Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1314 N McLean Dr - Plan
Bldg# 101118135 Elec# 20182009 APPROVALS: ELEC - MSmith The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 1314 N McLean Dr 2/9/2024 SYSTEM SIZE: DC: 5,600 Kw AC: 5.110 Kw <D PATIO COVER _ ___,,,, <D CHIMNEY -- TIE INT□ METER _ ____,,, #222012-784666 NOTES TOTAL R□□F AREA: 2373 FT 2 TOTAL NE� MOD AREA:303 FT 2 EXISTING MOD AREA: 0 FT 2 TOT AL MOD AREA: 303 FT 2 COVERAGE: 13% DESIGN �ILL C□MPL Y �ITH IRC P3102.1.3 ROOF ACCESS FIRE CODE APPROXIMATE POINT SETBACKS CONDUIT RUN □------ VISIBLE LOCKABLE LABELED DISCONNECT LOCATED WITHIN 1 OFT OF UTILITY METER. R□□F SECTION 1 TIL Ti 4/12 (18.43 °)AZIMUTH: 107 COUNT: 14 R□□F TYPE: COMP SHINGLE (N)JUNCTION BOXATTACHED TD ARRAY R□□F PLAN SCALE: 1/8' = 1'-0' Flagship Solar™ FLAGSHIP HOLDINGS LLC 707 18TH STREET BAKERSFIELD, CA 93301 661-428-9293LICENSE: CSLB#1094 787 1��1 TYLER CROSBY LOCATION DRA\rlN BY YUJ DRA\rlING DATE 16 Jo.nuo.ry 2 024 PAGE TITLE PAGE NUMBER SITE PLAN &c PV 2 LAYOUT Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502 Date Certified and Signed: 01/15/2024 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. 88083 , Expiration Date: 03/31/2024 . 1314 N McLean Dr 2/9/2024 1314 N McLean Dr 2/9/2024 1314 N McLean Dr 2/9/2024 Romex (NM Cable) may be run in the attic when origination and termination is made within NEMA 3R junction boxes. MAS(19) New Service Meter Panel must have underground (Lateral) future ability per SAMC. Some models require a "tunnel kit" for this purpose. This service panel is shown to have a PV line-side connection with a 100A Main and 100A loads bus. MAS(19) 1314 N McLean Dr 2/9/2024 1314 N McLean Dr 2/9/2024 DocuSign Envelope ID: 5C553FE9-2F42-4A1D-A538-4C4126D13BD3 1/11/2024 1314 N Mclean DriveChanh Ngo 1314 N McLean Dr 2/9/2024 Certificate Of Completion Envelope Id: 5C553FE92F424A1DA5384C4126D13BD3 Status: Completed Subject: Complete with DocuSign: Customer letter signed needed to submit to City of Santa Ana .pdf Source Envelope: Document Pages: 1 Signatures: 1 Envelope Originator: Certificate Pages: 4 Initials: 0 Trent Allison AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) admin@flagshipsolar.co IP Address: 173.198.109.1 Record Tracking Status: Original 1/11/2024 3:29:34 PM Holder: Trent Allison admin@flagshipsolar.co Location: DocuSign Signer Events Signature Timestamp Chanh Ngo huethingo@yahoo.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 172.56.185.207 Signed using mobile Sent: 1/11/2024 3:31:50 PM Viewed: 1/11/2024 5:42:42 PM Signed: 1/11/2024 5:43:45 PM Electronic Record and Signature Disclosure: Accepted: 1/11/2024 5:42:42 PM ID: dd90c225-e9cc-4c4f-9e17-b1e93cdb9229 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 1/11/2024 3:31:50 PM Certified Delivered Security Checked 1/11/2024 5:42:42 PM Signing Complete Security Checked 1/11/2024 5:43:45 PM Completed Security Checked 1/11/2024 5:43:45 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure 1314 N McLean Dr 2/9/2024 ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Mya Holt (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/13/2023 11:29:18 AM Parties agreed to: Chanh Ngo 1314 N McLean Dr 2/9/2024 Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact Mya Holt: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: mya@flagshipsolar.co To advise Mya Holt of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at mya@flagshipsolar.co and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from Mya Holt To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to mya@flagshipsolar.co and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with Mya Holt To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: 1314 N McLean Dr 2/9/2024 i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to mya@flagshipsolar.co and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that: You can access and read this Electronic Record and Signature Disclosure; and You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and Until or unless you notify Mya Holt as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by Mya Holt during the course of your relationship with Mya Holt. 1314 N McLean Dr 2/9/2024 Date: 01/12/2024 Job Number: 16173 Prepared for : Flagship Holdings LLC, 707 18th St., Bakersfield, CA 93301 Project.: CHANH NGO RESIDENCE , 1314 N MCLEAN DR, Santa Ana, CA, 92703 The following calculations are for the structural engineering design of the photovoltaic panels and are valid only for the structural info referenced in the stamped plan set. The verification of such info is the responsibility of others. After review, I certify that the roof structure has sufficient structural capacity for the applied PV loads. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. Engineerinc.io 303 N Glenoaks Blvd Suite 200 Burbank, CA 91502 (310) 928-0938 new@engineerinc.io Date Certified and Signed: 01/12/2024 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 1314 N McLean Dr 2/9/2024 Solar Module Details Module Type Canadian Module Quantity 14 Module Model Number CS1Y-400MS Design Criteria Code: 2022 California Building Code ASCE 7-16 Live Load (psf)20 Ult Wind Speed (mph)95 Exposure Cat C Ground Snow (psf)0 Structure Geometry Eave Height, he (ft)15 to 20ft Pitch of main roof (deg)18.43 Building Length, L (ft)56 Building Width, B (ft)50 Roof Area (Module Area) ft2 2800.00 Standoff(i.e., Roof Mount) Spacing Feet 4` NOTE: attachments should be installed in a staggered configuratiion to properly destributor loading. Roof Properties Roof Geometry type Gable Roof Roof Type Truss Roof Pitch (deg)18.43 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 1314 N McLean Dr 2/9/2024 Roofing Type Comp Shingles Sheathing Type 1/2" OSB Board Wood species No. 2, Douglas Fir-Larch Wood Fb (psf)900 Wood Fv (psf)180 Wood E (psf)1600000 Purlin C/C Spacing (in)12 Rafter C/C. Spacing (in.)24 Purlin Section Thickness, b (in.)2 Section Depth, d (in.)4 Rafter Section Thickness, b (in.)2 Section Depth, d (in.)4 Maximum Rafter Span (ft)7 Factors Cd(wind)1.60 Cd(Snow)1.60 CLS 1.15 CM 1 Ct 1 CL 0.75 CF 1.5 Cfu 1 Cv 1 Cr 1 M allowable_wind 413.44 M allowable_snow 297.16 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 1314 N McLean Dr 2/9/2024 Dead Load(psf) Comp Shingles 3.00 psf 1/2" OSB Board 2.00 psf Insulation 2.00 psf Total Roof 1DL 7 psf No. 2, Douglas Fir-Larch 31.00 lb/ft3 Solar Panel DL 3.00 psf Roof 1 Roof_Dist_DL 7.00 psf M_Roof_Dist_DL 2329.71 Def_Roof_Dist_DL 1.39 PV_uni_Dist_DL 3.00 psf M_PV_uni_Dist_DL 10.54 Def_PV_uni_Dist_DL 0.01 Total_Uni_DL 11.00 psf M_Total_DL 2340.25 Def_Total_DL 1.39 Snow Load(psf) Ground Snow Load, pg 0 Importance Factor, Ic 1 Thermal Factor, Ct 1 Exposure Factor, Ce 1 Flat roof snow, pF 0 Slope Factor, Cs 1 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 1314 N McLean Dr 2/9/2024 Sloped Row Snow, ps 0 Uni_Dist_S 0.00 M_uni_Dist_s 0.00 Def_uni_Dist_S 0.00 Wind Load Ultimate Wind Speed 95 Directionality Factor,kd 0.85 Topographic factor 1.00 Velocity pressure exposure factor,kz 0.88 Ground Elevation Factor,ke -0.09 Side Wall Width 50 Median Roof Height -4.80 Velocity pressure,qz 17.28 External Pressure Up,GCp_1 -0.3628 External Pressure Up,GCp_2 -0.5686 External Pressure Up,GCp_3 -0.9 External Pressure Down,GCp 0.1372 Design Pressure Up,p_1 -5.24 Design Pressure Up,p_2 -8.21 Design Pressure Up,p_3 -13.00 Design Pressure Up,p 1.98 Uni_Dist_W_up -13.00 M_uni_Dist_W_up -79.63 Def_uni_Dist_W_up -0.05 Uni_Dist_W_down 1.98 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 1314 N McLean Dr 2/9/2024 M_uni_Dist_W_down 12.13 Def_uni_Dist_W_down 0.01 Lag Screw Uplift Check (ASD) 5/16" Lag Screw Withdrawl value 205.00 lb/in Lag Screw Penetration 2.50 in Roof1 0.6D+0.6W(up z1)1594.368 > 512.5 Roof1 0.6D+0.6W(up z2)1592.586 > 512.5 Framing Check (ASD): Roof1 uni 1.0D+0.6W 2347.53 > 413.44 Lag Screw Penetration 2345.71 > 413.44 Roof1 0.6D+0.6W(up z1)2340.25 > 297.16 Roof1 0.6D+0.6W(up z2)1356.37 > 413.44 Seismic Check: Wood 5.00 psf 2x4 Studs @ 16"2.00 psf Gypsum 3.00 psf Misc(insulatioon,etc)2.00 psf Total wall DL 12.00 psf Total Wall Area (Approx)2590.00 ft2 Total Wall W 31080 lbs Total Roof DL 7.50 psf Total Roof Area (Approx)1264.81 ft2 Total Roof W 9486.075 lbs 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 1314 N McLean Dr 2/9/2024 OK PV Panel W 3.00 psf Area of panel 280.00 ft2 Total Roof W 758.89 lbs % increase=(Wadditional)/Wexisting 2.00% The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. Limits of Scope of Work and Liability Existing structure is assumed to have been designed and constructed following appropriate codes at time of erection, and assumed to have appropriate permits. The calculations produced are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were completed according to generally recognized structural analysis standards and procedures, professional engineering and design experience, opinions and judgements. Existing deficiencies which are unknown or were not observable during time of inspection are not included in this scope of work. All PV modules, racking, and mounting equipment shall be designed and installed per manufacturer's approved installation specifications. The Engineer of Record and Engineerinc assume no responsibility for misuse or improper installation. This analysis is not stamped for water leakage. Framing was determined based on information in provided plans and/or photos, along with engineering judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any concerns prior to starting construction. Prior to the commencement of work, the contractor shall verify the existing roof and framing conditions. Notify Engineerinc and the engineer of record of any Discrepancies prior to starting construction. Prior to the commencement of work, the contractor shall inspect framing for any damage such as water damage, cracked framing, etc. and notify the E.O.R. if any issues are found.These plans/calculations are stamped for structural code compliance of the roof framing supporting the proposed PV installation reference only. These plans/calculations are not stamped for water leakage. PV modules, racking, and attachment components must follow manufacturer guidelines and requirements. 