Loading...
HomeMy WebLinkAbout3202 S Center St - PlanScope: New PV system  installation, Busbar certification PV OCPD: 30A  Customer: JEFFREY KAHN Address: 3202 S CENTER ST, SANTA ANA, CA 92704 Utility: SCE Dear Sir/Madam, Due to age and maintenance conditions, the existing residential electrical panel label specifications are no longer visible. A site surveyor performed site visit and obtained site photos. I have reviewed the photo of the main service panel, and systems of similar panel of 12 space  ‐ 24 poles max with label in the past and thus conclude: The existing residential electrical main panel is Bryant – UB12-24R which has bus rating of 125A and main circuit breaker of 100A (Center‐fed). The attached single line diagram  design for this solar PV system  satisfies 2019 CEC article 690 and 705.12(B) requirements. Should you have any questions, please feel free to contact me at the information listed below. Respectfully, Chi Fung Leung, P.E. Chifung.leung@sunpowercorp.com Chi F Leung Digitally signed by Chi F Leung Date: 2022.11.07 01:22:19 -08'00' 3202 S Center St 12/28/22 20psf 95mph C 0psf Exposure Cat: Ground Snow: Code: 2019 California Building Code ASCE 7-16 Live Load: Ult Wind Speed: Design Criteria: 11/9/2022 Attn.: To Whom It May Concern re: Job JEFFREY KAHN: 3202 S CENTER ST, SANTA ANA, CALIFORNIA 92704 The following calculations are for the structural engineering design of the photovoltaic panels. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. If you have any questions, don't hesitate to contact. 51 Rio Roble, San Jose, CA 95134 | 1-408-240-5500 Steven Procter Digitally signed by Steven Procter Date: 2022.11.14 15:02:19 -06'00' 3202 S Center St 12/28/22 Date :11/9/2022 Job Code: JEFFREY KAHN 2 of 6 Structrure Geometry: Mean Roof Height, hn =13 ft Eave Height, he =8 ft Buiding Length, L =58 ft Building Width, B =48 ft Module Area =20.8 ft² Roof Properties: Roof Pitch (deg) = Roofing Type = Sheathing Type = Wood Species = Wood Fb (psf) = Wood Fv (psf) = Wood E (psf) = Wood Lag Withdrawal (lb/in) = Framing Type = Framing OC Spacing (in.) = Section Thickness, b (in.) = Section Depth, d (in.) = Section Modulus, Sx (in.^3) = Beam Span (ft) = Pen Trib Width (ft) = Rail Span (ft) = C D (Wind) = C D (Snow) = CLS = C M = Ct = CL = CF = Cfu = Ci = Cr = Mallowable_Wind (lb-ft) = Mallowable_snow (lb-ft) = 634 456 1.0 1.15 1.5 1.0 1.0 1.0 1.00 1.0 1.6 1.15 4.00 3.07 6 3.50 3.06 1.50 2x4 Truss 24 230400000 266 129600 25920 5/8 OSB Sheathing Doug Fir-Larch #2 Comp Shingle 23 Roof 1 51 Rio Roble, San Jose, CA 95134 | 1-408-240-5500 3202 S Center St 12/28/22 Date :11/9/2022 Job Code: JEFFREY KAHN 3 of 6 Dead Load: 3.0 2.0 0.6 1.0 Total Roof 1 DL 6.6 psf 2.4 psf Roof_Dist_DL = M_Roof_Dist_DL = Def_Roof_Dist_DL = PV_uni_Dist_DL = M_PV_uni_Dist_DL = Def_PV_uni_Dist_DL = Total_uni_DL = M_Total_uni_DL = Def_Total_uni_DL = Rail_Down_DL = Rail_M_DL = Pens_Down_DL = Pens_Side_DL = Wind Load: Ultimate Wind Speed = 95 mph Directionality Factor, kd = 0.85 Topographic Factor, kzt = 1 Velocity Pressure Exposure Factor, kz = 0.85 Ground Elevation Factor, ke = 1.00 psf Velocity Pressure, qz = 16.67 Solar Equalization Factor, γa = 0.60 12 8 27 7 0.0009 17 50 13 0.0003 0.0007 4 12 36 PV DL Roof 1 Comp Shingle 5/8 OSB Sheathing 2x4 Truss @ 24" OC Misc (Insulation etc) 51 Rio Roble, San Jose, CA 95134 | 1-408-240-5500 3202 S Center St 12/28/22 Date :11/9/2022 Job Code: JEFFREY KAHN 4 of 6 Array Edge Factor, γE = External Pressure Up, GCp_1 = External Pressure Up, GCp_2 = External Pressure Up, GCp_3 = External Pressure Down, GCp = psf Design Pressure Up, p_1 = psf Design Pressure Up, p_2 = psf Design Pressure Up, p_3 = psf Design Pressure Down, p = uni_Dist_W_up = M_uni_Dist_W_up = Def_uni_Dist_W_up = uni_Dist_W_down = M_uni_Dist_W_down = Def_uni_Dist_W_down = Module_Up_W1 = Module_Up_W2 = Module_Down_W = Rail_Up_W1 = Rail_Up_W2 = Rail_Down_W = Rail_M_Up_W1 = Rail_M_Up_W2 = Rail_M_Down_W = Pens_Up_W1 = Pens_Up_W2 = Pens_Down_W = Module Check: Roof 1 Down = 16 psf <125 psf OK Roof 1 Up z1 = 14 psf <75 psf OK Roof 1 Up z2 = 20 psf <75 psf OK -405 197 55 -276 -77 -113 -101 49 16 -69 -23 -33 96 0.0018 -0.0026 32 -45 -135 -34.51 16.00 -22.51 -33.01 -2.30 0.60 -1.50 -2.20 Roof 1 1.5 51 Rio Roble, San Jose, CA 95134 | 1-408-240-5500 3202 S Center St 12/28/22 Date :11/9/2022 Job Code: JEFFREY KAHN 5 of 6 Rail Check (LRFD): Roof 1 1.4D : 11 lb-ft <548 lb-ft OK Roof 1 1.2D + 1.6S + 0.5W : 36 lb-ft <548 lb-ft OK Roof 1 1.2D + 0.5S + 1.0W : 64 lb-ft <548 lb-ft OK Roof 1 0.9D + 1.0W (Up z1) : 70 lb-ft <548 lb-ft OK Roof 1 0.9D + 1.0W (Up z2) : 106 lb-ft <548 lb-ft OK Attachment Check (ASD): Roof 1 1.0D + 0.6W : 145 lbs <803 lbs OK Roof 1 1.0D + 0.75*[1.0S + 0.6W] : 116 lbs <803 lbs OK Roof 1 1.0D + 1.0S : 27 lbs <803 lbs OK Roof 1 0.6D + 0.6W (Up z1) : 150 lbs <803 lbs OK Roof 1 0.6D + 0.6W (Up z2) : 227 lbs <803 lbs OK Lag Screw Uplift Check (ASD): Roof 1 Lag Screw Withdrawl Value = 266 lbs 5/16 Dia. Roof 1 Lag Screw Penetration = 2.5 Roof 1 0.6D + 0.6W (Up z1) : 150 lbs <665 lbs OK Roof 1 0.6D + 0.6W (Up z2) : 227 lbs <665 lbs OK Framing Check (ASD): Roof 1 uni 1.0D + 0.6W : 107 lb-ft <634 lb-ft OK Roof 1 uni 1.0D + 0.75*[1.0S + 0.6W] : 93 lb-ft <634 lb-ft OK Roof 1 uni 1.0D + 1.0S : 50 lb-ft <456 lb-ft OK Roof 1 uni 0.6D + 0.6W (Up z1) : 51 lb-ft <634 lb-ft OK Seismic Check: Stucco 10.0 psf 2x4 Studs @ 16"2.0 psf Gypsum 3.0 psf Misc. (Insulation, etc.)2.0 psf 51 Rio Roble, San Jose, CA 95134 | 1-408-240-5500 3202 S Center St 12/28/22 Date :11/9/2022 Job Code: JEFFREY KAHN 6 of 6 17 psf 1696 ft^2 28832 lbs 7 psf 2784 ft^2 18379 lbs 46 lbs 12 546 lbs %increase = (Wexisting + Wadditional) / Wexisting = OK Limits of Scope of Work and Liability 1.16% The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. The calculations produced for this dwelling's assessment