Loading...
HomeMy WebLinkAbout2018 W Eleventh St Unit# 2 - PlanProject Name: Property address: APN: VICINITY MAP SCALE: NTS PV SOLAR SYSTEM DETAILS MAIN SERVICE PANEL BUS SIZE: MAIN SERVICE BREAKER SIZE: BUILDING INFORMATION: CONSTRUCTION TYPE: V-B OCCUPANCY: R ROOF: SYSTEM SIZE: DC STC: KW SYSTEM SIZE: AC CEC: KW SOLAR MODULES: ( ) ROOF PLAN SINGLE LINE DIAGRAM ATTACHMENT LAYOUT SIGNAGE ECB DATA SHEET INVERTER DATA SHEET 1 INDEX 2 3 4 5 6 7 8 9 10 SITE PLAN MODULE DATA SHEET SATELLITE VIEW SCALE: NTS RACKING DATA SHEET ATTACHMENT DATA SHEET COVER PAGE0 MAIN 3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED 4. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING COMMISSIONING AND ACCEPTANCE WITH THE CLIENT, UTILITY CO. AND CITY INSPECTORS AS NEEDED. 5. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS. 6. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. 7. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING THE EXTRA WEIGHT. 8. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS APPROPRIATE. 9. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS. 10. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS, ETC. SHALL BE HANDED OVER TO OWNER'S REPRESENTATIVE AT THE COMPLETION OF WORK PHOTOVOLTAIC NOTES: 1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED AND IDENTIFIED BY RECOGNIZED ELECTRICAL TESTING LABORATORY 2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL VENTS 3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. 5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS. 4. SOLAR INVERTER SHALL BE LISTED TO UL1741. 6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING SHALL BE PROTECTED FROM PHYSICAL DAMAGE. 7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS OVER 150V TO GROUND SHALL NOT BE ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE ENERGIZED. 8. INVERTER IS EQUIPED WITH INTEGRATED GFDI, THUS PROVIDING GROUND FAULT PROTECTION 9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED 10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY. 11. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING, AC GROUNDING AND BONDING BETWEEN AC AND DC SYSTEMS. 12. NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER. BOND BOTH ENDS OF RACEWAYS. GENERAL NOTES 1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED ELECTRICAL TESTING LABORATORY CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED BY THE MANUFACTURER ATTESTING TO ITS SAFETY 2. OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED OR BETTER COMP. SHINGLE 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 4.100 3.794 COVER PAGE0 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR THE INSTALLATION OF SOLAR ARRAYS AND PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH THE FOLLOWING CODES: 2020 NATIONAL ELECTRICAL CODE 2022 CALIFORNIA BUILDING CODE 2022 CALIFORNIA RESIDENTIAL CODE 2022 CALIFORNIA GREEN BUILDING STANDARD CODE 2022 CALIFORNIA PLUMBING CODE 2022 CALIFORNIA MECHANICAL CODE 2022 CALIFORNIA ELECTRICAL CODE 2022 CALIFORNIA FIRE CODE 2022 CALIFORNIA ENERGY CODE 2016 INTERNATIONAL PROPERTY MAINTENANCE CODE ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES MOUNTING SYSTEM: 100A 100A EXISTING METER REC 410 WATT IRONRIDGE XR10 RAIL ELECTRICAL INFORMATION: 11 MONITORING PAGE MICROINVERTER: ( ) Enphase IQ8+ Microinverter RSD DATA SHEET12 10 10 : 2 X 6 @ 24" O.C.RAFTER RACKING CLASIFICATION13 Date Certified and Exp. Date : 3/31/2026 Signed:04/03/2024 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 88083 03/31/2026 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (310) 928-0938 PV-0 Cover Page The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg#: 101118849 Elec#: 20182506 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 EMT Conduit Solar Module INDEX (N) Junction Box Microinverter Setback MSP JB Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 ROOF PLANPV-1 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR (E) Main Service Panel (N) AC DisconnectACD Roof Face Area:922 Total Module Area:180 Roof Coverage:19.52% (N) Enphase Combiner BoxECB Roof access is not located in areas that require placement of ground ladders over exterior wall openings CRC R331.4.1. 18'' fire setback 36 ' ' f i r e s e t b a c k 36 ' ' f i r e s e t b a c k Solar PV Array 10 - REC 410W Modules 10 - IQ8+ Microinverters Pitch: 18 Deg Orientation: 180 Deg JB MSP ACD ECB AC UNIT AC UNIT W 11th St MAIN HOUSE ADU Roof Access SCALE:3/32" = 1'-0" S 180 ° E 90 ° W 270 ° N 0° Date Certified and Exp. Date : 3/31/2026 Signed:04/03/2024 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________88083 03/31/2026 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (310) 928-0938 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 SITE PLANS-1 Main Service Panel INDEX MSP Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR AC DisconnectACD Enphase Combiner BoxECB 1.In the case of emergency, call_____________________at Work Phone #__________________or Home Phone #___________________. 2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum extent practicable. 3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage facilities or adjacent properties via runoff, vehicle tacking, or wind. 4. Appropriate BMP's for construction-related materials, wastes, spills shall be implemented to minimize transport from the site to streets, drainage facilities, or adjoining properties by wind or runoff. 5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce or remove sediment and other pollutants.6. All construction contractor and subcontractor personnel are to be made aware or the required best management practices and good housekeeping measures for the project site and any associated constructionstaging areas. 