HomeMy WebLinkAboutFLOOD ZONE - 4810 W Sixth St Unit# 2 - PlanBldg #101122162
APPROVALS:
PLNG - C. Santana
BLDG - J. Lo
POLICE - B. Martin
PUBLIC WORKS - B. Sarlak
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
PR
O
J
E
C
T
A
D
D
R
E
S
S
#DATE REVISION
REVISIONS
SHEET DESCRIPTION
TITLE 24
SHEET #
T24.1
DATE PROJECT #
RESIDENTIAL TITLE 24
DOCUMENTS &
HVAC DESIGN SERVICES
LITTLE TREE ENERGY
CONSULTING, LLC
D.B.A. TITLE 24 ASAP
23546 COMMUNITY ST
WEST HILLS, CA 91304
LINA@TITLE24ASAP.COM
CALL/TEXT (833) 482-4362
TITLE 24 ASAP
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
PR
O
J
E
C
T
A
D
D
R
E
S
S
#DATE REVISION
REVISIONS
SHEET DESCRIPTION
TITLE 24
SHEET #
DATE PROJECT #
RESIDENTIAL TITLE 24
DOCUMENTS &
HVAC DESIGN SERVICES
LITTLE TREE ENERGY
CONSULTING, LLC
D.B.A. TITLE 24 ASAP
23546 COMMUNITY ST
WEST HILLS, CA 91304
LINA@TITLE24ASAP.COM
CALL/TEXT (833) 482-4362
TITLE 24 ASAP
T24.2
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
PR
O
J
E
C
T
A
D
D
R
E
S
S
#DATE REVISION
REVISIONS
SHEET DESCRIPTION
TITLE 24
SHEET #
DATE PROJECT #
RESIDENTIAL TITLE 24
DOCUMENTS &
HVAC DESIGN SERVICES
LITTLE TREE ENERGY
CONSULTING, LLC
D.B.A. TITLE 24 ASAP
23546 COMMUNITY ST
WEST HILLS, CA 91304
LINA@TITLE24ASAP.COM
CALL/TEXT (833) 482-4362
TITLE 24 ASAP
T24.3
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
SANTA ANA CITY COUNCIL
Mayor
vamezcua@santa-ana.org
Mayor Pro Tem, Ward 1
tphan@santa-ana.org
Ward 2
bvazquez@santa-ana.org
Ward 3
jessielopez@santa-ana.org
Ward 4
pbacerra@santa-ana.org
Ward 5
jryanhernandez@santa-ana.org
Ward 6
dpenaloza@santa-ana.org
Valerie Amezcua
MAYOR PRO TEM
Thai Viet Phan
COUNCILMEMBERS
Phil Bacerra
Johnathan Ryan Hernandez
Jessie Lopez
David Penaloza
Benjamin Vazquez
CITY OF SANTA ANA
Planning and Building Agency
20 Civic Center Plaza ● P.O. Box 1988
Santa Ana, California 92702
www.santa-ana.org
CITY MANAGER
Alvaro Nuñez
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Jennifer L. Halll
August 8, 2024
Also sent via email to: westindevelopment@yahoo.com
Michael Vu
7291 Garden Grove Blvd
Suite J
Garden Grove, CA 92841
Subject: Address Assignment for a new detached Accessory Dwelling Unit (ADU) (APN: 100-581-
14) in Santa Ana, CA
Dear Mr. Vu,
The City of Santa Ana Planning and Building Agency (PBA) is the responsible agency for legal addressing
within the City of Santa Ana’s jurisdiction. This letter confirms the address assignment for new detached
ADU proposed at 4810 W. Sixth Street (APN: 100-581-14). Notice is hereby given that the following
assigned address(es) shall be posted onsite per the approved address plan, attached hereto as Exhibit
A.
Address(es) to be Activated/Posted
4810 W. Sixth Street, Unit 2
To subdivide commercial and/or residential units into multiple units, a building permit (and all other
associated permits), plans, and inspection approvals by the PBA are required. Address(es) will be verified
during inspections by the Building Safety Division.
Please update your records accordingly. Should you have any questions, feel free to contact me by phone
at 714-667-2728 or by email at CSantana@santa-ana.org.