303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (310) 928-0938 | new@engineerinc.io 1314 N McLean Dr 2/9/2024 Structural Engineering Letter Date: 01/12/2024 Project Name: CHANH NGO RESIDENCE Project Address: 1314 N MCLEAN DR, Santa Ana, CA, 92703 Contractor : Flagship Holdings LLC Contractor Address : 707 18th St., Bakersfield, CA 93301 Attn : To Whom It May Concern A Field observation of the condition of the existing framing system was performed by an audit team from Flagship Holdings LLC. From the Field observation of the property, the existing roof structure observed as follows: Existing roof is supported by 2 x 4 @ 24" rafters at the solar array. The rafters are sloped at approximately 18.43 degree and have maximum projected horizontal span of 7 feet in between load bearing supports. Design Criteria Applicable codes: 2022 California Building Code ASCE 7-16 Ground Snow Load: 0 psf Roof Dead Load: 20 psf Wind speed: 95 mph Risk Category: II Date Certified and Signed: 01/12/2024 I certify that the capacity of the structural roof framing that directly supports the additional gravity loading due to the solar panel supports and modules had been reviewed and determined to meet or exceed the requirements in accordance with the Design Criteria. If you have any questions or concerns please contact us, Engineerinc.io, 303 N Glenoaks Blvd Suite 200 Burbank, CA 91502 (310) 928-0938 new@engineerinc.io 1314 N McLean Dr 2/9/2024 1314 N McLean Dr 2/9/2024 1314 N McLean Dr 2/9/2024 1314 N McLean Dr 2/9/2024 1314 N McLean Dr 2/9/2024 1314 N McLean Dr 2/9/2024 1314 N McLean Dr 2/9/2024 1314 N McLean Dr 2/9/2024 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2. Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6. Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7. Will the PV system be installed without using any ballast system or counter-weight system? 8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org x x x x x x x x x x 1094787 B Flagship 1314 N Mclean Drive John Tyler Crosby 661-495-3838 Permits@flagshipsolar.co 01/12/2023 1314 N McLean Dr 2/9/2024 1314 N McLean Dr 2/9/2024 KEY FEATURES MBB technology with Circular Ribbon Higher output power Half-cell Technology Positive tolerance offer Bifacial cells, converting more sunlight into electricity Better shading tolerance Certified for salt/ammonia corrosion resistance Load certificates: wind to 2400Pa and snow to 5400Pa Lower LCOE PERC WARRANTY 405W Highest power output ABOUT VSUN Invested by Fuji Solar, VSUN SOLAR is a solar solution provider with headquartered in Tokyo, Japan that offers reliability, high e ciency solar products and technology globally. VSUN is rated as BNEF Tier 1 PV module manufacturer, PVEL Lab "Best performer" and EcoVadis "Bronze Award". PRODUCT CERTIFICATION 2.0%0.45% First-year degradation warranty Annual degradation over 30 years 30 YEAR POWER OUTPUT GUARANTEE 25 YEAR QUALITY ASSURANCE VSUN405-108BMH VSUN405-108BMH VSUN395-108BMH VSUN400-108BMH VSUN390-108BMH 20.74% Module e ciency UL 61730 & CSA 61730 IEC 61215 & IEC 61730 Update Time 2023 5 13: . . 100% Number of 5 years 10 years 15 years 20 years 25 years 30 years 90% 80% 98% 84.95% PERC Bifacial General Bifacial Excellent performance under weak light condition. 0 10 20 30 400 65 130 195 260 325 390 455 0 10 20 30 0 2 4 6 8 12 0 65 130 195 260 325 390 450 0 0 AM1.5,1000W/M2 Voltage/V Voltage/V Voltage/V 25℃ 10℃, Pmpp=424W 25℃, Pmpp=405W 40℃, Pmpp=386W 55℃, Pmpp=366W 70℃, Pmpp=347W 1000W/M2 800W/M2 600W/M2 400W/M2 200W/M2 2 4 6 8 10 40 10 20 30 40 10 12 14 14 B-Mounting Hole B A 109 ±3(43.03) 2 BACK VIEW 8 place 9(0.35) 30(1.18) 11(0.43) A-A Frame 113 ±4(44.65) 2 Note:mm(inch) FRONT VIEW Module Type Maximum Power - Pmax (W) Open Circuit Voltage - Voc (V) Short Circuit Current - Isc (A) Maximum Power Voltage - Vmpp (V) Maximum Power Current - Impp (A) Module Efficiency Pmax (W) 420 440 479 499 Maximum System Voltage [V] Series Fuse Rating [A] Bifaciality Fire Rating Back sheet Protection Class Cells Temperature Range Maximum Surface Load Application class Withstanding Hail 36 pcs Front Glass Junction Box 12.66 19.97% Vmpp (V)Impp (A)Pmax gain 20.23% 12.75 20.48% 12.84 -40 °C to + 85 °C 1500 Class II 17.10 31.12 16.05 37.2 14.1237.1 16.42 31.12 -0.27%/°C NOCT 45°C(±2°C) +5400/-2400 Pa +113/-50 psf 25% Class C for IEC and TYPE 1 for US 1760×1125×1253mm / 69.29*44.29*49.33inches Voltage Temperature Coeffici Temperature Characteristics 1722×1134×30mm (L×W×H) 67.80*44.65*1.18 inches (L×W×H) 21.4kg / 47.18lbs Black anodized aluminum profile AR-Coating toughened glass, 3.2 mm Transparent black-mesh backsheet 12×9 pcs mono solar cells series strings IP68, 3 diodes Potrait: 1200 mm , 1×4 mm2 or 12AWG, Staubli MC4 Connector Class A Dimensions Weight Frame 37.2 12.92 20.74% Isc (A) 31.17 Electrical Characteristics at Standard Test Conditions(STC) Material Characteristics System Design 15.41 20% 