HomeMy WebLinkAbout2010 E Warner Ave Bldg #P - PlanCONTRACTOR
SHEET DESCRIPTION:
COVER PAGE
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
WARNER REDHILL - NEW PEDESTAL AND WALL MOUNTED EV CHARGING SYSTEM
2010 E WARNER AVE, SANTA ANA, CA
Know what's below.
CALL before you dig.
CALL AT LEAST TWO WORKING
DAYS BEFORE YOU DIG
USA
Nor t h
DIG ALERT
CONTRACTOR SHALL VERIFY ALL PLANS & EXISTING LOCATIONS,
CONDITIONS ON THE JOB SITE & SHALL IMMEDIATELY NOTIFY THE
ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE
PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME
SATELLITE VIEW:
VICINITY VIEW:
SITE
SYSTEM INFORMATION
MANUFACTURER LITEON
PRODUCT ISO
CONNECTOR SAE J1772
LEVEL AC LEVEL 2
MOUNTING WALL OR PEDESTAL
MAX OUTPUT 32A;7.68KW MAX OUTPUT
SITE
SHEET INDEX
INDEX
EV - 01 COVER PAGE
EV - 02 SITE PLAN
EV - 03 ENLARGED PLAN I
EV - 04 ENLARGED PLAN II
EV - 05 ENLARGED PLAN III
EV - 06 ENLARGED PLAN IV
EV - 07 ENLARGED PLAN V
EV - 08 ENLARGED PLAN VI
EV - 09 SINGLE LINE DIAGRAM
EV - 10 PANEL SCHEDULE
EV - 11 NOTES
EV - 12 PLACARD
EV - 13 SPEC SHEET
EV - 14 SPEC SHEET
EV - 15 SPEC SHEET
EV - 16 SPEC SHEET
EV - 17 REFERENCE SPEC SHEET
EV - 18 REFERENCE SPEC SHEET
EV - 19 EXHIBIT UG CONDUIT RUNS
EV - 20 EXHIBIT EQUIPMENT MOUNTING SPECS
EV-01
TOTAL NUMBER OF EV CHARGERS: 58
UTILITY: SCE
EXISTING MAIN BREAKER RATING "PDSA": 277/480V,1600A
EXISTING EV MAIN BREAKER RATING "AEV1": 120/208V,800A
EXISTING EV MAIN BREAKER RATING "AEV3": 120/208V,800A
TOTAL MAX EV LOAD DEMAND: 482.78KW
MS-EV BRAND: EATON
MS-EV EXISTING OR NEW: EXISTING
BUILDING TYPE: MULTIFAMILY APT COMPLEX
CHARGING MAX KW CAPACITY: 7.680KW
SYSTEM VOLTAGE: 208
SINGLE OR THREE PHASE: THREE PHASE
EVSE LOCATION: PARKING GARAGE
EVSE RATIO 0.118
TYPE OF CONSTRUCTION TENANT IMPROVEMENT
APPLICABLE CODES:
2023 NATIONAL ELECTRICAL CODE
2022 BUILDING ENERGY EFFICIENCY STANDARDS
2022 CALIFORNIA BUILDING CODE (11B-228.3.1)
2022 CALIFORNIA ELECTRICAL CODE
PROJECT INFORMATION:
CONTRACTOR :CHARGIE
SCOPE OF WORK AND NOTES:
(1) FROM AN EXISTING SERVICE 1600A MSP "PDSA" , INSTALL 58 EVCS ON 2X EXISTING EV DEDICATED SUB PANELS "AEV1" RATED AT 1000A WITH A 800A MAIN BREAKER AND EV
DEDICATED SUB PANEL "AEV3" RATED AT 1000A WITH A 800A MAIN BREAKERS.
(2) ALL EVSE DEDICATED INFRASTRUCTURE IS EXISTING (PANELS, FEEDERS,BRANCH CIRCUITS,OCPD,CONDUITS,GROUNDING SYSTEM ) ,THIS INCLUDES ALL OTHER ELECTRICAL
INFRASTRUCTURE FOUND IN THIS BUILDING NAMELY MAIN SERVICE PANEL, TRANSFORMERS, TRANSFORMER GROUNDING SYSTEM AND GENERATORS.
(3) EV CHARGERS SHALL BE PEDESTAL MOUNTED AND PROTECTED WITH A BOLLARD, WHILE ALL OTHER CHARGERS SHALL BE WALL MOUNTED AND PROTECTED WITH A WALL COLLAR.
(4) THERE WILL NOT BE ANY OTHER ALTERATIONS TO THE EXISTING SITE OR BUILDING.
(5) ON THE GARAGE FIRST TIER, ONE RETAIL PARKING SPACE WILL BE REMOVED FOR A NEW RETAIL ACCESSIBLE EVCS ACCESS AISLE AND ACCESS PATH.
ON THE GARAGE SECOND TIER, ONE GUEST PARKING SPACE WILL BE REMOVED FOR A NEW NON-ASSIGNED RESIDENTIAL ACCESSIBLE EVCS ACCESS AISLE PER 11B-812.
(6) THERE WILL BE NO EXTERNAL EQUIPMENT INSTALLED AND NO EXTERIOR WORK UNDER THIS PERMIT.
EVCS INFORMATION:
EVCS MANUFACTURER: LITE-ON
EVCS LEVEL: AC LEVEL 2
EVCS TYPE: NON-RFID
KW CAPACITY PER CHARGER: 7.680 kW
VOLTAGE: 208 VAC SINGLE PHASE
CHARGING CABLE LENGTH: 25FT
PROPERTY INFORMATION:
BUILDING TYPE: MIXED USE BUILDING
OCCUPANCY CLASSIFICATION: RESIDENTIAL AND RETAIL
PARCEL APN: 430-222-07/430-222-16
NUMBER OF STORIES: 5
PARKING SPACES: 488
PARKING TYPE: 7 LEVEL PARKING GARAGE
ZONING CODE: CR
BUILDING FAR: 0.139
FLOOD RISK AREA: LOW
RECORDED OWNER: PROPERTY MANAGEMENT:
THIS MULTIFAMILY BUILDING IS NOT FOR PUBLIC HOUSING
NOTE: PROVIDED PARKING AND EV CHARGING TABLES FROM GARAGE ARCHITECTURAL SHEET GA0.10, PERMIT # 101107195
TABLES HAVE BEEN UPDATED TO REFLECT PARKING LOT MODIFICATIONS INCLUDED IN THE SCOPE OF WORK. PER CBC 11B, ONE
STANDARD EV ACCESSIBLE AND ONE VAN EV ACCESSIBLE PARKING STALL ARE INCLUDED ON THE FIRST TIER. IN COMPLIANCE
WITH CALIFORNIA GREEN BUILDING STANDARDS CODE 4.106.4.2.2.1.1, THREE RESIDENTIAL EV ACCESSIBLE PARKING STALLS ARE
INCLUDED ON THE SECOND AND THIRD TIERS.
215 21
3
9
130
385
7 66
64 74
84
2
56
20
5 26
36
02
8 1
2
385
130
84
599
339
73
8
17
339
73
521
36 1
2
53
Bldg# 101119118
Elec# 20182681
APPROVALS:
PLNG - CSantana
BLDG - CSG Consultant
ELEC - CSG Consultant
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
CONTRACTOR
SHEET DESCRIPTION:
NOTES
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
EV-11
SINGLE LINE NOTES:
1.ALL CONDUCTORS SHALL BE COPPER AS FOLLOWS:
#12AWG AND SMALLER - SOLID, TW
#10AWG AND LARGER - STRANDED, THHN OR THWN
ALL CONDUCTORS SIZES ARE BASED ON 75°C TEMPERATURE
RATINS (NEC.2014 TABLE 310.16)
2.ALL NEW CIRCUIT BREAKERS, FUSIBLE SWITCHES IN MAIN
SWITCHBOARD OR PANEL BOARDS SHALL BE SERIES RATED TO
MATCH EXISTING AIC RATING OR APPROVED EQUAL OR 65kAIC,
UNLESS NOTED OTHERWISE.
3.MOTOR CIRCUIT PROTECTORS SHALL NOT BE A PART OF SERIES
COMBINATION INTERRUPTING RATINGS.
4.SERIES COMBINATION AIC RATINGS SHALL NOT BE USED WHEN
THE SECONDARY EQUIPMENT IN THE SERIES IS SUBJECT TO A
TOTAL CONNECTED FULL LOAD MOTOR CURRENT OF MORE THAN
1% OF ITS AIC RATINGS.
5.EQUIPMENT ENCLOSURES SHALL BE CLEARLY MARKED
"CAUTION-SERIES RATED SYSTEM - 65KAMPS AVAILABLE,
IDENTIFIED REPLACEMENT COMPONENTS REQUIRED". IN
COMPLIANCE WITH 2016 CEC (NEC 2014) SECTION 110-22 END USE
EQUIPMENT SHALL ALSO BE MARKED WITH THE HIGHER SERIES
COMBINATION INTERRUPTING RATINGS AS PER 2016 CEC SECTION
240-89(C). NO EXCEPTION.
6.FUSES SHALL BE PROVIDED WITH REJECTION TYPE FUSE
HOLDERS.
7.ELECTRICAL EQUIPMENT SHALL BE LISTED BY THE CITY, WHERE
THE PROJECT IS LOCATED, RECOGNIZED ELECTRICAL TESTING
LABORATORY OR APPROVED BY THE DEPARTMENT.
8.NO PIPING, NO DUCTS OF EQUIPMENT FOREIGN TO ELECTRICAL
EQUIPMENT SHALL BE PERMITTED TO BE LOCATED WITHIN THE
DEDICATED SPACE ABOVE THE ELECTRICAL EQUIPMENT.
9.ALL ITEMS SHOWN ARE EXISTING U.O.N.
10.ALL FEEDER LENGTHS SHOWN ARE FOR VOLTAGE DROP AND
SHORT CIRCUIT CALCULATIONS ONLY.
11.MAXIMUM AVAILABLE FAULT CURRENT AT MAIN SERVICE
ENTRANCE IS ASSUMED TO BE 42KAIC U.O.N.
12.IN MAIN SWITCHBOARD BUS BRACING AND A.I.C. RATINGS OF ALL
DEVICES SHALL BE 42,000 MIN. U.O.N.
13.CIRCUIT BREAKERS IN ALL MAIN SWITCHBOARDS AND PANELS
SHALL BE FROM THE SAME MANUFACTURER AND ENTIRE SYSTEM.
14.ALL REMAINING SPACES IN MAIN SWITCHBOARDS AND PANELS
SHALL BE BUSSED.
15.ALL SUBPANELS SHALL BE RATED 42,000 AIC U.O.N.
16.SUBMIT SHOP DRAWINGS OF MAIN SWITCHBOARD TO SERVING
UTILITY COMPANY AND OBTAIN THERE APPROVAL PRIOR TO
RELEASING SHOP DRAWINGS TO MANUFACTURER. VERIFY TYPE
OF REQUIRED METER SOCKETS (IF NECESSARY).
17.ALL SECTIONS OF MAIN SWITCHBOARD SHALL HAVE THE
HORIZONTAL AND VERTICAL BUSS BARS RATED FOR THE AMPERE
RATING SHOWN ON SINGLE LINE DIAGRAMS. REDUCTION OF
AMPERE RATING OF BUSS BARS THROUGHOUT THE SECTIONS OF
MAIN SWITCHBOARDS IS NOT ACCEPTABLE.
18.NOTIFY SWITCHBOARD PANEL BOARDS MANUFACTURERS OF
FEEDER TERMINATIONS (TOP OR BOTTOM) PRIOR TO SUBMITTING
SHOP DRAWINGS.
19.PROVIDE A METALLIC CARD HOLDER ON INSIDE OF DOOR OF EACH
PANEL BOARD FOR INDEX CARD AND ACCURATE TYPEWRITTEN
PANEL SCHEDULE BE PUT BEHIND HEAVY PLASTIC COVER INTO
EACH PANEL. ROOM NUMBERS SHALL NOT BE THE ONES ON THE
PLANS BUT THE ONES DESIGNATED BY THE ARCHITECT AND/OR
OWNER.