Sincerely,
Cristian Santana
Cristian Santana
Assistant Planner I
Exhibit A – Address Plan
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Address Letter for 4810 W. Sixth Street
Page 2 of 2
c:
Vencent Quaglia, United States Post Office
Chris Tuiolosega, United States Post Office
Cipriano Corona, Marketing Manager, United States Post Office
Alex Alvarez, Postmaster Santa Ana, United States Post Office
Federal Express, Administration
Cathy Joseph, Garden Grove Unified School District
Christine Hy, Garden Grove Unified School District
Cathy Slader, Orange Unified School District
Orin Williams, Santa Ana Unified School District
Yvette Miranda, Santa Ana Unified School District
Cristina Bernal, Tustin Unified School District
Orange County Fire Authority
Neal Kelly, Registrar of Voters
Members, Board of Supervisors
Southern California Gas Company
Southern California Edison Company
Claude Parrish, County Assessor's Office
SAG, AT&T
UPS, Administration
City Manager’s Office
Beverly Martin, Police Community Services Specialist
Boris Duran, Police Systems Manager
Jennifer Mendoza, Police Communications Manager
Chris Hubbard, Police Systems Support Analyst
Alejandra Gutierrez, Treasury & Customer Services Manager
Hector Jimenez, Revenue Supervisor
Alfonso Chavez, Utilities Customer Services Supervisor
Judson Brown, Housing & Neighborhood Development Manager
Rudy Rosas, Principal Civil Engineer
Zdenek (Zed) Kekula, Principal Civil Engineer
Jason Kwak, Building Safety Manager
Evelyn LaRocca, Permit Supervisor
Kathy Hernandez, Permit Technician
Julie Amsden, Permit Technician
Ali Pezeshkpour, Planning Manager
Jerry Guevara, Senior Planner
Yvette Portugal, Code Enforcement Principal
Sergio Verino, Code Enforcement Principal
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Exhibit A
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
O R A N G E C O U N T Y F I R E A U T H O R I T Y
Plan Submittal Criteria Form
Required for Single Family or Duplex Residences
(Use Commercial form for lots with 3+ dwelling units or new residential tracts)
Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification.
Project Information
New Single Family Residence/Duplex Addition/Remodel ADU Other
Address: Unit #: City or Unincorporated County Area: ZIP:
Scope of Work:
Existing Area to Total Resulting Stories: Area Added in Past 2 Years
Yes No Questionnaire OCFA Plan Type if “Yes”
1. New – Is this a new single family residence or duplex? *(PR160) Residential Site
with Water Availability
2. ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has (PR400-402) Fire Sprinkler
Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire
sprinkler retrofit based on a threshold set by local ordinance?
(PR400-402) Fire Sprinkler
4. Distance – Is the most remote portion of the addition, ADU or other detached structure greater than *(PR160) Residential Site
5. Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non-
sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all
*(PR160) Residential Site
with Water Availability
6. Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or
removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed
(PR400-402) Fire Sprinkler
Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a
garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold
*(PR160) Residential Site
(PR400-402) Fire Sprinkler
8. Gate – Is a gate being installed across a driveway or road that is designated as a fire department
access roadway, or a driveway or road that serves more than a single home/duplex?
(PR180) Gate
9. Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal
Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas
seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only
applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000
*(PR160) Residential Site
*(PR172-174) Methane
Test/Mitigation Plans
10. Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to
slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation,
or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as
*(PR125) Fuel Modification
(PR182) Accessory
Structure
*OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals.
Applicant Certification
I certify, under penalty of perjury, under the laws of the State of California, that the information above is true:
Print Name:_______________________________________ Signature:___________________________________________ Date:______________
Phone Number:_____________________________________________ Email:_____________________________________________________________
Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a
written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required.
______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes”
and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral
Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination.
For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100
SFR
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
FLOOD ZONE - 4810 W Sixth
St Unit# 2
5/5/2025
Page 1 of 1
EXISTING ONE & TWO FAMILY DWELLINGS
ELECTRICAL SERVICES UNDERGROUND
EXCEPTION
CEC 2022 ELC-04
All new utility connections are required to be installed below grade by Santa Ana Municipal Code 41-
626(b). There is a standing exception for one and two family dwellings. This exception
applies only when the new electrical service is designed to be fed from below grade as well as
overhead.
This diagram is a typical unit. The utility is able to feed this cabinet from the top or the bottom without
interfering with the distribution wiring. All the circuit breakers and branch circuits are contained in the
circuit breaker side of this cabinet.