15.05 10% 400 13.68 31.17 37.2 405 37.36 30 70%±10% VSUN390-108BMH 13.48 5%37.1 Standard Test Conditions (STC): irradiance 1,000 W/m²; AM 1,5; module temperature 25°C. Pmax Sorting : 0~5W. Measuring Tolerance: ±3%. Remark: Electrical data do not refer to a single module and they are not part of the offer. They only serve for comparison among different module types. VSUN405-108BMH VSUN400-108BMH Electrical Characteristics with different rear side power gain(reference to 400 front) 30.82 VSUN395-108BMH 13.78 31.36 395 31 390 37.03 36.84 13.59 13.5 Voc (V) 31.17 14.36 Power Temperature Coefficie Current Temperature Coeffici IV-Curves 936 or 828 for US Cable& Connector Packaging Dimensions(L×W×H) Quantity per pallet Container 20' Container 40' Container 40'HC Dimensions 216 468 +0.048%/°C +0.32%/°C Update Time 2023 5 13: . . 1314 N McLean Dr- 20182344REV3/27/2024 IQ8 Series Microinverters Our newest IQ8 Microinverters are the industry’s first microgrid-forming, software- defined microinverters with split-phase power conversion capability to convert DC power to AC power efficiently. The brain of the semiconductor-based microinverter is our proprietary application-specific integrated circuit (ASIC) which enables the microinverter to operate in grid-tied or off-grid modes. This chip is built in advanced 55nm technology with high speed digital logic and has super-fast response times to changing loads and grid events, alleviating constraints on battery sizing for home energy systems. Part of the Enphase Energy System, IQ8 Series Microinverters integrate with the Enphase IQ Battery, Enphase IQ Gateway, and the Enphase App monitoring and analysis software. IQ8 Series Microinverters redefine reliability standards with more than one million cumulative hours of power-on testing, enabling an industry-leading limited warranty of up to 25 years. Connect PV modules quickly and easily to IQ8 Series Microinverters using the included Q-DCC-2 adapter cable with plug-n-play MC4 connectors. IQ8 Series Microinverters are UL Listed as PV Rapid Shut Down Equipment and conform with various regulations, when installed according to manufacturer’s instructions. Easy to install • Lightweight and compact with plug-n-play connectors • Power Line Communication (PLC) between components • Faster installation with simple two-wire cabling High productivity and reliability • Produce power even when the grid is down • More than one million cumulative hours of testing • Class II double-insulated enclosure • Optimized for the latest high- powered PV modules Microgrid-forming • Complies with the latest advanced grid support • Remote automatic updates for the latest grid requirements • Configurable to support a wide range of grid profiles • Meets CA Rule 21 (UL 1741-SA) requirements © 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ8 microinverters, and other names are trademarks of Enphase Energy, Inc. Data subject to change. IQ8SE-DS-0001-01-EN-US-2022-03-01 DATA SHEET (1) The IQ8H-208 variant will be operating in grid-tied mode only at 208V AC. (2) No enforced DC/AC ratio. See the compatibility calculator at https://link.enphase.com/module-compatibility (3) Maximum continuous input DC current is 10.6A (4) Nominal voltage range can be extended beyond nominal if required by the utility. (5) Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. IQ8 Series Microinverters INPUT DATA (DC)IQ8-60-2-US IQ8PLUS-72-2-US IQ8M-72-2-US IQ8A-72-2-US IQ8H-240-72-2-US IQ8H-208-72-2-US 1 Commonly used module pairings2 W 235 – 350 235 – 440 260 – 460 295 – 500 320 – 540+ 295 – 500+ Module compatibility 60-cell/120 half-cell, 66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 60-cell/120 half-cell 27 – 37 29 – 45 33 – 45 36 – 45 38 – 45 38 – 45 Operating range V 25 – 48 25 – 58 Min/max start voltage V 30 / 48 30 / 58 Max input DC voltage V 50 60 Max DC current3 [module Isc] A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC)IQ8-60-2-US IQ8PLUS-72-2-US IQ8M-72-2-US IQ8A-72-2-US IQ8H-240-72-2-US IQ8H-208-72-2-US Peak output power VA 245 300 330 366 384 366 Max continuous output power VA 240 290 325 349 380 360 Nominal (L-L) voltage/range4 V 240 / 211 – 264 208 / 183 – 250 Max continuous output current A 1.0 1.21 1.35 1.45 1.58 1.73 Nominal frequency Hz 60 Extended frequency range Hz 50 – 68 Max units per 20 A (L-L) branch circuit5 16 13 11 11 10 9 Total harmonic distortion <5% Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor (adjustable)0.85 leading – 0.85 lagging Peak efficiency %97.5 97.6 97.6 97.6 97.6 97.4 CEC weighted efficiency %97 97 97 97.5 97 97 Night-time power consumption mW 60 MECHANICAL DATA Ambient temperature range -40ºC to +60ºC (-40ºF to +140ºF) Relative humidity range 4% to 100% (condensing) DC Connector type MC4 Dimensions (HxWxD)212 mm (8.3”) x 175 mm (6.9”) x 30.2 mm (1.2”) Weight 1.08 kg (2.38 lbs) Cooling Natural convection – no fans Approved for wet locations Yes Acoustic noise at 1 m <60 dBA Pollution degree PD3 Enclosure Class II double-insulated, corrosion resistant polymeric enclosure