Loading...
HomeMy WebLinkAbout2102 S Flower St - PlanFP E E E E E G E E E E CE 50.25 CE 50.13 CE 50.49 (E) BUILDING TO BE DEMOLISHED (E) BUILDING TO BE DEMOLISHED (E) BUILDING TO BE DEMOLISHED (E) POOL & ASSOCIATED COMPONENTS TO BE DEMOLISHED PROTECT (E) PLAYGROUND (E) PARKING LOT PLAN NORTH PROTECT (E) SHADE STRUCTURE S F L O W E R S T SCOPE OF WORK (E) PLAQUE TO BE SALVAGED AND RELOCATED, S.L.D. V.I.F. 141" V.I.F. 294" V.I.F. 141" REMOVE (E) FLAGPOLE. ALL FLAGS TO BE RETURNED BACK TO THE CITY, S.L.D. EXISTING ELECTRICAL UTILITIES, S.E.D. FOR SCOPE OF WORK (E) MURAL WALL TO BE SALVAGED AT CURRENT LOCATION CONFER WITH SEOR & MURAL PRESERVATION TEAM ON HOW WING WALLS OF MURAL ARE TO BE DEMOLISHED PROPERTY LINE 15 ' - 0 " PRIOR TO DEMOLITION OF POOL DECK, SAWCUT AROUND MURAL SCOPE OF WORK, S.L.D. (E) "PARK RULES" SIGN TO BE RETURNED TO OWNER 03/31/25 ARCHITECT: ELS ARCHITECTURE AND URBAN DESIGN 2040 Addison Street Berkeley, CA 94704 P: 510.549.2929 CIVIL ENGINEER: KPFF 700 South Flower Street, Suite 2100 Los Angeles, CA 90017 P: 213.418.0201 LANDSCAPE ARCHITECT: SWA 570 Glenneyre Street Laguna Beach, CA 92651 P: 949.497.5471 STRUCTURAL ENGINEER: JOHN A. MARTIN & ASSOCIATES 950 South Grand Avenue, 4th Floor Los Angeles, CA 90015 P: 213.483.6490 MECHANICAL & ELECTRICAL ENGINEER: GUTTMANN & BLAEVOET 1620 Montgomery Street, Suite 230 San Francisco, CA 94111 P: 415.655.4000 AQUATICS: AQUATIC DESIGN GROUP 2226 Faraday Avenue Carlsbad, CA 92008 P: 760.438.8400 SPECIFICATIONS: SPECWEST 1975 E. Buck Ridge Pl Tucson, AZ 85737 P: 800.646.3820 SHEET NUMBER: PROJECT NUMBER: DATE: ISSUE: SHEET TITLE: PROJECT: CLIENT: PROJECT TEAM: STAMP: PERMIT SUBMITTAL SITE DEMOLITION PLAN A100D JULY 29, 2024 CITY OF SANTA ANA 20 CIVIC CENTER PLAZA, SANTA ANA, CA 92701 SANTA ANA MEMORIAL PARK AQUATICS CENTER 2102 S FLOWER ST SANTA ANA, CA 92707 202305 3/64" = 1'-0"1 SITE DEMOLITION PLAN 1. SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION. 2. VERIFY CONDITIONS IN FIELD PRIOR TO START OF CONSTRUCTION. BRING DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT TO OBTAIN RESOLUTION PRIOR TO PROCEEDING WITH THE WORK. 3. PREPARE SITE PER RECOMMENDATIONS IN GEOTECH REPORT. 4. FOR TREES TO BE SALVAGED, SEE LANDSCAPE DRAWINGS. 5. AREA WITHIN SCOPE OF WORK LINE TO BE DEMOLISHED U.O.N. BY OTHER DISCIPLINES. 6. GROUND MITIGATION TO OCCUR PER THE GEOTECH REPORT. 7. REFER TO AS-BUILTS PROVIDED BY OWNER FOR MORE INFORMATION ON EXISTING STRUCTURES AND UTILITIES. SHEET NOTES REVISION NUMBER DATE DESCRIPTION Bldg #101120240 APPROVALS: Plng - P. Raj 2102 S Flower St 1/16/2025 FL O W E R S T R E E T SAINT GERTRUDE PLACE ANAHURST PLACE PERMIT SUBMITTAL JULY 29, 2024 CITY OF SANTA ANA 20 CIVIC CENTER PLAZA, SANTA ANA, CA 92701 SANTA ANA MEMORIAL PARK AQUATICS CENTER 2102 S FLOWER