Only listed combination overhead and underground feed service boxes may be used to connect to
an overhead utility drop. This exception to an underground fed service applies only to existing single
family and two family residences.
Planning & Building Agency
Permits & Plan Check Section
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
Rigid
Conduit
Service
Entrance
Conductor
Riser
Underground
Service
Lateral
METER
Rev. 1/21/2020
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
GEOTECHNICAL INTERNATIONAL
LAN & ASSOCIATES
Land Survey & Civil, Structural & Geotechnical Engineering
13139 Harbor Boulevard, Garden Grove, CA 92843
Tel: (714) 414-9215, Fax: (714) 537 – 7974, Email: Lanpham9@hotmail.com
Project No. SA-03-09-24
September 16, 2024
Michael Vu
WESTIN DEVELOPMENT
714-878-7430
westindevelopment@yahoo.com
SUBJECT: Soil Report for Proposed New Detached ADU, 4810 W. 6th Street, Santa
Ana, CA 92703.
Dear Mr. Vu:
In accordance with the requirements of the City and per your request and authorization,
this soil report has been prepared for the proposed project.
It is noted that Geotechnical International was the project geotechnical consultant of
many similar projects in the City of Santa Ana. Therefore, we are familiar with the
geotechnical conditions of the site.
Follow is a summary of our findings and conclusions and recommendations for this
project.
Site Description and Proposed Development
The subject property is located on the southerly side of W. 6th Street, south of Hazard
Avenue, north of W. 5th Street (north of W. 1st Street), east of Rosita Street (east of N.
Euclid Street), west of N. Newhope Street, within a developed residential area.
A one-story house with an attached garage exists at the site.
Based on the Site Plan prepared by the designer, we understand that the proposed new
detached ADU will be located in the rear yard area.
Note to the geotechnical report reviewer: Please see the actual full-scale plans prepared
by the architect/designer/civil engineer which are separately submitted to the City for
review, for clarification/details of the proposed development, as needed.
The site is relatively flat; and we understand that additional raw cut/raw fill is not
proposed for the site.
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 2
Geotechnical Conditions
Based on the published geologic map prepared by the California Division of Mines and
Geology (CDMG), the site is located within a broad flat alluvium and colluvium area.
Based on the State of California SEISMIC HAZARD ZONES Map, Newport Beach
Quadrangle, the subject site is located within a potential liquefaction zone. For
conservative purposes, we assume that the site will be subjected to the liquefaction; and
to mitigate the potential adverse effects due to potential liquefaction, as for other recent
near-by projects, a strengthened foundation system is recommended to be used for the
proposed new structure.
To verify the near ground surface soils, a 5 ft. deep test hole has been drilled using a
hand-held drilling tool and soil samples were collected for laboratory testing. The
approximate location of the test hole is depicted on the Site Plan / Geotechnical Map. The
geotechnical boring log and summary of results of the laboratory testing are included in
Appendix B.
Based on the data of our test hole, the near ground surface earth materials generally
consisted of silty fine sand with minor clay and some gravel, damp to moist, medium
dense and have a very low expansion potential.
Groundwater
Free standing groundwater was not encountered in our test hole.
Based on the “Historically Highest Ground Water Contours and Borehole Log Data
Locations, Newport Beach Quadrangle”, Plate 1.2 of the Open-File Report 97-08
prepared by California Division of Mines and Geology (CDMG), Department of
Conservation, the historically highest groundwater level at the subject site is about 4.5 ft.
below the ground surface.
Free standing ground water was not reported to be an issue at the site and in the vicinity.
Deep footings/excavations are not proposed for the site; therefore adverse effects due to
groundwater are not anticipated for the proposed development.
Note: it is not anticipated; however, if wet soils are encountered, removal of the wet soils
and replacement with drier soils/cement slurry can be performed. In addition, if needed,
crushed rock and or geogrids for bridging, etc. can also be used. This will be determined
by the geotechnical consultant based on the exposed conditions during the excavations at
the site.
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 3
Seismicity
The subject site is located in Southern California, which is a major earthquake-prone
zone. Therefore, the owner(s) of this property should be aware of the seismic risks
associated with being located in this zone.
The Soil Site Class D Default can be used for the soils underlying the subject site.
