Loading...
HomeMy WebLinkAbout2320 W Dahl Ln & Unit# 2 - PlanDAHL RESIDENCE SANTA ANA, CA 92704 2320 W DAHL LN & 2320 W DAHL LN #2 ADDITION AND GARAGE CONVERSION GENERAL NOTES BUILDING DATA PROPERTY INFOSHEET INDEX ABBREVIATIONS LOT COVERAGE GROUND FLR. ARCHITECTURAL DRAWINGS BUILDING STANDARDS ADMINISTRATIVE CODE SCOPE OF WORK STRUCTURAL DRAWINGS FLOOR NOTES ROOF PLAN NOTES VICINITY MAP CONSULTANTS BUS STOP MAP ID: 6111 ADU / SFD RATIO SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: 22-10072 GA GA 19 DEC 24 . . . . . . . . . . . . TITLE AD D I T I O N A N D G A R A G E C O N V E R S I O N DA H L R E S I D E N C E 3 1 2 3 ENGINEER: Margarito Castillo, S.E. 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 CASTILLO ENGINEERING T: 562-961-5600 WWW.CASTILLOENGINEERING.COM 1147 E MARKET ST, LONG BEACH, CA 90805 T-1 TITLE SHEET Bldg #101121143-44 APPROVALS: PLNG - C. Santana BLDG - CSG POLICE - B. Martin PUBLIC WORKS - Y. Soto 2320 W Dahl Ln & Unit# 23/11/2025 N1EXISTING SITE PLAN (E) SINGLE FAMILY DWELLING 1,463.00 SQ.FT. 23 2 0 W D A H L L A N E (E) SLOPE 3:12(E) SLOPE 3:12 (E) SLOPE 1/2:12 (E) SLOPE 3:12 (E) SLOPE 3:12 (E) SLOPE 3:12 (E) SLOPE 3:12 (E) SLOPE 3:12 (E ) PA T I O C O V E R TO B E D E M O L I S H E D SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: 22-10072 GA GA 19 NOV 24 . . . . . . . . . . . . TITLE AD D I T I O N A N D G A R A G E C O N V E R S I O N DA H L R E S I D E N C E 3 1 2 3 ENGINEER: Margarito Castillo, S.E. 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 CASTILLO ENGINEERING T: 562-961-5600 WWW.CASTILLOENGINEERING.COM 1147 E MARKET ST, LONG BEACH, CA 90805 A1.0 EXISTING SITE PLAN 2320 W Dahl Ln & Unit# 23/11/2025 N1PROPOSED SITE PLAN (E) SINGLE FAMILY DWELLING 1,463.00 SQ.FT. (E) GARAGE CONVERT INTO ADU 366.00 SQ.FT. 23 2 0 W D A H L L A N E TOTAL (N) ADU 700.00 SQ.FT. (N) ADDITION 334.00 SQ.FT. (E) SLOPE 3:12(E) SLOPE 3:12 (E) SLOPE 1/2:12 (E) SLOPE 3:12 SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: 22-10072 GA GA 19 NOV 24 . . . . . . . . . . . . TITLE AD D I T I O N A N D G A R A G E C O N V E R S I O N DA H L R E S I D E N C E 3 1 2 3 ENGINEER: Margarito Castillo, S.E. 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 CASTILLO ENGINEERING T: 562-961-5600 WWW.CASTILLOENGINEERING.COM 1147 E MARKET ST, LONG BEACH, CA 90805 A1.1 PROPOSED SITE PLAN 2320 W Dahl Ln & Unit# 23/11/2025 1 DEMO PLAN LEGEND KEYNOTES THE KEY NOTES DIRECTLY BELOW REFER TO THE DEMO PLAN ONLY 2 1 4 3 5 4 6 SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: 22-10072 GA GA 19 NOV 24 . . . . . . . . . . . . TITLE AD D I T I O N A N D G A R A G E C O N V E R S I O N DA H L R E S I D E N C E 3 1 2 3 ENGINEER: Margarito Castillo, S.E. 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 CASTILLO ENGINEERING T: 562-961-5600 WWW.CASTILLOENGINEERING.COM 1147 E MARKET ST, LONG BEACH, CA 90805 A2.0 DEMO PLAN 2320 W Dahl Ln & Unit# 23/11/2025 GFI DOOR SCHEDULE SIZEMARK REMARKS WINDOW SCHEDULE SIZE QUANTITY MARK REMARKS LEGEND QUANTITY 1 FLOOR PLAN PROPOSED AFCI AFCI AFCI AFCI AFCI AFCI AFCI AFCI AFCI GFI GFI GFI GFI GFI GFI AFCI AFCI AFCI AFCIAFCI WP GRIDS KEYNOTES A3.2 B A3.2 B A3.2 A A3.2 A SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: 22-10072 GA GA 19 DEC 24 . . . . . . . . . . . . TITLE AD D I T I O N A N D G A R A G E C O N V E R S I O N DA H L R E S I D E N C E 3 1 2 3 ENGINEER: Margarito Castillo, S.E. 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 CASTILLO ENGINEERING T: 562-961-5600 WWW.CASTILLOENGINEERING.COM 1147 E MARKET ST, LONG BEACH, CA 90805 A2.2 FLOOR PLAN 2320 W Dahl Ln & Unit# 23/11/2025 1 ROOF PLAN 2 KEYNOTES ATTIC VENTILATION THE KEY NOTES DIRECTLY BELOW REFER TO THE ROOF PLAN ONLY 1 LEGEND (E) SLOPE 3:12 SLOPE 3:12 (E) SLOPE 3:12 SLOPE 3:12 (E) SLOPE 1/2:12 SLOPE 3:12 (E) SLOPE 3:12 (E) SLOPE 3:12 SL O P E 2 : 1 2 COOL ROOF SPECS · · ·® ™ ® ™ ® ·PRODUCT TYPE: ASPHALT SHINGLE ·COLOR: GRAY ·SOLAR REFLECTANCE: (INITIAL= 0.20) - (3 YEAR= 0.23) ·THERMAL EMITTANCE: (INITIAL= 0.92) - (3 YEAR= 0.93 ·SRI: (INITIAL= 20) - (3 YEAR= 24) SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: 22-10072 GA GA 19 DEC 24 . . . . . . . . . . . . TITLE AD D I T I O N A N D G A R A G E C O N V E R S I O N DA H L R E S I D E N C E 3 1 2 3 ENGINEER: Margarito Castillo, S.E. 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 CASTILLO ENGINEERING T: 562-961-5600 WWW.CASTILLOENGINEERING.COM 1147 E MARKET ST, LONG BEACH, CA 90805 A2.5 ROOF PLAN 2320 W Dahl Ln & Unit# 23/11/2025 1 (E) NORTH ELEVATION 3 (E) SOUTH ELEVATION 3 (E) EAST ELEVATION 4 (E) WEST ELEVATION KEYNOTES THE KEY NOTES DIRECTLY BELOW REFER TO THE ELEVATIONS ONLY2 2 2 SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: 22-10072 GA GA 19 NOV 24 . . . . . . . . . . . . TITLE AD D I T I O N A N D G A R A G E C O N V E R S I O N DA H L R E S I D E N C E 3 1 2 3 ENGINEER: Margarito Castillo, S.E. 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 CASTILLO ENGINEERING T: 562-961-5600 WWW.CASTILLOENGINEERING.COM 1147 E MARKET ST, LONG BEACH, CA 90805 A3.0 EXISTING ELEVATIONS 2320 W Dahl Ln & Unit# 23/11/2025 KEYNOTES THE KEY NOTES DIRECTLY BELOW REFER TO THE ELEVATIONS ONLY ( E ) STUCCO ( E ) STUCCO ( E ) STUCCO ( E ) STUCCO ( E ) STUCCO 1 NORTH ELEVATION 3 SOUTH ELEVATION 3 EAST ELEVATION 4 WEST ELEVATION 42 2 42 4 32 2 NO CHANGES 5 23202320 #2 SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: 22-10072 GA GA 19 NOV 24 . . . . . . . . . . . . TITLE AD D I T I O N A N D G A R A G E C O N V E R S I O N DA H L R E S I D E N C E 3 1 2 3 ENGINEER: Margarito Castillo, S.E. 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 CASTILLO ENGINEERING T: 562-961-5600 WWW.CASTILLOENGINEERING.COM 1147 E MARKET ST, LONG BEACH, CA 90805 A3.1 PROPOSED ELEVATIONS 2320 W Dahl Ln & Unit# 23/11/2025 2 B-B SECTION KEYNOTES THE KEY NOTES DIRECTLY BELOW REFER TO THE SECTIONS ONLY 1 A-A SECTION SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: 22-10072 GA GA 19 DEC 24 . . . . . . . . . . . . TITLE AD D I T I O N A N D G A R A G E C O N V E R S I O N DA H L R E S I D E N C E 3 1 2 3 ENGINEER: Margarito Castillo, S.E. 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 CASTILLO ENGINEERING T: 562-961-5600 WWW.CASTILLOENGINEERING.COM 1147 E MARKET ST, LONG BEACH, CA 90805 A3.2 SECTIONS 2320 W Dahl Ln & Unit# 23/11/2025 9 5 1 10 6 2 11 7 3 12 8 4 DETAILDETAILDETAILDETAIL DETAIL DETAIL DETAIL DETAIL DETAIL DETAIL DETAIL DETAIL ® ® ® ® SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: 22-10072 GA GA 19 NOV 24 . . . . . . . . . . . . TITLE AD D I T I O N A N D G A R A G E C O N V E R S I O N DA H L R E S I D E N C E 3 1 2 3 ENGINEER: Margarito Castillo, S.E. 