Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
509 S Starboard Street - Plan
HOMEOWNER: ANDY NGUYEN PH: 714.200.4535 ADDRESS: 509 S. STARBOARD STREET SANTA ANA, CA 92704 DATE: 7/24/24 ING ELECTRIC INC. 1451 DOMINGUEZ RANCH ROAD CORONA, CA 92882 PH: 951.399.2555 ING ELECTRIC INC. C10 - 1048140 6C E R INSTALL (6) APTOS DNA-120-MF10-440W SOLAR ELECTRIC MODULES AND (6) SOLAREDGE S440 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY COMPOSITION ROOF IN ADDITION TO AN EXISTING SYSTEM. REPLACE EXISTING INVERTER WITH (1) SOLAREDGE ENERGY HUB SE7600H-US INVERTER WITH INTEGRATED DC DISCONNECT, (1) DC DISCONNECT, AND INSTALL (1) LG CHEM RESU 16H PRIME BATTERY, AND REWIRE THROUGH EXISTING SYSTEM. ICINIT NGUYEN RESIDENCE 6 EET IN E SHEET 1 PROJECT INFO, VICINITY MAP, SCOPE OF WORK SHEET 2 SITE/ROOF PLAN, ELEVATION DETAIL SHEET 3 ELECTRIC LINE DRAWING, GROUNDING DETAIL SHEET 4 CALCULATIONS, SIGNS, GENERAL NOTES SHEET 5 NOTES ATTACHED MODULE, INVERTER, MOUNTING HARDWARE SPEC SHEETS NTS 6 EET N TICE N C NGE6 T R 6E6 T E6E C ENT6 R ING6 IT T T E RITTEN C N6ENT ENNI ER E E R 6C TT RRI6 RE 6TRICTL R I ITE . PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 (21) SOLARWORLD SW 285 MONO BLK PEAK POWER = 285 W MAX OPERATING CURRENT = 9.20 A MAX OPERATING VOLTAGE = 31.3 V OPEN CIRCUIT VOLTAGE = 37.7 V SHORT CIRCUIT CURRENT = 9.84 A MAX SERIES FUSE RATING = 25 A TEMP. COEFF. OF Voc = -0.31%/°C DIMENSIONS = 65.9" X 39.4" X 1.3" WEIGHT = 39.7 LBS 99523PV4 T LT IC 6 L R R ECT IN R TI N NEW SYSTEM SIZE: 2.640 kW (DC), 2.420 kW (AC) TOTAL SYSTEM SIZE: 8.625 kW (DC), 7.600 kW (AC) EXISTING MODULES: NEW MODULES: EXISTING MODULE ADD-ON: (21) SOLAREDGE P300 DC POWER OPTIMIZERS MAX DC INPUT VOLTAGE = 48 V OPERATING VOLTAGE RANGE = 8 V - 48 V MAX DC INPUT CURRENT = 12.50 A MAX DC OUTPUT CURRENT = 15 A DC OUTPUT VOLTAGE = 350 V MAX POWER PER STRING (CONTROLLED BY INVERTER) = 5250 W NEMA 6P ENCLOSURE DIMENSIONS = 5.6" X 8.3" X 1.6" WEIGHT = 2.1 LB(6) APTOS DNA-120-MF10-440W PEAK POWER = 440 W MAX OPERATING CURRENT = 13.05 A MAX OPERATING VOLTAGE = 33.72 V OPEN CIRCUIT VOLTAGE = 41.02 V SHORT CIRCUIT CURRENT = 13.73 A MAX SERIES FUSE RATING = 25 A TEMP. COEFF. OF Voc = -0.27%/°C DIMENSIONS = 74.9" X 44.6" X 1.3" WEIGHT = 52.9 LBS NEW INVERTER/DC DISCONNECT: (1) SOLAREDGE ENERGY HUB SE7600H-US MAX DC INPUT VOLTAGE = 480 V NOMINAL DC INPUT VOLTAGE = 400 V MAX DC INPUT CURRENT = 20.0 A DC DISCONNECT MAX INPUT CURRENT = 45.0 A NUMBER OF DC INPUTS = 2 RATED AC POWER = 7600 W AC VOLTAGE = 240 V MAX AC OUTPUT CURRENT = 32.0 A NEMA 4X ENCLOSURE DIMENSIONS = 17.7" X 14.6" X 6.8" WEIGHT = 26 LBS NEW BATTERY: (1) LG CHEM RESU 16H PRIME USABLE ENERGY = 16 kWh PEAK POWER = 11 kW FOR 10SEC. PEAK CURRENT = 32.8 A FOR 10SEC. MAX POWER = 7.0 kW IP55 ENCLOSURE DIMENSIONS = 19.8" X 42.8" X 11.6" WEIGHT = 350 LBS NEW MODULE ADD-ON: (6) SOLAREDGE S440 DC POWER OPTIMIZERS MAX DC INPUT VOLTAGE = 60 V OPERATING VOLTAGE RANGE = 8 V - 60 V MAX DC INPUT CURRENT = 14.5 A MAX DC OUTPUT CURRENT = 15 A DC OUTPUT VOLTAGE = 380 V MAX POWER PER STRING (CONTROLLED BY INVERTER) = 5700 W NEMA 6P ENCLOSURE DIMENSIONS = 5.1" X 6.1" X 1.2" WEIGHT = 1.6 LB ARRAY:INSTALLED WEIGHT = 2.8 PSF TOTAL ROOF COVERAGE = 520 SF, LESS THAN 21% OF TOTAL ROOF AREA MOUNTING HARDWARE: K2 CROSSRAIL 44X RAIL K2 EVERFLASH ECOMP KIT ROOF ATTACHMENTS 5 16" STAINLESS STEEL LAG BOLTS @ 72" OC OR LESS WITH A MINIMUM OF 21 2" PENETRATION INTO ROOF RAFTERS EXISTING ROOF INFO: 1 STORY, COMPOSITION SHINGLE 2 X 4 TRUSSES @ 24" OC Bldg #: 101120511 Elec#: 20183762 Approvals: Elec: M Smith The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 509 S Starboard St-Solar9/16/2024 HOMEOWNER:ANDY NGUYEN PH: 714.200.4535 ADDRESS:509 S. STARBOARD STREET SANTA ANA, CA 92704 DATE: 7/24/24 ING ELECTRIC INC. 1451 DOMINGUEZ RANCH ROAD CORONA, CA 92882 PH: 951.399.2555 ING ELECTRIC INC. C10 - 1048140 CE R INSTALL (6) APTOS DNA-120-MF10-440W SOLAR ELECTRIC MODULES AND (6) SOLAREDGE S440 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY COMPOSITION ROOF IN ADDITION TO AN EXISTING SYSTEM. REPLACE EXISTING INVERTER WITH (1) SOLAREDGE ENERGY HUB SE7600H-US INVERTER WITH INTEGRATED DC DISCONNECT, (1) DC DISCONNECT, AND INSTALL (1) LG CHEM RESU 16H PRIME BATTERY, AND REWIRE THROUGH EXISTING SYSTEM. NOTE: DIMENSIONS AND FEATURES SHOWN ARE CLOSE TO SCALE BUT WERE TAKEN FROM A FIELD SURVEY AND APPROXIMATIONS MADE USING GOOGLE EARTH. PROPERTY LINE (E) 200 AMP MAIN SERVICE PANEL. T R R T R E E T N SCALE: 1/16"=1' 8 16 32 48 VENT (TYP) PROPERTY LINE (E) INVERTER/DC DISCONNECT TO BE REMOVED ITER LN EXISTING ARRAY: (21) MODULES EET NTICE N CNGE T R E TEE CENTRING ITT TE RITTEN CNENT ENNIER EE R CTT RRI RE TRICTL RIITE . PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 99523PV4 CHIMNEY NEW ARRAY #1: (6) MODULES TILT = 17°, AZ = 90° (E) AC DISCONNECT TO BE RELOCATED 30'-11" 1'-4" 4'-6" 28'-7" PROPERTY LINE ETERIR ET LL ELETIN ETIL SCALE: 1/4" = 1'-0" CORNER OF WALL 12" MIN (E) LIGHT BULB GROUND LEVEL EXISTING 1-STORY ROOF: COMPOSITION SHINGLE, FELT & 1 2" SHEATHING OVER RAFTERS EXISTING 2 X 4 TRUSSES @ 24" OC MODULES: 74.9" X 44.6" 52.9 LBS EACH K2 CROSSRAIL 44X RAIL MOUNTING SYSTEM WITH K2 EVERFLASH ECOMP KIT ROOF ATTACHMENTS (USE 5 16" STAINLESS STEEL LAG BOLTS @ 72" OC OR LESS WITH A MINIMUM EMBEDMENT OF 21 2" INTO ROOF RAFTERS), WATERPROOF ALL CONNECTION LOCATIONS PER MANUFACTURER'S INSTRUCTIONS 3" MIN. 8" MAX. NTS ELETIN ETIL 1 2 3 4 5 6 3' FIRE CLEARANCE 9' ROOF ACCESS POINTS ARE AT THE STRUCTURALLY STRONG PART OF THE BUILDING AND DO NOT REQUIRE LADDERING OVER OPENINGS. * TOTAL ROOF AREA = 2490 SF TOTAL SOLAR AREA = 520 SF 520 SF/2490 SF = 0.21 ARRAYS COVER 21% OF TOTAL ROOF AREA ** (E) AC DISCONNECT & (N) INVERTER/DC DISCONNECT (N) BATTERY & (N) DC DISCONNECT (N) BATTERY(N) DC DISCONNECT 509 S Starboard St-Solar9/16/2024 HOMEOWNER:ANDY NGUYEN PH: 714.200.4535 ADDRESS:509 S. STARBOARD STREET SANTA ANA, CA 92704 DATE: 7/24/24 ING ELECTRIC INC. 1451 DOMINGUEZ RANCH ROAD CORONA, CA 92882 PH: 951.399.2555 ING ELECTRIC INC. C10 - 1048140 CE R INSTALL (6) APTOS DNA-120-MF10-440W SOLAR ELECTRIC MODULES AND (6) SOLAREDGE S440 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY COMPOSITION ROOF IN ADDITION TO AN EXISTING SYSTEM. REPLACE EXISTING INVERTER WITH (1) SOLAREDGE ENERGY HUB SE7600H-US INVERTER WITH INTEGRATED DC DISCONNECT, (1) DC DISCONNECT, AND INSTALL (1) LG CHEM RESU 16H PRIME BATTERY, AND REWIRE THROUGH EXISTING SYSTEM. ELECTRICL LINE IGR EET NTICE N CNGE T R E TEE CENTRING ITT TE RITTEN CNENT ENNIER EE R CTT RRI RE TRICTL RIITE . PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 G L1 L2 EXISTING 60 A, 240 VAC, 1Ø AC DISCONNECT LOCKABLE, VISIBLE KNIFE-BLADE TYPE (3) 8 AWG THWN-2 & (1) 8 AWG GROUND IN 3 4" EMT CONDUIT 99523PV4 MAIN SERVICE INFO: 200 A, 120/240 VAC, 1Ø, 3-WIRE METER #222013-607963 40A 200A EXISTING BUILDING GROUNDING ELECTRODE SYSTEM M EXISTING SERVICE PANEL: 200 A BUS RATED, 240 VAC, 1Ø L1 L2 N G SOLAREDGE INTEGRATED DC DISCONNECT, AC DISCONNECT & RAPID SHUTDOWN DEVICE NEW SOLAREDGE ENERGY HUB SE7600H-US 240 VAC, 1Ø TRANSFORMERLESS INVERTER - + PV BAT NC NC NONO L1 L2 -+ NEW LG CHEM RESU 16H PRIME 400V BATTERY G BI-DIRECTIONAL POWER FLOW (3) 8 AWG THWN-2 & (1) 8 AWG GROUND IN 3 4" EMT CONDUIT NOTE TO INSTALLERS: PLEASE SEE THE INSTALLATION MANUAL FOR PROPER CT INSTALLATION (THEY ARE DIRECTIONAL) FOR MONITORING AND OPERATION. + - + - EXISTING SOURCE CIRCUIT #1: 14 MODULES, 600 VDC + - + - (4) 10 AWG PV IN AIR + - + - + - + - NEW SOURCE CIRCUIT #2: 13 MODULES, 600 VDC + - + - + - + - (13) 600 VDC SOLAREDGE OPTIMIZERS NEMA 3R, 600 VDC JUNCTION BOX (4) 10 AWG THWN-2 & (1) 8 AWG GROUND IN 3 4" EMT CONDUIT APTOS DNA-120-MF10-440W (14) 600 VDC SOLAREDGE P300 OPTIMIZERS SOLARWORLD SW 285 MONO BLK SOLARWORLD SW 285 MONO BLK SOLARWORLD SW 285 MONO BLK SOLARWORLD SW 285 MONO BLK APTOS DNA-120-MF10-440W USE K2 CROSSRAIL INTEGRATED GROUNDING TO GROUND ALL MODULES, OPTIMIZERS, JUNCTION BOXES AND ANY OTHER METAL PARTS AND #6 AWG SOLID COPPER WHERE NECESSARY CIRCUIT #2 : (6) NEW APTOS DNA-120-MF10-440W MODULES AND (6) NEW SOLAREDGE S440 OPTIMIZERS & (7) EXISTING SOLARWORLD SW 285 MONO BLK MODULES AND (7) EXISTING SOLAREDGE P300 OPTIMIZERS (2) 8 AWG THWN-2 & (1) 8 AWG GROUND IN 3 4" EMT CONDUIT NEMA 3R, 600 VDC 60 A DC DISCONNECT (2) 8 AWG THWN-2 & (1) 8 AWG GROUND IN 3 4" EMT CONDUIT 509 S Starboard St-Solar9/16/2024 HOMEOWNER:ANDY NGUYEN PH: 714.200.4535 ADDRESS:509 S. STARBOARD STREET SANTA ANA, CA 92704 DATE: 7/24/24 ING ELECTRIC INC. 1451 DOMINGUEZ RANCH ROAD CORONA, CA 92882 PH: 951.399.2555 ING ELECTRIC INC. C10 - 1048140 CE R INSTALL (6) APTOS DNA-120-MF10-440W SOLAR ELECTRIC MODULES AND (6) SOLAREDGE S440 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY COMPOSITION ROOF IN ADDITION TO AN EXISTING SYSTEM. REPLACE EXISTING INVERTER WITH (1) SOLAREDGE ENERGY HUB SE7600H-US INVERTER WITH INTEGRATED DC DISCONNECT, (1) DC DISCONNECT, AND INSTALL (1) LG CHEM RESU 16H PRIME BATTERY, AND REWIRE THROUGH EXISTING SYSTEM. EET NTICE N CNGE T R E TEE CENTRING ITT TE RITTEN CNENT ENNIER EE R CTT RRI RE TRICTL RIITE . PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 99523PV4 GENERL NTE 1.THIS SYSTEM COMPLIES WITH THE 2022 CRC, 2022 CBC, 2022 CFC, AND THE 2022 CEC. 2.THE SYSTEM WILL NOT BE TURNED-ON UNTIL THE SERVING UTILITY COMPANY HAS BEEN NOTIFIED. 3.THE INSTALLED SOLAR SYSTEM HAS A DISTRIBUTED WEIGHT LESS THAN 4 PSF. 4.THE CONCENTRATED LOAD FOR EACH VERTICAL SUPPORT IS LESS THAN 40 LBS. 5.ALL PV EQUIPMENT IS LISTED BY A RECOGNIZED TESTING LAB. INVERTERS ARE UL 1741 COMPLIANT. 6.THE BACKFED BREAKER WILL BE LOCATED AT THE OPPOSITE END OF THE BUS FROM THE MAIN BREAKER. 7.CONDUCTORS ARE 90° C RATED COPPER WIRE. 8.ANY CONDUCTORS EXPOSED TO SUNLIGHT ARE LISTED AS SUNLIGHT RESISTANT. 9.IF DC CONDUCTORS ARE RUN INSIDE THE BUILDING, THEY WILL BE CONTAINED IN A METAL RACEWAY. 10.ANY CONDUCTORS BETWEEN SEPARATE ARRAYS ON THE ROOF WILL BE PROTECTED IN CONDUIT. 11.THE EQUIPMENT GROUNDING CONDUCTOR ON THE ROOF WILL BE PROTECTED FROM PHYSICAL DAMAGE. IT WILL BE TUCKED NEATLY UNDER THE MODULES AND RAILS AND SECURED IN PLACE. 12.THE MODULES WILL BE ATTACHED TO THE EQUIPMENT GROUNDING CONDUCTOR IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. 13.ALL EXTERIOR CONDUIT, FITTINGS AND BOXES ARE RAIN-TIGHT AND APPROVED FOR USE IN WET LOCATIONS. 14.CLEARANCES AROUND ALL ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH CEC 110.26. 15.SOLAR MODULES WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL OR BUILDING ROOF VENTS. 16.IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE A VERIFIABLE GROUNDING ELECTRODE SYSTEM, A GROUNDING ELECTRODE SYSTEM WILL BE INSTALLED PER CEC 250.50. THE ELECTRICAL SERVICE WILL BE BONDED TO THE WATER AND GAS PIPING PER SECTION 250.104 OF THE CEC. 17.A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH CAL-OSHA REGULATIONS. TE CLCLTIN MODULE POWER = 285 W, 440 W NUMBER OF MODULES IN THE NEW STRING = 13 (7) 285 W + (6) 440 W = 4635 W OPTIMIZER MAX POWER PER STRING = 6000 W 4635 W < 6000 W, OK OPERATING CURRENT = POWER RATING/OPERATING VOLTAGE = 4635 W/400 V = 11.59 A OPTIMIZER TO INVERTER TARGET VOLTAGE/OPERATING VOLTAGE = 400 V MAX SYSTEM VOLTAGE (Voc) CONTROLLED BY INVERTER = 480 V SHORT-CIRCUIT CURRENT (Isc) CONTROLLED BY OPTIMIZER = 15.00 A INVERTER MAX OUTPUT CURRENT = 32.00 A 32.00 A (1.25) = 40.00 A [Ic], USE 40 A BREAKER MAIN SERVICE PANEL BUS RATING = 200 A MAIN SERVICE PANEL MAIN OCPD = 200 A 200 A + 40 A SOLAR OCPD = 240 A 200 A BUS (1.2) = 240 A 240 A = 240 A, OK IRE CLCLTIN FROM OPTIMIZERS TO INVERTER/DC DISCONNECT: AMBIENT TEMPERATURE = 34°C TEMPERATURE ADDER FOR CONDUIT NOT OFFSET FROM ROOF = 33°C ADJUSTMENT FACTOR PER TABLE 310.15(B)(2)(a) FOR 90°C INSULATED CONDUCTOR AT 34°C + 33°C = 67°C = 0.58 Isc = 15.00 A 15.00 A/0.58 = 25.86 A NUMBER OF CURRENT CARRYING CONDUCTORS IN CONDUIT = 4 ADJUSTMENT FACTOR PER TABLE 310.15(B)(3)(a) FOR CONDUIT FILL (4-6 CONDUCTORS IN CONDUIT) = 0.80 25.86 A/0.80 = 32.33 A SELECT WIRE SIZE WITH AMPACITY GREATER THAN 32.33 A, USE 10 AWG THWN-2 COPPER WIRE WITH AN AMPACITY OF 40 A SELECT CONDUIT FOR (4) 10 AWG THWN-2 & (1) 8 AWG GROUND = 3 4" EMT CONDUIT FROM THE INVERTER TO THE MAIN SERVICE PANEL: ADJUSTMENT FACTOR PER TABLE 310.15(B)(2)(a) FOR 90°C INSULATED CONDUCTOR AT 34°C = 0.96 Ic = 40.00 A 40.00 A/0.96 = 41.67 A SELECT WIRE SIZE WITH AMPACITY GREATER THAN 41.67 A, USE 8 AWG THWN-2 COPPER WIRE WITH AN AMPACITY OF 55 A SELECT CONDUIT FOR (3) 8 AWG THWN-2 & (1) 8 AWG GROUND = 3 4" EMT CONDUIT 509 S Starboard St-Solar9/16/2024 HOMEOWNER:ANDY NGUYEN PH: 714.200.4535 ADDRESS:509 S. STARBOARD STREET SANTA ANA, CA 92704 DATE: 7/24/24 ING ELECTRIC INC. 1451 DOMINGUEZ RANCH ROAD CORONA, CA 92882 PH: 951.399.2555 ING ELECTRIC INC. C10 - 1048140 CE R INSTALL (6) APTOS DNA-120-MF10-440W SOLAR ELECTRIC MODULES AND (6) SOLAREDGE S440 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY COMPOSITION ROOF IN ADDITION TO AN EXISTING SYSTEM. REPLACE EXISTING INVERTER WITH (1) SOLAREDGE ENERGY HUB SE7600H-US INVERTER WITH INTEGRATED DC DISCONNECT, (1) DC DISCONNECT, AND INSTALL (1) LG CHEM RESU 16H PRIME BATTERY, AND REWIRE THROUGH EXISTING SYSTEM. EET PLANS PREPARED BY: JENNIFER KEMME PH: 909.748.1300 99523PV4 TE IGNGETE IGNGE ALL SIGNAGE SHALL BE REFLECTIVE, UV RESISTANT PLASTIC, RED IN COLOR WITH WHITE LETTERING, AND ATTACHED WITH WEATHERPROOF ADHESIVE OR OTHER APPROVED METHOD. ALL LETTERS SHALL BE A MINIMUM OF 3 8" HEIGHT AND ALL CAPITALIZED. ALL CONDUIT, JUNCTION BOXES AND OTHER ENCLOSURES SHALL BE MARKED AT 10' MAX INTERVALS AND AT ALL BENDS, TERMINATIONS, SPLICES OR CONNECTIONS WITH "WARNING: PHOTOVOLTAIC POWER SOURCE". WARNING ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION TO BE INSTALLED AT ALL SERVICEABLE PANELS OR BOXES AND AT ALL DISCONNECTS: WARNING ELECTRIC SHOCK HAZARD THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED MAY BE ENERGIZED CAUTION: MULTIPLE SOURCES OF POWER POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS AS SHOWN. ADDRESS: 509 S. STARBOARD STREET, SANTA ANA, CA 92704 N TO BE INSTALLED ON THE OUTSIDE COVER OF THE MAIN SERVICE DISCONNECT: PV SOLAR DC DISCONNECT MAXIMUM VOLTAGE = 480.00 V MAXIMUM CIRCUIT CURRENT = 