HomeMy WebLinkAbout118 W Stevens Ave - PlanPETER MANGOSING RESIDENCE
118 W STEVENS AVE
SANTA ANA, CA 92707
PROJECT DESCRIPTION
INSTALL 9.480kW DC GRID TIED, ROOF FLUSH, MOUNTED PV
SYSTEM. TIE INTO NEW 100/100A PVL MAIN SERVICE PANEL
WITH SOLAR PERMIT.
SYSTEM SPECIFICATIONS
AHJ: CITY OF SANTA ANA
UTILITY COMPANY: SCE
SYSTEM SIZE: 9.480kW DC
8.541kW AC
SOLAR MODULES MAKE: MISSION SOLAR
MODEL: MSE395SX9R
QUANTITY: 24
MICROINVERTERS MAKE: ENPHASE
MODEL: IQ8PLUS-72-2-US
QUANTITY: 24
GENERAL NOTES:
1. All electrical equipment and materials shall be new and labeled,
listed, or certified by a nationally recognized electrical testing
laboratory accredited by the United States Occupational Safety
Health Administration
2. Outdoor equipment shall be NEMA 3R rated or equivalent
3. All equipment shall be grounded per National Electrical Code
4. Contractor shall obtain electrical permits prior to installation
and shall coordinate all inspections, testing commissioning and
acceptance with the client,
utility co. and city inspectors as needed.
5. The electrical contractor shall verify the exact locations of
service points and service sizes with the serving utility company and
comply with all utility companies requirements.
Drawings are diagrammatic only, routing of raceways shall be option
of the contractor unless otherwise noted and shall be coordinated
with other trades.
If the roof material or the roof structure not adequate for PV
installation, call the engineer of record prior to installation. The
contractor is responsible to verify that the roof is capable of
withstanding the extra weight.
8. If the distances for cable runs are different than shown, the
contractor shall notify the electrical engineer to validate the wire
size. Final drawings will be red-lined and updated as appropriate.
9. Whenever a discrepancy in quality of equipment arises on the
drawing or specifications, the contractor shall be responsible for
providing and installing all materials and services required by the
strictest conditions noted on the drawings or in the specifications to
ensure complete compliance and longevity of the operable system
required by the engineer of record.
10. All work shall comply with the State of California, and Santa Ana
City applicable codes and regulations.
11. All electrical equipment shall be UL listed or listed by a city of
Santa Ana recognized electrical laboratory or approved by the
department.
PHOTOVOLTAIC NOTES:
1. Rooftop mounted photovoltaic panels and modules shall be tested
,listed and identified by recognized testing laboratory.
2. Solar system shall not cover any plumbing or mechanical vents 3.
Modules and support structures shall be grounded unless racking has
integrated ground.
4. Removal of an interactive inverter or other equipment shall not
disconnect the bonding connection between the grounding electrode
conductor and the photovoltaic source and/or output circuit
grounded conductors.
5. All PV modules and associated equipment and wiring shall be
protected from physical damage.
6. Live parts of PV source circuits and PV output circuits over
150v to ground shall not be accessible to other than qualified
persons while energized.
7. Inverter is equipped with integrated DC disconnect, thus
providing ground fault protection
8. All conductors shall be copper and 75 deg rated
9. A single conductor shall be permitted to be used to perform
the multiple functions of dc grounding, AC grounding and bonding
between AC and DC systems.
10. Non-current carrying metal parts of equipment shall be
effectively bonded together. Bond both ends of raceways.
These drawings are protected by copyright under US alaw. Any form
of reproduction is strictly prohibited without prior written approval
from FLAGSHIP SOLAR.
GOVERNING CODES:
THE INSTALLATION OF SOLAR ARRAYS AND
PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY
WITH THE FOLLOWING CODES
·2022 California Building Code
·2022 California Residential Code
·2022 California Green Building Standard Code
·2022 California Plumbing Code
·2022 California Mechanical Code
·2022 California Electrical Code
·2022 California Fire Code
·2022 California Energy Code
·2022 California Electrical Code
·2020 National Electrical Code
·2023 LA County Electrical Code
ALL OTHER ORDINANCE ADOPTED BY THE LOCAL
GOVERNING AGENCIES.
Bldg# 101117734
Elec# 20181730
Approvals:
Elec - MSmith
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
PLAN CHECK NOTE:
Romex may be used only within a dry building space such as an attic and may
terminate within a NEMA 3R junction box at the outdoor interface. MASmith (19)
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
Certificate Of Completion
Envelope Id: 43FA784027C3480E8BE7FA4884D858B6 Status: Completed
Subject: Complete with DocuSign: Customer letter signed needed to submit to City of Santa Ana .pdf
Source Envelope:
Document Pages: 1 Signatures: 1 Envelope Originator:
Certificate Pages: 1 Initials: 0 Anthony Starbuck
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-07:00) Mountain Time (US & Canada)
15911 Canterbury Ct
nil
Bakersfield, CA 93314
anthony@flagshipsolar.co
IP Address: 173.198.109.1
Record Tracking
Status: Original
11/7/2023 10:27:17 AM
Holder: Anthony Starbuck
anthony@flagshipsolar.co
Location: DocuSign
Signer Events Signature Timestamp
PETER MANGOSING
pmango57@yahoo.com
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 64.58.153.2
Sent: 11/7/2023 10:37:31 AM
Resent: 11/9/2023 2:20:48 PM
Viewed: 11/9/2023 3:04:56 PM
Signed: 11/9/2023 3:05:10 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 11/7/2023 10:37:31 AM
Certified Delivered Security Checked 11/9/2023 3:04:56 PM
Signing Complete Security Checked 11/9/2023 3:05:10 PM
Completed Security Checked 11/9/2023 3:05:10 PM
Payment Events Status Timestamps
118 W Stevens Ave -
201817302/22/2024
DocuSign Envelope ID: 43FA7840-27C3-480E-8BE7-FA4884D858B6
11/9/2023
Peter Mangosing
118 W Stevens Ave Santa Ana,
Ca 92707
Peter Mangosing
118 W Stevens Ave -
201817302/22/2024
76 North Meadowbrook Drive
Scott E. Wyssling, PE Alpine, UT 84004
Coleman D. Larsen, SE, PE office (201) 874-3483
Gregory T. Elvestad, PE swyssling@wysslingconsulting.com
November 3, 2023 Revised January 4, 2024 Flagship Holdings, LLC 15911 Canterbury Court Bakersfield, CA 93314 Re: Engineering Services Mangosing Residence 118 W Stevens Avenue, Santa Ana CA 9.480 kW System To Whom It May Concern: We have received information regarding solar panel installation on the roof of the above referenced structure. Our evaluation of the structure is to verify the existing capacity of the roof system and its ability to support the additional loads imposed by the proposed solar system.