are only for the proposed solar panel installation referenced in the stamped plan set and were made according to generally recognized structural anlaysis standards and procedures. Total Roof Area = Total Roof W =Existing Weight PV Panel W = Number of Panels = Total PV W =Additional Weight Total Wall DL = Total Wall Area = Total Wall W =Existing Weight Total Roof DL = 51 Rio Roble, San Jose, CA 95134 | 1-408-240-5500 3202 S Center St 12/28/22 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org Digitally signed by Camille Adecer Date: 2022.12.14 19:26:59 -08'00' 4 4 4 4 4 4 4 4 4 4 3202 S Center St 12/28/22 Expedited Permit Process for PV Systems - AC Module1 Expedited Permit Process for PV Systems AC Module The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the AC Module to use with the Expedited Permit Process. The Standard String, Micro-Inverter, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 3202 S Center St 12/28/22 Expedited Permit Process for PV Systems2 Expedited Permit Process for Small-Scale PV Systems AC Module The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 3202 S Center St 12/28/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 AC Module Site Plan                                                          SUNPOWER CORPORATION JEFFREY KAHN - SOLAR PV 1414 HARBOUR WAY S RICHMOND CA 94804 5102608200 3202 S CENTER ST SANTA ANA, CA 92704 5.22 3202 S Center St 12/28/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 AC Module Electrical Diagram Contractor Name, Address and Phone: One-Line Standard Electrical Diagram for AC Module PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV SCALE NTS Date: SHEET Drawn By: Checked By: DESCRIPTION OR CONDUCTOR TYPE USE-2 or PV WIRE GEC EGC X ALL THAT APPLY EXTERIOR CABLE LISTED W/ INV. THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY NO DC GEC IF 690.35 SYSTEM THWN-2 or XHHW-2 or RHW-2 GEC EGC X ALL THAT APPLY TAG 1 2 3 4 5 CONDUIT AND CONDUCTOR SCHEDULE COND. GAUGE MFG MFG NUMBER OF CONDUCTORS MFG Cable MFG Cable CONDUIT TYPE N/A N/A N/A CONDUIT SIZE N/A N/A N/A DESCRIPTIONTAG 1 2 3 4 5 6 7 PART NUMBER NOTES FOR UNUSED AC MODULES PUT "N/A” in BLANK ABOVE 1 2 2 3 EQUIPMENT SCHEDULE J-BOX 4 AC DISCO M BUILDING GROUNDING ELECTRODE G M UTILITY SERVICE MAIN SERVICE PANEL MAIN OCPD INVERTER OCPD 5 6 7 5 3 4 G SEE GUIDE APPENDIX D FOR INFORMATION ON MODULE AND ARRAY GROUNDING AC COMBINER PANEL G ____ AC MODULES IN BRANCH- CIRCUIT MOD __1__ DC AC MOD __1__ DC AC MOD __1__ DC AC ____ AC MODULES IN BRANCH- CIRCUIT MOD __1__ DC AC MOD __1__ DC AC MOD __1__ DC AC 1 1414 HARBOUR WAY S RICHMOND CA 94804 5102608200 SUNPOWER CORPORATION JEFFREY KAHN - SOLAR PV 3202 S CENTER ST SANTA ANA, CA 92704 5.22 3202 S Center St 12/28/22 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Notes for AC Module Electrical Diagram Contractor Name, Address and Phone: Bill Ted Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: Site Address: System AC Size: SIZE FSCM NO DWG NO REV SCALE NTS Date: SHEET Drawn By: Checked By: NOMINAL OPERATING AC VOLTAGE NOMINAL OPERATING AC FREQUENCY MAXIMUM AC POWER MAXIMUM AC CURRENT MAXIMUM OCPD RATING AC MODULE MAKE AC MODULE MODEL AC MODULE RATINGS (Guide Appendix C) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT (N/A) 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OUTPUT CIRCUIT OCPD(s), ONE FOR EACH AC MODULE CIRCUIT. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ____oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE ___oC 2.) 2009 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR 6 OR LESS CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR AC MODULES INVERTER OUTPUT CIRCUITS WITH 12 AMPS OR LESS WHEN PROTECTED BY A 15- AMP OR SMALLER OCPD. b) 10 AWG, 90 oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR AC MODULES INVERTER OUTPUT CIRCUITS WITH 16 AMPS OR LESS WHEN PROTECTED BY A 20- AMP OR SMALLER OCPD. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix F): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE®REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) N/A since no dc wiring AC OUTPUT CURRENT NOMINAL AC VOLTAGE SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) SUNPOWER CORPORATION 1414 HARBOUR WAY S RICHMOND CA 94804 3202 S CENTER ST SANTA ANA, CA 92704 JEFFREY KAHN - SOLAR PV 5102608200 5.22 3202 S Center St 12/28/22 420-440W Residential AC Module SunPower® Maxeon® Technology Built specifically for use with the SunPower Equinox ® system, the only fully integrated solar solution designed, engineered, and warranted by one company. Highest Power AC Density Available. The patented, solid-copper foundation Maxeon Gen 6 cell is over 5% larger than prior generations, delivering the highest e fficiency AC solar panel available. 1 Highest Lifetime Energy and Savings Designed to deliver 60% more energy over 25 years in real-world conditions like partial shade and high temperatures.2 Best Reliability, Best Warranty With more than 42.6 million and 15 GW modules deployed around the world, SunPower technology is proven to last. That’s why we stand behind our module and microinverter with the industry’s best 25-year Combined Power and Product Warranty. Datasheet 5 0 10 15 20 25 150% 140% 130% 120% 110% 100% 90% 80% 70% 60%25 - y e a r E n e r g y Y i e l d p e r W a t t Years of Operation Up to 60% More Lifetime Energy Conventional Panel M-Series Part of the SunPower Equinox® Solar System •Compatible with mySunPowerTM monitoring •Seamless aesthetics Factory-integrated Microinverter •Highest-power integrated AC module in solar •Engineered and calibrated by SunPower for SunPower AC modules 6. 3 7 i n [1 6 1 . 7 m m ] 6. 5 4 i n [1 6 6 m m ] 5% larger 1-800-SUNPOWER | sunpower.com M-Series: M440 | M435 | M430 | M425 | M420 SunPower ® Residential AC Module 1 Based on datasheet review of websites of top 20 manufacturers per Wood Mackenzie US PV Leaderboard Q3 2021. 