20.PROVIDE TWO (2) KEYS WITH EACH PANEL BOARD. ALL PANELS
BOARDS LOCKS SHALL BE KEYED ALIKE.
21.WHERE TWO OF THREE POLE BREAKERS OCCUR IN LIGHTING
PANELS THE MULTI-POLE BREAKERS SHALL HAVE A COMMON TRIP
"QUICKLAG" TYPE UNITS. SINGLE POLE BREAKERS WITH TIE-BAR
BETWEEN HANDLES WILL NOT BE ACCEPTABLE.
22.PROVIDE BLACK ON WHITE LAMINATED PLASTIC NAMEPLATE
ENGRAVED IN MIN 1
4" HIGH LETTERS, ATTACHED NAMEPLATES TO
EQUIPMENT, SWITCHBOARD(S), DISTRIBUTION BOARD(S), PANEL
BOARDS AND DISCONNECTS ETC, WITH RIVETS, BOLTS, OR SHEET
METAL SCREWS. CEMENT ATTACHMENTS ARE NOT ACCEPTABLE.
23.TIME SWITCHES, CONTACTORS, RELAYS, ETCH SHOWN TO BE
FURNISHED WITH PANEL BOARDS SHALL BE LOCATED IN
BARRIERED COMPARTMENTS BEHIND SEPARATE DOORS, MAINTAIN
2" OF SOLD TRIP BETWEEN DOORS. IF NECESSARY, INSTALL
SWITCHES, CONTACTORS, RELAYS, ETCH IN SEPARATE
WEATHERPROOF CABINETS WITH HINGED LOCKABLE DOORS.
PROVIDE SCREW-ON TYPE NAMEPLATES, FULLY COMPLY WITH
LATEST HANDICAP STANDARDS.
IMPORTANT BID NOTES:
1.DUE TO THE SMALL SCALE OF DRAWINGS, IT IS NOT ALWAYS
POSSIBLE TO SHOW ALL DEVICES WHICH MAYBE REQUIRED.
CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ALL EXISTING
CONDITIONS BEFORE SUBMITTING HIS/HER BID. NO ADDITIONAL
COMPENSATION WILL BE MADE FOR EXTRA DUE TO CONTRACTOR'S
FAILURE TO VISIT THE JOB SITE AND/OR FAILURE TO DETERMINE ALL
EXISTING CONDITIONS BEFORE SUBMITTING HIS/HER BID.
2.REFER TO COMPLETE ARCHITECTURAL AND ELECTRICAL DRAWINGS
FOR ADDITIONAL NOTES, SPECIFICATIONS, DETAILS, CONTROLS,
ETC. REPORT TO ARCHITECTURE'S CLARIFICATION IN BASE BID. THIS
REQUIREMENT WILL BE STRICTLY ENFORCED. NO CHANGE ORDERS
WILL BE ALLOWED IF THE CONTRACTOR FAILS TO PERFORM THIS
FUNCTION.
3.CONTRACTOR SHALL REVIEW, VERIFY AND MEET ALL SPECIFICATION
AND STANDARD AS DENOTED IN DIVISION 26 SPEC BOOK.
DEMOLITION NOTES:
1.THE DRAWINGS SHOW THE WORK TO BE IN PLACE AT THE
COMPLETION OF INSTALLATION. MAKE NECESSARY ALTERATIONS
TO COORDINATE AND CONNECT THE EXISTING ELECTRICAL WORK
WITH THE NEW SUCH THAT, WHEN THE WORK IS DONE, THE ENTIRE
ELECTRICAL INSTALLATION, EXISTING AND NEW, IS IN COMPLETE
OPERATING CONDITION.
2.UNLESS SPECIFICALLY NOTED ON THE CONTRARY, ALL EXISTING
LIGHTING FIXTURES, SWITCHES, CONTROLS AND OTHER MATERIALS
OR EQUIPMENTS WHICH ARE REPLACED BY NEW AND ARE NOT
INDICATED TO BE REUSED SHALL BE RETURNED TO THE OWNER OR
BE DISPOSED AS DIRECTED BY THE OWNER.
3.EXISTING MATERIAL TO REMAIN UPON COMPLETION IS INDICATED
ON DRAWINGS AS EXISTING, FEEDERS (CONDUIT AND WIRES) ARE
EXISTING TO THEIR RESPECTIVE SOURCE. ALTHOUGH NOT
INDICATED ON THE DRAWINGS. TEMPORARY REMOVAL OR
RE-ROUTE CONDUITS AND REPLACE EXISTING WIRES WITH NEW
DURING CONSTRUCTION WORK MAYBE REQUIRED.
4.PROVIDE AND INSTALL NEW COVER PLATES FOR ALL REMOVED
OUTLETS, SWITCHES, LIGHT FIXTURES, AND OTHER ELECTRICAL
DEVICES WHEN THE OUTLET BOX IS TO REMAIN.
5.REMOVE ALL EXISTING ABANDONED FEEDERS (CONDUITS AND
WIRES) BACK TO PANEL BOARDS. LABEL NEW PANEL DIRECTORY AS
"SPARE".
6.MAINTAIN CONTINUITY OF ALL ELECTRICAL SYSTEMS, EQUIPMENT,
ETC., FED BY ABANDONED OUTLET. THEY SHOULD BE IN OPERATION
AFTER THE WORK IS DONE. MAINTAINING CONTINUITY SHALL
CONSIST OF RE-ROUTING OF CONDUIT AND WIRING, AS REQUIRED
TO SUIT THE EXISTING CONDITIONS.
7.(E) J-BOX DENOTES APPROXIMATE LOCATION OF EXISTING BOXES
IN ACCESSIBLE CEILING SPACE. ALL CONDUIT SHOWN FROM J-BOX
IS NEW UNLESS SHOWN OTHERWISE AS EXISTING.
8.EXISTING LOADS SHOWN ON PANEL SCHEDULES ARE BASED ON
ASSUMPTIONS MADE BY FIELD VISIT, ELECTRICAL BILLS OR PUBLIC
RESOURCES. NOTIFY ENGINEER IMMEDIATELY IF LOADS EXCEED
16AMPS ON ANY 20A/1P CIRCUIT. NO EXCEPTION.
9.CAREFULLY REVIEW ARCHITECT'S DEMO DRAWINGS FOR LOCATION
OF WALLS BEING REMOVED UNDER THE SCOPE OF THIS WORK AND
REMOVE ALL FEEDERS (CONDUITS AND WIRES) BACK TO THE LAST
DEVICE LEFT IN SERVICE. DON NOT LEAVE ABANDONED.
10.CAREFULLY REVIEW ARCHITECT'S DEMO DRAWINGS FOR EXISTING
FLOOR BOXES BEING REMOVED UNDER THIS SCOPE OF WORK.
REMOVE FLOOR BOXES AND FEEDERS (CONDUITS AND WIRES)
BACK TO LAST DEVICE LEFT IN SERVICE. DO NOT LEAVE
ABANDONED.
STRIPING AND MARKINGS:
1.ACCESS AISLES SHALL BE MARKED WITH PAINTED BORDERLINES
AROUND THEIR PERIMETER
2.THE AREA WITHIN THE BORDERLINES SHALL BE MARKED WITH
HATCHED LINES A MINIMUM OF 36 INCHES ON CENTER
3.THE COLOR OF THE BORDERLINES, HATCHED LINES, AND LETTERS
SHALL CONTRAST WITH THAT OF THE SURFACE OF THE ACCESS
AISLE
4.THE COLOR OF ALL STRIPING AND MARKINGS SHALL NOT BE THE
BLUE COLOR USED FOR IDENTIFICATION OF ACCESSIBLE PARKING
SPACES PER 11B-502.3.3
5.THE WORDS "NO PARKING" SHALL BE PAINTED WITHIN EACH
ACCESS AISLE IN LETTERS A MINIMUM OF 12 INCHES IN HEIGHT AND
LOCATED TO BE VISIBLE FROM THE ADJACENT VEHICULAR WAY
6.THE WORDS "EV CHARGING ONLY" SHALL BE PAINTED AT THE
LOWER END OF EACH EV SPACE IN LETTERS A MINIMUM OF 12
INCHES IN HEIGHT. THE CENTERLINE OF THE TEXT SHALL BE 6
INCHES MAXIMUM FROM THE CENTERLINE OF THE VEHICLE SPACE
AND ITS LOWER CORNER AT, OR LOWER SIDE ALIGNED WITH, THE
END OF THE PARKING SPACE. (11B-812.8.9)
GROUNDING:
1.ALL SERVICES SUPPLYING THE BUILDING SHALL HAVE THE SAME
GROUNDING ELECTRODE SYSTEM.
2.REMOVAL OF A GRID INTERACTIVE INVERTER OR OTHER EQUIPMENT
SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE
GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE
AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTOR.
3.GROUND BOND CONDUCTOR SHALL NOT BE SPLICED.
4.USE EQUAL OR APPROVED "LAY IN LUG" ILSCO, UL-467 RATED FOR
GROUNDING AND BONDING. HIGH STRENGTH COPPER ALLOY W/ SS
SCREW (AS NECESSARY)
CONDUCTORS:
1.ALL CONDUCTORS SHALL BE COPPER UNLESS OTHERWISE NOTED.
2.ALL PROPOSED CONDUCTORS RATED FOR 90°C., HOWEVER EQUIPMENT
RATINGS SHALL BE ASSUMED TO BE 75°C FOR ALL BUILDING FEEDERS AND
THEREFORE TERMINATIONS PRIOR TO CONNECTION. INTERMEDIATE
JUNCTION BOX MAY BE REQUIRED TO CHANGE FROM 90°C TO 75°C
WIRING. MATERIAL SHALL BE COPPER AND 90°C RATED, SUITABLE FOR
SUN EXPOSURE AND WET LOCATIONS. FIELD APPLIED COATINGS ARE NOT
ACCEPTABLE.
3.ALL WIRE INSULATION TYPE SHALL BE EV WIRE FOR AC EV CIRCUIT RUNS.
4.EACH EV MODULE HAS A POSITIVE AND NEGATIVE EV WIRE "SUNLIGHT
RESISTANT" QUICK CONNECT PLUG IN LEAD. VERIFY COMPATIBLE
EXTENSION WIRE PRIOR TO INSTALLATION.
5.ALL INTER-MODULE SERIES CONNECTIONS TO BE TIE STRAPPED (W/ BLACK
UV RESISTANT TIE
625.41 OVERCURRENT PROTECTION: OVERCURRENT PROTECTION FOR
FEEDERS AND BRANCH CIRCUITS SUPPLYING EQUIPMENT SHALL BE
SIZED FOR CONTINUOUS DUTY AND SHALL HAVE A RATING OF NOT LESS
THAN 125 PERCENT OF THE MAXIMUM LOAD OF THE EQUIPMENT. WHERE
NONCONTINUOUS LOADS ARE SUPPLIED FROM THE SAME FEEDER, THE
OVER-CURRENT DEVICE SHALL HAVE A RATING OF NOT LESS THAN THE
SUM OF THE NON-CONTINUOUS LOADS
PLUS 125 PERCENT OF THE CONTINUOUS LOADS.
625.42 RATING: THE EQUIPMENT SHALL HAVE SUFFICIENT RATING TO
SUPPLY THE LOAD SERVED. ELECTRIC VEHICLE CHARGING LOADS SHALL
BE CONSIDERED TO BE CONTINUOUS LOADS FOR THE PURPOSES OF
THIS ARTICLE.
WHERE AN AUTOMATIC LOAD MANAGEMENT SYSTEM IS USED, THE
MAXIMUM EQUIPMENT LOAD ON A SERVICE AND FEEDER SHALL BE THE
MAXIMUM LOAD PERMITTED BY THE AUTOMATIC LOAD MANAGEMENT
SYSTEM.
625.43 DISCONNECTING: MEANS FOR EQUIPMENT RATED MORE THAN 60
AMPERES OR MORE THAN 150 VOLTS TO GROUND, THE DISCONNECTING
MEANS SHALL BE PROVIDED
AND INSTALLED IN A READILY ACCESSIBLE LOCATION. THE
DISCONNECTING MEANS SHALL BE LOCKABLE OPEN IN ACCORDANCE
WITH 110.25.