The Seismic Design Category D can be used for the site.
The following seismic parameters obtained from the computer program https://
seismicmaps.org prepared by SEAOC [Structural Engineers Association Of
California] in conjunction with California’s Office of Statewide Health Planning and
Development [OSHPD] ) in accordance with ASCE7-16 can be used for the site.
• Fa = 1.2
• Fv = null*
• Mapped Spectral Accelerations Values:
Ss = 1.33 (for the short period of 0.2 second)
S1 = 0.474 (for the 1-second period)
• Maximum Considered Earthquake Spectral Response Accelerations:
SMs = FaSs = 1.596 (for the short period of 0.2 second)
SM1 = FvS1 = null* (for the 1-second period)
• Design Spectral Response Accelerations:
SDs = 2/3 SMs = 1.064 (for the short period of 0.2 second)
SD1 = 2/3 SM1 = null* (for the 1-second period)
• PGA = 0.568
Please see ASCE 7-16, Section 11.4.8.
Please see APPENDIX C for additional seismic parameters, as needed.
Note: In general, the structural consultant of record for this project should review the
seismic parameters provided in this report and the 2022 CBC to evaluate the seismic
design. Final selection of design coefficients should be made by the structural consultant
based on the local laws and ordinances, expected structure response, and the desired level
of conservatism.
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 4
The civil/structural design engineer should consult with the project geotechnical
consultant, if additional geotechnical information is needed for structural seismic design.
Faults
No active faults are known to exist within or near the site. The probability of primary
surface rupture or deformation at the site is, therefore, considered very low.
The site is not designated to be located within the Special Studies/Earthquake Zone under
the Alquist-Priolo Special Studies Act.
Liquefaction Potential
As previously mentioned, for conservative purposes, the subject site is assumed to be
subject to the liquefaction. Therefore, the owner(s) of this property should be aware of
the risks associated with the potential liquefaction such as structural distress due to the
potential differential settlement caused by the potential liquefaction.
As previously mentioned, for conservative purposes, a strengthened / stiffened
foundation system (having thicker slabs with more reinforcements and deeper and
wider footings with more reinforcement as recommended in this report) should be
used for support of the proposed structure.
Potential Consequences of Liquefaction or Secondary Liquefaction Included Hazards
Potential consequences of liquefaction or secondary liquefaction included hazards
generally consist of differential settlement (vertical deformations), lateral
movement/lateral spreading (horizontal deformations), oscillation, and reduction in
foundation soil-bearing capacity (bearing failure).
A sloping condition or drainage or stream channel does not exist at the site; therefore,
lateral movement/lateral spreading, oscillation, etc. due to potential liquefaction are not
anticipated to be credible hazards for the proposed new structure.
We believe if the area would be “liquefied” in the future due to a very strong earthquake,
the potential damage to the proposed new structures which will be properly structurally
designed in accordance with the new up-to-date codes would be much less severe than
the existing on-site structures and surrounding existing houses which have been
previously structurally designed based on old codes (which are much less stringent than
the current new codes). However, the owner(s) of this property should be aware of the
potential damage to the new structures due to liquefaction.
In summary, it should be recognized that structural mitigation may not reduce the
potential of the soils to liquefy during an earthquake; and there will remain some risk that
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 5
the new structures could still suffer damage if liquefaction occurs, during a very strong
earthquake.
For conservative purposes, a strengthened / stiffened foundation system as
recommended in this report should be used for support of the proposed structure.
Slope Stability
The site is a flat area; therefore, slope instability is not a concern for the proposed
development.
CONCLUSIONS AND RECOMMENDATIONS
General Conclusions
Construction of the proposed structure at the subject site is considered geotechnically
feasible, provided the recommendations outlined in this report are implemented.
Note: The conclusions and recommendations of this report are based on information as
interpreted from our limited subsurface investigation. It is not anticipated but they should
be revised accordingly if geotechnical conditions to be exposed during site preparation/
grading and construction significantly differ from our findings and interpretations.
In general, a conventional shallow foundation can be used for support of the proposed
structure.
The following recommendations are considered minimum and may be superseded by
more restrictive requirements of the architect, civil/structural engineer, building codes, or
governing agencies.
Geotechnical Impact on Neighboring Properties
Adverse geotechnical impact of the proposed development on the neighboring properties
is not anticipated, provided the recommendations outlined in this report are properly
implemented.