Environ. category / UV exposure rating NEMA Type 6 / outdoor COMPLIANCE Certifications CA Rule 21 (UL 1741-SA), UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according to manufacturer’s instructions. IQ8SE-DS-0001-01-EN-US-2022-03-01 Date Certified and Signed: 01/15/2024 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________E 20878 09/30/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502(310) 928-0938 1314 N McLean Dr- 20182344REV3/27/2024 1314 N McLean Dr- 20182344REV3/27/2024 1314 N McLean Dr- 20182344REV3/27/2024 Date Certified and Exp. Date : 3/31/2024 Signed:01/15/2024 Engineerinc.io, 303 N Glenoaks Blvd Burbank, CA 91502(310) 928-0938 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________88083 03/31/2024 1314 N McLean Dr- 20182344REV3/27/2024 Date Certified and Exp. Date : 3/31/2024 Signed:01/15/2024 Engineerinc.io, 303 N Glenoaks BlvdBurbank, CA 91502(310) 928-0938 Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California. License No. ____________, Expiration Date: _______________88083 03/31/2024 1314 N McLean Dr- 20182344REV3/27/2024 CHANH NGO RESIDENCE 1314 N MCLEAN DR SANTA ANA, CA 92703 PROJECT DESCRIPTION INSTALL 5.600kW DC GRID TIED, ROOF FLUSH, MOUNTED PV SYSTEM. TIE INTO EXISTING 100/100A MAIN SERVICE PANEL SYSTEM SPECIFICATIONS AHJ: CITY OF SANTA ANA UTILITY COMPANY: SCE SYSTEM SIZE: 5.600kW DC 5.064kW AC SOLAR MODULES MAKE: VSUN SOLAR MODEL: VSUN400-108BMH QUANTITY: 14 MICROINVERTERS MAKE: ENPHASE MODEL: IQ8PLUS-72-2-US QUANTITY: 14 BATTERY MAKE: ENPHASE ENERGY MODEL: IQBATTERY-5P-1P-NA QUANTITY: 2 GENERAL NOTES: 1. All electrical equipment and materials shall be new and labeled, listed, or certified by a nationally recognized electrical testing laboratory accredited by the United States Occupational Safety Health Administration 2. Outdoor equipment shall be NEMA 3R rated or equivalent 3. All equipment shall be grounded per National Electrical Code 4. Contractor shall obtain electrical permits prior to installation and shall coordinate all inspections, testing commissioning and acceptance with the client, utility co. and city inspectors as needed. 5. The electrical contractor shall verify the exact locations of service points and service sizes with the serving utility company and comply with all utility companies requirements. Drawings are diagrammatic only, routing of raceways shall be option of the contractor unless otherwise noted and shall be coordinated with other trades. If the roof material or the roof structure not adequate for PV installation, call the engineer of record prior to installation. The contractor is responsible to verify that the roof is capable of withstanding the extra weight. 8. If the distances for cable runs are different than shown, the contractor shall notify the electrical engineer to validate the wire size. Final drawings will be red-lined and updated as appropriate. 9. Whenever a discrepancy in quality of equipment arises on the drawing or specifications, the contractor shall be responsible for providing and installing all materials and services required by the strictest conditions noted on the drawings or in the specifications to ensure complete compliance and longevity of the operable system required by the engineer of record. 10. All work shall comply with the State of California, and Santa Ana City applicable codes and regulations. 11. All electrical equipment shall be UL listed or listed by a Santa Ana City recognized electrical laboratory or approved by the department. PHOTOVOLTAIC NOTES: 1. Rooftop mounted photovoltaic panels and modules shall be tested ,listed and identified by recognized testing laboratory. 2. Solar system shall not cover any plumbing or mechanical vents 3. Modules and support structures shall be grounded unless racking has integrated ground. 4. Removal of an interactive inverter or other equipment shall not disconnect the bonding connection between the grounding electrode conductor and the photovoltaic source and/or output circuit grounded conductors. 5. All PV modules and associated equipment and wiring shall be protected from physical damage. 6. Live parts of PV source circuits and PV output circuits over 150v to ground shall not be accessible to other than qualified persons while energized. 7. Inverter is equipped with integrated DC disconnect, thus providing ground fault protection 8. All conductors shall be copper and 75 deg rated 9. A single conductor shall be permitted to be used to perform the multiple functions of dc grounding, AC grounding and bonding between AC and DC systems. 