ACCESSIBLE ROUTES AND ACCESS AISLES:
1.ACCESS AISLES SHALL BE LEVEL WITH THE EV SPACE SERVED, AND
SLOPES/CROSS -SLOPES SHALL NOT EXCEED 1:48
2.ACCESSIBILITY COMPLIANT EV SPACES SHALL BE LOACTED ON AN
ACCESSIBLE ROUTE TO AN ACESSIBLE BUILDING ENTRANCE. (11B-206.4
& 11B-812.5)
3.EVCS SHALL BE DESIGNED SO ACCESSIBLE ROUTES ARE NOT
OBSTRUCTED BY CABLES OR OTHER ELEMENTS. (11B-812.5.5)
4.PROVIDE CURBS, WHEEL STOPS, BOLLARDS, OR OTHER BARRIERS TO
PREVENT ENCROACHMENT OF VEHICLE OVER THE REQUIRED CLEAR
WIDTH OF ACCESSIBLE ROUTES. (11B-812.5.3)
WIRING METHODS:
1.FOR UNDERGROUND AND EXPOSED UP TO +5'-0" OR DAMP LOCATION,
THE CONDUIT SHALL BE RIGID STEEL GALVANIZED IMC. NO RUNNING
THREADS ARE PERMITTED.
2.GALVANIZED EMT SHALL BE USED IN DRY CONCEALED LOCATIONS AN
EXPOSED ABOVE +5-0". EMT CONNECTORS SHALL BE WATERTIGHT
COMPRESSION TYPE.
3.GALVANIZED FLEXIBLE CONDUIT SHALL BE USED ONLY FOR MOTOR AND
FIXTURE CONNECTIONS IN LENGTHS NOT TO EXCEED 66'
4.CONDUITS PENETRATING THE ROOF SHALL BE FLASHED AND COUNTER
FLASHED.
5.INSTALL FITTINGS, SPECIAL DEVICES AND MATERIAL, WHICH MAY BE
REQUIRED FOR THE PROPER INSTALLATION OF THE CONDUIT SYSTEM.
NOTE:
110.27(B)PREVENT PHYSICAL DAMAGE:IN LOCATIONS
WHERE ELECTRICAL EQUIPMENT IS LIKELY TO BE
EXPOSED TO PHYSICAL DAMAGE, ENCLOSURES OR
GAURDS SHALL BE SO ARRANGED AND OF SUCH
STRENGTH AS TO PREVENT SUCH DAMAGE.
DEDICATED ELECTRICAL SPACE: WIDTH AND DEPTH
OF EQUIPMENT EXTENDING FROM THE FLOOR TO
1.8M (6FT) ABOVE EQUIPMENT OR TO STRUCTURAL
CEILING
NOTE:
NEW SERVICES IS LOCATED OUTDOORS IN THE
PARKING SPACES THAT ARE BELOW THE RESIDENTIAL
UNITS
NOTE:
"ALL ELECTRICAL EQUIPMENT SHALL BE LABELED,
LISTED, OR CERTIFIED BY A NATIONALLY RECOGNIZED
TESTING LABORATORY ACCREDITED BY THE UNITED
STATES OCCUPATIONAL SAFTY HEALTH
ADMINISTRATION."
1109.16 General. Where Electric Vehicle Charging
Stations are provided, all charging stations shall be
provided in accordance with this section and
applicable portions of ICC A117.1.
1109.16.1 Existing facilities. Where Electric Vehicle
Charging Stations are either added or altered within a
facility having existing Electric Vehicle Charging Stations,
the requirements this section shall apply only to the
newly installed or altered Electric Vehicle Charging
Stations.
1109.16.2 Minimum number. Where Electric Vehicle
Charging Stations are provided for public use, the
minimum number of accessible Electric Vehicle Charging
Stations shall be provided in accordance with Table
1109.16.2. Where new Electric Vehicle Charging
Stations are installed in facilities with existing Electric
Vehicle Charging Stations, the total number provided in
Table 1109.16.2 shall include both existing and new
Electric Vehicle Charging Stations. Where an Electric
Vehicle Charging Station charger can simultaneously
charge more than one vehicle, the number of Electric
Vehicle Charging Station chargers provided shall be
considered equivalent to the number of electric vehicles
that can be simultaneously charged.
Parking spaces serving Electric Vehicle Charging
Stations per this section shall not account for any of the
accessible parking spaces (as required by Section 1106)
on the site unless specifically provided with accessible
identification signage per Section 1109.16.6.
Exception:
1.Electric Vehicle Charging Stations not available to
the general public and intended for use by a designated
vehicle or driver shall not be required to comply with this
section. Examples include, but are not limited to,
charging stations serving public or private fleet vehicles,
assigned to an employee, or serving private residences.
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
BLDG. 'D'BLDG. 'D'
C
C
20'-0"
19'-4 1/4"
BLDG. 'C'
C
BLDG. 'B'
21'-4 1/4"
KS KB
OTISGEN23500 LB / 200 FPM5'-0" PIT
C
OTISGEN23500 LB / 200 FPM5'-0" PIT14'-8" OVERRUN9'-9" TALL CAB HEIGHT100' MAX. TRAVELNO PIT LADDER RECESS
RETAIL RETAIL
DA03
EXHAUST
80 SQ. FT.5' DIA.
RETAIL RETAIL
14'-8" OVERRUN9'-9" TALL CAB HEIGHT100' MAX. TRAVELNO PIT LADDER RECESS
UP
ELEVATOR
LOBBY
SUPPLY
80 SQ. FT.
ACCESS ROOM
TRASH TERMINATION ROOM
STEP
SUPPLY
70 SQ. FT.
UP
OTISGEN23500 LB / 200 FPM5'-0" PIT14'-8" OVERRUN9'-9" TALL CAB HEIGHT100' MAX. TRAVELNO PIT LADDER RECESS
NO
PARKING
UP DN
EXHAUST
72 SQ. FT.
NOVAN
MOTORCYCLE R R R R R R
PARKING
ELEV.
#2
R
RAMP 5%
MAX. SLOPE
UP
8.5x18
8.5x18
R
R
R
R
8.5x18
8.5x18
8.5x18
R R
R
R
8.5x18
8.5x18
8.5x18
R
R
R 8.5x18
8.5x18 R 8.5x18
8.5x18
8.5x18
R
R
R
R
R
R
8.5x18
8.5x18
8.5x18
R
R
R
8.5x18
8.5x18
R8.5x18
8.5x18
8.5x18 8.5x18
R
R
R
R
R
8.5x18
8.5x18
8.5x18
R
R
R
R
R
R
8.5x18
8.5x18
8.5x18
R
R
R
R
R
R
8.5x18 R
R
8.5x18
8.5x18
R
R
R
DN BEGIN
LEVEL 18.5x18
MOTORCYCLE
R
OTISGEN2
UP RAMP 5%
MAX. SLOPE
R
R R
UP DN ELEV.
#1
ELECT.
ROOM/
MAINT.
R
R
R
R
G
G
R
R
R R R R R SUPPLY
72 SQ. FT.
BLDG. 'B'20'-0"
BLDG. 'C'
C
UP
R R 9x18
3500 LB / 200 FPM5'-0" PIT14'-8" OVERRUN9'-9" TALL CAB HEIGHT100' MAX. TRAVELNO PIT LADDER RECESS
FB2
RETAIL
TRASH
8.5x18
R R
8.5x18
8.5x18 8.5x18
R
R
R R 9x18
EXHAUST
71 SQ. FT.APOT APOT
SUPPLY
80 SQ. FT.
30" DIA.30" DIA.
8.5x18 R 8.5x18 8.5x18 R
8.5x18 R 8.5x18 8.5x18
8.5x18 R 8.5x18 8.5x18
R
R R 8.5x18
TRASH TERMINATION ROOM
10.5x18 R 10.5x18 10.5x18
R 10.5x18 10.5x18 R
R
R
R 8.5x18
8.5x18 6"1
DAS
8.5x18 R 8.5x18 8.5x18
8.5x18 R 8.5x18 8.5x18
R
R
R
R
8.5x18
STEP
8.5x18
8.5x18
ELECTRICAL
ROOM
2
6"
2'-0" 2'-0"
1
1
8.5x18
DOMESTIC WATER
PUMP ROOM
R
R 8.5x18
APOT
8.5x18
6"6"20'-11 1/2"6"2'-0" 2'-0"
2 2
APOT
8.5x18
8.5x18
R R
8.5x18 R
G
G
R
R
R
R 6"2'-0" 2'-0"
TRASH
TERMINATION
ROOM
ELECTRICAL
ROOM
KS KB
STEP
R
UP
R
ELEVATOR
MACHINE
ROOM
RAMP UP
<6.00%
RETAIL RETAIL RETAIL RETAIL RETAIL RETAIL
2'-6"2'-6"
UP
DOMESTIC WATER
PUMP ROOM
RETAIL UP
STEP TRASH
TERMINATION
ROOM
6"
5' DIA.
ACCESS ROOM
SIDE SIDEAPPROACH+54" MAX. A.F.S.
48
APPROACH+54" MAX. A.F.S.
48
APOT OTISGEN23500 LB / 200 FPM5'-0" PIT14'-8" OVERRUN9'-9" TALL CAB HEIGHT100' MAX. TRAVELNO PIT LADDER RECESS
EXHAUST
80 SQ. FT.
C
20'-10"
C
RED HILL Ave.
UPDN
RETAIL
VAN
NO
PARKINGRETAILRETAIL
NO
PARKING
RETAILRETAILRETAILRETAILRETAILRETAILRETAIL
APOT
30" DIA.30" DIA.
SIDESIDEAPPROACH+54" MAX. A.F.S.
48
APPROACH+54" MAX. A.F.S.
48
UPDN
DA02 DA01
AP
O
T
FB
2
RE
T
A
I
L
FB
2
NO
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
PA
R
K
I
N
G
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
VA
N
NO
PA
R
K
I
N
G
FB
2
NO
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
PA
R
K
I
N
G
##
#
##
#
##
#
##
#
RE
T
A
I
L
RE
T
A
I
L
EL
E
C
.
V
E
H
I
C
L
E
CH
A
R
G
I
N
G
RE
T
A
I
L
EL
E
C
.
V
E
H
I
C
L
E
CH
A
R
G
I
N
G
RE
T
A
I
L
RE
T
A
I
L
AP
O
T
FB
2
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
VA
N
EL
E
C
.
V
E
H
I
C
L
E
CH
A
R
G
I
N
G
NO
PA
R
K
I
N
G
RE
T
A
I
L
EL
E
C
.
V
E
H
I
C
L
E
CH
A
R
G
I
N
G
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
EL
E
C
.
V
E
H
I
C
L
E
CH
A
R
G
I
N
G
RE
T
A
I
L
EL
E
C
.
V
E
H
I
C
L
E
CH
A
R
G
I
N
G
RE
T
A
I
L
RE
T
A
I
L
EL
E
C
.
V
E
H
I
C
L
E
CH
A
R
G
I
N
G
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
FB
2
30
UP
5' DIA
.
30
NO
PA
R
K
I
N
G
VA
N
O
O
O
O
O OOO
TH
U
R
S
T
O
N
HYD
R
O
350
0
L
B
/
1
5
0
F
P
M
4'-0
"
P
I
T
12'
-
6
"
O
V
E
R
R
U
N
8'-0
"
C
A
B
H
E
I
G
H
T
8.
5
x
1
8
RA
M
P
5
%
8.
5
x
1
8
MA
X
.
S
L
O
P
E
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
8.
5
x
1
8
O
O
O
O
12'-
6
"
O
V
E
R
R
U
N
8'-0
"
C
A
B
H
E
I
G
H
T
350
0
L
B
/
1
5
0
F
P
M
4'-0
"
P
I
T
THU
R
S
T
O
N
HYD
R
O
ST
E
P
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
FB
2
DN
ST
E
P
ST
E
P
ST
E
P
ST
E
P
NO
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
PA
R
K
I
N
G
RE
T
A
I
L
RE
T
A
I
L
RA
M
P
D
O
W
N
<6
.
0
0
%
RA
M
P
U
P
<6
.