Site Preparation/Grading
To create a relatively uniform new engineered compacted fill layer for a proposed new
structural slab-on-grade area, over-excavation and recompaction of about 3 ft. deep
(measured from the existing ground surface) of the existing on-site soils should be
performed. The lateral limits of the over-excavation should be minimum equal to depth of
removal (3 ft. in this case) beyond the outside perimeter of the proposed new structure.
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 6
For the proposed new exterior concrete slabs including new driveway, if any, the
overexcavation and recompaction should be minimum 1 ft deep and 1 ft. outside of the
new slab areas.
Deeper remedial removal is not anticipated; however, this will be determined in the field
by the project geotechnical engineer, based on the actual conditions to be exposed at the
time of the site grading/preparation.
The fill/backfill materials, if any, should be free of organic matter and oversized
materials, 4 inches or greater in diameter, placed in near-horizontal loose lifts not to
exceed eight inches in thickness, and moisture conditioned to slightly over optimum
moisture content prior to compaction.
Imported soils, if any, should have a very low expansion potential and should be
geotechnically observed/tested and accepted by the geotechnical consultant prior to using
at the site.
In general, grading at the site, if any, should be performed in accordance with the
requirements of the City and under the geotechnical observation and testing of the project
geotechnical consultant. The compaction criterion for fill and backfill materials is a
minimum of 90% of the maximum density determined in accordance with ASTM Test
Method D1557.
Temporary Excavations
In general, temporary excavations should be performed in accordance with OSHA
requirements. In general, care should be taken during excavation near an existing
structural object, if any to ensure no damage is done to the existing object.
For this project, the detached ADU will be located far away from the existing building.
Therefore, impact of the proposed temporary excavation to the existing building is not
anticipated.
BUILDING FOUNDATION DESIGN GUIDELINES
Geotechnical Parameters For Structural Design
For conservative purposes, the following “lowest” code values should be used for
structural design, as needed.
a. Allowable vertical bearing earth pressure: 1,500 psf.
An increase of one-third is permitted when using the alternative load
combinations that include wind or earthquake loads.
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 7
b. Lateral bearing passive earth pressure: 100 psf. per foot into competent materials
below the finished ground surface.
An increase of one third is permitted when using the alternative load
combinations that include wind or earthquake loads.
c. Lateral Sliding Resistance: cohesion = 130 psf.
The cohesion value is to be multiplied by the contact area.
In no case shall the lateral sliding resistance exceed one-half the dead load.
d. Soil unit weight: 120 pcf.
New Building Footings
In general, the foundation system for the proposed structure must be properly designed by
the civil/structural design engineer of record for this project and reviewed and approved
by the city prior to construction.
New building footings should be embedded minimum 24-inches below the adjacent
lowest finished grade. Minimum widths for isolated columns/pad footings, if any, should
be 24-inches, and for continuous wall footings should be 15-inches for one-story and 18-
inches for two story portions, if any.
Minimum reinforcement for new continuous footings should be two #5 re-bars at top and
two #5 re-bars at bottom.
Settlement
Distress to the existing house due to settlement of the underlying soils was not
observed/reported. Therefore, deep-seated settlement of the soils underlying the site is
not considered to be a concern for the proposed development.
In general, based on our experience, the conventional total settlement of ½ inch and a
differential settlement of ¼ inch over a horizontal distance of 30 feet are anticipated for
the proposed new structure and would occur during the construction stage.
New (Interior) Building Slabs-on-Grade
New (interior) building slabs-on-grade should be minimum 5 inches thick, reinforced
with #4 re-bars at 12 inches on centers, or equivalent, placed at mid-height of the slab.
New slabs should be underlain by a 2-inch thick layer of clean sand. For moisture
sensitive floor areas, the new slabs should be underlain by a 10-mil polyethylene
moisture barrier membrane (such as Visqueen). The moisture barrier membrane should
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 8
be properly lapped and sealed at joints and around any breaks such as openings for utility
conduits.
Note: CAL Green Code, and/or other applicable codes/City’s requirements should govern
and be followed. The entire slab-on-grade system including the capillary break /
vapor/moisture retarder should be properly designed by the project civil /structural design
engineer of record (but not by the geotechnical engineer) and reviewed and approved by
the City prior to construction.