10. Non-current carrying metal parts of equipment shall be effectively bonded together. Bond both ends of raceways. These drawings are protected by copyright under US law. Any form of reproduction is strictly prohibited without prior written approval from FLAGSHIP SOLAR. GOVERNING CODES: THE INSTALLATION OF SOLAR ARRAYS AND PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH THE FOLLOWING CODES ·2022 California Building Code ·2022 California Residential Code ·2022 California Green Building Standard Code ·2022 California Plumbing Code ·2022 California Mechanical Code ·2022 California Electrical Code ·2022 California Fire Code ·2022 California Energy Code ·2022 California Electrical Code ·2020 National Electrical Code ·2023 LA County Electrical Code ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES. Elect#: 20182344 Rev to: 20182009 Approvals: Elect: MSmith The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 1314 N McLean Dr- 20182344REV3/27/2024 Tuesday, January 16, 2024 Project name: Chanh Ngo Project Address: 1314 N Mclean Dr Santa Ana, CA 92703 To: City of Santa Ana Changes clouded: REQUIREMENTS PAGE # CHANGES Patio cover 2 & 5 Specified patio cover on both Site Plan and Property Plan. 1314 N McLean Dr- 20182344REV3/27/2024 1314 N McLean Dr- 20182344REV3/27/2024 1314 N McLean Dr- 20182344REV3/27/2024 DEAD LOAD CALCULATIONS LOAD QTY WEIGHT TOTAL MODULE 14 49.8 697.2 MICROINVERTER 14 2.38 33.32 RAILS LINEAR FT 91 0.75 68.25 ATTACHMENT 26.00 0.55 14.30 TOTAL ARRAY WEIGHT 813.07 AREA NAME QTY MODULES 14 21.67 303.36 POINT LOAD (TOTAL ARRAY WEIGHT / # OF ATTACHMENTS)31.27 DISTRIBUTED LOAD (TOTAL WEIGHT / ARRAYAREA 2.68 1314 N McLean Dr- 20182344REV3/27/2024 1. ROOFTOP CONDUIT SHALL BE INSTALLED NO LESS THAN 7/8" ABOVE THE ROOF DECK. 2. GROUNDING SHALL BE IRREVERSIBLE CRIMPED. 3. IF UFER IS NOT PRESENT, 2 GROUNDING RODS ARE REQUIRED TO BE INSTALLED 6 FEET APART, BONDED TOGETHER WITH #6 AWG, COLD WATER LINE AND GAS LINE NEED TO BE BONDED PER NEC 250.53 4. ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, TESTED, OR CERTIFIED BY A NATIONAL RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION. 5. WHEN A BACKFEED BREAKER IS THE METHOD OF UTILITY INTERCONNECTION, BREAKER SHALL NOT READ "LINE" OR "LOAD". 6. CONDUIT SHALL NOT PASS WITHIN 10 FEET OVERHEAD OF THE GAS RISER. 7. ALL EMT FITTINGS SHALL BE LISTED AS WEATHERPROOF FITTINGS PER NEC 314.15. 8. CONDUIT ON THE ROOF SHALL BE RAN TO REDUCE TRIP HAZARDS AND MAXIMIZE VENTILATION OPPORTUNITIES BY FOLLOWING RIDGES, HIPS, AND VALLEYS. CONDUIT RUNS FROM COMBINER BOXES OR THE LAST ARRAY SHALL FOLLOW, AS CLOSE AS POSSIBLE, THE RIDGE, HIP OR VALLEY TO THE NEAREST OUTSIDE WALL. 9. CONDUIT RUNS BETWEEN ARRAYS AND/OR COMBINER BOXES SHALL BE RUN SUCH THAT CONDUIT PATHS ARE MINIMIZED AND STILL COMPLY WITH THE ROUTING NOTED ABOVE. 10. DC WIRING WHEN RAN IN THE ATTIC OR ENCLOSED SPACES SHALL BE IN CONDUIT AND, TO THE MAXIMUM EXTENT POSSIBLE, BE RAN ALONG THE BOTTOM OF LOAD BEARING MEMBERS. 11. RACEWAY SHALL BE PROVIDED WITH EXPANSION, EXPANSION-DEFLECTION, OR DEFLECTION FITTING WHERE NECESSARY TO COMPENSATE FOR THERMAL EXPANSION, DEFLECTION AND CONTRACTION. System Components PV Mods MicroInverters Make VSUN SOLAR Make Enphase Model VSUN400-108B MH Model IQ8PLUS-72-2- US Imp (A)12.84 Max DC Volt Rating (V)60 Vmp (V)31.17 Min DC Volt Rating (V)25 Voc (V)37.2 AC Nomial Voltage (V)240 Isc (A)13.68 Peak Efficiency (%)97.6 Pmax (W)400 Max Per Branch 13 VOC Temp Coeff (%)-0.27 System Calculations Module Pmax Module Count Inverter Efficiency DC System Size 400 14 N/A 5.600 Module PTC Rating (CEC)Module Count Inverter Efficiency AC System Size 372.900 14 97%5.064 String Calculations String # of Modules Max Cont. Current (V) Amps per Modules Max Designed Amps 1 7 1.21 1.25 10.5875 2 7 1.21 1.25 10.5875 3 0 0 0 0 4 0 0 0 0 5 0 0 0 0 6 0 0 0 0 Total 14 21.175 Conductor Sizing Tag Number Description AWG Type Material # of Conductors # of Current Carrying Conductors Conduit Size Ampacity Fill Derate Temp Derate Derated Ampacity Max Current 1 Module to Junction Box 12 Q Cable CU 5 4 N/A 30 1 0.91 27.3 10.5875 2 Junction Box to Combiner 12 THWN-2 CU 5 4 3/4 30 0.8 0.91 21.84 10.5875 3 Combiner to Main Panel 10 THWN-2 CU 4 3 3/4 40 1 0.91 36.4 21.175 Interconnection Calculations Max Output current @ 125% Backfeed Breaker Size (A) Panel Bus Bar Rating (A) Panel Breaker Size (A)Bus X 120%Amps Availiable 120% Rule 21.175 30 100 100 120 20 OKAY with PCS Main Panel Info Service Type Underground Main Panel Disconnect 100 Main Panel Bus 100 Romex (NM Cable) may be run in the attic when origination and termination is made within NEMA 3R junction boxes. MAS(19) 1314 N McLean Dr- 20182344REV3/27/2024 MARKINGS, LABELS AND WIRING SIGNS A. Purpose: Provide emergency responders with appropriate warning and guidance with respect to isolating solar electric system. This can facilitate identifying energized electrical lines that connect solar panels to the inverter, as these should not be cut when venting for smoke removal. B. Main Service Disconnect. 1. Residential buildings - The marking main be placed within the main service disconnect. The marking shall be placed 2. Commercial buildings - Tha marking shall be placed adjacent to the main service disconnect clearly visible from the location where the level is operated. 