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 CASTILLO ENGINEERING T: 562-961-5600 WWW.CASTILLOENGINEERING.COM 1147 E MARKET ST, LONG BEACH, CA 90805 A4.0 TYPICAL DETAILS 2320 W Dahl Ln & Unit# 23/11/2025 SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: 22-10072 GA GA 19 NOV 24 . . . . . . . . . . . . TITLE AD D I T I O N A N D G A R A G E C O N V E R S I O N DA H L R E S I D E N C E 3 1 2 3 ENGINEER: Margarito Castillo, S.E. 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 CASTILLO ENGINEERING T: 562-961-5600 WWW.CASTILLOENGINEERING.COM 1147 E MARKET ST, LONG BEACH, CA 90805 T-3 GENERAL NOTES 2320 W Dahl Ln & Unit# 23/11/2025 STRUCTURAL NOTES S1.0 SHEET NUMBER SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: . . . . . . . . . . . . TITLE 3 1 2 3 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 324 SOUTH AVE, LONG BEACH, CA 90805 T: 562-961-5600 WWW.CASTILLOENGINEERING.COM PR O J E C T A D D R E S S : 22-10072 JUVENTINO MC 26 JUL 24 GA R A G E C O N V E R T I N T O A D U DA H L R E S I D E N C E ( U N I T 2 ) 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 STRUCTURAL NOTES 2320 W Dahl Ln & Unit# 23/11/2025 TYPICAL DETAIL1TYPICAL DETAIL2TYPICAL DETAIL4 TYPICAL DETAIL5TYPICAL DETAIL6TYPICAL DETAIL7TYPICAL DETAIL8 TYPICAL DETAIL12 TYPICAL DETAIL11 TYPICAL DETAIL10 TYPICAL DETAIL9 TYPICAL DETAIL3 S1.1 SHEET NUMBER SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: . . . . . . . . . . . . TITLE 3 1 2 3 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 324 SOUTH AVE, LONG BEACH, CA 90805 T: 562-961-5600 WWW.CASTILLOENGINEERING.COM PR O J E C T A D D R E S S : 22-10072 JUVENTINO MC 26 JUL 24 GA R A G E C O N V E R T I N T O A D U DA H L R E S I D E N C E ( U N I T 2 ) 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 TYPICAL DETAILS 2320 W Dahl Ln & Unit# 23/11/2025 TYPICAL DETAIL2TYPICAL DETAIL4 TYPICAL DETAIL5TYPICAL DETAIL6TYPICAL DETAIL8 TYPICAL DETAIL12 TYPICAL DETAIL9TYPICAL DETAIL10 S1.2 SHEET NUMBER SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: . . . . . . . . . . . . TITLE 3 1 2 3 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 324 SOUTH AVE, LONG BEACH, CA 90805 T: 562-961-5600 WWW.CASTILLOENGINEERING.COM PR O J E C T A D D R E S S : 22-10072 JUVENTINO MC 26 JUL 24 GA R A G E C O N V E R T I N T O A D U DA H L R E S I D E N C E ( U N I T 2 ) 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 TYPICAL DETAILS 2320 W Dahl Ln & Unit# 23/11/2025 TYPICAL DETAIL1TYPICAL DETAIL2TYPICAL DETAIL4 TYPICAL DETAIL12 TYPICAL DETAIL11 TYPICAL DETAIL3 TYPICAL DETAIL9TYPICAL DETAIL10 S1.3 SHEET NUMBER SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: . . . . . . . . . . . . TITLE 3 1 2 3 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 324 SOUTH AVE, LONG BEACH, CA 90805 T: 562-961-5600 WWW.CASTILLOENGINEERING.COM PR O J E C T A D D R E S S : 22-10072 JUVENTINO MC 26 JUL 24 GA R A G E C O N V E R T I N T O A D U DA H L R E S I D E N C E ( U N I T 2 ) 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 TYPICAL DETAILS 2320 W Dahl Ln & Unit# 23/11/2025 TYPICAL DETAIL1TYPICAL DETAIL2TYPICAL DETAIL4 TYPICAL DETAIL6TYPICAL DETAIL7TYPICAL DETAIL8 TYPICAL DETAIL12 TYPICAL DETAIL11 TYPICAL DETAIL3 TYPICAL DETAIL10 TYPICAL DETAIL9 S1.4 SHEET NUMBER SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: . . . . . . . . . . . . TITLE 3 1 2 3 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 324 SOUTH AVE, LONG BEACH, CA 90805 T: 562-961-5600 WWW.CASTILLOENGINEERING.COM PR O J E C T A D D R E S S : 22-10072 JUVENTINO MC 26 JUL 24 GA R A G E C O N V E R T I N T O A D U DA H L R E S I D E N C E ( U N I T 2 ) 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 TYPICAL DETAILS 2320 W Dahl Ln & Unit# 23/11/2025 N1FOUNDATION PLAN SHEET NUMBER SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: . . . . . . . . . . . . TITLE 3 1 2 3 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 324 SOUTH AVE, LONG BEACH, CA 90805 T: 562-961-5600 WWW.CASTILLOENGINEERING.COM PR O J E C T A D D R E S S : 22-10072 JUVENTINO MC 26 JUL 24 GA R A G E C O N V E R T I N T O A D U DA H L R E S I D E N C E ( U N I T 2 ) 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 S2.0 FOUNDATION PLAN 2320 W Dahl Ln & Unit# 23/11/2025 N1ROOF FRAMING PLAN C.J. SHEET NUMBER SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: . . . . . . . . . . . . TITLE 3 1 2 3 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 324 SOUTH AVE, LONG BEACH, CA 90805 T: 562-961-5600 WWW.CASTILLOENGINEERING.COM PR O J E C T A D D R E S S : 22-10072 JUVENTINO MC 26 JUL 24 GA R A G E C O N V E R T I N T O A D U DA H L R E S I D E N C E ( U N I T 2 ) 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 S2.2 ROOF FRAMING PLAN 2320 W Dahl Ln & Unit# 23/11/2025 DETAIL1DETAIL2DETAIL4 DETAIL5DETAIL6DETAIL7DETAIL8 DETAIL12 DETAIL11 DETAIL10 DETAIL9 DETAIL3 S3.0 SHEET NUMBER SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: . . . . . . . . . . . . TITLE 3 1 2 3 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 324 SOUTH AVE, LONG BEACH, CA 90805 T: 562-961-5600 WWW.CASTILLOENGINEERING.COM PR O J E C T A D D R E S S : 22-10072 JUVENTINO MC 26 JUL 24 GA R A G E C O N V E R T I N T O A D U DA H L R E S I D E N C E ( U N I T 2 ) 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 FOUNDATION DETAILS 2320 W Dahl Ln & Unit# 23/11/2025 DETAIL1DETAIL2DETAIL4 DETAIL5DETAIL6DETAIL7DETAIL8 DETAIL12 DETAIL11 DETAIL10 DETAIL9 DETAIL3 S5.0 SHEET NUMBER SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: . . . . . . . . . . . . TITLE 3 1 2 3 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 324 SOUTH AVE, LONG BEACH, CA 90805 T: 562-961-5600 WWW.CASTILLOENGINEERING.COM PR O J E C T A D D R E S S : 22-10072 JUVENTINO MC 26 JUL 24 GA R A G E C O N V E R T I N T O A D U DA H L R E S I D E N C E ( U N I T 2 ) 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 ROOF FRAMING DETAILS 2320 W Dahl Ln & Unit# 23/11/2025 SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS DRAWN : CHECKED : DATE : JOB NO. TO THE C.B.C. MARK DATE PROJECT: 22-10072 GA GA 19 NOV 24 . . . . . . . . . . . . TITLE AD D I T I O N A N D G A R A G E C O N V E R S I O N DA H L R E S I D E N C E 3 1 2 3 ENGINEER: Margarito Castillo, S.E. 23 2 0 W D A H L L N & 2 3 2 0 W D A H L L N # 2 SA N T A A N A , C A 9 2 7 0 4 CASTILLO ENGINEERING T: 562-961-5600 WWW.CASTILLOENGINEERING.COM 1147 E MARKET ST, LONG BEACH, CA 90805 T-2 TITLE 24 REPORT 2320 W Dahl Ln & Unit# 23/11/2025 structural calculations for DAHL RESIDENCE (UNIT 2) garage convert into adu 2320 W DAHL LN & 2320 W DAHL LN #2 SANTA ANA, CA 92704 26-Jul-24 CE JOB NO. : 22--10072 S T R U C T U R A L 3 2 4 E S O U T H S T , L O N G B E A C H , C A L I F O R N I A 9 0 8 0 5 T : 5 6 2 . 