New Exterior Slabs-on-Grade
To reduce the potential for excessive cracking, new exterior concrete slabs-on-grade, if
any, should be minimum 4 inches thick, provided with construction or weakened plane
joints at frequent intervals (e. g., every 6 feet or less). Provision of a 2-inch thick layer of
crushed rock, gravel, or clean sand to be placed beneath the slabs and/or reinforcement,
such as #3 re-bars at 24 inches on-centers, or equivalent, placed at the mid-height of the
slab should be considered. The subgrade soils for the exterior slabs should be properly re-
compacted.
Slab Subgrade Pre-Saturation
The conventional pre-saturation of subgrade soils to minimum 140% of the optimum
moisture content to minimum 24 inches deep is not considered necessary for this project.
However, spraying with water should be performed prior to concrete pour.
Other Recommendations for Reducing Slab Cracking
While not a geotechnical issue, the potential for slab cracking may also be reduced by
careful control of water/cement ratio and slump of concrete. The contractor should take
appropriate curing precautions during the pouring of concrete in hot weather to reduce
cracking of slabs.
A slip sheet (or equivalent) can be utilized if grouted tile, marble tile, or other crack-
sensitive floor covering is planned directly on concrete slabs.
New Driveway
The minimum section required by the City can be used for a new driveway, if any. If
there is no minimum requirements by the City, a 5-inch thick concrete slab (PCC),
reinforced with #4 rebar (placed at mid-height of slabs) at 18 inches on-centers both
ways, or 5-in. thick asphalt concrete (AC), or equivalent, over a 6-inch thick layer of
aggregate base (AB) can be used. The aggregate base and subgrade should be properly
compacted to a minimum of 95% and 90%, respectively, of the maximum density
determined in accordance with ASTM D1557 prior to placement of the concrete slab.
Spraying the compacted subgrade soils with water should be performed prior to concrete
pour.
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 9
If pavers are to be used, they must be properly designed by the civil engineer of record
for this project and approved by the city prior to construction. Additional geotechnical
data can be provided for design, if requested.
Site Drainage
In general, proper surface drainage should be checked, improved as needed, and
maintained to ensure surface water flows away from all structures. Requirements by the
city and applicable CBC (2022 CBC) should also be followed.
Roof gutters should be properly provided. Roof drains, gutters and downspouts should be
maintained to function as intended. Outlet drains should be kept open.
Irrigation at the site, if any, should be kept to a minimum required to support plant life.
In the future, sources of uncontrolled water, such as leaky sewer, water (domestic,
irrigation) or drainpipe, should be repaired if identified.
Seismic Design
We recommend the proposed new structure be structurally designed to meet the
applicable building codes and requirements of the controlling governmental agencies.
The seismic parameters provided in the “Seismicity” section of this report can be used.
The civil/structural design engineer should consult with the project geotechnical
consultant, if additional geotechnical information is needed for the seismic design.
Cement Type For Concrete in Contact with On-Site Earth Materials
Our previous tests performed on the soils of many lots in the City of Santa Ana which are
similar to the on-site soils show negligible water-soluble sulfate contents. Sulfate attack
on concrete was not observed for the existing on-site house and other houses in the
surrounding areas. It appears sulfate attack on concrete is not considered to be a problem
for this project. However, for conservative purpose, Type V cement with a maximum
water/cement ratio of 0.45 and a minimum concrete strength, f'c of 4,500 psi is
recommended to be used for concrete in contact with the on-site soils. Additional water-
soluble sulfate content testing can be performed for the soils at the site, as needed. The
test can be conducted during and/or after completion of site preparation/grading.
The applicable California Building Code (2022 CBC) and other requirements by
controlling governmental agencies should be followed.
Corrosion To Ferrous Metals and Copper
For conservative purposes, the on-site soils can be considered severely corrosive to
ferrous metals and copper. Underground/buried ferrous metals or copper are not planned
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 10
to be used for this project. However, if underground/buried ferrous metals or copper are
planned to be used at the site, they should be properly protected. A corrosion specialist
can be consulted. Testing can be performed for verification of the potential corrosion of
the soils at the site to ferrous metals and copper, if needed. The test can be performed
during and/or after completion of grading.