0
0
%
FB
2
30
5' DIA
.
30
20
'
-
0
"
37
'
-
1
1
3
/
4
"
UP
UP
NO
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
##
#
##
#
##
#
##
#
PA
R
K
I
N
G
DN
RA
M
P
D
O
W
N
% M
A
X
.
RA
M
P
U
P
5.
2
3
%
M
A
X
.
15
'
-
9
1
/
4
"
RE
T
A
I
L
VA
N
EL
E
C
.
V
E
H
I
C
L
E
CH
A
R
G
I
N
G
NO
PA
R
K
I
N
G
RE
T
A
I
L
EL
E
C
.
V
E
H
I
C
L
E
CH
A
R
G
I
N
G
RE
T
A
I
L
EL
E
C
.
V
E
H
I
C
L
E
CH
A
R
G
I
N
G
RE
T
A
I
L
RE
T
A
I
L
EL
E
C
.
V
E
H
I
C
L
E
CH
A
R
G
I
N
G
RE
T
A
I
L
EL
E
C
.
V
E
H
I
C
L
E
CH
A
R
G
I
N
G
RE
T
A
I
L
CL
E
A
N
A
I
R
/
VA
N
P
O
O
L
/
E
V
RE
T
A
I
L
CL
E
A
N
A
I
R
/
VA
N
P
O
O
L
/
E
V
RE
T
A
I
L
CL
E
A
N
A
I
R
/
VA
N
P
O
O
L
/
E
V
RE
T
A
I
L
CL
E
A
N
A
I
R
/
VA
N
P
O
O
L
/
E
V
RE
T
A
I
L
CL
E
A
N
A
I
R
/
VA
N
P
O
O
L
/
E
V
RE
T
A
I
L
CL
E
A
N
A
I
R
/
VA
N
P
O
O
L
/
E
V
RE
T
A
I
L
CL
E
A
N
A
I
R
/
VA
N
P
O
O
L
/
E
V
RE
T
A
I
L
CL
E
A
N
A
I
R
/
VA
N
P
O
O
L
/
E
V
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
RE
T
A
I
L
SL
O
P
E
D
O
W
N
AP
O
T
25
'
-
7
1
/
4
"
E
W
A
R
N
E
R
A
v
e
.
SS
DA82
AP
O
T
BLDG. 'A'
BUILDING 'A' PARKING STRUCTURE
2010 E WARNER AVE, SANTA ANA
UNDER CURRENT PERMIT
BUILDING 'B' PARKING STRUCTURE
2350 S REDHILL AVE, SANTA ANA,
CA 92705
UNDER SEPARATE PERMIT
BUILDING 'C' PARKING STRUCTURE
2390 S REDHILL AVE, SANTA ANA,
CA 92705
UNDER SEPARATE PERMIT
BUILDING 'D' PARKING STRUCTURE
1938 E WARNER AVE, SANTA ANA,
CA 92705
UNDER SEPARATE PERMIT
BUILDING 'B'
2320 S REDHILL AVE, SANTA ANA,
CA 92705
19'
CONTRACTOR
SHEET DESCRIPTION:
SITE PLAN
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
ENLARGED PLAN:
NOTE: THE HIGH FORWARD REACH SHALL
BE 48 INCHES (1219.2 MM) MAXIMUM AND
THE LOW FORWARD REACH SHALL BE 15
INCHES (381 MM) MINIMUM ABOVE THE
FINISH FLOOR OR GROUND. THE
CONTRACTOR NEED TO PROVIDE DURING
THE INSTALLATION
REACH RANGES:
LEGEND:
MSP - EV
PULL
PNL - EV
N
G
(N) TRANSFORMER
(N)TRANSFORMER
G
M
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
- SAFETY BOLLARD
- CONDUIT
- PARKING SIGN
- MAIN SERVICE PANEL (EV)
- PULL SECTION
- EV PANEL
- EV TRANSFORMER
- DISCONNECT
- METER
- GAS METER
- EV CHARGING STALL
- EV SINGLE PORT
WALL MOUNTED
- EV SINGLE PORT
PEDESTAL MOUNTED
- 2 EV SINGLE PORT
PEDESTAL MOUNTED
- ACCESSIBLE STALL
ELECTRIC
VEHICLE
CHARGING
STATION
PARKING ONLY
WHILE CHARGING
EV PANEL
SAFETY BOLLARD
SAFETY BOLLARD:
PARKING SIGN
N
S
EW
CIRCUITS
PNL CHARGER TOATAL CHARGERS
A1EV EV1 - EV07 7 CHARGERS
A2EV EV08 - EV14 7 CHARGERS
A3EV EV15 - EV27 13 CHARGERS
A4EV EV28- EV39 12 CHARGERS
A5EV EV40 - EV51 12 CHARGERS
A6EV EV52 - EV58 7 CHARGERS
EV-02
SCALE: 1"=64'
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
PROPERTY LINE
430-222-07
430-222-16
PROPERTY LINE
430-222-07
430-222-16
PROPERTY LINE
430-222-07
430-222-16
PROPERTY LINE
430-222-07
430-222-16
NO EXTERNAL WORK IS PROPOSED FOR THE PROJECT
UNDER THE CURRENT PERMIT
- RETAIL PARKING
- GUEST PARKING
- RESIDENT PARKING
RETAIL
GUEST
###
- NEW ACCESS AISLE MARKINGS
NO
P
A
R
K
I
N
G
- NEW EVCS ACCESSIBLE ONLY SIGNAGE
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
UP
OTIS
GEN2
3500 LB / 200 FPM
5'-0" PIT
14'-8" OVERRUN
9'-9" TALL CAB HEIGHT
100' MAX. TRAVEL
RETAIL RETAIL RETAIL RETAIL
AD
AD
5' DIA.
ED
AD
STEP
UP
ED
2 2
1
1
1
AD
AD
AD
ADUP
UP
DN
%
M
A
X
.
5.
2
3
%
M
A
X
.
SL
O
P
E
D
O
W
N
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
7 SINGLE PORT WALL MOUNTED EV STATION
0 DUAL PORT PEDESTAL MOUNTED EV STATION
0 SINGLE PORT PEDESTAL MOUNTED EV STATION
ACCESSIBLE EV STATION
GARAGE FIRST TIER
7 TOTAL EV STATIONS ON FIRST TIER & LOWER TIER
10'-7"
18'-11"
9'
4'
25'-10"
28'-10"
12'
21'
NEW
ACCESS
PATH
5'
9'
NEW
ACCESS
AISLE
IDENTIFICATION SIGN
IDENTIFICATION SIGN
CONTRACTOR
SHEET DESCRIPTION:
ENLARGED PLAN I
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
N
S
EW
SITE PLAN:
NOTE: THE HIGH FORWARD REACH SHALL
BE 48 INCHES (1219.2 MM) MAXIMUM AND
THE LOW FORWARD REACH SHALL BE 15
INCHES (381 MM) MINIMUM ABOVE THE
FINISH FLOOR OR GROUND. THE
CONTRACTOR NEED TO PROVIDE DURING
THE INSTALLATION
REACH RANGES:
ELECTRIC
VEHICLE
CHARGING
STATION
PARKING ONLY
WHILE CHARGING
EV PANEL
SAFETY BOLLARD
SAFETY BOLLARD:
PARKING SIGN
EV-03
SCALE: 1"=15.8'
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
LEGEND:
MSP - EV
PULL
PNL - EV
N
G
(N) TRANSFORMER
(N)TRANSFORMER
G
M
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
- SAFETY BOLLARD
- CONDUIT
- PARKING SIGN
- MAIN SERVICE PANEL (EV)
- PULL SECTION
- EV PANEL
- EV TRANSFORMER
- DISCONNECT
- METER
- GAS METER
- EV CHARGING STALL
- EV SINGLE PORT
WALL MOUNTED
- EV SINGLE PORT
PEDESTAL MOUNTED
- 2 EV SINGLE PORT
PEDESTAL MOUNTED
- RETAIL PARKING
- GUEST PARKING
- RESIDENT PARKING
RETAIL
GUEST
###
NO
P
A
R
K
I
N
G
- ACCESSIBLE STALL
- NEW ACCESS AISLE MARKINGS
- NEW EVCS ACCESSIBLE ONLY SIGNAGE
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3
DN UP
OTIS
GEN2
3500 LB / 200 FPM
5'-0" PIT
14'-8" OVERRUN
9'-9" TALL CAB HEIGHT
100' MAX. TRAVEL
#####################
FB1
5' DIA.
ED
UP DN
ED
2
2
2
ED 1
FB1
FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3
UP
DN
UP
DN
5.
2
3
%
M
A
X
.
5.
4
3
%
M
A
X
.
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
3 SINGLE PORT WALL MOUNTED EV STATION
0 DUAL PORT PEDESTAL MOUNTED EV STATION
4 SINGLE PORT PEDESTAL MOUNTED EV STATION
ACCESSIBLE EV STATION
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULT
CHARGING FAULT
18'-11"
8'-11"
25'-8"
26'-2"
9'
18'-11"
GARAGE SECOND TIER
7 TOTAL EV STATIONS ON SECOND TIER
18'-10"
9'-4"
9'
12'
19'-4"
9'
IDENTIFICATION SIGN
IDENTIFICATION SIGN
36.77672005
NEW
ACCESS
AISLE
ELECTRIC
VEHICLE
CHARGING
STATION
PARKING ONLY
WHILE CHARGING
EV PANEL
SAFETY BOLLARD
SAFETY BOLLARD:
PARKING SIGN
EV-04
SCALE: 1"=15.8'
CONTRACTOR
SHEET DESCRIPTION:
ENLARGED PLAN II
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
N
S
EW
SITE PLAN:
NOTE: THE HIGH FORWARD REACH SHALL
BE 48 INCHES (1219.2 MM) MAXIMUM AND
THE LOW FORWARD REACH SHALL BE 15
INCHES (381 MM) MINIMUM ABOVE THE
FINISH FLOOR OR GROUND. THE
CONTRACTOR NEED TO PROVIDE DURING
THE INSTALLATION
REACH RANGES:
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
LEGEND:
MSP - EV
PULL
PNL - EV
N
G
(N) TRANSFORMER
(N)TRANSFORMER
G
M
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
- SAFETY BOLLARD
- CONDUIT
- PARKING SIGN
- MAIN SERVICE PANEL (EV)
- PULL SECTION
- EV PANEL
- EV TRANSFORMER
- DISCONNECT
- METER
- GAS METER
- EV CHARGING STALL
- EV SINGLE PORT
WALL MOUNTED
- EV SINGLE PORT
PEDESTAL MOUNTED
- 2 EV SINGLE PORT
PEDESTAL MOUNTED
- RETAIL PARKING
- GUEST PARKING
- RESIDENT PARKING
RETAIL
GUEST
###
NO
P
A
R
K
I
N
G
- ACCESSIBLE STALL
- NEW ACCESS AISLE MARKINGS
- NEW EVCS ACCESSIBLE ONLY SIGNAGE
NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED.
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
OT
I
S
GE
N
2
35
0
0
L
B
/
2
0
0
F
P
M
5'
-
0
"
P
I
T
14
'
-
8
"
O
V
E
R
R
U
N
9'
-
9
"
T
A
L
L
C
A
B
H
E
I
G
H
T
10
0
'
M
A
X
.
T
R
A
V
E
L
##
#
##
#
##
#
##
#
##
#
##
#
##
#
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
DN UP
FB
1
5'
D
I
A
.
ED
UP DN
ED
1 1
2 2
2 2
ED
1 1
1
FB1
FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3
UP
DN
UP
DN
5.
4
3
%
M
A
X
.
5.
4
3
%
M
A
X
.