2 Maxeon 435 W, 22.5% efficient, compared to a Conventional Panel on same-sized arrays (260 W, 16% efficient, approx. 1.6 m²), 7.9% more energy per watt (based on PVSyst pan files for avg. US climate), 0.5%/yr slower degradation rate (Jordan, et. al. “Robust PV Degradation Methodology and Application.”PVSC 2018). 3 Voltage range can be extended beyond nominal if required by the utility. 4 Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. 5 Factory set to IEEE 1547a-2014 default settings. CA Rule 21 default settings profile set during commissioning. 6 Standard Test Conditions (1000 W/m² irradiance, AM 1.5, 25°C). All DC voltage is fully contained within the module. 7 UL Listed as PVRSE and conforms with NEC 2017 and NEC 2020 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors; when installed according to manufacturer’s instructions. 8 Please read the safety and installation instructions for more information regarding load ratings and mounting configurations. See www.sunpower.com/company for more reference information. Specifications included in this datasheet are subject to change without notice. ©2022 SunPower Corporation. All rights reserved. SUNPOWER, the SUNPOWER logo, EQUINOX and MYSUNPOWER are trademarks or registered trademarks of SunPower Corporation in the U.S. MAXEON is a registered trademark of Maxeon Solar Technologies, Ltd. For more information visit www.maxeon.com/legal. AC Electrical Data Inverter Model: Type H (Enphase IQ7HS) @240 VAC @208 VAC Peak Output Power (VA)384 369 Max. Continuous Output Power (VA)384 369 Nom. (L–L) Voltage/Range3 (V)240 / 211–264 208 / 183–229 Max. Continuous Output Current (Arms)1.60 1.77 Max. Units per 20 A (L–L) Branch Circuit4 10 9 CEC Weighted Efficiency 97.0%96.5% Nom. Frequency 60 Hz Extended Frequency Range 47–68 Hz AC Short Circuit Fault Current Over 3 Cycles 4.82 A rms Overvoltage Class AC Port III AC Port Backfeed Current 18 mA Power Factor Setting 1.0 Power Factor (adjustable)0.85 (inductive) / 0.85 (capacitive) DC Power Data SPR-M440- H-AC SPR-M435- H-AC SPR-M430- H-AC SPR-M425- H-AC SPR-M420- H-AC Nom. Power6 (Pnom) W 440 435 430 425 420 Power Tolerance +5/−0% Module Efficiency 22.8% 22.5% 22.3% 22.0% 21.7% Temp. Coef. (Power)−0.29% / °C Shade Tolerance Integrated module-level max. power point tracking Tested Operating Conditions Operating Temp.-40° F to +185°F (-40°C to +85°C) Max. Ambient Temp. 122°F (50°C) Max. Test Load8 Wind: 125 psf, 6000 Pa, 611 kg/m² back Snow: 187 psf, 9000 Pa, 917 kg/m² front Max. Design Load Wind: 75 psf, 3600 Pa, 367 kg/m² back Snow: 125 psf, 6000 Pa, 611 kg/m² front Impact Resistance 1 inch (25 mm) diameter hail at 52 mph (23 m/s) Mechanical Data Solar Cells 66 Maxeon Gen 6 Front Glass High-transmission tempered glass with anti-reflective coating Environmental Rating Outdoor rated Frame Class 1 black anodized (highest AAMA rating) Weight 48 lb (21.8 kg) Recommended Max. Module Spacing 1.3 in. (33 mm) Warranties, Certifications, and Compliance Warranties • 25-year limited power warranty • 25-year limited product warranty Certifications and Compliance • UL 1741 / IEEE-1547 • UL 1741 AC Module (Type 2 fire rated) • UL 61730 • UL 62109-1 / IEC 62109-2 • FCC Part 15 Class B • ICES-0003 Class B • CAN/CSA-C22.2 NO. 107.1-01 • CA Rule 21 (UL 1741 SA)5 (includes Volt/Var and Reactive Power Priority) • UL Listed PV Rapid Shutdown Equipment7 Enables installation in accordance with: • NEC 690.6 (AC module) • NEC 690.12 Rapid Shutdown (inside and outside the array) • NEC 690.15 AC Connectors, 690.33(A)–(E)(1) When used with AC module Q Cables and accessories (UL 6703 and UL 2238)7: • Rated for load break disconnect When used with InvisiMount racking and InvisiMount accessories (UL 2703): • Module grounding and bonding through InvisiMount • Class A fire rated PID Test 1000 V: IEC 62804 Packaging Configuration Modules per pallet 25 Packaging box dimensions ×775.4 75.4 755.4 × 42. (1915 × 1072 × 1220 mm) Pallet gross weight 1300.7 lb (590 kg) Pallets per container 32 Net weight per container 41,623 lb (18,880 kg) 1-800-SUNPOWER | sunpower.com 539973 RevD April 2022 Please read the safety and installation instructions for details. 3202 S Center St 12/28/22 COMP MOUNTS Pegasus Solar Inc 100 West Ohio Avenue, Richmond, CA 94804 T: 510.210.3797 www.pegasussolar.com WATERTIGHT FOR LIFE Pegasus Solar's Comp Mounts are a cost effective, high-quality option for rail installations on composition shingle roofs. Designed to last decades, the one-piece flashing with elevated cone means there is simply nothing to fail. A BETTER DAY ON THE JOB Simple 3-piece design for rapid installation Encapsulating design raises the water seal 0.9" above roof deck One-piece flashing with elevated cone – No press-fits or deck-level EPDM washers to fail 25-year Warranty Manufactured with advanced materials and coatings to outlast the roof itself Superior Waterproofing Tested to AC286 without sealant 0.9" elevated water seal Code Compliant Fully IBC/CBC Code Compliant Exceeds ASCE 7-16 Standards All-In-One Kit Packaging Flashings, L-Feet and SS lags with bonded EPDM washers are included in each 24-pack COMP MOUNTS Pegasus Solar Inc 100 West Ohio Avenue, Richmond, CA 94804 T: 510.210.3797 www.pegasussolar.com 1. Drill pilot hole in center of rafter. 3. Place L-Foot over cone and install lag with washer through L-Foot. 2. Optional: Apply a "U-shape" of sealant to underside of flashing and postition under 2nd shingle course, cone over pilot hole. 4. Drive lag to required depth. Attach rail per rail manufacturer's instructions. Comp Mount Install Kits tents PendinBoxes per Palletg. All rPaights reserved. 