Loading...
HomeMy WebLinkAbout2010 E Warner Ave Bldg #P - PlanCONTRACTOR SHEET DESCRIPTION: COVER PAGE DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. WARNER REDHILL - NEW PEDESTAL AND WALL MOUNTED EV CHARGING SYSTEM 2010 E WARNER AVE, SANTA ANA, CA Know what's below. CALL before you dig. CALL AT LEAST TWO WORKING DAYS BEFORE YOU DIG USA Nor t h DIG ALERT CONTRACTOR SHALL VERIFY ALL PLANS & EXISTING LOCATIONS, CONDITIONS ON THE JOB SITE & SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME SATELLITE VIEW: VICINITY VIEW: SITE SYSTEM INFORMATION MANUFACTURER LITEON PRODUCT ISO CONNECTOR SAE J1772 LEVEL AC LEVEL 2 MOUNTING WALL OR PEDESTAL MAX OUTPUT 32A;7.68KW MAX OUTPUT SITE SHEET INDEX INDEX EV - 01 COVER PAGE EV - 02 SITE PLAN EV - 03 ENLARGED PLAN I EV - 04 ENLARGED PLAN II EV - 05 ENLARGED PLAN III EV - 06 ENLARGED PLAN IV EV - 07 ENLARGED PLAN V EV - 08 ENLARGED PLAN VI EV - 09 SINGLE LINE DIAGRAM EV - 10 PANEL SCHEDULE EV - 11 NOTES EV - 12 PLACARD EV - 13 SPEC SHEET EV - 14 SPEC SHEET EV - 15 SPEC SHEET EV - 16 SPEC SHEET EV - 17 REFERENCE SPEC SHEET EV - 18 REFERENCE SPEC SHEET EV - 19 EXHIBIT UG CONDUIT RUNS EV - 20 EXHIBIT EQUIPMENT MOUNTING SPECS EV-01 TOTAL NUMBER OF EV CHARGERS: 58 UTILITY: SCE EXISTING MAIN BREAKER RATING "PDSA": 277/480V,1600A EXISTING EV MAIN BREAKER RATING "AEV1": 120/208V,800A EXISTING EV MAIN BREAKER RATING "AEV3": 120/208V,800A TOTAL MAX EV LOAD DEMAND: 482.78KW MS-EV BRAND: EATON MS-EV EXISTING OR NEW: EXISTING BUILDING TYPE: MULTIFAMILY APT COMPLEX CHARGING MAX KW CAPACITY: 7.680KW SYSTEM VOLTAGE: 208 SINGLE OR THREE PHASE: THREE PHASE EVSE LOCATION: PARKING GARAGE EVSE RATIO 0.118 TYPE OF CONSTRUCTION TENANT IMPROVEMENT APPLICABLE CODES: 2023 NATIONAL ELECTRICAL CODE 2022 BUILDING ENERGY EFFICIENCY STANDARDS 2022 CALIFORNIA BUILDING CODE (11B-228.3.1) 2022 CALIFORNIA ELECTRICAL CODE PROJECT INFORMATION: CONTRACTOR :CHARGIE SCOPE OF WORK AND NOTES: (1) FROM AN EXISTING SERVICE 1600A MSP "PDSA" , INSTALL 58 EVCS ON 2X EXISTING EV DEDICATED SUB PANELS "AEV1" RATED AT 1000A WITH A 800A MAIN BREAKER AND EV DEDICATED SUB PANEL "AEV3" RATED AT 1000A WITH A 800A MAIN BREAKERS. (2) ALL EVSE DEDICATED INFRASTRUCTURE IS EXISTING (PANELS, FEEDERS,BRANCH CIRCUITS,OCPD,CONDUITS,GROUNDING SYSTEM ) ,THIS INCLUDES ALL OTHER ELECTRICAL INFRASTRUCTURE FOUND IN THIS BUILDING NAMELY MAIN SERVICE PANEL, TRANSFORMERS, TRANSFORMER GROUNDING SYSTEM AND GENERATORS. (3) EV CHARGERS SHALL BE PEDESTAL MOUNTED AND PROTECTED WITH A BOLLARD, WHILE ALL OTHER CHARGERS SHALL BE WALL MOUNTED AND PROTECTED WITH A WALL COLLAR. (4) THERE WILL NOT BE ANY OTHER ALTERATIONS TO THE EXISTING SITE OR BUILDING. (5) ON THE GARAGE FIRST TIER, ONE RETAIL PARKING SPACE WILL BE REMOVED FOR A NEW RETAIL ACCESSIBLE EVCS ACCESS AISLE AND ACCESS PATH. ON THE GARAGE SECOND TIER, ONE GUEST PARKING SPACE WILL BE REMOVED FOR A NEW NON-ASSIGNED RESIDENTIAL ACCESSIBLE EVCS ACCESS AISLE PER 11B-812. (6) THERE WILL BE NO EXTERNAL EQUIPMENT INSTALLED AND NO EXTERIOR WORK UNDER THIS PERMIT. EVCS INFORMATION: EVCS MANUFACTURER: LITE-ON EVCS LEVEL: AC LEVEL 2 EVCS TYPE: NON-RFID KW CAPACITY PER CHARGER: 7.680 kW VOLTAGE: 208 VAC SINGLE PHASE CHARGING CABLE LENGTH: 25FT PROPERTY INFORMATION: BUILDING TYPE: MIXED USE BUILDING OCCUPANCY CLASSIFICATION: RESIDENTIAL AND RETAIL PARCEL APN: 430-222-07/430-222-16 NUMBER OF STORIES: 5 PARKING SPACES: 488 PARKING TYPE: 7 LEVEL PARKING GARAGE ZONING CODE: CR BUILDING FAR: 0.139 FLOOD RISK AREA: LOW RECORDED OWNER: PROPERTY MANAGEMENT: THIS MULTIFAMILY BUILDING IS NOT FOR PUBLIC HOUSING NOTE: PROVIDED PARKING AND EV CHARGING TABLES FROM GARAGE ARCHITECTURAL SHEET GA0.10, PERMIT # 101107195 TABLES HAVE BEEN UPDATED TO REFLECT PARKING LOT MODIFICATIONS INCLUDED IN THE SCOPE OF WORK. PER CBC 11B, ONE STANDARD EV ACCESSIBLE AND ONE VAN EV ACCESSIBLE PARKING STALL ARE INCLUDED ON THE FIRST TIER. IN COMPLIANCE WITH CALIFORNIA GREEN BUILDING STANDARDS CODE 4.106.4.2.2.1.1, THREE RESIDENTIAL EV ACCESSIBLE PARKING STALLS ARE INCLUDED ON THE SECOND AND THIRD TIERS. 215 21 3 9 130 385 7 66 64 74 84 2 56 20 5 26 36 02 8 1 2 385 130 84 599 339 73 8 17 339 73 521 36 1 2 53 Bldg# 101119118 Elec# 20182681 APPROVALS: PLNG - CSantana BLDG - CSG Consultant ELEC - CSG Consultant 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 CONTRACTOR SHEET DESCRIPTION: NOTES DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. EV-11 SINGLE LINE NOTES: 1.ALL CONDUCTORS SHALL BE COPPER AS FOLLOWS: #12AWG AND SMALLER - SOLID, TW #10AWG AND LARGER - STRANDED, THHN OR THWN ALL CONDUCTORS SIZES ARE BASED ON 75°C TEMPERATURE RATINS (NEC.2014 TABLE 310.16) 2.ALL NEW CIRCUIT BREAKERS, FUSIBLE SWITCHES IN MAIN SWITCHBOARD OR PANEL BOARDS SHALL BE SERIES RATED TO MATCH EXISTING AIC RATING OR APPROVED EQUAL OR 65kAIC, UNLESS NOTED OTHERWISE. 3.MOTOR CIRCUIT PROTECTORS SHALL NOT BE A PART OF SERIES COMBINATION INTERRUPTING RATINGS. 4.SERIES COMBINATION AIC RATINGS SHALL NOT BE USED WHEN THE SECONDARY EQUIPMENT IN THE SERIES IS SUBJECT TO A TOTAL CONNECTED FULL LOAD MOTOR CURRENT OF MORE THAN 1% OF ITS AIC RATINGS. 5.EQUIPMENT ENCLOSURES SHALL BE CLEARLY MARKED "CAUTION-SERIES RATED SYSTEM - 65KAMPS AVAILABLE, IDENTIFIED REPLACEMENT COMPONENTS REQUIRED". IN COMPLIANCE WITH 2016 CEC (NEC 2014) SECTION 110-22 END USE EQUIPMENT SHALL ALSO BE MARKED WITH THE HIGHER SERIES COMBINATION INTERRUPTING RATINGS AS PER 2016 CEC SECTION 240-89(C). NO EXCEPTION. 6.FUSES SHALL BE PROVIDED WITH REJECTION TYPE FUSE HOLDERS. 7.ELECTRICAL EQUIPMENT SHALL BE LISTED BY THE CITY, WHERE THE PROJECT IS LOCATED, RECOGNIZED ELECTRICAL TESTING LABORATORY OR APPROVED BY THE DEPARTMENT. 8.NO PIPING, NO DUCTS OF EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE LOCATED WITHIN THE DEDICATED SPACE ABOVE THE ELECTRICAL EQUIPMENT. 9.ALL ITEMS SHOWN ARE EXISTING U.O.N. 10.ALL FEEDER LENGTHS SHOWN ARE FOR VOLTAGE DROP AND SHORT CIRCUIT CALCULATIONS ONLY. 11.MAXIMUM AVAILABLE FAULT CURRENT AT MAIN SERVICE ENTRANCE IS ASSUMED TO BE 42KAIC U.O.N. 12.IN MAIN SWITCHBOARD BUS BRACING AND A.I.C. RATINGS OF ALL DEVICES SHALL BE 42,000 MIN. U.O.N. 13.CIRCUIT BREAKERS IN ALL MAIN SWITCHBOARDS AND PANELS SHALL BE FROM THE SAME MANUFACTURER AND ENTIRE SYSTEM. 14.ALL REMAINING SPACES IN MAIN SWITCHBOARDS AND PANELS SHALL BE BUSSED. 15.ALL SUBPANELS SHALL BE RATED 42,000 AIC U.O.N. 16.SUBMIT SHOP DRAWINGS OF MAIN SWITCHBOARD TO SERVING UTILITY COMPANY AND OBTAIN THERE APPROVAL PRIOR TO RELEASING SHOP DRAWINGS TO MANUFACTURER. VERIFY TYPE OF REQUIRED METER SOCKETS (IF NECESSARY). 17.ALL SECTIONS OF MAIN SWITCHBOARD SHALL HAVE THE HORIZONTAL AND VERTICAL BUSS BARS RATED FOR THE AMPERE RATING SHOWN ON SINGLE LINE DIAGRAMS. REDUCTION OF AMPERE RATING OF BUSS BARS THROUGHOUT THE SECTIONS OF MAIN SWITCHBOARDS IS NOT ACCEPTABLE. 18.NOTIFY SWITCHBOARD PANEL BOARDS MANUFACTURERS OF FEEDER TERMINATIONS (TOP OR BOTTOM) PRIOR TO SUBMITTING SHOP DRAWINGS. 19.PROVIDE A METALLIC CARD HOLDER ON INSIDE OF DOOR OF EACH PANEL BOARD FOR INDEX CARD AND ACCURATE TYPEWRITTEN PANEL SCHEDULE BE PUT BEHIND HEAVY PLASTIC COVER INTO EACH PANEL. ROOM NUMBERS SHALL NOT BE THE ONES ON THE PLANS BUT THE ONES DESIGNATED BY THE ARCHITECT AND/OR OWNER. 20.PROVIDE TWO (2) KEYS WITH EACH PANEL BOARD. ALL PANELS BOARDS LOCKS SHALL BE KEYED ALIKE. 21.WHERE TWO OF THREE POLE BREAKERS OCCUR IN LIGHTING PANELS THE MULTI-POLE BREAKERS SHALL HAVE A COMMON TRIP "QUICKLAG" TYPE UNITS. SINGLE POLE BREAKERS WITH TIE-BAR BETWEEN HANDLES WILL NOT BE ACCEPTABLE. 22.PROVIDE BLACK ON WHITE LAMINATED PLASTIC NAMEPLATE ENGRAVED IN MIN 1 4" HIGH LETTERS, ATTACHED NAMEPLATES TO EQUIPMENT, SWITCHBOARD(S), DISTRIBUTION BOARD(S), PANEL BOARDS AND DISCONNECTS ETC, WITH RIVETS, BOLTS, OR SHEET METAL SCREWS. CEMENT ATTACHMENTS ARE NOT ACCEPTABLE. 