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
7 SINGLE PORT WALL MOUNTED EV STATION
0 DUAL PORT PEDESTAL MOUNTED EV STATION
6 SINGLE PORT PEDESTAL MOUNTED EV STATION
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
ACCESSIBLE EV STATION
18'-10"
8'-10"
GARAGE THIRD TIER
13 TOTAL EV STATIONS ON THIRD TIER
25'-8"
25'-8"
AM
B
12'
19'-3"
9'
6'-11"
IDENTIFICATION SIGN
ELECTRIC
VEHICLE
CHARGING
STATION
PARKING ONLY
WHILE CHARGING
EV PANEL
SAFETY BOLLARD
SAFETY BOLLARD:
PARKING SIGN
EV-05
SCALE: 1"=15.87'
CONTRACTOR
SHEET DESCRIPTION:
ENLARGED PLAN III
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
N
S
EW
SITE PLAN:
NOTE: THE HIGH FORWARD REACH SHALL
BE 48 INCHES (1219.2 MM) MAXIMUM AND
THE LOW FORWARD REACH SHALL BE 15
INCHES (381 MM) MINIMUM ABOVE THE
FINISH FLOOR OR GROUND. THE
CONTRACTOR NEED TO PROVIDE DURING
THE INSTALLATION
REACH RANGES:
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
LEGEND:
MSP - EV
PULL
PNL - EV
N
G
(N) TRANSFORMER
(N)TRANSFORMER
G
M
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
- SAFETY BOLLARD
- CONDUIT
- PARKING SIGN
- MAIN SERVICE PANEL (EV)
- PULL SECTION
- EV PANEL
- EV TRANSFORMER
- DISCONNECT
- METER
- GAS METER
- EV CHARGING STALL
- EV SINGLE PORT
WALL MOUNTED
- EV SINGLE PORT
PEDESTAL MOUNTED
- 2 EV SINGLE PORT
PEDESTAL MOUNTED
- RETAIL PARKING
- GUEST PARKING
- RESIDENT PARKING
RETAIL
GUEST
###
NO
P
A
R
K
I
N
G
- ACCESSIBLE STALL
- NEW ACCESS AISLE MARKINGS
- NEW EVCS ACCESSIBLE ONLY SIGNAGE
NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED.
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
DN UP
OT
I
S
GE
N
2
35
0
0
L
B
/
2
0
0
F
P
M
5'
-
0
"
P
I
T
14
'
-
8
"
O
V
E
R
R
U
N
9'
-
9
"
T
A
L
L
C
A
B
H
E
I
G
H
T
10
0
'
M
A
X
.
T
R
A
V
E
L
##
#
##
#
##
#
##
#
##
#
##
#
##
#
FB
1
5'
D
I
A
.
ED
UP DN
ED
1 1
2 2
2 2
ED
1 1
FB
1
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
UP
DN
UP
DN
5.
4
3
%
M
A
X
.
5.
4
3
%
M
A
X
.
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
6 SINGLE PORT WALL MOUNTED EV STATION
0 DUAL PORT PEDESTAL MOUNTED EV STATION
6 SINGLE PORT PEDESTAL MOUNTED EV STATION
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
18'-11"
GARAGE FOURTH TIER
12 TOTAL EV STATIONS ON FOURTH TIER
25'-8"
25'-8"
CONTRACTOR
SHEET DESCRIPTION:
ENLARGED PLAN IV
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
N
S
EW
SITE PLAN:
NOTE: THE HIGH FORWARD REACH SHALL
BE 48 INCHES (1219.2 MM) MAXIMUM AND
THE LOW FORWARD REACH SHALL BE 15
INCHES (381 MM) MINIMUM ABOVE THE
FINISH FLOOR OR GROUND. THE
CONTRACTOR NEED TO PROVIDE DURING
THE INSTALLATION
REACH RANGES:
ELECTRIC
VEHICLE
CHARGING
STATION
PARKING ONLY
WHILE CHARGING
EV PANEL
SAFETY BOLLARD
SAFETY BOLLARD:
PARKING SIGN
EV-06
SCALE: 1"=15.87'
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
LEGEND:
MSP - EV
PULL
PNL - EV
N
G
(N) TRANSFORMER
(N)TRANSFORMER
G
M
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
- SAFETY BOLLARD
- CONDUIT
- PARKING SIGN
- MAIN SERVICE PANEL (EV)
- PULL SECTION
- EV PANEL
- EV TRANSFORMER
- DISCONNECT
- METER
- GAS METER
- EV CHARGING STALL
- EV SINGLE PORT
WALL MOUNTED
- EV SINGLE PORT
PEDESTAL MOUNTED
- 2 EV SINGLE PORT
PEDESTAL MOUNTED
- RETAIL PARKING
- GUEST PARKING
- RESIDENT PARKING
RETAIL
GUEST
###
NO
P
A
R
K
I
N
G
- ACCESSIBLE STALL
- NEW ACCESS AISLE MARKINGS
- NEW EVCS ACCESSIBLE ONLY SIGNAGE
NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED.
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
OT
I
S
GE
N
2
35
0
0
L
B
/
2
0
0
F
P
M
5'
-
0
"
P
I
T
14
'
-
8
"
O
V
E
R
R
U
N
9'
-
9
"
T
A
L
L
C
A
B
H
E
I
G
H
T
10
0
'
M
A
X
.
T
R
A
V
E
L
##
#
##
#
##
#
##
#
##
#
##
#
##
#
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
DN UP
FB
1
5'
D
I
A
.
ED
UP DN
ED
1 1
2 2
2 2
ED
1 1
FB
1
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
UP
DN
UP
DN
5.
4
3
%
M
A
X
.
5.
4
3
%
M
A
X
.
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
6 SINGLE PORT WALL MOUNTED EV STATION
0 DUAL PORT PEDESTAL MOUNTED EV STATION
6 SINGLE PORT PEDESTAL MOUNTED EV STATION
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
18'-5"
8'-11"
25'-8"
25'-8"
GARAGE FIFTH TIER
12 TOTAL EV STATIONS ON FIFTH TIER
CONTRACTOR
SHEET DESCRIPTION:
ENLARGED PLAN V
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
N
S
EW
SITE PLAN:
NOTE: THE HIGH FORWARD REACH SHALL
BE 48 INCHES (1219.2 MM) MAXIMUM AND
THE LOW FORWARD REACH SHALL BE 15
INCHES (381 MM) MINIMUM ABOVE THE
FINISH FLOOR OR GROUND. THE
CONTRACTOR NEED TO PROVIDE DURING
THE INSTALLATION
REACH RANGES:
ELECTRIC
VEHICLE
CHARGING
STATION
PARKING ONLY
WHILE CHARGING
EV PANEL
SAFETY BOLLARD
SAFETY BOLLARD:
PARKING SIGN
EV-07
SCALE: 1"=15.87'
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
LEGEND:
MSP - EV
PULL
PNL - EV
N
G
(N) TRANSFORMER
(N)TRANSFORMER
G
M
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
- SAFETY BOLLARD
- CONDUIT
- PARKING SIGN
- MAIN SERVICE PANEL (EV)
- PULL SECTION
- EV PANEL
- EV TRANSFORMER
- DISCONNECT
- METER
- GAS METER
- EV CHARGING STALL
- EV SINGLE PORT
WALL MOUNTED
- EV SINGLE PORT
PEDESTAL MOUNTED
- 2 EV SINGLE PORT
PEDESTAL MOUNTED
- RETAIL PARKING
- GUEST PARKING
- RESIDENT PARKING
RETAIL
GUEST
###
NO
P
A
R
K
I
N
G
- ACCESSIBLE STALL
- NEW ACCESS AISLE MARKINGS
- NEW EVCS ACCESSIBLE ONLY SIGNAGE
NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED.
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
DN
UP
OT
I
S
GE
N
2
35
0
0
L
B
/
2
0
0
F
P
M
5'
-
0
"
P
I
T
14
'
-
8
"
O
V
E
R
R
U
N
9'
-
9
"
T
A
L
L
C
A
B
H
E
I
G
H
T
10
0
'
M
A
X
.
T
R
A
V
E
L
##
#
##
#
##
#
##
#
##
#
##
#
5'
D
I
A
.
RD
OD
DN
UP
ED
1
2 2
1 1
1UP
DN
UP
DN
5.
4
3
%
M
A
X
.
5.
4
3
%
M
A
X
.
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
3 SINGLE PORT WALL MOUNTED EV STATION
0 DUAL PORT PEDESTAL MOUNTED EV STATION
3 SINGLE PORT PEDESTAL MOUNTED EV STATION
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGINGPOWER FAULTCHARGING FAULT
18'-1"
9'
25'-8"
25'-8"
GARAGE SIXTH TIER
7 TOTAL EV STATIONS ON SIXTH TIER
CONTRACTOR
SHEET DESCRIPTION:
ENLARGED PLAN VI
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
N
S
EW
NOTE: THE HIGH FORWARD REACH SHALL
BE 48 INCHES (1219.2 MM) MAXIMUM AND
THE LOW FORWARD REACH SHALL BE 15
INCHES (381 MM) MINIMUM ABOVE THE
FINISH FLOOR OR GROUND. THE
CONTRACTOR NEED TO PROVIDE DURING
THE INSTALLATION
REACH RANGES:
ELECTRIC
VEHICLE
CHARGING
STATION
PARKING ONLY
WHILE CHARGING
EV PANEL
SAFETY BOLLARD
SAFETY BOLLARD:
PARKING SIGN
EV-08
SCALE: 1"=15.87'
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
LEGEND:
MSP - EV
PULL
PNL - EV
N
G
(N) TRANSFORMER
(N)TRANSFORMER
G
M
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
- SAFETY BOLLARD
- CONDUIT
- PARKING SIGN
- MAIN SERVICE PANEL (EV)
- PULL SECTION
- EV PANEL
- EV TRANSFORMER
- DISCONNECT
- METER
- GAS METER
- EV CHARGING STALL
- EV SINGLE PORT
WALL MOUNTED
- EV SINGLE PORT
PEDESTAL MOUNTED
- 2 EV SINGLE PORT
PEDESTAL MOUNTED
- RETAIL PARKING
- GUEST PARKING
- RESIDENT PARKING
RETAIL
GUEST
###
NO
P
A
R
K
I
N
G
- ACCESSIBLE STALL
- NEW ACCESS AISLE MARKINGS
- NEW EVCS ACCESSIBLE ONLY SIGNAGE
NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED.
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
CONTRACTOR
SHEET DESCRIPTION:
SLD
DRAWN DATE 13.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
SINGLE LINE DIAGRAM I: EXISTING "PDSA"
EV-09
PROJECT
INFORMATION:
CHARGIE WILL DESIGN
AND INSTALL THE
ENTIRE EV CHARGING
SYSTEM.
GFP
GFP
EXISTING FEEDER SCHEDULE
EXISTING BONDING NETWORK
1"C, 1#250 KCMILS AL GROUND TO GEC SYSTEM
1"C, 1#250 KCMILS AL GROUND TO GEC SYSTEM
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
CONTRACTOR
SHEET DESCRIPTION:
PNL SCH
DRAWN DATE 13.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
EV-10
EXISTING PANEL SCHEDULES
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE CHARGING SYSTEM.