2019 Pegasus Solar Inc PSCR-CBB0 Closed Slot L-Foot, Flashing, 5/16"x 4-1/2" SS Lag with metalized EPDM washer PSCR-UBB0 Open Slot L-Foot, Flashing, 5/16"x 4-1/2" SS Lag with metalized EPDM washer SPCR-CBBH Closed Slot L-Foot, Flashing, 5/16"x 4-1/2" SS Lag with metalized EPDM washer and M10 Hex Bolt BlackL-Foot and Black Flashing Most Composition Shingle IBC, ASCE/SEI 7-16, AC286 Railed Systems Galvalume Plus Aluminum 24 72 L-Foot Type Kit Contents SKU Kit Quantity L-Foot Material Flashing Material Compatible Rail Install Application Certifications Roof Type Finish Closed Slot PSCR-CMM0 L-Foot, Flashing, 5/16"x 4-1/2" SS Lag with metalized EPDM washer Mill L-Foot and Mill Flashing Painted Galvalume Plus PSCR-UMM0 Open Slot L-Foot, Flashing, 5/16"x 4-1/2" SS Lag with metalized EPDM washer 3202 S Center St 12/28/22 SunPower ® InvisiMount™ | Residential Mounting System Simple and Fast Installation • Integrated module-to-rail grounding • Pre-assembled mid and end clamps • Levitating mid clamp for easy placement • Mid clamp width facilitates consistent, even module spacing • UL 2703 Listed integrated grounding Flexible Design • Addresses nearly all sloped residential roofs • Design in landscape and portrait with up to 8ʼ rail span • Pre-drilled rails and rail splice • Rails enable easy obstacle management Customer-Preferred Aesthetics • #1 module and #1 mounting aesthetics • Best-in-class system aesthetics • Premium, low-profile design • Black anodized components • Hidden mid clamps and capped, flush end clamps Part of Superior System • Built for use with SunPower DC and AC modules • Best-in-class system reliability and aesthetics • Optional rooftop transition flashing, rail- mounted J-box, and wire management rail clips • Combine with SunPower modules and SunPower EnergyLink ® monitoring app sunpower.com Elegant Simplicity SunPower ® InvisiMount™ is a SunPower-designed rail-based mounting system. The InvisiMount system addresses residential sloped roofs and combines faster installation time, design flexibility, and superior aesthetics. The InvisiMount product was specifically envisioned and engineered to pair with SunPower modules. The resulting system-level approach amplifies the aesthetic and installation benefits—for homeowners and for installers. Datasheet SunPower ® InvisiMount™ | Residential Mounting System InvisiMount Component Details Mid clamp Black oxide stainless steel 300 series 63 g (2.2 oz) End clamp Black anodized aluminum 6000 series 110 g (3.88 oz) Rail Black anodized aluminum 6000 series 830 g/m (9 oz/ft) Rail splice Aluminum alloy 6000 series 830 g/m (9 oz/ft) Rail bolt M10-1.5 × 25 mm; custom T-head SS304 18 g (0.63 oz) Rail nut M10-1.5; DIN 6923 SS304 nominal Ground lug assembly SS304; A2-70 bolt; tin-plated copper lug 106.5 g (3.75 oz) Row-to-row grounding clip SS 301 with SS 304 M6 bolts 75 g (2.6 oz) Row-to-row spacer Black POM-grade plastic 5 g (0.18 oz) Roof Attachment Hardware Supported by Design Tool Application • Composition Shingle Rafter Attachment • Composition Shingle Roof Decking Attachment • Curved and Flat Tile Roof Attachment • Universal interface for other roof attachments InvisiMount Operating Conditions Temperature −40° C to 90° C (−40° F to 194° F) Max. Load (LRFD)• 3000 Pa uplift • 6000 Pa downforce Roof Attachment Hardware Warranties Refer to roof attachment hardware manufacturer’s documentation. InvisiMount Warranties And Certifications Warranties • 25-year product warranty • 5-year finish warranty Certifications • UL 2703 Listed • Class A Fire Rated Professional Engineer (PE) must then stamp all calculations. If you have any questions please contact SunPower Technical Support at 1-855-977-7867. © 2018 SunPower Corporation. All Rights Reserved. SUNPOWER, the SUNPOWER logo, EQUINOX, and INVISIMOUNT are trademarks or registered trademarks of SunPower Corporation. All other trademarks are the property of their respective owners. Specifications included in this datasheet are subject to change without notice. InvisiMount Components Module¹ / Mid Clamp and Rail Mid Clamp End Clamp Rail and Rail Splice Ground Lug Assembly Module¹ / End Clamp and Rail sunpower.com 509506 RevF ¹ Module frame that is compatible with the InvisiMount system required for hardware interoperability. ² SunPower recommends that all Equinox™, InvisiMount™, and AC module systems always be designed using the InvisiMount Span Tables #524734. If a designer decides to instead use the component capacities listed in this document to design a system, note that the capacities shown are Load and Resistance Factor Design (LRFD) design loads, and are NOT to be used for Allowable Stress Design (ASD) calculations; and that a licensed InvisiMount Component LRFD Capacities² Mid clamp Uplift 664 lbf Shear 540 lbf End clamp Uplift 899 lbf Shear 220 lbf Rail Moment: upward 548 lbf-ft Moment: downward 580 lbf-ft Rail splice Moment: upward 548 lbf-ft Moment: downward 580 lbf-ft L-foot Uplift 1000 lbf Shear 390 lbf Datasheet Row-to-Row Spacer Row-to-Row Grounding Clip 3202 S Center St 12/28/22 Equinox Junction Boxes SunPower®Equinox™ Accessories SPECIFICATIONS Model RMJ v2 Comp Shingle Transition J-Box Kit Part Number 530167 530168 Max. Voltage Rating 600 V (AC or DC) Ambient Temp. Range −35°C to 75°C (−31°F to 167°F) Enclosure Material Flame-retardant, UV-resistant, high-impact resistant resin Attachment/Flashing Material 304 stainless steel Steel w/zinc-aluminum coating Cavity Dimensions 150 ×150 ×62 mm (5.91” ×5.91” ×2.13”) Enclosure Volume 1150 cc (70 in3) Attachment/Flashing Finish Black oxide Black powder coat Compatibility InvisiMount rail Comp shingle roofs Assembled Weight 0.78 kg (1.7 lb)1.27 kg (2.8 lb) Certifications & Ratings • Watertight, UL Type 4 • UL 94 5VA • UL 1741 • UL 2703 (with InvisiMount) • Watertight, UL Type 4 • UL 94 5VA • UL 1741 Additional Hardware Included • 3/4″ cord grip • Lay-in lug • 3/4″cord grip • #12 screws with EPDM