30.00 A MAXIMUM RATED OUTPUT CURRENT OF THE DC-TO-DC CONVERTER = 15.00 A TO BE INSTALLED ON THE FRONT OF THE NEW DC DISCONNECT: RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM AC OUTPUT CURRENT = 32.00 A NOMINAL OPERATING AC VOLTAGE = 240 V TO BE INSTALLED ON THE FRONT OF THE AC DISCONNECT: WARNING POWER SOURCE OUTPUT CONNECTION - DO NOT RELOCATE THIS OVERCURRENT DEVICE TO BE INSTALLED AT THE BACKFED BREAKER SERVING THE PV SOLAR SYSTEM: TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TO BE INSTALLED ON THE FRONT OF THE MAIN SERVICE DISCONNECT: "SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN" SHALL BE BLACK LETTERING ON YELLOW BACKGROUND. THE REMAINDER OF THE SIGN SHALL BE BLACK LETTERING ON WHITE BACKGROUND. WARNING ARC FLASH AND SHOCK HAZARD APPROPRIATE PPE REQUIRED DO NOT OPERATE CONTROLS OR OPEN COVERS WITHOUT APPROPRIATE PERSONAL PROTECTION EQUIPMENT. FAILURE TO COMPLY MAY RESULT IN INJURY OR DEATH! REFER TO NFPA 70E FOR MINIMUM PPE REQUIREMENTS TO BE INSTALLED ON THE FRONT OF THE BATTERY: ENERGY STORAGE SYSTEM DISCONNECT TO BE INSTALLED ON THE FRONT OF THE INVERTER: SOLAR ARRAY (ON ROOF) SERVICE POINT & UTILITY METERING PV SYSTEM DISCONNECT FOR UTILITY OPERATION INVERTER & DC DISCONNECT BATTERY DC DISCONNECT 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2. Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6. Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7. Will the PV system be installed without using any ballast system or counter-weight system? 8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2. Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6. Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7. Will the PV system be installed without using any ballast system or counter-weight system? 8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M -19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 P O W E R O P T I M I Z E R SolarEdge Power Optimizer Module Add-On For North America P300 / P400 / P405 Superior e ciency (99.5%) Mi gates all types of module mismatch losses, from manufacturing tolerance to par al shading Flexible system design for maximum space u liza on Fast installa on with a single bolt Next genera on maintenance with module-level monitoring Module-level voltage shutdown for installer and re ghter safety s © SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: 12/2014 V.01. Subject to change without notice. (2) It is not allowed to mix P405 with P300/P400/P600/P700 in one string. (for thin lm modules) hd W (1)300 t D s (Voc at lowest temperature) 125 Vdc MPPT Opera ng Range 8 - 48 8 - 80 12.5 - 105 Vdc Maximum Short Circuit Current (Isc) 10 Adc D 12.5 Adc Maximum E ciency 99.5 Weighted E ciency 98.8 Overvoltage Category OUTPUT DURING OPERATION POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER D 15 Adc D s 60 Vdc