7. At the end of each day of construction activity all construction debris and waste materials shall be collected and properly disposed in trash or recycle bins. 8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or pollutants off the site. Discharges of material other than stormwater only when necessary forperformance andcompletion of construction practices and where they do not: cause or contribute to a violation of any water quality standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardoussubstance ina quantity reportable under Federal Regulations 40 CFR Parts 117 and 302. 9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paintflakesor stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment wash water and concrete wash water; concrete, detergent or floatable wastes; wastes from anyengine/equipment steam cleaning or chemical degreasing and superchlorinated potable water line flushing. During construction, permittee shall dispose of such materials in a specified and controlled temporaryarea on -site, physically separated from potential stormwater runoff, with ultimate disposal in accordance with local, state and federal requirements. 10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited. Dewatering of non-contaminated groundwater requires a National Pollutant Discharge EliminationSystem Permit from the respective State Regional Water Quality Control Board. 11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each working day. Drainage is to be directed toward desilting facilities. 12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent public trespass onto areas where impounded water creates a hazardous condition. 13. The permittee and contractor shall inspect the erosion control work and insure that the work is in accordance with the approved plans. 14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property owners: that dumping of chemicals into the storm drain system or the watershed is prohibited. 15. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary materials shall be available on site and stockpiled at convenient locations to facilitate rapidconstruction of temporary devices when rain is imminent. 16. All removable erosion protective devices shall be in place at the end of each working day when the 5-Day Rain Probability Forecast exceeds 40%. 17.Sediments from areas disturbed by construction shall beretained on site using an effective combination of erosion and sediment controls to the maximum extent practicable, and stockpiles of soil shall be properly containted to minimize sediment transport from the site tostreets, drainage facilities of adjacent properties via runoff,vehicle tracking, or wind. 18. Appropriate BMPs for construction-related materials, wastes, spills or residues shall be implemented and retained on site to minimize transport from the site to streets, drainage facilities, or adjoining property bywind or runoff 112' 59' 112' 59' 95'-11" 24'-5"20' 6' MSP ACD ECB AC UNIT AC UNIT PROPERTY LINE W 11th St MAIN HOUSE ADU Driveway SCALE:1/16" = 1'-0" S 180 ° E 90 ° W 270 ° N 0° Date Certified and Exp. Date : 3/31/2026 Signed:03/29/2024 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________88083 03/31/2026 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (310) 928-0938 Professional Certification. I hereby certify that these documentswere prepared or approved by me, and that I am a duly licensedprofessional engineer under the laws of the State of California.License No. ____________, Expiration Date: _______________8808303/31/2026Engineerinc.io,303 N Glenoaks BlvdBurbank, CA 91502(310) 928-0938 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 ATTACHMENT LAYOUTS-2 RAIL ATTACHMENT 2 X 6 @ 24" O.C. Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR Racking: IronRidge XR10 Rail Attachment: IronRIdge FlashFoot2 PV MODULE FRAME IRONRIDGE RAIL DETAIL, END CLAMP FRONTB IRONRIDGE STOPPER SLEEVE IRONRIDGE UNIVERSAL FASTENING OBJECTPV MODULE FRAME IRONRIDGE RAIL DETAIL, END CLAMP PLANB IRONRIDGE STOPPER SLEEVE IRONRIDGE UNIVERSAL FASTENING OBJECT PV MODULE FRAME IRONRIDGE RAIL DETAIL, MID CLAMP FRONTC IRONRIDGE UNIVERSAL FASTENING OBJECTPV MODULE FRAME DETAIL, MID CLAMP PLANC IRONRIDGE UNIVERSAL FASTENING OBJECT IRONRIDGE RAIL IRONRIDGE FLASHFOOT2 A IRONRIDGE RAIL PV MODULE 0.4xL MAX. CB D IRONRIDGE STOPPER SLEEVE IRONRIDGE UNIVERSAL FASTENING OBJECT IRONRIDGE FLASHFOOT2 IRONRIDGE UNIVERSAL FASTENING OBJECT (E) ROOF MEMBRANE IRONRIDGE FLASHFOOT2 IRONRIDGE RAIL PV MODULE, BY OTHERS (E) BUILDING STRUCTURE (E) ROOF MEMBRANE IRONRIDGE FLASHFOOT2 IRONRIDGE RAIL PV MODULE, BY OTHERS (E) BUILDING STRUCTURE DETAIL, FLASHFOOT2 SIDEA DETAIL, FLASHFOOT2 FRONTD 5/16" STAINLESS STEEL LAG SCREW MIN. 2.5" EMBED INTO FRAMING MEMBER FRONT VIEW SIDE VIEW (E) RAFTERS 3.0 12.0 4.50 9.0 3.67 3.56 1.02 IRONRIDGE ATTACHMENT AND RACKING DETAILS 1. 2. 3. Roof attachment hardware to be mounted to existing structure with O.C. rail spans or less. 4. Lag bolts are 5/16" X 3.5" stainless steel with 2.5" minimum embedment into the center of the roof 5. Roof sheathed with 1/2" plywood and upper surface is faced with felt paper. Finished roof surface is One layer of .COMP. SHINGLE MODULE WEIGHT (lbs)47.4 # OF MODULES 10 TOTAL MODULE WEIGHT (lbs)474.0 RACKING WEIGHT (lbs)94.8 MICROINVERTER WEIGHT (lbs)23.8 TOTAL SYSTEM WEIGHT (lbs)592.6 # OF STANDOFFS (lbs)20 MAX SPAN BETWEEN STANDOFFS (in) LOADING PER STANDOFF (in)29.6 TOTAL AREA (sq.ft.)211.2 LOADING (psf)2.8 48" 48"RAFTER SOLAR MODULE Blocking Maximum 6" 2 X 6 @ 24" O.C. COMP. SHINGLE ROOF SECTION DETAIL RAFTER Roof Face Area:1519 Total Module Area:180 Roof Coverage:11.85% 12'-7" 23'-9" 7'-4" Date Certified and Exp. Date : 3/31/2026 Signed:03/29/2024 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________88083 03/31/2026 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (310) 928-0938 Professional Certification. I hereby certify that these documentswere prepared or approved by me, and that I am a duly