A. Site Assessment Information 1. Site visit documentation identifying attic information including size and spacing of framing for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information will be utilized for approval and construction of the proposed system.
B. Description of Structure:
Roof Framing: Assumed prefabricated wood trusses with all truss members constructed of 2 x 4 dimensional lumber at 24” on center.
Roof Material: Tile Roofing
Roof Slope: 18.43 degrees
Attic Access: Inaccessible
Foundation: Permanent
C. Loading Criteria Used
• Dead Load
o Existing Roofing and framing = 13 psf
o New Solar Panels and Racking = 3 psf
o TOTAL = 16 PSF
• Dead Load
o Existing Roofing and framing = 7 psf
o New Solar Panels and Racking = 3 psf
o TOTAL = 10 psf
• Live Load = 20 psf (reducible) – 0 psf at locations of solar panels
• Ground Snow Load = 0 psf
• Wind Load based on ASCE 7-16
o Ultimate Wind Speed = 95 mph (based on Risk Category II)
o Exposure Category C
Analysis performed of the existing roof structure utilizing the above loading criteria is in accordance
with the 2022 California Building Code, including provisions allowing existing structures to not
require strengthening if the new loads do not exceed existing design loads by 105% for gravity
elements and 110% for seismic elements. This analysis indicates that the existing framing will
support the additional panel loading without damage, if installed correctly.
118 W Stevens Ave -
201817302/22/2024
Page 2 of 2
D. Solar Panel Anchorage
1. The solar panels shall be mounted in accordance with the most recent Unirac installation manual. If during solar panel installation, the roof framing members appear unstable or deflect non -uniformly, our office should be notified before proceeding with the in stallation. 2. The maximum allowable withdrawal force for a #14 lag screw is 194 lbs per inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications. Based on a minimum penetration depth of 2½”, the allowable capacity per connection is greater than the design withdrawal force (demand). Considering the variable factors for the existing roof framing and installation tolerances, the connection using two #14 diameter lag screw with a minimum of 2½” embedment will be adequate and will include a sufficient factor of safety. 3. Considering the wind speed, roof slopes, size and spacing of framing members, and condition of the roof, the panel supports shall be placed no greater than 48” on center. Based on the above evaluation, this office certifies that with the racking and mounting specified, the existing roof system will adequately support the additional loading imposed by the solar system. This evaluation is in conformance with the 2022 California Building Code, current industry standards, and is based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. Very truly yours, Scott E. Wyssling, PE California License No. 83664
Signed 1/04/2024
118 W Stevens Ave -
201817302/22/2024
Wyssling Consulting
76 N. Meadowbrook Drive
Alpine, UT 84004
(201) 874-3483
swyssling@wysslingconsulting.com
Existing Mangosing Residence
Roof Dead Load 118 W Stevens Avenue
9.0 psf Clay or Conc Tile Santa Ana, CA
1.6 psf 1/2" Plywood Sheathing
0.8 psf 2x4 Trusses @ 24 in. o.c.
1.0 psf Ceiling, Mechanical, Electrical
0.6 psf Miscellaneous
13.0 psf TOTAL
Second Floor Dead Load
7.5 psf Floor Finishes
3.3 psf 1 1/8" Subfloor Sheathing
3.4 psf Joists @ 16' o.c.
15 psf Partitions
3.6 psf Ceiling, Mechanical, Electrical
1.25 psf Miscellaneous
34.05 psf TOTAL
Roof Live Load Floor Live Load
20 psf 40 psf
Roof Snow Load
Ground SnowLoad=0 psf (to be divided by cosine of roof angle for horizontal projection ASCE 7 Sec. 7.4)
pf = 0.7 Ce Ct I pg =0 psf Ce = 1, Ct = 1.1 Flat Roof Snow Load (ASCE 7-16 Eq. 7.3-1)
Cs =0.94 ASCE 7-16 Figure 7.4-1
Additional
Roof Dead Load - New Solar Panels
3 psf
Roof Live Load at Solar Panels
0 psf
Roof Snow Load at Solar Panels
0 psf Sloped Roof Snow Load (ASCE 7-16 Eq. 7.4-1)
Total
Total Existing Roof Load = (DLROOF + Max(LLROOF or S)) AreaROOF
86691 lbs
Total New Roof Load = (DLROOF + DLADD + Max(LLROOF or S)) AreaROOF
77626 lbs
Change in Demand = (Total New Roof Load - Existing Roof Load) / Existing Roof Load
-10.46%
2021 IEBC Section 805.2 states:
"Any existing gravity load-carrying structural element for which an alteration causes an increase in design gravity load
of more than 5 percent shall be strengthened, supplemented, replaced or otherwise altered as needed to carry the
increased gravity load required by this code for new structures."
