x 9' = 1080 # 966 W = 39plf RM = 5568 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 1080# Puplift = 0 # at 8.00 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 8.00 feet 798# 798# Ft(left)= Use Shear Type10 Ft(right)= WALL#2 L= 7.75 ft H= 9.00 ft Shear load Vseis.& Vwind= 936# & 467# P OTM = (936)x(9);467)x(9)= 8424 ; 4201 ft-lb W = plf Wt wall= 15psf x 7.75' x 9' = 1046.3 # 936 W = 39plf RM = 5225 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 1046# Puplift = 0 # at 7.75 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 7.75 feet 809# 809# Ft(left)= Use Shear Type10 Ft(right)= WALL#3 L= 3.50 ft H= 9.00 ft Shear load Vseis.& Vwind= 512# & 305# P OTM = (512)x(9);305)x(9)= 4608 ; 2742 ft-lb W = plf Wt wall= 15psf x 3.5' x 9' = 472.5 # 512 W = 39plf RM = 1066 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 473# Puplift = 0 # at 3.50 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 3.50 feet 1270# 1270# Ft(left)= Use Shear Type10 Ft(right)= 1270 647 1270 647 HDU2/4x4 Min. HDU2/4x4 Min. 798 798 129 129 809 142 HDU2/4x4 Min. HDU2/4x4 Min. HDU2/4x4 Min. Hold-Down (0.6D+W)& Post Hold-Down 809 142 ((0.6-0.14Sds)D+0.7ρQe) Seismic Force (lb): ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post ind Force (lb): TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. Seismic Force (lb): ((0.6-0.14Sds)D+0.7ρQe) Seismic Force (lb): (0.6D+W) ind Force (lb): & Post Hold-Down ind Force (lb): HDU2/4x4 Min. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 WALL#4 L= 4.00 ft H= 9.00 ft Shear load Vseis.& Vwind= 585# & 348# P OTM = (585)x(9);348)x(9)=5265 ; 3134 ft-lb W = 39 plf Wt wall= 15psf x 4' x 9' = 540 # 585 W = 39plf RM = 1392 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 540# Puplift = 0 # at 4.00 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 4.00 feet 1237# 1237# Ft(left)= Use Shear Type10 Ft(right)= WALL#5 L= 2.75 ft H= 9.00 ft Shear load Vseis.& Vwind= 402# & 239# P OTM = (402)x(9);239)x(9)= 3618 ; 2155 ft-lb W = plf Wt wall= 15psf x 2.75' x 9' = 371.25 # 402 W = 39plf RM = 658 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 371# Puplift = 0 # at 2.75 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 2.75 feet 1329# 1329# Ft(left)= Use Shear Type10 Ft(right)= WALL#6 L= 2.75 ft H= 9.00 ft Shear load Vseis.& Vwind= 402# & 239# P OTM = (402)x(9);239)x(9)= 3618 ; 2155 ft-lb W = plf Wt wall= 15psf x 2.75' x 9' = 371.25 # 402 W = 39plf RM = 658 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 371# Puplift = 0 # at 2.75 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 2.75 feet 1329# 1329# Ft(left)= Use Shear Type10 Ft(right)= TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. Seismic Force (lb): ind Force (lb): Hold-Down ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post 1237 613 HDU2/4x4 Min. 1237 613 HDU2/4x4 Min. Seismic Force (lb): ind Force (lb): Hold-Down ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post 1329 704 HDU2/4x4 Min. 1329 704 HDU2/4x4 Min. Seismic Force (lb): ind Force (lb): Hold-Down ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post 1329 704 HDU2/4x4 Min. 1329 704 HDU2/4x4 Min. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 WALL#7 L= 4.00 ft H= 9.00 ft Shear load Vseis.& Vwind= 884# & 1223# P OTM = (884)x(9);1223)x(9)=7956 ; 11010 ft-lb W = 39 plf Wt wall= 15psf x 4' x 9' = 540 # 1223 W = 39plf RM = 1392 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 540# Puplift = 0 # at 4.00 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 4.00 feet 2713# 2713# Ft(left)= Use Shear Type10 Ft(right)= WALL#8 L= 10.50 ft H= 9.00 ft Shear load Vseis.& Vwind= 1901# & 2289# P OTM = (1901)x(9);2289)x(9)= 17109 ; 20599 ft-lb W = plf Wt wall= 15psf x 10.5' x 9' = 1417.5 # 2289 W = 39plf RM = 9592 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 1418# Puplift = 0 # at 10.50 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 10.50 feet 1247# 1247# Ft(left)= Use Shear Type10 Ft(right)= WALL#9 L= 8.00 ft H= 9.00 ft Shear load Vseis.& Vwind= 1017# & 1315# P OTM = (1017)x(9);1315)x(9)= 9153 ; 11834 ft-lb W = plf Wt wall= 15psf x 8' x 9' = 1080 # 1315 W = 39plf RM = 5568 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 1080# Puplift = 0 # at 8.00 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 8.00 feet 857# 857# Ft(left)= Use Shear Type10 Ft(right)= TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. Seismic Force (lb): ind Force (lb): Hold-Down ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post 1954 2713 HDU2/4x4 Min. 1954 2713 HDU2/4x4 Min. Seismic Force (lb): ind Force (lb): Hold-Down ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post 1247 1448 HDU2/4x4 Min. 1247 1448 HDU2/4x4 Min. Seismic Force (lb): ind Force (lb): Hold-Down ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post 857 1096 HDU2/4x4 Min. 857 1096 HDU2/4x4 Min. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. S.W. #:1, 2 AT ROOF V 2170 lbs + 25% = 2712 L total 16 ft Shear length (Li) 7.75 8 0 D total 34 ft Open length (Di) 0 13.75 20.5 0 Ld 50 ft (Vd - Vw) X Li -914 -944 0 Vd 54 #/' Vd X Di 0 746 1112 0 Vw 172 #/' Summary load 0 0 -914 -168 -1112 0 0 Drag 0 0 914 168 1112 0 0 Vd - Vw -118 #/' Max Drag 1112 lbs NO. 16d NAILS = 11 S.W. #:3, 4-6 V 2170 lbs + 25% = 2712 L total 13 ft Shear length (Li) 3.5 4 2.75 D total 37 ft Open length (Di) 7.75 12.5 10 6.5 Ld 50 ft (Vd - Vw) X Li -539 -616 -424 Vd 55 #/' Vd X Di 422 681 545 354 Vw 209 #/' Summary load 0 422 -117 565 -52 493 69 Drag 0 422 117 565 52 493 69 Vd - Vw -154 #/' Max Drag 565 lbs NO. 16d NAILS = 6 S.W. #:7 V 1223 lbs + 25% = 1529 L total 4 ft Shear length (Li) 4 0 0 D total 14 ft Open length (Di) 4.75 8.75 0 0 Ld 18 ft (Vd - Vw) X Li -1180 0 0 Vd 87 #/' Vd X Di 415 765 0 0 Vw 382 #/' Summary load 0 415 -765 0 0 0 0 Drag 0 415 765 0 0 0 0 Vd - Vw -295 #/' Max Drag 765 lbs NO. 16d NAILS = 7 0 500 1000 1500 1 2 3 4 5 6 7 8 0 200 400 600 1 2 3 4 5 6 7 8 0 500 1000 1 2 3 4 5 6 7 8 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. S.W. #:9 AT ROOF V 1315 lbs + 25% = 1644 L total 8 ft Shear length (Li) 8 0 0 D total 10 ft Open length (Di) 9.5 0 0 0 Ld 18 ft (Vd - Vw) X Li -892 0 0 Vd 94 #/' Vd X Di 892 0 0 0 Vw 205 #/' Summary load 0 892 0 0 0 0 0 Drag 0 892 0 0 0 0 0 Vd - Vw -112 #/' Max Drag 892 lbs NO. 16d NAILS = 9 S.W. #:0 V lbs + 25% = 0 L total 3 ft Shear length (Li) 2.75 0 0 D total 15 ft Open length (Di) 4.75 9.75 0 0 Ld 17 ft (Vd - Vw) X Li 0 0 0 Vd #/' Vd X Di 0 0 0 0 Vw #/' Summary load 0 0 0 0 0 0 0 Drag 0 0 0 0 0 0 0 Vd - Vw #/' Max Drag lbs NO. 16d NAILS = 0 S.W. #:0 V lbs + 25% = 0 L total 4 ft Shear length (Li) 4 0 0 D total 32 ft Open length (Di) 19.5 12.5 0 0 Ld 36 ft (Vd - Vw) X Li 0 0 0 Vd #/' Vd X Di 0 0 0 0 Vw #/' Summary load 0 0 0 0 0 0 0 Drag 0 0 0 0 0 0 0 Vd - Vw #/' Max Drag lbs NO. 16d NAILS = 0 0 500 1000 1 2 3 4 5 6 7 8 0 1 1 1 2 3 4 5 6 7 8 0 1 1 1 2 3 4 5 6 7 8 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 ASCE Hazards Report Address: 718 S Flintridge Dr Santa Ana, California 92704 Standard:ASCE/SEI 7-16 Latitude:33.73748 Risk Category:II Longitude:-117.935918 Soil Class:D - Stiff Soil Elevation:57.848527963357554 ft (NAVD 88) Page 1 of 3https://ascehazardtool.org/Fri Mar 08 2024 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 SS : 1.332 S1 : 0.476 F a : 1 F v : N/A SMS : 1.332 SM1 : N/A SDS : 0.888 SD1 : N/A T L : 8 PGA : 0.57 PGA M : 0.627 F PGA : 1.1 Ie : 1 C v : 1.366 Seismic Site Soil Class: Results: Data Accessed: Date Source: D - Stiff Soil USGS Seismic Design Maps Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8. Fri Mar 08 2024 Page 2 of 3https://ascehazardtool.org/Fri Mar 08 2024 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 The ASCE Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or has been extrapolated from maps incorporated in the ASCE standard. While ASCE has made every effort to use data obtained from reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation, relationship, or sponsorship of such third-party content by or from ASCE. ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the contents of this Tool or the ASCE standard. In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors, employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE Hazard Tool. Page 3 of 3https://ascehazardtool.org/Fri Mar 08 2024 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 SANTA ANA CITY COUNCIL Mayor vamezcua@santa-ana.org Mayor Pro Tem, Ward 1 tphan@santa-ana.org Ward 2 bvazquez@santa-ana.org Ward 3 jessielopez@santa-ana.org Ward 4 pbacerra@santa-ana.org Ward 5 jryanhernandez@santa-ana.org Ward 6 dpenaloza@santa-ana.org MAYOR Valerie Amezcua MAYOR PRO TEM Thai Viet Phan COUNCILMEMBERS Phil Bacerra Johnathan Ryan Hernandez Jessie Lopez David Penaloza Benjamin Vazquez CITY OF SANTA ANA PLANNING AND BUILDING AGENCY 20 Civic Center Plaza ● P.O. Box 1988 Santa Ana, California 92702 www.santa-ana.org INTERIM CITY MANAGER Tom Hatch CITY ATTORNEY Sonia R. Carvalho CITY CLERK Jennifer L. Hall January 23, 2024 Also sent via email to: hieuluu.cra@gmail.com Dinh Van Mai 718 South Flintridge Drive Santa Ana, CA 92704 Subject: Address Assignment for a Detached Accessory Dwelling Unit located at 718 South Flintridge Drive (APN: 188-062-04) in Santa Ana, CA Dear Mr. Mai, The City of Santa Ana Planning and Building Agency (PBA) is the responsible agency for legal addressing within the City of Santa Ana’s jurisdiction. This letter confirms the address assignment for a 800-square-feet detached ADU located at 718 South Flintridge Drive (APN: 188-062-04). Notice is hereby given that the following assigned address shall be posted onsite per the approved address plan, attached hereto as Exhibit A. Address to be Activated/Posted 718 South Flintridge To subdivide commercial and/or residential units into multiple units, a building permit (and all other associated permits), plans, and inspection approvals by the PBA are required. Address(es) will be verified during inspections by the Building Safety Division. Please update your records accordingly. Should you have any questions, feel free to contact me by phone at (714) 664-2753 or by email at PRaj@santa-ana.org. Sincerely, Punkaj Raj Planning