3. Markings: Verbiage, Format and Type of Material. a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All letters shall be capitalized. Arial or similar font, non bold. c. Material: Reflective, weather resistant material suitable for the environment (use UL - 969 as standard for weather rating). Durable adhesive materials meet this requirement. C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC combiners and junction boxes: 1. Markings: Verbiage, Format and Type of Material. a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turns, above and for below penetrations, all DC combiners and junction boxes b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall adhere to "V. V-3b, c" of this requirement. c. Inverters are not required to have caution markings 1. Marking is required on all interior and exterior DC conduit raceways,enclosures,cable assemblies,and junction boxes,combiner boxes and disconnects. 2. The materials used for marking shall be reflective,weather resistant material suitable for the environment. 3. Marcking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE. 4. Marking shall be placed adjacent to the main service disconnect in a location clearly visible from the location where the disconnect is operated. INVERTER *if applicable PV ARRAY J BOX 1 2 7 INTEGRATED DC DISCONNECT 4 5 7 9 7 PV SUB-PANEL * if applicable 11 8 10 SUB-PANEL * if applicable 7 9 8 10 AC DISCONNECT * if applicable 7 7 9 METER MAIN SERVICE PANEL 8 12 10 CAUTION 1314 N MCLEAN DR, SANTA ANA POWER TO THIS BUILDING IS SUPPLIED FROM THE FOLLOWINGSOURCES WITH MAIN DISCONNECTS LOCATED AS SHOWN LABEL 12 SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS LABEL 1 CAUTION AUTHORIZED SOLAR PERSONNAL ONLY! LABEL 2 CAUTION SOLAR DC CURRENT PRESENT DURING DAYLIGHT HOURS (STICKER TO BE LOCATED ON CONDUIT WITH DC CURRENT EVERY 4' HORIZONTALLY OR 10' VERTICALLY AND 1' FROM EACH SIDE OF A BEND) LABEL 7 AC DISCONNECT AC PHOTOVOLTAIC POWER SOURCE RATED AC OUTPUT CURRENT:21.17 A MAXNOMINAL AC OPERATING VOLTAGE: 240 Vac LABEL 8 THIS PANEL FED BY MULTIPLE SOURCES (UTILITY & SOLAR) LABEL 3 WARNING! ELECTRIC SHOCK HAZARD. IF GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. LABEL 4 DC DISCONNECT DC PHOTOVOLTAIC POWER SOURCE RATED MAX POWER POINT CURRENT- RATED MAX POWER POINT VOLTAGE- MAXIMUM SYSTEM VOLTAGE- SHORT CIRCUIT CURRENT- AMPS VOLTS VOLTS AMPS LABEL 5 WARNING! ELECTRIC SHOCK HAZARD. DO NOT TOUCH THE TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. LABEL 6 PV SUB-PANEL ONLY (TO BE LOCATED ON SUB-PANEL ONLY WHEN SUB-PANEL IS DEDICATED FOR PV ONLY) LABEL 9 LABEL 10 SOLAR (STICKER LOCATED INSIDE PANEL NEXT TO SOLAR BREAKER) WARNING! INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE (STICKER LOCATED INSIDE PANEL BELOW PV BREAKER) LABEL 11 PV LOAD CENTER SIZED FOR PV BREAKERS ONLY OR RENDERED UNABLE TO ACCEPT ANY ADDITIONAL LOADS. (STICKER LOCATED ON THE PV SUB PANEL) DIRECTORY Permanent directory or plaque providing location of service disconnecting means and photovoltaic system disconnecting means, if not located at the same location. (Plaques shall be metal or plastic, with engraved or machine printed letters, or electro-photo plating, in a contrasting color to the plaque. Plaques shall be permanently attached to the equipment or in the required location using an approved method that is suitable to withstand the environment to which it is exposed. Plaques and signages shall meet legibility, defacement, exposure and adhesion requirements of Underwriters Laboratories marking and labeling system 969(UL969). 1314 N McLean Dr- 20182344REV3/27/2024 CITY OF SANTA ANA SOLAR PERMIT APPLICATION WORKSHEET PLEASE PRINT REV: 8/29/19 PROJECT ADDRESS:SUITE: SAPIN # USE OF BUILDING: RESIDENTIAL COMMERCIAL INDUSTRIAL OTHER MASTER ID# NATURE OF WORK: SOLAR P.V. SYSTEM SOLAR WATER HEATING/COLLECTOR SYSTEM OTHER JOB DESCRIPTION : ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________ BUILDING OWNER’S NAME: PHONE NO: ADDRESS:CITY: STATE:ZIP: TENANT’S NAME (Comm/Ind): PHONE NO: CONTRACTOR’S NAME: STATE CONTR. #: LICENSE CLASS: PHONE NO: ADDRESS:CITY: STATE:ZIP: WORKERS COMP. POLICY#: EXP. DATE: INSURANCE COMPANY: SANTA ANA BUS. LIC. #: ARCHITECT/ENGINEER: STATE LICENSE #: PHONE NO: ADDRESS:CITY: STATE:ZIP: CONTACT NAME: PHONE NO: E-MAIL ADDRESS: BLDG. FEE $ OCC. GROUP: P/C FEE PD $ VALUATION: $ SUBMITTAL DATE:____________________ TYPE OF CONSTR: FLOOD ZONE:___________________ PROCESSED________________________ PLANNING OK TO CHECK & DATE:__________________________ BLDG. DEPT. APPROVAL & DATE:___________________________ PLNG CONDITIONS: _________________________________________________________________________________________________ NUMBER OF PANELS:___________________ SYSTEM kWA:_________________________ Flagship 1094787 B Bakersfield CA State Compensation Insurance Fund Residential Solar Install 24 8.541 AC Peter Mangosing 714-745-7801 118 W Stevens Ave Santa Ana CA 92707 661-495-3838 707 18th Street 93301 9322330 8/10/24 383282 John Tyler Crosby Permits@flagshipsolar.co 661-495-3838 45000 1314 North McLean Drive Residential roof mount PV- 14 mods, 14 micro inverters, 5.064 KW AC , Valuation: $ 34000 Revisions- Layout change and changed battery from 1 Enphase Encharge 10 KW