licensedprofessional engineer under the laws of the State of California.License No. ____________, Expiration Date: _______________8808303/31/2026Engineerinc.io,303 N Glenoaks BlvdBurbank, CA 91502(310) 928-0938 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 WIRE SIZE CALCULATIONE-1 PERCENT OF VALUES NUMBER OF CURRENT CARRYING CONDUCTORS IN EMT .80 4-6 .70 7-9 .50 10-20 #ITEM DESCRIPTION QTY 1 PV MODULE 2 1 3 PVC JUNCTION BOX 4"x4"x2" UL LISTED WATER TIGHT NEMA TYPE 3 1 4 MAIN METER 1 5 MAIN SERVICE PANEL 1 6 2 3 120% RULE CALCULATION PER NEC 705.12(D)(2)(3) MAIN BUSBAR RATING:AMPS MAIN SERVICE BREAKER RATING:AMPS PV BACKFEDING CURRENT:AMPS BUSBAR X 120%- MAIN BREAKER = MAX PV BREAKER 100A - = 50A AC SYSTEM SIZE CALCULATION Module PTC Rating (W)x NO. of Modules x Average Inverter CEC Efficiency =AC System Size x x = kW AC 1 ( ) #10 AWG, CU-THWN-2 (1) #12 AWG, CU-THWN-2 EGC 40 X .71 X 3/4" EMT 2 Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR 120/240V 1P,3W TOP FED MAIN C/B 5 10 0 A (E) 100A MAIN SERVICE PANEL, WITH 100A MAIN BREAKERS EXISTING 100A MAIN SERVICE PANEL 20A 2 1 = 28.4 >= WIRE CHART # MAX AMPS X NEC MULT = DESIGN AMPS BREAKER SIZE (A)WIRE TYPE EGC WIRE RATING X TEMP DERATE X CONDUCTOR DERATE = DERATED WIRE CONDUIT SIZE # MAX AMPS X NEC MULT = DESIGN AMPS BREAKER SIZE (A)WIRE TYPE WIRE RATING X TEMP DERATE X CONDUCTOR DERATE = DERATED WIRE CONDUIT SIZE 4 M UTILITY METER 120/240V , 1P, 3W, 30A 7 AC Disconnect 30A 2P BLADE TYPE 240V NON-FUSIBLE AC DISCONNECT 1 7 3 3 --20A (3) #10 AWG, CU-THWN-2 (1) #12 AWG, CU-THWN-2 EGC 3/4" EMT 20A 100A 100A 100A MICROINVERTER REC SOLAR REC410 AA Pure Black Voc =49.0V, Vmp = 42.7V Isc =10.35A, Imp = 9.61A 391.22 3.794 1 ENPHASE COMBINER BOX (N)ENPHASE IQ COMBINER 3 WITH ENVOY 3G PV MONITORING SYSTEM (X-IQ-AM1-240-3) 120/240V, NEMA 3R 2 Enphase 15A 97% (N) ENPHASE IQ8+ MICROINVERTERS IQ8PLUS-72-2-US (240V) [SI1]) PEAK PWR TRACKING VOLTAGE: =29-45V CEC EFFICIENCY : = 97.0 % ENCLOSURE : NEMA 6 MAXIMUM INPUT CURRENT: = 15 A MAXIMUM OUTPUT CURRENT: = 1.21 A MAXIMUM INPUT POWER: = 235 - 440W+ MAXIMUM OUTPUT POWER: = 290 VA 10 10X1.25X1.21=15.12A 40 X .91 X 1 = 36.4 >= 15.1220A(3) #10 AWG, CU-THWN-2 (1) #12 AWG, CU-THWN-2 EGC 3/4" EMT 10 10 10X1.25X1.21=15.12A 20A 15.12 10X1.25X1.21=15.12A 20A (2)#12AWG, ENPHASE Q CABLE (1) #6 BARE SOLID COPPER GEC 30 X .71 X 1 = 21.3 >= 15.12 IN FREE AIR ... 1 6 String : (10) Modules, (10) Microinverters 20A a a 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 PV-2 SIGNAGE MARKINGS, LABELS AND WIRING SIGNS A. Purpose: Provide emergency responders with appropriate warning and guidance with respect to isolating solar electric system. This can facilitate identifying energized electrical lines that connect solar panels to the inverter, as these should not be cut when venting for smoke removal B. Main Service Disconnect. 1. Residential buildings - The marking may be placed within the main service disconnect. The marking shall be placed outside cover if the main service disconnect is operable with the service panel closed. 2. Commercial buildings - The marking shall be placed adjacent to the main service disconnect clearly visible from the location where the level is operated 3. Markings: Verbiage, Format and Type of Material. a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All letters shall be capitalized. Arial or similar font, non bold. c. Material: Reflective, weather resistant material suitable for the environment (use UL - 969 as standard for weather rating). Durable adhesive materials meet this requirement. C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC combiners and junction boxes: 1. Markings: Verbiage, Format and Type of Material. a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turns, above and for below penetrations, all DC combiners and junction boxes b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall adhere to "V. V-3b, c" of this requirement. c. Inverters are not required to have caution markings 1.Marking is required on all interior and exterior DC conduit raceways,enclosures,cable assemblies,and junction boxes,combiner boxes and disconnects. 2.The materials used for marking shall be reflective,weather resistant material suitable for the environment. Minimum 3/8 "letter height; all upper case letters Arial or similar font; Red background with white lettering. 3.Marking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE. 4.Marking shall be placed adjacent to the main service disconnect in a location clearly visible from the location where the disconnect is operated CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR 1 2 (STICKER TO BE LOCATED ON CONDUIT WITH DC CURRENT EVERY 4' HORIZONTALLY OR 10' VERTICALLY AND 1' FROM EACH SIDE OF A BEND) 3 4 10 (TO BE LOCATED ON SUB-PANEL ONLY WHEN SUB-PANEL IS DEDICATED FOR PV ONLY) 5 6 7 8 (STICKER LOCATED INSIDE PANEL NEXT TO SOLAR BREAKER) 9 (STICKER LOCATED INSIDE PANEL BELOW PV BREAKER) PV ARRAY J BOX PV SUB-PANEL * if applicable SUB-PANEL * if applicable AC DISCONNECT * if applicable METER MAIN SERVICE PANEL 2 1 5 6 8 7 9 6 8 7 9 6 6 8 7 9 12 (STICKER LOCATED ON THE PV SUB PANEL) 10 11 (STICKER LOCATED ON THE MAIN SERVICE PANEL) 11 CAUTION AUTHORIZED SOLAR PERSONNAL ONLY! CAUTION SOLAR DC CURRENT PRESENT DURING DAYLIGHT HOURS WARNING! ELECTRIC SHOCK HAZARD. IF GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. WARNING! ELECTRIC SHOCK HAZARD. DO NOT TOUCH THE TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. PV LOAD CENTER SIZED FOR PV BREAKERS ONLY OR RENDERED UNABLE TO ACCEPT ANY ADDITIONAL LOADS. PV SUB-PANEL ONLY AC DISCONNECT AC PHOTOVOLTAIC POWER SOURCE RATED AC OUTPUT CURRENT: MAX NOMINAL AC OPERATING VOLTAGE: Vac THIS PANEL FED BY MULTIPLE SOURCES (UTILITY & SOLAR) SOLAR WARNING! INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUT DOWN 13 (RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM) SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS 240 RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM 15.12A SERVICE POINT & UTILITY METERING AC DISCONNECT ENPHASE COMBINER You Are Here SOLAR PV ARRAY N 0 ° S 180 ° E 90 ° W 270 ° 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR MONITORING PAGE PV-3 Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 180° AZIMUTH ±18° SLOPE 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 COVER SHEET Contractor: Vibe Solar Project: Nhat Duong Project Address: 2018 W 11th St Unit #2 Santa Ana, CA 92703 Photovoltaic sheets PV.0, PV.1, PV.2, PV.3 Electrical sheets E-1 Structural sheets S-1, S-2 PE Calculations Supporting Documents 7, 8, 9, 10, 11, 12, 13 Solar Permit Application Residential Solar Checklist Contractors State Business License City of Santa Ana Business License Authorization letter 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 Expedited Permit Process for PV Systems - Micro-Inverter1 Expedited Permit Process for PV Systems Micro-Inverter The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Micro-Inverter to use with the Expedited Per- mit Process. The Standard String, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 Expedited Permit Process for PV Systems — Micro-Inverter 2 Expedited Permit Process for Small-Scale PV Systems Micro-Inverter The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Micro-Inverter Site Plan             18'' fire setback 36 ' ' f i r e s e t b a c k 36 ' ' f i r e s e t b a c k Solar PV Array 10 - REC 410W Modules 10 - IQ8+ Microinverters Pitch: 18 Deg Orientation: 180 Deg JB MSP ACD ECB AC UNIT AC UNIT W 11th St MAIN HOUSE ADU Roof Access 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Micro-Inverter Electrical Diagram Contractor Name, Address and Phone:One-Line Standard Electrical Diagram for Micro-Inverter PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.1a SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A SAME SAME CONDUIT SIZE N/A N/A N/A SAME SAME DESCRIPTION PV DC or AC MODULE DC/AC INVERTER (MICRO) J-BOX (IF USED) PV ARRAY AC COMB. PANEL (IF USED) GEN METER (IF USED) AC DISCONNECT (IF USED) SERVICE PANEL TAG 1 2 3 4 5 6 7 8 PART NUMBER NOTES FOR UNUSED MODULES PUT "N/A” in BLANK ABOVE 1 1 3 2 3 EQUIPMENT SCHEDULE 2 _____ MICRO-INVERTERS IN BRANCH- CIRCUIT MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC MOD ____ DC AC J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 6 7 8 5 4 5 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ MICRO-INVERTERS IN BRANCH- CIRCUIT 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Contractor Name, Address and Phone:Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV E1.2a SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH MICRO-INVERTER CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ____oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE.b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix E): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) No sign necessary since 690.51 marking on PV module covers needed information AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Notes for Micro-Inverter Electrical Diagram 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 City of Santa Ana I, Nhat Duong, grant Vibe Solar the authorization to install solar on my property at 2018 W 11th Street Unit #2, Santa Ana, CA 92703. Thank you, Nhat Duong 03/29/2024 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 Document History SignNow E-Signature Audit Log All dates expressed in MM/DD/YYYY (US) Document name:Nhat Duong Authorization letter Document created:03/29/2024 19:21:35 Document pages:1 Document ID:054c4f096948441488b908b4ae6ad4310b4ad371 Document Sent:03/29/2024 19:22:50 UTC Document Status:Signed 03/29/2024 20:02:39UTC Sender:alantruex@vibesolar.com Signers:duongbaonhat@yahoo.com CC:ani@vibesolar.com Client Event By Server Time Client Time IP Address SignNow Web Application Uploaded the Document alantruex@vibesolar.com 03/29/2024 19:21:35 pm UTC 03/29/2024 19:21:35 pm UTC 98.97.124.15 SignNow Web Application Viewed the Document alantruex@vibesolar.com 03/29/2024 19:21:44 pm UTC 03/29/2024 19:21:44 pm UTC 98.97.124.15 SignNow Web Application Document Saved alantruex@vibesolar.com 03/29/2024 19:22:44 pm UTC 03/29/2024 19:22:45 pm UTC 98.97.124.15 SignNow Web Application Invite Sent to: duongbaonhat@yahoo.com alantruex@vibesolar.com 03/29/2024 19:22:51 pm UTC 03/29/2024 19:22:51 pm UTC 98.97.124.15 SignNow Web Application Viewed the Document duongbaonhat@yahoo.com 03/29/2024 20:02:23 pm UTC 03/29/2024 20:02:22 pm UTC 172.58.0.56 SignNow Web Application Signed the Document duongbaonhat@yahoo.com 03/29/2024 20:02:38 pm UTC 03/29/2024 20:02:38 pm UTC 172.58.0.56 SignNow Web Application Document Saved duongbaonhat@yahoo.com 03/29/2024 20:02:39 pm UTC 03/29/2024 20:02:38 pm UTC 172.58.0.56 SignNow Web Application Signer duongbaonhat@yahoo.com received a signed document copy duongbaonhat@yahoo.com 03/29/2024 20:02:47 pm UTC 03/29/2024 20:02:38 pm UTC 172.58.0.56 SignNow Web Application Viewed the Document alantruex@vibesolar.com 03/29/2024 21:22:24 pm UTC 03/29/2024 21:22:24 pm UTC 98.97.124.15 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 City of Santa Ana I, Nhat Duong, grant Vibe Solar the authorization to install solar on my property at 2018 W 11th Street Unit #2, Santa Ana, CA 92703. Thank you, Nhat Duong 03/29/2024 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 Document History SignNow E-Signature Audit Log All dates expressed in MM/DD/YYYY (US) Document name:Nhat Duong Authorization letter Document created:03/29/2024 19:21:35 Document pages:1 Document ID:054c4f096948441488b908b4ae6ad4310b4ad371 Document Sent:03/29/2024 19:22:50 UTC Document Status:Signed 03/29/2024 20:02:39UTC Sender:alantruex@vibesolar.com