23.TIME SWITCHES, CONTACTORS, RELAYS, ETCH SHOWN TO BE FURNISHED WITH PANEL BOARDS SHALL BE LOCATED IN BARRIERED COMPARTMENTS BEHIND SEPARATE DOORS, MAINTAIN 2" OF SOLD TRIP BETWEEN DOORS. IF NECESSARY, INSTALL SWITCHES, CONTACTORS, RELAYS, ETCH IN SEPARATE WEATHERPROOF CABINETS WITH HINGED LOCKABLE DOORS. PROVIDE SCREW-ON TYPE NAMEPLATES, FULLY COMPLY WITH LATEST HANDICAP STANDARDS. IMPORTANT BID NOTES: 1.DUE TO THE SMALL SCALE OF DRAWINGS, IT IS NOT ALWAYS POSSIBLE TO SHOW ALL DEVICES WHICH MAYBE REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ALL EXISTING CONDITIONS BEFORE SUBMITTING HIS/HER BID. NO ADDITIONAL COMPENSATION WILL BE MADE FOR EXTRA DUE TO CONTRACTOR'S FAILURE TO VISIT THE JOB SITE AND/OR FAILURE TO DETERMINE ALL EXISTING CONDITIONS BEFORE SUBMITTING HIS/HER BID. 2.REFER TO COMPLETE ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL NOTES, SPECIFICATIONS, DETAILS, CONTROLS, ETC. REPORT TO ARCHITECTURE'S CLARIFICATION IN BASE BID. THIS REQUIREMENT WILL BE STRICTLY ENFORCED. NO CHANGE ORDERS WILL BE ALLOWED IF THE CONTRACTOR FAILS TO PERFORM THIS FUNCTION. 3.CONTRACTOR SHALL REVIEW, VERIFY AND MEET ALL SPECIFICATION AND STANDARD AS DENOTED IN DIVISION 26 SPEC BOOK. DEMOLITION NOTES: 1.THE DRAWINGS SHOW THE WORK TO BE IN PLACE AT THE COMPLETION OF INSTALLATION. MAKE NECESSARY ALTERATIONS TO COORDINATE AND CONNECT THE EXISTING ELECTRICAL WORK WITH THE NEW SUCH THAT, WHEN THE WORK IS DONE, THE ENTIRE ELECTRICAL INSTALLATION, EXISTING AND NEW, IS IN COMPLETE OPERATING CONDITION. 2.UNLESS SPECIFICALLY NOTED ON THE CONTRARY, ALL EXISTING LIGHTING FIXTURES, SWITCHES, CONTROLS AND OTHER MATERIALS OR EQUIPMENTS WHICH ARE REPLACED BY NEW AND ARE NOT INDICATED TO BE REUSED SHALL BE RETURNED TO THE OWNER OR BE DISPOSED AS DIRECTED BY THE OWNER. 3.EXISTING MATERIAL TO REMAIN UPON COMPLETION IS INDICATED ON DRAWINGS AS EXISTING, FEEDERS (CONDUIT AND WIRES) ARE EXISTING TO THEIR RESPECTIVE SOURCE. ALTHOUGH NOT INDICATED ON THE DRAWINGS. TEMPORARY REMOVAL OR RE-ROUTE CONDUITS AND REPLACE EXISTING WIRES WITH NEW DURING CONSTRUCTION WORK MAYBE REQUIRED. 4.PROVIDE AND INSTALL NEW COVER PLATES FOR ALL REMOVED OUTLETS, SWITCHES, LIGHT FIXTURES, AND OTHER ELECTRICAL DEVICES WHEN THE OUTLET BOX IS TO REMAIN. 5.REMOVE ALL EXISTING ABANDONED FEEDERS (CONDUITS AND WIRES) BACK TO PANEL BOARDS. LABEL NEW PANEL DIRECTORY AS "SPARE". 6.MAINTAIN CONTINUITY OF ALL ELECTRICAL SYSTEMS, EQUIPMENT, ETC., FED BY ABANDONED OUTLET. THEY SHOULD BE IN OPERATION AFTER THE WORK IS DONE. MAINTAINING CONTINUITY SHALL CONSIST OF RE-ROUTING OF CONDUIT AND WIRING, AS REQUIRED TO SUIT THE EXISTING CONDITIONS. 7.(E) J-BOX DENOTES APPROXIMATE LOCATION OF EXISTING BOXES IN ACCESSIBLE CEILING SPACE. ALL CONDUIT SHOWN FROM J-BOX IS NEW UNLESS SHOWN OTHERWISE AS EXISTING. 8.EXISTING LOADS SHOWN ON PANEL SCHEDULES ARE BASED ON ASSUMPTIONS MADE BY FIELD VISIT, ELECTRICAL BILLS OR PUBLIC RESOURCES. NOTIFY ENGINEER IMMEDIATELY IF LOADS EXCEED 16AMPS ON ANY 20A/1P CIRCUIT. NO EXCEPTION. 9.CAREFULLY REVIEW ARCHITECT'S DEMO DRAWINGS FOR LOCATION OF WALLS BEING REMOVED UNDER THE SCOPE OF THIS WORK AND REMOVE ALL FEEDERS (CONDUITS AND WIRES) BACK TO THE LAST DEVICE LEFT IN SERVICE. DON NOT LEAVE ABANDONED. 10.CAREFULLY REVIEW ARCHITECT'S DEMO DRAWINGS FOR EXISTING FLOOR BOXES BEING REMOVED UNDER THIS SCOPE OF WORK. REMOVE FLOOR BOXES AND FEEDERS (CONDUITS AND WIRES) BACK TO LAST DEVICE LEFT IN SERVICE. DO NOT LEAVE ABANDONED. STRIPING AND MARKINGS: 1.ACCESS AISLES SHALL BE MARKED WITH PAINTED BORDERLINES AROUND THEIR PERIMETER 2.THE AREA WITHIN THE BORDERLINES SHALL BE MARKED WITH HATCHED LINES A MINIMUM OF 36 INCHES ON CENTER 3.THE COLOR OF THE BORDERLINES, HATCHED LINES, AND LETTERS SHALL CONTRAST WITH THAT OF THE SURFACE OF THE ACCESS AISLE 4.THE COLOR OF ALL STRIPING AND MARKINGS SHALL NOT BE THE BLUE COLOR USED FOR IDENTIFICATION OF ACCESSIBLE PARKING SPACES PER 11B-502.3.3 5.THE WORDS "NO PARKING" SHALL BE PAINTED WITHIN EACH ACCESS AISLE IN LETTERS A MINIMUM OF 12 INCHES IN HEIGHT AND LOCATED TO BE VISIBLE FROM THE ADJACENT VEHICULAR WAY 6.THE WORDS "EV CHARGING ONLY" SHALL BE PAINTED AT THE LOWER END OF EACH EV SPACE IN LETTERS A MINIMUM OF 12 INCHES IN HEIGHT. THE CENTERLINE OF THE TEXT SHALL BE 6 INCHES MAXIMUM FROM THE CENTERLINE OF THE VEHICLE SPACE AND ITS LOWER CORNER AT, OR LOWER SIDE ALIGNED WITH, THE END OF THE PARKING SPACE. (11B-812.8.9) GROUNDING: 1.ALL SERVICES SUPPLYING THE BUILDING SHALL HAVE THE SAME GROUNDING ELECTRODE SYSTEM. 2.REMOVAL OF A GRID INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTOR. 3.GROUND BOND CONDUCTOR SHALL NOT BE SPLICED. 4.USE EQUAL OR APPROVED "LAY IN LUG" ILSCO, UL-467 RATED FOR GROUNDING AND BONDING. HIGH STRENGTH COPPER ALLOY W/ SS SCREW (AS NECESSARY) CONDUCTORS: 1.ALL CONDUCTORS SHALL BE COPPER UNLESS OTHERWISE NOTED. 2.ALL PROPOSED CONDUCTORS RATED FOR 90°C., HOWEVER EQUIPMENT RATINGS SHALL BE ASSUMED TO BE 75°C FOR ALL BUILDING FEEDERS AND THEREFORE TERMINATIONS PRIOR TO CONNECTION. INTERMEDIATE JUNCTION BOX MAY BE REQUIRED TO CHANGE FROM 90°C TO 75°C WIRING. MATERIAL SHALL BE COPPER AND 90°C RATED, SUITABLE FOR SUN EXPOSURE AND WET LOCATIONS. FIELD APPLIED COATINGS ARE NOT ACCEPTABLE. 3.ALL WIRE INSULATION TYPE SHALL BE EV WIRE FOR AC EV CIRCUIT RUNS. 4.EACH EV MODULE HAS A POSITIVE AND NEGATIVE EV WIRE "SUNLIGHT RESISTANT" QUICK CONNECT PLUG IN LEAD. VERIFY COMPATIBLE EXTENSION WIRE PRIOR TO INSTALLATION. 5.ALL INTER-MODULE SERIES CONNECTIONS TO BE TIE STRAPPED (W/ BLACK UV RESISTANT TIE 625.41 OVERCURRENT PROTECTION: OVERCURRENT PROTECTION FOR FEEDERS AND BRANCH CIRCUITS SUPPLYING EQUIPMENT SHALL BE SIZED FOR CONTINUOUS DUTY AND SHALL HAVE A RATING OF NOT LESS THAN 125 PERCENT OF THE MAXIMUM LOAD OF THE EQUIPMENT. WHERE NONCONTINUOUS LOADS ARE SUPPLIED FROM THE SAME FEEDER, THE OVER-CURRENT DEVICE SHALL HAVE A RATING OF NOT LESS THAN THE SUM OF THE NON-CONTINUOUS LOADS PLUS 125 PERCENT OF THE CONTINUOUS LOADS. 625.42 RATING: THE EQUIPMENT SHALL HAVE SUFFICIENT RATING TO SUPPLY THE LOAD SERVED. ELECTRIC VEHICLE CHARGING LOADS SHALL BE CONSIDERED TO BE CONTINUOUS LOADS FOR THE PURPOSES OF THIS ARTICLE. WHERE AN AUTOMATIC LOAD MANAGEMENT SYSTEM IS USED, THE MAXIMUM EQUIPMENT LOAD ON A SERVICE AND FEEDER SHALL BE THE MAXIMUM LOAD PERMITTED BY THE AUTOMATIC LOAD MANAGEMENT SYSTEM. 625.43 DISCONNECTING: MEANS FOR EQUIPMENT RATED MORE THAN 60 AMPERES OR MORE THAN 150 VOLTS TO GROUND, THE DISCONNECTING MEANS SHALL BE PROVIDED AND INSTALLED IN A READILY ACCESSIBLE LOCATION. THE DISCONNECTING MEANS SHALL BE LOCKABLE OPEN IN ACCORDANCE WITH 110.25. ACCESSIBLE ROUTES AND ACCESS AISLES: 1.ACCESS AISLES SHALL BE LEVEL WITH THE EV SPACE SERVED, AND SLOPES/CROSS -SLOPES SHALL NOT EXCEED 1:48 2.ACCESSIBILITY COMPLIANT EV SPACES SHALL BE LOACTED ON AN ACCESSIBLE ROUTE TO AN ACESSIBLE BUILDING ENTRANCE. (11B-206.4 & 11B-812.5) 3.EVCS SHALL BE DESIGNED SO ACCESSIBLE ROUTES ARE NOT OBSTRUCTED BY CABLES OR OTHER ELEMENTS. (11B-812.5.5) 4.PROVIDE CURBS, WHEEL STOPS, BOLLARDS, OR OTHER BARRIERS TO PREVENT ENCROACHMENT OF VEHICLE OVER THE REQUIRED CLEAR WIDTH OF ACCESSIBLE ROUTES. (11B-812.5.3) WIRING METHODS: 1.FOR UNDERGROUND AND EXPOSED UP TO +5'-0" OR DAMP LOCATION, THE CONDUIT SHALL BE RIGID STEEL GALVANIZED IMC. NO RUNNING THREADS ARE PERMITTED. 2.GALVANIZED EMT SHALL BE USED IN DRY CONCEALED LOCATIONS AN EXPOSED ABOVE +5-0". EMT CONNECTORS SHALL BE WATERTIGHT COMPRESSION TYPE. 3.GALVANIZED FLEXIBLE CONDUIT SHALL BE USED ONLY FOR MOTOR AND FIXTURE CONNECTIONS IN LENGTHS NOT TO EXCEED 66' 4.CONDUITS PENETRATING THE ROOF SHALL BE FLASHED AND COUNTER FLASHED. 