(E) A1EV SECTION: OF MAIN C.B. 400AMP
MAIN LUGSLOCATION: PARKING
GARAGE LEVEL 1 SERVING: NORMAL POWER
SURFACE MNT.BOT FEED
LOAD
TYPE CIRCUIT DESCRIPTION
CONN VA C.B.C.B.CONN VA
CIRCUIT DESCRIPTION LOAD
TYPE
A B C AMP.POLE CKT AMP.POLE CKT C B A
N EV1
3,328
40 2 1
3 40 2 2
4
3,328
EV4 N
3,328 3,328
N EV2
3,328
40 2 5
7 40 2 6
8
3,328
EV5 N
3,328 3,328
N EV3
3,328
40 2 9
11 40 2 10
12
3,328
EV6 N
3,328 3,328
N GW 20 1 13 40 2 14
16
3,328
EV7 N
180 3,328
6,836 6,656 6,656 CONNECTED TOTAL LOAD 46.77 KVA
DEMAND TOTAL LOAD:58.46 KVA 6,656 9,984 9,984
TOTAL AMPS: 162.46 AMPS
(E) A3EV SECTION: OF MAIN C.B. 400AMP
MAIN LUGSLOCATION: PARKING
GARAGE LEVEL 3 SERVING: NORMAL POWER
SURFACE MNT.BOT FEED
LOAD
TYPE CIRCUIT DESCRIPTION
CONN VA C.B.C.B.CONN VA
CIRCUIT DESCRIPTION LOAD
TYPE
A B C AMP.POLE CKT AMP.POLE CKT C B A
N EV1
3,328
40 2 1
3 40 2 2
4
3,328
EV7 N
3,328 3,328
N EV2
3,328
40 2 5
7 40 2 6
8
3,328
EV8 N
3,328 3,328
N EV3
3,328
40 2 9
11 40 2 10
12
3,328
EV9 N
3,328 3,328
N EV4
3,328
40 2 13
15 40 2 14
16
3,328
EV10 N
3,328 3,328
N EV5
3,328
40 2 17
19 40 2 18
20
3,328
EV11 N
3,328 3,328
N EV6
3,328
40 2 21
23 40 2 22
24
3,328
EV12 N
3,328 3,328
40 2 26
28
3,328
EV13 N
3,328
13,492 13,312 13,312 CONNECTED TOTAL LOAD 86.708 KVA
DEMAND TOTAL LOAD:108.385 KVA 13,312 16,640 16,640
TOTAL AMPS: 300.54 AMPS
(E) A4EV SECTION: OF MAIN C.B. 400AMP
MAIN LUGSLOCATION: PARKING
GARAGE LEVEL 4 SERVING: NORMAL POWER
SURFACE MNT.BOT FEED
LOAD
TYPE CIRCUIT DESCRIPTION
CONN VA C.B.C.B.CONN VA
CIRCUIT DESCRIPTION LOAD
TYPE
A B C AMP.POLE CKT AMP.POLE CKT C B A
N EV1
3,328
40 2 1
3 40 2 2
4
3,328
EV7 N
3,328 3,328
N EV2
3,328
40 2 5
7 40 2 6
8
3,328
EV8 N
3,328 3,328
N EV3
3,328
40 2 9
11 40 2 10
12
3,328
EV9 N
3,328 3,328
N EV4
3,328
40 2 13
15 40 2 14
16
3,328
EV10 N
3,328 3,328
N EV5
3,328
40 2 17
19 40 2 18
20
3,328
EV11 N
3,328 3,328
N EV6
3,328
40 2 21
23 40 2 22
24
3,328
EV12 N
3,328 3,328
13,312 13,312 13,312 CONNECTED TOTAL LOAD 80.052 KVA
DEMAND TOTAL LOAD:100,65 KVA 13,312 13,312 13,312
TOTAL AMPS: 277.45 AMPS
(E) A5EV SECTION: OF MAIN C.B. 400AMP
MAIN LUGSLOCATION: PARKING
GARAGE LEVEL 5 SERVING: NORMAL POWER
SURFACE MNT.BOT FEED
LOAD
TYPE CIRCUIT DESCRIPTION
CONN VA C.B.C.B.CONN VA
CIRCUIT DESCRIPTION LOAD
TYPE
A B C AMP.POLE CKT AMP.POLE CKT C B A
N EV1
3,328
40 2 1
3 40 2 2
4
3,328
EV7 N
3,328 3,328
N EV2
3,328
40 2 5
7 40 2 6
8
3,328
EV8 N
3,328 3,328
N EV3
3,328
40 2 9
11 40 2 10
12
3,328
EV9 N
3,328 3,328
N EV4
3,328
40 2 13
15 40 2 14
16
3,328
EV10 N
3,328 3,328
N EV5
3,328
40 2 17
19 40 2 18
20
3,328
EV11 N
3,328 3,328
N EV6
3,328
40 2 21
23 40 2 22
24
3,328
EV12 N
3,328 3,328
13,312 13,312 13,312 CONNECTED TOTAL LOAD 80.052 KVA
DEMAND TOTAL LOAD:100,65 KVA 13,312 13,312 13,312
TOTAL AMPS: 277.45 AMPS
BUILDING A NEW EV LOAD CALCULATION
FOR THIS PERMIT
PNL LOAD DEMAND AMPS
A1EV 58.46 KVA 162.46
A2EV 58.24 KVA 161.82
A3EV 108.16 KVA 300.54
A4EV 99.84 KVA 277.45
A5EV 99.84 KVA 277.45
A6EV 58.24 KVA 161.82
NEW EV TOTAL
AMPS @ 208 1341.65 A 58 CHARGERS
(E) A2EV SECTION: OF MAIN C.B. 400AMP
MAIN LUGSLOCATION: PARKING
GARAGE LEVEL 2 SERVING: NORMAL POWER
SURFACE MNT.BOT FEED
LOAD
TYPE CIRCUIT DESCRIPTION
CONN VA C.B.C.B.CONN VA
CIRCUIT DESCRIPTION LOAD
TYPE
A B C AMP.POLE CKT AMP.POLE CKT C B A
N EV1
3,328
40 2 1
3 40 2 2
4
3,328
EV4 N
3,328 3,328
N EV2
3,328
40 2 5
7 40 2 6
8
3,328
EV5 N
3,328 3,328
N EV3
3,328
40 2 9
11 40 2 10
12
3,328
EV6 N
3,328 3,328
40 2 14
16
3,328
EV7 N
3,328
6,656 6,656 6,656 CONNECTED TOTAL LOAD 46.59 KVA
DEMAND TOTAL LOAD:58.24 KVA 6,656 9,984 9,984
TOTAL AMPS: 161.82 AMPS
(E) A6EV SECTION: OF MAIN C.B. 400AMP
MAIN LUGSLOCATION: PARKING
GARAGE LEVEL 6 SERVING: NORMAL POWER
SURFACE MNT.BOT FEED
LOAD
TYPE CIRCUIT DESCRIPTION
CONN VA C.B.C.B.CONN VA
CIRCUIT DESCRIPTION LOAD
TYPE
A B C AMP.POLE CKT AMP.POLE CKT C B A
N EV1
3,328
40 2 1
3 40 2 2
4
3,328
EV4 N
3,328 3,328
N EV2
3,328
40 2 5
7 40 2 6
8
3,328
EV5 N
3,328 3,328
N EV3
3,328
40 2 9
11 40 2 10
12
3,328
EV6 N
3,328 3,328
40 2 14
16
3,328
EV7 N
3,328
6,836 6,656 6,656 CONNECTED TOTAL LOAD 46.772 KVA
DEMAND TOTAL LOAD:58.465 KVA 6,656 9,984 9,984
TOTAL AMPS: 162.46 AMPS
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
CONTRACTOR
SHEET DESCRIPTION:
PLACARD
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
WARNING PLACARDS:
DEDICATED TO EV ONLY
OTHER LOADS MUST
NOT BE CONNECTED
LABEL LOCATION:
TO BE PLACED IN DEDICATED EV SUB PANEL
& NEXT TO THE EV BREAKER IN THE
DISTRIBUTION PANEL
SIZE: 4" X 2" QTY:1
LABEL LOCATION:
TO BE PLACED IN DEDICATED EV SUB PANEL
& NEXT TO THE EV BREAKER IN THE
DISTRIBUTION PANEL
SIZE: 4" X 2" QTY:1
SIGNAGE REQUIREMENTS AND NOTES:
1.ACCESSIBLE SIGNAGE IS NOT REQUIRED WHERE A TOTAL OF FOUR OF FEWER EV SPACES ARE PROVIDED.
2.FIVE TO TWENTY-FIVE TOTAL EV SPACES ARE PROVIDED:
A - ONE VAN ACCESSIBLE EV SPACE SHALL BE IDENTIFIED BY ISA SIGNAGE
B - ACCESSIBLE SIGNAGE IS NOT REQUIRED AT THE STANDARD ACCESSIBLE EV SPACES
3.TWENTY-SIX OR MORE EV SPACES ARE PROVIDED
4.ALL REQUIRED VAN ACCESSIBLE AND STANDARD ACCESSIBLE EV SPACES SHALL BE IDENTIFIED BY ISA
SIGNAGE
5.IDENTIFICATION SIGNS SHALL BE REFLECTORIZED WITH MINIMUM AREA OF 70 SQUARE INCHES. (11B-812.8.7)
6.THE IDENTIFICATION SIGN SHALL BE VISIBLE FROM THE EV SPACE IT SERVES
7.SIGNS IDENTIFYING VAN ACCESSIBLE EV SPACES SHALL CONTAIN THE WORDS "VAN ACCESSIBLE"
8.IDENTIFICATION SIGNS SHALL BE PERMANENTLY POSTED EITHER IMMEDIATELY ADJACENT TO THE VEHICLE
SPACE OF WITHIN THE PROJECTED VEHICLE SPACE WIDTH AT THE FRONT END OF VEHICLE SPACE.
(11B-812.8.7)
9.MOUNTING HEIGHT OF IDENTIFICATION SIGNS SHALL BE:
A - 60 INCHES MINIMUM ABOVE THE FINISH FLOOR OF GROUND SURFACE MEASURED TO THE BOTTOM OF
THE SIGN, ORB - 80 INCHES MINIMUM ABOVE THE FINISH FLOOR OR GROUND SURFACE MEASURED TO THE
BOTTOM OF THE SIGN, WHEN THE SIGN PROJECTS OVER THE ACCESS AISLE OR OTHER CIRCULATION PATH.
A1EV
LABEL LOCATION:
TO BE PLACED ON THE CIRCUITS ON MSP - EV
SIZE: 1'6" X 1" QTY:1
EV-12
2010 E Warner Ave, Santa Ana, CA
208/120V 1000A 3Ø 4W CAUTION
EXISTING SERVICE PANELS LOCATION IS
SHOWN
2300 Red Hill Ave, Santa Ana
SERVICE 1
SERVICE 2
A4EV
LABEL LOCATION:
TO BE PLACED ON THE CIRCUITS ON MSP - EV
SIZE: 1'6" X 1" QTY:1
A2EV
LABEL LOCATION:
TO BE PLACED ON THE CIRCUITS ON MSP - EV
SIZE: 1'6" X 1" QTY:1
A5EV
LABEL LOCATION:
TO BE PLACED ON THE CIRCUITS ON MSP - EV
SIZE: 1'6" X 1" QTY:1
A3EV
LABEL LOCATION:
TO BE PLACED ON THE CIRCUITS ON MSP - EV
SIZE: 1'6" X 1" QTY:1
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
A6EV
LABEL LOCATION:
TO BE PLACED ON THE CIRCUITS ON MSP - EV
SIZE: 1'6" X 1" QTY:1
LABEL LOCATION:
TO BE PLACED IN DEDICATED EV SUB PANEL
& NEXT TO THE EV BREAKER IN THE
DISTRIBUTION PANEL
SIZE: 4" X 2" QTY:1
2010 E Warner Ave, Santa Ana, CA
208/120V 1000A 3Ø 4W
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
CONTRACTOR
SHEET DESCRIPTION:
SPEC SHEET 1
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
EV-13
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
CONTRACTOR
SHEET DESCRIPTION:
SPEC SHEET 2
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
EV-14
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
CONTRACTOR
SHEET DESCRIPTION:
SPEC SHEET 3
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
EV-15
27"12"
36"
48"
10"
216"
216"
108"
27"
216"
60"48"
216"
60"48"
108"
60"144"
48"
16.5"
108"
EVSE ACCESSIBILITY
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
CONTRACTOR
SHEET DESCRIPTION:
SPEC SHEET 4
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
EV-16
EV CHARGERS MOUNTING ANCHORAGE
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
CONTRACTOR
SHEET DESCRIPTION:
REF SPEC SHEET 1
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
EV-17
FOR REFERENCE ONLY
GARAGE ARCHITECTURE SHEET GA9.4, PERMIT # 101107195 2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
EV-18
CONTRACTOR
SHEET DESCRIPTION:
REF SPEC SHEET 2
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
FOR REFERENCE ONLY
GARAGE ARCHITECTURE SHEET GA9.4, PERMIT # 101107195 2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
CONTRACTOR
SHEET DESCRIPTION:
EXHIBIT UG CONDUIT RUNS
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
EV-19
EXISTING UNDERGROUND CONDUIT DETAILS.