Signers:duongbaonhat@yahoo.com CC:ani@vibesolar.com Client Event By Server Time Client Time IP Address SignNow Web Application Uploaded the Document alantruex@vibesolar.com 03/29/2024 19:21:35 pm UTC 03/29/2024 19:21:35 pm UTC 98.97.124.15 SignNow Web Application Viewed the Document alantruex@vibesolar.com 03/29/2024 19:21:44 pm UTC 03/29/2024 19:21:44 pm UTC 98.97.124.15 SignNow Web Application Document Saved alantruex@vibesolar.com 03/29/2024 19:22:44 pm UTC 03/29/2024 19:22:45 pm UTC 98.97.124.15 SignNow Web Application Invite Sent to: duongbaonhat@yahoo.com alantruex@vibesolar.com 03/29/2024 19:22:51 pm UTC 03/29/2024 19:22:51 pm UTC 98.97.124.15 SignNow Web Application Viewed the Document duongbaonhat@yahoo.com 03/29/2024 20:02:23 pm UTC 03/29/2024 20:02:22 pm UTC 172.58.0.56 SignNow Web Application Signed the Document duongbaonhat@yahoo.com 03/29/2024 20:02:38 pm UTC 03/29/2024 20:02:38 pm UTC 172.58.0.56 SignNow Web Application Document Saved duongbaonhat@yahoo.com 03/29/2024 20:02:39 pm UTC 03/29/2024 20:02:38 pm UTC 172.58.0.56 SignNow Web Application Signer duongbaonhat@yahoo.com received a signed document copy duongbaonhat@yahoo.com 03/29/2024 20:02:47 pm UTC 03/29/2024 20:02:38 pm UTC 172.58.0.56 SignNow Web Application Viewed the Document alantruex@vibesolar.com 03/29/2024 21:22:24 pm UTC 03/29/2024 21:22:24 pm UTC 98.97.124.15 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 Structural Engineering Letter Date: 03/29/2024 Project Name: Nhat Duong Project Address: 2018 W 11th St Unit #2 , Santa Ana, CA, 92703 Contractor : Vibe Solar Contractor Address : 1206 Commerce Center Dr #103 Lancaster, CA 93534 Attn : To Whom It May Concern A Field observation of the condition of the existing framing system was performed by an audit team from Vibe Solar. From the Field observation of the property, the existing roof structure observed as follows: Existing roof is supported by 2 x 6 @ 24" rafters at the solar array. The rafters are sloped at approximately 18 degree and have maximum projected horizontal span of 11 feet in between load bearing supports. Design Criteria Applicable codes: 2022 California Building Code ASCE 7-16 Ground Snow Load: 0 psf Roof Dead Load: 20 psf Wind speed: 95 mph Risk Category: II I certify that the capacity of the structural roof framing that directly supports the additional gravity loading due to the solar panel supports and modules had been reviewed and determined to meet or exceed the requirements in accordance with the Design Criteria. If you have any questions or concerns please contact us, Engineerinc.io, 303 N Glenoaks Blvd Suite 200 Burbank, CA 91502 (310) 928-0938 new@engineerinc.io Date Certified and Exp. Date : 3/31/2026 Signed:03/29/2024 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 Date: 03/29/2024 Job Number: 24-00319 Prepared for : Vibe Solar, 1206 Commerce Center Dr #103 Lancaster, CA 93534 Project.: Nhat Duong , 2018 W 11th St Unit #2 , Santa Ana, CA, 92703 The following calculations are for the structural engineering design of the photovoltaic panels and are valid only for the structural info referenced in the stamped plan set. The verification of such info is the responsibility of others. After review, I certify that the roof structure has sufficient structural capacity for the applied PV loads. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. Engineerinc.io 303 N Glenoaks Blvd Suite 200 Burbank, CA 91502 (310) 928-0938 new@engineerinc.io 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io Date Certified and Exp. Date : 3/31/2026 Signed:03/29/2024 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 Solar Module Details Module Type REC Module Quantity 10 Module Model Number 410 watt Design Criteria Code: 2022 California Building Code ASCE 7-16 Live Load (psf)20 Ult Wind Speed (mph)95 Exposure Cat C Ground Snow (psf)0 Structure Geometry Eave Height, he (ft)15 to 20ft Pitch of main roof (deg)18 Building Length, L (ft)45 Building Width, B (ft)25 Roof Area (Module Area) ft2 1125.00 Standoff(i.e., Roof Mount) Spacing Feet 4` Roof Properties Roof Geometry type Mono Slope Roof Roof Type Single Span Rafter Roof Pitch (deg)18 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 Roofing Type Comp Shingles Sheathing Type 1/2" OSB Board Wood species No. 2, Douglas Fir-Larch Wood Fb (psf)900 Wood Fv (psf)180 Wood E (psf)1600000 Purlin C/C Spacing (in)12 Rafter C/C. Spacing (in.)24 Purlin Section Thickness, b (in.)2 Section Depth, d (in.)4 Rafter Section Thickness, b (in.)2 Section Depth, d (in.)6 Maximum Rafter Span (ft)11 Factors Cd(wind)1.60 Cd(Snow)1.60 CLS 1.15 CM 1 Ct 1 CL 0.75 CF 1.5 Cfu 1 Cv 1 Cr 1 M allowable_wind 1020.94 M allowable_snow 733.80 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 Dead Load(psf) Comp Shingles 3.00 psf 1/2" OSB Board 2.00 psf Insulation 2.00 psf Total Roof 1DL 7 psf No. 2, Douglas Fir-Larch 31.00 lb/ft3 Solar Panel DL 3.00 psf Roof 1 Roof_Dist_DL 7.00 psf M_Roof_Dist_DL 4651.24 Def_Roof_Dist_DL 1.76 PV_uni_Dist_DL 3.00 psf M_PV_uni_Dist_DL 39.02 Def_PV_uni_Dist_DL 0.01 Total_Uni_DL 11.00 psf M_Total_DL 4690.26 Def_Total_DL 1.78 Snow Load(psf) Ground Snow Load, pg 0 Importance Factor, Ic 1 Thermal Factor, Ct 1 Exposure Factor, Ce 1 Flat roof snow, pF 0 Slope Factor, Cs 1 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 Sloped Row Snow, ps 0 Uni_Dist_S 0.00 M_uni_Dist_s 0.00 Def_uni_Dist_S 0.00 Wind Load Ultimate Wind Speed 95 Directionality Factor,kd 0.85 Topographic factor 1.00 Velocity pressure exposure factor,kz 0.88 Ground Elevation Factor,ke 0.07 Side Wall Width 25 Median Roof Height 3.28 Velocity pressure,qz 17.28 External Pressure Up,GCp_1 -0.38 External Pressure Up,GCp_2 -0.56 External Pressure Up,GCp_3 -0.9 External Pressure Down,GCp 0.12 Design Pressure Up,p_1 -5.49 Design Pressure Up,p_2 -8.09 Design Pressure Up,p_3 -13.00 Design Pressure