5.INSTALL FITTINGS, SPECIAL DEVICES AND MATERIAL, WHICH MAY BE REQUIRED FOR THE PROPER INSTALLATION OF THE CONDUIT SYSTEM. NOTE: 110.27(B)PREVENT PHYSICAL DAMAGE:IN LOCATIONS WHERE ELECTRICAL EQUIPMENT IS LIKELY TO BE EXPOSED TO PHYSICAL DAMAGE, ENCLOSURES OR GAURDS SHALL BE SO ARRANGED AND OF SUCH STRENGTH AS TO PREVENT SUCH DAMAGE. DEDICATED ELECTRICAL SPACE: WIDTH AND DEPTH OF EQUIPMENT EXTENDING FROM THE FLOOR TO 1.8M (6FT) ABOVE EQUIPMENT OR TO STRUCTURAL CEILING NOTE: NEW SERVICES IS LOCATED OUTDOORS IN THE PARKING SPACES THAT ARE BELOW THE RESIDENTIAL UNITS NOTE: "ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFTY HEALTH ADMINISTRATION." 1109.16 General. Where Electric Vehicle Charging Stations are provided, all charging stations shall be provided in accordance with this section and applicable portions of ICC A117.1. 1109.16.1 Existing facilities. Where Electric Vehicle Charging Stations are either added or altered within a facility having existing Electric Vehicle Charging Stations, the requirements this section shall apply only to the newly installed or altered Electric Vehicle Charging Stations. 1109.16.2 Minimum number. Where Electric Vehicle Charging Stations are provided for public use, the minimum number of accessible Electric Vehicle Charging Stations shall be provided in accordance with Table 1109.16.2. Where new Electric Vehicle Charging Stations are installed in facilities with existing Electric Vehicle Charging Stations, the total number provided in Table 1109.16.2 shall include both existing and new Electric Vehicle Charging Stations. Where an Electric Vehicle Charging Station charger can simultaneously charge more than one vehicle, the number of Electric Vehicle Charging Station chargers provided shall be considered equivalent to the number of electric vehicles that can be simultaneously charged. Parking spaces serving Electric Vehicle Charging Stations per this section shall not account for any of the accessible parking spaces (as required by Section 1106) on the site unless specifically provided with accessible identification signage per Section 1109.16.6. Exception: 1.Electric Vehicle Charging Stations not available to the general public and intended for use by a designated vehicle or driver shall not be required to comply with this section. Examples include, but are not limited to, charging stations serving public or private fleet vehicles, assigned to an employee, or serving private residences. 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 BLDG. 'D'BLDG. 'D' C C 20'-0" 19'-4 1/4" BLDG. 'C' C BLDG. 'B' 21'-4 1/4" KS KB OTISGEN23500 LB / 200 FPM5'-0" PIT C OTISGEN23500 LB / 200 FPM5'-0" PIT14'-8" OVERRUN9'-9" TALL CAB HEIGHT100' MAX. TRAVELNO PIT LADDER RECESS RETAIL RETAIL DA03 EXHAUST 80 SQ. FT.5' DIA. RETAIL RETAIL 14'-8" OVERRUN9'-9" TALL CAB HEIGHT100' MAX. TRAVELNO PIT LADDER RECESS UP ELEVATOR LOBBY SUPPLY 80 SQ. FT. ACCESS ROOM TRASH TERMINATION ROOM STEP SUPPLY 70 SQ. FT. UP OTISGEN23500 LB / 200 FPM5'-0" PIT14'-8" OVERRUN9'-9" TALL CAB HEIGHT100' MAX. TRAVELNO PIT LADDER RECESS NO PARKING UP DN EXHAUST 72 SQ. FT. NOVAN MOTORCYCLE R R R R R R PARKING ELEV. #2 R RAMP 5% MAX. SLOPE UP 8.5x18 8.5x18 R R R R 8.5x18 8.5x18 8.5x18 R R R R 8.5x18 8.5x18 8.5x18 R R R 8.5x18 8.5x18 R 8.5x18 8.5x18 8.5x18 R R R R R R 8.5x18 8.5x18 8.5x18 R R R 8.5x18 8.5x18 R8.5x18 8.5x18 8.5x18 8.5x18 R R R R R 8.5x18 8.5x18 8.5x18 R R R R R R 8.5x18 8.5x18 8.5x18 R R R R R R 8.5x18 R R 8.5x18 8.5x18 R R R DN BEGIN LEVEL 18.5x18 MOTORCYCLE R OTISGEN2 UP RAMP 5% MAX. SLOPE R R R UP DN ELEV. #1 ELECT. ROOM/ MAINT. R R R R G G R R R R R R R SUPPLY 72 SQ. FT. BLDG. 'B'20'-0" BLDG. 'C' C UP R R 9x18 3500 LB / 200 FPM5'-0" PIT14'-8" OVERRUN9'-9" TALL CAB HEIGHT100' MAX. TRAVELNO PIT LADDER RECESS FB2 RETAIL TRASH 8.5x18 R R 8.5x18 8.5x18 8.5x18 R R R R 9x18 EXHAUST 71 SQ. FT.APOT APOT SUPPLY 80 SQ. FT. 30" DIA.30" DIA. 8.5x18 R 8.5x18 8.5x18 R 8.5x18 R 8.5x18 8.5x18 8.5x18 R 8.5x18 8.5x18 R R R 8.5x18 TRASH TERMINATION ROOM 10.5x18 R 10.5x18 10.5x18 R 10.5x18 10.5x18 R R R R 8.5x18 8.5x18 6"1 DAS 8.5x18 R 8.5x18 8.5x18 8.5x18 R 8.5x18 8.5x18 R R R R 8.5x18 STEP 8.5x18 8.5x18 ELECTRICAL ROOM 2 6" 2'-0" 2'-0" 1 1 8.5x18 DOMESTIC WATER PUMP ROOM R R 8.5x18 APOT 8.5x18 6"6"20'-11 1/2"6"2'-0" 2'-0" 2 2 APOT 8.5x18 8.5x18 R R 8.5x18 R G G R R R R 6"2'-0" 2'-0" TRASH TERMINATION ROOM ELECTRICAL ROOM KS KB STEP R UP R ELEVATOR MACHINE ROOM RAMP UP <6.00% RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL 2'-6"2'-6" UP DOMESTIC WATER PUMP ROOM RETAIL UP STEP TRASH TERMINATION ROOM 6" 5' DIA. ACCESS ROOM SIDE SIDEAPPROACH+54" MAX. A.F.S. 48 APPROACH+54" MAX. A.F.S. 48 APOT OTISGEN23500 LB / 200 FPM5'-0" PIT14'-8" OVERRUN9'-9" TALL CAB HEIGHT100' MAX. TRAVELNO PIT LADDER RECESS EXHAUST 80 SQ. FT. C 20'-10" C RED HILL Ave. UPDN RETAIL VAN NO PARKINGRETAILRETAIL NO PARKING RETAILRETAILRETAILRETAILRETAILRETAILRETAIL APOT 30" DIA.30" DIA. SIDESIDEAPPROACH+54" MAX. A.F.S. 48 APPROACH+54" MAX. A.F.S. 48 UPDN DA02 DA01 AP O T FB 2 RE T A I L FB 2 NO RE T A I L RE T A I L RE T A I L PA R K I N G RE T A I L RE T A I L RE T A I L VA N NO PA R K I N G FB 2 NO RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L PA R K I N G ## # ## # ## # ## # RE T A I L RE T A I L EL E C . V E H I C L E CH A R G I N G RE T A I L EL E C . V E H I C L E CH A R G I N G RE T A I L RE T A I L AP O T FB 2 RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L VA N EL E C . V E H I C L E CH A R G I N G NO PA R K I N G RE T A I L EL E C . V E H I C L E CH A R G I N G RE T A I L RE T A I L RE T A I L RE T A I L EL E C . V E H I C L E CH A R G I N G RE T A I L EL E C . V E H I C L E CH A R G I N G RE T A I L RE T A I L EL E C . V E H I C L E CH A R G I N G RE T A I L RE T A I L RE T A I L FB 2 30 UP 5' DIA . 30 NO PA R K I N G VA N O O O O O OOO TH U R S T O N HYD R O 350 0 L B / 1 5 0 F P M 4'-0 " P I T 12' - 6 " O V E R R U N 8'-0 " C A B H E I G H T 8. 5 x 1 8 RA M P 5 % 8. 5 x 1 8 MA X . S L O P E 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 8. 5 x 1 8 O O O O 12'- 6 " O V E R R U N 8'-0 " C A B H E I G H T 350 0 L B / 1 5 0 F P M 4'-0 " P I T THU R S T O N HYD R O ST E P RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L FB 2 DN ST E P ST E P ST E P ST E P NO RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L PA R K I N G RE T A I L RE T A I L RA M P D O W N <6 . 0 0 % RA M P U P <6 . 0 0 % FB 2 30 5' DIA . 30 20 ' - 0 " 37 ' - 1 1 3 / 4 " UP UP NO RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L RE T A I L ## # ## # ## # ## # PA R K I N G DN RA M P D O W N % M A X . RA M P U P 5. 2 3 % M A X . 15 ' - 9 1 / 4 " RE T A I L VA N EL E C . V E H I C L E CH A R G I N G NO PA R K I N G RE T A I L EL E C . V E H I C L E CH A R G I N G RE T A I L EL E C . V E H I C L E CH A R G I N G RE T A I L RE T A I L EL E C . V E H I C L E CH A R G I N G RE T A I L EL E C . V E H I C L E CH A R G I N G RE T A I L CL E A N A I R / VA N P O O L / E V RE T A I L CL E A N A I R / VA N P O O L / E V RE T A I L CL E A N A I R / VA N P O O L / E V RE T A I L CL E A N A I R / VA N P O O L / E V RE T A I L CL E A N A I R / VA N P O O L / E V RE T A I L CL E A N A I R / VA N P O O L / E V RE T A I L CL E A N A I R / VA N P O O L / E V RE T A I L CL E A N A I R / VA N P O O L / E V RE T A I L RE T A I L RE T A I L RE T A I L SL O P E D O W N AP O T 25 ' - 7 1 / 4 " E W A R N E R A v e . SS DA82 AP O T BLDG. 