Gravity Loads
Total New Gravity Loads are less than Existing Loads. OK
Signed 1/04/2024
118 W Stevens Ave -
201817302/22/2024
Wyssling Consulting
76 N. Meadowbrook Drive
Alpine, UT 84004
(201) 874-3483
swyssling@wysslingconsulting.com
V =95 Basic Wind Speed Mangosing Residence
Exposure C ASCE 7-16, Section 26.7 118 W Stevens Avenue
Kz =0.94 Velocity Pressure Coefficient, ASCE 7-16, Figure 26.10-1 Santa Ana, CA
Kzt =1 Topographic Factor, ASCE 7-16, Section 26.8.2
Kd =0.85 Directionality Factor, ASCE 7-16, Section 26.6
Ke =0.999 Ground Elevation Factor, ASCE 7-16, Section 26.9
qh =18.4 psf qh = 0.00256KzKztKdKeV2 (ASCE 7-16 Eq. 26.10-1)
Roof Angle =18.43 deg
Roof Type Gable
sanchor =48 in Horizontal spacing of roof anchors
Atrib =12.51 sf Panel Area tributary to each roof anchor
GCp External Pressure Coefficient, ASCE 7-16, Figure 30.3-2
Roof Zone Zone 1 2e 2n 2r 3e 3r
-2.00 -2.00 -2.98 -2.98 -2.98 -3.55
ga =0.79 Pressure Equalization Factor, ASCE 7-16 Figure 29.4.-8
gE =1.00 Edge Array Factor, ASCE 29.4.4 edges < 0.5*building height, and panel spacing < 4ft.
pnet = qhGCpgEga =Design Wind Pressure, ASCE 7-16, Equation 29.4-7
Roof Zone 1 2e 2n 2r 3e 3r
-29 psf -29 psf -43 psf -43 psf -43 psf -52 psf Min Pressure = -16 psf
Use 29 psf Use 29 psf Use 43 psf Use 43 psf Use 43 psf Use 52 psf ULTIMATE
x 0.6 =17 psf 17 psf 26 psf 26 psf 26 psf 31 psf ALLOWABLE
Connection to Existing Roof Framing
F.S. =1 Additional Factor of Safety applied to withdrawl force, if desired
Atrib =12.5 ft2
DLpanel =3 psf
Roof Zone 1 2e 2n 2r 3e 3r
Wuplift =29 psf 29 psf 43 psf 43 psf 43 psf 52 psf
Plag = F.S. x Atrib x (0.6D - 0.6W) =Withdrawl force for each roof anchor
Roof Zone 1 2e 2n 2r 3e 3r
-199.3 lbs -199.3 lbs -306.2 lbs -306.2 lbs -306.2 lbs -368.5 lbs
Connection Capacity
db =1/4 in Lag Screw diameter
Dpen =2 1/2 in Lag Screw penetration into existing framing member
No. of Screws 2 Screws per Connection
Species of wood framing
CD =1.6 Load Duration Factor for Wind Loading, NDS Table 2.3.2
Ct =0.7 Temperature Factor, NDS Table 10.3.4
W =173 lb/in Withdrawl Capacity, NDS Equation 11.2-1
W' = CD x Ct x W =194 lb/in Adjusted withdrawl value
Pallow = Dpen x W' =970 lbs (Using (2) screws per connection)
Roof Zone 1 2e 2n 2r 3e 3r
DEMAND =199 lbs 199 lbs 306 lbs 306 lbs 306 lbs 369 lbs
CAPACITY =970 lbs 970 lbs 970 lbs 970 lbs 970 lbs 970 lbs
up to72in ok up to72in ok up to72in ok up to72in ok up to72in ok up to72in ok
This analysis calculates the
capacity of the lag screws
only. For capacity of the
complete mounting system,
please see manufacturer's
recommendations.
Spruce-Pine-Fir
Wind Uplift
Rooftop Solar Panels Parallel to Roof Surface
ASCE 7-16, Section 29.4.4
Signed 1/04/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
118 W Stevens Ave -
201817302/22/2024
Rev: 7/15/2021
RESIDENTIAL
PHOTOVOLTAIC
SOL-01 CBC 2019
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1. Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2. Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3. Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4. Will the PV system weigh maximum 4 pounds per square feet or less?
5. Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6. Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7. Will the PV system be installed without using any ballast system or counter-weight
system?
8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10. Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Phone Number: Date:
Email Address:
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
118 W Stevens Ave
Flagship Solar
1094787
118 W Stevens Ave -
201817302/22/2024
PETER MANGOSING RESIDENCE
118 W STEVENS AVE
SANTA ANA, CA 92707
PROJECT DESCRIPTION
INSTALL 9.480kW DC GRID TIED, ROOF FLUSH, MOUNTED PV
SYSTEM. TIE INTO NEW 100/100A PVL MAIN SERVICE PANEL
WITH SOLAR PERMIT.
SYSTEM SPECIFICATIONS
AHJ: CITY OF SANTA ANA
UTILITY COMPANY: SCE
SYSTEM SIZE: 9.480kW DC
8.541kW AC
SOLAR MODULES MAKE: MISSION SOLAR
MODEL: MSE395SX9R
QUANTITY: 24
MICROINVERTERS MAKE: ENPHASE
MODEL: IQ8PLUS-72-2-US
QUANTITY: 24
GENERAL NOTES:
1. All electrical equipment and materials shall be new and labeled,
listed, or certified by a nationally recognized electrical testing
laboratory accredited by the United States Occupational Safety
Health Administration
2. Outdoor equipment shall be NEMA 3R rated or equivalent
3. All equipment shall be grounded per National Electrical Code
4. Contractor shall obtain electrical permits prior to installation
and shall coordinate all inspections, testing commissioning and
acceptance with the client,
utility co. and city inspectors as needed.