Technician Exhibit A – Address Plan FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Address Letter for 718 South Flintridge Drive Page 2 of 2 c: Vencent Quaglia, United States Post Office Chris Tuiolosega, United States Post Office Cipriano Corona, Marketing Manager, United States Post Office Alex Alvarez, Postmaster Santa Ana, United States Post Office Federal Express, Administration Cathy Joseph, Garden Grove Unified School District Christine Hy, Garden Grove Unified School District Cathy Slader, Orange Unified School District Orin Williams, Santa Ana Unified School District Yvette Miranda, Santa Ana Unified School District Cristina Bernal, Tustin Unified School District Mishele Richards, Orange County Fire Authority, GEO Files Coordinator Orange County Fire Authority Neal Kelly, Registrar of Voters Members, Board of Supervisors Southern California Gas Company Southern California Edison Company Claude Parrish, County Assessor's Office SAG, AT&T UPS, Administration City Manager’s Office Beverly Martin, Police Community Services Specialist Boris Duran, Police Systems Manager Jennifer Mendoza, Police Communications Manager Chris Hubbard, Police Systems Support Analyst Alejandra Gutierrez, Treasury & Customer Services Manager Hector Jimenez, Revenue Supervisor Alfonso Chavez, Utilities Customer Services Supervisor Judson Brown, Housing & Neighborhood Development Manager Rudy Rosas, Principal Civil Engineer Zdenek (Zed) Kekula, Principal Civil Engineer Jason Kwak, Building Safety Manager Evelyn LaRocca, Permit Supervisor Kathy Hernandez, Permit Technician Julie Amsden, Permit Technician Ali Pezeshkpour, Planning Manager Jerry Guevara, Senior Planner Alvaro Nunez, PBA Assistant Director and Code Enforcement Manager FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Submittal Criteria Form Required for Single Family or Duplex Residences (Use Commercial form for lots with 3+ dwelling units or new residential tracts) Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification. Project Information  New Single Family Residence/Duplex  Addition/Remodel  ADU  Other Address: Unit #: City or Unincorporated County Area: ZIP: Scope of Work: Existing Area: Area to be Added: Total Resulting Area: Stories: Area Added in Past 2 Years (excluding this project): Yes No Questionnaire OCFA Plan Type if “Yes” 1.   New – Is this a new single family residence or duplex? *(PR160) Residential Site with Water Availability (PR400-402) Fire Sprinkler 2.   ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has fire sprinklers or a house that will have fire sprinklers added as part of this project? (PR400-402) Fire Sprinkler 3.   Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire sprinkler retrofit based on a threshold set by local ordinance? (PR400-402) Fire Sprinkler 4.   Distance – Is the most remote portion of the addition, ADU or other detached structure greater than 140-feet from the fire access roadway? *(PR160) Residential Site 5.   Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non- sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all enclosed spaces, such as garages, stairs, and detached structures separated by less than 10-feet? *(PR160) Residential Site with Water Availability 6.   Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed contractor to determine if a fire sprinkler modification is needed. (PR400-402) Fire Sprinkler 7.   Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold set by local ordinance? *(PR160) Residential Site (PR400-402) Fire Sprinkler 8.   Gate – Is a gate being installed across a driveway or road that is designated as a fire department access roadway, or a driveway or road that serves more than a single home/duplex? (PR180) Gate 9.   Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000 sf, and ADU’s). *(PR160) Residential Site *(PR172-174) Methane Test/Mitigation Plans 10.   Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation, or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as defined by the State, or (D) near an area that could be affected by a wildfire in the open space. *(PR125) Fuel Modification (PR182) Accessory Structure *OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals. Applicant Certification I certify, under penalty of perjury, under the laws of the State of California, that the information above is true: Print Name:_______________________________________ Signature:___________________________________________ Date:______________ Phone Number:_____________________________________________ Email:_____________________________________________________________ Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required. ______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes” and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination. For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100 SFR FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Page 1 of 1 EXISTING ONE & TWO FAMILY DWELLINGS ELECTRICAL SERVICES UNDERGROUND EXCEPTION CEC 2022 ELC-04 All new utility connections are required to be installed below grade by Santa Ana Municipal Code 41- 626(b). There is a standing exception for one and two family dwellings. This exception applies only when the new electrical service is designed to be fed from below grade as well as overhead. This diagram is a typical unit. The utility is able to feed this cabinet from the top or the bottom without interfering with the distribution wiring. All the circuit breakers and branch circuits are contained in the circuit breaker side of this cabinet. Only listed combination overhead and underground feed service boxes may be used to connect to an overhead utility drop. This exception to an underground fed service applies only to existing single family and two family residences. Planning & Building Agency Permits & Plan Check Section 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 Rigid Conduit Service Entrance Conductor Riser Underground Service Lateral METER Rev. 1/21/2020 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Bldg #101119235-36 APPROVALS: PLNG - P. Raj BLDG - J.Lo POLICE - B. Martin PUBLIC WORKS - B. Sarlak FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 SCOPE OF WORK PL 6 0 . 0 0 ' WA T E R PL 100.00' NO R T H CL Fl i n t r i d g e D r . EXISTING DRIVEWAY EXISTING 6'H CMU BLOCK WALL PL 100.00' PL 6 0 . 0 0 ' Existing 2-Car garage 390 Sf. EXISTING 5'H IRON FENCE EL E C T R I C 718 S. Flintridge Dr. EXISTING HOUSE 1,285 SF. ADU PORCH 104 SF. PROPOSED ADU 800 SF. EXISTING 6'H CMU BLOCK WALL EX I S T I N G 6 ' H C M U BL O C K W A L L EXISTING 5'H IRON FENCE ELECTRICAL EXISTING LANDSCAPE EXCESS CONCRETE TO BE REPLACED WITH LANDSCAPE LATER SCIENTIFIC NAME Common Name LEGEND QUANTITY Size TYPE Location LANDSCAPE PLANTS LEGEND Rhaphiolepis indica India Hawthorn Evergreen Along driveway Total 6 minimum 5-gallon shrub every 2 feet with 2" mulch at bottom Barbara Karst Bougainvillea or Fruit Trees per owner Evergreen Vine Along perimeter Quantity as shown 5-gallon size every 20 feet Total 10 minimum 1-gallon shrub every 3 feet with 2" mulch at bottom Rosaceae Rose (species per owner's choise) Perennial As shown on plan Grass n/a Grass As shown n/a Area as shown Prunus Red flowering Peach Quantity as shown 24" box Evergreen Canopy As shown Pop-up Sprinkler (per owner) n/a As shown n/a As shown Mulch n/a Mulch As shown 2" Area as shown n/a As shown n/a As shown V Vines n/a · · · A.0 SHEET# JOB# DRAWN BY DATE SCALE REVISIONS 03/26/2024 be r e p r o d u c e d w i t h o u t t h e w r i t t e n c o n s e n t o f T M C E n g i n e e r s , I n c . Th i s D o c u m e n t i s t h e p r o p e r t y o f T M C E n g i n e e r s , I n c . a n d s h a l l n o t CO P Y R I G H T CPR O P O S E D D E T A C H E D A C C E S S O R Y DW E L L I N G U N I T ( A D U ) Ex i s t i n g A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , S a n t a A n a , C A . 9 2 7 0 4 AD U A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , U n i t # 2 , S a n t a A n a , C A . 92 7 0 4 De s i g n e d B y : HI E U L U U Em a i l : h i e u l u u . c r a @ g m a i l . c o m P h o n e : ( 7 1 4 ) 2 2 7 - 8 7 9 1 TMC2318 C I V I L TIE N CHU H.L. PR O J E C T D A T A , N O T E S , PR O P O S E D S I T E P L A N , A N D AD U R O O F P L A N Project Summary PLAN LEGEND Scale: 1/8" = 1'-0" PROPOSED SITE PLAN and LANDSCAPE PLAN1 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Existing 2-Car garage Existing Bedroom #1 Existing Bedroom #2 Existing Bedroom #3 Existing Bath #1 Existing Bath #2 Existing Kitchen Existing Living Room EL E C T R I C 1 1 1 2 3 3 1 1 2 3 3 3 4 4 8 6 7 Existing Patio To Be Demolished 750 Sf. PL 6 0 . 0 0 ' WA T E R PL 100.00' NO R T H CL Fl i n t r i d g e D r . EXISTING DRIVEWAY EXISTING 6'H CMU BLOCK WALL PL 100.00' PL 6 0 . 0 0 ' Existing 2-Car garage Existing Bedroom #1 Existing Bedroom #2 Existing Bedroom #3 Existing Bath #1 Existing Bath #2 Existing Kitchen Existing Living Room EXISTING 5'H IRON FENCE EL E C T R I C Existing Patio To Be Demolished 750 Sf. EXISTING 5'H IRON FENCE Existing Shed To Be Demolished 50 Sf. EXISTING 6'H CMU BLOCK WALL EXCESS CONCRETE TO BE REPLACED WITH LANDSCAPE LATER D O O R S C H E D U L E SIZE#GLAZ'G.THK REMARKSTYPEU-VAL.SHGC 1 3/4" 1 3/8"NONE __ NONE __2 2'-6" X 6'-8"INTERIOR SWINGING1 3/8"1 EXISTING 1 3/8"3 FRENCH DOOR 0.29 0.22 ENTRY DOOR 3'-0" X 6'-8"EXISTING EXISTING2'-6" X 6'-8"NONE MATERIAL W I N D O W S C H E D U L E SYM OPERATION GLAZ'G.U-VALUE MFR.SHGC VINYL FRAMELOW E DUAL GLAZING 0.29 0.223'-0" x 1'-0"1 2 7'-0" x 3'-0" SIZE (wxh) PER OWNER'S CHOICE SLIDING SLIDING 7 3'-6" x 3'-6" 8 REMARKS 1'-6" x 2'-6"SINGLE HUNG EXISTING EXISTING EXISTING EXISTING 3 SLIDING 4 SLIDING 5 SLIDING 4'-0" x 4'-0" 5'-6" x 3'-0" 4'-0" x 4'-0" SLIDING6'-0" x 3'-0"6 SLIDING EXISTING EXISTING EXISTING EXISTING A.0.1 SHEET# JOB# DRAWN BY DATE SCALE REVISIONS 03/26/2024 be r e p r o d u c e d w i t h o u t t h e w r i t t e n c o n s e n t o f T M C E n g i n e e r s , I n c . Th i s D o c u m e n t i s t h e p r o p e r t y o f T M C E n g i n e e r s , I n c . a n d s h a l l n o t CO P Y R I G H T CPR O P O S E D D E T A C H E D A C C E S S O R Y DW E L L I N G U N I T ( A D U ) Ex i s t i n g A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , S a n t a A n a , C A . 