Geotechnical Review of Grading and Foundation Plans
Based on the City’s requirements, the project geotechnical consultant should review,
“approve” and sign the project grading and foundation plans with details/specifications, if
any, indicating conformation to applicable geotechnical recommendations.
We will corporate with the civil/structural design engineers who prepare the plans to
ensure our geotechnical recommendations are properly incorporated into the plans.
Geotechnical Observation and Testing During Construction
We recommend that a qualified geotechnical consultant be retained to provide
geotechnical engineering services, including geotechnical observation/testing, during the
construction phase of the project. This is to verify the compliance with the design,
specifications and/or recommendations, and to allow design changes in the event that
subsurface conditions differ from those anticipated.
Geotechnical observation/testing can be performed at the following stages:
During ANY grading operations, including excavation, removal, filling and
backfilling, etc.
During and after excavation for footings to verify the adequacy of underlying
materials.
After pre-saturation of slab subgrade earth materials, if any, prior to pouring
concrete.
After compaction of subgrade soils and/or aggregate base for exterior slabs and or
driveway, if any.
During backfill of drainage and utility line trenches, if any, to verify proper
compaction.
When/If any unusual geotechnical conditions are encountered.
Note: If Geotechnical International is not provided the opportunity to perform the
geotechnical observation/testing during the construction phase, Geotechnical
International will take no responsibility for the conclusions and recommendations
contained in our report in the event that subsurface conditions differ from those
interpreted and anticipated during our preliminary investigation phase prior to the start of
construction.
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 11
CLOSURE
The conclusion and recommendations contained in this report are presented based on
geotechnical data as described herein which are believed representative of the total
project area. However, earth materials can vary in characteristics, both laterally and
vertically, and those variations could affect the conclusions and recommendations
contained herein. As such, observation and testing by a qualified geotechnical consultant
during the construction phase of the project are essential to confirming the basis of this
report.
This report has been prepared consistent with that level of care being provided by other
professionals providing similar services at the locale and time period. The contents of this
report are professional opinions and as such, are not to be considered a guaranty or
warranty.
This report should be reviewed and updated after a period of one year or if the lot
ownership or site conditions / proposed development change from that described herein.
The following are attached and complete our report:
Appendix A – References
Appendix B – Geotechnical Log of Test Hole and Laboratory Test Results
Appendix C – Seismic Data
Figure 1 – Vicinity Map
Figure 2 – Site Plan/Geotechnical Map
If you have any questions or require clarification, please contact this office. This
opportunity to be of service is sincerely appreciated.
Very truly yours,
Lan N. Pham, P.E.
Chief Geotechnical Engineer
RGE686, Exp. 3/31/25
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 12
APPENDIX A
REFERENCES
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 13
REFERENCES
1.California Division of Mines and Geology (CDMG), the Resources Agency,
Dept. of Conservation, 1981, “Geology Map of Orange County Showing
Mines and Mineral Deposits”, scale 1:48,000, 1” = 4000’, or 1” = 0.76 miles,
prepared in corporation with County of Orange EMA, compiled by P.K.
Morton and R.V. Miller, dated 1981.
2.California Division of Mines and Geology (CDMG), Department of
Conservation, 1997, 1998, “Seismic Hazard Zones, Newport Beach
Quadrangle”, Scale 1:24,000 (1” = 2,000 ft or 1” = 0.38 miles), Liquefaction
Zone Released April 17, 1997, Landslide Released: April 15, 1998.
3.California Division of Mines and Geology, 1997, “Seismic Hazard Zone
Report for The Anaheim and Newport Beach 7.5-minute Quadrangle, Orange
County, California,” Seismic Hazard Zone Report 03,” revised 2006.
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 14
APPENDIX B
GEOTECHNICAL LOG OF TEST HOLE
AND
LABORATORY TEST RESULTS
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 15
GEOTECHNICAL LOG OF TEST HOLE
Date: September 6, 2024 TEST HOLE No. 1
Project No. Michael Vu Job No.: SA-03-09-24
Hole Diameter: 4 + inches Equipment: Hand-Auger
DEPTH DESCRIPTION
0’ - 2’+ (Grass). Medium grey silty fine sand with minor clay, damp
to moist, medium dense.
2’- end Medium gray silty fine sand, moist to very moist, medium dense.