ST, SANTA ANA, CA 92707 202305 REVISION NUMBER DATE DESCRIPTION ARCHITECT: ELS ARCHITECTURE AND URBAN DESIGN 2040 Addison Street Berkeley, CA 94704 P: 510.549.2929 CIVIL ENGINEER: KPFF 700 South Flower Street, Suite 2100 Los Angeles, CA 90017 P: 213.418.0201 LANDSCAPE ARCHITECT: SWA 570 Glenneyre Street Laguna Beach, CA 92651 P: 949.497.5471 STRUCTURAL ENGINEER: JOHN A. MARTIN & ASSOCIATES 950 South Grand Avenue, 4th Floor Los Angeles, CA 90015 P: 213.483.6490 MECHANICAL & ELECTRICAL ENGINEER: GUTTMANN & BLAEVOET 1620 Montgomery Street, Suite 230 San Francisco, CA 94111 P: 415.655.4000 AQUATICS: AQUATIC DESIGN GROUP 2226 Faraday Avenue Carlsbad, CA 92008 P: 760.438.8400 SPECIFICATIONS: SPECWEST 1975 E. Buck Ridge Pl Tucson, AZ 85737 P: 800.646.3820 SHEET NUMBER: PROJECT NUMBER: DATE: ISSUE: SHEET TITLE: PROJECT: CLIENT: PROJECT TEAM: STAMP: NOT F O R CON S T R U C T I O N DEMOLITION PLAN C1.20 2102 S Flower St 1/16/2025 FP E E G E E CE 50.25 CE 50.13 CE 50.49 EXISTING SPORTS FIELDS (E) MSB-AL2 2 3 1 1 (E) BUILDING TO BE DEMOLISHED (E) BUILDING TO BE DEMOLISHED (E) POOL & ASSOCIATED COMPONENTS TO BE DEMOLISHED (E) BUILDING TO BE DEMOLISHED (E) BUILDING TO BE DEMOLISHED (E) PARKING LOT, N.I.C. PROTECT (E) PLAYGROUND SCOPE OF WORK PROTECT (E) SHADE STRUCTURE 4 45 5 ARCHITECT: ELS ARCHITECTURE AND URBAN DESIGN 2040 Addison Street Berkeley, CA 94704 P: 510.549.2929 CIVIL ENGINEER: KPFF 700 South Flower Street, Suite 2100 Los Angeles, CA 90017 P: 213.418.0201 LANDSCAPE ARCHITECT: SWA 570 Glenneyre Street Laguna Beach, CA 92651 P: 949.497.5471 STRUCTURAL ENGINEER: JOHN A. MARTIN & ASSOCIATES 950 South Grand Avenue, 4th Floor Los Angeles, CA 90015 P: 213.483.6490 MECHANICAL & ELECTRICAL ENGINEER: GUTTMANN & BLAEVOET 1620 Montgomery Street, Suite 230 San Francisco, CA 94111 P: 415.655.4000 AQUATICS: AQUATIC DESIGN GROUP 2226 Faraday Avenue Carlsbad, CA 92008 P: 760.438.8400 SPECIFICATIONS: SPECWEST 1975 E. Buck Ridge Pl Tucson, AZ 85737 P: 800.646.3820 SHEET NUMBER: PROJECT NUMBER: DATE: ISSUE: SHEET TITLE: PROJECT: CLIENT: PROJECT TEAM: STAMP: SHEET NOTES PERMIT SUBMITTAL OVERALL SITE PLAN - POWER DEMO E100D JULY 29, 2024 CITY OF SANTA ANA 20 CIVIC CENTER PLAZA, SANTA ANA, CA 92701 SANTA ANA MEMORIAL PARK AQUATICS CENTER 2102 S FLOWER ST SANTA ANA, CA 92707 202305 1" = 20'-0"1 SITE DEMOLITION PLAN - POWER A. REFER TO DEMOLITION DRAWINGS FOR ALL WORK ASSOCIATED TO BE REMOVED. DEMO WORK ARE DEPICTED BY WALLS DRAWN AS DASHED LINES. B. REMOVE AND DISPOSE OF ALL ELECTRICAL EQUIPMENT, RACEWAY AND WIRING IN AREAS AFFECTED EXCEPT FOR ITEMS INDICATED TO REMAIN OR COULD BE RE-USED. C. ALL DEMOLITION WORK SHALL BE IN COMPLIANCE WITH THE LATEST EDITION OF ALL APPLICABLE LOCAL, STATE AND NATIONAL CODES AND REGULATIONS. D. REFER TO DEMOLITION DRAWINGS FOR GENERAL