*PLEASE NOTE THAT THE ACTUAL DETAILS AND INFORMATION WERE PROVIDED BY STRUCTURAL AND ELECTRICAL DURING INITIAL PLAN SUBMITTAL.PLEASE REFER TO THE ATTACHED APPROVED PLANS
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
24"
FOR REFERENCE ONLY
12"
12"
24"
12"
24"
EXISTING DIRECT BURIAL SECONDARY UNDERGROUND CONDUIT DETAILS EXISTING UNDERGROUND SECONDARY PULL BOX DETAILS
EXISTING EMERGING UNDERGROUND EV BRANCH CIRCUIT CONDUIT DETAILS-COLUMN MOUNTED EXISTING SECONDARY UNDERGROUND EMERGING CONDUIT DETAILS
36"
48"
1.5"
24"
24"
NTSNTS
NTS
EXHIBIT EXISTING EMERGING UNDERGROUND EV BRANCH
CIRCUIT JBOX COLUMN MOUNT
2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
CONTRACTOR
SHEET DESCRIPTION:
EXHIBIT EQUIPMENT
MOUNTING SPEC
DRAWN DATE 27.06.2024
DRAWN BY EMMANUEL
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
EV-20
EXISTING MOUNTING DETAILS.
*PLEASE NOTE THAT THE ACTUAL DETAILS AND INFORMATION WERE PROVIDED BY STRUCTURAL AND ELECTRICAL
DURING INITIAL PLAN SUBMITTAL.PLEASE REFER TO THE ATTACHED APPROVED PLANS
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
FOR REFERENCE ONLY 2010 E Warner Ave, Bldg P
- 101119118 & 20182681
7/8/2024
YES NO
INSTRUCTIONS:
ORAN GE COUNTY FI RE AUTHORI TY
Plan Submittal Criteria
COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects
and RESIDENTIAL TRACT developments
· Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place.
· Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section.
· If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA.
· In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations.
· Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding
requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602.
Address Suite City
Project Scope/Business Description
1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways,
curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within
300 feet of an active or proposed oil well? Fire Master Plan (PR145)
2. Property is adjacent to a wildland area or non-irrigated native vegetation?
Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124)
3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from
an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170)
4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving
private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475)
5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000
sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable
to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless
classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration
or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses
where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories
with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285)
6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card,
button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan
depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520)
7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment;
industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible
liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium
ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations?
Special Equipment Plan (PR315, PR340-PR382)
8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft
maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if
H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240)
9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard
commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330)
10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a
commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335)
Initial each of the following two items indicating that you have read and understand the statement:
11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is
required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed
Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications.
12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located
in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327—
Initials the building department will determine specific requirements.
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name Signature
Phone Number ( ) Date / /
Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA
review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the
applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the
appropriate plans and fees for OCFA review. 10-08-14 EE
COM
2010 E Warner Ave, Bldg P
- 101119118 & 201826817/8/2024
O R A N G E C O U N T Y F I R E A U T H O R I T Y
Plan Referral Form
Required for OCFA to review plans upon the request of the Building Department when
the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”.
City / County Official Requesting Review:
City / County Reference #: Date: __________________________________
City / County: _____________________________________ E-Mail: __________________________________
Contact Name: _____________________________________ Phone #: _________________________________
Title: _____________________________________
** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. **
Reason(s) for Review:
Please describe why OCFA Plan Review is or may be required by the City/County :
OCFA COMMENTS:
No further action required on this specific plan type, based
on information provided on: ____/______/______.
Project to be taken in for OCFA Review.
Other:
Name: _________________________________________
Contact #: ______________________________________ Date: _________________________________
OCFA Authorization
Updated: 06/02/2020 rs
2010 E Warner Ave, Bldg P
- 101119118 & 201826817/8/2024
2010 E Warner Ave, Bldg P
- 101119118 & 201826817/8/2024
CONTRACTOR
SHEET DESCRIPTION:
COVER PAGE
DRAWN DATE 15.08.2024
DRAWN BY BRANDON
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
STRIPING AND EVCS LOCATIONS 15.08.2024
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
A
WARNER REDHILL - NEW PEDESTAL AND WALL MOUNTED EV CHARGING SYSTEM
2010 E WARNER AVE, SANTA ANA, CA
Know what's below.
CALL before you dig.
CALL AT LEAST TWO WORKING
DAYS BEFORE YOU DIG
USA
Nor t h
DIG ALERT
CONTRACTOR SHALL VERIFY ALL PLANS & EXISTING LOCATIONS,
CONDITIONS ON THE JOB SITE & SHALL IMMEDIATELY NOTIFY THE
ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE
PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME
SATELLITE VIEW:
VICINITY VIEW:
SITE
SYSTEM INFORMATION
MANUFACTURER LITEON
PRODUCT ISO
CONNECTOR SAE J1772
LEVEL AC LEVEL 2
MOUNTING WALL OR PEDESTAL
MAX OUTPUT 32A;7.68KW MAX OUTPUT
SITE
SHEET INDEX
INDEX
EV - 01 COVER PAGE
EV - 02 SITE PLAN
EV - 03 ENLARGED PLAN I
EV - 04 ENLARGED PLAN II
EV - 05 ENLARGED PLAN III
EV - 06 ENLARGED PLAN IV
EV - 07 ENLARGED PLAN V
EV - 08 ENLARGED PLAN VI
EV - 09 SINGLE LINE DIAGRAM
EV - 10 PANEL SCHEDULE
EV - 11 NOTES
EV - 12 PLACARD
EV - 13 SPEC SHEET
EV - 14 SPEC SHEET
EV - 15 SPEC SHEET
EV - 16 SPEC SHEET
EV - 17 REFERENCE SPEC SHEET
EV - 18 REFERENCE SPEC SHEET
EV - 19 EXHIBIT UG CONDUIT RUNS
EV - 20 EXHIBIT EQUIPMENT MOUNTING SPECS
EV-01
TOTAL NUMBER OF EV CHARGERS: 58
UTILITY: SCE
EXISTING MAIN BREAKER RATING "PDSA": 277/480V,1600A
EXISTING EV MAIN BREAKER RATING "AEV1": 120/208V,800A
EXISTING EV MAIN BREAKER RATING "AEV3": 120/208V,800A
TOTAL MAX EV LOAD DEMAND: 482.78KW
MS-EV BRAND: EATON
MS-EV EXISTING OR NEW: EXISTING
BUILDING TYPE: MULTIFAMILY APT COMPLEX
CHARGING MAX KW CAPACITY: 7.680KW
SYSTEM VOLTAGE: 208
SINGLE OR THREE PHASE: THREE PHASE
EVSE LOCATION: PARKING GARAGE
EVSE RATIO 0.118
TYPE OF CONSTRUCTION TENANT IMPROVEMENT
APPLICABLE CODES:
2023 NATIONAL ELECTRICAL CODE
2022 BUILDING ENERGY EFFICIENCY STANDARDS
2022 CALIFORNIA BUILDING CODE (11B-228.3.1)
2022 CALIFORNIA ELECTRICAL CODE
PROJECT INFORMATION:
CONTRACTOR :CHARGIE
SCOPE OF WORK AND NOTES:
(1) FROM AN EXISTING SERVICE 1600A MSP "PDSA" , INSTALL 58 EVCS ON 2X EXISTING EV DEDICATED SUB PANELS "AEV1" RATED AT 1000A WITH A 800A MAIN BREAKER AND EV
DEDICATED SUB PANEL "AEV3" RATED AT 1000A WITH A 800A MAIN BREAKERS.
(2) ALL EVSE DEDICATED INFRASTRUCTURE IS EXISTING (PANELS, FEEDERS,BRANCH CIRCUITS,OCPD,CONDUITS,GROUNDING SYSTEM ) ,THIS INCLUDES ALL OTHER ELECTRICAL
INFRASTRUCTURE FOUND IN THIS BUILDING NAMELY MAIN SERVICE PANEL, TRANSFORMERS, TRANSFORMER GROUNDING SYSTEM AND GENERATORS.
(3) EV CHARGERS SHALL BE PEDESTAL MOUNTED AND PROTECTED WITH A BOLLARD, WHILE ALL OTHER CHARGERS SHALL BE WALL MOUNTED AND PROTECTED WITH A WALL COLLAR.
(4) THERE WILL NOT BE ANY OTHER ALTERATIONS TO THE EXISTING SITE OR BUILDING.
(5) ON THE GARAGE FIRST TIER, ONE RETAIL PARKING SPACE WILL BE REMOVED FOR A NEW RETAIL ACCESSIBLE EVCS ACCESS AISLE AND ACCESS PATH.
(6) THERE WILL BE NO EXTERNAL EQUIPMENT INSTALLED AND NO EXTERIOR WORK UNDER THIS PERMIT.
EVCS INFORMATION:
EVCS MANUFACTURER: LITE-ON
EVCS LEVEL: AC LEVEL 2
EVCS TYPE: NON-RFID
KW CAPACITY PER CHARGER: 7.680 kW
VOLTAGE: 208 VAC SINGLE PHASE
CHARGING CABLE LENGTH: 25FT
PROPERTY INFORMATION:
BUILDING TYPE: MIXED USE BUILDING
OCCUPANCY CLASSIFICATION: RESIDENTIAL AND RETAIL
PARCEL APN: 430-222-07/430-222-16
NUMBER OF STORIES: 5
PARKING SPACES: 488
PARKING TYPE: 7 LEVEL PARKING GARAGE
ZONING CODE: CR
BUILDING FAR: 0.139
FLOOD RISK AREA: LOW
RECORDED OWNER: PROPERTY MANAGEMENT:
THIS MULTIFAMILY BUILDING IS NOT FOR PUBLIC HOUSING
NOTE: PROVIDED PARKING AND EV CHARGING TABLES FROM GARAGE ARCHITECTURAL SHEET GA0.10, PERMIT # 101107195
TABLES HAVE BEEN UPDATED TO REFLECT PARKING LOT MODIFICATIONS INCLUDED IN THE SCOPE OF WORK. PER CBC 11B, ONE
STANDARD EV ACCESSIBLE AND ONE VAN EV ACCESSIBLE PARKING STALL ARE INCLUDED ON THE FIRST TIER. IN COMPLIANCE
WITH CALIFORNIA GREEN BUILDING STANDARDS CODE 4.106.4.2.2.1.1, THREE RESIDENTIAL EV ACCESSIBLE PARKING STALLS ARE
INCLUDED ON THE SECOND, THIRD, AND SIXTH TIERS.
3
9
131
385
7 66
64 74
84
56
20
5 26
35
60
13
385
131
84
600
73
340
73
523
35 1
2
53
6
NOTE: CALIFORNIA BUILDING CODE CHAPTER 11B APPLIES TO RETAIL
PARKING ON THE FIRST TIER ONLY. ACCESSIBLE EVCS ARE INCLUDED ON
THE SECOND, THIRD, AND SIXTH TIERS PER CALIFORNIA GREEN BUILDING
STANDARDS CODE SECTION 4.106.4.2.2.1.
A
A
A
110
110 13
REVISION TO:
Bldg# 101119118
REVISION:
Bldg# 101120627
APPROVALS:
PLNG - CSantana
BLDG - CSG Consultants
2010 E Warner Ave, Bldg
P9/20/2024
UP
OTIS
GEN2
3500 LB / 200 FPM
5'-0" PIT
14'-8" OVERRUN
9'-9" TALL CAB HEIGHT
100' MAX. TRAVEL
RETAIL RETAIL
RETAIL
AD
AD
5' DIA.
ED
AD
STEP
UP
ED
2 2
1
1
1
AD
AD
AD
ADUP
UP
DN
%
M
A
X
.
5.
2
3
%
M
A
X
.