9 6 1 . 5 6 0 0 W W W . C A S T I L L O E N G I N E E R I N G . C O M 1 2320 W Dahl Ln & Unit# 23/11/2025 ARCHITECT CASTILLO ENGINEERING, INC.JOB 1205 Pine Avenue, Suite 201 Long Beach, CA 90813 ENGR. MC JOB NO. SHEET NO. DESIGN CRITERIA 1 Soil supporting footings is natural grade or engineered fill. 2 Soil allowable bearing pressure used in design_______________________________ 3 Footing shall extend_____ minimum into undisturbed soil or_____ below finish grade whichever is lower. 4 All concrete shall develop a minimum compressive strength of 2500 psi in 28 days. 5 Reinforcing steel shall conform to ASTM 615, Grade 60. 6 Structural steel shall conform to the following: Wide flange shapes ASTM A992 TS shapes ASTM A500, Grade B Pipe shapes ASTM A53 , Grade B Other rolled shapes, Bars and plates ASTM A36 7 Structural steel shall be fabricated in a shop of an approved fabricator. 8 All welding shall be done by Certified Welders. 9 Concrete Block shall conform to ASTM C90, Grade N-1. 10 Grout shall develop 2000 psi in 28 days. 11 Mortar shall be Type S and develop 1800 psi in 28 days. 12 All lumber shall be grade marked Douglas Fir. (Grading rule No. 17) Light Framing Construction Joist & Planks No. 2 Beams & Stringers No. 1 Posts & Timbers No. 1 13 Glue Laminated Timbers shall be combination No. 24F-V8. 14 Plywood shall conform to PS 1-95, Structural 1. 15 All material and workmanship shall conform to the requirements of 2019 California Building Code. 2 2320 W Dahl Ln & Unit# 23/11/2025 3 2320 W Dahl Ln & Unit# 23/11/2025 CA S T I L L O E N G I N E E R I N G PR O J E C T : 12 0 5 P I N E A V E N U E , S U I T E 2 0 1 , L O N G B E A C H , C A 9 0 8 1 3 37 6 8 3 . 0 0 Ba s e d O n : 20 1 9 CB C Wo o d : Do u g l a s - F i r / L a r c h E = 1 , 5 0 0 , 0 0 0 p s i ( C o n s t L i g h t F r a m i n g ) E = 1 , 6 0 0 , 0 0 0 p s i ( # 2 J o i s t s & P l a n k s , # 1 B e a m s & S t r i n g e r s , # 1 P o s t s & T i m b e r s ) FL O O R RO O F ME M B E R : SI Z E : (3 5 P C F ) PR O P E R T I E S : BE N D I N G S T R E S S : 1. 0 0 (k - f t & k ) No m i n a l Gr a d e Ty p e (p s i ) 2x 4 Co n s t . LF 1. 5 3. 5 0 1. 3 5. 3 3. 1 5. 4 10 0 0 1. 0 0 10 0 0 0. 6 3 0. 2 6 0. 2 9 0. 7 9 0. 3 2 0. 3 7 2x 6 #2 JP 1. 5 5. 5 0 2. 0 8. 3 7. 6 20 . 8 90 0 1. 3 0 11 7 0 0. 9 9 0. 7 4 0. 8 5 1. 2 4 0. 9 2 1. 0 6 2x 8 #2 JP 1. 5 7. 2 5 2. 6 10 . 9 13 . 1 47 . 6 90 0 1. 2 0 10 8 0 1. 3 1 1. 1 8 1. 3 6 1. 6 3 1. 4 8 1. 7 0 2x 1 0 #2 JP 1. 5 9. 2 5 3. 4 13 . 9 21 . 4 98 . 9 90 0 1. 1 0 99 0 1. 6 7 1. 7 6 2. 0 3 2. 0 8 2. 2 1 2. 5 4 2x 1 2 #2 JP 1. 5 11 . 2 5 4. 1 16 . 9 31 . 6 17 8 . 0 90 0 1. 0 0 90 0 2. 0 3 2. 3 7 2. 7 3 2. 5 3 2. 9 7 3. 4 1 2x 1 4 #2 JP 1. 5 13 . 2 5 4. 8 19 . 9 43 . 9 29 0 . 8 90 0 0. 9 0 81 0 2. 3 9 2. 9 6 3. 4 1 2. 9 8 3. 7 0 4. 2 6 4x 4 Co n s t LF 3. 5 3. 5 0 3. 0 12 . 3 7. 1 12 . 5 10 0 0 1. 0 0 10 0 0 1. 4 7 0. 6 0 0. 6 8 1. 8 4 0. 7 4 0. 8 6 4x 6 #2 JP 3. 5 5. 5 0 4. 7 19 . 3 17 . 6 48 . 5 90 0 1. 3 0 11 7 0 2. 3 1 1. 7 2 1. 9 8 2. 8 9 2. 1 5 2. 4 7 4x 8 #2 JP 3. 5 7. 2 5 6. 2 25 . 4 30 . 7 11 1 . 1 90 0 1. 3 0 11 7 0 3. 0 5 2. 9 9 3. 4 4 3. 8 1 3. 7 4 4. 3 0 4x 1 0 #2 JP 3. 5 9. 2 5 7. 9 32 . 4 49 . 9 23 0 . 8 90 0 1. 2 0 10 8 0 3. 8 9 4. 4 9 5. 1 7 4. 8 6 5. 6 2 6. 4 6 4x 1 2 #2 JP 3. 5 11 . 2 5 9. 6 39 . 4 73 . 8 41 5 . 3 90 0 1. 1 0 99 0 4. 7 3 6. 0 9 7. 0 0 5. 9 1 7. 6 1 8. 7 6 4x 1 4 #2 JP 3. 5 13 . 2 5 11 . 3 46 . 4 10 2 . 4 67 8 . 5 90 0 1. 0 0 90 0 5. 5 7 7. 6 8 8. 8 3 6. 9 6 9. 6 0 11 . 0 6x 4 #2 JP 5. 5 3. 5 0 4. 7 19 . 3 11 . 2 19 . 7 90 0 1. 0 0 90 0 2. 3 1 0. 8 4 2. 8 9 1. 0 5 6x 6 #1 PT 5. 5 5. 5 0 7. 4 30 . 3 27 . 7 76 . 3 12 0 0 1. 0 0 12 0 0 3. 4 3 2. 7 7 4. 2 9 3. 4 7 6x 8 #1 PT 5. 5 7. 5 0 10 . 0 41 . 3 51 . 6 19 3 . 4 12 0 0 1. 0 0 12 0 0 4. 6 8 5. 1 6 5. 8 4 6. 4 5 6x 1 0 #1 BS 5. 5 9. 5 0 12 . 7 52 . 3 82 . 7 39 3 . 0 13 5 0 1. 0 0 13 5 0 5. 9 2 9. 3 1 7. 4 0 11 . 6 6x 1 2 #1 BS 5. 5 11 . 5 0 15 . 4 63 . 3 12 1 . 2 69 7 . 1 13 5 0 1. 0 0 13 5 0 7. 1 7 13 . 6 8. 9 6 17 . 0 6x 1 4 #1 BS 5. 5 13 . 5 0 18 . 0 74 . 3 16 7 . 1 11 2 7 . 7 13 5 0 0. 9 9 13 3 2 8. 4 2 18 . 6 10 . 5 23 . 2 4 2320 W Dahl Ln & Unit# 23/11/2025 5 2320 W Dahl Ln & Unit# 23/11/2025 6 2320 W Dahl Ln & Unit# 23/11/2025 7 2320 W Dahl Ln & Unit# 23/11/2025 8 2320 W Dahl Ln & Unit# 23/11/2025 CASTILLO ENGINEERING, INC 1205 Pine Avenue, Suite 201 Long Beach, CA 90813 ROOF LOADS composite shingles 2.5 psf re-roof 2.0 psf 1/2" plywwod 1.5 psf rafters 4.0 psf insulation 0.5 psf Ceiling 3.0 psf beams/headers 1.0 psf MP&E/ misc.0.5 psf D=15.0 psf Lr=20.0 psf REDUCIBLE FLOOR LOADS flooring 1.0 psf 3/4" plywood 2.3 psf joist 3.0 psf ceiling 4.0 psf beams/headers 2.0 psf MP&E/ misc.2.7 psf D=15.0 psf L=40.0 psf EXTERIOR WALL LOADS 7/8" stucco 10.0 psf 1/2" plywood 1.5 psf 2x6 studs at 16"oc 1.5 psf insulation 0.5 psf 1/2" gyp board 2.3 psf MP&E/ misc.0.2 psf D=16.0 psf INTERIOR WALL LOADS 1/2" gyp board 2.3 psf 1/2" plywood 1.5 psf 2x6 studs at 16"oc 1.5 psf insulation 0.5 psf 1/2" gyp board 2.3 psf MP&E/ misc.1.9 psf D=10.0 psf 9 2320 W Dahl Ln & Unit# 23/11/2025 10 2320 W Dahl Ln & Unit# 23/11/2025 11 2320 W Dahl Ln & Unit# 23/11/2025 12 2320 W Dahl Ln & Unit# 23/11/2025 13 2320 W Dahl Ln & Unit# 23/11/2025 CE E n g i n e e r i n g S o f t w a r e v 1 . 0 PR O J E C T : == T Y P I C A L S Q U A R E P A D F O O T I N G D E S I G N T A B L E = = (2 / 9 9 ) Ba r # So i l B e a r i n g P r e s s u r e : Mi s c e l l a n e o u s : 3 0 . 1 1 q = 15 0 0 ps f c o l u m n f o o t p r i n t = 4 in 4 0 . 2 0 (f o r s e l e c t i o n o f s t e e l s p a c i n g v s . s i z e o n l y ) 6 0 . 4 4 Ma t e r i a l S t r e n g t h s : 7 0 . 6 0 co n c r e t e = 25 0 0 ps i No t e s : 8 0 . 7 8 10 1 . 2 3 11 1 . 5 6 Ma r k : Si z e T h i c k (f t ) - S Q . ( i n ) ( k ) ( i n ) 1. 5 1 2 3. 0 4 8 0 . 0 1 2 . 2 Y 2 . 7 6 5 . 3 Y 7 0 . 0 2 0 . 0 2 0 . 7 2 0 . 3 9 0 . 3 9 2 # 4 2. 0 1 2 5. 4 0 8 0 . 7 1 6 . 3 Y 6 . 5 6 5 . 3 Y 1 8 0 . 0 5 0 . 0 4 0 . 9 6 0 . 5 2 0 . 5 2 3 # 4 2. 5 1 2 8. 4 4 8 2 . 3 2 0 . 4 Y 1 1 . 3 6 5 . 3 Y 3 8 0 . 0 8 0 . 0 9 1 . 2 0 0 . 6 5 0 . 6 5 4 # 4 3. 0 1 2 12 . 2 8 4 . 3 2 4 . 5 Y 1 7 . 3 6 5 . 3 Y 6 9 0 . 1 3 0 . 1 6 1 . 4 4 0 . 7 8 0 . 7 8 4 # 4 3. 5 1 2 16 . 5 8 6 . 9 2 8 . 6 Y 2 4 . 3 6 5 . 3 Y 1 1 4 0 . 