CONDITIONS OF THE WORK AND OTHER REQUIREMENTS. E. CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS BEFORE SUBMITTAL OF BID. F. DEMOLITION DRAWINGS DO NOT INDICATE ALL THE CONDITIONS, DETAILS AND WORK REQUIRED. CONTRACTOR SHALL EXAMINE THE BUILDING TO DETERMINE ACTUAL CONDITIONS AND EXTENT OF THE WORK. ANY DETAILS NOT CLEAR TO THE CONTRACTOR SHALL BE REFERRED TO THE ARCHITECT FOR CLARIFICATION. G. CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND REMOVAL OF ALL EXISTING ELECTRICAL SYSTEMS NOTED TO BE DEMOLISHED. NO PORTION OF THE DEMOLISHED ELECTRICAL SYSTEMS MAY BE ABANDONED IN PLACE. H. DEMOLITION WORK SHALL BE A PHASED OPERATION AND SHALL COMPLY WITH THE CONSTRUCTION SCHEDULE. SUBMIT A SCHEDULE OF DEMOLITION WORK 14 DAYS PRIOR TO THE START OF WORK. CONTRACTOR SHALL NOT PROCEED WITH THE WORK UNTIL RECEIVING WRITTEN PERMISSION. I. COORDINATE THE DEMOLITION OF AFFECTED ELECTRICAL SYSTEMS WITH OTHER TRADES IN ORDER TO EXPEDITE THE WORK AND TO MINIMIZE DOWNTIME. J. PROVIDE TEMPORARY POWER AS NEEDED DURING DEMOLITION IN ORDER TO ALLOW ALL TRADES TO PERFORM THEIR WORK. K. REMOVE EXISTING SYSTEMS, SHOWN OR SPECIFIED, NECESSARY OR REASONABLY INFERRED, FOR COMPLETION OF THE WORK. THE SCHOOL DISTRICT HAS THE OPTION OF RETAINING ANY ITEM OF MATERIAL REMOVED UNDER THIS CONTRACT. ITEM OR MATERIALS NOT RETAINED BY THE SCHOOL DISTRICT SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE PREMISES AND LEGALLY DISPOSED OF OFF-SITE. L. DISPOSE OF FLUORESCENT LAMPS, BALLASTS AND OTHER HAZARDOUS MATERIALS IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS. M. DISCONNECT AND REMOVE ALL LIGHT FIXTURES, SWITCHES, LIGHTING CONTROLS. ASSOCIATED BRANCH WIRING TO REMAIN FOR RE-USE. WHERE COULD BE REUSE, BACKBOXES TO REMAIN FOR RECONNECTION. N. DISCONNECT AND REMOVE ALL DISCONNECTS, STARTERS AND WIRING FOR MOTORS AND MECHANICAL EQUIPMENT WHICH ARE REMOVED. O. REMOVE ALL WIRING DETERMINED TO BE DISCONNECTED AND ABANDONED, AND REMOVE ALL CONDUIT AND JUNCTION BOXES DETERMINED TO BE EMPTY AND NOT INTENDED TO BE REUSED DURING THE CONSTRUCTION PHASE. P. PROTECT REMAINING MAIN SWITCHBOARD, PANELBOARDS AND OTHER ELECTRICAL EQUIPMENT FROM DUST AND DAMAGE DURING DEMOLITION. SAFELY DISCONNECT ANY OTHER DEVICES AND EQUIPMENT BEFORE DEMOLITION. Q. RACEWAYS AND WIRING TO EXTERIOR LIGHTING AND DEVICES SHALL REMAIN. MAINTAIN CONDUIT AND WIRING ENTERING THE BUILDING SO THEY CAN BE RECONNECTED TO EXISTING PANELBOARDS. R. REPAIR ANY REMAINING SURFACES WHICH HAVE BEEN DAMAGED DURING THE WORK. REPAIR SHALL BRING SURFACE BACK TO ORIGINAL CONDITION. REPAIR OR REPLACE CEILING TILES DAMAGED DURING DEMOLITION. S. MAINTAIN CIRCUIT CONTINUITY TO DEVICES IN ADJACENT SPACES BEYOND THE PROJECT AREA. PROVIDE J-BOXES AS REQUIRED FOR RECONNECTION. T. UPDATE ALL PANELBOARD DIRECTORIES ON BRANCH CIRCUIT WIRING THAT HAS BEEN REMOVED IN PANELBOARD TO REMAIN. U. CONTRACTOR IS REQUIRED TO TRACE EXISTING INSTALLATION PRIOR TO DEMOLITION. WHERE EXISTING EQUIPMENT CONNECTIONS ARE AFFECTED BY THE NEW PANELBOARD, RESTORE ALL ELECTRICAL CONNECTION PER EXISTING CONDITION. V. DISCONNECT POWER FROM ALL MECHANICAL OR PLUMBING EQUIPMENT SHOWN TO BE DEMOLISHED ON THE MECHANICAL/PLUMBING DRAWINGS. 