'A' BUILDING 'A' PARKING STRUCTURE 2010 E WARNER AVE, SANTA ANA UNDER CURRENT PERMIT BUILDING 'B' PARKING STRUCTURE 2350 S REDHILL AVE, SANTA ANA, CA 92705 UNDER SEPARATE PERMIT BUILDING 'C' PARKING STRUCTURE 2390 S REDHILL AVE, SANTA ANA, CA 92705 UNDER SEPARATE PERMIT BUILDING 'D' PARKING STRUCTURE 1938 E WARNER AVE, SANTA ANA, CA 92705 UNDER SEPARATE PERMIT BUILDING 'B' 2320 S REDHILL AVE, SANTA ANA, CA 92705 19' CONTRACTOR SHEET DESCRIPTION: SITE PLAN DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. ENLARGED PLAN: NOTE: THE HIGH FORWARD REACH SHALL BE 48 INCHES (1219.2 MM) MAXIMUM AND THE LOW FORWARD REACH SHALL BE 15 INCHES (381 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND. THE CONTRACTOR NEED TO PROVIDE DURING THE INSTALLATION REACH RANGES: LEGEND: MSP - EV PULL PNL - EV N G (N) TRANSFORMER (N)TRANSFORMER G M CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT - SAFETY BOLLARD - CONDUIT - PARKING SIGN - MAIN SERVICE PANEL (EV) - PULL SECTION - EV PANEL - EV TRANSFORMER - DISCONNECT - METER - GAS METER - EV CHARGING STALL - EV SINGLE PORT WALL MOUNTED - EV SINGLE PORT PEDESTAL MOUNTED - 2 EV SINGLE PORT PEDESTAL MOUNTED - ACCESSIBLE STALL ELECTRIC VEHICLE CHARGING STATION PARKING ONLY WHILE CHARGING EV PANEL SAFETY BOLLARD SAFETY BOLLARD: PARKING SIGN N S EW CIRCUITS PNL CHARGER TOATAL CHARGERS A1EV EV1 - EV07 7 CHARGERS A2EV EV08 - EV14 7 CHARGERS A3EV EV15 - EV27 13 CHARGERS A4EV EV28- EV39 12 CHARGERS A5EV EV40 - EV51 12 CHARGERS A6EV EV52 - EV58 7 CHARGERS EV-02 SCALE: 1"=64' PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. PROPERTY LINE 430-222-07 430-222-16 PROPERTY LINE 430-222-07 430-222-16 PROPERTY LINE 430-222-07 430-222-16 PROPERTY LINE 430-222-07 430-222-16 NO EXTERNAL WORK IS PROPOSED FOR THE PROJECT UNDER THE CURRENT PERMIT - RETAIL PARKING - GUEST PARKING - RESIDENT PARKING RETAIL GUEST ### - NEW ACCESS AISLE MARKINGS NO P A R K I N G - NEW EVCS ACCESSIBLE ONLY SIGNAGE 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 UP OTIS GEN2 3500 LB / 200 FPM 5'-0" PIT 14'-8" OVERRUN 9'-9" TALL CAB HEIGHT 100' MAX. TRAVEL RETAIL RETAIL RETAIL RETAIL AD AD 5' DIA. ED AD STEP UP ED 2 2 1 1 1 AD AD AD ADUP UP DN % M A X . 5. 2 3 % M A X . SL O P E D O W N CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT 7 SINGLE PORT WALL MOUNTED EV STATION 0 DUAL PORT PEDESTAL MOUNTED EV STATION 0 SINGLE PORT PEDESTAL MOUNTED EV STATION ACCESSIBLE EV STATION GARAGE FIRST TIER 7 TOTAL EV STATIONS ON FIRST TIER & LOWER TIER 10'-7" 18'-11" 9' 4' 25'-10" 28'-10" 12' 21' NEW ACCESS PATH 5' 9' NEW ACCESS AISLE IDENTIFICATION SIGN IDENTIFICATION SIGN CONTRACTOR SHEET DESCRIPTION: ENLARGED PLAN I DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. N S EW SITE PLAN: NOTE: THE HIGH FORWARD REACH SHALL BE 48 INCHES (1219.2 MM) MAXIMUM AND THE LOW FORWARD REACH SHALL BE 15 INCHES (381 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND. THE CONTRACTOR NEED TO PROVIDE DURING THE INSTALLATION REACH RANGES: ELECTRIC VEHICLE CHARGING STATION PARKING ONLY WHILE CHARGING EV PANEL SAFETY BOLLARD SAFETY BOLLARD: PARKING SIGN EV-03 SCALE: 1"=15.8' PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. LEGEND: MSP - EV PULL PNL - EV N G (N) TRANSFORMER (N)TRANSFORMER G M CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT - SAFETY BOLLARD - CONDUIT - PARKING SIGN - MAIN SERVICE PANEL (EV) - PULL SECTION - EV PANEL - EV TRANSFORMER - DISCONNECT - METER - GAS METER - EV CHARGING STALL - EV SINGLE PORT WALL MOUNTED - EV SINGLE PORT PEDESTAL MOUNTED - 2 EV SINGLE PORT PEDESTAL MOUNTED - RETAIL PARKING - GUEST PARKING - RESIDENT PARKING RETAIL GUEST ### NO P A R K I N G - ACCESSIBLE STALL - NEW ACCESS AISLE MARKINGS - NEW EVCS ACCESSIBLE ONLY SIGNAGE 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 DN UP OTIS GEN2 3500 LB / 200 FPM 5'-0" PIT 14'-8" OVERRUN 9'-9" TALL CAB HEIGHT 100' MAX. TRAVEL ##################### FB1 5' DIA. ED UP DN ED 2 2 2 ED 1 FB1 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 UP DN UP DN 5. 2 3 % M A X . 5. 4 3 % M A X . FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT 3 SINGLE PORT WALL MOUNTED EV STATION 0 DUAL PORT PEDESTAL MOUNTED EV STATION 4 SINGLE PORT PEDESTAL MOUNTED EV STATION ACCESSIBLE EV STATION CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULT CHARGING FAULT 18'-11" 8'-11" 25'-8" 26'-2" 9' 18'-11" GARAGE SECOND TIER 7 TOTAL EV STATIONS ON SECOND TIER 18'-10" 9'-4" 9' 12' 19'-4" 9' IDENTIFICATION SIGN IDENTIFICATION SIGN 36.77672005 NEW ACCESS AISLE ELECTRIC VEHICLE CHARGING STATION PARKING ONLY WHILE CHARGING EV PANEL SAFETY BOLLARD SAFETY BOLLARD: PARKING SIGN EV-04 SCALE: 1"=15.8' CONTRACTOR SHEET DESCRIPTION: ENLARGED PLAN II DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. N S EW SITE PLAN: NOTE: THE HIGH FORWARD REACH SHALL BE 48 INCHES (1219.2 MM) MAXIMUM AND THE LOW FORWARD REACH SHALL BE 15 INCHES (381 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND. THE CONTRACTOR NEED TO PROVIDE DURING THE INSTALLATION REACH RANGES: PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. LEGEND: MSP - EV PULL PNL - EV N G (N) TRANSFORMER (N)TRANSFORMER G M CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT - SAFETY BOLLARD - CONDUIT - PARKING SIGN - MAIN SERVICE PANEL (EV) - PULL SECTION - EV PANEL - EV TRANSFORMER - DISCONNECT - METER - GAS METER - EV CHARGING STALL - EV SINGLE PORT WALL MOUNTED - EV SINGLE PORT PEDESTAL MOUNTED - 2 EV SINGLE PORT PEDESTAL MOUNTED - RETAIL PARKING - GUEST PARKING - RESIDENT PARKING RETAIL GUEST ### NO P A R K I N G - ACCESSIBLE STALL - NEW ACCESS AISLE MARKINGS - NEW EVCS ACCESSIBLE ONLY SIGNAGE NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED. 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 OT I S GE N 2 35 0 0 L B / 2 0 0 F P M 5' - 0 " P I T 14 ' - 8 " O V E R R U N 9' - 9 " T A L L C A B H E I G H T 10 0 ' M A X . T R A V E L ## # ## # ## # ## # ## # ## # ## # FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 DN UP FB 1 5' D I A . ED UP DN ED 1 1 2 2 2 2 ED 1 1 1 FB1 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 UP DN UP DN 5. 4 3 % M A X . 5. 4 3 % M A X . FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT 7 SINGLE PORT WALL MOUNTED EV STATION 0 DUAL PORT PEDESTAL MOUNTED EV STATION 6 SINGLE PORT PEDESTAL MOUNTED EV STATION CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT ACCESSIBLE EV STATION 18'-10" 8'-10" GARAGE THIRD TIER 13 TOTAL EV STATIONS ON THIRD TIER 25'-8" 25'-8" AM B 12' 19'-3" 9' 6'-11" IDENTIFICATION SIGN ELECTRIC VEHICLE CHARGING STATION PARKING ONLY WHILE CHARGING EV PANEL SAFETY BOLLARD SAFETY BOLLARD: PARKING SIGN EV-05 SCALE: 1"=15.87' CONTRACTOR SHEET DESCRIPTION: ENLARGED PLAN III DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. N S EW SITE PLAN: NOTE: THE HIGH FORWARD REACH SHALL BE 48 INCHES (1219.2 MM) MAXIMUM AND THE LOW FORWARD REACH SHALL BE 15 INCHES (381 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND. THE CONTRACTOR NEED TO PROVIDE DURING THE INSTALLATION REACH RANGES: PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. LEGEND: MSP - EV PULL PNL - EV N G (N) TRANSFORMER (N)TRANSFORMER G M CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT - SAFETY BOLLARD - CONDUIT - PARKING SIGN - MAIN SERVICE PANEL (EV) - PULL SECTION - EV PANEL - EV TRANSFORMER - DISCONNECT - METER - GAS METER - EV CHARGING STALL - EV SINGLE PORT WALL MOUNTED - EV SINGLE PORT PEDESTAL MOUNTED - 2 EV SINGLE PORT PEDESTAL MOUNTED - RETAIL PARKING - GUEST PARKING - RESIDENT PARKING RETAIL GUEST ### NO P A R K I N G - ACCESSIBLE STALL - NEW ACCESS AISLE MARKINGS - NEW EVCS ACCESSIBLE ONLY SIGNAGE NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED. 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 DN UP OT I S GE N 2 35 0 0 L B / 2 0 0 F P M 5' - 0 " P I T 14 ' - 8 " O V E R R U N 9' - 9 " T A L L C A B H E I G H T 10 0 ' M A X . T R A V E L ## # ## # ## # ## # ## # ## # ## # FB 1 5' D I A . ED UP DN ED 1 1 2 2 2 2 ED 1 1 FB 1 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 UP DN UP DN 5. 4 3 % M A X . 5. 4 3 % M A X . FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT 6 SINGLE PORT WALL MOUNTED EV STATION 0 DUAL PORT PEDESTAL MOUNTED EV STATION 6 SINGLE PORT PEDESTAL MOUNTED EV STATION CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT 18'-11" GARAGE FOURTH TIER 12 TOTAL EV STATIONS ON FOURTH TIER 25'-8" 25'-8" CONTRACTOR SHEET DESCRIPTION: ENLARGED PLAN IV DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. N S EW SITE PLAN: NOTE: THE HIGH FORWARD REACH SHALL BE 48 INCHES (1219.2 MM) MAXIMUM AND THE LOW FORWARD REACH SHALL BE 15 INCHES (381 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND. THE CONTRACTOR NEED TO PROVIDE DURING THE INSTALLATION REACH RANGES: ELECTRIC VEHICLE CHARGING STATION PARKING ONLY WHILE CHARGING EV PANEL SAFETY BOLLARD SAFETY BOLLARD: PARKING SIGN EV-06 SCALE: 1"=15.87' PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. LEGEND: MSP - EV PULL PNL - EV N G (N) TRANSFORMER (N)TRANSFORMER G M CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT - SAFETY BOLLARD - CONDUIT - PARKING SIGN - MAIN SERVICE PANEL (EV) - PULL SECTION - EV PANEL - EV TRANSFORMER - DISCONNECT - METER - GAS METER - EV CHARGING STALL - EV SINGLE PORT WALL MOUNTED - EV SINGLE PORT PEDESTAL MOUNTED - 2 EV SINGLE PORT PEDESTAL MOUNTED - RETAIL PARKING - GUEST PARKING - RESIDENT PARKING RETAIL GUEST ### NO P A R K I N G - ACCESSIBLE STALL - NEW ACCESS AISLE MARKINGS - NEW EVCS ACCESSIBLE ONLY SIGNAGE NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED. 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 OT I S GE N 2 35 0 0 L B / 2 0 0 F P M 5' - 0 " P I T 14 ' - 8 " O V E R R U N 9' - 9 " T A L L C A B H E I G H T 10 0 ' M A X . T R A V E L ## # ## # ## # ## # ## # ## # ## # FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 DN UP FB 1 5' D I A . ED UP DN ED 1 1 2 2 2 2 ED 1 1 FB 1 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 UP DN UP DN 5. 4 3 % M A X . 5. 4 3 % M A X . FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT 6 SINGLE PORT WALL MOUNTED EV STATION 0 DUAL PORT PEDESTAL MOUNTED EV STATION 6 SINGLE PORT PEDESTAL MOUNTED EV STATION CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT 18'-5" 8'-11" 25'-8" 25'-8" GARAGE FIFTH TIER 12 TOTAL EV STATIONS ON FIFTH TIER CONTRACTOR SHEET DESCRIPTION: ENLARGED PLAN V DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. N S EW SITE PLAN: NOTE: THE HIGH FORWARD REACH SHALL BE 48 INCHES (1219.2 MM) MAXIMUM AND THE LOW FORWARD REACH SHALL BE 15 INCHES (381 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND. THE CONTRACTOR NEED TO PROVIDE DURING THE INSTALLATION REACH RANGES: ELECTRIC VEHICLE CHARGING STATION PARKING ONLY WHILE CHARGING EV PANEL SAFETY BOLLARD SAFETY BOLLARD: PARKING SIGN EV-07 SCALE: 1"=15.87' PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. LEGEND: MSP - EV PULL PNL - EV N G (N) TRANSFORMER (N)TRANSFORMER G M CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT - SAFETY BOLLARD - CONDUIT - PARKING SIGN - MAIN SERVICE PANEL (EV) - PULL SECTION - EV PANEL - EV TRANSFORMER - DISCONNECT - METER - GAS METER - EV CHARGING STALL - EV SINGLE PORT WALL MOUNTED - EV SINGLE PORT PEDESTAL MOUNTED - 2 EV SINGLE PORT PEDESTAL MOUNTED - RETAIL PARKING - GUEST PARKING - RESIDENT PARKING RETAIL GUEST ### NO P A R K I N G - ACCESSIBLE STALL - NEW ACCESS AISLE MARKINGS - NEW EVCS ACCESSIBLE ONLY SIGNAGE NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED. 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 DN UP OT I S GE N 2 35 0 0 L B / 2 0 0 F P M 5' - 0 " P I T 14 ' - 8 " O V E R R U N 9' - 9 " T A L L C A B H E I G H T 10 0 ' M A X . T R A V E L ## # ## # ## # ## # ## # ## # 5' D I A . RD OD DN UP ED 1 2 2 1 1 1UP DN UP DN 5. 4 3 % M A X . 5. 4 3 % M A X . CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT 3 SINGLE PORT WALL MOUNTED EV STATION 0 DUAL PORT PEDESTAL MOUNTED EV STATION 3 SINGLE PORT PEDESTAL MOUNTED EV STATION CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGINGPOWER FAULTCHARGING FAULT 18'-1" 9' 25'-8" 25'-8" GARAGE SIXTH TIER 7 TOTAL EV STATIONS ON SIXTH TIER CONTRACTOR SHEET DESCRIPTION: ENLARGED PLAN VI DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. N S EW NOTE: THE HIGH FORWARD REACH SHALL BE 48 INCHES (1219.2 MM) MAXIMUM AND THE LOW FORWARD REACH SHALL BE 15 INCHES (381 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND. THE CONTRACTOR NEED TO PROVIDE DURING THE INSTALLATION REACH RANGES: ELECTRIC VEHICLE CHARGING STATION PARKING ONLY WHILE CHARGING EV PANEL SAFETY BOLLARD SAFETY BOLLARD: PARKING SIGN EV-08 SCALE: 1"=15.87' PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. LEGEND: MSP - EV PULL PNL - EV N G (N) TRANSFORMER (N)TRANSFORMER G M CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT - SAFETY BOLLARD - CONDUIT - PARKING SIGN - MAIN SERVICE PANEL (EV) - PULL SECTION - EV PANEL - EV TRANSFORMER - DISCONNECT - METER - GAS METER - EV CHARGING STALL - EV SINGLE PORT WALL MOUNTED - EV SINGLE PORT PEDESTAL MOUNTED - 2 EV SINGLE PORT PEDESTAL MOUNTED - RETAIL PARKING - GUEST PARKING - RESIDENT PARKING RETAIL GUEST ### NO P A R K I N G - ACCESSIBLE STALL - NEW ACCESS AISLE MARKINGS - NEW EVCS ACCESSIBLE ONLY SIGNAGE NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED. 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 CONTRACTOR SHEET DESCRIPTION: SLD DRAWN DATE 13.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. SINGLE LINE DIAGRAM I: EXISTING "PDSA" EV-09 PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. GFP GFP EXISTING FEEDER SCHEDULE EXISTING BONDING NETWORK 1"C, 1#250 KCMILS AL GROUND TO GEC SYSTEM 1"C, 1#250 KCMILS AL GROUND TO GEC SYSTEM 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 CONTRACTOR SHEET DESCRIPTION: PNL SCH DRAWN DATE 13.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. EV-10 EXISTING PANEL SCHEDULES PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE CHARGING SYSTEM. (E) A1EV SECTION: OF MAIN C.B. 400AMP MAIN LUGSLOCATION: PARKING GARAGE LEVEL 1 SERVING: NORMAL POWER SURFACE MNT.BOT FEED LOAD TYPE CIRCUIT DESCRIPTION CONN VA C.B.C.B.CONN VA CIRCUIT DESCRIPTION LOAD TYPE A B C AMP.POLE CKT AMP.POLE CKT C B A N EV1 3,328 40 2 1 3 40 2 2 4 3,328 EV4 N 3,328 3,328 N EV2 3,328 40 2 5 7 40 2 6 8 3,328 EV5 N 3,328 3,328 N EV3 3,328 40 2 9 11 40 2 10 12 3,328 EV6 N 3,328 3,328 N GW 20 1 13 40 2 14 16 3,328 EV7 N 180 3,328 6,836 6,656 6,656 CONNECTED TOTAL LOAD 46.77 KVA DEMAND TOTAL LOAD:58.46 KVA 6,656 9,984 9,984 TOTAL AMPS: 162.46 AMPS (E) A3EV SECTION: OF MAIN C.B. 400AMP MAIN LUGSLOCATION: PARKING GARAGE LEVEL 3 SERVING: NORMAL POWER SURFACE MNT.BOT FEED LOAD TYPE CIRCUIT DESCRIPTION CONN VA C.B.C.B.CONN VA CIRCUIT DESCRIPTION LOAD TYPE A B C AMP.POLE CKT AMP.POLE CKT C B A N EV1 3,328 40 2 1 3 40 2 2 4 3,328 EV7 N 3,328 3,328 N EV2 3,328 40 2 5 7 40 2 6 8 3,328 EV8 N 3,328 3,328 N EV3 3,328 40 2 9 11 40 2 10 12 3,328 EV9 N 3,328 3,328 N EV4 3,328 40 2 13 15 40 2 14 16 3,328 EV10 N 3,328 3,328 N EV5 3,328 40 2 17 19 40 2 18 20 3,328 EV11 N 3,328 3,328 N EV6 3,328 40 2 21 23 40 2 22 24 3,328 EV12 N 3,328 3,328 40 2 26 28 3,328 EV13 N 3,328 13,492 13,312 13,312 CONNECTED TOTAL LOAD 86.708 KVA DEMAND TOTAL LOAD:108.385 KVA 13,312 16,640 16,640 TOTAL AMPS: 300.54 AMPS (E) A4EV SECTION: OF MAIN C.B. 400AMP MAIN LUGSLOCATION: PARKING GARAGE LEVEL 4 SERVING: NORMAL POWER SURFACE MNT.BOT FEED LOAD TYPE CIRCUIT DESCRIPTION CONN VA C.B.C.B.CONN VA CIRCUIT DESCRIPTION LOAD TYPE A B C AMP.POLE CKT AMP.POLE CKT C B A N EV1 3,328 40 2 1 3 40 2 2 4 3,328 EV7 N 3,328 3,328 N EV2 3,328 40 2 5 7 40 2 6 8 3,328 EV8 N 3,328 3,328 N EV3 3,328 40 2 9 11 40 2 10 12 3,328 EV9 N 3,328 3,328 N EV4 3,328 40 2 13 15 40 2 14 16 3,328 EV10 N 3,328 3,328 N EV5 3,328 40 2 17 19 40 2 18 20 3,328 EV11 N 3,328 3,328 N EV6 3,328 40 2 21 23 40 2 22 24 3,328 EV12 N 3,328 3,328 13,312 13,312 13,312 CONNECTED TOTAL LOAD 80.052 KVA DEMAND TOTAL LOAD:100,65 KVA 13,312 13,312 13,312 TOTAL AMPS: 277.45 AMPS (E) A5EV SECTION: OF MAIN C.B. 400AMP MAIN LUGSLOCATION: PARKING GARAGE LEVEL 5 SERVING: NORMAL POWER SURFACE MNT.BOT FEED LOAD TYPE CIRCUIT DESCRIPTION CONN VA C.B.C.B.CONN VA CIRCUIT DESCRIPTION LOAD TYPE A B C AMP.POLE CKT AMP.POLE CKT C B A N EV1 3,328 40 2 1 3 40 2 2 4 3,328 EV7 N 3,328 3,328 N EV2 3,328 40 2 5 7 40 2 6 8 3,328 EV8 N 3,328 3,328 N EV3 3,328 40 2 9 11 40 2 10 12 3,328 