1 8 0 . 2 7 1 . 6 8 0 . 9 1 0 . 9 1 5 # 4 4. 0 1 2 21 . 6 8 1 0 . 1 3 2 . 6 Y 3 2 . 4 6 5 . 3 Y 1 7 4 0 . 2 4 0 . 4 1 1 . 9 2 1 . 0 4 1 . 0 4 6 # 4 4. 5 1 2 27 . 3 8 1 3 . 8 3 6 . 7 Y 4 1 . 6 6 5 . 3 Y 2 5 3 0 . 3 1 0 . 6 0 2 . 1 6 1 . 1 7 1 . 1 7 4 # 5 5. 0 1 2 33 . 8 8 1 8 . 0 4 0 . 8 Y 5 1 . 8 6 5 . 3 Y 3 5 3 0 . 3 9 0 . 8 4 2 . 4 0 1 . 3 0 1 . 3 0 5 # 5 5. 5 1 2 40 . 8 8 2 2 . 8 4 4 . 9 Y 6 3 . 2 6 5 . 3 Y 4 7 6 0 . 4 9 1 . 1 4 2 . 6 4 1 . 4 3 1 . 5 1 5 # 5 6. 0 1 5 47 . 3 1 1 2 4 . 2 6 7 . 3 Y 7 2 . 3 1 1 2 . 2 Y 6 0 7 0 . 4 1 1 . 0 4 3 . 6 0 1 . 9 4 1 . 9 4 7 # 5 14 2320 W Dahl Ln & Unit# 23/11/2025 HB1RJ 2 RJ1 RJ1H4 H3 CJ1 CJ1 H1 H1 B1 H2H2H2HB1 B2 ROOF FRAMING KEY PLAN B3 15 2320 W Dahl Ln & Unit# 23/11/2025 CASTILLO ENGINEERING INC.Project 2320 W DAHL LN 1327 Loma Avenue Long Beach, CA 90804 Engr.Date:Job No.22-10072 Sheet 11ft 4ft Tag Beam 5 L =15 ft Member=4x10 A =32.38 in^2 S =49.9 in^3 No. of members=1 I =230.8 in^4 0.49 CD=1.25 E =1,600,000 psi CF=1.20 Va =3.885 kips CV=1.00 Ma =3.743 k-ft Cr=1.00 Total Load L/n=180 Live Load L/n=240 L=15ft 0.74 0.97 Uniform load (W1) D L Trib w1,1 (5 +20)x 1.33 =6.65 +26.6 w1,2 (16 +)x 3 =48 +0 w1,3 (+)x 0 =0 +0 w1,4 (+)x 0 =0 +0 w1,5 (+)x 0 =0 +0 W1 =54.65 +26.6 =0.081 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 0 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 0 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 p1,1 (+)x 0 x 0 =0 +0 p1,2 (+)x 0 x 0 =0 +0 p1,3 (+)x 0 x 0 =0 +0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 15 Point Load (P2) D L Trib.1 Trib.2 p2,1 (211.29 +281.72)x 1 x 1 =211 +282 p2,2 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =211 +282 =0.49 kips 11 4 Shear R1=0.741 kips R2=-0.971 kips Stress Ratio Vmax=0.97 kips Vallow.=4.86 x 1 =4.8563 kips OK .20 Flexure M=3.38 k-ft Mallow.=5.62 x 1 =5.615 k-ft OK .60 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.251 +0.000 +0.000 +0.119 =0.37 =L <L OK deflection:.37 488 180 0.251 +0.119 D (L Only)=0.082 +0 +0 +0.06812206 =0.15 =L L OK deflection:.20 1199 240 USE:1- 4X10 shear: 7/25/24 12:00 AM B1 flexure: 16 2320 W Dahl Ln & Unit# 23/11/2025 CASTILLO ENGINEERING INC.Project 2320 W DAHL LN 1327 Loma Avenue Long Beach, CA 90804 Engr.Date:Job No.22-10072 Sheet Tag Beam 5 4ft 11ft L =15 ft Member=4x10 A =32.38 in^2 S =49.9 in^3 No. of members=1 I =230.8 in^4 0.49 CD=1.25 E =1,600,000 psi CF=1.20 Va =3.885 kips CV=1.00 Ma =3.743 k-ft Cr=1.00 Total Load L/n=180 Live Load L/n=240 L=15ft 0.97 0.74 Uniform load (W1) D L Trib w1,1 (5 +20)x 1.33 =6.65 +26.6 w1,2 (16 +)x 3 =48 +0 w1,3 (+)x 0 =0 +0 w1,4 (+)x 0 =0 +0 w1,5 (+)x 0 =0 +0 W1 =54.65 +26.6 =0.081 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 0 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 0 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 p1,1 (211.29 +281.72)x 1 x 1 =211 +282 p1,2 (+)x 0 x 0 =0 +0 p1,3 (+)x 0 x 0 =0 +0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =211 +282 =0.49 kips 4 11 Point Load (P2) D L Trib.1 Trib.2 p2,1 (+)x 0 x 0 =0 +0 p2,2 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 15 Shear R1=0.971 kips R2=-0.741 kips Stress Ratio Vmax=0.97 kips Vallow.=4.86 x 1 =4.8563 kips OK .20 Flexure M=3.38 k-ft Mallow.=5.62 x 1 =5.615 k-ft OK .60 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.251 +0.000 +0.119 +0.000 =0.37 =L <L OK deflection:.37 488 180 0.251 +0 D (L Only)=0.082 +0 +0.07 +0 =0.15 =L L OK deflection:.20 1199 240 USE:1- 4X10 shear: 7/25/24 12:00 AM B2 flexure: 17 2320 W Dahl Ln & Unit# 23/11/2025 CASTILLO ENGINEERING INC.Project 2320 W DAHL LN 1327 Loma Avenue Long Beach, CA 90804 Engr.Date:Job No.22-10072 Sheet Tag Beam 5 2.5ft 19.16ft L =21.66 ft Member=7x14 PSL A =98.00 in^2 S =228.7 in^3 No. of members=1 I =1600.7 in^4 1.48 CD=1.25 E =2,000,000 psi CF=1.00 Va =18.947 kips CV=0.98 Ma =54.324 k-ft Cr=1.00 Total Load L/n=180 Live Load L/n=240 L=21.66ft 7.43 6.29 Uniform load (W1) D L Trib w1,1 (15 +20)x 15 =225 +300 w1,2 (10 +)x 4 =40 +0 w1,3 (+)x 0 =0 +0 w1,4 (+)x 0 =0 +0 w1,5 (+)x 0 =0 +0 W1 =265 +300 =0.565 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 0 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 0 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 p1,1 (317.15 +422.86)x 1 x 1 =317 +423 p1,2 (317.15 +422.86)x 1 x 1 =317 +423 p1,3 (+)x 0 x 0 =0 +0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =634 +846 =1.48 kips 2.5 19.16 Point Load (P2) D L Trib.1 Trib.2 p2,1 (+)x 0 x 0 =0 +0 p2,2 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 21.66 Shear R1=7.428 kips R2=-6.290 kips Stress Ratio Vmax=7.43 kips Vallow.=23.68 x 1 =23.683 kips OK .31 Flexure M=35.01 k-ft Mallow.=66.75 x 1 =66.752 k-ft OK .52 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.874 +0.000 +0.059 +0.000 =0.93 =L <L OK deflection:.65 279 180 0.874 +0 D (L Only)=0.464 +0 +0.03 +0 =0.5 =L L OK deflection:.46 522 240 USE:1- 7X14 PSL shear: 7/25/24 12:00 AM B3 flexure: 18 2320 W Dahl Ln & Unit# 23/11/2025 ARCHITECT CASTILLO ENGINEERING, INC.JOB 2320 W DAHL LN 1205 Pine Avenue, Suite 201, Long Beach, CA 90813 T:562.961.5600 F:562.961.5700 ENGR. MC DATE JOB NO. 22-10072 SHEET NO. HIP RIDGE BEAM DESIGN L= ft ft w= ( + ) x /2 x 2 / (2)^.5 = + = plf W=x x = k x 1 / 3 = k x 2 / 3 = k <k M= 2x x =k-ft <k-ft 9 x D= x (x 12 )^3 = in = 76.7 x x 3.5 x USE: L 161 4x6 0.74 0.493 0.17 5.50 0.87 9.19 (.17) (.27) (3)^.5 HB1 739 1600000 0.74 0.5 662 2.89 2.15 25/07/2024 6.50 0.246 9.20.74 9.19 6.502015 (.41) 92 16169 9.19 0.74 BEAM L1 L1 L w W V1 19 2320 W Dahl Ln & Unit# 23/11/2025 CASTILLO ENGINEERING INC.Project 2320 W DAHL LN 1327 Loma Avenue Long Beach, CA 90804 Engr.Date:Job No.22-10072 Sheet Tag Beam 5 L =15 ft Member=2x8 A =10.88 in^2 S =13.1 in^3 No. of members=1 I =47.6 in^4 CD=1.25 E =1,600,000 psi CF=1.20 Va =1.305 kips CV=1.00 Ma =0.986 k-ft Cr=1.15 Total Load L/n=180 Live Load L/n=240 L=15ft 0.25 0.25 Uniform load (W1) D L Trib w1,1 (5 +20)x 1.33 =6.65 +26.6 w1,2 (16 +)x 0 =0 +0 w1,3 (+)x 0 =0 +0 w1,4 (+)x 0 =0 +0 w1,5 (+)x 0 =0 +0 W1 =6.65 +26.6 =0.033 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 0 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 0 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 p1,1 (+)x 0 x 0 =0 +0 p1,2 (+)x 0 x 0 =0 +0 p1,3 (+)x 0 x 0 =0 +0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 15 Point Load (P2) D L Trib.1 Trib.2 p2,1 (+)x 0 x 0 =0 +0 p2,2 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 15 Shear R1=0.249 kips R2=-0.249 kips Stress Ratio Vmax=0.25 kips Vallow.=1.63 x 1 =1.6313 kips OK .15 Flexure M=0.94 k-ft Mallow.