1 COORDINATE WITH SCE TO SAFE-OFF AND REMOVAL OF EXISTING SCE EQUIPMENT. SCE RESPONSIBLE FOR REMOVING SERVICE TRANSFORMER, PRIMARY CONDUCTORS, METER AND ANY UPSTREAM EQUIPMENT WITHIN THE OWNER'S PROPERTY AS REQUIRED REMOVE EXISTING MAIN DISTRIBUTION BOARD "MSB-1" & ASSOCIATED LOADS FOR THE EXISTING POOL BUILDING. INTERCEPT FEEDER GOING TO "MSB-2" AND "MUSCO LIGHTS" CIRCUITS AND CONTROLS. CUT- OVER BOTH LOADS TO NEW "MSB". REFER TO SHEET E5.02. REMOVE EXISTING MAIN DISTRIBUTION BOARD "MSB-AL2". INTERCEPT FEEDER GOING TO "AL-DB2" AND (4) LIGHTS. CUT-OVER BOTH LOADS TO NEW "MSB". REFER TO SHEET E5.02. PRIOR TO INTERCEPTING CIRCUITS . TRACE AND CONFIRM EACH CIRCUIT AND DEVICE OF BEST LOCATION TO PLACE JUNTION BOX. COORDINATE WITH AND LANDSCAPE BEST LOCATION OF BOX IN ORDER TO AVOID OBSTRUCTION OF NEW LANDSCAPE AND ARCHITECTURAL FEATURES. RELOCATE, EXTEND OR RE-ROUTE ANY EXISTING CIRCUITS FEEDING EXISTING LOADS TO REMAIN AND WHICH CIRCUITS PASS THROUGH THE AREA OF WORK PROVIDE TEMPORARY POWER FOR THE DURATION OF CONSTRUCTION TO EXISTING LOADS TO REMAIN SEE SLD ON E5.01. TEMPORARY POWER SHALL INCLUDE TEMPORARY GENERATOR AND FUEL CONSUMPTION AND OR UTITLITY TEMPORARY SERVICE. IT IS RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL NECESSARY CONNECTIONS AND EQUIPMENT FOR TEMPORARY POWER. 2 3 4 5 5 3 4 5 2 4MSB-1 MSB-AL2 4 5 DEMOLITION NOTES REVISION NUMBER DATE DESCRIPTION 2102 S Flower St 1/16/2025 EXISTING PLAYGROUND TO REMAIN EXISTING PARKING LOT TO REMAIN S. F L O W E R S T . LI M I T O F W O R K LIMIT OF WORK LI M I T O F W O R K ARCHITECT: ELS ARCHITECTURE AND URBAN DESIGN 2040 Addison Street Berkeley, CA 94704 P: 510.549.2929 CIVIL ENGINEER: KPFF 700 South Flower Street, Suite 2100 Los Angeles, CA 90017 P: 213.418.0201 LANDSCAPE ARCHITECT: SWA 570 Glenneyre Street Laguna Beach, CA 92651 P: 949.497.5471 STRUCTURAL ENGINEER: JOHN A. MARTIN & ASSOCIATES 950 South Grand Avenue, 4th Floor Los Angeles, CA 90015 P: 213.483.6490 MECHANICAL & ELECTRICAL ENGINEER: GUTTMANN & BLAEVOET 1620 Montgomery Street, Suite 230 San Francisco, CA 94111 P: 415.655.4000 AQUATICS: AQUATIC DESIGN GROUP 2226 Faraday Avenue Carlsbad, CA 92008 P: 760.438.8400 SPECIFICATIONS: SPECWEST 1975 E. Buck Ridge Pl Tucson, AZ 85737 P: 800.646.3820 SHEET NUMBER: PROJECT NUMBER: DATE: ISSUE: SHEET TITLE: PROJECT: CLIENT: PROJECT TEAM: STAMP: PERMIT SUBMITTAL JULY 29, 2024 CITY OF SANTA ANA 20 CIVIC CENTER PLAZA, SANTA ANA, CA 92701 SANTA ANA MEMORIAL PARK AQUATICS CENTER 2102 S FLOWER ST, SANTA ANA, CA 92707 202305 REVISION NUMBER DATE DESCRIPTION SCALE:NORTH: Sean O M a l l ey' #3286 12/31/2024 P: \ E L S \ E L S T 3 0 2 S a n t a A n a M e m o r i a l P a r k \ 4 D r a w i n g s G r a p h i c s \ A u t o C A D \ S h e e t s \ C o n s t r u c t i o n S e t \ L 0 . 