washer Composition Shingle Roof Transition Junction Box Datasheet InvisiMount™ Rail-Mounted Junction Box (RMJ) v2 • 70% larger than original InvisiMount J-box. • Integrated grounding to InvisiMount rail, replacing grounding lug assembly. • Snap-on attachment for fast and secure installation. • Enables transitioning conductors directly through the roof. • Integrated flashing for peace of mind. • Compatible with composition shingle roofs. COMPONENT DIMENSIONS J- B o x E n c l o s u r e (u s e d i n b o t h R M J a n d T r a n s i t i o n J - b o x ) Fl a s h i n g (u s e d o n l y w i t h T r a n s i t i o n J - B o x ) Equinox Junction Boxes SunPower®Equinox™ Accessories Datasheet 539382 RevA 3202 S Center St 12/28/22 Improve Support, Reduce Costs An intuitive monitoring website enables you to: • • • • See a visual map of customer sites Remotely manage hundreds of sites Remotely diagnose and troubleshoot system issues Drill down for the status of individual devices Add Value for Customers With mySunPower™ monitoring customers can: • • • • • Track their energy production by day, month, year and in different weather conditions See their energy use and estimated bill savings Maximize their savings with automatic system alerts and tips Customize storage settings and easily monitor and track available battery power Receive elective system reports SunPower ® Monitoring — Plug-and-Play Installation This complete solution for residential monitoring and control includes the SunPower ® PV Supervisor (PVS) which improves the installation process, overall system reliability, and customer experience: • • • • • • • • • Compact footprint for improved aesthetics Robust cloud connectivity and comprehensive local connectivity Flexible configuration of devices during installation Consumption metering Revenue-quality production metering Web-based commissioning Remote diagnostics of PVS and inverters Durable UL Type 3R enclosure helps reduce maintenance costs Easy integration with SunPower eBOS Robust Cloud Connectivity Multiple options to maintain optimal connectivity: • • • Hardwired Ethernet WiFi Cellular backup sunpower.com SunPower ® Monitoring | Residential SunPower PV Supervisor Operating Conditions Temperature • −22°F to +140°F (−30°C to +60°C) Humidity (max.) • 95%, non-condensing Warranty and Certifications Warranty • 10-year Limited Warranty Certifications • UL, cUL, CE, UL 61010-1 and -2, FCC Part 15 (Class B) Mechanical Weight • 5.5 lb (2.5 kg) Dimensions • 11.8 × 8.0 × 4.2 in. (30.5 × 20.5 × 10.8 cm) Enclosure rating • UL 50E Type 3R Site Requirements Number of modules supported per PVS • 85 (SunPower AC modules) Internet access • High-speed internet access via accessible router or switch Power • 100–240 VAC (L–N), 50 or 60 Hz • 208 VAC (L–L in phase 3), 60 Hz Communication RS-485 • Supports string inverters, external meters, and other auxiliary devices Integrated metering • One channel of revenue-quality production metering • Two channels of consumption metering Ethernet • 1 LAN (or optional WAN) port PLC • Supports SunPower AC modules WiFi • 802.11b/g/n 2.4 GHz and 5 GHz Cellular • LTE Cat-M1/3G UMTS ZigBee • IEEE 802.15.4 MAC, 2.4 GHz ISM band Data storage • 60 days Upgrades • Automatic firmware upgrades Web and Mobile Device Support Customer site • mysunpower.com Partner site • monitor.sunpower.com Browsers • Firefox, Safari, and Chrome Mobile devices • iPhone®, iPad®, and Android™ Customer app 1 Create account online at mysunpower.com 2 On a mobile device, download the SunPower Monitoring app from Apple App Store or Google Play™ Store 3 Sign in using account email and password SunPower ® AC ModulesPVS SunPower ® Pro Fleet Management for Installers mySunPowerTM for Homeownes © 2020 SunPower Corporation. All Rights Reserved. SUNPOWER, the SUNPOWER logo and MYSUNPOWER are trademarks or registered trademarks of SunPower Corporation in the U.S. and other countries as well. All other logos and trademarks are the properties of their respective owners. 530536 Rev D 3202 S Center St 12/28/22 3202 S Center St 12/28/22 NO 3THWN-2 EGC: THWN-2 1 NO #10 #10 EMT 3/4"C C (N) LOAD CENTER MIN., 120/240 V, M.L.O, NEMA-3R LOCATION: GND YES 20A, 2P 20A, 2P SOUTH 100A 15A, 2P ETHERNET CONNECTION TO DSL/CABLE MODEM CAT5e PVS6 (3) #14 THWN (1) #14 THWN EGC NO NO EGC: Bare CU #6 BRANCH CIRCUIT FROM PV ARRAY TO JUNCTION BOX #12 2 A -- 1 B JUNCTION BOX, NEMA-3R THWN-2 EGC: THWN-2 1 4 B 3 #10 #10 EMT 3/4" #10 #10 CONDUCTOR / CONDUIT SCHEDULE DESCRIPTION & CONDUCTOR TYPE CONDUCTOR SIZE (AWG)CONDUIT/CABLE TYPE CONDUIT SIZENUMBER OF CONDUCTORS 1 ROOFTOP ARRAY WIRING A DC AC Branch Circuit #1AC DC AC Branch Circuit #2 6 AC MODULES 6 AC MODULES TAG H (E) UTILITY BIDIRECTIONAL METER #: 222012782899 EXISTING GROUND NO MLO NO GROUNDED (INCLUDE GEC) UNGROUNDEDü INSTALLATION NOTES 1 CHECK BOX FOR WHETHER SYSTEM IS GROUNDED OR UNGROUNDED: FOR UNGROUNDED SYSTEMS: · DC OCPD DISCONNECT BOTH CONDUCTORS OF EACH SOURCE CIRCUIT. · UNGROUNDED CONDUCTORS MUST BE IDENTIFIED PER 210.5(C). WHITE FINISHED CONDUCTORS ARE NOT PERMITTED. 2 3 4 5 6 7 8 9 10 DC / DC CONVERTERS NO SOURCE CIRCUIT JUNCTION BOX SUNVAULT ESS SUNVAULT BATTERY INVERTER SOLAR LOAD CENTER PV PRODUCTION METER SEPARATE AC DISCONNECT HEAT DETECTOR YES NO 11 13 BACK UP LOAD CENTER NON-BACK UP LOAD CENTER EV SUPPLY EQUIPMENT NO NO NO TAG DESCRIPTION 12 REMOTE POWER OFF SWITCH 14 HUB+ INCOMING SOURCE FEED , 120/240 V, 1 PH, 3 W *MSP MAX PV BREAKER (A): x 120% - = LOCATION: MANUF: GND MCB CENTER FED NOTE: "PER NEC 705.12(B)(2)(3)(d), A CONNECTION AT EITHER END, BUT NOT BOTH ENDS, OF A CENTER-FED PANELBOARD IN DWELLINGS SHALL BE PERMITTED WHERE THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR DOES NOT EXCEED 120 PERCENT OF THE CURRENT RATING OF THE BUSBAR. (E) LOADS (E) LOADS (E) LOADS GND 100A, 2P 50A 125A 30A, 2P SOUTH BRYANT 125A 100A (E) MAIN SERVICE PANEL SUNPOWER AC MODULES INTERGRATED WITH MICROINVERTER 1 ACMSOLAR AC MODULE / BRANCH 1. DC CIRCUIT IS ISOLATED AND INSULATED FROM GROUND AND MEETS THE REQUIREMENT OF NEC 690.35. 