=1.70 x 1 =1.7001 k-ft OK .55 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.497 +0.000 +0.000 +0.000 =0.50 =L <L OK deflection:.50 362 180 0.497 +0 D (L Only)=0.398 +0 +0 +0 =0.4 =L L OK deflection:.53 453 240 USE:1- 2X8 shear: 7/25/24 12:00 AM CJ1 flexure: 20 2320 W Dahl Ln & Unit# 23/11/2025 CASTILLO ENGINEERING INC.Project 2320 W DAHL LN 1327 Loma Avenue Long Beach, CA 90804 Engr.Date:Job No.22-10072 Sheet Tag Beam 5 L =4 ft Member=4x6 A =19.25 in^2 S =17.6 in^3 No. of members=1 I =48.5 in^4 CD=1.25 E =1,600,000 psi CF=1.30 Va =2.310 kips CV=1.00 Ma =1.323 k-ft Cr=1.00 Total Load L/n=180 Live Load L/n=240 L=4ft 1.27 1.27 Uniform load (W1) D L Trib w1,1 (15 +20)x 17.5 =262.5 +350 w1,2 (16 +)x 1.5 =24 +0 w1,3 (+)x 0 =0 +0 w1,4 (+)x 0 =0 +0 w1,5 (+)x 0 =0 +0 W1 =286.5 +350 =0.637 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 0 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 0 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 p1,1 (+)x 0 x 0 =0 +0 p1,2 (+)x 0 x 0 =0 +0 p1,3 (+)x 0 x 0 =0 +0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 4 Point Load (P2) D L Trib.1 Trib.2 p2,1 (+)x 0 x 0 =0 +0 p2,2 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 4 Shear R1=1.273 kips R2=-1.273 kips Stress Ratio Vmax=1.27 kips Vallow.=2.89 x 1 =2.8875 kips OK .44 Flexure M=1.27 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .59 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.047 +0.000 +0.000 +0.000 =0.05 =L <L OK deflection:.18 1017 180 0.047 +0 D (L Only)=0.026 +0 +0 +0 =0.03 =L L OK deflection:.13 1849 240 USE:1- 4X6 shear: 7/25/24 12:00 AM H1 flexure: 21 2320 W Dahl Ln & Unit# 23/11/2025 CASTILLO ENGINEERING INC.Project 2320 W DAHL LN 1327 Loma Avenue Long Beach, CA 90804 Engr.Date:Job No.22-10072 Sheet Tag Beam 5 L =3 ft Member=4x6 A =19.25 in^2 S =17.6 in^3 No. of members=1 I =48.5 in^4 CD=1.25 E =1,600,000 psi CF=1.30 Va =2.310 kips CV=1.00 Ma =1.323 k-ft Cr=1.00 Total Load L/n=180 Live Load L/n=240 L=3ft 0.36 0.36 Uniform load (W1) D L Trib w1,1 (15 +20)x 6.25 =93.75 +125 w1,2 (16 +)x 1.5 =24 +0 w1,3 (+)x 0 =0 +0 w1,4 (+)x 0 =0 +0 w1,5 (+)x 0 =0 +0 W1 =117.75 +125 =0.243 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 0 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 0 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 p1,1 (+)x 0 x 0 =0 +0 p1,2 (+)x 0 x 0 =0 +0 p1,3 (+)x 0 x 0 =0 +0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 3 Point Load (P2) D L Trib.1 Trib.2 p2,1 (+)x 0 x 0 =0 +0 p2,2 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 3 Shear R1=0.364 kips R2=-0.364 kips Stress Ratio Vmax=0.36 kips Vallow.=2.89 x 1 =2.8875 kips OK .13 Flexure M=0.27 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .13 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.006 +0.000 +0.000 +0.000 =0.01 =L <L OK deflection:.03 6318 180 0.006 +0 D (L Only)=0.003 +0 +0 +0 =0 =L L OK deflection:.02 12269 240 USE:1- 4X6 shear: 7/25/24 12:00 AM H2 flexure: 22 2320 W Dahl Ln & Unit# 23/11/2025 CASTILLO ENGINEERING INC.Project 2320 W DAHL LN 1327 Loma Avenue Long Beach, CA 90804 Engr.Date:Job No.22-10072 Sheet Tag Beam 5 L =2 ft Member=4x6 A =19.25 in^2 S =17.6 in^3 No. of members=1 I =48.5 in^4 CD=1.25 E =1,600,000 psi CF=1.30 Va =2.310 kips CV=1.00 Ma =1.323 k-ft Cr=1.00 Total Load L/n=180 Live Load L/n=240 L=2ft 0.12 0.12 Uniform load (W1) D L Trib w1,1 (15 +20)x 2.83 =42.45 +56.6 w1,2 (16 +)x 1.5 =24 +0 w1,3 (+)x 0 =0 +0 w1,4 (+)x 0 =0 +0 w1,5 (+)x 0 =0 +0 W1 =66.45 +56.6 =0.123 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 0 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 0 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 p1,1 (+)x 0 x 0 =0 +0 p1,2 (+)x 0 x 0 =0 +0 p1,3 (+)x 0 x 0 =0 +0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 2 Point Load (P2) D L Trib.1 Trib.2 p2,1 (+)x 0 x 0 =0 +0 p2,2 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 2 Shear R1=0.123 kips R2=-0.123 kips Stress Ratio Vmax=0.12 kips Vallow.=2.89 x 1 =2.8875 kips OK .04 Flexure M=0.06 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .03 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.001 +0.000 +0.000 +0.000 =0.00 =L <L OK deflection:.00 42065 180 6E-04 +0 D (L Only)=3E-04 +0 +0 +0 =0 =L L OK deflection:.00 91451 240 USE:1- 4X6 shear: 7/25/24 12:00 AM H3 flexure: 23 2320 W Dahl Ln & Unit# 23/11/2025 CASTILLO ENGINEERING INC.Project 2320 W DAHL LN 1327 Loma Avenue Long Beach, CA 90804 Engr.Date:Job No.22-10072 Sheet Tag Beam 5 L =4 ft Member=4x6 A =19.25 in^2 S =17.6 in^3 No. of members=1 I =48.5 in^4 CD=1.25 E =1,600,000 psi CF=1.30 Va =2.310 kips CV=1.00 Ma =1.323 k-ft Cr=1.00 Total Load L/n=180 Live Load L/n=240 L=4ft 1.27 1.27 Uniform load (W1) D L Trib w1,1 (15 +20)x 17.5 =262.5 +350 w1,2 (16 +)x 1.5 =24 +0 w1,3 (+)x 0 =0 +0 w1,4 (+)x 0 =0 +0 w1,5 (+)x 0 =0 +0 W1 =286.5 +350 =0.637 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 0 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 0 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 p1,1 (+)x 0 x 0 =0 +0 p1,2 (+)x 0 x 0 =0 +0 p1,3 (+)x 0 x 0 =0 +0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 4 Point Load (P2) D L Trib.1 Trib.2 p2,1 (+)x 0 x 0 =0 +0 p2,2 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 4 Shear R1=1.273 kips R2=-1.273 kips Stress Ratio Vmax=1.27 kips Vallow.=2.89 x 1 =2.8875 kips OK .44 Flexure M=1.27 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .59 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.047 +0.000 +0.000 +0.000 =0.05 =L <L OK deflection:.18 1017 180 0.047 +0 D (L Only)=0.026 +0 +0 +0 =0.03 =L L OK deflection:.13 1849 240 USE:1- 4X6 shear: 7/25/24 12:00 AM H4 flexure: 24 2320 W Dahl Ln & Unit# 23/11/2025 CASTILLO ENGINEERING INC.Project 1327 Loma Avenue Long Beach, CA 90804 Engr.Date:Job No.22-10072 Sheet Tag Beam 5 L = 15 ft Member= 2x8 A = 10.88 in^2 S = 13.1 in^3 No. of members= 1 I = 47.6 in^4 CD= 1.25 E = 1,600,000 psi CF= 1.20 Va = 1.305 kips CV= 1.00 Ma = 0.986 k-ft Cr= 1.15 Total Load L/n= 180 Live Load L/n= 240 L= 15ft 0.35 0.35 Uniform load (W1) D L Trib w1,1 (15 + 20) x 1.33 = 19.95 + 26.6 w1,2 ( + ) x 0 = 0 + 0 w1,3 ( + ) x 0 = 0 + 0 w1,4 ( + ) x 0 = 0 + 0 w1,5 ( + ) x 0 = 0 + 0 W1 = 19.95 + 26.6 =0.047 kl Triangular load (W2) D L Trib ` w2,1 (0 + 0) x 0 = 0 + 0 w2,2 (0 + 0) x 0 = 0 + 0 w2,3 (0 + 0) x 0 = 0 + 0 w2,4 (0 + 0) x 0 = 0 + 0 w2,5 (0 + 0) x 0 = 0 + 0 W2 = 0 + 0 =0.000 kl Point Load (P1) D L Trib.1 Trib.2 p1,1 ( + ) x 0 x 0 = 0 + 0 p1,2 ( + ) x 0 x 0 = 0 + 0 p1,3 ( + ) x 0 x 0 = 0 + 0 p1,4 ( + ) x 0 x 0 = 0 + 0 p1,5 ( + ) x 0 x 0 = 0 + 0 X1 (ft) X2 (ft) P1 = 0 + 0 =0.00 kips 0 15 Point Load (P2) D L Trib.1 Trib.2 p2,1 ( + ) x 0 x 0 = 0 + 0 p2,2 ( + ) x 0 x 0 = 0 + 0 p2,4 ( + ) x 0 x 0 = 0 + 0 p2,4 ( + ) x 0 x 0 = 0 + 0 p2,5 ( + ) x 0 x 0 = 0 + 0 X3 (ft) X4 (ft) P2 = 0 + 0 =0.00 kips 0 15 Shear R1= 0.349 kips R2= -0.349 kips Stress Ratio Vmax= 0.35 kips allow.1.63 x 1 = 1.6313 kips OK .21 Flexure M= 1.31 k-ft Mallow.1.70 x 1 = 1.7001 k-ft OK .77 Deflection D =D w1 + Dw2 + D p1 + Dp2 D (D+L)= 0.696 + 0.000 + 0.000 + 0.000 = 0.70 = L < L OK deflection:.70 259 180 0.696 + 0 D (L Only)= 0.398 + 0 + 0 +0 = 0.398 = L L OK deflection:.53 453 240 USE:1- 2X8 RJ1 flexure: shear: 7/26/24 12:00 AM 25 2320 W Dahl Ln & Unit# 23/11/2025 CASTILLO ENGINEERING INC.Project 2320 W DAHL LN 1327 Loma Avenue Long Beach, CA 90804 Engr.Date:Job No.22-10072 Sheet Tag Beam 5 L =6.25 ft Member=2x6 A =8.25 in^2 S =7.6 in^3 No. of members=1 I =20.8 in^4 CD=1.25 E =1,600,000 psi CF=1.30 Va =0.990 kips CV=1.00 Ma =0.567 k-ft Cr=1.15 Total Load L/n=180 Live Load L/n=240 L=6.25ft 0.15 0.15 Uniform load (W1) D L Trib w1,1 (15 +20)x 1.33 =19.95 +26.6 w1,2 (16 +)x 0 =0 +0 w1,3 (+)x 0 =0 +0 w1,4 (+)x 0 =0 +0 w1,5 (+)x 0 =0 +0 W1 =19.95 +26.6 =0.047 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 0 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 0 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 p1,1 (+)x 0 x 0 =0 +0 p1,2 (+)x 0 x 0 =0 +0 p1,3 (+)x 0 x 0 =0 +0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 6.25 Point Load (P2) D L Trib.1 Trib.2 p2,1 (+)x 0 x 0 =0 +0 p2,2 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 6.25 Shear R1=0.145 kips R2=-0.145 kips Stress Ratio Vmax=0.15 kips Vallow.=1.24 x 1 =1.2375 kips OK .12 Flexure M=0.23 k-ft Mallow.=1.06 x 1 =1.0599 k-ft OK .21 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.048 +0.000 +0.000 +0.000 =0.05 =L <L OK deflection:.12 1562 180 0.048 +0 D (L Only)=0.027 +0 +0 +0 =0.03 =L L OK deflection:.09 2733 240 USE:1- 2X6 shear: 7/25/24 12:00 AM RJ2 flexure: 26 2320 W Dahl Ln & Unit# 23/11/2025 CF1 CF 2 CF 2 F1 6.29K F3 0.97K F4 0.246K F2 7.43K F3 0.97K F4 0.246K FOUNDATION KEY PLAN 27 2320 W Dahl Ln & Unit# 23/11/2025 ARCHITECT CASTILLO ENGINEERING, INC.JOB 2320 W DAHL LN 1205 Pine Avenue, Suite 201, Long Beach, CA 90813 ENGR. MC DATE JOB NO. 22-10072 SHEET NO. CONTINUOUS FOOTINGS CF-1 LOADING:TRIB. ( + ) x ft = + ( + ) x ft = + ( + ) x ft = + w = + =plf B=plf = ft psf USE: CF-2 LOADING:TRIB. ( + ) x ft = + ( + ) x ft = + ( + ) x ft = + w = + =plf B=plf = ft psf USE:1'-0" WIDE FTG. 740.5 1'-0" WIDE FTG. 350 350 0 0 390.5 740.5 0.58 1275 128 262.5 WALL: 16 0 8 FLOOR:40 0 ROOF: 0 0.27 D L 17.515 20 15 1275 346.75 128 125 0 0 93.75 0 125 0 WALL:8 25/07/2024 20 D L ROOF: FLOOR: 15 6.25 346.75 16 221.75 4015 0 F-CONTINUOUS FOOTINGS-1500 28 2320 W Dahl Ln & Unit# 23/11/2025 ARCHITECT Castillo Engineering, Inc.PROJECT 2320 W DAHL LN 1205 Pine Avenue, Suite 201 Long Beach, CA 90813 ENGR. MC DATE JOB NO. 22-10072 SHEET NO. A = 12 ( 32 + 3.50 + 32 ) =L 67.5 in 5.63 ft q = 1500 psf (BEARING CAPACITY)(SELF WEIGHT) PA =1500 -( 5.63 x 2.67 )=K Pload =1.9505 K Pnet =5.89 k 144 5.63 ft2 CF1. CAPACITY CHECK 1000 25/07/2024 40( 5.63 )7.84 Pnet = 5.89 29 2320 W Dahl Ln & Unit# 23/11/2025 ARCHITECT Castillo Engineering, Inc.PROJECT 2320 W DAHL LN 1205 Pine Avenue, Suite 201 Long Beach, CA 90813 ENGR. MC DATE JOB NO. 22-10072 SHEET NO. A = 12 ( 32 + 3.50 + 32 ) =L 67.5 in 5.63 ft q = 1500 psf (BEARING CAPACITY)(SELF WEIGHT) PA =1500 -( 5.63 x 2.67 )=K Pload =4.1653 K Pnet =3.68 k 144 5.63 ft2 CF2. CAPACITY CHECK 1000 25/07/2024 40( 5.63 )7.84 Pnet = 3.68 30 2320 W Dahl Ln & Unit# 23/11/2025 ARCHITECT CASTILLO ENGINEERING INC.JOB 2320 W DAHL LN 1205 Pine Avenue, Suite 201 Long Beach, CA 90813 ENGR. MC DATE JOB NO. 22-10072 SHEET NO. SPREAD FOOTINGS P1 =K P2 =K P3 =K P4 =K TOTAL =K P ALLOW.=K USE:TYPE 2.5 FOOTING P1 =K P2 =K P3 =K P4 =K TOTAL =K P ALLOW.=K USE:TYPE 2.5 FOOTING P1 =K P2 =K P3 =K P4 =K TOTAL =K P ALLOW.=K USE:TYPE 1.5 FOOTING P1 =K P2 =K P3 =K P4 =K P TOTAL =K P ALLOW.=K USE:TYPE 1.5 FOOTING 0.97 3.04 F3 0 8.44 0 0 0 0 7.43 0 0 F4 0.246 0.246 3.04 0 F1 6.29 0 0 F2 0.97 25/07/2024 0 0 6.29 8.44 7.43 F-SPREAD FOOTINGS1500 31 2320 W Dahl Ln & Unit# 23/11/2025 ASCE Hazards Report Address: 2320 W Dahl Ln Santa Ana, California 92704 Standard:ASCE/SEI 7-22 Latitude:33.731682 Risk Category:II Longitude:-117.899844 Soil Class:Default Elevation:63.047423589039795 ft (NAVD 88) Page 1 of 4https://ascehazardtool.org/Thu Jul 25 2024 32 2320 W Dahl Ln & Unit# 23/11/2025 PGA M : 0.67 SMS : 1.74 SM1 : 1.23 SDS : 1.16 SD1 : 0.82 T L : 8 SS : 1.49 S1 : 0.56 VS30 : 260 Seismic Design Category:D Multi-Period Design Spectrum S (g) vs T(s)a Multi-Period MCE SpectrumR S (g) vs T(s)a Two-Period Design Spectrum S (g) vs T(s)a Two-Period MCE SpectrumR S (g) vs T(s)a Design Vertical Response Spectrum Vertical ground motion data has not yet been made available by USGS. MCE Vertical Response SpectrumR Vertical ground motion data has not yet been made available by USGS. Seismic DefaultSite Soil Class: Results: Page 2 of 4https://ascehazardtool.org/Thu Jul 25 2024 33 2320 W Dahl Ln & Unit# 23/11/2025 Data Accessed: Thu Jul 25 2024 Date Source: USGS Seismic Design Maps based on ASCE/SEI 7-22 and ASCE/SEI 7-22 Table 1.5-2. Additional data for site-specific ground motion procedures in accordance with ASCE/SEI 7-22 Ch. 21 are available from USGS. Page 3 of 4https://ascehazardtool.org/Thu Jul 25 2024 34 2320 W Dahl Ln & Unit# 23/11/2025 The ASCE Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or has been extrapolated from maps incorporated in the ASCE standard. While ASCE has made every effort to use data obtained from reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation, relationship, or sponsorship of such third-party content by or from ASCE. ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the contents of this Tool or the ASCE standard. In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors, employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE Hazard Tool. Page 4 of 4https://ascehazardtool.org/Thu Jul 25 2024 35 2320 W Dahl Ln & Unit# 23/11/2025 A= 2672.70 SQ. FT. P= 225.5 FT. ROOF AREA AND WALLS PERIMETER 36 2320 W Dahl Ln & Unit# 23/11/2025 Castillo Engineering Inc.JOB: 1205 Pine Avenue, Suite 201 Long Beach, CA 90813 ENGR:JOB NO. SEISMIC BASE SHEAR (ASCE 7-22) Degrees Degrees (Table 20.3-1) R =(Table 12.2-1) SMS = S1 = SM1 = SDS = (2/3)SMS (11.4-3) = (2/3)x = SD1 = (2/3)SM1 (11.4-4) = (2/3)x = Ta =Ct hn x (12.8-7) =x 12 = V = Cs W VMIN = W VMIN = 0.5 S1 Ie W For S1 is equal to or greater than 0.6g = x x W = W [GOVERNS] VMAX = W =x W =W x V =r W =x x W =x W = W [Strength Level] V = x W 2320 W DAHL LN 22-10072 D 6.5 FG DATE: 25/07/2024 Latitude: 0.132 1.74 1.23 0.820 0.02 0.75 1.74 0.56 Longitude: 33.731682 -117.8998 SITE CLASS: 1.23 1.160 0.95862 SDS Ie 0.820 1.00 0.132 6.5 SD1 Ie 6.5 T R 0.01 1.00 6.5 0.043 0.7 0.16 0.233 1.30.179 0.233 R 1.160 1.00 1.3 37 2320 W Dahl Ln & Unit# 23/11/2025 Castillo Engineering Inc.JOB 1205 Pine Avenue, Suite 201 FG DATE JOB NO. 22-10072 SHEET NO. SEISMIC ANALYSIS WEIGHT Wroof = ( 15 + 5.0 ) x ft^2 = kips Wwall = 16 x 8 ft /2 x ft = kips W2 = kips BASE SHEAR = x = x =kips WTOTAL 2320 W DAHL LN 67.9 53.5 225.5 14.4 2672.7 lbs/sq ft 25/07/2024 VBASE ENGR. VBASE 0.16 11.070.16 67.9 (4.140) 38 2320 W Dahl Ln & Unit# 23/11/2025 A=395.67 A=522.74 X1.1 X2.1 X2.2 SHEAR WALLS KEY PLAN X 39 2320 W Dahl Ln & Unit# 23/11/2025 A=460.95 A=457.46 Y1 . 1 Y2 . 1 Y2 . 2 SHEAR WALLS KEY PLAN Y 40 2320 W Dahl Ln & Unit# 23/11/2025 ARCHITECT JOB 2320 W DAHL LN CASTILLO ENGINEERING, INC. 1205 PINE AVE ENGR. MC DATE:LONG BEACH CA JOB NO. 22-10072 SHEET NO. SEISMIC FORCES First Floor Shearwall Forces L1 Level 1 F1=4.140 psf SW U-FORCE T.A.FORCE L1 L2 L3 L4 X1 4.14 395.67 1.64 KIPS 31.00 ft X2 4.14 522.74 2.16 KIPS 5.25 ft 10.75 ft Y1 4.14 460.95 1.91 KIPS 14.08 ft Y2 4.14 457.46 1.89 KIPS 4.50 ft 7.00 ft July 25, 2024 LENGHT WALLS 41 2320 W Dahl Ln & Unit# 23/11/2025 ARCHITECT JOB 2320 W DAHL LN CASTILLO ENGINEERING, INC. 1205 Pine Avenue, Suite 201 ENGR. MC DATE:Long Beach, CA 90804 22-10072 SHEET NO. TAG:X1.1 ( 31.00 ft), FORCE: SEISMIC GOVERNS F1=kips Load Comb. :(0.6-.14SDS) D + E SDS :1.16 SHEAR STRESS X1.1 :L1=ft v=lbs =plf ft Ltotal=ft OVERTURNING height= 8.00 ft MOT=x x 8 = ROOF:psf x ft =plf h/w= 0.26 OK WALL:psf x ft =plf w =plf Vallow= 340 PLF MR=x 31.00 ^2/2 =k-ft USE: TYPE 6 SHEARWALL - 0.44 x =kips kips OK USE:4x 4 POST w/H.D. 148 HDU2 53 31.00 July 25, 2024 1.3315 TributaryUnit load 1.64 SHEARWALL CALCULATIONS 1638 31.00 X1.1 T= Tallow= 13.1 0.00 WALL: 0.148 16 1.64 0.00 31.00 31.00 71.09 71.09 8.00 13.1 20 128 31.00 31.00 42 2320 W Dahl Ln & Unit# 23/11/2025 ARCHITECT JOB 2320 W DAHL LN CASTILLO ENGINEERING, INC. 1205 Pine Avenue, Suite 201 ENGR. MC DATE:Long Beach, CA 90804 22-10072 SHEET NO. TAG:X2.1 ( 5.25 ft),X2.2 ( 10.75 FORCE: SEISMIC GOVERNS F1=kips Load Comb. :(0.6-.14SDS) D + E SDS :1.16 SHEAR STRESS X2.1 :L1=ft v=lbs =plf X2.2 :L2=ft ft Ltotal=ft OVERTURNING height= 8.00 ft MOT=x x 8 = ROOF:psf x ft =plf h/w= 1.52 OK WALL:psf x ft =plf w =plf Vallow= 340 PLF MR=x 5.25 ^2/2 =k-ft USE: TYPE 6 SHEARWALL - 0.44 x =kips kips OK USE:4x 4 POST w/H.D. height= 8.00 ft MOT=x x 8 = ROOF:psf x ft =plf h/w= 0.74 OK WALL:psf x ft =plf w =plf Vallow= 340 PLF MR=x 10.75 ^2/2 =k-ft USE: TYPE 6 SHEARWALL - 0.44 x =kips kips OK USE:4x 4 POST w/H.D. 181 16.00 181 HDU2 HDU2 135 16.00 July 25, 2024 3.5015 TributaryUnit load 10.43 2.16 SHEARWALL CALCULATIONS 2164 0.181 0.6611.63 16.00 X2.1 T= Tallow= 5.7 3.08 WALL: 0.181 16 2.16 0.87 5.25 5.25 10.75 2.49 2.49 8.00 5.7 53 128 16.00 5.25 Unit load Tributary 11.63 10.75 53 16 15 8.00 10.75 10.43 WALL:X2.2 2.16 128 3.50 Tallow=3.08 T= 43 2320 W Dahl Ln & Unit# 23/11/2025 ARCHITECT JOB 2320 W DAHL LN CASTILLO ENGINEERING, INC. 1205 Pine Avenue, Suite 201 ENGR. MC DATE:Long Beach, CA 90804 22-10072 SHEET NO. TAG:Y1.1 ( 14.08 ft), FORCE: SEISMIC GOVERNS F1=kips Load Comb. :(0.6-.14SDS) D + E SDS :1.16 SHEAR STRESS Y1.1 :L1=ft v=lbs =plf ft Ltotal=ft OVERTURNING height= 8.00 ft MOT=x x 8 = ROOF:psf x ft =plf h/w= 0.57 OK WALL:psf x ft =plf w =plf Vallow= 340 PLF MR=x 14.08 ^2/2 =k-ft USE: TYPE 6 SHEARWALL - 0.44 x =kips kips OK USE:4x 4 POST w/H.D. 391 HDU2 136 14.08 July 25, 2024 17.5015 TributaryUnit load 1.91 SHEARWALL CALCULATIONS 1908 14.08 Y1.1 T= Tallow= 15.3 0.00 WALL: 0.391 16 1.91 0.00 14.08 14.08 38.71 38.71 8.00 15.3 263 128 14.08 14.08 44 2320 W Dahl Ln & Unit# 23/11/2025 ARCHITECT JOB 2320 W DAHL LN CASTILLO ENGINEERING, INC. 1205 Pine Avenue, Suite 201 ENGR. MC DATE:Long Beach, CA 90804 22-10072 SHEET NO. TAG:Y2.1 ( 4.50 ft),Y2.2 ( 7.00 FORCE: SEISMIC GOVERNS F1=kips Load Comb. :(0.6-.14SDS) D + E SDS :1.16 SHEAR STRESS Y2.1 :L1=ft v=lbs =plf Y2.2 :L2=ft ft Ltotal=ft OVERTURNING height= 8.00 ft MOT=x x 8 = ROOF:psf x ft =plf h/w= 1.78 OK WALL:psf x ft =plf w =plf Vallow= 340 PLF MR=x 4.50 ^2/2 =k-ft USE: TYPE 6 SHEARWALL - 0.44 x =kips kips OK USE:4x 4 POST w/H.D. height= 8.00 ft MOT=x x 8 = ROOF:psf x ft =plf h/w= 1.14 OK WALL:psf x ft =plf w =plf Vallow= 340 PLF MR=x 7.00 ^2/2 =k-ft USE: TYPE 6 SHEARWALL - 0.44 x =kips kips OK USE:4x 4 POST w/H.D. 391 11.50 391 HDU2 HDU2 165 11.50 July 25, 2024 17.5015 TributaryUnit load 9.57 1.89 SHEARWALL CALCULATIONS 1894 0.391 0.729.22 11.50 Y2.1 T= Tallow= 5.9 3.08 WALL: 0.391 16 1.89 0.93 4.50 4.50 7.00 3.95 3.95 8.00 5.9 263 128 11.50 4.50 Unit load Tributary 9.22 7.00 263 16 15 8.00 7.00 9.57 WALL:Y2.2 1.89 128 17.50 Tallow=3.08 T= 45 2320 W Dahl Ln & Unit# 23/11/2025 SANTA ANA CITY COUNCIL Mayor vamezcua@santa-ana.org Mayor Pro Tem, Ward 1 tphan@santa-ana.org Ward 2 bvazquez@santa-ana.org Ward 3 jessielopez@santa-ana.org Ward 4 pbacerra@santa-ana.org Ward 5 jryanhernandez@santa-ana.org Ward 6 dpenaloza@santa-ana.org MAYOR Valerie Amezcua MAYOR PRO TEM Thai Viet Phan COUNCILMEMBERS Phil Bacerra Johnathan Ryan Hernandez Jessie Lopez David Penaloza Benjamin Vazquez CITY OF SANTA ANA PLANNING AND BUILDING AGENCY 20 Civic Center Plaza ● P.O. Box 1988 Santa Ana, California 92702 www.santa-ana.org INTERIM CITY MANAGER Alvaro Nuñez CITY ATTORNEY Sonia R. Carvalho CITY CLERK Jennifer L. Hall July 21, 2024 Also sent via email to: julie@castilloengineering.com Imelda A. Villegas 2320 West Dahl Lane Santa Ana, CA 92704 Subject: Address Assignment for an Attached Accessory Dwelling Unit located at 2320 West Dahl Lane (APN: 109-081-23) in Santa Ana, CA Dear Imelda, The City of Santa Ana Planning and Building Agency (PBA) is the responsible agency for legal addressing within the City of Santa Ana’s jurisdiction. This letter confirms the address assignment for a 700-square-foot garage-conversion ADU located at 2320 West Dahl Lane (APN: 109-081- 23). Notice is hereby given that the following assigned address shall be posted onsite per the approved address plan, attached hereto as Exhibit A. Address to be Activated/Posted To subdivide commercial and/or residential units into multiple units, a building permit (and all other