0 5 D E M O L I T I O N P L A N . d w g | CA N D E R S O N | PR E V I O U S P A P E R S I Z E ( 3 0 . 0 0 X 4 2 . 0 0 I N C H E S ) | 7/ 1 9 / 2 0 2 4 0 10'20' 1" = 20' DEMOLITION PLAN L0.05 DEMOLITION LEGEND ITEM DESCRIPTION ARCHITECT: ELS ARCHITECTURE AND URBAN DESIGN 2040 Addison Street Berkeley, CA 94704 P: 510.549.2929 CIVIL ENGINEER: KPFF 700 South Flower Street, Suite 2100 Los Angeles, CA 90017 P: 213.418.0201 LANDSCAPE ARCHITECT: SWA 570 Glenneyre Street Laguna Beach, CA 92651 P: 949.497.5471 STRUCTURAL ENGINEER: JOHN A. MARTIN & ASSOCIATES 950 South Grand Avenue, 4th Floor Los Angeles, CA 90015 P: 213.483.6490 MECHANICAL & ELECTRICAL ENGINEER: GUTTMANN & BLAEVOET 1620 Montgomery Street, Suite 230 San Francisco, CA 94111 P: 415.655.4000 AQUATICS: AQUATIC DESIGN GROUP 2226 Faraday Avenue Carlsbad, CA 92008 P: 760.438.8400 SPECIFICATIONS: SPECWEST 1975 E. Buck Ridge Pl Tucson, AZ 85737 P: 800.646.3820 SHEET NUMBER: PROJECT NUMBER: DATE: ISSUE: SHEET TITLE: PROJECT: CLIENT: PROJECT TEAM: STAMP: PERMIT SUBMITTAL JULY 29, 2024 CITY OF SANTA ANA 20 CIVIC CENTER PLAZA, SANTA ANA, CA 92701 SANTA ANA MEMORIAL PARK AQUATICS CENTER 2102 S FLOWER ST, SANTA ANA, CA 92707 202305 REVISION NUMBER DATE DESCRIPTION SCALE:NORTH: Sean O M a l l ey' #3286 12/31/2024 2102 S Flower St 1/16/2025 South Coast Air Quality Management District 21865 Copley Drive, Diamond Bar, CA 91765­4182 Phone: (909) 396­2336 www.aqmd.gov Facility ID 158700 Notification Number 817259 Rule 1403 Notification of Procedure 1 3 Asbestos Removal Please maintain a copy of this Notification at the job site, either electronic or paper. Project Type Project Type Asbestos Removal Project Urgency Routine Origin Date 11/11/2024 2:39:27 PM Completed By Christian Garcia Phone Number (310) 999­5723 User Email cgarcia@gamacsi.com Contractor Information Company Name GAMA CONTRACTING SVCS INC Address 1835 FLORADALE AVE City SOUTH EL MONTE State CA Zip 91733 CSLB License #780316 OSHA REG #00943 Supervisor #1 Antonio Ayala Phone (951) 212­8126 Supervisor #2 Jose Castellanos Phone (626) 587­9233 Supervisor #3 Marco Castellanos Phone (626) 712­9442 Supervisor #4 Camilo Flores Phone (626) 639­7785 Supervisor #5 Carlos Huerta Phone (909) 717­2814 Supervisor #6 Erick Marin Phone (323) 595­6570 Supervisor #7 Jorge Morsa Phone (323) 346­7235 Supervisor #8 Armando Perez Phone (714) 492­4072 Supervisor #9 Michael Ponce Phone (626) 