OUTPUT DURING STANDBY POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF Safety Output Voltage per Power Op mizer 1 Vdc STANDARD COMPLIANCE D FCC Part15 Class B, IEC61000-6-2, IEC61000-6-3 Safety IEC62109-1 (class II safety), UL1741 INSTALLATION SPECIFICATIONS D s 1000 Vdc Dimensions (W x L x H) Pxxx-2 series 141 x 212 x 40.5 / 5.55 x 8.34 x 1.59 mm / in Pxxx-5 series 128 x 152 x 27.5 / 5 x 5.97 x 1.08 128 x 152 x 35 / 5 x 5.97 x 1.37 128 x 152 x 48 / 5 x 5.97 x 1.89 mm / in Weight (including cables)Pxxx-2 series 950 / 2.1 gr / lb Pxxx-5 series 770 / 1.7 930 / 2.05 930 / 2.05 gr / lb Input Connector MC4 Compa ble Output Wire Type / Connector Double Insulated; MC4 Compa ble Output Wire Length 0.95 / 3.0 1.2 / 3.9 m / Opera ng Temperature Range -40 - +85 / -40 - +185 ˚C / ˚F Protec on Ra ng Pxxx-2 series IP65 / NEMA4 Pxxx-5 series IP68 / NEMA6P Rela ve Humidity 0 - 100 (1) Rated STC power of the module. Module of up to +5% power tolerance allowed. SolarEdge Power Optimizer Module Add-On for North America P300 / P400 / P405 PV SYSTEM DESIGN USING A SOLAREDGE INVERTER 2 SINGLE PHASE THREE PHASE 208V THREE PHASE 480V Minimum String Length (Power Op mizers) 10 18 Maximum String Length (Power Op mizers) D W 6000 12750 t Parallel Strings of Di erent Lengths or Orienta ons 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 509 S Starboard St-Solar9/16/2024 STRUCTURAL ANALYSIS FOR NEW PHOTOVOLTAIC SOLAR SYSTEM NOTE: THESE CALCULATIONS ARE BASED ON INFORMATION AND MEASUREMENTS PROVIDED BY THE CONTRACTOR FROMHIS SITE INSPECTION. 1 Project Information:PV SOLAR ARRAY: NGUYEN RESIDENCELatitude33.7402°deg N 509 S. STARBOARD STREET, SANTA ANA, CA 92704Longitude-117.942°deg WWind Speed 110 mph 95 mph (ASCE 7-22)Wind Exposure CSite Class DSeismic Design Category D 2 Loads: Existing Roof Dead Loads:2 x 4 Trusses @ 24" OC 2.6 psf1/2" Roof Sheathing 1.7 psfRoof Felt 1.5 psfComposition5.0 psfMiscellaneous3.2 psfTotal14.0 psf Existing Snow Load:0.0 psfExisting Roof Live Load:20.0 psfProposed Roof Live Load: 20.0 psf Wind Load: Using CBC 2022 (ASCE 7-22), Chapter 29: Wind Loads on Rooftop Equipment, the following wind pressures were calculated.p = qh (GCp) (ge) (ga) = 7.88 -40.52 psfqh = 0.00256 Kz Kzt Kd Ke V2 =21.76 psfKz = 0.85 (0-15 = 0.85, 20 = 0.90, 25 = 0.94, 30 = 0.98, 40 = 1.04)GCp =0.7 -3.6 (Roof pitch = 17 deg, Zone = 2, Aeff = 23.2 sf) ge = 1.50 ga = 0.80 Lag Bolt Capacity:5/16" lag bolt capacity = 270 lbs per inch embedmentWith 2 1/2" minimum embedment, capacity = 675 lbsRequired Capacity:40.52 psf *6 modules *23.2 sf =5640.2 lbs5640.2 lbs /10 lag bolt connections = 564.0 lbsThe pull-out capacity of the 5/16" lag bolts with a minimum 2 1/2" embedment into the roof rafter is sufficientto meet the demand of the wind uplift force on the solar system. Seismic Load: Per the CEBC 2022 Section 503.4, if