2. SUNPOWER PROVIDED CABLES COMES WITH TWO (2) #12 AWG WIRE AND THIS IS BY DESIGN. NEUTRAL AND ADDITIONAL GROUND WIRE IS NOT REQUIRED FOR PROVIDED TRUNK AND EXTENSION CABLES. 3. SUNPOWER AC MODULES HAVE BEEN TESTED AND CERTIFIED TO UL 2703 FOR INTEGRATED GROUNDING AND HENCE A SEPARATE GROUND WIRE IS NOT REQUIRED WITHIN THE ARRAY. 4. USE ROW-TO-ROW GROUNDING CLIP PROVIDED TO GROUND ROWS OF MODULE. BOND SUB-ARRAYS BY RUNNING #6 AWG BARE CU WIRE AND GROUND LUGS AT A SINGLE POINT ON EACH SUB-ARRAY AND THEN TO THE JUNCTION BOX. REFER TO PVE-4 FOR ADDITIONAL DETAILS. 1. PROPER LISTING EXPECTED FOR CONDITIONS OF USE ON ALL LUGS, FITTINGS, CRIMPS, ETC. 2. ALL CONDUIT BEND RADII TO CONFORM TO THE NEC MINIMUM BEND RADII REQUIREMENTS. 3. MINIMUM CLEARANCE SHALL BE MAINTAINED PER NEC FOR ALL NEW EQUIPMENT TO BE INSTALLED. 4. EXISTING GROUNDING ELECTRODE SYSTEM MUST MEET NEC AND LOCAL UTILITY REQUIREMENTS. 5. COPPER CONDUCTORS SHALL BE USED UNLESS SPECIFIED. 6. TYPE NM (ROMEX) CONDUCTORS ARE ALLOWED FOR INTERNAL AND ATTIC RUNS AND SHALL BE INSTALLED MEETING NEC REQUIREMENTS. 7. IF MAIN SERVICE PANEL IS TO BE UPGRADED, IT WILL BE PERMITTED AND INSTALLED BY 3RD PARTY. 8. AC WIRING SHALL UPSIZE IF VOLTAGE DROP EXCEEDS 2%. 9. RUN CONDUCTORS IN EXISTING CONDUIT WHEN AVAILABLE PROVIDED IT HAS NO OTHER CONDUCTORS RUNNING THROUGH IT. 10. EQUIVALENT SPECIFICATION ON CABLES AND ELECTRICAL EQUIPMENT SPECIFIED ARE ACCEPTABLE. 11. AS DC POWER IS INTERNAL TO THE MODULE, GROUNDING ELECTRODE CONDUCTOR (GEC) FOR THE MODULE OR ARRAY IS NOT REQUIRED. AC MODULES NOTESELECTRICAL NOTES PV CERTIFICATIONS AND COMPLIANCE · UL 1741 / IEEE-1547 · UL 1741 AC MODULE (TYPE 2 FIRE RATED) · UL 62109-1 / IEC 62109-2 · UL LISTED PV RAPID SHUTDOWN EQUIPMENT ENABLES INSTALLATION IN ACCORDANCE WITH: · NEC 690.6 (AC MODULE) · NEC 690.12 RAPID SHUTDOWN (INSIDE AND OUTSIDE THE ARRAY) · NEC 690.15 AC CONNECTORS, 690.33(A)–(E)(1) SUNPOWER PROVIDED AC MODULES EXTENSION CABLE, LISTED AS AN ASSEMBLY MODEL: SPR-M-435-H-AC (240) | QTY: 12 MODEL: SPR-M-435-H-AC (240) [SI] | QTY: 12 CONSUMPTION CT : CATEGORY 4 - SIMPLE - PARALLEL SET - BUNDLING OF CONDUCTORS QUAD/TWIN BREAKER REQUIRED PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE J E F F R E Y K A H N 32 0 2 S C E N T E R S T SA N T A A N A , C A L I F O R N I A 9 2 7 0 4 RP-368636 5. 2 2 k W SPRI - ANAHEIM 11-09-2022 A.KHAN AZAM KHAN SHEET NTS EL E C T R I C A L S I N G L E - L I N E D I A G R A M & S P E C I F I C A T I O N S PVE-1 3202 S Center St 12/28/22 ELECTRICAL CALCULATIONS BRANCH 2BRANCH 1 NUMBER OF MODULES VOLTAGE RATED AC OUTPUT CURRENT: IOUT = MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE TEMPERATURE ADDER TEMPERATURE USED FOR AMPACITY DE-RATING TEMPERATURE DE-RATING COEFFICIENT FILL DE-RATING COEFFICIENT IWIREMIN = IMAX / TEMP_COEFF / FILL_COEFF WIRE SIZE AMPACITY CONDUCTOR SIZE CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP OVERCURRENT PROTECTION MINIMUM OCPD = IOUT x 1.25 CALCULATED VOLTAGE DROP ONE WAY CIRCUIT LENGTH SUBPANEL TO GRID-TIE WIRING VOLTAGE SUM OF BRANCHES: IOUT_TOTAL = MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE TEMPERATURE USED FOR AMPACITY DE-RATING TEMPERATURE DE-RATING COEFFICIENT FILL DE-RATING COEFFICIENT IWIREMIN = IMAX / TEMP_COEFF / FILL_COEFF WIRE SIZE AMPACITY CONDUCTOR SIZE CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP OVERCURRENT PROTECTION MINIMUM OCPD = IOUT x 1.25 VOLTAGE DROP ONE WAY CIRCUIT LENGTH ROOF JCT BOX TO SUBPANEL WIRING #10 6 240 V 9.6 A 12.00 A 34 °C 22 °C 56 °C 0.71 0.8 21.12 A 40 A #10 #10 0.62% 20A, 2P 12.00 A #10 6 240 V 9.6 A 12.00 A 34 °C 22 °C 56 °C 0.71 0.8 21.12 A 40 A #10 #10 0.62% 20A, 2P 12.00 A 62 FT.62 FT. 24.00 A 30A, 2P 0.10% #10 #10 35 A 25.53 A 1.00 0.94 34 °C 34 °C #10 5 FT. 24.00 A 19.2 A 240 V PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE JE F F R E Y K A H N 32 0 2 S C E N T E R S T SA N T A A N A , C A L I F O R N I A 9 2 7 0 4 RP-368636 5. 2 2 k W SPRI - ANAHEIM 11-09-2022 A.KHAN AZAM KHAN SHEET EL E C T R I C A L C A L C U L A T I O N NTS PVE-2 3202 S Center St 12/28/22 · RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS SIGNAGE LOCATIONS: · SHALL BE LOCATED ON OR NO MORE THAN 1 M (3 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. AMPS VOLTS PHOTOVOLTAIC POINT OF INTERCONNECTION WARNING: DUAL POWER SOURCE. SECOND SOURCE IS PHOTOVOLTAIC SYSTEM SIGNAGE LOCATIONS: · MAIN SERVICE PANEL · INDOOR / OUTDOOR SUBPANEL MAXIMUM RATED AC OUTPUT CURRENT: MAXIMUM OPERATING AC VOLTAGE: 19.2 A 240 V 1. MATERIAL USED FOR THE SIGNAGE SHALL BE REFLECTIVE, WEATHER RESISTANT AND SUITABLE FOR THE ENVIRONMENT. 2. ALL SIGNAGE SHALL HAVE ALL CAPITAL LETTERS WITH MINIMUM 3 8" LETTER HEIGHT, WHITE ON RED BACKGROUND. 3. MAIN SERVICE DISCONNECT MARKING SHALL BE PLACED ADJACENT TO MAIN SERVICE DISCONNECT IN A LOCATION CLEARLY VISIBLE FROM THE LOCATION WHERE THE LEVER IS OPERATED. 4. MARKING IS REQUIRED ON ALL INTERIOR AND EXTERIOR DC CONDUIT, RACEWAYS, ENCLOSURES, CABLE ASSEMBLIES, AND JUNCTION BOXES TO ALERT THE FIRE SERVICE TO AVOID CUTTING THEM. MARKINGS SHALL BE PLACED EVERY 10', AT TURNS AND ABOVE AND/OR BELOW PENETRATIONS, AND AT ALL DC COMBINER AND JUNCTION BOXES. 5. DO NOT USE SCREWS FOR SIGNAGE ATTACHMENT. USE ONLY APPROVED ADHESIVE. SIGNAGE NOTES ELECTRICAL DATA & SPECIFICATIONS PV SOLAR BREAKER DO NOT RELOCATE THIS OVERCURRENT DEVICE NEC 705.12(B)(2)(3)(b) SIGNAGE LOCATIONS: · MAIN SERVICE PANEL · NEW INDOOR / OUTDOOR LOAD CENTER · INDOOR / OUTDOOR SUBPANEL PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE JE F F R E Y K A H N 32 0 2 S C E N T E R S T SA N T A A N A , C A L I F O R N I A 9 2 7 0 4 RP-368636 5. 