Total Depth: 5 ft. +
No Caving
No Free-Standing Groundwater
Hole backfilled with onsite soils
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 16
EXPANSION INDEX TEST RESULTS
Sample Compacted Moisture Content Expansion Expansion
Location Dry Compacted Final Index Potential
Density (pcf) (%) (%) Classification
TH-1 @ 0’ – 3’ sandy: non-expansive.
Test Method: ASTM D4829
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 17
ATTERBERG LIMITS TEST RESULTS
Sample Location Liquid Limit Plastic Limit Plasticity Index
TH-1 @ 0’ - 3’ sandy: could not perform the tests.
Test Method: ASTM D4318
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
Page 18
APPENDIX C
SEISMIC DATA
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
USGS web services were down for some period of time and as a result this tool wasn't operational, resulting in timeout error.
USGS web services are now operational so this tool should work as expected.
4810 W 6th St, Santa Ana, CA 92703, USA
Latitude, Longitude: 33.7495904, -117.9326922
Date 9/10/2024, 8:48:32 PM
Design Code Reference Document ASCE7-16
Risk Category II
Site Class D - Default (See Section 11.4.3)
Type Value Description
SS 1.33 MCER ground motion. (for 0.2 second period)
S1 0.474 MCER ground motion. (for 1.0s period)
SMS 1.596 Site-modified spectral acceleration value
SM1 null -See Section 11.4.8 Site-modified spectral acceleration value
SDS 1.064 Numeric seismic design value at 0.2 second SA
SD1 null -See Section 11.4.8 Numeric seismic design value at 1.0 second SA
Type Value Description
SDC null -See Section 11.4.8 Seismic design category
Fa 1.2 Site amplification factor at 0.2 second
Fv null -See Section 11.4.8 Site amplification factor at 1.0 second
PGA 0.568 MCEG peak ground acceleration
FPGA 1.2 Site amplification factor at PGA
PGAM 0.682 Site modified peak ground acceleration
TL 8 Long-period transition period in seconds
SsRT 1.33 Probabilistic risk-targeted ground motion. (0.2 second)
SsUH 1.444 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration
SsD 1.943 Factored deterministic acceleration value. (0.2 second)
S1RT 0.474 Probabilistic risk-targeted ground motion. (1.0 second)
S1UH 0.514 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration.
S1D 0.67 Factored deterministic acceleration value. (1.0 second)
PGAd 0.797 Factored deterministic acceleration value. (Peak Ground Acceleration)
PGAUH 0.568 Uniform-hazard (2% probability of exceedance in 50 years) Peak Ground Acceleration
CRS 0.921 Mapped value of the risk coefficient at short periods
CR1 0.921 Mapped value of the risk coefficient at a period of 1 s
CV 1.366 Vertical coefficient
9/10/24, 8:48 PM U.S. Seismic Design Maps
https://www.seismicmaps.org 1/2
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
DISCLAIMER
While the information presented on this website is believed to be correct, SEAOC /OSHPD and its sponsors and contributors assume no responsibility or
liability for its accuracy. The material presented in this web application should not be used or relied upon for any specific application without competent
examination and verification of its accuracy, suitability and applicability by engineers or other licensed professionals. SEAOC / OSHPD do not intend that the
use of this information replace the sound judgment of such competent professionals, having experience and knowledge in the field of practice, nor to substitute
for the standard of care required of such professionals in interpreting and applying the results of the seismic data provided by this website. Users of the
information from this website assume all liability arising from such use. Use of the output of this website does not imply approval by the governing building
code bodies responsible for building code approval and interpretation for the building site described by latitude/longitude location in the search results of this
website.
9/10/24, 8:48 PM U.S. Seismic Design Maps
https://www.seismicmaps.org 2/2
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
VICINITY MAP
FIGURE 1
4810 W. 6th STREET
SANTA ANA, CA 92703
SITE
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025
4810 W. 6th STREET
SANTA ANA, CA 92703
SITE PLAN/GEOTECHNICAL MAP
FIGURE 2
Approximate
Location of
Test Hole
TH-1
TH-1
TH
E
E
N
T
I
R
E
S
I
T
E
I
S
U
N
D
E
R
L
A
I
N
B
Y
A
L
L
U
V
I
U
M
A
N
D
C
O
L
L
U
V
I
U
M
REDUCED SCALE
FLOOD ZONE - 4810 W Sixth
St Unit# 25/5/2025