5. The electrical contractor shall verify the exact locations of
service points and service sizes with the serving utility company and
comply with all utility companies requirements.
Drawings are diagrammatic only, routing of raceways shall be option
of the contractor unless otherwise noted and shall be coordinated
with other trades.
If the roof material or the roof structure not adequate for PV
installation, call the engineer of record prior to installation. The
contractor is responsible to verify that the roof is capable of
withstanding the extra weight.
8. If the distances for cable runs are different than shown, the
contractor shall notify the electrical engineer to validate the wire
size. Final drawings will be red-lined and updated as appropriate.
9. Whenever a discrepancy in quality of equipment arises on the
drawing or specifications, the contractor shall be responsible for
providing and installing all materials and services required by the
strictest conditions noted on the drawings or in the specifications to
ensure complete compliance and longevity of the operable system
required by the engineer of record.
10. All work shall comply with the State of California, and Santa Ana
City applicable codes and regulations.
11. All electrical equipment shall be UL listed or listed by a city of
Santa Ana recognized electrical laboratory or approved by the
department.
PHOTOVOLTAIC NOTES:
1. Rooftop mounted photovoltaic panels and modules shall be tested
,listed and identified by recognized testing laboratory.
2. Solar system shall not cover any plumbing or mechanical vents 3.
Modules and support structures shall be grounded unless racking has
integrated ground.
4. Removal of an interactive inverter or other equipment shall not
disconnect the bonding connection between the grounding electrode
conductor and the photovoltaic source and/or output circuit
grounded conductors.
5. All PV modules and associated equipment and wiring shall be
protected from physical damage.
6. Live parts of PV source circuits and PV output circuits over
150v to ground shall not be accessible to other than qualified
persons while energized.
7. Inverter is equipped with integrated DC disconnect, thus
providing ground fault protection
8. All conductors shall be copper and 75 deg rated
9. A single conductor shall be permitted to be used to perform
the multiple functions of dc grounding, AC grounding and bonding
between AC and DC systems.
10. Non-current carrying metal parts of equipment shall be
effectively bonded together. Bond both ends of raceways.
These drawings are protected by copyright under US alaw. Any form
of reproduction is strictly prohibited without prior written approval
from FLAGSHIP SOLAR.
GOVERNING CODES:
THE INSTALLATION OF SOLAR ARRAYS AND
PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY
WITH THE FOLLOWING CODES
·2022 California Building Code
·2022 California Residential Code
·2022 California Green Building Standard Code
·2022 California Plumbing Code
·2022 California Mechanical Code
·2022 California Electrical Code
·2022 California Fire Code
·2022 California Energy Code
·2022 California Electrical Code
·2020 National Electrical Code
·2023 LA County Electrical Code
ALL OTHER ORDINANCE ADOPTED BY THE LOCAL
GOVERNING AGENCIES.
Signed 1/04/2024
Bldg#: 101118569
Elec#: 20182343
Rev:
Bldg#: 101117734
Elec#: 20181730
Approvals
Elec: MSmith
***The scope of the plans is for the installation of the solar photovoltaic system only and the
approval is subject to compliance with all applicable city and state codes and regulations
regarding construction. The approval of the plans does not constitute any certification of the
accuracy, completeness, or building permit status of the existing buildings and structures as
shown.
118 W Stevens Ave -
20183019REV26/25/2024
SYSTEM SIZE:
DC: 9.480 Kw
AC: 8.541 Kw
R□□F SECTION 3
TILT: 4/12 (18.43 °)
AZIMUTH: 262
COUNT: 1
R□□F TYPE: ROLL COMP
(N)JUNCTION BOX -�
ATTACHED TD ARRAY
NOTES
R□□F SECTION 1
TILT: 4/12 <18.43 °)
AZIMUTH: 82
COUNT: 14
R□□F TYPE: ROLL COMP
1'-6*
0 0
0
TOTAL R□□F AREA: 2627 FT 2 ROOF ACCESS FIRE CODE APPROXIMATE TOTAL NE� MOD AREA:520 FT 2
EXISTING MOD AREA: 0 FT 2
TOT AL MOD AREA: 520 FT 2
COVERAGE: 201/.
DESIGN �ILL C□MPL Y �ITH !RC
P3102.1.3
POINT SETBACKS CONDUIT RUN □------
VISIBLE LOCKABLE LABELED DISCONNECT LOCATED WITHIN 1 OFT OF UTILITY METER.