9 2 7 0 4 AD U A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , U n i t # 2 , S a n t a A n a , C A . 92 7 0 4 De s i g n e d B y : HI E U L U U Em a i l : h i e u l u u . c r a @ g m a i l . c o m P h o n e : ( 7 1 4 ) 2 2 7 - 8 7 9 1 TMC2318 C I V I L TI E N CHU H.L. LEGEND EX I S T I N G M A I N H O U S E : S I T E PL A N , F L O O R P L A N , R O O F PL A N A N D E L E V A T I O N S Scale: 3/16" = 1'-0" EXISTING MAIN HOUSE FLOOR PLAN2 Roof Plan Notes Scale: 1/8" = 1'-0" EXISTING SITE PLAN1 PLAN LEGEND Scale: 3/16" = 1'-0" EXISTING HOUSE : NORTH ELEVATION5 Scale: 3/16" = 1'-0" EXISTING HOUSE : WEST ELEVATION4 Scale: 3/16" = 1'-0" EXISTING HOUSE : EAST ELEVATION3 Scale: 3/16" = 1'-0" EXISTING HOUSE : SOUTH ELEVATION6 Scale: 1/8" = 1'-0" EXISTING MAIN HOUSE ROOF PLAN7 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 A.3 SHEET# JOB# DRAWN BY DATE SCALE REVISIONS 03/26/2024 be r e p r o d u c e d w i t h o u t t h e w r i t t e n c o n s e n t o f T M C E n g i n e e r s , I n c . Th i s D o c u m e n t i s t h e p r o p e r t y o f T M C E n g i n e e r s , I n c . a n d s h a l l n o t CO P Y R I G H T CPR O P O S E D D E T A C H E D A C C E S S O R Y DW E L L I N G U N I T ( A D U ) Ex i s t i n g A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , S a n t a A n a , C A . 9 2 7 0 4 AD U A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , U n i t # 2 , S a n t a A n a , C A . 92 7 0 4 De s i g n e d B y : HI E U L U U Em a i l : h i e u l u u . c r a @ g m a i l . c o m P h o n e : ( 7 1 4 ) 2 2 7 - 8 7 9 1 TMC2318 C I V I L TIE N CHU H.L. FE M A : E L E V A T I O N C E R T I F I C A T E S FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 SHEET# JOB# DRAWN BY DATE SCALE REVISIONS 03/26/2024 be r e p r o d u c e d w i t h o u t t h e w r i t t e n c o n s e n t o f T M C E n g i n e e r s , I n c . Th i s D o c u m e n t i s t h e p r o p e r t y o f T M C E n g i n e e r s , I n c . a n d s h a l l n o t CO P Y R I G H T CPR O P O S E D D E T A C H E D A C C E S S O R Y DW E L L I N G U N I T ( A D U ) Ex i s t i n g A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , S a n t a A n a , C A . 9 2 7 0 4 AD U A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , U n i t # 2 , S a n t a A n a , C A . 92 7 0 4 De s i g n e d B y : HI E U L U U Em a i l : h i e u l u u . c r a @ g m a i l . c o m P h o n e : ( 7 1 4 ) 2 2 7 - 8 7 9 1 TMC2318 C I V I L TIE N CHU H.L. GB.1 Gr e e n B u i l d i n g Re s i d e n t i a l Ma n d a t o r y C h e c k l i s t x builder x builder x builder x x x x x x x builder x builder x x builder x x builder x builder x builder x builder x builder x builder x builder FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 SHEET# JOB# DRAWN BY DATE SCALE REVISIONS 03/26/2024 be r e p r o d u c e d w i t h o u t t h e w r i t t e n c o n s e n t o f T M C E n g i n e e r s , I n c . Th i s D o c u m e n t i s t h e p r o p e r t y o f T M C E n g i n e e r s , I n c . a n d s h a l l n o t CO P Y R I G H T CPR O P O S E D D E T A C H E D A C C E S S O R Y DW E L L I N G U N I T ( A D U ) Ex i s t i n g A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , S a n t a A n a , C A . 9 2 7 0 4 AD U A d d r e s s : 7 1 8 S F l i n t r i d g e D r . , U n i t # 2 , S a n t a A n a , C A . 92 7 0 4 De s i g n e d B y : HI E U L U U Em a i l : h i e u l u u . c r a @ g m a i l . c o m P h o n e : ( 7 1 4 ) 2 2 7 - 8 7 9 1 TMC2318 C I V I L TIE N CHU H.L. GB.2 Gr e e n B u i l d i n g Re s i d e n t i a l Ma n d a t o r y C h e c k l i s t x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder x builder FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 1 Date: March 8, 2024 To Owner: Mr. DINH MAI Address: 718 S Flindridge Dr, Santa Ana, CA 92704. Subject: Report of Geotechnical Engineering Investigation, Proposed Residential Development at 718 S Flindridge Dr, Santa Ana, CA. 92704. Project Number: GEO2339424TMC Gentlemen: In accordance with your request, I am pleased to submit this geotechnical engineering report for the proposed development at subject site. The purpose of this report was to evaluate the subsurface conditions and provide recommendations for foundation designs and other relevant parameters for the proposed construction. Based on the findings of our field exploration, laboratory testing and engineering analysis, the proposed construction of the subject site for the intended use is feasible from the geotechnical engineering viewpoint, provided that specific recommendations set forth herein are followed. This opportunity to be of service is sincerely appreciated. If you have any questions pertaining to this report, please call the undersigned. Respectfully submitted, Tien Chu Dist: (2) Addressee FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 2 REPORT OF GEOTECHNICAL ENGINEERING INVESTIGATION Proposed Residential Development at 718 S Flindridge Dr, Santa Ana, CA. 92704 Project Number: GEO2339424TMC Prepared by TMC ENGINEERS INC. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 3 1.0 INTRODUCTION 1.1 Purpose This report presents a summary of our preliminary geotechnical engineering investigation for the proposed development at the subject site. The purposes of this investigation were to evaluate the subsurface conditions at the area of proposed construction and to provide recommendations pertinent to grading, foundation design and other relevant parameters. 1.2 Scope of Services Our scope of services included: • Review of available soil and geologic data of the area. • Logging and sampling of hand auger boring to a maximum depth of 5 feet below the existing ground surface. Boring logs are presented in Appendix “A” (Field Investigation). • Laboratory testing of representative samples collected from the proposed construction area to establish engineering characteristics of the on-site soils. The laboratory test results are presented in Appendix B (Laboratory Testing) and on the boring logs (Appendix A). • Engineering analyses of the geotechnical data obtained from our background studies, field investigation, and laboratory testing. • Preparation of this report presenting our findings, conclusions, and recommendations for the proposed development. 1.3 Proposed Construction It is anticipated that the proposed construction is a new ADU residential with a one-story house in the rear of lot site. The structure of the proposed residential building is anticipated to be one story in height. Column loads are be light. Final grade is anticipated to be near the existing grade. 1.4 Site Conditions The subject site is located at East side of Flindridge Dr.., South of McFadden St.., West of Harbor Blvd, East of Euclid street, North of Edinger Ave. within a fully development area. An existing one story house with typical concrete driveway, sidewalks, rear yard. The subject site is relatively flat and is currently occupied by a residential house and a garage. No major surface erosions were observed at the time of our field investigation. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 4 2.0 SUBSURFACE EXPLORATION AND LABORATORY TESTING 2.1 Subsurface Exploration Our subsurface exploration consisted of drilling hand auger boring to a maximum depth of 5 feet below the existing ground surface. Relatively undisturbed, bulk samples were collected during drilling for laboratory testing. The approximate locations of the boring are shown on the attached Site Plan. Boring logs are presented in Appendix A. 2.2 Laboratory Testing Representative samples were tested for the following parameters: Atterberg Limits, expansion index. The results of our laboratory testing along with a summary of the testing procedures are presented in Appendix B. 3.0 SUMMARY OF GEOTECHNICAL CONDITIONS 3.1 Soil Conditions Based on field observation and testing of sampler of the near ground surface soil. The ground surface soils consist of silty very fine sand. In general, these soils exist slightly moist to moist condition. 3.2 Groundwater Ground water was not encountered at a depth of about 5 feet below the existing ground surface during our subsurface investigation. Based on our review of the “Historically Highest Ground Water Contours and Borehole Log Data Locations, Anaheim and Newport Beach Quadrangle” per page # 22, it is estimated that the highest ground water level is approximate 5 feet below the existing grade. It should be noted that the CDMG ground water map is obtained by evaluating technical publications, geotechnical borehole data, water-well logs dating back to the “turn-of-the-century”. This report also indicated that ground water levels in the areas from 1960-1997 data are generally 5 to 50 feet deeper than the earlier measured data. No specific date was provided pertaining to the high ground water level. Deep footings and excavations are not proposed for this site, therefore the effect due to ground FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 5 water are not anticipated for the proposed structural. SEISMIC DESIGN CONSIDERATIONS Although no know active faults traverse through the subject site, like most of Southern California, the subject site lies within a seismically active area. Earthquake resistance structural design is recommended. Designing structural to be earthquake-proof is generally considered to be impractical, especially for private projects, due to cost limitations, significant damage to structures may be unavoidable during large earthquakes. The structural design of the proposed structures should be based on the 2022 California Building Code. The following minimum seismic parameter should be used: Latitude = 33.73748, Longitude = - 117.935918 Site Class: D-default Ss= 1.332 S1= 0.476 SMS= 1.332 SDS=0.888 Seismic Design Category: D This minimum code values are intended to protect life and may not provide an acceptable level of protection against significant cosmetic damage and serious economic loss. A significantly higher than code lateral design parameter would be necessary to further reduce potential economic loss during a major seismic event. Structural engineers, however, often regard higher than code values as impractical for use in structural design. The structural engineer and project owner must decide what level of risk is acceptable and to assign appropriate seismic values for use in structural design. The risk of damage to the structural due to a large earthquake cannot be totally eliminated and obtain appropriate insurance as a mitigation measure is strongly recommended. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 6 5.0 SEISMIC HAZARDS 5.1 Liquefaction Potential Liquefaction is the transformation of a granular material from a solid to a liquid state as a result of as flow land sliding, lateral spread, loss of bearing capacity, or settlement. Based on the Seismic Hazard Zones Map, Newport Beach Quadrangle, the site is located within a potential liquefaction zone. Therefore, liquefaction may occur at the site, and the property owner(s) should be aware of the risks associated with being in a potential liquefaction zone. We recommend the proposed new structures should have a strengthened footing system as recommended in this report, and the proposed new structures will be designed based on up-to-date building codes to reduce the potential adverse effects due to potential liquefaction increasing pore-water pressure. The material will then lose strength and can flow if unrestrained, thus leading to ground failure. Liquefaction can be triggered in saturated cohesionless material by short-term cyclic loading, such as shaking due to an earthquake. Ground failure that results from liquefaction can be manifested to the proposed new structures. It should be recognized that structural mitigation may not reduce the potential of the soils to liquefy during an earthquake; and there will remain some risks that the structure could still suffer damage if liquefaction occurs during a very strong earthquake. Differential settlement due to liquefaction may occur, to reduce the potential adverse effect to the proposed new structural due to potential liquefaction induced differential settlement and/or reduction in soil bearing capacity, and it is our opinion that our recommendations shall satisfy the liquefaction requirements. 5.2 Lurching Soil lurching refers to the rolling motion on the surface due to the passage of seismic surface waves. Effects of this nature are not considered significant on the subject site where the thickness of alluvium does not vary appreciably under structures. 5.3 Surface Rupture FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 7 Surface rupture is a break in the ground surface during or as a consequence of seismic activity. The potential for surface rupture on the subject site is considered negligible due to the absence of known active faults at the site. 5.4 Ground Shaking Throughout southern California, ground shaking, as a result of earthquakes, is a constant potential hazard. The relative potential for damage from this hazard is a function of the type and magnitude of earthquake events and the distance of the subject site from the event. Accordingly, proposed structures should be designed and constructed in accordance with applicable portions of the building code. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 8 6.0 CONCLUSIONS Based on the results of our subsurface investigation, it is our opinion that the proposed residential development is feasible from a geotechnical standpoint, provided the recommendations contained herein are incorporated in the design and construction. The following is a summary of the geotechnical design and construction factors that may affect development of the site. 6.1 Seismicity Based on our studies on seismicity, there are no known active faults crossing the property. However, the site is located in a seismically active region and is subject to seismically induced ground shaking from nearby and distant faults, which is a characteristic of all Southern California areas. 6.2 Liquefaction Differential settlement due to liquefaction is roughly estimated to be about ¼ inch for a horizontal distance of 40 feet. Please note that this is only a rough estimate. 6.3 Groundwater Ground water was not encountered at a depth of about 5 feet below the existing ground surface during our subsurface investigation. In our opinion, groundwater will not be a problem during the near surface construction. 6.4 Expansion Potential Based on our field observation and testing of sample of the near ground surface on-site earth materials, the foundation subgrade soils at the site generally consisted of sandy soil with some sill and have a very low expansion potential. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 9 7.0 RECOMMENDATIONS The following recommendations should be incorporated into the design or construction phases. 7.1 Grading 7.1.1 Site Preparation Prior to initiating grading operations, any existing vegetation, trash, debris, over-sized materials (greater than 12 inches), and other deleterious materials within fill areas should be removed from the site. 7.1.2 Surficial Soil Removals For the proposed new house, after removal of existing concrete slabs where occur and/or vegetation including roots. It is recommended that the top 2 feet thick near surface earth materials should be over-excavated and re-compacted. Removal should be extended at least 2 feet beyond building lines. No deeper removal is anticipated, however, if deeper loose soils are encountered, deeper removal and re-compaction will be required. This will be determined at the field by the project geotechnical/civil engineer, based on the actual conditions exposed at the time of site grading. The removed clean on-site earth materials without any debris, vegetation and roots can be re- used as fill or back fill material. Fill, back fill material or additional imported soils should be free of organic matter and oversize material, 6 inches or greater in diameter, placed in near-horizontal loose lift not to exceed 4 inches in thickness and moisture conditioned to slightly over optimum moisture content prior to compaction. Imported soil, if any, should have a very low expansion potential and should be geotechnical observed/tested and accepted by the geotechnical/civil engineer prior to using at the site. In general, grading at the site should be performed in accordance with the requirements of the city and under the geotechnical observation and testing of the project geotechnical / civil engineer. The compaction criteria for fill and backfill material is a minimum of 90% of the maximum density determined in accordance with ASTM Test Method D1557. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 10 7.1.3 Structural Backfill The onsite soils may be used as compacted fill provided they are free of organic materials and debris. Fills should be placed in relatively thin lifts; brought to near optimum moisture content, then compacted to obtain at least 90 percent relative compaction based on laboratory standard ASTM D-1557-07. 7.1.4 Site Drainage Foundation and slab performance depend greatly on how well runoff waters drain from the site. This is true both during construction and over the entire life of the structure. The ground surface around structures should be graded so that water flows rapidly away from structure. Roof gutters and downspouts should be properly provided and maintained. In the future, sources of uncontrolled water, such as leaky sewer, water (domestic, irrigation) or drain pipes should be repaired if identified. The requirements of the governmental agency and the current CBC should be followed, as needed. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 11 7.2 Shallow Foundation Design 7.2.1 Allowable foundation and Lateral Pressure: Based on our field investigation and laboratory testing results. In accordance with Section 1806.2 of the 2022 California Building Code. It is recommended that the following parameters should be considered in the foundation design and construction: For conservative, the lowest values in table 1806.2, 2022 CBC Code, allowable bearing value of 1500 pounds per square foot. 7.2.2 Settlement Distress to the existing house due to settlement of the underlying soil was not observed. Settlement of soils underlying is not a concerned for the proposed development. Under construction, differential settlement between adjacent columns is not anticipated to exceed 1/4 inch for the adjacent column spaced at a distance of about 40 feet. 7.2.3 Lateral Pressures Passive earth pressure may be computed as an equivalent fluid pressure of 150 pounds per cubic foot, with a maximum earth pressure of 1500 pounds per square foot. An allowable coefficient of friction between soil and concrete of 0.3 may be used with the dead load forces. When combining passive pressure and frictional resistance, the passive pressure component should be reduced by one-third. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 12 7.2.4 Foundation Construction It is anticipated that the entire structure will be underlain by onsite soils of very low expansion potential. All new footings should be founded at a minimum depth of 24 inches below the lowest adjacent ground surface. All continuous footings should have at least two No. 4 reinforcing bars placed both at the top and two No. 4 reinforcing bars placed at the bottom of the footings. + New building footings: New continuous footings 12 inches wide at one-story, 15 inches wide at two-story. 24 inches deep at interior and exterior footings. Shallow pad footings at least 24 square inch and 24 inches deep. All continuous new footings should have at least two No. 4 reinforcing bars placed at the top and two No. 4 reinforcing bars placed at the bottom of the footings. 7.2.5 Concrete Slab Concrete slabs should be a minimum of 4 inches thick and reinforced with a minimum of No. 4 bars spacing at 18 inch both ways and its equivalent. All slab reinforcement should be supported to ensure proper positioning during placement of concrete. Concrete slabs in moisture sensitive areas should be underlain with a vapor barrier consist of a minimum of 10-mil vaper retarder with all laps sealed. A minimum of 2 inch of sand should be placed over the membrane to aid in uniform curing of concrete and 2 inch of sand under vapor barrier. Alternate per Cal Green code, a 4-inch-thick base of ½ inch or larger clean aggregate shall be provided with a 10-mil vaper retarder with all laps sealed in direct contact with concrete. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 13 7.3 Temporary Trench Excavation and Backfill All trench excavations should conform to CAL-OSHA and local safety codes. All utilities trench backfill should be brought to near optimum moisture content and then compacted to obtain a minimum relative compaction of 90 percent of ASTM D-1557-07. 7.4 Nonstructural concrete Flatwork: Sidewalk and Private Driveway 4 inches (sidewalk) and 5 inch (driveway) minimum thickness reinforce concrete with # 3 at 24” on center. Crack control with saw cut or deep tool joint to a minimum of 1/3 the concrete thickness, maximum joint spacing is 5 feet (sidewalk) and 10 feet or quarter cut (driveway) whichever closer. 8.0 CORROSION POTENTIAL Sulfate attack was not observed for the existing buildings in this subjected area. Type V cement with concrete strength 3000 psi is recommended to use, Water-Cement ratio=0.5. Other requirement from government agencies, if any, can be followed. It is recommended that the subsurface soils can be corrosive to buried metal pipe. It is recommended that any underground steel utilities be blasted and given protective coating. Should additional protective measures be warranted, a corrosion specialist should be consulted. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 14 9.0 INSPECTION As a necessary requisite to the use of this report, the following inspection is recommended: Temporary excavations. Removal of surficial soils. Backfill placement and compaction. • Foundation excavations. The geotechnical engineer should be notified at least 1 day in advance of the start of construction. A joint meeting between the client, the contractor, and the geotechnical engineer is recommended prior to the start of construction to discuss specific procedures and scheduling. 10.0 INVESTIGATION LIMITATIONS + The materials encountered on the subject site and utilized in our laboratory testing program are believed to be representative of the area. However, soil may vary in characters between the exploratory borings. Since our investigation is based on the site materials observed, selected laboratory testing, and engineering analyses, the conclusions and recommendations are professional opinion. These opinions have been derived in accordance with current standard of practice. + Based on our site investigation and recommendation, we believed that the proposed improvements will not adversely impact adjoining site. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 15 11.0 REFERENCES Ishihara, K. and Yoshimine, M., (1992), “Evaluation of Settlements in Sand Deposits Following Liquefaction During Earthquakes”, Japanese Society of Soil Mechanics and Foundation Engineering, Vol. 32, No. 1, pp. 173-188 Guidelines for Evaluating and Mitigating Seismic Hazards in California, 2008 Special Publication 117A, revised and re-adopted September 11, 2008. T.Y. Loud, I.M. Idriss, and et. al. (2001), “Liquefaction Resistance of Soils: Summary Report from the 1996 NCEER and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils”, Journal of the Geotechnical Engineering Division, American Society of Civil Engineers, Vol. 127, No. GT10, pp. 817-833. California Geological Survey “Probabilistic Seismic Hazard Mapping Ground Motion Page.” California Division of Mines and Geology, 1998, Seismic Hazard Zone Report for the Newport Beach Seismic Hazard Zone. EERC, “Recent Advances in Soil Liquefaction Engineering: A Unified and Consistent Framework”, EERC Report No. 2003-06, 26th Annual ASCE Geotehcnial Spring Seminar, Long Beach, April 30, 2003 Southern California Earthquake Center (SCEC), “Recommended Procedures for Implementation of DMG Special Publication 117, Guidelines for Analyzing and Mitigating Liquefaction Hazards in California”, March, 1999. www. conservation.ca.gov/cgs/rghm/psha/fault_parameters/pdf/Documents/B_flt.pdf Report of Geotechnical Engineering Investigation, Proposed Residential Development 930 S Birch St, Santa Ana, CA 92701; Project Number: 0119DD Report of Geotechnical Engineering Investigation, Proposed Residential Development, 601 S SUSAN ST. SANTA ANA, CA 92704. Project Number: 0116NT Report of Geotechnical Engineering Investigation, Proposed Residential Development 930 S Birch St, Santa Ana, CA 92701; Project Number: 0119DD Report of Geotechnical Engineering Investigation, Proposed Residential Development 2302 W Stanford St, Santa Ana, CA 92704; Project Number: 0120KHOA Report of Geotechnical Engineering Investigation, Proposed Residential Development 3614 W Camile St, Santa Ana, CA 92704; Project Number: 9017TMC Report of Geotechnical Engineering Investigation, Proposed Residential Development 2221 1 2 CYPRESS AVE, SANTA ANA , CA 92707; Project Number: 14120DT Report of Geotechnical Engineering Investigation, Proposed Residential Development 2108 Alona St, FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 16 Santa Ana, CA 92706; Project Number: GEO14720DT Report of Geotechnical Engineering Investigation, Proposed Residential Development 1121 S Golden W Ave, Santa Ana, CA 92704; Project Number: GEO0221KHOA Report of Geotechnical Engineering Investigation, Proposed Residential Development, 634 UNIT 2 S. BAMDAL ST., SANTA ANA, CA 92703; Project Number: GEO16121DT SOIL Report of Geotechnical Engineering Investigation, Proposed Residential Development, 2302 W La Verne Ave, Santa Ana, CA 92704; Project Number: GEO15521DT Report of Geotechnical Engineering Investigation, Proposed Residential Development, 601 AND 601 1/2 S. SUSANE ST, SANTA ANA - CA 92704; Project Number: GEO16521DT Report of Geotechnical Engineering Investigation, Proposed Residential Development 1510 & 1510 1/2 N. BEWLEY ST., SANTA ANA, CA 92703,; Project Number: GEO 16221DT Report of Geotechnical Engineering Investigation, Proposed Residential Development, 4325 W Oakfield Ave, Santa Ana, CA 92703 SOIL REPORT; Project Number: GEO12-0522ESS Report of Geotechnical Engineering Investigation, Proposed Residential Development 2018 W.11th, Santa Ana, CA. 92703; Project Number: GEO13-31222TMC Report of Geotechnical Engineering Investigation, Proposed Residential Development: 1413 N Hastings St., Santa Ana, CA 92703,; Project Number: GEO14-14022QD Report of Geotechnical Engineering Investigation, Proposed Residential Development: 5113 W Roberts Dr, Santa Ana, CA 92704; Project Number: GEO15-14523QD Report of Geotechnical Engineering Investigation, Proposed Residential Development: 1702 S Rene Dr, Santa Ana, CA 92704; Project Number: GEO16-18123DT Report of Geotechnical Engineering Investigation, Proposed Residential Development: 1021 W Cubbon St. Santa Ana, CA 92703; Project Number: GEO17-0123HP Report of Geotechnical Engineering Investigation, Proposed Residential Development 5017 W 6th St, Santa Ana, CA 92703,; Project Number: GEO18 Report of Geotechnical Engineering Investigation, Proposed Residential Development 1204 W 2nd St, Santa Ana, CA 92703; Project Number: GEO19 Report of Geotechnical Engineering Investigation, Proposed Residential Development, 1402 S Lowell St, Santa Ana, CA 92707; Project Number: GEO20 Report of Geotechnical Engineering Investigation, Proposed Residential Development 522 S Raitt St, Santa Ana, CA 92703,; Project Number: GEO21 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 17 APPENDIX A FIELD INVESTIGATION Subsurface conditions were explored by drilling hand auger boring to a maximum depth of 5 feet at approximate locations shown on the enclosed Site Plan. Upon completion of excavating, the boreholes were backfilled with onsite soils that were removed from the excavations. The drilling of the test boring was supervised by a geotechnical engineer, who continuously logged the borings and visually classified the soils in accordance with the Unified Soil Classification System. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 18 GEOTECHNICAL LOG OF TEST HOLES Test hole Number: BH-1 Hole Diameter: 4 inches Equipment: Hand-Auger DEPTH DESCRIPTION 0ft –2 ft Poorly grade sand with sill (SP-SM), dry, fine to medium sand, medium dense, light brown 2 ft - 5ft Poorly grade sand with sill (SP-SM), dry to moist, fine sand, dense, light brown Total depth: 5 ft No Caving No free standing water Hole back fill with on-site soil FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 19 APPENDIX B LABORATORY TESTING Expansion Index Expansion Index test was conducted on the existing onsite near surface materials sampled during field investigation. The test is performed in accordance with ASTM D-4829. The testing results are presented below: Sample Location Dry Density pcf Moisture content % Expansion Index Classification BH-1 2.0’ 128 11.8 Zero Ver Low Corrosion Potential Chemical laboratory test were conducted on the existing onsite near surface materials. The rests are performed in accordance with California Test Method 417, 422, 532 and 643. The resting results are shown in table below: Sample Location PH Sulfate Content % b Wei ht Min. Resistivity ohm-cm Chloride Content ppm BH-1 0’ to 5’ 8 0.0656 1,976 133 Note: N/R= Not Requested FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 20 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 21 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 22 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. Geotechnical, Structural and Civil Engineering Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com Page 23 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 STRUCTURAL CALCULATION FOR ADDRESS AT: Date: 2/11/24 Codes: 2022 CBC and as amended by City Ordinance Seismic Analysis: Equivalent Lateral Force Procedure, ASCE 7-16; Wind Analysis: Method 2: Analytical Procedure PROJECT: DINH MAI & THOA TRUONG's RESIDENCE 718 S FLINDTRIDGE DR., SANTA ANA, CA. 92704 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: 714 -829-5053; Email: Tienchu.e mail.com. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 PRIMARY ROOF LOADING EXTERIOR WALL LOADING ROOF FRAMING 3.55 FRAMING 0.96 1/2" PLYWOOD 1.50 DRYWALL ONE SIDE 2.60 ROOF MATERIAL 3.25 STUCCO ONE SIDE 10.00 DRYWALL 2.60 Misc. 1.44 Misc. (as solar panels) 3.10 Total load (psf) 15.00 Total Roof Dead Load (psf) 14.00 Total Roof Live Load (psf) 20.00 INTERIOR WALL LOADING Total load (psf) 34.00 FRAMING 0.96 DRYWALL BOTH SIDE 5.20 ROOF RAFTER LOADING Misc. 0.84 ROOF RAFTER 2.05 Total load (psf) 7.00 PLYWOOD 1.50 ROOF MATERIAL 3.25 PRIMARY FLOOR LOADING Misc. (as solar panels) 3.20 FLOOR FRAMING 3.14 Total Roof Dead Load (psf) 10.00 PLYWOOD (3/4") 2.25 Total Roof Live Load (psf) 20.00 DRYWALL 2.60 Total load (psf) 30.00 CARPET 1.00 Misc. 3.01 CEILING LOADING Total Floor Dead Load (psf) 12.00 CEILING JOIST 2.05 Total Floor Live Load (psf) 40.00 DRYWALL 2.60 Total load (psf) 52.00 Misc. 1.35 Total Roof Dead Load (psf) 6.00 DECK LOADING Total Roof Live Load (psf) 10.00 FLOOR FRAMING 3.14 Total load (psf) 16.00 PLYWOOD (3/4") 2.25 DRYWALL 2.60 GUARD / HAND RAIL CALCULATION Misc. 0.01 M=200*(42")=8400 lb-in Total Floor Dead Load (psf) 8.00 P=8400/3.25=2285#Total Floor Live Load (psf) 60.00 3/8" DIA. BOLTS CAPACITY Total load (psf) 68.00 IN WITHDRAWL IS 305 #/IN. PENETRATION. L=2585/2 BOLTS /305 = 4.2" USE 4 3/4" SQ. X 1/4" THICK PLATE W/(4) 3/8x10" MIN. LAG BOLT TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: 714 -829-5053; Email: Tienchu.e mail.com. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Project #: 1 MEMBER SPAN: P1 = lbs from @ X1=DL= P2 = lbs from @ X2=DL= P3 = lbs from @ X3=DL= FROM (ft) - TO (ft)PSF PLF DEAD LOAD plf CHOOSE BM TYPE= 3 0.00 - 9.25 ROOF T.L.=(34 ) x (1.33 ) = 45.22 14 PSF=>18.62 0.00 - 9.25 WALL T.L.=(15 ) x (0 ) = 0 15 PSF=>0 0.00 - 9.25 FLR. T.L.=(52 ) x (0 ) = 0 12 PSF=>0 0.00 - 9.25 Deck. T.L.=(72 ) x (0 ) = 0 12 PSF=>0 0.00 - 9.25 16 ) x (0 ) = 0 6 PSF=>0 Beam Weight = 1.83 1.83 1.83 Fb = 900 psi Fv = 180 psi E = 1.6 x106 si d = 5.5 inc Mmax =ft-lb= in-K Vmax=Rmax-(Wxd)= lbs b = 1.5 inch RL= 218 lbs RR= 218 lbs (Dead) R =95 lbs (Dead) R = 95 lbs If d>12, Size Factor, S = (12/d)(n)=>S =1.00 (Live) R = 123 lbs (Live) R = 123 lbs {n=0.111 for PSL and 6xSAWN members, n=0.136 for LVL and n=0.092 for LSL} Cd= 4 Cd= 1.25 Are you using Repetitive Member? no => Rm = 1 REQUIRED PROVIDED S=Mmax / (Fb*Cd*Sf*Rm) = 5.368 in3 S=in3 O.K. A=1.5 * Vmax / (Fv*Cd) = 1.307 in2 A=in2 O.K. Allow.Def.= L/ 240 = 0.4625 in Dac =in O.K. L/ 477 USE BEAM : ( 1 )2 x 6 2 MEMBER SPAN: P1 = lbs from @ X1=DL= P2 = lbs from @ X2=DL= P3 = lbs from @ X3=DL= FROM (ft) - TO (ft)PSF PLF DEAD LOAD plf CHOOSE BM TYPE= 3 0.00 - 17.25 ROOF T.L.=(34 ) x (0 ) = 0 14 PSF=>0 0.00 - 17.25 WALL T.L.=(15 ) x (0 ) = 0 15 PSF=>0 0.00 - 17.25 FLR. T.L.=(52 ) x (0 ) = 0 12 PSF=>0 0.00 - 17.25 Deck. T.L.=(72 ) x (0 ) = 0 12 PSF=>0 0.00 - 17.25 16 ) x (1.33 ) = 21.28 6 PSF=>7.98 Beam Weight = 2.42 2.42 2.42 Fb = 900 psi Fv = 180 psi E = 1.6 x106 si d = 7.25 inc Mmax =ft-lb= in-K Vmax=Rmax-(Wxd)= lbs b = 1.5 inch RL= 204 lbs RR= 204 lbs (Dead) R =90 lbs (Dead) R = 90 lbs If d>12, Size Factor, S = (12/d)(n)=>S =1.00 (Live) R = 115 lbs (Live) R = 115 lbs {n=0.111 for PSL and 6xSAWN members, n=0.136 for LVL and n=0.092 for LSL} Cd= 4 Cd= 1.25 Are you using Repetitive Member? no => Rm = 1 REQUIRED PROVIDED S=Mmax / (Fb*Cd*Sf*Rm) = 9.4017 in3 S=in3 O.K. A=1.5 * Vmax / (Fv*Cd) = 1.2671 in2 A=in2 O.K. Allow.Def.= L/ 240 = 0.8625 in Dac =in O.K. L/ 334 USE BEAM : ( 1 )2 x 8 0.62 Douglas Fir # 2 Roof % Capacity 13.1 71.5 10.9 11.7 TRIBUTARY (ft) 881 10.58 190 17.25 ft 503 6.04 196 Roof % Capacity 7.6 71.0 8.3 15.8 0.23 Douglas Fir # 2 CEILING JOIST TRIBUTARY (ft) TMC ENGINEERS INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. DATE: 2/11/24 39424TMC ROOF RAFTER 9.25 ft FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Project #: 3 MEMBER SPAN: P1 = lbs from @ X1=DL= P2 = lbs from @ X2=DL= P3 = lbs from @ X3=DL= FROM (ft) - TO (ft)PSF PLF DEAD LOAD plf CHOOSE BM TYPE= 8 0.00 - 21.50 ROOF T.L.=(34 ) x (4 ) = 136 14 PSF=>56 0.00 - 21.50 WALL T.L.=(15 ) x (1 ) = 15 15 PSF=>15 0.00 - 21.50 FLR. T.L.=(52 ) x (0 ) = 0 12 PSF=>0 0.00 - 21.50 Deck. T.L.=(72 ) x (0 ) = 0 12 PSF=>0 0.00 - 21.50 16 ) x (0 ) = 0 6 PSF=>0 Beam Weight = 11.72 11.72 11.72 Fb = 2400 psi Fv = 265 psi E = 1.8 x106 si d = 12 inc Mmax =ft-lb= in-K Vmax=Rmax-(Wxd)= lbs b = 3.125 inch RL= 1749 lbs RR= 1749 lbs (Dead) R =889 lbs (Dead) R = 889 lbs If d>12, Size Factor, S = (12/d)(n)=>S =1.00 (Live) R = 860 lbs (Live) R = 860 lbs {n=0.111 for PSL and 6xSAWN members, n=0.136 for LVL and n=0.092 for LSL} Cd= 4 Cd= 1.25 Are you using Repetitive Member? no => Rm = 1 REQUIRED PROVIDED S=Mmax / (Fb*Cd*Sf*Rm) = 37.608 in3 S=in3 O.K. A=1.5 * Vmax / (Fv*Cd) = 7.1842 in2 A=in2 O.K. Allow.Def.= L/ 240 = 1.075 in Dac =in O.K. L/ 267 USE BEAM : ( 1 )3.125 x 12 4 MEMBER SPAN: P1 = lbs from @ X1=DL= P2 = lbs from @ X2=DL= P3 = lbs from @ X3=DL= FROM (ft) - TO (ft)PSF PLF DEAD LOAD plf CHOOSE BM TYPE= 2 0.00 - 6.25 ROOF T.L.=(34 ) x (10.5 ) = 357 14 PSF=>147 0.00 - 6.25 WALL T.L.=(15 ) x (2 ) = 30 15 PSF=>30 0.00 - 6.25 FLR. T.L.=(52 ) x (0 ) = 0 12 PSF=>0 0.00 - 6.25 Deck. T.L.=(72 ) x (0 ) = 0 12 PSF=>0 0.00 - 6.25 16 ) x (0 ) = 0 6 PSF=>0 Beam Weight = 5.64 5.64 5.64 Fb = 1000 psi Fv = 180 psi E = 1.6 x106 si d = 7.25 inc Mmax =ft-lb= in-K Vmax=Rmax-(Wxd)= lbs b = 3.5 inch RL= 1227 lbs RR= 1227 lbs (Dead) R =571 lbs (Dead) R = 571 lbs If d>12, Size Factor, S = (12/d)(n)=>S =1.00 (Live) R = 656 lbs (Live) R = 656 lbs {n=0.111 for PSL and 6xSAWN members, n=0.136 for LVL and n=0.092 for LSL} Cd= 4 Cd= 1.25 Are you using Repetitive Member? no => Rm = 1 REQUIRED PROVIDED S=Mmax / (Fb*Cd*Sf*Rm) = 18.405 in3 S=in3 O.K. A=1.5 * Vmax / (Fv*Cd) = 6.5985 in2 A=in2 O.K. Allow.Def.= L/ 240 = 0.3125 in Dac =in O.K. L/ 989 USE BEAM : ( 1 )4 x 8 0.08 Douglas Fir # 1 Roof % Capacity 30.7 60.0 25.4 26.0 TRIBUTARY (ft) 1917 23.01 990 6.25 ft 9402 112.83 1587 Roof % Capacity 75.0 50.1 37.5 19.2 0.97 Glulam GLB 24F-V4 HDR AT LIVING/ BED 2 TRIBUTARY (ft) TMC ENGINEERS INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. DATE: 2/11/24 39424TMC BM. AT PORCH 21.50 ft FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Project #: 5 MEMBER SPAN: P1 = lbs from @ X1=DL= P2 = lbs from @ X2=DL= P3 = lbs from @ X3=DL= FROM (ft) - TO (ft)PSF PLF DEAD LOAD plf CHOOSE BM TYPE= 2 0.00 - 13.75 ROOF T.L.=(34 ) x (8.75 ) = 297.5 14 PSF=>122.5 0.00 - 13.75 WALL T.L.=(15 ) x (0 ) = 0 15 PSF=>0 0.00 - 13.75 FLR. T.L.=(52 ) x (0 ) = 0 12 PSF=>0 0.00 - 13.75 Deck. T.L.=(72 ) x (0 ) = 0 12 PSF=>0 0.00 - 13.75 16 ) x (0 ) = 0 6 PSF=>0 Beam Weight = 8.75 8.75 8.75 Fb = 1000 psi Fv = 180 psi E = 1.6 x106 si d = 11.25 inc Mmax =ft-lb= in-K Vmax=Rmax-(Wxd)= lbs b = 3.5 inch RL= 2105 lbs RR= 2105 lbs (Dead) R =902 lbs (Dead) R = 902 lbs If d>12, Size Factor, S = (12/d)(n)=>S =1.00 (Live) R = 1203 lbs (Live) R = 1203 lbs {n=0.111 for PSL and 6xSAWN members, n=0.136 for LVL and n=0.092 for LSL} Cd= 4 Cd= 1.25 Are you using Repetitive Member? no => Rm = 1 REQUIRED PROVIDED S=Mmax / (Fb*Cd*Sf*Rm) = 69.48 in3 S=in3 O.K. A=1.5 * Vmax / (Fv*Cd) = 12.122 in2 A=in2 O.K. Allow.Def.= L/ 240 = 0.6875 in Dac =in O.K. L/ 445 USE BEAM : ( 1 )4 x 12 MEMBER SPAN: P1 = lbs from @ X1=DL= P2 = lbs from @ X2=DL= P3 = lbs from @ X3=DL= FROM (ft) - TO (ft)PSF PLF DEAD LOAD plf CHOOSE BM TYPE= 2 0.00 - 6.25 ROOF T.L.=(34 ) x (10.5 ) = 357 14 PSF=>147 0.00 - 6.25 WALL T.L.=(15 ) x (2 ) = 30 15 PSF=>30 0.00 - 6.25 FLR. T.L.=(52 ) x (0 ) = 0 12 PSF=>0 0.00 - 6.25 Deck. T.L.=(72 ) x (0 ) = 0 12 PSF=>0 0.00 - 6.25 16 ) x (0 ) = 0 6 PSF=>0 Beam Weight = 5.64 5.64 5.64 Fb = 1000 psi Fv = 180 psi E = 1.6 x106 si d = 7.25 inc Mmax =ft-lb= in-K Vmax=Rmax-(Wxd)= lbs b = 3.5 inch RL= 1227 lbs RR= 1227 lbs (Dead) R =571 lbs (Dead) R = 571 lbs If d>12, Size Factor, S = (12/d)(n)=>S =1.00 (Live) R = 656 lbs (Live) R = 656 lbs {n=0.111 for PSL and 6xSAWN members, n=0.136 for LVL and n=0.092 for LSL} Cd= 4 Cd= 1.25 Are you using Repetitive Member? no => Rm = 1 REQUIRED PROVIDED S=Mmax / (Fb*Cd*Sf*Rm) = 18.405 in3 S=in3 O.K. A=1.5 * Vmax / (Fv*Cd) = 6.5985 in2 A=in2 O.K. Allow.Def.= L/ 240 = 0.3125 in Dac =in O.K. L/ 989 USE BEAM : ( 1 )4 x 8 TRIBUTARY (ft) TMC ENGINEERS INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. DATE: 2/11/24 39424TMC CLG. BM. AT BED 1 13.75 ft 6.25 ft 7238 86.85 1818 Roof % Capacity 73.8 94.1 39.4 30.8 0.37 Douglas Fir # 1 void TRIBUTARY (ft) 1917 23.01 990 0.08 Douglas Fir # 1 Roof % Capacity 30.7 60.0 25.4 26.0 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 MATERIAL SPECIFICATIONS Minimum material specifications for design: 1. Concrete member strength is as noted 2. Hardware embedment into concrete is based on f'c=2500 psi, U.N.O. 3. Steel reinforcement is grade 60 except that No.3 and No.4 bars are grade 40 4. Nails are 8d common, 10d common and 16d framing (short), U.N.O. 5. Glue-Laminated beams are 24F-V4 for simple span and 24F-V8 for other conds. 6. Steel: I-beams are A36, pipe is 53B, and tube is A500B 7. Cold Formed steel is A653, 16 gauge and heavier is 50 ksi; 18 gauge and lighter is 33ksi SHEAR WALL SCHEDULE Mark Seis.(plf) Wind (plf)x1.4 10 260 364 11 350 490 12 490 686 13 600 840 14 870 1218 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. Per table 4.3A (Special Design Provision for Wind and Seimic ) FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 WIND LOADS- Horizontal Pressures [W(+)] Wind Load calculation ASCE 7-22 Risk Category: II 3-second gust wind speed (mph): 95 Exposure Category: C ASD load Factor: 0.6 Height and Exposure Coefficients: Height 0-15' 15'-20' 20'-25' 25'-30' Coeff. 