EV9 N 3,328 3,328 N EV4 3,328 40 2 13 15 40 2 14 16 3,328 EV10 N 3,328 3,328 N EV5 3,328 40 2 17 19 40 2 18 20 3,328 EV11 N 3,328 3,328 N EV6 3,328 40 2 21 23 40 2 22 24 3,328 EV12 N 3,328 3,328 13,312 13,312 13,312 CONNECTED TOTAL LOAD 80.052 KVA DEMAND TOTAL LOAD:100,65 KVA 13,312 13,312 13,312 TOTAL AMPS: 277.45 AMPS BUILDING A NEW EV LOAD CALCULATION FOR THIS PERMIT PNL LOAD DEMAND AMPS A1EV 58.46 KVA 162.46 A2EV 58.24 KVA 161.82 A3EV 108.16 KVA 300.54 A4EV 99.84 KVA 277.45 A5EV 99.84 KVA 277.45 A6EV 58.24 KVA 161.82 NEW EV TOTAL AMPS @ 208 1341.65 A 58 CHARGERS (E) A2EV SECTION: OF MAIN C.B. 400AMP MAIN LUGSLOCATION: PARKING GARAGE LEVEL 2 SERVING: NORMAL POWER SURFACE MNT.BOT FEED LOAD TYPE CIRCUIT DESCRIPTION CONN VA C.B.C.B.CONN VA CIRCUIT DESCRIPTION LOAD TYPE A B C AMP.POLE CKT AMP.POLE CKT C B A N EV1 3,328 40 2 1 3 40 2 2 4 3,328 EV4 N 3,328 3,328 N EV2 3,328 40 2 5 7 40 2 6 8 3,328 EV5 N 3,328 3,328 N EV3 3,328 40 2 9 11 40 2 10 12 3,328 EV6 N 3,328 3,328 40 2 14 16 3,328 EV7 N 3,328 6,656 6,656 6,656 CONNECTED TOTAL LOAD 46.59 KVA DEMAND TOTAL LOAD:58.24 KVA 6,656 9,984 9,984 TOTAL AMPS: 161.82 AMPS (E) A6EV SECTION: OF MAIN C.B. 400AMP MAIN LUGSLOCATION: PARKING GARAGE LEVEL 6 SERVING: NORMAL POWER SURFACE MNT.BOT FEED LOAD TYPE CIRCUIT DESCRIPTION CONN VA C.B.C.B.CONN VA CIRCUIT DESCRIPTION LOAD TYPE A B C AMP.POLE CKT AMP.POLE CKT C B A N EV1 3,328 40 2 1 3 40 2 2 4 3,328 EV4 N 3,328 3,328 N EV2 3,328 40 2 5 7 40 2 6 8 3,328 EV5 N 3,328 3,328 N EV3 3,328 40 2 9 11 40 2 10 12 3,328 EV6 N 3,328 3,328 40 2 14 16 3,328 EV7 N 3,328 6,836 6,656 6,656 CONNECTED TOTAL LOAD 46.772 KVA DEMAND TOTAL LOAD:58.465 KVA 6,656 9,984 9,984 TOTAL AMPS: 162.46 AMPS 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 CONTRACTOR SHEET DESCRIPTION: PLACARD DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. WARNING PLACARDS: DEDICATED TO EV ONLY OTHER LOADS MUST NOT BE CONNECTED LABEL LOCATION: TO BE PLACED IN DEDICATED EV SUB PANEL & NEXT TO THE EV BREAKER IN THE DISTRIBUTION PANEL SIZE: 4" X 2" QTY:1 LABEL LOCATION: TO BE PLACED IN DEDICATED EV SUB PANEL & NEXT TO THE EV BREAKER IN THE DISTRIBUTION PANEL SIZE: 4" X 2" QTY:1 SIGNAGE REQUIREMENTS AND NOTES: 1.ACCESSIBLE SIGNAGE IS NOT REQUIRED WHERE A TOTAL OF FOUR OF FEWER EV SPACES ARE PROVIDED. 2.FIVE TO TWENTY-FIVE TOTAL EV SPACES ARE PROVIDED: A - ONE VAN ACCESSIBLE EV SPACE SHALL BE IDENTIFIED BY ISA SIGNAGE B - ACCESSIBLE SIGNAGE IS NOT REQUIRED AT THE STANDARD ACCESSIBLE EV SPACES 3.TWENTY-SIX OR MORE EV SPACES ARE PROVIDED 4.ALL REQUIRED VAN ACCESSIBLE AND STANDARD ACCESSIBLE EV SPACES SHALL BE IDENTIFIED BY ISA SIGNAGE 5.IDENTIFICATION SIGNS SHALL BE REFLECTORIZED WITH MINIMUM AREA OF 70 SQUARE INCHES. (11B-812.8.7) 6.THE IDENTIFICATION SIGN SHALL BE VISIBLE FROM THE EV SPACE IT SERVES 7.SIGNS IDENTIFYING VAN ACCESSIBLE EV SPACES SHALL CONTAIN THE WORDS "VAN ACCESSIBLE" 8.IDENTIFICATION SIGNS SHALL BE PERMANENTLY POSTED EITHER IMMEDIATELY ADJACENT TO THE VEHICLE SPACE OF WITHIN THE PROJECTED VEHICLE SPACE WIDTH AT THE FRONT END OF VEHICLE SPACE. (11B-812.8.7) 9.MOUNTING HEIGHT OF IDENTIFICATION SIGNS SHALL BE: A - 60 INCHES MINIMUM ABOVE THE FINISH FLOOR OF GROUND SURFACE MEASURED TO THE BOTTOM OF THE SIGN, ORB - 80 INCHES MINIMUM ABOVE THE FINISH FLOOR OR GROUND SURFACE MEASURED TO THE BOTTOM OF THE SIGN, WHEN THE SIGN PROJECTS OVER THE ACCESS AISLE OR OTHER CIRCULATION PATH. A1EV LABEL LOCATION: TO BE PLACED ON THE CIRCUITS ON MSP - EV SIZE: 1'6" X 1" QTY:1 EV-12 2010 E Warner Ave, Santa Ana, CA 208/120V 1000A 3Ø 4W CAUTION EXISTING SERVICE PANELS LOCATION IS SHOWN 2300 Red Hill Ave, Santa Ana SERVICE 1 SERVICE 2 A4EV LABEL LOCATION: TO BE PLACED ON THE CIRCUITS ON MSP - EV SIZE: 1'6" X 1" QTY:1 A2EV LABEL LOCATION: TO BE PLACED ON THE CIRCUITS ON MSP - EV SIZE: 1'6" X 1" QTY:1 A5EV LABEL LOCATION: TO BE PLACED ON THE CIRCUITS ON MSP - EV SIZE: 1'6" X 1" QTY:1 A3EV LABEL LOCATION: TO BE PLACED ON THE CIRCUITS ON MSP - EV SIZE: 1'6" X 1" QTY:1 PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. A6EV LABEL LOCATION: TO BE PLACED ON THE CIRCUITS ON MSP - EV SIZE: 1'6" X 1" QTY:1 LABEL LOCATION: TO BE PLACED IN DEDICATED EV SUB PANEL & NEXT TO THE EV BREAKER IN THE DISTRIBUTION PANEL SIZE: 4" X 2" QTY:1 2010 E Warner Ave, Santa Ana, CA 208/120V 1000A 3Ø 4W 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 CONTRACTOR SHEET DESCRIPTION: SPEC SHEET 1 DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. EV-13 PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 CONTRACTOR SHEET DESCRIPTION: SPEC SHEET 2 DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. EV-14 PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 CONTRACTOR SHEET DESCRIPTION: SPEC SHEET 3 DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. EV-15 27"12" 36" 48" 10" 216" 216" 108" 27" 216" 60"48" 216" 60"48" 108" 60"144" 48" 16.5" 108" EVSE ACCESSIBILITY PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 CONTRACTOR SHEET DESCRIPTION: SPEC SHEET 4 DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. EV-16 EV CHARGERS MOUNTING ANCHORAGE PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 CONTRACTOR SHEET DESCRIPTION: REF SPEC SHEET 1 DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. EV-17 FOR REFERENCE ONLY GARAGE ARCHITECTURE SHEET GA9.4, PERMIT # 101107195 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 EV-18 CONTRACTOR SHEET DESCRIPTION: REF SPEC SHEET 2 DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. FOR REFERENCE ONLY GARAGE ARCHITECTURE SHEET GA9.4, PERMIT # 101107195 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 CONTRACTOR SHEET DESCRIPTION: EXHIBIT UG CONDUIT RUNS DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. EV-19 EXISTING UNDERGROUND CONDUIT DETAILS. *PLEASE NOTE THAT THE ACTUAL DETAILS AND INFORMATION WERE PROVIDED BY STRUCTURAL AND ELECTRICAL DURING INITIAL PLAN SUBMITTAL.PLEASE REFER TO THE ATTACHED APPROVED PLANS PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. 24" FOR REFERENCE ONLY 12" 12" 24" 12" 24" EXISTING DIRECT BURIAL SECONDARY UNDERGROUND CONDUIT DETAILS EXISTING UNDERGROUND SECONDARY PULL BOX DETAILS EXISTING EMERGING UNDERGROUND EV BRANCH CIRCUIT CONDUIT DETAILS-COLUMN MOUNTED EXISTING SECONDARY UNDERGROUND EMERGING CONDUIT DETAILS 36" 48" 1.5" 24" 24" NTSNTS NTS EXHIBIT EXISTING EMERGING UNDERGROUND EV BRANCH CIRCUIT JBOX COLUMN MOUNT 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 CONTRACTOR SHEET DESCRIPTION: EXHIBIT EQUIPMENT MOUNTING SPEC DRAWN DATE 27.06.2024 DRAWN BY EMMANUEL REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. EV-20 EXISTING MOUNTING DETAILS. *PLEASE NOTE THAT THE ACTUAL DETAILS AND INFORMATION WERE PROVIDED BY STRUCTURAL AND ELECTRICAL DURING INITIAL PLAN SUBMITTAL.PLEASE REFER TO THE ATTACHED APPROVED PLANS PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. FOR REFERENCE ONLY 2010 E Warner Ave, Bldg P - 101119118 & 20182681 7/8/2024 YES NO INSTRUCTIONS: ORAN GE COUNTY FI RE AUTHORI TY Plan Submittal Criteria COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects and RESIDENTIAL TRACT developments · Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place. · Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section. · If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA. · In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations. · Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602. Address Suite City Project Scope/Business Description 1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways, curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within 300 feet of an active or proposed oil well? Fire Master Plan (PR145) 2. Property is adjacent to a wildland area or non-irrigated native vegetation? Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124) 3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170) 4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475) 5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000 sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285) 6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card, button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520) 7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment; industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations? Special Equipment Plan (PR315, PR340-PR382) 8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240) 9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330) 10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335) Initial each of the following two items indicating that you have read and understand the statement: 11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications. 12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327— Initials the building department will determine specific requirements. I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name Signature Phone Number ( ) Date / / Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the appropriate plans and fees for OCFA review. 10-08-14 EE COM 2010 E Warner Ave, Bldg P - 101119118 & 201826817/8/2024 O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Referral Form Required for OCFA to review plans upon the request of the Building Department when the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”. City / County Official Requesting Review: City / County Reference #: Date: __________________________________ City / County: _____________________________________ E-Mail: __________________________________ Contact Name: _____________________________________ Phone #: _________________________________ Title: _____________________________________ ** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. ** Reason(s) for Review: Please describe why OCFA Plan Review is or may be required by the City/County : OCFA COMMENTS:  No further action required on this specific plan type, based on information provided on: ____/______/______.  Project to be taken in for OCFA Review. Other: Name: _________________________________________ Contact #: ______________________________________ Date: _________________________________ OCFA Authorization Updated: 06/02/2020 rs 2010 E Warner Ave, Bldg P - 101119118 & 201826817/8/2024 2010 E Warner Ave, Bldg P - 101119118 & 201826817/8/2024 CONTRACTOR SHEET DESCRIPTION: COVER PAGE DRAWN DATE 15.08.2024 DRAWN BY BRANDON REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE STRIPING AND EVCS LOCATIONS 15.08.2024 SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. A WARNER REDHILL - NEW PEDESTAL AND WALL MOUNTED EV CHARGING SYSTEM 2010 E WARNER AVE, SANTA ANA, CA Know what's below. CALL before you dig. CALL AT LEAST TWO WORKING DAYS BEFORE YOU DIG USA Nor t h DIG ALERT CONTRACTOR SHALL VERIFY ALL PLANS & EXISTING LOCATIONS, CONDITIONS ON THE JOB SITE & SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME SATELLITE VIEW: VICINITY VIEW: SITE SYSTEM INFORMATION MANUFACTURER LITEON PRODUCT ISO CONNECTOR SAE J1772 LEVEL AC LEVEL 2 MOUNTING WALL OR PEDESTAL MAX OUTPUT 32A;7.68KW MAX OUTPUT SITE SHEET INDEX INDEX EV - 01 COVER PAGE EV - 02 SITE PLAN EV - 03 ENLARGED PLAN I EV - 04 ENLARGED PLAN II EV - 05 ENLARGED PLAN III EV - 06 ENLARGED PLAN IV EV - 07 ENLARGED PLAN V EV - 08 ENLARGED PLAN VI EV - 09 SINGLE LINE DIAGRAM EV - 10 PANEL SCHEDULE EV - 11 NOTES EV - 12 PLACARD EV - 13 SPEC SHEET EV - 14 SPEC SHEET EV - 15 SPEC SHEET EV - 16 SPEC SHEET EV - 17 REFERENCE SPEC SHEET EV - 18 REFERENCE SPEC SHEET EV - 19 EXHIBIT UG CONDUIT RUNS EV - 20 EXHIBIT EQUIPMENT MOUNTING SPECS EV-01 TOTAL NUMBER OF EV CHARGERS: 58 UTILITY: SCE EXISTING MAIN BREAKER RATING "PDSA": 277/480V,1600A EXISTING EV MAIN BREAKER RATING "AEV1": 120/208V,800A EXISTING EV MAIN BREAKER RATING "AEV3": 120/208V,800A TOTAL MAX EV LOAD DEMAND: 482.78KW MS-EV BRAND: EATON MS-EV EXISTING OR NEW: EXISTING BUILDING TYPE: MULTIFAMILY APT COMPLEX CHARGING MAX KW CAPACITY: 7.680KW SYSTEM VOLTAGE: 208 SINGLE OR THREE PHASE: THREE PHASE EVSE LOCATION: PARKING GARAGE EVSE RATIO 0.118 TYPE OF CONSTRUCTION TENANT IMPROVEMENT APPLICABLE CODES: 2023 NATIONAL ELECTRICAL CODE 2022 BUILDING ENERGY EFFICIENCY STANDARDS 2022 CALIFORNIA BUILDING CODE (11B-228.3.1) 2022 CALIFORNIA ELECTRICAL CODE PROJECT INFORMATION: CONTRACTOR :CHARGIE SCOPE OF WORK AND NOTES: (1) FROM AN EXISTING SERVICE 1600A MSP "PDSA" , INSTALL 58 EVCS ON 2X EXISTING EV DEDICATED SUB PANELS "AEV1" RATED AT 1000A WITH A 800A MAIN BREAKER AND EV DEDICATED SUB PANEL "AEV3" RATED AT 1000A WITH A 800A MAIN BREAKERS. (2) ALL EVSE DEDICATED INFRASTRUCTURE IS EXISTING (PANELS, FEEDERS,BRANCH CIRCUITS,OCPD,CONDUITS,GROUNDING SYSTEM ) ,THIS INCLUDES ALL OTHER ELECTRICAL INFRASTRUCTURE FOUND IN THIS BUILDING NAMELY MAIN SERVICE PANEL, TRANSFORMERS, TRANSFORMER GROUNDING SYSTEM AND GENERATORS. (3) EV CHARGERS SHALL BE PEDESTAL MOUNTED AND PROTECTED WITH A BOLLARD, WHILE ALL OTHER CHARGERS SHALL BE WALL MOUNTED AND PROTECTED WITH A WALL COLLAR. (4) THERE WILL NOT BE ANY OTHER ALTERATIONS TO THE EXISTING SITE OR BUILDING. (5) ON THE GARAGE FIRST TIER, ONE RETAIL PARKING SPACE WILL BE REMOVED FOR A NEW RETAIL ACCESSIBLE EVCS ACCESS AISLE AND ACCESS PATH. (6) THERE WILL BE NO EXTERNAL EQUIPMENT INSTALLED AND NO EXTERIOR WORK UNDER THIS PERMIT. EVCS INFORMATION: EVCS MANUFACTURER: LITE-ON EVCS LEVEL: AC LEVEL 2 EVCS TYPE: NON-RFID KW CAPACITY PER CHARGER: 7.680 kW VOLTAGE: 208 VAC SINGLE PHASE CHARGING CABLE LENGTH: 25FT PROPERTY INFORMATION: BUILDING TYPE: MIXED USE BUILDING OCCUPANCY CLASSIFICATION: RESIDENTIAL AND RETAIL PARCEL APN: 430-222-07/430-222-16 NUMBER OF STORIES: 5 PARKING SPACES: 488 PARKING TYPE: 7 LEVEL PARKING GARAGE ZONING CODE: CR BUILDING FAR: 0.139 FLOOD RISK AREA: LOW RECORDED OWNER: PROPERTY MANAGEMENT: THIS MULTIFAMILY BUILDING IS NOT FOR PUBLIC HOUSING NOTE: PROVIDED PARKING AND EV CHARGING TABLES FROM GARAGE ARCHITECTURAL SHEET GA0.10, PERMIT # 101107195 TABLES HAVE BEEN UPDATED TO REFLECT PARKING LOT MODIFICATIONS INCLUDED IN THE SCOPE OF WORK. PER CBC 11B, ONE STANDARD EV ACCESSIBLE AND ONE VAN EV ACCESSIBLE PARKING STALL ARE INCLUDED ON THE FIRST TIER. IN COMPLIANCE WITH CALIFORNIA GREEN BUILDING STANDARDS CODE 4.106.4.2.2.1.1, THREE RESIDENTIAL EV ACCESSIBLE PARKING STALLS ARE INCLUDED ON THE SECOND, THIRD, AND SIXTH TIERS. 3 9 131 385 7 66 64 74 84 56 20 5 26 35 60 13 385 131 84 600 73 340 73 523 35 1 2 53 6 NOTE: CALIFORNIA BUILDING CODE CHAPTER 11B APPLIES TO RETAIL PARKING ON THE FIRST TIER ONLY. ACCESSIBLE EVCS ARE INCLUDED ON THE SECOND, THIRD, AND SIXTH TIERS PER CALIFORNIA GREEN BUILDING STANDARDS CODE SECTION 4.106.4.2.2.1. A A A 110 110 13 REVISION TO: Bldg# 101119118 REVISION: Bldg# 101120627 APPROVALS: PLNG - CSantana BLDG - CSG Consultants 2010 E Warner Ave, Bldg P9/20/2024 UP OTIS GEN2 3500 LB / 200 FPM 5'-0" PIT 14'-8" OVERRUN 9'-9" TALL CAB HEIGHT 100' MAX. TRAVEL RETAIL RETAIL RETAIL AD AD 5' DIA. ED AD STEP UP ED 2 2 1 1 1 AD AD AD ADUP UP DN % M A X . 5. 