Up,p 1.73 Uni_Dist_W_up -13.00 M_uni_Dist_W_up -196.63 Def_uni_Dist_W_up -0.07 Uni_Dist_W_down 1.73 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 M_uni_Dist_W_down 26.17 Def_uni_Dist_W_down 0.01 Lag Screw Uplift Check (ASD) 5/16" Lag Screw Withdrawl value 205.00 lb/in Lag Screw Penetration 2.50 in Roof1 0.6D+0.6W(up z1)2026.338 > 512.5 Roof1 0.6D+0.6W(up z2)2024.778 > 512.5 Framing Check (ASD): Roof1 uni 1.0D+0.6W 4705.96 > 1020.94 Lag Screw Penetration 4702.04 > 1020.94 Roof1 0.6D+0.6W(up z1)4690.26 > 733.80 Roof1 0.6D+0.6W(up z2)2696.18 > 1020.94 Seismic Check: Wood 5.00 psf 2x4 Studs @ 16"2.00 psf Gypsum 3.00 psf Misc(insulatioon,etc)2.00 psf Total wall DL 12.00 psf Total Wall Area (Approx)1715.00 ft2 Total Wall W 20580 lbs Total Roof DL 7.50 psf Total Roof Area (Approx)630.84 ft2 Total Roof W 4731.3 lbs 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 OK PV Panel W 3.00 psf Area of panel 200.00 ft2 Total Roof W 369.42 lbs % increase=(Wadditional)/Wexisting 1.54% The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. Limits of Scope of Work and Liability Existing structure is assumed to have been designed and constructed following appropriate codes at time of erection, and assumed to have appropriate permits. The calculations produced are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were completed according to generally recognized structural analysis standards and procedures, professional engineering and design experience, opinions and judgements. Existing deficiencies which are unknown or were not observable during time of inspection are not included in this scope of work. All PV modules, racking, and mounting equipment shall be designed and installed per manufacturer's approved installation specifications. The Engineer of Record and Engineerinc assume no responsibility for misuse or improper installation. This analysis is not stamped for water leakage. Framing was determined based on information in provided plans and/or photos, along with engineering judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any concerns prior to starting construction. Prior to the commencement of work, the contractor shall verify the existing roof and framing conditions. Notify Engineerinc and the engineer of record of any Discrepancies prior to starting construction. Prior to the commencement of work, the contractor shall inspect framing for any damage such as water damage, cracked framing, etc. and notify the E.O.R. if any issues are found.These plans/calculations are stamped for structural code compliance of the roof framing supporting the proposed PV installation reference only. These plans/calculations are not stamped for water leakage. PV modules, racking, and attachment components must follow manufacturer guidelines and requirements. 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 INVERTER DATA SHEET7 Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 MODULE DATA SHEET8 Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 9 ECB DATA SHEET Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 RACKING DATA SHEET Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR 10 Date Certified and Exp. Date : 3/31/2026 Signed:04/03/2024 Date Certified and Exp. Date : 3/31/2026 Signed:04/03/2024 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________88083 03/31/2026 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (310) 928-0938 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________8808303/31/2026 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (310) 928-0938 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 11 ATTACHMENT DATA SHEET Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR Date Certified and Exp. Date : 3/31/2026 Signed:04/03/2024 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________88083 03/31/2026 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (310) 928-0938 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________8808303/31/2026 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (310) 928-0938 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 12 Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR RSD DATA SHEET 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 13 Project Name: Property address: APN: 03/21/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR RACKING CLASSIFICATION Date Certified and Exp. Date : 3/31/2026 Signed:04/03/2024 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________88083 03/31/2026 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 (310) 928-0938 2018 W Eleventh St Unit# 2- 101118849 & 20182506 4/11/2024 2018 W Eleventh St Unit# 2- 101118849 & 201825064/11/2024 SITE PLANS-1 Main Service Panel INDEX MSP Project Name: Property address: APN: 12/13/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR AC DisconnectACD Distribution PanelDP Enphase Combiner BoxECB 1. In the case of emergency, call_____________________at Work Phone #__________________or Home Phone #___________________. 2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum extent practicable. 3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage facilities or adjacent properties via runoff, vehicle tacking, or wind. 4. Appropriate BMP's for construction-related materials, wastes, spills shall be implemented to minimize transport from the site to streets, drainage facilities, or adjoining properties by wind or runoff. 5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce or remove sediment and other pollutants.6. All construction contractor and subcontractor personnel are to be made aware or the required best management practices and good housekeeping measures for the project site and any associated constructionstaging areas. 