�-TIE INT□ METER
#222013-180557
R□□F SECTION 2
TILT: 4/12 (18.43 °)
AZIMUTH: 172
COUNT: 9
R□□F TYPE: ROLL COMP
R□□F PLAN
SCALE: 1/8' = 1'-0'
Flagship Solar™
FLAGSHIP HOLDINGS LLC
15911 CANTERBURY CT.
BAKERSFIELD,
CA 93314
661-428-9293
LICENSE: CSLB#1094 787
TYLER CROSBY
LOCATION
DRA\rlN BY
YUJ
DRA\rlING DATE
30 Jo.nuo.ry 2024
PAGE TITLE PAGE NUMBER
SITE PLAN
&c PV 2 LAYOUT
Signed 1/04/2024
118 W Stevens Ave -
20183019REV26/25/2024
SYSTEM SIZE:
DC: 9.480 Kw
AC: 8.541 Kw
12.'-4 11/16
(24)MISSION SOLAR
MSE395SX9R MODULES v/ITH
(24)ENPHASE
IQ8PLUS-72-2-US
MICR □INVERTERS ON THE BACK
OF EACH MODULE
(N)JUNCTION BOX A TT ACHED
TD ARRAY
ROOF ACCESS FIRE CODE APPROXIMATE POINT SETBACKS CONDUIT RUN
'
(Y)
118 vi STEVENS AVE
SANT A ANA, CA 92707
�---L 041'-5 112.·/�
':::j FRONT OF HOME
I
L •
BACK OF HOME
VISIBLE LOCKABLE LABELED DISCONNECT LOCATED WITHIN 1 OFT OF UTILITY METER.
--(N) AC DISCONNECT
«l0FT FROM METER) --<N) COMBINER PANEL
--(N) BATTERY
--(N) MAIN SERVICE PANEL
--(N) UTILITY METER
'\. \
41'~8' ----------------�
'\.
�
�- - -------- - ---129'-5 3/4' - -,-.,,....�- --- --- -- -- --- -----1-_,, � I CP
SITE PLAN
SCALE: 1/16' = 1'-0 °
Flagship Solar™
FLAGSHIP HOLDINGS LLC
15911 CANTERBURY CT,
BAKERSFIELD,
CA 93314
661-428-9293
LICENSE: CSLB#1094 787
TYLER CROSBY
LOCATION
DRA\rlN BY
YUJ
DRA\rlING DATE
30 Jo.nuo.ry 2024
PAGE TITLE
PROPERTY
PLAN
PAGE NUMBER
5
Signed 1/04/2024
118 W Stevens Ave -
20183019REV26/25/2024
DEAD LOAD CALCULATIONS
LOAD QTY WEIGHT TOTAL
MODULE 24 49.8 1195.2
MICROINVERTER 24 2.38 57.12
RAILS LINEAR FT 184 0.75 138
ATTACHMENT 64.00 0.55 35.20
TOTAL ARRAY WEIGHT 1425.52
AREA NAME QTY
MODULES 24 21.67 520.05
POINT LOAD (TOTAL ARRAY WEIGHT / # OF
ATTACHMENTS)22.27
DISTRIBUTED LOAD (TOTAL WEIGHT / ARRAYAREA 2.74
Signed 1/04/2024
118 W Stevens Ave -
20183019REV26/25/2024
1.ROOFTOP CONDUIT SHALL BE INSTALLED NO LESS THAN 7/8" ABOVE THE ROOF DECK.
2. GROUNDING SHALL BE IRREVERSIBLE CRIMPED.
3. IF UFER IS NOT PRESENT, 2 GROUNDING RODS ARE REQUIRED TO BE INSTALLED 6 FEET APART, BONDED
TOGETHER WITH #6 AWG, COLD WATER LINE AND GAS LINE NEED TO BE BONDED PER NEC 250.53
4. ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, TESTED, OR CERTIFIED BY A NATIONAL RECOGNIZED
TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH
ADMINISTRATION.
5. WHEN A BACKFEED BREAKER IS THE METHOD OF UTILITY INTERCONNECTION, BREAKER SHALL NOT READ
"LINE" OR "LOAD".
6. CONDUIT SHALL NOT PASS WITHIN 10 FEET OVERHEAD OF THE GAS RISER.
7. ALL EMT FITTINGS SHALL BE LISTED AS WEATHERPROOF FITTINGS PER NEC 314.15.
8. CONDUIT ON THE ROOF SHALL BE RAN TO REDUCE TRIP HAZARDS AND MAXIMIZE VENTILATION
OPPORTUNITIES BY FOLLOWING RIDGES, HIPS, AND VALLEYS. CONDUIT RUNS FROM COMBINER BOXES
OR THE LAST ARRAY SHALL FOLLOW, AS CLOSE AS POSSIBLE, THE RIDGE, HIP OR VALLEY TO THE
NEAREST OUTSIDE WALL.
9. CONDUIT RUNS BETWEEN ARRAYS AND/OR COMBINER BOXES SHALL BE RUN SUCH THAT CONDUIT PATHS
ARE MINIMIZED AND STILL COMPLY WITH THE ROUTING NOTED ABOVE.
10. DC WIRING WHEN RAN IN THE ATTIC OR ENCLOSED SPACES SHALL BE IN CONDUIT AND, TO THE MAXIMUM
EXTENT POSSIBLE, BE RAN ALONG THE BOTTOM OF LOAD BEARING MEMBERS.
11. RACEWAY SHALL BE PROVIDED WITH EXPANSION, EXPANSION-DEFLECTION, OR DEFLECTION FITTING
WHERE NECESSARY TO COMPENSATE FOR THERMAL EXPANSION, DEFLECTION AND CONTRACTION.