associated permits), plans, and inspection approvals by the PBA are required. The address will be verified during inspections by the Building Safety Division. Please update your records accordingly. Should you have any questions, feel free to contact me by phone at (714) 664-2753 or by email at PRaj@santa-ana.org. Sincerely, Punkaj Raj Planning Technician Exhibit A – Address Plan 2320 W Dahl Ln & Unit# 23/11/2025 Address Letter for 2320 West Dahl Lane Page 2 of 2 c: Vencent Quaglia, United States Post Office Chris Tuiolosega, United States Post Office Cipriano Corona, Marketing Manager, United States Post Office Alex Alvarez, Postmaster Santa Ana, United States Post Office Federal Express, Administration Cathy Joseph, Garden Grove Unified School District Christine Hy, Garden Grove Unified School District Cathy Slader, Orange Unified School District Orin Williams, Santa Ana Unified School District Yvette Miranda, Santa Ana Unified School District Cristina Bernal, Tustin Unified School District Mishele Richards, Orange County Fire Authority, GEO Files Coordinator Orange County Fire Authority Neal Kelly, Registrar of Voters Members, Board of Supervisors Southern California Gas Company Southern California Edison Company Claude Parrish, County Assessor's Office SAG, AT&T UPS, Administration City Manager’s Office Beverly Martin, Police Community Services Specialist Boris Duran, Police Systems Manager Jennifer Mendoza, Police Communications Manager Chris Hubbard, Police Systems Support Analyst Alejandra Gutierrez, Treasury & Customer Services Manager Hector Jimenez, Revenue Supervisor Alfonso Chavez, Utilities Customer Services Supervisor Judson Brown, Housing & Neighborhood Development Manager Rudy Rosas, Principal Civil Engineer Zdenek (Zed) Kekula, Principal Civil Engineer Jason Kwak, Building Safety Manager Evelyn LaRocca, Permit Supervisor Kathy Hernandez, Permit Technician Julie Amsden, Permit Technician Ali Pezeshkpour, Planning Manager Jerry Guevara, Senior Planner Alvaro Nunez, PBA Assistant Director and Code Enforcement Manager 2320 W Dahl Ln & Unit# 23/11/2025 (N) ADU2320 W. DAHLLANE, UNIT 2 (E) SINGLE-FAMILY DWELLING2320 W. DAHL LANE EXHIBIT A: ADDRESS PLAN 2320 W Dahl Ln & Unit# 23/11/2025 O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Submittal Criteria Form Required for Single Family or Duplex Residences (Use Commercial form for lots with 3+ dwelling units or new residential tracts) Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification. Project Information  New Single Family Residence/Duplex  Addition/Remodel  ADU  Other Address: Unit #: City or Unincorporated County Area: ZIP: Scope of Work: Existing Area: Area to be Added: Total Resulting Area: Stories: Area Added in Past 2 Years (excluding this project): Yes No Questionnaire OCFA Plan Type if “Yes” 1.   New – Is this a new single family residence or duplex? *(PR160) Residential Site with Water Availability (PR400-402) Fire Sprinkler 2.   ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has fire sprinklers or a house that will have fire sprinklers added as part of this project? (PR400-402) Fire Sprinkler 3.   Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire sprinkler retrofit based on a threshold set by local ordinance? (PR400-402) Fire Sprinkler 4.   Distance – Is the most remote portion of the addition, ADU or other detached structure greater than 140-feet from the fire access roadway? *(PR160) Residential Site 5.   Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non- sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all enclosed spaces, such as garages, stairs, and detached structures separated by less than 10-feet? *(PR160) Residential Site with Water Availability 6.   Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed contractor to determine if a fire sprinkler modification is needed. (PR400-402) Fire Sprinkler 7.   Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold set by local ordinance? *(PR160) Residential Site (PR400-402) Fire Sprinkler 8.   Gate – Is a gate being installed across a driveway or road that is designated as a fire department access roadway, or a driveway or road that serves more than a single home/duplex? (PR180) Gate 9.   Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000 sf, and ADU’s). *(PR160) Residential Site *(PR172-174) Methane Test/Mitigation Plans 10.   Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation, or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as defined by the State, or (D) near an area that could be affected by a wildfire in the open space. *(PR125) Fuel Modification (PR182) Accessory Structure *OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals. Applicant Certification I certify, under penalty of perjury, under the laws of the State of California, that the information above is true: Print Name:_______________________________________ Signature:___________________________________________ Date:______________ Phone Number:_____________________________________________ Email:_____________________________________________________________ Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required. ______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes” and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination. For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100 SFR 2320 W Dahl Ln & Unit# 23/11/2025 2320 W Dahl Ln & Unit# 23/11/2025 Page 1 of 1 EXISTING ONE & TWO FAMILY DWELLINGS ELECTRICAL SERVICES UNDERGROUND EXCEPTION CEC 2022 ELC-04 All new utility connections are required to be installed below grade by Santa Ana Municipal Code 41- 626(b). There is a standing exception for one and two family dwellings. This exception applies only when the new electrical service is designed to be fed from below grade as well as overhead. This diagram is a typical unit. The utility is able to feed this cabinet from the top or the bottom without interfering with the distribution wiring. All the circuit breakers and branch circuits are contained in the circuit breaker side of this cabinet. Only listed combination overhead and underground feed service boxes may be used to connect to an overhead utility drop. This exception to an underground fed service applies only to existing single family and two family residences. Planning & Building Agency Permits & Plan Check Section 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 Rigid Conduit Service Entrance Conductor Riser Underground Service Lateral METER Rev. 1/21/2020 2320 W Dahl Ln & Unit# 23/11/2025