2 2 k W SPRI - ANAHEIM 11-09-2022 A.KHAN AZAM KHAN SHEET EL E C T R I C A L D A T A & S P E C I F I C A T I O N S NTS PVE-3 3202 S Center St 12/28/22 PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE JE F F R E Y K A H N 32 0 2 S C E N T E R S T SA N T A A N A , C A L I F O R N I A 9 2 7 0 4 RP-368636 5. 2 2 k W SPRI - ANAHEIM 11-09-2022 A.KHAN AZAM KHAN N-LC FIGURE 1: SUNPOWER EQUINOX GROUNDING DETAILS SHEET NTS POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECT(S) LOCATED AS SHOWN: CAUTION: PHOTOVOLTAIC ARRAY ON ROOF SERVICE POINT & UTILITY METERING SOLAR LOAD CENTER FIGURE 2: PLACARD IDENTIFYING LOCATION OF DISCONNECTS AND POWER SOURCES PL A C A R D / S U N P O W E R E Q U I N O X GR O U N D I N G D E T A I L S 3202 S CENTER ST PVE-4 3202 S Center St 12/28/22 RO O F 1 N-LC PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE JE F F R E Y K A H N 32 0 2 S C E N T E R S T SA N T A A N A , C A L I F O R N I A 9 2 7 0 4 RP-368636 5. 2 2 k W SPRI - ANAHEIM 11-09-2022 A.KHAN AZAM KHAN 1ROOF AZIMUTH PITCH MODULE QTY. 5.5:12 269° 12 SHEET BR A N C H D I A G R A M NTS N PVE-5 PRINT NAME OF CREW LEAD ON SITE: _________________________________ CREW LEAD SIGNATURE: _________________________________ BRANCH VOLTAGES: 1. 2. 3. 4. 5. 6. 3202 S Center St 12/28/22 N RO O F 1 N-LC 58'-2" 48 ' 36" 18" 36 " 18" S C E N T E R S T (E) GATE ROOF ACCESS POINT (E) POOL (E) GARAGE (E) GATE ROOF ACCESS POINT (E) PATIO PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE JE F F R E Y K A H N 32 0 2 S C E N T E R S T SA N T A A N A , C A L I F O R N I A 9 2 7 0 4 RP-368636 5. 2 2 k W SPRI - ANAHEIM 11-09-2022 A.KHAN AZAM KHAN SHEET AR R A Y L A Y O U T 3/32" = 1'-0" L E G E N D JUNCTION BOX UTILITY SERVICE POINT AND METERING PROPERTY LINE FIRE ACCESS PATHWAY CONDUIT N-LC NEW LOAD CENTER NOTE: 1. FIELD ADJUSTMENTS OF FEWER THAN 6” MAY BE ALLOWED BASED ON SITE CONDITIONS AND MEASUREMENTS. N 1ROOF AZIMUTH PITCH MODULE QTY. 5.5:12 269° 12 PVA-1 MODULE: MICROINVERTER: QTY: QTY: ROOF TYPE:NO. OF STORIES: TOTAL ATTACHMENT COUNT: TOTAL ROOF AREA: TOTAL % OF ROOF COVERED BY SOLAR: TOTAL ARRAY AREA: COMP SHINGLE 1 - STORY 24 2521 sq.ft. 10% 254 sq.ft. SPR-M-435-H-AC (240) SPR-M-435-H-AC (240) [SI] 12 12 SEALED FOR ATTACHMENTS AND EXISTING FRAMING ONLY Steven Procter Digitally signed by Steven Procter Date: 2022.11.14 15:02:00 -06'00' 3202 S Center St 12/28/22 FIGURE 3: MOUNTING CLAMP POSITIONING DETAILSTABLE 2: PENETRATION GUIDE FOR INSTALL STACKED STAGGERED FULLY STAGGERED STACKED/STAGGEREDFULLY STAGGERED *CHECK TABLE 1 FOR MAX. PENETRATION SPACING AND PENETRATION PATTERN FOR EACH ARRAY. TWO OR MORE ROWS OF MODULES ONE ROW OF MODULES MID CLAMP L FOOT INVISIMOUNT RAIL 0.75" MIN. (E) RAFTER 5/16" S.S. LAG BOLT WITH 5/16" WASHER @ CENTER TYP. PRE-DRILL REQUIRED. 2- 1 / 2 " M I N . PV MODULE COMPOSITION SHINGLES FLASHING 3. 5 " 1. 8 " 1. 7 " INVISIMOUNT ROOF ATTACHMENT DETAILS HARDWARE: PEGASUS L-FOOT TABLE 1 – ARRAYS INFORMATION ROOF PITCH ROOFING TYPE ATTACHMENT TYPE NO. OF STORIES FRAMING TYPE (in.) MAX. RAFTER SPAN (ft.) PENETRATION PATTERN (in.) MAX. ATTACHMENT SPACING (in.) MAX. RAIL OVERHANG (in.) ROOF 1 23°Comp Shingle Pegasus L-foot 1 2x4 Truss @ 24" OC 6'Stacked 48"16" -------------------- -------------------- -------------------- -------------------- -------------------- INVISIMOUNT RAIL PV MODULE 3.5"MAX 2"MI N EXTERNAL LOAD BEARING WALL STRUCTURAL FRAMING SIDE DETAIL Roof 1 ·RAILS SHALL BE POSITIONED IN THE NON-CROSS HATCHED REGIONS 66 CELL MODULE 2" 11.8" 2"11.8" 11 " 17 " 2" 26 " MI C R O I N V E R T E R E X C L U S I O N Z O N E PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE JE F F R E Y K A H N 32 0 2 S C E N T E R S T SA N T A A N A , C A L I F O R N I A 9 2 7 0 4 RP-368636 5. 2 2 k W SPRI - ANAHEIM 11-09-2022 A.KHAN AZAM KHAN SHEET ST R U C T U R A L I N F O R M A T I O N AN D M O U N T I N G D E T A I L S NTS PVS-1 SEALED FOR ATTACHMENTS AND EXISTING FRAMING ONLY Steven Procter Digitally signed by Steven Procter Date: 2022.11.14 15:02:06 -06'00' 3202 S Center St 12/28/22 3202 S Center St 12/28/22 CODE INFORMATION APPLICABLE CODES, LAWS AND REGULATIONS CODE INFORMATION APPLICABLE CODES, LAWS AND REGULATIONS 2019 CALIFORNIA BUILDING CODE (CBC) 2019 CALIFORNIA RESIDENTIAL CODE (CRC) 2019 CALIFORNIA FIRE CODE (CFC) 2019 CALIFORNIA ELECTRICAL CODE (CEC) 2019 CALIFORNIA MECHANICAL CODE (CMC) 2019 CALIFORNIA PLUMBING CODE (CPC) PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE JE F F R E Y K A H N 32 0 2 S C E N T E R S T SA N T A A N A , C A L I F O R N I A 9 2 7 0 4 RP-368636 5. 2 2 k W SPRI - ANAHEIM 11-09-2022 A.KHAN AZAM KHAN (N) GRID TIED PHOTOVOLTAIC SYSTEM SOLAR INDIVIDUAL PERMIT PACKAGE JEFFREY KAHN 3202 S CENTER ST (714) 606-7801 SANTA ANA, CALIFORNIA 92704 5.22 kW AHJ: SANTA ANA CITY UTILITY: SOUTHERN CALIFORNIA EDISON CO SATELLITE IMAGE CO V E R S H E E T PROJECT LOCATION NTS SHEET INDEX SCOPE OF WORK - (N) 5.220 kW PHOTOVOLTAIC SYSTEM - (12) SunPower SPR-M-435-H-AC PV MODULES - POINT OF INTERCONNECTION AT MAIN SERVICE PANEL WITH CIRCUIT BREAKER - QUAD/TWIN BREAKER REQUIRED NOTES SHEET PVA-0 ARCHITECTURAL DRAWINGS ELECTRICAL DRAWINGS PVE-1 ELECTRICAL SINGLE-LINE DIAGRAM & PVE-2 ELECTRICAL CALCULATION PVE-3 ELECTRICAL DATA & SPECIFICATIONS SPECIFICATIONS PVE-4 PVE-5 BRANCH DIAGRAM STRUCTURAL DRAWINGS PVS-1 STRUCTURAL INFORMATION & PVA-0 COVER SHEET PVA-1 ARRAY LAYOUT EQUINOX GROUNDING DETAILS PV MOUNTING DETAILS Bldg permit #101113270 Elect permit #20178305 Permits issued on 12/22/22 ***The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown*** 3202 S Center St 12/28/22 CODE INFORMATION APPLICABLE CODES, LAWS AND REGULATIONS CODE INFORMATION APPLICABLE CODES, LAWS AND REGULATIONS 2019 CALIFORNIA BUILDING CODE (CBC) 2019 CALIFORNIA RESIDENTIAL CODE (CRC) 2019 CALIFORNIA FIRE CODE (CFC) 2019 CALIFORNIA ELECTRICAL CODE (CEC) 2019 CALIFORNIA MECHANICAL CODE (CMC) 2019 CALIFORNIA PLUMBING CODE (CPC) PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE 1 MPU TO 225A/200A 04/18/2023 SS 2 REVISED TO OLD CODE 05/02/2023 SS JE F F R E Y K A H N 32 0 2 S C E N T E R S T SA N T A A N A , C A L I F O R N I A 9 2 7 0 4 RP-368636 5. 