the demand-capacity ratio of the lateral load-carrying elements increases less than 10% due to the addition of the solar system, no special provisions or structuralmodifications are required.Existing Roof Weight = 14.0 psf *2490 sf =34860 lbsWeight of Solar System = 27 modules *54.5 lbs +313 lbs of racking = 1785 lbs1785lbs / 34860 lbs =0.05The increase in load from the solar system will not increase the demand-capacity ratio of the existing lateralload-carrying elements by over 10%. NOTICE: VISION CIVIL ENGINEERING: JENNIFER KEMME, PEANY CHANGES TO OR USES OF THESE DOCUMENTS 12273 11TH STREET, YUCAIPA, CA 92399WITHOUT THE WRITTEN CONSENT OF VISION 909.754.8300,JENKEMME@VISIONCE.COMCIVIL ENGINEERING IS STRICTLY PROHIBITED.RCE 73054, EXP 12/31/24 Prepared by JENNIFER KEMME 7/24/2024 Page 1 509 S Starboard St-Solar9/16/2024 STRUCTURAL ANALYSIS FOR NEW PHOTOVOLTAIC SOLAR SYSTEM NOTE: THESE CALCULATIONS ARE BASED ON INFORMATION AND MEASUREMENTS PROVIDED BY THE CONTRACTOR FROMHIS SITE INSPECTION. 3 Analysis of Existing Rafter Capacity:PV SOLAR ARRAY: NGUYEN RESIDENCE509 S. STARBOARD STREET, SANTA ANA, CA 92704 Rafter Loads:Solar system dead load = 397 lbs /10 lag bolts total =39.7 lbs at each lag boltExisting roof dead load =14 psfSnow load = 0 psfRoof live load =20 psfWind load = 109.7 lbs,564.0 lbsRafter span =7.0 ft Load Combinations That Apply:#1: D + Lr or S = 14 psf +39.7 lbs at each lag bolt +20.0 psf#2: D + 0.75(0.6W) + 0.75(Lr or S) = (14 psf +39.7 lbs at each lag bolt) + (0.75 (0.6)109.7 lbs at each lag bolt) + (0.75 (20 psf))#3: 0.6D + 0.6W = 0.6 (14 psf + 39.7 lbs at each lag bolt) - (0.6)564.0 lbs at each lag bolt Calculated Maximum Bending Moment:#1:208.3 ft/lbs +69.5 ft/lbs = 277.7 ft/lbs[(34 psf) (7 ft^2)] / 8 = 208.3 ft/lbs[(39.7 lbs) (7.0 ft)] / 4 =69.5 ft/lbs#2:85.8 ft/lbs +69.5 ft/lbs +86.4 ft/lbs +91.9 ft/lbs =333.5 ft/lbs[(14 psf) (7 ft^2)] / 8 = 85.8 ft/lbs[(39.7 lbs) (7.0 ft)] / 4 =69.5 ft/lbs109.7 lbs) (7 ft)] / 4 = 86.4 ft/lbs0.75 [(20 psf) (7 ft^2)] / 8 = 91.9 ft/lbs#3:51.5 ft/lbs +41.7 ft/lbs -592.2 ft/lbs =-499.1 ft/lbs0.6 [(14 psf) (7 ft^2)] / 8 = 51.5 ft/lbs0.6 [(39.7 lbs) (7.0 ft)] / 4 =41.7 ft/lbs0.6 [(564.0 lbs) (7 ft)] / 4 =592.2 ft/lbs Section Required:499.1 ft/lbs (12) (0.7) / 1518 psi = 2.8 cu inSection Provided:1.5 (3.5 ^2) / 6 =3.1 cu in3.1 cu in >2.8 cu in, OK Calculated Deflection:[5(34 psf / 12) (84 in^4)] / [384 (1200000) (5.4 )] =0.29 inAllowable Deflection:84 in / 240 = 0.35 in0.35 in >0.29 in, OK NOTICE: VISION CIVIL ENGINEERING: JENNIFER KEMME, PEANY CHANGES TO OR USES OF THESE DOCUMENTS 12273 11TH STREET, YUCAIPA, CA 92399WITHOUT THE WRITTEN CONSENT OF VISION 909.754.8300,JENKEMME@VISIONCE.COMCIVIL ENGINEERING IS STRICTLY PROHIBITED.RCE 73054, EXP 12/31/24 0.75 [(0.6)( Prepared by JENNIFER KEMME 7/24/2024 Page 2 509 S Starboard St-Solar9/16/2024