System Components
PV Mods MicroInverters
Make Mission Solar Make Enphase
Model MSE395SX9R Model IQ8PLUS-72-2-US
Imp (A)10.68 Max DC Volt
Rating (V)60
Vmp (V)36.99 Min DC Volt
Rating (V)25
Voc (V)45.18 AC Nomial
Voltage (V)240
Isc (A)11.24 Peak Efficiency
(%)97.6
Pmax (W)395 Max Per Branch 13
VOC Temp
Coeff (%)-0.259
System Calculations
Module Pmax Module Count Inverter
Efficiency DC System Size
395 24 N/A 9.480
Module PTC
Rating (CEC)Module Count Inverter
Efficiency AC System Size
366.900 24 97%8.541
String Calculations
String # of
Modules
Max Cont. Current
(V)Amps per
Modules
Max DesignedAmps
1 12 1.21 1.25 18.15
2 12 1.21 1.25 18.15
3 0 0 0 0
4 0 0 0 0
5 0 0 0 0
6 0 0 0 0
Total 24 36.3
Conductor Sizing
Tag Number Description AWG Type Material # of
Conductors
# of Current
Carrying
Conductors
Conduit Size Ampacity Fill Derate Temp Derate DeratedAmpacity Max Current
1 Module to Junction Box 12 Q Cable CU 5 4 N/A 30 1 0.91 27.3 18.15
2 Junction Box to Combiner 12 THWN-2 CU 5 4 3/4 30 0.8 0.91 21.84 18.15
3 Combiner to PVL 6 THWN-2 CU 4 3 3/4 75 1 0.91 68.25 36.3
Interconnection Calculations
Max Output current @ 125%Backfeed Breaker Size (A)Panel Bus Bar Rating (A)Panel Breaker Size (A)Bus X 120%Amps Availiable PVL Interconnectionup to 125A
36.3 40 + 20 = 60A 100 100 120 125 OKAY
Main Panel Info
Service Type Underground
Main Panel Disconnect 100
Main Panel Bus 100
Signed 1/04/2024
118 W Stevens Ave -
20183019REV26/25/2024
WARNING: PHOTOVOLTAIC
POWER SOURCE
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SHUT DOWN PV STSTEM
AND REDUCE
SHOCK HAZARD
IN THE ARRAY
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
SOLAR ELECTRIC
PV PANELS
PHOTOVOLTAIC SYSTEM
AC DISCONNECT
OPERATING VOLTAGE: VOLTS
OPERATING CURRENT: AMPS
240
29.04
RAPID SHUTDOWN
SWITCH FOR
SOLAR PV SYSTEM
ELECTRIC SHOCK HAZARD
WARNING!
CAUTION
118 W STEVENS AVE, SANTA ANA
POWER TO THIS BUILDING IS SUPPLIED FROM THE FOLLOWINGSOURCES WITH MAIN DISCONNECTS LOCATED AS SHOWN
WARNING - ELECTRICAL SHOCK HAZARD
NO USER SERVICEABLE PARTS INSIDE
CONTACT AUTHORIZED SERVICE PROVIDER FOR ASSISTANCE
CAUTION:
MULTIPLE SOURCES OF POWER.
!
PHOTOVOLTAIC
SOLAR BREAKER
Signed 1/04/2024
118 W Stevens Ave -
20183019REV26/25/2024
PETER MANGOSING RESIDENCE
118 W STEVENS AVE
SANTA ANA, CA 92707
PROJECT DESCRIPTION
INSTALL 9.480kW DC GRID TIED, ROOF FLUSH, MOUNTED PV
SYSTEM. TIE INTO NEW 100/100A PVL MAIN SERVICE PANEL
WITH SOLAR PERMIT.
SYSTEM SPECIFICATIONS
AHJ:CITY OF SANTA ANA
UTILITY COMPANY:SCE
SYSTEM SIZE:9.480kW DC
8.541kW AC
SOLAR MODULES MAKE: MISSION SOLAR
MODEL:MSE395SX9R
QUANTITY: 24
MICROINVERTERS MAKE: ENPHASE
MODEL:IQ8PLUS-72-2-US
QUANTITY: 24
GENERAL NOTES:
1. All electrical equipment and materials shall be new and labeled,
listed, or certified by a nationally recognized electrical testing
laboratory accredited by the United States Occupational Safety
Health Administration
2. Outdoor equipment shall be NEMA 3R rated or equivalent
3. All equipment shall be grounded per National Electrical Code
4. Contractor shall obtain electrical permits prior to installation
and shall coordinate all inspections, testing commissioning and
acceptance with the client,
utility co. and city inspectors as needed.
5. The electrical contractor shall verify the exact locations of
service points and service sizes with the serving utility company and
comply with all utility companies requirements.
Drawings are diagrammatic only, routing of raceways shall be option
of the contractor unless otherwise noted and shall be coordinated
with other trades.
If the roof material or the roof structure not adequate for PV
installation, call the engineer of record prior to installation. The
contractor is responsible to verify that the roof is capable of
withstanding the extra weight.
8. If the distances for cable runs are different than shown, the
contractor shall notify the electrical engineer to validate the wire
size. Final drawings will be red-lined and updated as appropriate.
9. Whenever a discrepancy in quality of equipment arises on the
drawing or specifications, the contractor shall be responsible for
providing and installing all materials and services required by the
strictest conditions noted on the drawings or in the specifications to
ensure complete compliance and longevity of the operable system
required by the engineer of record.
10. All work shall comply with the State of California, and Santa Ana
City applicable codes and regulations.
11. All electrical equipment shall be UL listed or listed by a city of
Santa Ana recognized electrical laboratory or approved by the
department.
PHOTOVOLTAIC NOTES:
1. Rooftop mounted photovoltaic panels and modules shall be tested
,listed and identified by recognized testing laboratory.
2. Solar system shall not cover any plumbing or mechanical vents 3.
Modules and support structures shall be grounded unless racking has
integrated ground.
4. Removal of an interactive inverter or other equipment shall not
disconnect the bonding connection between the grounding electrode
conductor and the photovoltaic source and/or output circuit
grounded conductors.
5. All PV modules and associated equipment and wiring shall be
protected from physical damage.
6. Live parts of PV source circuits and PV output circuits over
150v to ground shall not be accessible to other than qualified
persons while energized.