7. At the end of each day of construction activity all construction debris and waste materials shall be collected and properly disposed in trash or recycle bins. 8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or pollutants off the site. Discharges of material other than stormwater only when necessary forperformance andcompletion of construction practices and where they do not: cause or contribute to a violation of any water quality standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardoussubstance ina quantity reportable under Federal Regulations 40 CFR Parts 117 and 302. 9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paintflakesor stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment wash water and concrete wash water; concrete, detergent or floatable wastes; wastes from anyengine/equipment steam cleaning or chemical degreasing and superchlorinated potable water line flushing. During construction, permittee shall dispose of such materials in a specified and controlled temporaryarea on -site, physically separated from potential stormwater runoff, with ultimate disposal in accordance with local, state and federal requirements. 10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited. Dewatering of non-contaminated groundwater requires a National Pollutant Discharge EliminationSystem Permit from the respective State Regional Water Quality Control Board. 11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each working day. Drainage is to be directed toward desilting facilities. 12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent public trespass onto areas where impounded water creates a hazardous condition. 13. The permittee and contractor shall inspect the erosion control work and insure that the work is in accordance with the approved plans. 14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property owners: that dumping of chemicals into the storm drain system or the watershed is prohibited. 15. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary materials shall be available on site and stockpiled at convenient locations to facilitate rapidconstruction of temporary devices when rain is imminent. 16. All removable erosion protective devices shall be in place at the end of each working day when the 5-Day Rain Probability Forecast exceeds 40%. 17.Sediments from areas disturbed by construction shall beretained on site using an effective combination of erosion and sediment controls to the maximum extent practicable, and stockpiles of soil shall be properly containted to minimize sediment transport from the site tostreets, drainage facilities of adjacent properties via runoff,vehicle tracking, or wind. 18. Appropriate BMPs for construction-related materials, wastes, spills or residues shall be implemented and retained on site to minimize transport from the site to streets, drainage facilities, or adjoining property bywind or runoff 112' 59' 112' 59' 95'-11" 24'-5" 20' 6' MSP ACD ECB AC UNIT AC UNIT PROPERTY LINE W 11th St MAIN HOUSE ADU Driveway DP SCALE: 1/16" = 1'-0" S 180 ° E 90 ° W 270 ° N 0° Exp. Date: 12/31/2025 Date Certified and Signed: 12/23/2024 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________ 57196 12/31/2025 Engineerinc.io, 303 N Glenoaks Blvd #200 Burbank, CA 91502 (310) 928-0938 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Elec#: 20184832 Revision to: Bldg#: 101118849 Elec#: 20182506 Approvals: Elec: M Smith 2018 W Eleventh St Unit# 21/27/2025 WIRE SIZE CALCULATIONE-1 PERCENT OF VALUES NUMBER OF CURRENT CARRYING CONDUCTORS IN EMT .80 4-6 .70 7-9 .50 10-20 #ITEM DESCRIPTION QTY 1 PV MODULE 2 1 3 PVC JUNCTION BOX 4"x4"x2" UL LISTED WATER TIGHT NEMA TYPE 3 1 4 MAIN METER 1 5 MAIN SERVICE PANEL 1 6 2 3 120% RULE CALCULATION PER NEC 705.12(D)(2)(3) DISTRIBUTION PANEL BUSBAR RATING:AMPS MAIN SERVICE BREAKER RATING:AMPS PV BACKFEDING CURRENT:AMPS BUSBAR X 120%- MAIN BREAKER = MAX PV BREAKER 240A - = 140A AC SYSTEM SIZE CALCULATION Module PTC Rating (W)x NO. of Modules x Average Inverter CEC Efficiency =AC System Size x x = kW AC 1 ( ) #10 AWG, CU-THWN-2 (1) #12 AWG, CU-THWN-2 EGC 40 X .71 X 3/4" EMT 2 Project Name: Property address: APN: 12/13/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR 5 100A (E) 100A MAIN SERVICE PANEL, WITH 100A MAIN BREAKERS 2 1 = 28.4 >= WIRE CHART # MAX AMPS X NEC MULT = DESIGN AMPS BREAKER SIZE (A)WIRE TYPE EGC WIRE RATING X TEMP DERATE X CONDUCTOR DERATE = DERATED WIRE CONDUIT SIZE # MAX AMPS X NEC MULT = DESIGN AMPS BREAKER SIZE (A)WIRE TYPE WIRE RATING X TEMP DERATE X CONDUCTOR DERATE = DERATED WIRE CONDUIT SIZE 4 M UTILITY METER 120/240V , 1P, 3W, 30A 7 AC Disconnect 30A 2P BLADE TYPE 240V NON-FUSIBLE AC DISCONNECT 1 7 3 3 --20A (3) #10 AWG, CU-THWN-2 (1) #12 AWG, CU-THWN-2 EGC 3/4" EMT 8 DISTRIBUTION PANEL (E)200A DISTRIBUTION PANEL 240V 1P, 3W 1 8 20A 20A 100A 200A 100AMICROINVERTER REC SOLAR REC410 AA Pure Black Voc =49.0V, Vmp = 42.7V Isc =10.35A, Imp = 9.61A 391.22 3.794 1 ENPHASE COMBINER BOX (N)ENPHASE IQ COMBINER 3 WITH ENVOY 3G PV MONITORING SYSTEM (X-IQ-AM1-240-3) 120/240V, NEMA 3R 2 Enphase 15A 97% (N) ENPHASE IQ8+ MICROINVERTERS IQ8PLUS-72-2-US (240V) [SI1]) PEAK PWR TRACKING VOLTAGE: =29-45V CEC EFFICIENCY := 97.0 % ENCLOSURE : NEMA 6 MAXIMUM INPUT CURRENT: = 15 A MAXIMUM OUTPUT CURRENT: = 1.21 A MAXIMUM INPUT POWER: = 235 - 440W+ MAXIMUM OUTPUT POWER: = 290 VA 10 10X1.25X1.21=15.12A 40 X .91 X 1 = 36.4 >= 15.1220A(3) #10 AWG, CU-THWN-2 (1) #12 AWG, CU-THWN-2 EGC 3/4" EMT 10 10 10X1.25X1.21=15.12A 20A 15.12 10X1.25X1.21=15.12A 20A (2)#12AWG, ENPHASE Q CABLE (1) #6 BARE SOLID COPPER GEC 30 X .71 X 1 = 21.3 >= 15.12 IN FREE AIR ... 1 6 String : (10) Modules, (10) Microinverters 20A a a M100A Existing Conduit 2018 W Eleventh St Unit# 21/27/2025 PV-2 SIGNAGE MARKINGS, LABELS AND WIRING SIGNS A. Purpose: Provide emergency responders with appropriate warning and guidance with respect to isolating solar electric system. This can facilitate identifying energized electrical lines that connect solar panels to the inverter, as these should not be cut when venting for smoke removal B. Main Service Disconnect. 