1.21 1.29 1.35 1.4 Edge Strips and End Zones: Building Eave Height (ft): 10.5 Min. Horiz. Dim (ft): 21.5 Edge Strip (a): 10% of min. Horiz. Dim.:2.15 40% of bldg eave height:4.2 4% of min. Horiz. Dim.:0.86 Default min edge strip dim.:3 Governing Edge strip value: 3 End Zone Width (2a):6 Building Roof Pitch/ Roof angle(Transverse - Y): 4 :12 Building Roof Pitch/ Roof angle(Longitudinal - X): 4 :12 Number of story: 1 1st floor top plate: 9 Wind load Horizontal (plf) Wind roof height (ft): Transverse -Y: 14 Longitudinal - X: 13 Wind Load (plf) - Transverse -Y: Wind Load (plf) - Longitudinal - X: A B C D A B C D 1st Flr 62.34 -20.04 41.55 -11.25 62.34 -16.03 41.55 -9.00 Wind load Vertical (psf) E F G H Eoh Goh -20.81 -14.13 -14.52 -10.77 -29.16 -22.75 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 SEISMIC LOADS Seismic load calculation per ASCE7-22, Section 12.8: Equivalent Lateral Force Procedure Location : 718 S FLINDTRIDGE DR., SANTA ANA, CA. 92704 Site Coordinates 33.73748°N, 117.935918°W Site specific variables: Risk Category: II 1s spectral response acceleration parameter S1:0.476 g Seismic use group: I 0.2s spectral response acceleration parameter Ss: 1.332 g Site class: D-default Seismic roof height (hn): 10.5 (ft) Seismic design Cat.: D Long-period transition period TL = 8 (sec) Redundancy factor ρ: 1.3 The important factor I: 1 Intermediate Calculations: Fv = 1.8 SM1 =0.8568 SD1 =0.571 T = 0.117 Fa = 1.2 SMS =1.5984 SDS =1.066 Cs max1=Sd1/(T*(R/I)):(for TL>T)= 0.75 Cs min 1= 0.01 Csmax2=Sd1*TL/(T^2*(R/I)):(for TL<T)= 51.66 Csmin2=0.5*S1/(R/I):(forS1>0.6)= 0.04 Transverse Ry = 6.5 Cs= Sds/(R/I) =0.16 V=Cs*W*0.7*ρ=0.15*W Longitudinal Rx = 6.5 Cs= Sds/(R/I) =0.16 V=Cs*W*0.7*ρ=0.15*W Vertical Seimic Load Effect Ev=0.14Sds x Dead Load= 0.15*DL Wall Mass Ext Walls Int Walls Total Plate Floor Length Mass Length Mass Mass Level HT (ft) Thk (in) (ft) (Kips) (ft) (Kips) (kips) 1st Flr 9 8 139 18.77 77 6.93 25.70 Total Mass Diaphragms Wall Area Weight Mass Walls Walls Mass Total Abv Blw Mass Level (sq ft) (psf) (kips) kips kips (Kips) (kips) 1st Flr 903.00 14 12.64 0 12.8475 12.85 25.49 Mass Distribution Longditudinal Transverse Diaphgram Wx Hx WxHx Fx Fx/A Fy Fy/A Fpx/Ax Level (kips) (ft) (kip-ft) (kips) (psf) (kips) (psf) (psf) 1st Flr 25.49 10.50 267.64 3.80 4.211 3.80 4.211 6.02 Total 25.490 267.640 3.803 3.803 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 SEISMIC LOAD AT 1st FLOOR LONGITUDINAL DIRECTION : Wall Trib. Area Fabv. Ftrib. Ftotal L Q Mark Allow (sqr ft) (lb) (lb) (lb) (ft) (plf) (plf) 1 966 8 121 10 260 2 936 7.75 121 10 260 3 512 3.5 146 10 241.4 4 585 4 146 10 260 5 402 2.75 146 10 218.6 6 402 2.75 146 10 218.6 REDUCED SHEAR CAPACITY (1.25-0.125*H/B) TRANSVERSE DIRECTION : Wall Trib. Area Fabv. Ftrib. Ftotal L Q Mark Allow (sqr ft) (lb) (lb) (lb) (ft) (plf) (plf) 7 210 0 884 884 4 221 10 260 8 451.5 0 1901 1901 10.5 181 10 260 9 241.5 0 1017 1017 8 127 10 260 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. 451.5 0 1901 451.5 0 1901 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Nam 39424tmc Date: 3/8/24 WIND LOAD AT 1st FLOOR LONGITUDINAL DIRECTION : Wall Length W(+)end W(+)int. W(+)roof W(+)total L Q Mark Allow (ft) wall (lb) wall (lb)(min.10psf)(lb) (ft) (plf) (plf) 1 482 8 60 10 364 2 467 7.75 60 10 364 3 305 3.5 87 10 338 4 348 4 87 10 364 5 239 2.75 87 10 306 6 239 2.75 87 10 306 REDUCED SHEAR CAPACITY (1.25-0.125*H/B) TRANSVERSE DIRECTION : Wall Length W(+)end W(+)int. W(+)roof W(+)total L Q Mark Allow (ft) wall (lb) wall (lb)(min.+10psf)(lb) (ft) (plf) (plf) 7 12 374 249 600 1223 4 306 10 364 8 25 0 1039 1250 2289 10.5 218 10 364 9 13 374 291 650 1315 8 164 10 364 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. 9 374 125 450 11 374 208 550 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 SUMMARY LOAD AT 1st FLOOR LONGITUDINAL DIRECTION : Wall Fwind Fseis Fgovern L Mark Allow (#) Allow (#) (lb) (lb) (lb) (ft) Wind Seismic 1 482 966 966 8.0 10 2912 2080 2 467 936 936 7.8 10 2821 2015 3 305 512 512 3.5 10 1274 910 4 348 585 585 4.0 10 1456 1040 5 239 402 402 2.8 10 1001 715 6 239 402 402 2.8 10 1001 715 TRANSVERSE DIRECTION : Wall Fwind Fseis Fgovern L Mark Allow (#) Allow (#) (lb) (lb) (lb) (ft) Wind Seismic 7 1223 884 1223 4.0 10 1456 1040 8 2289 1901 2289 10.5 10 3822 2730 9 1315 1017 1315 8.0 10 2912 2080 TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 WALL#1 L= 8.00 ft H= 9.00 ft Shear load Vseis.& Vwind= 966# & 482# P OTM = (966)x(9);482)x(9)=8694 ; 4337 ft-lb W = 39 plf Wt wall= 15psf x 8' x 9' = 1080 # 966 W = 39plf RM = 5568 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 1080# Puplift = 0 # at 8.00 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 8.00 feet 798# 798# Ft(left)= Use Shear Type10 Ft(right)= WALL#2 L= 7.75 ft H= 9.00 ft Shear load Vseis.& Vwind= 936# & 467# P OTM = (936)x(9);467)x(9)= 8424 ; 4201 ft-lb W = plf Wt wall= 15psf x 7.75' x 9' = 1046.3 # 936 W = 39plf RM = 5225 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 1046# Puplift = 0 # at 7.75 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 7.75 feet 809# 809# Ft(left)= Use Shear Type10 Ft(right)= WALL#3 L= 3.50 ft H= 9.00 ft Shear load Vseis.& Vwind= 512# & 305# P OTM = (512)x(9);305)x(9)= 4608 ; 2742 ft-lb W = plf Wt wall= 15psf x 3.5' x 9' = 472.5 # 512 W = 39plf RM = 1066 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 473# Puplift = 0 # at 3.50 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 3.50 feet 1270# 1270# Ft(left)= Use Shear Type10 Ft(right)= 1270 647 1270 647 HDU2/4x4 Min. HDU2/4x4 Min. 798 798 129 129 809 142 HDU2/4x4 Min. HDU2/4x4 Min. HDU2/4x4 Min. Hold-Down (0.6D+W)& Post Hold-Down 809 142 ((0.6-0.14Sds)D+0.7ρQe) Seismic Force (lb): ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post ind Force (lb): TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. Seismic Force (lb): ((0.6-0.14Sds)D+0.7ρQe) Seismic Force (lb): (0.6D+W) ind Force (lb): & Post Hold-Down ind Force (lb): HDU2/4x4 Min. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 WALL#4 L= 4.00 ft H= 9.00 ft Shear load Vseis.& Vwind= 585# & 348# P OTM = (585)x(9);348)x(9)=5265 ; 3134 ft-lb W = 39 plf Wt wall= 15psf x 4' x 9' = 540 # 585 W = 39plf RM = 1392 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 540# Puplift = 0 # at 4.00 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 4.00 feet 1237# 1237# Ft(left)= Use Shear Type10 Ft(right)= WALL#5 L= 2.75 ft H= 9.00 ft Shear load Vseis.& Vwind= 402# & 239# P OTM = (402)x(9);239)x(9)= 3618 ; 2155 ft-lb W = plf Wt wall= 15psf x 2.75' x 9' = 371.25 # 402 W = 39plf RM = 658 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 371# Puplift = 0 # at 2.75 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 2.75 feet 1329# 1329# Ft(left)= Use Shear Type10 Ft(right)= WALL#6 L= 2.75 ft H= 9.00 ft Shear load Vseis.& Vwind= 402# & 239# P OTM = (402)x(9);239)x(9)= 3618 ; 2155 ft-lb W = plf Wt wall= 15psf x 2.75' x 9' = 371.25 # 402 W = 39plf RM = 658 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 371# Puplift = 0 # at 2.75 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 2.75 feet 1329# 1329# Ft(left)= Use Shear Type10 Ft(right)= TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. Seismic Force (lb): ind Force (lb): Hold-Down ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post 1237 613 HDU2/4x4 Min. 1237 613 HDU2/4x4 Min. Seismic Force (lb): ind Force (lb): Hold-Down ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post 1329 704 HDU2/4x4 Min. 1329 704 HDU2/4x4 Min. Seismic Force (lb): ind Force (lb): Hold-Down ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post 1329 704 HDU2/4x4 Min. 1329 704 HDU2/4x4 Min. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Job Name: 39424tmc Date: 3/8/24 WALL#7 L= 4.00 ft H= 9.00 ft Shear load Vseis.& Vwind= 884# & 1223# P OTM = (884)x(9);1223)x(9)=7956 ; 11010 ft-lb W = 39 plf Wt wall= 15psf x 4' x 9' = 540 # 1223 W = 39plf RM = 1392 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 540# Puplift = 0 # at 4.00 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 4.00 feet 2713# 2713# Ft(left)= Use Shear Type10 Ft(right)= WALL#8 L= 10.50 ft H= 9.00 ft Shear load Vseis.& Vwind= 1901# & 2289# P OTM = (1901)x(9);2289)x(9)= 17109 ; 20599 ft-lb W = plf Wt wall= 15psf x 10.5' x 9' = 1417.5 # 2289 W = 39plf RM = 9592 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 1418# Puplift = 0 # at 10.50 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 10.50 feet 1247# 1247# Ft(left)= Use Shear Type10 Ft(right)= WALL#9 L= 8.00 ft H= 9.00 ft Shear load Vseis.& Vwind= 1017# & 1315# P OTM = (1017)x(9);1315)x(9)= 9153 ; 11834 ft-lb W = plf Wt wall= 15psf x 8' x 9' = 1080 # 1315 W = 39plf RM = 5568 ft-lb Max drag loads = 1600# Puplift = 0 # at 0.00 feet Wt= 1080# Puplift = 0 # at 8.00 feet Pdown = 0 # at 0.00 feet Pdown = 0 # at 8.00 feet 857# 857# Ft(left)= Use Shear Type10 Ft(right)= TMC ENGINEER INC. 9542 Pacific Ave, Anaheim, CA 92804 Phone: (714)-829-5053; Email: Tienchu.pe@gmail.com. Seismic Force (lb): ind Force (lb): Hold-Down ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post 1954 2713 HDU2/4x4 Min. 1954 2713 HDU2/4x4 Min. Seismic Force (lb): ind Force (lb): Hold-Down ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post 1247 1448 HDU2/4x4 Min. 1247 1448 HDU2/4x4 Min. Seismic Force (lb): ind Force (lb): Hold-Down ((0.6-0.14Sds)D+0.7ρQe)(0.6D+W)& Post 857 1096 HDU2/4x4 Min. 857 1096 HDU2/4x4 Min. FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. S.W. #:1, 2 AT ROOF V 2170 lbs + 25% = 2712 L total 16 ft Shear length (Li) 7.75 8 0 D total 34 ft Open length (Di) 0 13.75 20.5 0 Ld 50 ft (Vd - Vw) X Li -914 -944 0 Vd 54 #/' Vd X Di 0 746 1112 0 Vw 172 #/' Summary load 0 0 -914 -168 -1112 0 0 Drag 0 0 914 168 1112 0 0 Vd - Vw -118 #/' Max Drag 1112 lbs NO. 16d NAILS = 11 S.W. #:3, 4-6 V 2170 lbs + 25% = 2712 L total 13 ft Shear length (Li) 3.5 4 2.75 D total 37 ft Open length (Di) 7.75 12.5 10 6.5 Ld 50 ft (Vd - Vw) X Li -539 -616 -424 Vd 55 #/' Vd X Di 422 681 545 354 Vw 209 #/' Summary load 0 422 -117 565 -52 493 69 Drag 0 422 117 565 52 493 69 Vd - Vw -154 #/' Max Drag 565 lbs NO. 16d NAILS = 6 S.W. #:7 V 1223 lbs + 25% = 1529 L total 4 ft Shear length (Li) 4 0 0 D total 14 ft Open length (Di) 4.75 8.75 0 0 Ld 18 ft (Vd - Vw) X Li -1180 0 0 Vd 87 #/' Vd X Di 415 765 0 0 Vw 382 #/' Summary load 0 415 -765 0 0 0 0 Drag 0 415 765 0 0 0 0 Vd - Vw -295 #/' Max Drag 765 lbs NO. 16d NAILS = 7 0 500 1000 1500 1 2 3 4 5 6 7 8 0 200 400 600 1 2 3 4 5 6 7 8 0 500 1000 1 2 3 4 5 6 7 8 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 TMC ENGINEERS INC. S.W. #:9 AT ROOF V 1315 lbs + 25% = 1644 L total 8 ft Shear