2 2 k W SPRI - ANAHEIM 11-09-2022 A.KHAN AZAM KHAN (N) GRID TIED PHOTOVOLTAIC SYSTEM SOLAR INDIVIDUAL PERMIT PACKAGE JEFFREY KAHN 3202 S CENTER ST (714) 606-7801 SANTA ANA, CALIFORNIA 92704 5.22 kW AHJ: SANTA ANA CITY UTILITY: SOUTHERN CALIFORNIA EDISON CO SATELLITE IMAGE CO V E R S H E E T PROJECT LOCATION NTS SHEET INDEX SCOPE OF WORK - (N) 5.220 KW PHOTOVOLTAIC SYSTEM - (12) SUNPOWER SPR-M-435-H-AC PV MODULES - POINT OF INTERCONNECTION AT MAIN SERVICE PANEL WITH CIRCUIT BREAKER - MAIN PANEL UPGRADE TO (N) 225A/200A NOTES SHEET PVA-0 ARCHITECTURAL DRAWINGS ELECTRICAL DRAWINGS PVE-1 ELECTRICAL SINGLE-LINE DIAGRAM & PVE-2 ELECTRICAL CALCULATION PVE-3 ELECTRICAL DATA & SPECIFICATIONS SPECIFICATIONS PVE-4 PVE-5 BRANCH DIAGRAM STRUCTURAL DRAWINGS PVS-1 STRUCTURAL INFORMATION & PVA-0 COVER SHEET PVA-1 ARRAY LAYOUT EQUINOX GROUNDING DETAILS PV MOUNTING DETAILS 1 2 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. REVISED 101113270/20178305 Issued 12/22/22 20179503 Issued 05/03/23 3202 S Center St 05/04/23 NO 3THWN-2 EGC: THWN-2 1 NO #10 #10 EMT 3/4"C C (N) LOAD CENTER MIN., 120/240 V, M.L.O, NEMA-3R LOCATION: GND YES 20A, 2P 20A, 2P SOUTH 100A 15A, 2P ETHERNET CONNECTION TO DSL/CABLE MODEM CAT5e PVS6 (3) #14 THWN (1) #14 THWN EGC NO NO EGC: Bare CU #6 BRANCH CIRCUIT FROM PV ARRAY TO JUNCTION BOX #12 2 A -- 1 B JUNCTION BOX, NEMA-3R THWN-2 EGC: THWN-2 1 4 B 3 #10 #10 EMT 3/4" #10 #10 CONDUCTOR / CONDUIT SCHEDULE DESCRIPTION & CONDUCTOR TYPE CONDUCTOR SIZE (AWG)CONDUIT/CABLE TYPE CONDUIT SIZENUMBER OF CONDUCTORS 1 ROOFTOP ARRAY WIRING A DC AC Branch Circuit #1AC DC AC Branch Circuit #2 6 AC MODULES 6 AC MODULES TAG H (E) UTILITY BIDIRECTIONAL METER #: 222012782899 EXISTING GROUND NO MLO NO GROUNDED (INCLUDE GEC) UNGROUNDEDü INSTALLATION NOTES 1 CHECK BOX FOR WHETHER SYSTEM IS GROUNDED OR UNGROUNDED: FOR UNGROUNDED SYSTEMS: · DC OCPD DISCONNECT BOTH CONDUCTORS OF EACH SOURCE CIRCUIT. · UNGROUNDED CONDUCTORS MUST BE IDENTIFIED PER 210.5(C). WHITE FINISHED CONDUCTORS ARE NOT PERMITTED. 2 3 4 5 6 7 8 9 10 DC / DC CONVERTERS NO SOURCE CIRCUIT JUNCTION BOX SUNVAULT ESS SUNVAULT BATTERY INVERTER SOLAR LOAD CENTER PV PRODUCTION METER SEPARATE AC DISCONNECT HEAT DETECTOR YES NO 11 13 BACK UP LOAD CENTER NON-BACK UP LOAD CENTER EV SUPPLY EQUIPMENT NO NO NO TAG DESCRIPTION 12 REMOTE POWER OFF SWITCH 14 HUB+ INCOMING SOURCE FEED , 120/240 V, 1 PH, 3 W *MSP MAX PV BREAKER (A): x 120% - = LOCATION: MANUF: GND TOP FED MCB PV BREAKER: TO BE INSTALLED ON THE OPPOSITE SIDE OF THE MAIN OCPD OF THE BUSBAR (E) LOADS (E) LOADS (E) LOADS GND 200A, 2P 70A 225A 30A, 2P SOUTH ------- 225A 200A (N) MAIN SERVICE PANEL SUNPOWER AC MODULES INTERGRATED WITH MICROINVERTER 1 ACMSOLAR AC MODULE / BRANCH 1. DC CIRCUIT IS ISOLATED AND INSULATED FROM GROUND AND MEETS THE REQUIREMENT OF NEC 690.35. 2. SUNPOWER PROVIDED CABLES COMES WITH TWO (2) #12 AWG WIRE AND THIS IS BY DESIGN. NEUTRAL AND ADDITIONAL GROUND WIRE IS NOT REQUIRED FOR PROVIDED TRUNK AND EXTENSION CABLES. 3. SUNPOWER AC MODULES HAVE BEEN TESTED AND CERTIFIED TO UL 2703 FOR INTEGRATED GROUNDING AND HENCE A SEPARATE GROUND WIRE IS NOT REQUIRED WITHIN THE ARRAY. 4. USE ROW-TO-ROW GROUNDING CLIP PROVIDED TO GROUND ROWS OF MODULE. BOND SUB-ARRAYS BY RUNNING #6 AWG BARE CU WIRE AND GROUND LUGS AT A SINGLE POINT ON EACH SUB-ARRAY AND THEN TO THE JUNCTION BOX. REFER TO PVE-4 FOR ADDITIONAL DETAILS. 1. PROPER LISTING EXPECTED FOR CONDITIONS OF USE ON ALL LUGS, FITTINGS, CRIMPS, ETC. 2. ALL CONDUIT BEND RADII TO CONFORM TO THE NEC MINIMUM BEND RADII REQUIREMENTS. 3. MINIMUM CLEARANCE SHALL BE MAINTAINED PER NEC FOR ALL NEW EQUIPMENT TO BE INSTALLED. 4. EXISTING GROUNDING ELECTRODE SYSTEM MUST MEET NEC AND LOCAL UTILITY REQUIREMENTS. 5. COPPER CONDUCTORS SHALL BE USED UNLESS SPECIFIED. 6. TYPE NM (ROMEX) CONDUCTORS ARE ALLOWED FOR INTERNAL AND ATTIC RUNS AND SHALL BE INSTALLED MEETING NEC REQUIREMENTS. 7. IF MAIN SERVICE PANEL IS TO BE UPGRADED, IT WILL BE PERMITTED AND INSTALLED BY 3RD PARTY. 8. AC WIRING SHALL UPSIZE IF VOLTAGE DROP EXCEEDS 2%. 9. RUN CONDUCTORS IN EXISTING CONDUIT WHEN AVAILABLE PROVIDED IT HAS NO OTHER CONDUCTORS RUNNING THROUGH IT. 10. EQUIVALENT SPECIFICATION ON CABLES AND ELECTRICAL EQUIPMENT SPECIFIED ARE ACCEPTABLE. 11. AS DC POWER IS INTERNAL TO THE MODULE, GROUNDING ELECTRODE CONDUCTOR (GEC) FOR THE MODULE OR ARRAY IS NOT REQUIRED. AC MODULES NOTESELECTRICAL NOTES PV CERTIFICATIONS AND COMPLIANCE · UL 1741 / IEEE-1547 · UL 1741 AC MODULE (TYPE 2 FIRE RATED) · UL 62109-1 / IEC 62109-2 · UL LISTED PV RAPID SHUTDOWN EQUIPMENT ENABLES INSTALLATION IN ACCORDANCE WITH: · NEC 690.6 (AC MODULE) · NEC 690.12 RAPID SHUTDOWN (INSIDE AND OUTSIDE THE ARRAY) · NEC 690.15 AC CONNECTORS, 690.33(A)–(E)(1) SUNPOWER PROVIDED AC MODULES EXTENSION CABLE, LISTED AS AN ASSEMBLY MODEL: SPR-M-435-H-AC (240) | QTY: 12 MODEL: SPR-M-435-H-AC (240) [SI] | QTY: 12 CONSUMPTION CT : CATEGORY 4 - SIMPLE - PARALLEL SET - BUNDLING OF CONDUCTORS PROJECT INSTALLER 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SO L A R I N D I V I D U A L P E R M I T P A C K A G E GR I D - T I E D P H O T O V O L T A I C S Y S T E M REV DESCRIPTION DATE DB DRAWN BY: DATE DRAWN SCALE 1 MPU TO 225A/200A 04/18/2023 SS J E F F R E Y K A H N 32 0 2 S C E N T E R S T SA N T A A N A , C A L I F O R N I A 9 2 7 0 4 RP-368636 5. 2 2 k W SPRI - ANAHEIM 11-09-2022 A.KHAN AZAM KHAN SHEET NTS EL E C T R I C A L S I N G L E - L I N E D I A G R A M & S P E C I F I C A T I O N S PVE-1 1 3202 S Center St 05/04/23