7. Inverter is equipped with integrated DC disconnect, thus
providing ground fault protection
8. All conductors shall be copper and 75 deg rated
9. A single conductor shall be permitted to be used to perform
the multiple functions of dc grounding, AC grounding and bonding
between AC and DC systems.
10. Non-current carrying metal parts of equipment shall be
effectively bonded together. Bond both ends of raceways.
These drawings are protected by copyright under US alaw. Any form
of reproduction is strictly prohibited without prior written approval
from FLAGSHIP SOLAR.
GOVERNING CODES:
THE INSTALLATION OF SOLAR ARRAYS AND
PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY
WITH THE FOLLOWING CODES
·2022 California Building Code
·2022 California Residential Code
·2022 California Green Building Standard Code
·2022 California Plumbing Code
·2022 California Mechanical Code
·2022 California Electrical Code
·2022 California Fire Code
·2022 California Energy Code
·2022 California Electrical Code
·2020 National Electrical Code
·2023 LA County Electrical Code
ALL OTHER ORDINANCE ADOPTED BY THE LOCAL
GOVERNING AGENCIES.
Signed 1/04/2024
118 W Stevens Ave -
20183019REV26/26/2024
SYSTEM SIZE:
DC: 9.480 Kw
AC: 8.541 Kw
R□□F SECTION 3
TILT: 4/12 (18.43 °)
AZIMUTH: 262
COUNT: 1
R□□F TYPE: ROLL COMP
(N)JUNCTION BOX -�
ATTACHED TD ARRAY
NOTES
R□□F SECTION 1
TILT: 4/12 <18.43 °)
AZIMUTH: 82
COUNT: 14
R□□F TYPE: ROLL COMP
1'-6*
0 0
0
TOTAL R□□F AREA: 2627 FT 2 ROOF ACCESS FIRE CODE APPROXIMATE TOTAL NE� MOD AREA:520 FT 2
EXISTING MOD AREA: 0 FT 2
TOT AL MOD AREA: 520 FT 2
COVERAGE: 201/.
DESIGN �ILL C□MPL Y �ITH !RC
P3102.1.3
POINT SETBACKS CONDUIT RUN □------
VISIBLE LOCKABLE LABELED DISCONNECT LOCATED WITHIN 1 OFT OF UTILITY METER.
�-TIE INT□ METER
#222013-180557
R□□F SECTION 2
TILT: 4/12 (18.43 °)
AZIMUTH: 172
COUNT: 9
R□□F TYPE: ROLL COMP
R□□F PLAN
SCALE: 1/8' = 1'-0'
Flagship Solar™
FLAGSHIP HOLDINGS LLC
15911 CANTERBURY CT.
BAKERSFIELD,
CA 93314
661-428-9293
LICENSE: CSLB#1094 787
TYLER CROSBY
LOCATION
DRA\rlN BY
YUJ
DRA\rlING DATE
30 Jo.nuo.ry 2024
PAGE TITLE PAGE NUMBER
SITE PLAN
&c PV 2 LAYOUT
Signed 1/04/2024
118 W Stevens Ave -
20183019REV26/26/2024
SYSTEM SIZE:
DC: 9.480 Kw
AC: 8.541 Kw
12.'-4 11/16
(24)MISSION SOLAR
MSE395SX9R MODULES v/ITH
(24)ENPHASE
IQ8PLUS-72-2-US
MICR □INVERTERS ON THE BACK
OF EACH MODULE
(N)JUNCTION BOX A TT ACHED
TD ARRAY
ROOF ACCESS FIRE CODE APPROXIMATE POINT SETBACKS CONDUIT RUN
'
(Y)
118 vi STEVENS AVE
SANT A ANA, CA 92707
�---L 041'-5 112.·/�
':::j FRONT OF HOME
I
L •
BACK OF HOME
VISIBLE LOCKABLE LABELED DISCONNECT LOCATED WITHIN 1 OFT OF UTILITY METER.
--(N) AC DISCONNECT
«l0FT FROM METER) --<N) COMBINER PANEL
--(N) BATTERY
--(N) MAIN SERVICE PANEL
--(N) UTILITY METER
'\. \
41'~8' ----------------�
'\.
�
�- - -------- - ---129'-5 3/4' - -,-.,,....�- --- --- -- -- --- -----1-_,, � I CP
SITE PLAN
SCALE: 1/16' = 1'-0 °
Flagship Solar™
FLAGSHIP HOLDINGS LLC
15911 CANTERBURY CT,
BAKERSFIELD,
CA 93314
661-428-9293
LICENSE: CSLB#1094 787
TYLER CROSBY
LOCATION
DRA\rlN BY
YUJ
DRA\rlING DATE
30 Jo.nuo.ry 2024
PAGE TITLE
PROPERTY
PLAN
PAGE NUMBER
5
Signed 1/04/2024
118 W Stevens Ave -
20183019REV26/26/2024
DEAD LOAD CALCULATIONS
LOAD QTY WEIGHT TOTAL
MODULE 24 49.8 1195.2
MICROINVERTER 24 2.38 57.12
RAILS LINEAR FT 184 0.75 138
ATTACHMENT 64.00 0.55 35.20
TOTAL ARRAY WEIGHT 1425.52
AREA NAME QTY
MODULES 24 21.67 520.05
POINT LOAD (TOTAL ARRAY WEIGHT / # OF
ATTACHMENTS)22.27
DISTRIBUTED LOAD (TOTAL WEIGHT / ARRAYAREA 2.74
Signed 1/04/2024
118 W Stevens Ave -
20183019REV26/26/2024
1.ROOFTOP CONDUIT SHALL BE INSTALLED NO LESS THAN 7/8" ABOVE THE ROOF DECK.