1. Residential buildings - The marking may be placed within the main service disconnect. The marking shall be placed outside cover if the main service disconnect is operable with the service panel closed. 2. Commercial buildings - The marking shall be placed adjacent to the main service disconnect clearly visible from the location where the level is operated 3. Markings: Verbiage, Format and Type of Material. a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All letters shall be capitalized. Arial or similar font, non bold. c. Material: Reflective, weather resistant material suitable for the environment (use UL - 969 as standard for weather rating). Durable adhesive materials meet this requirement. C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC combiners and junction boxes: 1. Markings: Verbiage, Format and Type of Material. a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turns, above and for below penetrations, all DC combiners and junction boxes b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall adhere to "V. V-3b, c" of this requirement. c. Inverters are not required to have caution markings 1.Marking is required on all interior and exterior DC conduit raceways,enclosures,cable assemblies,and junction boxes,combiner boxes and disconnects. 2.The materials used for marking shall be reflective,weather resistant material suitable for the environment. Minimum 3/8 "letter height; all upper case letters Arial or similar font; Red background with white lettering. 3.Marking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE. 4.Marking shall be placed adjacent to the main service disconnect in a location clearly visible from the location where the disconnect is operated CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: Project Name: Property address: APN: 12/13/2024DATE: Nhat Duong 2018 W 11th St Unit #2 Santa Ana, CA 92703 00417320 Vibe Solar Lic #: 1036012, C-10 Address: 1206 Commerce Center Dr #103 Lancaster, CA 93534 Phone number: (661) 485-5000 E-mail: xiomara@vibesolar.com CONTRACTOR 1 2 (STICKER TO BE LOCATED ON CONDUIT WITH DC CURRENT EVERY 4' HORIZONTALLY OR 10' VERTICALLY AND 1' FROM EACH SIDE OF A BEND) 3 4 10 (TO BE LOCATED ON SUB-PANEL ONLY WHEN SUB-PANEL IS DEDICATED FOR PV ONLY) 5 6 7 8 (STICKER LOCATED INSIDE PANEL NEXT TO SOLAR BREAKER) 9 (STICKER LOCATED INSIDE PANEL BELOW PV BREAKER) PV ARRAY J BOX PV SUB-PANEL * if applicable SUB-PANEL * if applicable AC DISCONNECT * if applicable METER MAIN SERVICE PANEL 2 1 5 6 8 7 9 6 8 7 9 6 6 8 7 9 12 (STICKER LOCATED ON THE PV SUB PANEL) 10 11 (STICKER LOCATED ON THE MAIN SERVICE PANEL) 11 CAUTION AUTHORIZED SOLAR PERSONNAL ONLY! CAUTION SOLAR DC CURRENT PRESENT DURING DAYLIGHT HOURS WARNING! ELECTRIC SHOCK HAZARD. IF GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. WARNING! ELECTRIC SHOCK HAZARD. DO NOT TOUCH THE TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. PV LOAD CENTER SIZED FOR PV BREAKERS ONLY OR RENDERED UNABLE TO ACCEPT ANY ADDITIONAL LOADS. PV SUB-PANEL ONLY AC DISCONNECT AC PHOTOVOLTAIC POWER SOURCE RATED AC OUTPUT CURRENT: MAX NOMINAL AC OPERATING VOLTAGE: Vac THIS PANEL FED BY MULTIPLE SOURCES (UTILITY & SOLAR) SOLAR WARNING! INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUT DOWN 13 (RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM) SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS 240 RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM 15.12A SERVICE POINT & UTILITY METERING AC DISCONNECT ENPHASE COMBINER You Are Here SOLAR PV ARRAY DISTRIBUTION PANEL N 0 ° S 180 ° E 90 ° W 270 ° 2018 W Eleventh St Unit# 21/27/2025 PCC-13 Rev. 06-17-2019 White-Plan Check Yellow-Applicant REVISION /SUPPLEMENTAL PLAN CHECK REQUEST PCC-13 CBC 2019 Rev 4/2022 Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org Project Address: _________________________________________ Suite #_______________________________ New Plan Check No.____________________________________________________________________________ Original Plan Check No.:__________________________________ Permit Issuance Date:____________________ Original Plan Checker: __________________________________________________________________________ Amount Paid: $__________________________________________ Misc. Receipt #: ________________________ Processed by: ___________________________________________ Date: ________________________________ Plan Checker Approval: ___________________________________ Date: ________________________________ Additional Hours:________________________________________ @ $247.72 = $ _________________________ Print Name:_____________________________________________ Signature: ____________________________ Representing: ________________________________________________________________________________ Telephone: ( ) ____________________________________ Fax: ( ) __________________________________ Contact Person: ________________________________________ Telephone: ( ) ________________________ E-mail (Strongly Recommended): _________________________________________________________________ PLANS PREPARED BY AN ARCHITECT OR ENGINEER MUST BE SIGNED BY THE PROFESSIONAL WHO PREPARES THEM. PLEASE WRITE A BRIEF DESCRIPTION OF THE REVISION/SUPPLEMENT AND IF POSSIBLE AREA OF WORK. ALL REVI- SIONS ARE TO BE CLOUDED AND PROPERLY IDENTIFIED: (i.e. Deltas, Sheet Numbers, etc.). Electrical, Plumbing and/or Mechanical plans – stamped job set shall accompany revised plans. ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ 2018 W 11th St Unit #2 Santa Ana, CA 92703 101118849 4/10/2024 Ani Quintanilla Vibe Solar Ani Quintanilla 625-5896 485-5000 818 661 ani@vibesolar.com REVISION: Equipment location is changed / Distribution panel is added 2018 W Eleventh St Unit# 21/27/2025