battery to 2 Enphase Encharge 5P batteries. Added 1314 N McLean Dr- 20182344REV3/27/2024 CITY OF SANTA ANA DEVELOPMENT FEES WORKSHEET -- ELECTRICAL PERMIT APP FOR ELECTRICAL 06-30-2020 APP-02 CEC2019 Project Address: Contractor: Tenant Name: Address: Building Owner: City: St.: Zip: Address: Contractor License No.: City: St.: Zip: Contractor Email: Phone: Phone: Contact Person: Contact E-Mail Strongly Recommended PLEASE PRINT: Contact Phone: NEW BUILDING OCCUPANCY CHANGE ELECTRICAL ITEM Count $ EACH ELECTRICAL ITEM Count $ EACH 1.57 LOW VOLTAGE SYSTEMS – EACH: phone, data outlet, speaker, thermostat, door holder, doorbell, pull station, smoke (circle items) Light Switches, Occupancy Sensors 1.70 Light Fixtures 1.13 COMMERCIAL: Air Conditioners, Heat Pumps 104.40 FIRST 10 devices or outlets 36.50 Factory-Wired Units (Solid Hook-Ups) 26.71 Additional devices, each 3.45 Dedicated Circuits (15 or 20 AMP Receptacles) 26.71 Each control panel, power supply annunciator, switch or aux equip. 17.39 Time Clock, Photo-Cell, Time Switch 13.03 Track-Light, Cable Tray, Special Raceway, Plugmold, Under-Floor Duct, Plug-In Busway, Surface Duct, (Each 100 Feet or any fraction thereof) 26.71 RESIDENTIAL: Single Dwelling unit 39.56 Each add’l dwelling unit (2 to 20) 34.80 Each add’l unit (over 20) 21.24 SERVICE METERS & PANELS: Service Meter, Reset Meter, Subpanel, Switchboard, Motor Control Center, Transfer Switch, Busduct, or other Distribution Equipment changes or modifications. (circle items as needed) MISCELLANEOUS Light Standard (Pole) with 1 Fixture 26.72 Additional Fixtures – same pole 0.00 Power Pole (Temporary) 111.04 Use this column if a Service All others here Additional distribution poles 26.72 Under 400 amperes 57.40 Swimming Pool, Spa, Fountain 130.46 400 amperes to 1199 amperes 156.51 Above ground spa 56.37 1200 amperes and over 260.79 Demolition 52.21 POWER APPARATUS: Motor, Transformer, Welder, Industrial Equipment, Oven, Rectifier, Generator, Surge Arrestor, Water Heater, Photovoltaic Panel, or other Power Equipment changes or modifications. (circle items as needed) Per HP, kW, or kVA & neon/LED decorative lighting ($200 refundable sign bond) 80.95 NEW or TOTAL REWIRE for SINGLE FAMILY DWELLINGS SFD Per square foot .16 0 to 1 3.84 Garage Per square foot .16 Over 1 to 10 25.09 SUBTOTAL $ Over 10 to 50 49.78 P/C 65% of SUBTOTAL $ Over 50 to 100 113.06 MIN. FEE – (Nonresidential) $ 79.06 Over 100 to 500 162.45 ISSUANCE & General Plan Surcharge $ 59.30 + 23.79 = $83.09 Over 500 202.92 TOTAL $ OFFICE USE ONLY BLDG PMT RECEIPT BY DATE OCCUPANCY TYPE P/CPAID x Flagship 1094787 B 2-5P Batteries John Tyler Crosby 661-495-3838 permits@flagshipsolar.co 118 W Stevens Ave Santa Ane Ca 92707 Peter Mangosing Peter Mangosing 118 W Stevens Ave Santa Ana Ca 92707 661-495-3838 707 18th Street BAKERSFIELD CA 93301 permits@flagshipsolar.co 661-495-3838 1314 N McLean Dr- 20182344REV3/27/2024 PCC-13 Rev. 06-17-2019 White-Plan Check Yellow-Applicant REVISION /SUPPLEMENTAL PLAN CHECK REQUEST PCC-13 CBC 2022 Rev 6-09-2023 Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org Project Address: _________________________________________ Suite #_______________________________ New Plan Check No.____________________________________________________________________________ Original Plan Check No.:__________________________________ Permit Issuance Date:____________________ Original Plan Checker: __________________________________________________________________________ Amount Paid: $__________________________________________ Misc. Receipt #: ________________________ Processed by: ___________________________________________ Date: ________________________________ Plan Checker Approval: ___________________________________ Date: ________________________________ Additional Hours:________________________________________ @ $257.88 = $ _________________________ Print Name:_____________________________________________ Signature: ____________________________ Representing: ________________________________________________________________________________ Telephone: ( ) ____________________________________ Fax: ( ) __________________________________ Contact Person: ________________________________________ Telephone: ( ) ________________________ E-mail (Strongly Recommended): _________________________________________________________________ PLANS PREPARED BY AN ARCHITECT OR ENGINEER MUST BE SIGNED BY THE PROFESSIONAL WHO PREPARES THEM. PLEASE WRITE A BRIEF DESCRIPTION OF THE REVISION/SUPPLEMENT AND IF POSSIBLE AREA OF WORK. ALL REVISIONS ARE TO BE CLOUDED AND PROPERLY IDENTIFIED: (i.e. Deltas,Sheet Numbers, etc.). Electrical, Plumbing and/or Mechanical plans – stamped job set shall accompany revised plans. ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ 1314 North McLean Drive Santa Ana Ca 92703 02/12/2024 John Tyler Crosby Flagship Solar 661-495-3838 John Tyler Crosby 661-495-3838 Permits@flagshipsolar.co Revisions- MPU removed, Changed the 10 KW battery to (2) 5P Batteries 1314 N McLean Dr- 20182344REV3/27/2024