length (Li) 8 0 0 D total 10 ft Open length (Di) 9.5 0 0 0 Ld 18 ft (Vd - Vw) X Li -892 0 0 Vd 94 #/' Vd X Di 892 0 0 0 Vw 205 #/' Summary load 0 892 0 0 0 0 0 Drag 0 892 0 0 0 0 0 Vd - Vw -112 #/' Max Drag 892 lbs NO. 16d NAILS = 9 S.W. #:0 V lbs + 25% = 0 L total 3 ft Shear length (Li) 2.75 0 0 D total 15 ft Open length (Di) 4.75 9.75 0 0 Ld 17 ft (Vd - Vw) X Li 0 0 0 Vd #/' Vd X Di 0 0 0 0 Vw #/' Summary load 0 0 0 0 0 0 0 Drag 0 0 0 0 0 0 0 Vd - Vw #/' Max Drag lbs NO. 16d NAILS = 0 S.W. #:0 V lbs + 25% = 0 L total 4 ft Shear length (Li) 4 0 0 D total 32 ft Open length (Di) 19.5 12.5 0 0 Ld 36 ft (Vd - Vw) X Li 0 0 0 Vd #/' Vd X Di 0 0 0 0 Vw #/' Summary load 0 0 0 0 0 0 0 Drag 0 0 0 0 0 0 0 Vd - Vw #/' Max Drag lbs NO. 16d NAILS = 0 0 500 1000 1 2 3 4 5 6 7 8 0 1 1 1 2 3 4 5 6 7 8 0 1 1 1 2 3 4 5 6 7 8 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 ASCE Hazards Report Address: 718 S Flintridge Dr Santa Ana, California 92704 Standard:ASCE/SEI 7-16 Latitude:33.73748 Risk Category:II Longitude:-117.935918 Soil Class:D - Stiff Soil Elevation:57.848527963357554 ft (NAVD 88) Page 1 of 3https://ascehazardtool.org/Fri Mar 08 2024 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 SS : 1.332 S1 : 0.476 F a : 1 F v : N/A SMS : 1.332 SM1 : N/A SDS : 0.888 SD1 : N/A T L : 8 PGA : 0.57 PGA M : 0.627 F PGA : 1.1 Ie : 1 C v : 1.366 Seismic Site Soil Class: Results: Data Accessed: Date Source: D - Stiff Soil USGS Seismic Design Maps Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8. Fri Mar 08 2024 Page 2 of 3https://ascehazardtool.org/Fri Mar 08 2024 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 The ASCE Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or has been extrapolated from maps incorporated in the ASCE standard. While ASCE has made every effort to use data obtained from reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation, relationship, or sponsorship of such third-party content by or from ASCE. ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the contents of this Tool or the ASCE standard. In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors, employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE Hazard Tool. Page 3 of 3https://ascehazardtool.org/Fri Mar 08 2024 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 SANTA ANA CITY COUNCIL Mayor vamezcua@santa-ana.org Mayor Pro Tem, Ward 1 tphan@santa-ana.org Ward 2 bvazquez@santa-ana.org Ward 3 jessielopez@santa-ana.org Ward 4 pbacerra@santa-ana.org Ward 5 jryanhernandez@santa-ana.org Ward 6 dpenaloza@santa-ana.org MAYOR Valerie Amezcua MAYOR PRO TEM Thai Viet Phan COUNCILMEMBERS Phil Bacerra Johnathan Ryan Hernandez Jessie Lopez David Penaloza Benjamin Vazquez CITY OF SANTA ANA PLANNING AND BUILDING AGENCY 20 Civic Center Plaza ● P.O. Box 1988 Santa Ana, California 92702 www.santa-ana.org INTERIM CITY MANAGER Tom Hatch CITY ATTORNEY Sonia R. Carvalho CITY CLERK Jennifer L. Hall January 23, 2024 Also sent via email to: hieuluu.cra@gmail.com Dinh Van Mai 718 South Flintridge Drive Santa Ana, CA 92704 Subject: Address Assignment for a Detached Accessory Dwelling Unit located at 718 South Flintridge Drive (APN: 188-062-04) in Santa Ana, CA Dear Mr. Mai, The City of Santa Ana Planning and Building Agency (PBA) is the responsible agency for legal addressing within the City of Santa Ana’s jurisdiction. This letter confirms the address assignment for a 800-square-feet detached ADU located at 718 South Flintridge Drive (APN: 188-062-04). Notice is hereby given that the following assigned address shall be posted onsite per the approved address plan, attached hereto as Exhibit A. Address to be Activated/Posted 718 South Flintridge To subdivide commercial and/or residential units into multiple units, a building permit (and all other associated permits), plans, and inspection approvals by the PBA are required. Address(es) will be verified during inspections by the Building Safety Division. Please update your records accordingly. Should you have any questions, feel free to contact me by phone at (714) 664-2753 or by email at PRaj@santa-ana.org. Sincerely, Punkaj Raj Planning Technician Exhibit A – Address Plan FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Address Letter for 718 South Flintridge Drive Page 2 of 2 c: Vencent Quaglia, United States Post Office Chris Tuiolosega, United States Post Office Cipriano Corona, Marketing Manager, United States Post Office Alex Alvarez, Postmaster Santa Ana, United States Post Office Federal Express, Administration Cathy Joseph, Garden Grove Unified School District Christine Hy, Garden Grove Unified School District Cathy Slader, Orange Unified School District Orin Williams, Santa Ana Unified School District Yvette Miranda, Santa Ana Unified School District Cristina Bernal, Tustin Unified School District Mishele Richards, Orange County Fire Authority, GEO Files Coordinator Orange County Fire Authority Neal Kelly, Registrar of Voters Members, Board of Supervisors Southern California Gas Company Southern California Edison Company Claude Parrish, County Assessor's Office SAG, AT&T UPS, Administration City Manager’s Office Beverly Martin, Police Community Services Specialist Boris Duran, Police Systems Manager Jennifer Mendoza, Police Communications Manager Chris Hubbard, Police Systems Support Analyst Alejandra Gutierrez, Treasury & Customer Services Manager Hector Jimenez, Revenue Supervisor Alfonso Chavez, Utilities Customer Services Supervisor Judson Brown, Housing & Neighborhood Development Manager Rudy Rosas, Principal Civil Engineer Zdenek (Zed) Kekula, Principal Civil Engineer Jason Kwak, Building Safety Manager Evelyn LaRocca, Permit Supervisor Kathy Hernandez, Permit Technician Julie Amsden, Permit Technician Ali Pezeshkpour, Planning Manager Jerry Guevara, Senior Planner Alvaro Nunez, PBA Assistant Director and Code Enforcement Manager FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Submittal Criteria Form Required for Single Family or Duplex Residences (Use Commercial form for lots with 3+ dwelling units or new residential tracts) Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification. Project Information  New Single Family Residence/Duplex  Addition/Remodel  ADU  Other Address: Unit #: City or Unincorporated County Area: ZIP: Scope of Work: Existing Area: Area to be Added: Total Resulting Area: Stories: Area Added in Past 2 Years (excluding this project): Yes No Questionnaire OCFA Plan Type if “Yes” 1.   New – Is this a new single family residence or duplex? *(PR160) Residential Site with Water Availability (PR400-402) Fire Sprinkler 2.   ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has fire sprinklers or a house that will have fire sprinklers added as part of this project? (PR400-402) Fire Sprinkler 3.   Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire sprinkler retrofit based on a threshold set by local ordinance? (PR400-402) Fire Sprinkler 4.   Distance – Is the most remote portion of the addition, ADU or other detached structure greater than 140-feet from the fire access roadway? *(PR160) Residential Site 5.   Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non- sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all enclosed spaces, such as garages, stairs, and detached structures separated by less than 10-feet? *(PR160) Residential Site with Water Availability 6.   Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed contractor to determine if a fire sprinkler modification is needed. (PR400-402) Fire Sprinkler 7.   Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold set by local ordinance? *(PR160) Residential Site (PR400-402) Fire Sprinkler 8.   Gate – Is a gate being installed across a driveway or road that is designated as a fire department access roadway, or a driveway or road that serves more than a single home/duplex? (PR180) Gate 9.   Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000 sf, and ADU’s). *(PR160) Residential Site *(PR172-174) Methane Test/Mitigation Plans 10.   Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation, or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as defined by the State, or (D) near an area that could be affected by a wildfire in the open space. *(PR125) Fuel Modification (PR182) Accessory Structure *OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals. Applicant Certification I certify, under penalty of perjury, under the laws of the State of California, that the information above is true: Print Name:_______________________________________ Signature:___________________________________________ Date:______________ Phone Number:_____________________________________________ Email:_____________________________________________________________ Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required. ______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes” and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination. For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100 SFR FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025 Page 1 of 1 EXISTING ONE & TWO FAMILY DWELLINGS ELECTRICAL SERVICES UNDERGROUND EXCEPTION CEC 2022 ELC-04 All new utility connections are required to be installed below grade by Santa Ana Municipal Code 41- 626(b). There is a standing exception for one and two family dwellings. This exception applies only when the new electrical service is designed to be fed from below grade as well as overhead. This diagram is a typical unit. The utility is able to feed this cabinet from the top or the bottom without interfering with the distribution wiring. All the circuit breakers and branch circuits are contained in the circuit breaker side of this cabinet. Only listed combination overhead and underground feed service boxes may be used to connect to an overhead utility drop. This exception to an underground fed service applies only to existing single family and two family residences. Planning & Building Agency Permits & Plan Check Section 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 Rigid Conduit Service Entrance Conductor Riser Underground Service Lateral METER Rev. 1/21/2020 FLOOD ZONE - 718 S Flintridge Dr Unit# 23/26/2025