SL
O
P
E
D
O
W
N
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
7 SINGLE PORT WALL MOUNTED EV STATION
0 DUAL PORT PEDESTAL MOUNTED EV STATION
0 SINGLE PORT PEDESTAL MOUNTED EV STATION
ACCESSIBLE EV STATION
GARAGE FIRST TIER
7 TOTAL EV STATIONS ON FIRST TIER & LOWER TIER
10'-7"
18'-11"
9'
4'
25'-10"
28'-10"
12'
19'
NEW
ACCESS
PATH
5'
9'
NEW
ACCESS
AISLE
IDENTIFICATION SIGN
IDENTIFICATION SIGN
CONTRACTOR
SHEET DESCRIPTION:
ENLARGED PLAN I
DRAWN DATE 15.08.2024
DRAWN BY BRANDON
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
STRIPING AND EVCS LOCATIONS 15.08.2024
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
A
N
S
EW
SITE PLAN:
NOTE: THE HIGH FORWARD REACH SHALL
BE 48 INCHES (1219.2 MM) MAXIMUM AND
THE LOW FORWARD REACH SHALL BE 15
INCHES (381 MM) MINIMUM ABOVE THE
FINISH FLOOR OR GROUND. THE
CONTRACTOR NEED TO PROVIDE DURING
THE INSTALLATION
REACH RANGES:
ELECTRIC
VEHICLE
CHARGING
STATION
PARKING ONLY
WHILE CHARGING
EV PANEL
SAFETY BOLLARD
SAFETY BOLLARD:
PARKING SIGN
EV-03
SCALE: 1"=15.8'
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
LEGEND:
MSP - EV
PULL
PNL - EV
N
G
(N) TRANSFORMER
(N)TRANSFORMER
G
M
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
- SAFETY BOLLARD
- CONDUIT
- PARKING SIGN
- MAIN SERVICE PANEL (EV)
- PULL SECTION
- EV PANEL
- EV TRANSFORMER
- DISCONNECT
- METER
- GAS METER
- EV CHARGING STALL
- EV SINGLE PORT
WALL MOUNTED
- EV SINGLE PORT
PEDESTAL MOUNTED
- 2 EV SINGLE PORT
PEDESTAL MOUNTED
- RETAIL PARKING
- GUEST PARKING
- RESIDENT PARKING
RETAIL
GUEST
###
NO
P
A
R
K
I
N
G
- ACCESSIBLE STALL
- NEW ACCESS AISLE MARKINGS
- NEW EVCS ACCESSIBLE ONLY SIGNAGE
NOTE: CBC CHAPTER 11B APPLIES TO FIRST TIER RETAIL PARKING ONLY
A
A
2010 E Warner Ave, Bldg
P9/20/2024
FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3
DN UP
OTIS
GEN2
3500 LB / 200 FPM
5'-0" PIT
14'-8" OVERRUN
9'-9" TALL CAB HEIGHT
100' MAX. TRAVEL
#####################
FB1
5' DIA.
ED
UP DN
ED
2
2
2
ED
FB1
FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3
UP
DN
UP
DN
5.
2
3
%
M
A
X
.
5.
4
3
%
M
A
X
.
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
3 SINGLE PORT WALL MOUNTED EV STATION
0 DUAL PORT PEDESTAL MOUNTED EV STATION
4 SINGLE PORT PEDESTAL MOUNTED EV STATION
ACCESSIBLE EV STATION
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULT
CHARGING FAULT
18'-11"
8'-11"
25'-8"
26'-2"
9'
18'-11"
GARAGE SECOND TIER
7 TOTAL EV STATIONS ON SECOND TIER
18'-10"
IDENTIFICATION SIGN
36.77672005
130'-5"
9'
8'
18'
5'
ELECTRIC
VEHICLE
CHARGING
STATION
PARKING ONLY
WHILE CHARGING
EV PANEL
SAFETY BOLLARD
SAFETY BOLLARD:
PARKING SIGN
EV-04
SCALE: 1"=15.8'
CONTRACTOR
SHEET DESCRIPTION:
ENLARGED PLAN II
DRAWN DATE 15.08.2024
DRAWN BY BRANDON
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
STRIPING AND EVCS LOCATIONS 15.08.2024
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
A
N
S
EW
SITE PLAN:
NOTE: THE HIGH FORWARD REACH SHALL
BE 48 INCHES (1219.2 MM) MAXIMUM AND
THE LOW FORWARD REACH SHALL BE 15
INCHES (381 MM) MINIMUM ABOVE THE
FINISH FLOOR OR GROUND. THE
CONTRACTOR NEED TO PROVIDE DURING
THE INSTALLATION
REACH RANGES:
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
LEGEND:
MSP - EV
PULL
PNL - EV
N
G
(N) TRANSFORMER
(N)TRANSFORMER
G
M
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
- SAFETY BOLLARD
- CONDUIT
- PARKING SIGN
- MAIN SERVICE PANEL (EV)
- PULL SECTION
- EV PANEL
- EV TRANSFORMER
- DISCONNECT
- METER
- GAS METER
- EV CHARGING STALL
- EV SINGLE PORT
WALL MOUNTED
- EV SINGLE PORT
PEDESTAL MOUNTED
- 2 EV SINGLE PORT
PEDESTAL MOUNTED
- RETAIL PARKING
- GUEST PARKING
- RESIDENT PARKING
RETAIL
GUEST
###
NO
P
A
R
K
I
N
G
- ACCESSIBLE STALL
- NEW ACCESS AISLE MARKINGS
- NEW EVCS ACCESSIBLE ONLY SIGNAGE
NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED.
NOTE: ACCESSIBLE EVCS INCLUDED PER CALIFORNIA GREEN BUILDING
STANDARDS CODE SECTION 4.106.4.2.2.1
A
A
A
2010 E Warner Ave, Bldg
P9/20/2024
OT
I
S
GE
N
2
35
0
0
L
B
/
2
0
0
F
P
M
5'
-
0
"
P
I
T
14
'
-
8
"
O
V
E
R
R
U
N
9'
-
9
"
T
A
L
L
C
A
B
H
E
I
G
H
T
10
0
'
M
A
X
.
T
R
A
V
E
L
##
#
##
#
##
#
##
#
##
#
##
#
##
#
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
DN UP
FB
1
5'
D
I
A
.
ED
UP DN
ED
1 1
2 2
2 2
ED
1 1
FB1
FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3 FW3
UP
DN
UP
DN
5.
4
3
%
M
A
X
.
5.
4
3
%
M
A
X
.
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
7 SINGLE PORT WALL MOUNTED EV STATION
0 DUAL PORT PEDESTAL MOUNTED EV STATION
6 SINGLE PORT PEDESTAL MOUNTED EV STATION
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
ACCESSIBLE EV STATION
18'-10"
8'-10"
GARAGE THIRD TIER
13 TOTAL EV STATIONS ON THIRD TIER
25'-8"
25'-8"
IDENTIFICATION SIGN
9'
8'
18'
5'
ELECTRIC
VEHICLE
CHARGING
STATION
PARKING ONLY
WHILE CHARGING
EV PANEL
SAFETY BOLLARD
SAFETY BOLLARD:
PARKING SIGN
EV-05
SCALE: 1"=15.87'
CONTRACTOR
SHEET DESCRIPTION:
ENLARGED PLAN III
DRAWN DATE 15.08.2024
DRAWN BY BRANDON
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
STRIPING AND EVCS LOCATIONS 15.08.2024
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
A
N
S
EW
SITE PLAN:
NOTE: THE HIGH FORWARD REACH SHALL
BE 48 INCHES (1219.2 MM) MAXIMUM AND
THE LOW FORWARD REACH SHALL BE 15
INCHES (381 MM) MINIMUM ABOVE THE
FINISH FLOOR OR GROUND. THE
CONTRACTOR NEED TO PROVIDE DURING
THE INSTALLATION
REACH RANGES:
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
LEGEND:
MSP - EV
PULL
PNL - EV
N
G
(N) TRANSFORMER
(N)TRANSFORMER
G
M
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
- SAFETY BOLLARD
- CONDUIT
- PARKING SIGN
- MAIN SERVICE PANEL (EV)
- PULL SECTION
- EV PANEL
- EV TRANSFORMER
- DISCONNECT
- METER
- GAS METER
- EV CHARGING STALL
- EV SINGLE PORT
WALL MOUNTED
- EV SINGLE PORT
PEDESTAL MOUNTED
- 2 EV SINGLE PORT
PEDESTAL MOUNTED
- RETAIL PARKING
- GUEST PARKING
- RESIDENT PARKING
RETAIL
GUEST
###
NO
P
A
R
K
I
N
G
- ACCESSIBLE STALL
- NEW ACCESS AISLE MARKINGS
- NEW EVCS ACCESSIBLE ONLY SIGNAGE
NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED.
NOTE: ACCESSIBLE EVCS INCLUDED PER CALIFORNIA GREEN BUILDING
STANDARDS CODE SECTION 4.106.4.2.2.1
A
A
2010 E Warner Ave, Bldg
P9/20/2024
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
DN UP
OT
I
S
GE
N
2
35
0
0
L
B
/
2
0
0
F
P
M
5'
-
0
"
P
I
T
14
'
-
8
"
O
V
E
R
R
U
N
9'
-
9
"
T
A
L
L
C
A
B
H
E
I
G
H
T
10
0
'
M
A
X
.
T
R
A
V
E
L
##
#
##
#
##
#
##
#
##
#
##
#
##
#
FB
1
5'
D
I
A
.
ED
UP DN
ED
1 1
2 2
2 2
ED
1 1
FB
1
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
UP
DN
UP
DN
5.
4
3
%
M
A
X
.
5.
4
3
%
M
A
X
.
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
FW
3
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
6 SINGLE PORT WALL MOUNTED EV STATION
0 DUAL PORT PEDESTAL MOUNTED EV STATION
6 SINGLE PORT PEDESTAL MOUNTED EV STATION
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWERCHARGINGPOWER FAULTCHARGING FAULT
18'-11"
GARAGE FOURTH TIER
12 TOTAL EV STATIONS ON FOURTH TIER
25'-8"
25'-8"
CONTRACTOR
SHEET DESCRIPTION:
ENLARGED PLAN IV
DRAWN DATE 15.08.2024
DRAWN BY BRANDON
REVIEWED BY ----
REVISIONS
REV DESCRIPTION DATE
STRIPING AND EVCS LOCATIONS 15.08.2024
SHEET INDEX
UTILITY : SCE
PROJECT INFORMATION
AHJ : SANTA ANA
ADDRESS : 2010 E WARNER AVE,
SANTA ANA, CA
NAME : WARNER REDHILL
APN : 430-222-07/430-222-16
SYSTEM INFORMATION:
(58)LITEON
CHARGING STATIONS
PROJECT INFORMATION:
CHARGIE TO DESIGN AND
INSTALL THE CHARGING
SYSTEM.
A
N
S
EW
SITE PLAN:
NOTE: THE HIGH FORWARD REACH SHALL
BE 48 INCHES (1219.2 MM) MAXIMUM AND
THE LOW FORWARD REACH SHALL BE 15
INCHES (381 MM) MINIMUM ABOVE THE
FINISH FLOOR OR GROUND. THE
CONTRACTOR NEED TO PROVIDE DURING
THE INSTALLATION
REACH RANGES:
ELECTRIC
VEHICLE
CHARGING
STATION
PARKING ONLY
WHILE CHARGING
EV PANEL
SAFETY BOLLARD
SAFETY BOLLARD:
PARKING SIGN
EV-06
SCALE: 1"=15.87'
PROJECT INFORMATION:
CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM.
LEGEND:
MSP - EV
PULL
PNL - EV
N
G
(N) TRANSFORMER
(N)TRANSFORMER
G
M
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
CHARGIE
ELECTRIC VEHICLE
CHARGE STATION
HIGH POWER
POWER
CHARGING
POWER FAULT
CHARGING FAULT
- SAFETY BOLLARD
- CONDUIT
- PARKING SIGN
- MAIN SERVICE PANEL (EV)
- PULL SECTION
- EV PANEL
- EV TRANSFORMER
- DISCONNECT
- METER
- GAS METER
- EV CHARGING STALL
- EV SINGLE PORT
WALL MOUNTED
- EV SINGLE PORT
PEDESTAL MOUNTED
- 2 EV SINGLE PORT
PEDESTAL MOUNTED
- RETAIL PARKING
- GUEST PARKING
- RESIDENT PARKING
RETAIL
GUEST
###
NO
P
A
R
K
I
N
G
- ACCESSIBLE STALL
- NEW ACCESS AISLE MARKINGS
- NEW EVCS ACCESSIBLE ONLY SIGNAGE
NOTE: ALL TENANT EVCS STALLS ARE ASSIGNED.
2010 E Warner Ave, Bldg
P9/20/2024