454­9782 Supervisor #10 Efren Roman Phone (323) 617­7863 Supervisor #11 Guillermo Ugalde Phone (323) 715­1011 Supervisor #12 Raul Martinez Phone (626) 595­6570 Site Information Site Name Santa Ana Memorial Park Pool Abatement Project #724104PW Site Street #2102 Street Name S FLOWER ST Cross Street Site County City SANTA ANA State CA Zip 92707 Contact Name Zaldy Barte Contact Phone (661)607­2313 Site Owner City of Santa Ana Public Works Owner Address 20 Civic Center Plaza Road City Santa Ana State CA Zip 92701 Project Start Date 1/6/2025 Project End Date 1/10/2025 2102 S Flower St 1/16/2025 Project Work Shift(s)Day Building Size in Sq.ft 5500 Number of Floors 1 Building Age (years)58 Number of Building/Dwelling Units 1 Building Prior Use Public Building Asbestos Survey Yes Asbestos Found Yes Asbestos Removed No Building to be Demolished Yes Describe Work floor tile, floor mastic, transite and mastic abatement Describe Work Location Main lobby, Roof stack and Roof area, seams Project Information Asbestos Information Amount of Asbestos in each type in Sq.Ft Asbestos Amount to be Removed in Sq.Ft FRIABLE 2010    CLASS I 2095    CLASS II 0    Total 4105    Asbestos Removal From Surfaces , Pipes Control Procedures 1 , 3 Asbestos Detection Procedure(s)Survey Survey Information Certified Asbestos Inspector Name Zachary Rosas Certification Expiration Date​4/22/2025 12:00:00 AM Survey Plan Date 8/13/2024 12:00:00 AM Phone Number (949)252­2145 Email navid@omegaenv.com Waste Information Waste Transporter ECTI Address 953 WEST REECE STREET City SAN BERNARDINO State CA Zip 92411   Landfill La Paz County Landfill Address 26999 Highway 95, Mile Post 128 City Parker State AZ Zip 95344 Fee Payment Total Amount of Asbestos to be Removed in sq.ft 4105 Tracking Number 4448885 Project Size Fee 242.32 Additional Fee 0 Total Fee $ 242.32 Acoustic Ceiling 0 Linoleum 0 Insulation 0 Fire Proofing 0 Ducting 0 Dry Wall / Joint Compound 0 HEPA Vacuum & wet wipe 0 Personal Contents, Disposed 0 Mastic (Non­friable)50 Floor Tiles (Non­friable)2010 Transite 35 Roofing 0 Stucco 0 Plaster 0 Other (Friable)2010 Coal Tar Wrap 0 Floor Tile (Friable)0 Other (Non­friable)0 Nonporous Contents, HV&WW 0 2102 S Flower St 1/16/2025 Payment Made $ 242.32 Balance Due $ 0 By clicking the Sign & Submit button, I certify that an individual trained in the provisions of SCAQMD Rule 1403 and the Asbestos NESHAP (CFR Title 40, Part 61, Subpart M) will be onsite during the demolition or renovation and evidence that the required training has been accomplished by this person will be available for inspection during normal business hours. In addition, I certify that all of the information contained herein and information submitted with this Notification is true and correct. 2102 S Flower St 1/16/2025