2. GROUNDING SHALL BE IRREVERSIBLE CRIMPED.
3. IF UFER IS NOT PRESENT, 2 GROUNDING RODS ARE REQUIRED TO BE INSTALLED 6 FEET APART, BONDED
TOGETHER WITH #6 AWG, COLD WATER LINE AND GAS LINE NEED TO BE BONDED PER NEC 250.53
4. ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, TESTED, OR CERTIFIED BY A NATIONAL RECOGNIZED
TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH
ADMINISTRATION.
5. WHEN A BACKFEED BREAKER IS THE METHOD OF UTILITY INTERCONNECTION, BREAKER SHALL NOT READ
"LINE" OR "LOAD".
6. CONDUIT SHALL NOT PASS WITHIN 10 FEET OVERHEAD OF THE GAS RISER.
7. ALL EMT FITTINGS SHALL BE LISTED AS WEATHERPROOF FITTINGS PER NEC 314.15.
8. CONDUIT ON THE ROOF SHALL BE RAN TO REDUCE TRIP HAZARDS AND MAXIMIZE VENTILATION
OPPORTUNITIES BY FOLLOWING RIDGES, HIPS, AND VALLEYS. CONDUIT RUNS FROM COMBINER BOXES
OR THE LAST ARRAY SHALL FOLLOW, AS CLOSE AS POSSIBLE, THE RIDGE, HIP OR VALLEY TO THE
NEAREST OUTSIDE WALL.
9. CONDUIT RUNS BETWEEN ARRAYS AND/OR COMBINER BOXES SHALL BE RUN SUCH THAT CONDUIT PATHS
ARE MINIMIZED AND STILL COMPLY WITH THE ROUTING NOTED ABOVE.
10. DC WIRING WHEN RAN IN THE ATTIC OR ENCLOSED SPACES SHALL BE IN CONDUIT AND, TO THE MAXIMUM
EXTENT POSSIBLE, BE RAN ALONG THE BOTTOM OF LOAD BEARING MEMBERS.
11. RACEWAY SHALL BE PROVIDED WITH EXPANSION, EXPANSION-DEFLECTION, OR DEFLECTION FITTING
WHERE NECESSARY TO COMPENSATE FOR THERMAL EXPANSION, DEFLECTION AND CONTRACTION.
System Components
PV Mods MicroInverters
Make Mission Solar Make Enphase
Model MSE395SX9R Model IQ8PLUS-72-2-US
Imp (A)10.68 Max DC Volt
Rating (V)60
Vmp (V)36.99 Min DC Volt
Rating (V)25
Voc (V)45.18 AC Nomial
Voltage (V)240
Isc (A)11.24 Peak Efficiency
(%)97.6
Pmax (W)395 Max Per Branch 13
VOC Temp
Coeff (%)-0.259
System Calculations
Module Pmax Module Count Inverter
Efficiency DC System Size
395 24 N/A 9.480
Module PTC
Rating (CEC)Module Count Inverter
Efficiency AC System Size
366.900 24 97%8.541
String Calculations
String # of
Modules
Max Cont. Current
(V)Amps per
Modules
Max DesignedAmps
1 12 1.21 1.25 18.15
2 12 1.21 1.25 18.15
3 0 0 0 0
4 0 0 0 0
5 0 0 0 0
6 0 0 0 0
Total 24 36.3
Conductor Sizing
Tag Number Description AWG Type Material # of
Conductors
# of Current
Carrying
Conductors
Conduit Size Ampacity Fill Derate Temp Derate DeratedAmpacity Max Current
1 Module to Junction Box 12 Q Cable CU 5 4 N/A 30 1 0.91 27.3 18.15
2 Junction Box to Combiner 12 THWN-2 CU 5 4 3/4 30 0.8 0.91 21.84 18.15
3 Combiner to PVL 6 THWN-2 CU 4 3 3/4 75 1 0.91 68.25 36.3
Interconnection Calculations
Max Output current @ 125%Backfeed Breaker Size (A)Panel Bus Bar Rating (A)Panel Breaker Size (A)Bus X 120%Amps Availiable PVL Interconnectionup to 125A
36.3 40 + 20 = 60A 100 100 120 125 OKAY
Main Panel Info
Service Type Underground
Main Panel Disconnect 100
Main Panel Bus 100
Signed 1/04/2024
118 W Stevens Ave -
20183019REV26/26/2024
WARNING: PHOTOVOLTAIC
POWER SOURCE
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SHUT DOWN PV STSTEM
AND REDUCE
SHOCK HAZARD
IN THE ARRAY
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
SOLAR ELECTRIC
PV PANELS
PHOTOVOLTAIC SYSTEM
AC DISCONNECT
OPERATING VOLTAGE: VOLTS
OPERATING CURRENT: AMPS
240
29.04
RAPID SHUTDOWN
SWITCH FOR
SOLAR PV SYSTEM
ELECTRIC SHOCK HAZARD
WARNING!
CAUTION
118 W STEVENS AVE, SANTA ANA
POWER TO THIS BUILDING IS SUPPLIED FROM THE FOLLOWINGSOURCES WITH MAIN DISCONNECTS LOCATED AS SHOWN
WARNING - ELECTRICAL SHOCK HAZARD
NO USER SERVICEABLE PARTS INSIDE
CONTACT AUTHORIZED SERVICE PROVIDER FOR ASSISTANCE
CAUTION:
MULTIPLE SOURCES OF POWER.
!
PHOTOVOLTAIC
SOLAR BREAKER
Signed 1/04/2024
118 W Stevens Ave -
20183019REV26/26/2024