2 3 % M A X . SL O P E D O W N CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT 7 SINGLE PORT WALL MOUNTED EV STATION 0 DUAL PORT PEDESTAL MOUNTED EV STATION 0 SINGLE PORT PEDESTAL MOUNTED EV STATION ACCESSIBLE EV STATION GARAGE FIRST TIER 7 TOTAL EV STATIONS ON FIRST TIER & LOWER TIER 10'-7" 18'-11" 9' 4' 25'-10" 28'-10" 12' 19' NEW ACCESS PATH 5' 9' NEW ACCESS AISLE IDENTIFICATION SIGN IDENTIFICATION SIGN CONTRACTOR SHEET DESCRIPTION: ENLARGED PLAN I DRAWN DATE 15.08.2024 DRAWN BY BRANDON REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE STRIPING AND EVCS LOCATIONS 15.08.2024 SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. A N S EW SITE PLAN: NOTE: THE HIGH FORWARD REACH SHALL BE 48 INCHES (1219.2 MM) MAXIMUM AND THE LOW FORWARD REACH SHALL BE 15 INCHES (381 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND. THE CONTRACTOR NEED TO PROVIDE DURING THE INSTALLATION REACH RANGES: ELECTRIC VEHICLE CHARGING STATION PARKING ONLY WHILE CHARGING EV PANEL SAFETY BOLLARD SAFETY BOLLARD: PARKING SIGN EV-03 SCALE: 1"=15.8' PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. LEGEND: MSP - EV PULL PNL - EV N G (N) TRANSFORMER (N)TRANSFORMER G M CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT - SAFETY BOLLARD - CONDUIT - PARKING SIGN - MAIN SERVICE PANEL (EV) - PULL SECTION - EV PANEL - EV TRANSFORMER - DISCONNECT - METER - GAS METER - EV CHARGING STALL - EV SINGLE PORT WALL MOUNTED - EV SINGLE PORT PEDESTAL MOUNTED - 2 EV SINGLE PORT PEDESTAL MOUNTED - RETAIL PARKING - GUEST PARKING - RESIDENT PARKING RETAIL GUEST ### NO P A R K I N G - ACCESSIBLE STALL - NEW ACCESS AISLE MARKINGS - NEW EVCS ACCESSIBLE ONLY SIGNAGE NOTE: CBC CHAPTER 11B APPLIES TO FIRST TIER RETAIL PARKING ONLY A A 2010 E Warner Ave, Bldg P9/20/2024 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 DN UP OTIS GEN2 3500 LB / 200 FPM 5'-0" PIT 14'-8" OVERRUN 9'-9" TALL CAB HEIGHT 100' MAX. TRAVEL ##################### FB1 5' DIA. ED UP DN ED 2 2 2 ED FB1 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 UP DN UP DN 5. 2 3 % M A X . 5. 4 3 % M A X . FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT 3 SINGLE PORT WALL MOUNTED EV STATION 0 DUAL PORT PEDESTAL MOUNTED EV STATION 4 SINGLE PORT PEDESTAL MOUNTED EV STATION ACCESSIBLE EV STATION CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULT CHARGING FAULT 18'-11" 8'-11" 25'-8" 26'-2" 9' 18'-11" GARAGE SECOND TIER 7 TOTAL EV STATIONS ON SECOND TIER 18'-10" IDENTIFICATION SIGN 36.77672005 130'-5" 9' 8' 18' 5' ELECTRIC VEHICLE CHARGING STATION PARKING ONLY WHILE CHARGING EV PANEL SAFETY BOLLARD SAFETY BOLLARD: PARKING SIGN EV-04 SCALE: 1"=15.8' CONTRACTOR SHEET DESCRIPTION: ENLARGED PLAN II DRAWN DATE 15.08.2024 DRAWN BY BRANDON REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE STRIPING AND EVCS LOCATIONS 15.08.2024 SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. A N S EW SITE PLAN: NOTE: THE HIGH FORWARD REACH SHALL BE 48 INCHES (1219.2 MM) MAXIMUM AND THE LOW FORWARD REACH SHALL BE 15 INCHES (381 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND. THE CONTRACTOR NEED TO PROVIDE DURING THE INSTALLATION REACH RANGES: PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. LEGEND: MSP - EV PULL PNL - EV N G (N) TRANSFORMER (N)TRANSFORMER G M CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT - SAFETY BOLLARD - CONDUIT - PARKING SIGN - MAIN SERVICE PANEL (EV) - PULL SECTION - EV PANEL - EV TRANSFORMER - DISCONNECT - METER - GAS METER - EV CHARGING STALL - EV SINGLE PORT WALL MOUNTED - EV SINGLE PORT PEDESTAL MOUNTED - 2 EV SINGLE PORT PEDESTAL MOUNTED - RETAIL PARKING - GUEST PARKING - RESIDENT PARKING RETAIL GUEST ### NO P A R K I N G - ACCESSIBLE STALL - NEW ACCESS AISLE MARKINGS - NEW EVCS ACCESSIBLE ONLY SIGNAGE NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED. NOTE: ACCESSIBLE EVCS INCLUDED PER CALIFORNIA GREEN BUILDING STANDARDS CODE SECTION 4.106.4.2.2.1 A A A 2010 E Warner Ave, Bldg P9/20/2024 OT I S GE N 2 35 0 0 L B / 2 0 0 F P M 5' - 0 " P I T 14 ' - 8 " O V E R R U N 9' - 9 " T A L L C A B H E I G H T 10 0 ' M A X . T R A V E L ## # ## # ## # ## # ## # ## # ## # FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 DN UP FB 1 5' D I A . ED UP DN ED 1 1 2 2 2 2 ED 1 1 FB1 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 UP DN UP DN 5. 4 3 % M A X . 5. 4 3 % M A X . FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT 7 SINGLE PORT WALL MOUNTED EV STATION 0 DUAL PORT PEDESTAL MOUNTED EV STATION 6 SINGLE PORT PEDESTAL MOUNTED EV STATION CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT ACCESSIBLE EV STATION 18'-10" 8'-10" GARAGE THIRD TIER 13 TOTAL EV STATIONS ON THIRD TIER 25'-8" 25'-8" IDENTIFICATION SIGN 9' 8' 18' 5' ELECTRIC VEHICLE CHARGING STATION PARKING ONLY WHILE CHARGING EV PANEL SAFETY BOLLARD SAFETY BOLLARD: PARKING SIGN EV-05 SCALE: 1"=15.87' CONTRACTOR SHEET DESCRIPTION: ENLARGED PLAN III DRAWN DATE 15.08.2024 DRAWN BY BRANDON REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE STRIPING AND EVCS LOCATIONS 15.08.2024 SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. A N S EW SITE PLAN: NOTE: THE HIGH FORWARD REACH SHALL BE 48 INCHES (1219.2 MM) MAXIMUM AND THE LOW FORWARD REACH SHALL BE 15 INCHES (381 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND. THE CONTRACTOR NEED TO PROVIDE DURING THE INSTALLATION REACH RANGES: PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. LEGEND: MSP - EV PULL PNL - EV N G (N) TRANSFORMER (N)TRANSFORMER G M CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT - SAFETY BOLLARD - CONDUIT - PARKING SIGN - MAIN SERVICE PANEL (EV) - PULL SECTION - EV PANEL - EV TRANSFORMER - DISCONNECT - METER - GAS METER - EV CHARGING STALL - EV SINGLE PORT WALL MOUNTED - EV SINGLE PORT PEDESTAL MOUNTED - 2 EV SINGLE PORT PEDESTAL MOUNTED - RETAIL PARKING - GUEST PARKING - RESIDENT PARKING RETAIL GUEST ### NO P A R K I N G - ACCESSIBLE STALL - NEW ACCESS AISLE MARKINGS - NEW EVCS ACCESSIBLE ONLY SIGNAGE NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED. NOTE: ACCESSIBLE EVCS INCLUDED PER CALIFORNIA GREEN BUILDING STANDARDS CODE SECTION 4.106.4.2.2.1 A A 2010 E Warner Ave, Bldg P9/20/2024 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 DN UP OT I S GE N 2 35 0 0 L B / 2 0 0 F P M 5' - 0 " P I T 14 ' - 8 " O V E R R U N 9' - 9 " T A L L C A B H E I G H T 10 0 ' M A X . T R A V E L ## # ## # ## # ## # ## # ## # ## # FB 1 5' D I A . ED UP DN ED 1 1 2 2 2 2 ED 1 1 FB 1 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 UP DN UP DN 5. 4 3 % M A X . 5. 4 3 % M A X . FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 FW 3 CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT 6 SINGLE PORT WALL MOUNTED EV STATION 0 DUAL PORT PEDESTAL MOUNTED EV STATION 6 SINGLE PORT PEDESTAL MOUNTED EV STATION CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWERCHARGINGPOWER FAULTCHARGING FAULT 18'-11" GARAGE FOURTH TIER 12 TOTAL EV STATIONS ON FOURTH TIER 25'-8" 25'-8" CONTRACTOR SHEET DESCRIPTION: ENLARGED PLAN IV DRAWN DATE 15.08.2024 DRAWN BY BRANDON REVIEWED BY ---- REVISIONS REV DESCRIPTION DATE STRIPING AND EVCS LOCATIONS 15.08.2024 SHEET INDEX UTILITY : SCE PROJECT INFORMATION AHJ : SANTA ANA ADDRESS : 2010 E WARNER AVE, SANTA ANA, CA NAME : WARNER REDHILL APN : 430-222-07/430-222-16 SYSTEM INFORMATION: (58)LITEON CHARGING STATIONS PROJECT INFORMATION: CHARGIE TO DESIGN AND INSTALL THE CHARGING SYSTEM. A N S EW SITE PLAN: NOTE: THE HIGH FORWARD REACH SHALL BE 48 INCHES (1219.2 MM) MAXIMUM AND THE LOW FORWARD REACH SHALL BE 15 INCHES (381 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND. THE CONTRACTOR NEED TO PROVIDE DURING THE INSTALLATION REACH RANGES: ELECTRIC VEHICLE CHARGING STATION PARKING ONLY WHILE CHARGING EV PANEL SAFETY BOLLARD SAFETY BOLLARD: PARKING SIGN EV-06 SCALE: 1"=15.87' PROJECT INFORMATION: CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. LEGEND: MSP - EV PULL PNL - EV N G (N) TRANSFORMER (N)TRANSFORMER G M CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT CHARGIE ELECTRIC VEHICLE CHARGE STATION HIGH POWER POWER CHARGING POWER FAULT CHARGING FAULT - SAFETY BOLLARD - CONDUIT - PARKING SIGN - MAIN SERVICE PANEL (EV) - PULL SECTION - EV PANEL - EV TRANSFORMER - DISCONNECT - METER - GAS METER - EV CHARGING STALL - EV SINGLE PORT WALL MOUNTED - EV SINGLE PORT PEDESTAL MOUNTED - 2 EV SINGLE PORT PEDESTAL MOUNTED - RETAIL PARKING - GUEST PARKING - RESIDENT PARKING RETAIL GUEST ### NO P A R K I N G - ACCESSIBLE STALL - NEW ACCESS AISLE MARKINGS - NEW EVCS ACCESSIBLE ONLY SIGNAGE NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED. 2010 E Warner Ave, Bldg P9/20/2024